Cottageville Park UpdateMemorandum Public Works Department To: Honorable Mayor and Members of the City Council From: Steven J. Stadler, Public Works Director Copy: Mike Mornson, City Manager Date: May 8, 2014 Subject: Cottageville Park Update Cottageville Park Improvements Current status: Design is underway for the Cottageville Park improvements. The design is currently at 60% complete. The 60% design cost estimate exceeds the conceptual cost estimate. We are working to identify ways to reduce the construction costs. Current project cost estimates are as follows: 60% construction cost estimate = $1,836,896 This 60% design cost estimate includes: $250,000 — play equipment allowance $184,392 — upgrading the current alley to 32' wide roadway with new utilities that would be done in conjunction with the Oxford Green redevelopment Design & Construction services fees = $231,560 TOTAL PROJECT COSTS: $2,068,456 The project budget is as follows: BWSR Grant: $410,250 Henn Cty Grant: $15,000 Shepard of the Hills project donation: $13,000 Hopkins Storm Sewer Fund: $750,000 Hopkins Park Capital Improvement Fund: $408,000 Water and Sanitary Sewer Funds: $26,500 PIR funding for alley upgrade: $157,892 (this amount may be reduced by PPL contribution) TOTAL PROJECT BUDGET: $1,780,642 It should be pointed out that the above costs do not include purchase and demolition of the remaining duplex at 433/435 Blake Road. Those costs are estimated at $400,000. Staff would like to fund this property acquisition from the storm sewer utility fund. In addition, the above costs do not include any future phases of work at the Cottageville Park site. A public open house is scheduled for May 20 at the Eisenhower Community Center. The notices for this meeting were mailed out last week. Protect Design: The project consultant, Hart-Howerton and Wenck Associates, Inc. will present the design elements at the work session. The 60% design documents are attached. The play equipment design is also underway and staff will provide concept information for City Council at the work session meeting. We will be seeking public input on play equipment options at the May 20 meeting. Project Schedule: May 14: MCWD Board design review May 19: Hopkins Park Board review May 20: Public Meeting May 22: MCWD permit approval & approval to bid project June 3: Hopkins City Council design approval June 12: MCWD final plan approval, if required June 10 —July 1: Advertise forbids June 24: Pre -Bid Meeting July 1: Inform Hopkins City Council on bids received/recommendation July 10: Bid award: MCWD Board August — October 2014: Construction If needed, the bid dates, bid award date could slip two weeks. HP s+, :���.%±:.:.�e�.:.,y:.'.+w�"',,•ir��TM�.-.:;'::..r.w..�.ra.�.w.�....�.rw. h..e. Hopkim Minnrrota March 27 20I4 Hi lan n+w:�'. o."ro• .. �d .'".+" "."" .�`�.'... °.:.� ...'., , -+ .. �..,.. �. Hopkim, Mirmuora March 27, 2014 Now, T. s.Rsim= tm m OWDMI M IN TVR " S umm O Auw Lm 0. Ti[ OONSM Lm %a OE1FlSSMSS x=xm 5 m TIE W aAm a o/MCE wL w..mm 'bT/J M CUDNN6 FOR W COUjrMX AC KFlCTON sI EYLSW TAIBT C JIM DQA b'/t.? LOCAINW N VNOESSIWO MIMES 6LmN AS tYS T C OIXWACTOR SNML K KSTONMsu ICA OALML9 i AWS A' — LW[TW[ MIMES. T WALL [OORERATC WN ILL OR3TY CO mu W WRRMNRC T s mVa AFm/SR IELOGTSN W LWQ TIE LYYIISA !WL CWLf OOIIOL SEAR m W AT SSI-ASh0oo2 AT LEW b NWR9 N ASVANCE FOR TIC LOG— Q ALL LR.'OOIQWIIm WRQ G9LS DZLLAIS. vo; MAWmm & m OTIM+ YllRlm STLUCASSS Sam ma w@ SI[ COIIW'MR SW' FOAR AT NO O TIE E o Wik]1 OAIIACl9 W1RkO Cd6MC110lI AT NO COST m TI[ RIIOI 1G KfTpf — LMS GOPHER STATE ONE CALL TVR /STY AKh [SI-ASS-CW3 TOLL IMEE 1 -SSS -553-1155 AL' TLVim CCW w ONCES SIALL Cow= m TE LAMP EORmN OF TE MMEWfA WN.VL ON WFORM TIWMD OONRmI. WA= =AM TIE LATEST F= WMDL FOR MI MAY TRWIX CSMS0. LTF LAYMM MINNEHAHA CREEK WATERSHED DISTRICT COTTAGEVILLE PARK PHASE 1 60% DESIGN MAY 2014 rl��ar ®=",..=- W ick PROJECT VICINITY MAP z ted']!, O r 1.0 t WM. In surAw= MAY WO v IM mm Is Ulm" OLK" IMLA m ox" "U %* DM"O AMMM TO rlIE MMNM O s Act 9 WN INE co-=w " wa" of uwm t. UMN DATA. Wc L=MN M � 6a GA& =MOW- FIM OM MMM =MC, AAD 7 WARNING, -- K � FM CA c a AUNSTWDOLOML ICY SOME ANO/n/raXAl191N AS VTWIY " OF LM (M� "An (M 41 01 4:4-0001 AT UAV 0 � 01 Vill, w 'a� CAMM CONK r� PM YANHOLM PALM M eu— WAR M REP M n1E AMW K N A, No cost TO C" avlolm wu No GOPHER STATE ONE CALL M AM&' 01-� —04,. ,1"[: M 2. M W.JA 2 M � rcaw m mloouur mm AM OR wcrr PFATEM w w M 00 cow—m LrQFND ---- ---- Dam ww cow" 4�1 A?r I ------- DWM um cam� HIAWATHA AVE cwm sm on L.Wmm &Ulm ``409` LAKE ST NE I I @ W=WACE WhJlY MOMAOM N 1M MM t$ mmm umm a L&M IL im oftft tm ws wERMNFL A=vwc To TIE cumw a/A M-2. ENRUID %0.�OA[D DVDELM Mt ME CMLWDON MD DUKIM DF DDM MMWACE 1 --A mm Lm" or mbnowe VIM such As WARNING: cm Tmz'4w. rm snv_ mpLmm axam AIm CAME W AFM UVOK Mw.Mw rm =p U,� T � I RaEAE f PLvow tilt �TF M " UM 00�ANCS M —C LL �.T � IT.1t oc a1 31 Ld mmm *F " UNDO HM �m -m "WAL TV= WME aoa.a 1w cmmAcm 9ii i AT WM M GOPHER STATE ONE CALL C" AK&' 01 -464 -OM rm -vw . w4 Rw. d2ckm r=w MDMB AND AN Lim a� w D-- LL Dcu� � m mMk �wCA: w cl �%mmcuwm UMCtM W OWW VjKMAtt VW" MW 3. TI AL' E,IOADU co"M wcwm ML K m - aWl K m mv*"Lft wc w nn Alw� lamb," K VE MMM LK =nl-c = =ow" AWM %= AND wgwrc 8ME HIAWATHA AVE wm AND MoD14" MK. ao� clps-- > no LAKE ST N: I cavi N � � '�' T i tlnar�r>townan � P4 � � I vxrrw s.vr� Y w i i All, . riY 3' DbOCCI TO rwrt. 1• x Y 9 iaDnri s�4' $ eU F.IAINATHA YF r� /` I c 'ri AVE l - ``� Pk �� I� •� � \` /gam '/� i� ' r LAME ST NE DIA V:XG C4.0 POEM ]iwenck I �we,tck nARrInowl N Il W V YR O[ OIInIM rf� � ti � �,iww �A•�.�y�ta� y I 1 �v�p�yo� R+Mm IMN tlIS roSM MA KMq lq � i w o� a x Nr �"`• �9 [r ars aa.arrc s SEGS aal.at m ar taM M Ire �A V d rL y CONTECR UKIDMROLWD SIMAOE DETAIL /j\ UNDER 9=40 SAND FILTER CW DETAIL g E N w'y �� CAL [�Nr1O1{f' .iC. ATi ItfYB rA -r N6rY. IWa ilTlAtllM• rK•LNrr raR Ao1 P 11' YA asa a NY�a we �I s :a s � a LA :cr r. ,*-ID STORAGE CLTEf 11ANNDLE C8.0 /lr: •ZI ISa3iC c K 6 c K i Y R 1A �' I(jK��C N�1O V V • 1/' V wOWenck s. TART I IOWERTO STTKL PX)IO'.T me =� -' X X@ i ARS PfAYMEA Es; X i • XX CONCRETE g8 STEELEDGER XXf x VVU i� ss:�'li' si'x as 1 I wrERPRE" SION XX . # �T .� y • . ' i of - )% CONCRETE BAND PARK EMM SIGN XX - x i CONCRETE WALK xx x .i.r. . - XX NrBiPRETIVESIGN ! a w" NN SEE SHT. L1.1 FOR DETAILED LAYOUT OF CREEK OVERLOOK GARDEN AND s ` OUTFLOW CHANNEL (THIS AREA) x n CNAMELOUTLET VV SEE CML DR4 & c. L6.r.M 'DArE J xx CONCRETE WALK .sue J , XX PARK ENTRY S1GN x J \• C \ z I � I SITE LAYOUT PLAN 9't O1ECT 05/07/14 WORM M[CN•EDT,r G FOR REVIEW ONLY5�' DEL1�0� PEDESTRIAN LIGHT FIXTURE OPTION Alcott COTTAGEVILLE PARK LIGHTING NOTES AND LEGEND THEE AccEIr uaruc V EXISTING TREES TO REMAIN. MINIMUM TYPE FIXTURE TYPE DISTURBANCE OF ROOTS. WAP CATALOG NUMBER REMARKS 7T PEOESIRYN PIXE LIGHT "TT PROPOSED TREES. PROVIDE 0O LIGHTW G AS INDICATED �80 FT DALEM SPACING TYP.) ,,-w, pV�J 14 LIGHTING NOTES XXX/12 t CONTRACTOR SHALL VERIFY ALL MDMTNG CONDITIONS PRIOR TO ORDERING f*=RES. BK LIGHTING ARLED.RM.E22.SP.A9.BZW.12B.6 LANDSCAPE PATH PP.SI2BZWSF POWER PIPE ACCENT LGHTING 2 CONTRACTOR SHALL PWVIDE ALL HMDWAPE. BRACKETS, MRpIG. TRA WORMERS REMOTE BOXES ANCHORS AND EDAPUENT TO INSTALL A KriGREE ANO FUNCTIONAL "of"TIM S NO SUBSTTUTXGb SHALL BE ACCEPTED MIHOUT PRIOR REHPR AND IRBTrW APPROVAL ByARDMC.- 4. CONTACT GOPHER ONE CALL FOR UTT.I„ LOWU PRIOR TO ANY MAVATION. 1 TREE I01 LOCATIONS ARE APPRO WTE FLAG LOCATONS FOR APPROVAL BY ARDSRCT AFTER TREE PLANTFEO ANDBEFORE FOUL OWALLARDH OF WIT. AN FAC: M AT TREE TRIDO(S AS OBECRD BY MQ97CT. & SET PEDESTRAN POLE LIGHT FDILRES 24 INCHES FROM W OF ADOMT PAVNG TO CENTER OF ;WM AND FOOTING. OMCEPT WHERE ND1FD OTHERWISE. T. STAKE LOCATIONS OF ALL ACCFM LIGHTS FOR APPROVAL BY ARCHITECT PRIOR TO LIGHT FIXTURE SCHEDULE (SEE NOTES) CITY. TYPE FIXTURE TYPE VOLTAGE WAP CATALOG NUMBER REMARKS 11 LANDSCAPE FORMS ALOOTT LED TYPE PEDESTRIAN (SEE WAGES ABOVE) POLE LIGHT 14 SA GROUND MOUNT XXX/12 LED ONCL) 3000k BK LIGHTING ARLED.RM.E22.SP.A9.BZW.12B.6 LANDSCAPE PATH PP.SI2BZWSF POWER PIPE ACCENT LGHTING UGHTING CONCEPT PLAN (B 05/07/14 NORM FOR REVIEW ONLY 15 fedwencfc �ro I a� D PARK CAPITAL IMPROVEMENTS FUND (301) 0 510 71201 4 Actual Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected 2012 2m 2014 2D15 2016 2017 2019 220 2021 jQjj �0b�, =1 Working Capital Beginning Year 112,195 82,902 139,566 (38,738) 133,174 296,470 519.664 676.564 668,150 379,495 532,180 09,445 691.728 903.780 872,194 1,174,659 1,511.199 Revenues: Taxes (from matured Park Bonds) (1b3) 62 Merest 698 311 11396 (387) 3,995 8.894 15,590 20,297 20.045 11,385 15,965 20,983 20,752 27,113 26,166 35,240 45,336 Docicatim feta 163.772 0 D 0 0 0 Joint Re refutds 6,267 6,000 6,000 6,DDO 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6.000 6.00 6,000 6,000 6,000 Franduse Fees (gas .IK) 2014 it. 85,300 85,300 8S,300 65,300 95,300 85,300 85,300 85,300 95,300 85.300 85.300 85.300 85,300 85,300 85,300 Franchise Fees(gaslelec) 20121nar 210,000 210,DOD 210,OOD 210,000 210,000 21 D,000 210.000 210,000 21OA00 210.000 2101000 21D,D00 210,000 21 D,000 210,000 Transfer in Frand115e Fees' 16D,00 me Hepm Const Grara 160,000 Met Owed - saaareemtlgrant 50,000 Grams -Private Fomdae" 10,000 ati Donons• general 1,000 20,182 1,000 Donations -benches Total Revenues 245,333 176,822 463,896 300,913 30505 310,194 316,890 321,597 321,345 31ZWS 317265 322283 322,062 328,413 327,466 336,540 346AN Expendfhrres: C1.P. Projects 264,781 111,158 6351m 122,000 135,000 60,000 160.800 330,000 610,000 160,000 150,D00 33D,00 11OA00 360,000 25,00 0 50.000 2,850 Slone Park.-ibnent 7,000_ 7000 TAO 7.800 7,W _ 7,000 0 Total ExpendAres 274,511 120,158 642.00 129,000 142,000 87,00 160,000 330,000 610,000 160,000 160,000 330,00 11CA00 360,000 25,000 0 50,000 Worldrg Caplet Year Fid 82,902 139,568 (38,738) 133,174 296,470 519,664 676,554 668.150 379,495 $32,180 699.446 691,728 903,780 872,194 1,174,658 1,511,199 1,807,835 2014 Protects 2015 Prokera 2018 i+ro7ects ' Transfer n of Franchise Fees Adivated OwOvio gEpLa( - Caaagevde Park - play egtpment (2014) 60,000 Park Valley- play eypment eohected In 2012-2013 not needed 40.800 40,000 Valrey Park - outdoor husking 60.000 Bumes Park -warming house 20.000 Burnes Park • resurface teen's courts for debt service m street protects. 130AOD 100,000 Oakes Park - Play equipment 30,000 Oaken Park-ptaac st*kw 20.000 Oakes Park • ternia courts Gong farward rhe 2012 ll -arise tee 10AGO ICA00 Oakes Park- Drinking fouran 25,000 Valley Pah - construct storage budding 60.000 Valley Park -werming house i creas , has been Proposed to be used 40.000 20,OOD Oakes Park • D9h&V 7.000 Skate Pok irorovemenb 160.000 for park projear rather area &-4 200.000 CottagevU Park play e* ipment 122A00 projects. 208,000 CoaageAks Park ger2ml bnprov is 7.000 7.000 Skate Park knprovemema -Yr 3 of 3 yr agreement 2016 8Tkipta 635,00 177,000 0 100.000 H9op Park- play ersipmem 35.00 Burnes Park - day etaipment 7.000 Skate Park inu revamants 142,00 2017 Pretectr 80,00 Vane, Park -otav caul ne t 7.00 Skate Park In-meh. 87,000