VI.2. Approve Final Plans and Order Bids for 2015 Municipal Parking Lot Improvements (CR-2015-021); Stanley
February 17, 2015 Council Report 2015-021
APPROVE FINAL PLANS AND ORDER BIDS
2015 MUNICIPAL PARKING LOT IMPROVEMENTS
CITY PROJECT 2014-17
Proposed Action.
Staff recommends the following motion: Adopt Resolution 2015-017, Resolution Approving
Plans and Specifications and Authorizing Advertisement for Bids, 2015 Municipal Parking Lot
Improvements, City Project 2014-17 and companion Resolution 2015-018, stating City’s intent
to sell bonds to fund this project.
Overview.
The 2015 Capital Improvements Plan (CIP) includes a project to rehabilitate various municipal
parking lots and facilities. Included in this project are Municipal Parking Lot 300, City Hall
parking lot, Pavilion parking lot, Central Park parking lot and trail, the Hennepin County
thth
Regional Railroad Authority (HCRRA) alley between 7 and 8 Avenues, and Clocktower
Plaza. The final plans are substantially complete, staff now asks the council to approve these
plans and authorize advertisement for bids.
Primary Issues to Consider. Supporting information.
Scope of improvements Engineer’s Estimate
Public Input Final Plans (available on request)
Estimated Costs and Funding Resolutions 2015-017 and 2015-018
Project Schedule
Staff recommendation
_________________________________
Nate Stanley, City Engineer
Financial Impact: $ 1,378,200 Budgeted: Y/N _Y___ Source: PIR Related
Documents (CIP, ERP, etc.): CIP_ Notes: _______________________
C:\\Users\\adomeier\\AppData\\Local\\Microsoft\\Windows\\Temporary Internet Files\\Content.Outlook\\3394JZ13\\CR2015-021 Approve Final Plans
Order Bids 2015 Municipal Parking Lot Improvements.docx
Council Report 2015-021
Page 2
Analysis of Issues
Scope of Improvements
•
All parking lot pavements will be reconstructed. The City Hall parking lot will be
reclaimed, all other lots will have the pavement completely removed and replaced. Spot
curb repairs will be completed as necessary. Storm sewer, drainage structure, and
pedestrian access improvements will also be completed as necessary.
The trail around Central Park will be removed and replaced. Grade and cross section
improvements will be made to improve the surface of the trail.
The HCRRA alley will be paved with asphalt and concrete curb and gutter. Storm sewer
will be added along the alley to provide for adequate drainage.
At Clocktower Plaza, the existing planters and the planter wall adjacent to the building on
the west side of the plaza will be removed. All standard and memorial pavers will be
removed and replaced. Replacement of the pavers will include new memorial pavers,
standard pavers, and pervious pavers. Overstory trees will be planted through the plaza to
provide shade, and a new seat wall will be constructed along the west side of the plaza
adjacent to the existing building. The planting bed between the wall and building will be
landscaped, as well as the planting area adjacent to Municipal Parking Lot 300. New
seating and lighting will be provided in the plaza. The existing memorial plaque will be
relocated to the north end of the plaza, the clocktower will remain.
Other improvements that will be completed as a part of this project include spot repair of
sidewalks and alleys throughout the city. This component is part of the city’s annual
maintenance program and is being bid with this project to streamline project management
and take advantage of pricing.
Public Input
•
A public informational meeting to present preliminary plans for the project was held
December 18, 2014. The meeting was broken into segments to focus on three major
topics: Municipal Lot 300, HCRRA alley, and Clocktower Plaza. Information on
proposed improvements, construction impacts, and schedule was presented and questions
were answered. The meeting was sparsely attended, those in attendance were supportive
of the project and indicated they found the meeting useful.
Estimated Costs and Funding
•
The total project cost including engineering, administration, and contingency is estimated
to be $1,378,200.
C:\\Users\\adomeier\\AppData\\Local\\Microsoft\\Windows\\Temporary Internet Files\\Content.Outlook\\3394JZ13\\CR2015-021 Approve Final Plans
Order Bids 2015 Municipal Parking Lot Improvements.docx
Council Report 2015-021
Page 3
The estimated project costs and funding sources are as follows:
Proposed Funding Expense
Municipal Lot 300 $164,310
City Hall Parking Lot 124,300
Pavilion & Central Park Parking and Trail 421,805
HCRRA Alley 97,325
Clocktower Plaza 277,610
Sidewalk and Alley Spot Repair 36,700
Construction Contingencies 56,100
Engineering and Indirect Costs 200,050
PI-PIR/General Obligation Bonds $1,378,200
Total $1,378,200 $1,378,200
Project Schedule
•
Approve final plans/order bids February 17, 2015
Open Bids March 24, 2015
Award Contract April 7, 2015
Begin Construction April, 2015
Complete Construction August, 2015
Staff Recommendation
•
Staff recommends approving final plans and authorizing bids for this project with
adoption of Resolution 2015-017 and companion reimbursement Resolution 2015-018.
C:\\Users\\adomeier\\AppData\\Local\\Microsoft\\Windows\\Temporary Internet Files\\Content.Outlook\\3394JZ13\\CR2015-021 Approve Final Plans
Order Bids 2015 Municipal Parking Lot Improvements.docx
CITY OF HOPKINS
HENNEPIN COUNTY, MINNESOTA
RESOLUTION NO. 2015-017
RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND
AUTHORIZING ADVERTISEMENT FOR BIDS
2015 MUNICIPAL PARKING LOT IMPROVEMENTS
CITY PROJECT 2014-17
WHEREAS
plans and specifications were developed for improvements to Municipal
,
Parking Lot 300, City Hall parking lot, Pavilion parking lot, Central Park parking lot and trail,
HCRRA alley, Clocktower Plaza including pavement, concrete curbing, sidewalk, trail, lighting,
signage, drainage, and landscaping improvements and all necessary appurtenances, and
WHEREAS
plans and specifications were developed for the annual citywide spot
,
sidewalk and alley repair, and
WHEREAS
plans and specifications for City Project No. 2014-17 have been prepared
,
by Bolton & Menk, Inc., and have been presented to Council for approval, and
NOW, THEREFORE, BE IT RESOLVED
by the City Council of the City of Hopkins,
Minnesota:
1.Such plans and specification, a copy of which are attached hereto and made a part hereof;
are hereby approved and ordered placed on file in the office of the City Clerk.
2.The City Clerk shall prepare and cause to be inserted in the official paper and in the
Construction Bulletin an advertisement for bids upon the making of such improvement
under such approved plans and specifications. The advertisement shall be published three
times, at least three weeks before date set for bid opening, shall specify the work to be
done, shall state that bids will be received by the clerk until 11:00 a.m., on the 24th day
of March, 2015, at the City Hall and that no bids shall be considered unless sealed and
filed with the clerk and accompanied by a certified check or bid bond, payable to the City
of Hopkins, Minnesota for 5% of the amount of such bid.
3.The clerk and city engineer are hereby authorized and instructed to receive, open, and
read aloud bids received at the time and place herein noted, and to tabulate the bids
received. The Council will consider the bids and award of contract at the first regular City
Council meeting of April 2015 in the Council Chambers.
th
Adopted by the City Council of the City of Hopkins, Minnesota, this 17 day of February, 2015.
By_______________________________
Kristi Halverson, Mayor Pro Tem
ATTEST:
_________________________________
Amy Domeier, City Clerk
ENGINEER'S ESTIMATE
MUNICIPAL PARKING LOT IMPROVEMENTS
CITY OF HOPKINS, MN
BMI PROJECT NO. T14.108034
90% SUBMITTAL ENGINEER'S ESTIMATE: 2/6/15
CITYWIDE SPOT ALLEY &
PROJECT TOTAL
ITEM UNITLOT 300CITY HALLCENTRAL PARKCLOCK TOWER PLAZAHCRRA ALLEY
SIDEWALK
DESCRIPTIONNOTESUNIT
NO.COST
QUANTAMOUNTQUANTAMOUNTQUANTAMOUNTQUANTAMOUNTQUANTAMOUNTQUANTAMOUNTQUANTAMOUNT
1MOBILIZATIONLS0.159,000.00$ 0.106,000.00$ 0.4024,000.00$ 0.2012,000.00$ 0.106,000.00$ 0.053,000.00$
$60,000.001.0060,000.00$
2TRAFFIC CONTROLLS$15,000.000.15$ 2,250.000.10$ 1,500.000.40$ 6,000.000.20$ 3,000.000.10$ 1,500.000.05$
750.001.0015,000.00$
3REMOVE BITUMINOUS PAVEMENTSY$ 18,000.00$ -$ 38,400.00$ --$ $
300.00
$6.003000640050945056,700.00$
4REMOVE DRAINAGE STRUCTUREEA$500.002$ 1,000.00$ --$ -$ -$ -$
21,000.00$
5REMOVE STORM SEWER PIPELF$ 2,175.00$ --$ -$ -$ -$
$15.001451452,175.00$
6COMMON EXCAVATION(EV)(P)CY$20.00$ --$ 1908$ 38,160.00210$ 4,200.00388$ 7,760.00$
-250650,120.00$
7SUB GRADE EXCAVATION(EV)CY$ 3,750.00$ 4,050.00$ 4,800.00$ -$ -975.00$
$15.002502703206590513,575.00$
8REMOVE CURB & GUTTERLF$ 975.00$ 1,175.00$ 3,750.00$ -$ 1,250.00$
500.00
$5.0019523575025010015307,650.00$
9REMOVE PARKING STOPSEA$ --$ $ 3,700.00$ --$ -$
$100.0037373,700.00$
10REMOVE CONCRETE PAVEMENT (WALKS, DRIVEWAYS, AND ALLEYS)SY$ 650.00$ 2,600.00$ --$ $
1,000.00$ 6,500.00
$10.0065260100650107510,750.00$
11REMOVE RETAINING WALLSF$40.00$ --$ -$ -$ 12$ -480.00$
12480.00$
12EXPLOATORY EXCAVATIONHR$ 2,400.00$ 2,400.00$ 2,400.00$ 2,400.00$ 2,400.00$
-
$600.00444442012,000.00$
13SAWING CONCRETE PAVEMENT (FULL-DEPTH)LF$5.00$ --$ -$ -$ 15$
75.0050$ 250.0065325.00$
14SAWING BITUMINOUS PAVEMENT (FULL-DEPTH)LF$ 60.00$ 60.00$ 330.00$ -$
330.00$ 150.00
$3.00202011011050310930.00$
15SALVAGE BENCHEA$300.002$ 600.00$ --$ -$ -$ -$
2600.00$
16RECLAIM BITUMINOUSSY$ -$ 6,400.00$ --$ -$ -$
$2.00320032006,400.00$
17SUB GRADE PREPERATIONSY$ 2,370.00$ 3,200.00$ --$ -$ -$
$1.002370320055705,570.00$
18GEOTEXTILE FABRICSY$2.00$ --$ 100$ 200.00$ --$ -$
100200.00$
19AGGREGATE BASE CLASS 2 SURFACINGTON$ --$ -$ -$ $ -375.00$
$25.001515375.00$
20AGGREGATE BASE CLASS 5TON$15.0070010,500.00$ $ 290043,500.00-$ $ 4506,750.00-$
$ 405060,750.00-$
21SELECT GRANULAR BORROWTON$12.00-$ -$ 60720.00$ $ --$ -$
60720.00$
22BITUMINOUS MATERIAL FOR TACK COATGAL$4.00200800.0$ 2561,024.000$ 2901,160.00$ $ 65260.00-$
-$ 8113,244.00$
23TOPSOIL(LV)CY$ 5,000.00$ -$ 15,600.00$ -$ 3,400.00$ -
$40.001253908560024,000.00$
24TYPE SP 9.5 WEARING COURSE MIXTON$85.0030025,500.00$ 40534,425.00$ 42035,700.00$ $ 1008,500.00-$
$ 1225104,125.00-$
25TYPE SP 9.5 NON WEARING COURSE MIXTON$80.0030024,$ 40532,400.00000.00$ 42033,600.00$ $ 1008,000.00-$
$ 122598,000.00-$
26B612 CURB & GUTTERLF$15.001802,700.00$ 2253,375.00$ 125018,750.00$ $ --$ -$
165524,825.00$
27B618 CURB & GUTTERLF$20.0010200.00$ $ --$ -$ 72014,400.00$ 1002,000.00$
83016,600.00$
28SURMOUNTABLE CURB & GUTTERLF$15.00-$ -$ 1201,800.00$ $ --$
-$ 1201,800.00$
29VALLEY GUTTERSY$65.00-$ -$ 201,300.00$ $ --$ -$
201,300.00$
302' CONCRETE TRAIL EDGESF$10.00-$ -$ 7957,950.00$ $ --$ -$
7957,950.00$
314" CONCRETE PAVEMENT (PUBLIC)SF$5.005652,825.00$ 6103,050.00$ 8404,200.00$ 18789,390.00$ 20100.00$
300015,000.00$ 691334,565.00$
324" CONCRETE PAVEMENT (PRIVATE)SF$5.00-$ -$ -$ -$ -$
6003,000.00$ 6003,000.00$
336" CONCRETE PAVEMENTSF$8.0060480.00$ 25200.00$ 3002,400.00$ $ 3702,960.00-$ 2502,000.00$
10058,040.00$
348" CONCRETE PAVEMENTSF$11.003053,355.00$ 3503,850.00$ $ --$ 2352,585.00$ $
8909,790.00-$
3524" LONG #4 EPOXY COATED DOWEL BARS EA$5.00-$ -$ -$ -$ -$
50250.00$ 50250.00$
36TRUNCATED DOMESSF$50.0012600.00$ 12600.00$ 482,400.00$ $ --$ 402,000.00$
1125,600.00$
373" BITUMINOUS DRIVEWAY & TRAIL PAVEMENT (SPWEA240B)SY$20.00$ --$ 2300$ 46,000.00$ --$
50$ 1,000.00235047,000.00$
3812" STORM SEWER PIPELF$ 14,300.00$ -$ 17,710.00$ --$ -$
$55.0026032258232,010.00$
3915" STORM SEWER PIPELF$ --$ -$ -$ $ 7,620.00$
-
$60.001271277,620.00$
40CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020EA$2,000.002$ 4,000.00$ --$ -$ -$
-$ 24,000.00$
41CONSTRUCT DRAINAGE STRUCTURE 2' X 3' BOXEA$ 3,200.00$ -$ 11,200.00$ -$ 6,400.00$
-
$1,600.002741320,800.00$
42STORM SEWER CASTING R-3067VEA$750.003$ 2,250.00$ -7$ 5,250.00$ -4$ 3,000.00$
-1410,500.00$
43STORM SEWER CASTING R-4342EA$ 750.00$ --$ -$ -$ -$
$750.0011750.00$
44STORM SEWER CASTING R-1733EA$750.00$ --$ 1$ 750.00$ -1$ -750.00$
21,500.00$
45CONNECT TO EXISTING STORM SEWEREA$ 2,000.00$ -$ 3,000.00$ -$ 1,000.00$
-
$1,000.0023166,000.00$
46RECONSTRUCT DRAINAGE STRUCTUREEA$ -$ 1,500.00$ 1,500.00$ --$ -$
$1,500.001123,000.00$
47ADJUST STORM CASTINGEA$ 500.00$ 500.00$ 2,500.00$ --$ -$
$500.0011573,500.00$
48SAFL BAFFLEEA$ --$ $ 7,000.00$ --$ -$
$7,000.00117,000.00$
49HYDROMULCH & SEED MIX 270SY$3.50230$ 805.00$ -3430$ 12,005.00$ -760$ 2,660.00$
-442015,470.00$
50SOD - LAWN TYPESY$ --$ -$ -$ $ 2,250.00$
-
$5.004504502,250.00$
51LANDSCAPE ROCKCY$15.00$ --$ -$ -$ 25$ -375.00$
25375.00$
52REMOVE & REPLACE MODULAR BLOCK CAPLF$ -$ 1,500.00$ --$ -$ -$
$30.0050501,500.00$
53RELOCATE LIGHTING UNITEA$4,000.00$ -1$ 4,000.00$ --$ -$ -$
14,000.00$
54HANDICAP PARKING SYMBOLEA$ 800.00$ 400.00$ 400.00$ --$ -$
$200.0042281,600.00$
55"VISITOR" PARKING SYMBOLEA$ 1,000.00$ 400.00$ --$ -$ -$
$200.005271,400.00$
56"POLICE PARKING ONLY" SYMBOLEA$ 1,200.00$ 2,400.00$ --$ -$ -$
$200.00612183,600.00$
574" SOLID WHITE EPOXY LINELF$ 1,525.00$ 2,090.00$ 3,100.00$ --$ -$
$1.0015252090310067156,715.00$
58INSTALL NEW SIGNEA$200.0017$ 3,400.0023$ 4,600.004$ 800.00$ -2$ -400.00$
469,200.00$
59INSTALL NEW SIGN POSTEA$ 100.00$ -$ 200.00$ --$ -$
$100.00123300.00$
ENGINEER'S ESTIMATE
MUNICIPAL PARKING LOT IMPROVEMENTS
CITY OF HOPKINS, MN
BMI PROJECT NO. T14.108034
90% SUBMITTAL ENGINEER'S ESTIMATE: 2/6/15
CITYWIDE SPOT ALLEY &
PROJECT TOTAL
ITEM UNITLOT 300CITY HALLCENTRAL PARKCLOCK TOWER PLAZAHCRRA ALLEY
SIDEWALK
DESCRIPTIONNOTESUNIT
NO.COST
QUANTAMOUNTQUANTAMOUNTQUANTAMOUNTQUANTAMOUNTQUANTAMOUNTQUANTAMOUNTQUANTAMOUNT
60PERENIAL/ GRASSPLANT$18.0041$ 738.00$ --$ -$ -$ -$
41738.00$
61SHRUBPLANT$ 1,520.00$ --$ -$ -$ -$
$80.0019191,520.00$
62REINSTALL BENCHEA$500.002$ 1,000.00$ --$ -$ -$ -$
21,000.00$
63RAPID STABILIZATION METHOD 3GAL$ 1,140.50$ -$ 17,008.26$ -$ 3,768.60$
-
$4.002854252942547921,917.36$
64SILT FENCE, TYPE PREASSEMBLEDLF$ 693.00$ -$ 762.00$ --$ -$
$3.002312544851,455.00$
65INLET PROTECTIONEA$ 1,200.00$ 600.00$ 1,800.00$ --$ -$
$200.00639183,600.00$
66REMOVE MISC. (IRRIGATION, ELECTRICAL, LANDSCAPE, ETC.)LS$ --$ -$ $ 8,000.00$
--$
$8,000.00118,000.00$
67REMOVE RETAINING WALL/COLUMN (CONCRETE/BRICK)SF$7.00$ --$ -$ 2500$ 17,500.00$
--$ 250017,500.00$
68REMOVE PAVEMENT (CONCRETE OR PAVER)SY$ --$ -$ $ 4,150.00$ --$
$10.004154154,150.00$
69CONCRETE PAVER- SOLDIER COURSE - (6 CM)SF$16.00$ --$ -$ 260$ 4,160.00$
--$ 2604,160.00$
70CONCRETE PAVER- TYPE 'A' (6 CM)SF$ --$ -$ $ 9,488.00$ --$
$16.005935939,488.00$
71CONCRETE PAVER- TYPE 'B' (6 CM)SF$16.00$ --$ -$ 532$ 8,512.00$
--$ 5328,512.00$
72SALVAGE & REINSTALL PAVERSSF$ 3,000.00$ --$ -$ -$ -$
$10.003003003,000.00$
73CONCRETE MEMORIAL PAVER (6 CM)EA$ --$ -$ $ 15,460.00$ --$
$20.0077377315,460.00$
74PERMEABLE CONCRETE PAVER (8 CM)SF$ --$ -$ $ 7,568.00$ --$
$16.004734737,568.00$
75CONCRETE SEATWALLLF$ --$ -$ $ 46,500.00$ --$
$300.0015515546,500.00$
76NARRATIVE PLAZA PLAQUE MARKERLS$400.00$ --$ -$ 1$ 400.00$
--$ 1400.00$
778" WIDE CONCRETE TREE GRATE COLLARLF$ --$ -$ $ 1,980.00$ --$
$10.001981981,980.00$
78TREE GRATE/ROOT BALL PVC PIPING SYSTEMEA$100.00$ --$ -$ 9$ 900.00$
--$ 9900.00$
79TREE GRATE PEA GRAVELCY$ --$ -$ $ 225.00$ --$
$75.0033225.00$
80STEEL EDGER (PAVER/PLANTER EDGE)LF$10.00$ --$ -$ 24$ 240.00$
--$ 24240.00$
81ORNAMENTAL FENCELF$ --$ -$ $ 1,760.00$ --$
$110.0016161,760.00$
82LIMESTONE BENCHEA$ --$ -$ $ 8,000.00$ --$
$2,000.00448,000.00$
83SITE FURNITURE (TABLE/CHAIRS/UMBRELLA)EA$ --$ -$ $ 10,000.00$
--$
$2,500.004410,000.00$
84TREE (2.5" CAL.)EA$ --$ -$ $ 4,750.00$ --$
$475.0010104,750.00$
85TREE (2" CAL.)EA$400.00$ --$ -$ 1$ 400.00$ --$
1400.00$
86SHRUB (#5 CONTAINER)EA$ --$ -$ $ 1,040.00$ --$
$80.0013131,040.00$
87PERENNIAL (#1 CONTAINER)EA$18.00$ --$ -$ 86$ 1,548.00$ --$
861,548.00$
88SHREDDED HARDWOOD MULCHCY$ --$ -$ $ 350.00$ --$
$50.0077350.00$
89TREE GRATE PEA GRAVELEA$1,500.00$ --$ -$ 9$ 13,500.00$ --$
913,500.00$
904" SCH. 40 PVC DRAIN TILE (SOLID)LF$ --$ -$ $ 600.00$ --$
$5.00120120600.00$
914" SCH. 40 PVC DRAIN TILE (PERFORATED)LF$ --$ -$ $ 600.00$
--$
$5.00120120600.00$
92IRRIGATION LS$15,000.00$ --$ -$ 1$ 15,000.00$ --$
115,000.00$
933/4" PVC/HDPELF$ --$ -$ $ 1,085.00$ --$
$3.503103101,085.00$
941" PVC/HDPELF$4.50$ --$ -$ 450$ 2,025.00$ --$
4502,025.00$
95#10 AWG CULF$ --$ -$ $ 2,025.00$ --$
$0.90225022502,025.00$
96#8 AWG CULF$1.20$ --$ -$ 630$ 756.00$ --$
630756.00$
97LIGHT FIXTURE- TYPE A (PEDESTRIAN)EA$ --$ -$ $ 9,000.00$ --$
$3,000.00339,000.00$
98LIGHT FIXTURE- TYPE B (BOLLARD)EA$ --$ -$ $ 28,000.00$ --$
$4,000.007728,000.00$
99LIGHT FIXTURE- TYPE C (FLOOD)EA$ --$ -$ $ 1,500.00$ --$
$750.00221,500.00$
100LIGHT FIXTURE- TYPE D (COVE LED)LF$ --$ -$ $ 12,000.00$ --$
$75.0016016012,000.00$
101GRADE MOUNT RECEPTACLE FIXTUREEA$400.00$ --$ -$ 11$ 4,400.00$
--$ 114,400.00$
102HANDHOLEEA$ --$ -$ $ 1,200.00$ --$
$600.00221,200.00$
103LIGHTING CONTROLEA$ --$ -$ $ 2,000.00$ --$
$2,000.00112,000.00$
SUBTOTAL$ 124,299.00164,311.50$ 421,805.26$ 277,612.00$ 97,323.60$ 36,700.00$ 1,122,051.36$
5% CONTINGENCY$ 8,215.57$ 6,214.95$ 21,090.26$ 13,880.60$ 4,866.18$ 1,835.00$ 56,102.57
TOTAL ESTIMATED CONSTRUCTION COST172,527.07$ 130,513.95$ 442,895.53$ 291,492.60$ 102,189.77$ 38,535.00$ 1,178,153.92$
CITY OF HOPKINS
HENNEPIN COUNTY, MINNESOTA
RESOLUTION NO. 2015-018
DECLARING THE OFFICIAL INTENT OF THE CITY OF HOPKINS
TO REIMBURSE CERTAIN EXPENDITURES FROM
GENERAL OBLIGATION IMPROVEMENT BOND PROCEEDS
TO BE ISSUED BY THE CITY OF HOPKINS
WHEREAS
, the Internal Revenue Service has issued Treas. Reg. #1.150-2
providing that proceeds of tax-exempt bonds used to reimburse prior expenditures shall not
be deemed spent unless certain requirements are met; and
WHEREAS
, the City expects to incur certain expenditures, which may be financed
temporarily from sources other than bonds, and reimbursed from the bond proceeds;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF HOPKINS, MINNESOTA (THE CITY) AS FOLLLOWS
:
1. The City intends to incur expenditures for the project described in Council Report
2015-021, for City Project 2014-17 (the “Project”), and intends to reimburse itself
for such expenditures from the bond proceeds to be issued by the City in the
maximum principal amount described in the “project”.
2. The City Manager is authorized to designate additions to Project 2014-17 in
circumstances where time is of the essence, and any such designation shall be
reported to the Council at the earliest practicable date and shall be filed with the
official books and records of the City.
3. This resolution is intended to constitute a declaration of official intent for the
purpose of Treas. Reg. #1.150-2 and any successor law, regulation, ruling or
amendment pertaining thereto.
th
Adopted by the City Council of the City of Hopkins, Minnesota, this 17 day of February,
2015.
By_______________________________
Kristi Halverson, Mayor Pro Tem
ATTEST:
_______________________________
Amy Domeier, City Clerk