Loading...
2016-2020 Capital Improvement Plan (C.I.P.); HarkessCITY OF HOPKINS FINANCE DEPARTMENT MEMORANDUM Date: July 9, 2015 To: Mayor & City Council From: Christine Harkess, Finance Director Subject: 2015-20109 Capital Improvement Plan (C.I.P.) Attached is a proposed CIP which has undergone several staff revisions. At the work session we will review the 2016-2020 documents and incorporate any changes from the work session discussion. Included in this packet are the following – 1.Summary of changes in the 2016-2020 CIP 2.The cash flow statements by fund 3.Project reports summarized by year, department and funding source for the years 2016- 2020 4.Map of the street projects for the next 5 years (page 14 of PDF) 5.Report from Oertel Architects on the condition of the PW Garage (pages 25-40 of PDF) Individual project sheets providing a description of the project, justification, and funding source are not included but can be provided if you are interested in reviewing them. Please let me know if you’d like to review the individual project sheets and I will email them to you. There are a total of 89 individual project sheets. Not all funds are balanced as we are working with Ehlers to update our Financial Management Plan. We will discuss the changes and our options to balance all funds. The presentation on Tuesday will be put up on the SMART board for ease of discussion. There are a lot of components and this will ensure we are all at the same point for the discussion and will allow staff to highlight items of interest easier. SUMMARY OF CHANGES – 2016-2020 CIP Capital Improvement Fund 1.All Art Center items have been removed from the CIP and put into the Arts Center Fund per the Financial Management Plan. 2.All building and contents related items are now in the CIP and not spread between the ERP and CIP. 3.The Activity Center gymnasium roof and Raspberry room roofs were moved from 2016 to 2018; and the lower roof replacement was moved from 2017 to 2018 to put all the roof replacements projects together to get better pricing. 4.Activity Center multi-purpose gymnasium improvements scheduled for 2015 were moved to 2016. 5.Activity Center Lounge/Computer Lab/Library tables and chair replacement cost was adjusted down by $2,500 to more accurately reflect cost. 6.Activity Center added in 2016 a sound system for the Harmony Hill room at a cost of $6,000. The current system in non-functional. 7.Activity Center added in 2017 costs to remodel the former Historical Society area. 8.Police carpet replacement of $40,000 was moved from 2016 to 2018. 9.Fire Department carpet and apparatus floor refinishing were broken into two projects and the apparatus floor refinishing was moved to 2018. 10.City Hall lobby upgrade was moved from 2016 at a cost of $110,000 to 2018 at a cost of $150,000. 11.Public Works wash bay and air handler replacements were deleted from 2015 as they will now be part of the Public Works garage upgrade which was added to the CIP at a cost of $340,000 exclusive of the Enterprise Funds shares. 12.Public Works added in 2016 replacement of the gate operators at a cost of $20,000. The current gate operators are at end of life and replacement parts are no longer available. 13.Fire Department added in 2019 the replacement of classroom chairs - $21,789 and tables - $7,800. The classroom is heavily used by city and public and the room needs to remain presentable and functional. Park Dedication Fund The Park Board is in the middle of a Park Reinvestment Plan. Input has been received from the public and is being incorporated into the plan by the consultant. We expect the plan to be completed in mid-August and presented at a council work session in September. In the interim the following modifications to the plan have been made. 1.Cottageville Park pavilion was added in 2016 at a cost of $250,000 2.Shady Oak beach improvements were added in 2016 for $13,300, in 2017 for $16,500 and in 2019 for $11,500. 3.Items may change in years and amounts as the Park Reinvestment Plan is completed. Communications Fund 1.No changes from prior CIP. MSA Fund 1.No changes from prior CIP. PIR Fund 1.Bonds are projected to be sold each year we have a street project. 2.Annual Street Overlay Program was added at a cost of $250,000 in 2016 and increasing each year by $25,000. 3.Annual Sign Management program was added at a cost of $20,000 each year. 4.Residential street improvements 2016 a. - $3,815,000 PIR i. - $2,505,000 – increase of $965,000 1.Residential street projects decreased by $300,000 2.Eight Ave LRT Corridor - $500,000 3.RR plan design for quiet zone moved from 2015 4.Blake Road corridor - $100,000 5.Excelsior Blvd retaining wall - $300,000 6.Repair parking lot 600 sidewalk & curb - $30,000 7.Repair Excelsior Blvd median pavers - $40,000 SA ii. - $1,310,000 – increase of $250,000 1.Residential street projects 2017 b. - $6,293,600 PIR i. - $4,229,600 increase of $1,438,600 1.Increased residential street projects decreased by $500,000 2.Eight Avenue corridor added at a cost of $1,018,600 3.Blake Road corridor improvements of $250,000 increased to $875,000. SA ii. - $2,064,000 – increase of $1,000,000 1.Residential street improvements 2018 c. - $4,112,600 PIR i. - $3,212,600 – increase of $787,600 1.Residential street improvements decreased by $500,000. 2.Blake Road corridor improvements that were in at a cost of $600,000 were increased to $1,567,600 SA ii. - $900,000 – increase of $150,000 1.Residential street improvements 2019 d. - $4,737,600 PIR i. - $3,237,600 – increase of $1,737,600 1.Residential street improvements were increased by $325,000 2.Blake Road corridor improvements were added at a cost of $1,067,600 SA ii. - $1,500,000 – increase of $750,000 2020 e. - $4,080,000 PIR i. - $2,195,000 SA ii. - $1,885,000 Water Fund 1.Residential street improvements a.2016 - $866,000 – increase of $80,000. Residential street improvements increased by $200,000, Public Works garage upgrade was increased by $30,000 and the Eight Ave LRT corridor project at $155,000 was moved to 2017 and increased by $10,000. b.2017 - $1,665,000 – increase of $1,265,000; residential street improvements increased by $1,100,000 and the Eight Ave LTR corridor project was moved from 2016. c.2018 - $1,200,000 – increase of $350,000; residential street improvements increased $100,000 and the Blake Road corridor improvements increased $250,000 d.2019 - $1,768,000 – increase of $1,500,000; residential street improvements increased by $1,000,000 and Blake Road corridor improvements were added at $500,000. e.2020 - $1,510,000 Sanitary Sewer Fund 1.Residential street improvements a.2016 - $630,000 – increase of $330,000; Residential street improvement increased by $425,000, Eight Ave LRT project of $100,000 moved to 2017. PW garage upgrade increased by $5,000. b.2017 - $600,000 – increase of $260,000 for residential street improvements and the Eight Ave LRT project of $100,000 was moved to 2017. c.2018 – $875,000 – increase of $400,000; Residential street improvement increased by $175,000 and Blake Road corridor improvements increased by $225,000 d.2019 - $1,053,000 – increase of $755,000; Residential street improvements increased by $380,000 and Blake Road corridor improvements were added for $375,000. e.2020 - $760,000 Storm Sewer Fund 1.Residential street improvements a.2016 - $526,000 – increase of $130,000. Residential street improvements increased $250,000, Public Works garage project increased by $30,000 and the Eight Ave LRT project of $150,000 was moved to 2017 and costs increased to $305,000. b.2017 - $926,000 – increase of $685,000; $380,000 for residential street improvements and the Eight Ave LRT project was moved from 2016 to 2017. c.2018 - $371,000 – increase of $50,000 for residential street improvements d.2019 - $540,000 – increase of $350,000 for residential street improvements e.2020 - $710,000 Pavilion Fund 1.2016 –$125,000 - project costs decreased by $150,000 a.Overhead door project of $40,000 was moved to 2019 and costs increased to $65,000 b.Roof replacement project of $140,000 moved to 2017 c.Exterior sign project cost of $40,000 added 2.2017 – $347,000 - project costs increased $296,000 a.Roof replacement moved from 2016 b.Desiccant replacement of dehumidification system increased by $1,000 c.Engineering fees of $200,000 added as we begin the project of replacing the refrigeration system in the floor d.Restroom and lobby floor improvement moved to 2018 and costs decreased by $10,000 3.2018 – $2,676,000 – project costs increased by $2,582,500 a.Refrigeration system and arena floor replacement moved up from 2020 b.Restroom and lobby floor improvements moved from 2017 c.Overhead door improvement moved from 2016 d.Skate Tile replacement project added at a cost of $75,000 e.Entry and lobby door replacement project increased from $7,000 to $18,000 f.Painting of exterior building costs increased $6,000 g.Painting of the arena ceiling and bar joists increased by $8,000 h.Mezzanine rooftop unit replacement was moved to 2019 4.2019 – $41,000 – project costs increased by $31,500 a.Mezzanine rooftop unit was moved from 2018 and costs increased $3,500 b.HHS Team Room rooftop unit replacement costs increased by $1,500 5.2020 – no projects currently scheduled Art Center Fund 1.2016 - $103,100 – project costs increased by $41,175 a.Re-landscaping of east and west faces of building was moved from 2015 - $3,600 b.Restroom improvements added - $1,200 c.Chairs & tables added - $17,800 d.Jaycee Studio curtain system added - $30,000 e.Replace stage flooring added - $30,000 f.Improve theater sound system added - $10,500 g.Seal floors in kitchen and restrooms added - $10,000 h.Entryway planters deleted - $2,800 2.2017 - $331,125 – project costs increased by $11,125 a.Restroom improvements added - $2,000 b.Storage and hanging display system - $3,125 – moved from 2016 c.Interior door renovations added - $6.000 3.2018 - $107,274 – project costs increased by $55,274 a.Remodeling of administrative office moved from 2016 - $50,000 b.Storage cabinets for catering kitchen added - $5,574 4.2019 – No projects currently scheduled 5.2020 - $36,500 a.Carpeting in various rooms and hallway - $21,500 b.Seal floor in kitchen and restrooms - $15,000 FACILITIES & BUILDINGS7/9/2015 CAPITAL IMPROVEMENTS FUND (305) ActualActualProjectedProjectedProjectedProjectedProjectedProjected 20132014201520162017201820192020 Working Capital Beginning Year 135,687194,214255,974264,753(177,380)(143,267)(451,983)(491,832) Revenues: Interest(646)1,6821,2801,324(887)(716)(2,260)(2,459) Transfers from General Fund Tax Levy(red per FMP)123,687123,94253,00035,000150,000175,000125,000150,000 Total Revenues123,041125,62454,28036,324149,113174,284122,740147,541 Expenditures: C.I.P. Projects64,51463,86445,500478,457115,000483,000162,589118,000 Transfer to General Fund Total Expenditures64,51463,86445,500478,457115,000483,000162,589118,000 Working Capital Year End194,214255,974 264,753(177,380)(143,267)(451,983)(491,832)(462,291) 2015 Projects Public Works Garage Upgrade - engineering20,000 Activity Center - Fencing/Landscaping 13,000 Activity Center - Multi-purpose Gym Improvements - moved to 2016 - PW - Wash Bay Roof Replacement delete and do with garage upgrade - PW - Wash Bay Air Handler Replacement delete and do with garage upgrade - PW - Fuel Management System Upgrade 12,500 45,500 2016 Projects 28,000Fire Dept - Repl carpet 340,000Public Works Garage Upgrade (total project = $570,000 - $230K from Ent Funds) Activity Center - Multi-purpose Gym Improvements 67,000 Activity Center Lounge/Computer Lab/Library - tables and chairs17,457 Activity Center - Harmony Hill Sound System - New item 6,000 PW - garage openers New item 20,000 478,457 2017 Projects 15,000Activity Center - dishwasher 100,000Activity Center - Former Historical Society Area 115,000 2018 Projects 150,000City Hall Lobby Upgrade Police Dept - replace carpet40,000 28,000Fire Dept - Repl apparatus floor finish 105,000Activity Ctr - replace gymnasium roof 80,000Activity Center - Raspberry Room roof replacement 80,000Activity Center - lower roof repl 483,000 2019 Projects 18,000PW - overhead door repl 115,000City Hall - roof repl 21,789Fire - classroom chairs 7,800Fire -classroom tables 162,589 2020 Projects 58,000Replace carpeting 10,000PW - repl wash 50,000PW - garage roof repl 118,000 PARK CAPITAL IMPROVEMENTS FUND (301)7/9/2015 ActualActualProjectedProjectedProjectedProjectedProjectedProjected 20132014201520162017201820192020 82,902139,565141,30537,018(300,871)(212,097)(384,160)(242,885) Working Capital Beginning Year Revenues: Taxes (from matured Park Bonds)62495 Interest3111,8431,4131,111(9,026)(6,363)(11,525)(7,287) Dedication fees000000 Joint Rec refunds6,2676,0006,0006,0006,0006,0006,000 Franchise Fees (gas/elec) 2014 incr 83,27085,30085,30085,30085,30085,30085,300 Franchise Fees (gas/elec) 2012 incr45,019210,000210,000210,000210,000210,000210,000 Transfer in Franchise Fees *200,000 Hennepin County Grant150,000 Met Council - easememt/grant Grants - Private Foundations Donations - general19,18112,050 Donations - benches1,000 Transfer in - Storm Sewer for Cottaeville Park351,966 g Total Revenues176,822494,644502,713302,411292,274294,937289,775294,013 Expenditures: C.I.P. Projects113,158133,938600,000633,300196,500460,000141,500660,000 Cottageville Property Acquisition351,966 Skate Park commitment7,0007,0007,0007,0007,0007,0007,000 Total Expenditures120,158492,904607,000640,300203,500467,000148,500660,000 37,018(300,871)(212,097)(384,160)(242,885)(608,871) Working Capital Year End139,565141,305 2015 Projects 2015 Items REMOVED Interlachen Warming House60,00070,000 Burnes Park - warming house Cotta150,000geville Park Play Equip30,000 Oakes Park - picnic shelter Cottagev180,000ille Park Play Equip - CDBG Funds40,000 Oakes Park - Lighting Cottagev200,000ille Park Improvements25,000 Valley Park - construct storage building 50,000600,000 Depot Recreation Area 2016 Projects Burnes Park Play Equipment50,0002019 Projects Cottagev250,000ille Park - phase II imprv50,000 Burnes Park - Lighting Downtown Park - Rehab30,00070,000 Harley Hopkins Park - Warming House Cottagev250,000ille Park Pavilion50,000 Harley Hopkins Park - Lighting Shady Oak Beach Improve.11,50013,300 Shady Oak Beach Improve. 141,500633,300 2017 Projects2020 Projects Hilltop Park - play 100,000equipment20,000 Central Park Tennis Courts Valley Park - play equipment400,00080,000 Central Park Warming House Shady Oak Beach Improve.50,00016,500 Interlachen Park - Lights 50,000196,500 Interlachen Park - Warming House Maetzold Field Play Equipment60,000 2018 Projects Maetzold Field Warming House80,000 Park Valley - play equpment660,00060,000 Burnes Park - resurface tennis courts20,000 Oakes Park - tennis courts20,000 Valley Park - warming house60,000 Burns Park - splash pad300,000 460,000 This is an estimate of projects to be completed. The Park CIP is on hold until the Park Investment Plan is completed and reviewed by the Park Board. The plan will come to council in September. 7/9/2015 MUNICIPAL STATE AID FUND (302) ActualActualProjectedProjectedProjectedProjectedProjectedProjected 20132014201520162017201820192020 2,064,148467,786513,07415,63915,71715,796(1,084,125)(689,546) Working Capital Beginning Bal Revenues: State MSA Funds, projects446,66200000400,000400,000 State MSA Advance2,022,202 Interest Earnings(5,873)23,7632,565787979(5,421)(3,448) Hennepin County -SOR Land Reimb2,271,909122,186 Shady Oak Rd - Land Sale proceeds3,698 Bond issue1,630,000 Total Revenues2,716,3962,168,1511,632,565787979394,579396,552 Transfer Out for Projects CIP State Aid Projects Highway 7 & 5th Ave Traffic Signal167,077 Shady Oak Rd - Co Rd 615,3691,099,020500,000 Shady Oak Rd ROW Purchase 1,814,674758,729 Shady Oak Rd Land Acqusition2,293,859134,539 Mainstreet Rehabilitation1,630,000 ARTery - 8th Ave S128,624 County Road 3 - EB700,000 Sixth St S 11th - 12th Ave400,000 () Misc Expenses31,7791,951 Total Expenditures4,312,7582,122,8632,130,000001,100,00000 15,63915,71715,796(1,084,125)(689,546)(292,993) Working Capital Ending Balance467,786513,074 includes cash, interest rcvbl, & A/P Cash Balance 12/31/20XX1,216,1252,970,112 ESTIMATED Cash Balance 12/31/20XX2,472,6772,472,7552,472,8341,372,9131,767,492 Amount owed Hennepin County as of 12-31-14(2,573,403) Total cost of Shady Oak Road project is estimated at $27 million. Hopkins share is $4 million not including the land acquisition line item an acquson cossa excee Ldiititthtd reimbursement34,302 Cash Flow AnalysisP.I.R. FUND (501)7/9/2015 ActualProjectedProjectedProjectedProjectedProjectedProjected 2014201520162017201820192020 Working Capital Beginning Year2,341,0892,238,6421,631,2831,554,8961,575,2561,377,5211,167,926 Revenues: Property Taxes8,247 Special Assessment Revenues - from levy181,546164,10700000 Special Assessment Revenues - Prepaid62,000262,000412,800180,000300,000377,000 Interest28,40010,0747,3416,9977,0896,1995,256 Bond Proceeds 1,849,4662,800,0003,553,0006,000,0003,932,6004,437,6003,750,000 Transfer In - matured bonds (excess) Total Revenues2,067,6593,036,1813,822,3416,419,7974,119,6894,743,7994,132,256 Expenditures: C.I.P. Projects1,550,0803,255,0002,505,0004,229,6003,212,6003,237,6002,195,000 C.I.P. Projects - Special Assm310,0001,310,0002,064,000900,0001,500,0001,885,000 Transfers for SA Debt collected thru Assm Debt Service Transfers - 2007B14,81517,18219,54838,8350 Debt Service Transfers - 2010A - Imprv58,53661,35864,18067,00269,82480,79483,045 Debt Service Transfers - 2010B - Rfdg Debt Service Transfers (prepaids to DS funds) rise Funds546,675 Transfer Out - Bond Proceeds to Enterp Total Expenditures2,170,1063,643,5403,898,7286,399,4374,317,4244,953,3944,298,045 Working Capital Year End2,238,6421,631,2831,554,8961,575,2561,377,5211,167,9261,002,136 Total Projects Scheduled (CIP & SA)1,550,0803,565,0003,815,0006,293,6004,112,6004,737,6004,080,000 WATER FUND - WORKING CAPITAL PROJECTION7/9/2015 ActualActualProjectedProjectedProjectedProjectedProjectedProjected 20132014201520162017201820192020 76,872597,73173,581165,107379,255439,824489,396472,677 Working Capital Beginning Yea r Revenues: Operating Revenues1,468,9561,487,4511,485,0001,544,4001,606,1761,670,4231,737,2401,806,730 Othe14,32710,398158,533165,235172,272179,661187,418195,564 r Interest1393,736000000 Grants/Other Govt Fundin9,580 g Gain on Sale of Asset21,855 Bond Issuance860,000200,000800,0001,500,0001,100,0001,700,0001,500,000 Total Revenues2,365,2771,511,1651,843,5332,509,6353,278,4482,950,0843,624,6583,502,294 Expenditures: Operation Expense1,069,7411,237,6691,073,8461,111,2441,150,0271,190,2491,231,9691,275,245 Other Exp - bond issuance-fiscal fee Other Exp - int on current bonds64,62055,944000 Other Exp - int on refunded bonds2,700 Other Exp - int on 2009 bonds22,85021,35019,72517,88715,96313,900 Other Exp - int on 2012 bonds13,37912,52911,62910,7299,8298,929 Other Exp - int on 2013 bonds17,43116,43115,43114,38113,28112,181 Other Exp -est interest on Future Bonds 029,60072,600100,600144,402178,806 Equipment Replacement Items06,80035,00026,8000 Capital Improvements462,660425,139250,000866,0001,665,0001,200,0001,768,0001,510,000 Principal Bond payment260,000 Principal Bond payment - refunded175,000180,000 Principal Bond pmnt - 2009 debt50,00050,00050,00050,00055,00055,00055,000 y Principal Bond pmnt - 2012 debt40,00040,00045,00045,00045,00045,00045,000 y Principal Bond pmnt - 2013 debt50,00050,00050,00055,00055,00055,000 y Principal Bond pmnt - Future Deb 013,33366,667166,667239,933353,199 yt Capital Lease PW Facilit1045,00045,00045,00045,00045,00045,00045,000 (y)() Total Expenditures1,857,0212,028,7521,752,0062,295,4873,217,8792,900,5133,641,3773,562,260 Chane in available funds508,256517,58791,527214,14860,56949,57116,71959,967 g()()() Inventor chane520 yg Bond Premium/Discount Exp12,5516,563 () Working Capital Ending Yea597,73173,581165,107379,255439,824489,396472,677412,710 r (1) Capital Lease moved to Storm Sewer - back to water fund in 2014 (water/sprinkler) Rate History 2014 - 2019 financial data was taken from the Utility Master Plan done by City Engineer (revenues adjusted) 1984 $0.85 1993 $1.05Notes - master plan rates fixture/no surchare option 1997 $1.10Income - 2008 and forward used utilit y(g) 2000 $1.20 2005 $1.40 Per Utility Master Plan (10/07) 2008 $1.65Equipmen t 2009 $1.862015 - phone sstem y 2010 $1.902016 - 3/4 ton utilit truck y 2011 $1.94/2.40 - not incr, left at $1.902017 - 1/2 ton truck 2012 $1.96 / 2.40 2013 $2.02 / 2.40 2014 $2.10 / 2.50 2015 $2.18 / 2.60 projected rate 2016 $2.25 / 2.70 increases 2017 $2.35 / 2.85 2018 $2.45 / 3.00 these are the correct rates per the UMP SEWER FUND - WORKING CAPITAL PROJECTION7/9/2015 ActualActualProjectedProjectedProjectedProjectedProjectedProjected 20132014201520162017201820192020 Working Capital Beginning Year394,411229,722116,280448,106790,3771,075,7161,370,0251,578,664 Revenues: Operating Revenues1,981,5802,011,8972,399,7002,496,6002,593,5002,696,1002,804,4002,912,700 Grants/Other Govt Funding86,445 Other17,90314,01620,00020,00020,00020,00020,00020,000 Interest333,3522911,1201,9762,6893,4253,947 Bond Issuance490,0000650,000575,000850,0001,000,000740,000 Total Revenues2,489,5162,115,7102,419,9913,167,7203,190,4763,568,7893,827,8253,676,647 Expenditures: Operation Expense551,763545,842570,253589,319609,053629,484650,634672,533 MWCC Charges (3% inflation)1,222,8931,281,3541,319,7951,359,3881,400,1701,442,1751,485,4401,530,004 Other - Bond Issuance-fiscal fees Interest Expense 45,01541,89628,45026,57524,46322,18719,82517,200 Interest Expense - 2012 Debt2,9492,7492,5492,3492,1491,949 Interest Expense - 2013 Debt9,9189,3188,7198,1197,5196,919 Interest Expense - Future Debt019,50035,45058,50084,352100,406 Equipment Replacement Items06,80033,60026,400180,800 Capital Improvements773,923238,4680630,000600,000875,0001,053,000760,000 Principal Bond payment (2009)70,00060,00060,00065,00065,00065,00070,00070,000 Principal Bond payment (2012)10,00010,00010,00010,00010,00010,00010,000 Principal Bond payment (2013)30,00030,00030,00030,00030,00030,000 Principal Bond payments Future Debt0043,33381,667138,266204,867 Capital Lease (PW Facility) (1)050,00050,00050,00050,00050,00050,00050,000 Total Expenditures2,663,5942,227,5602,088,1642,825,4492,905,1373,274,4813,619,1863,644,677 Change in available funds(174,078)(111,850)331,826342,271285,339294,309208,63931,969 Inventory change900 Bond Premium/Discount Exp9,299(1,592) Working Capital Ending Year229,722116,280448,106790,3771,075,7161,370,0251,578,6641,610,633 (1) Capital Lease moved to Storm Sewer - back in fund in 2014 2014 - 2018 financial data was taken from the Utilit Master Plan done b Cit Eninee Rate Histor yyyygr 1983 $1.50 1989 $1.75 1991 $2.00 1993 $2.50Notes - 1999 $2.25 Rate DECREASE Income - 2008 and forward used utility master plan rates (no fixture option) 2006 $2.50 rate increaseEquipmen t Per Utility Master Plan (10/07)2015 - phone system 2008 $2.702016 - 3/4 ton utility truck 2009 $3.102017 - generator 2010 $3.402020 - Jet Vactor 2011 $3.70 - act 3.60 2012 $3.75 2013 $3.90 2014 $4.10 2015 $4.30 2016 $4.55 projected rate 2017 $4.80 increases 2018 $5.10 these are the correct rates per the UMP STORM SEWER FUND - WORKING CAPITAL PROJECTION7/9/2015 ActualActualProjectedProjectedProjectedProjectedProjectedProjected 2014201520162017201820192020 2013 Working Capital Beginning Year744,314883,002508,676700,0611,006,6371,247,2741,423,5631,539,335 Revenues: Operating Revenues794,630797,899797,899797,899797,899797,899797,899797,899 Other4,9734,9995,0005,0005,0005,0005,0005,000 Interest(1,717)8,1591,2721,7502,5173,1183,5593,848 Bond Issuance380,000400,000500,000900,000350,000500,000700,000 Total Revenues1,177,886811,0571,204,1711,304,6491,705,4161,156,0171,306,4581,506,747 Expenditures: Operation Expense177,656247,948252,907257,965263,124268,387273,755279,230 Other - Bond Issuance-fiscal fees Bond Interest - existing35,43730,439 Bond Interest - 2009 refunded bonds1,875 Bond Interest - 2010 bonds14,58513,62312,48511,1739,6297,805 Bond Interest - 2012 bonds5,6815,2814,8814,4814,0813,681 Bond Interest - 2013 bonds7,7387,3386,8886,3885,8885,388 026,20051,40058,30069,00084,700 Interest Expense - Future Debt Capital Outlay (per ERP)000000 Cottageville Property purchase351,966 Cottageville Park Storm Water Mgmt Capital Improvements506,675322,057470,000526,000926,000371,000540,000710,000 2009 Principal Bond payment120,000125,000125,000 2010 Principal Bond payment70,00065,00070,00070,00070,00070,00075,00080,000 2012 Principal Bond payment15,00015,00020,00020,00020,00020,00020,00020,000 2013 Principal Bond payment20,00020,00025,00025,00025,00025,000 026,66760,000120,000143,333176,668 Principal Bond payments Future Debt Capital Lease - PW Facility (1)120,00025,00025,00025,00025,00025,00025,00025,000 Total Expenditures1,044,7681,182,4101,012,786998,0741,464,778979,7291,190,6861,417,471 Change in available funds133,118(371,353)191,385306,576240,637176,289115,77289,276 Inventory change372275 Bond Premium/Discount Exp (net)5,198(3,248) Working Capital Ending Year883,002508,676700,0611,006,6371,247,2741,423,5631,539,3351,628,611 (1) In 2012 this includes Water, Sewer & Storm Sewer transfers; in 2014 transfer returned to normal level Rate History (per month) 1989 $4.75 per quarter 1991 $6.00 per quarter 1992 $2.50 1993 $3.00 1998 $3.20 1999 $4.00 2006 $4.50 2009 $5.00 PAVILION - ICE ARENA - WORKING CAPITAL PROJECTIONS7/9/2015 ActualActualProjectedProjectedProjectedProjectedProjectedProjected 2014201520162017201820192020 2013 Working Capital Beginning Year 141,036117,122 (45,594) (51,095) (113,365) (388,779) (2,983,678) (2,933,361) Revenues: Operating Revenues359,961 369,371 387,840 407,232 427,593 448,973 471,421 494,992 Leases38,000 Levy per FMP65,000 65,000 65,000 65,000 65,000 Other7,224 14,655 10,000 10,000 10,000 10,000 10,000 10,000 Donations (bleacher heating) Interest(191) 877 Transfer In3,873 Total Revenues404,994 388,776 462,840 482,232 502,593 523,973 546,421 504,992 Expenditures: Operation Expense351,064 374,117 385,341 396,901 408,808 421,072 433,704 446,715 Capital Outlay - ERP7,833 179,983 - - - - - - Capital Improvements- - 60,000 125,000 347,000 2,676,000 41,000 Equip Certif - principal15,000 20,000 20,000 20,000 20,000 20,000 20,000 Equip Certif - interest3,130 2,937 3,000 2,600 2,200 1,800 1,400 1,000 Payment on Interfund Loan18,752 3,068 - - Total Expenditures380,779 575,105 468,341 544,501 778,008 3,118,872 496,104 467,715 Change in available funds24,215 (186,329) (5,501) (62,269) (275,415) (2,594,899) 50,317 37,277 Bond Premium/Discount Exp (net)(301) (301) Working Capital Ending Year141,036 (45,594) (51,095) (113,365) (388,779) (2,983,678) (2,933,361) (2,896,084) Pavilion Projects CIP201560,000 Evaporator Condenser Replacement CIP201695,000 Indoor Turf Replacement CIP201630,000 Exterior Sign 125,000 CIP2017140,000 Roof Replacement CIP20177,000 Desiccant Repl of Dehumidification System CIP2017200,000 Refrigerations System - Engineering 347,000 CIP201835,000 Skate Tile Lobby Improvement CIP201865,000 Overhead Door Relacement p CIP201875,000 Skate Tile Replacement CIP20182,400,000Refrieration Euiment & Area Floor Relacement gqpp CIP201825,000 Entry & Lobby Door Replacement CIP201828,000 Paint Pavilion Exterior CIP201848,000 Painting the Arena Ceiling and Bar Joist 2,676,000 CIP201930,000 Mezzanine Rooftop Unit Replacement CIP201911,000 HHS Team Room Rooftop Unit Replacement 41,000 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20162020 thru PROJECTS BY YEAR Project NameProject #Priority Project Cost Department 2016 Activity Center - Multi Purpose/Gym Improvements267,000Activity Center 14-CIP-AC002 Activity Ctr - Lounge/Comptr/Lib - Tables & Chairsn/a17,547Activity Center 16-CIP-AC034 Activity Center - Harmony Hill Sound SystemActivity Center26,000 16-CIP-AC036 Arts Center - Re-landscape E & W faces of building23,600Arts Center 13-CIP-AR001 Arts Center - Restroom ImprovementsArts Center11,200 13-CIP-AR002 Arts Center - Chairs & TablesArts Center117,800 16-CIP-AC001 Arts Center - Jaycee Studio Curtain SystemArts Center230,000 16-CIP-AC002 Arts Center - Replace Stage FlooringArts Center111,000 16-CIP-AC004 Arts Center - Improve Theater Sound SystemArts Center110,500 16-CIP-AC005 Arts Center - Seal Floors in Restroom & KitchenArts Center110,000 16-CIP-AC006 Technology Improvement - Council Chambers & Studion/a12,500Communications 13 CIP-CM001 8th Ave Parking FacilityDevelopmentn/a4,000,000 12-CIP-D408 Fire - Replace Carpet and Apparatus Floor Finishn/a28,000Fire 08-CIP-FD019 Pavilion Indoor Turf ReplacementPavilionn/a95,000 10-CIP-P319 Pavilion Exterior SignPavilionn/a30,000 16-CIP-P326 Public Works Garage UpgradePublic Works: Bldg/Equip Serv1570,000 13-CIP-B011 PW - Gate OperatorsPublic Works: Bldg/Equip Servn/a20,000 16-CIP-B004 Skate ParkPublic Works: Parksn/a7,000 08-CIP-P003 Burnes Park - Play EquipmentPublic Works: Parksn/a50,000 13-CIP-P043 Cottageville Park - Phase II ImprovementsPublic Works: Parksn/a250,000 13-CIP-P054 Rehab Downtown ParkPublic Works: Parksn/a70,000 14-CIP-P001 Cottageville Park PavilionPublic Works: Parksn/a400,000 16-CIP-P001 Residential Street Improvements and UtilitiesPublic Works: Streets/Trafficn/a4,100,000 01-CIP-S101 Citywide Concrete AlleysPublic Works: Streets/Trafficn/a75,000 01-CIP-S103 Plan, Design and Implement Railroad Quiet Zonen/a25,000Public Works: Streets/Traffic 11-CIP-S120 Pedestrian & Bicycle Access ImprovementsPublic Works: Streets/Trafficn/a25,000 13-CIP-S040 Blake Road Corridor ImprovementsPublic Works: Streets/Trafficn/a350,000 15-CIP-S001 Excelsior Boulevard Retaining WallPublic Works: Streets/Trafficn/a600,000 16-CIP-S040 Street Overlay ImprovementsPublic Works: Streets/Trafficn/a250,000 16-CIP-S041 Street Sign ManagementPublic Works: Streets/Trafficn/a20,000 16-CIP-S042 Repair Parking Lot 600 Sidewalk & CurbPublic Works: Streets/Trafficn/a30,000 16-CIP-S043 Eighth Avenue LRT CorridorPublic Works: Transportationn/a500,000 01-CIP-S503 Repair Excelsior Blvd Median PaversPublic Works: Transportationn/a40,000 16-CIP-S044 Storm Drainage System Maintenance - Alley Repairsn/a21,000Public Works: Utilities 01-CIP-U002 St. Louis Park Emergency ConnectionPublic Works: Utilitiesn/a211,000 08-CIP-U010 Shady Oak Beach ImprovementsRecreation340,000 16-CIP-R003 11,994,147 Total for 2016 2017 Activity Center - DishwasherActivity Center415,000 14-CIP-AC004 Activity Center - Former Historical Society AreaActivity Center1100,000 16-CIP-AC035 Arts Center - Replace Rooftop HVAC UnitsArts Centern/a320,000 08-CIP-AR013 Arts Center - Restroom ImprovementsArts Center12,000 13-CIP-AR002 Arts Center - Storage & Hanging, Display SystemsArts Center13,125 13-CIP-AR004 Friday, July 10, 2015 Page 1 Project NameProject #Priority Project Cost Department Arts Center - Interior Door RenovationsArts Center26,000 16-CIP-AC007 Technology Improvement - Council Chambers & Studion/a23,000Communications 13 CIP-CM001 Pavilion Roof ReplacementPavilion1140,000 09-CIP-P026 Pavilion - Desiccant Repl of Dehumidification Systn/a7,000Pavilion 10-CIP-P320 Pavilion - Refrigeration System - Engineering Feesn/a200,000Pavilion 16-CIP-P327 Skate ParkPublic Works: Parksn/a7,000 08-CIP-P003 Hilltop Park - Play EquipmentPublic Works: Parksn/a100,000 08-CIP-P014 Valley Park - Play EquipmentPublic Works: Parksn/a80,000 08-CIP-P015 Residential Street Improvements and UtilitiesPublic Works: Streets/Trafficn/a6,600,000 01-CIP-S101 Citywide Concrete AlleysPublic Works: Streets/Trafficn/a80,000 01-CIP-S103 Pedestrian & Bicycle Access ImprovementsPublic Works: Streets/Trafficn/a25,000 13-CIP-S040 Blake Road Corridor ImprovementsPublic Works: Streets/Trafficn/a3,375,000 15-CIP-S001 Street Overlay ImprovementsPublic Works: Streets/Trafficn/a275,000 16-CIP-S041 Street Sign ManagementPublic Works: Streets/Trafficn/a20,000 16-CIP-S042 Eighth Avenue LRT CorridorPublic Works: Transportationn/a4,033,600 01-CIP-S503 Storm Drainage System Maintenance - Alley Repairsn/a21,000Public Works: Utilities 01-CIP-U002 Shady Oak Beach ImprovementsRecreation350,000 16-CIP-R003 15,482,725 Total for 2017 2018 Activity Center - Replace Gymnasium RoofActivity Centern/a105,000 08-CIP-AC018 Activity Center - Raspberry Room Roof Replacementn/a80,000Activity Center 08-CIP-AC024 Activity Center - Lower Roof ReplacementActivity Centern/a80,000 09-CIP-AC031 Arts Center - Replace Lobby CarpetArts Centern/a52,000 09-CIP-AR027 Arts Center - Remodel Administrative OfficesArts Center250,000 14-CIP-AR004 Art Center - Storage Cabinets for Catering KitchenArts Center35,274 16-CIP-AC003 City Hall Lobby UpgradeCity Hall Administrationn/a150,000 09-CIP-CH030 Technology Improvement - Council Chambers & Studion/a15,000Communications 13 CIP-CM001 Fire - Replace Carpet and Apparatus Floor Finishn/a28,000Fire 08-CIP-FD019 Pavilion Restroom/Lobby Floor ImprovementPavilionn/a35,000 07-CIP-P313 Pavilion Overhead Door ImprovementPavilionn/a65,000 07-CIP-P314 Pavilion - Skate Tile ReplacementPavilionn/a75,000 10-CIP-P317 Pavilion - Refrigeration Equip & Arena Floor Repln/a2,400,000Pavilion 10-CIP-P318 Pavilion Entry and Lobby Door ReplacementPavilion325,000 13-CIP-P324 Pavilion - Paint Exterior BuildingPavilion128,000 13-CIP-P325 Pavilion Painting the Arena Ceiling and Bar JoistPavilion148,000 14-CIP-P010 Replace Carpet - Police StationPolicen/a40,000 08-CIP-PD016 Skate ParkPublic Works: Parksn/a7,000 08-CIP-P003 Park Valley - Play EquipmentPublic Works: Parksn/a60,000 08-CIP-P010 Burnes Park - Resurface Tennis CourtsPublic Works: Parksn/a20,000 08-CIP-P011 Oakes Park - Tennis CourtsPublic Works: Parksn/a20,000 13-CIP-P044 Valley Park - Warming HousePublic Works: Parksn/a60,000 13-CIP-P045 Burnes Park Splash PadPublic Works: Parksn/a300,000 14-CIP-P002 Residential Street Improvements and UtilitiesPublic Works: Streets/Trafficn/a3,450,000 01-CIP-S101 County Road 3Public Works: Streets/Trafficn/a2,300,000 01-CIP-S104 Sixth Street South (11th to 12th Avenue South)Public Works: Streets/Trafficn/a500,000 01-CIP-S504 Plan, Design and Implement Railroad Quiet Zonen/a200,000Public Works: Streets/Traffic 11-CIP-S120 Pedestrian & Bicycle Access ImprovementsPublic Works: Streets/Trafficn/a25,000 13-CIP-S040 Blake Road Corridor ImprovementsPublic Works: Streets/Trafficn/a7,610,650 15-CIP-S001 Street Overlay ImprovementsPublic Works: Streets/Trafficn/a300,000 16-CIP-S041 Street Sign ManagementPublic Works: Streets/Trafficn/a20,000 16-CIP-S042 Light Rail Transit Stations (3)Public Works: Transportationn/a500,000 01-CIP-S502 Storm Drainage System Maintenance - Alley Repairsn/a21,000Public Works: Utilities 01-CIP-U002 18,674,924 Total for 2018 Friday, July 10, 2015 Page 2 Project NameProject #Priority Project Cost Department 2019 City Hall Roof ReplacementCity Hall Administrationn/a115,000 09-CIP-CH029 Fire - Classroom ChairsFiren/a21,789 16-CIP-FD001 Fire - Classroom TablesFiren/a7,800 16-CIP-FD002 Pavilion Mezzanine Rooftop Unit ReplacementPavilion130,000 13-CIP-P321 Pavilion HHS Team Room Rooftop Unit ReplPavilion111,000 13-CIP-P322 Public Works - Replace Overhead DoorsPublic Works: Bldg/Equip Servn/a90,000 08-CIP-B023 Skate ParkPublic Works: Parksn/a7,000 08-CIP-P003 Burnes Park - LightingPublic Works: Parksn/a50,000 13-CIP-P046 Harley Hopkins Park - Warming HousePublic Works: Parksn/a30,000 13-CIP-P056 Harley Hopkins Park - LightingPublic Works: Parksn/a50,000 13-CIP-P057 Residential Street Improvements and UtilitiesPublic Works: Streets/Trafficn/a5,575,000 01-CIP-S101 Blake Road Corridor ImprovementsPublic Works: Streets/Trafficn/a7,110,650 15-CIP-S001 Street Overlay ImprovementsPublic Works: Streets/Trafficn/a325,000 16-CIP-S041 Street Sign ManagementPublic Works: Streets/Trafficn/a20,000 16-CIP-S042 Storm Drainage System Maintenance - Alley Repairsn/a22,000Public Works: Utilities 01-CIP-U002 Lift Station # 4Public Works: Utilitiesn/a160,000 08-CIP-U001 Shady Oak Beach ImprovementsRecreation335,000 16-CIP-R003 13,660,239 Total for 2019 2020 Art Center - Various Rooms and Hallway (Carpet)n/a21,500Arts Center 09-CIP-AR028 Arts Center - Seal Floors in Restroom & KitchenArts Center115,000 16-CIP-AC006 City Hall - Replace CarpetingCity Hall Administrationn/a58,000 08-CIP-B010 Public Works - Replace Wash Bay RoofPublic Works: Bldg/Equip Servn/a50,000 08-CIP-B021 Public Works Garage Roof ReplacementPublic Works: Bldg/Equip Servn/a50,000 09-CIP-B034 Central Park Tennis CourtsPublic Works: Parksn/a20,000 05-CIP-P202 Central Park - Warming HousePublic Works: Parksn/a400,000 13-CIP-P050 Interlachen Park - LightingPublic Works: Parksn/a50,000 13-CIP-P059 Maetzold Field - Play EquipmentPublic Works: Parksn/a60,000 13-CIP-P062 Maetzold Field - Warming HousePublic Works: Parksn/a80,000 13-CIP-P063 Residential Street Improvements and UtilitiesPublic Works: Streets/Trafficn/a6,660,000 01-CIP-S101 Street Overlay ImprovementsPublic Works: Streets/Trafficn/a350,000 16-CIP-S041 Street Sign ManagementPublic Works: Streets/Trafficn/a20,000 16-CIP-S042 7,834,500 Total for 2020 67,646,535 GRAND TOTAL Friday, July 10, 2015 Page 3 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20162020 thru PROJECTS BY DEPARTMENT DepartmentProject#Priority20162017201820192020 Total Activity Center Activity Center - Replace Gymnasium Roofn/a105,000 08-CIP-AC018105,000 Activity Center - Raspberry Room Roof Replacementn/a80,000 08-CIP-AC02480,000 Activity Center - Lower Roof Replacementn/a80,000 09-CIP-AC03180,000 Activity Center - Multi Purpose/Gym Improvements267,000 14-CIP-AC00267,000 Activity Center - Dishwasher415,000 14-CIP-AC00415,000 Activity Ctr - Lounge/Comptr/Lib - Tables & Chairsn/a17,547 16-CIP-AC03417,547 Activity Center - Former Historical Society Area1100,000 16-CIP-AC035100,000 Activity Center - Harmony Hill Sound System26,000 16-CIP-AC0366,000 Activity Center Total 90,547115,000265,000 470,547 Arts Center Arts Center - Replace Rooftop HVAC Unitsn/a320,000 08-CIP-AR013320,000 Arts Center - Replace Lobby Carpetn/a52,000 09-CIP-AR02752,000 Art Center - Various Rooms and Hallway (Carpet)n/a21,500 09-CIP-AR02821,500 Arts Center - Re-landscape E & W faces of building23,600 13-CIP-AR0013,600 Arts Center - Restroom Improvements11,2002,000 13-CIP-AR0023,200 Arts Center - Storage & Hanging, Display Systems13,125 13-CIP-AR0043,125 Arts Center - Remodel Administrative Offices250,000 14-CIP-AR00450,000 Arts Center - Chairs & Tables117,800 16-CIP-AC00117,800 Arts Center - Jaycee Studio Curtain System230,000 16-CIP-AC00230,000 Art Center - Storage Cabinets for Catering Kitchen35,274 16-CIP-AC0035,274 Arts Center - Replace Stage Flooring111,000 16-CIP-AC00411,000 Arts Center - Improve Theater Sound System110,500 16-CIP-AC00510,500 Arts Center - Seal Floors in Restroom & Kitchen110,00015,000 16-CIP-AC00625,000 Arts Center - Interior Door Renovations26,000 16-CIP-AC0076,000 Arts Center Total 558,999 84,100331,125107,27436,500 City Hall Administration City Hall - Replace Carpetingn/a58,000 08-CIP-B01058,000 City Hall Roof Replacementn/a115,000 09-CIP-CH029115,000 City Hall Lobby Upgraden/a150,000 09-CIP-CH030150,000 City Hall Administration Total 150,000115,00058,000 323,000 Communications Technology Improvement - Council Chambers & Studion/a12,50023,00015,000 13 CIP-CM00150,500 Communications Total 50,500 12,50023,00015,000 Development 8th Ave Parking Facilityn/a4,000,000 12-CIP-D4084,000,000 Development Total 4,000,000 4,000,000 Friday, July 10, 2015 Page 1 DepartmentProject#Priority20162017201820192020 Total Fire Fire - Replace Carpet and Apparatus Floor Finishn/a28,00028,000 08-CIP-FD01956,000 Fire - Classroom Chairsn/a21,789 16-CIP-FD00121,789 Fire - Classroom Tablesn/a7,800 16-CIP-FD0027,800 Fire Total 28,00028,00029,589 85,589 Pavilion Pavilion Restroom/Lobby Floor Improvementn/a35,000 07-CIP-P31335,000 Pavilion Overhead Door Improvementn/a65,000 07-CIP-P31465,000 Pavilion Roof Replacement1140,000 09-CIP-P026140,000 Pavilion - Skate Tile Replacementn/a75,000 10-CIP-P31775,000 Pavilion - Refrigeration Equip & Arena Floor Repln/a2,400,000 10-CIP-P3182,400,000 Pavilion Indoor Turf Replacementn/a95,000 10-CIP-P31995,000 Pavilion - Desiccant Repl of Dehumidification Systn/a7,000 10-CIP-P3207,000 Pavilion Mezzanine Rooftop Unit Replacement130,000 13-CIP-P32130,000 Pavilion HHS Team Room Rooftop Unit Repl111,000 13-CIP-P32211,000 Pavilion Entry and Lobby Door Replacement325,000 13-CIP-P32425,000 Pavilion - Paint Exterior Building128,000 13-CIP-P32528,000 Pavilion Painting the Arena Ceiling and Bar Joist148,000 14-CIP-P01048,000 Pavilion Exterior Signn/a30,000 16-CIP-P32630,000 Pavilion - Refrigeration System - Engineering Feesn/a200,000 16-CIP-P327200,000 Pavilion Total 125,000347,0002,676,00041,000 3,189,000 Police Replace Carpet - Police Stationn/a40,000 08-CIP-PD01640,000 Police Total 40,000 40,000 Public Works: Bldg/Equip Serv Public Works - Replace Wash Bay Roofn/a50,000 08-CIP-B02150,000 Public Works - Replace Overhead Doorsn/a90,000 08-CIP-B02390,000 Public Works Garage Roof Replacementn/a50,000 09-CIP-B03450,000 Public Works Garage Upgrade1570,000 13-CIP-B011570,000 PW - Gate Operatorsn/a20,000 16-CIP-B00420,000 Public Works: Bldg/Equip Serv Total 590,00090,000100,000 780,000 Public Works: Parks Central Park Tennis Courtsn/a20,000 05-CIP-P20220,000 Skate Parkn/a7,0007,0007,0007,000 08-CIP-P00328,000 Park Valley - Play Equipmentn/a60,000 08-CIP-P01060,000 Burnes Park - Resurface Tennis Courtsn/a20,000 08-CIP-P01120,000 Hilltop Park - Play Equipmentn/a100,000 08-CIP-P014100,000 Valley Park - Play Equipmentn/a80,000 08-CIP-P01580,000 Burnes Park - Play Equipmentn/a50,000 13-CIP-P04350,000 Oakes Park - Tennis Courtsn/a20,000 13-CIP-P04420,000 Valley Park - Warming Housen/a60,000 13-CIP-P04560,000 Burnes Park - Lightingn/a50,000 13-CIP-P04650,000 Central Park - Warming Housen/a400,000 13-CIP-P050400,000 Cottageville Park - Phase II Improvementsn/a250,000 13-CIP-P054250,000 Harley Hopkins Park - Warming Housen/a30,000 13-CIP-P05630,000 Harley Hopkins Park - Lightingn/a50,000 13-CIP-P05750,000 Interlachen Park - Lightingn/a50,000 13-CIP-P05950,000 Maetzold Field - Play Equipmentn/a60,000 13-CIP-P06260,000 Friday, July 10, 2015 Page 2 DepartmentProject#Priority20162017201820192020 Total Maetzold Field - Warming Housen/a80,000 13-CIP-P06380,000 Rehab Downtown Parkn/a70,000 14-CIP-P00170,000 Burnes Park Splash Padn/a300,000 14-CIP-P002300,000 Cottageville Park Pavilionn/a400,000 16-CIP-P001400,000 Public Works: Parks Total 2,178,000 777,000187,000467,000137,000610,000 Public Works: Streets/Traffic Residential Street Improvements and Utilitiesn/a4,100,0006,600,0003,450,0005,575,0006,660,000 01-CIP-S10126,385,000 Citywide Concrete Alleysn/a75,00080,000 01-CIP-S103155,000 County Road 3n/a2,300,000 01-CIP-S1042,300,000 Sixth Street South (11th to 12th Avenue South)n/a500,000 01-CIP-S504500,000 Plan, Design and Implement Railroad Quiet Zonen/a25,000200,000 11-CIP-S120225,000 Pedestrian & Bicycle Access Improvementsn/a25,00025,00025,000 13-CIP-S04075,000 Blake Road Corridor Improvementsn/a350,0003,375,0007,610,6507,110,650 15-CIP-S00118,446,300 Excelsior Boulevard Retaining Walln/a600,000 16-CIP-S040600,000 Street Overlay Improvementsn/a250,000275,000300,000325,000350,000 16-CIP-S0411,500,000 Street Sign Managementn/a20,00020,00020,00020,00020,000 16-CIP-S042100,000 Repair Parking Lot 600 Sidewalk & Curbn/a30,000 16-CIP-S04330,000 Public Works: Streets/Traffic Total 5,475,00010,375,00014,405,65013,030,6507,030,000 50,316,300 Public Works: Transportation Light Rail Transit Stations (3)n/a500,000 01-CIP-S502500,000 Eighth Avenue LRT Corridorn/a500,0004,033,600 01-CIP-S5034,533,600 Repair Excelsior Blvd Median Paversn/a40,000 16-CIP-S04440,000 Public Works: Transportation Total 540,0004,033,600500,000 5,073,600 Public Works: Utilities Storm Drainage System Maintenance - Alley Repairsn/a21,00021,00021,00022,000 01-CIP-U00285,000 Lift Station # 4n/a160,000 08-CIP-U001160,000 St. Louis Park Emergency Connectionn/a211,000 08-CIP-U010211,000 Public Works: Utilities Total 232,00021,00021,000182,000 456,000 Recreation Shady Oak Beach Improvements340,00050,00035,000 16-CIP-R003125,000 Recreation Total 40,00050,00035,000 125,000 GRAND TOTAL 11,994,14715,482,72518,674,92413,660,2397,834,500 67,646,535 Friday, July 10, 2015 Page 3 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20162020 thru PROJECTS BY FUNDING SOURCE SourceProject#Priority20162017201820192020Total AC - Arts Center Fund Arts Center - Replace Rooftop HVAC Unitsn/a320,000 08-CIP-AR013320,000 Arts Center - Replace Lobby Carpetn/a52,000 09-CIP-AR02752,000 Art Center - Various Rooms and Hallway (Carpet)n/a21,500 09-CIP-AR02821,500 Arts Center - Re-landscape E & W faces of building23,600 13-CIP-AR0013,600 Arts Center - Restroom Improvements11,2002,000 13-CIP-AR0023,200 Arts Center - Storage & Hanging, Display Systems13,125 13-CIP-AR0043,125 Arts Center - Remodel Administrative Offices250,000 14-CIP-AR00450,000 Arts Center - Chairs & Tables117,800 16-CIP-AC00117,800 Arts Center - Jaycee Studio Curtain System230,000 16-CIP-AC00230,000 Art Center - Storage Cabinets for Catering Kitchen35,274 16-CIP-AC0035,274 Arts Center - Replace Stage Flooring130,000 16-CIP-AC00430,000 Arts Center - Improve Theater Sound System110,500 16-CIP-AC00510,500 Arts Center - Seal Floors in Restroom & Kitchen110,00015,000 16-CIP-AC00625,000 Arts Center - Interior Door Renovations26,000 16-CIP-AC0076,000 AC - Arts Center Fund Total 103,100331,125107,27436,500 577,999 CI - Capital Improvement Fund Activity Center - Replace Gymnasium Roofn/a105,000 08-CIP-AC018105,000 Activity Center - Raspberry Room Roof Replacementn/a80,000 08-CIP-AC02480,000 City Hall - Replace Carpetingn/a58,000 08-CIP-B01058,000 Public Works - Replace Wash Bay Roofn/a10,000 08-CIP-B02110,000 Public Works - Replace Overhead Doorsn/a18,000 08-CIP-B02318,000 Fire - Replace Carpet and Apparatus Floor Finishn/a28,00028,000 08-CIP-FD01956,000 Replace Carpet - Police Stationn/a40,000 08-CIP-PD01640,000 Activity Center - Lower Roof Replacementn/a80,000 09-CIP-AC03180,000 Public Works Garage Roof Replacementn/a50,000 09-CIP-B03450,000 City Hall Roof Replacementn/a115,000 09-CIP-CH029115,000 City Hall Lobby Upgraden/a150,000 09-CIP-CH030150,000 Public Works Garage Upgrade1340,000 13-CIP-B011340,000 Activity Center - Multi Purpose/Gym Improvements267,000 14-CIP-AC00267,000 Activity Center - Dishwasher415,000 14-CIP-AC00415,000 Activity Ctr - Lounge/Comptr/Lib - Tables & Chairsn/a17,457 16-CIP-AC03417,457 Activity Center - Former Historical Society Area1100,000 16-CIP-AC035100,000 Activity Center - Harmony Hill Sound System26,000 16-CIP-AC0366,000 PW - Gate Operatorsn/a20,000 16-CIP-B00420,000 Fire - Classroom Chairsn/a21,789 16-CIP-FD00121,789 Fire - Classroom Tablesn/a7,800 16-CIP-FD0027,800 CI - Capital Improvement Fund Total 478,457115,000483,000162,589118,000 1,357,046 CT - Cable Franchise Fees Technology Improvement - Council Chambers & Studion/a12,50023,00015,000 13 CIP-CM00150,500 Friday, July 10, 2015 Page 1 SourceProect#Priorit20162017201820192020Total jy CT - Cable Franchise Fees Total 12,50023,00015,000 50,500 ED - Economic Development Fund 8th Ave Parking Facilityn/a4,000,000 12-CIP-D4084,000,000 ED - Economic Development Fund Total 4,000,000 4,000,000 GU - Other Governmental Units County Road 3n/a1,600,000 01-CIP-S1041,600,000 Eighth Avenue LRT Corridorn/a2,445,000 01-CIP-S5032,445,000 Blake Road Corridor Improvementsn/a250,0002,500,0005,168,0505,168,050 15-CIP-S00113,086,100 Cottageville Park Pavilionn/a100,000 16-CIP-P001100,000 Shady Oak Beach Improvements326,70033,50023,500 16-CIP-R00383,700 Excelsior Boulevard Retaining Walln/a300,000 16-CIP-S040300,000 GU - Other Governmental Units Total 676,7004,978,5006,768,0505,191,550 17,614,800 MS - Municipal State Aid Streets County Road 3n/a700,000 01-CIP-S104700,000 Sixth Street South (11th to 12th Avenue South)n/a400,000 01-CIP-S504400,000 MS - Municipal State Aid Streets Total 1,100,000 1,100,000 PA - Pavilion Fund Pavilion Restroom/Lobby Floor Improvementn/a35,000 07-CIP-P31335,000 Pavilion Overhead Door Improvementn/a65,000 07-CIP-P31465,000 Pavilion Roof Replacement1140,000 09-CIP-P026140,000 Pavilion - Skate Tile Replacementn/a75,000 10-CIP-P31775,000 Pavilion - Refrigeration Equip & Arena Floor Repln/a2,400,000 10-CIP-P3182,400,000 Pavilion Indoor Turf Replacementn/a95,000 10-CIP-P31995,000 Pavilion - Desiccant Repl of Dehumidification Systn/a7,000 10-CIP-P3207,000 Pavilion Mezzanine Rooftop Unit Replacement130,000 13-CIP-P32130,000 Pavilion HHS Team Room Rooftop Unit Repl111,000 13-CIP-P32211,000 Pavilion Entry and Lobby Door Replacement325,000 13-CIP-P32425,000 Pavilion - Paint Exterior Building128,000 13-CIP-P32528,000 Pavilion Painting the Arena Ceiling and Bar Joist148,000 14-CIP-P01048,000 Pavilion Exterior Signn/a30,000 16-CIP-P32630,000 Pavilion - Refrigeration System - Engineering Feesn/a200,000 16-CIP-P327200,000 PA - Pavilion Fund Total 125,000347,0002,676,00041,000 3,189,000 PDF- Park Dedication Fund Central Park Tennis Courtsn/a20,000 05-CIP-P20220,000 Skate Parkn/a7,0007,0007,0007,000 08-CIP-P00328,000 Park Valley - Play Equipmentn/a60,000 08-CIP-P01060,000 Burnes Park - Resurface Tennis Courtsn/a20,000 08-CIP-P01120,000 Hilltop Park - Play Equipmentn/a100,000 08-CIP-P014100,000 Valley Park - Play Equipmentn/a80,000 08-CIP-P01580,000 Burnes Park - Play Equipmentn/a50,000 13-CIP-P04350,000 Oakes Park - Tennis Courtsn/a20,000 13-CIP-P04420,000 Valley Park - Warming Housen/a60,000 13-CIP-P04560,000 Burnes Park - Lightingn/a50,000 13-CIP-P04650,000 Friday, July 10, 2015 Page 2 SourceProect#Priorit20162017201820192020Total jy Central Park - Warming Housen/a400,000 13-CIP-P050400,000 Cottageville Park - Phase II Improvementsn/a250,000 13-CIP-P054250,000 Harley Hopkins Park - Warming Housen/a30,000 13-CIP-P05630,000 Harley Hopkins Park - Lightingn/a50,000 13-CIP-P05750,000 Interlachen Park - Lightingn/a50,000 13-CIP-P05950,000 Interlachen Park - Warming Housen/a50,000 13-CIP-P06050,000 Maetzold Field - Play Equipmentn/a60,000 13-CIP-P06260,000 Maetzold Field - Warming Housen/a80,000 13-CIP-P06380,000 Rehab Downtown Parkn/a70,000 14-CIP-P00170,000 Burnes Park Splash Padn/a300,000 14-CIP-P002300,000 Cottageville Park Pavilionn/a250,000 16-CIP-P001250,000 Shady Oak Beach Improvements313,30016,50011,500 16-CIP-R00341,300 PDF- Park Dedication Fund Total 2,119,300 640,300203,500467,000148,500660,000 PF - Private Sector Funds Cottageville Park Pavilionn/a50,000 16-CIP-P00150,000 PF - Private Sector Funds Total 50,000 50,000 PI - PIR/General Obligation Bonds Residential Street Improvements and Utilitiesn/a1,200,0002,000,0001,000,0001,825,0001,825,000 01-CIP-S1017,850,000 Citywide Concrete Alleysn/a15,00016,000 01-CIP-S10331,000 Eighth Avenue LRT Corridorn/a500,0001,018,600 01-CIP-S5031,518,600 Sixth Street South (11th to 12th Avenue South)n/a100,000 01-CIP-S504100,000 Plan, Design and Implement Railroad Quiet Zonen/a25,000200,000 11-CIP-S120225,000 Pedestrian & Bicycle Access Improvementsn/a25,00025,00025,000 13-CIP-S04075,000 Blake Road Corridor Improvementsn/a100,000875,0001,567,6001,067,600 15-CIP-S0013,610,200 Excelsior Boulevard Retaining Walln/a300,000 16-CIP-S040300,000 Street Overlay Improvementsn/a250,000275,000300,000325,000350,000 16-CIP-S0411,500,000 Street Sign Managementn/a20,00020,00020,00020,00020,000 16-CIP-S042100,000 Repair Parking Lot 600 Sidewalk & Curbn/a30,000 16-CIP-S04330,000 Repair Excelsior Blvd Median Paversn/a40,000 16-CIP-S04440,000 PI - PIR/General Obligation Bonds Total 2,505,0004,229,6003,212,6003,237,6002,195,000 15,379,800 RF - Refuse Fund Public Works - Replace Wash Bay Roofn/a10,000 08-CIP-B02110,000 Public Works - Replace Overhead Doorsn/a18,000 08-CIP-B02318,000 Public Works Garage Upgrade190,000 13-CIP-B01190,000 RF - Refuse Fund Total 90,00018,00010,000 118,000 SA - Special Assessment Residential Street Improvements and Utilitiesn/a1,250,0002,000,000900,0001,500,0001,885,000 01-CIP-S1017,535,000 Citywide Concrete Alleysn/a60,00064,000 01-CIP-S103124,000 SA - Special Assessment Total 1,310,0002,064,000900,0001,500,0001,885,000 7,659,000 SF - Sanitary Sewer Fund Residential Street Improvements and Utilitiesn/a600,000500,000500,000500,000750,000 01-CIP-S1012,850,000 Eighth Avenue LRT Corridorn/a100,000 01-CIP-S503100,000 Public Works - Replace Wash Bay Roofn/a10,000 08-CIP-B02110,000 Friday, July 10, 2015 Page 3 SourceProect#Priorit20162017201820192020Total jy Public Works - Replace Overhead Doorsn/a18,000 08-CIP-B02318,000 Lift Station # 4n/a160,000 08-CIP-U001160,000 Public Works Garage Upgrade130,000 13-CIP-B01130,000 Blake Road Corridor Improvementsn/a375,000375,000 15-CIP-S001750,000 SF - Sanitary Sewer Fund Total 630,000600,000875,0001,053,000760,000 3,918,000 SU - Storm Sewer Fund Residential Street Improvements and Utilitiesn/a450,000600,000350,000500,000700,000 01-CIP-S1012,600,000 Eighth Avenue LRT Corridorn/a305,000 01-CIP-S503305,000 Storm Drainage System Maintenance - Alley Repairsn/a21,00021,00021,00022,000 01-CIP-U00285,000 Public Works - Replace Wash Bay Roofn/a10,000 08-CIP-B02110,000 Public Works - Replace Overhead Doorsn/a18,000 08-CIP-B02318,000 Public Works Garage Upgrade155,000 13-CIP-B01155,000 SU - Storm Sewer Fund Total 526,000926,000371,000540,000710,000 3,073,000 TF - Tax Increment Financing Light Rail Transit Stations (3)n/a500,000 01-CIP-S502500,000 TF - Tax Increment Financing Total 500,000 500,000 WF - Water Fund Residential Street Improvements and Utilitiesn/a600,0001,500,000700,0001,250,0001,500,000 01-CIP-S1015,550,000 Eighth Avenue LRT Corridorn/a165,000 01-CIP-S503165,000 Public Works - Replace Wash Bay Roofn/a10,000 08-CIP-B02110,000 Public Works - Replace Overhead Doorsn/a18,000 08-CIP-B02318,000 St. Louis Park Emergency Connectionn/a211,000 08-CIP-U010211,000 Public Works Garage Upgrade155,000 13-CIP-B01155,000 Blake Road Corridor Improvementsn/a500,000500,000 15-CIP-S0011,000,000 WF - Water Fund Total 866,0001,665,0001,200,0001,768,0001,510,000 7,009,000 GRAND TOTAL 67,715,445 12,013,05715,482,72518,674,92413,660,2397,884,500 Friday, July 10, 2015 Page 4 City of Hopkins Public Works Department Review of Conditions with Recommendations for Upgrade and Repair Performed by: Oertel Architects May 27, 2015 Hopkins Existing Building Evaluation1 Introduction The existing public works building consists of the original building and the addition / remodeling work that was completed in 2004. In 2004, the addition included a large vehicle storage area, segregated garbage truck storage, shops, mezzanine (with elevator), storage, additional office space and related items. The work at the time also included improvements to the office area, lunch room and lockers /restrooms. A new salt storage building, fuel island, and other exterior improvements were a part of the work performed eleven years ago. The mechanic’s area, associated mezzanine storage, and wash bay were not a significant part of the 2004 project. Virtually no work was involved at these locations. In all, these areas are in fair condition but potential improvements are evident. The addition remains in virtually new or good condition. The purpose of this study was first to assess and review all portions of the building and provide an evaluation of the condition, space usage, and concerns (whether life/safety, performance, or function). The result of this study is to provide a list of recommendations. The majority of the on-site assessment was performed the week of February 16, 2014. The weather conditions included very cold temperatures with sunny skies. Most crews were out on duty with a few remaining crew leaders and staff on hand. Consequently, many of the vehicles were off-site. While the vast majority of the building systems and overall building layout serves their purpose, and appear to function quite well, there are a few key areas of interest subject to potential improvements. These can be summarized as follows: 1.Since the addition was completed, lighting types and options have changed and improved considerably. High efficiency fluorescent and, more recently, LED lighting has totally replaced metal halide style lights, prevalent in use ten to twenty years ago. The older style lights require a lengthy start up time (10 to 15 minutes) and consequently are somewhat ineffective when lighting is only needed for a few minutes. Plus, these lights tend to remain on since the wait time for full brilliance can be frustrating. In addition, modern control systems can assist with limiting energy usage, automatically turning on/off and changing in intensity. 2.Mechanical systems, particularly operational units, have a typical life expectancy of 20 years without excessive maintenance or failures. The units at the wash bay and mechanic’s area may be due for replacement and other considerations might be made. The unit in the wash bay would best be located outside of the salt spray. Units in the mechanic’s area might have better controls. 3.There is concern for the fumes in the mechanic’s bay entering the office area. There are several likely reasons for this: a.The building system is marginally pressurized and balanced. We performed a test (using a magnehelic gauge made especially for this purpose) and the office area is just barely in positive pressure relative to the mechanic’s space. This means that, while the office is in Hopkins Existing Building Evaluation2 Introduction positive air flow, more positive pressurization would help air flow from the office to the mechanic’s area. b.There is a door directly between the office and shop. Due to a stair location, as originally built, the door swings open into the office and, at time of use, the exhaust gasses can readily enter the office. c.There are no perimeter seals on the door between the vehicle areas and the office area. d.Although there was a perceived concern that the floor between the open mezzanine and the office area might have gaps and open joints, allowing air to fall through, the precast floor appears to be well secured and sealed. e.Most important, it appears that air from the mezzanine and mechanic’s area is being drawn into the office through the numerous furnaces located on the mezzanine. 4.In addition to the replacement of the mechanical unit in the wash bay, other minor items are of concern. These include relocation of controls (in the path of salt spray) corroded steel door/frame/hardware, a coating needed on the wall/ceiling surfaces and other minor items. 5.The doors from the shops, a part of the 2004 expansion, could use canopies, which would help to protect from the weather and ice/snow build-up falling from the sloped roof. 6.Exterior storage: Birds have tended to find nesting areas in the areas under the roof. There is no secure closure or means of hiding loose materials. 7.The mechanic’s area could use a number of improvements. This shop is pretty much as it was for the past 30 years. The main heavy duty lift is antiquated, even a safety hazard, and could be leaking oil in the shaft. The floors are cracked. The space has uneven and inadequate lighting. 8.Currently, the mechanic’s area has four work bays. The bay to the east is compromised by walls and a ramp which leads up to the wash bay. If the service door to the wash bay were removed, along with the ramp and walls, the flexibility and workability would be greatly improved. Refer to the following pages for more information. Hopkins Existing Building Evaluation3 Vehicle Maintenance Area General overview The vehicle maintenance area was one of two areas of the 2004 public works building project that were essentially untouched. Consequently, this mechanic’s area has garnered the most attention in this study. Like the rest of the building, the structural shell is in good condition and the types of potential repairs and improvements, for the most part, are the type of thing that can be expected. Photograph above of the shop from the mezzanine: Working space around the vehicles is not generous but adequate. Based on our experience, the recommended Number of work bays is adequate. number of repair bays per mechanic would be 2 to 1. Including the segregated stall to the Below: The crane in the background (red beam) clears a east, there are a total of four bays. We would vehicle but will not do so if any equipment is raised on the otherwise recommend a fabrication / welding lift. bay in addition to the four mechanic’s bays Also note, due to clearance and interference concerns, the but, with the dedicated shops spaces at the radiant heaters (pocketed in the concrete deck) loose some east side of the building, the repair area seems efficiency. This type of heating system heats materials as adequate. If a full renovation of the space opposed to the air. were to be considered, the lift in the segregated bay might be moved to the main space. In lieu of the existing in-floor heavy duty lift, a mobile lift would be recommended. Consequently, the eastern bay will be more useful for a variety of uses and users, with more flexible use of the three connected main bays with the mobile lift. While the area of the space is adequate, the existing building is much shorter in height than we would otherwise recommend. A 7-1/2 ton crane was added after the original building was built. There are some considerable height limitations currently, but it would be somewhat ridiculous to advise on any changes at this point. Hopkins Existing Building Evaluation4 Vehicle Maintenance Area Key observations The key issues and requirements for this area include: 1.Air quality between this space and the office area needs to be improved. 2.The existing in-ground lift is antiquated, with outdated technology, and there may be oils leaks within the below- grade shaft. The in-ground lift has an operating arm which extends up 3.The floor has numerous cracks, is not from the floor, a potential hazard which the crew cover with a vest to help avoid an incident. flat enough for repair purposes, and the drains do not have a dedicated sand clean-out pit. 4.Lighting is antiquated and insufficient. In addition, the brightness contrast does not aid in detailed repairs. 5.An emergency eyewash should be provided in this space. There are a number of other smaller items and comments which included: 1.Gaskets are missing on the service doors. 2.Compressor is not fully enclosed and is Above: cracks in the floor and spallingof concrete around the drains. Pitting is evident elsewhere. loud. 3.Interior window has cracked glass. Below: Acoustic partitions are used to help diminish noise from the compressor at the mezzanine but this does not Recommendations and solutions: adequately solve the problem. 1.Remove the existing in-ground truck lift and provide a new lift. This might be a portable and flexible 4-post unit with wireless controls. 2.Replace the floor slab, repair/replace drains, and add a sump clean-out pit. 3.Remove door/frame between the shop and office area and block off opening. 4.Provide seals at the door frames on the mezzanine. Hopkins Existing Building Evaluation5 Vehicle Maintenance Area 5.Relocate the waste oil tank to the lube room and provide necessary containment for potential leaks. 6.Add small (12” diameter) light-gathering skylights. 7.Clean and re-paint entire space. 8.Add a sound-resistant enclosure at the mezzanine for the compressor. Vehicle Maintenance comparison As noted, this existing area has been in use without any real upgrades for some time, unlike the majority of the other spaces and rooms within the building. As a point of comparison to the images of the existing space on the previous pages, to the right are newer examples of maintenance spaces for other cities the size of Hopkins. From top to bottom: Otsego, Waconia and White Bear Lake public works operations / mechanic’s areas. Note the following elements in each space: 1.There is ample room to work around vehicles. 2.Ceilings are tall with the ability to move the crane above an elevated vehicle. 3.Lifts are safe and easy to operate. 4.Floors are relatively flat and flush. 5.There is plenty of daylight and artificial lighting. 6.Although only in use for only several months, the areas are nonetheless tidy and organized. 7.Compressors are relatively quiet, in an enclosed room, as is the lube equipment. Hopkins Existing Building Evaluation6 Wash Bay General overview The wash bay is in relatively good condition, considering the age and heavy usage of the space. The primary concern here is that salt spray has considerable negative impacts on the building systems, especially those mechanical or steel in nature. Key observations The key issues and requirements for this area include: 1.The make-up air unit may need replacement and should be located outside of the bay. 2.There was a smell of natural gas near the pressure washer unit and piping. 3.The steel doors, frames, and hardware are corroded. Hardware was not fully functional. Above: The pressure washer was not in working order the day of the assessment (although an order was 4.Several items are mounted to the wall, placed to fix the unit that day.) The unit above is not a within the line of salt spray, and should be premium grade unit and may need replacement regardless. The unit is best located outside of the bay relocated: electrical box, controls, etc. with remote controls for ease of use within the bay. 5.There is an open ½” wide joint around the The same holds truefor the make-up air unit, below. perimeter of the floor slab which should be sealed off to prevent the salt water from entering the ground beneath. 6.Lighting is functional and, for the most part, weather-tight but antiquated. This could be upgraded someday but there is no urgency. 7.Walls and ceiling would best be served with an epoxy paint coating. Hopkins Existing Building Evaluation7 Wash Bay Recommendations and solutions: 1.Replace the existing make up air unit and relocate to the storage space or roof-top. 2.Relocate several components on the west wall. 3.Replace service door, frame, and hardware. 4.Seal off the floor perimeter. 5.Replace lighting and provide lighting controls. 6.Provide epoxy paint coating at walls and ceiling. Above:Steel and salt are not compatible materials. This exit/service door and hardware show signs of rust. The closer and lock do not automatically activate due to corrosion and this door was not locked upon arrival early in the morning. Below:Various items mounted to the wall are also in the line of potential salt spray. Hopkins Existing Building Evaluation8 Vehicle Storage Area General overview The large vehicle storage, part of the 2004 building project, remains in good condition. A few years after the completion, it was noted that the concrete floor had excessive cracking. It was determined that the floor drains were improperly installed. The contractor repaired these floor areas. The floors, walls, ceilings and door systems are in good condition. The mezzanines remain in use, as intended. A few areas of the space were carved out Above:A photograph of the shop from the mezzanine. Working space around the vehicles is not for use by staff. This was not anticipated during the generous but adequate. Number of work bays is design phase but do serve a purpose. Between the adequate. Note that the base of the gate at the storage areas (above and below selected areas of mezzanine should have a kick plate in order to meet the mezzanines) more task lighting and general use OSHA requirements. lighting is required. Bottom:View of the garbage truck storage area, in good condition. Further down, the garbage truck In all, this vehicle storage area meets current and storage area. future needs for a functioning and workable space. The same holds true for the dedicated garbage truck space. Not only are the same systems in good condition, the odors in the space, a concern prior to design and construction, are virtually non-existent. Concerning issues with vehicle storage, a minor item is the existing insulated glazing panels, which are translucent (no see-through capability) and do not provide staff working in this large space with the ability to see outdoors. The panels can selectively, or as a whole, be replaced with actual insulated vision glass. Key observations There are few items, minor in comparison with the maintenance area, for example. 1.Add additional lighting at work areas and selected mezzanine locations. 2.Incorporate additional controls to automatically limit lighting duration and reduce energy costs. Hopkins Existing Building Evaluation9 Office Area, Shops, and Other Spaces General overview The Shops are all in good condition, organized and serving the purpose as intended. The office area is also in good order, and except for the air quality concerns noted elsewhere, there is minimal need to upgrade anything. This includes the restrooms/ lockers, break room and other associated areas. At the mezzanine level, the door frames do Above: A photograph of the carpentryshop. This shop, not have any gaskets, which would help like the others, is organized and tidy. No additional maintain pressurization and prohibit air and improvements are needed here. dust from the vehicle areas from entering the corridor area. Should the city consider closing off the door to Below: Exterior view of the shops, west elevation.An the shop from the office area, the easterly extended roof edge or small canopies just above the service space outside the director’s office could be doors would help diminish the annoyance of snow and ice falling from the roof above. used for other purposes. Key observations The key issues and requirements for this area include: 1.The primary concern is that snow and ice, from the roof above the exterior service doors lands, directly on egress paths. Hopkins Existing Building Evaluation10 Exterior Storage General overview The covered exterior storage area just west of the building serves the purpose it was intended for but could use a few improvements. The main thing is that birds tend to gravitate to the upper roof components. Recommendations and solutions: 1.Provide a wide overhead or sliding door. 2.Include a service door for code- compliant exiting purposes. Above:View into the storage area: Closure would prohibit birds from entering and also help secure and hide 3.In order to avoid the cost of installing the stored materials. footings, the improvements would be secured and hung from above. Below:View, looking to the east, at the open space next to the salt storage building. The north end of the public works site is currently an open area used for storage and parking could be upgraded in order to have more dedicated storage, covered from the elements and hidden from the public by walls or barriers. Refer to recommendations with upgrades to make these two exterior locations more functional and usable during all type of weather conditions. Hopkins Existing Building Evaluation11 Recommended Items and Estimated Costs ITEM PRIORITYESTIMATED COST MECHANIC’S AREA IMPROVEMENTS Medium to High $295,000.00 Replace floor slab ***$40,000.00 Provide new 50,000 lb. vehicle lift with demo of *** $125,000.00 existing Demolish walls and ramp with misc. repairs***$18,000.00 Provide wall at compressor ***$4,000.00 Replace door to office with wall ***$2,000.00 Exhaust / pressurization***$40,000.00 Provide new wall / door at mezzanine***$9,000.00 Provide emergency eye wash ***$2,500.00 Relocatewaste oil tank with new containment & *** $4,500.00 used oil filter container New lift & relocation of existing platform **$11,000.00 Replace existing inefficient lights with LED**$9,000.00 Provide dedicated exhaust reels **$14,000.00 Provide more accessible flammable trap **$5,000.00 Paint / cleaning **$8,000.00 Minor fixes**$3,000.00 Provide several skylights at roof * $4,000.00* ITEMPRIORITYESTIMATED COST WASH BAY IMPROVEMENTS Medium $51,000.00 Infill service door to mechanic’s area***$2,000.00 Replace / relocate mechanical unit **$28,000.00 Replace door, frame, and hardware**$2,000.00 Relocate misc. items **$1,000.00 Seal perimeter of floor slab **$500.00 Replace broken glass **$500.00 Epoxy paint / cleaning ** to ***$8,000.00 Wash system **$7,000.00 Minor items **$2,000.00 ITEM PRIORITYESTIMATED COST VEHICLE STORAGE AREA IMPROVEMENTS Medium to Low $25,000.00 Add to and retrofit lighting **$10,000.00 Provide lighting controls **$15,000.00 Minor items * $5,000.00* Replace translucent panels with glass* $30,000.00 ($2,000 each)* Priority: *** high ** medium * low *low priority items are not included in the total cost Hopkins Existing Building Evaluation12 Recommended Items and Estimated Costs ITEMPRIORITYESTIMATEDCOST SHOPS / OFFICE Low $ - Add canopies at service doors * $2,200.00* Misc. minor items * $3,000.00* ITEM PRIORITYESTIMATED COST EXTERIOR COVERED STORAGE Medium $2,800.00 Provide mesh / grid at ceiling location**$800.00 Other items **$2,000.00 ITEM PRIORITYESTIMATED COST OPEN SITE LOCATION TO THE NORTH Medium $90,000.00 Provide new covered / open storage **$90,000.00 Subtotal of estimated costs:$463,800.00 12% for fees, inspections, expenses, and related$55,656.00 Subtotal:$519,456.00 10% contingency$51,945.60 TOTAL ESTIMATED COST FOR THIS PHASE: $571,401.60 TOTAL OF LOW PRIORITY ITEMS NOT INCLUDED IN THIS PHASE: $44,200.00 Priority: *** high ** medium * low * low priority items are not included in the total cost DESCRIPTION OF MAJOR ITEMS MECHANIC’S AREA The items noted above should all be included in any renovation for a variety of reasons. The scope of this work falls into several categories: 1.Providing a new wall from the mezzanine deck to the ceiling, approximately 8 feet west of the railing, along with a wide service door to fully seal off the office from the mezzanine. At the same time, an enclosure should be provided around the compressor. As a part of this, HVAC work should be performed to create a greater positive pressure in the office (relative to the mechanic’s area) and also add controls and a unit to pressurize the mezzanine. 2.The access for this area to the wash bay is not necessary. By removing the ramp and door, along with the other block walls, this portion of the mechanic’s area would be wide open and much more usable. Hopkins Existing Building Evaluation13 Recommended Items and Estimated Costs 3.Completely replacing the concrete floor, installing a new flammable trap, and including dedicated exhaust reels for mechanics to use while operating / repairing equipment. 4.A counterpart of this would be to remove the antiquated and questionable in-floor lift and providing an in ground heavy duty 50,000 lb. capacity lift. In addition, the existing platform lift would be moved to a new bay. 5.A bolt-down vehicle lift would help in serving smaller vehicles and free up the existing drive-on lift for other vehicles. 6.Since this area has remained as-is for some time, the existing lighting is due for an upgrade. Also under consideration might be the inclusion of several small but powerful skylights especially designed to collect daylight and distribute it to the interior of the space. 7.Other items include installing an emergency eye wash, painting the area to help clean it up and provide improve light reflectance, along with a few other minor items. WASH BAY The wash bay, by nature, is a highly corrosive environment. Because of this, the steel door and frame need to be replaced. Since the existing mechanical unit at the ceiling is reaching the end of its life expectancy, a new unit should be installed outside of the wash bay. There are a number of minor items related to the accelerated disrepair in this area which should be addressed along with the more major items. An epoxy paint coating has already been considered by staff for the existing walls and ceilings and this work should be scheduled to coincide with other work in this area. VEHICLE STORAGE There are not major items necessary for this space but minor items should be considered including: 1.Providing lighting at dedicated work areas at the main floor and along the mezzanine. 2.Something which may or may not be desired is replacement of the existing translucent panels in the exterior walls. While these are energy efficient, staff cannot look outdoors or appreciate a higher level of daylight. These could be replaced as a whole or in selected areas. ALL OTHER CATEGORIES: The remaining items are essentially exterior related. These include: Hopkins Existing Building Evaluation14 Recommended Items and Estimated Costs 1.Providing canopies at the exterior shop doors to prohibit snow and ice fall directly below the doorways. 2.Providing a way to prohibit birds from nesting at the existing covered storage area. This can be accomplished in two ways. The least cost would be to string a cord type mesh along the entire upper area – this technique was found to be effective for a McLeod County salt storage building. The more costly option would be to fully enclose the area with a new sliding door, partial wall and service door. 3.Providing an addition, in effect, to the west of the salt storage building. This addition could match the architecture of the salt building and be used for additional material storage (excess salt, loose materials, power equipment, and items used in the winter which need immediate access). Hopkins Existing Building Evaluation15 Recommended Items and Estimated Costs PLAN MEZZANINE FLOOR 2nd