Loading...
VII.2. Award of Contract: VFW and Syndicate Sales Parking Lot Project, City Project 2016-07; Stanley (CR2016-043) (2)BID TABULATION SUMMARY PROJECT: VFW and Syndicate Sales Parking Lot Improvements OWNER: City of Hopkins, MN WSB PROJECT NO.: 1502-540 Bids Opened: Tuesday, April 5, 2016 10:00 am ContractorBid Security (5%)Schedule ASchedule BGrand Total Bid 1Northwest Asphalt, Inc.X$314,913.10$110,343.35$425,256.45 2Park Construction CompanyX$327,371.10$108,740.75$436,111.85 3Sunram ConstructionX$335,752.80$104,874.00$440,626.80 4Omann Brothers, Inc.X$349,510.00$117,434.00$466,944.00 5New Look Contracting, Inc.X$347,058.00$121,647.00$468,705.00 Engineer's Opinion of Cost$426,516.50$141,339.50$567,856.00 I hereby certify that this is a true and correct tabulation of the bids as received on April 5, 2016 Nicholas Hentges, PE Project Manager Denotes corrected figure K:\\01502-540\\Admin\\Construction Admin\\1502-54 Bid Tab Summary 040516 4/6/2016 WSB Project Bid Abstract Project Name: Project No.: 01502-54 Client: City of Minnetonka Bid Opening: Owner: Minneapoli s Park Construction Project: 01502-54 - MTKA - Downtown Business Lots Engineers Estimate Northwest Asphalt, Inc. Sunram Construction Company - Mpls Line No. Item Units QuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price SCHEDULE A 1 2021.501 MOBILIZATION LS 1$20,000.00$20,000.00$31,144.00$31,144.00$11,300.00$11,300.00$11,500.20$11,500.20 2 2101.511 CLEARING & GRUBBING LS 1$3,000.00$3,000.00$8,250.00$8,250.00$7,650.00$7,650.00$8,000.00$8,000.00 3 2104.501 REMOVE WOOD FENCE L F 40$15.00$600.00$10.00$400.00$10.20$408.00$12.00$480.00 4 2104.505 REMOVE BITUMINOUS PAVEMENT S Y 1630$5.00$8,150.00$2.50$4,075.00$3.20$5,216.00$3.50$5,705.00 5 2104.503 REMOVE CONCRETE WALK S F 535$4.00$2,140.00$1.00$535.00$2.10$1,123.50$1.90$1,016.50 $1,016.50 6 2104.503 REMOVE CONCRETE SLAB S F 80$14.00$1,120.00$2.50$200.00$3.90$312.00$3.90$312.00 7 2104.523 SALVAGE CASTING EACH 1$300.00$300.00$50.00$50.00$204.00$204.00$500.00$500.00 8 2104.525 ABANDON & SEAL WELL SHAFT EACH 1$5,000.00$5,000.00$2,000.00$2,000.00$765.00$765.00$2,500.00$2,500.00 9 2104.601 REMOVE CONCRETE RAMP & STAIRS LS 1$5,000.00$5,000.00$1,500.00$1,500.00$619.00$619.00$4,050.00$4,050.00 10 2104.601 REMOVE MISCELLANEOUS STRUCTURES LS 1$7,500.00$7,500.00$1,000.00$1,000.00$966.00$966.00$8,000.00$8,000.00 11 2105.501 COMMON EXCAVATION (P) C Y 1040$26.00$27,040.00$18.75$19,500.00$19.60$20,384.00$23.80$24,752.00 12 2105.521 GRANULAR BORROW (CV) (P) C Y 19$28.00$532.00$35.00$665.00$34.70$659.30$58.00$1,102.00 13 2105.522 SELECT GRANULAR BORROW (CV) (P) C Y 691$30.00$20,730.00$28.55$19,728.05$27.40$18,933.40$34.25$23,666.75 14 2105.522 SELECT GRANULAR BORROW MOD 10% (CV) (P) C Y 383$36.00$13,788.00$25.75$9,862.25$32.50$12,447.50$24.00$9,192.00 15 2211.503 AGGREGATE BASE (CV) CLASS 5 C Y 368$44.00$16,192.00$30.95$11,389.60$32.40$11,923.20$44.20$16,265.60 16 2360.501 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON 560$90.00$50,400.00$77.10$43,176.00$78.50$43,960.00$78.75$44,100.00 17 2402.583 ORNAMENTAL METAL RAILING L F 150$180.00$27,000.00$187.00$28,050.00$334.00$50,100.00$180.00$27,000.00 18 2402.585 PIPE RAILING L F 55$130.00$7,150.00$135.00$7,425.00$122.00$6,710.00$135.00$7,425.00 19 2411.507 CONCRETE STAIRWAY EACH 2$9,000.00$18,000.00$5,040.00$10,080.00$5,880.00$11,760.00$6,000.00$12,000.00 20 2411.507 CONCRETE STAIRWAY EACH 1$5,000.00$5,000.00$3,465.00$3,465.00$3,580.00$3,580.00$4,000.00$4,000.00 21 2411.511 STRUCTURE EXCAVATION CLASS U C Y 281$40.00$11,240.00$25.00$7,025.00$22.90$6,434.90$24.15$6,786.15 22 2411.604 MODULAR BLOCK RETAINING WALL SPECIAL S Y 175$525.00$91,875.00$315.00$55,125.00$305.00$53,375.00$306.00$53,550.00 23 2411.618 MODULAR BLOCK RETAINING WALL S F 256$34.00$8,704.00$25.20$6,451.20$24.50$6,272.00$28.60$7,321.60 1 24 2411.618 ANTI-GRAFFITI COATING S F 1575$6.00$9,450.00$1.35$2,126.25$1.30$2,047.50$2.10$3,307.50 Park Construction Project: 01502-54 - MTKA - Downtown Business Lots Engineers Estimate Northwest Asphalt, Inc. Sunram Construction Company - Mpls Line No. Item Units QuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price 25 2411.618 ARCH SURFACE FINISH (MULTI COLOR) S F 1575$7.00$11,025.00$3.95$6,221.25$3.85$6,063.75$4.75$7,481.25 26 2503.541 15" RC PIPE SEWER DES 3006 CL V L F 51$75.00$3,825.00$38.00$1,938.00$66.30$3,381.30$56.25$2,868.75 27 2503.602 CONNECT TO EXISTING STORM SEWER EACH 1$1,200.00$1,200.00$1,000.00$1,000.00$714.00$714.00$800.00$800.00 28 2506.502 CONST DRAINAGE STRUCTURE DESIGN SPECIAL EACH 1$2,500.00$2,500.00$1,500.00$1,500.00$4,600.00$4,600.00$3,100.00$3,100.00 29 2506.503 RECONSTRUCT DRAINAGE STRUCTURE L F 7$500.00$3,500.00$350.00$2,450.00$255.00$1,785.00$440.00$3,080.00 30 2506.516 CASTING ASSEMBLY EACH 1$800.00$800.00$550.00$550.00$459.00$459.00$800.00$800.00 31 2506.521 INSTALL CASTING EACH 1$450.00$450.00$100.00$100.00$255.00$255.00$350.00$350.00 32 2506.522 ADJUST FRAME & RING CASTING EACH 1$700.00$700.00$500.00$500.00$765.00$765.00$350.00$350.00 33 2521.501 4" CONCRETE WALK S F 1187$8.50$10,089.50$5.50$6,528.50$6.30$7,478.10$5.00$5,935.00 34 2531.501 CONCRETE CURB & GUTTER DESIGN B612 L F 280$35.00$9,800.00$20.00$5,600.00$20.20$5,656.00$20.00$5,600.00 35 2531.502 CONCRETE CURB DESIGN V10 (MODIFIED) L F 62$50.00$3,100.00$76.50$4,743.00$101.00$6,262.00$76.50$4,743.00 36 2557.603 WOODEN FENCE L F 20$60.00$1,200.00$50.00$1,000.00$51.00$1,020.00$75.00$1,500.00 37 2563.601 TRAFFIC CONTROL LS 1$2,500.00$2,500.00$1,000.00$1,000.00$1,020.00$1,020.00$5,000.00$5,000.00 38 2564.531 SIGN PANELS TYPE C S F 7$100.00$700.00$50.00$350.00$45.90$321.30$50.00$350.00 39 2573.502 SILT FENCE, TYPE MS L F 385$5.00$1,925.00$3.00$1,155.00$2.55$981.75$3.50$1,347.50 40 2573.530 STORM DRAIN INLET PROTECTION EACH 5$275.00$1,375.00$150.00$750.00$204.00$1,020.00$125.00$625.00 41 2573.535 STABILIZED CONSTRUCTION EXIT LS 1$1,500.00$1,500.00$500.00$500.00$954.00$954.00$800.00$800.00 42 2574.525 LOAM TOPSOIL BORROW C Y 38$52.00$1,976.00$35.00$1,330.00$54.20$2,059.60$90.00$3,420.00 43 2575.505 SODDING TYPE SALT TOLERANT S Y 130$18.00$2,340.00$11.50$1,495.00$11.70$1,521.00$15.00$1,950.00 44 2582.501 PAVT MSSG (HANDICAPPED SYMBOL) EPOXY EACH 4$175.00$700.00$115.00$460.00$151.00$604.00$120.00$480.00 45 2582.502 4" SOLID LINE WHITE-EPOXY L F 1200$4.50$5,400.00$2.10$2,520.00$2.75$3,300.00$2.20$2,640.00 Total SCHEDULE A: $426,516.50 $314,913.10 $327,371.10 $335,752.80 $314,913.10 $335,752.80 Schedule B 46 2021.501 MOBILIZATION LS 1$5,000.00$5,000.00$14,283.00$14,283.00$4,780.00$4,780.00$6,000.05$6,000.05 47 2104.501 REMOVE RETAINING WALL L F 10$15.00$150.00$20.00$200.00$21.50$215.00$50.00$500.00 48 2105.501 COMMON EXCAVATION (P) C Y 150$28.00$4,200.00$30.00$4,500.00$21.60$3,240.00$23.80$3,570.00 49 2105.522 SELECT GRANULAR BORROW (CV) (P) C Y 150$32.00$4,800.00$28.55$4,282.50$27.10$4,065.00$34.25$5,137.50 50 2105.522 SELECT GRANULAR BORROW MOD 10% (CV) (P) C Y 350$36.00$12,600.00$25.75$9,012.50$27.10$9,485.00$24.00$8,400.00 51 2105.523 COMMON BORROW (CV) C Y 200$38.00$7,600.00$20.00$4,000.00$17.00$3,400.00$24.00$4,800.00 52 2211.503 AGGREGATE BASE (CV) CLASS 5 C Y 78$48.00$3,744.00$30.00$2,340.00$37.30$2,909.40$44.20$3,447.60 53 2360.501 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON 95$95.00$9,025.00$86.80$8,246.00$87.10$8,274.50$100.00$9,500.00 54 2402.583 ORNAMENTAL METAL RAILING L F 58$180.00$10,440.00$187.00$10,846.00$334.00$19,372.00$180.00$10,440.00 55 2411.511 STRUCTURE EXCAVATION CLASS U C Y 40$40.00$1,600.00$30.00$1,200.00$39.70$1,588.00$24.15$966.00 56 2411.604 MODULAR BLOCK RETAINING WALL SPECIAL S Y 91$525.00$47,775.00$315.00$28,665.00$305.00$27,755.00$306.00$27,846.00 57 2411.618 ANTI-GRAFFITI COATING S F 819$6.00$4,914.00$1.35$1,105.65$1.30$1,064.70$2.10$1,719.90 2 Park Construction Project: 01502-54 - MTKA - Downtown Business Lots Engineers Estimate Northwest Asphalt, Inc. Sunram Construction Company - Mpls Line No. Item Units QuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price 58 2411.618 ARCH SURFACE FINISH (MULTI COLOR) S F 819$7.00$5,733.00$3.95$3,235.05$3.85$3,153.15$4.75$3,890.25 59 2504.602 ADJUST GATE VALVE & BOX EACH 1$550.00$550.00$350.00$350.00$255.00$255.00$500.00$500.00 60 2521.501 4" CONCRETE WALK S F 853$9.50$8,103.50$5.55$4,734.15$6.30$5,373.90$5.00$4,265.00 61 2531.501 CONCRETE CURB & GUTTER DESIGN B612 L F 195$35.00$6,825.00$22.50$4,387.50$20.50$3,997.50$22.50$4,387.50 62 2531.502 CONCRETE CURB DESIGN V10 L F 63$50.00$3,150.00$73.00$4,599.00$86.70$5,462.10$73.00$4,599.00 63 2531.618 TRUNCATED DOMES S F 10$70.00$700.00$147.00$1,470.00$56.10$561.00$147.00$1,470.00 64 2564.531 SIGN PANELS TYPE C S F 2$100.00$200.00$75.00$150.00$66.30$132.60$100.00$200.00 65 2573.502 SILT FENCE, TYPE MS L F 150$5.00$750.00$4.50$675.00$4.10$615.00$3.50$525.00 66 2573.530 STORM DRAIN INLET PROTECTION EACH 1$275.00$275.00$150.00$150.00$204.00$204.00$125.00$125.00 67 2573.535 STABILIZED CONSTRUCTION EXIT LS 1$1,500.00$1,500.00$500.00$500.00$954.00$954.00$800.00$800.00 68 2574.525 LOAM TOPSOIL BORROW C Y 9$52.00$468.00$35.00$315.00$72.10$648.90$90.00$810.00 69 2575.505 SODDING TYPE SALT TOLERANT S Y 30$18.00$540.00$25.00$750.00$25.50$765.00$20.00$600.00 70 2582.501 PAVT MSSG (HANDICAPPED SYMBOL) EPOXY EACH 1$175.00$175.00$115.00$115.00$151.00$151.00$120.00$120.00 71 2582.502 4" SOLID LINE WHITE-EPOXY L F 116$4.50$522.00$2.00$232.00$2.75$319.00$2.20$255.20 Total Schedule B: $141,339.50 $110,343.35 $108,740.75 $104,874.00 Total SCHEDULE A: $426,516.50 $314,913.10 $327,371.10 $335,752.80 $314,913.10 Total Schedule B: $141,339.50 $110,343.35 $108,740.75 $104,874.00 $108,740.75 Totals for Project 01502-54 $567,856.00 $425,256.45 $436,111.85 $440,626.80 $425,256.45 $436,111.85 $440,626.80 % of Estimate for Project 01502-54 -25.11% -23.20% -22.41% 3 Project: 01502-54 - MTKA - Downtown Business Lots Engineers Estimate Omann Brothers, Inc. New Look Contracting, Inc. Line No. Item Units QuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price SCHEDULE A 1 2021.501 MOBILIZATION LS 1$20,000.00$20,000.00$15,000.00$15,000.00$12,000.00$12,000.00 2 2101.511 CLEARING & GRUBBING LS 1$3,000.00$3,000.00$10,500.00$10,500.00$12,000.00$12,000.00 3 2104.501 REMOVE WOOD FENCE L F 40$15.00$600.00$12.50$500.00$14.00$560.00 4 2104.505 REMOVE BITUMINOUS PAVEMENT S Y 1630$5.00$8,150.00$8.70$14,181.00$6.00$9,780.00 5 2104.503 REMOVE CONCRETE WALK S F 535$4.00$2,140.00$3.00$1,605.00$2.00$1,070.00 6 2104.503 REMOVE CONCRETE SLAB S F 80$14.00$1,120.00$3.00$240.00$18.00$1,440.00 7 2104.523 SALVAGE CASTING EACH 1$300.00$300.00$100.00$100.00$100.00$100.00 8 2104.525 ABANDON & SEAL WELL SHAFT EACH 1$5,000.00$5,000.00$6,000.00$6,000.00$2,450.00$2,450.00 9 2104.601 REMOVE CONCRETE RAMP & STAIRS LS 1$5,000.00$5,000.00$1,500.00$1,500.00$2,500.00$2,500.00 10 2104.601 REMOVE MISCELLANEOUS STRUCTURES LS 1$7,500.00$7,500.00$2,500.00$2,500.00$5,550.00$5,550.00 11 2105.501 COMMON EXCAVATION (P) C Y 1040$26.00$27,040.00$25.00$26,000.00$20.00$20,800.00 12 2105.521 GRANULAR BORROW (CV) (P) C Y 19$28.00$532.00$65.00$1,235.00$65.00$1,235.00 13 2105.522 SELECT GRANULAR BORROW (CV) (P) C Y 691$30.00$20,730.00$38.35$26,499.85$25.00$17,275.00 14 2105.522 SELECT GRANULAR BORROW MOD 10% (CV) (P) C Y 383$36.00$13,788.00$48.00$18,384.00$25.00$9,575.00 15 2211.503 AGGREGATE BASE (CV) CLASS 5 C Y 368$44.00$16,192.00$54.30$19,982.40$42.00$15,456.00 16 2360.501 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON 560$90.00$50,400.00$77.50$43,400.00$98.00$54,880.00 17 2402.583 ORNAMENTAL METAL RAILING L F 150$180.00$27,000.00$175.00$26,250.00$215.00$32,250.00 18 2402.585 PIPE RAILING L F 55$130.00$7,150.00$125.00$6,875.00$155.00$8,525.00 19 2411.507 CONCRETE STAIRWAY EACH 2$9,000.00$18,000.00$3,300.00$6,600.00$2,250.00$4,500.00 20 2411.507 CONCRETE STAIRWAY EACH 1$5,000.00$5,000.00$2,800.00$2,800.00$2,250.00$2,250.00 21 2411.511 STRUCTURE EXCAVATION CLASS U C Y 281$40.00$11,240.00$25.00$7,025.00$22.00$6,182.00 22 2411.604 MODULAR BLOCK RETAINING WALL SPECIAL S Y 175$525.00$91,875.00$310.00$54,250.00$362.00$63,350.00 23 2411.618 MODULAR BLOCK RETAINING WALL S F 256$34.00$8,704.00$25.25$6,464.00$29.00$7,424.00 24 2411.618 ANTI-GRAFFITI COATING S F 1575$6.00$9,450.00$1.30$2,047.50$1.00$1,575.00 25 2411.618 ARCH SURFACE FINISH (MULTI COLOR) S F 1575$7.00$11,025.00$3.95$6,221.25$4.00$6,300.00 26 2503.541 15" RC PIPE SEWER DES 3006 CL V L F 51$75.00$3,825.00$65.00$3,315.00$50.00$2,550.00 27 2503.602 CONNECT TO EXISTING STORM SEWER EACH 1$1,200.00$1,200.00$1,500.00$1,500.00$550.00$550.00 28 2506.502 CONST DRAINAGE STRUCTURE DESIGN SPECIAL EACH 1$2,500.00$2,500.00$1,250.00$1,250.00$1,250.00$1,250.00 29 2506.503 RECONSTRUCT DRAINAGE STRUCTURE L F 7$500.00$3,500.00$1,000.00$7,000.00$825.00$5,775.00 30 2506.516 CASTING ASSEMBLY EACH 1$800.00$800.00$400.00$400.00$750.00$750.00 31 2506.521 INSTALL CASTING EACH 1$450.00$450.00$200.00$200.00$600.00$600.00 32 2506.522 ADJUST FRAME & RING CASTING EACH 1$700.00$700.00$150.00$150.00$600.00$600.00 33 2521.501 4" CONCRETE WALK S F 1187$8.50$10,089.50$4.75$5,638.25$6.00$7,122.00 34 2531.501 CONCRETE CURB & GUTTER DESIGN B612 L F 280$35.00$9,800.00$26.25$7,350.00$32.00$8,960.00 4 Project: 01502-54 - MTKA - Downtown Business Lots Engineers Estimate Omann Brothers, Inc. New Look Contracting, Inc. Line No. Item Units QuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price 35 2531.502 CONCRETE CURB DESIGN V10 (MODIFIED) L F 62$50.00$3,100.00$42.00$2,604.00$43.00$2,666.00 36 2557.603 WOODEN FENCE L F 20$60.00$1,200.00$55.00$1,100.00$100.00$2,000.00 37 2563.601 TRAFFIC CONTROL LS 1$2,500.00$2,500.00$500.00$500.00$1,500.00$1,500.00 38 2564.531 SIGN PANELS TYPE C S F 7$100.00$700.00$210.00$1,470.00$125.00$875.00 39 2573.502 SILT FENCE, TYPE MS L F 385$5.00$1,925.00$3.15$1,212.75$3.00$1,155.00 40 2573.530 STORM DRAIN INLET PROTECTION EACH 5$275.00$1,375.00$125.00$625.00$350.00$1,750.00 41 2573.535 STABILIZED CONSTRUCTION EXIT LS 1$1,500.00$1,500.00$2,000.00$2,000.00$1,500.00$1,500.00 42 2574.525 LOAM TOPSOIL BORROW C Y 38$52.00$1,976.00$65.00$2,470.00$36.00$1,368.00 43 2575.505 SODDING TYPE SALT TOLERANT S Y 130$18.00$2,340.00$10.50$1,365.00$22.00$2,860.00 44 2582.501 PAVT MSSG (HANDICAPPED SYMBOL) EPOXY EACH 4$175.00$700.00$125.00$500.00$150.00$600.00 45 2582.502 4" SOLID LINE WHITE-EPOXY L F 1200$4.50$5,400.00$2.25$2,700.00$3.00$3,600.00 Total SCHEDULE A: $426,516.50 $349,510.00 $347,058.00 Schedule B 46 2021.501 MOBILIZATION LS 1$5,000.00$5,000.00$5,000.00$5,000.00$7,500.00$7,500.00 47 2104.501 REMOVE RETAINING WALL L F 10$15.00$150.00$50.00$500.00$38.00$380.00 48 2105.501 COMMON EXCAVATION (P) C Y 150$28.00$4,200.00$25.00$3,750.00$30.00$4,500.00 49 2105.522 SELECT GRANULAR BORROW (CV) (P) C Y 150$32.00$4,800.00$50.00$7,500.00$32.00$4,800.00 50 2105.522 SELECT GRANULAR BORROW MOD 10% (CV) (P) C Y 350$36.00$12,600.00$48.00$16,800.00$32.00$11,200.00 51 2105.523 COMMON BORROW (CV) C Y 200$38.00$7,600.00$30.00$6,000.00$32.00$6,400.00 52 2211.503 AGGREGATE BASE (CV) CLASS 5 C Y 78$48.00$3,744.00$75.00$5,850.00$53.00$4,134.00 53 2360.501 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON 95$95.00$9,025.00$105.50$10,022.50$110.00$10,450.00 54 2402.583 ORNAMENTAL METAL RAILING L F 58$180.00$10,440.00$175.00$10,150.00$215.00$12,470.00 55 2411.511 STRUCTURE EXCAVATION CLASS U C Y 40$40.00$1,600.00$50.00$2,000.00$36.00$1,440.00 56 2411.604 MODULAR BLOCK RETAINING WALL SPECIAL S Y 91$525.00$47,775.00$310.00$28,210.00$365.00$33,215.00 57 2411.618 ANTI-GRAFFITI COATING S F 819$6.00$4,914.00$1.30$1,064.70$2.00$1,638.00 58 2411.618 ARCH SURFACE FINISH (MULTI COLOR) S F 819$7.00$5,733.00$3.95$3,235.05$5.00$4,095.00 59 2504.602 ADJUST GATE VALVE & BOX EACH 1$550.00$550.00$250.00$250.00$600.00$600.00 60 2521.501 4" CONCRETE WALK S F 853$9.50$8,103.50$4.50$3,838.50$6.00$5,118.00 61 2531.501 CONCRETE CURB & GUTTER DESIGN B612 L F 195$35.00$6,825.00$26.25$5,118.75$33.00$6,435.00 62 2531.502 CONCRETE CURB DESIGN V10 L F 63$50.00$3,150.00$42.00$2,646.00$40.00$2,520.00 63 2531.618 TRUNCATED DOMES S F 10$70.00$700.00$55.00$550.00$72.00$720.00 64 2564.531 SIGN PANELS TYPE C S F 2$100.00$200.00$275.00$550.00$125.00$250.00 65 2573.502 SILT FENCE, TYPE MS L F 150$5.00$750.00$3.25$487.50$3.00$450.00 66 2573.530 STORM DRAIN INLET PROTECTION EACH 1$275.00$275.00$125.00$125.00$350.00$350.00 67 2573.535 STABILIZED CONSTRUCTION EXIT LS 1$1,500.00$1,500.00$2,500.00$2,500.00$1,500.00$1,500.00 5 Project: 01502-54 - MTKA - Downtown Business Lots Engineers Estimate Omann Brothers, Inc. New Look Contracting, Inc. Line No. Item Units QuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price 68 2574.525 LOAM TOPSOIL BORROW C Y 9$52.00$468.00$65.00$585.00$36.00$324.00 69 2575.505 SODDING TYPE SALT TOLERANT S Y 30$18.00$540.00$10.50$315.00$22.00$660.00 70 2582.501 PAVT MSSG (HANDICAPPED SYMBOL) EPOXY EACH 1$175.00$175.00$125.00$125.00$150.00$150.00 71 2582.502 4" SOLID LINE WHITE-EPOXY L F 116$4.50$522.00$2.25$261.00$3.00$348.00 Total Schedule B: $141,339.50 $117,434.00 $121,647.00 Total SCHEDULE A: $426,516.50 $349,510.00 $347,058.00 Total Schedule B: $141,339.50 $117,434.00 $121,647.00 Totals for Project 01502-54 $567,856.00 $466,944.00 $468,705.00 % of Estimate for Project 01502-54 -17.77% -17.46% I hereby certify that this is an exact reproduction of bids received. Certified By: License No. Date: 6 CITY OF HOPKINS HENNEPIN COUNTY, MINNESOTA RESOLUTION NO. 2016-037 RESOLUTION FOR AWARD OF CONTRACT VFW AND SYNDICATE SALES PARKING LOT PROJECT CITY PROJECT 2016-07 BE IT RESOLVED BY THE CITY COUNCIL OF HOPKINS, MINNESOTA , that the lowest bid of Northwest Asphalt, Inc. in the amount of $425,256.45 is the lowest responsible bid for the VFW and Syndicate Sales Parking Lot Project, City Project 2016-07, and the Mayor and City Manager are hereby authorized and directed to enter into a contract with said bidder for and on behalf of the City. th Adopted by the City Council of the City of Hopkins, Minnesota, this 19 day of April, 2016. By___________________________________ Molly Cummings, Mayor ATTEST: _____________________________________ Amy Domeier, City Clerk C:\\Users\\adomeier\\AppData\\Local\\Microsoft\\Windows\\Temporary Internet Files\\Content.Outlook\\3394JZ13\\R2016-037 Award Contract VFW Parking Lot Project (2).docx