2013 - 2017 CIP CAPITAL IMPROVEMENT PLAN 2013-2017 DATE: August 2012 TO: Honorable Mayor and Members of the City Council FROM: Mike Mornson, City Manager 2013-2017 CAPITAL IMPROVEMENT PLAN SUBJECT: With this letter I respectfully submit the 2013-2017 Capital Improvement Plan. This five- year planning document represents the combined efforts of city staff, advisory commissions, citizens and the City Council. The Capital Improvement Plan is a five-year forecast of project needs in the City of Hopkins. It is intended to alert the Council and citizens to the major capital needs on the horizon. The first year of the plan becomes an adopted capital budget and relates almost completely to the operating budget that is approved on a yearly basis. The remaining four year represents an estimate of project needs and funding capabilities of the city. This year’s plan does not include proposed equipment purchases. A document relating specifically to equipment replacement needs has been developed into a separate document. The Capital Improvement Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city’s capital programming needs. At the same time, sufficient projected detail is provided to enable those who review the information to make informed decisions on the programming of projects over the next several years. Please use the information provided to formulate plans, projects and questions. The Capital Improvement Plan can serve the community best by provoking thoughts and actions. This document was developed by the Finance Department with assistance of all city departments. I want to especially thank all those involved in the development of the Capital Improvement Plan and especially Steve Stadler, Public Works Director, Kersten Elverum, Planning and Economic Development Director, Christine Harkess, Finance Director, and Debbie Sperling, Administrative Assistant for their hard work and dedication. 1 CAPITAL IMPROVEMENT PLAN 2013-2017 TABLE OF CONTENTS Page City Manager's Message 1 Table of Contents 2 Introduction Introduction and Purpose4 Program Descriptions5 Utilities Program5 Transportation Program6 Parks, Forestry, and Pavilion Program9 General Public Buildings Program8 Economic Development11 Sources of Funding Sources of Funding13 Funding Abreviations16 Programs and Categories17 Summary of Impacts on Major Funding Sources 19 Cash Flow Statements Park Capital Improvement Fund24 Capital Improvemetn Fund25 Municipal State Aid Fund26 Permanent Improvement Revolving Fund (PIR)27 Water Utility Fund28 Sewer Utility Fund29 Storm Sewer Utiltiy Fund30 Pavilion - Ice Arean Fund31 Five-Year Project Summaries Projects by Year33 Department Summary35 Projects by Department36 Funding Source Summary39 Projects by Funding Source40 Project Descriptions & Narratives Economic Development44 General Public Buildings49 Parks & Recreation72 Streets79 Utilities96 2 Introduction 3 INTRODUCTION AND PURPOSE The Capital Improvement Plan is a flexible plan based upon long-range physical planning and financial projections, which schedules the major public improvements that may be incurred by the City over the next five years. Flexibility of the Capital Improvement Plan is established through annual review, and revision if necessary. The annual review assures that the program will become a continuing part of the budgetary process and that it will be consistent with changing demands as well as changing patterns in cost and financial resources. Funds are appropriated only for the first year of the program, which is then included in the annual budget. The Capital Improvement Plan serves as a tool for implementing certain aspects of the City's comprehensive plan; therefore, the program describes the overall objectives of City development, the relationship between projects with respect to timing and need, and the City's fiscal capabilities. The Capital Improvement Plan can help assure: 1. A systematic approach to planning and initiating capital projects affording the opportunity to plan the location, timing, and financing of needed public improvements; 2. The development of a realistic program of capital spending within the City's projected fiscal capability to finance such projects, avoiding sharp change in the tax levy or bonded indebtedness; 3. The coordination of public and private improvement projects permitting adequate time for design and engineering to eliminate duplication of effort and expense; 4. The expenditure of public funds that is compatible with the City's adopted Comprehensive Plan; 5. That the public is kept informed of the proposed future projects and expenditures; 6. That private investors are aware of the City's long-range development program so that they may guide their development in a way that is compatible with the City's program; 7. Aid in achieving federal and/or state participation by providing the necessary planning and lead time necessary for a successful application in addition to meeting prerequisites needed for certain federal and state grants. 4 PROGRAM DESCRIPTIONS In order to effectively plan for and manage the projects contained in a Capital Improvement Plan, it is necessary to group similar activities into "Program Categories". The City of Hopkins' activities are divided into four program categories which are 1) Utilities, 2) Transportation, 3) Parks, Forestry and Pavilion, and 4) General Public Buildings. The City also includes an outline of proposed expenditures for unscheduled projects. Program categories are explained in the following sections. UTILITIES PROGRAM Program Description: The Utilities Program includes the municipal water, municipal sanitary sewer, storm sewer and refuse systems. Program Goal: Provide reliable, efficient, and safe utility service to all parts of the City with a minimum of adverse effects on the environment. Subprograms: Water, sanitary sewer, storm sewer, and refuse service. I. Municipal Water System Subprogram (WA) A. Subprogram Goal: The goal of the Municipal Water System subprogram is to provide water in sufficient quantities at sufficient pressure, with a high degree of reliability and safety to all parts of the City so as to satisfy the normal demands of the general public for water while at the same time providing sufficient reserves in case of fire emergency or power outages. B. Objectives: 1. Water quality shall meet the purity standards of the Minnesota Department of Health. 2. Any hydrant on the system shall, under maximum condition, deliver no less than 500 gallons per minute with a residual pressure of 20 pounds per square inch. 3. The system shall be looped to provide maximum reliability. 4. The supply and storage system shall be designed and maintained to have maximum reliability. 5 II. Municipal Sanitary Sewer Subprogram (SA) A. Subprogram Goal: The goal of the Municipal Sanitary Sewer subprogram is to promote a healthful environment by collecting all sewage from existing and projected development in a sanitary and economic manner. B. Objectives: 1. Provide sewer lines of adequate size and grade to collect and transmit all discharge sewage. 2. Prevent sewage from overflowing into the natural environment. 3. Prevent sewage back-ups. 4. Encourage or promote connection of all generators of sewage to the Municipal system. 5. Meet the effluent and infiltration standards of the Metropolitan Waste Control Commission. III. Storm Sewer Subprogram (SS) A. Subprogram Goal: Manage and control surface and ground waters in order to protect the man-made and natural environment in a safe and efficient manner. B. Objectives: 1. Prevent flooding. 2. Prevent damage to property due to erosion. 3. Meet water quality standards established by the controlling regulatory law or authority. TRANSPORTATION PROGRAM Program Description: This program includes streets, walkways, traffic signs and signals, vehicular parking facilities, and street lighting. Program Goal: Provide for the safe and efficient movement of people and goods throughout the city. 6 Subprograms: Streets, Walkways/Sidewalks, Signs/Signals, Parking Facilities, and Street Lights. I. Streets Subprogram (ST) A. Subprogram Goal: The goal of the Streets subprogram is to provide safe, convenient, economic public streets to best facilitate the movement of vehicular traffic. B. Objectives: 1. Streets should be constructed with permanent surfaces, concrete curb and gutter, and with ancillary storm drainage, to standards established by the City. 2. Streets should be of a size and load capacity consistent with their functional classifications. 3. Timely major repair to preserve the basic capital investment in streets. II. Walkways/Sidewalks Subprogram (WS) A. Subprogram Goal: To provide a safe and convenient pedestrian system with incidental recreational benefits. III. Signs/Signals Subprogram (SI) A. Subprogram Goal: The goal of the Signs/Signals subprogram is to provide an efficient and orderly system of street and traffic signing so as to promote safe, convenient travel throughout the City. B. Objectives: 1. Signs and signals should be installed in conformity with the Minnesota Manual on Uniform Traffic Control Devices. 2. Periodic surveys and studies should be made to document the effectiveness of City signing patterns. IV. Parking Facilities Subprogram (PA) A. Subprogram Goal: To provide such supporting facilities as will promote maximum use of public parking spaces by employers, employees, customers, and visitors. 7 B. Objectives: 1. Provide parking facilities for present and anticipated needs of the City of Hopkins. V. Street Lights Subprogram (SL) A. Subprogram Goal: To provide a system of street lighting within the City that will promote safe and convenient vehicular and pedestrian travel on City Streets. B. Objectives: 1. To provide lighting at each street intersection within the City. 2. To provide mid-block street lighting in conformance with the City's street lighting policy, in order to provide equitable, cost efficient lighting. 3. To continually update the system so as to provide energy and cost efficient lighting. PARKS, FORESTRY AND PAVILION PROGRAM Program Description: This program includes community parks, neighborhood parks, open spaces, recreational structures and facilities. Program Goal: The goal of the Park and Recreation Program is to provide facilities for safe, stimulating, and comprehensive leisure time activities of Hopkins citizens. Subprograms: Neighborhood Facilities, Community Facilities I. Neighborhood Facilities Subprogram (NF) A. Subprogram Goals: To acquire ownership or use rights of park sites located to provide convenient walking access to all Hopkins citizens and to develop such sites to provide optimum recreational serviceability consistent with the preservation and enhancement of pleasing aesthetic qualities. B. Objectives: 1. Acquire property or use rights on those neighborhoods that do not have convenient walking access to neighborhood park facilities. 2. Develop neighborhood park facilities to meet the needs of various user groups. 8 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Preserve and enhance the aesthetic qualities of neighborhood parks. II. Community Facilities Subprogram (CF) A. Subprogram Goals: The goal of the Community Facilities subprogram is to develop, or acquire ownership or use rights of sites which serve the entire City and to provide facilities that serve community-wide needs. B. Objectives: 1. Acquire sites that have valuable and unique natural characteristics to preserve irreplaceable community resources. 2. Preserve by acquisition, gift, or other arrangement properties that have valuable historic-cultural qualities. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Construct or acquire structures and facilities necessary to meet the changing needs of the community. GENERAL PUBLIC BUILDINGS PROGRAM Program Description: The General Public Buildings Program includes all municipal buildings except those provided for in the Utility and Park Facilities Program. Program Goal: Provide buildings that are adequate and convenient for the efficient accommodation of City functions. Subprograms: Administrative Offices, Maintenance Facilities, Fire Facilities, Community Center. I. Administrative Offices Subprogram (AO) A. Subprogram Goal: The goal of the Administrative Offices subprogram is to provide facilities for the efficient and safe conduct of legislative and administrative functions of the City. 9 B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of the City services. II. Maintenance Facilities Subprogram (MF) A. Subprogram Goal: The goal of the Maintenance Facilities subprogram is to provide facilities for the efficient and safe conduct of City maintenance functions. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of City services. III. Fire Facilities Subprogram (FF) A. Subprogram Goal: To provide a fire station, or stations, for storage of Fire Department equipment and for the training and meetings of volunteer fire fighters to provide prompt and efficient protection to life and property. B. Objectives: 1. Provide a maximum four-minute daytime and three-minute nighttime response to all points within the City. 2. Meet objective 1 through the use of volunteers. IV. Community Center Subprogram (CC) A. Subprogram Goal: To provide a community facility, or facilities, which meet the social, recreational, and cultural needs of all citizens, particularly senior citizens. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repairs. 10 2. Construct or acquire structures and facilities necessary to meet the changing needs of the City. 3. Upgrade facilities as necessary to provide for efficient, safe, and effective provision of City services. ECONOMIC DEVELOPMENT PROGRAM Program Description: This program includes redevelopment projects that have been identified through adopted plans and goals of the City of Hopkins. Program Goal: To facilitate the redevelopment of key sites in order to achieve the state objectives of the project. Objectives: 1. Elimination of blight or blighting conditions 2. Creation of jobs 3. Increase property value(s) 4. Catalyst of additional redevelopment 5. Environmental clean-up Increase transit-oriented development around LRT stations 11 Sources of Funding 12 SOURCES OF FUNDING In order to fund the anticipated Capital Improvements, the City must draw upon a variety of sources. Many of these sources have a specific or "dedicated" purpose (i.e., the water utility fund will finance water main installation but not a street overlay). Therefore, it is important to identify the uses and limitations of the various revenue sources. CURRENT REVENUES - GENERAL FUND (CR) This represents funding from current year revenue collections in the General Fund that support operations and capital outlay expenditures. Revenue sources include property tax levies, state aid payments, and various permit and license fees. This source of funding is generally used only for operations and small capital purchases. GENERAL FUND RESERVES (GR) Reserves of the general fund are the funds remaining after subtracting cash flow and emergency amounts from the City's cash balance, sometimes referred to as "fund balance". The use of General Fund Reserves is not recommended for Capital Improvements without significant staff and Council review. COMMUNICATION (formerly Cable TV) FUND (CT) This funding source consists of franchise fees received from the local Cable TV company, in excess of the amounts earmarked for the access programming and commission budgets. Expenditures are limited to cable-related facilities, or must have a cable related purpose. ECONOMIC DEVELOPMENT FUND (ED) This funding source was established by the Housing and Redevelopment Authority (HRA) and the City of Hopkins, to provide funding for the purpose of promoting development and redevelopment within the City. The Economic Development fund is a revolving fund administered by the HRA, intended to provide an ongoing funding source used to reduce or extend the long term debt involved with development and redevelopment activities. The HRA reviews all proposed uses of this fund on an individual basis. GRANT-IN-AID (GA) This is aid received from either the Federal or State government. In many cases, grants are made on matching basis, which means the City shares a portion of the costs of the project being funded. 13 MUNICIPAL STATE AID STREETS (MS) This funding source represents funds received from the State of Minnesota to support construction and maintenance of State Aid classified municipal streets. State law defines the types and limits of State Aid Streets expenditures. PERMANENT IMPROVEMENT REVOLVING/GENERAL OBLIGATION BONDS (PI) Improvements with a life of several years may be financed from the proceeds of a General Obligation Bond Issue. Law limits the total debt that can be incurred under this method of financing. With some exception, General Obligation Bonds are generally subject to a referendum process. Examples of projects, which may not require a referendum, are those financed through the use of special assessments where at least 20 percent of the project cost is assessed to the benefiting property owners. The remaining portion not assessed can be financed through general obligation bonds repaid by a tax levy. PRIVATE SECTOR FUNDING (PF) This funding source consists primarily of payments made by developers for the purchase of land, the installation of water, sewer, or streets or other related expenditures. It can also refer to donations made to the City by individuals or groups. OTHER GOVERNMENTAL UNITS (GU) These are funds received from Hennepin County, adjacent communities, etc. for projects that also benefit a jurisdiction other than the City of Hopkins. REVENUE BONDS (RB) These are bonds issued for improvements made for specific revenue producing facility or operation. The debt incurred is repaid from the revenue generated by the facility. If the revenue generated is insufficient, then the difference becomes an annual obligation of the taxpayers and becomes an additional tax levy. These are generally not subject to referendum. REAL ESTATE SALES FUND (RE) This funding source consists primarily of funds built up from the sale of City owned property. To date, the fund has been used for building improvements. Because the sale of both general City property and park/recreation property are accumulated into this fund, earmarking a portion for recreational purposes may be justified. 14 SPECIAL ASSESSMENT (SA) A number of projects may be realistically financed using Special Assessment to pay the ultimate cost. Almost any project can potentially be financed using the assessment process. In each case it is necessary to make a determination that the assessed property will benefit by the amount of the assessment. The cost of street reconstruction is shared by the property owner and the City. Special assessments to individual properties are capped per city policy. Concurrent improvement costs to the utility systems are assumed by the respective utility funds. TAX INCREMENT FINANCING (TF) This funding source results from the tax value of new development that is "incrementally" greater than the existing tax value. Typically, bonds are sold based on the assumption that the higher tax receipts will retire the bonds. However, the use of TIF funds through a "pay as you go" method has become more common. This type of funding can be used for public improvements within a redevelopment district to support the goals of redevelopment, specifically the elimination of blighted conditions. Approval of the Hopkins HRA should be anticipated prior to the commitment of these funds. State law strictly regulates the use of these funds. WATER FUNDS (WF) Water funds consist of revenue generated from the sale of water. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. SANITARY SEWER FUNDS (SF) Sanitary sewer funds consist of revenue generated from charges made for sewage disposal. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. STORM SEWER UTILITY REVENUES (SU) Storm sewer funds consist of revenue generated by charging storm water drainage fee to parcels of land for the availability and use of municipal storm sewer facilities. Expenditures from this funding source are related to drainage facilities. PAVILION FUND (PA) Pavilion Funds consist of revenues generated from rental fees collected from users of the Pavilion. These funds are utilized to pay for operating, and capital expenditures. 15 Funding Sources Communication (formerly Cable TV) Fund CT Current Revenues – General Fund CR General Fund Reserves GR Economic Development Fund ED Grant-In-Aid GA Housing and Redevelopment Authority HRA Municipal State-Aid Streets MS Other Government Units GU Park Dedication Fund PDF Pavilion Fund PA Permanent Improvement Revolving/General Obligation Bonds PI Private Sector Funds PF Real Estate Sales Fund RE Revenue Bonds RB Sanitary Sewer Fund SF Special Assessment SA Storm Sewer Fund SU Tax Increment Financing TF Water Fund WF 16 Programs and Categories Utilities Program Municipal Water System Category Municipal Sanitary Sewer Category Storm Sewer Category Transportation Program Streets Category Walkways/Sidewalks Category Signs/Signals Category Parking Facilities Category Street Lights Category Parks, Forestry and Pavilion Program Neighborhood Facilities Category Community Facilities Category General Public Buildings Program Administrative Offices Category Maintenance Facilities Category Fire Facilities Category Community Center Category Arts Center Category Economic Development Program 17 Summary of Impacts on Major Funding Sources 18 SUMMARY OF PROJECT IMPACTS ON MAJOR FUNDING SOURCES CURRENT REVENUES/GENERAL FUND RESERVES Expenditures for 2012 are budgeted at an increase of 2.5% over the 2011 budget. The 2012 budget was compiled as a maintenance budget following the State’s change to Market Value Exclusion (MVE) from Market Value Homestead Credit and the uncertainty as to how that would impact values and the taxes placed on various properties. To keep the budget balanced we eliminated capital outlay from the General Fund, salaries were held at 2011 rates and implemented small cuts across all departments. The 2013 budget has begun with all departments again working towards a maintenance budget. The tax levy is the major source of revenues (82%) for the General Fund and therefore would need to increase if general fund operating and capital expenditures increase in 2013. Annually the legislature debates the future of tax levy limits which were reinstated for 2009 and again eliminated for . Unassigned fund balance in the General Fund totals $4,266,048 at the end of 2011 and is projected to remain at that level for 2012. The State Auditor’s Office recommends no less than five month of operating expenditures in reserves. For 2012 five months of expenditures would total $4,398,552. At January 1, 2012 the fund balance was at 40.4% of budgeted expenditures. PERMANENT IMPROVEMENT REVOLVING FUND, (P.I.R.) - G.O. DEBT Funding from bonds is used to reimburse the P.I.R. fund for public improvement projects, which have been previously expended. The debt is funded by special assessment collections and city tax levies over a ten to fifteen year period.Bonds totaling $3,355,000 will be sold in 2012 to fund the 2011 and 2012 street improvement projects. The next bond sale is scheduled for 2013 and will be for the 2013 project that was originally scheduled for two years but was moved to 2013 to minimize the disruption of the neighborhood, get positive construction bids and a favorable bond rate. Those bonds are expected to total $4.2 million. The P.I.R. fund has completed substantial projects over the last three years totaling almost $5 million. This pace is expected to continue with scheduled projects for 2013 totaling $3,995,000 and future projects in the years 2014-2017 totaling over $8.97 million. Projects scheduled for stnd 2013 include the Presidential Avenue S, and 1 S and 2 St S between Monroe and Harrison Streets along with W Park Rd. (see project 01-CIP-S101 for details), Mainstreet signal upgrades, Blake Road streetscape and replacement of the asphalt walk on Excelsior Blvd. The funding is provided for these projects by special assessments, $1,500,000 and PIR/Bonding, $2,495,000 for a total project estimated at $3,995,000. In the years 2014-2017 as mentioned above, the city has an aggressive residential street improvement schedule planned, in addition to major improvements to County Road 61 – Shady Oak Road, all of which will require bonding. 19 MUNICIPAL STATE AID FUND Funding for municipal state aid road projects comes from state MSA funding and is drawn down as projects are done. State funding is not sufficient for current planned projects as a significant draw was made on existing funds for the Co Rd 3 – Phase I project. This draw totaled $3,243,793 of which $2,907,829 has been paid from available allotments and $335,964 will come from future allotments as they become available in the years 2013 and forward. In addition in the queue is a request for $950,956 for the Minnetonka Mills Rd project and th $894,020 for the 5 St South project. These funds will be released once the Co Rd 3 funds are fully drawn down. This will push back receipt of funds for other eligible MSA funded projects; however those project requests will be placed in the queue for future allotment payments. Currently there is one MSA project scheduled for 2014-2015 and one for 2016. In 2014-2015 the County Road 61, Shady Oak Road project that involves the cities of Hopkins and Minnetonka, Hennepin County and the State will be done. The project is in the planning stages and has a tentative scheduled construction start date of 2014. The project is estimated at $20.4 million of which $2.8 is Hopkins share of the project of which $1.3 million is budgeted. The remaining $1.5 million is right-of-way acquisition costs for which we currently have no funding. We continue to work with Hennepin County and the City of Minnetonka to develop funding for this project. CAPITAL IMPROVEMENT FUND Funding for these improvements comes from a general tax levy that was implemented in 2005 at $25,000. With the exception of2010 when the levy was eliminated due budget constraints as a result of the governor’s MVHC unallotment, we have been able to steadily increase this levy and it is budgeted at $125,000 for 2013. Projects scheduled in 2013 total $35,500 and are for flooring projects at the Arts Center. PARK IMPROVEMENT FUND The source of funding for this fund is development fees charged to developers for park development. Future funds are dependent on future development and redevelopment in the city. Projects scheduled for 2013 total $112,000 and include play equipment in Oakes Park, Burns Park tennis and play court maintenance and Skate Park improvement. While past redevelopment projects generated $384,000 in Park Dedication Fees those funds will shortly be exhausted if additional resources are not identified. Additional development projects in the planning stages are anticipated to bring in additional funds within the next year. The Park Board spent considerable time soliciting resident input on city parks and developed a long-range plan for the city’s park system. This plan is the basis for future park improvements. WATER FUND Implementing the rates as proposed in the Utility Master Plan (UMP) along with a bond sale in 2012 provide the funding needed for projects scheduled over the next several years. 20 Projects planned for 2013 include $1,1,000 in water main improvements done in conjunction with street improvements, $95,000 for meter replacements, $33,000 for emergency choline shut- off valves and $20,000 for an emergency connection to the City of Edina. The public works facility improvement project annual transfer of $45,000 has been transferred to the Storm Sewer Utility fund for the years 2012–2023. As established by the Utility Master Plan completed in 2007 and reviewed every two years thereafter, annual incremental increases are planned for the next 17 years. Water rates will increase in 2013 by approximately 3%, and will be in line with the current UMP. SANITARY SEWER FUND Implementing the rates as proposed in the Utility Master Plan (UMP) along with a bond sale in 2012 provide the funding needed for projects scheduled over the next several years. Projects planned for 2013 include $700,000 in sewer main improvements done in conjunction with street improvement projects and $15,000 in Lift Station maintenance. In addition to the scheduled capital expenditures, the Metropolitan Waste Control Commission is projecting annual increases in its disposal charges to local governments. The public works facility improvement project annual transfer of $50,000 has been transferred to the Storm Sewer Utility fund for the years 2012–2023. As established by the Utility Master Plan completed in 2007 and reviewed every two years thereafter, annual incremental increases are planned for the next 17 years. Water rates will increase in 2013 by approximately 4%, and will be in line with the current UMP. STORM SEWER FUND The storm sewer utility issued bonds in 2003 to help cover infrastructure costs that were incurred prior to 2003. Bonds will be sold in 2012 for the 2011 and 2012 project costs. These bonds issues along with current revenues should provide the needed funding for scheduled projects. Projects scheduled for 2013 include $500,000 in storm sewer improvements done in conjunction with street improvement projects, $19,000 in storm drainage system maintenance and $250,000 in storm water improvements in Cottageville Park. The public works facility improvement project will cost the storm sewer enterprise $25,000 a year for twenty years (2004–2023). In addition beginning in 2012 the Storm Sewer Utility fund will absorb the public works facility transfers for both the water fund ($45,000) and the sewer fund ($50,000) for a total increased cost of $95,000. The most recent rate increase pursuant to the 2007 Utility Master Plan was done in 2009. This rate increase is expected to support the storm sewer system well into the future and currently no additional rates increases are proposed. 21 PAVILION FUND The Pavilion Fund was added to the CIP in 2006 to provide for future improvements that will be needed as this facility ages. As an Enterprise Fund capital items are usually funded within the fund but due to several large capital improvements over the past few years this fund while meeting its operational needs does not currently have adequate financial resources to meet future capital needs. Some of the improvements recently completed were done at the request of major leaseholders of the facility and are being paid by those leaseholders through long-term lease arrangements. This facility built in 1990 is starting to need repairs and replacement to areas that are heavily used; there are no capital projects scheduled for 2013, however in 2014-2017 facility projects totaling $375,000 will be needed. As part of the 2013 budget process funding of these Pavilion capital needs will need to be addressed as well as future infrastructure needs which will continue to increase as the building ages and facility use remains in high demand. TAX INCREMENT FINANCING FUNDS Considering all tax increment districts, as a whole cash on hand, projected increments and loan repayments are sufficient to cover TIF project expenditures. The state has provided municipalities with a pooling tool to accommodate short-term deficiencies within the districts. The city will be allowed to pool the districts tax increment revenues to cover outstanding debt. Currently none of the city’s districts are projected to have shortfalls. 22 Cash Flow Statements 23 PARK CAPITAL IMPROVEMENTS FUND (301)07/19/2012 ActualProjectedProjectedProjectedProjectedProjectedProjected 2011201220132014201520162017 Working Capital Beginning Year232,629112,195170,31742,020(53,560)(54,095)(55,718) Revenues: Taxes (from matured Park Bonds1,346 Interest1,5851,1221,703420(536)(1,623)(1,672) Dedication fees0128,00000000 Hennepin County Grant150,000 Met Council - easememt/grant50,000300,000 Grants - Private Foundations30,000 Donations - general01,0001,0001,000 Donations - benches Transfer in - close fund 4122,581 Total Revenues5,512360,122302,7031,420(536)(1,623)(1,672) Expenditures: C.I.P. Projects118,946295,000105,00090,00000 Cottageville Property Acquisition319,000 Skate Park commitment7,0007,0007,0007,000 Total Expenditures125,946302,000431,00097,000000 Working Capital Year End112,195170,31742,020(53,560)(54,095)(55,718)(57,390) 24 07/19/2012 CAPITAL IMPROVEMENTS FUND (305) ActualProjectedProjectedProjectedProjectedProjectedProjected 201220132014201520162017 2011 Working Capital Beginning Year221,836272,47118,784108,37792,919243,384108,601 Revenues: Miscellaneous Interest1,8221,362945424651,217543 Federal Stimulus Funds Transfers In from General Fund Tax Levy96,141125,000125,000125,000150,000150,000150,000 Total Revenues97,963126,362125,094125,542150,465151,217150,543 Expenditures: Pavilion Projects Expenses - Audit1,125 C.I.P. Projects46,203380,05035,500141,0000286,000543,510 Transfer to General Fund Total Expenditures47,328380,05035,500141,0000286,000543,510 Working Capital Year End272,47118,784108,37792,919243,384108,601(284,366) 25 07/19/2012 MUNICIPAL STATE AID FUND (302) ActualProjectedProjectedProjectedProjectedProjectedProjected 2011201220132014201520162017 Working Capital Beginning Bal1,303,1081,666,3332,094,2402,480,182819,984438,184(279,289) Revenues: State MSA Funds, projects421,691411,244365,000365,000365,000365,000365,000 Interest Earnings12,16716,66320,94224,8028,20017,527(11,172) Total Revenues433,858427,907385,942389,802373,200382,527353,828 Expenditures: CIP State Aid Projects70,633002,050,000755,0001,100,0000 Total Expenditures70,633002,050,000755,0001,100,0000 Working Capital Ending Balance1,666,3332,094,2402,480,182819,984438,184(279,289)74,540 includes cash, interest rcvbl, & A/P Cash Balance 12/31/20XX1,662,371 Cash Balance 7/19/20122,075,689 ESTIMATED Cash Balance 12/31/20XX2,090,2782,476,221816,023434,222(283,250)70,578 (3)ProjectTotal DuePaid Balance State Aid Funds due CityTotalFrom StateTo DateDue 7/19/12 Excelsior Blvd5,408,756.283,243,792.742,907,828.85335,963.89 Minnetonka Blvd1,231,889.51950,955.56 950,955.56- 5th Street South1,165,881.73894,019.71 894,019.71- Total7,806,527.525,088,768.012,907,828.852,180,939.16 65.19% 26 Cash Flow AnalysisP.I.R. FUND(501)07/19/2012 ActualProjectedProjectedProjectedProjectedProjectedProjected 2011201220132014201520162017 Working Capital Beginning Year 1,814,430563,5332,271,5272,002,5891,597,1884,084,2481,486,434 Revenues: Special Assessment Revenues (1)788,484700,668568,551558,298725,584754,518821,876 Interest6,4402,53610,2229,0127,18718,3796,689 Bond Proceeds 3,286,5103,500,0005,000,0001,500,000 Total Revenues794,9243,989,7144,078,773567,3105,732,771772,8972,328,565 Expenditures: C.I.P. Projects1,795,1101,095,0002,495,000620,0001,600,0001,865,0001,566,000 C.I.P. Projects - Special Assm900,0001,500,00001,200,0001,060,0001,064,000 Transfers for SA Debt collected thru Assm Debt Service Transfers - 2007B71,90071,90071,90071,90071,90071,90071,900 Debt Service Transfers - 2010A - Imprv120,592156,600156,600156,600156,600156,600156,600 Debt Service Transfers - 2010B - Rfdg58,21958,219 Debt Service Transfers - 2012 debt ($1.289M)124,211124,211124,211124,211124,211 Debt Service Transfers - 2013 debt ($1.125M)93,00093,00093,000 Total Expenditures2,045,8212,281,7194,347,711972,7113,245,7113,370,7113,075,711 Working Capital Year End563,5332,271,5272,002,5891,597,1884,084,2481,486,434739,288 (1) Includes current, delinquent and penalties Total Projects Scheduled (CIP & SA)1,795,1101,995,0003,995,000620,0002,800,0002,925,0002,630,000 27 WATER FUND - WORKING CAPITAL PROJECTION07/19/2012 ActualProjectedProjectedProjectedProjectedProjectedProjected 2011201220132014201520162017 Working Capital Beginning Year (268,206)(488,484)252,992265,385400,298824,120518,919 Revenues: Operating Revenues1,265,9301,262,0501,300,6001,339,1501,377,8501,416,5501,461,500 Other132,583129,480140,280152,149158,533165,235172,272 Interest(2,329)000000 Bond Issuance760,5191,200,0001,200,000 Total Revenues1,396,1842,152,0492,640,8801,491,2992,736,3831,581,7851,633,772 Expenditures: Operation Expense986,607969,4481,002,9981,037,7811,073,8461,111,2441,150,027 Other Exp - int on current bonds36,91300 Other Exp - int on refunded bonds14,82511,4757,5872,700 Other Exp - int on 2009 bonds26,30025,35024,22522,85021,35019,725 Other Exp - int on 2012 bonds5,66416,79316,36515,89315,375 Other Exp - int on 2013 bonds65,00062,50059,750 Other Exp - int on 2015 bonds65,00062,500 Equipment Replacement Items0075,00006,800061,700 Capital Improvements384,169190,0001,248,0000800,000411,000200,000 Principal Bond payment200,000 Principal Bond payment - refunded165,000170,000175,000180,000 Principal Bond pymnt - 2009 debt45,00050,00050,00050,00050,00050,000 Principal Bond pymnt - 2012 debt40,00045,00045,00045,00045,000 Principal Bond pymnt - 2013 debt50,00055,00060,000 Principal Bond pymnt - 2015 debt50,00055,000 Capital Lease (PW Facility) (1)0000000 Total Expenditures1,607,6891,410,5732,628,4871,356,3862,312,5611,886,9871,779,077 Change in available funds(211,505)741,47612,393134,914423,822(305,202)(145,305) Inventory change194 Bond Premium/Discount Exp(8,967) Working Capital Ending Year(488,484)252,992265,385400,298824,120518,919373,614 (1) Capital Lease moved to Storm Sewe r Rate Histor 2012 - 2017 financial data was taken from the Utility Master Plan done by City Engineer y 1984 $0.85 1993 $1.05Notes - 1997 $1.10Income - 2008 and forward used utility master plan rates (fixture/no surcharge option) 2000 $1.20 2005 $1.40 Per Utility Master Plan (10/07) 2008 $1.65 2009 $1.86 2010 $1.90 2011 $1.94 - not increased, left at $1.90 2012 $1.96 2013 $2.02 projected rate projected rate 2014 $2.08 increasesincreases 2015 $2.14 2016 $2.20 2017 $2.27 28 SEWER FUND - WORKING CAPITAL PROJECTION07/19/2012 ActualProjectedProjectedProjectedProjectedProjectedProjected 201220132014201520162017 2011 Working Capital Beginning Year79,00698,771398,662619,769763,261943,574778,988 Revenues: Operating Revenues1,823,0542,137,5002,223,0002,308,5002,399,7002,496,6002,593,500 Other15,89523,00020,00020,00020,00020,00020,000 Interest4212,4699971,5491,9082,3591,947 Bond Issuance170,520700,000500,000 Total Revenues1,839,3692,333,4892,943,9972,330,0492,921,6082,518,9592,615,447 Expenditures: Operation Expense473,113516,840534,037551,833570,253589,319609,053 MWCC Charges (3% inflation)1,148,0361,309,1081,371,1261,436,1441,504,3071,575,7711,650,698 Interest Expense - 2009 Debt32,65132,65031,45030,10028,45026,57524,463 Interest Expense - 2012 Debt1,2773,7803,6853,5803,465 Interest Expense - 2013 Debt21,00019,80018,70017,500 Interest Expense - 2015 Debt15,00014,100 Equipment Replacement Items00035,7006,80033,60026,400 Capital Improvements114,363115,000715,0000500,000280,000120,000 Principal Bond payment (2009)50,00060,00060,00060,00060,00065,00065,000 Principal Bond payment (2012)10,00010,00010,00010,00010,000 Principal Bond payment (2013)38,00038,00038,00038,000 Principal Bond payment (2015)28,00028,000 Capital Lease (PW Facility) (1)0000000 Total Expenditures1,818,1632,033,5982,722,8902,186,5572,741,2952,683,5452,606,679 Change in available funds21,207299,891221,107143,492180,313(164,586)8,768 Inventory change0 Bond Premium/Discount Exp(1,442) Working Capital Ending Year98,771398,662619,769763,261943,574778,988787,757 (1) Capital Lease moved to Storm Sewer Rate Histor y 1983 $1.50 2009 - 2017 financial data was taken from the Utility Master Plan done by City Engineer 1989 $1.75 1991 $2.00 1993 $2.50 1999 $2.25 Rate DECREASE 2006 $2.50 rate increase Per Utility Master Plan (10/07) 2008 $2.70 2009 $3.10 2010 $3.40 2011 $3.70 - act 3.60 2012 $3.75 2013 $3.90 projected rate projected rate 2014 $4.05 increasesincreases 2015 $4.21 2016 $4.38 2017 $4.55 these are the correct rates per the UMP 29 07/19/2012 STORM SEWER FUND - WORKING CAPITAL PROJECTION ActualProjectedProjectedProjectedProjectedProjectedProjected 201220132014201520162017 2011 Working Capital Beginning Year1,103,820402,095655,958659,418658,844504,785664,341 Revenues: Operating Revenues796,587802,140802,140802,140802,140802,140802,140 Other6,8305,0005,0005,0005,0005,0005,000 Interest2,1091,0051,6401,6491,6471,2621,661 Bond Issuance321,840500,000 Total Revenues805,5261,129,9851,308,780808,789808,787808,402808,801 Expenditures: Operation Expense178,068181,299184,925188,623192,396196,244200,169 Bond Interest - existing30,150 Bond Interest - 2009 refunded bonds10,4758,0755,3121,875 Bond Interest - 2010 bonds16,34815,93515,34814,58513,62312,485 Bond Interest - 2012 bonds2,3857,0806,8906,6806,450 Bond Interest - 2013 bonds15,00014,10013,30012,500 Capital Outlay (per ERP)0000000 Capital Improvements148,011368,000769,000220,000370,000181,000131,000 2003 Principal Bond payment910,000 2009 Principal Bond payment115,000120,000120,000125,000125,000 2010 Principal Bond payment60,00070,00065,00070,00070,00070,000 2012 Principal Bond payment15,00020,00020,00020,00020,000 2013 Principal Bond payment28,00028,00028,00028,000 Capital Lease - PW Facility (1)120,000120,000120,000120,000120,000120,000120,000 Total Expenditures1,501,229876,1221,305,320809,363962,846648,846600,604 Change in available funds(695,703)253,8643,460(574)(154,059)159,556208,197 Inventory change(660) Bond Premium/Discount Exp (net)(5,362) Working Capital Ending Year402,095655,958659,418658,844504,785664,341872,538 1 In 2011 this includes Water, Sewer & Storm Sewer transfers () Rate Historper month y() 1989 $4.75 per quarter 1991 $6.00 per quarter 1992 $2.50 1993 $3.00 1998 $3.20 1999 $4.00 2006 $4.50 2009 $5.00 30 PAVILION - ICE ARENA - WORKING CAPITAL PROJECTIONS07/19/2012 ActualProjectedProjectedProjectedProjectedProjectedProjected 2011201220132014201520162017 Working Capital Beginning Year (39,521)(55,254) 128,515 (19,591) (101,480) (123,904) (203,201) Revenues: Operating Revenues340,319357,335434,343456,060 375,202 393,962 4 13,660 Leases38,00038,000 38,000 38,000 38,000 3 8,000 38,000 current lease expires in 2013 Other7,4309,60010,00010,000 10,000 1 0,000 10,000 Donations (bleacher heating)10,000 Equipment Certificates185,000 Interest1,573 Total Revenues387,322599,935482,343504,060 423,202 441,962 4 61,660 Expenditures: Operation Expense348,446358,899403,944416,063 369,666 380,756 3 92,179 Capital Outlay- 185,000- - - - - Capital Improvements 53,000- 120,000-69,000135,00051,000 Payment on Equip Certific1,03223,09522,465 2 2,905 22,695 Payment on Interfund Loan23,14315,609 20,000 - - - Total Expenditures371,589431,899561,639489,528 571,307 523,851 4 84,084 Change in available funds15,733168,036(148,105)(81,890)(22,424)(79,297)14,532 Working Capital Ending Year(39,521)128,515(19,591) (123,904)(203,201)(101,480)(188,669) Note: The School District lease expires in November 2013. A new lease will be negotiated with the School District, however a projected amount for the new lease is unknown at this time. The current lease amount of $38,000 was left as a placeholder. 31 Five Year Project Summaries 32 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20132017 thru PROJECTS BY YEAR Project NameProject #Priority Project Cost Department 2013 Activity Center Café on 14thActivity Center09-CIP-AC032n/a90,000 Carpet Replacement: Theater and Dressing Rooms222,000Arts Center 12- CIP-AR01 Seal Floors in Public Restrooms and KitchenArts Center111,000 12-CIP-AR003 Replace Miniblinds with Roller BlindsArts Center12,500 12-CIP-AR004 Block 64 Redevelopment ProjectDevelopmentn/a5,500,000 06-CIP-D404 8th Ave Streetscape and parking facilityDevelopmentn/a5,000,000 12-CIP-D408 Play Equipment - Oakes ParkPublic Works: Parksn/a60,000 08-CIP-P016 Repair Tennis Courts and Burnes Park Play CourtPublic Works: Parks12-CIP-P037n/a45,000 Residential Street ImprovementsPublic Works: Streets/Traffic01-CIP-S101n/a3,800,000 Residential Street Improvements--UtilitiesPublic Works: Streets/Traffic01-CIP-S102n/a2,300,000 Mainstreet Traffic Signal UpgradesPublic Works: Streets/Traffic11-CIP-S121350,000 Blake Road StreetscapePublic Works: Streets/Traffic11-CIP-S122n/a200,000 Replace Asphalt Walk - Excelsior Blvd.Public Works: Streets/Traffic12-CIP-S038n/a60,000 Storm Drainage System Maintenance - Alley RepairsPublic Works: Utilities01-CIP-U002n/a19,000 Meter ReplacementPublic Works: Utilities08-CIP-U000n/a95,000 Emergency Chlorine Shut Off ValvesPublic Works: Utilitiesn/a33,000 08-CIP-U008 Sanitary Sewer Lift Station MaintenancePublic Works: Utilitiesn/a15,000 08-CIP-U009 Storm Water Improvements - Cottageville ParkPublic Works: Utilitiesn/a250,000 11-CIP-S123 Emergency Water Connection with EdinaPublic Works: Utilities220,000 11-CIP-U011 Skate ParkRecreationn/a7,000 08-CIP-R001 17,579,500 Total for 2013 2014 Replace Carpet - Activity Center RoomsActivity Center08-CIP-AC015n/a36,000 Replace Gynmasium Roof - Activity CenterActivity Center08-CIP-AC018n/a105,000 Redevelopment, East Excelsior BoulevardDevelopment01-CIP-D401n/a2,000,000 Pavilion Roof ReplacementPavilion09-CIP-P0261120,000 Play Equipment - Park ValleyPublic Works: Parks08-CIP-P010n/a45,000 Play Equipment - Hilltop ParkPublic Works: Parks08-CIP-P014n/a45,000 County Road 61 (Shady Oak Road)Public Works: Streets/Traffic01-CIP-S106n/a8,200,000 Highway 7 and 5th Ave North - Signal ReplacementPublic Works: Streets/Traffic3445,000 10-CIP- S120 Plan, Design and Implement Railroad Quiet ZonePublic Works: Streets/Trafficn/a225,000 11-CIP-S120 Mainstreet Traffic Signal UpgradesPublic Works: Streets/Traffic350,000 11-CIP-S121 2014 Street Overlay ProjectPublic Works: Streets/Trafficn/a200,000 12-CIP-039 Storm Drainage System Maintenance - Alley RepairsPublic Works: Utilitiesn/a20,000 01-CIP-U002 Storm Water Management ProjectsPublic Works: Utilitiesn/a200,000 01-CIP-U003 Skate ParkRecreation08-CIP-R001n/a7,000 11,698,000 Total for 2014 2015 Blake Corridor RedevelopmentDevelopment09-CIP-D406n/a5,000,000 Pavilion Gas Fired Rooftop FurnacePavilion09-CIP-P025n/a9,000 Pavilion Evaporator Condenser ReplacementPavilion09-CIP-P036n/a60,000 Tuesday, August 07, 2012 33 Project NameProject #Priority Project Cost Department Residential Street ImprovementsPublic Works: Streets/Traffic01-CIP-S101n/a2,300,000 Residential Street Improvements--UtilitiesPublic Works: Streets/Trafficn/a1,650,000 01-CIP-S102 County Road 61 (Shady Oak Road)Public Works: Streets/Trafficn/a12,250,000 01-CIP-S106 Mainstreet Traffic Signal UpgradesPublic Works: Streets/Traffic350,000 11-CIP-S121 Light Rail Transit Stations (2)Public Works: Transportationn/a150,000 01-CIP-S502 Eighth Avenue LRT CorridorPublic Works: Transportationn/a200,000 01-CIP-S503 Storm Drainage System Maintenance - Alley Repairsn/a20,000Public Works: Utilities 01-CIP-U002 Depot Recreation AreaRecreation10-CIP-R0022500,000 22,189,000 Total for 2015 2016 Activity Center - Raspberry Room Roof Replacementn/a80,000Activity Center08-CIP-AC024 City Hall Lobby UpgradeCity Hall Administrationn/a110,000 09-CIP-CH030 Replace Carpet and Apparatus Floor Finish - FDFiren/a56,000 08-CIP-FD019 Pavilion Overhead Door ImprovementPavilionn/a40,000 07-CIP-P314 Pavilion Indoor Turf ReplacementPavilionn/a95,000 10-CIP-P319 Replace Carpet - Police StationPolicen/a40,000 08-CIP-PD016 Residential Street ImprovementsPublic Works: Streets/Trafficn/a2,500,000 01-CIP-S101 Residential Street Improvements--UtilitiesPublic Works: Streets/Traffic01-CIP-S102n/a430,000 Citywide Concrete AlleysPublic Works: Streets/Traffic01-CIP-S103n/a75,000 County Road 3Public Works: Streets/Traffic01-CIP-S104n/a2,300,000 Sixth Street South (11th to 12th Avenue South)Public Works: Streets/Traffic01-CIP-S504n/a500,000 Parking Lots - Lot 200Public Works: Streets/Traffic06-CIP-S118n/a250,000 Mainstreet Traffic Signal UpgradesPublic Works: Streets/Traffic11-CIP-S121350,000 Storm Drainage System Maintenance - Alley RepairsPublic Works: Utilities01-CIP-U002n/a21,000 Lift Station # 4Public Works: Utilities08-CIP-U001n/a160,000 St. Louis Park Emergency ConnectionPublic Works: Utilitiesn/a211,000 08-CIP-U010 6,918,000 Total for 2016 2017 Activity Center - Lower Roof ReplacementActivity Centern/a80,000 09-CIP-AC031 Replace 25 Ton Rooftop HVAC Unit - HCAArts Centern/a100,000 08CIP-AR013 Replace theatre seats and backsArts Center1138,510 12-CIP-AR002 Replace Information Desk and KioskArts Center15,000 12-CIP-AR005 Replace 15 Rooftop HVAC units - HCAArts Center12-CIP-AR036n/a220,000 Pavilion skate Tile Replacement/Lobby ImprovementPavilion07-CIP-P313n/a45,000 Pavilion - Desiccant Repl of Dehumidification SystPavilion10-CIP-P320n/a6,000 Residential Street ImprovementsPublic Works: Streets/Traffic01-CIP-S101n/a2,500,000 Residential Street Improvements--UtilitiesPublic Works: Streets/Traffic01-CIP-S102n/a430,000 Citywide Concrete AlleysPublic Works: Streets/Traffic01-CIP-S103n/a80,000 Mainstreet Traffic Signal UpgradesPublic Works: Streets/Traffic350,000 11-CIP-S121 Storm Drainage System Maintenance - Alley RepairsPublic Works: Utilitiesn/a21,000 01-CIP-U002 3,675,510 Total for 2017 62,060,010 GRAND TOTAL Tuesday, August 07, 2012 34 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20132017 thru DEPARTMENT SUMMARY Department20132014201520162017Total Activity Center90,000141,00080,00080,000391,000 Arts Center35,500463,510 499,010 City Hall Administration110,000 110,000 Development10,500,0002,000,0005,000,000 17,500,000 Fire56,000 56,000 Pavilion120,00069,000135,00051,000375,000 Police40,00040,000 Public Works: Parks105,00090,000195,000 Public Works: Streets/Traffic6,410,0009,120,00016,250,0006,105,0003,060,000 40,945,000 Public Works: Transportation350,000 350,000 Public Works: Utilities432,000220,00020,000392,00021,000 1,085,000 Recreation7,0007,000500,000514,000 17,579,50011,698,00022,189,0006,918,0003,675,510 TOTAL 62,060,010 35 Tuesday, August 07, 2012 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20132017 thru PROJECTS BY DEPARTMENT DepartmentProject#Priority20132014201520162017 Total Activity Center Replace Carpet - Activity Center Roomsn/a08-CIP-AC01536,00036,000 Replace Gynmasium Roof - Activity Centern/a105,000 08-CIP-AC018105,000 Activity Center - Raspberry Room Roof Replacementn/a80,000 08-CIP-AC02480,000 Activity Center - Lower Roof Replacementn/a80,000 09-CIP-AC03180,000 Activity Center Café on 14thn/a90,000 09-CIP-AC03290,000 90,000141,00080,00080,000391,000 Activity Center Total Arts Center Replace 25 Ton Rooftop HVAC Unit - HCAn/a08CIP-AR013100,000100,000 Carpet Replacement: Theater and Dressing Rooms12- CIP-AR01222,00022,000 Replace theatre seats and backs12-CIP-AR0021138,510138,510 Seal Floors in Public Restrooms and Kitchen12-CIP-AR003111,00011,000 Replace Miniblinds with Roller Blinds12-CIP-AR00412,5002,500 Replace Information Desk and Kiosk12-CIP-AR00515,0005,000 Replace 15 Rooftop HVAC units - HCA12-CIP-AR036n/a220,000220,000 35,500463,510499,010 Arts Center Total City Hall Administration City Hall Lobby Upgraden/a110,000 09-CIP-CH030110,000 110,000110,000 City Hall Administration Total Development Redevelopment, East Excelsior Boulevardn/a01-CIP-D4012,000,0002,000,000 Block 64 Redevelopment Projectn/a06-CIP-D4045,500,0005,500,000 Blake Corridor Redevelopment09-CIP-D406n/a5,000,0005,000,000 8th Ave Streetscape and parking facility12-CIP-D408n/a5,000,0005,000,000 10,500,0002,000,0005,000,00017,500,000 Development Total Fire Replace Carpet and Apparatus Floor Finish - FDn/a56,000 08-CIP-FD01956,000 56,00056,000 Fire Total Pavilion Pavilion skate Tile Replacement/Lobby Improvementn/a07-CIP-P31345,00045,000 Pavilion Overhead Door Improvement07-CIP-P314n/a40,00040,000 Pavilion Gas Fired Rooftop Furnace09-CIP-P025n/a9,0009,000 Pavilion Roof Replacement09-CIP-P0261120,000120,000 Pavilion Evaporator Condenser Replacement09-CIP-P036n/a60,00060,000 Pavilion Indoor Turf Replacementn/a95,000 10-CIP-P31995,000 Pavilion - Desiccant Repl of Dehumidification Systn/a6,000 10-CIP-P3206,000 36 Tuesday, August 07, 2012 DepartmentProject#Priority20132014201520162017 Total 120,00069,000135,00051,000375,000 Pavilion Total Police Replace Carpet - Police Station08-CIP-PD016n/a40,00040,000 40,00040,000 Police Total Public Works: Parks Play Equipment - Park Valleyn/a45,000 08-CIP-P01045,000 Play Equipment - Hilltop Parkn/a45,000 08-CIP-P01445,000 Play Equipment - Oakes Parkn/a60,000 08-CIP-P01660,000 Repair Tennis Courts and Burnes Park Play Courtn/a45,000 12-CIP-P03745,000 195,000 105,00090,000 Public Works: Parks Total Public Works: Streets/Traffic Residential Street Improvementsn/a01-CIP-S1013,800,0002,300,0002,500,0002,500,00011,100,000 Residential Street Improvements--Utilitiesn/a01-CIP-S1022,300,0001,650,000430,000430,0004,810,000 Citywide Concrete Alleys01-CIP-S103n/a75,00080,000155,000 County Road 301-CIP-S104n/a2,300,0002,300,000 County Road 61 (Shady Oak Road)n/a8,200,00012,250,000 01-CIP-S10620,450,000 Sixth Street South (11th to 12th Avenue South)n/a500,000 01-CIP-S504500,000 Parking Lots - Lot 200n/a250,000 06-CIP-S118250,000 Highway 7 and 5th Ave North - Signal Replacement3445,000 10-CIP- S120445,000 Plan, Design and Implement Railroad Quiet Zonen/a225,000 11-CIP-S120225,000 Mainstreet Traffic Signal Upgrades350,00050,00050,00050,00050,000 11-CIP-S121250,000 Blake Road Streetscape11-CIP-S122n/a200,000200,000 2014 Street Overlay Project12-CIP-039n/a200,000200,000 Replace Asphalt Walk - Excelsior Blvd.12-CIP-S038n/a60,00060,000 6,410,0009,120,00016,250,0006,105,0003,060,00040,945,000 Public Works: Streets/Traffic Total Public Works: Transportation Light Rail Transit Stations (2)n/a01-CIP-S502150,000150,000 Eighth Avenue LRT Corridorn/a200,000 01-CIP-S503200,000 350,000350,000 Public Works: Transportation Total Public Works: Utilities Storm Drainage System Maintenance - Alley Repairsn/a01-CIP-U00219,00020,00020,00021,00021,000101,000 Storm Water Management Projects01-CIP-U003n/a200,000200,000 Meter Replacement08-CIP-U000n/a95,00095,000 Lift Station # 408-CIP-U001n/a160,000160,000 Emergency Chlorine Shut Off Valves08-CIP-U008n/a33,00033,000 Sanitary Sewer Lift Station Maintenance08-CIP-U009n/a15,00015,000 St. Louis Park Emergency Connection08-CIP-U010n/a211,000211,000 Storm Water Improvements - Cottageville Parkn/a250,000 11-CIP-S123250,000 Emergency Water Connection with Edina220,000 11-CIP-U01120,000 432,000220,00020,000392,00021,0001,085,000 Public Works: Utilities Total Recreation Skate Parkn/a08-CIP-R0017,0007,00014,000 Depot Recreation Area210-CIP-R002500,000500,000 514,000 7,0007,000500,000 Recreation Total 37 Tuesday, August 07, 2012 DepartmentProject#Priority20132014201520162017 Total 17,579,50011,698,00022,189,0006,918,0003,675,51062,060,010 GRAND TOTAL 38 Tuesday, August 07, 2012 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20132017 thru FUNDING SOURCE SUMMARY 20132014201520162017Total Source CI - Capital Improvement Fund35,500141,000286,000543,5101,006,010 ED - Economic Development Fund7,000,000 7,000,000 GU - Other Governmental Units115,0006,450,00011,645,0001,600,00019,810,000 MS - Municipal State Aid Streets2,050,000755,0001,100,000 3,905,000 PA - Pavilion Fund120,00069,000135,00051,000375,000 PDF- Park Dedication Fund112,00097,000209,000 PF - Private Sector Funds90,000 90,000 PI - PIR/General Obligation Bonds2,495,000620,0001,600,0001,865,0001,566,0008,146,000 SA - Special Assessment1,500,0001,200,0001,060,0001,064,000 4,824,000 SF - Sanitary Sewer Fund715,000500,000280,000120,0001,615,000 SU - Storm Sewer Fund769,000220,000370,000181,000131,0001,671,000 TF - Tax Increment Financing3,500,0002,000,0005,250,000 10,750,000 WF - Water Fund1,248,000800,000411,000200,0002,659,000 17,579,50011,698,00022,189,0006,918,0003,675,51062,060,010 GRAND TOTAL Tuesday, August 07, 2012 39 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20132017 thru PROJECTS BY FUNDING SOURCE SourceProject#Priority20132014201520162017Total CI - Capital Improvement Fund Replace Carpet - Activity Center Roomsn/a36,000 08-CIP-AC01536,000 Replace Gynmasium Roof - Activity Centern/a08-CIP-AC018105,000105,000 Activity Center - Raspberry Room Roof Replacement08-CIP-AC024n/a80,00080,000 Replace 25 Ton Rooftop HVAC Unit - HCA08CIP-AR013n/a100,000100,000 Replace Carpet and Apparatus Floor Finish - FD08-CIP-FD019n/a56,00056,000 Replace Carpet - Police Station08-CIP-PD016n/a40,00040,000 Activity Center - Lower Roof Replacement09-CIP-AC031n/a80,00080,000 City Hall Lobby Upgrade09-CIP-CH030n/a110,000110,000 Carpet Replacement: Theater and Dressing Rooms222,000 12- CIP-AR0122,000 Replace theatre seats and backs1138,510 12-CIP-AR002138,510 Seal Floors in Public Restrooms and Kitchen111,000 12-CIP-AR00311,000 Replace Miniblinds with Roller Blinds12,500 12-CIP-AR0042,500 Replace Information Desk and Kiosk15,000 12-CIP-AR0055,000 Replace 15 Rooftop HVAC units - HCAn/a220,000 12-CIP-AR036220,000 35,500141,000286,000543,5101,006,010 CI - Capital Improvement Fund Total ED - Economic Development Fund Block 64 Redevelopment Projectn/a06-CIP-D4042,000,0002,000,000 8th Ave Streetscape and parking facility12-CIP-D408n/a5,000,0005,000,000 7,000,000 7,000,000 ED - Economic Development Fund Total GU - Other Governmental Units County Road 3n/a1,600,000 01-CIP-S1041,600,000 County Road 61 (Shady Oak Road)n/a6,150,00011,045,000 01-CIP-S10617,195,000 Eighth Avenue LRT Corridorn/a100,000 01-CIP-S503100,000 Highway 7 and 5th Ave North - Signal Replacement3300,000 10-CIP- S120300,000 Depot Recreation Area10-CIP-R0022500,000500,000 Blake Road Streetscape11-CIP-S122n/a100,000100,000 Replace Asphalt Walk - Excelsior Blvd.12-CIP-S038n/a15,00015,000 19,810,000 115,0006,450,00011,645,0001,600,000 GU - Other Governmental Units Total MS - Municipal State Aid Streets County Road 301-CIP-S104n/a700,000700,000 County Road 61 (Shady Oak Road)n/a2,050,000755,000 01-CIP-S1062,805,000 Sixth Street South (11th to 12th Avenue South)n/a400,000 01-CIP-S504400,000 2,050,000755,0001,100,0003,905,000 MS - Municipal State Aid Streets Total PA - Pavilion Fund Tuesday, August 07, 2012 40 SourceProect#Priorit20132014201520162017Total jy Pavilion skate Tile Replacement/Lobby Improvementn/a07-CIP-P31345,00045,000 Pavilion Overhead Door Improvementn/a40,000 07-CIP-P31440,000 Pavilion Gas Fired Rooftop Furnacen/a9,000 09-CIP-P0259,000 Pavilion Roof Replacement1120,000 09-CIP-P026120,000 Pavilion Evaporator Condenser Replacementn/a60,000 09-CIP-P03660,000 Pavilion Indoor Turf Replacementn/a95,000 10-CIP-P31995,000 Pavilion - Desiccant Repl of Dehumidification Systn/a6,000 10-CIP-P3206,000 375,000 120,00069,000135,00051,000 PA - Pavilion Fund Total PDF- Park Dedication Fund Play Equipment - Park Valleyn/a08-CIP-P01045,00045,000 Play Equipment - Hilltop Parkn/a45,000 08-CIP-P01445,000 Play Equipment - Oakes Parkn/a60,000 08-CIP-P01660,000 Skate Parkn/a7,0007,000 08-CIP-R00114,000 Repair Tennis Courts and Burnes Park Play Courtn/a45,000 12-CIP-P03745,000 112,00097,000209,000 PDF- Park Dedication Fund Total PF - Private Sector Funds Activity Center Café on 14thn/a09-CIP-AC03290,00090,000 90,000 90,000 PF - Private Sector Funds Total PI - PIR/General Obligation Bonds Residential Street Improvements01-CIP-S101n/a2,300,0001,350,0001,500,0001,500,0006,650,000 Citywide Concrete Alleysn/a15,00016,000 01-CIP-S10331,000 County Road 61 (Shady Oak Road)n/a200,000 01-CIP-S106200,000 Sixth Street South (11th to 12th Avenue South)n/a100,000 01-CIP-S504100,000 Parking Lots - Lot 200n/a200,000 06-CIP-S118200,000 Highway 7 and 5th Ave North - Signal Replacement3145,000 10-CIP- S120145,000 Plan, Design and Implement Railroad Quiet Zonen/a225,000 11-CIP-S120225,000 Mainstreet Traffic Signal Upgrades11-CIP-S121350,00050,00050,00050,00050,000250,000 Blake Road Streetscape11-CIP-S122n/a100,000100,000 2014 Street Overlay Project12-CIP-039n/a200,000200,000 Replace Asphalt Walk - Excelsior Blvd.12-CIP-S038n/a45,00045,000 8,146,000 2,495,000620,0001,600,0001,865,0001,566,000 PI - PIR/General Obligation Bonds Total SA - Special Assessment Residential Street Improvementsn/a01-CIP-S1011,500,000950,0001,000,0001,000,0004,450,000 Citywide Concrete Alleysn/a60,00064,000 01-CIP-S103124,000 County Road 61 (Shady Oak Road)n/a250,000 01-CIP-S106250,000 1,500,0001,200,0001,060,0001,064,0004,824,000 SA - Special Assessment Total SF - Sanitary Sewer Fund Residential Street Improvements--Utilitiesn/a01-CIP-S102700,000500,000120,000120,0001,440,000 Lift Station # 408-CIP-U001n/a160,000160,000 Sanitary Sewer Lift Station Maintenance08-CIP-U009n/a15,00015,000 715,000500,000280,000120,0001,615,000 SF - Sanitary Sewer Fund Total Tuesday, August 07, 2012 41 SourceProect#Priorit20132014201520162017Total jy SU - Storm Sewer Fund Residential Street Improvements--Utilitiesn/a01-CIP-S102500,000350,000110,000110,0001,070,000 Storm Drainage System Maintenance - Alley Repairs01-CIP-U002n/a19,00020,00020,00021,00021,000101,000 Storm Water Management Projects01-CIP-U003n/a200,000200,000 Parking Lots - Lot 20006-CIP-S118n/a50,00050,000 Storm Water Improvements - Cottageville Parkn/a250,000 11-CIP-S123250,000 769,000220,000370,000181,000131,0001,671,000 SU - Storm Sewer Fund Total TF - Tax Increment Financing Redevelopment, East Excelsior Boulevardn/a2,000,000 01-CIP-D4012,000,000 Light Rail Transit Stations (2)n/a01-CIP-S502150,000150,000 Eighth Avenue LRT Corridor01-CIP-S503n/a100,000100,000 Block 64 Redevelopment Project06-CIP-D404n/a3,500,0003,500,000 Blake Corridor Redevelopment09-CIP-D406n/a5,000,0005,000,000 3,500,0002,000,0005,250,00010,750,000 TF - Tax Increment Financing Total WF - Water Fund Residential Street Improvements--Utilitiesn/a01-CIP-S1021,100,000800,000200,000200,0002,300,000 Meter Replacementn/a95,000 08-CIP-U00095,000 Emergency Chlorine Shut Off Valvesn/a33,000 08-CIP-U00833,000 St. Louis Park Emergency Connectionn/a211,000 08-CIP-U010211,000 Emergency Water Connection with Edina220,000 11-CIP-U01120,000 1,248,000800,000411,000200,0002,659,000 WF - Water Fund Total 62,060,010 17,579,50011,698,00022,189,0006,918,0003,675,510 GRAND TOTAL Tuesday, August 07, 2012 42 Project Descriptions And Narratives 43 Economic Development 44 CAPITAL IMPROVEMENT PLAN 20132017 thru Department Development Cit of Hokins MN yp, ContactED Director TypeImprovement 01-CIP-D401 Project # Useful Life Unassigned Redevelopment, East Excelsior Boulevard Project Name Category Economic Development FuturePriority n/a Total Project Cost: $2,000,000 Description North side of Excelsior Boulevard from Highway 169 to approximately Blake Road. Redevelopment of older commercial area. Based on the adopted redevelopment plan, it would involve commercial, and residential uses. Identified in the East End Redevelopment Study. Justification Excelsior Boulevard was upgraded in this area, providing for additional property on the north side of the roadway. The buildings in this area are older and no longer the highest and best use for this property. The funding amount is an estimate and will vary depending on the scope and timing of the project. ExpendituresTotal 20132014201520162017 Construction/Maintenance 2,000,0002,000,000 2,000,0002,000,000 Total Funding Sources20132014201520162017Total 2,000,0002,000,000 TF - Tax Increment Financing 2,000,0002,000,000 Total Budget Impact/Other Tuesday, August 07, 2012 45 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentDevelopment Cit of Hokins MN yp, Contact ED Director Type Improvement 06-CIP-D404 Project # Useful Life Block 64 Redevelopment Project Project Name Category Economic Development FuturePriorityn/a Total Project Cost:$5,500,000 Description Redevelopment of block between 5th and 6th Avenues, north of Mainstreet, South of 1st Street North. There currently is no proposed schedule for construction. Justification Will redevelop older commercial and residential areas. ExpendituresTotal 20132014201520162017 Construction/Maintenance 5,500,0005,500,000 5,500,0005,500,000 Total Funding Sources20132014201520162017Total 2,000,0002,000,000 ED - Economic Development F 3,500,0003,500,000 TF - Tax Increment Financing 5,500,0005,500,000 Total Budget Impact/Other Tuesday, August 07, 2012 46 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentDevelopment Cit of Hokins MN yp, Contact ED Director Type Improvement 09-CIP-D406 Project # Useful Life Blake Corridor Redevelopment Project Name Category Economic Development FuturePriorityn/a Total Project Cost:$5,000,000 Description Redevelopment of properties along the Blake Road Corridor including the Cottageville Park area. Justification Removal of blighted and/or obsolete structures, improve access to transit and improve livability of the area. ExpendituresTotal 20132014201520162017 Land Acquisition/Demolition 5,000,0005,000,000 5,000,0005,000,000 Total Funding Sources20132014201520162017Total 5,000,0005,000,000 TF - Tax Increment Financing 5,000,0005,000,000 Total Budget Impact/Other Tuesday, August 07, 2012 47 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentDevelopment Cit of Hokins MN yp, Contact ED Director Type Improvement 12-CIP-D408 Project # Useful Life 8th Ave Streetscape and parking facility Project Name Category Economic Development FuturePriorityn/a Total Project Cost:$5,000,000 Description Sidewalks, landscaping, Public Art, Bike Lanes, Street furniture, and other pedestrian and bike improvements. Parking Ramp Construction, north of Mainstreet between 8th and 9th Ave South Justification The City of Hopkins has planned for 8th Avenue to be the gateway to the downtown from Excelsior Blvd to the Hopkins SWLRT Station. For this to be accomplished, 8th Ave must be transformed into a pedestrian and bike friendly two-block stretch. The proposed parking ramp will be used to support transit-oriented development. ExpendituresTotal 20132014201520162017 Construction/Maintenance 5,000,0005,000,000 5,000,0005,000,000 Total Funding Sources20132014201520162017Total 5,000,0005,000,000 ED - Economic Development F 5,000,0005,000,000 Total Budget Impact/Other LCA TOD Grant, various grant development Accounts, Bonds Tuesday, August 07, 2012 48 General Public Buildings 49 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentActivity Center Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-AC015 Project # Useful Life Replace Carpet - Activity Center Rooms Project Name Category Buildings: Activity Center FuturePriorityn/a Total Project Cost:$36,000 Description Replace Carpeting in Activity Center Raspberry Rooms, TV/Game Room; hallways. Justification Carpet is 18 years old, worn and requires replacement. ExpendituresTotal 20132014201520162017 Construction/Maintenance 36,00036,000 36,00036,000 Total Funding Sources20132014201520162017Total 36,00036,000 CI - Capital Improvement Fund 36,00036,000 Total Budget Impact/Other Tuesday, August 07, 2012 50 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentActivity Center Cit of Hokins MN yp, Contact Public Works Director Type Improvement 08-CIP-AC018 Project # Useful Life 25 years Replace Gynmasium Roof - Activity Center Project Name Category Buildings: Activity Center FuturePriorityn/a Total Project Cost:$105,000 Description Existing roof was installed in 1989 and is at the end of its projected useful life. Portion is cost share with Raspberry Ridge Condo Assn. Justification Roof was installed in 1989 and is at the end of its 25 year useful life. ExpendituresTotal 20132014201520162017 Construction/Maintenance 105,000105,000 105,000105,000 Total Funding Sources20132014201520162017Total 105,000105,000 CI - Capital Improvement Fund 105,000105,000 Total Budget Impact/Other Tuesday, August 07, 2012 51 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentActivity Center Cit of Hokins MN yp, Contact PW Director Type Improvement 08-CIP-AC024 Project # Useful Life Activity Center - Raspberry Room Roof Replacement Project Name Category Buildings: Activity Center FuturePriorityn/a Total Project Cost:$80,000 Description Built up asphalt roofing system covering Raspberry Rooms, Craft Room and Hallways at the Activity Center Justification Existing roof was replaced in 1992, Expected life is 25 years. ExpendituresTotal 20132014201520162017 Construction/Maintenance 80,00080,000 80,00080,000 Total Funding Sources20132014201520162017Total 80,00080,000 CI - Capital Improvement Fund 80,00080,000 Total Budget Impact/Other Inspection, repair and upkeep of roofing systems prevent deterioration of interior building structure and damage to interior components of building. Tuesday, August 07, 2012 52 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentActivity Center Cit of Hokins MN yp, Contact PW Director Type Improvement 09-CIP-AC031 Project # Useful Life 25 years Activity Center - Lower Roof Replacement Project Name Category Buildings: Activity Center FuturePriorityn/a Total Project Cost:$80,000 Description Built up Roof on Activity Center Raspberry Rooms and Hallway. Justification Existing roof was installed in 1992, estimated replacement due in 2017. ExpendituresTotal 20132014201520162017 Construction/Maintenance 80,00080,000 80,00080,000 Total Funding Sources20132014201520162017Total 80,00080,000 CI - Capital Improvement Fund 80,00080,000 Total Budget Impact/Other Tuesday, August 07, 2012 53 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentActivity Center Cit of Hokins MN yp, Contact PW Director Type Improvement 09-CIP-AC032 Project # Useful Life Activity Center Café on 14th Project Name Category Buildings: Activity Center FuturePriorityn/a Total Project Cost:$90,000 Description General - The Activity Center Café on 14th project is a project aimed at a growing trend among senior centers to reach out to younger audiences such as the baby boom generation. This project will tranform the Activity Center from a traditional senior/community center into a restaurant, gathering place, learning center, and health club - that happens to have customers who may range in age from 50-90 (but still open to all ages). The original model of a Café community facility was developed in Chicago and has been successfully implimented in other cities. The capital improvement portion of this new project involves utilizing the existing kitchen in a café fashion that would serve food in the morning until after lunch to people seated in what is currently the lounge area. Detailed - The project involves opening up a portion of the wall between the kitchen and lounge area and building a wall along what is now the serving line area of the kitchen. This new wall will close off the kitchen on the gym side and create a hallway for entrance and exit from the gym's West doors. The kitchen needs to be redesigned from it's previous school cafateria layout to a smaller "café" kitchen area with the appropriate equipment to serve breakfasts and sandwich/salad/soup based lunches. The lounge area carpet will be replaced with tile, a computer & table will be added for internet access in the lounge. Funding Sources: Sources have yet to be identified but possible partners in the project could include: The Hopkins Historical Society, Hopkins School District, a new non-profit "Friends of the Activity Center" organization. Justification It is well documented that baby boomers are not utilizing traditional senior centers as readily as seniors have in the past. People do not visit senior centers because it's for people of their age, they go there for the goods and services they need. The goal of the Café is to attract the younger older adult - younger in outlook, attitude and years - those who would benefit but seldom use "senior" sevices, to increase partnership, visibility and service reach, to improve the quality of life for our older adults, and to increase satisfaction of services. The café concept would satisfy several City strategic goals such as building on the small town feel of Hopkins through developing new methods that are more responsive to citizens and customers. If partnering with the Historical Society the project will enhance the sense of place. Expenditures20132014201520162017Total 90,00090,000 Construction/Maintenance 90,00090,000 Total Funding Sources20132014201520162017Total PF - Private Sector Funds 90,00090,000 90,00090,000 Total Budget Impact/Other The operational goal of the café would be to break even as a food service, but the Café would draw customers to the Activity Center to participate in the activitites many programs and activities offered by the Center thus increasing program and membership revenues. Tuesday, August 07, 2012 54 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentArts Center Cit of Hokins MN yp, Contact Public Works Director Type Improvement 08CIP-AR013 Project # Useful Life Replace 25 Ton Rooftop HVAC Unit - HCA Project Name Category Buildings: Arts Center FuturePriorityn/a Total Project Cost:$100,000 Description Replace existing 25 ton rooftop HVAC unit Justification Planned replacement at 20 years estimated useful life. ExpendituresTotal 20132014201520162017 Construction/Maintenance 100,000100,000 100,000100,000 Total Funding Sources20132014201520162017Total 100,000100,000 CI - Capital Improvement Fund 100,000100,000 Total Budget Impact/Other Tuesday, August 07, 2012 55 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Director Type Improvement 12- CIP-AR01 Project # Useful Life 10 years Carpet Replacement: Theater and Dressing Rooms Project Name Category Buildings: Arts Center FuturePriority2 Very Important Total Project Cost:$51,500 Description Remove carpet and carpet base in the thearter walkways, main dressing rooms, theater sound locks, JC studio dressing rooms, A/V storage room Justification This carpet will be 16 years old in 2013 and will have exceeded its useful life. ExpendituresTotalFuture 20132014201520162017 Construction/Maintenance 22,00022,000 29,500 22,00022,000 TotalTotal Funding Sources20132014201520162017TotalFuture 22,00022,000 CI - Capital Improvement Fund 29,500 22,00022,000 TotalTotal Budget Impact/Other Repeat project in 2023 at $29, 500 (Est) Future 0 Total Tuesday, August 07, 2012 56 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Director Type Improvement 12-CIP-AR002 Project # Useful Life 20 years Replace theatre seats and backs Project Name Category Buildings: Arts Center FuturePriority1 Urgent Total Project Cost:$138,510 Description Remove and replace theater seats and backs. (Keeping existing stanchions) Based on quote from Cosney (they recently did Eisenhower seating) with Classic Quattro seat, 33" low back, waterfall back and seat tailoring. Sherpa Shire-Grade G fabric (similar to existing), plush foam seat, 2" back foam, lexan seat numbers, demo and removal of existing seats and backs includes attic stock. 2011 pricing $116,000 with 3% inflation compounded over 5 years $138,510 Justification Seats will be 20 years old in 2017 and will have exceeded useful life. Stanchions should still be usable. Quote includes replacement of all seats and backs. This is not due until 2017 but wanted to get as much info as possible now to allow for time to plan. ExpendituresTotal 20132014201520162017 Construction/Maintenance 138,510138,510 138,510138,510 Total Funding Sources20132014201520162017Total 138,510138,510 CI - Capital Improvement Fund 138,510138,510 Total Budget Impact/Other Could consider replacing main floor one year and balcony another year if required by cash flow. Need tow weeks in theater to make exchange. Work on stage at same time okay will install team. Opportunity to potentially do a "seat sponsor" funding program similar to what was done before Repeat project in 2037 Tuesday, August 07, 2012 57 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Director Type Improvement 12-CIP-AR003 Project # Useful Life 7 years Seal Floors in Public Restrooms and Kitchen Project Name Category Buildings: Arts Center FuturePriority1 Urgent Total Project Cost:$11,000 Description Have grout and tile cleaned in the restrooms and kitchen, color grout a neutral shade, and then seal the entire floor. Justification The current grout is white but over time, even with regular cleaning and diligent mopping, portions of it turn grey. We have done deep cleaning which turns it white temporarily but then it gets patchy again. This makes the restroom floors look dirty, even when they are not. ExpendituresTotal 20132014201520162017 Construction/Maintenance 11,00011,000 11,00011,000 Total Funding Sources20132014201520162017Total 11,00011,000 CI - Capital Improvement Fund 11,00011,000 Total Budget Impact/Other Repeat in 7 years, at approximately $13,500 Tuesday, August 07, 2012 58 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Director Type Improvement 12-CIP-AR004 Project # Useful Life 10 years Replace Miniblinds with Roller Blinds Project Name Category Buildings: Arts Center FuturePriority1 Urgent Total Project Cost:$2,500 Description Replace existing miniblinds in the community room, class room, and conference room with roller blinds. Justification Existing miniblinds are hazardous due to the long cords which are left when the blinds are pulled up. Replacing that with a roller chain set up will be safer. This proposal does not include automatic up and down, they would still be adjusted manually. ExpendituresTotal 20132014201520162017 Construction/Maintenance 2,5002,500 2,5002,500 Total Funding Sources20132014201520162017Total 2,5002,500 CI - Capital Improvement Fund 2,5002,500 Total Budget Impact/Other Tuesday, August 07, 2012 59 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Director Type Improvement 12-CIP-AR005 Project # Useful Life 15 years Replace Information Desk and Kiosk Project Name Category Buildings: Arts Center FuturePriority1 Urgent Total Project Cost:$5,000 Description Replace informational Kiosk and desk with more functional information center. Justification Current informational kiosk and information desk are not ideal for assisting visitors with way finding and disseminating information. Guests arriving are frequently confused and have a hard time finding location of meetings. Etc. Also, we would like to be able to display larger concert posters, the rental brochure, membership brochures and more. ExpendituresTotal 20132014201520162017 Construction/Maintenance 5,0005,000 5,0005,000 Total Funding Sources20132014201520162017Total 5,0005,000 CI - Capital Improvement Fund 5,0005,000 Total Budget Impact/Other Tuesday, August 07, 2012 60 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentArts Center Cit of Hokins MN yp, Contact Bldg/Equip Supt Type Improvement 12-CIP-AR036 Project # Useful Life 20 years Replace 15 Rooftop HVAC units - HCA Project Name Category Buildings: Arts Center FuturePriorityn/a Total Project Cost:$220,000 Description Rooftop heating and AC units were installed in 1997. Useful life is 20 years. 15 total units from 25 tons to 5 ton. Justification ExpendituresTotal 20132014201520162017 Construction/Maintenance 220,000220,000 220,000220,000 Total Funding Sources20132014201520162017Total 220,000220,000 CI - Capital Improvement Fund 220,000220,000 Total Budget Impact/Other Tuesday, August 07, 2012 61 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentCity Hall Administration Cit of Hokins MN yp, Contact Public Works Director Type Improvement 09-CIP-CH030 Project # Useful Life 20 years City Hall Lobby Upgrade Project Name Category Bldg: City Hall FuturePriorityn/a Total Project Cost:$110,000 Description City Hall Lobby Upgrade was proposed as part of the 2007 City Hall upgrade/Carpet project. This part was not completed exceeding estimates. Justification Existing lobby is dated, ceiling tiles have yellowed and wallpaper has numerous stains from 19 years of service. ExpendituresTotal 20132014201520162017 Construction/Maintenance 110,000110,000 110,000110,000 Total Funding Sources20132014201520162017Total 110,000110,000 CI - Capital Improvement Fund 110,000110,000 Total Budget Impact/Other Tuesday, August 07, 2012 62 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentFire Cit of Hokins MN yp, Contact Fire Chief Type Improvement 08-CIP-FD019 Project # Useful Life 10 years Replace Carpet and Apparatus Floor Finish - FD Project Name Category Buildings: Fire Facilities FuturePriorityn/a Total Project Cost:$56,000 Description Replace carpet and apparatus floor finish systems. Justification Planned replacement at end of estimated 10 year useful life. Classroom and 2nd and 3rd Floor entryway and louge replacement, due to excessive use of classroom and lounge. FD spoke with Steve Stadler and he was ok with moving it up to 10 years from 15 years. ExpendituresTotal 20132014201520162017 Construction/Maintenance 56,00056,000 56,00056,000 Total Funding Sources20132014201520162017Total 56,00056,000 CI - Capital Improvement Fund 56,00056,000 Total Budget Impact/Other Original plan replacement was 15 years. Due to excessive use of classroom and lounge the life was moved to 10 years. Tuesday, August 07, 2012 63 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPavilion Cit of Hokins MN yp, Contact PW Director Type Improvement 07-CIP-P313 Project # Useful Life 10 years Pavilion skate Tile Replacement/Lobby Improvement Project Name Category Parks/Fores/Pav.: Comm. Facil. FuturePriorityn/a Total Project Cost:$97,000 Description Replacement of existing skate tile and adding skate tile and ceramic tile to the lobby. Replacement of existing tile in team rooms, arena, warming room , and referees room: 5,500 square feet. Install skate tile to a portion of lobby so skaters can access drinking fountains; 500 square feet. Install ceramic tile in the entryway and a portion of the lobby: 500 square feet. Floor has a 10 Year Life - Put in CIP again for 2017 for evalutaion. May only need to do the high traffice areas. Justification Current skate tile is 16 years old and is the original tile; the wear layer of the tile is worn through in the high traffic areas. Original tile was not glued, which increases maintenance and can create gaps in seams. This can allow skates to touch the concrete underneath the tile. Lobby skate and ceramic tile would add to the building aesthetics. When done in 2007 this project cost $41,339.30. PriorExpendituresTotal 20132014201520162017 Construction/Maintenance 45,00045,000 52,000 45,00045,000 TotalTotal PriorFunding Sources20132014201520162017Total 45,00045,000 52,000 PA - Pavilion Fund 45,00045,000 TotalTotal Budget Impact/Other New tile glued down will save on maintenance, be safer, and improve facility appearance and marketability. Tuesday, August 07, 2012 64 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPavilion Cit of Hokins MN yp, Contact Public Works Director Type Improvement 07-CIP-P314 Project # Useful Life 30 years Pavilion Overhead Door Improvement Project Name Category Bldgs: Pavillion FuturePriorityn/a Total Project Cost:$40,000 Description Remove and lock-in four of the six overhead doors on the west side of the Pavilion with a portion to have windows or glass block to allow light to come through. Install automatic openers on the remaining four overhead doors in the arena. ESTIMATED PROJECT SCHEDULE: 2015 Justification Currently the overhead doors are seldom utilized and the removal and installation of glass blocks or windows will decrease the need to use arena lighting and add to arena aesthetics. Saving on repairs and maintenance of the removed doors. Pavilion user groups have asked for this project. ExpendituresTotal 20132014201520162017 Construction/Maintenance 40,00040,000 40,00040,000 Total Funding Sources20132014201520162017Total 40,00040,000 PA - Pavilion Fund 40,00040,000 Total Budget Impact/Other Potential savings on utilities and greater satisfaction from user groups with arena aesthetics. Tuesday, August 07, 2012 65 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPavilion Cit of Hokins MN yp, Contact Public Works Director Type Improvement 09-CIP-P025 Project # Useful Life 20 years Pavilion Gas Fired Rooftop Furnace Project Name Category Bldgs: Pavillion FuturePriorityn/a Total Project Cost:$9,000 Description Remove and replace existing gas fired rooftop furnace used for heating the team rooms. ESTIMATED PROJECT SCHEDULE: Spring/Summer 2015 Justification Current unit was installed during construction of the facility in 1990. Planned replacement for end of estimated useful life. ExpendituresTotal 20132014201520162017 Construction/Maintenance 9,0009,000 9,0009,000 Total Funding Sources20132014201520162017Total 9,0009,000 PA - Pavilion Fund 9,0009,000 Total Budget Impact/Other Savings on utilities due to increase in efficiency of new units. Tuesday, August 07, 2012 66 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPavilion Cit of Hokins MN yp, Contact Public Works Director Type Improvement 09-CIP-P026 Project # Useful Life 25 years Pavilion Roof Replacement Project Name Category Bldgs: Pavillion FuturePriority1 Urgent Total Project Cost:$120,000 Description Removal and replacement of existing ballast and membrane for both the north and south roof sections. Justification Repairs made in 2005 extended the life of the roof but it is now 25 years old and has surpassed manufacturers recommendation for replacements. The current roof has leaks and given the current condition of the membrane more failures are expected. ExpendituresTotal 20132014201520162017 Construction/Maintenance 120,000120,000 120,000120,000 Total Funding Sources20132014201520162017Total 120,000120,000 PA - Pavilion Fund 120,000120,000 Total Budget Impact/Other Roof leaks can potentially be harmful to the steel roof deck and may cause damage to equipment and interior of Pavilion, impacting operations and adding cost to roof replacement. Tuesday, August 07, 2012 67 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPavilion Cit of Hokins MN yp, Contact Public Works Director Type Improvement 09-CIP-P036 Project # Useful Life 15-25 years Pavilion Evaporator Condenser Replacement Project Name Category Bldgs: Pavillion FuturePriorityn/a Total Project Cost:$60,000 Description Remove and replace existing condenser with a new condenser, sump tank, pump and fan motors. ESTIMATED PROJECT SCHEDULE: 2015 Justification Existing condenser has extensive scaling and has experienced a loss in efficiency causing higher head pressures and putting greater strain on compressors. ExpendituresTotal 20132014201520162017 Construction/Maintenance 60,00060,000 60,00060,000 Total Funding Sources20132014201520162017Total 60,00060,000 PA - Pavilion Fund 60,00060,000 Total Budget Impact/Other Given the age, scaling, and corrosion of the existing condenser a freon leak could potentially develop causing greater expense and need for repair. Tuesday, August 07, 2012 68 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPavilion Cit of Hokins MN yp, Contact Facilities Director Type Improvement 10-CIP-P319 Project # Useful Life 15 years Pavilion Indoor Turf Replacement Project Name Category Bldgs: Pavillion FuturePriorityn/a Total Project Cost:$95,000 Description Purchase new turf for the Pavilion's arena Justification The current turf was purchased in 1998 and has a useful life of 15 years (2013), the turf is showing signs of wear and has been patched in a few areas. Replacement will be needed by 2016. ExpendituresTotal 20132014201520162017 Construction/Maintenance 95,00095,000 95,00095,000 Total Funding Sources20132014201520162017Total 95,00095,000 PA - Pavilion Fund 95,00095,000 Total Budget Impact/Other Possible resale of the existing turf may offset some of the cost of a new turf system. Tuesday, August 07, 2012 69 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPavilion Cit of Hokins MN yp, Contact Facilities Director Type Improvement 10-CIP-P320 Project # Useful Life 10 years Pavilion - Desiccant Repl of Dehumidification Syst Project Name Category Bldgs: Pavillion FuturePriorityn/a Total Project Cost:$6,000 Description Purchase and replace the desiccant medium used in the Pavilion's dehumidification system. Justification The current desiccant has never been replaced and has surpassed its useful life. New desiccant will make the system run more efficient and effectively saving on natural gas and electricity. Also provide dryer air which can have a positive effect on ice quality and indirectly cause more efficient operation of the refrigeration equipment. ExpendituresTotal 20132014201520162017 Construction/Maintenance 6,0006,000 6,0006,000 Total Funding Sources20132014201520162017Total 6,0006,000 PA - Pavilion Fund 6,0006,000 Total Budget Impact/Other Tuesday, August 07, 2012 70 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPolice Cit of Hokins MN yp, Contact Police Chief Type Improvement 08-CIP-PD016 Project # Useful Life 7 years Replace Carpet - Police Station Project Name Category Buildings: Police Department FuturePriorityn/a Total Project Cost:$40,000 Description Replace Police Station Carpeting Justification Planned replacement at end of estimated 10 year useful life. This is a 24hour/day work center that required the shorter carpet replacement cycle. ExpendituresTotal 20132014201520162017 Construction/Maintenance 40,00040,000 40,00040,000 Total Funding Sources20132014201520162017Total 40,00040,000 CI - Capital Improvement Fund 40,00040,000 Total Budget Impact/Other May have to look at other flooring option for dispatch. (ie combination of carpet and tile due to wear under desk areas. Previously in at a 7 year life - moved back to 10 year life Tuesday, August 07, 2012 71 Parks and Recreation 72 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact PW Director Type Improvement 08-CIP-P010 Project # Useful Life Play Equipment - Park Valley Project Name Category Parks/Fores/Pav.: Comm. Facil. FuturePriorityn/a Total Project Cost:$45,000 Description Replace park play equipment 2014 ----------- 45,000.00 Justification Upgrade of park play equipment after 20 - 25 years of use. ExpendituresTotal 20132014201520162017 Construction/Maintenance 45,00045,000 45,00045,000 Total Funding Sources20132014201520162017Total 45,00045,000 PDF- Park Dedication Fund 45,00045,000 Total Budget Impact/Other Tuesday, August 07, 2012 73 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-P014 Project # Useful Life Play Equipment - Hilltop Park Project Name Category Parks/Fores/Pav.: Comm. Facil. FuturePriorityn/a Total Project Cost:$45,000 Description Replace park play equipment. Justification Upgrade of park play equipment after 20-25 years ExpendituresTotal 20132014201520162017 Construction/Maintenance 45,00045,000 45,00045,000 Total Funding Sources20132014201520162017Total 45,00045,000 PDF- Park Dedication Fund 45,00045,000 Total Budget Impact/Other Tuesday, August 07, 2012 74 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-P016 Project # Useful Life Play Equipment - Oakes Park Project Name Category Parks/Fores/Pav.: Comm. Facil. FuturePriorityn/a Total Project Cost:$60,000 Description Replace park play equipment. Justification Upgrade of park play equipment after 20-25 years of use. ExpendituresTotal 20132014201520162017 Construction/Maintenance 60,00060,000 60,00060,000 Total Funding Sources20132014201520162017Total 60,00060,000 PDF- Park Dedication Fund 60,00060,000 Total Budget Impact/Other Tuesday, August 07, 2012 75 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Unassigned 12-CIP-P037 Project # Useful Life Repair Tennis Courts and Burnes Park Play Court Project Name Category PW - Parks FuturePriorityn/a Total Project Cost:$45,000 Description Surface repairs, crack repairs to tennis courts at Central Park, Burnes Park and Oakes Park. Asphalt overlay and new color coating system for Burnes Park play court. Justification Repairs needed to protect investment in courts asphalt pavement, prolongs life and improve play conditions. ExpendituresTotal 20132014201520162017 Construction/Maintenance 45,00045,000 45,00045,000 Total Funding Sources20132014201520162017Total 45,00045,000 PDF- Park Dedication Fund 45,00045,000 Total Budget Impact/Other Tuesday, August 07, 2012 76 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentRecreation Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-R001 Project # Useful Life 15 years Skate Park Project Name Category PW - Parks FuturePriorityn/a Total Project Cost:$49,000 Description Annual equipment enhancments to Overpass Skate Park Justification Per our agreement with 3rd Lair, who manages the Skate Park, we need to put $7,000 of enhancements into the Skate Park for the years 2006-2008. The agreement for 2009-2011 requires annual enhancements of $7,000. The agreement for 2012-2014 is currently being renewed for $7,000 each year. Per the Overpass Skate Park Operators Agreement, the city annually puts an amount specified in the agreement of enhancements into the park to change/improve the park each year to keep the park attractive and challenging to users. PriorExpendituresTotal 20132014201520162017 Construction/Maintenance 7,0007,00014,000 35,000 7,0007,00014,000 TotalTotal PriorFunding Sources20132014201520162017Total 7,0007,00014,000 35,000 PDF- Park Dedication Fund 7,0007,00014,000 TotalTotal Budget Impact/Other Formerly budgeted in Skate Park Enterprise Fund, which was eliminated 12/31/2005. It is now budgeted in the Park Dedication Fund. Tuesday, August 07, 2012 77 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentRecreation Cit of Hokins MN yp, Contact PW Director Type Improvement 10-CIP-R002 Project # Useful Life 25 years Depot Recreation Area Project Name Category PW - Parks FuturePriority2 Very Important Total Project Cost:$500,000 Description This project includes the addition of an outdoor multipurpose rink/court and support building on property west of the Depot facility. These amenities are proposed to be utilized as part of Depot youth engagement activities and as part of the community rec leagues and playground programs. The multipurpose rink/court will include an asphalt surface and hockey dasher boards for skating and broomball use in the winter; and equipment to accommodate basketball, inline skating, volleyball and soccer uses in the spring, summer and fall months. The support facility will include equipment for a bike maintenance and repair site sponsored by the Depot, as well as restrooms, storage areas and a general multipurposearea to be used as a warming house in the winter. Hennepin County Grant of $150,000 will be applied for. Justification The Depot site has needed outdoor amenities for its target audience since its founding. A year-round sports "anchor" at the Depot site to complement arts and music and entreprenurial business experience for youth will provide additional reniforcemement of positive behaviors. As more people come to the Depot for youth activities as well as general use during daytime hours, such a facility could be used all day and into the evening hours. Proximity to the rail corridor will accord high visibility and symbolize active living and community connections in a walkable, bike-able community. Rec league broomball or hockey could share ice with free skating times. Local business employees could take advantage of the facilty over lunch times. Easy trail access makes the Depot and easy ride for kids who would come there to play. The Depot has been working toward more bike -oriented prgrams open to the whole community (e.g. Bike Scream Sundays) and has some connections already with local bike retailer/advocates at Freewheel by hosting a bike equipment vending machine on site. Dedicated space would give new possibilities to this aspect of the "Depot on the Move" Initiative. Expenditures20132014201520162017Total 500,000500,000 Construction 500,000500,000 Total Funding Sources20132014201520162017Total 500,000500,000 GU - Other Governmental Unit 500,000500,000 Total Budget Impact/Other Tuesday, August 07, 2012 78 Streets, Traffic & Transportation 79 80 CAPITAL IMPROVEMENT PLAN 20132017 thru Department Public Works: Streets/Traffic Cit of Hokins MN yp, ContactPublic Works Director TypeImprovement 01-CIP-S101 Project # Useful Life Unassigned Residential Street Improvements Project Name Category Trans: Streets FuturePriority n/a Total Project Cost: $17,290,000 Description Program to improve streets needing repair or reconstruction as indicated by street condition survey, or as part of an area street improvement. 2013: Presidential Avenues South and 1st Street and 2nd Street South, between Monroe and Harrison, West Park Road 2016 - 2017: Park Valley and Peaceful Valley Reclamation Project - East and West Park Valley Road; 9th Avenue South between Westbrooke Way and 7th Street South; 6th Street South between 10th Avenue and 6th Ave South; 7th Street South between 10th Avenue and East Park Valley Road; 5th Ave South between 5th Street South and 7th Street South 2015: Texas Avenue from Lake Street to Cambridge Street; Oxford Street from Blake Road to Texas Ace; Cambridge Street from Blake Road to Texas Ave; Murphy Street from Lake Street to Oxford Street; Lake Street from Blake Road to Texas Ave. Justification Ongoing street improvements determined through Pavement Management Program. PriorExpenditures20132014201520162017Total 3,800,0002,300,0002,500,0002,500,00011,100,000 6,190,000 Construction/Maintenance 3,800,0002,300,0002,500,0002,500,00011,100,000 TotalTotal PriorFunding SourcesTotal 20132014201520162017 PI - PIR/General Obligation Bo 2,300,0001,350,0001,500,0001,500,0006,650,000 6,190,000 SA - Special Assessment 1,500,000950,0001,000,0001,000,0004,450,000 Total 3,800,0002,300,0002,500,0002,500,00011,100,000 Total Budget Impact/Other Consistent with the City Council adopted Roadway Improvement Policy, street ratings, and Pavement Management Program. Tuesday, August 07, 2012 81 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S102 Project # Useful Life Unassigned Residential Street Improvements--Utilities Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$7,260,000 Description Locations to be determined as they are consistent with the street reconstruction program. Program to reconstruct deteriorated water main and sanitary sewer and to provide storm sewer improvements in conjunction with street improvement projects. Public hearing: Year prior to planned construction Plans and specifications: Year prior to planned construction Bid: Year of planned construction Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections. Justification In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installed new. In some cases, water main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The numbers assume the city funding 100% of major storm sewer, water main, and sanitary sewer re/construction. These costs are to be used in conjunction with street reconstruction costs shown on 01-CIP-S101. PriorExpenditures20132014201520162017Total Construction/Maintenance 2,300,0001,650,000430,000430,0004,810,000 2,450,000 2,300,0001,650,000430,000430,0004,810,000 TotalTotal PriorFunding Sources20132014201520162017Total 700,000500,000120,000120,0001,440,000 2,450,000 SF - Sanitary Sewer Fund 500,000350,000110,000110,0001,070,000 SU - Storm Sewer Fund Total 1,100,000800,000200,000200,0002,300,000 WF - Water Fund 2,300,0001,650,000430,000430,0004,810,000 Total Budget Impact/Other Public Hearing - year prior to planned construction Plans and specifications - year prior to planned construction Bid - year of planned construction Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections. Tuesday, August 07, 2012 82 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S103 Project # Useful Life Unassigned Citywide Concrete Alleys Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$1,368,000 Description 2017: Alley south of 6th Street South and North of Nine Mile Creek, between 11th Avenue South and 10th Avenue South. 2012: Alley south of 3rd Street North and North of 2nd Street North, between 6th Avenue North and 5th Avenue North. Alley South of Mainstreet between 8th and 9th Ave South Program to construct concrete alleys in areas designated as poor on the Alley Condition Survey. Public Hearing - year prior to project. Plans, specifications, bid, construction - year of project. Consistant with the Ctiy Council adopted Roadway Improvement Policy and Alley ratings. Justification The city has had a policy of constructing concrete alleys for a number of years. This policy has proved to be sound by the concrete alleys' durability and low maintenance costs. Current policy has the city share at 20% of the cost in residential areas. The city will experience cost savings due to lower maintenance costs. PriorExpenditures20132014201520162017Total 75,00080,000155,000 1,213,000 Construction/Maintenance 75,00080,000155,000 TotalTotal PriorFunding SourcesTotal 20132014201520162017 PI - PIR/General Obligation Bo 15,00016,00031,000 1,213,000 SA - Special Assessment 60,00064,000124,000 Total 75,00080,000155,000 Total Budget Impact/Other Consistent with the City Council adopted Roadway Improvement Policy and Alley ratings. Tuesday, August 07, 2012 83 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S104 Project # Useful Life Unassigned County Road 3 Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$2,300,000 Description County Road 3 from Shady Oak Road to Meadowbrook Road. Lighting, landscaping, street, etc. improvements along Excelsior Boulevard from the east to west city limits. GO Bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue Segment 1: Construction - 1998/1999 Segment 2: Planning - 2004; bidding and construction (median upgrades only) - 2005 Segment 3: Planning and acquisition - 1999/2001, bidding/construction - 2002/2003/2004 Segment 4: Planning and acquisition - 2012/2013, bidding/construction - 2014/2015 TIF funded work includes the following: A signalized intersection will be constructed at Monroe Avenue. A second intersection will also be built at Jackson Ave/St. Louis Street. There will also be a reconfiguration of Monroe Avenue and Milwaukee south of Excelsior Boulevard. This work is being completed in conjunction with the reconstruction of Excelsior Boulevard from Highway 169 to Blake Road. The intersection is being constructed to facilitate redevelopment of the SuperValu north annex site. Justification Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in all four segments of County Road 3: - Segment 1 from Shady Oak Road to 11th Avenue S.; upgrade existing undivided roadway, upgrade 11th Avenue intersection to meet future needs, implement beautification program--completed in 1998 - Segment 2 from 11th Avenue S. to Hwy 169; median pavers construction - Segment 3 from Highway 169 to Blake Road; upgrade existing narrow undivided roadway, resolve safety issues at railroad crossing, improve north-south access, account for future LRT access, address redevelopment needs, add integration for full access at Jackson Avenue. - Segment 4 from Blake Road to Meadowbrook Road; upgrade roadway, implement beautification program. PriorExpenditures20132014201520162017Total 2,300,0002,300,000 0 Construction/Maintenance 2,300,0002,300,000 TotalTotal PriorFunding Sources20132014201520162017Total GU - Other Governmental Unit 1,600,0001,600,000 0 MS - Municipal State Aid Stree 700,000700,000 Total 2,300,0002,300,000 Total Budget Impact/Other GO bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue. Segment 1: Construction - 1998/1999 Segment 2: Planning - 2005; bidding and construction (median upgrades only) - 2006 Segment 3: Planning and acquisition - 1999/2000; bidding/construction - 2003/2004 Segment 4: Planning and acquisition - 2012/2013; bidding and construction - 2014/2015 Consistent with Hennepin County CIP and City Council action. Tuesday, August 07, 2012 84 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S106 Project # Useful Life Unassigned County Road 61 (Shady Oak Road) Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$20,450,000 Description Shady Oak Road from County Road 3 to T.H. 7, Mainstreet from 20th Avenue to Shady Oak Road. Lighting, landscaping, street, etc., improvements from County Road 3 to T.H. 7 Reconstruction and amenities on Mainstreet from 20th Avenue to Shady Oak Road. Reconstruction of West Park Road, 2nd Street N., and 21st Avenue N. (2nd Street-4th Street N.) See also 01-CIP U003 for the Storm Sewer Management associated with this project. Justification Deficiencies appear on Shady Oak Road in terms of roadway conditions, traffic/pedestrian movement, safety, and aesthetics. Upgrade an undivided roadway, resolve safety issues with number of driveway access points and intersection at Mainstreet. Lighting needs upgrading and provide beautification program. ExpendituresTotal 20132014201520162017 Construction/Maintenance 8,200,00012,250,00020,450,000 8,200,00012,250,00020,450,000 Total Funding Sources20132014201520162017Total 6,150,00011,045,00017,195,000 GU - Other Governmental Unit 2,050,000755,0002,805,000 MS - Municipal State Aid Stree 200,000200,000 PI - PIR/General Obligation Bo 250,000250,000 SA - Special Assessment 8,200,00012,250,00020,450,000 Total Budget Impact/Other 2012-2014: Planning and acquisition 2014/2015: Bidding and construction Consistent with Hennepin County CIP, city's desire to upgrade the roadway, and reconstruction program for all of Mainstreet. This project totals $20,450,000. Hopkins share of the county project is $2,805,000 of which we have $1.3 million budgeted. The remaining $1.5 + million is right-of-way acquisitions for which we currently have no funding. The project is not feasible under the current funding program. GU funding includes $7.28 million Federal Grant. Tuesday, August 07, 2012 85 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S504 Project # Useful Life Unassigned Sixth Street South (11th to 12th Avenue South) Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$500,000 Description Sixth Street South from 11th Avenue South to 12th Avenue South. Extension of roadway and box culvert crossing at Nine Mile Creek. Justification This project will offer a second access to the industrial area (fire access). Will direct some of the existing industrial traffic north, away from the residential intersection at Seventh Street and 11th Avenue. Will connect a current dead-end alley, west of 11th Avenue. ExpendituresTotal 20132014201520162017 Construction/Maintenance 500,000500,000 500,000500,000 Total Funding Sources20132014201520162017Total 400,000400,000 MS - Municipal State Aid Stree 100,000100,000 PI - PIR/General Obligation Bo 500,000500,000 Total Budget Impact/Other Currently on MSA plans. Tuesday, August 07, 2012 86 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 06-CIP-S118 Project # Useful Life Parking Lots - Lot 200 Project Name Category Trans: Parking Facilities FuturePriorityn/a Total Project Cost:$250,000 Description 2010: Municipal Parking Lot 200, south of Mainstreet between 8th and 9th Avenues. Rehabilitate parking lot pavement Justification Pavement has deteriorated to the point where cracksealing and sealcoating are not effective. ExpendituresTotal 20132014201520162017 Construction/Maintenance 250,000250,000 250,000250,000 Total Funding Sources20132014201520162017Total 200,000200,000 PI - PIR/General Obligation Bo 50,00050,000 SU - Storm Sewer Fund 250,000250,000 Total Budget Impact/Other Tuesday, August 07, 2012 87 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact PW Director Type Improvement 10-CIP- S120 Project # Useful Life 25 years Highway 7 and 5th Ave North - Signal Replacement Project Name Category Trans: Streets FuturePriority3 Important Total Project Cost:$445,000 Description Traffic signal replacement at the intersection of Highway 7 and 5th Ave North. Justification MN DOT has mandated the replacement of this signal. ExpendituresTotal 20132014201520162017 Construction 445,000445,000 445,000445,000 Total Funding Sources20132014201520162017Total 300,000300,000 GU - Other Governmental Unit 145,000145,000 PI - PIR/General Obligation Bo 445,000445,000 Total Budget Impact/Other Tuesday, August 07, 2012 88 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Facilities Director Type Improvement 11-CIP-S120 Project # Useful Life 30 years Plan, Design and Implement Railroad Quiet Zone Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$255,000 Description Modify existing railroad grade crossings to satisfy Federal Railroad Administration (FRA) requirements to create a Whistle-Free Quiet Zone for the CP Railroad corridor. Phase I: Plan and coordinate requirements with FRA and SWLRT project office. Design necessary supplemental safety measures (SSM). Phase II: Construct SSM's and implement Quiet Zone. Justification Train horns sound in early morning hours and are disruptive to nearby residential areas. PriorExpendituresTotal 20132014201520162017 Construction/Maintenance 225,000225,000 30,000 225,000225,000 TotalTotal PriorFunding Sources20132014201520162017Total 225,000225,000 30,000 PI - PIR/General Obligation Bo 225,000225,000 TotalTotal Budget Impact/Other Tuesday, August 07, 2012 89 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Facilities Director Type Improvement 11-CIP-S121 Project # Useful Life 30 years Mainstreet Traffic Signal Upgrades Project Name Category Trans: Streets FuturePriority3 Important Total Project Cost:$500,000 Description These projects upgrade the Mainstreet traffic signals with LED lighting, countdown timers, controllers, and audible signals for the visually impaired. The equipment currently in place was installed ___ years ago and is in need of replacement. 2017: 11th Ave and Mainstreet 2013: 5th and 8th Ave and Mainstreet 2014: 9th and 10th Ave and Mainstreet 2015: 17th Avenue and Mainstreet and 5th Ave and Minnetonka Mills 2016: 12th and 7th Ave and Mainstreet 2017: 14th and Mainstreet, 11th Ave S and 5th Ave S Justification PriorExpenditures20132014201520162017Total Construction/Maintenance 50,00050,00050,00050,00050,000250,000 250,000 50,00050,00050,00050,00050,000250,000 TotalTotal PriorFunding Sources20132014201520162017Total 50,00050,00050,00050,00050,000250,000 250,000 PI - PIR/General Obligation Bo 50,00050,00050,00050,00050,000250,000 TotalTotal Budget Impact/Other Tuesday, August 07, 2012 90 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Facilities Director Type Improvement 11-CIP-S122 Project # Useful Life 50 years Blake Road Streetscape Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$200,000 Description This project continues the upgrade of Blake Road with lighting and streetscape enhancements. Much of the funding for this work comes from Hennepin County Grants. Justification ExpendituresTotal 20132014201520162017 Construction/Maintenance 200,000200,000 200,000200,000 Total Funding Sources20132014201520162017Total 100,000100,000 GU - Other Governmental Unit 100,000100,000 PI - PIR/General Obligation Bo 200,000200,000 Total Budget Impact/Other Tuesday, August 07, 2012 91 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact PW Director Type Improvement 12-CIP-039 Project # Useful Life 2014 Street Overlay Project Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$200,000 Description 2014 - 3,000 LF of Mill and Overlay in the Oakridge South neighborhood Justification Maintain streets that are in need of work but do not need to be reconstructed. ExpendituresTotal 20132014201520162017 Construction 200,000200,000 200,000200,000 Total Funding Sources20132014201520162017Total 200,000200,000 PI - PIR/General Obligation Bo 200,000200,000 Total Budget Impact/Other New item added in 2012 for 2014 Tuesday, August 07, 2012 92 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 12-CIP-S038 Project # Useful Life Replace Asphalt Walk - Excelsior Blvd. Project Name Category Trans: Walkways/Sidewalks FuturePriorityn/a Total Project Cost:$60,000 Description Recontruct the existing asphalt walk agbong the north side os Excelsior Blvd East of Blake Rd to Powell Rd. Justification The existing walk is deteriorated beyond overlay and sections of the walk have excessive cross slope. ExpendituresTotal 20132014201520162017 Construction/Maintenance 60,00060,000 60,00060,000 Total Funding Sources20132014201520162017Total 15,00015,000 GU - Other Governmental Unit 45,00045,000 PI - PIR/General Obligation Bo 60,00060,000 Total Budget Impact/Other Tuesday, August 07, 2012 93 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Transportation Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S502 Project # Useful Life Unassigned Light Rail Transit Stations (2) Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$150,000 Description 1) Intersection of Third Street South and Fifth Avenue South 2) Second Street Northeast Supplemental improvements to two Light Rail Transit (LRT) stations in the proposed HCRRA locations. Justification The HCRRA proposes to construct two stations along the Southwest Corridor. The proposed expenditures would be in addition to the funds expended by the HCRRA. The additional funds would be used to ensure the stations are high quality in appearance. ExpendituresTotal 20132014201520162017 Construction/Maintenance 150,000150,000 150,000150,000 Total Funding Sources20132014201520162017Total 150,000150,000 TF - Tax Increment Financing 150,000150,000 Total Budget Impact/Other Dependent on HCRRA plans. Consistent with plans for LRT stops in Hopkins by Hennepin County. Tuesday, August 07, 2012 94 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Transportation Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S503 Project # Useful Life Unassigned Eighth Avenue LRT Corridor Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$200,000 Description Eighth Avenue from County Road 3 to Mainstreet Design and installtion of pedestrian improvements and streetscape improvements Justification ExpendituresTotal 20132014201520162017 Construction/Maintenance 200,000200,000 200,000200,000 Total Funding Sources20132014201520162017Total 100,000100,000 GU - Other Governmental Unit 100,000100,000 TF - Tax Increment Financing 200,000200,000 Total Budget Impact/Other Dependent on Metropolitan Council SWLRT plans Tuesday, August 07, 2012 95 Utilities 96 CAPITAL IMPROVEMENT PLAN 20132017 thru Department Public Works: Utilities Cit of Hokins MN yp, ContactPublic Works Director TypeImprovement 01-CIP-U002 Project # Useful Life Unassigned Storm Drainage System Maintenance - Alley Repairs Project Name Category Utilities: Municipal Sanitary S FuturePriority n/a Total Project Cost: $168,000 Description 2009-2013: Concrete alley repairs Justification Annual alley pavement concrete slab repairs are needed. PriorExpendituresTotal 20132014201520162017 Construction/Maintenance 19,00020,00020,00021,00021,000101,000 67,000 19,00020,00020,00021,00021,000101,000 TotalTotal PriorFunding Sources20132014201520162017Total 19,00020,00020,00021,00021,000101,000 67,000 SU - Storm Sewer Fund 19,00020,00020,00021,00021,000101,000 TotalTotal Budget Impact/Other Consistent with the Storm Water Management Plan. Tuesday, August 07, 2012 97 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-U003 Project # Useful Life Unassigned Storm Water Management Projects Project Name Category Utilities: Storm Sewer FuturePriorityn/a Total Project Cost:$200,000 Description 2014: Provide outlet pipe to Shady Oak Pond into CSAH 61 storm drainage piping in conjunction with Shady Oak Road reconstruction Justification Shady Oak Pond has no outlet and floods streets and residential property if not pumped. Consistent with City Council approved action plan of October 21, 1997, the City's Storm Management Plan, and Shady Oak Road reconstruction timetable. ExpendituresTotal 20132014201520162017 Construction/Maintenance 200,000200,000 200,000200,000 Total Funding Sources20132014201520162017Total 200,000200,000 SU - Storm Sewer Fund 200,000200,000 Total Budget Impact/Other Consistent with City Council approved Action Plan of October 21, 1997, the City's Storm Management Plan, and Shady Oak Road reconstruction timetable. Tuesday, August 07, 2012 98 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Public Works Director Type Improvement 08-CIP-U000 Project # Useful Life Meter Replacement Project Name Category Utilities: Municipal Sanitary S FuturePriorityn/a Total Project Cost:$475,000 Description Meter Replacement Justification Items identified in 2007 comprehensive utility plan to provide safe and reliable water. PriorExpendituresTotal 20132014201520162017 Construction/Maintenance 95,00095,000 380,000 95,00095,000 TotalTotal PriorFunding Sources20132014201520162017Total 95,00095,000 380,000 WF - Water Fund 95,00095,000 TotalTotal Budget Impact/Other Tuesday, August 07, 2012 99 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Public Works Director Type Improvement 08-CIP-U001 Project # Useful Life Lift Station # 4 Project Name Category Utilities: Municipal Sanitary S FuturePriorityn/a Total Project Cost:$160,000 Description Rehabilitate LS No. 4 Justification Lift station No. 4 was identified for rehab in the 2007 comprehensive utility plan Regular major maintenance identified in the 2007 comprehensive utility plan. ExpendituresTotal 20132014201520162017 Construction/Maintenance 160,000160,000 160,000160,000 Total Funding Sources20132014201520162017Total 160,000160,000 SF - Sanitary Sewer Fund 160,000160,000 Total Budget Impact/Other Tuesday, August 07, 2012 100 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-U008 Project # Useful Life Emergency Chlorine Shut Off Valves Project Name Category Utilities: Municipal Sanitary S FuturePriorityn/a Total Project Cost:$33,000 Description Emergency Chlorine Shut Off Valves Justification Items identified in 2007 comprehensive utility plan to provide safe and reliable water. ExpendituresTotal 20132014201520162017 Construction/Maintenance 33,00033,000 33,00033,000 Total Funding Sources20132014201520162017Total 33,00033,000 WF - Water Fund 33,00033,000 Total Budget Impact/Other Tuesday, August 07, 2012 101 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-U009 Project # Useful Life Sanitary Sewer Lift Station Maintenance Project Name Category Utilities: Municipal Sanitary S FuturePriorityn/a Total Project Cost:$15,000 Description Regular LS Major Maintenance Justification Regular major maintenance identified in the 2007 comprehensive utility plan. ExpendituresTotal 20132014201520162017 Construction/Maintenance 15,00015,000 15,00015,000 Total Funding Sources20132014201520162017Total 15,00015,000 SF - Sanitary Sewer Fund 15,00015,000 Total Budget Impact/Other Tuesday, August 07, 2012 102 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-U010 Project # Useful Life St. Louis Park Emergency Connection Project Name Category Utilities: Municipal Sanitary S FuturePriorityn/a Total Project Cost:$211,000 Description St. Louis Park emergency connection. Justification Items identified in 2007 comprehensive utility plan to provide safe and reliable water. ExpendituresTotal 20132014201520162017 Construction/Maintenance 211,000211,000 211,000211,000 Total Funding Sources20132014201520162017Total 211,000211,000 WF - Water Fund 211,000211,000 Total Budget Impact/Other Tuesday, August 07, 2012 103 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Type Improvement 11-CIP-S123 Project # Useful Life Storm Water Improvements - Cottageville Park Project Name Category Utilities: Storm Sewer FuturePriorityn/a Total Project Cost:$250,000 Description These improvements provide water quality improvements fore Minnehaha Creek as outlined in the cooperative agreement with the Minnehaha Creek Watershed District for the renovation of the Blake Road/Lake Street/Cottaageville Park area. Justification ExpendituresTotal 20132014201520162017 Construction/Maintenance 250,000250,000 250,000250,000 Total Funding Sources20132014201520162017Total 250,000250,000 SU - Storm Sewer Fund 250,000250,000 Total Budget Impact/Other Tuesday, August 07, 2012 104 CAPITAL IMPROVEMENT PLAN 20132017 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Facilities Director Type Improvement 11-CIP-U011 Project # Useful Life 50 years Emergency Water Connection with Edina Project Name Category Utilities: Municipal Water Syst FuturePriority2 Very Important Total Project Cost:$20,000 Description This project connects the Hopkins and Edina water systems to provide mutual aid in the case of an emergency. The project include the construction of an 8" waterline and valve across 2nd Street South in the South Presidential Neighborhood. Justification ExpendituresTotal 20132014201520162017 Construction/Maintenance 20,00020,000 20,00020,000 Total Funding Sources20132014201520162017Total 20,00020,000 WF - Water Fund 20,00020,000 Total Budget Impact/Other Tuesday, August 07, 2012 104