CR2014-063 - 2015-2019 Capital Improvement Plan4 °M July 15, 2014 Council Report 2014-063 City of 11op ill 2015-2019 CAPITAL IMPROVEMENT PLAN Proposed Action Staff recommends adoption of the following motion: Move to adopt the 2015-2019 Capital Improvements Plan. Adoption of this motion will authorize staff to begin efforts to implement 2015 projects by including them in the 2015 budget process, and to begin the preliminary process for their implementation. Overview The Capital Improvements Plan is a planning document intended to help the City anticipate major capital items and to consider the financial impact of proceeding with those planned improvements. Discussions have been held with the Park Board and Planning Commission, as well as the City Council, in detailing proposed and necessary improvements. Staff is recommending adoption of the plan. Primary Issues to Consider Does adoption of the CIP mean projects will be implemented? The CIP is a planning document, not an implementation action, and therefore, additional approvals will be necessary for projects to proceed. Appropriate notifications would also be made for those projects that have funding implications. Are funds available for all projects? The plan outlines funding implications if all projects are implemented. Necessary funding changes have been anticipated as part of this plan, and are recommended therein Supporting Information 2015-2019 CIP Power Point slides 2015-2019 Capital Improvements Plan Christine M. Harkess, CPA, CGFM Finance Director Financial Impact: $ projects included in budgets Budgeted: Y/N X N Source: Various Related Documents (CIP, ERP, etc.): CIP Notes: Capital Improvement Plan 2015-2019 • The Capital Improvement Plan is a tool for long range capital planning and financial projections. • The plan is reviewed annually to ensure the overall objectives of City development, assessment of project needs and the City's fiscal capabilities. • Following are highlights of the plan for 2015. • Taxes • Special assessments • Bonding • Special fees • Municipal state aid • Utilities revenues • Other governmental units • Private sector funds The impact of specific capital projects are carefully considered prior to approval of the project. • Activity Center - Fencing & landscaping - Multi-purpose Gym Improvements • Arts Center - Replace theater seats and backs - Replace information desk and kiosk - Landscaping east & west sides of building - Storage in art classroom - Kitchen hand washing sink - Paint theater • Council Chambers - Technology Improvements • Parks - Burnes Park - warming house - Oakes Park - replace picnic shelter - Oakes Park -lighting - Valley Park - storage building - Skate Park Improvements • Depot Recreation Area - Grant Funding - City Support • Pavilion - Evaporator Condenser Replacement • Public Works Building/Equipment Services - Garage upgrade - Wash bay roof replacement - Wash bay air handler replacement - Fuel management system • The city has a ....................................................................................................................................................................................................................... pavement / q CAPITAL VknnQcuNEKrvi !'^JMlbC;Wnq! management plan which provides information regarding'ki Ntl �n f y - scheduled street ,r!,1 k repairs and211 improvements'dty;�� , �� ............ • In most cases, where street reconstruction takes place, storm sewer facilities either need upgrading or replacement. - Costs are included in street project total on previous slide • 2015 Utility Projects - Storm Drainage system maintenance - Storm Water management projects • 2015 Improvements Total $25,228,110 • Funding - Arts Center Fund $ 170,610 - Capital Improvement Fund $ 150,500 - Cable Franchise Fees $ 35,000 - Other Government Units $ 20,265,000 - Pavilion $ 60,000 - Park Improvement Fund $ 212,000 - PIR/Bonding/Special Assessments $ 3,565,000 - Private Sector Funds $ 50,000 - Utility Funds $ 720,000 City of flopkims CAPITAL IMPROVEMENT PLAN 2015-2019 .., City o'q1opns iIY 'U first trees Saute + CCap xns, `tet i-757. * P ne. 952.935-8474 a; 95-9351834 Web address. aerx hop insrnn.cang DATE: July 2014 TO: Honorable Mayor and Members of the City Council FROM: Mike Mornson, City Manager SUBJECT: 2015-2019 CAPITAL IMPROVEMENT PLAN With this letter I respectfully submit the 2015-2019 Capital Improvement Plan. This five- year planning document represents the combined efforts of city staff, advisory commissions, citizens and the City Council. The Capital Improvement Plan is a five-year forecast of project needs in the City of Hopkins. It is intended to alert the Council and citizens to the major capital needs on the horizon. The first year of the plan becomes an adopted capital budget and relates almost completely to the operating budget that is approved on a yearly basis. The remaining four year represents an estimate of project needs and funding capabilities of the city. This year's plan does not include proposed equipment purchases. A document relating specifically to equipment replacement needs has been developed into a separate document. The Capital Improvement Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city's capital programming needs. At the same time, sufficient projected detail is provided to enable those who review the information to make informed decisions on the programming of projects over the next several years. Please use the information provided to formulate plans, projects and questions. The Capital Improvement Plan can serve the community best by provoking thoughts and actions. This document was developed by the Finance Department with assistance of all city departments. I want to especially thank all those involved in the development of the Capital Improvement Plan and especially Steve Stadler, Public Works Director, Kersten Elverum, Planning and Economic Development Director, Christine Harkess, Finance Director, and Debbie Sperling, Administrative Assistant for their hard work and dedication. Partnering urif6 t(te Carnncnnity to Enhance the uality of Li e + Inspire + Edtecate + Invo(ve + Communicate + CAPITAL IMPROVEMENT PLAN 2015-2019 TABLE OF CONTENTS Page City Manager's Message Table of Contents 2 Introduction Introduction and Purpose 5 Program Descriptions 27 Utilities Program 6 Transportation Program 7 Parks, Forestry, and Pavilion Program 9 General Public Buildings Program 10 Economic Development 12 Sources of Funding Sources of Funding 15 Funding Source Abreviations 18 Summary of Impacts on Major Funding Sources 21 Cash Flow Statements 39 Park Capital Improvement Fund 27 Capital Improvemetn Fund 28 Communication Fund 29 Municipal State Aid Fund 30 Permanent Improvement Revolving Fund (PIR) 31 Water Utility Fund 32 Sewer Utility Fund 33 Storm Sewer Utiltiy Fund 34 Pavilion - Ice Arena Fund 35 Five -Year Project Summaries Projects by Year 39 Department Summary 42 Projects by Department 43 Funding Source Summary 46 Projects by Funding Source 47 Project Descriptions & Narratives Economic Development 53 General Public Buildings 59 Parks & Recreation 101 Streets 123 Street Improvement Map 125 Utilities 141 `a Introduction INTRODUCTION AND PURPOSE The Capital Improvement Plan is a flexible plan based upon long-range physical planning and financial projections, which schedules the major public improvements that may be incurred by the City over the next five years. Flexibility of the Capital Improvement Plan is established through annual review, and revision if necessary. The annual review assures that the program will become a continuing part of the budgetary process and that it will be consistent with changing demands as well as changing patterns in cost and financial resources. Funds are appropriated only for the first year of the program, which is then included in the annual budget. The Capital Improvement Plan serves as a tool for implementing certain aspects of the City's comprehensive plan; therefore, the program describes the overall objectives of City development, the relationship between projects with respect to timing and need, and the City's fiscal capabilities. The Capital Improvement Plan can help assure: 1. A systematic approach to planning and initiating capital projects affording the opportunity to plan the location, timing, and financing of needed public improvements; 2. The development of a realistic program of capital spending within the City's projected fiscal capability to finance such projects, avoiding sharp change in the tax levy or bonded indebtedness; 3. The coordination of public and private improvement projects permitting adequate time for design and engineering to eliminate duplication of effort and expense; 4. The expenditure of public funds that is compatible with the City's adopted Comprehensive Plan; 5. That the public is kept informed of the proposed future projects and expenditures; 6. That private investors are aware of the City's long-range development program so that they may guide their development in a way that is compatible with the City's program; 7. Aid in achieving federal and/or state participation by providing the necessary planning and lead time necessary for a successful application in addition to meeting prerequisites needed for certain federal and state grants. PROGRAM DESCRIPTIONS In order to effectively plan for and manage the projects contained in a Capital Improvement Plan, it is necessary to group similar activities into "Program Categories". The City of Hopkins' activities are divided into four program categories which are 1) Utilities, 2) Transportation, 3) Parks, Forestry and Pavilion, and 4) General Public Buildings. The City also includes an outline of proposed expenditures for unscheduled projects. Program categories are explained in the following sections. UTILITIES PROGRAM Program Description: The Utilities Program includes the municipal water, municipal sanitary sewer, storm sewer and refuse systems. Program Goal: Provide reliable, efficient, and safe utility service to all parts of the City with a minimum of adverse effects on the environment. Subprograms: Water, sanitary sewer, storm sewer, and refuse service. I. Municipal Water System Subprogram (WA) A. Subprogram Goal: The goal of the Municipal Water System subprogram is to provide water in sufficient quantities at sufficient pressure, with a high degree of reliability and safety to all parts of the City so as to satisfy the normal demands of the general public for water while at the same time providing sufficient reserves in case of fire emergency or power outages. B. Objectives: 1. Water quality shall meet the purity standards of the Minnesota Department of Health. 2. Any hydrant on the system shall, under maximum condition, deliver no less than 500 gallons per minute with a residual pressure of 20 pounds per square inch. 3. The system shall be looped to provide maximum reliability. 4. The supply and storage system shall be designed and maintained to have maximum reliability. 11 II. Municipal Sanitary Sewer Subprogram (SA) A. Subprogram Goal: The goal of the Municipal Sanitary Sewer subprogram is to promote a healthful environment by collecting all sewage from existing and projected development in a sanitary and economic manner. B. Objectives: 1. Provide sewer lines of adequate size and grade to collect and transmit all discharge sewage. 2. Prevent sewage from overflowing into the natural environment. 3. Prevent sewage back-ups. 4. Encourage or promote connection of all generators of sewage to the Municipal system. 5. Meet the effluent and infiltration standards of the Metropolitan Waste Control Commission. III. Storm Sewer Subprogram (SS) A. Subprogram Goal: Manage and control surface and ground waters in order to protect the man-made and natural environment in a safe and efficient manner. B. Objectives: 1. Prevent flooding. 2. Prevent damage to property due to erosion. 3. Meet water quality standards established by the controlling regulatory law or authority. TRANSPORTATION PROGRAM Program Description: This program includes streets, walkways, traffic signs and signals, vehicular parking facilities, and street lighting. Program Goal: Provide for the safe and efficient movement of people and goods throughout the city. Subprograms: Streets, Walkways/Sidewalks, Signs/Signals, Parking Facilities, and Street Lights. I. Streets Subprogram (ST) A. Subprogram Goal: The goal of the Streets subprogram is to provide safe, convenient, economic public streets to best facilitate the movement of vehicular traffic. B. Objectives: 1. Streets should be constructed with permanent surfaces, concrete curb and gutter, and with ancillary storm drainage, to standards established by the City. 2. Streets should be of a size and load capacity consistent with their functional classifications. 3. Timely major repair to preserve the basic capital investment in streets. II. Walkways/Sidewalks Subprogram (WS) A. Subprogram Goal: To provide a safe and convenient pedestrian system with incidental recreational benefits. III. Signs/Signals Subprogram (SI) A. Subprogram Goal: The goal of the Signs/Signals subprogram is to provide an efficient and orderly system of street and traffic signing so as to promote safe, convenient travel throughout the City. B. Objectives: Signs and signals should be installed in conformity with the Minnesota Manual on Uniform Traffic Control Devices. 2. Periodic surveys and studies should be made to document the effectiveness of City signing patterns. IV. Parking Facilities Subprogram (PA) A. Subprogram Goal: To provide such supporting facilities as will promote maximum use of public parking spaces by employers, employees, customers, and visitors. B. Objectives: 1. Provide parking facilities for present and anticipated needs of the City of Hopkins. V. Street Lights Subprogram (SL) A. Subprogram Goal: To provide a system of street lighting within the City that will promote safe and convenient vehicular and pedestrian travel on City Streets. B. Objectives: 1. To provide lighting at each street intersection within the City. 2. To provide mid -block street lighting in conformance with the City's street lighting policy, in order to provide equitable, cost efficient lighting. 3. To continually update the system so as to provide energy and cost efficient lighting. PARKS, FORESTRY AND PAVILION PROGRAM Program Description: This program includes community parks, neighborhood parks, open spaces, recreational structures and facilities. Program Goal: The goal of the Park and Recreation Program is to provide facilities for safe, stimulating, and comprehensive leisure time activities of Hopkins citizens. Subprograms: Neighborhood Facilities, Community Facilities I. Neighborhood Facilities Subprogram (NF) A. Subprogram Goals: To acquire ownership or use rights of park sites located to provide convenient walking access to all Hopkins citizens and to develop such sites to provide optimum recreational serviceability consistent with the preservation and enhancement of pleasing aesthetic qualities. B. Objectives: 1. Acquire property or use rights on those neighborhoods that do not have convenient walking access to neighborhood park facilities. 2. Develop neighborhood park facilities to meet the needs of various user groups. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Preserve and enhance the aesthetic qualities of neighborhood parks. II. Community Facilities Subprogram (CF) A. Subprogram Goals: The goal of the Community Facilities subprogram is to develop, or acquire ownership or use rights of sites which serve the entire City and to provide facilities that serve community -wide needs. B. Objectives: Acquire sites that have valuable and unique natural characteristics to preserve irreplaceable community resources. 2. Preserve by acquisition, gift, or other arrangement properties that have valuable historic -cultural qualities. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Construct or acquire structures and facilities necessary to meet the changing needs of the community. GENERAL PUBLIC BUILDINGS PROGRAM Program Description: The General Public Buildings Program includes all municipal buildings except those provided for in the Utility and Park Facilities Program. Program Goal: Provide buildings that are adequate and convenient for the efficient accommodation of City functions. Subprograms: Administrative Offices, Maintenance Facilities, Fire Facilities, Community Center. I. Administrative Offices Subprogram (AO) A. Subprogram Goal: The goal of the Administrative Offices subprogram is to provide facilities for the efficient and safe conduct of legislative and administrative functions of the City. Ilt B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of the City services. II. Maintenance Facilities Subprogram (MF) A. Subprogram Goal: The goal of the Maintenance Facilities subprogram is to provide facilities for the efficient and safe conduct of City maintenance functions. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of City services. III. Fire Facilities Subprogram (FF) A. Subprogram Goal: To provide a fire station, or stations, for storage of Fire Department equipment and for the training and meetings of volunteer fire fighters to provide prompt and efficient protection to life and property. B. Objectives: 1. Provide a maximum four -minute daytime and three-minute nighttime response to all points within the City. 2. Meet objective 1 through the use of volunteers. IV. Community Center Subprogram (CC) A. Subprogram Goal: To provide a community facility, or facilities, which meet the social, recreational, and cultural needs of all citizens, particularly senior citizens. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repairs. is 2. Construct or acquire structures and facilities necessary to meet the changing needs of the City. 3. Upgrade facilities as necessary to provide for efficient, safe, and effective provision of City services. ECONOMIC DEVELOPMENT PROGRAM Program Description: This program includes redevelopment projects that have been identified through adopted plans and goals of the City of Hopkins. Program Goal: To facilitate the redevelopment of key sites in order to achieve the state objectives of the project. Objectives: 1. Elimination of blight or blighting conditions 2. Creation of jobs 3. Increase property value(s) 4. Catalyst of additional redevelopment 5. Environmental clean-up 6. Increase transit -oriented development around LRT stations Im Sources of Funding 13 14 SOURCES OF FUNDING In order to fund the anticipated Capital Improvements, the City must draw upon a variety of sources. Many of these sources have a specific or "dedicated" purpose (i.e., the water utility fund will finance water main installation but not a street overlay). Therefore, it is important to identify the uses and limitations of the various revenue sources. CURRENT REVENUES - GENERAL FUND (CR) This represents funding from current year revenue collections in the General Fund that support operations and capital outlay expenditures. Revenue sources include property tax levies, state aid payments, and various permit and license fees. This source of funding is generally used only for operations and small capital purchases. GENERAL FUND RESERVES (GR) Reserves of the general fund are the funds remaining after subtracting cash flow and emergency amounts from the City's cash balance, sometimes referred to as "fund balance". The use of General Fund Reserves is not recommended for Capital Improvements without significant staff and Council review. COMMUNICATION (formerly Cable TV) FUND (CT) This funding source consists of franchise fees received from the local Cable TV company, in excess of the amounts earmarked for the access programming and commission budgets. Expenditures are limited to cable -related facilities, or must have a cable related purpose. ECONOMIC DEVELOPMENT FUND (ED) This funding source was established by the Housing and Redevelopment Authority (HRA) and the City of Hopkins, to provide funding for the purpose of promoting development and redevelopment within the City. The Economic Development fund is a revolving fund administered by the HRA, intended to provide an ongoing funding source used to reduce or extend the long term debt involved with development and redevelopment activities. The HRA reviews all proposed uses of this fund on an individual basis. GRANT-IN-AID (GA) This is aid received from either the Federal or State government. In many cases, grants are made on matching basis, which means the City shares a portion of the costs of the project being funded. MUNICIPAL STATE AID STREETS (MS) This funding source represents funds received from the State of Minnesota to support construction and maintenance of State Aid classified municipal streets. State law defines the types and limits of State Aid Streets expenditures. PERMANENT IMPROVEMENT REVOLVING/GENERAL OBLIGATION BONDS (PI) Improvements with a life of several years may be financed from the proceeds of a General Obligation Bond Issue. Law limits the total debt that can be incurred under this method of financing. With some exception, General Obligation Bonds are generally subject to a referendum process. Examples of projects, which may not require a referendum, are those financed through the use of special assessments where at least 20 percent of the project cost is assessed to the benefiting property owners. The remaining portion not assessed can be financed through general obligation bonds repaid by a tax levy. PRIVATE SECTOR FUNDING (PF) This funding source consists primarily of payments made by developers for the purchase of land, the installation of water, sewer, or streets or other related expenditures. It can also refer to donations made to the City by individuals or groups. OTHER GOVERNMENTAL UNITS (GU) These are funds received from Hennepin County, adjacent communities, etc. for projects that also benefit a jurisdiction other than the City of Hopkins. REVENUE BONDS (RB) These are bonds issued for improvements made for specific revenue producing facility or operation. The debt incurred is repaid from the revenue generated by the facility. If the revenue generated is insufficient, then the difference becomes an annual obligation of the taxpayers and becomes an additional tax levy. These are generally not subject to referendum. REAL ESTATE SALES FUND (RE) This funding source consists primarily of funds built up from the sale of City owned property. To date, the fund has been used for building improvements. Because the sale of both general City property and park/recreation property are accumulated into this fund, earmarking a portion for recreational purposes may be justified. IV -1 SPECIAL ASSESSMENT (SA) A number of projects may be realistically financed using Special Assessment to pay the ultimate cost. Almost any project can potentially be financed using the assessment process. In each case it is necessary to make a determination that the assessed property will benefit by the amount of the assessment. The cost of street reconstruction is shared by the property owner and the City. Special assessments to individual properties are capped per city policy. Concurrent improvement costs to the utility systems are assumed by the respective utility funds. TAX INCREMENT FINANCING (TF) This funding source results from the tax value of new development that is "incrementally" greater than the existing tax value. Typically, bonds are sold based on the assumption that the higher tax receipts will retire the bonds. However, the use of TIF funds through a "pay as you go" method has become more common. This type of funding can be used for public improvements within a redevelopment district to support the goals of redevelopment, specifically the elimination of blighted conditions. Approval of the Hopkins HRA should be anticipated prior to the commitment of these funds. State law strictly regulates the use of these funds. WATER FUNDS (WF) Water funds consist of revenue generated from the sale of water. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. SANITARY SEWER FUNDS (SF) Sanitary sewer funds consist of revenue generated from charges made for sewage disposal. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. STORM SEWER UTILITY REVENUES (SU) Storm sewer funds consist of revenue generated by charging storm water drainage fee to parcels of land for the availability and use of municipal storm sewer facilities. Expenditures from this funding source are related to drainage facilities. PAVILION FUND (PA) Pavilion Funds consist of revenues generated from rental fees collected from users of the Pavilion. These funds are utilized to pay for operating, and capital expenditures. 17 Funding Sources Communication (formerly Cable TV) Fund CT Current Revenues — General Fund CR General Fund Reserves GR Economic Development Fund ED Grant -In -Aid GA Housing and Redevelopment Authority HRA Municipal State -Aid Streets MS Other Government Units GU Park Dedication Fund PDF Pavilion Fund PA Permanent Improvement Revolving/General Obligation Bonds PI Private Sector Funds PF Real Estate Sales Fund RE Revenue Bonds RB Sanitary Sewer Fund SF Special Assessment SA Storm Sewer Fund SU Tax Increment Financing TF Water Fund WF 18 Summary of Impacts on Major Funding Sources IP M SUMMARY OF PROJECT IMPACTS ON MAJOR FUNDING SOURCES CURRENT REVENUES/GENERAL FUND RESERVES Expenditures for 2014 are budgeted at an increase of 3.46% over the 2013 budget. The 2014 budget was compiled with an average 2% salary increase. The 2014 budget began with levy limits but the City will receive approximately $289,000 in LGA. The tax levy is the major source of revenues (82%) for the General Fund and therefore presents a challenge when levy limits are in place. Unassigned fund balance in the General Fund totals $4,823,141 at the end of 2013 and is projected to remain at that level for 2014. The State Auditor's Office recommends no less than five month of operating expenditures in reserves. For 2014 five months of expenditures would total $4,560,887 or 41.6%. At January 1, 2014 the unassigned fund balance was at 44.1% of budgeted expenditures. PERMANENT IMPROVEMENT REVOLVING FUND, (P.LR.) - G.O. DEBT Funding from bonds is used to reimburse the P.I.R. fund for public improvement projects, which have been previously expended. The debt is funded by special assessment collections and city tax levies over a ten to fifteen year period. Bonds totaling $1,895,000 were sold in 2014 to fund the 2014 street improvement projects. The next bond sale is scheduled for 2015 and will be for the Mainstreet Rehabilitation project. These bonds are expected to total approximately $4,000,000. The P.I.R. fund has completed substantial projects over the last three and this pace is expected to continue with scheduled projects for 2015 totaling $3,565,000 and future projects in the years 2016-2019 totaling over $12 million. Projects scheduled for 2015 include the Mainstreet Rehabilitation project, parking lot improvements, and pedestrian/bicycle access improvements. The funding is provided for these projects by special assessments and PIR/Bonding. In the years 2015-2019 as mentioned above, the city has an aggressive residential street improvement schedule planned, in addition to major improvements to County Road 61 — Shady Oak Road, all of which will require bonding. MUNICIPAL STATE AID FUND Funding for municipal state aid road projects comes from state MSA funding and is drawn down as projects are done. State funding is not sufficient for current planned projects as the City has been aggressive in doing MSA projects. In the queue for reimbursement is a request for $793,328 for Excelsior Blvd and $793,137 for the Minnetonka Mills Rd project. These funds will be released as the annual allotment becomes available. At the current rate of reimbursement it will take four years to receive all funds due on these two projects. This pushes back receipt of funds for other eligible MSA funded projects; however those project requests will be placed in the queue for future allotment payments. Currently there is one MSA project scheduled for 2015 and two for 2018. In 2015 the County Road 61, Shady Oak Road project that involves the cities of Hopkins and Minnetonka, Hennepin Qi County and the State will be done. The project is in the construction stage with construction begun in 2014. The project is estimated at $20.4 million of which $2.8 is Hopkins share of the project. In 2018 projects for Co Rd 3 from Blake Road to Meadowbrook Road ($700,000 MSA share) and Sixth St S from 1 lfh to 12th Avenue for the extension of roadway and culvert crossing Nine Mile Creek ($400,000 MSA share) are scheduled. They too will be added to the queue for reimbursement. CAPITAL IMPROVEMENT FUND Funding for these improvements comes from a general tax levy that was implemented in 2005. Upon approval of the a Financial Management Plan the levy was scaled back in 205 and 2016 to allow for other needs to take precedence. The full levy is restored in 2017. Projects scheduled in 2015 total $150,500 and include Public Works garage improvements, Public Works fuel management system upgrade and Activity Center fencing, landscaping and multi-purpose gym improvements. Going forward projects exceeds available funding, and therefore will be re- evaluated and postponed until funding can be identified. The projects currently are placed in the CIP but will not be done if funding is not secured. PARK IMPROVEMENT FUND The source of funding for this fund is development fees charged to developers for park development, in addition to franchise fees from gas and electric services. The franchise fees are expected to supply approximately $295,000 to the fund for much needed park projects. Developer payments are uncertain as they are dependent on future development and redevelopment in the city. Projects scheduled for 2015 total $212,000 and include a warming house at Burnes Park, picnic shelter and lighting at Oakes Park, a storage building at Valley Park and a recreation area at the Depot Coffee House. The Park Board spent considerable time soliciting resident input on city parks and developed a long-range plan for the city's park system. This plan is the basis for future park improvements. WATER FUND Implementing the rates as proposed in the Utility Master Plan (UMP) along with a bond sale in 2014 provide the funding needed for projects scheduled for 2014. Bonds will need to be sold in 2016 and each year thereafter in which there are water projects associated with the residential street improvement program. Projects planned for 2015 include $250,000 in water main improvements done in conjunction with street improvements. The public works facility improvement project annual transfer of $45,000 has been reinstated and goes until 2023. As established by the Utility Master Plan completed in 2007 and reviewed every two years thereafter, annual incremental increases are planned for the next 17 years. Water rates will increase in 2015 by approximately 4% or $0.08 per 1,000 gallons of water and will be in line with the current UMP. W SANITARY SEWER FUND Implementing the rates as proposed in the Utility Master Plan (UMP) along with a bond sale in 2014 provide the funding needed for projects scheduled for 2014. Bonds will need to be sold in 2015 and each year thereafter in which there are sewer projects associated with the residential street improvement program. There are no projects planned for 2015. In addition to the scheduled capital expenditures, the Metropolitan Waste Control Commission is projecting annual increases in its disposal charges to local governments. The public works facility improvement project annual transfer of $50,000 has been reinstated and goes until 2023. As established by the Utility Master Plan completed in 2007 and reviewed every two years thereafter, annual incremental increases are planned for the next 17 years. Water rates will increase in 2015 by approximately 4.8% or $0.20 and will be in line with the current UMP. STORM SEWER FUND Bonds will be sold in 2015 for the 2015 storm water management project. These bonds issues along with current revenues should provide the needed funding for scheduled projects. Projects scheduled for 2015 total $470,000 for storm water management projects, parking lot and HCRRA alley improvements and alley repairs. The public works facility improvement project will cost the storm sewer enterprise $25,000 a year for twenty years (2004-2023). The most recent rate increase pursuant to the 2007 Utility Master Plan was done in 2009. This rate increase is expected to support the storm sewer system well into the future and currently no additional rates increases are proposed. PAVILION FUND This facility built in 1990 is starting to need repairs and replacement to areas that are heavily used; capital projects scheduled for 2015 include $60,000 for the Pavilion evaporator condenser replacement. In 2016-2019 facility projects totaling $429,000 will be needed. A Financial Management Plan was developed in 2014 to address the growing capital needs of the Pavilion along with other funds. A levy was put in place for 2015-2019 to address the growing capital needs. TAX INCREMENT FINANCING FUNDS Considering the tax increment districts as a whole, cash on hand, projected increments and loan repayments are sufficient to cover TIF project expenditures. The state has provided municipalities with a pooling tool to accommodate short-term deficiencies within the districts. The city will be allowed to pool the districts tax increment revenues to cover outstanding debt. Currently none of the city's districts are projected to have shortfalls. 23 24 Cash Flow Statements 41 Working Capital Beginning Year Revenues: Taxes (from matured Park Bonds) Interest Dedication fees Joint Rec refunds Franchise Fees (gas/elec) 2014 incr Franchise Fees (gas/elec) 2012 incr Transfer in Franchise Fees " Hennepin County Grant Met Council - easememt/grant Grants - Private Foundations Donations - general Donations - benches Total Revenues Expenditures: C.I.P. Projects Cottageville Property Acquisition Skate Park commitment Total Expenditures Working Capital Year End PARK CAPITAL IMPROVEMENTS FUND (301) 0711012014 150,000 20,182 1,000 176,822 Revised 301,783 305,441 303,295 306,783 301,977 Actual Projected Projected Projected Projected Projected Projected 2013 2014 2015 2016 2017 2018 2019 82,902 139,566 48,262 138,044 66,486 182,780 22,564 62 595,000 212,000 377,000 187,000 467,000 137,000 311 1,396 483 4,141 1,995 5,483 677 0 0 0 0 0 0 6,267 6,000 6,000 6,000 6,000 6,000 6,000 85,300 85,300 85,300 85,300 85,300 85,300 210,000 210,000 210,000 210,000 210,000 210,000 200,000 150,000 20,182 1,000 176,822 503,696 301,783 305,441 303,295 306,783 301,977 113,158 588,000 205,000 370,000 180,000 460,000 130,000 0 7,000 7,000 7,000 7,000 7,000 7,000 7,000 120,158 595,000 212,000 377,000 187,000 467,000 137,000 139,566 48,262 138,044 66,486 182,780 22,564 187,541 27 Working Capital Beginning Year Revenues: Interest Transfers from General Fund Tax Levy (red Ipe1,1'::::IM ") Total Revenues Expenditures: C.I.P. Projects Transfer to General Fund Total Expenditures Working Capital Year End FACILITIES & BUILDINGS CAPITAL IMPROVEMENTS FUND (305) 07/10/2014 Actual Projected Projected Projected Projected Projected Projected 2013 2014 2015 2016 2017 2018 2019 135,687 194,214 275,185 179,061 (246,044) (142,274) 82,014 (646) 971 1,376 895 (1,230) (711) 410 50,000 50,000 50,000 123,687 125,000 53,000 35,000 150,000 175,000 125,000 123,041 125,971 54,376 85,895 198,770 224,289 125,410 64,514 45,000 150,500 511,000 95,000 0 133,000 64,514 45,000 150,500 511,000 95,000 0 133,000 194,214 275,185 179,061 (246,044) (142,274) 82,014 74,424 28 Working Capital Beginning Year Revenues: Franchise Fees Franchise Fees - PEG Fees Interest Total Revenues Expenditures: Expense Transfer Out Capital Outlay Total Expenditures Change in available funds Working Capital Ending Year 0711012014 COMMUNICATIONS (Cable TV) - WORKING CAPITAL PROJECTIONS Projected Projected Projected Projected Projected Projected Projected 2013 2014 2015 2016 2017 2018 2019 381,181 418,657 417,712 387,326 375,265 348,480 325,286 224,130 210,000 210,000 210,000 210,000 210,000 210,000 28,577 15,000 15,000 15,000 15,000 15,000 15,000 (931) 1,675 1,671 1,549 1,501 1,394 1,301 251,776 226,675 226,671 226,549 226,501 226,394 226,301 127,379 131,200 135,136 139,190 143,366 147,667 152,097 86,920 86,920 86,920 86,920 86,920 86,920 86,920 - 9,500 35,000 12,500 23,000 15,000 - 214,299 227,620 257,056 238,610 253,286 249,587 239,017 37,477 (946) (30,386) (12,061) (26,785) (23,193) (12,716) 418,657 417,712 387,326 375,265 348,480 325,286 312,570 `1 0711012014 132-020-013 132-350-001 (3) Project Total Due Paid Balance State Aid Funds due City Total From State To Date Due 5/31/14 Excelsior Blvd CSAH 3/61 5,629,235.87 4,086,619.00 3,293,290.51 793,328.49 Minnetonka Mills Rd 1,231,889.51 894,019.71 100,882.69 793,137.02 Total 6,861,125.38 4,980,638.71 3,394,173.20 1,586,465.51 72.59 Kid MUNICIPAL STATE AID FUND (302) Actual Projected Projected Projected Projected Projected Projected 2013 2014 2015 2016 2017 2018 2019 Working Capital Beginning Bal 2,064,148 467,787 2,307,436 1,318,973 1,325,568 1,332,195 238,856 Revenues: State MSA Funds, projects 446,662 0 0 0 0 0 400,000 State MSA Advance 2,087,310 Interest Earnings (5,873) 2,339 11,537 6,595 6,628 6,661 1,194 Hennepin County Hennepin County - Land Reimb 2,271,909 Land Sale proceeds 3,698 Bond issue 1,630,000 Total Revenues 2,716,396 2,089,649 1,641,537 6,595 6,628 6,661 401,194 Transfer Out for Projects CIP State Aid Projects 190,697 County Rd 61 - Shady Oak Rd 2,050,000 1,000,000 Mainstreet Rehabilitation 1,630,000 County Road 3 - EB 700,000 Sixth St S (11th - 12th Ave) 400,000 Shady Oak Rd ROW Purchase (1) 1,814,674 (1,800,000) Misc Expenses 31,779 Shady Oak Rd Land Acqusition 2,275,607 Total Expenditures 4,312,757 250,000 2,630,000 0 0 1,100,000 0 Working Capital Ending Balance 467,787 2,307,436 1,318,973 1,325,568 1,332,195 238,856 640,051 includes cash, interest rcvbl, & A/P Cash Balance 12/31/20XX 1,216,125 ESTIMATED Cash Balance 12/31/20XX 3,055,774 2,067,311 2,073,906 2,080,534 987,195 1,388,389 Amount owed Hennepin County as of 12-31-13 (1,814,674) (1) Hopkins share of expenditures paid by Hennepin County and not yet billed. Project expenses budgeted for 2014 total $2,050,000, however we are recognizing a liability for amounts already expended on Hopkins behalf by Hennepin County so show that as a deduct of the 2014 budget. 132-020-013 132-350-001 (3) Project Total Due Paid Balance State Aid Funds due City Total From State To Date Due 5/31/14 Excelsior Blvd CSAH 3/61 5,629,235.87 4,086,619.00 3,293,290.51 793,328.49 Minnetonka Mills Rd 1,231,889.51 894,019.71 100,882.69 793,137.02 Total 6,861,125.38 4,980,638.71 3,394,173.20 1,586,465.51 72.59 Kid Cash Flow Analysis P.I.R. FUND (501) 07110€2014 Working Capital Beginning Year Revenues: Special Assessment Revenues - from levy Special Assessment Revenues - Prepaid Interest Bond Proceeds Transfer In - matured bonds (excess) Total Revenues Expenditures: C.I.P. Projects C.I.P. Projects - Special Assm Transfers for SA Debt collected thru Assm Debt Service Transfers - 2007B Debt Service Transfers - 2010A - Impry Debt Service Transfers - 20106 - Rfdg Debt Service Transfers (prepaids to DS funds) Total Expenditures Working Capital Year End Total Projects Scheduled (CIP & SA) Actual Projected Projected Projected Projected Projected Projected 2013 2014 2015 2016 2017 2018 2019 2,389,701 2,341,089 1,730,273 976,519 897,186 795,386 594,141 305,687 25,000 20,000 0 0 0 0 24,000 62,000 212,000 212,800 150,000 150,000 (562) 10,535 7,786 4,394 4,037 3,579 2,674 1,906,296 1,878,000 2,800,000 2,388,000 3,642,200 3,025,000 2,100,000 18,483 2,229,904 1,937,535 2,889,786 2,604,394 3,859,037 3,178,579 2,252,674 2,074,511 2,355,000 3,255,000 1,540,000 2,791,000 2,425,000 1,500,000 120,000 310,000 1,060,000 1,064,000 750,000 750,000 15,384 14,815 17,182 19,548 38,835 0 62,203 58,536 61,358 64,180 67,002 69,824 80,794 0 126,418 2,278,516 2,548,351 3,643,540 2,683,728 3,960,837 3,379,824 2,465,794 2,341,089 1,730,273 976,519 897,186 795,386 594,141 381,021 2,074,511 2,475,000 3,565,000 2,600,000 3,855,000 3,175,000 2,250,000 WATER FUND -WORKING CAPITAL PROJECTION 07/10/2011 [c% Actual Projected Projected Projected Projected Projected Projected 2013 2014 2015 2016 2017 2018 2019 Working Capital Beginning Year 76,872 597,731 873,064 838,711 1,019,606 1,104,705 1,219,632 Revenues: Operating Revenues 1,468,956 1,541,669 1,377,850 1,416,550 1,461,500 1,506,450 1,551,550 Other 14,327 152,149 158,533 165,235 172,272 179,661 187,418 Interest 139 0 0 0 0 0 0 Gain on Sale of Asset 21,855 Bond Issuance 860,000 195,000 200,000 780,000 400,000 850,000 268,000 Total Revenues 2,365,277 1,888,818 1,736,383 2,361,785 2,033,772 2,536,111 2,006,968 Expenditures: Operation Expense 1,069,741 1,037,781 1,073,846 1,111,244 1,150,027 1,190,249 1,231,969 Other Exp - bond issuance -fiscal fee Other Exp - int on current bonds 64,620 0 0 0 Other Exp - int on refunded bonds 7,587 2,700 Other Exp - int on 2009 bonds 24,225 22,850 21,350 19,725 17,887 15,963 Other Exp - int on 2012 bonds 14,179 13,379 12,529 11,629 10,729 9,829 Other Exp - int on 2013 bonds 22,713 17,431 16,431 15,431 14,381 13,281 Other l ffly .est interest on 1:uture Bonds 5,730 17,035 21,861 33,037 34,635 Equipment Replacement Items 0 6,800 0 61,700 Capital Improvements 462,660 197,000 250,000 786,000 400,000 850,000 268,000 Principal Bond payment 260,000 Principal Bond payment - refunded 175,000 180,000 Principal Bond pymnt - 2009 debt 50,000 50,000 50,000 50,000 55,000 55,000 Principal Bond pymnt - 2012 debt 40,000 40,000 45,000 45,000 45,000 45,000 Principal Bond pymnt - 2013 debt 50,000 50,000 50,000 55,000 55,000 111'rincipal Bondpyi'nnt C uture Debt 13,000 26,300 78,300 104,900 161,500 Capital Lease (PW Facility) (1) 0 45,000 45,000 45,000 45,000 45,000 45,000 Total Expenditures 1,857,021 1,613,485 1,770,736 2,180,890 1,948,673 2,421,184 1,953,177 Change in available funds 508,256 275,334 (34,353) 180,895 85,099 114,927 53,791 Inventory change 52 Bond Premium/Discount Exp 12,551 Working Capital Ending Year 597,731 873,064 838,711 1,019,606 1,104,705 1,219,632 1,273,424 (1) Capital Lease moved to Storm Sewer - back to water fund in 2014 Rate History (water/sprinkler) 2014 - 2019 financial data was taken from the Utility plaster Plan clone by City Engineer 1984 $0.85 1993 $1.05 Notes - 1997 $1.10 Income - 2008 and forward used utility master plan rates (fixture/no surcharge option) 2000 $1.20 2005 $1.40 Per Utility Master Plan (10/07) 2008 $1.65 2009 $1.86 2010 $1.90 2011 $1.94/2.40 - not incr, left at $1.90 2012 $1.96/2.40 2013 $2.02/2.40 2014 $2.10/2.50 2015 $2.1812.60 2016 $2.25/2 70 projected rate 2017 $2.35/2.85 increases 2018 $2.45/3.00 these are the correct rates per the UMP [c% SEWER FUND -WORKING CAPITAL PROJECTION 07M=014 33 Actual Projected Projected Projected Projected Projected Projected 2013 2014 2015 2016 2017 2018 2019 Working Capital Beginning Year 394,411 229,722 370,127 505,976 615,059 713,615 823,069 Revenues: Operating Revenues 1,981,580 2,308,500 2,399,700 2,496,600 2,593,500 2,696,100 2,804,400 Other 17,903 20,000 20,000 20,000 20,000 20,000 20,000 Interest 33 574 925 1,265 1,538 1,784 2,058 Bond Issuance 490,000 150,000 0 300,000 240,000 475,000 298,000 Total Revenues 2,489,516 2,479,074 2,420,625 2,817,865 2,855,038 3,192,884 3,124,458 Expenditures: Operation Expense 551,763 551,833 570,253 589,319 609,053 629,484 650,634 MWCC Charges (3% inflation) 1,222,893 1,436,144 1,504,307 1,575,771 1,650,698 1,729,256 1,811,624 Other - Bond Issuance -fiscal fees Interest Expense 45,015 30,100 28,450 26,575 24,463 22,187 19,825 Interest Expense - 2012 Debt 3,149 2,949 2,749 2,549 2,349 2,149 Interest Expense - 2013 Debt 12,943 9,918 9,318 8,719 8,119 7,519 Interest tllll?x1:teal,se, .. iUtUM t:1ebt 2,100 6,450 9,600 16,035 19,341 Equipment Replacement Items 0 6,800 33,600 26,400 Capital Improvements 773,923 154,500 0 300,000 240,000 475,000 298,000 Principal Bond payment (2009) 70,000 60,000 60,000 65,000 65,000 65,000 70,000 Principal Bond payment (2012) 10,000 10,000 10,000 10,000 10,000 10,000 Principal Bond payment (2013) 30,000 30,000 30,000 30,000 30,000 30,000 Pn n �°,�i pa,�� t 1l3 on d p1 ,�� ym en t.s 1:: a tur e tae b t 10,000 10,000 30,000 46,000 77,600 Capital Lease (PW Facility) (1) 0 50,000 50,000 50,000 50,000 50,000 50,000 Total Expenditures 2,663,594 2,338,669 2,284,777 2,708,782 2,756,482 3,083,430 3,064,691 Change in available funds (174,078) 140,406 135,849 109,083 98,556 109,454 59,766 Inventory change 90 Bond Premium/Discount Exp 9,299 Working Capital Ending Year 229,722 370,127 505,976 615,059 713,615 823,069 882,835 (1) Capital Lease moved to Storm Sewer - back in fund in 2014 Rate History 2014 - 2018 financial data was taker from the Utility Master Pfau doge by City Engineer 1983 $1.50 1989 $1.75 1991 $2.00 1993 $2.50 Notes - 1999 $2.25 Rate DECREASE Income - 2008 and forward used utility master plan rates (no fixture option) 2006 $2.50 rate increase Per Utility Master Plan (10/07) 2008$2.70 2009$3.10 2010$3.40 2011 $3.70 - act 3.60 2012$3.75 2013$3.90 2014$4.10 2015$4 30 2016$4 55 2017$480 projected rate increases 2018$5.10 these are the correct rates per the UMP 33 STORM SEWER FUND - WORKING CAPITAL PROJECTION 47/14/2414 Inventory change 372 Bond Premium/Discount Exp (net) 5,198 Working Capital Ending Year 883,002 116,885 184,295 584,429 949,815 1,294,855 1,594,622 (1) In 2012 this includes Water, Sewer & Storm Sewer transfers; in 2014 transfer returned to normal level Rate History (per month) 1989 $4.75 per quarter 1991 $6.00 per quarter 1992 $2.50 1993 $3.00 1998 $3.20 1999 $4.00 2006 $4.50 2009 $5.00 34 Actual Projected Projected Projected Projected Projected Projected 2013 2014 2015 2016 2017 2018 2019 Working Capital Beginning Year 744,314 883,002 116,885 184,295 584,429 949,815 1,294,855 Revenues: Operating Revenues 794,630 794,630 794,630 794,630 794,630 794,630 794,630 Other 4,973 5,000 5,000 5,000 5,000 5,000 5,000 Interest (1,717) 2,208 292 461 1,461 2,375 3,237 Bond Issuance 380,000 300,000 240,000 395,000 240,000 320,000 190,000 Total Revenues 1,177,886 1,101,838 1,039,922 1,195,091 1,041,091 1,122,005 992,867 Expenditures: Operation Expense 177,656 181,209 184,833 188,530 192,301 196,147 200,070 Other - Bond Issuance -fiscal fees Bond Interest - existing 35,437 Bond Interest - 2009 refunded bonds 5,312 1,875 Bond Interest - 2010 bonds 15,348 14,585 13,623 12,485 11,173 9,629 Bond Interest - 2012 bonds 6,031 5,681 5,281 4,881 4,481 4,081 Bond Interest - 2013 bonds 10,054 7,738 7,338 6,888 6,388 5,888 Interest all'i.?Xpell,se'..1UtUMt:1ebt 7,800 13,185 15,850 19,476 20,832 Capital Outlay (per ERP) 0 0 0 0 0 0 0 Cottageville Property purchase 400,000 Cottageville Park Storm Water Mgmt 1,000,000 Capital Improvements 506,675 20,000 470,000 396,000 241,000 321,000 190,000 Capital Improvements - PW Bldg 18,000 2009 Principal Bond payment 120,000 125,000 125,000 2010 Principal Bond payment 70,000 65,000 70,000 70,000 70,000 70,000 75,000 2012 Principal Bond payment 15,000 15,000 20,000 20,000 20,000 20,000 20,000 2013 Principal Bond payment 20,000 20,000 25,000 25,000 25,000 Pnn�°,�ip: ,��t 1l3ondpe��yment.s 1::uture taebt 20,000 36,000 62,300 78,300 99,601 Capital Lease - PW Facility (1) 120,000 25,000 25,000 25,000 25,000 25,000 25,000 Total Expenditures 1,044,768 1,867,955 972,512 794,957 675,705 776,965 693,100 Change in available funds 133,118 (766,117) 67,410 400,134 365,386 345,040 299,767 Inventory change 372 Bond Premium/Discount Exp (net) 5,198 Working Capital Ending Year 883,002 116,885 184,295 584,429 949,815 1,294,855 1,594,622 (1) In 2012 this includes Water, Sewer & Storm Sewer transfers; in 2014 transfer returned to normal level Rate History (per month) 1989 $4.75 per quarter 1991 $6.00 per quarter 1992 $2.50 1993 $3.00 1998 $3.20 1999 $4.00 2006 $4.50 2009 $5.00 34 Ick: PAVILION - ICE ARENA - WORKING CAPITAL PROJECTIONS 0'7/1J/2014 Actual Projected Projected Projected Projected Projected Projected 2013 2014 2015 2016 2017 2018 2019 Working Capital Beginning Year 117,122 141,036 145,981 162,394 (39,123) 5,086 17,218 Revenues: Operating Revenues 359,961 377,959 396,857 416,700 437,535 459,412 482,382 Leases 38,000 current lease expires in 2013 I evy per I\i1' 65,000 65,000 65,000 65,000 65,000 Other 7,224 10,000 10,000 10,000 10,000 10,000 10,000 Interest (191) Total Revenues 404,994 387,959 471,857 491,700 512,535 534,412 557,382 Expenditures: Operation Expense 351,064 361,596 372,444 383,617 395,126 406,979 419,189 Capital Outlay - ERP 7,833 - - 12,000 - - - Capital Improvements - - 60,000 275,000 51,000 93,500 9,500 Payment on Equip Certific P&I 3,130 18,350 23,000 22,600 22,200 21,800 21,400 Payment on Interfund Loan 18,752 3,068 - - Total Expenditures 380,779 383,014 455,444 693,217 468,326 522,279 450,089 Change in available funds 24,215 4,945 16,413 (201,517) 44,209 12,132 107,293 Bond Premium/Discount Exp (net) (301) Working Capital Ending Year 141,036 145,981 162,394 (39,123) 5,086 17,218 124,512 Ick: Ki Five Year Project Summaries 37 38 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 2015 thru 2019 PROJECTS BY YEAR Project Name Department Project # Priority Project Cost 2015 Activity Center - Fencing/Landscaping Activity Center 94-CIP-AC009 1 13,000 Activity Center - Multi Purpose/Gym Improvements Activity Center 94-C/P-AC002 2 67,000 Arts Center - Replace theatre seats and backs Arts Center 92-C/P-AR002 1 138,510 Arts Center - Replace Information Desk and Kiosk Arts Center 92-C/P-AR005 1 5,000 Arts Center - Re -landscape E & W faces of building Arts Center 93-C/P-AR009 2 3,600 Arts Center - Storage in Art Classroom Arts Center 94-C/P-AR009 1 3,500 Arts Center - Kitchen Handwashing Sink Arts Center 94-CIP-AR002 1 5,000 Arts Center - Paint Theatre Arts Center 94-CIP-AR003 2 15,000 Technology Improvement- Council Chambers & Studio Communications 13C/P-CM009 n/a 35,000 Redevelopment, East Excelsior Boulevard Development 09-C/P-D4090 n/a 2,000,000 Block 64 Redevelopment Project Development 06-C/P-D404 n/a 4,500,000 Blake Corridor Redevelopment Development 09-C/P-D406 n/a 5,000,000 Pavilion Evaporator Condenser Replacement Pavilion 09-C/P-PO36 n/a 60,000 Public Works Garage Upgrade Public Works: Bldg/Equip Sery 93-C/P-8099 1 20,000 Wash Bay Roof Replacement Public Works: Bldg/Equip Sery 94-C/P-8009 4 23,000 Wash Bay Air Handler Replacement Public Works: Bldg/Equip Sery 94-C/P-B002 3 15,000 Fuel Management System Upgrade Public Works: Bldg/Equip Sery 94-C/P-B003 4 12,500 Skate Park Public Works: Parks 08-C/P-P003 n/a 7,000 Burnes Park - Warming House Public Works: Parks 93-C/P-PO40 n/a 60,000 Oakes Park - Replace Picnic Shelter Public Works: Parks 93-C/P-PO41 n/a 30,000 Valley Park - Construct Storage Building Public Works: Parks 93-C/P-PO42 n/a 25,000 Oakes Park - Lighting Public Works: Parks 93-C/P-PO72 n/a 40,000 County Road 61 (Shady Oak Road) Public Works: Streets/Traffic 09-C/P-S 906 n/a 18,800,000 Parking Lots and HCRRA Alley Improvements Public Works: Streets/Traffic 06-C/P-5998 n/a 1,150,000 Plan, Design and Implement Railroad Quiet Zone Public Works: Streets/Traffic 99-C/P-S 920 n/a 25,000 Mainstreet Rehabilitation Public Works: Streets/Traffic 99-C/P-S 929 3 4,000,000 Pedestrian & Bicycle Access Improvements Public Works: Streets/Traffic 93-C/P-SO40 n/a 25,000 2015 Street Overlay Project Public Works: Streets/Traffic 95--C/P-5039 n/a 175,000 Storm Drainage System Maintenance - Alley Repairs Public Works: Utilities 09-C/P-0002 n/a 20,000 Storm Water Management Projects Public Works: Utilities 09-C/P-0003 n/a 230,000 Depot Recreation Area Recreation 90-CIP-RO02 2 225,000 Total for 2015 36,728,110 2016 Activity Center - Replace Gynmasium Roof Activity Center 08-C/P-ACO18 n/a 105,000 Activity Center - Raspberry Room Roof Replacement Activity Center 08-C/P-ACO24 n/a 80,000 Activity Center Computer/Library Room Enhancements Activity Center 94-ClP-AC003 4 20,000 Arts Center - Storage & Hanging, Display Systems Arts Center 93-C/P-AR004 1 3,125 Arts Center- Remodel Administrative Off ces Arts Center 94-C/P-AR004 2 50,000 Arts Center - Entryway Planters Arts Center 94-C/P-AR005 3 2,800 City Hall Lobby Upgrade City Hall Administration 09-C/P-CH030 n/a 110,000 Technology Improvement- Council Chambers & Studio Communications 93C/P-CM009 n/a 12,500 8th Ave Streetscape and parking facility Development 92-C/P-D408 n/a 4,000,000 Replace Carpet and Apparatus Floor Finish - FD Fire 08-C/P-FDO 19 n/a 56,000 Thursday, July 10, 2014 39 Project Name Department Project # Priority Project Cost Pavilion Overhead Door Improvement Pavilion 07-C/P-P394 n/a 40,000 Pavilion Roof Replacement Pavilion 09-C/P-PO26 1 140,000 Pavilion Indoor Turf Replacement Pavilion 90-C/P-P399 n/a 95,000 Replace Carpet - Police Station Police 08-C/P-PDO16 n/a 40,000 Public Works Garage Upgrade Public Works: Bldg/Equip Sery 93-C/P-8099 1 200,000 Skate Park Public Works: Parks 08-C/P-P003 n/a 7,000 Burnes Park - Play Equipment Public Works: Parks 93-C/P-PO43 n/a 50,000 Cottageville Park - Phase II Improvements Public Works: Parks 93-C/P-PO54 n/a 250,000 Rehab Downtown Park Public Works: Parks 94-C/P-P009 n/a 70,000 Residential Street Improvements and Utilities Public Works: Streets/Traffic 01 -CF -S101 n/a 3,275,000 Citywide Concrete Alleys Public Works: Streets/Traffic 09-C/P-5903 n/a 75,000 Pedestrian & Bicycle Access Improvements Public Works: Streets/Traffic 93-C/P-SO40 n/a 25,000 Eighth Avenue LRT Corridor Public Works: Transportation 09-C/P-5503 n/a 3,700,000 Storm Drainage System Maintenance - Alley Repairs Public Works: Utilities 09-C/P-0002 n/a 21,000 St. Louis Park Emergency Connection Public Works: Utilities 08-C/P-0090 n/a 211,000 Thursday, July 10, 2014 40 Total for 2016 12,638,425 2017 Activity Center - Lower Roof Replacement Activity Center 09-C/P-AC031 n/a 80,000 Activity Center - Dishwasher Activity Center 94-ClP-AC004 5 15,000 Arts Center - Replace Rooftop HVAC Units Arts Center 08-C/P-AR013 n/a 320,000 Technology Improvement- Council Chambers & Studio Communications 13C/P-CM009 n/a 23,000 Pavilion skate Tile Replacement/Lobby Improvement Pavilion 07-C/P-P393 n/a 45,000 Pavilion - Desiccant Repl of Dehumidification Syst Pavilion 90-C/P-P320 n/a 6,000 Skate Park Public Works: Parks 08-C/P-P003 n/a 7,000 Hilltop Park - Play Equipment Public Works: Parks 08-C/P-P094 n/a 100,000 Valley Park - Play Equipment Public Works: Parks 08-C/P-P095 n/a 80,000 Residential Street Improvements and Utilities Public Works: Streets/Traffic 01 -CF -S101 n/a 4,360,000 Citywide Concrete Alleys Public Works: Streets/Traffic 09-CIP-S 903 n/a 80,000 Pedestrian & Bicycle Access Improvements Public Works: Streets/Traffic 93-C/P-SO40 n/a 25,000 Blake Road Corridor Improvements Public Works: Streets/Traffic 95--C/P-5009 n/a 1,000,000 Storm Drainage System Maintenance - Alley Repairs Public Works: Utilities 09-C/P-0002 n/a 21,000 Total for 2017 6,162,000 2018 Arts Center - Replace Lobby Carpet Arts Center 09-C/P-AR027 n/a 52,000 Technology Improvement- Council Chambers & Studio Communications 93C/P-CM009 n/a 15,000 Pavilion Mezzanine Rooftop Unit Replacement Pavilion 93-C/P-P329 1 24,500 Pavilion Entry and Lobby Door Replacement Pavilion 93-C/P-P324 3 7,000 Pavilion - Paint Exterior Building Pavilion 93-C/P-P325 1 22,000 Pavilion Painting the Arena Ceiling and Bar Joist Pavilion 94-C/P-P090 1 40,000 Skate Park Public Works: Parks 08-C/P-P003 n/a 7,000 Park Valley - Play Equipment Public Works: Parks 08-C/P-P090 n/a 60,000 Burnes Park - Resurface Tennis Courts Public Works: Parks 08-C/P-P099 n/a 20,000 Oakes Park - Tennis Courts Public Works: Parks 93-C/P-PO44 n/a 20,000 Valley Park - Warming House Public Works: Parks 93-C/P-PO45 n/a 60,000 Burnes Park Splash Pad Public Works: Parks 94-C/P-P002 n/a 300,000 Residential Street Improvements and Utilities Public Works: Streets/Traffic 01 -CF -S101 n/a 3,475,000 County Road 3 Public Works: Streets/Traffic 09-C/P-5904 n/a 2,300,000 Sixth Street South (11th to 12th Avenue South) Public Works: Streets/Traffic 09-C/P-5504 n/a 500,000 Plan, Design and Implement Railroad Quiet Zone Public Works: Streets/Traffic 99-C/P-S 920 n/a 200,000 Pedestrian & Bicycle Access Improvements Public Works: Streets/Traffic 93-C/P-SO40 n/a 25,000 Blake Road Corridor Improvements Public Works: Streets/Traffic 95--C/P-5009 n/a 9,000,000 Light Rail Transit Stations (3) Public Works: Transportation 09-C/P-5502 n/a 500,000 Storm Drainage System Maintenance - Alley Repairs Public Works: Utilities 09-C/P-0002 n/a 21,000 Thursday, July 10, 2014 40 Project Name Department Project # Priority Project Cost 2019 City Hall Roof Replacement Pavilion HHS Team Room Rooftop Unit Repl Public Works - Replace Overhead Doors Skate Park Burnes Park - Lighting Harley Hopkins Park - Warming House Harley Hopkins Park - Lighting Residential Street Improvements and Utilities Storm Drainage System Maintenance - Alley Repairs Lift Station # 4 GRAND TOTAL Total for 2018 16,648,500 City Hall Administration 09-C9P-CH029 n/a 115,000 Pavilion 93-C9P-P322 1 9,500 Public Works: Bldg/Equip Sery 08-CIP-8023 n/a 90,000 Public Works: Parks 08-C9P-P003 n/a 7,000 Public Works: Parks 93-CIP-PO46 n/a 50,000 Public Works: Parks 93-CIP-PO56 n/a 30,000 Public Works: Parks 93-C/P-PO57 n/a 50,000 Public Works: Streets/Traffic 01 -CF -S101 n/a 2,770,000 Public Works: Utilities 09-C/P-0002 n/a 22,000 Public Works: Utilities 08-C/P-0009 n/a 160,000 Total for 2019 3,303,500 75,480,535 Thursday, July 10, 2014 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 2015 thm 2019 DEPARTMENT SUMMARY Department 2015 2016 2017 2018 2019 Total Activity Center 80,000 205,000 95,000 380,000 Arts Center 170,610 55,925 320,000 52,000 598,535 City Hall Administration 110,000 115,000 225,000 Communications 35,000 12,500 23,000 15,000 85,500 Development 11,500,000 4,000,000 95,500,000 Fire 56,000 56,000 Pavilion 60,000 275,000 51,000 93,500 9,500 489,000 Police 40,000 40,000 Public Works: Bldg/Equip Sery 70,500 200,000 90,000 360,500 Public Works: Parks 162,000 377,000 187,000 467,000 137,000 9,330,000 Public Works: Streets/Traffic 24,175,000 3,375,000 5,465,000 15,500,000 2,770,000 59,285,000 Public Works: Transportation 3,700,000 500,000 4,200,000 Public Works: Utilities 250,000 232,000 21,000 21,000 182,000 706,000 Recreation 225,000 225,000 TOTAL 36,728,110 12,638,425 6,162,000 16,648,500 3,303,500 75,460,535 42 Thursday, July 10, 2014 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 2015 thru 2019 PROJECTS BY DEPARTMENT Department Project# Priority 2015 2016 2017 2018 2019 Total Activity Center Activity Center- Replace Gynmasium Roof 08-C/P-AC098 n/a 105,000 905,000 Activity Center- Raspberry Room Roof Replacement 08-C/P-ACO24 n/a 80,000 80,000 Activity Center - Lower Roof Replacement 09-C/P-AC031 n/a 80,000 80,000 Activity Center- Fencing/Landscaping 94-ClP-ACOO 9 1 13,000 93,000 Activity Center- Multi Purpose/Gym Improvements 94-C/P-AC002 2 67,000 67,000 Activity Center Computer/Library Room Enhancements 94-ClP-AC003 4 20,000 20,000 Activity Center - Dishwasher 94-ClP-AC004 5 15,000 95,000 Activity Center Total 80,000 205,000 95,000 380,000 Arts Center Arts Center- Replace Rooftop HVAC Units 08-C/P-AR013 n/a 320,000 320,000 Arts Center- Replace Lobby Carpet 09-C/P-AR027 n/a 52,000 52,000 Arts Center - Replace theatre seats and backs 92-C/P-AR002 1 138,510 938,590 Arts Center - Replace Information Desk and Kiosk 92-C/P-AR005 1 5,000 5,000 Arts Center - Re -landscape E & W faces of building 93-C/P-AR009 2 3,600 3,600 Arts Center - Storage & Hanging, Display Systems 93-C/P-AR004 1 3,125 3,125 Arts Center - Storage in Art Classroom 94-C/P-AR009 1 3,500 3,500 Arts Center- Kitchen Handwashing Sink 94-CIP-AR002 1 5,000 5,000 Arts Center - Paint Theatre 94-CIP-AR003 2 15,000 95,000 Arts Center- Remodel Administrative Offices 94-C/P-AR004 2 50,000 50,000 Arts Center- Entryway Planters 94-C/P-AR005 3 2,800 2,800 Arts Center Total 170,610 55,925 320,000 52,000 598,535 City Hall Administration City Hall Roof Replacement 09-C/P-CH029 n/a 115,000 995,000 City Hall Lobby Upgrade 09-C/P-CH030 n/a 110,000 990,000 City Hall Administration Total 110,000 115,000 225,000 Communications Technology Improvement- Council Chambers & Studio 13C/P-CM009 n/a 35,000 12,500 23,000 15,000 85,500 Communications Total 35,000 12,500 23,000 15,000 85,500 Develo ment Redevelopment, East Excelsior Boulevard 09-C/P-D4090 n/a 2,000,000 2,000,000 Block 64 Redevelopment Project 06-C/P-D404 n/a 4,500,000 4,500,000 Blake Corridor Redevelopment 09-C1P-D406 n/a 5,000,000 5,000,000 8th Ave Streetscape and parking facility 92-C/P-D408 n/a 4,000,000 4,000,000 Development Total 11,500,000 4,000,000 15,500,000 Fire Replace Carpet and Apparatus Floor Finish - FD 08-C/P-FD099 n/a 56,000 56,000 43 Thursday, July 10, 2014 Department Project# Priority 2015 2016 2017 2018 2019 Total Five Total Pavilion 56,000 7,000 Pavilion skate Tile Replacement/Lobby Improvement 07-C/P-P393 n/a Pavilion Overhead Door Improvement 07-C/P-P394 n/a Pavilion Roof Replacement 09-C/P-PO26 1 Pavilion Evaporator Condenser Replacement 09-C/P-PO36 n/a Pavilion Indoor Turf Replacement 90-C/P-P399 n/a Pavilion - Desiccant Repl of Dehumidification Syst 90-C/P-P320 n/a Pavilion Mezzanine Rooftop Unit Replacement 93-C/P-P329 1 Pavilion HHS Team Room Rooftop Unit Repl 93-C/P-P322 1 Pavilion Entry and Lobby Door Replacement 93-C/P-P324 3 Pavilion - Paint Exterior Building 93-C/P-P325 1 Pavilion Painting the Arena Ceiling and Bar Joist 94-C/P-P090 1 Pavilion Total 24,500 24,500 30,000 Police Replace Carpet - Police Station 08-C/P-PD096 n/a Police Total 7,000 7,000 Public Works: Bldg/Equip Sery Public Works - Replace Overhead Doors 08-C/P-BO23 n/a Public Works Garage Upgrade 93-C/P-8099 1 Wash Bay Roof Replacement 94-C/P-8009 4 Wash Bay Air Handler Replacement 94-C/P-B002 3 Fuel Management System Upgrade 94-C/P-B003 4 Public Works: Bldg/Equip Se>v Total 40,000 50,000 40,000 250,000 Public Works: Parks Skate Park 08-C1P-P003 n/a Park Valley - Play Equipment 08-C/P-P090 n/a Burnes Park - Resurface Tennis Courts 08-C/P-P099 n/a Hilltop Park - Play Equipment 08-C/P-P094 n/a Valley Park - Play Equipment 08-C/P-P095 n/a Burnes Park - Warming House 93-CIP-PO40 n/a Oakes Park - Replace Picnic Shelter 93-C/P-PO41 n/a Valley Park - Construct Storage Building 93-C/P-PO42 n/a Burnes Park - Play Equipment 93-C/P-PO43 n/a Oakes Park - Tennis Courts 93-CIP-PO44 n/a Valley Park - Warming House 93-C/P-PO45 n/a Burnes Park - Lighting 93-CIP-PO46 n/a Cottageville Park - Phase II Improvements 93-CIP-PO54 n/a Harley Hopkins Park - Warming House 93-C/P-PO56 n/a Harley Hopkins Park - Lighting 93-C/P-PO57 n/a Oakes Park - Lighting 93-CIP-PO72 n/a Rehab Downtown Park 94-C1P-P009 n/a Burnes Park Splash Pad 94-C/P-P002 n/a Public Works: Parks Total Public Works: Streets/Traffic Residential Street Improvements and Utilities 09-C/P-5909 n/a Citywide Concrete Alleys 09-C1P-5903 n/a 7,000 56,000 7,000 7,000 56,000 35,000 45,000 45,000 40,000 40,000 20,000 140,000 20,000 940,000 60,000 900,000 60,000 95,000 95,000 60,000 6,000 6,000 60,000 30,000 24,500 24,500 30,000 25,000 9,500 9,500 7,000 7,000 22,000 50,000 22,000 40,000 40,000 60,000 275,000 51,000 93,500 9,500 489,000 60,000 40,000 40,000 50,000 40,000 250,000 40,000 250,000 90,000 90,000 20,000 200,000 30,000 30,000 220,000 23,000 50,000 23,000 15,000 15,000 12,500 70,000 12,500 70,500 200,000 90,000 360,500 7,000 7,000 7,000 7,000 7,000 35,000 60,000 60,000 20,000 20,000 100,000 900,000 80,000 80,000 60,000 60,000 30,000 30,000 25,000 25,000 50,000 50,000 20,000 20,000 60,000 60,000 50,000 50,000 250,000 250,000 30,000 30,000 50,000 50,000 40,000 40,000 70,000 70,000 300,000 300,000 162,000 377,000 187,000 467,000 137,000 1330,000 3,275,000 4,360,000 3,475,000 2,770,000 93,880,000 75,000 80,000 955,000 44 Thursday, July 10, 2014 Department Project# Priority 2015 County Road 3 09-C1P-5904 n/a 18,800,000 County Road 61 (Shady Oak Road) 09-C1P-5906 n/a 18,800,000 Sixth Street South (11th to 12th Avenue South) 09-C1P-5504 n/a 4,000,000 Parking Lots and HCRRA Alley Improvements 06-CIP-5998 n/a 1,150,000 Plan, Design and Implement Railroad Quiet Zone 99-C/P-S 920 n/a 25,000 Mainstreet Rehabilitation 99-C1P-S 929 3 4,000,000 Pedestrian & Bicycle Access Improvements 93-C/P-SO40 n/a 25,000 Blake Road Corridor Improvements 95--C/P-5009 n/a GRAND TOTAL 2015 Street Overlay Project 95--C/P-5039 n/a 175,000 Public Works: Streets/Traffic Total 2,300,000 5,465,000 18,800,000 Public Works: Trans ortation Light Rail Transit Stations (3) 09-C/P-5502 n/a Eighth Avenue LRT Corridor 09-C1P-5503 n/a Public Works: Transportation Total 4,000,000 25,000 25,000 25,000 Public Works: Utilities Storm Drainage System Maintenance - Alley Repairs 09-CIP-0002 n/a Storm Water Management Projects 09-CIP-0003 n/a Lift Station # 4 08-CIP-0009 n/a St. Louis Park Emergency Connection 08-CIP-0090 n/a Public Works: Utilities Total 105,000 230,000 960,000 211,000 250,000 232,000 Recreation Depot Recreation Area 90-CIP-R002 2 Recreation Total 225,000 GRAND TOTAL 2016 2017 2018 2019 Total 2,300,000 2,300,000 5,465,000 18,800,000 500,000 500,000 1,150,000 200,000 225,000 4,000,000 25,000 25,000 25,000 900,000 1,000,000 9,000,000 90,000,000 975,000 24,175,000 3,375,000 5,465,000 15,500,000 2,770,000 51,285,000 3,700,000 500,000 500,000 3,700,000 3,700,000 500,000 4,200, 000 20,000 230,000 21,000 211,000 21,000 21,000 22,000 160,000 105,000 230,000 960,000 211,000 250,000 232,000 21,000 21,000 182,000 706,000 225,000 225,000 225,000 225000 36,728,110 12,638,425 6,162,000 16,648,500 3,303,500 75,480,535 45 Thursday, July 10, 2014 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 2015 thm 2019 FUNDING SOURCE SUMMARY Source 2015 2016 2017 AC - Arts Center Fund Cl - Capital Improvement Fund CT - Cable Franchise Fees ED - Economic Development Fund GU - Other Governmental Units MS - Municipal State Aid Streets PA - Pavilion Fund PDF- Park Dedication Fund PF - Private Sector Funds PI - PIR/General Obligation Bonds RF - Refuse Fund SA - Special Assessment SF - Sanitary Sewer Fund SU - Storm Sewer Fund TF - Tax Increment Financing WF - Water Fund GRAND TOTAL 2018 2019 Total 170,610 55,925 320,000 52,000 598,535 150,500 511,000 95,000 133,000 889,500 35,000 12,500 23,000 15,000 85,500 1,000,000 4,000,000 5,000,000 17,635,000 2,300,000 750,000 9,600,000 30,285,000 2,630,000 1,100,000 3,730,000 60,000 275,000 51,000 93,500 9,500 489,000 212,000 377,000 187,000 467,000 137,000 9,380,000 50,000 50,000 3,255,000 1,540,000 2,791,000 2,425,000 1,500,000 99,599,000 25,000 18,000 43,000 310,000 1,060,000 1,064,000 750,000 750,000 3,934,000 300,000 240,000 475,000 298,000 9,393,000 470,000 396,000 241,000 321,000 190,000 9,698,000 10,500,000 1,000,000 500,000 92, 000, 000 250,000 786,000 400,000 850,000 268,000 2,554,000 36,728,110 12,638,425 6,162,000 16,648,500 3,303,500 75,480,535 El Thursday, July 10, 2014 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 2015 thra 2019 PROJECTS BY FUNDING SOURCE Source Project# Priority 2015 2016 2017 2018 2019 Total AC - Arts Center Fund 1 Arts Center- Replace Rooftop HVAC Units 08-C/P-AR093 n/a 320,000 320,000 Arts Center - Replace Lobby Carpet 09-C/P-AR027 n/a 52,000 52,000 Arts Center - Replace theatre seats and backs 92-C/P-AR002 1 138,510 938,590 Arts Center - Replace Information Desk and Kiosk 92-C/P-AR005 1 5,000 5,000 Arts Center - Re -landscape E & W faces of building 93-C/P-AR009 2 3,600 3,600 Arts Center- Storage & Hanging, Display Systems 93-C/P-AR004 1 3,125 3,125 Arts Center - Storage in Art Classroom 94-C/P-AR009 1 3,500 3,500 Arts Center - Kitchen Handwashing Sink 94-ClP-AR002 1 5,000 5,000 Arts Center - Paint Theatre 94-ClP-AR003 2 15,000 95,000 Arts Center- Remodel Administrative Offices 94-C/P-AR004 2 50,000 50,000 Arts Center - Entryway Planters 94-C/P-AR005 3 2,800 2,800 AC - Arts Center Fund Total 170,610 55,925 320,000 52,000 598,535 CI - Capital Improvement Fund Activity Center - Replace Gynmasium Roof 08-C/P-AC098 n/a 105,000 905,000 Activity Center- Raspberry Room Roof Replacement 08-C/P-ACO24 n/a 80,000 80,000 Public Works - Replace Overhead Doors 08-C/P-BO23 n/a 18,000 98,000 Replace Carpet and Apparatus Floor Finish - FD 08-C/P-FD099 n/a 56,000 56,000 Replace Carpet- Police Station 08-C/P-PD096 n/a 40,000 40,000 Activity Center- Lower Roof Replacement 09-C/P-AC031 n/a 80,000 80,000 City Hall Roof Replacement 09-C/P-CH029 n/a 115,000 995,000 City Hall Lobby Upgrade 09-C/P-CH030 n/a 110,000 990,000 Public Works Garage Upgrade 93-C/P-8099 1 20,000 100,000 920,000 Activity Center- Fencing/Landscaping 94-ClP-ACOO 9 1 13,000 93,000 Activity Center- Multi Purpose/Gym Improvements 94-C/P-AC002 2 67,000 67,000 Activity Center Computer/Library Room Enhancements 94-ClP-AC003 4 20,000 20,000 Activity Center- Dishwasher 94-ClP-AC004 5 15,000 95,000 Wash Bay Roof Replacement 94-C/P-8009 4 23,000 23,000 Wash Bay Air Handler Replacement 94-C/P-B002 3 15,000 95,000 Fuel Management System Upgrade 94-C/P-B003 4 12,500 92,500 Cl - Capital Improvement Fund Total 150,500 511,000 95,000 133,000 889,500 CT - Cable Franchise Fees Technology Improvement- Council Chambers & Studio 13C/P-CM009 n/a 35,000 12,500 23,000 15,000 85,500 CT - Cable Franchise Fees Total 35,000 12,500 23,000 15,000 85,500 ED - Economic Development Fund Block 64 Redevelopment Project 06-C1P-D404 n/a 1,000,000 9,000,000 8th Ave Streetscape and parking facility 92-C/P-D408 n/a 4,000,000 4,000,000 Thursday, July 10, 2014 47 Source Project# Priority ED - Economic Development Fund Total 1,600,000 GU - Other Governmental Units County Road 3 09-ClP-S 904 County Road 61 (Shady Oak Road) 09-C/P-S 906 Eighth Avenue LRT Corridor 09-C1P-5503 Depot Recreation Area 90-CIP-RO02 Mainstreet Rehabilitation 99-C/P-S 929 Blake Road Corridor Improvements 95-C/P-5009 GU - Other Governmental Units Total 2 125,000 MS - Municipal State Aid Streets County Road 3 09-CIP-S 904 County Road 61 (Shady Oak Road) 09-C/P-S 906 Sixth Street South (11th to 12th Avenue South) 09-C1P-5504 Mainstreet Rehabilitation 99-C/P-S 929 MS - Municipal State Aid Streets Total 750,000 8,000,000 PA - Pavilion Fund Pavilion skate Tile Replacement/Lobby Improvement 07-C/P-P393 Pavilion Overhead Door Improvement 07-C/P-P394 Pavilion Roof Replacement 09-C/P-PO26 Pavilion Evaporator Condenser Replacement 09-C/P-PO36 Pavilion Indoor Turf Replacement 90-C/P-P399 Pavilion - Desiccant Repl of Dehumidification Syst 90-C/P-P320 Pavilion Mezzanine Rooftop Unit Replacement 93-C/P-P329 Pavilion HHS Team Room Rooftop Unit Repl 93-C/P-P322 Pavilion Entry and Lobby Door Replacement 93-C/P-P324 Pavilion - Paint Exterior Building 93-C/P-P325 Pavilion Painting the Arena Ceiling and Bar Joist 94-C/P-P090 PA - Pavilion Fund Total 400,000 3 1,630,000 PDF- Park Dedication Fund Skate Park 08-C1P-P003 Park Valley - Play Equipment 08-C/P-P090 Burnes Park - Resurface Tennis Courts 08-CIP-P099 Hilltop Park - Play Equipment 08-C/P-P094 Valley Park - Play Equipment 08-C/P-P095 Depot Recreation Area 90-CIP-RO02 Burnes Park - Warming House 93-CIP-PO40 Oakes Park - Replace Picnic Shelter 93-C/P-PO41 Valley Park - Construct Storage Building 93-C/P-PO42 Burnes Park - Play Equipment 93-C/P-PO43 Oakes Park - Tennis Courts 93-CIP-PO44 Valley Park - Warming House 93-C/P-PO45 Burnes Park - Lighting 93-CIP-PO46 Cottageville Park - Phase II Improvements 93-CIP-PO54 Harley Hopkins Park - Warming House 93-C/P-PO56 Harley Hopkins Park - Lighting 93-C/P-PO57 2015 2016 2017 2018 2019 Total 1,000,000 4,000,000 5,000,000 n/a 1,600,000 1600, 000 n/a 16,850,000 96,850,000 n/a 2,300,000 2,300,000 2 125,000 125,000 3 660,000 660,000 n/a 750,000 8,000,000 8,750,000 17,635,000 2,300,000 750,000 9,600,000 30,285,000 n/a 700,000 700,000 n/a 1,000,000 1000,000 n/a 400,000 400,000 3 1,630,000 1630, 000 2,630,000 1,100,000 3,730,000 n/a 45,000 45,000 n/a 40,000 40,000 1 140,000 940,000 n/a 60,000 60,000 n/a 95,000 95,000 n/a 6,000 6,000 1 24,500 24,500 1 9,500 9,500 3 7,000 7,000 1 22,000 22,000 1 40,000 40,000 60,000 275,000 51,000 93,500 9,500 489,000 n/a 7,000 7,000 7,000 7,000 7,000 35,000 n/a 60,000 60,000 n/a 20,000 20,000 n/a 100,000 100,000 n/a 80,000 80,000 2 50,000 50,000 n/a 60,000 60,000 n/a 30,000 30,000 n/a 25,000 25,000 n/a 50,000 50,000 n/a 20,000 20,000 n/a 60,000 60,000 n/a 50,000 50,000 n/a 250,000 250,000 n/a 30,000 30,000 n/a 50,000 50,000 48 Thursday, July 10, 2014 Source Project# Priority 2015 Oakes Park - Lighting 93-CIP-P072 n/a 40,000 Rehab Downtown Park 94-CIP-P009 n/a Burnes Park Splash Pad 94-C/P-P002 n/a PDF- Park Dedication Fund Total PF - Private Sector Funds 377,000 Depot Recreation Area 90-CIP-R002 PF - Private Sector Funds Total 1,380,000 2 50,000 PI - PIR/General Obligation Bonds Residential Street Improvements and Utilities 09-C/P-S 909 Citywide Concrete Alleys 09-CIP-S 903 County Road 61 (Shady Oak Road) 09-CIP-S 906 Sixth Street South (11th to 12th Avenue South) 09-C1P-5504 Parking Lots and HCRRA Alley Improvements 06-CIP-S 998 Plan, Design and Implement Railroad Quiet Zone 99-C/P-S 920 Mainstreet Rehabilitation 99-C/P-S 929 Pedestrian & Bicycle Access Improvements 93-C/P-SO40 Blake Road Corridor Improvements 95-C/P-5009 2015 Street Overlay Project 95-C/P-5039 PI - PIR/General Obligation Bonds Total n/a 700,000 RF - Refuse Fund Public Works - Replace Overhead Doors 08-C/P-B023 Public Works Garage Upgrade 93-C/P-8099 RF - Refuse Fund Total 100,000 100,000 SA - Special Assessment Residential Street Improvements and Utilities 09-C/P-S 909 Citywide Concrete Alleys 09-CIP-S 903 County Road 61 (Shady Oak Road) 09-CIP-S 906 Mainstreet Rehabilitation 99-C/P-S 929 SA - Special Assessment Total 225,000 3 1,400,000 SF - Sanitary Sewer Fund Residential Street Improvements and Utilities 09-C/P-S 909 Eighth Avenue LRT Corridor 09-C1P-5503 Public Works - Replace Overhead Doors 08-C/P-B023 Lift Station # 4 08-CIP-0009 Public Works Garage Upgrade 93-C/P-8099 Blake Road Corridor Improvements 95-C/P-5009 SF - Sanitary Sewer Fund Total 600,000 850,000 SU - Storm Sewer Fund Residential Street Improvements and Utilities 09-C/P-S 909 Eighth Avenue LRT Corridor 09-C1P-5503 2016 2017 2018 2019 Total 40,000 70,000 70,000 300,000 300,000 212,000 377,000 187,000 467,000 137,000 1,380,000 2 50,000 50,000 50,000 50,000 n/a 1,500,000 2,500,000 1,500,000 1,500,000 7,000,000 n/a 15,000 16,000 31,000 n/a 700,000 700,000 n/a 100,000 100,000 n/a 930,000 930,000 n/a 25,000 200,000 225,000 3 1,400,000 1400, 000 n/a 25,000 25,000 25,000 25,000 900,000 n/a 250,000 600,000 850,000 n/a 175,000 975,000 3,255,000 1,540,000 2,791,000 2,425,000 1,500,000 11,511,000 n/a 18,000 98,000 1 25,000 25,000 25,000 18,000 43,000 n/a 1,000,000 1,000,000 750,000 750,000 3,500,000 n/a 60,000 64,000 924,000 n/a 250,000 250,000 3 60,000 60,000 310,000 1,060,000 1,064,000 750,000 750,000 3,934,000 n/a 175,000 240,000 325,000 120,000 860,000 n/a 100,000 100,000 n/a 18,000 98,000 n/a 160,000 960,000 1 25,000 25,000 n/a 150,000 150,000 300,000 240,000 475,000 298,000 1313,000 n/a 200,000 220,000 300,000 150,000 870,000 n/a 150,000 150,000 BP; Thursday, July 10, 2014 Source Project# Priority 2015 2016 2017 2018 2019 Total Storm Drainage System Maintenance -Alley Repairs 09-C/P-0002 n/a 20,000 21,000 21,000 21,000 22,000 905,000 Storm Water Management Projects 09-CIP-0003 n/a 230,000 230,000 Parking Lots and HCRRA Alley Improvements 06-C1P-S 998 n/a 220,000 220,000 Public Works - Replace Overhead Doors 08-C/P-BO23 n/a 18,000 98,000 Public Works Garage Upgrade 93-C/P-8099 1 25,000 25,000 SU - Storm Sewer Fund Total 470,000 396,000 241,000 321,000 190,000 1,618,000 TF - Tax Increment Financing Redevelopment, East Excelsior Boulevard 09-C/P-D4090 n/a 2,000,000 2,000,000 Light Rail Transit Stations (3) 09-C/P-5502 n/a 500,000 500,000 Eighth Avenue LRT Corridor 09-C1P-5503 n/a 1,000,000 9,000,000 Block 64 Redevelopment Project 06-C/P-D404 n/a 3,500,000 3,500,000 Blake Corridor Redevelopment 09-C1P-D406 n/a 5,000,000 5,000,000 TF - Tax Increment Financing Total 10,500,000 1,000,000 500,000 12,000,000 WF - Water Fund Residential Street Improvements and Utilities 09-C/P-S 909 n/a 400,000 400,000 600,000 250,000 9,650,000 Eighth Avenue LRT Corridor 09-C1P-5503 n/a 150,000 950,000 Public Works - Replace Overhead Doors 08-C/P-BO23 n/a 18,000 98,000 St. Louis Park Emergency Connection 08-C/P-0090 n/a 211,000 299,000 Mainstreet Rehabilitation 99-C1P-S 929 3 250,000 250,000 Public Works Garage Upgrade 93-C/P-8099 1 25,000 25,000 Blake Road Corridor Improvements 95-C/P-5009 n/a 250,000 250,000 WF - Water Fund Total 250,000 786,000 400,000 850,000 268,000 2,554,000 GRAND TOTAL 36,728,110 12,638,425 6,162,000 16,648,500 3,303,500 75,480,535 Thursday, July 10, 2014 6 Project Descriptions And Narratives 62 6% Economic Development 53 54 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 01-CIP-D4010 Project Name Redevelopment, East Excelsior Boulevard Future Department Development Contact ED Director Type Improvement Useful Life Unassigned Category Economic Development Priority n/a Description Total Project Cost: $2,000,000 forth side of Excelsior Boulevard from Highway 169 to approximately Blake Road. Zedevelopment of older commercial area. Based on the adopted redevelopment plan, it would involve commercial, and residential uses. Identified n the East End Redevelopment Study. Justification -xcelsior Boulevard was upgraded in this area, providing for additional property on the north side of the roadway. The buildings in this area are >lder and no longer the highest and best use for this property. The funding amount is an estimate and will vary depending on the scope and timing >f the project, likely to be completed along with the construction of the S WERT Blake Station. Expenditures 2015 2016 2017 2018 2019 Total Land Acquisition 2,000,000 2,000,000 Total 2,000,000 2,000,000 Funding Sources 2015 2016 2017 2018 2019 Total TF - Tax Increment Financing 2,000,000 2,000,000 Total 2,000,000 2,000,000 Thursday, July 10, 2014 OR CAPITAL I1PROVEM ENTT PLANT 2015 thea 2019 7� �1V � Department Development 1�� City of Hopkins, Contact ED Director Project # 06-CIP-D404 Type Improvement Useful Life Project Name Block 64 Redevelopment Project p � Category Economic Development Future Priority n/a Description Total Project Cost: $4,500,000 Zedevelopment of block between 5th and 6th Avenues, north of Mainstreet, South of 1st Street North. There currently is no proposed schedule for Justification Mill redevelop older commercial and residential areas. Expenditures 2015 2016 2017 2018 2019 Total Land Acquisition 4,500,000 4,500,000 TOW 4,500,000 4,500,000 Funding Sources 2015 2016 2017 2018 2019 Total ED - Economic Development 1,000,000 1,000,000 Fund TF - Tax Increment Financing 3,500,000 3,500,000 Total 4,500,000 4,500,000 Budget Impact/Other Che $1 mil from ED fund will be in the form of donated land currently held. Thursday, July 10, 2014 611 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 09-CIP-D406 Project Name Blake Corridor Redevelopment Future Department Development Contact ED Director Type Improvement Useful Life 5,000,000 Category Economic Development Priority n/a Description Total Project Cost: $5,000,000 Redevelopment of properties along the Blake Road Corridor including the Cottageville Park area. Justification Removal of blighted and/or obsolete structures, improve access to transit and improve livability of the area. Expenditures 2015 2016 2017 2018 2019 Total Land Acquisition/Demolition 5,000,000 5,000,000 Total 5,000,000 5,000,000 Funding Sources 2015 2016 2017 2018 2019 Total TF - Tax Increment Financing 5,000,000 5,000,000 Total 5,000,000 5,000,000 Thursday, July 10, 2014 57 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 12-CIP-D408 Project Name 8th Ave Streetscape and parking facility Future Description 'arking Ramp Construction, for structure to serve east side of the downtown. Justification Che proposed parking ramp will be used to support transit -oriented development. Department Development Contact ED Director Type Improvement Useful Life 4,000,000 2016 2017 Category Economic Development Priority n/a Total Project Cost: $4,000,000 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 4,000,000 4,000,000 Total Funding Sources 2015 4,000,000 2016 2017 4,000,000 2018 2019 Total ED - Economic Development Fund 4,000,000 4,000,000 Total 4,000,000 4,000,000 TOD Grant, various grant development Accounts, Bonds 58 Thursday, July 10, 2014 General Public Buildings 6T [Yt CAPITAL HOPROVEMENT PLAN 2015 Mm 2019 Department Activity Center City of Hopkins, MN Contact Public Works Director Project # 08-CIP-AC018 Type Improvement Useful Life 25 years Project Name Activit Center - Replace G nmasium Roof Y p Y Category Buildings: Activity Center Future Priority n/a Description Total Project Cost: $105,000 -xisting roof was installed in 1989 and is at the end of its projected useful life. Portion is cost share with Raspberry Ridge Condo Assn. Justification Zoof was installed in 1989 and is at the end of its 25 year useful life. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 105,000 105,000 Total 105,000 105,000 Funding Sources 2015 2016 2017 2018 2019 Total CI - Capital Improvement Fund 105,000 105,000 Total 105,000 105,000 in good condition - move project from 2014 to 2016 and re-evaluate in 2 years. Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Activity Center 1�� City of Hopkins, Contact PW Director Project # 08-CIP-ACO24 Type Improvement Useful Life Project Name Activit Center -Raspberry berr Room Roof Replacement Y p y p Category Buildings: Activity Center Future Priority n/a Description Total Project Cost: $80,000 3uilt up asphalt roofing system covering Raspberry Rooms, Craft Room and Hallways at the Activity Center Justification -xisting roof was replaced in 1992, Expected life is 25 years. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 80,000 80,000 Total 80,000 80,000 Funding Sources 2015 2016 2017 2018 2019 Total CI - Capital Improvement Fund 80,000 80,000 Total 80,000 80,000 repair and upkeep of roofing systems prevent deterioration of interior building structure and damage to interior components of building. Thursday, July 10, 2014 CM CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Activity Center 1�� City of Hopkins, Contact PW Director Project # 09-CIP-AC031 Type Improvement Useful Life 25 years Project Name Activit Center - Lower Roof Replacement Y p Category Buildings: Activity Center Future Priority n/a Description 3uilt up Roof on Activity Center Raspberry Rooms and Hallway. Justification -xisting roof was installed in 1992, estimated replacement due in 2017. Total Project Cost: $80,000 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 80,000 80,000 Total 80,000 80,000 Funding Sources 2015 2016 2017 2018 2019 Total CI - Capital Improvement Fund 80,000 80,000 Total 80,000 80,000 Thursday, July 10, 2014 63 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 14-CIP-AC001 Project Name Activity Center -Fen cing/Lan dscaping Future Department Activity Center Contact Susan Newville Type Improvement Useful Life Category Buildings: Activity Center Priority 1 Urgent Description I Total Project Cost: $13,000 Zeplace the 8' fence at the Hopkins Activity Center parking lot with a 3' fence. Landscape the signage at the corner of 14th and 1st Street North, he curbing in the parking lot, the east side and the northeast side of the building. 'arking has always been a challenge for the Activity Center. We have only 18 parking spots, which 3 are handicap only. Street parking on 14th yvenue is being taken up by Raspberry Ridge residents, Mainstreet School of Performing Arts, and the dentist office at the corner of 14th and dainstreet. We do have parking at Meatzold Field but our guest do not have a visual of that parking lot and replacing the present 8' fence with a 3' ence would give us that visual of additional parking. We need to continue to enhance the outside landscaping with the fresh plantings and mulch hound our building and parking lot. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 13,000 13,000 Total 13,000 13,000 Funding Sources 2015 2016 2017 2018 2019 Total CI - Capital Improvement Fund 13,000 13,000 Total 13,000 13,000 Thursday, July 10, 2014 64 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Activity Censer 1�� City of Hopkins, Contact Susan Newville Project # 14-CIP-AC002 Type Improvement Useful Life Project Name Activit Center - Multi Purpose/Gym Im Improvements Yp Category Buildings: Activity Center Future Priority 2 Very Important Description 'aint the large dividing wall between the north and south gyms. File all the interior walls. Zeplace aging window sashes Total Project Cost: $67,000 Justification Che dividing wall has not been painted since 19990. The present upper brick walls have holes in it and is water stained. The lower walls are ;overed with gym mats mainly to hide all the holes and broken tiles behind them. We would like to upgrade the looks of thus space to enhance its appearance for potential receptions, parties, meetings, etc... The window shades were installed in 1990. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 67,000 67,000 Total 67,000 67,000 Funding Sources 2015 2016 2017 2018 2019 Total CI - Capital Improvement Fund 67,000 67,000 Total 67,000 67,000 Thursday, July 10, 2014 M -i CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Activity Censer 1�� City of Hopkins, Contact Susan Newville Project # 14-CIP-AC003 Type Unassigned Useful Life Project Name Activit Center Com uter/Librar Room Enhancements Y p Y Category Buildings: Activity Censer Future Priority 4 Less Important Description Total Project Cost: $20,000 Zemove walls of the present computer room and convert it to an open area for socializing, card playing, etc and convert the library into a computer Justification ks our programs grow, our needs for different room configurations changes. We have found we do not need all the present space for our Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 20,000 20,000 Total 20,000 20,000 Funding Sources 2015 2016 2017 2018 2019 Total CI - Capital Improvement Fund 20,000 20,000 Total 20,000 20,000 Thursday, July 10, 2014 CY CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Activity Censer 1�� City of Hopkins, Contact Susan Newville Project # 14-CIP-AC004 Type Improvement Useful Life Project Name Activit Center - Dishwasher Y Category Unassigned Future Priority 5 Future Consideration Description I Total Project Cost: $15,000 )ishwasher for the kitchen needed for daily operations of the Hopkins Activity Center and rentals. Justification Che present dishwasher was installed in 1990 and is not running at code in its present state. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 15,000 15,000 Total 15,000 15,000 Funding Sources 2015 2016 2017 2018 2019 Total CI - Capital Improvement Fund 15,000 15,000 Total 15,000 15,000 salvage/resale value on replaced pieces: $200. 67 Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Arts Center 1�J City of Hopkins, Contact Public Works Director Project # 08-CIP-AR013 Type Improvement Useful Life Project Name Arts Center - Replace Rooftop HVAC Units p p Category Buildings: Arts Center Future Priority n/a Description 2eplace rooftop heating and AC units that were installin in 1997. Usefeul life is 20 years. There are 15 total units from 25 tons to 5 tons Justification Tanned replacement at 20 years estimated useful life. Total Project Cost: $320,000 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 320,000 320,000 Total 320,000 320,000 Funding Sources 2015 2016 2017 2018 2019 Total AC - Arts Center Fund 320,000 320,000 Total 320,000 320,000 Thursday, July 10, 2014 68 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 09-CIP-AR027 Project Name Arts Center - Replace Lobby Carpet Future Department Arts Center Contact Arts Center Director Type Improvement Useful Life 10 years Category Buildings: Arts Center Priority n/a Description Total Project Cost: $52,000 keplace the lobby carpet including staircases, second floor, elevator floor, coat room and dance studio dressing room. TED PROJECT SHCEDULE: Future 2018 Justification Che Lobby carpet will be at the end of it's useful life in a high traffic area like the lobby. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 52,000 52,000 Total 52,000 52,000 Funding Sources 2015 2016 2017 2018 2019 Total AC - Arts Center Fund 52,000 52,000 Total 52,000 52,000 Thursday, July 10, 2014 M&I CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 12-CIP-AR002 Project Name Arts Center - Replace theatre seats and backs Future Department Arts Center Contact Arts Center Director Type Improvement Useful Life 20 years Category Buildings: Arts Center Priority 1 Urgent Description I Total Project Cost: $138,510 kemove and replace theater seats and backs. (Keeping existing stanchions) Based on quote from Cosney (they recently did Eisenhower seating) with Classic Quattro seat, 33" low back, waterfall back and seat tailoring. Sherpa Shire -Grade G fabric (similar to existing), plush foam seat, 2" back foam, lexan seat numbers, demo and removal of existing seats and Jacks includes attic stock. 2011 pricing $116,000 with 3% inflation compounded over 5 years $138,510 Justification ;eats will be 20 years old in 2017 and will have exceeded useful life. Stanchions should still be usable. Quote includes replacement of all seats ind backs. is not due until 2017 but wanted to get as much info as possible now to allow for time to plan. TS are deteriating more quickly than anticipated. Many have had repairs but we are approaching the limits of repairability. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 138,510 138,510 Total 138,510 138,510 Funding Sources 2015 2016 2017 2018 2019 Total AC - Arts Center Fund 138,510 138,510 Total 138,510 138,510 ould consider replacing main floor one year and balcony another year if required by cash flow. eed tow weeks in theater to make exchange. Work on stage at same time okay will install team. pportunity to potentially do a "seat sponsor" funding program similar to what was done before ect in 2037 rift Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 12-CIP-AR005 Project Name Arts Center - Replace Information Desk and Kiosk Future Department Arts Center Contact Arts Center Director Type Improvement Useful Life 15 years Category Buildings: Arts Center Priority 1 Urgent Description I Total Project Cost: $5,000 2eplace informational Kiosk and desk with more functional information center. 'urrent informational kiosk and information desk are not ideal for assisting visitors with way finding and disseminating information. Guests nriving are frequently confused and have a hard time finding location of meetings. Etc. Also, we would like to be able to display larger concert >osters, the rental brochure, membership brochures and more. Ae would like to move this project from 2017 to 2015 as our information Kiosk is failing and its function can easily be incorporated into the nformational design. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 5,000 5,000 Total 5,000 5,000 Funding Sources 2015 2016 2017 2018 2019 Total AC - Arts Center Fund 5,000 5,000 Total 5,000 5,000 Thursday, July 10, 2014 r`i CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 13-CIP-AR001 Project Name Arts Center - Re -landscape E & W faces of building Future Department Arts Center Contact Arts Center Co -Director Type Improvement Useful Life 15 years Category Buildings: Arts Center Priority 2 Very Important Description Total Project Cost: $3,600 2emove old shrubs, rework beds, install new plantings and mulch. Project inclues hiring a company to design and install. Justification 'urrent shrubs are dying. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 3,600 3,600 Total 3,600 3,600 Funding Sources 2015 2016 2017 2018 2019 Total AC - Arts Center Fund 3,600 3,600 Total 3,600 3,600 Thursday, July 10, 2014 W CAPITAL I1PROVEM ENT PLANT 2015 thea 2019 City of Hopkins, MN 'roject # 13-CIP-AR004 'roject Name Arts Center - Storage & Hanging, Display Systems Future Department Arts Center Contact Arts Center Co -Director Type Improvement Useful Life 15-20 years Category Buildings: Arts Center Priority 1 Urgent Description Total Project Cost: $9,625 Janging Display System in Jaycee Studio and Community Room: Wall mounted rails with rod & hook system (adjustable) on one wall of each •oom to allow renters as well as tenants and HCA to hang artwork or decor items for events and meetings. (Priority # 2) Storage in Art Class: Build storage units in the art classroom along East wall and move the cabinets currently on East wall to South wall next to he sink area. (useful life 20 years and priority # 1) Ideally we would like to do this in 2013. 2edo Storage Closets: Revamp existing storage rooms to improve functionality. (Useful life of 15 years, priority #2) Justification Storage and Hanging Display System: The Art Center has no way of exhibiting items heavier then cardstock in these spaces. System must be rlexible and unobtrusive when not in use as these are multi -use spaces. (Priority # 2) Storage in art classroom: This would create neater storage of art classroom materials such as easels. It would also create dedicated space in which o store gallery materials such as pedestals, vatrines and shelves - Something that does not exist at present. This would decrease the damage to ;allery materials we currently experience. (useful life of 20 years, priority # 1) 2edo Storage Closets: Creating more efficient storage would eliminate the need to rent off-site storage. (Useful life of 15 vears, priority #2) P111 ioiir Expenditures 2015 2016 2017 2018 2019 Total 6,50; Construction/Maintenance 3,125 3,125 I..�u t a III PIri(i ir Total Funding Sources 2015 3,125 2016 2017 3,125 2018 2019 Total AC - Arts Center Fund 3,125 3,125 ..6,,6,00 I�u t ,,,,,a III Total 3,125 3,125 Budget Impact/Other 73 Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 14-CIP-AR001 Project Name Arts Center - Storage in Art Classroom Future Department Arts Center Contact Arts Center Co -Director Type Improvement Useful Life 20 years Category Buildings: Arts Center Priority 1 Urgent Description I Total Project Cost: $3,500 Build Storage units in the art classroom along east wall and move the cabinets currently on east wall to south wall next to the sink area. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 3,500 3,500 Total 3,500 3,500 Funding Sources 2015 2016 2017 2018 2019 Total AC - Arts Center Fund 3,500 3,500 Total 3,500 3,500 Thursday, July 10, 2014 74 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 14-CIP-AR002 Project Name Arts Center - Kitchen Handwashing Sink Future Department Arts Center Contact Arts Center Co -Director Type Improvement Useful Life Category Buildings: Arts Center Priority 1 Urgent Description Total Project Cost: $5,000 nstall a hand -washing sink in the catering kitchen. This will require plumbing as well as purchasing the fixture and ffittings. Justification Zequired by the County health inspections department. We must have a designated handwashing sink separate from our other kitchen sink in order o serve food at events in the building. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 5,000 5,000 Total 5,000 5,000 Funding Sources 2015 2016 2017 2018 2019 Total AC - Arts Center Fund 5,000 5,000 Total 5,000 5,000 Thursday, July 10, 2014 Mi CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 14-CIP-AR003 Project Name Arts Center - Paint Theatre Future Department Arts Center Contact Arts Center Co -Director Type Improvement Useful Life 15 years Category Buildings: Arts Center Priority 2 Very Important Description Total Project Cost: $15,000 Paint house of theatre which hasn't been done since 1997. Thius will require professional painters and estimated 65 gallons of paint to cover the louse walls. Justification t is time to spruce up the paint. With the addition of new carpeting in 2013 and new seating in 2015, it is perfect timing to paint the walls so that hey are not only clean and fresh, but coordinate in color with the rest of the theater house decor. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 15,000 15,000 Total 15,000 15,000 Funding Sources 2015 2016 2017 2018 2019 Total AC - Arts Center Fund 15,000 15,000 Total 15,000 15,000 Thursday, July 10, 2014 re-, CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Arts Center 1�� City of Hopkins, Contact Arts Center Co -Director Project # 14-CIP-AR004 Type Improvement Useful Life Project Name Arts Center - Remodel Administrative Offices Category Buildings: Arts Center Future Priority 2 Very Important Description Total Project Cost: $50,000 kemodel administrative offices on second floor, moving the conference room to room 206 and combing room 204 and 205 into one office area. kddinz one work station. Justification Ahile this does not significantly increase office square footage, it does create a more flexible space that will accommodate the addition on one nore work station. This in in anticipation for the need for an additional office worker, whether paid or volunteer, within two years. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 50,000 50,000 Total 50,000 50,000 Funding Sources 2015 2016 2017 2018 2019 Total AC - Arts Center Fund 50,000 50,000 Total 50,000 50,000 Thursday, July 10, 2014 77 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Arts Center 1�� City of Hopkins, Contact Arts Center Co -Director Project # 14-CIP-AR005 Type Improvement Useful Life Project Name Arts Center - Entryway Planters � Y Category Buildings: Arts Center Future Priority 3Important Description nstall 2 large cement planters by main front entryway (costs includes shipping) Justification 3urpose is to create an entryway focal point that is attractive and welcoming. Total Project Cost: $2,800 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 2,800 2,800 Total 2,800 2,800 Funding Sources 2015 2016 2017 2018 2019 Total AC - Arts Center Fund 2,800 2,800 Total 2,800 2,800 Thursday, July 10, 2014 78 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department City Hall Administration 1�J City of Hopkins, Contact Public Works Director Project # 09-CIP-CH029 Type Improvement Useful Life 25 years Project Name Cit Hall Roof Replacement 3' pacemenCategory Bldg: City Hall Future Priority n/a Description 3uild up roof on City Hall and Council Chambers Justification -xisting roof was installed in 1994, estimated replacement due in 2019 Total Project Cost: $115,000 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 115,000 115,000 ToW 115,000 115,000 Funding Sources 2015 2016 2017 2018 2019 Total CI - Capital Improvement Fund 115,000 115,000 Total 115,000 115,000 Thursday, July 10, 2014 r9; CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department City Hall Administration 1�J City of Hopkins, Contact Public Works Director Project # 09-CIP-CH030 Type Improvement Useful Life 20 years Project Name Cit Hall Lobb Upgrade 3' 3' Category Bldg: City Hall Future Priority n/a Description Total Project Cost: $110,000 'ity Hall Lobby Upgrade was proposed as part of the 2007 City Hall upgrade/Carpet project. This part was not completed exceeding estimates. Justification -xisting lobby is dated, ceiling tiles have yellowed and wallpaper has numerous stains from 19 years of service. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 110,000 110,000 Total 110,000 110,000 Funding Sources 2015 2016 2017 2018 2019 Total CI - Capital Improvement Fund 110,000 110,000 Total 110,000 110,000 Thursday, July 10, 2014 80 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 13 CIP-CM001 Project Name Technology Improvement -Council Chambers & Studio Future Department Communications Contact Asst City Manager Type Improvement Useful Life 10 years Category Bldg: City Hall Priority n/a Description I Total Project Cost: $95,000 2014 - Installation of surge protection and uninterruptible power supplies in the studio. 2015 - Upgrade equipment in the Council Chamber presentation table 2016 - Replace current document camera with high resolution camera. 2017 - Projection system 2018 - Sound system 2019 - Council chamber cameras Justification 2014 - current and future technology improvements are processor based and are sensitive to power fluctuations 2015 - The current presentation swithcing configuration requires the control room operator to determine what is presented to the room. Presenters do not have much control over their presentations and outside presenters need to use the City computer system. The new equipment will allow the presenter to use their own equipment which will simplify the process while protecting the City's computer network. 2016 - The existing camera is standard definition. The new camera will be high resolution 2017 - Current projectors are 10 years old and low resolution. 2018 - Current ceiling speakers are old and need to be replaced. Lobby speakers have no volume control. 2019 - Current cameras will be 15 years old by 2019 and are standard definition. Replace with high definition cameras. PIri(i ir Expenditures 2015 2016 2017 2018 2019 Total Communications 35,000 12,500 23,000 15,000 85,500 .9,,,500 "�o�ta�,,,,,� 11 Total 35,000 12,500 23,000 15,000 85,500 PIri(i ir Funding Sources 2015 2016 2017 2018 2019 Total 1 9,500, CT - Cable Franchise Fees 35,000 12,500 23,000 15,000 85,500 i'otali Total 35,000 12,500 23,000 15,000 85,500 Thursday, July 10, 2014 81 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 08-CIP-FDO19 Project Name Replace Carpet and Apparatus Floor Finish - FD Future Description Zeplace carpet and apparatus floor finish systems. Department Fire Contact Fire Chief Type Improvement Useful Life 10 years Category Buildings: Fire Facilities Priority n/a Total Project Cost: $56,000 Justification Tanned replacement at end of estimated 10 year useful life. Classroom and 2nd and 3rd Floor entryway and louge replacement, due to excessive xse of classroom and lounge. 'D spoke with Steve Stadler and he was ok with moving it up to 10 years from 15 years. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 56,000 56,000 Total 56,000 56,000 Funding Sources 2015 2016 2017 2018 2019 Total CI - Capital Improvement Fund 56,000 56,000 Total 56,000 56,000 iginal plan replacement was 15 years. Due to excessive use of classroom and lounge the life was moved to 10 years. Thursday, July 10, 2014 82 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 07-CIP-P313 Project Name Pavilion skate Tile Replacement/Lobby Improvement Future Department Pavilion Contact PW Director Type Improvement Useful Life 10 years Category Parks/Fores/Pay.: Comm. Facil Priority n/a Description Total Project Cost: $97,000 Zeplacement of existing skate tile and adding skate tile and ceramic tile to the lobby. Replacement of existing tile in team rooms, arena, warming �oom , and referees room: 5,500 square feet. Install skate tile to a portion of lobby so skaters can access drinking fountains; 500 square feet. nstall ceramic tile in the entryway and a portion of the lobby: 500 square feet. has a 10 Year Life - Put in CIP again for 2017 for evalutaion. May only need to do the high traffice areas. Justification 'urrent skate tile is 16 years old and is the original tile; the wear layer of the tile is worn through in the high traffic areas. Original tile was not slued, which increases maintenance and can create gaps in seams. This can allow skates to touch the concrete underneath the tile. Lobby skate ind ceramic tile would add to the building aesthetics. When done in 2007 this project cost $41,339.30. P111 oiir Expenditures 2015 2016 2017 2018 2019 Total 1:::EK Construction/Maintenance 45,000 45,000 't'ot Ali Total 45,000 45,000 PIII- i(i III- Funding Sources 62,00„0 PA - Pavilion Fund I'ota 111 2015 2016 2017 2018 2019 45,000 Total 45,000 Total 45,000 45,000 ew the glued down will save on maintenance, be safer, and improve facility appearance and marketability. Thursday, July 10, 2014 83 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Pavilion 1�J City of Hopkins, Contact Public Works Director Project # 07-CIP-P314 Type Improvement Useful Life 30 years Project Name Pavilion Overhead Door Improvement p Category Bldgs: Pavillion Future Priority n/a Description Total Project Cost: $40,000 Remove and lock -in four of the six overhead doors on the west side of the Pavilion with a portion to have windows or glass block to allow light to come through. Install automatic openers on the remaining four overhead doors in the arena. ESTIMATED PROJECT SCHEDULE: 2015 Justification Currently the overhead doors are seldom utilized and the removal and installation of glass blocks or windows will decrease the need to use arena lighting and add to arena aesthetics. Saving on repairs and maintenance of the removed doors. Pavilion user groups have asked for this project. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 40,000 40,000 Total 40,000 40,000 Funding Sources 2015 2016 2017 2018 2019 Total PA - Pavilion Fund 40,000 40,000 Total 40,000 40,000 savings on utilities and greater satisfaction from user groups with arena aesthetics. Thursday, July 10, 2014 84 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Pavilion 1�J City of Hopkins, Contact Public Works Director Project # 09-CIP-PO26 Type Improvement Useful Life 25 years Project Name Pavilion Roof Replacement p Category Bldgs: Pavillion Future Priority 1 Urgent Description Total Project Cost: $140,000 Zemoval and replacement of existing ballast and membrane for both the north and south roof sections. Justification Zepairs made in 2005 extended the life of the roof but it is now 25 years old and has surpassed manufacturers recommendation for replacements. Che current roof has leaks and given the current condition of the membrane more failures are expected. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 140,000 140,000 Total 140,000 140,000 Funding Sources 2015 2016 2017 2018 2019 Total PA - Pavilion Fund 140,000 140,000 Total 140,000 140,000 leaks can potentially be harmful to the steel roof deck and may cause damage to equipment and interior of Pavilion, impacting operations and g cost to roof replacement. Thursday, July 10, 2014 85 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Pavilion 1�J City of Hopkins, Contact Public Works Director Project # 09-CIP-PO36 Type Improvement Useful Life 15-25 years Project Name Pavilion Evaporator Condenser Replacement p p Category Bldgs: Pavillion Future Priority n/a Description Total Project Cost: $60,000 Zemove and replace existing condenser with a new condenser, sump tank, pump and fan motors. --STIMATED PROJECT SCHEDULE: 2015 Justification -xisting condenser has extensive scaling and has experienced a loss in efficiency causing higher head pressures and putting greater strain on ;omnressors. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 60,000 60,000 Total 60,000 60,000 Funding Sources 2015 2016 2017 2018 2019 Total PA - Pavilion Fund 60,000 60,000 Total 60,000 60,000 the age, scaling, and corrosion of the existing condenser a freon leak could potentially develop causing greater expense and need for repair. Thursday, July 10, 2014 II CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 10-CIP-P319 Project Name Pavilion Indoor Turf Replacement Future Description 'urchase new turf for the Pavilion's arena Department Pavilion Contact Facilities Director Type Improvement Useful Life 15 years Category Bldgs: Pavillion Priority n/a Total Project Cost: $95,000 Justification Che current turf was purchased in 1998 and has a useful life of 15 years (2013), the turf is showing signs of wear and has been patched in a few peas. Replacement will be needed by 2016. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 95,000 95,000 Total 95,000 95,000 Funding Sources 2015 2016 2017 2018 2019 Total PA - Pavilion Fund 95,000 95,000 Total 95,000 95,000 resale of the existing turf may offset some of the cost of a new turf system. Thursday, July 10, 2014 87 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 10-CIP-P320 Project Name Pavilion - Desiccant Repl of Dehumidification Syst Future Description 'urchase and replace the desiccant medium used in the Pavilion's dehumidification system. Department Pavilion Contact Facilities Director Type Improvement Useful Life 10 years Category Bldgs: Pavillion Priority n/a Total Project Cost: $6,000 Justification Che current desiccant has never been replaced and has surpassed its useful life. New desiccant will make the system run more efficient and :ffectively saving on natural gas and electricity. Also provide dryer air which can have a positive effect on ice quality and indirectly cause more ;fficient operation of the refrigeration equipment. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 6,000 6,000 Total 6,000 6,000 Funding Sources 2015 2016 2017 2018 2019 Total PA - Pavilion Fund 6,000 6,000 'row 6,000 6,000 Thursday, July 10, 2014 88 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Pavilion 1�� City of Hopkins, Contact Don Olson Project # 13-CIP-P321 Type Improvement Useful Life 15 years Project Name Pavilion Mezzanine RooftopUnit Replacement p Category Bldgs: Pavillion Future Priority 1 Urgent Description I Total Project Cost: $24,500 'urchase and installation of (3) rooftop HVAC units that suppy heating and cooling to the Pavilions Mezzanine Justification Che current units were installed in 2003 and are at the end of their useful life. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 24,500 24,500 Total 24,500 24,500 Funding Sources 2015 2016 2017 2018 2019 Total PA - Pavilion Fund 24,500 24,500 Total 24,500 24,500 Thursday, July 10, 2014 89 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 13-CIP-P322 Project Name Pavilion HHS Team Room Rooftop Unit Repl Future Department Pavilion Contact Don Olson Type Improvement Useful Life 15 years Category Bldgs: Pavillion Priority 1 Urgent Description I Total Project Cost: $9,500 'urchase and installation of (1) rooftop HVAC unit that supply's heating and cooling to the High School Hockey Team Rooms. Justification Che current unit was installed in 2004 and is at the end of its useful life. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 9,500 9,500 Total Funding Sources 2015 9,500 2016 2017 2018 2019 9,500 Total PA - Pavilion Fund 9,500 9,500 Total 9,500 9,500 Thursday, July 10, 2014 O CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Pavilion 1�� City of Hopkins, Contact Don Olson Project # 13-CIP-P324 Type Improvement Useful Life 25 years Project Name Pavilion Entryand Lobb Door Replacement Y p Category Bldgs: Pavillion Future Priority 3Important Description Total Project Cost: $7,000 'urchase and install (10) doors, closers, and push bars to replace the current doors at the entrance to the Pavilion. Justification Che current doors were installed when the facility was built in 1990 and have exceeded their useful life. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 7,000 7,000 Total 7,000 7,000 Funding Sources 2015 2016 2017 2018 2019 Total PA - Pavilion Fund 7,000 7,000 Total 7,000 7,000 Thursday, July 10, 2014 SSI CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 13-CIP-P325 Project Name Pavilion - Paint Exterior Building Future Description lire a painting contractor to pain the Pavilions exterior. Department Pavilion Contact Don Olson Type Improvement Useful Life 25 years Category Bldgs: Pavillion Priority 1 Urgent Total Project Cost: $22,000 Justification Che exterior block of the facility has not been painted since the facility was built and the current paint is faded and chipped in areas. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 22,000 22,000 Total 22,000 22,000 Funding Sources 2015 2016 2017 2018 2019 Total PA - Pavilion Fund 22,000 22,000 Total 22,000 22,000 Thursday, July 10, 2014 0 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 14-CIP-POIO Project Name Pavilion Painting the Arena Ceiling and Bar Joist Future Description lire a painting contractor to clean, prep, and paint the roof deck, bar joist, and arena walls. Department Pavilion Contact Don Olson Type Improvement Useful Life 25 years Category Bldgs: Pavillion Priority 1 Urgent Total Project Cost: $40,000 Justification Che current coating was painted when the facility was built and is in need of recoating to protect roof deck and bar joist from rust. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 40,000 40,000 Total 40,000 40,000 Funding Sources 2015 2016 2017 2018 2019 Total PA - Pavilion Fund 40,000 40,000 Total 40,000 40,000 Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 08-CIP-PDO16 Project Name Replace Carpet- Police Station Future Description Zeplace Police Station Carpeting Department Police Contact Police Chief Type Improvement Useful Life 7 years Category Buildings: Police Department Priority n/a Total Project Cost: $40,000 Justification Tanned replacement at end of estimated 10 year useful life. This is a 24hour/day work center that required the shorter carpet replacement cycle. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 40,000 40,000 Total 40,000 40,000 Funding Sources 2015 2016 2017 2018 2019 Total CI - Capital Improvement Fund 40,000 40,000 Total 40,000 40,000 have to look at other flooring option for dispatch. (ie combination of carpet and tile due to wear under desk areas. ously in at a 7 year life - moved back to 10 year life Thursday, July 10, 2014 OZI! CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 08-CIP-BO23 Project Name Public Works -Replace Overhead Doors Future Description Zeplace overhead doors Department Public Works: Bldg/Equip Ser Contact Facilities Director Type Improvement Useful Life 18,000 Category Buildings: Maintenance Facilit Priority n/a Total Project Cost: $90,000 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 90,000 90,000 Total 90,000 90,000 Funding Sources 2015 2016 2017 2018 2019 Total Cl - Capital Improvement Fund 18,000 18,000 RF - Refuse Fund 18,000 18,000 SF - Sanitary Sewer Fund 18,000 18,000 SU - Storm Sewer Fund 18,000 18,000 WF - Water Fund 18,000 18,000 Total 90,000 90,000 Thursday, July 10, 2014 0161 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 13-CIP-BOI I Project Name Public Works Garage Upgrade Future Department Public Works: Bldg/Equip Ser Contact Public Works Director Type Improvement Useful Life 30 years Category Buildings: Maintenance Facilit Priority 1 Urgent Description I Total Project Cost: $220,000 The current Vehicle Maintenance Garage at Public Works was constucted in 1981, an addition was added in 1995. The floor hoist was installed in 1989. The concrete flooring and drainage system are in very poor condition. The current below grade vehicle lift needs to be relocated above grade to prevent groundwater contamination from an undetectable failure in the piping or hoist. A roll -around above grade hoist sytem will need to be utilized in place of the existing below grade hoist. Due to the sloping of the existing floor and its condition it would need to be replaced to be able to use this type of lift. Existing ventilation, installed in 1989 will also need to be upgraded to meet current regulations on air quality. The concrete flooring and drainage system are in very poor condition. A small twin post above ground lift will be utilized for cars and light trucks. 1: 2015: Site evaluation and cost estimates, plans and specifications 2: 2016 Construction Justification 'urrent garage area needs to be brought up to new requirments for above and below ground hoists. ststem needs to be brounght up to current standards and to prevent garage fumes from entering office area. and drain system in poor condition. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 20,000 200,000 220,000 Total 20,000 200,000 220,000 Funding Sources 2015 2016 2017 2018 2019 Total Cl - Capital Improvement Fund 20,000 100,000 120,000 RF - Refuse Fund 25,000 25,000 SF - Sanitary Sewer Fund 25,000 25,000 SU - Storm Sewer Fund 25,000 25,000 WF - Water Fund 25,000 25,000 Total 20,000 200,000 220,000 011 Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Public Works: Bldg/Equip Ser 1�J City of Hopkins, Contact Public Works Director Project # 14-CIP-BOO1 Type Unassigned Useful Life 20 years Project Name Wash Ba Roof Replacement Y p Category Buildings: Maintenance Facilit Future Priority 4 Less Important Description -xisting roof over wash bay area and shop are at the Public Works site. Total Project Cost: $23,000 Justification -xistitng roof was installed in 1995. At this time we have had numerous leaks and roof has reached the end of its life span Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 23,000 23,000 Total 23,000 23,000 Funding Sources 2015 2016 2017 2018 2019 Total CI - Capital Improvement Fund 23,000 23,000 Total 23,000 23,000 Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �iV � Department Public Works: Bldg/Equip Ser 1�� City of Hopkins, Contact Bldg/Equip Supt Project # 14-CIP-B002 Type Improvement Useful Life 20 years Project Name Wash Ba Air Handler Replacement Y p Category Unassigned Future Priority 3Important Description kir Handler Unit that heats the Wash Bay area at Public Works Total Project Cost: $15,000 Justification -xisting Unit was purchased in 1987 and was originally installed at the Hopkins Landfill Storage Building. It was moved into its present location n 1994. Existing unit is corroded badly from the harsh environment of a wash bay. Could look at option of relocating to Roof Area as part of '.015 Roof Replacement. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 15,000 15,000 Total 15,000 15,000 Funding Sources 2015 2016 2017 2018 2019 Total CI - Capital Improvement Fund 15,000 15,000 Total 15,000 15,000 Thursday, July 10, 2014 or- CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �iV � Department Public Works: Bldg/Equip Ser 1�� City of Hopkins, Contact Bldg/Equip Supt Project # 14-CIP-13003 Type Improvement Useful Life 20 years Project Name Fuel Management System Upgrade g Y Category Unassigned Future Priority 4 Less Important Description I Total Project Cost: $12,500 Che Fuel Management System is used to monitor and dispense Fuel to the Cities fleet of Equipment. Hardware consists of a dispenser at the Fuel sland a Software package tied to the Cities Fleet Maintenance Program and individual cards or keys in each vehicle. Justification -xisting system was installed in 1989 and updated in 1995. The hardware and software are obsolete and a failure of this system could disrupt our ibility to dispense fuel. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 12,500 12,500 Total 12,500 12,500 Funding Sources 2015 2016 2017 2018 2019 Total CI - Capital Improvement Fund 12,500 12,500 Total 12,500 12,500 Thursday, July 10, 2014 O Will Parks and Recreation Illy CAPITAL I1PROVEM ENT PLANT 2015 thea 2019 City of Hopkins, MN Project # 08-CIP-P003 Project Name Skate Park Future Department Public Works: Parks Contact Facilities Director Type Improvement Useful Life 15 years Category PW - Parks Priority n/a Description I Total Project Cost: $84,000 knnual equipment enhancments to Overpass Skate Park Per our agreement with 3rd Lair, who manages the Skate Park, we need to put $7,000 of enhancements into the Skate Park for the years 2006-2008. The agreement for 2009-2011 requires annual enhancements of $7,000. The agreement for 2012-2014 is currently being renewed for $7,000 each year. 7The current agreement of $7,000 per year is expected to be continued for 2015-2017 Per the Overpass Skate Park Operators Agreement, the city annually puts an amount specified in the agreement of enhancements into the park to ,change/improve the park each year to keep the park attractive and challenging to users. PIri(i ir Expenditures 2015 2016 2017 2018 2019 Total 49,000 Construction/Maintenance 7,000 7,000 7,000 7,000 7,000 35,000 I"tote]]] Total 7,000 7,000 7,000 7,000 7,000 35,000 PIri(i ir Funding Sources 2015 2016 2017 2018 2019 Total [:::49,E PDF- Park Dedication Fund 7,000 7,000 7,000 7,000 7,000 35,000 I"tote]]] Total 7,000 7,000 7,000 7,000 7,000 35,000 Budget Impact/Other Formerly budgeted in Skate Park Enterprise Fund, which was eliminated 12/31/2005. It is now budgeted in the Park Dedication Fund Thursday, July 10, 2014 111191 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 08-CIP-POIO Project Name Park Valley- Play Equipment Future Description Zeplace park play equipment Justification Jpgrade of park play equipment after 20 - 25 years of use. Department Public Works: Parks Contact PW Director Type Improvement Useful Life 60,000 Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $60,000 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 60,000 60,000 Total 60,000 60,000 Funding Sources 2015 2016 2017 2018 2019 Total PDF- Park Dedication Fund 60,000 60,000 Total 60,000 60,000 from 2014 to 2018 and increased cost from $45,000 to $60,000. Thursday, July 10, 2014 CAPITAL HOPROVEM ENT PLAN City of Hopkins, MN Project # 08-CIP-POI I Project Name Burnes Park -Resurface Tennis Courts Future Description 'rackseal and apply new surface color coat to Burnes Park tennis courts. 'eriodic repairs needed to ensure quality safe playing surface. 2015 thru 2019 Department Public Works: Parks Contact Facilities Director Justification York needed to restore asphalt surface condition and extend life of tennis courts. P111 oiir Expenditures 1:::EK Construction/Maintenance l'ota it Total P Irio Ir Funding Sources 1 10,00„0 PDF- Park Dedication Fund l'olatli Total 20,000 20,000 Type Improvement Useful Life Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $30,000 2015 2016 2017 2018 2019 Total 20,000 20,000 20,000 20,000 2015 2016 2017 2018 2019 Total 20,000 20,000 ork last done in 2009 - periodically needs repairs. 1111.7 Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 08-CIP-P014 Project Name Hilltop Park -Play Equipment Future Description Zeplace park play equipment. Justification Zeplace park play equipment after 20-25 years - installed in 1990 and needs replacement Department Public Works: Parks Contact Facilities Director Type Improvement Useful Life Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $100,000 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2015 2016 2017 2018 2019 Total PDF- Park Dedication Fund 100,000 100,000 Total 100,000 100,000 ect changed from $45,000 to $100,000 and moved from 2014 top 2016 Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 08-CIP-P015 Project Name Valley Park - Play Equipment Future Description Zeplace park play equipment. Department Public Works: Parks Contact Facilities Director Type Improvement Useful Life Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $80,000 Justification 'lay container upgraded in 2012 and rope climber installed. Other existing play equipment was installed in 1992 and needs replacement. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 80,000 80,000 Total 80,000 80,000 Funding Sources 2015 2016 2017 2018 2019 Total PDF- Park Dedication Fund 80,000 80,000 Total 80,000 80,000 project to incicude play equipment replacement in 2017 IUfl Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 13-CIP-PO40 Project Name Burnes Park -Warming House Future Description Zehab Warming House - $60,000 Department Public Works: Parks Contact Public Works Director Type Improvement Useful Life Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $60,000 Justification Che existing warming house is 40+ years old and looks dates and drab. Install new roffing, exterior treatment and landscaping. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 60,000 60,000 Total 60,000 60,000 Funding Sources 2015 2016 2017 2018 2019 Total PDF- Park Dedication Fund 60,000 60,000 Total 60,000 60,000 ew to CIP in 2013 111M Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 13-CIP-PO41 Project Name Oakes Park -Replace Picnic Shelter Future Description Zeplace picnic shelter - $30,000 Justification -xisting shelter is 30+ years old and deteriorated, concrete slab floor is heaving. Department Public Works: Parks Contact Public Works Director Type Improvement Useful Life Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $30,000 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 30,000 30,000 Total 30,000 30,000 Funding Sources 2015 2016 2017 2018 2019 Total PDF- Park Dedication Fund 30,000 30,000 Total 30,000 30,000 ew to CIP in 2013 IMM Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 13-CIP-PO42 Project Name Valley Park -Construct Storage Building Future Description 'onstruct storage building - $25,000 Department Public Works: Parks Contact Public Works Director Type Improvement Useful Life Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $25,000 Justification itorage area needed to support organizations using the athletic fleids and for park maintenance needs. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 25,000 25,000 Total 25,000 25,000 Funding Sources 2015 2016 2017 2018 2019 Total PDF- Park Dedication Fund 25,000 25,000 Total 25,000 25,000 ew to CIP in 2013 IsM Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLANT 2015 thea 2019 City of Hopkins, MN Project # 13-CIP-PO43 Project Name Burnes Park -Play Equipment Future Description Zeplace 2-5 play equipment - $35,000, Install concrete play container edging 15,000 'lay Equipment - $200,000 in 2025 Department Public Works: Parks Contact Public Works Director Type Improvement Useful Life 200m,000 Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $250,000 Justification -xisting equipment was installed in 1996. This large park and its play equipment are heavily used by area residents and for large picnic events. Expenditures 2015 2016 2017 2018 2019 Total Futuure Construction/Maintenance 50,000 50,000 200m,000 Total 50,000 50,000 Funding Sources 2015 2016 2017 2018 2019 Total Futuure PDF- Park Dedication Fund 50,000 50,000 200mm000 Total 50,000 50,000 Budget Impact/Other ,Tew to CIP in 2013 ISE Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLANT 2015 thea 2019 City of Hopkins, MN Project # 13-CIP-PO44 Project Name Oakes Park- Tennis Courts Future Description Zepair tennis courts - $20,000 '.025 - Tennis Courts Reconstruct= $180,000 (2 courts) Justification 'eriodic repairs needed to ensure quality safe playing surface Department Public Works: Parks Contact Public Works Director Type Improvement Useful Life 180 000 Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $200,000 Expenditures 2015 2016 2017 2018 2019 Total Fitfit re Construction/Maintenance 20,000 20,000 180 000 Total 20,000 20,000 Funding Sources 2015 2016 2017 2018 2019 Total Fitfit re PDF- Park Dedication Fund 20,000 20,000 180mm000 Total 20,000 20,000 Budget Impact/Other added to CIP in 2013 Ifif: Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Public Works: Parks 1�J City of Hopkins, Contact Public Works Director Project # 13-CIP-PO45 Type Improvement Useful Life Project Name Valle Park - Warming House Y g Category Parks/Fores/Pay.: Comm. Facil Future Priority n/a Description Zehab Warming House - $60,000 Total Project Cost: $60,000 Justification Che existing warming house is 40+ years old and looks dated and drab. Install new roofing, elextrical upgrades, plumbinf upgrades, exterior reatements and landscaping. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 60,000 60,000 Total 60,000 60,000 Funding Sources 2015 2016 2017 2018 2019 Total PDF- Park Dedication Fund 60,000 60,000 Total 60,000 60,000 Thursday, July 10, 2014 IsM CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Public Works: Parks 1�J City of Hopkins, Contact Public Works Director Project # 13-CIP-PO46 Type Improvement Useful Life Project Name Burnes Park -Lighting Category Parks/Fores/Pay.: Comm. Facil Future Priority n/a Description iahitno - Total Project Cost: $50,000 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 50,000 50,000 Total 50,000 50,000 Funding Sources 2015 2016 2017 2018 2019 Total PDF- Park Dedication Fund 50,000 50,000 Total 50,000 50,000 IMEI Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Public Works: Parks 1�J City of Hopkins, Contact Public Works Director Project # 13-CIP-PO54 Type Improvement Useful Life Project Name Cotta eville Park -Phase II Improvements gCategory Parks/Fores/Pay.: Comm. Facil Future Priority n/a Description Total Project Cost: $250,000 'icnic Shelter, Restrooms, 2-5 play area, misc. site work. Lake Street/Blake Road gateway area Improvements. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 250,000 250,000 Total 250,000 250,000 Funding Sources 2015 2016 2017 2018 2019 Total PDF- Park Dedication Fund 250,000 250,000 Total 250,000 250,000 Thursday, July 10, 2014 IS&I CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Public Works: Parks 1�J City of Hopkins, Contact Public Works Director Project # 13-CIP-PO56 Type Improvement Useful Life Project Name HarleyHopkins Park -Warming House p g Category Parks/Fores/Pay.: Comm. Facil Future Priority n/a Description Harming House Total Project Cost: $30,000 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 30,000 30,000 ToW 30,000 30,000 Funding Sources 2015 2016 2017 2018 2019 Total PDF- Park Dedication Fund 30,000 30,000 Total 30,000 30,000 Thursday, July 10, 2014 ffdy CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Public Works: Parks 1�J City of Hopkins, Contact Public Works Director Project # 13-CIP-PO57 Type Improvement Useful Life Project Name HarleyHopkins Pk Lighting o p Park - g g Category Parks/Fores/Pay.: Comm. Facil Future Priority n/a Total Project Cost: $50,000 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 50,000 50,000 Too 50,000 50,000 Funding Sources 2015 2016 2017 2018 2019 Total PDF- Park Dedication Fund 50,000 50,000 Total 50,000 50,000 Thursday, July 10, 2014 ffirl CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 13-CIP-PO72 Project Name Oakes Park - Lighting Future ate/Upgrade Lighting - $40,000 - $20,000 from MCES due to moving the hockey rink for their lift station. Department Public Works: Parks Contact Public Works Director Type Unassigned Useful Life Category PW - Parks Priority n/a Total Project Cost: $40,000 Justification Che lighting for open skate and hockey needs replacement due to age and energy inefficiency and must be relocated for the MCES lift station Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 40,000 40,000 Total 40,000 40,000 Funding Sources 2015 2016 2017 2018 2019 Total PDF- Park Dedication Fund 40,000 40,000 Total 40,000 40,000 Thursday, July 10, 2014 ffir-1 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 14-CIP-P001 Project Name Rehab Downtown Park Future Department Public Works: Parks Contact PW Director Type Improvement Useful Life Category PW - Parks Priority n/a Description Total Project Cost: $70,000 Zehabilitate landscape planting areas. Install decorative banners at entrances. Replace drinking fountain. Construct portable restroom enclosure. Justification original landscaping is decades old and needs refreshing, existing drinking fountain is damaged Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 70,000 70,000 Total 70,000 70,000 Funding Sources 2015 2016 2017 2018 2019 Total PDF- Park Dedication Fund 70,000 70,000 Total 70,000 70,000 Thursday, July 10, 2014 ISM CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Public Works: Parks 1�J City of Hopkins, Contact PW Director Project # 14-CIP-P002 Type Improvement Useful Life Project Name Burnes Park Splash Pad p Category PW -Parks Future Priority n/a Description 'onstruct Splash pad play area including water reuse/filtration/treatment system. Justification k water play area alternative to Shady Oak Beach is needed for 2-5 year old children Total Project Cost: $300,000 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 300,000 300,000 Total 300,000 300,000 Funding Sources 2015 2016 2017 2018 2019 Total PDF- Park Dedication Fund 300,000 300,000 Total 300,000 300,000 Thursday, July 10, 2014 flee] CAPITAL I1PROVEM ENT PLANT 2015 thea 2019 City of Hopkins, MN Project # 10-CIP-RO02 Project Name Depot Recreation Area Future Department Recreation Contact PW Director Type Improvement Useful Life 25 years Category PW - Parks Priority 2 Very Important Total Project Cost: $225,000 Depot property serves as a prominent gateway to the city of Hopkins for people exiting Highway 169 to Excelsior Boulevard; as well as those oying the adjacent regional trail. This project includes the addition of an outdoor multipurpose court (basketball, volleyball, boot hockey, etc.), fiches, picnic tables and related landscaping improvements designed to enhance the site both recreationally and aesthetically. New recreational enities would enhance the already popular Depot youth programs in place; while also providing recreational opportunities to residents and ers living in the general area or using the regional trail. 3posed funding is from: Hennepin County Grant - $125,000 Other Agencies - $50,000 Park Dedication - $50.000 The Depot site has needed outdoor amenities for its target audience of youth since its founding. A year-round sports and recreational anchor for youth will provide additional reinforcement of positive behaviors. As more people come to the Depot for youth activities and general use by trail, the planned recreational amenities would be used all day and into the evening hours. Proximity to the regional trail will accord high visibility and symbolize active living and community connections in the walkable and bike -able city that Hopkins has become. The site would become our city's newest park and allow for general and reserved community use such as hosting Joint Recreation programs, picnics and special events for all occasions. Easy access from the regional trail makes the Depot site an easy ride for kids and adults alike who would come for recreation. Expenditures 2015 2016 2017 2018 2019 Total Construction 225,000 225,000 Total 225,000 225,000 Funding Sources 2015 2016 2017 2018 2019 Total GU - Other Governmental 125,000 125,000 Units PDF- Park Dedication Fund 50,000 50,000 PF - Private Sector Funds 50,000 50,000 Total 225,000 225,000 Budget Impact/Otlher 'ost reduced from $500,000 tp $225,000 IM Thursday, July 10, 2014 `w, Streets, Traffic & Transportation 123 124 � •»<+ «: / \�! § 125 1, J § a. § k k k k k k tn to P- e (71 125 1, IP41 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN 'roject # 01-CIP-5101 'roject Name Residential Street Improvements and Utilities Future Department Public Works: Streets/Traffic Contact Public Works Director Type Improvement Useful Life Unassigned Category Trans: Streets Priority n/a Description I Total Project Cost: $19,205,000 -ocations to be determined consistent with the street reconstruction program. Program includes reconstruction of deteriorated water main, sanitary ,ewer and storm sewer in conjunction with street improvement projects. Utility improvements are consistent with the Storm Water Management 'Ian, Water and Sewer Utility Master Plan, and televised inspections. '.016: Avenues west streets Reconstruction Project '.017: Park Valley and Peaceful Valley. Reclamation project. '.018: Northeast Hopins Reconstruction Project. '.019: Avenues Streets Reconstructioin Proiect. Justification n most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installed new. In some cases, nater main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The costs assume the city funding 100% of major storm sewer, water main, and sanitary sewer improvements. piir�kilir Expenditures 2015 2016 2017 2018 2019 Total 6,,,325,,,000 Construction/Maintenance 3,275,000 4,360,000 3,475,000 2,770,000 13,880,000 hitali Total 3,275,000 4,360,000 3,475,000 2,770,000 13,880,000 17iri(i ir Funding Sources 2015 2016 2017 2018 2019 Total 5.'.3.2.5.'..... PI - PIR/General Obligation 1,500,000 2,500,000 1,500,000 1,500,000 7,000,000 Bonds hitali SA - Special Assessment 1,000,000 1,000,000 750,000 750,000 3,500,000 SF - Sanitary Sewer Fund 175,000 240,000 325,000 120,000 860,000 SU - Storm Sewer Fund 200,000 220,000 300,000 150,000 870,000 WF - Water Fund 400,000 400,000 600,000 250,000 1,650,000 Total 3,275,000 4,360,000 3,475,000 2,770,000 13,880,000 Public Hearing - year prior to planned construction Plans and specifications - year prior to planned construction Bid - year of planned construction Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections. Consistent with the City Council adopted Roadway Improvement Policy, Street Ratings, Pavement Management Program, Storm Water Manaaement Plan. Water and Sewer Utilitv Master Plan, and televised insroections. Thursday, July 10, 2014 ff6�l CAPITAL I1PROVEM ENT PLANT 2015 thea 2019 City of Hopkins, MN Project # 01-CIP-5103 Project Name Citywide Concrete Alleys Future Department Public Works: Streets/Traffic Contact Public Works Director Type Improvement Useful Life Unassigned Category Trans: Streets Priority n/a Description I Total Project Cost: $1,368,000 2016: Alley South of Mainstreet between 8th and 9th Ave South 2017: Alley south of 6th Street South and North of Nine Mile Creek, between 11th Avenue South and 10th Avenue South. Program to construct concrete alleys in areas designated as poor on the Alley Condition Survey. Justification The city has had a policy of constructing concrete alleys for a number of years. This policy has proved to be sound by the concrete alleys' durability and low maintenance costs. Current policy has the city share at 20% of the cost in residential areas. The city will experience cost savings due to lower maintenance costs. pill -kill- Expenditures 1,21„3,000 Construction/Maintenance hi1at1i Total 1 I3 (i I- Funding Sources 1 1,2„1„3,000, PI - PIR/General Obligation Bonds titaniI en Q ---iii A,,-,,--,+ 2015 2016 2017 2018 2019 Total 75,000 80,000 155,000 75,000 80,000 155,000 2015 2016 2017 2018 2019 Total 15,000 16,000 31,000 60,000 64,000 124,000 Total 75,000 80,000 155,000 Budget Impact/Other 'onsistent with the City Council adopted Roadway Improvement Policy and Alley ratings. Thursday, July 10, 2014 128 CAPITAL I1PROVEM ENT PLANT 2015 thea 2019 City of Hopkins, MN Project # 01-CIP-5104 Project Name County Road 3 Department Public Works: Streets/Traffic Contact Public Works Director Type Improvement Useful Life Unassigned Category Trans: Streets Future Priority n/a Description I Total Project Cost: $2,300,000 'ounty Road 3 from Shady Oak Road to Meadowbrook Road. -ighting, landscaping, street, etc. improvements along Excelsior Boulevard from the east to west city limits. 30 Bond payments to be financed by a combination of existing TIE revenue, Municipal State Aid road funds, additional TIE revenue created by ;conomic development, grant funds, and, as a last resort, general city revenue ;egment 1: Construction - 1998/1999 ;egment 2: Planning - 2004; bidding and construction (median upgrades only) - 2005 ;egment 3: Planning and acquisition - 1999/2001, bidding/construction - 2002/2003/2004 ;egment 4: Planning and acquisition - Not in County funding plan F funded work includes the following: signalized intersection will be constructed at Monroe Avenue. A second intersection will also be built at Jackson Ave/St. Louis Street. There 11 also be a reconfiguration of Monroe Avenue and Milwaukee south of Excelsior Boulevard. This work is being completed in conjunction with reconstruction of Excelsior Boulevard from Highway 169 to Blake Road. The intersection is being constructed to facilitate redevelopment of SuperValu north annex site. i Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in all four segments of County Road 3: - Segment 1 from Shady Oak Road to 11th Avenue S.; upgrade existing undivided roadway, upgrade 11th Avenue intersection to meet future needs, implement beautification program --completed in 1998 Segment 2 from 11th Avenue S. to Hwy 169; median pavers construction Segment 3 from Highway 169 to Blake Road; upgrade existing narrow undivided roadway, resolve safety issues at railroad crossing, improve north -south access, account for future LRT access, address redevelopment needs, add integration for full access at Jackson Avenue. - Se¢ment 4 from Blake Road to Meadowbrook Road: upgrade roadway. implement beautification program. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 2,300,000 2,300,000 Total 2,300,000 2,300,000 17iri(i ir Funding Sources 2015 2016 2017 2018 2019 Total GU - Other Governmental 1,600,000 1,600,000 ... Units l otali MS - Municipal State Aid 700,000 700,000 Streets Total 2,300,000 2,300,000 Budget Impact/Otlher GO bond payments to be financed by a combination of existing TIE revenue, Municipal State Aid road funds, additional TIE revenue created by economic development, grant funds, and, as a last resort, general city revenue. Segment 1: Construction- 1998/1999 Segment 2: Planning - 2005; bidding and construction (median upgrades only) - 2006 Segment 3: Planning and acquisition - 1999/2000; bidding/construction - 2003/2004 Segment 4: Planning and acquisition - Not in County Funding Plan Consistent with Hennepin Countv CIP and Citv Council action. Thursday, July 10, 2014 IVZ] CAPITAL I1PROVEM ENT PLANT 2015 thea 2019 City of Hopkins, MN ?roject # 01-CIP-SIO6 'roject Name County Road 61 (Shady Oak Road) Future Department Public Works: Streets/Traffic Contact Public Works Director Type Improvement Useful Life Unassigned Category Trans: Streets Priority n/a Description I Total Project Cost: $27,000,000 Shady Oak Road from County Road 3 to T.H. 7, Mainstreet from 20th Avenue to Shady Oak Road. Lighting, landscaping, street, etc., improvements from County Road 3 to T.H. 7 Reconstruction and amenities on Mainstreet from 20th Avenue to Shady Oak Road. Reconstruction of West Park Road, 2nd Street N., and 21st Avenue N. (2nd Street -4th Street N.) See also 01-CIP U003 for the Storm Sewer Management associated with this project. Justification Deficiencies appear on Shady Oak Road in terms of roadway conditions, traffic/pedestrian movement, safety, and aesthetics. Upgrade an undivided roadway, resolve safety issues with number of driveway access points and intersection at Mainstreet. Lighting needs upgrading and provide beautification program. P111-joiir Expenditures 2015 2016 2017 2018 2019 Total 8,,,200,000 Construction/Maintenance 18,800,000 18,800,000 ]'til a 111 Total 18,800,000 18,800,000 P111 -jour Funding Sources 2015 2016 2017 2018 2019 Total 1 8,200,000, GU - Other Governmental 16,850,000 16,850,000 Units iil �lll MS - Municipal State Aid 1,000,000 1,000,000 Streets PI - PIR/General Obligation 700,000 700,000 Bonds SA - Special Assessment 250,000 250,000 Total 18,800,000 18,800,000 Budget Impact/Other '.012-2014: Planning and acquisition '.014/2015: Bidding and construction with Hennepin County CIP, city's desire to upgrade the roadway, and reconstruction program for all of Mainstreet. t totals $27,000,000. Hopkins share of the county project is $4,000,000. Thursday, July 10, 2014 11611] CAPITAL I1PROVEM ENT PLANT 2015 thea 2019 City of Hopkins, MN Project # 01-CIP-5504 Project Name Sixth Street South (11th to 12th Avenue South) Future Description iixth Street South from 11th Avenue South to 12th Avenue South. -xtension of roadway and box culvert crossing at Nine Mile Creek. Department Public Works: Streets/Traffic Contact Public Works Director Type Improvement Useful Life Unassigned Category Trans: Streets Priority n/a Total Project Cost: $500,000 Justification Chis project will offer a second access to the industrial area (fire access). Will direct some of the existing industrial traffic north, away from the residential intersection at Seventh Street and 11th Avenue. Will connect a current dead-end alley, west of 11th Avenue. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 500,000 500,000 Total 500,000 500,000 Funding Sources 2015 2016 2017 2018 2019 Total MS - Municipal State Aid 400,000 400,000 Streets PI - PIR/General Obligation 100,000 100,000 Bonds Total 500,000 500,000 Budget Impact/Other 'urrently on MSA plans. 1161 Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLANT 2015 thea 2019 City of Hopkins, MN Project # 06-CIP-5118 Project Name Parking Lots and HCRRA Alley Improvements Future Department Public Works: Streets/Traffic Contact Public Works Director Type Improvement Useful Life Category Trans: Parking Facilities Priority n/a Description Total Project Cost: $1,150,000 '.015: Municipal Parking Lot 200, south of Mainstreet between 8th and 9th Avenues. Municipal Parking Lot 300, South of Mainstreet between )th and 10th Avenues. Pavilion parking lot, City Hall Parking Lot. HCRRA Alley, north of Mainstreet between 7th and 8th Avenues. Zehabilitate parking lot pavement and pave alleys. Justification 'avement has deteriorated to the point where cracksealing and sealcoating are not effective. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 1,150,000 1,150,000 Total Funding Sources 1,150,000 2015 2016 1,150,000 2017 2018 2019 Total PI - PIR/General Obligation Bonds SU - Storm Sewer Fund 930,000 220,000 930,000 220,000 Total 1,150,000 1,150,000 Budget Impact/Other IB3: Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN 'roject # 11-CIP-5120 'roject Name Plan, Design and Implement Railroad Quiet Zone Future Department Public Works: Streets/Traffic Contact Facilities Director Type Improvement Useful Life 30 years Category Trans: Streets Priority n/a Description Total Project Cost: $225,000 Modify existing railroad grade crossings to satisfy Federal Railroad Administration (FRA) requirements to create a Whistle -Free Quiet Zone for the CP Railroad corridor. Phase L Plan and coordinate requirements with FRA and SWLRT project office. Design necessary supplemental safety measures (SSM). Phase IL Construct SSM's and implement Quiet Zone. Justification Train horns sound in early morning hours and are disruptive to nearby residential areas. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 25,000 200,000 225,000 Total Funding Sources 25,000 2015 2016 200,000 2017 2018 2019 225,000 Total PI - PIR/General Obligation Bonds 25,000 200,000 225,000 Total 25,000 200,000 225,000 is anticipated that design and coordination work will be completed in 2015. Construction of the crossing improvements will be timed to ,incide with the SWLRT construction. Thursday, July 10, 2014 133 CAPITAL I1PROVEM ENT PLANT 2015 thea 2019 City of Hopkins, MN Project # 11-CIP-5121 Project Name Mainstreet Rehabilitation Future Department Public Works: Streets/Traffic Contact Facilities Director Type Improvement Useful Life 30 years Category Trans: Streets Priority 3Important Description Total Project Cost: $4,400,000 Chis project includes a mill and overlay from 5th Ave North to Shady Oak Road, upgrade of pedestrian facilities to include enhanced crosswalks, sidewalk repair, street lighting upgrades, and traffic signal upgrades. The watermain is also proposed to be replced between 5th Avenue and 11th kvenue. Justification 'avement, sidewalk, pavers, street lights and traffic signals are becoming worn and in need of updating. The watermain is old and undersized for he demand downtown. piir�kilir Expenditures 2015 2016 2017 2018 2019 Total 400,,,,000 Construction/Maintenance 4,000,000 4,000,000 l"gut Ali Total 4,000,000 4,000,000 PIriti Ir Funding Sources 2015 2016 2017 2018 2019 Total 1 400,000, GU - Other Governmental 660,000 660,000 Units t tutr�lll MS - Municipal State Aid 1,630,000 1,630,000 Streets PI - PIR/General Obligation 1,400,000 1,400,000 Bonds SA - Special Assessment 60,000 60,000 WF - Water Fund 250,000 250,000 TOW 4,000,000 4,000,000 Budget Impact/Other Che project scope was expanded to include the entire length of Mainstreet. Thursday, July 10, 2014 134 CAPITAL I1PROVEM ENT PLANT 2015 thea 2019 City of Hopkins, MN Project # 13-CIP-SO40 Project Name Pedestrian & Bicycle Access Improvements Future Description '.014-2018 - Painting bike lanes, constructing trails and sidewalks Department Public Works: Streets/Traffic Contact PW Director Type Improvement Useful Life 20 years Category Trans: Streets Priority n/a Total Project Cost: $125,000 Justification 'ouncil recently adopted plan to increase pedestrian and bicycle access and safety. These improvements begin to implement that plan. piir�kilir Expenditures 2015 ......,,,,,, 25,,,000 Construction/Maintenance 25,000 hitatli Total 25,000 PIri(i ir Funding Sources 2015 2016 2017 2018 2019 Total 25,000 25,000 25,000 100,000 25,000 25,000 25,000 100,000 2016 2017 2018 2019 Total 1 i5,00„0 PI - PIR/General Obligation 25,000 25,000 25,000 25,000 Bonds 100,000 ui �mwa�ui Total 25,000 25,000 25,000 25,000 100,000 Budget Impact/Other Thursday, July 10, 2014 11617 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN 'roject # 15-CIP-5001 'roject Name Blake Road Corridor Improvements Future Department Public Works: Streets/Traffic Contact PW Director Type Unassigned Useful Life 10,000,000 Category PW - Parks Priority n/a Description I Total Project Cost: $10,000,000 Slake Road from Interlachen Boulevard (Edina) to north of TH7 (St. Louis Park) will be reconstructed to enhance accommodations for >edestrians, bicycles, and buses, improve access to adjacent neighborhoods, provide the necessary infrastructure to support redevelopment and enhance economic growth along the corridor, improve and enhance traffic flow at major intersections/interchanges, and provide for access to the Aanned SWLRT Blake Station. Blake road is a heavily travelled thoroughfare and currently a county road between Excelsior Boulevard and TH7. The construction of a SWLRT station at Blake road will increase traffic and present significant redevelopment opportunity along the corridor. Many traffic issues exist along Blake road including lack of pedestrian accommodations, congestion and poor access. The City of Hopkins is currently leading a study in partnership with the cities of Edina and St. Louis Park, Hennepin County, MNDOT, the Minnehaha Creek Watershed District, Three Rivers Park District, and the SWLRT project office to develop a plan for the future transportation needs of the corridor Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 1,000,000 9,000,000 10,000,000 Total 1,000,000 9,000,000 10,000,000 Funding Sources 2015 2016 2017 2018 2019 Total GU - Other Governmental 750,000 8,000,000 8,750,000 Units PI - PIR/General Obligation 250,000 600,000 850,000 Bonds SF - Sanitary Sewer Fund 150,000 150,000 WF - Water Fund 250,000 250,000 Total 1,000,000 9,000,000 10,000,000 with the City Council adopted roadway improvement policy. Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 15-CIP-5039 Project Name 2015 Street Overlay Project Future Description '.015-2, 50OLF of mill and overlay along Oakridge Road from TH 7 to the city limit. Department Public Works: Streets/Traffic Contact PW Director Type Improvement Useful Life 175,000 Category Trans: Streets Priority n/a Total Project Cost: $175,000 Justification daintain streets that are in need of work but do not need to be reconstructed. dill and overlay is needed to rehabilitate the deteriorating pavement of this heavily travelled roadway. 3opkins is partnering with Minnetonka to improve the roadway along the entire length. Expenditures 2015 2016 2017 2018 2019 Total Construction 175,000 175,000 Total Funding Sources 175,000 2015 2016 175,000 2017 2018 2019 Total PI - PIR/General Obligation Bonds 175,000 175,000 Total 175,000 175,000 ew item added in 2014 for 2015 f6Y/ Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 01-CIP-5502 Project Name Light Rail Transit Stations (3) Future Description supplemental improvements to 3 Light Rail Transit (LRT) station areas in the proposed locations. Department Public Works: Transportation Contact Public Works Director Type Improvement Useful Life Unassigned Category Trans: Streets Priority n/a Total Project Cost: $500,000 Justification Che HCRRA proposes to construct three stations along the Southwest Corridor. The proposed expenditures would be in addition to the funds :xpended by the HCRRA. The additional funds would be used to ensure the stations are high quality in appearance. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 500,000 500,000 Total 500,000 500,000 Funding Sources 2015 2016 2017 2018 2019 Total TF - Tax Increment Financing 500,000 500,000 Total 500,000 500,000 on HCRRA plans. with plans for LRT stops in Hopkins by Hennepin County. 138 Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAIT 2015 thea 2019 7� �1V � Department Public Works: Transportation 1�J City of Hopkins, Contact Public Works Director Project # 01-CIP-S503 Type Improvement Useful Life Unassigned Project Name Eighth Avenue LRT Corridor g Category Trans: Streets Future Priority n/a Description Total Project Cost: $3,700,000 --ighth Avenue from County Road 3 to Mainstreet and access modifications along 2nd Street South. )esign and construction of pedestrian improvements, streetscape improvements, street reconstruction, utility improvements and drainage Justification Che city desires to create a vibrant corridor between the proposed SWLRT station at Excelsior Boulevard and historic downtown Hopkins, that vill accommodate pedestrians and bicycles as well as vehicles. Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 3,700,000 3,700,000 Total 3,700,000 3,700,000 Funding Sources 2015 2016 2017 2018 2019 Total GU - Other Governmental 2,300,000 2,300,000 Units SF - Sanitary Sewer Fund 100,000 100,000 SU - Storm Sewer Fund 150,000 150,000 TF - Tax Increment Financing 1,000,000 1,000,000 WF - Water Fund 150,000 150,000 Total 3,700,000 3,700,000 Budget Impact/Other )ependent on Metropolitan Council SWLRT plans IRN Thursday, July 10, 2014 1011 Utilities fCS fCy CAPITAL ROPROVEM ENT PLAN City of Hopkins, MN 2015 thru 2019 Department Public Works: Utilities Contact Public Works Director Project # 01-CIP-UO02 Project Name Storm Drainage System Maintenance - Alley Repairs Future Description '.015-2019 Concrete alley repairs Justification knnual alley pavement concrete slab repairs are needed. P111 oiir Expenditures 2015 2016 906,000 Construction/Maintenance 20,000 21,000 l'otatli Total 20,000 21,000 P111 oiir Funding Sources 2015 2016 Type Improvement Useful Life Unassigned Category Utilities: Municipal Sanitary S Priority n/a Total Project Cost: $211,000 2017 2018 2019 Total 21,000 21,000 22,000 105,000 21,000 21,000 22,000 105,000 2017 2018 2019 Total 1 906,000, SU - Storm Sewer Fund 20,000 21,000 21,000 21,000 22,000 105,000 l'otali Total 20,000 21,000 21,000 21,000 22,000 105,000 with the Storm Water Management Plan. 143 Thursday, July 10, 2014 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 7� �1V � Department Public Works: Utilities 1�J City of Hopkins, Contact Public Works Director Project # 01-CIP-UO03 Type Improvement Useful Life Unassigned Project Name Storm Water Management Projects g � Category Utilities: Storm Sewer Future Priority n/a Description Total Project Cost: $1,230,000 '.014: Provide outlet pipe to Shady Oak Pond into CSAR 61 storm drainage piping in conjunction with Shady Oak Road reconstruction 1230,000 -- MOVE to 2015 '.014: Cottageville Park stormwater improvemetns - $650,000 Justification ihady Oak Pond has no outlet and floods streets and residential property if not pumped. 'onsistent with City Council approved action plan of October 21, 1997, the City's Storm Management Plan, and Shady Oak Road reconstruction P111 oiir Expenditures 2015 1,000,,,000 Construction/Maintenance 230,000 l'otatli Total 230,000 P Irio Ir Funding Sources 2015 1..........1.,000,000 SU - Storm Sewer Fund 230,000 2016 2017 2018 2019 Total 230,000 230,000 2016 2017 2018 2019 Total 230,000 i"gut Ali Total 230,000 230,000 with City Council approved Action Plan of October 21, 1997, the City's Storm Management Plan, and Shady Oak Road reconstruction Thursday, July 10, 2014 144 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN 'roject # 08-CIP-U001 ?roject Name Lift Station # 4 Future Description Zehabilitate LS No. 4 Justification rift station No. 4 was identified for rehab in the 2007 comprehensive utility plan Zegular major maintenance identified in the 2007 comprehensive utility plan. Department Public Works: Utilities Contact Public Works Director Type Improvement Useful Life Category Utilities: Municipal Sanitary S Priority n/a Total Project Cost: $160,000 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 160,000 160,000 Total 160,000 160,000 Funding Sources 2015 2016 2017 2018 2019 Total SF - Sanitary Sewer Fund 160,000 160,000 Total 160,000 160,000 Thursday, July 10, 2014 IM -1 CAPITAL I1PROVEM ENT PLAN 2015 thea 2019 City of Hopkins, MN Project # 08-CIP-U010 Project Name St. Louis Park Emergency Connection Future Description it. Louis Park emergency connection. Justification tems identified in 2007 comprehensive utility plan to provide safe and reliable water. Department Public Works: Utilities Contact Facilities Director Type Improvement Useful Life Category Utilities: Municipal Sanitary S Priority n/a Total Project Cost: $211,000 Expenditures 2015 2016 2017 2018 2019 Total Construction/Maintenance 211,000 211,000 Total 211,000 211,000 Funding Sources 2015 2016 2017 2018 2019 Total WF - Water Fund 211,000 211,000 Total 211,000 211,000 Thursday, July 10, 2014 1EII