CR 2014-062 ERP for 2015-2019July 1, 2014A:a Council Report 2014-062
City of Hopkins
2015-2019 EQUIPMENT REPLACEMENT PLAN
Proposed Action
Staff recommends adoption of the following motion: Move to adopt the 2015-2019 Equipment Replacement
Plan.
Overview
The equipment replacement plan is a detailed summary of the next five years of a twenty-year replacement
schedule, for equipment of the City of Hopkins. General and Special Revenue fund equipment items are
placed in the Equipment Replacement Fund budget which derives its revenues from service charges to the
General and Special Revenue funds, equipment sales and interest earnings. The Art Center and Enterprise
fund equipment in the plan is placed in the individual fund budgets, in the year in which the equipment is to
be purchased.
Approval of the 2015-2019 allows staff to incorporate the 2015 ERP items into the 2015 budgets and begin
preparation for their purchase. Items that fall under the Minnesota Statutes Uniform Bidding/Contracting
Laws will require further approval by the council before their purchase.
Staff is recommending adoption of the plan.
Primary Issues to Consider
• Should the annual service charges to the general and special revenue funds be adjusted?
• What changes have occurred in the equipment replacement plan since last year?
Supporting Information
• 2015-2019 ERP Power Point slides
• 2015-2019 Equipment Replacement Plan
Christine M. Harkess, CPA, CGFM
Finance Director
Financial Impact: $ as provided in plan Budgeted: Y/N X N Source: Various
Related Documents (CIP, ERP, etc.): ERP Notes:
Equipment Replacement Plan
2015-2019
ERP Background
• The city has established an equipment replacement plan that is
reviewed and adjusted on an annual basis.
• The purpose of the plan was to smooth out the funding of large
pieces of equipment. In the past this allowed the City to avoid
bonding for purchases thereby saving interest costs.
• The purchase of the ladder truck in 2008 was the first time apiece
of equipment needed to be financed. This truck will be paid off in
2018.
• Equipment certificates were sold in 2013 to fund equipment needs
in 2013 and 2014.
Minnesota
• The cost of equipment is allocated back to the user departments
based on life expectancy and cost of the equipment.
• A 9% increase to the charge is planned for 2015.
• Impact of increase to the General Fund is $30,000
• Increases in the charge are planned for future years
• Bond Issue planned for 2017
• Grants are and will be applied for
ERP Future
• Revenues in the Equipment Replacement fund are derived from
charges to city departments that use the equipment - mainly the
General Fund.
• Cash flow projections are updated annually to ensure adequate
funds for scheduled replacements.
• Funding challenges are foreseen in the future and alternative
options have been explored.
- Equipment Certificates for some 2016-2018 purchases
- Equipment Certificates maybe sold in 2017
OJ-
11opkim
innesota
Revenue, Capital Expenditures
and Cash Variances �inthonsa�ds,
2500
2000 L
1500
■ Revenue
1000 ■ Capital Expend.
o Cash
500
0
2012 2013 2014 2015 2016 2917 2018 2019
-500
PArtnenng WATh the COMMunitc to ClIKUKs the 9WRInY of 1A.
c a 1rnv+Ge • C.a+vvnrxiei�i+k
dEMIL
2015 ERP
• In 2015 the city is planning on leasing, replacing or
upgrading ten vehicles and two pieces of equipment.
• All vehicles and equipment are reviewed annually and
useful lives adjusted while maintaining the integrity,
reliability and safety of the vehicles, equipment and
employees.
• Purchases are made based upon the condition of the
equipment, not simply on the ERP Schedule.
Gill. ol-
kins
w Minnesota
• Sound system/Public Address System
• Tables
f
City Hall Equipment
• Telephone system is due for replacement
• Annually the city replaces a portion of its
obsolete computers with newer technology.
- This includes both computers and servers in
all city departments
�9I71'S25Dt3
• The fire department annually assess its fleet and
adjusts the useful lives of the equipment accordingly.
• 2008 Aerial Ladder Lease Payment
- 10 year lease at $54,217 annually
• Items scheduled for replacementA
- Duty Chief Vehicles to be leased_
- Workout equipment
- Floor Scrubber
Police Equipment
• Marked patrol cars (2)
• Sergeant's vehicle
• Leased Vehicles
- Administration (2)
- Drug Task Force
- School Resource Officer
• Radios for leased vehicles
• Network server
• Building Video Server
City olopkim
Minnesota
-
e Streets Department
Public Works
- 4x4 3/4 Ton Truck with Plow
Equipment
Public Works
' Equipment
• Forestry
- Riding Mower
- Grass Seed Overseeder
�-,
City ol-
`� K14
apkins
• Refuse
- Refuse Truck
Public Works
Equipment
Arts Center
Equipment
• Video Camera Updates
• Community Room Audio Visual
• Digital Information Sign
• Floor Scrubber
MPT
Gill. ol-
kim
v Minnesota
• The Equipment Replacement Plan is a valuable tool used to
assess, plan and fund future equipment needs of the City.
• In the past by annually evaluating equipment and adjusting
useful lives where practical, the city has been able to
maintain the reserves in this fund to cover equipment
• Maintaining adequate funding for future needs continues to
be a challenge.
• Equipment certificates will need to be sold for future
purchases
• Transfers and tax levy are scheduled.
City of Hopkins
EQUIPMENT REPLACEMENT PLAN
2015-2019
t l -
A
-W-A
City or Hops
13200City of q1opk ns
1010 Fast Street South • Hopky: w 55343-7573 * Pham:952-935-8474 • FaX. 952-935-1834
- Web address: www.hop(tinsmn.com
DATE: July 2014
TO: Honorable Mayor and Members of the City Council
FROM: Mike Mornson, City Manager
SUBJECT: 2015-2019 EQUIPMENT REPLACEMENT PLAN
With this letter, I respectfully submit the 2015-2019 Equipment Replacement Plan. This
five-year planning document represents the combined efforts of city staff and the City
Council.
The Equipment Replacement Plan is a five-year forecast of equipment replacement needs
in the City of Hopkins. It is intended to alert the Council and citizens of equipment
replacement needs that are needed to maintain the efficiency of city services and the
safety of city staff. The first year of the plan becomes the adopted budget, however the
equipment is again re-evaluated before final approval is given for the purchase. The
remaining four years represents estimated replacement needs and the related funding.
The Equipment Replacement Plan does not include proposed capital projects. A
document relating specifically to capital project needs has been developed into a separate
document.
The Equipment Replacement Plan is intended to serve as a planning tool and is therefore
structured to present a meaningful, long-range perspective of the city's equipment needs
over the next 20 years. At the same time sufficient details on individual pieces of
equipment scheduled for replacement is provided to enable those who review the
information to make informed decisions of the city's equipment needs over the next several
years.
Please use the information provided to assist in the understanding of the city's equipment
needs as they relate to the delivery of service to the citizens of Hopkins.
This document was developed by the Finance Department with the assistance of all city
departments. I wish to especially thank all those involved in the development of the
Equipment Replacement Plan, and especially Steve Stadler, Public Works Director, Mike
Reynolds, Police Chief, Brent Johnson, Police Captain, Dale Specken, Fire Chief,
Christine Harkess, Finance Director and Deb Dahlheimer, Sr. Finance Clerk for their hard
work and dedication.
Partnering with the Community to Enhance the Quality of Life
+ Inspire • Educate • Involve • Communicate �
1
EQUIPMENT REPLACEMENT PLAN
2015-2019
TABLE OF CONTENTS
Paqe
City Manager's Message
Table of Contents 2
Introduction
Background and Summary of Changes from 2013 Plan 5
Cash Flow Statements
Equipment Replacement Fund 11
Chart - Revenues, Expenditures & Working Capital 12
Five -Year Project Summaries
Projects by Year
15
Department Summary
18
Projects by Department
19
Funding Source Summary
22
Projects by Funding Source
23
Equipment Requests
Individual Equipment Request Details
27
Activity Center
29
Arts Center
32
City Hall Administration
37
Community Services
41
Fire
42
HRA
57
Pavilion
58
Police
59
Public Works
74
Refuse
93
Sewer
95
Water
97
Twenty Year Replacement Schedule
Twenty Year Replacement Schedule by Department 101
Equipment and Building Inventory
Building Inventory 109
Vehicle and Equipment Inventory 111
`,
INTRODUCTION
City or Hops
EQUIPMENT REPLACEMENT PLAN 2015-2019
BACKGROUND AND SUMMARY OF CHANGES FROM 2014 PLAN
Background
The Equipment Replacement Plan is a twenty-year forecast and a five-year plan of equipment
needs in the City of Hopkins. It is intended to inform the Council and citizens of the major
equipment needs on the horizon. The first year of the plan becomes an adopted equipment
budget and relates to the operating budget of the equipment replacement fund, which is approved
on an annual basis. The remaining nineteen years represent an estimate of equipment needs and
funding capabilities of the City. Funding requirements vary from year to year. In order to
maintain a fairly consistent levy each year, the twenty-year schedule is projected with a 3%
inflation factor for operating expenses and a yearly average dollar capital expenditure of
$929,300. This is a 6.7% increase or $58,600 over the 2014 plan.
The cash flow requirements to fund equipment needs in the equipment replacement fund will
experience a roller coaster effect over the next 20 years given the projected equipment needs and
3% inflation rate. The intragovernmental charges were increased in 2014 by 8% after being held
flat for 2013. Rates will again be increased in 2015 by 9% and plans are to increase the rate
going forward with increases of 9% over the next 5 years. The majority of items purchased with
ERP funds are used by departments within the General Fund which accounts for the most of the
operations of the city.
There have been many changes in technology and the way we operate and as a result there is
more equipment in the plan; however the rate has not increased to accommodate the increase in
equipment. Equipment that was purchased with grants such as digital squad cameras, laptop
computers in squad cars and fire vehicles, AED's, infrared cameras and fitness equipment in the
fire hall fitness room now are included in the ERP but the rates have not kept up with the
addition of all these items.
The long term viability of the fund remains questionable and will result in difficult decisions
regarding equipment and operations. These issues were addressed as part of the Financial
Management Plan (IMP) completed in 2014. The IMP establishes funding mechanisms to get
the fund to a constant balance of $750,000. Items that will be considered and/or implemented
are rate increases, a tax levy and issuing equipment certificates.
As discussed above are scheduling a 9% rate increase for 2015-2019 and plan to sell Equipment
Certificates in 2017 to fund some of the equipment scheduled for 2016-2018. This will allow us
to replace aging equipment and spread the payments over 10 years. The required Equipment
Certificate payment will be part of the debt levy in the applicable year.
Each year staff re-evaluates the equipment needs and adjusts the schedule accordingly. Changes
to the plan are reflected in the document. Refurbishments, extended life expectancy and closer
cost estimates of replacements have been incorporated into the plan. The equipment replacement
charges in the general fund represent approximately 2.8% of total general fund expenditures.
The Equipment Replacement Plan's basic premise is scheduled replacement of present
equipment. A new item must, in the year proposed, be presented in the annual operating budget
67
with a stipulation that replacement will be necessary in the future. Flexibility of the Equipment
Replacement Plan is established through annual review and revision, if necessary.
Summary of Changes from 2014 Plan
Highlights of changes from last year's equipment replacement plan for the years 2015-2019:
Activity Center: Sound system/public address system for $8,900 was added in 2015.
The sound system is used throughout the facility and the current
equipment does not work due to equipment failure.
Tables for $12,200 were added for 2015. The Activity Center would
like to add 23 tables to add depth to the type of activities they can
accommodate.
Arts Center: Video camera updates for $3,700 were added in 2015. The Arts
Center would like to replace the front entry camera with a better
resolution camera for security purposes along with adding cameras to
other areas of the facility.
A new floor scrubber for $8,000 was added in 2015. The current floor
scrubber has reached its life expectancy and no longer performs
efficiently.
City Hall: Network server budget was increased by $7,000 to $15,000 due to the
cost of replacing servers.
Community Services: Document scanners previously in at $6,000 for 2017 and 2018 are now
it at $10,000 for 2016 and are on a 4 year replacement cycle.
Fire: The fire utility vehicle pickup used by the Fire Inspector was deleted.
Plans are to lease a pick-up truck
Two fire chief duty vehicles were added in 2015 and two were added
in 2017. Plans are to lease all four duty chief vehicles. Cost to outfit
each vehicle is also budget at $5,000 per vehicle in the year of the
leases. These vehicles are used by the Chief, two Asst Chief's and
Duty Officer to respond to calls during their duty week to help assess
what is happening and setting up command and establishing command
and control. The Chief's vehicles are also used for travel to meetings
and Training outside the city.
6
The duty chief vehicle schedule in 2016 was deleted due to the lease
proposal.
The Telesquirt fire truck scheduled for 2017 has an increased cost of
$79,100 for a total of $650,000. This vehicle will replace a 25 year
vehicle that is currently being used for response. This vehicle due to
its age is in need of replacement due to both age and on-going
maintenance costs
HRA No changes.
Pavilion: Scoreboard for $12,000 was added in 2016. The scoreboard is used
for hockey, soccer and lacrosse among other activities. The current
scoreboard is original to building and was purchased in 1990.
Parking: No changes.
Police: The leases for the chief s, captains, DTF and school resource officer
cars was adjusted to actual. The original amount budgeted was an
estimate of the lease and once they department selected a vehicle
actual costs were known. The school resource officer car was
formerly the FOCUS car.
Digital squad cameras scheduled for 2015 at a cost of $53,400 and
mobile data computers scheduled for 2014 at a cost of $62,700 have
been combined into one unit. The total cost estimated at $116,100 is
now $148,500 and are requested for 2014. Due to changes in
equipment the Police Department feels this is a better option and will
save money in the long run. The two items were in the plan on a 5
year replacement schedule and the new equipment will be on an 8-10
year replacement schedule.
The cost for the mobile radios for the new squads has been reduced to
only account for the purchased squads. Leased squad outfitting is in a
separate line item. This results in a savings of $16,400.
The cost of the SWAT vehicle was increased by $20,000 to $50,000
due the cost of the vehicle. The vehicle was originally in at $30,000.
Portable radios for police and fire have been moved from 2018 to 2017
as the current radios will not be supported after that date. Cost
remains at $534,400 and staff is researching options for financing the
acquisition of the radios.
VA
Network server budget for the police was increased by $6,500 to
$15,000 due to the cost of replacing servers.
Building video server was added in 2015 with replacement scheduled
for 2019. The 2015 cost will come from DUI funds and in the future
from the ERP.
Public Works: The lives of the equipment are annually reviewed by the public works
department and over the past 10 years they have extended the lives of
the 1 -ton trucks from 8 to 12 years and the dump trucks from 13 to 17
years. Extending the lives of major equipment comes with the risk of
increased maintenance costs. When maintenance costs become
unmanageable the equipment will be put on the schedule for earlier
replacement.
Engineering
No changes
Building/Equipment Services
No changes
Parks/Forestry
Added a grass seed applicator (overseeder) at a cost of $11,500. This
item was previously in the ERP but not purchased and did not get
rescheduled.
Streets/Traffic
A sign machine scheduled for 2015 was pushed back to 2016.
A tandem dump truck originally scheduled for 2018 was pulled
forward to 2017. Cost remains the same.
Refuse
A rear loading refuse truck scheduled for replacement in 2015 at a cost
of $101,600 has been moved back to 2016.
Water
No changes
Sewer
No changes
8
CASH FLOW STATEMENTS
--qca
City or Hops
Ilt
is
EQUIPMENT REPLACEMENT FUND (602)
06/10/2014
Revised
Impact on General Fund
24,812
30,549
33,003
36,592
39,562
Rate Change
0%
8%
9%
9%
9%
9%
9%
ACTUAL
BUDGET
BUDGET
BUDGET
BUDGET
BUDGET
BUDGET
2013
2014
2015
2016
2017
2018
2019
Working Capital Begin Year
1,084,439
726,160
384,854
304,844
(82,843)
83,982
(57,464)
Revenues from charges
320,157
345,770
376,889
410,809
447,782
488,082
532,009
Tax Levy per IMP
138,563
326,713
Transfer in General Fund
50,000
50,000
50,000
50,000
Transfer In - Pavilion - Capital Lease
15,609
Transfer In - Pavilion - Hockey Loan
3,143
3,068
Interest earnings
4,843
8,068
4,655
3,855
(22)
1,646
232
Net Incr (Deer) in FV of Investments
(7,689)
Other revenues (sale of assets)
29,020
30,000
30,000
30,000
30,000
30,000
35,000
Equipment Certificates (Bonds)
451,769
1,601,700
Transfers In (Mise)
23,580
Total Revenues
840,432
436,906
461,544
494,664
2,129,460
658,291
893,954
Expenditures (excludes Depr.)
32,726
33,708
34,719
35,761
36,833
37,938
39,077
Fire Truck Financing Pymnts (2009-2018)
53,841
54,217
54,217
54,217
54,217
54,217
Capital Outlay - Equipment
1,043,649
690,288
452,618
792,374
1,871,585
584,207
386,856
2012 Equip Certificate Pymnts (10yr 3%)
68,495
Total Expenses
1,1989711
778,212
541,554
8829351
199629635
799,737
549,308
Working Capital Ending Balance
7269160
384,854
304,844
(829843)
839982
(579464)
2879183
(cash + receivables - payables)
ActuallEstimated Cash balances
806,821
465,514
385,505
(2,182)
164,643
23,197
367,844
is
I��
rn
O
N
m
N
a)
a+
M
Q
C
C
M
U
�
Q
aA
o�C
w
C:
W
_
ra
_
ra
�
O
+
O
N
H
0
H
n
c-I
O
N
�V
lD
^�
YL
C)
O
N
V
C
Ln
O
i
N
O
f0
0
p
N
N
N
i
m
CL
r-I
p
X
N
W
�
N
C)
a
o
N
N
W
^I
NO
C)
y
I
N
O
O
O
O
O
p
O
O
O
O
O
p
O
O
O
O
O
O
Lr
O
Ln
O
Ln
Lf1
N
N
r
cI
v
I��
FIVE-YEAR
PROJECT SUMMARIES
13
--qca
City or Hops
14
City of Hopkins, MN
EQUIPMENT REPLACEMENT PLAN
2015 thru 2019
PROJECTS BY YEAR
Project Name Department Project # Priority Project Cost
2015
Activity Center Sound System/Public Address System
Activity Center
09 -ERP -0032
n/a
8,800
Activity Center Tables
Activity Center
09 -ERP -0033
n/a
12,200
Art Center Video Camera Updates
Arts Center
09 -ERP -9903
n/a
3,700
Art Center Community Room Audio Visual
Arts Center
09 -ERP- 9 905
n/a
11,000
Art Center Digital Information Sign
Arts Center
09 -ERP- 9906
2
2,000
Art Center Floor Scrubber
Arts Center
09 -ERP- 9909
n/a
8,000
Network Server
City Hall Administration
09 -ERP -0003
n/a
15,000
Telephone System
City Hall Administration
09 -ERP -0004
n/a
89,600
Computers
City Hall Administration
09 -ERP -0006
n/a
30,000
Fire/Duty Chief & Utility Leased Vehicles (5)
Fire
09 -ERP -0903a
n/a
19,606
Outfit Duty Chief Leased Vehicles (5)
Fire
09 -ERP -0903b
n/a
10,000
Aerial Truck
Fire
09 -ERP -0906
n/a
54,217
Floor Scrubber
Fire
09 -ERP -0994
n/a
14,300
Workout Equipment - Eliptical
Fire
09 -ERP -0996
n/a
5,800
Workout Equipment - Treadmill #1
Fire
09 -ERP -0197
n/a
5,800
Workout Equipment - Weight Lifting
Fire
09 -ERP -0999
n/a
5,800
44 3/4 Ton Truck
HRA
09 -ERP -0400
n/a
32,400
Marked Patrol Vehicles (6)
Police
09 -ERP -0200
n/a
90,000
Sergeants Vehicle
Police
09 -ERP -0209
n/a
45,000
Police Administrative Vehicles (2)
Police
09 -ERP -0204
n/a
11,923
Police Admin Cars - outfit leased vehicles
Police
09 -ERP -0204a
n/a
5,000
Drug Task Force Vehicle
Police
09 -ERP -0206
n/a
6,189
School Resource Officer Car
Police
09 -ERP -0290
n/a
6,000
School Resource Ofcr Car - outfit leased vehicle
Police
09 -ERP -0290a
n/a
5,000
Network Server (3)
Police
09 -ERP -0299
n/a
15,000
Radios - Portable and Mobile Devices
Police
09 -ERP -0295
n/a
12,300
Building Video Server
Police
09 -ERP -298
n/a
17,000
Riding Mowers (2)
Public Works: Parks/Forestry
09 -ERP -0808
n/a
11,000
Grass Seed Applicator (Overseeder)
Public Works: Parks/Forestry
09 -ERP -0897
n/a
11,500
4X4 3/4 Ton Truck with Plow
Public Works: Streets/Traffic
09 -ERP -0309
n/a
30,400
Refuse Truck (RAP -R) (2)
Refuse
09 -ERP -0900
n/a
204,800
Total for 2015
799,335
2016
Network Server
City Hall Administration
09 -ERP -0003
n/a
15,000
Computers
City Hall Administration
09 -ERP -0006
n/a
30,000
Document Management Scanner (2)
Community Services
09 -ERP -0008
n/a
10,000
Fire/Duty Chief & Utility Leased Vehicles (5)
Fire
09 -ERP -0903a
n/a
19,606
Aerial Truck
Fire
09 -ERP -0906
n/a
54,217
Air Compressor
Fire
09 -ERP -0907
n/a
34,900
Self Contained Breathing Apparatus (SCBA) (45)
Fire
09 -ERP -0908
n/a
250,000
Pavilion Arena Scoreboard
Pavilion
09 -ERP- 9002
n/a
12,000
Marked Patrol Vehicles (6)
Police
09 -ERP -0200
n/a
90,000
Parking Enforcement Vehicle (Parking Fund)
Police
09 -ERP -0202
n/a
27,200
Monday, June 16, 2014
15
Project Name Department Project # Priority Project Cost
Police Administrative Vehicles (2)
Police
09 -ERP -0204
n/a
16,794
Police Admin Cars - outfit leased vehicles
Police
09 -ERP -0204a
n/a
5,000
SWAT Vehicle
Police
09 -ERP -0205
n/a
50,000
Drug Task Force Vehicle
Police
09 -ERP -0206
n/a
11,074
Drug Task Force Vehicle - outfit leased vehicle
Police
09 -ERP -0206a
n/a
5,000
School Resource Officer Car
Police
09 -ERP -0290
n/a
6,000
Network Server (3)
Police
09 -ERP -0299
n/a
15,000
Radios - Portable and Mobile Devices
Police
09 -ERP -0295
n/a
4,100
Riding Mowers (2)
Public Works: Parks/Forestry
09 -ERP -0808
n/a
20,000
Slope Mower
Public Works: Parks/Forestry
09 -ERP -0809
n/a
32,700
Skid Loader (2)
Public Works: Streets/Traffic
09 -ERP -0309
n/a
41,900
Roller
Public Works: Streets/Traffic
09 -ERP -0392
n/a
45,900
Asphalt Paver
Public Works: Streets/Traffic
09 -ERP -0394
n/a
48,800
Sign Machine (Traffic)
Public Works: Streets/Traffic
09 -ERP -0397
n/a
13,400
Refuse Truck (Rear -L)
Refuse
09 -ERP -0909
n/a
101,600
3/4 Ton Utility Truck
Sewer
09 -ERP -0559
n/a
33,600
Monday, June 16, 2014
16
Total for 2016
993,791
2017
Network Server
City Hall Administration
09 -ERP -0003
n/a
15,000
Computers
City Hall Administration
09 -ERP -0006
n/a
30,000
Tele -Squirt (Engine 2)
Fire
09 -ERP -0900
n/a
650,000
Fire/Duty Chief & Utility Leased Vehicles (5)
Fire
09 -ERP -0903a
n/a
32,707
Outfit Duty Chief Leased Vehicles (5)
Fire
09 -ERP -0903b
n/a
10,000
Aerial Truck
Fire
09 -ERP -0906
n/a
54,217
Thermal Imaging Camera (2)
Fire
09 -ERP -0992
n/a
12,900
Workout Equipment - Treadmill #2
Fire
09 -ERP -0998
n/a
5,800
Workout Equipment - Dumb Bells
Fire
09 -ERP -0922
n/a
5,000
Marked Patrol Vehicles (6)
Police
09 -ERP -0200
n/a
98,000
Police Administrative Vehicles (2)
Police
09 -ERP -0204
n/a
21,999
Police Admin Cars - outfit leased vehicles
Police
09 -ERP -0204a
n/a
5,000
Drug Task Force Vehicle
Police
09 -ERP -0206
n/a
11,074
School Resource Officer Car
Police
09 -ERP -0290
n/a
11,205
School Resource Ofcr Car - outfit leased vehicle
Police
09 -ERP -0290a
n/a
5,000
Network Server (3)
Police
01 -ERP -0211
n/a
15,000
Radios - Portable and Mobile Devices
Police
09 -ERP -0295
n/a
534,400
Taser Replacement
Police
09 -ERP -0297
3
20,900
Stump Cutter
Public Works: Parks/Forestry
09 -ERP -0892
n/a
21,200
Skid Loader
Public Works: Parks/Forestry
09 -ERP -0895
n/a
32,000
Tandem Dump Truck
Public Works: Streets/Traffic
09 -ERP -0306
n/a
173,200
Water Truck
Public Works: Streets/Traffic
09 -ERP -0307
n/a
150,000
Striper
Public Works: Streets/Traffic
09 -ERP -0393
n/a
11,200
Generator (2)
Sewer
09 -ERP -0555
n/a
26,400
1/2 Ton Truck
Water
09 -ERP -0500
n/a
26,800
3/4 Ton Utility Truck
Water
09 -ERP -0509
n/a
34,900
Total for 2017
2,013,902
2018
Art Center Theater Projector
Arts Center
09 -ERP -9904
n/a
17,100
Network Server
City Hall Administration
09 -ERP -0003
n/a
15,000
Computers
City Hall Administration
09 -ERP -0006
n/a
30,000
Core Network Switch
City Hall Administration
09 -ERP -0092
n/a
12,000
Fire/Duty Chief & Utility Leased Vehicles (5)
Fire
09 -ERP -0903a
n/a
32,707
Aerial Truck
Fire
09 -ERP -0906
n/a
54,217
Automated External Defibrillator (2)
Fire
09 -ERP -0920
n/a
7,800
Monday, June 16, 2014
16
Project Name Department Project # Priority Project Cost
Marked Patrol Vehicles (6)
Police
09 -ERP -0200
n/a
98,000
Police Administrative Vehicles (2)
Police
09 -ERP -0204
n/a
22,655
Police Admin Cars - outfit leased vehicles
Police
09 -ERP -0204a
n/a
5,000
Drug Task Force Vehicle
Police
09 -ERP -0206
n/a
11,740
Drug Task Force Vehicle - outfit leased vehicle
Police
09 -ERP -0206a
n/a
5,000
School Resource Officer Car
Police
09 -ERP -0290
n/a
11,205
Network Server (3)
Police
09 -ERP -0299
n/a
15,000
Tactical Ballistic Vests
Police
09 -ERP -0294
n/a
26,900
4X41/2 Ton Truck
Public Works: Bldg/Equip Sery
09 -ERP -0790
n/a
31,300
Turf Sweeper
Public Works: Parks/Forestry
09 -ERP -0899
n/a
18,000
Toolcat
Public Works: Parks/Forestry
09 -ERP -0896
n/a
63,300
4x2 1 Ton Dump Truck
Public Works: Streets/Traffic
09 -ERP -0302
n/a
54,600
Single Axle Dump Truck (3)
Public Works: Streets/Traffic
09 -ERP -0305
n/a
124,000
Total for 2019 386,856
GRAND TOTAL 4,849,408
Monday, June 16, 2014
17
Total for 2018
655,524
2019
Activity Center Refigerator/Freezer
Activity Center
09 -ERP -0039
n/a
1
Network Server
City Hall Administration
09 -ERP -0003
n/a
15,000
Computers
City Hall Administration
09 -ERP -0006
n/a
30,000
Fire/Duty Chief & Utility Leased Vehicles (5)
Fire
09 -ERP -0903a
n/a
32,707
Outfit Duty Chief Leased Vehicles (5)
Fire
09 -ERP -0903b
n/a
10,000
Extrication Tool (2)
Fire
09 -ERP -0909
n/a
27,400
Marked Patrol Vehicles (6)
Police
09 -ERP -0200
n/a
98,000
Sergeants Vehicle
Police
09 -ERP -0209
n/a
50,600
Police Administrative Vehicles (2)
Police
09 -ERP -0204
n/a
23,329
Police Admin Cars - outfit leased vehicles
Police
09 -ERP -0204a
n/a
5,000
Drug Task Force Vehicle
Police
09 -ERP -0206
n/a
11,740
School Resource Officer Car
Police
09 -ERP -0290
n/a
11,879
School Resource Ofcr Car - outfit leased vehicle
Police
09 -ERP -0290a
n/a
5,000
Network Server (3)
Police
09 -ERP -0299
n/a
15,000
Building Video Server
Police
09 -ERP -298
n/a
17,000
Trucksters (3)
Public Works: Parks/Forestry
09 -ERP -0807
n/a
34,200
Total for 2019 386,856
GRAND TOTAL 4,849,408
Monday, June 16, 2014
17
City of Hopkins, MN
EQUIPMENT REPLACEMENT PLAN
2015 tiim 2019
DEPARTMENT SUMMARY
Department 2015 2016 2017
Activity Center
21,000
Arts Center
24,700
City Hall Administration
134,600
45,000
45,000
Community Services
10,000
Fire
115,523
358,723
770,624
HRA
32,400
Pavilion
12,000
Police
213,412
230,168
722,578
Public Works: Bldg/Equip Sery
Public Works: Parks/Forestry
22,500
52,700
53,200
Public Works: Streets/Traffic
30,400
150,000
334,400
Refuse
204,800
101,600
Sewer
33,600
26,400
Water
61,700
2018 2019 Total
17,100
57,000
94,724
1
45,000
70,107
195,500 237,548
31,300
81,300 34,200
178,600
21,001
41,800
326,600
10,000
1409,709
32,400
12,000
1599,206
31,300
243,900
693,400
306,400
60,000
61,700
TOTAL 799,335 993,791 2,013,902 655,524 386,856 4,949,40E
18 Monday, June 16, 2014
City of Hopkins, MN
EQUIPMENT REPLACEMENT PLAN
2015 tiim 2019
PROJECTS BY DEPARTMENT
Department Project# Priority 2015 2016 2017 2018 2019 Total
Activity Center
Activity Center Refrigerator/Freezer
09 -ERP -0039
n/a
1
9
Activity Center Sound System/Public Address System
09 -ERP -0032
n/a
8,800
8,800
Activity Center Tables
09 -ERP -0033
n/a
12,200
92,200
Activity Center Total
21,000
1
21,001
Arts Center
Art Center Video Camera Updates
09 -ERP -9903
n/a
3,700
3,700
Art Center Theater Projector
09 -ERP -9904
n/a
17,100
97,900
Art Center Community Room Audio Visual
09 -ERP -9905
n/a
11,000
99,000
Art Center Digital Information Sign
09 -ERP -9906
2
2,000
2,000
Art Center Floor Scrubber
09 -ERP -9909
n/a
8,000
8,000
Arts Center Total
24,700
17,100
41,800
City Hall Administration
Network Server
09 -ERP -0003
nla
15,000
15;000
15,000
15,000
15,000
75,000
Telephone System
09 -ERP -0004
n/a
89,600
89,600
Computers
09 -ERP -0006
n/a
30,000
30,000
30,000
30,000
30,000
950,000
Core Network Switch
09 -ERP -0092
n/a
12,000
12,000
City Hall Administration Total
134,600
45,000
45,000
57,000
45,000
326,600
ICommunity Services
Document Management Scanner (2)
09 -ERP -0008
n/a
10;000
90,000
Community Services Total
10,000
10,000
Fire
Tele -Squirt (Engine 2)
09 -ERP -0900
n/a
650,000
650,000
Fire/Duty Chief & Utility Leased Vehicles (5)
09 -ERP -0903a
n/a
19,606
19,606
32,707
32,707
32,707
137333
Outfit Duty Chief Leased Vehicles (5)
09 -ERP -0903b
n/a
10,000
10,000
10,000
30,000
Aerial Truck
09 -ERP -0906
n/a
54,217
54,217
54,217
54,217
296,868
Air Compressor
09 -ERP -0907
n/a
34,900
34,900
Self Contained Breathing Apparatus (SCBA) (45)
09 -ERP -0908
n/a
250,000
250,000
Extrication Tool (2)
09 -ERP -0909
n/a
27,400
27,400
Thermal Imaging Camera (2)
09 -ERP -0992
n/a
12,900
92,900
Floor Scrubber
09 -ERP -0994
n/a
14,300
94,300
Workout Equipment-Eliptical
09 -ERP -0996
n/a
5,800
5,800
Workout Equipment- Treadmill #1
09 -ERP -0997
n/a
5,800
5,800
Workout Equipment - Treadmill #2
09 -ERP -0998
n/a
5,800
5,800
Workout Equipment - Weight Lifting
09 -ERP -0999
n/a
5,800
5,800
Automated External Defibrillator(2)
09 -ERP -0920
n/a
7,800
7,800
Workout Equipment- Dumb Bells
09 -ERP -0922
n/a
5,000
5,000
19 Monday, June 16, 2014
Department Project# Priority 2015 2016 2017 2018 2019 Total
Fire Total
HRA
90,000
98,000
44 3/4 Ton Truck
09 -ERP -0400
n/a
LIRA Total
39,000
50,600
95,600
Pavilion
Pavilion Arena Scoreboard
09 -ERP -9002
n/a
Pavilion Total
09 -ERP -0808
n/a
Slope Mower
09 -ERP -0809
n/a
Police
Marked Patrol Vehicles (6)
09 -ERP -0200
n/a
Sergeant's Vehicle
09 -ERP -0209
n/a
Parking Enforcement Vehicle (Parking Fund)
09 -ERP -0202
n/a
Police Administrative Vehicles (2)
09 -ERP -0204
nla
Police Admin Cars - outfit leased vehicles
09 -ERP -0204a
n/a
SWAT Vehicle
09 -ERP -0205
n/a
Drug Task Force Vehicle
09 -ERP -0206
n/a
Drug Task Force Vehicle - outfit leased vehicle
09 -ERP -0206a
n/a
School Resource Officer Car
09 -ERP -0290
n/a
School Resource Ofcr Car - outfit leased vehicle
09 -ERP -0290a
n/a
Network Server (3)
09 -ERP -0299
n/a
Tactical Ballistic Vests
09 -ERP -0294
n/a
Radios - Portable and Mobile Devices
09 -ERP -0295
n/a
Taser Replacement
09 -ERP -0297
3
Building Video Server
09 -ERP -298
n/a
Police Total
Public Works: Bldg/Equip Sery
90,000
98,000
4X41/2 Ton Truck
09 -ERP -0790
n/a
Public Works: Bldg/Equip Sery Total
39,000
50,600
95,600
Public Works: Parks/Forestry
Trucksters (3)
09 -ERP -0807
n/a
Riding Mowers (2)
09 -ERP -0808
n/a
Slope Mower
09 -ERP -0809
n/a
Turf Sweeper
09 -ERP -0899
n/a
Stump Cutter
09 -ERP -0892
n/a
Skid Loader
09 -ERP -0895
n/a
Toolcat
09 -ERP -0896
n/a
Grass Seed Applicator (Overseeder)
09 -ERP -0817
n/a
Public Works: Parks/Forestry Total
11,074
11,740
11,740
59,897
53,200
Public Works: Streets/Traffic
4X4 3/4 Ton Truck with Plow
09 -ERP -0309
n/a
42 1 Ton Dump Truck
09 -ERP -0302
n/a
Single Axle Dump Truck (3)
09 -ERP -0305
n/a
Tandem Dump Truck
09 -ERP -0306
n/a
Water Truck
09 -ERP -0307
n/a
Skid Loader (2)
09 -ERP -0309
n/a
Roller
09 -ERP -0392
n/a
115,523 358,723 770,624 94,724 70,107 1,409,701
32,400 32,400
32,400 32,400
12,000 12,000
12,000 12,000
90,000
90,000
98,000
98,000
98,000
474,000
45,000
39,000
50,600
95,600
27,200
32,700
27,200
11,923
16,794
21,999
22,655
23,329
96,700
5,000
5,000
5,000
5,000
5,000
25,000
50,000
63,300
63,300
50,000
6,189
11,074
11,074
11,740
11,740
59,897
53,200
5,000
243,900
5,000
10,000
6,000
6,000
11,205
11,205
11,879
46,289
5,000
5,000
5,000
95,000
15,000
15,000
15,000
15,000
15,000
75,000
150,000
26,900
26,900
12,300
4,100
534,400
45,900
550,800
45,900
20,900
20,900
17,000
17,000
34,000
213,412
230,168
722,578
195,500
237,548
1599,206
31,300 31,300
31,300 31,300
20 Monday, June 16, 2014
34,200
34,200
11,000
20,000
39,000
32,700
32,700
18,000
18,000
21,200
21,200
32,000
32,000
63,300
63,300
11,500
99,500
22,500
52,700
53,200
81,300 34,200
243,900
30,400
30,400
54,600
54,600
124,000
124,000
173,200
973,200
150,000
950,000
41,900
41,900
45,900
45,900
20 Monday, June 16, 2014
Department
Project#
Priority
2015
2016
2017 2018 2019
Total
Striper
09-ERP-0393
n/a
11,200
99,200
Asphalt Paver
09-ERP-0394
n/a
48,800
48,800
Sign Machine (Traffic)
09-ERP-0397
n/a
13,400
93,400
Public Works: Streets/Traffic Total
30,400
150,000
334,400 178,600
693,400
Refuse
Refuse Truck (RAP-R) (2)
09-ERP-0900
n/a
204,800
204,800
Refuse Truck (Rear-L)
09-ERP-0909
n/a
101,600
909,600
Refuse Total
204,800
101,600
306,400
Sewer
3/4 Ton Utility Truck
09-ERP-0559
n/a
33,600
33,600
Generator (2)
09-ERP-0555
n/a
26,400
26,400
Sewer Total
33,600
26,400
60,000
Water
1/2 Ton Truck
09-ERP-0500
n/a
26,800
26,800
3/4 Ton Utility Truck
09-ERP-0509
n/a
34,900
34,900
Water Total
61,700
61,700
GRAND TOTAL
799,335
993,791
2,013,902 655,524 386,856
4,849,408
21 Monday, June 16, 2014
City of Hopkins, MN
EQUIPMENT REPLACEMENT PLAN
2015 thm 2019
FUNDING SOURCE SUMMARY
Source 2015 2016 2017
AC - Arts Center Fund
24,700
54,217
216,868
Bonds/Lease
54,217
54,217
54,217
Drug Task Force Funds
17,000
12,000
Equipment Replacement Fund
452,618
792,374
1,871,585
HRA - Housing and Redevelopment Authority
32,400
655,524 386,856
4,649,409
PA - Pavilion Fund
12,000
RF - Refuse Fund
204,800
101,600
SF - Sanitary Sewer Fund
6,800
33,600
26,400
WF - Water Fund
6,800
61,700
GRAND TOTAL
799,335
993,791
2,013,902
W -A
2018 2019 Total
17,100
41,800
54,217
216,868
17000
584,207 386,856
4,087,640
32,400
12,000
306,400
66,800
68,500
655,524 386,856
4,649,409
Monday, June 16, 2014
City of Hopkins, MN
EQUIPMENT REPLACEMENT PLAN
2015 thru 2019
PROJECTS BY FUNDING SOURCE
Source Project# Priority 2015 2016 2017 2018 2019 Total
AC - Arts Center Fund 1
Art Center Video Camera Updates
09 -ERP -9903
nla
3,700
3,700
Art Center Theater Projector
09 -ERP -9904
n/a
17,100
97,900
Art Center Community Room Audio Visual
09 -ERP -9905
nla
11,000
99,000
Art Center Digital I nformation Sign
09 -ERP -9906
2
2,000
2,000
Art Center Floor Scrubber
09 -ERP -9909
n/a
8,000
8,000
AC - Arts Center Fund Total
24,700
17,100
41,800
Bonds/Lease
Aerial Truck
09 -ERP -0906
n/a
54,217
54,217
54,217
54,217
296,868
Bonds/Lease Total
54,217
54,217
54,217
54,217
216,868
Drug Task Force Funds
Building Video Server
09 -ERP -298
n/a
17,000
97,000
Drug Task Force Funds Total
17,000
17,000
Equipment Replacement Fund
Network Server
09 -ERP -0003
n/a
15,000
15,000
15,000
15,000
15,000
75,000
Telephone System
09 -ERP -0004
n/a
76,000
76,000
Computers
09 -ERP -0006
n/a
30,000
30,000
30,000
30,000
30,000
950,000
Document Management Scanner (2)
09 -ERP -0008
n/a
10,000
10,000
Core Network Switch
09 -ERP -0092
n/a
12,000
92,000
Activity Center Refrigerator/Freezer
09 -ERP -0039
n/a
1
9
Activity Center Sound System/Public Address System
09 -ERP -0032
n/a
8,800
8,800
Activity Center Tables
09 -ERP -0033
n/a
12,200
92,200
Tele -Squirt (Engine 2)
09 -ERP -0900
n/a
650,000
650,000
Fire/Duty Chief & Utility Leased Vehicles (5)
09 -ERP -0903a
n/a
19,606
19,606
32,707
32,707
32,707
937,333
Outfit Duty Chief Leased Vehicles (5)
09 -ERP -0903b
n/a
10,000
10,000
10,000
30,000
Air Compressor
09 -ERP -0907
n/a
34,900
34,900
Self Contained Breathing Apparatus (SCBA) (45)
09 -ERP -0908
n/a
250,000
250,000
Extrication Tool (2)
09 -ERP -0909
n/a
27,400
27400
Thermal Imaging Camera (2)
09 -ERP -0992
n/a
12,900
92,900
Floor Scrubber
09 -ERP -0994
n/a
14,300
94,300
Workout Equipment -Eliptical
09 -ERP -0996
n/a
5,800
5,800
Workout Equipment- Treadmill #1
09 -ERP -0997
n/a
5,800
5,800
Workout Equipment- Treadmill #2
09 -ERP -0998
n/a
5;800
5,800
Workout Equipment - Weight Lifting
09 -ERP -0999
nla
5,800
5,800
Automated External Defibrillator(2)
09 -ERP -0920
n/a
7,800
7,800
Workout Equipment - Dumb Bells
09 -ERP -0922
n/a
5,000
5,000
Marked Patrol Vehicles (6)
09 -ERP -0200
n/a
90;000
90,000
98,000
98;000
98,000
474,000
Sergeant's Vehicle
09 -ERP -0209
n/a
45;000
50,600
95,600
Monday, June 16, 2014
23
Source Project# Priority 2015 2016 2017 2018 2019 Total
Parking Enforcement Vehicle (Parking Fund)
09 -ERP -0202
n/a
27,200
27,200
Police Administrative Vehicles (2)
09 -ERP -0204
nla
11,923
16,794
21,999
22,655
23,329
96,700
Police Admin Cars - outfit leased vehicles
09 -ERP -0204a
n/a
5,000
5,000
5,000
5,000
5,000
25,000
SWAT Vehicle
09 -ERP -0205
n/a
50,000
50,000
Drug Task Force Vehicle
09 -ERP -0206
n/a
6,189
11,074
11,074
11,740
11,740
59,897
Drug Task Force Vehicle - outfit leased vehicle
09 -ERP -0206a
n/a
5,000
5,000
10,000
School Resource Officer Car
09 -ERP -0290
n/a
6,000
6,000
11,205
11,205
11,879
46,289
School Resource Ofcr Car - outfit leased vehicle
09 -ERP -0290a
n/a
5,000
5,000
5,000
15,000
Network Server (3)
09 -ERP -0299
n/a
15,000
15,000
15,000
15,000
15,000
75,000
Tactical Ballistic Vests
09 -ERP -0294
nla
26,900
26,900
Radios - Portable and Mobile Devices
09 -ERP -0295
n/a
12,300
4,100
534,400
550,800
Taser Replacement
09 -ERP -0297
3
20,900
20,900
4X4 3/4 Ton Truck with Plow
09 -ERP -0309
n/a
30,400
30,400
42 1 Ton Dump Truck
09 -ERP -0302
n/a
54,600
54,600
Single Axle Dump Truck (3)
09 -ERP -0305
n/a
124,000
124,000
Tandem Dump Truck
09 -ERP -0306
n/a
173,200
973,200
Water Truck
09 -ERP -0307
n/a
150,000
950,000
Skid Loader (2)
09 -ERP -0309
n/a
41,900
49,900
Roller
09 -ERP -0392
n/a
45,900
45,900
Striper
09 -ERP -0393
n/a
11,200
99,200
Asphalt Paver
09 -ERP -0394
n/a
48,800
48,800
Sign Machine (Traffic)
09 -ERP -0397
n/a
13,400
13,400
4X41/2 Ton Truck
09 -ERP -0790
n/a
31,300
39,300
Trucksters (3)
09 -ERP -0807
n/a
34,200
34,200
Riding Mowers (2)
09 -ERP -0808
n/a
11,000
20,000
39,000
Slope Mower
09 -ERP -0809
n/a
32,700
32,700
Turf Sweeper
09 -ERP -0899
n/a
18,000
98,000
Stump Cutter
09 -ERP -0892
n/a
21,200
29,200
Skid Loader
09 -ERP -0895
n/a
32,000
32,000
Toolcat
09 -ERP -0896
n/a
63,300
63,300
Grass Seed Applicator (Overseeder)
09 -ERP -0897
nla
11,500
99,500
Building Video Server
09 -ERP -298
n/a
17,000
97,000
Equipment Replacement Fund Total
452,618
792,374
1,871,585
584,207
386,856
4,087,640
HRA - Housing and Redevelopment A
4x4 3/4 Ton Truck
09 -ERP -0400
n/a
32,400
32,400
HRA - Housing and Redevelopment
32,400
32,400
Authority Total
PA - Pavilion Fund
Pavilion Arena Scoreboard
09 -ERP -9002
n/a
12,000
92,000
PA - Pavilion Fund Total
12,000
12,000
IRF - Refuse Fund
Refuse Truck (RAP -R) (2)
09 -ERP -0900
n/a
204,800
204,800
Refuse Truck (Rear -L)
09 -ERP -0909
n/a
101,600
909,600
RF - Refuse Fund Total
204,800
101,600
306,400
ISF - Sanitary Sewer Fund
Telephone System
09 -ERP -0004
n/a
6,800
6,800
Monday, June 16, 2014
24
Source Project# Priority
3/4 Ton Utility Truck 09 -ERP -0559 n/a
Generator (2) 09 -ERP -0555 n/a
SF - Sanitary Sewer Fund Total
WF - Water Fund
Telephone System 09 -ERP -0004 n/a
1/2 Ton Truck 09 -ERP -0500 n/a
3/4 Ton Utility Truck 09 -ERP -0509 n/a
WF - Water Fund Total
GRAND TOTAL
W
2015 2016 2017 2018 2019 Total
33,600 33,600
26,400 26,400
6,800 33,600 26,400 66,800
6,800 6,800
26,800 26,800
34,900 34,900
6,800 61,700 68,500
799,335 993,791 2,013,902 655,524 386,856 4,849,408
Monday, June 16, 2014
--qca
City or Hops
`1-
EQUIPMENT REQUESTS
27
--qca
City or Hops
28
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Project # 01 -ERP -0031
Project Name Activity Center Refrigerator/Freezer
Future
Description
'ommerical, stainless steel refrigerator and freezer.
2015 thru 2019
Department Activity Center
Contact Facilities Director
Type Equipment
Useful Life 30 years
Category Equipment
Priority n/a
Total Project Cost: $10,501
Justification
Cooling/freezing needed for programs or by use of the participants and their activities. Present unit was here when activity center opened in
1980. This unit was part of the old South Jr. High cafeteria kitchen. The unit continues to have problems due to the age of the unit.
Prior Expenditures
10,500 Equipment
Total Total
Prior Funding Sources
10,500 Equipment Replacement Fund
Total Total
2015
2016
2017
2018
2019
Total
1
1
1
1
2015
2016
2017
2018
2019
Total
from 20 year plan - Delayed indefinetly. Will use and repair as necessary.
salvage/resale value on replaced item: $-0-
Monday, June 16, 2014
29
EQUIPMENT REPLACEMENT PLAN 2015 ffim 2019
City of Hopkins, MN
'roject # 01 -ERP -0032
'roject Name Activity Center Sound System/Public Address System
Future
Department
Activity Center
Contact
Facilities Director
Type
Equipment
Useful Life
15 years
Category
Equipment
Priority
n/a
Description Total Project Cost: $22,500
k11 new equipment to allow for sound in every room as well as the public address system in the gymnasium and Raspberry Room.
Justification
fur current sound system does not work due to equipment failure as well as our PA system in our gymnasium no longer works due to equipment
ailure. The sound system was installed shortly after we opened in 1980 and the PA system was upgraded in 1990, but has now failed. The
Wpberry Room is now being used more and more for lectures and classroom type activities and we would like to improve the system we curren
xse in there.
Expenditures 2015 2016 2017 2018 2019 Total Future
Equipment 8;800 8,800 13,700
Total 8,800 8,800 Total
Funding Sources 2015 2016 2017 2018 2019 Total Future
Equipment Replacement Fund 8,800 8,800 13,700
Total 8,800 8,800 Total
Budget Impact/Qtber
Jariance from 20 year plan - New item.
?stimate salvage/resale value on replaced items: $ -0-
30
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0033
Project Name Activity Center Tables
Future
Description
?3 tables - 6'x 24" mobile, multiple use, folding tables @$475 each
Department
Activity Center
Contact
Facilities Director
Type
Equipment
Useful Life
15 years
Category
Equipment
Priority n/a
Total Project Cost: $31,200
Justification
Chis type of table will add depth to the type of activities we can accommodate at the Activity Center. It will help cut staff time taken to setting up
and resetting up rooms for varying types of activities that occur. For instance, we set up the Raspberry Room for a class very differently than we
to for an anniversary reception.
Expenditures
2015 2016
2017 2018 2019 Total
Future
Equipment
12,200
12,200
19,000
Total
12,200
12,200
Total
Funding Sources
2015 2016
2017 2018 2019 Total
Future
Equipment Replacement Fund
12,200
12,200
19,000
Total
12,200
12,200
Total
Budget Impact/Qther
Jariance from 20 year plan - New item
?stimate salvage/resale value on replaced items: $
0
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -1103
Project Name Art Center Video Camera Updates
Future
Department
Arts Center
Contact
Arts Center Director
Type
Equipment
Useful Life
5 years
Category
Equipment
Priority
n/a
Description Total Project Cost: $22,000
?,eplace the front entry camera with a better resolution camera. Relocate existing to above the display cabinet in the lobby. Add additional camera
o the gallery, left of door to capture shot of faces of those exiting. Add a camera to the back hallway of the second floor.
Justification
There was an item taken from a display case in 2011 and existing cameras did not provide clear angle and view of the culprit. Also, addition of a
;amera in the back hallway may reduce tendency of youth to hang out in that area and engage in inappropriate behavior.
Prior Expenditures
2015 2016
2017 2018 2019 Total
Future
3,200 Equipment
3;700
3,700
15,100
Total
Total 3,700
3,700
Total
Prior Funding Sources
3,200 AC - Arts Center Fund
Total
2015 2016 2017 2018 2019 Total Future
3,700 3,700 15,100
Total 3,700 3,700 Total
Budget Impact/Qther
Jariance from 20 year plan - Move up from 2017 to 2015.
?stimate salvage/resale value on replaced item: $-0-
WA
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 thm 2019
City of Hopkins, MN
Project # 01 -ERP -1104
Project Name Art Center Theater projector
Future
Department Arts Center
Contact Arts Center Director
Type
Equipment
Useful Life
5 years
Category
Equipment
Priority
n/a
Description I
Total Project Cost: $75,000
Current projector is 3000 lumen -- 6500 lumen is required for theater usage including in partial light situations and to achieve the clarity needed
for detailed images. Such a projector costs about $7,200 (including mounting and rigging hardware, cables and installation labor). The projector
also needs to be part of a professional system that permits it to be operated from the theater tech booth or from on-stage -- the current projector is
only operable from a hand-held remote requiring the operator to dash into the audience of the theater. This total cost of $15,200 includes all the
wiring and hardware needed to support a projector well into the future. The projector itself is estimated to have a 5 -year useful life. (The existing
projector will be moved to one of the meeting rooms).
Justification
Che justification of this expense is two -fold: First, in order to attract and retain arts and corporate renters we need to be able to provide the
echr&al support required for their events. Income from such rentals (including Pen Pals and Digital Rivers) is becoming increasingly vital to the
financial health of the Center. If we are not capable of competing with similar size venues, we will lose this income. Secondly, as a professional
irts presenter we need to have the technical capatabilities to run our own programs in a professional manner.
ear2018: $17,100
ear 2023 $19,800
ear 2028 $22.900
Prior
15,200
Total
Prior
15,200
Total
Expenditures 2015 2016 2017 2018 2019 Total Future
Equipment
Funding Sources
AC - Arts Center Fund
17,100 17,100 42,700
Tom 17,100 17,100 Total
2015 2016 2017 2018 2019
17,100
Total 17,100
Total
Future
17,100
42,700
17,100
Total
$15, 000 to retain major renters such as Pen Pals and Digital Rivers is worthwhile. Pen Pals alone brings in about $20.000/year in
Digital Rivers just under $9,000.
Monday, June 16, 2014
33
EQUIPMENT REPLACEMENT PLAN 2015 ffim 2019
City of Hopkins, MIST
'roject # 01 -ERP -1105
'rojeet Name Art Center Community Room Audio Visual
Future
Department
Arts Center
Contact
Arts Center Director
Type
Equipment
Useful Life
7 years
Category
Equipment
Priority
n/a
Description Total Project Cost: $41,100
Install a projector in a ceiling mount. Wire speakers into the ceiling. Wire input for computer on front wall. Add two microphones. Mount
supporting hardware in rack that fits into closet.
Justification
kn increasing number of users of this room require media support. Current means of providing this include the use of an oversized AN cart, cords
stretch across the floor and a large speaker on a stick. We can streamline the appearance and functionality by making these appropriate changes.
Fhese changes also address safety concerns. They will help attract safety concerns. They will help attract and retain rental customers as well as
appropriately support our own activities.
Expenditures
2015 2016
2017 2018 2019 Total
Future
Equipment
11,000
11,000
30,100
Total
Funding Sources
AC - Arts Center Fund
11,000
2015 2016
11,000
11,000
2017 2018 2019 Total
11,000
Total
Future
30,100
Total
11,000
11,000
Total
Budget Impact/Other
vlove this item from 2014 to 2017
34
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -1106
Project Name Art Center Digital Information Sign
Future
Description
Add programmable and highly visable digital sign to information desk area.
Yiewsonic 42" with integrated media, software - or similar)
Department
Arts Center
Contact
Arts Center Co -Director
Type
Equipment
Useful Life
5 years
Category
Equipment
Priority 2 Very Important
Total Project Cost: $10,100
Justification
'urrent system of posting printed schedules and key information each day is overlooked by visitors and difficult to update rapidly.
Expenditures
2015 2016
2017 2018 2019 Total
Future
Equipment
2;000
2,000
8,100
Total
2,000
2,000
Total
Funding Sources
2015 2016
2017 2018 2019 Total
Future
AC - Arts Center Fund
2,000
2,000
8,100
Total
2,000
2,000
Total
Budget Impact/Other
Jariance from 20 year plan - New Item
?stimated salvage/resale value $0
moi
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -1109
Project Name Art Center Floor Scrubber
Future
Description
26 -inch autoscrubber
Justification
'urrent scrubber has reached its lifetime and no longer spins fast enough to be effective.
Department
Arts Center
Contact
Arts Center Co -Director
Type
Equipment
Useful Life
10 years
Category
Equipment
Priority n/a
Total Project Cost: $18,800
Expenditures
2015 2016
2017 2018 2019 Total
Future
Equipment
8;000
8,000
10,800
Total
8,000
8,000
Total
Funding Sources
2015 2016
2017 2018 2019 Total
Future
AC - Arts Center Fund
8,000
8,000
10,800
Total
8,000
8,000
Total
Budget Impact/Qther
Jariance from 20 year plan - New item
?stimate salvage/resale value on replaced item: $-0-
K%
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0003
Project Name Network Server
Future
Department City Hall Administration
Contact Finance Director/IT
Type
Equipment
Useful Life
1 year
Category
Equipment
Priority
n/a
Description I
Total Project Cost: $397,000
Che network server is the hub of the network. New computers are faster and more reliable.
Justification
letworking allows user to share information that is stored in a single location, the network server. This is more efficient because the information
toes not have to be stored on many different computers. It also makes for better accuracy because as the information changes or is updated, every
rser is working with the same data.
Prior Expenditures
2015
2016
2017
2018
2019
Total
Future
97,000 Equipment
15,000
15,000
15,000
15,000
15,000
75,000
225,000
Total
Total 15,000
15,000
15,000
15,000
15,000
75,000
Total
Prior Funding Sources
2015
2016
2017
2018
2019
Total
Future
97,000 Equipment Replacement Fund
15,000
15,000
15,000
15,000
15,000
75,000
225,000
Total Total
15,000
15,000
15,000
15,000
15,000
75,000
Total
Budget Ifnpact/Qther
Variance from 20 year plan - Increase from 8,000 to 15,000. Software licensing has become more expensive. We are paying half of our server
)udget to required software and 8,000 isn't enough anymore.
?stimate salvage/resale value on replaced item: $-0-
Monday, June 16, 2014
37
EQUIPMENT REPLACEMENT PLAN 2015 thm 2019
Department City Hall Administration
City of Hopkins, MN Contact IT Director
Project # 01 -ERP -0004 Type Equipment
Useful Life 8 years
Project Name Telephone System
llCategory Equipment
Future Priority n/a
Description Total Project Cost: $349,900
ncludes the PBX, the voice mail systems, and all telephone instruments. Currently there are over 200 extensions served by this system. Also
ncludes software for the PBX and voice mail systems.
Justification
vlaking, receiving and routing telephone calls, storing voice mail messages, and providing telephone based information services (snow line, etc.)
Prior Expenditures
60,000 Equipment
Total Tota
Prior Funding Sources
60,000 Equipment Replacement Fund
Total SF - Sanitary Sewer Fund
2015 2016 2017 2018 2019
89,600
89,600
2015 2016 2017 2018 2019
76,000
6,800
6,800
Total Future
89,600
200,300
89,600
Total
Total
Future
76,000
200,300
6,800
Total
Total 89,600 89,600
Budget Impact/Other
Variance from 20 year plan - Upgrade to controller in 2009 delays complete replacement to 2015.
?stimate salvage/resale value on replaced item: $
Monday, June 16, 2014
38
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0006
Project Name Computers
Future
Department City Hall Administration
Contact Finance Director/IT
Type Equipment
Useful Life 3-5 years
Category Equipment
Priority n/a
Description Total Project Cost: $1,020,000
3ersonal computer purchases and upgrades for the entire City staff. Coordinating personal computer purchases from individual departments to one
Justification
Cools enabling staff to perform job responsibilities efficiently and effectively.
Prior Expenditures
2015
2016
2017
2018
2019
Total
Future
420,000 Equipment
30;000
30,000
30,000
30,000
30,000
150,000
450,000
Total
Total 30,000
30,000
30,000
30,000
30,000
150,000
Total
Prior Funding Sources
2015
2016
2017
2018
2019
Total
Future
420,000 Equipment Replacement Fund
30,000
30,000
30,000
30,000
30,000
150,000
450,000
Total Total
30,000
30,000
30,000
30,000
30,000
150,000
Total
Budget Impact/Qther
Jariance from 20 year plan - none
?stimate salvage/resale value on replaced item: $-0-
39
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 thm 2019
City of Hopkins, MN
Project # 01 -ERP -0012
Project Name Core Network Switch
Future
Department
City Hall Administration
Contact
Finance Director/IT
Type
Equipment
Useful Life
6 years
Category
Equipment
Priority
n/a
Description Total Project Cost: $53,300
'rovides layer 3 IP presence for the network, core switching connectivity, backbone on which all network communication is built and facilitates
ibr optic network connection to fire department.
2 - Cisco 3560E-24PD managed switch - $3,000 each
2 - Cisco X2-IOGB-LR fiber optic transceiver - $1200 each
cost listed is for equipment only and does not include tax, shipping and other related costs
Justification
Current two switches are obsolete, end of life and no longer supported by manufacturer. Past lost of service resulted in significant network outage
that was immediately noticed by many employees.
Prior Expenditures
10,000 Equipment
Total
2015 2016 2017 2018 2019 Total Future
12,000 12,000 31,300
Tom 12,000 12,000 Total
Prior Funding Sources
10,000 Equipment Replacement Fund
Total Total
2015 2016 2017 2018 2019
12,000
12,000
Total
Future
12,000
31,300
12,000
Total
ice from 20 year plan - Not currently in ERP but critical to network communication infrastructure. This is outside the budget for city hall
network budget as the "Lisa" service is scheduled for replacement due to end of life, out of PCI compliance and obsolete.
ite salvage/resale value on replace item: - $-0-
Monday, June 16, 2014
40
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0008
Project Name Document Management Scanner (2)
Future
Department Community Services
Contact City Clerk
Type
Equipment
Useful Life
4 years
Category
Equipment
Priority
n/a
Description Total Project Cost: $87,600
,arge document (1 P' x17") scanner for document management and retention as well as general administrative use.
two scanners in 2012 at a cost of $10,315 - 1 at scanner station, 1 in City Clerk's office
equipment: Canon DR 7550C
Justification
;canners are needed for converting paper copies to electronic data to reduce storage space.
Prior Expenditures 2015
2016 2017
2018 2019 Total
Future
23,300 Equipment
10,000
10,000
54,300
Total Total
10,000
10,000
Total
Prior Funding Sources 2015
2016 2017
2018 2019 Total
Future
23,300 Equipment Replacement Fund
10,000
10,000
54,300
Total Total
10,000
10,000
Total
Budget Impact/Qther
Jariance from 20 year plan - Two scanners purchased in 2012 and will be replaced every four years.
?stimate salvage/resale value on replaced item: $50041,000
Monday, June 16, 2014
41
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0100
Project Name Tele -Squirt (Engine 2)
Future
Description
'ire engine: full size response truck
Department
Fire
Contact
Fire Chief
Type
Equipment
Useful Life
10 years
Category
Vehicles
Priority n/a
Total Project Cost: $1,523,500
(Current vehicle: 1989 Ford L9000 Tele -Squirt (9102) I
Justification
This is a replacement engine for response to emergency response in the City. We will be reducing the fleet by one truck in making this one unit
(ladder/pumper) which would reduce the life of a vehicle from 25 years to 10 years. We are finding that the life a vehicle is no longer 20 years.
Expenditures 2015
2016 2017 2018
2019 Total
Future
Equipment
650,000
650,000
873,500
Total
650,000
650,000
Total
Funding Sources 2015
2016 2017 2018
2019 Total
Future
Equipment Replacement Fund
650,000
650,000
873,500
Total
650,000
650,000
Total
Budget Imlpact/Qther
Variance from 20 year plan - was scheduled for replacement in 2019 and has been moved up to 2017. Change useful life from 25 to 10 years.
Jpdated value to reflect more accurate replacement cost.
?stimate salvage/resale value on replaced item: $
Monday, June 16, 2014
E,%
EQUIPMENT REPLACEMENT PLAN 2015 thm 2019
City of Hopkins, MN
Project # 01 -ERP -0103a
Project Name Fire/Duty Chief & Utility Leased Vehicles (5)
Future
Department Fire
Contact Fire Chief
Type
Equipment
Useful Life
4 years
Category
Vehicles
Priority
n/a
Description I
Total Project Cost: $627,938
3roposal to switch from owned to leased utility and squad vehicles for fire department use. - 4 year leases on each vehicle
2015 - Ford F150 - General Use ($6,486 annual)
2015 - Ford Explorer - two to be used by two duty chiefs ($6,560 annual each)
one replaced vehicle used by Sandon that belongs to the City of Edina
one will replace the Chevy Impala currently used
'.017 - Ford Explorer - two to be used by Fire Chief & Asst Fire Chief ($6,560 annual each)
Current vehicle - 2006 Durango used by Asst Chief Mackey
Current vehicle - 2010 Chevy Tahoe used by Fire Chief
need to budget for outfitting the vehicles - $5,000 each
Justification
fur current fleet of vehicles is becoming aged and is in need of replacement over the next couple of years. This replacement is scheduled into the
mrrent ERP but at a rate that will not allow us to replace vehicles in a timely manner and will continue to keep older and maintenance intensive
7ehicles in the fleet. The department's current vehicle replacement structure means vehicles are kept in the department for 10+ years. Keeping the
7ehicles for this extended period of time greatly increased the cost of maintenance and often requires much more costly maintenance procedures.
3y switching to a leasing program this will ensure that vehicles are replaced at 4 years allowing us to avoid the costly repairs associated with these
elder vehicles. Maintenance is also built into this program, at a substantial savings over our current expenditures. Engaging in a leasing program is
)v far the most cost effective wav to accomDlish the goal of fleet replacement.
Expenditures 2015 2016 2017 2018 2019 Total Future
Vehicles 19,606
19,606
32,707
32,707
32,707
137,333
490,605
Total 19,606
19,606
32,707
32,707
32,707
137,333
Total
Funding Sources 2015
2016
2017
2018
2019
Total
Future
Equipment Replacement Fund 19,606
19,606
32,707
32,707
32,707
137,333
490,605
Tom 19,606
19,606
32,707
32,707
32,707
137,333
Total
Budget Impact/®ther
Jariance from 20 year plan - New item. Projected savings of a least $43,324 over 18 year period, actual savings could be compounded through the
equity of leased vehicles due to lower mileage and reuse of some emergency equipment between up -fits of vehicles.
Monday, June 16, 2014
43
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0103b
Project Name Outfit Duty Chief Leased Vehicles (5)
Future
Description
'ost to outfit leased vehicles
'.015 - lease one Ford F-150 utility vehicle
?015 - lease two Ford Explorers for duty crews
'.017 - lease two Ford Explorers for Fire Chief and Asst. Fire Chief
Justification
,eased vehicles need to be outfitted for use by Fire Dept.
Department
Fire
Contact
Fire Chief
Type
Equipment
Useful Life
4 years
Category
Vehicles
Priority n/a
Total Project Cost: $100,000
Expenditures
2015 2016
2017 2018
2019
Total
Future
Vehicles
10;000
10,000
10,000
30,000
70,000
Total
10,000
10,000
10,000
30,000
Total
Funding Sources
2015 2016
2017 2018
2019
Total
Future
Equipment Replacement Fund
10,000
10,000
10,000
30,000
70,000
Total
10,000
10,000
10,000
30,000
Total
Budget Impact/Other
variance from 20 year plan - New item. Cost of outfitting new leased vehicles for Fire Dept.
Monday, June I6, 2014
44
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0106
Project Name Aerial Truck
Future
Department Fire
Contact Fire Chief
Type Equipment
Useful Life 20 years
Category Vehicles
Priority n/a
Description Total Project Cost: $2,559,597
ane hundred foot aerial ladder truck with a 1500 GPM fire pump and a full compliment of ground ladders. Lease payments due 2009-2018 on
'.008 purchase of Pierce Aerial Truck. Payments due semi-annually each April 23 and October 23.
'urrent vehicle: 2008 Pierce Arrow XT Aerial Ladder (#109)
Justification
Jchicle was purchased in 2008 at a total cost of $870,427.08 including mounted equipment. Vehicle was paid using $445,427.08 in ERP cash and
i 10 -year capital lease of $425,000. At the end of the lease term payments (P&I) will total $542,170. Total costs of aerial including cash
)ayments equals $987,597.
Prior Expenditures
770,729 Equipment
Total
Prior Funding Sources
770,729 Bonds/Lease
Total
2015 2016 2017 2018 2019 Total Future
54,217
54,217
54,217
54,217
216,868
1,572,000
Tom 54,217
54,217
54,217
54,217
216,868
Total
2015
2016
2017
2018 2019
Total
Future
54,217 54,217 54,217 54,217 216,868 1,572,000
Total 54,217 54,217 54,217 54,217 216,868 Total
from 20 year plan - .Lease payments on financing added to the plan.
salvage/resale value on replaced item: $
Monday, June 16, 2014
:R
EQUIPMENT REPLACEMENT PLAN 2015 ffim 2019
Department Fire
City of Hopkins, MN Contact Fire Chief
Project # 01 -ERP -0107 Type Equipment
Useful Life 15 years
Project Name Air Compressor h Category Equipment
Future Priority n/a
Description Total Project Cost: $89,300
Che air compressor is used to fill breathing apparatus that has been used by Fire personnel after training and fires.
Justification
Expenditures 2015
2016 2017
2018 2019 Total
Future
Equipment
34,900
34,900
54,400
Total
34,900
34,900
Total
Funding Sources 2015
2016 2017
2018 2019 Total
Future
Equipment Replacement Fund
34,900
34,900
54,400
Total
34,900
34,900
Total
Budget Impact/Other
Jariance from 20 year plan - move back to 2017
?stimate salvage/resale value on replaced item - $
'urchased: 1996
:
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0108
Project Name Self Contained Breathing Apparatus (SCBA) (45)
Future
Description
3reathing apparatus for interior firefighting for firefighters.
Department Fire
Contact Fire Chief
Type Equipment
Useful Life 10 years
Category Equipment
Priority n/a
Total Project Cost: $752,000
Justification
Che breathing apparatus was taken out of the ERP in 2006 because we thought we were getting a grant. Grant was not successful. The SCBA's
45) need to be replaced because they are at the end of their life and cannot be hydro tested any longer.
Prior Expenditures 2015
2016 2017
2018 2019 Total
Future
166,000 Equipment
250,000
250,000
336,000
Total Total
250,000
250,000
Total
Prior Funding Sources 2015
2016 2017
2018 2019 Total
Future
166,000 Equipment Replacement Fund
250,000
250,000
336,000
Total Total
250,000
250,000
Total
Budget Impact/Qther
Jariance from 20 year plan - New item.
?stimate salvage/resale value on replaced item: $
47
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0109
Project Name Extrication Tool (2)
Future
Description
lydraulic rescue and extrication tool with spreader, cutters and hydraulic ram.
Department Fire
Contact Fire Chief
Type Equipment
Useful Life 10 years
Category Equipment
Priority n/a
Total Project Cost: $177,200
Justification
k11 vehicle and industrial rescue situations which will require patient disentanglement or entrapment. This tool wil be added to the purchase of the
luick attack pumper. The tool will be scaled down to a smaller tool, possibly reducing cost.
Prior Expenditures 2015
2016 2017 2018 2019
Total
Future
42,600 Equipment
27,400
27,400
107,200
Total Total
27,400
27,400
Total
Prior Funding Sources 2015
2016 2017 2018 2019
Total
Future
42,600 Equipment Replacement Fund
27,400
27,400
107,200
Total Total
27,400
27,400
Total
Budget Impact/Other
Jariance from 20 year plan - move back from 2015 to 2019.
?stimate salvage/resale value on replaced item: $1,000
'urchased: 2007
48
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 thm 2019
City of Hopkins, MN
Project # 01 -ERP -0112
Project Name Thermal Imaging Camera (2)
Future
Department Fire
Contact Fire Chief
Type Equipment
Useful Life 10 years
Category Equipment
Priority n/a
Description Total Project Cost: $92,900
Jsed by our fire companies to locate victims trapped in a smoke filled building. It helps us determine where fire and heat may be hidden allowing
or faster extinguishment.
ote: purchased 2003 & 2007
Justification
'urrent camera is ten years old and has been through many hot fires and needs to be replaced. Current camera was purchased with donation
Prior Expenditures 2015
2016 2017 2018
2019 Total
Future
26,500 Equipment
12,900
12,900
53,500
Total Total
12,900
12,900
Total
Prior Funding Sources 2015
2016 2017 2018
2019 Total
Future
26,500 Equipment Replacement Fund
12,900
12,900
53,500
Total Total
12,900
12,900
Total
Budget Impact/Other
variance from 20 year plan - department owns 2 cameras. Previously one one was included in the replacement plan. This will add to the
eplacement schedule the camera purchased from the Fire Dept budget in 2003.
?stimate salvage/resale value on repalced item: $-0-
Monday, June 16, 2014
49
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0114
Project Name Floor Scrubber
Future
Description
loor scrubber to keep apparatus floors clean.
2004 Tennant 5400
Justification
icrubber is used to keep apparatus floors clean so that floor will last longer.
Department
Fire
Contact
Fire Chief
Type
Equipment
Useful Life
12 years
Category
Equipment
Priority
n/a
Total Project Cost: $34,600
Expenditures
2015 2016
2017 2018 2019 Total
Future
Equipment
14,300
14,300
20,300
Total
Funding Sources
Equipment Replacement Fund
14,300
2015 2016
14,300
14,300
2017 2018 2019 Total
14,300
Total
Future
20,300
Total
14,300
14,300
Total
ice from 20 year plan - Eliminate sweeper and add scrubber as scrubber is used more.
from 2016 to 2015
ite salvage/resale value on replaced item: $0
Monday, June 16, 2014
50
EQUIPMENT REPLACEMENT PLAN 2015 ffim 2019
7� �1V � Department Fire
1VJ
City of Hopkins, Contact Fire Chief
Project # 01 -ERP -0116 Type Equipment
Useful Life 6 years
Project Name Workout Equipment - Elitical
h Category Equipment
Future Priority n/a
Description Total Project Cost: $29,600
Workout equipment used in Fire Department workout room. One eliptical machine replaced on a 6 year cycle, one every 3 years.
Justification
Chis equipment is available to all City employees for health and wellness.
Expenditures
2015 2016
2017 2018 2019 Total
Future
Equipment
5;800
5,800
23,800
Total
5,800
5,800
Total
Funding Sources
2015 2016
2017 2018 2019 Total
Future
Equipment Replacement Fund
5,800
5,800
23,800
Total
5,800
5,800
Total
Budget Impact/Other
Variance from 20 year plan - had two eliptical machines in the ERP. One was replaced along with the stairmaster with a summit trainer. The
'emaining eliptical is scheduled for replacement in 2015.
?stimate salvage/resale value on replaced item: $
Monday, June 16, 2014
A'
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0117
Project Name Workout Equipment- Treadmill #1
Future
Description
Workout equipment used in Fire Department workout room.
ane summit trainer replaced on a 5 year cycle.
2010 Summit Trainer - will be replaced with a treadmill
Justification
Chis equipment is available to all City employees for health and wellness.
Prior Expenditures
5,000 Equipment
Total
Department
Fire
Contact
Fire Chief
Type
Equipment
Useful Life
5 years
Category
Equipment
Priority
n/a
Total Project Cost: $34,300
2015 2016 2017 2018 2019 Total Future
5,800 5,800 23,500
Total 5,800 5,800 Total
Prior Funding Sources
2015 2016
2017 2018 2019 Total
Future
5,000 Equipment Replacement Fund
5,800
5,800
23,500
Total Total
5,800
5,800
Total
from 20 year plan - replaces stairmaster.
salvage/resale value on replaced item: $
6Y:
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0118
Project Name Workout Equipment- Treadmill #2
Future
Description
Workout equipment used in the Fire Department workout room.
ane treadmill replaced on a 5 year cycle.
Justification
Chis equipment is available to all City employees for health and wellness.
Department Fire
Contact Fire Chief
Type
Equipment
Useful Life
5 years
Category
Equipment
Priority
n/a
Total Project Cost: $34,300
Prior Expenditures 2015
2016 2017 2018
2019 Total
Future
5,000 Equipment
5,800
5,800
23,500
Total Total
5,800
5,800
Total
Prior Funding Sources 2015
2016 2017 2018
2019 Total
Future
5,000 Equipment Replacement Fund
5,800
5,800
23,500
Total Total
5,800
5,800
Total
Budget Impact/Other
Jariance from 20 year plan - move back one year from 2011 to 2012.
?stimate salvage/resale value on replaced item: $
53
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0119
Project Name Workout Equipment- Weight Lifting
Future
Description
imith machine - weight lifting machine.
Department
Fire
Contact
Fire Chief
Type
Equipment
Useful Life
5 years
Category
Equipment
Priority n/a
Total Project Cost: $29,300
Justification
or use by Police, Fire, Public Works, City staff to keep in shape to perform job duties and stay healthy. Current machine will be 7 years old in
!012. Suggested replacement is every 5 years.
Expenditures
2015 2016
2017 2018 2019 Total
Future
Equipment
5;800
5,800
23,500
Total
5,800
5,800
Total
Funding Sources
2015 2016
2017 2018 2019 Total
Future
Equipment Replacement Fund
5,800
5,800
23,500
Total
5,800
5,800
Total
Budget Impact/Other
Jariance from 20 year plan - move back from 2011 to 2015
?stimate salvage/resale value on replaced items: $
54
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0120
Project Name Automated External Defibrillator (2)
Future
Description
)efibrillator is used to help get someones heart restarted during a cardiac arrest.
awn 2 - both are replaced at one time due to changing technology.
Department
Fire
Contact
Fire Chief
Type
Equipment
Useful Life
4 years
Category
Equipment
Priority
n/a
Total Project Cost: $60,600
(Current equipment: 2010 - 4 AEDs I
2010 ERP had 2 AEDs schedule for replacement at $6,000. Four were purchased.
Justification
With changes in technology, the AED's should be replaced every four years.
Cost - $3,000 per unit
Prior Expenditures
13,200 Equipment
Total
2015 2016 2017 2018 2019 Total Future
7,800 7,800 39,600
Total 7,800 7,800 Total
Prior Funding Sources 2015
2016 2017 2018 2019
Total
Future
13,200 Equipment Replacement Fund
7,800
7,800
39,600
Total Total
7,800
7,800
Total
from 20 year plan - adjustment from 3 years to 4 years.
salvage/resale value on replaced item: $
61i
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0122
Project Name Workout Equipment -Dumb Bells
Future
Description
Workout equipment used in Fire Department workout room.
Department
Fire
Contact
Fire Chief
Type
Equipment
Useful Life
10 years
Category
Equipment
Priority n/a
Total Project Cost: $11,700
Justification
'urrent dumb bells are 15 plus years old. The current dumb bells are older and some of the weights contained lead based plaint. This purchase
vould update our dumb bells to the current type fitness bells.
Expenditures 2015
2016 2017 2018
2019 Total
Future
Equipment
5,000
5,000
6,700
Total
5,000
5,000
Total
Funding Sources 2015
2016 2017 2018
2019 Total
Future
Equipment Replacement Fund
5,000
5,000
6,700
Total
5,000
5,000
Total
Budget Impact/Other
Jariance from 20 year plan - Move back from 2014 to 2017.
?stimate salvage/resale value on replaced item: $
67:
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 thm 2019
City of Hopkins, MN
Project # 01 -ERP -0400
Project Name 4x43/4 Ton Truck
Future
Department HRA
Contact Unassigned
Type
Equipment
Useful Life
8 years
Category
Vehicles
Priority
n/a
Description Total Project Cost: $148,400
1 wheel drive 3/4 ton truck to be used by Public Housing maintenance staff. Includes snow plow.
vehicle: 2007 Chevrolet
Justification
for Public Housing Superintendent and snow plowing at various HRA properties around the city.
Prior Expenditures
2015 2016
2017 2018 2019 Total
Future
22,800 Vehicles
32,400
32,400
93,200
Total
Total 32,400
32,400
Total
Prior Funding Sources 2015 2016 2017 2018 2019 Total Future
22,800 HRA - Housing and 32,400 32,400 93,200
Redevelopment Authority
Total Total
Total 32,400 32,400
Budget Impact/Qther
Jariance from 20 year plan - none
?stimate salvage/resale value on replaced item: $1,800
57
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Project # 01 -ERP -1002
Project Name Pavilion Arena Scoreboard
2015 thru 2019
Department Pavilion
Contact Facilities Director
Type Equipment
Useful Life 20 years
Category Equipment
Future Priority n/a
Description Total Project Cost: $12,000
krena scoreboard used for hockey, lacrosse, soccer and other activities in the arena.
Justification
Che current scoreboard was purchased and installed during the original construction of the Pavilion in 1990. The current scoreboard is outdated
and is hard to find qualified repair personnel and replacement parts.
Expenditures 2015
2016 2017
2018 2019 Total
Equipment
12,000
12,000
Total
Funding Sources 2015
12,000
2016 2017
12,000
2018 2019 Total
PA - Pavilion Fund
12,000
12,000
Total
12,000
12,000
from 20 year plan - New item
salvage/resale value on replaced item: $
58
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0200
Project Name Marked Patrol Vehicles (6)
Future
Department Police
Contact Police Chief
Type
Equipment
Useful Life
3 years
Category
Vehicles
Priority
n/a
Description Total Project Cost: $3,279,900
vlarked patrol vehicles used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties.
consists of 6 patrol vehicles - 5 marked, 1 unmarked.
vehicles: (3) 2011 Ford Crown Victorias, (2) 2010 Ford Crown Victorias, (1) 2009 Ford Crown Victoria
Justification
;et up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for
'outine and emergency operations. Vehicles contain secure seating for prisoner transport.
Prior Expenditures
2015
2016
2017
2018
2019
Total
Future
868,100 Vehicles
90,000
90,000
98,000
98,000
98,000
474,000
1,937,800
Total
Total 90,000
90,000
98,000
98,000
98,000
474,000
Total
Prior Funding Sources
2015
2016
2017
2018
2019
Total
Future
868,100 Equipment Replacement Fund
90,000
90,000
98,000
98,000
98,000
474,000
1,937,800
Total Total
90,000
90,000
98,000
98,000
98,000
474,000
Total
Budget Impact/Other
Jariance from 20 year plan - cost modified due to new models of squads which need to be re -outfitted for all equipment.
?stimate salvage/resale value on replaced item: $4,000 each
Monday, June 16, 2014
59
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0201
Project Name Sergeant's Vehicle
Future
Department Police
Contact Police Chief
Type
Equipment
Useful Life
4 years
Category
Vehicles
Priority
n/a
Description Total Project Cost: $322,200
vlarked patrol vehicle used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties.
1 year rotation.
vehicle: 2011 Ford Crown Victoria
Justification
;et up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for
'outine and emergency operations. Vehicles contain secure seating for prisoner transport.
Prior Expenditures
2015 2016
2017 2018 2019
Total
Future
33,600 Vehicles
45;000
50,600
95,600
193,000
Total
Total 45,000
50,600
95,600
Total
Prior Funding Sources
2015 2016
2017 2018 2019
Total
Future
33,600 Equipment Replacement Fund
45,000
50,600
95,600
193,000
Total Total
45,000
50,600
95,600
Total
Budget Impact/Other
variance from 20 year plan - cost modified due to new model of car which will require all new equipment.
?stimate salvage/resale value on replaced item: $3,500 each
Monday, June 16, 2014
60
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0202
Project Name Parking Enforcement Vehicle (Parking Fund)
Future
Description
'arking enforcement vehicle.
Department
Police
Contact
Police Chief
Type
Equipment
Useful Life
10 years
Category
Vehicles
Priority
n/a
Total Project Cost: $82,500
Current vehicle: 2006 Jeep Liberty (#211)
Justification
Use by parking enforcement officers in the course of their duties enforcing parking regulations in the downtown area.
Prior Expenditures
18,700 Vehicles
Total
2015 2016 2017 2018 2019 Total Future
27,200 27,200 36,600
Tom 27,200 27,200 Total
Prior Funding Sources 2015
2016 2017
2018 2019 Total
Future
18,700 Equipment Replacement Fund
27,200
27,200
36,600
Total Total
27,200
27,200
Total
from 20 year plan - amount allocated is not sufficient. Increase to $27,200.
salvage/resale value on replaced item: $1,500
Monday, June 16, 2014
61
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0204
Project Name Police Administrative Vehicles (2)
Future
Description
'olice administration (chief, captian), Investigative Sergeant, and Detective vehicles.
Chief s vehicle - even numbered years
Captain's vehicle - odd numbered years
Department Police
Contact Police Chief
Type
Equipment
Useful Life
2 years
Category
Vehicles
Priority
n/a
Total Project Cost: $846,913
ve 2014 - Chief vehicle to be leased for 4 years - 2yr for chief and 2yr for Investigative Sergeant. In year 3 the Chief will get a new leased
and use for two years before again passing the vehicle down to the Investigative Sergeant who will use it for another 2 years.
ve 2015 - Captain vehcile to be leaed for 4 years - 2yr for captain and 2yr for Detective 0. In year 3 of lease the Capitain will get a new
vehicle, use for 2 years before passing down to Detective 93 who will use it for another two years.
are 4 leased vehicles accounted for in this ERP item
vehicles: 2013 Ford Taurus, 2011 Ford Taurus 021
Justification
Jnmarked vehicles, equipped with radios, siren and red grille lites used by chief and captain. Staff use is for two years. Vehicles are then rotated
town to detectives and are kept for an additional 3-4 years. Vehicles are also used for surveillance by uniform and plain clothes officers.
Prior Expenditures
303,394 Vehicles
Total
2015 2016
11,923 16,794
Total 11,923 16,794
2017 2018
21,999 22,655
21,999 22,655
2019
23,329
23,329
Total Future
96,700 446,819
96,700 Total
Prior Funding Sources
2015
2016
2017
2018
2019
Total
Future
303,394 Equipment Replacement Fund
11,923
16,794
21,999
22,655
23,329
96,700
446,819
Total Total
11,923
16,794
21,999
22,655
23,329
96,700
Total
Budget Impact/Other
Variance from 20 year plan - starting in 2014 chiefs vehcile will be leased and in 2015 the captians will be leased.
?stimate salvage/resale value on replaced item: $4,000 each for current vehicles not leased.
Monday, June 16, 2014
62
EQUIPMENT REPLACEMENT PLAN 2015 ffim 2019
City of Hopkins, MN
Project # 01 -ERP -0204a
Project Name Police Admin Cars - outfit leased vehicles
Future
Description
'ost to outfit leased police chief and captains cars
Department Police
Contact Police Chief
Type Equipment
Useful Life
Category Vehicles
Priority n/a
Total Project Cost: $105,000
Justification
Me need to account for the cost to outfit the vehicles that are leased. Estimated cost is $5,000 per new vehicle.
'hief & Captain get a new vehicle every other year.
Year 3 & 4 of chief lease - investigative sergeant
Year 3 & 4 of captain lease - detective
ince one is purchased each year the cost is estimated at $5,000 per vehicle per year.
Prior Expenditures
2015
2016
2017
2018
2019
Total
Future
5,000 Equipment
5,000
5,000
5,000
5,000
5,000
25,000
75,000
Total
Total 5,000
5,000
5,000
5,000
5,000
25,000
Total
Prior Funding Sources
2015
2016
2017
2018
2019
Total
Future
5,000 Equipment Replacement Fund
5,000
5,000
5,000
5,000
5,000
25,000
75,000
Total Total
5,000
5,000
5,000
5,000
5,000
25,000
Total
Budget Imlpact/Qther
Variance from 20 year plan: Cost of outfitting chiefs and captain's vehicles is now accounted for separately from the vehicle purchase since the
lehicles are now leased.
Monday, June 16, 2014
63
EQUIPMENT REPLACEMENT PLAN 2015 thm 2019
City of Hopkins, MN
Project # 01 -ERP -0205
Project Name SWAT Vehicle
Future
Description
Jnmarked van to transport police tactics team for high risk calls, training and mutual aid.
TWAT - Special Weapons And Tatics
Current vehicle: 1998 Chevrolet Cube Van (#240)
Justification
Previous vehicle (15 years old) was a safety hazard and was replaced in 2005.
Department
Police
Contact
Police Chief
Type
Equipment
Useful Life
15 years
Category
Vehicles
Priority
n/a
Total Project Cost: $127,900
Expenditures 2015
2016 2017
2018 2019 Total
Future
Vehicles
50,000
50,000
77,900
Total
Funding Sources 2015
Equipment Replacement Fund
50,000
2016 2017
50,000
50,000
2018 2019 Total
50,000
Total
Future
77,900
Total
50,000
50,000
Total
from 20 year plan - Increase cost from 30,000 to 50,000
salvage/resale value on replaced item: $3,000
64
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0206
ProjeetName Drug Task Force Vehicle
Future
Department
Police
Contact
Police Chief
Type
Equipment
Useful Life
4 years
Category
Vehicles
Priority
n/a
Description Total Project Cost: $284,951
Drug Task Force Vehicle
Effective in 2014 this vehicle will be leased for 4 years
2 years as a DTF vehicle
2 years as Detective #1 vehicle
(This accounts for the lease for 2 vehicles)
Justification
Previously in the NW Metro DTF which provided a vehicle.
Now in SW Metro DTF and we need to provide our own vehicle.
Prior Expenditures
4,694 Vehicles
Total
2015 2016 2017 2018 2019 Total Future
6,189
11,074
11,074
11,740
11,740
51,817
228,440
Tom 6,189
11,074
11,074
11,740
11,740
51,817
Total
51,817
228,440
Total Total
6,189
11,074
Prior Funding Sources
2015
2016
2017
2018
2019
Total
Future
4,694 Equipment Replacement Fund
6,189
11,074
11,074
11,740
11,740
51,817
228,440
Total Total
6,189
11,074
11,074
11,740
11,740
51,817
Total
from 20 year plan: New for 2014
65
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0206a
Project Name Drug Task Force Vehicle -outfit leased vehicle
Future
Description
'ost to outfit leased Drug Task Force vehicle
Department Police
Contact Police Chief
Type Equipment
Useful Life
Category Vehicles
Priority n/a
Total Project Cost: $55,000
Justification
Ye need to account for the cost to outfit the vehicles that are leased. Estimated cost is $5,000 per new vehicle.
vehicle will be replaced every 2 years with the 2nd two years of the lease going to a Detective.
Prior Expenditures 2015
2016 2017
2018 2019
Total
Future
5,000 Equipment
5,000
5,000
10,000
40,000
Total Total
5,000
5,000
10,000
Total
Prior Funding Sources 2015
2016 2017
2018 2019
Total
Future
5,000 Equipment Replacement Fund
5,000
5,000
10,000
40,000
Total Total
5,000
5,000
10,000
Total
Budget Impact/Other
iariance from 20 year plan: Cost of outfitting DTT vehicles is now accounted for separately from the vehicle purchase since the vehicle is now
iow leased.
Monday, June 16, 2014
66
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0210
Project Name School Resource Officer Car
Future
Department
Police
Contact
Police Chief
Type
Equipment
Useful Life
4 years
Category
Vehicles
Priority
n/a
Description Total Project Cost: $270,308
Focus Vehicle
(Focus on Crime Using Strategies)
Effective in 2015 this vehicle will be leased for 4 years
2 years as a Focus vehicle
2 years as Detective #2 vehicle
(This accounts for the lease for 2 vehicles)
Justification
This is the street crime/undercover vehicle. Previously did not have a car for this purpose.
Expenditures
2015
2016
2017
2018
2019
Total
Future
Equipment
6;000
6,000
11,205
11,205
11,879
46,289
224,019
Tom
Funding Sources
Equipment Replacement Fund
6,000
2015
6;000
6,000
2016
6,000
11,205
2017
11,205
11,205
2018
11,205
11,879
2019
11,879
46,289
Total
46,289
Total
Future
224,019
Total
6,000
6,000
11,205
11,205
11,879
46,289
Total
from 20 year plan: New for 2015
67
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0210a
Project Name School Resource Ofcr Car -outfit leased vehicle
Future
Description
'ost to outfit leased Focus vehicle
Department
Police
Contact
Police Chief
Type
Equipment
Useful Life
5,000
Category
Vehicles
Priority n/a
Total Project Cost: $50,000
Justification
7Ve need to account for the cost to outfit the vehicles that are leased. Estimated cost is $5,000 per new vehicle.
ocus vehicle will be replaced every 2 years with the 2nd two years of the lease going to a Detective
Expenditures
2015 2016
2017 2018
2019
Total
Future
Equipment
5,000
5,000
5,000
15,000
35,000
Total
5,000
5,000
5,000
15,000
Total
Funding Sources
2015 2016
2017 2018
2019
Total
Future
Equipment Replacement Fund
5,000
5,000
5,000
15,000
35,000
Total
5,000
5,000
5,000
15,000
Total
Budget Impact/Other
Variance from 20 year plan: Cost of outfitting Focus vehicle is now accounted for separately from the vehicle purchase since the vehicle is now
iow leased.
Monday, June 16, 2014
68
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0211
Project Name Network Server (3)
Future
Department Police
Contact Police Chief/IT
Type
Equipment
Useful Life
3 years
Category
Equipment
Priority
n/a
Description Total Project Cost: $402,000
'omputer servers store information and system programs.
ane server @ $15,000 (to be purchased for digital squad car cameras storage and retrieval - see 01 -ERP -213)
Justification
knnual replacement cycle allows development of system storage program. Use of newer servers for heavy use programs while older servers used
or data storage.
Prior Expenditures
2015
2016
2017
2018
2019
Total
Future
102,000 Equipment
15,000
15,000
15,000
15,000
15,000
75,000
225,000
Total
Total 15,000
15,000
15,000
15,000
15,000
75,000
Total
Prior Funding Sources
2015
2016
2017
2018
2019
Total
Future
102,000 Equipment Replacement Fund
15,000
15,000
15,000
15,000
15,000
75,000
225,000
Total Total
15,000
15,000
15,000
15,000
15,000
75,000
Total
Budget Ifnpact/Qther
Variance from 20 year plan - Increase from 8,500 to 15,000. Software licensing has become more expensive. We are paying half our server
)udget for required software and 8,500 isn't enough anymore.
?stimate salvage/resale value on replaced item - $
Monday, June 16, 2014
69
EQUIPMENT REPLACEMENT PLAN 2015 thru 2019
City of Hopkins, MN
Project # 01 -ERP -0214
Project Name Tactical Ballistic Vests
Future
Department Police
Contact Police Chief
Type
Equipment
Useful Life
5 years
Category
Equipment
Priority
n/a
Description I
Total Project Cost: $179,500
Cactical ballistic vests worn by members of the Hopkins Police Department High-risk Entry and Assault Team (HEAT). These vests offer a higher
evel of protection against weapon assault than the regular duty ballistic vest.
11 - 2008 Titan Tactical Ballistic Vests
Justification
ederal and State grant monies have been available through the Ballistic Vest Program over the past several years. These grants only pay a portion
)f the total cost of the vest, leaving the Police Department to pay the balance. There is no guarantee that these grants will be available in the future
JVarranty on the current vests expires in 2013.
'ost: 11 vests
Prior Expenditures 2015
2016 2017 2018 2019
Total
Future
43,200 Equipment
26,900
26,900
109,400
Total Total
26,900
26,900
Total
Prior Funding Sources 2015
2016 2017 2018 2019
Total
Future
43,200 Equipment Replacement Fund
26,900
26,900
109,400
Total Total
26,900
26,900
Total
Budget Iolpact/Qther
Variance from 20 year plan - Team membership has increased to 11.
?stimate salvage/resale value on replaced item: $
70
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 thru 2019
City of Hopkins, MN
'roject # 01 -ERP -0215
'roject Name Radios -Portable and Mobile Devices
Future
Department
Police
Contact
Police Chief
Type
Equipment
Useful Life
Equipment
Category
Equipment
Priority
n/a
Description I
Total Project Cost: $583,600
'ortable and mobile radios used by the police, fire and public works departments to allow these departments to communicate on one frequency.
'olice and fire use their radios on a daily/regular basis. The public works only uses theirs in the event of an emergency.
?stimated Replacement Cost (based on 2012 cost)
Portable - $3,800 x 111 = $421,800
Mobile - $4,100 x 26 = $106,600
Total Radios $528,500
Installation of mobile $ 71,600 est
Grand Total $600,000 target budget
Police Fire PW Total
Portable 65 46 0 111 PW radios went to Fire as PW wasn't using them.
Mobile 17 9 0 26
'olice Est Cost $363,500
ire Est Cost $236,500
'ub Works Est Cost $ 0
Justification
'rovides radios so that the police, fire and public works can communicate on a common radio frequency during an emergency and multiple county
ile radios were replaced in police cars due to new model cars:
- replaced in Captain car, squad #3, & #5 (3 = $12,300)
- replace in Squad #1, #2, PSO, Chief, DTF (5 = $20,500)
- replace in squad #4, #6, Sergeant, (3 = $12,300) - Captian & Schl Res Ofcr funded
through a different line item now that these vehicles are leased
- replace in squad parking (1 = $4,100)
- some cars are duplicated as thev are moved down to investieators
Prior
Expenditures
2015
2016
2017 2018
2019 Total
32,800
Equipment
12;300
4;100
534;400
550,800
Total
Prior
Total
Funding Sources
12,300
2015
4,100
2016
534,400
2017 2018
550,800
2019 Total
32,800
Total
Equipment Replacement Fund
Total
12,300
12,300
4,100
4,100
534,400
534,400
550,800
550,800
ariance from 20 year plan - Radio's have a 7-10 year life expectancy. Due to new squad models and the placement of the radios we needed to
xy a new model of radio to fit into the squads..
stimate salvage/resale value on replaced item: $0
Monday, June 16, 2014
rf'
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0217
Project Name Taser Replacement
Future
Department Police
Contact Police Captain
Type
Equipment
Useful Life
4 years
Category
Equipment
Priority
3lmportant
Description I
Total Project Cost: $119,300
Che police department will need to replace all of its X26 Tasers (ECD) Electronic Control Devices including all software and HD Camera systems
and transition to the new X2 Tasers.
Justification
Che current Tasers will need to be replaced due to the age and use of the equipment.
Prior Expenditures 2015
2016 2017 2018
2019 Total
Future
18,600 Equipment
20,900
20,900
79,800
Total Total
20,900
20,900
Total
Prior Funding Sources 2015
2016 2017 2018
2019 Total
Future
18,600 Equipment Replacement Fund
20,900
20,900
79,800
Total Total
20,900
20,900
Total
Budget Ilmpact/Other
Jsing the numbers obtained from Tasers Bob Lovering, the cost breaks down as shown below
X2 Tasers
$7,600.00
HD Cams
$3,999.60
4yr Warranty/X2
$2,399.92
4yr Warranty/Cam
$1,199.96
i Blade Tech Holsters
$ 359.70
i6 Cartridges
$1,621.20
)ownload Kit
$ 14.95
;hipping
$ 120.00
Total
$17,315.33 (plus tax)
w/Tax est $18,575
NJ,
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
Department Police
City of Hopkins, M1V7�� Contact Police Chief/IT
Type Equipment
Useful Life 4 years
Category Equipment
Future Priority n/a
Description Total Project Cost: $85,000
3uilding Video Server hardware and associated software is used to store video recorded by the cameras in and around the police department
ncluding interview rooms as well as booking. We record approximately 6 TB of video every 2-3 weeks. Large amounts of storage are required
or 30 days of archival storage on the server itself.
Justification
vlaintenance agreement with software vendor needs to be renewed every three years. Computer hardware should be refreshed around the same
ime to mimimize drive failure and take advantage of new storage technology.
Expenditures 2015 2016 2017 2018 2019
Equipment 17,000 17,000
Total 17,000 17,000
Funding Sources 2015 2016 2017 2018 2019
Drug Task Force Funds 17,000
Equipment Replacement Fund
Total 17,000
17,000
17,000
Total Future
34,000
51,000
34,000
Total
Total
Future
17,000
51,000
17,000
Total
Budget Ifnpact/Qther
Variance from 20 year plan - New item. Current equipment was purchased with DTF funding as will the 2015 replacement. Beginning in 2019 it
vill be funded with ERP funds.
?stimate salvage/resale value on replaced item: $-0-
Monday, June I6, 2014
73
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0710
Project Name 4X4 1/2 Ton Truck
Future
Description
'ickup used by various divisions of Public Works.
Justification
eight hauling and transportation for supervisors. Maintenance garage service vehicle.
Department Public Works: Bldg/Equip Ser
Contact Public Works Director
Type
Equipment
Useful Life
10 years
Category
Vehicles
Priority
n/a
Total Project Cost: $96,700
Prior Expenditures 2015
2016 2017 2018 2019
Total
Future
23,300 Vehicles
31,300
31,300
42,100
Total Total
31,300
31,300
Total
Prior Funding Sources 2015
2016 2017 2018 2019
Total
Future
23,300 Equipment Replacement Fund
31,300
31;300
42,100
Total Total
31,300
31,300
Total
Budget Impact/Qther
Jariance from 20 year plan - move up from 2009 to 2008 - Fire Dept has requested to acquire surplus pickup for its use by daytime responders.
?stimate salvage/resale value on replaced item: $1,500
Monday, June 16, 2014
74
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0807
Project Name Trucksters (3)
Future
Department
Public Works: Parks/Forestry
Contact
Public Works Director
Type
Equipment
Useful Life
15 years
Category
Equipment
Priority
n/a
Description Total Project Cost: $145,440
Fruckster used by Parks Division of Public Works for ballfield and parks maintenance.
1996 Toro Workman W818), 2004 Toro Workman 3200 (9820), 2004 Toro Workman 2110
Justification
'ark maintenance, ballfield grooming and weed spraying.
Prior Expenditures
40,900 Equipment
Total
2015 2016 2017 2018 2019 Total Future
34,200 34,200 70,340
Tom 34,200 34,200 Total
Prior Funding Sources 2015
2016 2017 2018 2019
Total
Future
40,900 Equipment Replacement Fund
34,200
34,200
70,340
Total Total
34,200
34,200
Total
e from 20 year plan - Move from 2013 to 2014.
salvage/resale value on replaced item: (3) $1,400 each
to $11,000 to purchase a electric style workman.
rV
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project 9 01 -ERP -0808
Project Name Riding Mowers (2)
Future
Description
tiding mowers used by Parks Divison of Public Works.
2004 Toro Zero Turn (8826), 2006 Jacobson
Justification
dowing city parks and right of ways.
Mower (9823)
Department Public Works: Parks/Forestry
Contact Public Works Director
Type
Equipment
Useful Life
8 years
Category
Equipment
Priority
n/a
Total Project Cost: $169,000
Prior Expenditures
2015
2016 2017
2018 2019 Total
Future
49,000 Equipment
11,000
20,000
31,000
89,000
Total
Total 11,000
20,000
31,000
Total
Prior Funding Sources
2015
2016 2017
2018 2019 Total
Future
49,000 Equipment Replacement Fund
11,000
20,000
31,000
89,000
Total Total
11,000
20,000
31,000
Total
Budget Impact/Other I
variance from 20 year plan - move back from 2014 to 2015. Move back from 2015 to 2016.
estimate salvage/resale value on replaced item: $600 each
Monday, June 16, 2014
re
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0809
Project Name Slope Mower
Future
Description
2001 DEW EZE ATM72 Slope Mower
Justification
Department
Public Works: Parks/Forestry
Contact
Public Works Director
Type
Equipment
Useful Life
15 years
Category
Equipment
Priority
n/a
Total Project Cost: $83,600
Expenditures 2015
2016 2017
2018 2019 Total
Future
Equipment
32,700
32;700
50,900
Tom
Funding Sources 2015
Equipment Replacement Fund
32,700
2016 2017
32,700
32,700
2018 2019 Total
32,700
Total
Future
50,900
Total
32,700
32,700
Total
from 20 year plan - none
salvage/resale value on replaced item: $1,000
77
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0811
Project Name Turf Sweeper
Future
Description
Curf sweeper used by Parks Division of Public Works.
Justification
ipring and fall leaf pick up, debris pick up.
Department Public Works: Parks/Forestry
Contact Public Works Director
Type Equipment
Useful Life 15 years
Category Equipment
Priority n/a
Total Project Cost: $57,600
Prior Expenditures 2015
2016 2017 2018 2019
Total
Future
11,600 Equipment
18,000
18,000
28,000
Total Total
18,000
18,000
Total
Prior Funding Sources 2015
2016 2017 2018 2019
Total
Future
11,600 Equipment Replacement Fund
18,000
18,000
28,000
Total Total
18,000
18,000
Total
Budget Impact/Qtier
Jariance from 20 year plan - move from 2001 to 2003 - current unit in good condition.
?stimate salvage/resale value on replaced item: $1,500
Monday, June 16, 2014
78
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Project # 01 -ERP -0812
Project Name Stump Cutter
Future
Description
hump cutter used by Parks Division of Public Works.
Current equipment: 1997 Vermeer Stump Cutter (#832)
Justification
Chipping out stumps of trees removed from city property.
2015 thru 2019
Department Public Works: Parks/Forestry
Contact Public Works Director
Type Equipment
Useful Life 20 years
Category Equipment
Priority n/a
Total Project Cost: $21,200
Expenditures 2015
2016 2017 2018
2019 Total
Equipment
21,200
21,200
Total
Funding Sources 2015
21,200
2016 2017 2018
21,200
2019 Total
Equipment Replacement Fund
21,200
21,200
Total
21,200
21,200
Budget Imlpact/Other
Jariance from 20 year plan - extend to 20 years to reflect actual.
?stimate salvage/resale value on replaced item: $1,800
79
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0815
Project Name Skid Loader
Future
Description
2004 Bobcat 463
Justification
Department
Public Works: Parks/Forestry
Contact
Public Works Director
Type
Equipment
Useful Life
12 years
Category
Equipment
Priority
n/a
Total Project Cost: $77,600
Expenditures 2015
2016 2017 2018
2019 Total
Future
Equipment
32,000
32,000
45,600
Total
Funding Sources 2015
Equipment Replacement Fund
32,000
2016 2017 2018
32,000
32,000
2019 Total
32,000
Total
Future
45,600
Total
32,000
32,000
Total
from 20 year plan - new item in 2004.
salvage/resale value on replaced item: $
80
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 thm 2019
City of Hopkins, MN
Project # 01 -ERP -0816
Project Name Toolcat
Future
Department Public Works: Parks/Forestry
Contact Public Works Director
Type
Equipment
Useful Life
8 years
Category
Equipment
Priority
n/a
Description I
Total Project Cost: $295,100
Jse by Public Works for snow removal, skating rinks, sweeping, ballfield maintenance and transportation of people and materials.
vehicle: 2010 Bobcat (9815)
Justification
few machine.
Prior Expenditures 2015
2016 2017 2018 2019
Total
Future
50,000 Equipment
63,300
63,300
181,800
Total Total
63,300
63,300
Total
Prior Funding Sources 2015
2016 2017 2018 2019
Total
Future
50,000 Equipment Replacement Fund
63,300
63,300
181,800
Total Total
63,300
63,300
Total
Budget Iulpact/Qtier
Jariance from 20 year plan - New item which replaces one tractor.
?stimate salvage/resale value on replaced item: $
81
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 thru 2019
City of Hopkins, MN
Project # 01 -ERP -0817
Project Name Grass Seed Applicator (Overseeder)
Future
Department
Public Works: Parks/Forestry
Contact
Public Works Director
Type
Equipment
Useful Life
15 years
Category
Equipment
Priority
n/a
Description Total Project Cost: $29,400
'ull behind overseeder used to seed grass into established turf areas to build thicker grass in athletic fields and fill in spots that thin from overuse.
Justification
ields like Maetzold that are premier fields get constant use and require overseeding to maintain thick playable turf and non -irrigated fields such as
Valley Park also benefit from a turf management plan that includes overseeding. Have been borrowing an overseeder from Minnetonka but run
nto use conflicts as both communities need the overseeder during the same period between seasons and missed opportunities to seed are
ronortunities lost until next season.
Expenditures 2015 2016 2017 2018 2019 Total Future
Equipment 11,500 11,500 17,900
Total 11,500 11,500 Total
Funding Sources 2015 2016 2017 2018 2019 Total Future
Equipment Replacement Fund 11,500 11,500 17,900
Total 11,500 11,500 Total
Budget Impact/Qther
Variance from 20 year plan - New item.
?stimate salvage/resale value on replace item: $-0-
82
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 thru 2019
City of Hopkins, MN
Project # 01 -ERP -0301
Project Name 4X4 3/4 Ton Truck with Plow
Future
Description
{A ton pickup used by Street Divison of Public Works for heavy loads and pulling trailers.
Current vehicle: 2006 Ford F250 (11302)
Justification
Light hauling, pulling trailers, transportation to and from job sites.
Prior Expenditures
24,000 Vehicles
Total
Department
Public Works: Streets/Traffic
Contact
Public Works Director
Type
Equipment
Useful Life
8 years
Category
Vehicles
Priority
n/a
Total Project Cost: $141,700
2015 2016 2017 2018 2019 Total Future
30,400 30,400 87,300
Total 30,400 30,400 Total
Prior Funding Sources
2015 2016
2017 2018 2019 Total
Future
24,000 Equipment Replacement Fund
30,400
30,400
87,300
Total Total
30,400
30,400
Total
from 20 year plan - Unit in good condition - move out 2 years.
salvage/resale value on replaced item: $1,500
83
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0302
Project Name 4x2 1 Ton Dump Truck
Future
Description
Cruck used in the Street Division of Public Works.
Current vehicle: 2006 Ford F350 Pickup (#307)
Justification
Plows alleys in winter, light hauling, snow removal and transportation.
Prior Expenditures
30,500 Equipment
Total
Department
Public Works: Streets/Traffic
Contact
Public Works Director
Type
Equipment
Useful Life
12 years
Category
Equipment
Priority
n/a
Total Project Cost: $162,900
2015 2016 2017 2018 2019 Total Future
54,600 54,600 77,800
Tom 54,600 54,600 Total
Prior Funding Sources 2015
2016 2017 2018 2019
Total
Future
30,500 Equipment Replacement Fund
54,600
54,600
77,800
Total Total
54,600
54,600
Total
Variance from 20 year plan - change from 4x4 to 4x2 truck. Reduce cost to $30,500. Move up from 2008 to 2006. Extend useful life from 8 to
12 years.
Estimate salvage/resale value on replaced item: $3,500
Monday, June 16, 2014
84
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MN
Project # 01 -ERP -0305
Project Name Single Axle Dump Truck (3)
Future
Description
Tingle axle dump truck used by various division of Public Works.
Current vehicles: 2001 Ford L7501 (#313) & 2005 Freightliner M2 106 (9312)
Justification
Vehicle used for heavy hauling, snow plowing and sanding.
Adding additional single axle truck in place of tandem truck from 01 -ERP -306.
Prior Expenditures
207,400 Vehicles
Total
Department
Public Works: Streets/Traffic
Contact
Public Works Director
Type
Equipment
Useful Life
17 years
Category
Vehicles
Priority
n/a
Total Project Cost: $674,100
2015 2016 2017 2018 2019 Total Future
124,000 124,000 342,700
Total 124,000 124,000 Total
Prior Funding Sources 2015
2016 2017 2018 2019
Total
Future
207,400 Equipment Replacement Fund
124,000
124,000
342,700
Total Total
124,000
124,000
Total
triance from 20 year plan - Move 1 truck from tandem (was in 101 -ERP -306) to single axle for 2012.
timate salvage/resale value on replaced item: $4,500 each
e would then have 3 single axel (chagne from 2) dump truck and 1 tandem axel dump truck.
Monday, June 16, 2014
85
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0306
Project Name Tandem Dump Truck
Future
Description
dump truck used in Streets Division of Public Works.
Current vehicles: 1998 Ford LT8500 Tandem (9314)
Justification
Trucks used for heavy hauling, snow plowing and sanding.
Prior Expenditures
22,000 Vehicles
Total
Department
Public Works: Streets/Traffic
Contact
Public Works Director
Type
Equipment
Useful Life
17 years
Category
Vehicles
Priority
n/a
Total Project Cost: $481,500
2015 2016 2017 2018 2019 Total Future
173,200 173,200 286,300
Tom 173,200 173,200 Total
Prior Funding Sources 2015
2016 2017 2018
2019 Total
Future
22,000 Equipment Replacement Fund
173,200
173,200
286,300
Total Total
173,200
173,200
Total
from 20 year plan - Move from 2018 to 2017.
salvage/resale value on replaced item: $-0-
86
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0307
Project Name Water Truck
Future
Description
]Vater truck used in Streets and Parks Division of Public Works.
Current vehicle: 1995 Ford Water Truck (#316)
Justification
Used for street flushing, watering trees and plants, rink flooding and standby fire protection.
Prior Expenditures
45,000 Vehicles
Total
Department
Public Works: Streets/Traffic
Contact
Public Works Director
Type
Equipment
Useful Life
22 years
Category
Vehicles
Priority
n/a
Total Project Cost: $195,000
2015 2016 2017 2018 2019 Total
150,000
150,000
Total 150,000 150,000
Prior Funding Sources 2015 2016 2017 2018 2019 Total
45,000 Equipment Replacement Fund 150,000 150,000
Total Total 150,000 150,000
Budget Impact/Qthel
Variance from 20 year plan - replace tanker only in 2010 - replace tanker, cab & chassis in 2017, tanker only again in 2032 and entire vehicle in
2039. Change to a 22 year life.
Estimate salvage/resale value on replaced item: $8,500
Monday, June 16, 2014
87
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0309
Project Name Skid Loader (2)
Future
Description
,oading trucks, landscape work, snow removal, material handling.
Justification
Department
Public Works: Streets/Traffic
Contact
Public Works Director
Type
Equipment
Useful Life
12 years
Category
Equipment
Priority
n/a
Total Project Cost: $258,900
2004 Bobcat S-185 IR Skid Loader (#324) & 2011 Bobcat S650 Skid -Steer Loader
Prior Expenditures
36,000 Equipment
Total
2015 2016 2017 2018 2019 Total Future
41;900 41,900 181,000
Tom 41,900 41,900 Total
Prior Funding Sources 2015
2016 2017
2018 2019 Total
Future
36,000 Equipment Replacement Fund
41,900
41,900
181,000
Total Total
41,900
41,900
Total
from 20 year plan - move back from 2010 to 2011.
salvage/resale value on replaced item: $
88
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0312
Project Name Roller
Future
Description
Jsed by Street Department for asphalt repair and resurfacing.
1989 Ingersoll Rand Roller
Justification
Department
Public Works: Streets/Traffic
Contact
Public Works Director
Type
Equipment
Useful Life
20 years
Category
Equipment
Priority
n/a
Total Project Cost: $127,900
Expenditures 2015
2016 2017
2018 2019 Total
Future
Equipment
45;900
45,900
82,000
Total
Funding Sources 2015
Equipment Replacement Fund
45,900
2016 2017
45,900
45,900
2018 2019 Total
45,900
Total
Future
82,000
Total
45,900
45,900
Total
from 20 year plan - Move back from 2014 to 2016.
salvage/resale value on replaced item: $
89
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0313
Project Name Striper
Future
Description
eine striper.
1993 Line Striper A1990
Justification
Department
Public Works: Streets/Traffic
Contact
Public Works Director
Type
Equipment
Useful Life
12 years
Category
Equipment
Priority
n/a
Total Project Cost: $27,200
Expenditures 2015
2016 2017 2018
2019 Total
Future
Equipment
11;200
11,200
16,000
Total
Funding Sources 2015
Equipment Replacement Fund
11,200
2016 2017 2018
11,200
11,200
2019 Total
11,200
Total
Future
16,000
Total
11,200
11,200
Total
from 20 year plan - none
salvage/resale value on replaced item: $
90
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0314
Project Name Asphalt Paver
Future
Description
ksphalt paver used by Streets Division of Public Works.
1994 Caterpillar AD200B Paver
Justification
Saving streets and parking lots.
Department
Public Works: Streets/Traffic
Contact
Public Works Director
Type
Equipment
Useful Life
20 years
Category
Equipment
Priority
n/a
Total Project Cost: $138,800
Expenditures 2015
2016 2017
2018 2019 Total
Future
Equipment
48;800
48,800
90,000
Tom
Funding Sources 2015
Equipment Replacement Fund
48,800
2016 2017
48,800
48,800
2018 2019 Total
48,800
Total
Future
90,000
Total
48,800
48,800
Total
from 20 year plan. Move back from 2014 to 2015
salvage/resale value on replaced item: $500
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
Department Public Works: Streets/Traffic
City of Hopkins, MN Contact Public Works Director
Project # 01 -ERP -0317 Type Equipment
Useful Life 10 years
Project Name Sign Machine (Traffic) Category Equipment
Future Priority n/a
Description Total Project Cost: $31,500
dahcine used by the Traffic Division of Public Works to make traffic signs and related signs and decals for general city use.
2005 Signcad Sign Making System (#353)
Justification
?xisting machine is not repairable and needs updating/
Expenditures 2015
2016 2017
2018 2019 Total
Future
Equipment
13,400
13,400
18,100
Total
13,400
13,400
Total
Funding Sources 2015
2016 2017
2018 2019 Total
Future
Equipment Replacement Fund
13,400
13,400
18,100
Total
13,400
13,400
Total
Budget Impact/Other
Jariance from 20 year plan - Move back to 2016
?stimate salvage/resale value on replaced item: $-0-
MA
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0900
Project Name Refuse Truck (RAP -R) (2)
Future
Description
Zefuse truck used by Refuse Utility Division of Public Works.
'urent vehicle: 2005 Peterbilt
Justification
Zesidential waste pick up.
Prior Expenditures
349,100 Vehicles
Total
Prior Funding Sources
349,100 RF - Refuse Fund
Total
Rail (#901) & 2011
Rail
Department
Refuse
Contact
Public Works Director
Type
Equipment
Useful Life
10 years
Category
Vehicles
Priority
n/a
Total Project Cost: $1,462,600
2015 2016 2017 2018 2019 Total Future
204;800 204,800 908,700
Total 204,800 204,800 Total
2015 2016 2017 2018 2019 Total Future
204;800 204,800 908,700
Total 204,800 204,800 Total
from 20 year plan - increase cost to reflect actual
salvage/resale value on replaced item: $18,000
93
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0901
Project Name Refuse Truck (Rear -L)
Future
Description
Zefuse truck used by Refuse Utility Division of Public Works.
'urrent vehicle: 1996 Freightliner FL70
Justification
Zesidential waste pick up.
Department
Refuse
Contact
Public Works Director
Type
Equipment
Useful Life
10 years
Category
Vehicles
Priority
n/a
Total Project Cost: $238,100
Expenditures 2015
2016 2017
2018 2019 Total
Future
Vehicles
101,600
101,600
136,500
Total
Funding Sources 2015
RF - Refuse Fund
101,600
2016 2017
101,600
101,600
2018 2019 Total
101,600
Total
Future
136,500
Total
101,600
101,600
Total
from 20 year plan. Move back one year to evaluate needs.
salvage/resale value on replaced item: $9,000
94
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0551
Project Name 3/4 Ton Utility Truck
Future
Description
{A ton utility truck used by the Water/Sewer Division of Public Works.
Department
Sewer
Contact
Public Works Director
Type
Equipment
Useful Life
10 years
Category
Vehicles
Priority
n/a
Total Project Cost: $129,800
JCurrrent vehicle: 2007 Chevrolet Pickup (#505)
Justification
Transportation to and from job sites, box carries tools used by personnel for job site repairs and light hauling.
Prior Expenditures
51,000 Vehicles
Total
2015 2016 2017 2018 2019 Total Future
33,600 33,600 45,200
Total 33,600 33,600 Total
Prior Funding Sources 2015
2016 2017
2018 2019 Total
Future
51,000 SF - Sanitary Sewer Fund
33,600
33,600
45,200
Total Total
33,600
33,600
Total
from 20 year plan - none
salvage/resale value on replaced item: $2,500
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0555
Project Name Generator (2)
Future
Description
'ortable generator used by Water/Sewer Divisions of Public Works.
1997 Kohler Generator, 2008 Caterpillar C15
Justification
?mergency back up generator for lift stations and pumps, off site power for lights and welding.
Department
Sewer
Contact
Public Works Director
Type
Equipment
Useful Life
25 years
Category
Equipment
Priority
n/a
Total Project Cost: $49,400
Expenditures 2015
2016 2017 2018
2019 Total
Future
Equipment
26,400
26,400
23,000
Total
Funding Sources 2015
SF - Sanitary Sewer Fund
26,400
2016 2017 2018
26,400
26,400
2019 Total
26,400
Total
Future
23,000
Total
26,400
26,400
Total
from 20 year plan - none
salvage/resale value on replaced item: $2,500
�I:
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0500
Project Name 1/2 Ton Truck
Future
Description
Frucks used by Water Department.
'urrent vehicle: 2007 Chevrolet
Justification
Prior Expenditures
20,500 Vehicles
Total
Prior Funding Sources
20,500 WF - Water Fund
Total
Department
Water
Contact
Public Works Director
Type
Equipment
Useful Life
10 years
Category
Vehicles
Priority
n/a
Total Project Cost: $83,300
2015 2016 2017 2018 2019 Total Future
26,800 26,800 36,000
Total 26,800 26,800 Total
2015 2016 2017 2018 2019 Total Future
26,800 26,800 36,000
Total 26,800 26,800 Total
from 20 year plan - none
salvage/resale value on replaced item: $
97
Monday, June 16, 2014
EQUIPMENT REPLACEMENT PLAN 2015 Mm 2019
City of Hopkins, MIST
Project # 01 -ERP -0501
Project Name 3/4 Ton Utility Truck
Future
Description
{A ton utility truck used by the Water Division of Public Works.
Department
Water
Contact
Public Works Director
Type
Equipment
Useful Life
10 years
Category
Vehicles
Priority
n/a
Total Project Cost: $81,800
Current vehicle: 2006 Chevrolet Pickup
Justification
Transportation to and from job sites, box carries tools used by personnel for job site repairs and light hauling.
Expenditures 2015 2016 2017 2018 2019 Total Future
Vehicles 34,900 34,900 46,900
Tom 34,900 34,900 Total
Funding Sources 2015 2016 2017 2018 2019 Total Future
WF - Water Fund 34,900 34,900 46,900
Total 34,900 34,900 Total
from 20 year plan - none
salvage/resale value on replaced item: $2,500
98
Monday, June 16, 2014
TWENTY-YEAR
REPLACEMENT SCHEDULE
99
--qca
City or Hops
Will
1]am-14
IT-ATIDN FACTOR 10%
EQUIPMIF'Ni TREPLACEND:NTSCHEDUL:
REPL
EQUIPMENT NEHICLES YRS
2015 2016 201] 2018 2019
2020
2021 2022 2023
2- 2025 2- 2027 2028 2029 2030 2031 2032 2033 2034
ACITVITY CENTER
ERP -030 Copy-ffime(tobe heal)
ERP -031 ReGigaatu/Era'za
30
1
ERP 032 Swvd Sym®
15 8,800
13700
HRP -033 Tables
SUBTOTAL
15 1200
19,000
21,000
1
32]00
ARTS CENTER
ERP -1100 Copy M ffime(Iasal)
ERP -1101 CmpaExhazfa
10
5200
7,000
ERP -1102 Kitch® Cmaivg Egvipm®t
12
7,100
ERP -1103 Vidm Camas Updabs
5 3,7()()
i,-
5,000 5,800
ERP -1104 Tlo-Projata
5 17,100
]9,800
22,-
2900
ERP -1105 ly Raav AN
M
] 11,()W
13,500
16,bOD
D1=1-b.
ERP-110fi DigJal Ivfmvatiov 9igo
M1
5 25000
2,300
2,]00 3,100
ERP -110] Th—Pryatiov Svc
]0
6]00 9,000
ERP -1108 Th-Prmm.ffi M ,h-
fi
7,100
8500 10,200
HRP -1109 Flaa Savbba
to 8,000
10,800
21,700 17,100
13,700
18,700 19,800
6,700 18,500 15,600 22,90() 16,600 8,900 17,200 9,000
CITY HALL ADMEN
ERP -003 N-kUpgrade
1 15,000 15,000 15,000 15,000 15,000
15,000
15,000 15,000 15,000
15,000 15,0()0 15,000 15,0()0 15,000 15,000 15,000 15,000 15,000 15,000 15,000
ERP -004 Phove s-8
76,000
76,()00
93,500
EPR.. Fivevael6oftwme
7
ER - Cavpvtav
3-5 3(),000 3(),000 3(),000 3D,- .,WD
30,000
30,000 3(),000 30,000
3(),000 3D,O. 3D,O. 3(),000 3D,000 30,000 30,00() 30,00() 30,000 30,0()0 30,0()0
ERP -009 NtlwakIvfiash -Upgrade
15
23,400
ERP -012 -N-k SWit
6 12,000
14,300 1],000
EQUIPMENT SUBTOTAL
121,000 45,000 45,000 57,000 45,000
45,000
45,000 fi8,400 121,000
59,300 45,000 45,000 45,000 45,000 45,000 62,MO 138,500 45,000 45,000 45,000
COMMUNITY SER110ES
EAP -0O] M®v Copia (lea i)
ERP -002 Smill Copia (tobekasal)
ERP-0O8Doeum®[Mg�vt 6vavva(2)
4 10,000
11,300
12,700 14,300 16,000
EAP -0]0 Elstim Badha
20
ERP oil Ela .H vipm-
to
EQUIPMENT SUBTOTAL
i iw
11,300
1270() 14,300 16,000
101
REPL
EQL]PME\T NEMCLES YRS
2015
2016
201]
2018
2019
2020
2021
2022
2023
2028
2025 2026
202]
2028
2029 2030
2031
2032
2039 2034
FIRE
ERP -100
TeleSquik E-2 ]0
b5D,000
8]3,500
ERP -101
Fire Puapa EJ 20
]22,400
ERP-103Duly
ChiefVdkle 5
ERP-_
Fi ty Chief&] ityL JVeLi 4
19606
19606
32,]0]
32,]0]
32,]0]
32,]0]
32,]0]
32,]0]
32,]0]
32,]0] 32,]0]
32,]0]
32,]0]
32,]0] 32,]0]
32,]D]
32,]D]
32,]D] 32,]0]
ERP -]036
Outfit Duty Chie L�.sxl V hicks 4
10,000
1D,000
10,0011
]0,0110
10,000
1O,D00
1D,000
10,000
]0,0110
10,-
0,000ERP-1D5
I- ID5
Quick Attack Puapa/Rawe R I0
314,500
422,600
ERP -106
Aaial Thick L-9 20
54217
54217
54217
54,217
1,572,000
VEHICLES SUBTOTAL
83,823
73,823
746,924
86,924
42,]0]
32,]0]
42,]0]
34],20]
42,]0]
32,]0]
42,]0] ]55,10]
916,20]
1,604,]D]
42,]D] 32,]D]
42,]0]
4553D7
42,]D] 32,]0]
ERP -]0]
Air Cavpr- 15
31,900
54,4W
ERP -108
-thmg Appavms(45)(SCBA) W
25D,000
336,000
ERP -109
Ealricffiiw Twl(2) 10
2],400.
30,-
36,90D
403DD
ERP -110
Copy Nmchme (tobe l��)
ERP -112
Tharnal laagmg Csaaa (2) 10
12,900
15,-
17,400
20,]00
ERP -]]3
Em g -Z preparalvecs 6hm 20
38,5W
ERP -114
Flaw Saubba 12
14,-
203W
ERP -]]6
Wakwl Equip - Eliptiml 6
5,800
6,]00
],800
9300
ERP -117
Wakwt Equip-TreadaiR 41 5
5800
6,7.],800
9000
ERP118Wakwt
Equip-Tr�dain42 5
5,800
6,]00
]800
90D0
ERP -119
Wakwt Equip-Waght Lifting 5
5,800
6,]00
7,800
91OOD
ERP120Defi
BW(2) 4
7,800
8,600
9300
10,20011"m
ERP -122
Wakwt Equip-Duab Be➢s to
5000
6,]DO
ERP -215
RadiosPalabk&Mobile to -15
236,500
'
EQUIPMENT SUBTOTAL
31,700
284,900
260,200
7,800
27,400
13400
6,]00
45300
15400
15,wo 383,800
60,000
36,900 28,200
54,400
49300
30,000 11,500
POLICE
ERP -200
Squad 41 4204 3
49,OW
53,]00
58,]00
64,000
]0,000
]6,600
ERP -200
Squad 42 420] 3
49,-
13,7.58,]00
64,000
]D,-
76,60D
ERP -200
Squad 43 4208 3
45000
49000
53,]00
58,]00
64,000
]0,000
]6,500
ERP -200
Squad *IT3
450D0
49000
53,]00
58,]00
64,000
70,OW
]6,60D
ERP -2011
Squad 45 4229 3
4500D
49000
53,]00
58,]00
64,000
]0,00076,1W
ERP -200
Squad 46 4200 3
45000
49,DW
53,7W
58,70D
64-
]O,-
]6,600
ERP-201Sag-drick
4209 4
45000
50,600
5],000
64,000
72000
ERP_
Parking Vehicle 4211 to
2]200
36,600
ERP -203
PSOUfilh- 4212 660,400
]2,100
86,100
ERP -204
Ad Car 4 (chief) -l�sal 2
5,923
klW
6,100
6,470
6,470
6,8]0
6,870
]29D
7,29D
],]30
7,730 8200
820D
8,7W
8,7W 9230
9230
9,]90
9]90 10390
ERP -204a
Outfi--i Ad Car
5,OOD
5WD
S,ODO
S,ODO
S,ODO
5000
50D0
5,000
5,000
5,w0
Chiefcar to lw Sergeant -teasel 2
4,694
4,694
4,98D
4,98D
5280
5280
5,600
5,600
5900
5900 6,30D
630D
6,690
6,690 ],IW
],IOD
],530
],530 ],990
ERP -204
Adaw Car 4218 (captain) 2
6,000
6,000
63]0
63]0
6,]50
6,750
7,160
7,160
],600
],6W
8,060 8,060
8,560
8,560
9080 9080
9,630
9630
1D220 10220
ERP -204a
OutfilLasal Adaw Car
5000
5,w
5000
5000
5,wo
5000
5wo
5,wo
5000
5000
Capt car to D-we3-t-s 2
4,835
4,835
5,129
5,129
5440
5440
5770
5770
6,100 6,100
6,500
6,500
6,900 6,900
]300
]300
7,]50 7,]50
ERP -206
Drug Task Face -1 1 2
6,189
6,380
6380
6,]60
6,]60
],180
],180
],610
],610
8,D8D
8,080 8,5]D
8,5]D
9090
9090 96-
9640
10230
10230 10,850
I__�
OutfitL� iDTF rer
5,000
5,"
5,000
5000
5,000
S,ODO
5'"
5000
0D
50D
5000
--
OTFfo DB wel-l-s 2
4,694
4,694
4,980
4,980
5,280
5280
5600
5600
5900
5900 63006,3W
6,690
6,690 ],100
],100
7,53D
],530 ],990
ERP -210
ch
Sool RerourceCar -lase] 2
6,000
6,000
6,3]0
6,3]0
6,750
6,750
7,160
7,160
],600
],600
8 ,060 8,060
8,560
8,560
9080 9080
9,630
9630
10,220 10,220
ERP -210a
OutfilL
5000
5,w0
5000
5000
5000
5000
5000
5000
5000
School Rrnwree cart. -m e2 -1-s 2
4,835
4,835
5,129
5129
1'-
5440
5,]70
5,]]0
6,100 6,100
6,500
6,500
6,900 6,900
7,300
]300
],]50 7,750
ERP -205
SWATVdricle 4210 15
0,ow
77,90D
ERP -206
police Svcs Li -ffimh de19a1 15
VE£3ICLES SUBTOTAL
169112
211,068
152278
153600
205548
226,168
167210
168,]00
23]240
181,750
183,330 301390
261,490
199290
213,130 215,030
366,830
318210
234220 23G160
ERP -208
Cavputa Sysfan 20
ERP-2091apy
Machme(tobel��)
ERP -210
Log Recede (del.x ERP) 7
ERP -211
-k Sava(3) 3
15000
15000
15000
15000
15000
15,W0
15000
15000
15000
15000
15,000 15000
15000
15,Dw
15000 15000
15000
15000
15000 15000
ERP -212
Mobile Data CanpulasDig"lCeases 7148,500
148,500
ERP214
Tactical Bani9 Vems(9) 5
26�OD
31,200
36200
42,000
ERP-215RadiosPatabm&Mobile
12,300
4,100
297,900
ERP -216
911Phwe Sys (Vipa)(del9ad)
ERP217Tasa
Repmcan®t 4
20,900
23,500
26500
29,80D
ERP -218
Building Vidw Sava 4
17,-
17,000
17,000
17,000
17,000
EQUIPMENT SUBTOTAL
44,300
19100
333,800
41,900
32,000
15000
187,000
15000
63,200
15000
41,500 15000
32,000
199700
44,800 15,ow
32,OW
15,000
57,000 15000
102
P.W. STREETS/TRAFFIC
ERP -300 4x43/4Tov T.ck/Pl- 10 28,9. 38,8.
ERP -301 —3/4— .&M— 8 30,400 38,5. 4S,8.
ERP -302 4x21 T- Dm Tmrk 12 54,6. ]],8.
ERP -303 1 T® Dump Tmck 12 49,5.
ERP -303 1T.D pT.& 12 51400 76,1.
ERP -304 1T. Bmv—& 17 136,-
305 Siegle Axle Dome T.& 17 132,100
ERP -305 Siegle Axk Dump T.& 17 1.,—
ERP-305 Smgle Axle Dm T.& 17 210,600
ER 1. Tavd,v Dump T.& 17 173200 2.,-
-307 Water T.& 22 150,.0
ERP -308 Frmt Evd Load, 15 268,000
ERP308—Evd Load, 18 268,600
—1. Skid Laada 12 41,9. 59,7.
ERP -309 Skid Laada 12 50,0. 713.
ERP310 Grad, 20 ]w3.
ERP -311 9wapa 20 156,400
—112 Roll, 20 45,900
ERP -313 Strip, 12 112. 16,0.
ERP -314 Paver 20 48,800
ERP -315 Svow Bkw 20
ERP -316 Traiki 20
ERP317Sip ffime 10 13,4.
ERP -318 Asphalt Het NSx Heafivg Box 12 22,1.
ERP -319 Reg®aatese kSwap, 20
VEHICLES SLBTOTAL 30,4. 150,0. .4,.0 1]8,600 288,500 103,.0 3360W 716. 167,300 18100 268,.0 59,7. 3.,0. ]],800 48,800 38,8. 433,7.
103
EQL]PME\T NEHICLES YRS
2015 201fi 201] 2018
2019 2020 2021 2022 2023 202A 2025 2026
P.W. ADARN
ERP -215
Radios-Patabk&Mobile
P.W. BLDGJEOUkm,3 T SVCS
ERP -]]0
12T.Tmck 10
313.
ERP- 11
VeLicle Waeha 12
8300
313.
8,300
P.W. ENGINEERING
ERP -]00
Evgweaivg V. 10
25900
28,900
P.W. PARKS & FORESTRY
ERP SGO
12 T. T.& to
35,-
-01
4x43/4Tov—& 8
42,6.
ERP SGI
—/4T.T.& 8
42,6.
ERP -802
3/4 T.I ffity Tmdc to
ERP -804
Log T.& (SG%w/Refu=e) 15
818.
—05
Aerial Lift 20
ERP -806
E 807
T.— 30
Truckma (N818) 15
E 807
Tr &—(4820) 15
ERP -80]
Tr &c (4821) 15
112.
ERP�O8
Ilidivg Mov, (H823) 8
209.
253.
ERPSO8
Ridivg Moxa(N826) 8
11000
13,9.
EAP�09
Slope Moxa (N828) 15
3257.
ERP -810
Lags TarfM (#825) 1D
92,7.
ERP 811
Ta B9w 15
ERP -812
Stmvp CLfta 20
212.
ERP$13
Brush Clipper 20
ERP 814
Traiki Elatbol 15
2,—
ERP815
9kidLmda 12
32,-
-
TM8
633.
8D2.
ERP$17
(3mas Sm Applicata 20
115.
VEHICLES—TOTAL
22,5. 52,7. 53,200 81,300
342. 180,1. 81800 49,3. 25,300 802.
P.W. STREETS/TRAFFIC
ERP -300 4x43/4Tov T.ck/Pl- 10 28,9. 38,8.
ERP -301 —3/4— .&M— 8 30,400 38,5. 4S,8.
ERP -302 4x21 T- Dm Tmrk 12 54,6. ]],8.
ERP -303 1 T® Dump Tmck 12 49,5.
ERP -303 1T.D pT.& 12 51400 76,1.
ERP -304 1T. Bmv—& 17 136,-
305 Siegle Axle Dome T.& 17 132,100
ERP -305 Siegle Axk Dump T.& 17 1.,—
ERP-305 Smgle Axle Dm T.& 17 210,600
ER 1. Tavd,v Dump T.& 17 173200 2.,-
-307 Water T.& 22 150,.0
ERP -308 Frmt Evd Load, 15 268,000
ERP308—Evd Load, 18 268,600
—1. Skid Laada 12 41,9. 59,7.
ERP -309 Skid Laada 12 50,0. 713.
ERP310 Grad, 20 ]w3.
ERP -311 9wapa 20 156,400
—112 Roll, 20 45,900
ERP -313 Strip, 12 112. 16,0.
ERP -314 Paver 20 48,800
ERP -315 Svow Bkw 20
ERP -316 Traiki 20
ERP317Sip ffime 10 13,4.
ERP -318 Asphalt Het NSx Heafivg Box 12 22,1.
ERP -319 Reg®aatese kSwap, 20
VEHICLES SLBTOTAL 30,4. 150,0. .4,.0 1]8,600 288,500 103,.0 3360W 716. 167,300 18100 268,.0 59,7. 3.,0. ]],800 48,800 38,8. 433,7.
103
REz'!
EQLIPMEhT NEMSYRS
2015 201fi 201J 2018 2019 2020 2021 2022 2023 2028 202.5 2026 202] 2028 2029 2030 2031 2032 2N3 2034
HRA
ERP -0o0 4x43/4Tov Tmck
8 325400 41,100 52,100
ERP -0O] Capia
8 ]6,500 20,900
SUBTOTAL
WATER
32,400 16,500 41,100 20,900 52,100
ERP -500 1J2 T®Truck]0
26,800 36000
ERP -501 3/4 T. Utility T.ok
]0 34900 46,900
ERP -502 Backhoe
20 153,700
ERP -503 Air(:mprecae
ERP-SOfi Copy-ohm,(to_l)
20 41,700
ERP -507 Tele h-Syat®
8 6,800 6,8[10 8,fi00
SUBTOTAL
SEWER
6800 61,700 6800 82,900 41,700 8,fi00 153,700
ERP -5511 4x43/417ov Thick]0
40300 54200
ERP -551 3/4 T®Utility Truck
]0 33,600 45200
ERP -552 I4 Vador
ERP -555 G®affiQ
20 1811,8110
25 26,400
ERP -555 Go-
-157 TelTh-Syat®
2523,000
8 68[111 6,800 8,600
SUBTOTAL
6800 33,fio0 26400 180,800 23,000 6800 40,300 41,200 8,fi00 54,200
REFUSE
ERP -9110 Refuse Truck (RAP -R)
]0 2111,800 2]5,2110
ERP -900 Refse Truck (R-)
10 270300 3632o0
ERP -901 RefsTruck(--L)
111 ioi,fi110 136,5D0
ERP -803 Swap Laada
20 144800
ERP -804 Lag Truck (5-
-T -AL
201,8011 1111,6011 270300 81,800 275,200 13650D 144,8011 363,2011
STOR ISEVVT.R
PAVILION
ERP -loon
12 178,000
ERP -1001 Elxtric [ce Edge
12 9,700
EAP -1002 Arnie Sem�amd
211 12,000
ERP -1003 Flaw Swbba
ERP -1004 Sm -Lift
104
EQLTPMENT NEHICLES
GENERAL FUNAVEHICLES/EQU1P 305,835 487,591 1286,802 53172A 2825455 438,975 49$417 ]01,10] fi65247 -,257 393337 1,157797 1445 fig] 2,062,497 681,577 fi96,937 526,93] 805,64] 435,02] $96,167
GENERAL FOND-0THER w- 21$ODO 359,OD0 639,DOD 1.,7. 104,401 93,OD0 23$700 128,]00 199,600 87,OD0 1.,- 443,8D0 137,000 259,000 126,70D 137,900 22A,%O 136,8W 132,000 71,SOD
HRA 32,400 16,500 41100 20,900 525100
ARTS CENTER 21700 ]],IOD 13,7OD 18,7W 19,800 6,]00 185D0 15,600 22,900 16,600 $900 17200 9,000
WATER 6,800 61,700 6800 82,900 41700 $fi00 153,700
SEWER 6,800 33600 26,4W 180,800 23,DOD 6,80D 40,3D0 452W 8,fi0D 54200
REPUSE 204,800 1O1fi00 2]0,300 81,800 275200 136,500 144,800 363200
STORMSEWER
PA m- 125000 9,000 187,7D0 13,OW 125100
GENERAL FUND'.
HRA TOTAL
ARTS CENTER Fl
UT-FUNDSI
TOTAL ALL FLT
GENERAL FUND!
NET GENERAL FL
20YEARAVERA(
ACTNITY CENTE
CITY HALL ADMI
COMMUMTY SEF
FIRE EQ---
UIPMENT
-I-.Q---
POLICEEQUIPMENT
B-
B-D QOIPMENF SERVICES EQ�
ENGEJEE -EQUIPMENT
PARKS&-STRY EQ -
STREET EQUIPMENL
GENERALFUNDVEHI--QUIPMENT
GENERAL FOND OTHER EQUIPMENT
GENERAL FUND TOTAL
HRA
ARTS CENTER FUND
WATER OTR,ITY FOND
SEWERO 7Y FUND
REFUSE
-7Y FUND
STORM SEWER --TY FUND
-v--
UTII.ITY VEFTtCLES/ QU@MENT
523,835 846,591 1,925,802 B8,- 386,856 5319]5 737,117 829,807 864,847 42],25] 493437 16D159] 1,582,69] 2,32149] 8D8,- 834,837 ]51,83] 942,44] 56],D27 96],66]
32,400 16,500 41,100 20,90D 52,1W
24,]00 17,100 13,700 18,700 19,800 6,700 1$SDO 15,600 22,900 16,600 $900 17200 9,000
218,400 147200 88,100 180,800 270,300 1D180D 13,- 49,300 275200 369,400 ffi,900 41,7W 13,000 144,8D0 380,40D 153,7W 66,30D
]99,335 993,]91 2,013,902 655,52A 386,856 ]26,4]5 100],417 9®,507 939,347 483,25] ]89,13] 1986,59] 1665,59] 2,386,09] 83],8]7 1,009,43] 1184,337 1113,347
483835 806,591 1,885,802 59$421 346,856 4919]5 69],11] ]89,80] 821,84] 38],25] 455,437 1561 597 1512,69] 2,28149] 76$2]] ]94,83] ]11,83] 9D2,447 527,D27
Tofet Av-
53,]01 2,700
1212200 fi0,fi00
64,3W 3200
1,233,3. 61,700
932W 4,-
67,700 3,400
1626,210 81,300
2,96$100 -,-
4,659,830 733-
3,92A.1
330003,926,001 -,-
18,585,831
96,300
105
--qca
City or Hops
EQUIPMENT AND BUILDING
INVENTORY
I W N
--qca
City or Hops
111M
CITY OF HOPKINS
BUILDING INVENTORY
January 2014
Location/Description Replacement Cost
City Hall & Police Station
$7,724,424
1010 1st Street S.
Fire Station
4,496,359
101 17th Avenue S.
Hopkins Activity Center
1,947,409
33 14th Avenue S.
Ice Arena/Pavilion
5,347,585
11000 Excelsior Boulevard
Arts Center
7,325,210
1111 Mainstreet
PW Admin/Garage
7,649,942
11100 Excelsior Boulevard
Moline Reservoir/Well 91
2,450,851
10421 Excelsor Boulevard
Blake Tower Reservior
1,478,791
151 Tyler Avenue South
Filtration Plant
3,603,386
1401 Elmo Park Service Road
Well 44 Workshop/Storage
694,892
1401 Elmo Park Service Road
Well 95
244,181
1205 Highway?
Well 96
325,588
801 Highway 7
Lift Station 92 - Drillane
69,461
619 Drillane Road
Lift Station 93 - Lindee's
138,777
901 Cambridge Street N.E.
Lift Station #4 - LTL Meadowbrook
101,560
244 Meadowbrook Road
Lift Station 95 - Big Meadowbrook 161,279
6601 Excelsior Blvd.
109
Location/Description Renlacement Cost
Lift Station #6 - Ronnie's
$101,560
8546 Excelsior Avenue E.
Lift Station #7 - Valley
320,926
801 6th Avenue S.
Band Shell - Downtown Park
38,391
16 9th Avenue S.
Concession Stand - Maetzold Field
159,010
1215 1 st Street N.
Park Building -Beach - Lifeguards
171,586
5200 Shady Oak Road
Park Building -Beach -Concessions
162,152
5200 Shady Oak Road
Park Shelter - Office/Bathhouse
393,880
5200 Shady Oak Road
Park Shelter - Burnes
52,405
201 Park Lane
Park Building - Central
118,960
101 17th Avenue S.
Park Building - Harley
40,310
108 Jackson Avenue S.
Park Shelter - Interlachen
64,423
220 Homedale Avenue
Park Building - Oakes
45,963
301 Tyler Avenue N.
Park Building - Valley
54,016
800 7th Avenue S.
Parking Ramp
6,650,133
10th Avenue and Mainstreet
Depot Coffee House
500,684
9451 Excelsior Boulevard
Overpass Skate Park
8,009
100 Washington Avenue
Studio
305,000
20 Shady Oak Road
Dow Towers (76 Units) HRA
22 5th Avenue S.
110
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
January 1, 2014
UNIT #
YEAR
MAKE
MODEL
VALUE
FIRE DEPARTMENT
2011
FORD
CROWN VICTORIA
100
2006
DODGE
DURANGO
$28,300
101
2003
CHEV
IMPALA
24,900
102.
1989
FORD
TELE -SQUIRT L9000
240,000
103.
2006
PETERBILT
PUMPER
403,300
104
2012
FORD
QUICK ATTACK PUMPER F550
248,500
108.
1995
CHEV
4X4 LITE RESCUE
25,000
109
2008
PIERCE
AERO XT
845,000
110
2010
CHEVROLET
TAHOE
30,000
115.
1952
MACK
PUMPER
4,000
POLICE DEPARTMENT
200.
2010
FORD
CROWN VICTORIA
$30,000
202.
2011
FORD
CROWN VICTORIA
31,000
205.
2011
FORD
CROWN VICTORIA
31,000
207.
2014
FORD
EXPLORER
47,500
208.
2013
FORD
EXPLORER
42,600
209.
2011
FORD
CROWN VICTORIA
31,000
211.
2006
JEEP
LIBERTY
18,800
212.
2008
CHEV
TAHOE
36,000
213.
2010
CHEV
IMPALA
26,000
214.
2007
DODGE
CHARGER
28,000
215.
2009
CHEV
IMPALA
25,000
216.
2011
FORD
TAURUS
30,000
217.
2008
FORD
TAURUS
22,000
218.
2013
FORD
INTERCEPTOR SUV
37,200
219.
2013
FORD
TAURUS
27,500
229.
2013
FORD
INTERCEPTOR
39,700
240.
1998
CHEV
P40 VAN
20,000
111
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
January 1, 2014
UNIT #
YEAR
MAKE
MODEL
VALUE
STREET/TRAFFIC DIVISION
301.
2013
FORD
F150
$21,000
302.
2006
FORD
F250
26,500
304.
2000
FORD
F450
34,000
305.
1997
FORD
1/2 TON
18,300
307.
2006
FORD
F350-1 TON DUMP
27,400
308.
2011
FORD
F350 - 2X4
20,300
309.
2012
FORD
F450
30,300
311.
2011
FREIGHTLINER
M2106V
79,400
312.
2005
FREIGHTLINER
SGLAX DUMP
98,000
313.
2001
FORD
L7501
72,000
314.
1998
FORD
LT 8500
86,000
316.
1995
FORD
WATER TRK
81,000
320.
1991
CATERPILLER
LOADER 926E
90,000
321.
2012
CATERPILLER
LOADER 924K
174,900
322.
2005
CATERPILLER
LOADER 938G
157,800
324.
2004
BOBCAT
SKID LOADER
30,000
325.
2011
BOBCAT
SKID STEER LOADER
38,000
326.
1989
CATERPILLAR
140-G
82,000
327.
2001
ELGIN
PELICAN SE
105,000
328.
2013
ISUZU
STREET SWEEPER
143,200
330.
1989
INGERSOL/RAND
ROLLER DD -25
23,000
337.
1994
CATERPILLAR
BOX PAVER
18,000
342.
1991
TARGET
CONCRETE SAW
2,400
344.
1996
SNOGO
WK 800
58,000
349.
1989
TRAIL -KING
TK6V-1200
3,000
350.
1993
TOWMASTER
T14
4,000
351.
2004
TENNANT
SWEEPER 3640
10,000
ENGINEERING DIVISION
700. 2002 CHEV
705. 2005 CHEV
TAHOE
IMPALA
BUILDING MAINTENANCE & EQUIPMENT SERVICES
$26,000
14,600
701. 2006 FORD 500 $16,000
702. 2004 FORD F350 23,000
704. 2005 FORD F250 24,000
112
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
January 1, 2014
UNIT #
YEAR
MAKE
MODEL
VALUE
PARKS/FORESTRY DIVISION
2004
CHEV
800.
2013
FORD
F 150
$25,400
801.
2012
FORD
F350 4X4
24,100
803.
2004
FORD
F350
23,000
804.
1995
CHEV
1 TON BOOM
16,000
805.
1998
DODGE
RAM 3500
24,000
810.
1993
INTERNATIONAL
LP 4700
50,000
811.
2006
INTERNATIONAL
LP 4600 LOG TRUCK
45,000
812.
2010
FREIGHTLINER
AERIAL LIFT
130,000
815.
2010
BOBCAT
TOOLCAT
50,000
818.
1996
TORO
TRUCKSTER
13,000
820.
2004
TORO
WORKMAN 3200
15,000
821.
2004
TORO
WORKMAN 2110
7,900
822.
2001
TORO
325-D MOWER
18,000
823.
2006
JACOBSON
MOWER
10,000
824.
1996
TORO
GROUND MASTER
16,000
825.
2010
TORO
4100D MOWER
53,000
826.
2004
TORO
Z587L
8,900
828.
2001
DEW EZE
ATM72
21,000
832.
1997
VERMEER
STUMP CTR 630A
15,400
833.
2004
BOBCAT
SKID LOADER
22,000
834.
1993
BRUSH BANDIT
CHIPPER 250
14,000
836.
RYAN
SOD CUTTER
2,000
842.
2011
P.J.
TRAILER
5,300
844.
2010
FELLING
TRAILER
4,000
845.
1997
REMACKEL
TRAILER
5,000
846.
2001
DRESSEN
8110
2,000
847.
2011
SPARKS
TILT TRAILER
5,300
411. 2007 CHEV 2500 HD $17,500
WATER/SEWER
500.
2007
CHEV
PICKUP
$22,000
501.
2004
CHEV
4X4 3/4 T SILVERADO
19,000
502.
1999
DODGE
DAKOTA 4X4
18,000
505.
2007
CHEV
CC25753
24,000
506.
2006
CHEV
SILVERADO
20,700
507.
2001
CHRYSLER
PT CRUISER
18,000
530.
2001
STERLING
VAC -CON
180,000
533.
2012
CATERPILLAR
420EH2 BACKHOE
86,500
534.
1997
KOHLER
GENERATOR/TRL
11,000
535.
1992
KOHLER
GENERATOR/TRL
10,000
536.
1989
FLEXIBLE
RODDING MACHINE
25,000
537.
2010
GENERATOR
C15
130,000
540.
2008
LEROI
AIR COMPRESSOR
12,000
542.
1994
WACKER
TAMPER
4,000
113
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
January 1, 2014
UNIT # YEAR MAKE MODEL
REFUSE
900.
2011
FREIGHTLINER
901.
2005
PETERBILT
903.
1995
FREIGHTLINER
PAVILION
802.
2012
FORD
809.
2003
OLYMPIA
RAPID -RAIL M2
320
FL -70
F350
ICE RESURFACER
114
VALUE
$211,800
162,000
54,000
$24,100
85,000