Loading...
77-2609 CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO. 77-2609 A RESOLUTION ORDERING PREPARATION OF ENGINEERS REPORT ON IMPROVEMENTS WHEREAS, a petition has been received requesting the improvement of Fifteenth Avenue South between Fifth Street and Sixth Street South by the installation of water and sewer main thereon and the assessment of benefitting property for all or a portion of the cost of the improvement pursuant to M.S.A. , Secs. 429.011 to Secs. 429.111, as amended. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HOPKINS, MINNESOTA, that the proposed improvement be referred to John Strojan, • City Engineer, for study and he is instructed to report with all convenient speed advising the Council in a preliminary way as to whether the proposed improvements are feasible and as to whether they should best be made as proposed or in connection with some other improvement, and the estimated cost of the improvements as recommended. Adopted by the City Council of the City of Hopkins, Minnesota, this 16th day of August, 1977. H. E. RICHARDSON, JERRE A. MILLER, City Clerk Mayor JOSEPH C. VESELY, 411 City Attorney J EXHIBITA Project 76-12 Sanitary sewer on 16th Avenue South from Fifth Street to a point approximately 118 feet south (Spantek) - Total cost of the project being $5,303.80 of which all is proposed to be assessed to the • Spantek property. Project 76-13 Watermain on 16th Avenue South from Fifth Street to a point approximately 118 feet south (Spantek) . Total cost of the project being $4,913.95 of which all is proposed to be assessed to the Spantek property. Project 76-13A Bituminous surfacing on 16th Avenue South from Fifth Street to a point approximately 118 feet south (Spantek) - Total cost of the project being $1,784.64 of which all is proposed to be assessed to the Spantek property. Project 76-02 Concrete curb and gutter on Second Street South from Fifth Avenue South to Eighth Avenue South. Total cost of the project being $2,970.69 of which $2,055.20 is proposed to be assessed at $4.283987 per front foot to the lots between 5th and 6th Avenue and at $4.9869 per front foot to the lots between 6th and 7th Avenue. • Project 76-03 Construction of parking spaces on Second Street South between Sixth Avenue South and Eight Avenue South. Total cost of the project being $5,321.88 of which all is proposed to be assessed at $71.77 per space between 6th and 7th Avenue and $2,522.86 to be assessed to the Hopkins Plaza. Project 76-04 Bituminous surfacing on Second Street South from Fifth Avenue South to Eighth Avenue South. Total cost of the project being $15,444.91 of which $7,715.29 is proposed to be assessed $.183891 per square foot to the properties between Sixth and Seventh Avenue; $.131806 per square foot to the properties between 5th and 6th Avenue. The balance to be paid by Tax Increment funds. Project 76-05 Installation of Storm sewer on Third Street South from County Highway No. 18 to Fifth Avenue South. Total cost of the project being $43,025.07 of which $13,876.33 proposed to be assessed to Hennepin County, CMStP&P Railroad; Chicago and Northwestern Railroad. The balance to be paid by the City. Project 76-06 Concrete curb and gutter on Third Street South from County Highway No. 18 to Fifth Avenue South. Total cost of the project being $6,320.53 of which all is proposed to be assessed to the abutting properties. &Sect 76-07 Bituminous surfacing on Third Street South from County Highway 18 to Fifth Avenue South. Total cost of the project being $18,446.40 of which all is proposed to be assessed to benefitting properties. 1/2 to the south side of Fifth Avenue and 1/2 to north side. Project 76-19 Extension of watermain on the easement on the south 20 feet of county owned parcel situated north of Parcel 7420 (Hopkins Nursing Home) Total cost of project being $3,211.29 of which all is proposed to be assessed. 30% to Hennepin County; 60% to Hopkins Nursing Home; 10% to the vacant land to the south. rroject 76-14 Installation of Street lights on Burnes Drive from Minnetonka Mills ' Road to the intersection of Burnes Drive and Campbell Drive and on Campbell Drive to the intersection of Campbell Drive and Burnes Drive. Total cost of the project being $3,520.02 of which all is proposed to be assessed equally against 34 parcels in the amount of $103.53 per property owner. •:oject 76-08 Street reconstruction and bituminous surfacing on Seventh Avenue South from Excelsior Avenue southerly to east-west alley. Total cost of the project being $2,807.20 of which all is proposed to be assessed. One half to Lots 1 thru 6, inclusive, Block 2; and one- half to Lots 1 thru 6, inclusive, Block 3. Water connection to 1020 Oakridge Road. Total cost of the project being $2,037.80 of which all is proposed to be assessed to the property owner. Tree Removal 102 Van Buren Avenue South, Lot 1, Block 35, West Minneapolis Center, Total cost $68.25; 1429 Oxford Street, Lot 36, Auditors Subdivision No. 239, Total cost $68.25, all of which is proposed to be assessed. Parking Lot Costs • Project 608 Crestland Lot (between 10th and 11th So.) $ 6,244.66 oject 724 Lot on 8th Avenue North/IP 18,237.55 Project 71-32 Beautification of parking lots 37,408.88 Project 72-16 Old Post Office Site 81,131.99 Project 72-24 Lot behind Kokesh Sporting Goods 120,147.25 $263,170.33 •