2014 - 2018 CIP CAPITAL IMPROVEMENT PLAN 2014-2018 DATE: August 2013 TO: Honorable Mayor and Members of the City Council FROM: Mike Mornson, City Manager 2014-2018 CAPITAL IMPROVEMENT PLAN SUBJECT: With this letter I respectfully submit the 2014-2018 Capital Improvement Plan. This five- year planning document represents the combined efforts of city staff, advisory commissions, citizens and the City Council. The Capital Improvement Plan is a five-year forecast of project needs in the City of Hopkins. It is intended to alert the Council and citizens to the major capital needs on the horizon. The first year of the plan becomes an adopted capital budget and relates almost completely to the operating budget that is approved on a yearly basis. The remaining four year represents an estimate of project needs and funding capabilities of the city. This year’s plan does not include proposed equipment purchases. A document relating specifically to equipment replacement needs has been developed into a separate document. The Capital Improvement Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city’s capital programming needs. At the same time, sufficient projected detail is provided to enable those who review the information to make informed decisions on the programming of projects over the next several years. Please use the information provided to formulate plans, projects and questions. The Capital Improvement Plan can serve the community best by provoking thoughts and actions. This document was developed by the Finance Department with assistance of all city departments. I want to especially thank all those involved in the development of the Capital Improvement Plan and especially Steve Stadler, Public Works Director, Kersten Elverum, Planning and Economic Development Director, Christine Harkess, Finance Director, and Debbie Sperling, Administrative Assistant for their hard work and dedication. 1 CAPITAL IMPROVEMENT PLAN 2014-2018 TABLE OF CONTENTS Page City Manager's Message 1 Table of Contents 2 Introduction Introduction and Purpose5 Program Descriptions Utilities Program6 Transportation Program7 Parks, Forestry, and Pavilion Program9 General Public Buildings Program10 Economic Development12 Sources of Funding Sources of Funding15 Funding Source Abreviations18 Programs and Categories19 Summary of Impacts on Major Funding Sources 23 Cash Flow Statements Park Capital Improvement Fund29 Capital Improvemetn Fund30 Municipal State Aid Fund31 Permanent Improvement Revolving Fund (PIR)32 Street Improvement Franchise Fees33 Water Utility Fund34 Sewer Utility Fund35 Storm Sewer Utiltiy Fund36 Pavilion - Ice Arean Fund37 Five-Year Project Summaries Projects by Year41 Department Summary44 Projects by Department45 Funding Source Summary48 Projects by Funding Source49 Project Descriptions & Narratives Economic Development55 General Public Buildings61 Parks & Recreation93 Streets113 Street Improvement Map115 Utilities130 2 Introduction 3 4 INTRODUCTION AND PURPOSE The Capital Improvement Plan is a flexible plan based upon long-range physical planning and financial projections, which schedules the major public improvements that may be incurred by the City over the next five years. Flexibility of the Capital Improvement Plan is established through annual review, and revision if necessary. The annual review assures that the program will become a continuing part of the budgetary process and that it will be consistent with changing demands as well as changing patterns in cost and financial resources. Funds are appropriated only for the first year of the program, which is then included in the annual budget. The Capital Improvement Plan serves as a tool for implementing certain aspects of the City's comprehensive plan; therefore, the program describes the overall objectives of City development, the relationship between projects with respect to timing and need, and the City's fiscal capabilities. The Capital Improvement Plan can help assure: 1. A systematic approach to planning and initiating capital projects affording the opportunity to plan the location, timing, and financing of needed public improvements; 2. The development of a realistic program of capital spending within the City's projected fiscal capability to finance such projects, avoiding sharp change in the tax levy or bonded indebtedness; 3. The coordination of public and private improvement projects permitting adequate time for design and engineering to eliminate duplication of effort and expense; 4. The expenditure of public funds that is compatible with the City's adopted Comprehensive Plan; 5. That the public is kept informed of the proposed future projects and expenditures; 6. That private investors are aware of the City's long-range development program so that they may guide their development in a way that is compatible with the City's program; 7. Aid in achieving federal and/or state participation by providing the necessary planning and lead time necessary for a successful application in addition to meeting prerequisites needed for certain federal and state grants. 5 PROGRAM DESCRIPTIONS In order to effectively plan for and manage the projects contained in a Capital Improvement Plan, it is necessary to group similar activities into "Program Categories". The City of Hopkins' activities are divided into four program categories which are 1) Utilities, 2) Transportation, 3) Parks, Forestry and Pavilion, and 4) General Public Buildings. The City also includes an outline of proposed expenditures for unscheduled projects. Program categories are explained in the following sections. UTILITIES PROGRAM Program Description: The Utilities Program includes the municipal water, municipal sanitary sewer, storm sewer and refuse systems. Program Goal: Provide reliable, efficient, and safe utility service to all parts of the City with a minimum of adverse effects on the environment. Subprograms: Water, sanitary sewer, storm sewer, and refuse service. I. Municipal Water System Subprogram (WA) A. Subprogram Goal: The goal of the Municipal Water System subprogram is to provide water in sufficient quantities at sufficient pressure, with a high degree of reliability and safety to all parts of the City so as to satisfy the normal demands of the general public for water while at the same time providing sufficient reserves in case of fire emergency or power outages. B. Objectives: 1. Water quality shall meet the purity standards of the Minnesota Department of Health. 2. Any hydrant on the system shall, under maximum condition, deliver no less than 500 gallons per minute with a residual pressure of 20 pounds per square inch. 3. The system shall be looped to provide maximum reliability. 4. The supply and storage system shall be designed and maintained to have maximum reliability. 6 II. Municipal Sanitary Sewer Subprogram (SA) A. Subprogram Goal: The goal of the Municipal Sanitary Sewer subprogram is to promote a healthful environment by collecting all sewage from existing and projected development in a sanitary and economic manner. B. Objectives: 1. Provide sewer lines of adequate size and grade to collect and transmit all discharge sewage. 2. Prevent sewage from overflowing into the natural environment. 3. Prevent sewage back-ups. 4. Encourage or promote connection of all generators of sewage to the Municipal system. 5. Meet the effluent and infiltration standards of the Metropolitan Waste Control Commission. III. Storm Sewer Subprogram (SS) A. Subprogram Goal: Manage and control surface and ground waters in order to protect the man-made and natural environment in a safe and efficient manner. B. Objectives: 1. Prevent flooding. 2. Prevent damage to property due to erosion. 3. Meet water quality standards established by the controlling regulatory law or authority. TRANSPORTATION PROGRAM Program Description: This program includes streets, walkways, traffic signs and signals, vehicular parking facilities, and street lighting. Program Goal: Provide for the safe and efficient movement of people and goods throughout the city. 7 Subprograms: Streets, Walkways/Sidewalks, Signs/Signals, Parking Facilities, and Street Lights. I. Streets Subprogram (ST) A. Subprogram Goal: The goal of the Streets subprogram is to provide safe, convenient, economic public streets to best facilitate the movement of vehicular traffic. B. Objectives: 1. Streets should be constructed with permanent surfaces, concrete curb and gutter, and with ancillary storm drainage, to standards established by the City. 2. Streets should be of a size and load capacity consistent with their functional classifications. 3. Timely major repair to preserve the basic capital investment in streets. II. Walkways/Sidewalks Subprogram (WS) A. Subprogram Goal: To provide a safe and convenient pedestrian system with incidental recreational benefits. III. Signs/Signals Subprogram (SI) A. Subprogram Goal: The goal of the Signs/Signals subprogram is to provide an efficient and orderly system of street and traffic signing so as to promote safe, convenient travel throughout the City. B. Objectives: 1. Signs and signals should be installed in conformity with the Minnesota Manual on Uniform Traffic Control Devices. 2. Periodic surveys and studies should be made to document the effectiveness of City signing patterns. IV. Parking Facilities Subprogram (PA) A. Subprogram Goal: To provide such supporting facilities as will promote maximum use of public parking spaces by employers, employees, customers, and visitors. 8 B. Objectives: 1. Provide parking facilities for present and anticipated needs of the City of Hopkins. V. Street Lights Subprogram (SL) A. Subprogram Goal: To provide a system of street lighting within the City that will promote safe and convenient vehicular and pedestrian travel on City Streets. B. Objectives: 1. To provide lighting at each street intersection within the City. 2. To provide mid-block street lighting in conformance with the City's street lighting policy, in order to provide equitable, cost efficient lighting. 3. To continually update the system so as to provide energy and cost efficient lighting. PARKS, FORESTRY AND PAVILION PROGRAM Program Description: This program includes community parks, neighborhood parks, open spaces, recreational structures and facilities. Program Goal: The goal of the Park and Recreation Program is to provide facilities for safe, stimulating, and comprehensive leisure time activities of Hopkins citizens. Subprograms: Neighborhood Facilities, Community Facilities I. Neighborhood Facilities Subprogram (NF) A. Subprogram Goals: To acquire ownership or use rights of park sites located to provide convenient walking access to all Hopkins citizens and to develop such sites to provide optimum recreational serviceability consistent with the preservation and enhancement of pleasing aesthetic qualities. B. Objectives: 1. Acquire property or use rights on those neighborhoods that do not have convenient walking access to neighborhood park facilities. 2. Develop neighborhood park facilities to meet the needs of various user groups. 9 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Preserve and enhance the aesthetic qualities of neighborhood parks. II. Community Facilities Subprogram (CF) A. Subprogram Goals: The goal of the Community Facilities subprogram is to develop, or acquire ownership or use rights of sites which serve the entire City and to provide facilities that serve community-wide needs. B. Objectives: 1. Acquire sites that have valuable and unique natural characteristics to preserve irreplaceable community resources. 2. Preserve by acquisition, gift, or other arrangement properties that have valuable historic-cultural qualities. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Construct or acquire structures and facilities necessary to meet the changing needs of the community. GENERAL PUBLIC BUILDINGS PROGRAM Program Description: The General Public Buildings Program includes all municipal buildings except those provided for in the Utility and Park Facilities Program. Program Goal: Provide buildings that are adequate and convenient for the efficient accommodation of City functions. Subprograms: Administrative Offices, Maintenance Facilities, Fire Facilities, Community Center. I. Administrative Offices Subprogram (AO) A. Subprogram Goal: The goal of the Administrative Offices subprogram is to provide facilities for the efficient and safe conduct of legislative and administrative functions of the City. 10 B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of the City services. II. Maintenance Facilities Subprogram (MF) A. Subprogram Goal: The goal of the Maintenance Facilities subprogram is to provide facilities for the efficient and safe conduct of City maintenance functions. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of City services. III. Fire Facilities Subprogram (FF) A. Subprogram Goal: To provide a fire station, or stations, for storage of Fire Department equipment and for the training and meetings of volunteer fire fighters to provide prompt and efficient protection to life and property. B. Objectives: 1. Provide a maximum four-minute daytime and three-minute nighttime response to all points within the City. 2. Meet objective 1 through the use of volunteers. IV. Community Center Subprogram (CC) A. Subprogram Goal: To provide a community facility, or facilities, which meet the social, recreational, and cultural needs of all citizens, particularly senior citizens. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repairs. 11 2. Construct or acquire structures and facilities necessary to meet the changing needs of the City. 3. Upgrade facilities as necessary to provide for efficient, safe, and effective provision of City services. ECONOMIC DEVELOPMENT PROGRAM Program Description: This program includes redevelopment projects that have been identified through adopted plans and goals of the City of Hopkins. Program Goal: To facilitate the redevelopment of key sites in order to achieve the state objectives of the project. Objectives: 1. Elimination of blight or blighting conditions 2. Creation of jobs 3. Increase property value(s) 4. Catalyst of additional redevelopment 5. Environmental clean-up Increase transit-oriented development around LRT stations 6. 12 Sources of Funding 13 14 SOURCES OF FUNDING In order to fund the anticipated Capital Improvements, the City must draw upon a variety of sources. Many of these sources have a specific or "dedicated" purpose (i.e., the water utility fund will finance water main installation but not a street overlay). Therefore, it is important to identify the uses and limitations of the various revenue sources. CURRENT REVENUES - GENERAL FUND (CR) This represents funding from current year revenue collections in the General Fund that support operations and capital outlay expenditures. Revenue sources include property tax levies, state aid payments, and various permit and license fees. This source of funding is generally used only for operations and small capital purchases. GENERAL FUND RESERVES (GR) Reserves of the general fund are the funds remaining after subtracting cash flow and emergency amounts from the City's cash balance, sometimes referred to as "fund balance". The use of General Fund Reserves is not recommended for Capital Improvements without significant staff and Council review. COMMUNICATION (formerly Cable TV) FUND (CT) This funding source consists of franchise fees received from the local Cable TV company, in excess of the amounts earmarked for the access programming and commission budgets. Expenditures are limited to cable-related facilities, or must have a cable related purpose. ECONOMIC DEVELOPMENT FUND (ED) This funding source was established by the Housing and Redevelopment Authority (HRA) and the City of Hopkins, to provide funding for the purpose of promoting development and redevelopment within the City. The Economic Development fund is a revolving fund administered by the HRA, intended to provide an ongoing funding source used to reduce or extend the long term debt involved with development and redevelopment activities. The HRA reviews all proposed uses of this fund on an individual basis. GRANT-IN-AID (GA) This is aid received from either the Federal or State government. In many cases, grants are made on matching basis, which means the City shares a portion of the costs of the project being funded. 15 MUNICIPAL STATE AID STREETS (MS) This funding source represents funds received from the State of Minnesota to support construction and maintenance of State Aid classified municipal streets. State law defines the types and limits of State Aid Streets expenditures. PERMANENT IMPROVEMENT REVOLVING/GENERAL OBLIGATION BONDS (PI) Improvements with a life of several years may be financed from the proceeds of a General Obligation Bond Issue. Law limits the total debt that can be incurred under this method of financing. With some exception, General Obligation Bonds are generally subject to a referendum process. Examples of projects, which may not require a referendum, are those financed through the use of special assessments where at least 20 percent of the project cost is assessed to the benefiting property owners. The remaining portion not assessed can be financed through general obligation bonds repaid by a tax levy. PRIVATE SECTOR FUNDING (PF) This funding source consists primarily of payments made by developers for the purchase of land, the installation of water, sewer, or streets or other related expenditures. It can also refer to donations made to the City by individuals or groups. OTHER GOVERNMENTAL UNITS (GU) These are funds received from Hennepin County, adjacent communities, etc. for projects that also benefit a jurisdiction other than the City of Hopkins. REVENUE BONDS (RB) These are bonds issued for improvements made for specific revenue producing facility or operation. The debt incurred is repaid from the revenue generated by the facility. If the revenue generated is insufficient, then the difference becomes an annual obligation of the taxpayers and becomes an additional tax levy. These are generally not subject to referendum. REAL ESTATE SALES FUND (RE) This funding source consists primarily of funds built up from the sale of City owned property. To date, the fund has been used for building improvements. Because the sale of both general City property and park/recreation property are accumulated into this fund, earmarking a portion for recreational purposes may be justified. 16 SPECIAL ASSESSMENT (SA) A number of projects may be realistically financed using Special Assessment to pay the ultimate cost. Almost any project can potentially be financed using the assessment process. In each case it is necessary to make a determination that the assessed property will benefit by the amount of the assessment. The cost of street reconstruction is shared by the property owner and the City. Special assessments to individual properties are capped per city policy. Concurrent improvement costs to the utility systems are assumed by the respective utility funds. TAX INCREMENT FINANCING (TF) This funding source results from the tax value of new development that is "incrementally" greater than the existing tax value. Typically, bonds are sold based on the assumption that the higher tax receipts will retire the bonds. However, the use of TIF funds through a "pay as you go" method has become more common. This type of funding can be used for public improvements within a redevelopment district to support the goals of redevelopment, specifically the elimination of blighted conditions. Approval of the Hopkins HRA should be anticipated prior to the commitment of these funds. State law strictly regulates the use of these funds. WATER FUNDS (WF) Water funds consist of revenue generated from the sale of water. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. SANITARY SEWER FUNDS (SF) Sanitary sewer funds consist of revenue generated from charges made for sewage disposal. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. STORM SEWER UTILITY REVENUES (SU) Storm sewer funds consist of revenue generated by charging storm water drainage fee to parcels of land for the availability and use of municipal storm sewer facilities. Expenditures from this funding source are related to drainage facilities. PAVILION FUND (PA) Pavilion Funds consist of revenues generated from rental fees collected from users of the Pavilion. These funds are utilized to pay for operating, and capital expenditures. 17 Funding Sources Communication (formerly Cable TV) Fund CT Current Revenues – General Fund CR General Fund Reserves GR Economic Development Fund ED Grant-In-Aid GA Housing and Redevelopment Authority HRA Municipal State-Aid Streets MS Other Government Units GU Park Dedication Fund PDF Pavilion Fund PA Permanent Improvement Revolving/General Obligation Bonds PI Private Sector Funds PF Real Estate Sales Fund RE Revenue Bonds RB Sanitary Sewer Fund SF Special Assessment SA Storm Sewer Fund SU Tax Increment Financing TF Water Fund WF 18 Programs and Categories Utilities Program Municipal Water System Category Municipal Sanitary Sewer Category Storm Sewer Category Transportation Program Streets Category Walkways/Sidewalks Category Signs/Signals Category Parking Facilities Category Street Lights Category Parks, Forestry and Pavilion Program Neighborhood Facilities Category Community Facilities Category General Public Buildings Program Administrative Offices Category Maintenance Facilities Category Fire Facilities Category Community Center Category Arts Center Category Economic Development Program 19 20 Summary of Impacts on Major Funding Sources 21 22 SUMMARY OF PROJECT IMPACTS ON MAJOR FUNDING SOURCES CURRENT REVENUES/GENERAL FUND RESERVES Expenditures for 2013 are budgeted at an increase of 0.23% over the 2012 budget. The 2013 budget was compiled eliminating dispatch which was transferred to the County in August 2012 and a 2% salary increase. With the transfer of dispatch the 2013 budget was virtually stable. The 2014 budget has begun with levy limits for 2014 but the City will receive approximately $289,000 in LGA. The tax levy is the major source of revenues (82%) for the General Fund and therefore presents a challenge when levy limits are in place. Unassigned fund balance in the General Fund totals $4,488,876 at the end of 2012 and is projected to remain at that level for 2013. The State Auditor’s Office recommends no less than five month of operating expenditures in reserves. For 2013 five months of expenditures would total $4,408,470 or 41.7%. At January 1, 2013 the unassigned fund balance was at 42.4% of budgeted expenditures. PERMANENT IMPROVEMENT REVOLVING FUND, (P.I.R.) - G.O. DEBT Funding from bonds is used to reimburse the P.I.R. fund for public improvement projects, which have been previously expended. The debt is funded by special assessment collections and city tax levies over a ten to fifteen year period. Bonds totaling $3,650,000 were sold in 2013 to fund the 2013 street improvement projects. The next bond sale is scheduled for 2014 and will be for 2014 Mainstreet Rehabilitation project and West Park Way overlay project. These bonds are expected to total approximately $2,300,000. The P.I.R. fund has completed substantial projects over the last three years totaling almost $7.7 million. This pace is expected to continue with scheduled projects for 2014 totaling $2,400,000 and future projects in the years 2015-2018 totaling over $9.7 million. Projects scheduled for 2014 include the Mainstreet Rehabilitation, West Park Road improvements, and Hobby Acres mill and overlay. The funding is provided for these projects by special assessments, $120,000 and PIR/Bonding, $2,300,000 for a total project estimated at $2,475,000. In the years 2015-2018 as mentioned above, the city has an aggressive residential street improvement schedule planned, in addition to major improvements to County Road 61 – Shady Oak Road, all of which will require bonding. STREET IMPROVEMENT FRANCHISE FEES Beginning in 2012 gas and electric fees were increased 66-70% from $0.70 for residential, $1.35 for Small non-demand, $6.00 for small demand and $42 for large commercial and industrial to offset the debt levy for street improvements and to hold down property taxes. In 2013 $85,620 was used to reduce the levy for the 2012B GO Improvement Bonds. In 2014 plans call to use $85,620 to write down the 2012B bond levy and $75,000 to write down the 23 2013A GO Improvement levy. The end result is to reduce the 2014 special levies by over $160,000 which then reduces the property tax levy needed for 2014. MUNICIPAL STATE AID FUND Funding for municipal state aid road projects comes from state MSA funding and is drawn down as projects are done. State funding is not sufficient for current planned projects as the City has been aggressive in doing MSA projects. In the queue for reimbursement is a request for th $950,956 for the Minnetonka Mills Rd project and $894,020 for the 5 St South project. These funds will be released as the annual allotment becomes available. At the current rate of reimbursement it will take five years to receive all funds due on these two projects. This pushes back receipt of funds for other eligible MSA funded projects; however those project requests will be placed in the queue for future allotment payments. Currently there is one MSA project scheduled for 2014-2015 and two for 2018. In 2014-2015 the County Road 61, Shady Oak Road project that involves the cities of Hopkins and Minnetonka, Hennepin County and the State will be done. The project is in the planning stages and has a scheduled construction start date of 2014. The project is estimated at $20.4 million of which $2.8 is Hopkins share of the project.In 2018 projects for Co Rd 3 from Blake Road to thth Meadowbrook Road ($700,000 MSA share) and Sixth St S from 11 to 12 Avenue for the extension of roadway and culvert crossing Nine Mile Creek ($400,000 MSA share) are scheduled. They too will be added to the queue for reimbursement. CAPITAL IMPROVEMENT FUND Funding for these improvements comes from a general tax levy that was implemented in 2005 at $25,000. With the exception of 2010 when the levy was eliminated due budget constraints as a result of the governor’s MVHC unallotment, we have been able to steadily increase this levy and it is budgeted at $125,000 for 2014.Projects scheduled in 2014 total $66,300 and include carpet replacement in the Activity Center and Art Center improvements. PARK IMPROVEMENT FUND The source of funding for this fund is development fees charged to developers for park development, however staff and council are recommending adding $0.50 to the gas and electric franchise fee to generate additional revenue for needed park improvements. Developer payments are uncertain as they are dependent on future development and redevelopment in the city. Projects scheduled for 2014 total $177,000 and include play equipment, outdoor lighting and a drinking fountain in Oakes Park, outdoor lighting in Valley Park and Skate Park improvement. In 2012 redevelopment projects generated $164,000 in Park Dedication Fees and those funds will be exhausted by 2014. Additional development projects in the planning stages are anticipated to bring in additional funds within the next several years. The Park Board spent considerable time soliciting resident input on city parks and developed a long-range plan for the city’s park system. This plan is the basis for future park improvements. WATER FUND 24 Implementing the rates as proposed in the Utility Master Plan (UMP) along with a bond sale in 2013 provide the funding needed for projects scheduled for 2013. Bonds will need to be sold in 2014 and each year thereafter in which there are water projects associated with the residential street improvement program. Projects planned for 2014 include $350,000 in water main improvements done in conjunction with street improvements and $95,000 for meter replacements. The public works facility improvement project annual transfer of $45,000 has been transferred to the Storm Sewer Utility fund for the years 2012–2023. As established by the Utility Master Plan completed in 2007 and reviewed every two years thereafter, annual incremental increases are planned for the next 17 years. Water rates will increase in 2014 by approximately 5% or $0.10 per 1,000 gallons of water and will be in line with the current UMP. SANITARY SEWER FUND Implementing the rates as proposed in the Utility Master Plan (UMP) along with a bond sale in 2013 provide the funding needed for projects scheduled for 2013. Bonds will need to be sold in 2014 and each year thereafter in which there are sewer projects associated with the residential street improvement program. Projects planned for 2014 include $225,000 in sewer main improvements done in conjunction with street improvement projects. In addition to the scheduled capital expenditures, the Metropolitan Waste Control Commission is projecting annual increases in its disposal charges to local governments. The public works facility improvement project annual transfer of $50,000 has been transferred to the Storm Sewer Utility fund for the years 2012–2023. As established by the Utility Master Plan completed in 2007 and reviewed every two years thereafter, annual incremental increases are planned for the next 17 years. Water rates will increase in 2014 by approximately 3.8% or $0.15 and will be in line with the current UMP. STORM SEWER FUND Bonds will be sold in 2014 for the 201 storm water management project. These bonds issues along with current revenues should provide the needed funding for scheduled projects. Projects scheduled for 2014 include an $880,000 storm water management project and $20,000 in storm drainage system maintenance. The public works facility improvement project will cost the storm sewer enterprise $25,000 a year for twenty years (2004–2023). In addition beginning in 2012 the Storm Sewer Utility fund will absorb the public works facility transfers for both the water fund ($45,000) and the sewer fund ($50,000) for a total increased cost of $95,000. 25 The most recent rate increase pursuant to the 2007 Utility Master Plan was done in 2009. This rate increase is expected to support the storm sewer system well into the future and currently no additional rates increases are proposed. PAVILION FUND The Pavilion Fund was added to the CIP in 2006 to provide for future improvements that will be needed as this facility ages. As an Enterprise Fund capital items are usually funded within the fund but due to several large capital improvements over the past few years this fund while meeting its operational needs does not currently have adequate financial resources to meet future capital needs. Some of the improvements recently completed were done at the request of major leaseholders of the facility and are being paid by those leaseholders through long-term lease arrangements. This facility built in 1990 is starting to need repairs and replacement to areas that are heavily used; capital projects scheduled for 2014 include $120,000 for the Pavilion roof replacement. In 2015-2018 facility projects totaling $328,500 will be needed. As part of the 2014 budget process funding of these Pavilion capital needs will need to be addressed as well as future infrastructure needs which will continue to increase as the building ages and facility use remains in high demand. TAX INCREMENT FINANCING FUNDS Considering all tax increment districts, as a whole cash on hand, projected increments and loan repayments are sufficient to cover TIF project expenditures. The state has provided municipalities with a pooling tool to accommodate short-term deficiencies within the districts. The city will be allowed to pool the districts tax increment revenues to cover outstanding debt. Currently none of the city’s districts are projected to have shortfalls. 26 Cash Flow Statements 27 28 PARK CAPITAL IMPROVEMENTS FUND (301)07/26/2013 ActualProjectedProjectedProjectedProjectedProjectedProjected 2012201320142015201620172018 Working Capital Beginning Year 112,19582,902188,179105,361(44,285)(96,314)(94,903) Revenues: Taxes (from matured Park Bonds)(133) Interest6988291,8821,054(1,329)(2,889)(2,847) Dedication fees163,77200000 Joint Rec refunds6,2676,0006,0006,0006,0006,000 Franchise Fees (gas/elec)85,30085,30085,30085,30085,300 Hennepin County Grant150,000 Met Council - easememt/grant50,000300,000 Grants - Private Foundations30,000 Donations - general1,00019,1821,000 Donations - benches Total Revenues245,338476,27894,18292,35489,97188,41188,453 Expenditures: C.I.P. Projects264,78145,000170,000235,000135,00080,000160,000 Cottageville Property Acquisition2,850319,000 Skate Park commitment7,0007,0007,0007,0007,0007,0000 Total Expenditures274,631371,000177,000242,000142,00087,000160,000 Working Capital Year End82,902 188,179105,361(44,285)(96,314)(94,903)(166,450) 29 FACILITIES & BUILDINGS07/26/2013 CAPITAL IMPROVEMENTS FUND (305) ActualProjectedProjectedProjectedProjectedProjectedProjected 2012201320142015201620172018 Working Capital Beginning Year272,471135,687160,865220,369342,871460(388,047) Revenues: Interest9166788041,1021,7142(1,940) Transfers from General Fund Tax Levy123,397125,000125,000150,000150,000150,000150,000 Total Revenues124,313125,678125,804151,102151,714150,002148,060 Expenditures: C.I.P. Projects261,098100,50066,30028,600494,125538,51052,000 Transfer to General Fund Total Expenditures261,098100,50066,30028,600494,125538,51052,000 Working Capital Year End135,687160,865220,369342,871460(388,047)(291,987) 30 07/26/2013 MUNICIPAL STATE AID FUND (302) ActualProjectedProjectedProjectedProjectedProjectedProjected 2012201320142015201620172018 Working Capital Beginning Bal1,666,3332,064,1482,442,432771,644387,503756,4401,127,222 Revenues: State MSA Funds, projects411,244367,964367,000367,000367,000367,000367,000 Hennepin County25,770 Bond issue Total Revenues425,038404,055379,212370,858368,938370,782372,636 Transfer Out for Projects CIP State Aid Projects27,2232,050,000755,000001,100,000 Shady Oak Land Acqusition25,770 Total Expenditures27,22325,7702,050,000755,000001,100,000 Working Capital Ending Balance2,064,1482,442,432771,644387,503756,4401,127,222399,858 includes cash, interest rcvbl, & A/P Cash Balance 12/31/20XX2,062,940 Cash Balance 7/3/20132,405,279 ESTIMATED Cash Balance 12/31/20XX734,491350,349719,2871,090,069362,705 (3)ProjectTotal DuePaid Balance State Aid Funds due CityTotalFrom StateTo DateDue 7/19/13 Excelsior Blvd5,408,756.28 3,243,792.74 3,243,792.74 - Minnetonka Blvd1,231,889.51 950,955.56 10,475.54 940,480.02 5th Street South1,165,881.73 894,019.71 - 894,019.71 Total 5,088,768.017,806,527.52 3,254,268.281,834,499.73 65.19% 31 Cash Flow AnalysisP.I.R. FUND (501)07/26/2013 ActualProjectedProjectedProjectedProjectedProjectedProjected 2012201320142015201620172018 Working Capital Beginning Year563,5332,389,701480,535287,916234,887152,21647,064 Revenues: Special Assessment Revenues - from levy735,405170,17229,57024,215000 Special Assessment Revenues - Prepaid203,81124,00090,000212,000212,800150,000 Interest1,4129,5592,1621,2961,057685212 Bond Proceeds 3,297,5731,906,2962,300,0001,885,0002,388,0002,392,2002,450,000 Total Revenues4,034,3902,289,8392,355,7322,000,5112,601,0572,605,6852,600,212 Expenditures: C.I.P. Projects1,921,5102,495,0002,355,0001,525,0001,540,0001,541,0001,850,000 C.I.P. Projects - Special Assm1,500,000120,000450,0001,060,0001,064,000750,000 Transfers for SA Debt collected thru Assm Debt Service Transfers - 2007B71,90015,38414,81517,18219,54838,8350 Debt Service Transfers - 2010A - Imprv156,59262,20358,53661,35864,18067,00269,824 Debt Service Transfers - 2010B - Rfdg58,2190 Debt Service Transfers126,418 Total Expenditures2,208,2214,199,0052,548,3512,053,5402,683,7282,710,8372,804,824 Working Capital Year End2,389,701480,535287,916234,887152,21647,064(157,548) Total Projects Scheduled (CIP & SA)1,921,5103,995,0002,475,0001,975,0002,600,0002,605,0002,600,000 32 Cash Flow AnalysisStreet Improvements - Franchise Fees (307)07/26/2013 ActualProjectedProjectedProjectedProjectedProjectedProjected 2012201320142015201620172018 Working Capital Beginning Year 0196,181321,444302,890334,253235,13776,196 Revenues: Franchise Fees195,615210,000210,000210,000210,000210,000210,000 Interest5668831,4461,3631,5041,058343 Total Revenues196,181210,883211,446211,363211,504211,058210,343 Expenditures: Transfer for Debt Service 2012B Bonds085,620140,00090,00085,620130,00085,620 2013A Bonds90,00090,00075,00090,00075,000 2014 Bonds150,000150,00050,000 Total Expenditures085,620230,000180,000310,620370,000210,620 Working Capital Year End196,181 321,444302,890334,253235,13776,19675,918 33 WATER FUND - WORKING CAPITAL PROJECTION07/26/2013 ActualProjectedProjectedProjectedProjectedProjectedProjected 201320142015201620172018 2012 Working Capital Beginning Year (488,484)76,872(249,301)(103,657)(24,280)244,951475,211 Revenues: Operating Revenues1,403,4201,300,6001,364,9801,377,8501,416,5501,461,5001,506,450 Other134,451140,280152,149158,533165,235172,272179,661 Interest(804)000000 Bond Issuance760,000868,955350,000200,000430,000200,000600,000 Total Revenues2,297,0672,309,8351,867,1291,736,3832,011,7851,833,7722,286,111 Expenditures: Operation Expense1,080,0741,002,9981,037,7811,073,8461,111,2441,150,0271,190,249 Other Exp - bond issuance-fiscal fee21,327 Other Exp - int on current bonds39,470000 Other Exp - int on refunded bonds11,4757,5872,700 Other Exp - int on 2009 bonds25,35024,22522,85021,35019,72517,887 Other Exp - int on 2012 bonds13,18514,17913,37912,52911,62910,729 Other Exp - int on 2013 bonds22,71317,43116,43115,43114,381 Equipment Replacement Items75,00006,800061,700 Capital Improvements388,0501,248,000350,000200,000436,000200,000600,000 Principal Bond payment210,000 Principal Bond payment - refunded170,000175,000180,000 Principal Bond pymnt - 2009 debt50,00050,00050,00050,00050,00055,000 Principal Bond pymnt - 2012 debt40,00040,00040,00045,00045,00045,000 Principal Bond pymnt - 2013 debt50,00050,00050,00055,000 Capital Lease (PW Facility) (1)0000000 Total Expenditures1,738,9212,636,0081,721,4851,657,0061,742,5541,603,5121,988,246 Change in available funds558,146(326,172)145,64479,377269,231230,260297,865 Inventory change(219) Bond Premium/Discount Exp7,428 Working Capital Ending Year76,872(249,301)(103,657)(24,280)244,951475,211773,076 (1) Capital Lease moved to Storm Sewer Rate History 2014 - 2018 financial data was taken from the Utility Master Plan done by City Engineer 1984 $0.85 1993 $1.05Notes - 1997 $1.10Income - 2008 and forward used utility master plan rates (fixture/no surcharge option) 2000 $1.20 2005 $1.40 Per Utility Master Plan (10/07) 2008 $1.65 2009 $1.86 2010 $1.90 2011 $1.94 - not increased, left at $1.90 2012 $1.96 2013 $2.02 2014 $2.08 - suggest $2.18 +.10 2015 $2.14 projected rate 2016 $2.20 increases 2017 $2.27 34 SEWER FUND - WORKING CAPITAL PROJECTION07/26/2013 ActualProjectedProjectedProjectedProjectedProjectedProjected 2012201320142015201620172018 Working Capital Beginning Year98,771394,411408,940363,237338,286191,018241,333 Revenues: Operating Revenues2,131,8812,223,0002,308,5002,399,7002,496,6002,593,5002,696,100 Other22,42420,00020,00020,00020,00020,00020,000 Interest6399861,022908846478603 Bond Issuance170,000495,102 Total Revenues2,324,9442,739,0882,329,5222,420,6082,517,4462,613,9782,716,703 Expenditures: Operation Expense475,599534,037551,833570,253589,319609,053629,484 MWCC Charges (3% inflation)1,132,2991,371,1261,436,1441,504,3071,575,7711,650,6981,729,256 Other - Bond Issuance-fiscal fees10,765 Interest Expense 32,46231,45030,10028,45026,57524,46322,187 Interest Expense - 2012 Debt2,9463,1492,9492,7492,5492,349 Interest Expense - 2013 Debt21,00019,80018,70017,500 Equipment Replacement Items0036,80033,60026,40059,700 Capital Improvements319,962715,000225,000175,000305,000120,000325,000 Principal Bond payment (2009)60,00060,00060,00060,00065,00065,00065,000 Principal Bond payment (2012)10,00010,00010,00010,00010,00010,000 Principal Bond payment (2013)38,00038,00038,00038,00038,000 Capital Lease (PW Facility) (1)000000 Total Expenditures2,031,0862,724,5592,375,2262,445,5592,664,7142,563,6632,880,976 Change in available funds293,85814,529(45,703)(24,951)(147,268)50,315(164,272) Inventory change(167) Bond Premium/Discount Exp1,949 Working Capital Ending Year394,411408,940363,237338,286191,018241,33377,060 (1) Capital Lease moved to Storm Sewer Rate Histor y2014 - 2018 financial data was taken from the Utility Master Plan done by City Engineer 1983 $1.50 1989 $1.75 1991 $2.00 1993 $2.50 Notes - 1999 $2.25 Rate DECREASE Income - 2008 and forward used utility master plan rates (no fixture option) 2006 $2.50 rate increase Per Utility Master Plan (10/07) 2008 $2.70 2009 $3.10 2010 $3.40 2011 $3.70 - act 3.60 2012 $3.75 2013 $3.90 2014 $4.05 2015 $4.21 projected rate 2016 $4.38 increases 2017 $4.55 35 STORM SEWER FUND - WORKING CAPITAL PROJECTION07/26/2013 ActualProjectedProjectedProjectedProjectedProjectedProjected 2012201320142015201620172018 Working Capital Beginning Year402,095717,491582,953(77,988)(187,743)(9,243)187,499 Revenues: Operating Revenues795,755795,755795,755795,755795,755795,755795,755 Other5,5905,0005,0005,0005,0005,0005,000 Interest4,1841,7941,457(195)(469)(23)469 Bond Issuance320,000383,957 Total Revenues1,125,5291,186,506802,212800,560800,286800,732801,224 Expenditures: Operation Expense193,587197,459201,408205,436209,545213,736218,010 Other - Bond Issuance-fiscal fees17,176 Bond Interest - existing25,280 Bond Interest - 2009 refunded bonds10,4758,0755,3121,875 Bond Interest - 2010 bonds16,34815,93515,34814,58513,62312,48511,173 Bond Interest - 2012 bonds5,5756,0315,6815,2814,8814,481 Bond Interest - 2013 bonds10,0547,7387,3386,8886,388 Capital Outlay (per ERP)0000000 Capital Improvements249,504769,000900,000320,000156,000131,000321,000 2009 Principal Bond payment120,000120,000125,000125,000 2010 Principal Bond payment60,00070,00065,00070,00070,00070,00070,000 2012 Principal Bond payment15,00015,00020,00020,00020,00020,000 2013 Principal Bond payment20,00020,00025,00025,000 Capital Lease - PW Facility (1)120,000120,000120,000120,000120,000120,000120,000 Total Expenditures812,3691,321,0441,463,153910,315621,787603,989796,052 Change in available funds313,160(134,538)(660,941)(109,755)178,499196,7425,172 Inventory change(248) Bond Premium/Discount Exp (net)2,485 Working Capital Ending Year717,491582,953(77,988)(187,743)(9,243)187,499192,671 (1) In 2011 this includes Water, Sewer & Storm Sewer transfers Rate History (per month) 1989 $4.75 per quarter 1991 $6.00 per quarter 1992 $2.50 1993 $3.00 1998 $3.20 1999 $4.00 2006 $4.50 2009 $5.00 36 PAVILION - ICE ARENA - WORKING CAPITAL PROJECTIONS07/26/2013 ActualProjectedProjectedProjectedProjectedProjectedProjected 201320142015201620172018 2012 Working Capital Beginning Year 117,122(39,521) (28,007) (118,891) (173,916) (285,380) (302,588) Revenues: Operating Revenues360,774417,641438,523483,472 378,813 397,753 460,449 Leases38,00019,000 38,000 current lease expires in 2013 Other7,99310,00010,00010,00010,000 10,000 10,000 Donations (bleacher heating) Equipment Certificates172,852 Interest1,033 Total Revenues580,652427,641448,523493,472 426,813 426,753 470,449 Expenditures: Operation Expense357,515390,666402,386426,892 368,240 379,288 414,458 Capital Outlay 185,000- - - - - - Capital Improvements45,053 120,000-135,00051,00073,500 69,000 Payment on Equip Certific 3,092-18,35023,00022,60021,800 22,200 Interest Expense1,028 Payment on Interfund Loan23,14315,609 - - - Total Expenditures426,739482,666559,986522,192 571,941 517,638 487,658 Change in available funds153,913(145,128)(90,884)(55,025)(111,463)(17,209)(28,720) Bond Premium/Discount Exp (net)2,730 Working Capital Ending Year117,122(28,007)(118,891)(173,916)(285,380)(302,588)(331,308) 37 38 Five Year Project Summaries 39 40 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20142018 thru PROJECTS BY YEAR Project NameProject #Priority Project Cost Department 2014 Replace Carpet - Activity Center RoomsActivity Centern/a36,000 Arts Center - Restroom ImprovementArts Center19,000 Arts Center - Chairs and TablesArts Center114,800 Arts Center - Storage & Hanging, Display SystemsArts Center16,500 Technology Improvement - Council Chambers & StudioCommunicationsn/a9,500 Block 64 Redevelopment ProjectDevelopmentn/a4,500,000 Pavilion Roof ReplacementPavilion1120,000 Valley Park - Outdoor LightingPublic Works: Parksn/a40,000 Skate ParkPublic Works: Parksn/a7,000 Oakes Park - Play EquipmentPublic Works: Parksn/a100,000 Oakes Park -Drinking FountainPublic Works: Parksn/a10,000 Oakes Park - LightingPublic Works: Parksn/a40,000 Residential Street ImprovementsPublic Works: Streets/Trafficn/a400,000 Residential Street Improvements--UtilitiesPublic Works: Streets/Trafficn/a575,000 County Road 61 (Shady Oak Road)Public Works: Streets/Trafficn/a8,200,000 Mainstreet RehabilitationPublic Works: Streets/Traffic32,000,000 2014 Street Overlay ProjectPublic Works: Streets/Trafficn/a550,000 Pedestrian & Bicycle Access ImprovementsPublic Works: Streets/Trafficn/a25,000 Storm Drainage System Maintenance - Alley RepairsPublic Works: Utilitiesn/a20,000 Storm Water Management ProjectsPublic Works: Utilitiesn/a880,000 17,542,800 Total for 2014 2015 Arts Center - Replace Information Desk and KioskArts Center15,000 Arts Center - Re-landscape E & W faces of building23,600Arts Center Technology Improvement - Council Chambers & Studion/a35,000Communications Redevelopment, East Excelsior BoulevardDevelopmentn/a2,000,000 Blake Corridor RedevelopmentDevelopmentn/a5,000,000 8th Ave Streetscape and parking facilityDevelopmentn/a5,000,000 Pavilion Gas Fired Rooftop FurnacePavilionn/a9,000 Pavilion Evaporator Condenser ReplacementPavilionn/a60,000 Public Works Garage UpgradePublic Works: Bldg/Equip Serv120,000 Skate ParkPublic Works: Parksn/a7,000 Cottageville Park - Play EquipmentPublic Works: Parksn/a120,000 Burnes Park - Warming HousePublic Works: Parksn/a60,000 Oakes Park - Replace Picnic ShelterPublic Works: Parksn/a30,000 Valley Park - Construct Storage BuildingPublic Works: Parksn/a25,000 Residential Street ImprovementsPublic Works: Streets/Trafficn/a1,500,000 Residential Street Improvements--UtilitiesPublic Works: Streets/Trafficn/a475,000 County Road 61 (Shady Oak Road)Public Works: Streets/Trafficn/a12,250,000 Parking LotsPublic Works: Streets/Trafficn/a1,000,000 Pedestrian & Bicycle Access ImprovementsPublic Works: Streets/Trafficn/a25,000 Light Rail Transit Stations (2)Public Works: Transportationn/a150,000 Storm Drainage System Maintenance - Alley RepairsPublic Works: Utilitiesn/a20,000 Monday, July 29, 2013 41 Project NameProject #Priority Project Cost Department Depot Recreation AreaRecreation2500,000 28,294,600 Total for 2015 2016 Replace Gynmasium Roof - Activity CenterActivity Centern/a105,000 Activity Center - Raspberry Room Roof Replacementn/a80,000Activity Center Arts Center - Storage & Hanging, Display SystemsArts Center13,125 City Hall Lobby UpgradeCity Hall Administrationn/a110,000 Technology Improvement - Council Chambers & StudioCommunicationsn/a12,500 Replace Carpet and Apparatus Floor Finish - FDFiren/a56,000 Pavilion Overhead Door ImprovementPavilionn/a40,000 Pavilion Indoor Turf ReplacementPavilionn/a95,000 Replace Carpet - Police StationPolicen/a40,000 Public Works Garage UpgradePublic Works: Bldg/Equip Serv1200,000 Skate ParkPublic Works: Parksn/a7,000 Hilltop Park - Play EquipmentPublic Works: Parksn/a100,000 Burnes Park - Play EquipmentPublic Works: Parksn/a35,000 Residential Street ImprovementsPublic Works: Streets/Trafficn/a2,500,000 Residential Street Improvements--UtilitiesPublic Works: Streets/Trafficn/a430,000 Citywide Concrete AlleysPublic Works: Streets/Trafficn/a75,000 Pedestrian & Bicycle Access ImprovementsPublic Works: Streets/Trafficn/a25,000 Storm Drainage System Maintenance - Alley RepairsPublic Works: Utilitiesn/a21,000 Lift Station # 4Public Works: Utilitiesn/a160,000 St. Louis Park Emergency ConnectionPublic Works: Utilitiesn/a211,000 4,305,625 Total for 2016 2017 Activity Center - Lower Roof ReplacementActivity Centern/a80,000 Arts Center - Replace 25 Ton Rooftop HVAC Unitn/a100,000Arts Center Arts Center - Replace theatre seats and backsArts Center1138,510 Arts Center - Replace 15 Rooftop HVAC unitsArts Centern/a220,000 Technology Improvement - Council Chambers & Studion/a23,000Communications Pavilion skate Tile Replacement/Lobby Improvementn/a45,000Pavilion Pavilion - Desiccant Repl of Dehumidification Systn/a6,000Pavilion Skate ParkPublic Works: Parksn/a7,000 Valley Park - Play EquipmentPublic Works: Parksn/a80,000 Residential Street ImprovementsPublic Works: Streets/Trafficn/a2,500,000 Residential Street Improvements--UtilitiesPublic Works: Streets/Trafficn/a430,000 Citywide Concrete AlleysPublic Works: Streets/Trafficn/a80,000 Pedestrian & Bicycle Access ImprovementsPublic Works: Streets/Trafficn/a25,000 Eighth Avenue LRT CorridorPublic Works: Transportationn/a200,000 Storm Drainage System Maintenance - Alley RepairsPublic Works: Utilitiesn/a21,000 3,955,510 Total for 2017 2018 Art Center - Replace Lobby CarpetArts Centern/a52,000 Technology Improvement - Council Chambers & Studion/a15,000Communications Mezzanine Rooftop Unit ReplacementPavilion124,500 Pavilion Entry and Lobby Door ReplacementPavilion37,000 Paint Pavilion ExteriorPavilion122,000 Pavilion-Painting the Arena Ceiling and Bar JoistPavilion120,000 Park Valley - Play EquipmentPublic Works: Parksn/a60,000 Burnes Park - Resurface Tennis CourtsPublic Works: Parksn/a20,000 Oakes Park - Tennis CourtsPublic Works: Parksn/a20,000 Monday, July 29, 2013 42 Project NameProject #Priority Project Cost Department Valley Park - Warming HousePublic Works: Parksn/a60,000 Residential Street ImprovementsPublic Works: Streets/Trafficn/a2,250,000 Residential Street Improvements--UtilitiesPublic Works: Streets/Trafficn/a1,225,000 County Road 3Public Works: Streets/Trafficn/a2,300,000 Sixth Street South (11th to 12th Avenue South)Public Works: Streets/Trafficn/a500,000 Plan, Design and Implement Railroad Quiet Zonen/a225,000Public Works: Streets/Traffic Pedestrian & Bicycle Access ImprovementsPublic Works: Streets/Trafficn/a25,000 Storm Drainage System Maintenance - Alley RepairsPublic Works: Utilitiesn/a21,000 6,846,500 Total for 2018 60,945,035 GRAND TOTAL Monday, July 29, 2013 43 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20142018 thru DEPARTMENT SUMMARY Department20142015201620172018Total Activity Center36,000185,00080,000 Arts Center30,3008,6003,125458,51052,000 City Hall Administration110,000 Communications9,50035,00012,50023,00015,000 Development4,500,00012,000,000 Fire56,000 Pavilion120,00069,000135,00051,00073,500 Police40,000 Public Works: Bldg/Equip Serv20,000200,000 Public Works: Parks197,000242,000142,00087,000160,000 Public Works: Streets/Traffic11,750,00015,250,0003,030,0003,035,0006,525,000 Public Works: Transportation150,000200,000 Public Works: Utilities900,00020,000392,00021,00021,000 Recreation500,000 17,542,80028,294,6004,305,6253,955,5106,846,500 TOTAL 44 Monday, July 29, 2013 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20142018 thru PROJECTS BY DEPARTMENT DepartmentProject#Priority20142015201620172018 Total Activity Center Replace Carpet - Activity Center Roomsn/a36,000 Replace Gynmasium Roof - Activity Centern/a105,000 Activity Center - Raspberry Room Roof Replacementn/a80,000 Activity Center - Lower Roof Replacementn/a80,000 Activity Center Total Arts Center Arts Center - Replace 25 Ton Rooftop HVAC Unitn/a100,000 Art Center - Replace Lobby Carpetn/a52,000 Arts Center - Replace theatre seats and backs1138,510 Arts Center - Replace Information Desk and Kiosk15,000 Arts Center - Replace 15 Rooftop HVAC unitsn/a220,000 Arts Center - Re-landscape E & W faces of building23,600 Arts Center - Restroom Improvement19,000 Arts Center - Chairs and Tables114,800 Arts Center - Storage & Hanging, Display Systems16,5003,125 Arts Center Total City Hall Administration City Hall Lobby Upgraden/a110,000 City Hall Administration Total Communications Technology Improvement - Council Chambers & Studion/a9,50035,00012,50023,00015,000 Communications Total Development Redevelopment, East Excelsior Boulevardn/a2,000,000 Block 64 Redevelopment Projectn/a4,500,000 Blake Corridor Redevelopmentn/a5,000,000 8th Ave Streetscape and parking facilityn/a5,000,000 Development Total Fire Replace Carpet and Apparatus Floor Finish - FDn/a56,000 Fire Total Pavilion Pavilion skate Tile Replacement/Lobby Improvementn/a45,000 Pavilion Overhead Door Improvementn/a40,000 45 Monday, July 29, 2013 DepartmentProject#Priority20142015201620172018 Total Pavilion Gas Fired Rooftop Furnacen/a9,000 Pavilion Roof Replacement1120,000 Pavilion Evaporator Condenser Replacementn/a60,000 Pavilion Indoor Turf Replacementn/a95,000 Pavilion - Desiccant Repl of Dehumidification Systn/a6,000 Mezzanine Rooftop Unit Replacement124,500 Pavilion Entry and Lobby Door Replacement37,000 Paint Pavilion Exterior122,000 Pavilion-Painting the Arena Ceiling and Bar Joist120,000 Pavilion Total Police Replace Carpet - Police Stationn/a40,000 Police Total Public Works: Bldg/Equip Serv Public Works Garage Upgrade120,000200,000 Public Works: Bldg/Equip Serv Total Public Works: Parks Valley Park - Outdoor Lightingn/a40,000 Skate Parkn/a7,0007,0007,0007,000 Park Valley - Play Equipmentn/a60,000 Burnes Park - Resurface Tennis Courtsn/a20,000 Hilltop Park - Play Equipmentn/a100,000 Valley Park - Play Equipmentn/a80,000 Oakes Park - Play Equipmentn/a100,000 Cottageville Park - Play Equipmentn/a120,000 Oakes Park -Drinking Fountainn/a10,000 Burnes Park - Warming Housen/a60,000 Oakes Park - Replace Picnic Sheltern/a30,000 Valley Park - Construct Storage Buildingn/a25,000 Burnes Park - Play Equipmentn/a35,000 Oakes Park - Tennis Courtsn/a20,000 Valley Park - Warming Housen/a60,000 Oakes Park - Lightingn/a40,000 Public Works: Parks Total Public Works: Streets/Traffic Residential Street Improvementsn/a400,0001,500,0002,500,0002,500,0002,250,000 Residential Street Improvements--Utilitiesn/a575,000475,000430,000430,0001,225,000 Citywide Concrete Alleysn/a75,00080,000 County Road 3n/a2,300,000 County Road 61 (Shady Oak Road)n/a8,200,00012,250,000 Sixth Street South (11th to 12th Avenue South)n/a500,000 Parking Lotsn/a1,000,000 Plan, Design and Implement Railroad Quiet Zonen/a225,000 Mainstreet Rehabilitation32,000,000 2014 Street Overlay Projectn/a550,000 Pedestrian & Bicycle Access Improvementsn/a25,00025,00025,00025,00025,000 Public Works: Streets/Traffic Total 46 Monday, July 29, 2013 DepartmentProject#Priority20142015201620172018 Total Public Works: Transportation Light Rail Transit Stations (2)n/a150,000 Eighth Avenue LRT Corridorn/a200,000 Public Works: Transportation Total Public Works: Utilities Storm Drainage System Maintenance - Alley Repairsn/a20,00020,00021,00021,00021,000 Storm Water Management Projectsn/a880,000 Lift Station # 4n/a160,000 St. Louis Park Emergency Connectionn/a211,000 Public Works: Utilities Total Recreation Depot Recreation Area2500,000 Recreation Total GRAND TOTAL 47 Monday, July 29, 2013 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20142018 thru FUNDING SOURCE SUMMARY 20142015201620172018Total Source CI - Capital Improvement Fund66,30028,600494,125538,51052,000 CT - Cable Franchise Fees9,50035,00012,50023,00015,000 ED - Economic Development Fund1,000,0005,000,000 GU - Other Governmental Units6,670,00012,345,000100,0001,600,000 MS - Municipal State Aid Streets2,050,000755,0001,100,000 PA - Pavilion Fund120,00069,000135,00051,00073,500 PDF- Park Dedication Fund177,000242,000222,0007,000160,000 PI - PIR/General Obligation Bonds2,355,0001,525,0001,540,0001,541,0001,850,000 RF - Refuse Fund25,000 SA - Special Assessment120,000450,0001,060,0001,064,000750,000 SF - Sanitary Sewer Fund225,000175,000305,000120,000325,000 SU - Storm Sewer Fund900,000320,000156,000131,000321,000 TF - Tax Increment Financing3,500,0007,150,000100,000 WF - Water Fund350,000200,000436,000200,000600,000 17,542,80028,294,6004,385,6253,875,5106,846,500 GRAND TOTAL Monday, July 29, 2013 48 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20142018 thru PROJECTS BY FUNDING SOURCE SourceProject#Priority20142015201620172018Total CI - Capital Improvement Fund Replace Carpet - Activity Center Roomsn/a36,000 Replace Gynmasium Roof - Activity Centern/a105,000 Activity Center - Raspberry Room Roof Replacementn/a80,000 Arts Center - Replace 25 Ton Rooftop HVAC Unitn/a100,000 Replace Carpet and Apparatus Floor Finish - FDn/a56,000 Replace Carpet - Police Stationn/a40,000 Activity Center - Lower Roof Replacementn/a80,000 Art Center - Replace Lobby Carpetn/a52,000 City Hall Lobby Upgraden/a110,000 Arts Center - Replace theatre seats and backs1138,510 Arts Center - Replace Information Desk and Kiosk15,000 Arts Center - Replace 15 Rooftop HVAC unitsn/a220,000 Arts Center - Re-landscape E & W faces of building23,600 Arts Center - Restroom Improvement19,000 Arts Center - Chairs and Tables114,800 Arts Center - Storage & Hanging, Display Systems16,5003,125 Public Works Garage Upgrade120,000100,000 CI - Capital Improvement Fund Total CT - Cable Franchise Fees Technology Improvement - Council Chambers & Studion/a9,50035,00012,50023,00015,000 CT - Cable Franchise Fees Total ED - Economic Development Fund Block 64 Redevelopment Projectn/a1,000,000 8th Ave Streetscape and parking facilityn/a5,000,000 ED - Economic Development Fund Total GU - Other Governmental Units Residential Street Improvementsn/a800,000 County Road 3n/a1,600,000 County Road 61 (Shady Oak Road)n/a6,150,00011,045,000 Eighth Avenue LRT Corridorn/a100,000 Depot Recreation Area2500,000 Mainstreet Rehabilitation3500,000 Oakes Park - Lightingn/a20,000 GU - Other Governmental Units Total Monday, July 29, 2013 49 SourceProect#Priorit20142015201620172018Total jy MS - Municipal State Aid Streets County Road 3n/a700,000 County Road 61 (Shady Oak Road)n/a2,050,000755,000 Sixth Street South (11th to 12th Avenue South)n/a400,000 MS - Municipal State Aid Streets Total PA - Pavilion Fund Pavilion skate Tile Replacement/Lobby Improvementn/a45,000 Pavilion Overhead Door Improvementn/a40,000 Pavilion Gas Fired Rooftop Furnacen/a9,000 Pavilion Roof Replacement1120,000 Pavilion Evaporator Condenser Replacementn/a60,000 Pavilion Indoor Turf Replacementn/a95,000 Pavilion - Desiccant Repl of Dehumidification Systn/a6,000 Mezzanine Rooftop Unit Replacement124,500 Pavilion Entry and Lobby Door Replacement37,000 Paint Pavilion Exterior122,000 Pavilion-Painting the Arena Ceiling and Bar Joist120,000 PA - Pavilion Fund Total PDF- Park Dedication Fund Valley Park - Outdoor Lightingn/a40,000 Skate Parkn/a7,0007,0007,0007,000 Park Valley - Play Equipmentn/a60,000 Burnes Park - Resurface Tennis Courtsn/a20,000 Hilltop Park - Play Equipmentn/a100,000 Valley Park - Play Equipmentn/a80,000 Oakes Park - Play Equipmentn/a100,000 Cottageville Park - Play Equipmentn/a120,000 Oakes Park -Drinking Fountainn/a10,000 Burnes Park - Warming Housen/a60,000 Oakes Park - Replace Picnic Sheltern/a30,000 Valley Park - Construct Storage Buildingn/a25,000 Burnes Park - Play Equipmentn/a35,000 Oakes Park - Tennis Courtsn/a20,000 Valley Park - Warming Housen/a60,000 Oakes Park - Lightingn/a20,000 PDF- Park Dedication Fund Total PI - PIR/General Obligation Bonds Residential Street Improvementsn/a280,000500,0001,500,0001,500,0001,500,000 Citywide Concrete Alleysn/a15,00016,000 County Road 61 (Shady Oak Road)n/a200,000 Sixth Street South (11th to 12th Avenue South)n/a100,000 Parking Lotsn/a800,000 Plan, Design and Implement Railroad Quiet Zonen/a225,000 Mainstreet Rehabilitation31,500,000 2014 Street Overlay Projectn/a550,000 Pedestrian & Bicycle Access Improvementsn/a25,00025,00025,00025,00025,000 Monday, July 29, 2013 50 SourceProect#Priorit20142015201620172018Total jy PI - PIR/General Obligation Bonds Total RF - Refuse Fund Public Works Garage Upgrade125,000 RF - Refuse Fund Total SA - Special Assessment Residential Street Improvementsn/a120,000200,0001,000,0001,000,000750,000 Citywide Concrete Alleysn/a60,00064,000 County Road 61 (Shady Oak Road)n/a250,000 SA - Special Assessment Total SF - Sanitary Sewer Fund Residential Street Improvements--Utilitiesn/a225,000175,000120,000120,000325,000 Lift Station # 4n/a160,000 Public Works Garage Upgrade125,000 SF - Sanitary Sewer Fund Total SU - Storm Sewer Fund Residential Street Improvements--Utilitiesn/a0100,000110,000110,000300,000 Storm Drainage System Maintenance - Alley Repairsn/a20,00020,00021,00021,00021,000 Storm Water Management Projectsn/a880,000 Parking Lotsn/a200,000 Public Works Garage Upgrade125,000 SU - Storm Sewer Fund Total TF - Tax Increment Financing Redevelopment, East Excelsior Boulevardn/a2,000,000 Light Rail Transit Stations (2)n/a150,000 Eighth Avenue LRT Corridorn/a100,000 Block 64 Redevelopment Projectn/a3,500,000 Blake Corridor Redevelopmentn/a5,000,000 TF - Tax Increment Financing Total WF - Water Fund Residential Street Improvements--Utilitiesn/a350,000200,000200,000200,000600,000 St. Louis Park Emergency Connectionn/a211,000 Public Works Garage Upgrade125,000 WF - Water Fund Total GRAND TOTAL Monday, July 29, 2013 51 52 Project Descriptions And Narratives 53 54 Economic Development 55 56 CAPITAL IMPROVEMENT PLAN 20142018 thru Department Development Cit of HokinsMN yp, ContactED Director TypeImprovement 01-CIP-D4010 Project # Useful Life Unassigned Redevelopment, East Excelsior Boulevard Project Name Category Economic Development FuturePriority n/a Total Project Cost: $2,000,000 Description North side of Excelsior Boulevard from Highway 169 to approximately Blake Road. Redevelopment of older commercial area. Based on the adopted redevelopment plan, it would involve commercial, and residential uses. Identified in the East End Redevelopment Study. Justification Excelsior Boulevard was upgraded in this area, providing for additional property on the north side of the roadway. The buildings in this area are older and no longer the highest and best use for this property. The funding amount is an estimate and will vary depending on the scope and timing of the project, likely to be completed along with the construction of the SWLRT Blake Station. ExpendituresTotal 20142015201620172018 Construction/Maintenance 2,000,0002,000,000 Total Funding Sources20142015201620172018Total 2,000,0002,000,000 TF - Tax Increment Financing Total Budget Impact/Other Monday, July 29, 2013 57 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentDevelopment Cit of Hokins MN yp, Contact ED Director Type Improvement 06-CIP-D404 Project # Useful Life Block 64 Redevelopment Project Project Name Category Economic Development FuturePriorityn/a Total Project Cost:$4,500,000 Description Redevelopment of block between 5th and 6th Avenues, north of Mainstreet, South of 1st Street North. There currently is no proposed schedule for construction. Justification Will redevelop older commercial and residential areas. ExpendituresTotal 20142015201620172018 Construction/Maintenance 4,500,0004,500,000 Total Funding Sources20142015201620172018Total 1,000,0001,000,000 ED - Economic Development F 3,500,0003,500,000 TF - Tax Increment Financing Total Budget Impact/Other Monday, July 29, 2013 58 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentDevelopment Cit of Hokins MN yp, Contact ED Director Type Improvement 09-CIP-D406 Project # Useful Life Blake Corridor Redevelopment Project Name Category Economic Development FuturePriorityn/a Total Project Cost:$5,000,000 Description Redevelopment of properties along the Blake Road Corridor including the Cottageville Park area. Justification Removal of blighted and/or obsolete structures, improve access to transit and improve livability of the area. ExpendituresTotal 20142015201620172018 Land Acquisition/Demolition 5,000,0005,000,000 Total Funding Sources20142015201620172018Total 5,000,0005,000,000 TF - Tax Increment Financing Total Budget Impact/Other Monday, July 29, 2013 59 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentDevelopment Cit of Hokins MN yp, Contact ED Director Type Improvement 12-CIP-D408 Project # Useful Life 8th Ave Streetscape and parking facility Project Name Category Economic Development FuturePriorityn/a Total Project Cost:$5,000,000 Description Sidewalks, landscaping, Public Art, Bike Lanes, Street furniture, and other pedestrian and bike improvements. Parking Ramp Construction, north of Mainstreet between 8th and 9th Ave South Justification The City of Hopkins has planned for 8th Avenue to be the gateway to the downtown from Excelsior Blvd to the Hopkins SWLRT Station. For this to be accomplished, 8th Ave must be transformed into a pedestrian and bike friendly two-block stretch. The proposed parking ramp will be used to support transit-oriented development. ExpendituresTotal 20142015201620172018 Construction/Maintenance 5,000,0005,000,000 Total Funding Sources20142015201620172018Total 5,000,0005,000,000 ED - Economic Development F Total Budget Impact/Other LCA TOD Grant, various grant development Accounts, Bonds Monday, July 29, 2013 60 General Public Buildings 61 62 CAPITAL IMPROVEMENT PLAN 20142018 thru Department Activity Center Cit of HokinsMN yp, ContactFacilities Director TypeImprovement 08-CIP-AC015 Project # Useful Life Replace Carpet - Activity Center Rooms Project Name Category Buildings: Activity Center FuturePriority n/a Total Project Cost: $36,000 Description Replace Carpeting in Activity Center Raspberry Rooms, TV/Game Room; hallways. Justification Carpet is 18 years old, worn and requires replacement. ExpendituresTotal 20142015201620172018 Construction/Maintenance 36,00036,000 Total Funding Sources20142015201620172018Total 36,00036,000 CI - Capital Improvement Fund Total Budget Impact/Other Monday, July 29, 2013 63 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentActivity Center Cit of Hokins MN yp, Contact Public Works Director Type Improvement 08-CIP-AC018 Project # Useful Life 25 years Replace Gynmasium Roof - Activity Center Project Name Category Buildings: Activity Center FuturePriorityn/a Total Project Cost:$105,000 Description Existing roof was installed in 1989 and is at the end of its projected useful life. Portion is cost share with Raspberry Ridge Condo Assn. Justification Roof was installed in 1989 and is at the end of its 25 year useful life. ExpendituresTotal 20142015201620172018 Construction/Maintenance 105,000105,000 Total Funding Sources20142015201620172018Total 105,000105,000 CI - Capital Improvement Fund Total Budget Impact/Other Roof in good condition - move project from 2014 to 2016 and re-evaluate in 2 years. Monday, July 29, 2013 64 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentActivity Center Cit of Hokins MN yp, Contact PW Director Type Improvement 08-CIP-AC024 Project # Useful Life Activity Center - Raspberry Room Roof Replacement Project Name Category Buildings: Activity Center FuturePriorityn/a Total Project Cost:$80,000 Description Built up asphalt roofing system covering Raspberry Rooms, Craft Room and Hallways at the Activity Center Justification Existing roof was replaced in 1992, Expected life is 25 years. ExpendituresTotal 20142015201620172018 Construction/Maintenance 80,00080,000 Total Funding Sources20142015201620172018Total 80,00080,000 CI - Capital Improvement Fund Total Budget Impact/Other Inspection, repair and upkeep of roofing systems prevent deterioration of interior building structure and damage to interior components of building. Monday, July 29, 2013 65 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentActivity Center Cit of Hokins MN yp, Contact PW Director Type Improvement 09-CIP-AC031 Project # Useful Life 25 years Activity Center - Lower Roof Replacement Project Name Category Buildings: Activity Center FuturePriorityn/a Total Project Cost:$80,000 Description Built up Roof on Activity Center Raspberry Rooms and Hallway. Justification Existing roof was installed in 1992, estimated replacement due in 2017. ExpendituresTotal 20142015201620172018 Construction/Maintenance 80,00080,000 Total Funding Sources20142015201620172018Total 80,00080,000 CI - Capital Improvement Fund Total Budget Impact/Other Monday, July 29, 2013 66 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentArts Center Cit of Hokins MN yp, Contact Public Works Director Type Improvement 08-CIP-AR013 Project # Useful Life Arts Center - Replace 25 Ton Rooftop HVAC Unit Project Name Category Buildings: Arts Center FuturePriorityn/a Total Project Cost:$100,000 Description Replace existing 25 ton rooftop HVAC unit Justification Planned replacement at 20 years estimated useful life. ExpendituresTotal 20142015201620172018 Construction/Maintenance 100,000100,000 Total Funding Sources20142015201620172018Total 100,000100,000 CI - Capital Improvement Fund Total Budget Impact/Other Monday, July 29, 2013 67 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Director Type Improvement 09-CIP-AR027 Project # Useful Life 10 years Art Center - Replace Lobby Carpet Project Name Category Buildings: Arts Center FuturePriorityn/a Total Project Cost:$52,000 Description Replace the lobby carpet including staircases, second floor, elevator floor, coat room and dance studio dressing room. ESTIMATED PROJECT SHCEDULE: Future 2018 Justification The Lobby carpet will be at the end of it's useful life in a high traffic area like the lobby. ExpendituresTotal 20142015201620172018 Construction/Maintenance 52,00052,000 Total Funding Sources20142015201620172018Total 52,00052,000 CI - Capital Improvement Fund Total Budget Impact/Other Monday, July 29, 2013 68 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Director Type Improvement 12-CIP-AR002 Project # Useful Life 20 years Arts Center - Replace theatre seats and backs Project Name Category Buildings: Arts Center FuturePriority1 Urgent Total Project Cost:$138,510 Description Remove and replace theater seats and backs. (Keeping existing stanchions) Based on quote from Cosney (they recently did Eisenhower seating) with Classic Quattro seat, 33" low back, waterfall back and seat tailoring. Sherpa Shire-Grade G fabric (similar to existing), plush foam seat, 2" back foam, lexan seat numbers, demo and removal of existing seats and backs includes attic stock. 2011 pricing $116,000 with 3% inflation compounded over 5 years $138,510 Justification Seats will be 20 years old in 2017 and will have exceeded useful life. Stanchions should still be usable. Quote includes replacement of all seats and backs. This is not due until 2017 but wanted to get as much info as possible now to allow for time to plan. ExpendituresTotal 20142015201620172018 Construction/Maintenance 138,510138,510 Total Funding Sources20142015201620172018Total 138,510138,510 CI - Capital Improvement Fund Total Budget Impact/Other Could consider replacing main floor one year and balcony another year if required by cash flow. Need tow weeks in theater to make exchange. Work on stage at same time okay will install team. Opportunity to potentially do a "seat sponsor" funding program similar to what was done before Repeat project in 2037 Monday, July 29, 2013 69 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Director Type Improvement 12-CIP-AR005 Project # Useful Life 15 years Arts Center - Replace Information Desk and Kiosk Project Name Category Buildings: Arts Center FuturePriority1 Urgent Total Project Cost:$5,000 Description Replace informational Kiosk and desk with more functional information center. Justification Current informational kiosk and information desk are not ideal for assisting visitors with way finding and disseminating information. Guests arriving are frequently confused and have a hard time finding location of meetings. Etc. Also, we would like to be able to display larger concert posters, the rental brochure, membership brochures and more. We would like to move this project from 2017 to 2015 as our information Kiosk is failing and its function can easily be incorporated into the informational design. ExpendituresTotal 20142015201620172018 Construction/Maintenance 5,0005,000 Total Funding Sources20142015201620172018Total 5,0005,000 CI - Capital Improvement Fund Total Budget Impact/Other Monday, July 29, 2013 70 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentArts Center Cit of Hokins MN yp, Contact Bldg/Equip Supt Type Improvement 12-CIP-AR036 Project # Useful Life 20 years Arts Center - Replace 15 Rooftop HVAC units Project Name Category Buildings: Arts Center FuturePriorityn/a Total Project Cost:$220,000 Description Rooftop heating and AC units were installed in 1997. Useful life is 20 years. 15 total units from 25 tons to 5 ton. Justification ExpendituresTotal 20142015201620172018 Construction/Maintenance 220,000220,000 Total Funding Sources20142015201620172018Total 220,000220,000 CI - Capital Improvement Fund Total Budget Impact/Other Monday, July 29, 2013 71 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Co-Director Type Improvement 13-CIP-AR001 Project # Useful Life 15 years Arts Center - Re-landscape E & W faces of building Project Name Category Buildings: Arts Center FuturePriority2 Very Important Total Project Cost:$3,600 Description Remove old shrubs, rework beds, install new plantings and mulch. Project inclues hiring a company to design and install. Justification Current shrubs are dying. ExpendituresTotal 20142015201620172018 Construction/Maintenance 3,6003,600 Total Funding Sources20142015201620172018Total 3,6003,600 CI - Capital Improvement Fund Total Budget Impact/Other Monday, July 29, 2013 72 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Co-Director Type Improvement 13-CIP-AR002 Project # Useful Life 10 - 12 years Arts Center - Restroom Improvement Project Name Category Buildings: Arts Center FuturePriority1 Urgent Total Project Cost:$9,000 Description Urinal Partitions: Need to replace the partitions between urinals in both men's restrooms. ( Useful life of 10 years) Restroom Countertops: Replace countertops in all 4 restrooms (Useful life of 12 years) Priority #2 Push Plate or Button: ($250 times 4 = $1000) Add push plate or button door openers to all restrooms for handicapped accessability. (Useful life of 10 years) Priority #1 Justification Urinal Partitions: Existing panels have rusted, making them difficult to keep clean and unappealing to patrons. (Useful life of 10 years) Restroom Countertops: Material stains and finish show all water marks. Further the pitch of the counters, holds water on top. Even though cleared multiple times a day, they appear dingy and dirty. (Useful life of 12 years) Add push buttons to restroom doors: Current handles are difficult for persons in wheelchair or with limited arm mobility to operate. Adding a push plate of button would address the issue and be in keeping with our commitment to being an accessible community resource and venue. ExpendituresTotal 20142015201620172018 Construction/Maintenance 9,0009,000 Total Funding Sources20142015201620172018Total CI - Capital Improvement Fund 9,0009,000 Total Budget Impact/Other Monday, July 29, 2013 73 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Co-Director Type Improvement 13-CIP-AR003 Project # Useful Life 8 - 15 years Arts Center - Chairs and Tables Project Name Category Buildings: Arts Center FuturePriority1 Urgent Total Project Cost:$14,800 Description Replace Tabletops in Art Classroom: Replace damaged tabletops in art classroom (useful life of 8 years, priority # 1) Tables and Chairs: Replace remaining old stacking chairs with ones to match chairs purchased in 2012. Replace the broken 60" round tables with lighter weight tables, and replace the old 8' tavles that require 2 people to carry with lightweight tables. 80 chairs @ $60.00 each, 6 - 60 " Duralite tables @ $360.00 each, 6 - 8 ' Duralite tables @ $340.00 each. (Useful life - 12 years---------Priority # 1) Additonal Café Tables: 4 adjustable tables for lobby. 4 talbes @ $150.00 each (usefull life of 15 years and priority # 2) Justification Replace tabletops in art classroom: These tabletops receive hard usage and are not failing. Need to replace them not only for our own use, but also to provide adequate support to tenant and rental uses, such as community education. (Usefull life of 8 years, Priority # 1) Chairs and Tables: The old stacking chairs are breaking and unsafe. The welds are breaking and they precariously stack. The large round tables are very heavy, the legs are breaking off of the table base, and the same is happening with the heavier 8 ' tables. Age and use is catching up. (Useful life of 12 years and priority is #1) Additional Café Tables: We often need more of the smaller tables for events. Some of the current tables have aged to the point they no longer adjust. (Useful life of 15 years and priority # 2) Expenditures20142015201620172018Total Construction/Maintenance 14,80014,800 Total Funding Sources20142015201620172018Total 14,80014,800 CI - Capital Improvement Fund Total Budget Impact/Other Monday, July 29, 2013 74 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Co-Director Type Improvement 13-CIP-AR004 Project # Useful Life 15-20 years Arts Center - Storage & Hanging, Display Systems Project Name Category Buildings: Arts Center FuturePriority1 Urgent Total Project Cost:$9,625 Description Hanging Display System in Jaycee Studio and Community Room: Wall mounted rails with rod & hook system (adjustable) on one wall of each room to allow renters as well as tenants and HCA to hang artwork or décor items for events and meetings. (Priority # 2) Storage in Art Class: Build storage units in the art classroom along East wall and move the cabinets currently on East wall to South wall next to the sink area. (useful life 20 years and priority # 1) Ideally we would like to do this in 2013. Redo Storage Closets: Revamp existing storage rooms to improve functionality. (Useful life of 15 years, priority #2) Justification Storage and Hanging Display System: The Art Center has no way of exhibiting items heavier then cardstock in these spaces. System must be flexible and unobtrusive when not in use as these are multi-use spaces. (Priority # 2) Storage in art classroom: This would create neater storage of art classroom materials such as easels. It would also create dedicated space in which to store gallery materials such as pedestals, vatrines and shelves - Something that does not exist at present. This would decrease the damage to gallery materials we currently experience. (useful life of 20 years, priority # 1) Redo Storage Closets: Creating more efficient storage would eliminate the need to rent off-site storage. (Useful life of 15 years, priority #2) ExpendituresTotal 20142015201620172018 6,5003,1259,625 Construction/Maintenance Total Funding Sources20142015201620172018Total 6,5003,1259,625 CI - Capital Improvement Fund Total Budget Impact/Other Monday, July 29, 2013 75 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentCity Hall Administration Cit of Hokins MN yp, Contact Public Works Director Type Improvement 09-CIP-CH030 Project # Useful Life 20 years City Hall Lobby Upgrade Project Name Category Bldg: City Hall FuturePriorityn/a Total Project Cost:$110,000 Description City Hall Lobby Upgrade was proposed as part of the 2007 City Hall upgrade/Carpet project. This part was not completed exceeding estimates. Justification Existing lobby is dated, ceiling tiles have yellowed and wallpaper has numerous stains from 19 years of service. ExpendituresTotal 20142015201620172018 Construction/Maintenance 110,000110,000 Total Funding Sources20142015201620172018Total 110,000110,000 CI - Capital Improvement Fund Total Budget Impact/Other Monday, July 29, 2013 76 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentCommunications Cit of Hokins MN yp, Contact Asst City Manager Type Improvement 13 CIP-CM001 Project # Useful Life 10 years Technology Improvement - Council Chambers & Studio Project Name Category Bldg: City Hall FuturePriorityn/a Total Project Cost:$95,000 Description 2014 - Installation of surge protection and uninterruptible power supplies in the studio. 2015 - Upgrade equipment in the Council Chamber presentation table 2016 - Replace current document camera with high resolution camera. 2017 - Projection system 2018 - Sound system 2019 - Council chamber cameras Justification 2014 - current and future technology improvements are processor based and are sensitive to power fluctuations 2015 - The current presentation swithcing configuration requires the control room operator to determine what is presented to the room. Presenters do not have much control over their presentations and outside presenters need to use the City computer system. The new equipment will allow the presenter to use their own equipment which will simplify the process while protecting the City's computer network. 2016 - The existing camera is standard definition. The new camera will be high resolution 2017 - Current projectors are 10 years old and low resolution. 2018 - Current ceiling speakers are old and need to be replaced. Lobby speakers have no volume control. 2019 - Current cameras will be 15 years old by 2019 and are standard definition. Replace with high definition cameras. Expenditures20142015201620172018Total Communications 9,50035,00012,50023,00015,00095,000 Total Funding Sources20142015201620172018Total 9,50035,00012,50023,00015,00095,000 CT - Cable Franchise Fees Total Budget Impact/Other Monday, July 29, 2013 77 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentFire Cit of Hokins MN yp, Contact Fire Chief Type Improvement 08-CIP-FD019 Project # Useful Life 10 years Replace Carpet and Apparatus Floor Finish - FD Project Name Category Buildings: Fire Facilities FuturePriorityn/a Total Project Cost:$56,000 Description Replace carpet and apparatus floor finish systems. Justification Planned replacement at end of estimated 10 year useful life. Classroom and 2nd and 3rd Floor entryway and louge replacement, due to excessive use of classroom and lounge. FD spoke with Steve Stadler and he was ok with moving it up to 10 years from 15 years. ExpendituresTotal 20142015201620172018 Construction/Maintenance 56,00056,000 Total Funding Sources20142015201620172018Total 56,00056,000 CI - Capital Improvement Fund Total Budget Impact/Other Original plan replacement was 15 years. Due to excessive use of classroom and lounge the life was moved to 10 years. Monday, July 29, 2013 78 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPavilion Cit of Hokins MN yp, Contact PW Director Type Improvement 07-CIP-P313 Project # Useful Life 10 years Pavilion skate Tile Replacement/Lobby Improvement Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$97,000 Description Replacement of existing skate tile and adding skate tile and ceramic tile to the lobby. Replacement of existing tile in team rooms, arena, warming room , and referees room: 5,500 square feet. Install skate tile to a portion of lobby so skaters can access drinking fountains; 500 square feet. Install ceramic tile in the entryway and a portion of the lobby: 500 square feet. Floor has a 10 Year Life - Put in CIP again for 2017 for evalutaion. May only need to do the high traffice areas. Justification Current skate tile is 16 years old and is the original tile; the wear layer of the tile is worn through in the high traffic areas. Original tile was not glued, which increases maintenance and can create gaps in seams. This can allow skates to touch the concrete underneath the tile. Lobby skate and ceramic tile would add to the building aesthetics. When done in 2007 this project cost $41,339.30. PriorExpendituresTotal 20142015201620172018 Construction/Maintenance 45,00045,000 52,000 TotalTotal PriorFunding Sources20142015201620172018Total 45,00045,000 52,000 PA - Pavilion Fund TotalTotal Budget Impact/Other New tile glued down will save on maintenance, be safer, and improve facility appearance and marketability. Monday, July 29, 2013 79 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPavilion Cit of Hokins MN yp, Contact Public Works Director Type Improvement 07-CIP-P314 Project # Useful Life 30 years Pavilion Overhead Door Improvement Project Name Category Bldgs: Pavillion FuturePriorityn/a Total Project Cost:$40,000 Description Remove and lock-in four of the six overhead doors on the west side of the Pavilion with a portion to have windows or glass block to allow light to come through. Install automatic openers on the remaining four overhead doors in the arena. ESTIMATED PROJECT SCHEDULE: 2015 Justification Currently the overhead doors are seldom utilized and the removal and installation of glass blocks or windows will decrease the need to use arena lighting and add to arena aesthetics. Saving on repairs and maintenance of the removed doors. Pavilion user groups have asked for this project. ExpendituresTotal 20142015201620172018 Construction/Maintenance 40,00040,000 Total Funding Sources20142015201620172018Total 40,00040,000 PA - Pavilion Fund Total Budget Impact/Other Potential savings on utilities and greater satisfaction from user groups with arena aesthetics. Monday, July 29, 2013 80 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPavilion Cit of Hokins MN yp, Contact Public Works Director Type Improvement 09-CIP-P025 Project # Useful Life 20 years Pavilion Gas Fired Rooftop Furnace Project Name Category Bldgs: Pavillion FuturePriorityn/a Total Project Cost:$9,000 Description Remove and replace existing gas fired rooftop furnace used for heating the team rooms. ESTIMATED PROJECT SCHEDULE: Spring/Summer 2015 Justification Current unit was installed during construction of the facility in 1990. Planned replacement for end of estimated useful life. ExpendituresTotal 20142015201620172018 Construction/Maintenance 9,0009,000 Total Funding Sources20142015201620172018Total 9,0009,000 PA - Pavilion Fund Total Budget Impact/Other Savings on utilities due to increase in efficiency of new units. Monday, July 29, 2013 81 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPavilion Cit of Hokins MN yp, Contact Public Works Director Type Improvement 09-CIP-P026 Project # Useful Life 25 years Pavilion Roof Replacement Project Name Category Bldgs: Pavillion FuturePriority1 Urgent Total Project Cost:$120,000 Description Removal and replacement of existing ballast and membrane for both the north and south roof sections. Justification Repairs made in 2005 extended the life of the roof but it is now 25 years old and has surpassed manufacturers recommendation for replacements. The current roof has leaks and given the current condition of the membrane more failures are expected. ExpendituresTotal 20142015201620172018 Construction/Maintenance 120,000120,000 Total Funding Sources20142015201620172018Total 120,000120,000 PA - Pavilion Fund Total Budget Impact/Other Roof leaks can potentially be harmful to the steel roof deck and may cause damage to equipment and interior of Pavilion, impacting operations and adding cost to roof replacement. Monday, July 29, 2013 82 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPavilion Cit of Hokins MN yp, Contact Public Works Director Type Improvement 09-CIP-P036 Project # Useful Life 15-25 years Pavilion Evaporator Condenser Replacement Project Name Category Bldgs: Pavillion FuturePriorityn/a Total Project Cost:$60,000 Description Remove and replace existing condenser with a new condenser, sump tank, pump and fan motors. ESTIMATED PROJECT SCHEDULE: 2015 Justification Existing condenser has extensive scaling and has experienced a loss in efficiency causing higher head pressures and putting greater strain on compressors. ExpendituresTotal 20142015201620172018 Construction/Maintenance 60,00060,000 Total Funding Sources20142015201620172018Total 60,00060,000 PA - Pavilion Fund Total Budget Impact/Other Given the age, scaling, and corrosion of the existing condenser a freon leak could potentially develop causing greater expense and need for repair. Monday, July 29, 2013 83 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPavilion Cit of Hokins MN yp, Contact Facilities Director Type Improvement 10-CIP-P319 Project # Useful Life 15 years Pavilion Indoor Turf Replacement Project Name Category Bldgs: Pavillion FuturePriorityn/a Total Project Cost:$95,000 Description Purchase new turf for the Pavilion's arena Justification The current turf was purchased in 1998 and has a useful life of 15 years (2013), the turf is showing signs of wear and has been patched in a few areas. Replacement will be needed by 2016. ExpendituresTotal 20142015201620172018 Construction/Maintenance 95,00095,000 Total Funding Sources20142015201620172018Total 95,00095,000 PA - Pavilion Fund Total Budget Impact/Other Possible resale of the existing turf may offset some of the cost of a new turf system. Monday, July 29, 2013 84 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPavilion Cit of Hokins MN yp, Contact Facilities Director Type Improvement 10-CIP-P320 Project # Useful Life 10 years Pavilion - Desiccant Repl of Dehumidification Syst Project Name Category Bldgs: Pavillion FuturePriorityn/a Total Project Cost:$6,000 Description Purchase and replace the desiccant medium used in the Pavilion's dehumidification system. Justification The current desiccant has never been replaced and has surpassed its useful life. New desiccant will make the system run more efficient and effectively saving on natural gas and electricity. Also provide dryer air which can have a positive effect on ice quality and indirectly cause more efficient operation of the refrigeration equipment. ExpendituresTotal 20142015201620172018 Construction/Maintenance 6,0006,000 Total Funding Sources20142015201620172018Total 6,0006,000 PA - Pavilion Fund Total Budget Impact/Other Monday, July 29, 2013 85 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPavilion Cit of Hokins MN yp, Contact Don Olson Type Improvement 13-CIP-P321 Project # Useful Life 15 years Mezzanine Rooftop Unit Replacement Project Name Category Bldgs: Pavillion FuturePriority1 Urgent Total Project Cost:$24,500 Description Purchase and installation of (3) rooftop HVAC units that suppy heating and cooling to the Pavilions Mezzanine Justification The current units were installed in 2003 and are at the end of their useful life. ExpendituresTotal 20142015201620172018 Construction/Maintenance 24,50024,500 Total Funding Sources20142015201620172018Total 24,50024,500 PA - Pavilion Fund Total Budget Impact/Other Monday, July 29, 2013 86 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPavilion Cit of Hokins MN yp, Contact Don Olson Type Improvement 13-CIP-P324 Project # Useful Life 25 years Pavilion Entry and Lobby Door Replacement Project Name Category Bldgs: Pavillion FuturePriority3 Important Total Project Cost:$7,000 Description Purchase and install (10) doors, closers, and push bars to replace the current doors at the entrance to the Pavilion. Justification The current doors were installed when the facility was built in 1990 and have exceeded their useful life. ExpendituresTotal 20142015201620172018 Construction/Maintenance 7,0007,000 Total Funding Sources20142015201620172018Total 7,0007,000 PA - Pavilion Fund Total Budget Impact/Other Monday, July 29, 2013 87 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPavilion Cit of Hokins MN yp, Contact Don Olson Type Improvement 13-CIP-P325 Project # Useful Life 25 years Paint Pavilion Exterior Project Name Category Bldgs: Pavillion FuturePriority1 Urgent Total Project Cost:$22,000 Description Hire a painting contractor to pain the Pavilions exterior. Justification The exterior block of the facility has not been painted since the facility was built and the current paint is faded and chipped in areas. ExpendituresTotal 20142015201620172018 Construction/Maintenance 22,00022,000 Total Funding Sources20142015201620172018Total 22,00022,000 PA - Pavilion Fund Total Budget Impact/Other Monday, July 29, 2013 88 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPavilion Cit of Hokins MN yp, Contact Don Olson Type Improvement 13-CIP-P326 Project # Useful Life 25 years Pavilion-Painting the Arena Ceiling and Bar Joist Project Name Category Bldgs: Pavillion FuturePriority1 Urgent Total Project Cost:$20,000 Description Hire a painting contractor to clean, prep, and paint the roof deck and bar joist in the arena. Justification The current coating was painted when the facility was built and is in need of recoating to protect roof deck and bar joist from rust. ExpendituresTotal 20142015201620172018 Construction/Maintenance 20,00020,000 Total Funding Sources20142015201620172018Total 20,00020,000 PA - Pavilion Fund Total Budget Impact/Other Monday, July 29, 2013 89 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPolice Cit of Hokins MN yp, Contact Police Chief Type Improvement 08-CIP-PD016 Project # Useful Life 7 years Replace Carpet - Police Station Project Name Category Buildings: Police Department FuturePriorityn/a Total Project Cost:$40,000 Description Replace Police Station Carpeting Justification Planned replacement at end of estimated 10 year useful life. This is a 24hour/day work center that required the shorter carpet replacement cycle. ExpendituresTotal 20142015201620172018 Construction/Maintenance 40,00040,000 Total Funding Sources20142015201620172018Total 40,00040,000 CI - Capital Improvement Fund Total Budget Impact/Other May have to look at other flooring option for dispatch. (ie combination of carpet and tile due to wear under desk areas. Previously in at a 7 year life - moved back to 10 year life Monday, July 29, 2013 90 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Bldg/Equip Ser Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-B011 Project # Useful Life 30 years Public Works Garage Upgrade Project Name Category Buildings: Maintenance Facilit FuturePriority1 Urgent Total Project Cost:$220,000 Description The current Vehicle Maintenance Garage at Public Works was constucted in 1981, an addition was added in 1995. The floor hoist was installed in 1989. The concrete flooring and drainage system are in very poor condition. The current below grade vehicle lift needs to be relocated above grade to prevent groundwater contamination from an undetectable failure in the piping or hoist. A roll-around above grade hoi st sytem will need to be utilized in place of the existing below grade hoist. Due to the sloping of the existing floor and its condition it would need to be replaced to be able to use this type of lift. Exis ting ventilation, installed in 1989 will also need to be upgraded to meet current regulations on air quality. The concrete flooring and drainage system are in very poor condition. A small twin post above ground lift will be utilized for cars and light trucks. Stage 1: 2015: Site evaluation and cost estimates, plans and specifications Stage 2: 2016 Construction Justification Current garage area needs to be brought up to new requirments for above and below ground hoists. Ventilation ststem needs to be brounght up to current standards and to prevent garage fumes from entering office area. Floor and drain system in poor condition. Expenditures20142015201620172018Total Construction/Maintenance 20,000200,000220,000 Total Funding Sources20142015201620172018Total 20,000100,000120,000 CI - Capital Improvement Fund 25,00025,000 RF - Refuse Fund 25,00025,000 SF - Sanitary Sewer Fund 25,00025,000 SU - Storm Sewer Fund WF - Water Fund 25,00025,000 Total Budget Impact/Other Monday, July 29, 2013 91 92 Parks and Recreation 93 94 CAPITAL IMPROVEMENT PLAN 20142018 thru Department Public Works: Parks Cit of HokinsMN yp, ContactPublic Works Director TypeImprovement 08-CIP-P001 Project # Useful Life Valley Park - Outdoor Lighting Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriority n/a Total Project Cost: $75,000 Description Upgrade Park Lighting - The lighitng for open skate and hockey needs replacement due to age and energy inefficiency. Justification Existing fixtures are old & energy inefficient. PriorExpendituresTotal 20142015201620172018 Construction/Maintenance 40,00040,000 35,000 TotalTotal PriorFunding Sources20142015201620172018Total 40,00040,000 35,000 PDF- Park Dedication Fund TotalTotal Budget Impact/Other Added lighting upgrade in 2013 Monday, July 29, 2013 95 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-P003 Project # Useful Life 15 years Skate Park Project Name Category PW - Parks FuturePriorityn/a Total Project Cost:$70,000 Description Annual equipment enhancments to Overpass Skate Park Justification Per our agreement with 3rd Lair, who manages the Skate Park, we need to put $7,000 of enhancements into the Skate Park for the years 2006-2008. The agreement for 2009-2011 requires annual enhancements of $7,000. The agreement for 2012-2014 is currently being renewed for $7,000 each year. 7The current agreement of $7,000 per year is expected to be continued for 2015-2017 Per the Overpass Skate Park Operators Agreement, the city annually puts an amount specified in the agreement of enhancements into the park to change/improve the park each year to keep the park attractive and challenging to users. PriorExpenditures20142015201620172018Total Construction/Maintenance 7,0007,0007,0007,00028,000 42,000 TotalTotal PriorFunding Sources20142015201620172018Total 7,0007,0007,0007,00028,000 42,000 PDF- Park Dedication Fund TotalTotal Budget Impact/Other Formerly budgeted in Skate Park Enterprise Fund, which was eliminated 12/31/2005. It is now budgeted in the Park Dedication Fund. Monday, July 29, 2013 96 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact PW Director Type Improvement 08-CIP-P010 Project # Useful Life Park Valley - Play Equipment Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$60,000 Description Replace park play equipment Justification Upgrade of park play equipment after 20 - 25 years of use. ExpendituresTotal 20142015201620172018 Construction/Maintenance 60,00060,000 Total Funding Sources20142015201620172018Total 60,00060,000 PDF- Park Dedication Fund Total Budget Impact/Other Moved from 2014 to 2018 and increased cost from $45,000 to $60,000. Monday, July 29, 2013 97 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-P011 Project # Useful Life Burnes Park - Resurface Tennis Courts Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$30,000 Description Crackseal and apply new surface color coat to Burnes Park tennis courts. Periodic repairs needed to ensure quality safe playing surface. Justification Work needed to restore asphalt surface condition and extend life of tennis courts. PriorExpendituresTotal 20142015201620172018 Construction/Maintenance 20,00020,000 10,000 TotalTotal PriorFunding Sources20142015201620172018Total 20,00020,000 10,000 PDF- Park Dedication Fund TotalTotal Budget Impact/Other Work last done in 2009 - periodically needs repairs. Monday, July 29, 2013 98 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-P014 Project # Useful Life Hilltop Park - Play Equipment Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$100,000 Description Replace park play equipment. Justification Replace park play equipment after 20-25 years - installed in 1990 and needs replacement ExpendituresTotal 20142015201620172018 Construction/Maintenance 100,000100,000 Total Funding Sources20142015201620172018Total 100,000100,000 PDF- Park Dedication Fund Total Budget Impact/Other Project changed from $45,000 to $100,000 and moved from 2014 top 2016 Monday, July 29, 2013 99 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-P015 Project # Useful Life Valley Park - Play Equipment Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$145,000 Description Replace park play equipment. Justification Play container upgraded in 2012 and rope climber installed. Other existing play equipment was installed in 1992 and needs replacement. PriorExpendituresTotal 20142015201620172018 Construction/Maintenance 80,00080,000 65,000 TotalTotal PriorFunding Sources20142015201620172018Total 80,00080,000 65,000 PDF- Park Dedication Fund TotalTotal Budget Impact/Other Modified project to inclcude play equipment replacement in 2017 Monday, July 29, 2013 100 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-P016 Project # Useful Life Oakes Park - Play Equipment Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$100,000 Description Replace park play equipment. Justification Upgrade of park play equipment after 20-25 years of use. ExpendituresTotal 20142015201620172018 Construction/Maintenance 100,000100,000 Total Funding Sources20142015201620172018Total 100,000100,000 PDF- Park Dedication Fund Total Budget Impact/Other Monday, July 29, 2013 101 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Facilities Director Type Improvement 11-CIP-P019 Project # Useful Life Cottageville Park - Play Equipment Project Name Category PW - Parks FuturePriorityn/a Total Project Cost:$165,000 Description Install play equiment. - The existing play equipment was installed in 1990. New play equipment is consistent with overall park improvement master plan. Justification In accordance with new park master plan, replace existing 23 year old play equipment. PriorExpendituresTotal 20142015201620172018 Construction/Maintenance 120,000120,000 45,000 TotalTotal PriorFunding Sources20142015201620172018Total 120,000120,000 45,000 PDF- Park Dedication Fund TotalTotal Budget Impact/Other Modified project in 2013 Monday, July 29, 2013 102 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P038 Project # Useful Life Oakes Park -Drinking Fountain Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$10,000 Description Install Drinking Fountain - $10,000 Justification Currently the park has no outside drinking fountain. ExpendituresTotal 20142015201620172018 Construction/Maintenance 10,00010,000 Total Funding Sources20142015201620172018Total 10,00010,000 PDF- Park Dedication Fund Total Budget Impact/Other New to CIP in 2013 Monday, July 29, 2013 103 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P040 Project # Useful Life Burnes Park - Warming House Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$60,000 Description Rehab Warming House - $60,000 Justification The existing warming house is 40+ years old and looks dates and drab. Install new roffing, exterior treatment and landscaping. ExpendituresTotal 20142015201620172018 Construction/Maintenance 60,00060,000 Total Funding Sources20142015201620172018Total 60,00060,000 PDF- Park Dedication Fund Total Budget Impact/Other New to CIP in 2013 Monday, July 29, 2013 104 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P041 Project # Useful Life Oakes Park - Replace Picnic Shelter Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$30,000 Description Replace picnic shelter - $30,000 Justification Existing shelter is 30+ years old and deteriorated, concrete slab floor is heaving. ExpendituresTotal 20142015201620172018 Construction/Maintenance 30,00030,000 Total Funding Sources20142015201620172018Total 30,00030,000 PDF- Park Dedication Fund Total Budget Impact/Other New to CIP in 2013 Monday, July 29, 2013 105 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P042 Project # Useful Life Valley Park - Construct Storage Building Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$25,000 Description Construct storage building - $25,000 Justification Storage area needed to support organizations using the athletic fleids and for park maintenance needs. ExpendituresTotal 20142015201620172018 Construction/Maintenance 25,00025,000 Total Funding Sources20142015201620172018Total 25,00025,000 PDF- Park Dedication Fund Total Budget Impact/Other New to CIP in 2013 Monday, July 29, 2013 106 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P043 Project # Useful Life Burnes Park - Play Equipment Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$235,000 Description Replace 2-5 play equipment - $35,000 Play Equipment - $200,000 in 2025 Justification Existing equipment was installed in 1996. This large park and its play equipment are heavily used by area residents and for large picnic events. ExpendituresTotalFuture 20142015201620172018 Construction/Maintenance 35,00035,000 200,000 TotalTotal Funding Sources20142015201620172018TotalFuture 35,00035,000 PDF- Park Dedication Fund 200,000 TotalTotal Budget Impact/Other New to CIP in 2013 Monday, July 29, 2013 107 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P044 Project # Useful Life Oakes Park - Tennis Courts Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$200,000 Description Repair tennis courts - $20,000 2025 - Tennis Courts Reconstruct = $180,000 (2 courts) Justification Periodic repairs needed to ensure quality safe playing surface ExpendituresTotalFuture 20142015201620172018 Construction/Maintenance 20,00020,000 180,000 TotalTotal Funding Sources20142015201620172018TotalFuture 20,00020,000 PDF- Park Dedication Fund 180,000 TotalTotal Budget Impact/Other Added to CIP in 2013 Monday, July 29, 2013 108 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P045 Project # Useful Life Valley Park - Warming House Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$60,000 Description Rehab Warming House - $60,000 Justification The existing warming house is 40+ years old and looks dated and drab. Install new roofing, elextrical upgrades, plumbinf upgrades, exterior treatements and landscaping. ExpendituresTotal 20142015201620172018 Construction/Maintenance 60,00060,000 Total Funding Sources20142015201620172018Total 60,00060,000 PDF- Park Dedication Fund Total Budget Impact/Other Added to CIP in 2013 Monday, July 29, 2013 109 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Type Unassigned 13-CIP-P072 Project # Useful Life Oakes Park - Lighting Project Name Category Unassigned FuturePriorityn/a Total Project Cost:$40,000 Description Relocate/Upgrade Lighting - $40,000 OGU - $20,000 from MCES due to moving the hockey rink for their lift station. Justification The lighting for open skate and hockey needs replacement due to age and energy inefficiency and must be relocated for the MCES lift station construction. ExpendituresTotal 20142015201620172018 Construction/Maintenance 40,00040,000 Total Funding Sources20142015201620172018Total 20,00020,000 GU - Other Governmental Unit 20,00020,000 PDF- Park Dedication Fund Total Budget Impact/Other Added item in 2013 Monday, July 29, 2013 110 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentRecreation Cit of Hokins MN yp, Contact PW Director Type Improvement 10-CIP-R002 Project # Useful Life 25 years Depot Recreation Area Project Name Category PW - Parks FuturePriority2 Very Important Total Project Cost:$500,000 Description This project includes the addition of an outdoor multipurpose rink/court and support building on property west of the Depot facility. These amenities are proposed to be utilized as part of Depot youth engagement activities and as part of the community rec leagues and playground programs. The multipurpose rink/court will include an asphalt surface and hockey dasher boards for skating and broomball use in the winter; and equipment to accommodate basketball, inline skating, volleyball and soccer uses in the spring, summer and fall months. The support facility will include equipment for a bike maintenance and repair site sponsored by the Depot, as well as restrooms, storage areas and a general multipurposearea to be used as a warming house in the winter. Hennepin County Grant of $150,000 will be applied for. Justification The Depot site has needed outdoor amenities for its target audience since its founding. A year-round sports "anchor" at the Depot site to complement arts and music and entreprenurial business experience for youth will provide additional reniforcemement of positive behaviors. As more people come to the Depot for youth activities as well as general use during daytime hours, such a facility could be used all day and into the evening hours. Proximity to the rail corridor will accord high visibility and symbolize active living and community connections in a walkable, bike-able community. Rec league broomball or hockey could share ice with free skating times. Local business employees could take advantage of the facilty over lunch times. Easy trail access makes the Depot and easy ride for kids who would come there to play. The Depot has been working toward more bike -oriented prgrams open to the whole community (e.g. Bike Scream Sundays) and has some connections already with local bike retailer/advocates at Freewheel by hosting a bike equipment vending machine on site. Dedicated space would give new possibilities to this aspect of the "Depot on the Move" Initiative. Expenditures20142015201620172018Total 500,000500,000 Construction Total Funding Sources20142015201620172018Total 500,000500,000 GU - Other Governmental Unit Total Budget Impact/Other Monday, July 29, 2013 111 112 Streets, Traffic & Transportation 113 114 115 116 CAPITAL IMPROVEMENT PLAN 20142018 thru Department Public Works: Streets/Traffic Cit of HokinsMN yp, ContactPublic Works Director TypeImprovement 01-CIP-S101 Project # Useful Life Unassigned Residential Street Improvements Project Name Category Trans: Streets FuturePriority n/a Total Project Cost: $19,140,000 Description Program to improve streets needing repair or reconstruction as indicated by street condition survey, or as part of an area street improvement. 2014: West Park Road, 21st Ave North - Mainstreet to First Street North 2015: Lake Street from Tyler Ave to Texas Ave. 2016 - 2017: Park Valley and Peaceful Valley Reclamation Project - East and West Park Valley Road; 9th Avenue South between Westbrooke Way and 7th Street South; 6th Street South between 10th Avenue and 6th Ave South; 7th Street South between 10th Avenue and East Park Valley Road; 5th Ave South between 5th Street South and 7th Street South 2018: Texas Avenue from Lake Street to Cambridge Street; Oxford Street from Blake Road to Texas Ace; Cambridge Street from Blake Road to Texas Ave; Murphy Street from Lake Street to Oxford Street. Justification Ongoing street improvements determined through Pavement Management Program. PriorExpenditures20142015201620172018Total 400,0001,500,0002,500,0002,500,0002,250,0009,150,000 9,990,000 Construction/Maintenance TotalTotal PriorFunding Sources20142015201620172018Total GU - Other Governmental Unit 800,000800,000 9,990,000 PI - PIR/General Obligation Bo 280,000500,0001,500,0001,500,0001,500,0005,280,000 Total SA - Special Assessment 120,000200,0001,000,0001,000,000750,0003,070,000 Total Budget Impact/Other Consistent with the City Council adopted Roadway Improvement Policy, street ratings, and Pavement Management Program. Monday, July 29, 2013 117 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S102 Project # Useful Life Unassigned Residential Street Improvements--Utilities Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$7,885,000 Description Locations to be determined as they are consistent with the street reconstruction program. Program to reconstruct deteriorated water main and sanitary sewer and to provide storm sewer improvements in conjunction with street improvement projects. Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections. Justification In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installed new. In some cases, water main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The numbers assume the city funding 100% of major storm sewer, water main, and sanitary sewer re/construction. These costs are to be used in conjunction with street reconstruction costs shown on 01-CIP-S101. PriorExpendituresTotal 20142015201620172018 Construction/Maintenance 575,000475,000430,000430,0001,225,0003,135,000 4,750,000 TotalTotal PriorFunding Sources20142015201620172018Total 225,000175,000120,000120,000325,000965,000 4,750,000 SF - Sanitary Sewer Fund 0100,000110,000110,000300,000620,000 SU - Storm Sewer Fund Total 350,000200,000200,000200,000600,0001,550,000 WF - Water Fund Total Budget Impact/Other Public Hearing - year prior to planned construction Plans and specifications - year prior to planned construction Bid - year of planned construction Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections. Monday, July 29, 2013 118 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S103 Project # Useful Life Unassigned Citywide Concrete Alleys Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$1,368,000 Description 2016: Alley South of Mainstreet between 8th and 9th Ave South 2017: Alley south of 6th Street South and North of Nine Mile Creek, between 11th Avenue South and 10th Avenue South. Program to construct concrete alleys in areas designated as poor on the Alley Condition Survey. Justification The city has had a policy of constructing concrete alleys for a number of years. This policy has proved to be sound by the concrete alleys' durability and low maintenance costs. Current policy has the city share at 20% of the cost in residential areas. The city will experience cost savings due to lower maintenance costs. PriorExpendituresTotal 20142015201620172018 Construction/Maintenance 75,00080,000155,000 1,213,000 TotalTotal PriorFunding Sources20142015201620172018Total 15,00016,00031,000 1,213,000 PI - PIR/General Obligation Bo 60,00064,000124,000 SA - Special Assessment Total Total Budget Impact/Other Consistent with the City Council adopted Roadway Improvement Policy and Alley ratings. Monday, July 29, 2013 119 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S104 Project # Useful Life Unassigned County Road 3 Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$2,300,000 Description County Road 3 from Shady Oak Road to Meadowbrook Road. Lighting, landscaping, street, etc. improvements along Excelsior Boulevard from the east to west city limits. GO Bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue Segment 1: Construction - 1998/1999 Segment 2: Planning - 2004; bidding and construction (median upgrades only) - 2005 Segment 3: Planning and acquisition - 1999/2001, bidding/construction - 2002/2003/2004 Segment 4: Planning and acquisition - Not in County funding plan TIF funded work includes the following: A signalized intersection will be constructed at Monroe Avenue. A second intersection will also be built at Jackson Ave/St. Louis Street. There will also be a reconfiguration of Monroe Avenue and Milwaukee south of Excelsior Boulevard. This work is being completed in conjunction with the reconstruction of Excelsior Boulevard from Highway 169 to Blake Road. The intersection is being constructed to facilitate redevelopment of the SuperValu north annex site. Justification Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in all four segments of County Road 3: - Segment 1 from Shady Oak Road to 11th Avenue S.; upgrade existing undivided roadway, upgrade 11th Avenue intersection to meet future needs, implement beautification program--completed in 1998 - Segment 2 from 11th Avenue S. to Hwy 169; median pavers construction - Segment 3 from Highway 169 to Blake Road; upgrade existing narrow undivided roadway, resolve safety issues at railroad crossing, improve north-south access, account for future LRT access, address redevelopment needs, add integration for full access at Jackson Avenue. - Segment 4 from Blake Road to Meadowbrook Road; upgrade roadway, implement beautification program. PriorExpenditures20142015201620172018Total 2,300,0002,300,000 0 Construction/Maintenance TotalTotal PriorFunding Sources20142015201620172018Total GU - Other Governmental Unit 1,600,0001,600,000 0 MS - Municipal State Aid Stree 700,000700,000 Total Total Budget Impact/Other GO bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue. Segment 1: Construction - 1998/1999 Segment 2: Planning - 2005; bidding and construction (median upgrades only) - 2006 Segment 3: Planning and acquisition - 1999/2000; bidding/construction - 2003/2004 Segment 4: Planning and acquisition - Not in County Funding Plan Consistent with Hennepin County CIP and City Council action. Monday, July 29, 2013 120 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S106 Project # Useful Life Unassigned County Road 61 (Shady Oak Road) Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$20,450,000 Description Shady Oak Road from County Road 3 to T.H. 7, Mainstreet from 20th Avenue to Shady Oak Road. Lighting, landscaping, street, etc., improvements from County Road 3 to T.H. 7 Reconstruction and amenities on Mainstreet from 20th Avenue to Shady Oak Road. Reconstruction of West Park Road, 2nd Street N., and 21st Avenue N. (2nd Street-4th Street N.) See also 01-CIP U003 for the Storm Sewer Management associated with this project. Justification Deficiencies appear on Shady Oak Road in terms of roadway conditions, traffic/pedestrian movement, safety, and aesthetics. Upgrade an undivided roadway, resolve safety issues with number of driveway access points and intersection at Mainstreet. Lighting needs upgrading and provide beautification program. ExpendituresTotal 20142015201620172018 Construction/Maintenance 8,200,00012,250,00020,450,000 Total Funding Sources20142015201620172018Total 6,150,00011,045,00017,195,000 GU - Other Governmental Unit 2,050,000755,0002,805,000 MS - Municipal State Aid Stree 200,000200,000 PI - PIR/General Obligation Bo 250,000250,000 SA - Special Assessment Total Budget Impact/Other 2012-2014: Planning and acquisition 2014/2015: Bidding and construction Consistent with Hennepin County CIP, city's desire to upgrade the roadway, and reconstruction program for all of Mainstreet. This project totals $20,450,000. Hopkins share of the county project is $2,805,000. Monday, July 29, 2013 121 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S504 Project # Useful Life Unassigned Sixth Street South (11th to 12th Avenue South) Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$500,000 Description Sixth Street South from 11th Avenue South to 12th Avenue South. Extension of roadway and box culvert crossing at Nine Mile Creek. Justification This project will offer a second access to the industrial area (fire access). Will direct some of the existing industrial traffic north, away from the residential intersection at Seventh Street and 11th Avenue. Will connect a current dead-end alley, west of 11th Avenue. ExpendituresTotal 20142015201620172018 Construction/Maintenance 500,000500,000 Total Funding Sources20142015201620172018Total 400,000400,000 MS - Municipal State Aid Stree 100,000100,000 PI - PIR/General Obligation Bo Total Budget Impact/Other Currently on MSA plans. Monday, July 29, 2013 122 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 06-CIP-S118 Project # Useful Life Parking Lots Project Name Category Trans: Parking Facilities FuturePriorityn/a Total Project Cost:$1,000,000 Description 2015: Municipal Parking Lot 200, south of Mainstreet between 8th and 9th Avenues, Pavilion parking lot, City Hall Parking Lot. Rehabilitate parking lot pavement Justification Pavement has deteriorated to the point where cracksealing and sealcoating are not effective. ExpendituresTotal 20142015201620172018 Construction/Maintenance 1,000,0001,000,000 Total Funding Sources20142015201620172018Total 800,000800,000 PI - PIR/General Obligation Bo 200,000200,000 SU - Storm Sewer Fund Total Budget Impact/Other Monday, July 29, 2013 123 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Facilities Director Type Improvement 11-CIP-S120 Project # Useful Life 30 years Plan, Design and Implement Railroad Quiet Zone Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$255,000 Description Modify existing railroad grade crossings to satisfy Federal Railroad Administration (FRA) requirements to create a Whistle-Free Quiet Zone for the CP Railroad corridor. Phase I: Plan and coordinate requirements with FRA and SWLRT project office. Design necessary supplemental safety measures (SSM). Phase II: Construct SSM's and implement Quiet Zone. Justification Train horns sound in early morning hours and are disruptive to nearby residential areas. PriorExpendituresTotal 20142015201620172018 Construction/Maintenance 225,000225,000 30,000 TotalTotal PriorFunding Sources20142015201620172018Total 225,000225,000 30,000 PI - PIR/General Obligation Bo TotalTotal Budget Impact/Other Monday, July 29, 2013 124 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Facilities Director Type Improvement 11-CIP-S121 Project # Useful Life 30 years Mainstreet Rehabilitation Project Name Category Trans: Streets FuturePriority3 Important Total Project Cost:$2,300,000 Description This project includes a mill and overlay from 5th Ave North to 13th Ave North, upgrade of pedestrian facilities to include enhanced crosswalks, sidewalk repair and traffic signal upgrades. Justification Pavement, sidewalk, pavers and traffic signals are becoming worn and in need of updating. PriorExpendituresTotal 20142015201620172018 Construction/Maintenance 2,000,0002,000,000 300,000 TotalTotal PriorFunding Sources20142015201620172018Total 500,000500,000 300,000 GU - Other Governmental Unit 1,500,0001,500,000 PI - PIR/General Obligation Bo Total Total Budget Impact/Other Monday, July 29, 2013 125 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact PW Director Type Improvement 12-CIP-S039 Project # Useful Life 2014 Street Overlay Project Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$550,000 Description 2014 - 3,000 LF of Mill and Overlay in the Hobby Acres. Justification Maintain streets that are in need of work but do not need to be reconstructed. Mill and overlay is needed ot fix deteriorating pavement. Last reconstructed in 1988. ExpendituresTotal 20142015201620172018 Construction 550,000550,000 Total Funding Sources20142015201620172018Total 550,000550,000 PI - PIR/General Obligation Bo Total Budget Impact/Other New item added in 2012 for 2014 2013 - Project increased from $300,000 to $550,000 Monday, July 29, 2013 126 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact PW Director Type Improvement 13-CIP-S040 Project # Useful Life 20 years Pedestrian & Bicycle Access Improvements Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$125,000 Description 2014-2018 - Painting bike lanes, constructing trails and sidewalks Justification Council recently adopted plan to increase pedestrian and bicycle access and safety. These improvements begin to implement that plan. ExpendituresTotal 20142015201620172018 Construction/Maintenance 25,00025,00025,00025,00025,000125,000 Total Funding Sources20142015201620172018Total 25,00025,00025,00025,00025,000125,000 PI - PIR/General Obligation Bo Total Budget Impact/Other Monday, July 29, 2013 127 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Transportation Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S502 Project # Useful Life Unassigned Light Rail Transit Stations (2) Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$150,000 Description 1) Intersection of Third Street South and Fifth Avenue South 2) Second Street Northeast Supplemental improvements to two Light Rail Transit (LRT) stations in the proposed HCRRA locations. Justification The HCRRA proposes to construct two stations along the Southwest Corridor. The proposed expenditures would be in addition to the funds expended by the HCRRA. The additional funds would be used to ensure the stations are high quality in appearance. ExpendituresTotal 20142015201620172018 Construction/Maintenance 150,000150,000 Total Funding Sources20142015201620172018Total 150,000150,000 TF - Tax Increment Financing Total Budget Impact/Other Dependent on HCRRA plans. Consistent with plans for LRT stops in Hopkins by Hennepin County. Monday, July 29, 2013 128 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Transportation Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S503 Project # Useful Life Unassigned Eighth Avenue LRT Corridor Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$200,000 Description Eighth Avenue from County Road 3 to Mainstreet Design and installtion of pedestrian improvements and streetscape improvements Justification ExpendituresTotal 20142015201620172018 Construction/Maintenance 200,000200,000 Total Funding Sources20142015201620172018Total 100,000100,000 GU - Other Governmental Unit 100,000100,000 TF - Tax Increment Financing Total Budget Impact/Other Dependent on Metropolitan Council SWLRT plans Monday, July 29, 2013 129 Utilities 130 CAPITAL IMPROVEMENT PLAN 20142018 thru Department Public Works: Utilities Cit of HokinsMN yp, ContactPublic Works Director TypeImprovement 01-CIP-U002 Project # Useful Life Unassigned Storm Drainage System Maintenance - Alley Repairs Project Name Category Utilities: Municipal Sanitary S FuturePriority n/a Total Project Cost: $189,000 Description 2014-2018 Concrete alley repairs Justification Annual alley pavement concrete slab repairs are needed. PriorExpendituresTotal 20142015201620172018 Construction/Maintenance 20,00020,00021,00021,00021,000103,000 86,000 TotalTotal PriorFunding Sources20142015201620172018Total 20,00020,00021,00021,00021,000103,000 86,000 SU - Storm Sewer Fund TotalTotal Budget Impact/Other Consistent with the Storm Water Management Plan. Monday, July 29, 2013 131 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-U003 Project # Useful Life Unassigned Storm Water Management Projects Project Name Category Utilities: Storm Sewer FuturePriorityn/a Total Project Cost:$880,000 Description 2014: Provide outlet pipe to Shady Oak Pond into CSAH 61 storm drainage piping in conjunction with Shady Oak Road reconstruction - $230,000 2014: Cottageville Park stormwater improvemetns - $650,000 Justification Shady Oak Pond has no outlet and floods streets and residential property if not pumped. Consistent with City Council approved action plan of October 21, 1997, the City's Storm Management Plan, and Shady Oak Road reconstruction timetable. ExpendituresTotal 20142015201620172018 Construction/Maintenance 880,000880,000 Total Funding Sources20142015201620172018Total 880,000880,000 SU - Storm Sewer Fund Total Budget Impact/Other Consistent with City Council approved Action Plan of October 21, 1997, the City's Storm Management Plan, and Shady Oak Road reconstruction timetable. Monday, July 29, 2013 132 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Public Works Director Type Improvement 08-CIP-U001 Project # Useful Life Lift Station # 4 Project Name Category Utilities: Municipal Sanitary S FuturePriorityn/a Total Project Cost:$160,000 Description Rehabilitate LS No. 4 Justification Lift station No. 4 was identified for rehab in the 2007 comprehensive utility plan Regular major maintenance identified in the 2007 comprehensive utility plan. ExpendituresTotal 20142015201620172018 Construction/Maintenance 160,000160,000 Total Funding Sources20142015201620172018Total 160,000160,000 SF - Sanitary Sewer Fund Total Budget Impact/Other Monday, July 29, 2013 133 CAPITAL IMPROVEMENT PLAN 20142018 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-U010 Project # Useful Life St. Louis Park Emergency Connection Project Name Category Utilities: Municipal Sanitary S FuturePriorityn/a Total Project Cost:$211,000 Description St. Louis Park emergency connection. Justification Items identified in 2007 comprehensive utility plan to provide safe and reliable water. ExpendituresTotal 20142015201620172018 Construction/Maintenance 211,000211,000 Total Funding Sources20142015201620172018Total 211,000211,000 WF - Water Fund Total Budget Impact/Other Monday, July 29, 2013 134