2015 - 2019 CIP CAPITAL IMPROVEMENT PLAN 2015-2019 DATE: July 2014 TO: Honorable Mayor and Members of the City Council FROM: Mike Mornson, City Manager 2015-2019 CAPITAL IMPROVEMENT PLAN SUBJECT: With this letter I respectfully submit the 2015-2019 Capital Improvement Plan. This five- year planning document represents the combined efforts of city staff, advisory commissions, citizens and the City Council. The Capital Improvement Plan is a five-year forecast of project needs in the City of Hopkins. It is intended to alert the Council and citizens to the major capital needs on the horizon. The first year of the plan becomes an adopted capital budget and relates almost completely to the operating budget that is approved on a yearly basis. The remaining four year represents an estimate of project needs and funding capabilities of the city. This year’s plan does not include proposed equipment purchases. A document relating specifically to equipment replacement needs has been developed into a separate document. The Capital Improvement Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city’s capital programming needs. At the same time, sufficient projected detail is provided to enable those who review the information to make informed decisions on the programming of projects over the next several years. Please use the information provided to formulate plans, projects and questions. The Capital Improvement Plan can serve the community best by provoking thoughts and actions. This document was developed by the Finance Department with assistance of all city departments. I want to especially thank all those involved in the development of the Capital Improvement Plan and especially Steve Stadler, Public Works Director, Kersten Elverum, Planning and Economic Development Director, Christine Harkess, Finance Director, and Debbie Sperling, Administrative Assistant for their hard work and dedication. 1 CAPITAL IMPROVEMENT PLAN 2015-2019 TABLE OF CONTENTS Page City Manager's Message 1 Table of Contents 2 Introduction Introduction and Purpose5 Program Descriptions Utilities Program6 Transportation Program7 Parks, Forestry, and Pavilion Program9 General Public Buildings Program10 Economic Development12 Sources of Funding Sources of Funding15 Funding Source Abreviations18 Summary of Impacts on Major Funding Sources 21 Cash Flow Statements Park Capital Improvement Fund27 Capital Improvemetn Fund28 Communication Fund29 Municipal State Aid Fund30 Permanent Improvement Revolving Fund (PIR)31 Water Utility Fund32 Sewer Utility Fund33 Storm Sewer Utiltiy Fund34 Pavilion - Ice Arena Fund35 Five-Year Project Summaries Projects by Year39 Department Summary42 Projects by Department43 Funding Source Summary46 Projects by Funding Source47 Project Descriptions & Narratives Economic Development53 General Public Buildings59 Parks & Recreation101 Streets123 Street Improvement Map125 Utilities141 2 Introduction 3 4 INTRODUCTION AND PURPOSE The Capital Improvement Plan is a flexible plan based upon long-range physical planning and financial projections, which schedules the major public improvements that may be incurred by the City over the next five years. Flexibility of the Capital Improvement Plan is established through annual review, and revision if necessary. The annual review assures that the program will become a continuing part of the budgetary process and that it will be consistent with changing demands as well as changing patterns in cost and financial resources. Funds are appropriated only for the first year of the program, which is then included in the annual budget. The Capital Improvement Plan serves as a tool for implementing certain aspects of the City's comprehensive plan; therefore, the program describes the overall objectives of City development, the relationship between projects with respect to timing and need, and the City's fiscal capabilities. The Capital Improvement Plan can help assure: 1. A systematic approach to planning and initiating capital projects affording the opportunity to plan the location, timing, and financing of needed public improvements; 2. The development of a realistic program of capital spending within the City's projected fiscal capability to finance such projects, avoiding sharp change in the tax levy or bonded indebtedness; 3. The coordination of public and private improvement projects permitting adequate time for design and engineering to eliminate duplication of effort and expense; 4. The expenditure of public funds that is compatible with the City's adopted Comprehensive Plan; 5. That the public is kept informed of the proposed future projects and expenditures; 6. That private investors are aware of the City's long-range development program so that they may guide their development in a way that is compatible with the City's program; 7. Aid in achieving federal and/or state participation by providing the necessary planning and lead time necessary for a successful application in addition to meeting prerequisites needed for certain federal and state grants. 5 PROGRAM DESCRIPTIONS In order to effectively plan for and manage the projects contained in a Capital Improvement Plan, it is necessary to group similar activities into "Program Categories". The City of Hopkins' activities are divided into four program categories which are 1) Utilities, 2) Transportation, 3) Parks, Forestry and Pavilion, and 4) General Public Buildings. The City also includes an outline of proposed expenditures for unscheduled projects. Program categories are explained in the following sections. UTILITIES PROGRAM Program Description: The Utilities Program includes the municipal water, municipal sanitary sewer, storm sewer and refuse systems. Program Goal: Provide reliable, efficient, and safe utility service to all parts of the City with a minimum of adverse effects on the environment. Subprograms: Water, sanitary sewer, storm sewer, and refuse service. I. Municipal Water System Subprogram (WA) A. Subprogram Goal: The goal of the Municipal Water System subprogram is to provide water in sufficient quantities at sufficient pressure, with a high degree of reliability and safety to all parts of the City so as to satisfy the normal demands of the general public for water while at the same time providing sufficient reserves in case of fire emergency or power outages. B. Objectives: 1. Water quality shall meet the purity standards of the Minnesota Department of Health. 2. Any hydrant on the system shall, under maximum condition, deliver no less than 500 gallons per minute with a residual pressure of 20 pounds per square inch. 3. The system shall be looped to provide maximum reliability. 4. The supply and storage system shall be designed and maintained to have maximum reliability. 6 II. Municipal Sanitary Sewer Subprogram (SA) A. Subprogram Goal: The goal of the Municipal Sanitary Sewer subprogram is to promote a healthful environment by collecting all sewage from existing and projected development in a sanitary and economic manner. B. Objectives: 1. Provide sewer lines of adequate size and grade to collect and transmit all discharge sewage. 2. Prevent sewage from overflowing into the natural environment. 3. Prevent sewage back-ups. 4. Encourage or promote connection of all generators of sewage to the Municipal system. 5. Meet the effluent and infiltration standards of the Metropolitan Waste Control Commission. III. Storm Sewer Subprogram (SS) A. Subprogram Goal: Manage and control surface and ground waters in order to protect the man-made and natural environment in a safe and efficient manner. B. Objectives: 1. Prevent flooding. 2. Prevent damage to property due to erosion. 3. Meet water quality standards established by the controlling regulatory law or authority. TRANSPORTATION PROGRAM Program Description: This program includes streets, walkways, traffic signs and signals, vehicular parking facilities, and street lighting. Program Goal: Provide for the safe and efficient movement of people and goods throughout the city. 7 Subprograms: Streets, Walkways/Sidewalks, Signs/Signals, Parking Facilities, and Street Lights. I. Streets Subprogram (ST) A. Subprogram Goal: The goal of the Streets subprogram is to provide safe, convenient, economic public streets to best facilitate the movement of vehicular traffic. B. Objectives: 1. Streets should be constructed with permanent surfaces, concrete curb and gutter, and with ancillary storm drainage, to standards established by the City. 2. Streets should be of a size and load capacity consistent with their functional classifications. 3. Timely major repair to preserve the basic capital investment in streets. II. Walkways/Sidewalks Subprogram (WS) A. Subprogram Goal: To provide a safe and convenient pedestrian system with incidental recreational benefits. III. Signs/Signals Subprogram (SI) A. Subprogram Goal: The goal of the Signs/Signals subprogram is to provide an efficient and orderly system of street and traffic signing so as to promote safe, convenient travel throughout the City. B. Objectives: 1. Signs and signals should be installed in conformity with the Minnesota Manual on Uniform Traffic Control Devices. 2. Periodic surveys and studies should be made to document the effectiveness of City signing patterns. IV. Parking Facilities Subprogram (PA) A. Subprogram Goal: To provide such supporting facilities as will promote maximum use of public parking spaces by employers, employees, customers, and visitors. 8 B. Objectives: 1. Provide parking facilities for present and anticipated needs of the City of Hopkins. V. Street Lights Subprogram (SL) A. Subprogram Goal: To provide a system of street lighting within the City that will promote safe and convenient vehicular and pedestrian travel on City Streets. B. Objectives: 1. To provide lighting at each street intersection within the City. 2. To provide mid-block street lighting in conformance with the City's street lighting policy, in order to provide equitable, cost efficient lighting. 3. To continually update the system so as to provide energy and cost efficient lighting. PARKS, FORESTRY AND PAVILION PROGRAM Program Description: This program includes community parks, neighborhood parks, open spaces, recreational structures and facilities. Program Goal: The goal of the Park and Recreation Program is to provide facilities for safe, stimulating, and comprehensive leisure time activities of Hopkins citizens. Subprograms: Neighborhood Facilities, Community Facilities I. Neighborhood Facilities Subprogram (NF) A. Subprogram Goals: To acquire ownership or use rights of park sites located to provide convenient walking access to all Hopkins citizens and to develop such sites to provide optimum recreational serviceability consistent with the preservation and enhancement of pleasing aesthetic qualities. B. Objectives: 1. Acquire property or use rights on those neighborhoods that do not have convenient walking access to neighborhood park facilities. 2. Develop neighborhood park facilities to meet the needs of various user groups. 9 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Preserve and enhance the aesthetic qualities of neighborhood parks. II. Community Facilities Subprogram (CF) A. Subprogram Goals: The goal of the Community Facilities subprogram is to develop, or acquire ownership or use rights of sites which serve the entire City and to provide facilities that serve community-wide needs. B. Objectives: 1. Acquire sites that have valuable and unique natural characteristics to preserve irreplaceable community resources. 2. Preserve by acquisition, gift, or other arrangement properties that have valuable historic-cultural qualities. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Construct or acquire structures and facilities necessary to meet the changing needs of the community. GENERAL PUBLIC BUILDINGS PROGRAM Program Description: The General Public Buildings Program includes all municipal buildings except those provided for in the Utility and Park Facilities Program. Program Goal: Provide buildings that are adequate and convenient for the efficient accommodation of City functions. Subprograms: Administrative Offices, Maintenance Facilities, Fire Facilities, Community Center. I. Administrative Offices Subprogram (AO) A. Subprogram Goal: The goal of the Administrative Offices subprogram is to provide facilities for the efficient and safe conduct of legislative and administrative functions of the City. 10 B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of the City services. II. Maintenance Facilities Subprogram (MF) A. Subprogram Goal: The goal of the Maintenance Facilities subprogram is to provide facilities for the efficient and safe conduct of City maintenance functions. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of City services. III. Fire Facilities Subprogram (FF) A. Subprogram Goal: To provide a fire station, or stations, for storage of Fire Department equipment and for the training and meetings of volunteer fire fighters to provide prompt and efficient protection to life and property. B. Objectives: 1. Provide a maximum four-minute daytime and three-minute nighttime response to all points within the City. 2. Meet objective 1 through the use of volunteers. IV. Community Center Subprogram (CC) A. Subprogram Goal: To provide a community facility, or facilities, which meet the social, recreational, and cultural needs of all citizens, particularly senior citizens. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repairs. 11 2. Construct or acquire structures and facilities necessary to meet the changing needs of the City. 3. Upgrade facilities as necessary to provide for efficient, safe, and effective provision of City services. ECONOMIC DEVELOPMENT PROGRAM Program Description: This program includes redevelopment projects that have been identified through adopted plans and goals of the City of Hopkins. Program Goal: To facilitate the redevelopment of key sites in order to achieve the state objectives of the project. Objectives: 1. Elimination of blight or blighting conditions 2. Creation of jobs 3. Increase property value(s) 4. Catalyst of additional redevelopment 5. Environmental clean-up Increase transit-oriented development around LRT stations 6. 12 Sources of Funding 13 14 SOURCES OF FUNDING In order to fund the anticipated Capital Improvements, the City must draw upon a variety of sources. Many of these sources have a specific or "dedicated" purpose (i.e., the water utility fund will finance water main installation but not a street overlay). Therefore, it is important to identify the uses and limitations of the various revenue sources. CURRENT REVENUES - GENERAL FUND (CR) This represents funding from current year revenue collections in the General Fund that support operations and capital outlay expenditures. Revenue sources include property tax levies, state aid payments, and various permit and license fees. This source of funding is generally used only for operations and small capital purchases. GENERAL FUND RESERVES (GR) Reserves of the general fund are the funds remaining after subtracting cash flow and emergency amounts from the City's cash balance, sometimes referred to as "fund balance". The use of General Fund Reserves is not recommended for Capital Improvements without significant staff and Council review. COMMUNICATION (formerly Cable TV) FUND (CT) This funding source consists of franchise fees received from the local Cable TV company, in excess of the amounts earmarked for the access programming and commission budgets. Expenditures are limited to cable-related facilities, or must have a cable related purpose. ECONOMIC DEVELOPMENT FUND (ED) This funding source was established by the Housing and Redevelopment Authority (HRA) and the City of Hopkins, to provide funding for the purpose of promoting development and redevelopment within the City. The Economic Development fund is a revolving fund administered by the HRA, intended to provide an ongoing funding source used to reduce or extend the long term debt involved with development and redevelopment activities. The HRA reviews all proposed uses of this fund on an individual basis. GRANT-IN-AID (GA) This is aid received from either the Federal or State government. In many cases, grants are made on matching basis, which means the City shares a portion of the costs of the project being funded. 15 MUNICIPAL STATE AID STREETS (MS) This funding source represents funds received from the State of Minnesota to support construction and maintenance of State Aid classified municipal streets. State law defines the types and limits of State Aid Streets expenditures. PERMANENT IMPROVEMENT REVOLVING/GENERAL OBLIGATION BONDS (PI) Improvements with a life of several years may be financed from the proceeds of a General Obligation Bond Issue. Law limits the total debt that can be incurred under this method of financing. With some exception, General Obligation Bonds are generally subject to a referendum process. Examples of projects, which may not require a referendum, are those financed through the use of special assessments where at least 20 percent of the project cost is assessed to the benefiting property owners. The remaining portion not assessed can be financed through general obligation bonds repaid by a tax levy. PRIVATE SECTOR FUNDING (PF) This funding source consists primarily of payments made by developers for the purchase of land, the installation of water, sewer, or streets or other related expenditures. It can also refer to donations made to the City by individuals or groups. OTHER GOVERNMENTAL UNITS (GU) These are funds received from Hennepin County, adjacent communities, etc. for projects that also benefit a jurisdiction other than the City of Hopkins. REVENUE BONDS (RB) These are bonds issued for improvements made for specific revenue producing facility or operation. The debt incurred is repaid from the revenue generated by the facility. If the revenue generated is insufficient, then the difference becomes an annual obligation of the taxpayers and becomes an additional tax levy. These are generally not subject to referendum. REAL ESTATE SALES FUND (RE) This funding source consists primarily of funds built up from the sale of City owned property. To date, the fund has been used for building improvements. Because the sale of both general City property and park/recreation property are accumulated into this fund, earmarking a portion for recreational purposes may be justified. 16 SPECIAL ASSESSMENT (SA) A number of projects may be realistically financed using Special Assessment to pay the ultimate cost. Almost any project can potentially be financed using the assessment process. In each case it is necessary to make a determination that the assessed property will benefit by the amount of the assessment. The cost of street reconstruction is shared by the property owner and the City. Special assessments to individual properties are capped per city policy. Concurrent improvement costs to the utility systems are assumed by the respective utility funds. TAX INCREMENT FINANCING (TF) This funding source results from the tax value of new development that is "incrementally" greater than the existing tax value. Typically, bonds are sold based on the assumption that the higher tax receipts will retire the bonds. However, the use of TIF funds through a "pay as you go" method has become more common. This type of funding can be used for public improvements within a redevelopment district to support the goals of redevelopment, specifically the elimination of blighted conditions. Approval of the Hopkins HRA should be anticipated prior to the commitment of these funds. State law strictly regulates the use of these funds. WATER FUNDS (WF) Water funds consist of revenue generated from the sale of water. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. SANITARY SEWER FUNDS (SF) Sanitary sewer funds consist of revenue generated from charges made for sewage disposal. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. STORM SEWER UTILITY REVENUES (SU) Storm sewer funds consist of revenue generated by charging storm water drainage fee to parcels of land for the availability and use of municipal storm sewer facilities. Expenditures from this funding source are related to drainage facilities. PAVILION FUND (PA) Pavilion Funds consist of revenues generated from rental fees collected from users of the Pavilion. These funds are utilized to pay for operating, and capital expenditures. 17 Funding Sources Communication (formerly Cable TV) Fund CT Current Revenues – General Fund CR General Fund Reserves GR Economic Development Fund ED Grant-In-Aid GA Housing and Redevelopment Authority HRA Municipal State-Aid Streets MS Other Government Units GU Park Dedication Fund PDF Pavilion Fund PA Permanent Improvement Revolving/General Obligation Bonds PI Private Sector Funds PF Real Estate Sales Fund RE Revenue Bonds RB Sanitary Sewer Fund SF Special Assessment SA Storm Sewer Fund SU Tax Increment Financing TF Water Fund WF 18 Summary of Impacts on Major Funding Sources 19 20 SUMMARY OF PROJECT IMPACTS ON MAJOR FUNDING SOURCES CURRENT REVENUES/GENERAL FUND RESERVES Expenditures for 2014 are budgeted at an increase of 3.46% over the 2013 budget. The 2014 budget was compiled with an average 2% salary increase. The 2014 budget began with levy limits but the City will receive approximately $289,000 in LGA. The tax levy is the major source of revenues (82%) for the General Fund and therefore presents a challenge when levy limits are in place. Unassigned fund balance in the General Fund totals $4,823,141 at the end of 2013 and is projected to remain at that level for 2014. The State Auditor’s Office recommends no less than five month of operating expenditures in reserves. For 2014 five months of expenditures would total $4,560,887 or 41.6%. At January 1, 2014 the unassigned fund balance was at 44.1% of budgeted expenditures. PERMANENT IMPROVEMENT REVOLVING FUND, (P.I.R.) - G.O. DEBT Funding from bonds is used to reimburse the P.I.R. fund for public improvement projects, which have been previously expended. The debt is funded by special assessment collections and city tax levies over a ten to fifteen year period. Bonds totaling $1,895,000 were sold in 2014 to fund the 2014 street improvement projects. The next bond sale is scheduled for 2015 and will be for the Mainstreet Rehabilitation project. These bonds are expected to total approximately $4,000,000. The P.I.R. fund has completed substantial projects over the last three and this pace is expected to continue with scheduled projects for 2015 totaling $3,565,000 and future projects in the years 2016-2019 totaling over $12 million. Projects scheduled for 2015 include the Mainstreet Rehabilitation project, parking lot improvements, and pedestrian/bicycle access improvements. The funding is provided for these projects by special assessments and PIR/Bonding. In the years 2015-2019 as mentioned above, the city has an aggressive residential street improvement schedule planned, in addition to major improvements to County Road 61 – Shady Oak Road, all of which will require bonding. MUNICIPAL STATE AID FUND Funding for municipal state aid road projects comes from state MSA funding and is drawn down as projects are done. State funding is not sufficient for current planned projects as the City has been aggressive in doing MSA projects. In the queue for reimbursement is a request for $793,328 for Excelsior Blvd and $793,137 for the Minnetonka Mills Rd project. These funds will be released as the annual allotment becomes available. At the current rate of reimbursement it will take four years to receive all funds due on these two projects. This pushes back receipt of funds for other eligible MSA funded projects; however those project requests will be placed in the queue for future allotment payments. Currently there is one MSA project scheduled for 2015 and two for 2018.In 2015 the County Road 61, Shady Oak Road project that involves the cities of Hopkins and Minnetonka, Hennepin 21 County and the State will be done. The project is in the construction stage with construction begun in 2014. The project is estimated at $20.4 million of which $2.8 is Hopkins share of the project. In 2018 projects for Co Rd 3 from Blake Road to Meadowbrook Road ($700,000 MSA thth share) and Sixth St S from 11 to 12 Avenue for the extension of roadway and culvert crossing Nine Mile Creek ($400,000 MSA share) are scheduled. They too will be added to the queue for reimbursement. CAPITAL IMPROVEMENT FUND Funding for these improvements comes from a general tax levy that was implemented in 2005. Upon approval of the a Financial Management Plan the levy was scaled back in 205 and 2016 to allow for other needs to take precedence. The full levy is restored in 2017. Projects scheduled in 2015 total $150,500 and include Public Works garage improvements, Public Works fuel management system upgrade and Activity Center fencing, landscaping and multi-purpose gym improvements. Going forward projects exceeds available funding, and therefore will be re- evaluated and postponed until funding can be identified. The projects currently are placed in the CIP but will not be done if funding is not secured. PARK IMPROVEMENT FUND The source of funding for this fund is development fees charged to developers for park development, in addition to franchise fees from gas and electric services. The franchise fees are expected to supply approximately $295,000 to the fund for much needed park projects. Developer payments are uncertain as they are dependent on future development and redevelopment in the city. Projects scheduled for 2015 total $212,000 and include a warming house at Burnes Park, picnic shelter and lighting at Oakes Park, a storage building at Valley Park and a recreation area at the Depot Coffee House. The Park Board spent considerable time soliciting resident input on city parks and developed a long-range plan for the city’s park system. This plan is the basis for future park improvements. WATER FUND Implementing the rates as proposed in the Utility Master Plan (UMP) along with a bond sale in 2014 provide the funding needed for projects scheduled for 2014. Bonds will need to be sold in 2016 and each year thereafter in which there are water projects associated with the residential street improvement program. Projects planned for 2015 include $250,000 in water main improvements done in conjunction with street improvements. The public works facility improvement project annual transfer of $45,000 has been reinstated and goes until 2023. As established by the Utility Master Plan completed in 2007 and reviewed every two years thereafter, annual incremental increases are planned for the next 17 years. Water rates will increase in 2015 by approximately 4% or $0.08 per 1,000 gallons of water and will be in line with the current UMP. 22 SANITARY SEWER FUND Implementing the rates as proposed in the Utility Master Plan (UMP) along with a bond sale in 2014 provide the funding needed for projects scheduled for 2014. Bonds will need to be sold in 2015 and each year thereafter in which there are sewer projects associated with the residential street improvement program. There are no projects planned for 2015. In addition to the scheduled capital expenditures, the Metropolitan Waste Control Commission is projecting annual increases in its disposal charges to local governments. The public works facility improvement project annual transfer of $50,000 has been reinstated and goes until 2023. As established by the Utility Master Plan completed in 2007 and reviewed every two years thereafter, annual incremental increases are planned for the next 17 years. Water rates will increase in 2015 by approximately 4.8% or $0.20 and will be in line with the current UMP. STORM SEWER FUND Bonds will be sold in 2015 for the 2015 storm water management project. These bonds issues along with current revenues should provide the needed funding for scheduled projects. Projects scheduled for 2015 total $470,000 for storm water management projects, parking lot and HCRRA alley improvements and alley repairs. The public works facility improvement project will cost the storm sewer enterprise $25,000 a year for twenty years (2004–2023). The most recent rate increase pursuant to the 2007 Utility Master Plan was done in 2009. This rate increase is expected to support the storm sewer system well into the future and currently no additional rates increases are proposed. PAVILION FUND This facility built in 1990 is starting to need repairs and replacement to areas that are heavily used; capital projects scheduled for 2015 include $60,000 for the Pavilion evaporator condenser replacement. In 2016-2019 facility projects totaling $429,000 will be needed. A Financial Management Plan was developed in 2014 to address the growing capital needs of the Pavilion along with other funds. A levy was put in place for 2015-2019 to address the growing capital needs. TAX INCREMENT FINANCING FUNDS Considering the tax increment districts as a whole, cash on hand, projected increments and loan repayments are sufficient to cover TIF project expenditures. The state has provided municipalities with a pooling tool to accommodate short-term deficiencies within the districts. The city will be allowed to pool the districts tax increment revenues to cover outstanding debt. Currently none of the city’s districts are projected to have shortfalls. 23 24 Cash Flow Statements 25 26 PARK CAPITAL IMPROVEMENTS FUND (301)07/10/2014 Revised ActualProjectedProjectedProjectedProjectedProjectedProjected 201420152016201720182019 2013 Working Capital Beginning Year 82,902139,56648,262138,04466,486182,78022,564 Revenues: Taxes (from matured Park Bonds)62 Interest3111,3964834,1411,9955,483677 Dedication fees000000 Joint Rec refunds6,2676,0006,0006,0006,0006,0006,000 Franchise Fees (gas/elec) 2014 incr 85,30085,30085,30085,30085,30085,300 Franchise Fees (gas/elec) 2012 incr210,000210,000210,000210,000210,000210,000 Transfer in Franchise Fees *200,000 Hennepin County Grant150,000 Met Council - easememt/grant Grants - Private Foundations Donations - general20,1821,000 Donations - benches Total Revenues176,822503,696301,783305,441303,295306,783301,977 Expenditures: C.I.P. Projects113,158588,000205,000370,000180,000460,000130,000 Cottageville Property Acquisition0 Skate Park commitment7,0007,0007,0007,0007,0007,0007,000 Total Expenditures120,158595,000212,000377,000187,000467,000137,000 Working Capital Year End139,566 48,262138,04466,486182,78022,564187,541 27 FACILITIES & BUILDINGS07/10/2014 CAPITAL IMPROVEMENTS FUND (305) ActualProjectedProjectedProjectedProjectedProjectedProjected 2013201420152016201720182019 Working Capital Beginning Year 135,687194,214275,185179,061(246,044)(142,274)82,014 Revenues: Interest(646)9711,376895(1,230)(711)410 Transfers from General Fund50,00050,00050,000 Tax Levy (red per FMP) 123,687125,00053,00035,000150,000175,000125,000 Total Revenues123,041125,97154,37685,895198,770224,289125,410 Expenditures: C.I.P. Projects64,51445,000150,500511,00095,0000133,000 Transfer to General Fund Total Expenditures64,51445,000150,500511,00095,0000133,000 Working Capital Year End194,214 275,185179,061(246,044)(142,274)82,01474,424 28 07/10/2014 COMMUNICATIONS (Cable TV) - WORKING CAPITAL PROJECTION S ProjectedProjectedProjectedProjectedProjectedProjectedProjected 2013201420152016201720182019 Working Capital Beginning Year381,181 418,657 417,712 387,326 375,265 348,480 325,286 Revenues: Franchise Fees224,130 210,000210,000 210,000 210,000 210,000 210,000 Franchise Fees - PEG Fees 28,577 15,000 15,000 15,000 15,000 15,000 15,000 Interest (931) 1,675 1,671 1,549 1,501 1,394 1,301 Total Revenues251,776 226,675226,671 226,549 226,501 226,394 226,301 Expenditures: Expense127,379 131,200135,136 139,190 143,366 147,667 152,097 Transfer Out 86,920 86,920 86,920 86,920 86,920 86,920 86,920 Capital Outlay - 9,500 35,000 12,500 23,000 15,000 - Total Expenditures214,299 227,620257,056 238,610 253,286 249,587 239,017 (12,061) (23,193) Change in available funds 37,477 (946) (30,386) (26,785) (12,716) 418,657 417,712387,326 375,265 Working Capital Ending Year 348,480 325,286 312,570 29 07/10/2014 MUNICIPAL STATE AID FUND (302) ActualProjectedProjectedProjectedProjectedProjectedProjected 2013201420152016201720182019 2,064,148467,7872,307,4361,318,9731,325,5681,332,195238,856 Working Capital Beginning Bal Revenues: State MSA Funds, projects446,66200000400,000 State MSA Advance2,087,310 Interest Earnings(5,873)2,33911,5376,5956,6286,6611,194 Hennepin County Hennepin County - Land Reimb2,271,909 Land Sale proceeds3,698 Bond issue1,630,000 Total Revenues2,716,3962,089,6491,641,5376,5956,6286,661401,194 Transfer Out for Projects CIP State Aid Projects190,697 County Rd 61 - Shady Oak Rd2,050,0001,000,000 Mainstreet Rehabilitation1,630,000 County Road 3 - EB700,000 Sixth St S (11th - 12th Ave)400,000 Shady Oak Rd ROW Purchase (1)1,814,674(1,800,000) Misc Expenses31,779 Shady Oak Rd Land Acqusition2,275,607 Total Expenditures4,312,757250,0002,630,000001,100,0000 2,307,4361,318,9731,325,5681,332,195238,856640,051 Working Capital Ending Balance467,787 includes cash, interest rcvbl, & A/P Cash Balance 12/31/20XX1,216,125 ESTIMATED Cash Balance 12/31/20XX3,055,7742,067,3112,073,9062,080,534987,1951,388,389 Amount owed Hennepin County as of 12-31-13(1,814,674) (1) Hopkins share of expenditures paid by Hennepin County and not yet billed. Project expenses budgeted for 2014 total $2,050,000, however we are recognizing a liability for amounts already expended on Hopkins y Hennepin County so show that as a deduct of the 2014 budget. behalf b (3) ProjectTotal DuePaid Balance State Aid Funds due CityTotalFrom StateTo DateDue 5/31/14 132-020-013Excelsior Blvd CSAH 3/615,629,235.87 4,086,619.00 3,293,290.51 793,328.49 132-350-001Minnetonka Mills Rd1, 894,019.71231,889.51 100,882.69 793,137.02 - 4,980,638.716,861,125.38 3,394,173.20 Total1,586,465.51 72.59% 30 Cash Flow AnalysisP.I.R. FUND (501)07/10/2014 ActualProjectedProjectedProjectedProjectedProjectedProjected 2013201420152016201720182019 Working Capital Beginning Year 2,389,7012,341,0891,730,273976,519897,186795,386594,141 Revenues: Special Assessment Revenues - from levy305,68725,00020,0000000 Special Assessment Revenues - Prepaid24,00062,000212,000212,800150,000150,000 Interest(562)10,5357,7864,3944,0373,5792,674 Bond Proceeds 1,906,2961,878,0002,800,0002,388,0003,642,2003,025,0002,100,000 Transfer In - matured bonds (excess)18,483 Total Revenues2,229,9041,937,5352,889,7862,604,3943,859,0373,178,5792,252,674 Expenditures: C.I.P. Projects2,074,5112,355,0003,255,0001,540,0002,791,0002,425,0001,500,000 C.I.P. Projects - Special Assm120,000310,0001,060,0001,064,000750,000750,000 Transfers for SA Debt collected thru Assm Debt Service Transfers - 2007B15,38414,81517,18219,54838,8350 Debt Service Transfers - 2010A - Imprv62,20358,53661,35864,18067,00269,82480,794 Debt Service Transfers - 2010B - Rfdg0 Debt Service Transfers (prepaids to DS funds)126,418 Total Expenditures2,278,5162,548,3513,643,5402,683,7283,960,8373,379,8242,465,794 Working Capital Year End2,341,089 1,730,273976,519897,186795,386594,141381,021 Total Projects Scheduled (CIP & SA)2,074,5112,475,0003,565,0002,600,0003,855,0003,175,0002,250,000 31 WATER FUND - WORKING CAPITAL PROJECTION07/10/2011 ActualProjectedProjectedProjectedProjectedProjectedProjected 201420152016201720182019 2013 Working Capital Beginning Year 76,872597,731873,064838,7111,019,6061,104,7051,219,632 Revenues: Operating Revenues1,468,9561,541,6691,377,8501,416,5501,461,5001,506,4501,551,550 Other14,327152,149158,533165,235172,272179,661187,418 Interest139000000 Gain on Sale of Asset21,855 Bond Issuance860,000195,000200,000780,000400,000850,000268,000 Total Revenues2,365,2771,888,8181,736,3832,361,7852,033,7722,536,1112,006,968 Expenditures: Operation Expense1,069,7411,037,7811,073,8461,111,2441,150,0271,190,2491,231,969 Other Exp - bond issuance-fiscal fee Other Exp - int on current bonds64,620000 Other Exp - int on refunded bonds7,5872,700 Other Exp - int on 2009 bonds24,22522,85021,35019,72517,88715,963 Other Exp - int on 2012 bonds14,17913,37912,52911,62910,7299,829 Other Exp - int on 2013 bonds22,71317,43116,43115,43114,38113,281 Other Exp -est interest on Future Bonds5,73017,03521,86133,03734,635 Equipment Replacement Items06,800061,700 Capital Improvements462,660197,000250,000786,000400,000850,000268,000 Principal Bond payment260,000 Principal Bond payment - refunded175,000180,000 Principal Bond pymnt - 2009 debt50,00050,00050,00050,00055,00055,000 Principal Bond pymnt - 2012 debt40,00040,00045,00045,00045,00045,000 Principal Bond pymnt - 2013 debt50,00050,00050,00055,00055,000 Principal Bond pymnt - Future Debt13,00026,30078,300104,900161,500 Capital Lease (PW Facility) (1)045,00045,00045,00045,00045,00045,000 Total Expenditures1,857,0211,613,4851,770,7362,180,8901,948,6732,421,1841,953,177 Change in available funds508,256275,334(34,353)180,89585,099114,92753,791 Inventory change52 Bond Premium/Discount Exp12,551 Working Capital Ending Year597,731873,064838,7111,019,6061,104,7051,219,6321,273,424 (1) Capital Lease moved to Storm Sewer - back to water fund in 2014 Rate History (water/sprinkler) 2014 - 2019 financial data was taken from the Utility Master Plan done by City Engineer 1984 $0.85 1993 $1.05 Notes - 1997 $1.10Income - 2008 and forward used utility master plan rates (fixture/no surcharge option) 2000 $1.20 2005 $1.40 Per Utility Master Plan (10/07) 2008 $1.65 2009 $1.86 2010 $1.90 2011 $1.94/2.40 - not incr, left at $1.90 2012 $1.96 / 2.40 2013 $2.02 / 2.40 2014 $2.10 / 2.50 2015 $2.18 / 2.60 projected rate 2016 $2.25 / 2.70 increases 2017 $2.35 / 2.85 2018 $2.45 / 3.00 these are the correct rates per the UMP 32 SEWER FUND - WORKING CAPITAL PROJECTION07/10/2014 ActualProjectedProjectedProjectedProjectedProjectedProjected 2013201420152016201720182019 Working Capital Beginning Year394,411229,722370,127505,976615,059713,615823,069 Revenues: Operating Revenues1,981,5802,308,5002,399,7002,496,6002,593,5002,696,1002,804,400 Other17,90320,00020,00020,00020,00020,00020,000 Interest335749251,2651,5381,7842,058 Bond Issuance490,000150,0000300,000240,000475,000298,000 Total Revenues2,489,5162,479,0742,420,6252,817,8652,855,0383,192,8843,124,458 Expenditures: Operation Expense551,763551,833570,253589,319609,053629,484650,634 MWCC Charges (3% inflation)1,222,8931,436,1441,504,3071,575,7711,650,6981,729,2561,811,624 Other - Bond Issuance-fiscal fees Interest Expense 45,01530,10028,45026,57524,46322,18719,825 Interest Expense - 2012 Debt3,1492,9492,7492,5492,3492,149 Interest Expense - 2013 Debt12,9439,9189,3188,7198,1197,519 Interest Expense - Future Debt2,1006,4509,60016,03519,341 Equipment Replacement Items06,80033,60026,400 Capital Improvements773,923154,5000300,000240,000475,000298,000 Principal Bond payment (2009)70,00060,00060,00065,00065,00065,00070,000 Principal Bond payment (2012)10,00010,00010,00010,00010,00010,000 Principal Bond payment (2013)30,00030,00030,00030,00030,00030,000 Principal Bond payments Future Debt10,00010,00030,00046,00077,600 Capital Lease (PW Facility) (1)050,00050,00050,00050,00050,00050,000 Total Expenditures2,663,5942,338,6692,284,7772,708,7822,756,4823,083,4303,064,691 Change in available funds(174,078)140,406135,849109,08398,556109,45459,766 Inventory change90 Bond Premium/Discount Exp9,299 Working Capital Ending Year229,722370,127505,976615,059713,615823,069882,835 (1) Capital Lease moved to Storm Sewer - back in fund in 2014 Rate Histor y2014 - 2018 financial data was taken from the Utility Master Plan done by City Engineer 1983 $1.50 1989 $1.75 1991 $2.00 1993 $2.50 Notes - 1999 $2.25 Rate DECREASE Income - 2008 and forward used utility master plan rates (no fixture option) 2006 $2.50 rate increase Per Utility Master Plan (10/07) 2008 $2.70 2009 $3.10 2010 $3.40 2011 $3.70 - act 3.60 2012 $3.75 2013 $3.90 2014 $4.10 2015 $4.30 2016 $4.55 projected rate 2017 $4.80 increases 2018 $5.10 these are the correct rates per the UMP 33 STORM SEWER FUND - WORKING CAPITAL PROJECTION07/10/2014 ActualProjectedProjectedProjectedProjectedProjectedProjected 2013201420152016201720182019 Working Capital Beginning Year 744,314883,002116,885184,295584,429949,8151,294,855 Revenues: Operating Revenues794,630794,630794,630794,630794,630794,630794,630 Other4,9735,0005,0005,0005,0005,0005,000 Interest(1,717)2,2082924611,4612,3753,237 Bond Issuance380,000300,000240,000395,000240,000320,000190,000 Total Revenues1,177,8861,101,8381,039,9221,195,0911,041,0911,122,005992,867 Expenditures: Operation Expense177,656181,209184,833188,530192,301196,147200,070 Other - Bond Issuance-fiscal fees Bond Interest - existing35,437 Bond Interest - 2009 refunded bonds5,3121,875 Bond Interest - 2010 bonds15,34814,58513,62312,48511,1739,629 Bond Interest - 2012 bonds6,0315,6815,2814,8814,4814,081 Bond Interest - 2013 bonds10,0547,7387,3386,8886,3885,888 Interest Expense - Future Debt7,80013,18515,85019,47620,832 Capital Outlay (per ERP)0000000 Cottageville Property purchase400,000 Cottageville Park Storm Water Mgmt1,000,000 Capital Improvements506,67520,000470,000396,000241,000321,000190,000 Capital Improvements - PW Bldg18,000 2009 Principal Bond payment120,000125,000125,000 2010 Principal Bond payment70,00065,00070,00070,00070,00070,00075,000 2012 Principal Bond payment15,00015,00020,00020,00020,00020,00020,000 2013 Principal Bond payment20,00020,00025,00025,00025,000 Principal Bond payments Future Debt20,00036,00062,30078,30099,601 Capital Lease - PW Facility (1)120,00025,00025,00025,00025,00025,00025,000 Total Expenditures1,044,7681,867,955972,512794,957675,705776,965693,100 Change in available funds133,118(766,117)67,410400,134365,386345,040299,767 Inventory change372 Bond Premium/Discount Exp (net)5,198 Working Capital Ending Year883,002116,885184,295584,429949,8151,294,8551,594,622 (1) In 2012 this includes Water, Sewer & Storm Sewer transfers; in 2014 transfer returned to normal level Rate History (per month) 1989 $4.75 per quarter 1991 $6.00 per quarter 1992 $2.50 1993 $3.00 1998 $3.20 1999 $4.00 2006 $4.50 2009 $5.00 34 PAVILION - ICE ARENA - WORKING CAPITAL PROJECTIONS07/10/2014 ActualProjectedProjectedProjectedProjectedProjectedProjected 201420152016201720182019 2013 Working Capital Beginning Year117,122145,981162,394(39,123)5,08617,218 141,036 Revenues: Operating Revenues359,961396,857416,700482,382 377,959 437,535 459,412 Leases38,000 current lease expires in 2013 Levy per FMP65,00065,00065,000 65,000 65,000 Other7,22410,00010,00010,00010,000 10,000 10,000 Interest(191) Total Revenues404,994471,857491,700557,382 387,959 512,535 534,412 Expenditures: Operation Expense351,064372,444383,617419,189 361,596 395,126 406,979 Capital Outlay - ERP7,833 12,000-- - - - Capital Improvements- 60,000-275,00051,00093,5009,500 Payment on Equip Certific P&I3,13018,35023,00022,60021,400 22,200 21,800 Payment on Interfund Loan18,7523,068 - - Total Expenditures380,779455,444693,217450,089 383,014 468,326 522,279 Change in available funds24,21516,413(201,517)44,209107,293 4,945 12,132 Bond Premium/Discount Exp (net)(301) Working Capital Ending Year141,036162,394(39,123)5,08617,218124,512 145,981 35 36 Five Year Project Summaries 37 38 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20152019 thru PROJECTS BY YEAR Project NameProject #Priority Project Cost Department 2015 Activity Center - Fencing/LandscapingActivity Center113,000 Activity Center - Multi Purpose/Gym Improvements267,000Activity Center Arts Center - Replace theatre seats and backsArts Center1138,510 Arts Center - Replace Information Desk and KioskArts Center15,000 Arts Center - Re-landscape E & W faces of buildingArts Center23,600 Arts Center - Storage in Art ClassroomArts Center13,500 Arts Center - Kitchen Handwashing SinkArts Center15,000 Arts Center - Paint TheatreArts Center215,000 Technology Improvement - Council Chambers & StudioCommunicationsn/a35,000 Redevelopment, East Excelsior BoulevardDevelopmentn/a2,000,000 Block 64 Redevelopment ProjectDevelopmentn/a4,500,000 Blake Corridor RedevelopmentDevelopmentn/a5,000,000 Pavilion Evaporator Condenser ReplacementPavilionn/a60,000 Public Works Garage UpgradePublic Works: Bldg/Equip Serv120,000 Wash Bay Roof ReplacementPublic Works: Bldg/Equip Serv423,000 Wash Bay Air Handler ReplacementPublic Works: Bldg/Equip Serv315,000 Fuel Management System UpgradePublic Works: Bldg/Equip Serv412,500 Skate ParkPublic Works: Parksn/a7,000 Burnes Park - Warming HousePublic Works: Parksn/a60,000 Oakes Park - Replace Picnic ShelterPublic Works: Parksn/a30,000 Valley Park - Construct Storage BuildingPublic Works: Parksn/a25,000 Oakes Park - LightingPublic Works: Parksn/a40,000 County Road 61 (Shady Oak Road)Public Works: Streets/Trafficn/a18,800,000 Parking Lots and HCRRA Alley ImprovementsPublic Works: Streets/Trafficn/a1,150,000 Plan, Design and Implement Railroad Quiet ZonePublic Works: Streets/Trafficn/a25,000 Mainstreet RehabilitationPublic Works: Streets/Traffic34,000,000 Pedestrian & Bicycle Access ImprovementsPublic Works: Streets/Trafficn/a25,000 2015 Street Overlay ProjectPublic Works: Streets/Trafficn/a175,000 Storm Drainage System Maintenance - Alley RepairsPublic Works: Utilitiesn/a20,000 Storm Water Management ProjectsPublic Works: Utilitiesn/a230,000 Depot Recreation AreaRecreation2225,000 36,728,110 Total for 2015 2016 Activity Center - Replace Gynmasium RoofActivity Centern/a105,000 Activity Center - Raspberry Room Roof Replacementn/a80,000Activity Center Activity Center Computer/Library Room Enhancements420,000Activity Center Arts Center - Storage & Hanging, Display SystemsArts Center13,125 Arts Center - Remodel Administrative OfficesArts Center250,000 Arts Center - Entryway PlantersArts Center32,800 City Hall Lobby UpgradeCity Hall Administrationn/a110,000 Technology Improvement - Council Chambers & StudioCommunicationsn/a12,500 8th Ave Streetscape and parking facilityDevelopmentn/a4,000,000 Replace Carpet and Apparatus Floor Finish - FDFiren/a56,000 Thursday, July 10, 2014 39 Project NameProject #Priority Project Cost Department Pavilion Overhead Door ImprovementPavilionn/a40,000 Pavilion Roof ReplacementPavilion1140,000 Pavilion Indoor Turf ReplacementPavilionn/a95,000 Replace Carpet - Police StationPolicen/a40,000 Public Works Garage UpgradePublic Works: Bldg/Equip Serv1200,000 Skate ParkPublic Works: Parksn/a7,000 Burnes Park - Play EquipmentPublic Works: Parksn/a50,000 Cottageville Park - Phase II ImprovementsPublic Works: Parksn/a250,000 Rehab Downtown ParkPublic Works: Parksn/a70,000 Residential Street Improvements and UtilitiesPublic Works: Streets/Trafficn/a3,275,000 Citywide Concrete AlleysPublic Works: Streets/Trafficn/a75,000 Pedestrian & Bicycle Access ImprovementsPublic Works: Streets/Trafficn/a25,000 Eighth Avenue LRT CorridorPublic Works: Transportationn/a3,700,000 Storm Drainage System Maintenance - Alley RepairsPublic Works: Utilitiesn/a21,000 St. Louis Park Emergency ConnectionPublic Works: Utilitiesn/a211,000 12,638,425 Total for 2016 2017 Activity Center - Lower Roof ReplacementActivity Centern/a80,000 Activity Center - DishwasherActivity Center515,000 Arts Center - Replace Rooftop HVAC UnitsArts Centern/a320,000 Technology Improvement - Council Chambers & StudioCommunicationsn/a23,000 Pavilion skate Tile Replacement/Lobby ImprovementPavilionn/a45,000 Pavilion - Desiccant Repl of Dehumidification SystPavilionn/a6,000 Skate ParkPublic Works: Parksn/a7,000 Hilltop Park - Play EquipmentPublic Works: Parksn/a100,000 Valley Park - Play EquipmentPublic Works: Parksn/a80,000 Residential Street Improvements and UtilitiesPublic Works: Streets/Trafficn/a4,360,000 Citywide Concrete AlleysPublic Works: Streets/Trafficn/a80,000 Pedestrian & Bicycle Access ImprovementsPublic Works: Streets/Trafficn/a25,000 Blake Road Corridor ImprovementsPublic Works: Streets/Trafficn/a1,000,000 Storm Drainage System Maintenance - Alley RepairsPublic Works: Utilitiesn/a21,000 6,162,000 Total for 2017 2018 Arts Center - Replace Lobby CarpetArts Centern/a52,000 Technology Improvement - Council Chambers & Studion/a15,000Communications Pavilion Mezzanine Rooftop Unit ReplacementPavilion124,500 Pavilion Entry and Lobby Door ReplacementPavilion37,000 Pavilion - Paint Exterior BuildingPavilion122,000 Pavilion Painting the Arena Ceiling and Bar JoistPavilion140,000 Skate ParkPublic Works: Parksn/a7,000 Park Valley - Play EquipmentPublic Works: Parksn/a60,000 Burnes Park - Resurface Tennis CourtsPublic Works: Parksn/a20,000 Oakes Park - Tennis CourtsPublic Works: Parksn/a20,000 Valley Park - Warming HousePublic Works: Parksn/a60,000 Burnes Park Splash PadPublic Works: Parksn/a300,000 Residential Street Improvements and UtilitiesPublic Works: Streets/Trafficn/a3,475,000 County Road 3Public Works: Streets/Trafficn/a2,300,000 Sixth Street South (11th to 12th Avenue South)Public Works: Streets/Trafficn/a500,000 Plan, Design and Implement Railroad Quiet ZonePublic Works: Streets/Trafficn/a200,000 Pedestrian & Bicycle Access ImprovementsPublic Works: Streets/Trafficn/a25,000 Blake Road Corridor ImprovementsPublic Works: Streets/Trafficn/a9,000,000 Light Rail Transit Stations (3)Public Works: Transportationn/a500,000 Storm Drainage System Maintenance - Alley RepairsPublic Works: Utilitiesn/a21,000 Thursday, July 10, 2014 40 Project NameProject #Priority Project Cost Department 16,648,500 Total for 2018 2019 City Hall Roof ReplacementCity Hall Administrationn/a115,000 Pavilion HHS Team Room Rooftop Unit ReplPavilion19,500 Public Works - Replace Overhead DoorsPublic Works: Bldg/Equip Servn/a90,000 Skate ParkPublic Works: Parksn/a7,000 Burnes Park - LightingPublic Works: Parksn/a50,000 Harley Hopkins Park - Warming HousePublic Works: Parksn/a30,000 Harley Hopkins Park - LightingPublic Works: Parksn/a50,000 Residential Street Improvements and UtilitiesPublic Works: Streets/Trafficn/a2,770,000 Storm Drainage System Maintenance - Alley RepairsPublic Works: Utilitiesn/a22,000 Lift Station # 4Public Works: Utilitiesn/a160,000 3,303,500 Total for 2019 75,480,535 GRAND TOTAL Thursday, July 10, 2014 41 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20152019 thru DEPARTMENT SUMMARY Department20152016201720182019Total Activity Center80,000205,00095,000 Arts Center170,61055,925320,00052,000 City Hall Administration110,000115,000 Communications35,00012,50023,00015,000 Development11,500,0004,000,000 Fire56,000 Pavilion60,000275,00051,00093,5009,500 Police40,000 Public Works: Bldg/Equip Serv70,500200,00090,000 Public Works: Parks162,000377,000187,000467,000137,000 Public Works: Streets/Traffic24,175,0003,375,0005,465,00015,500,0002,770,000 Public Works: Transportation3,700,000500,000 Public Works: Utilities250,000232,00021,00021,000182,000 Recreation225,000 36,728,11012,638,4256,162,00016,648,5003,303,500 TOTAL 42 Thursday, July 10, 2014 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20152019 thru PROJECTS BY DEPARTMENT DepartmentProject#Priority20152016201720182019 Total Activity Center Activity Center - Replace Gynmasium Roofn/a105,000 Activity Center - Raspberry Room Roof Replacementn/a80,000 Activity Center - Lower Roof Replacementn/a80,000 Activity Center - Fencing/Landscaping113,000 Activity Center - Multi Purpose/Gym Improvements267,000 Activity Center Computer/Library Room Enhancements420,000 Activity Center - Dishwasher515,000 Activity Center Total Arts Center Arts Center - Replace Rooftop HVAC Unitsn/a320,000 Arts Center - Replace Lobby Carpetn/a52,000 Arts Center - Replace theatre seats and backs1138,510 Arts Center - Replace Information Desk and Kiosk15,000 Arts Center - Re-landscape E & W faces of building23,600 Arts Center - Storage & Hanging, Display Systems13,125 Arts Center - Storage in Art Classroom13,500 Arts Center - Kitchen Handwashing Sink15,000 Arts Center - Paint Theatre215,000 Arts Center - Remodel Administrative Offices250,000 Arts Center - Entryway Planters32,800 Arts Center Total City Hall Administration City Hall Roof Replacementn/a115,000 City Hall Lobby Upgraden/a110,000 City Hall Administration Total Communications Technology Improvement - Council Chambers & Studion/a35,00012,50023,00015,000 Communications Total Development Redevelopment, East Excelsior Boulevardn/a2,000,000 Block 64 Redevelopment Projectn/a4,500,000 Blake Corridor Redevelopmentn/a5,000,000 8th Ave Streetscape and parking facilityn/a4,000,000 Development Total Fire Replace Carpet and Apparatus Floor Finish - FDn/a56,000 43 Thursday, July 10, 2014 DepartmentProject#Priority20152016201720182019 Total Fire Total Pavilion Pavilion skate Tile Replacement/Lobby Improvementn/a45,000 Pavilion Overhead Door Improvementn/a40,000 Pavilion Roof Replacement1140,000 Pavilion Evaporator Condenser Replacementn/a60,000 Pavilion Indoor Turf Replacementn/a95,000 Pavilion - Desiccant Repl of Dehumidification Systn/a6,000 Pavilion Mezzanine Rooftop Unit Replacement124,500 Pavilion HHS Team Room Rooftop Unit Repl19,500 Pavilion Entry and Lobby Door Replacement37,000 Pavilion - Paint Exterior Building122,000 Pavilion Painting the Arena Ceiling and Bar Joist140,000 Pavilion Total Police Replace Carpet - Police Stationn/a40,000 Police Total Public Works: Bldg/Equip Serv Public Works - Replace Overhead Doorsn/a90,000 Public Works Garage Upgrade120,000200,000 Wash Bay Roof Replacement423,000 Wash Bay Air Handler Replacement315,000 Fuel Management System Upgrade412,500 Public Works: Bldg/Equip Serv Total Public Works: Parks Skate Parkn/a7,0007,0007,0007,0007,000 Park Valley - Play Equipmentn/a60,000 Burnes Park - Resurface Tennis Courtsn/a20,000 Hilltop Park - Play Equipmentn/a100,000 Valley Park - Play Equipmentn/a80,000 Burnes Park - Warming Housen/a60,000 Oakes Park - Replace Picnic Sheltern/a30,000 Valley Park - Construct Storage Buildingn/a25,000 Burnes Park - Play Equipmentn/a50,000 Oakes Park - Tennis Courtsn/a20,000 Valley Park - Warming Housen/a60,000 Burnes Park - Lightingn/a50,000 Cottageville Park - Phase II Improvementsn/a250,000 Harley Hopkins Park - Warming Housen/a30,000 Harley Hopkins Park - Lightingn/a50,000 Oakes Park - Lightingn/a40,000 Rehab Downtown Parkn/a70,000 Burnes Park Splash Padn/a300,000 Public Works: Parks Total Public Works: Streets/Traffic Residential Street Improvements and Utilitiesn/a3,275,0004,360,0003,475,0002,770,000 Citywide Concrete Alleysn/a75,00080,000 44 Thursday, July 10, 2014 DepartmentProject#Priority20152016201720182019 Total County Road 3n/a2,300,000 County Road 61 (Shady Oak Road)n/a18,800,000 Sixth Street South (11th to 12th Avenue South)n/a500,000 Parking Lots and HCRRA Alley Improvementsn/a1,150,000 Plan, Design and Implement Railroad Quiet Zonen/a25,000200,000 Mainstreet Rehabilitation34,000,000 Pedestrian & Bicycle Access Improvementsn/a25,00025,00025,00025,000 Blake Road Corridor Improvementsn/a1,000,0009,000,000 2015 Street Overlay Projectn/a175,000 Public Works: Streets/Traffic Total Public Works: Transportation Light Rail Transit Stations (3)n/a500,000 Eighth Avenue LRT Corridorn/a3,700,000 Public Works: Transportation Total Public Works: Utilities Storm Drainage System Maintenance - Alley Repairsn/a20,00021,00021,00021,00022,000 Storm Water Management Projectsn/a230,000 Lift Station # 4n/a160,000 St. Louis Park Emergency Connectionn/a211,000 Public Works: Utilities Total Recreation Depot Recreation Area2225,000 Recreation Total GRAND TOTAL 45 Thursday, July 10, 2014 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20152019 thru FUNDING SOURCE SUMMARY 20152016201720182019Total Source AC - Arts Center Fund170,61055,925320,00052,000 CI - Capital Improvement Fund150,500511,00095,000133,000 CT - Cable Franchise Fees35,00012,50023,00015,000 ED - Economic Development Fund1,000,0004,000,000 GU - Other Governmental Units17,635,0002,300,000750,0009,600,000 MS - Municipal State Aid Streets2,630,0001,100,000 PA - Pavilion Fund60,000275,00051,00093,5009,500 PDF- Park Dedication Fund212,000377,000187,000467,000137,000 PF - Private Sector Funds50,000 PI - PIR/General Obligation Bonds3,255,0001,540,0002,791,0002,425,0001,500,000 RF - Refuse Fund25,00018,000 SA - Special Assessment310,0001,060,0001,064,000750,000750,000 SF - Sanitary Sewer Fund300,000240,000475,000298,000 SU - Storm Sewer Fund470,000396,000241,000321,000190,000 TF - Tax Increment Financing10,500,0001,000,000500,000 WF - Water Fund250,000786,000400,000850,000268,000 36,728,11012,638,4256,162,00016,648,5003,303,500 GRAND TOTAL Thursday, July 10, 2014 46 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 20152019 thru PROJECTS BY FUNDING SOURCE SourceProject#Priority20152016201720182019Total AC - Arts Center Fund Arts Center - Replace Rooftop HVAC Unitsn/a320,000 Arts Center - Replace Lobby Carpetn/a52,000 Arts Center - Replace theatre seats and backs1138,510 Arts Center - Replace Information Desk and Kiosk15,000 Arts Center - Re-landscape E & W faces of building23,600 Arts Center - Storage & Hanging, Display Systems13,125 Arts Center - Storage in Art Classroom13,500 Arts Center - Kitchen Handwashing Sink15,000 Arts Center - Paint Theatre215,000 Arts Center - Remodel Administrative Offices250,000 Arts Center - Entryway Planters32,800 AC - Arts Center Fund Total CI - Capital Improvement Fund Activity Center - Replace Gynmasium Roofn/a105,000 Activity Center - Raspberry Room Roof Replacementn/a80,000 Public Works - Replace Overhead Doorsn/a18,000 Replace Carpet and Apparatus Floor Finish - FDn/a56,000 Replace Carpet - Police Stationn/a40,000 Activity Center - Lower Roof Replacementn/a80,000 City Hall Roof Replacementn/a115,000 City Hall Lobby Upgraden/a110,000 Public Works Garage Upgrade120,000100,000 Activity Center - Fencing/Landscaping113,000 Activity Center - Multi Purpose/Gym Improvements267,000 Activity Center Computer/Library Room Enhancements420,000 Activity Center - Dishwasher515,000 Wash Bay Roof Replacement423,000 Wash Bay Air Handler Replacement315,000 Fuel Management System Upgrade412,500 CI - Capital Improvement Fund Total CT - Cable Franchise Fees Technology Improvement - Council Chambers & Studion/a35,00012,50023,00015,000 CT - Cable Franchise Fees Total ED - Economic Development Fund Block 64 Redevelopment Projectn/a1,000,000 8th Ave Streetscape and parking facilityn/a4,000,000 Thursday, July 10, 2014 47 SourceProect#Priorit20152016201720182019Total jy ED - Economic Development Fund Total GU - Other Governmental Units County Road 3n/a1,600,000 County Road 61 (Shady Oak Road)n/a16,850,000 Eighth Avenue LRT Corridorn/a2,300,000 Depot Recreation Area2125,000 Mainstreet Rehabilitation3660,000 Blake Road Corridor Improvementsn/a750,0008,000,000 GU - Other Governmental Units Total MS - Municipal State Aid Streets County Road 3n/a700,000 County Road 61 (Shady Oak Road)n/a1,000,000 Sixth Street South (11th to 12th Avenue South)n/a400,000 Mainstreet Rehabilitation31,630,000 MS - Municipal State Aid Streets Total PA - Pavilion Fund Pavilion skate Tile Replacement/Lobby Improvementn/a45,000 Pavilion Overhead Door Improvementn/a40,000 Pavilion Roof Replacement1140,000 Pavilion Evaporator Condenser Replacementn/a60,000 Pavilion Indoor Turf Replacementn/a95,000 Pavilion - Desiccant Repl of Dehumidification Systn/a6,000 Pavilion Mezzanine Rooftop Unit Replacement124,500 Pavilion HHS Team Room Rooftop Unit Repl19,500 Pavilion Entry and Lobby Door Replacement37,000 Pavilion - Paint Exterior Building122,000 Pavilion Painting the Arena Ceiling and Bar Joist140,000 PA - Pavilion Fund Total PDF- Park Dedication Fund Skate Parkn/a7,0007,0007,0007,0007,000 Park Valley - Play Equipmentn/a60,000 Burnes Park - Resurface Tennis Courtsn/a20,000 Hilltop Park - Play Equipmentn/a100,000 Valley Park - Play Equipmentn/a80,000 Depot Recreation Area250,000 Burnes Park - Warming Housen/a60,000 Oakes Park - Replace Picnic Sheltern/a30,000 Valley Park - Construct Storage Buildingn/a25,000 Burnes Park - Play Equipmentn/a50,000 Oakes Park - Tennis Courtsn/a20,000 Valley Park - Warming Housen/a60,000 Burnes Park - Lightingn/a50,000 Cottageville Park - Phase II Improvementsn/a250,000 Harley Hopkins Park - Warming Housen/a30,000 Harley Hopkins Park - Lightingn/a50,000 Thursday, July 10, 2014 48 SourceProect#Priorit20152016201720182019Total jy Oakes Park - Lightingn/a40,000 Rehab Downtown Parkn/a70,000 Burnes Park Splash Padn/a300,000 PDF- Park Dedication Fund Total PF - Private Sector Funds Depot Recreation Area250,000 PF - Private Sector Funds Total PI - PIR/General Obligation Bonds Residential Street Improvements and Utilitiesn/a1,500,0002,500,0001,500,0001,500,000 Citywide Concrete Alleysn/a15,00016,000 County Road 61 (Shady Oak Road)n/a700,000 Sixth Street South (11th to 12th Avenue South)n/a100,000 Parking Lots and HCRRA Alley Improvementsn/a930,000 Plan, Design and Implement Railroad Quiet Zonen/a25,000200,000 Mainstreet Rehabilitation31,400,000 Pedestrian & Bicycle Access Improvementsn/a25,00025,00025,00025,000 Blake Road Corridor Improvementsn/a250,000600,000 2015 Street Overlay Projectn/a175,000 PI - PIR/General Obligation Bonds Total RF - Refuse Fund Public Works - Replace Overhead Doorsn/a18,000 Public Works Garage Upgrade125,000 RF - Refuse Fund Total SA - Special Assessment Residential Street Improvements and Utilitiesn/a1,000,0001,000,000750,000750,000 Citywide Concrete Alleysn/a60,00064,000 County Road 61 (Shady Oak Road)n/a250,000 Mainstreet Rehabilitation360,000 SA - Special Assessment Total SF - Sanitary Sewer Fund Residential Street Improvements and Utilitiesn/a175,000240,000325,000120,000 Eighth Avenue LRT Corridorn/a100,000 Public Works - Replace Overhead Doorsn/a18,000 Lift Station # 4n/a160,000 Public Works Garage Upgrade125,000 Blake Road Corridor Improvementsn/a150,000 SF - Sanitary Sewer Fund Total SU - Storm Sewer Fund Residential Street Improvements and Utilitiesn/a200,000220,000300,000150,000 Eighth Avenue LRT Corridorn/a150,000 Thursday, July 10, 2014 49 SourceProect#Priorit20152016201720182019Total jy Storm Drainage System Maintenance - Alley Repairsn/a20,00021,00021,00021,00022,000 Storm Water Management Projectsn/a230,000 Parking Lots and HCRRA Alley Improvementsn/a220,000 Public Works - Replace Overhead Doorsn/a18,000 Public Works Garage Upgrade125,000 SU - Storm Sewer Fund Total TF - Tax Increment Financing Redevelopment, East Excelsior Boulevardn/a2,000,000 Light Rail Transit Stations (3)n/a500,000 Eighth Avenue LRT Corridorn/a1,000,000 Block 64 Redevelopment Projectn/a3,500,000 Blake Corridor Redevelopmentn/a5,000,000 TF - Tax Increment Financing Total WF - Water Fund Residential Street Improvements and Utilitiesn/a400,000400,000600,000250,000 Eighth Avenue LRT Corridorn/a150,000 Public Works - Replace Overhead Doorsn/a18,000 St. Louis Park Emergency Connectionn/a211,000 Mainstreet Rehabilitation3250,000 Public Works Garage Upgrade125,000 Blake Road Corridor Improvementsn/a250,000 WF - Water Fund Total GRAND TOTAL Thursday, July 10, 2014 50 Project Descriptions And Narratives 51 52 Economic Development 53 54 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentDevelopment Cit of Hokins MN yp, Contact ED Director Type Improvement 01-CIP-D4010 Project # Useful Life Unassigned Redevelopment, East Excelsior Boulevard Project Name Category Economic Development FuturePriorityn/a Total Project Cost:$2,000,000 Description North side of Excelsior Boulevard from Highway 169 to approximately Blake Road. Redevelopment of older commercial area. Based on the adopted redevelopment plan, it would involve commercial, and residential uses. Identified in the East End Redevelopment Study. Justification Excelsior Boulevard was upgraded in this area, providing for additional property on the north side of the roadway. The buildings in this area are older and no longer the highest and best use for this property. The funding amount is an estimate and will vary depending on the scope and timing of the project, likely to be completed along with the construction of the SWLRT Blake Station. ExpendituresTotal 20152016201720182019 Land Acquisition 2,000,0002,000,000 Total Funding Sources20152016201720182019Total 2,000,0002,000,000 TF - Tax Increment Financing Total Budget Impact/Other Thursday, July 10, 2014 55 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentDevelopment Cit of Hokins MN yp, Contact ED Director Type Improvement 06-CIP-D404 Project # Useful Life Block 64 Redevelopment Project Project Name Category Economic Development FuturePriorityn/a Total Project Cost:$4,500,000 Description Redevelopment of block between 5th and 6th Avenues, north of Mainstreet, South of 1st Street North. There currently is no proposed schedule for construction. Justification Will redevelop older commercial and residential areas. ExpendituresTotal 20152016201720182019 Land Acquisition 4,500,0004,500,000 Total Funding Sources20152016201720182019Total 1,000,0001,000,000 ED - Economic Development Fund 3,500,0003,500,000 TF - Tax Increment Financing Total Budget Impact/Other The $1 mil from ED fund will be in the form of donated land currently held. Thursday, July 10, 2014 56 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentDevelopment Cit of Hokins MN yp, Contact ED Director Type Improvement 09-CIP-D406 Project # Useful Life Blake Corridor Redevelopment Project Name Category Economic Development FuturePriorityn/a Total Project Cost:$5,000,000 Description Redevelopment of properties along the Blake Road Corridor including the Cottageville Park area. Justification Removal of blighted and/or obsolete structures, improve access to transit and improve livability of the area. ExpendituresTotal 20152016201720182019 Land Acquisition/Demolition 5,000,0005,000,000 Total Funding Sources20152016201720182019Total 5,000,0005,000,000 TF - Tax Increment Financing Total Budget Impact/Other Thursday, July 10, 2014 57 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentDevelopment Cit of Hokins MN yp, Contact ED Director Type Improvement 12-CIP-D408 Project # Useful Life 8th Ave Streetscape and parking facility Project Name Category Economic Development FuturePriorityn/a Total Project Cost:$4,000,000 Description Parking Ramp Construction, for structure to serve east side of the downtown. Justification The proposed parking ramp will be used to support transit-oriented development. ExpendituresTotal 20152016201720182019 Construction/Maintenance 4,000,0004,000,000 Total Funding Sources20152016201720182019Total 4,000,0004,000,000 ED - Economic Development Fund Total Budget Impact/Other LCA TOD Grant, various grant development Accounts, Bonds Thursday, July 10, 2014 58 General Public Buildings 59 60 CAPITAL IMPROVEMENT PLAN 20152019 thru Department Activity Center Cit of HokinsMN yp, ContactPublic Works Director Type Improvement 08-CIP-AC018 Project # Useful Life 25 years Activity Center - Replace Gynmasium Roof Project Name Category Buildings: Activity Center FuturePriorityn/a Total Project Cost:$105,000 Description Existing roof was installed in 1989 and is at the end of its projected useful life. Portion is cost share with Raspberry Ridge Condo Assn. Justification Roof was installed in 1989 and is at the end of its 25 year useful life. ExpendituresTotal 20152016201720182019 Construction/Maintenance 105,000105,000 Total Funding Sources20152016201720182019Total 105,000105,000 CI - Capital Improvement Fund Total Budget Impact/Other Roof in good condition - move project from 2014 to 2016 and re-evaluate in 2 years. Thursday, July 10, 2014 61 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentActivity Center Cit of Hokins MN yp, Contact PW Director Type Improvement 08-CIP-AC024 Project # Useful Life Activity Center - Raspberry Room Roof Replacement Project Name Category Buildings: Activity Center FuturePriorityn/a Total Project Cost:$80,000 Description Built up asphalt roofing system covering Raspberry Rooms, Craft Room and Hallways at the Activity Center Justification Existing roof was replaced in 1992, Expected life is 25 years. ExpendituresTotal 20152016201720182019 Construction/Maintenance 80,00080,000 Total Funding Sources20152016201720182019Total 80,00080,000 CI - Capital Improvement Fund Total Budget Impact/Other Inspection, repair and upkeep of roofing systems prevent deterioration of interior building structure and damage to interior components of building. Thursday, July 10, 2014 62 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentActivity Center Cit of Hokins MN yp, Contact PW Director Type Improvement 09-CIP-AC031 Project # Useful Life 25 years Activity Center - Lower Roof Replacement Project Name Category Buildings: Activity Center FuturePriorityn/a Total Project Cost:$80,000 Description Built up Roof on Activity Center Raspberry Rooms and Hallway. Justification Existing roof was installed in 1992, estimated replacement due in 2017. ExpendituresTotal 20152016201720182019 Construction/Maintenance 80,00080,000 Total Funding Sources20152016201720182019Total 80,00080,000 CI - Capital Improvement Fund Total Budget Impact/Other Thursday, July 10, 2014 63 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentActivity Center Cit of Hokins MN yp, Contact Susan Newville Type Improvement 14-CIP-AC001 Project # Useful Life Activity Center - Fencing/Landscaping Project Name Category Buildings: Activity Center FuturePriority1 Urgent Total Project Cost:$13,000 Description Replace the 8' fence at the Hopkins Activity Center parking lot with a 3' fence. Landscape the signage at the corner of 14th and 1st Street North, the curbing in the parking lot, the east side and the northeast side of the building. Justification Parking has always been a challenge for the Activity Center. We have only 18 parking spots, which 3 are handicap only. Street parking on 14th Avenue is being taken up by Raspberry Ridge residents, Mainstreet School of Performing Arts, and the dentist office at the corner of 14th and Mainstreet. We do have parking at Meatzold Field but our guest do not have a visual of that parking lot and replacing the present 8' fence with a 3' fence would give us that visual of additional parking. We need to continue to enhance the outside landscaping with the fresh plantings and mulch around our building and parking lot. ExpendituresTotal 20152016201720182019 Construction/Maintenance 13,00013,000 Total Funding Sources20152016201720182019Total 13,00013,000 CI - Capital Improvement Fund Total Budget Impact/Other Thursday, July 10, 2014 64 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentActivity Center Cit of Hokins MN yp, Contact Susan Newville Type Improvement 14-CIP-AC002 Project # Useful Life Activity Center - Multi Purpose/Gym Improvements Project Name Category Buildings: Activity Center FuturePriority2 Very Important Total Project Cost:$67,000 Description Paint the large dividing wall between the north and south gyms. Tile all the interior walls. Replace aging window sashes Justification The dividing wall has not been painted since 19990. The present upper brick walls have holes in it and is water stained. The lower walls are covered with gym mats mainly to hide all the holes and broken tiles behind them. We would like to upgrade the looks of thus space to enhance its appearance for potential receptions, parties, meetings, etc… The window shades were installed in 1990. ExpendituresTotal 20152016201720182019 Construction/Maintenance 67,00067,000 Total Funding Sources20152016201720182019Total 67,00067,000 CI - Capital Improvement Fund Total Budget Impact/Other Thursday, July 10, 2014 65 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentActivity Center Cit of Hokins MN yp, Contact Susan Newville Type Unassigned 14-CIP-AC003 Project # Useful Life Activity Center Computer/Library Room Enhancements Project Name Category Buildings: Activity Center FuturePriority4 Less Important Total Project Cost:$20,000 Description Remove walls of the present computer room and convert it to an open area for socializing, card playing, etc and convert the library into a computer room. Justification As our programs grow, our needs for different room configurations changes. We have found we do not need all the present space for our computers. ExpendituresTotal 20152016201720182019 Construction/Maintenance 20,00020,000 Total Funding Sources20152016201720182019Total 20,00020,000 CI - Capital Improvement Fund Total Budget Impact/Other Thursday, July 10, 2014 66 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentActivity Center Cit of Hokins MN yp, Contact Susan Newville Type Improvement 14-CIP-AC004 Project # Useful Life Activity Center - Dishwasher Project Name Category Unassigned FuturePriority5 Future Consideration Total Project Cost:$15,000 Description Dishwasher for the kitchen needed for daily operations of the Hopkins Activity Center and rentals. Justification The present dishwasher was installed in 1990 and is not running at code in its present state. ExpendituresTotal 20152016201720182019 Construction/Maintenance 15,00015,000 Total Funding Sources20152016201720182019Total 15,00015,000 CI - Capital Improvement Fund Total Budget Impact/Other Estimate salvage/resale value on replaced pieces: $200. Thursday, July 10, 2014 67 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentArts Center Cit of Hokins MN yp, Contact Public Works Director Type Improvement 08-CIP-AR013 Project # Useful Life Arts Center - Replace Rooftop HVAC Units Project Name Category Buildings: Arts Center FuturePriorityn/a Total Project Cost:$320,000 Description Replace rooftop heating and AC units that were installin in 1997. Usefeul life is 20 years. There are 15 total units from 25 tons to 5 tons Justification Planned replacement at 20 years estimated useful life. ExpendituresTotal 20152016201720182019 Construction/Maintenance 320,000320,000 Total Funding Sources20152016201720182019Total 320,000320,000 AC - Arts Center Fund Total Budget Impact/Other Thursday, July 10, 2014 68 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Director Type Improvement 09-CIP-AR027 Project # Useful Life 10 years Arts Center - Replace Lobby Carpet Project Name Category Buildings: Arts Center FuturePriorityn/a Total Project Cost:$52,000 Description Replace the lobby carpet including staircases, second floor, elevator floor, coat room and dance studio dressing room. ESTIMATED PROJECT SHCEDULE: Future 2018 Justification The Lobby carpet will be at the end of it's useful life in a high traffic area like the lobby. ExpendituresTotal 20152016201720182019 Construction/Maintenance 52,00052,000 Total Funding Sources20152016201720182019Total 52,00052,000 AC - Arts Center Fund Total Budget Impact/Other Thursday, July 10, 2014 69 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Director Type Improvement 12-CIP-AR002 Project # Useful Life 20 years Arts Center - Replace theatre seats and backs Project Name Category Buildings: Arts Center FuturePriority1 Urgent Total Project Cost:$138,510 Description Remove and replace theater seats and backs. (Keeping existing stanchions) Based on quote from Cosney (they recently did Eisenhower seating) with Classic Quattro seat, 33" low back, waterfall back and seat tailoring. Sherpa Shire-Grade G fabric (similar to existing), plush foam seat, 2" back foam, lexan seat numbers, demo and removal of existing seats and backs includes attic stock. 2011 pricing $116,000 with 3% inflation compounded over 5 years $138,510 Justification Seats will be 20 years old in 2017 and will have exceeded useful life. Stanchions should still be usable. Quote includes replacement of all seats and backs. This is not due until 2017 but wanted to get as much info as possible now to allow for time to plan. SEATS are deteriating more quickly than anticipated. Many have had repairs but we are approaching the limits of repairability. ExpendituresTotal 20152016201720182019 Construction/Maintenance 138,510138,510 Total Funding Sources20152016201720182019Total 138,510138,510 AC - Arts Center Fund Total Budget Impact/Other Could consider replacing main floor one year and balcony another year if required by cash flow. Need tow weeks in theater to make exchange. Work on stage at same time okay will install team. Opportunity to potentially do a "seat sponsor" funding program similar to what was done before Repeat project in 2037 Thursday, July 10, 2014 70 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Director Type Improvement 12-CIP-AR005 Project # Useful Life 15 years Arts Center - Replace Information Desk and Kiosk Project Name Category Buildings: Arts Center FuturePriority1 Urgent Total Project Cost:$5,000 Description Replace informational Kiosk and desk with more functional information center. Justification Current informational kiosk and information desk are not ideal for assisting visitors with way finding and disseminating information. Guests arriving are frequently confused and have a hard time finding location of meetings. Etc. Also, we would like to be able to display larger concert posters, the rental brochure, membership brochures and more. We would like to move this project from 2017 to 2015 as our information Kiosk is failing and its function can easily be incorporated into the informational design. ExpendituresTotal 20152016201720182019 Construction/Maintenance 5,0005,000 Total Funding Sources20152016201720182019Total 5,0005,000 AC - Arts Center Fund Total Budget Impact/Other Thursday, July 10, 2014 71 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Co-Director Type Improvement 13-CIP-AR001 Project # Useful Life 15 years Arts Center - Re-landscape E & W faces of building Project Name Category Buildings: Arts Center FuturePriority2 Very Important Total Project Cost:$3,600 Description Remove old shrubs, rework beds, install new plantings and mulch. Project inclues hiring a company to design and install. Justification Current shrubs are dying. ExpendituresTotal 20152016201720182019 Construction/Maintenance 3,6003,600 Total Funding Sources20152016201720182019Total 3,6003,600 AC - Arts Center Fund Total Budget Impact/Other Thursday, July 10, 2014 72 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Co-Director Type Improvement 13-CIP-AR004 Project # Useful Life 15-20 years Arts Center - Storage & Hanging, Display Systems Project Name Category Buildings: Arts Center FuturePriority1 Urgent Total Project Cost:$9,625 Description Hanging Display System in Jaycee Studio and Community Room: Wall mounted rails with rod & hook system (adjustable) on one wall of each room to allow renters as well as tenants and HCA to hang artwork or décor items for events and meetings. (Priority # 2) Storage in Art Class: Build storage units in the art classroom along East wall and move the cabinets currently on East wall to South wall next to the sink area. (useful life 20 years and priority # 1) Ideally we would like to do this in 2013. Redo Storage Closets: Revamp existing storage rooms to improve functionality. (Useful life of 15 years, priority #2) Justification Storage and Hanging Display System: The Art Center has no way of exhibiting items heavier then cardstock in these spaces. System must be flexible and unobtrusive when not in use as these are multi-use spaces. (Priority # 2) Storage in art classroom: This would create neater storage of art classroom materials such as easels. It would also create dedicated space in which to store gallery materials such as pedestals, vatrines and shelves - Something that does not exist at present. This would decrease the damage to gallery materials we currently experience. (useful life of 20 years, priority # 1) Redo Storage Closets: Creating more efficient storage would eliminate the need to rent off-site storage. (Useful life of 15 years, priority #2) PriorExpendituresTotal 20152016201720182019 3,1253,125 6,500 Construction/Maintenance TotalTotal PriorFunding Sources20152016201720182019Total 3,1253,125 6,500 AC - Arts Center Fund TotalTotal Budget Impact/Other Thursday, July 10, 2014 73 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Co-Director Type Improvement 14-CIP-AR001 Project # Useful Life 20 years Arts Center - Storage in Art Classroom Project Name Category Buildings: Arts Center FuturePriority1 Urgent Total Project Cost:$3,500 Description Build Storage units in the art classroom along east wall and move the cabinets currently on east wall to south wall next to the sink area. Justification ExpendituresTotal 20152016201720182019 Construction/Maintenance 3,5003,500 Total Funding Sources20152016201720182019Total 3,5003,500 AC - Arts Center Fund Total Budget Impact/Other Thursday, July 10, 2014 74 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Co-Director Type Improvement 14-CIP-AR002 Project # Useful Life Arts Center - Kitchen Handwashing Sink Project Name Category Buildings: Arts Center FuturePriority1 Urgent Total Project Cost:$5,000 Description Install a hand-washing sink in the catering kitchen. This will require plumbing as well as purchasing the fixture and ffittings. Justification Required by the County health inspections department. We must have a designated handwashing sink separate from our other kitchen sink in order to serve food at events in the building. ExpendituresTotal 20152016201720182019 Construction/Maintenance 5,0005,000 Total Funding Sources20152016201720182019Total 5,0005,000 AC - Arts Center Fund Total Budget Impact/Other Thursday, July 10, 2014 75 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Co-Director Type Improvement 14-CIP-AR003 Project # Useful Life 15 years Arts Center - Paint Theatre Project Name Category Buildings: Arts Center FuturePriority2 Very Important Total Project Cost:$15,000 Description Paint house of theatre which hasn't been done since 1997. Thius will require professional painters and estimated 65 gallons of paint to cover the house walls. Justification It is time to spruce up the paint. With the addition of new carpeting in 2013 and new seating in 2015, it is perfect timing to paint the walls so that they are not only clean and fresh, but coordinate in color with the rest of the theater house décor. ExpendituresTotal 20152016201720182019 Construction/Maintenance 15,00015,000 Total Funding Sources20152016201720182019Total 15,00015,000 AC - Arts Center Fund Total Budget Impact/Other Thursday, July 10, 2014 76 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Co-Director Type Improvement 14-CIP-AR004 Project # Useful Life Arts Center - Remodel Administrative Offices Project Name Category Buildings: Arts Center FuturePriority2 Very Important Total Project Cost:$50,000 Description Remodel administrative offices on second floor, moving the conference room to room 206 and combing room 204 and 205 into one office area. Adding one work station. Justification While this does not significantly increase office square footage, it does create a more flexible space that will accommodate the addition on one more work station. This in in anticipation for the need for an additional office worker, whether paid or volunteer, within two years. ExpendituresTotal 20152016201720182019 Construction/Maintenance 50,00050,000 Total Funding Sources20152016201720182019Total 50,00050,000 AC - Arts Center Fund Total Budget Impact/Other Thursday, July 10, 2014 77 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentArts Center Cit of Hokins MN yp, Contact Arts Center Co-Director Type Improvement 14-CIP-AR005 Project # Useful Life Arts Center - Entryway Planters Project Name Category Buildings: Arts Center FuturePriority3 Important Total Project Cost:$2,800 Description Install 2 large cement planters by main front entryway (costs includes shipping) Justification Purpose is to create an entryway focal point that is attractive and welcoming. ExpendituresTotal 20152016201720182019 Construction/Maintenance 2,8002,800 Total Funding Sources20152016201720182019Total 2,8002,800 AC - Arts Center Fund Total Budget Impact/Other Thursday, July 10, 2014 78 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentCity Hall Administration Cit of Hokins MN yp, Contact Public Works Director Type Improvement 09-CIP-CH029 Project # Useful Life 25 years City Hall Roof Replacement Project Name Category Bldg: City Hall FuturePriorityn/a Total Project Cost:$115,000 Description Build up roof on City Hall and Council Chambers Justification Existing roof was installed in 1994, estimated replacement due in 2019 ExpendituresTotal 20152016201720182019 Construction/Maintenance 115,000115,000 Total Funding Sources20152016201720182019Total 115,000115,000 CI - Capital Improvement Fund Total Budget Impact/Other Thursday, July 10, 2014 79 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentCity Hall Administration Cit of Hokins MN yp, Contact Public Works Director Type Improvement 09-CIP-CH030 Project # Useful Life 20 years City Hall Lobby Upgrade Project Name Category Bldg: City Hall FuturePriorityn/a Total Project Cost:$110,000 Description City Hall Lobby Upgrade was proposed as part of the 2007 City Hall upgrade/Carpet project. This part was not completed exceeding estimates. Justification Existing lobby is dated, ceiling tiles have yellowed and wallpaper has numerous stains from 19 years of service. ExpendituresTotal 20152016201720182019 Construction/Maintenance 110,000110,000 Total Funding Sources20152016201720182019Total 110,000110,000 CI - Capital Improvement Fund Total Budget Impact/Other Thursday, July 10, 2014 80 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentCommunications Cit of Hokins MN yp, Contact Asst City Manager Type Improvement 13 CIP-CM001 Project # Useful Life 10 years Technology Improvement - Council Chambers & Studio Project Name Category Bldg: City Hall FuturePriorityn/a Total Project Cost:$95,000 Description 2014 - Installation of surge protection and uninterruptible power supplies in the studio. 2015 - Upgrade equipment in the Council Chamber presentation table 2016 - Replace current document camera with high resolution camera. 2017 - Projection system 2018 - Sound system 2019 - Council chamber cameras Justification 2014 - current and future technology improvements are processor based and are sensitive to power fluctuations 2015 - The current presentation swithcing configuration requires the control room operator to determine what is presented to the room. Presenters do not have much control over their presentations and outside presenters need to use the City computer system. The new equipment will allow the presenter to use their own equipment which will simplify the process while protecting the City's computer network. 2016 - The existing camera is standard definition. The new camera will be high resolution 2017 - Current projectors are 10 years old and low resolution. 2018 - Current ceiling speakers are old and need to be replaced. Lobby speakers have no volume control. 2019 - Current cameras will be 15 years old by 2019 and are standard definition. Replace with high definition cameras. PriorExpenditures20152016201720182019Total Communications 35,00012,50023,00015,00085,500 9,500 TotalTotal PriorFunding Sources20152016201720182019Total 35,00012,50023,00015,00085,500 9,500 CT - Cable Franchise Fees TotalTotal Budget Impact/Other Thursday, July 10, 2014 81 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentFire Cit of Hokins MN yp, Contact Fire Chief Type Improvement 08-CIP-FD019 Project # Useful Life 10 years Replace Carpet and Apparatus Floor Finish - FD Project Name Category Buildings: Fire Facilities FuturePriorityn/a Total Project Cost:$56,000 Description Replace carpet and apparatus floor finish systems. Justification Planned replacement at end of estimated 10 year useful life. Classroom and 2nd and 3rd Floor entryway and louge replacement, due to excessive use of classroom and lounge. FD spoke with Steve Stadler and he was ok with moving it up to 10 years from 15 years. ExpendituresTotal 20152016201720182019 Construction/Maintenance 56,00056,000 Total Funding Sources20152016201720182019Total 56,00056,000 CI - Capital Improvement Fund Total Budget Impact/Other Original plan replacement was 15 years. Due to excessive use of classroom and lounge the life was moved to 10 years. Thursday, July 10, 2014 82 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPavilion Cit of Hokins MN yp, Contact PW Director Type Improvement 07-CIP-P313 Project # Useful Life 10 years Pavilion skate Tile Replacement/Lobby Improvement Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$97,000 Description Replacement of existing skate tile and adding skate tile and ceramic tile to the lobby. Replacement of existing tile in team rooms, arena, warming room , and referees room: 5,500 square feet. Install skate tile to a portion of lobby so skaters can access drinking fountains; 500 square feet. Install ceramic tile in the entryway and a portion of the lobby: 500 square feet. Floor has a 10 Year Life - Put in CIP again for 2017 for evalutaion. May only need to do the high traffice areas. Justification Current skate tile is 16 years old and is the original tile; the wear layer of the tile is worn through in the high traffic areas. Original tile was not glued, which increases maintenance and can create gaps in seams. This can allow skates to touch the concrete underneath the tile. Lobby skate and ceramic tile would add to the building aesthetics. When done in 2007 this project cost $41,339.30. PriorExpendituresTotal 20152016201720182019 Construction/Maintenance 45,00045,000 52,000 TotalTotal PriorFunding Sources20152016201720182019Total 45,00045,000 52,000 PA - Pavilion Fund TotalTotal Budget Impact/Other New tile glued down will save on maintenance, be safer, and improve facility appearance and marketability. Thursday, July 10, 2014 83 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPavilion Cit of Hokins MN yp, Contact Public Works Director Type Improvement 07-CIP-P314 Project # Useful Life 30 years Pavilion Overhead Door Improvement Project Name Category Bldgs: Pavillion FuturePriorityn/a Total Project Cost:$40,000 Description Remove and lock-in four of the six overhead doors on the west side of the Pavilion with a portion to have windows or glass block to allow light to come through. Install automatic openers on the remaining four overhead doors in the arena. ESTIMATED PROJECT SCHEDULE: 2015 Justification Currently the overhead doors are seldom utilized and the removal and installation of glass blocks or windows will decrease the need to use arena lighting and add to arena aesthetics. Saving on repairs and maintenance of the removed doors. Pavilion user groups have asked for this project. ExpendituresTotal 20152016201720182019 Construction/Maintenance 40,00040,000 Total Funding Sources20152016201720182019Total 40,00040,000 PA - Pavilion Fund Total Budget Impact/Other Potential savings on utilities and greater satisfaction from user groups with arena aesthetics. Thursday, July 10, 2014 84 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPavilion Cit of Hokins MN yp, Contact Public Works Director Type Improvement 09-CIP-P026 Project # Useful Life 25 years Pavilion Roof Replacement Project Name Category Bldgs: Pavillion FuturePriority1 Urgent Total Project Cost:$140,000 Description Removal and replacement of existing ballast and membrane for both the north and south roof sections. Justification Repairs made in 2005 extended the life of the roof but it is now 25 years old and has surpassed manufacturers recommendation for replacements. The current roof has leaks and given the current condition of the membrane more failures are expected. ExpendituresTotal 20152016201720182019 Construction/Maintenance 140,000140,000 Total Funding Sources20152016201720182019Total 140,000140,000 PA - Pavilion Fund Total Budget Impact/Other Roof leaks can potentially be harmful to the steel roof deck and may cause damage to equipment and interior of Pavilion, impacting operations and adding cost to roof replacement. Thursday, July 10, 2014 85 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPavilion Cit of Hokins MN yp, Contact Public Works Director Type Improvement 09-CIP-P036 Project # Useful Life 15-25 years Pavilion Evaporator Condenser Replacement Project Name Category Bldgs: Pavillion FuturePriorityn/a Total Project Cost:$60,000 Description Remove and replace existing condenser with a new condenser, sump tank, pump and fan motors. ESTIMATED PROJECT SCHEDULE: 2015 Justification Existing condenser has extensive scaling and has experienced a loss in efficiency causing higher head pressures and putting greater strain on compressors. ExpendituresTotal 20152016201720182019 Construction/Maintenance 60,00060,000 Total Funding Sources20152016201720182019Total 60,00060,000 PA - Pavilion Fund Total Budget Impact/Other Given the age, scaling, and corrosion of the existing condenser a freon leak could potentially develop causing greater expense and need for repair. Thursday, July 10, 2014 86 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPavilion Cit of Hokins MN yp, Contact Facilities Director Type Improvement 10-CIP-P319 Project # Useful Life 15 years Pavilion Indoor Turf Replacement Project Name Category Bldgs: Pavillion FuturePriorityn/a Total Project Cost:$95,000 Description Purchase new turf for the Pavilion's arena Justification The current turf was purchased in 1998 and has a useful life of 15 years (2013), the turf is showing signs of wear and has been patched in a few areas. Replacement will be needed by 2016. ExpendituresTotal 20152016201720182019 Construction/Maintenance 95,00095,000 Total Funding Sources20152016201720182019Total 95,00095,000 PA - Pavilion Fund Total Budget Impact/Other Possible resale of the existing turf may offset some of the cost of a new turf system. Thursday, July 10, 2014 87 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPavilion Cit of Hokins MN yp, Contact Facilities Director Type Improvement 10-CIP-P320 Project # Useful Life 10 years Pavilion - Desiccant Repl of Dehumidification Syst Project Name Category Bldgs: Pavillion FuturePriorityn/a Total Project Cost:$6,000 Description Purchase and replace the desiccant medium used in the Pavilion's dehumidification system. Justification The current desiccant has never been replaced and has surpassed its useful life. New desiccant will make the system run more efficient and effectively saving on natural gas and electricity. Also provide dryer air which can have a positive effect on ice quality and indirectly cause more efficient operation of the refrigeration equipment. ExpendituresTotal 20152016201720182019 Construction/Maintenance 6,0006,000 Total Funding Sources20152016201720182019Total 6,0006,000 PA - Pavilion Fund Total Budget Impact/Other Thursday, July 10, 2014 88 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPavilion Cit of Hokins MN yp, Contact Don Olson Type Improvement 13-CIP-P321 Project # Useful Life 15 years Pavilion Mezzanine Rooftop Unit Replacement Project Name Category Bldgs: Pavillion FuturePriority1 Urgent Total Project Cost:$24,500 Description Purchase and installation of (3) rooftop HVAC units that suppy heating and cooling to the Pavilions Mezzanine Justification The current units were installed in 2003 and are at the end of their useful life. ExpendituresTotal 20152016201720182019 Construction/Maintenance 24,50024,500 Total Funding Sources20152016201720182019Total 24,50024,500 PA - Pavilion Fund Total Budget Impact/Other Thursday, July 10, 2014 89 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPavilion Cit of Hokins MN yp, Contact Don Olson Type Improvement 13-CIP-P322 Project # Useful Life 15 years Pavilion HHS Team Room Rooftop Unit Repl Project Name Category Bldgs: Pavillion FuturePriority1 Urgent Total Project Cost:$9,500 Description Purchase and installation of (1) rooftop HVAC unit that supply's heating and cooling to the High School Hockey Team Rooms. Justification The current unit was installed in 2004 and is at the end of its useful life. ExpendituresTotal 20152016201720182019 Construction/Maintenance 9,5009,500 Total Funding Sources20152016201720182019Total 9,5009,500 PA - Pavilion Fund Total Budget Impact/Other Thursday, July 10, 2014 90 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPavilion Cit of Hokins MN yp, Contact Don Olson Type Improvement 13-CIP-P324 Project # Useful Life 25 years Pavilion Entry and Lobby Door Replacement Project Name Category Bldgs: Pavillion FuturePriority3 Important Total Project Cost:$7,000 Description Purchase and install (10) doors, closers, and push bars to replace the current doors at the entrance to the Pavilion. Justification The current doors were installed when the facility was built in 1990 and have exceeded their useful life. ExpendituresTotal 20152016201720182019 Construction/Maintenance 7,0007,000 Total Funding Sources20152016201720182019Total 7,0007,000 PA - Pavilion Fund Total Budget Impact/Other Thursday, July 10, 2014 91 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPavilion Cit of Hokins MN yp, Contact Don Olson Type Improvement 13-CIP-P325 Project # Useful Life 25 years Pavilion - Paint Exterior Building Project Name Category Bldgs: Pavillion FuturePriority1 Urgent Total Project Cost:$22,000 Description Hire a painting contractor to pain the Pavilions exterior. Justification The exterior block of the facility has not been painted since the facility was built and the current paint is faded and chipped in areas. ExpendituresTotal 20152016201720182019 Construction/Maintenance 22,00022,000 Total Funding Sources20152016201720182019Total 22,00022,000 PA - Pavilion Fund Total Budget Impact/Other Thursday, July 10, 2014 92 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPavilion Cit of Hokins MN yp, Contact Don Olson Type Improvement 14-CIP-P010 Project # Useful Life 25 years Pavilion Painting the Arena Ceiling and Bar Joist Project Name Category Bldgs: Pavillion FuturePriority1 Urgent Total Project Cost:$40,000 Description Hire a painting contractor to clean, prep, and paint the roof deck, bar joist, and arena walls. Justification The current coating was painted when the facility was built and is in need of recoating to protect roof deck and bar joist from rust. ExpendituresTotal 20152016201720182019 Construction/Maintenance 40,00040,000 Total Funding Sources20152016201720182019Total 40,00040,000 PA - Pavilion Fund Total Budget Impact/Other Thursday, July 10, 2014 93 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPolice Cit of Hokins MN yp, Contact Police Chief Type Improvement 08-CIP-PD016 Project # Useful Life 7 years Replace Carpet - Police Station Project Name Category Buildings: Police Department FuturePriorityn/a Total Project Cost:$40,000 Description Replace Police Station Carpeting Justification Planned replacement at end of estimated 10 year useful life. This is a 24hour/day work center that required the shorter carpet replacement cycle. ExpendituresTotal 20152016201720182019 Construction/Maintenance 40,00040,000 Total Funding Sources20152016201720182019Total 40,00040,000 CI - Capital Improvement Fund Total Budget Impact/Other May have to look at other flooring option for dispatch. (ie combination of carpet and tile due to wear under desk areas. Previously in at a 7 year life - moved back to 10 year life Thursday, July 10, 2014 94 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Bldg/Equip Ser Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-B023 Project # Useful Life Public Works - Replace Overhead Doors Project Name Category Buildings: Maintenance Facilit FuturePriorityn/a Total Project Cost:$90,000 Description Replace overhead doors Justification ExpendituresTotal 20152016201720182019 Construction/Maintenance 90,00090,000 Total Funding Sources20152016201720182019Total 18,00018,000 CI - Capital Improvement Fund 18,00018,000 RF - Refuse Fund 18,00018,000 SF - Sanitary Sewer Fund 18,00018,000 SU - Storm Sewer Fund WF - Water Fund 18,00018,000 Total Budget Impact/Other Thursday, July 10, 2014 95 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Bldg/Equip Ser Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-B011 Project # Useful Life 30 years Public Works Garage Upgrade Project Name Category Buildings: Maintenance Facilit FuturePriority1 Urgent Total Project Cost:$220,000 Description The current Vehicle Maintenance Garage at Public Works was constucted in 1981, an addition was added in 1995. The floor hoist was installed in 1989. The concrete flooring and drainage system are in very poor condition. The current below grade vehicle lift needs to be relocated above grade to prevent groundwater contamination from an undetectable failure in the piping or hoist. A roll-around above grade hoi st sytem will need to be utilized in place of the existing below grade hoist. Due to the sloping of the existing floor and its condition it would need to be replaced to be able to use this type of lift. Exis ting ventilation, installed in 1989 will also need to be upgraded to meet current regulations on air quality. The concrete flooring and drainage system are in very poor condition. A small twin post above ground lift will be utilized for cars and light trucks. Stage 1: 2015: Site evaluation and cost estimates, plans and specifications Stage 2: 2016 Construction Justification Current garage area needs to be brought up to new requirments for above and below ground hoists. Ventilation ststem needs to be brounght up to current standards and to prevent garage fumes from entering office area. Floor and drain system in poor condition. Expenditures20152016201720182019Total Construction/Maintenance 20,000200,000220,000 Total Funding Sources20152016201720182019Total 20,000100,000120,000 CI - Capital Improvement Fund 25,00025,000 RF - Refuse Fund 25,00025,000 SF - Sanitary Sewer Fund 25,00025,000 SU - Storm Sewer Fund WF - Water Fund 25,00025,000 Total Budget Impact/Other Thursday, July 10, 2014 96 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Bldg/Equip Ser Cit of Hokins MN yp, Contact Public Works Director Type Unassigned 14-CIP-B001 Project # Useful Life 20 years Wash Bay Roof Replacement Project Name Category Buildings: Maintenance Facilit FuturePriority4 Less Important Total Project Cost:$23,000 Description Existing roof over wash bay area and shop are at the Public Works site. Justification Existitng roof was installed in 1995. At this time we have had numerous leaks and roof has reached the end of its life span ExpendituresTotal 20152016201720182019 Construction/Maintenance 23,00023,000 Total Funding Sources20152016201720182019Total 23,00023,000 CI - Capital Improvement Fund Total Budget Impact/Other Thursday, July 10, 2014 97 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Bldg/Equip Ser Cit of Hokins MN yp, Contact Bldg/Equip Supt Type Improvement 14-CIP-B002 Project # Useful Life 20 years Wash Bay Air Handler Replacement Project Name Category Unassigned FuturePriority3 Important Total Project Cost:$15,000 Description Air Handler Unit that heats the Wash Bay area at Public Works Justification Existing Unit was purchased in 1987 and was originally installed at the Hopkins Landfill Storage Building. It was moved into its present location in 1994. Existing unit is corroded badly from the harsh environment of a wash bay. Could look at option of relocating to Roof Area as part of 2015 Roof Replacement. ExpendituresTotal 20152016201720182019 Construction/Maintenance 15,00015,000 Total Funding Sources20152016201720182019Total 15,00015,000 CI - Capital Improvement Fund Total Budget Impact/Other Thursday, July 10, 2014 98 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Bldg/Equip Ser Cit of Hokins MN yp, Contact Bldg/Equip Supt Type Improvement 14-CIP-B003 Project # Useful Life 20 years Fuel Management System Upgrade Project Name Category Unassigned FuturePriority4 Less Important Total Project Cost:$12,500 Description The Fuel Management System is used to monitor and dispense Fuel to the Cities fleet of Equipment. Hardware consists of a dispenser at the Fuel Island a Software package tied to the Cities Fleet Maintenance Program and individual cards or keys in each vehicle. Justification Existing system was installed in 1989 and updated in 1995. The hardware and software are obsolete and a failure of this system could disrupt our ability to dispense fuel. ExpendituresTotal 20152016201720182019 Construction/Maintenance 12,50012,500 Total Funding Sources20152016201720182019Total 12,50012,500 CI - Capital Improvement Fund Total Budget Impact/Other Thursday, July 10, 2014 99 100 Parks and Recreation 101 102 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-P003 Project # Useful Life 15 years Skate Park Project Name Category PW - Parks FuturePriorityn/a Total Project Cost:$84,000 Description Annual equipment enhancments to Overpass Skate Park Justification Per our agreement with 3rd Lair, who manages the Skate Park, we need to put $7,000 of enhancements into the Skate Park for the years 2006-2008. The agreement for 2009-2011 requires annual enhancements of $7,000. The agreement for 2012-2014 is currently being renewed for $7,000 each year. 7The current agreement of $7,000 per year is expected to be continued for 2015-2017 Per the Overpass Skate Park Operators Agreement, the city annually puts an amount specified in the agreement of enhancements into the park to change/improve the park each year to keep the park attractive and challenging to users. PriorExpenditures20152016201720182019Total Construction/Maintenance 7,0007,0007,0007,0007,00035,000 49,000 TotalTotal PriorFunding Sources20152016201720182019Total 7,0007,0007,0007,0007,00035,000 49,000 PDF- Park Dedication Fund TotalTotal Budget Impact/Other Formerly budgeted in Skate Park Enterprise Fund, which was eliminated 12/31/2005. It is now budgeted in the Park Dedication Fund. Thursday, July 10, 2014 103 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact PW Director Type Improvement 08-CIP-P010 Project # Useful Life Park Valley - Play Equipment Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$60,000 Description Replace park play equipment Justification Upgrade of park play equipment after 20 - 25 years of use. ExpendituresTotal 20152016201720182019 Construction/Maintenance 60,00060,000 Total Funding Sources20152016201720182019Total 60,00060,000 PDF- Park Dedication Fund Total Budget Impact/Other Moved from 2014 to 2018 and increased cost from $45,000 to $60,000. Thursday, July 10, 2014 104 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-P011 Project # Useful Life Burnes Park - Resurface Tennis Courts Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$30,000 Description Crackseal and apply new surface color coat to Burnes Park tennis courts. Periodic repairs needed to ensure quality safe playing surface. Justification Work needed to restore asphalt surface condition and extend life of tennis courts. PriorExpendituresTotal 20152016201720182019 Construction/Maintenance 20,00020,000 10,000 TotalTotal PriorFunding Sources20152016201720182019Total 20,00020,000 10,000 PDF- Park Dedication Fund TotalTotal Budget Impact/Other Work last done in 2009 - periodically needs repairs. Thursday, July 10, 2014 105 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-P014 Project # Useful Life Hilltop Park - Play Equipment Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$100,000 Description Replace park play equipment. Justification Replace park play equipment after 20-25 years - installed in 1990 and needs replacement ExpendituresTotal 20152016201720182019 Construction/Maintenance 100,000100,000 Total Funding Sources20152016201720182019Total 100,000100,000 PDF- Park Dedication Fund Total Budget Impact/Other Project changed from $45,000 to $100,000 and moved from 2014 top 2016 Thursday, July 10, 2014 106 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-P015 Project # Useful Life Valley Park - Play Equipment Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$80,000 Description Replace park play equipment. Justification Play container upgraded in 2012 and rope climber installed. Other existing play equipment was installed in 1992 and needs replacement. ExpendituresTotal 20152016201720182019 Construction/Maintenance 80,00080,000 Total Funding Sources20152016201720182019Total 80,00080,000 PDF- Park Dedication Fund Total Budget Impact/Other Modified project to inclcude play equipment replacement in 2017 Thursday, July 10, 2014 107 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P040 Project # Useful Life Burnes Park - Warming House Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$60,000 Description Rehab Warming House - $60,000 Justification The existing warming house is 40+ years old and looks dates and drab. Install new roffing, exterior treatment and landscaping. ExpendituresTotal 20152016201720182019 Construction/Maintenance 60,00060,000 Total Funding Sources20152016201720182019Total 60,00060,000 PDF- Park Dedication Fund Total Budget Impact/Other New to CIP in 2013 Thursday, July 10, 2014 108 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P041 Project # Useful Life Oakes Park - Replace Picnic Shelter Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$30,000 Description Replace picnic shelter - $30,000 Justification Existing shelter is 30+ years old and deteriorated, concrete slab floor is heaving. ExpendituresTotal 20152016201720182019 Construction/Maintenance 30,00030,000 Total Funding Sources20152016201720182019Total 30,00030,000 PDF- Park Dedication Fund Total Budget Impact/Other New to CIP in 2013 Thursday, July 10, 2014 109 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P042 Project # Useful Life Valley Park - Construct Storage Building Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$25,000 Description Construct storage building - $25,000 Justification Storage area needed to support organizations using the athletic fleids and for park maintenance needs. ExpendituresTotal 20152016201720182019 Construction/Maintenance 25,00025,000 Total Funding Sources20152016201720182019Total 25,00025,000 PDF- Park Dedication Fund Total Budget Impact/Other New to CIP in 2013 Thursday, July 10, 2014 110 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P043 Project # Useful Life Burnes Park - Play Equipment Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$250,000 Description Replace 2-5 play equipment - $35,000, Install concrete play container edging 15,000 Play Equipment - $200,000 in 2025 Justification Existing equipment was installed in 1996. This large park and its play equipment are heavily used by area residents and for large picnic events. ExpendituresTotalFuture 20152016201720182019 Construction/Maintenance 50,00050,000 200,000 TotalTotal Funding Sources20152016201720182019TotalFuture 50,00050,000 PDF- Park Dedication Fund 200,000 TotalTotal Budget Impact/Other New to CIP in 2013 Thursday, July 10, 2014 111 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P044 Project # Useful Life Oakes Park - Tennis Courts Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$200,000 Description Repair tennis courts - $20,000 2025 - Tennis Courts Reconstruct = $180,000 (2 courts) Justification Periodic repairs needed to ensure quality safe playing surface ExpendituresTotalFuture 20152016201720182019 Construction/Maintenance 20,00020,000 180,000 TotalTotal Funding Sources20152016201720182019TotalFuture 20,00020,000 PDF- Park Dedication Fund 180,000 TotalTotal Budget Impact/Other Added to CIP in 2013 Thursday, July 10, 2014 112 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P045 Project # Useful Life Valley Park - Warming House Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$60,000 Description Rehab Warming House - $60,000 Justification The existing warming house is 40+ years old and looks dated and drab. Install new roofing, elextrical upgrades, plumbinf upgrades, exterior treatements and landscaping. ExpendituresTotal 20152016201720182019 Construction/Maintenance 60,00060,000 Total Funding Sources20152016201720182019Total 60,00060,000 PDF- Park Dedication Fund Total Budget Impact/Other Added to CIP in 2013 Thursday, July 10, 2014 113 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P046 Project # Useful Life Burnes Park - Lighting Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$50,000 Description Lighitng - Justification ExpendituresTotal 20152016201720182019 Construction/Maintenance 50,00050,000 Total Funding Sources20152016201720182019Total 50,00050,000 PDF- Park Dedication Fund Total Budget Impact/Other Thursday, July 10, 2014 114 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P054 Project # Useful Life Cottageville Park - Phase II Improvements Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$250,000 Description Picnic Shelter, Restrooms, 2-5 play area, misc. site work. Lake Street/Blake Road gateway area Improvements. Justification ExpendituresTotal 20152016201720182019 Construction/Maintenance 250,000250,000 Total Funding Sources20152016201720182019Total 250,000250,000 PDF- Park Dedication Fund Total Budget Impact/Other Thursday, July 10, 2014 115 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P056 Project # Useful Life Harley Hopkins Park - Warming House Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$30,000 Description Warming House Justification ExpendituresTotal 20152016201720182019 Construction/Maintenance 30,00030,000 Total Funding Sources20152016201720182019Total 30,00030,000 PDF- Park Dedication Fund Total Budget Impact/Other Thursday, July 10, 2014 116 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Improvement 13-CIP-P057 Project # Useful Life Harley Hopkins Park - Lighting Project Name Category Parks/Fores/Pav.: Comm. Facil FuturePriorityn/a Total Project Cost:$50,000 Description Lighting Justification ExpendituresTotal 20152016201720182019 Construction/Maintenance 50,00050,000 Total Funding Sources20152016201720182019Total 50,00050,000 PDF- Park Dedication Fund Total Budget Impact/Other Thursday, July 10, 2014 117 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact Public Works Director Type Unassigned 13-CIP-P072 Project # Useful Life Oakes Park - Lighting Project Name Category PW - Parks FuturePriorityn/a Total Project Cost:$40,000 Description Relocate/Upgrade Lighting - $40,000 OGU - $20,000 from MCES due to moving the hockey rink for their lift station. Justification The lighting for open skate and hockey needs replacement due to age and energy inefficiency and must be relocated for the MCES lift station construction. ExpendituresTotal 20152016201720182019 Construction/Maintenance 40,00040,000 Total Funding Sources20152016201720182019Total 40,00040,000 PDF- Park Dedication Fund Total Budget Impact/Other Added item in 2013 Thursday, July 10, 2014 118 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact PW Director Type Improvement 14-CIP-P001 Project # Useful Life Rehab Downtown Park Project Name Category PW - Parks FuturePriorityn/a Total Project Cost:$70,000 Description Rehabilitate landscape planting areas. Install decorative banners at entrances. Replace drinking fountain. Construct portable restroom enclosure. Justification Original landscaping is decades old and needs refreshing, existing drinking fountain is damaged ExpendituresTotal 20152016201720182019 Construction/Maintenance 70,00070,000 Total Funding Sources20152016201720182019Total 70,00070,000 PDF- Park Dedication Fund Total Budget Impact/Other Thursday, July 10, 2014 119 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Parks Cit of Hokins MN yp, Contact PW Director Type Improvement 14-CIP-P002 Project # Useful Life Burnes Park Splash Pad Project Name Category PW - Parks FuturePriorityn/a Total Project Cost:$300,000 Description Construct Splash pad play area including water reuse/filtration/treatment system. Justification A water play area alternative to Shady Oak Beach is needed for 2-5 year old children ExpendituresTotal 20152016201720182019 Construction/Maintenance 300,000300,000 Total Funding Sources20152016201720182019Total 300,000300,000 PDF- Park Dedication Fund Total Budget Impact/Other Thursday, July 10, 2014 120 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentRecreation Cit of Hokins MN yp, Contact PW Director Type Improvement 10-CIP-R002 Project # Useful Life 25 years Depot Recreation Area Project Name Category PW - Parks FuturePriority2 Very Important Total Project Cost:$225,000 Description The Depot property serves as a prominent gateway to the city of Hopkins for people exiting Highway 169 to Excelsior Boulevard; as well as those enjoying the adjacent regional trail. This project includes the addition of an outdoor multipurpose court (basketball, volleyball, boot hockey, etc.), benches, picnic tables and related landscaping improvements designed to enhance the site both recreationally and aesthetically. New recreational amenities would enhance the already popular Depot youth programs in place; while also providing recreational opportunities to residents and others living in the general area or using the regional trail. Proposed funding is from: Hennepin County Grant - $125,000 Other Agencies - $50,000 Park Dedication - $50,000 Justification The Depot site has needed outdoor amenities for its target audience of youth since its founding. A year-round sports and recreational anchor for youth will provide additional reinforcement of positive behaviors. As more people come to the Depot for youth activities and general use by trail, the planned recreational amenities would be used all day and into the evening hours. Proximity to the regional trail will accord high visibility and symbolize active living and community connections in the walkable and bike-able city that Hopkins has become. The site would become our city’s newest park and allow for general and reserved community use such as hosting Joint Recreation programs, picnics and special events for all occasions. Easy access from the regional trail makes the Depot site an easy ride for kids and adults alike who would come for recreation. Expenditures20152016201720182019Total 225,000225,000 Construction Total Funding Sources20152016201720182019Total 125,000125,000 GU - Other Governmental Units 50,00050,000 PDF- Park Dedication Fund 50,00050,000 PF - Private Sector Funds Total Budget Impact/Other Cost reduced from $500,000 tp $225,000 Thursday, July 10, 2014 121 122 Streets, Traffic & Transportation 123 124 125 126 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S101 Project # Useful Life Unassigned Residential Street Improvements and Utilities Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$19,205,000 Description Locations to be determined consistent with the street reconstruction program. Program includes reconstruction of deteriorated water main, sanitary sewer and storm sewer in conjunction with street improvement projects. Utility improvements are consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. 2016: Avenues west streets Reconstruction Project 2017: Park Valley and Peaceful Valley. Reclamation project. 2018: Northeast Hopins Reconstruction Project. 2019: Avenues Streets Reconstructioin Project. Justification In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installed new. In some cases, water main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The costs assume the city funding 100% of major storm sewer, water main, and sanitary sewer improvements. PriorExpenditures20152016201720182019Total Construction/Maintenance 3,275,0004,360,0003,475,0002,770,00013,880,000 5,325,000 TotalTotal PriorFunding Sources20152016201720182019Total 1,500,0002,500,0001,500,0001,500,0007,000,000 5,325,000 PI - PIR/General Obligation Bonds Total SA - Special Assessment 1,000,0001,000,000750,000750,0003,500,000 175,000240,000325,000120,000860,000 SF - Sanitary Sewer Fund 200,000220,000300,000150,000870,000 SU - Storm Sewer Fund 400,000400,000600,000250,0001,650,000 WF - Water Fund Total Budget Impact/Other Public Hearing - year prior to planned construction Plans and specifications - year prior to planned construction Bid - year of planned construction Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections. Consistent with the City Council adopted Roadway Improvement Policy, Street Ratings, Pavement Management Program, Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. Thursday, July 10, 2014 127 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S103 Project # Useful Life Unassigned Citywide Concrete Alleys Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$1,368,000 Description 2016: Alley South of Mainstreet between 8th and 9th Ave South 2017: Alley south of 6th Street South and North of Nine Mile Creek, between 11th Avenue South and 10th Avenue South. Program to construct concrete alleys in areas designated as poor on the Alley Condition Survey. Justification The city has had a policy of constructing concrete alleys for a number of years. This policy has proved to be sound by the concrete alleys' durability and low maintenance costs. Current policy has the city share at 20% of the cost in residential areas. The city will experience cost savings due to lower maintenance costs. PriorExpendituresTotal 20152016201720182019 Construction/Maintenance 75,00080,000155,000 1,213,000 TotalTotal PriorFunding Sources20152016201720182019Total 15,00016,00031,000 1,213,000 PI - PIR/General Obligation Bonds Total SA - Special Assessment 60,00064,000124,000 Total Budget Impact/Other Consistent with the City Council adopted Roadway Improvement Policy and Alley ratings. Thursday, July 10, 2014 128 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S104 Project # Useful Life Unassigned County Road 3 Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$2,300,000 Description County Road 3 from Shady Oak Road to Meadowbrook Road. Lighting, landscaping, street, etc. improvements along Excelsior Boulevard from the east to west city limits. GO Bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue Segment 1: Construction - 1998/1999 Segment 2: Planning - 2004; bidding and construction (median upgrades only) - 2005 Segment 3: Planning and acquisition - 1999/2001, bidding/construction - 2002/2003/2004 Segment 4: Planning and acquisition - Not in County funding plan TIF funded work includes the following: A signalized intersection will be constructed at Monroe Avenue. A second intersection will also be built at Jackson Ave/St. Louis Street. There will also be a reconfiguration of Monroe Avenue and Milwaukee south of Excelsior Boulevard. This work is being completed in conjunction with the reconstruction of Excelsior Boulevard from Highway 169 to Blake Road. The intersection is being constructed to facilitate redevelopment of the SuperValu north annex site. Justification Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in all four segments of County Road 3: - Segment 1 from Shady Oak Road to 11th Avenue S.; upgrade existing undivided roadway, upgrade 11th Avenue intersection to meet future needs, implement beautification program--completed in 1998 - Segment 2 from 11th Avenue S. to Hwy 169; median pavers construction - Segment 3 from Highway 169 to Blake Road; upgrade existing narrow undivided roadway, resolve safety issues at railroad crossing, improve north-south access, account for future LRT access, address redevelopment needs, add integration for full access at Jackson Avenue. - Segment 4 from Blake Road to Meadowbrook Road; upgrade roadway, implement beautification program. PriorExpenditures20152016201720182019Total 2,300,0002,300,000 0 Construction/Maintenance TotalTotal PriorFunding Sources20152016201720182019Total GU - Other Governmental 1,600,0001,600,000 0 Units Total 700,000700,000 MS - Municipal State Aid Streets Total Budget Impact/Other GO bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue. Segment 1: Construction - 1998/1999 Segment 2: Planning - 2005; bidding and construction (median upgrades only) - 2006 Segment 3: Planning and acquisition - 1999/2000; bidding/construction - 2003/2004 Segment 4: Planning and acquisition - Not in County Funding Plan Consistent with Hennepin County CIP and City Council action. Thursday, July 10, 2014 129 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S106 Project # Useful Life Unassigned County Road 61 (Shady Oak Road) Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$27,000,000 Description Shady Oak Road from County Road 3 to T.H. 7, Mainstreet from 20th Avenue to Shady Oak Road. Lighting, landscaping, street, etc., improvements from County Road 3 to T.H. 7 Reconstruction and amenities on Mainstreet from 20th Avenue to Shady Oak Road. Reconstruction of West Park Road, 2nd Street N., and 21st Avenue N. (2nd Street-4th Street N.) See also 01-CIP U003 for the Storm Sewer Management associated with this project. Justification Deficiencies appear on Shady Oak Road in terms of roadway conditions, traffic/pedestrian movement, safety, and aesthetics. Upgrade an undivided roadway, resolve safety issues with number of driveway access points and intersection at Mainstreet. Lighting needs upgrading and provide beautification program. PriorExpendituresTotal 20152016201720182019 Construction/Maintenance 18,800,00018,800,000 8,200,000 TotalTotal PriorFunding Sources20152016201720182019Total 16,850,00016,850,000 8,200,000 GU - Other Governmental Units Total MS - Municipal State Aid 1,000,0001,000,000 Streets PI - PIR/General Obligation 700,000700,000 Bonds 250,000250,000 SA - Special Assessment Total Budget Impact/Other 2012-2014: Planning and acquisition 2014/2015: Bidding and construction Consistent with Hennepin County CIP, city's desire to upgrade the roadway, and reconstruction program for all of Mainstreet. This project totals $27,000,000. Hopkins share of the county project is $4,000,000. Thursday, July 10, 2014 130 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S504 Project # Useful Life Unassigned Sixth Street South (11th to 12th Avenue South) Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$500,000 Description Sixth Street South from 11th Avenue South to 12th Avenue South. Extension of roadway and box culvert crossing at Nine Mile Creek. Justification This project will offer a second access to the industrial area (fire access). Will direct some of the existing industrial traffic north, away from the residential intersection at Seventh Street and 11th Avenue. Will connect a current dead-end alley, west of 11th Avenue. ExpendituresTotal 20152016201720182019 Construction/Maintenance 500,000500,000 Total Funding Sources20152016201720182019Total 400,000400,000 MS - Municipal State Aid Streets 100,000100,000 PI - PIR/General Obligation Bonds Total Budget Impact/Other Currently on MSA plans. Thursday, July 10, 2014 131 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Public Works Director Type Improvement 06-CIP-S118 Project # Useful Life Parking Lots and HCRRA Alley Improvements Project Name Category Trans: Parking Facilities FuturePriorityn/a Total Project Cost:$1,150,000 Description 2015: Municipal Parking Lot 200, south of Mainstreet between 8th and 9th Avenues. Municipal Parking Lot 300, South of Mainstreet between 9th and 10th Avenues. Pavilion parking lot, City Hall Parking Lot. HCRRA Alley, north of Mainstreet between 7th and 8th Avenues. Rehabilitate parking lot pavement and pave alleys. Justification Pavement has deteriorated to the point where cracksealing and sealcoating are not effective. ExpendituresTotal 20152016201720182019 Construction/Maintenance 1,150,0001,150,000 Total Funding Sources20152016201720182019Total 930,000930,000 PI - PIR/General Obligation Bonds 220,000220,000 SU - Storm Sewer Fund Total Budget Impact/Other Thursday, July 10, 2014 132 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Facilities Director Type Improvement 11-CIP-S120 Project # Useful Life 30 years Plan, Design and Implement Railroad Quiet Zone Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$225,000 Description Modify existing railroad grade crossings to satisfy Federal Railroad Administration (FRA) requirements to create a Whistle-Free Quiet Zone for the CP Railroad corridor. Phase I: Plan and coordinate requirements with FRA and SWLRT project office. Design necessary supplemental safety measures (SSM). Phase II: Construct SSM's and implement Quiet Zone. Justification Train horns sound in early morning hours and are disruptive to nearby residential areas. ExpendituresTotal 20152016201720182019 Construction/Maintenance 25,000200,000225,000 Total Funding Sources20152016201720182019Total 25,000200,000225,000 PI - PIR/General Obligation Bonds Total Budget Impact/Other It is anticipated that design and coordination work will be completed in 2015. Construction of the crossing improvements will be timed to coincide with the SWLRT construction. Thursday, July 10, 2014 133 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact Facilities Director Type Improvement 11-CIP-S121 Project # Useful Life 30 years Mainstreet Rehabilitation Project Name Category Trans: Streets FuturePriority3 Important Total Project Cost:$4,400,000 Description This project includes a mill and overlay from 5th Ave North to Shady Oak Road, upgrade of pedestrian facilities to include enhanced crosswalks, sidewalk repair, street lighting upgrades, and traffic signal upgrades. The watermain is also proposed to be replced between 5th Avenue and 11th Avenue. Justification Pavement, sidewalk, pavers, street lights and traffic signals are becoming worn and in need of updating. The watermain is old and undersized for the demand downtown. PriorExpendituresTotal 20152016201720182019 Construction/Maintenance 4,000,0004,000,000 400,000 TotalTotal PriorFunding Sources20152016201720182019Total 660,000660,000 400,000 GU - Other Governmental Units Total MS - Municipal State Aid 1,630,0001,630,000 Streets PI - PIR/General Obligation 1,400,0001,400,000 Bonds 60,00060,000 SA - Special Assessment 250,000250,000 WF - Water Fund Total Budget Impact/Other The project scope was expanded to include the entire length of Mainstreet. Thursday, July 10, 2014 134 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact PW Director Type Improvement 13-CIP-S040 Project # Useful Life 20 years Pedestrian & Bicycle Access Improvements Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$125,000 Description 2014-2018 - Painting bike lanes, constructing trails and sidewalks Justification Council recently adopted plan to increase pedestrian and bicycle access and safety. These improvements begin to implement that plan. PriorExpendituresTotal 20152016201720182019 Construction/Maintenance 25,00025,00025,00025,000100,000 25,000 TotalTotal PriorFunding Sources20152016201720182019Total 25,00025,00025,00025,000100,000 25,000 PI - PIR/General Obligation Bonds Total Total Budget Impact/Other Thursday, July 10, 2014 135 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact PW Director Type Unassigned 15-CIP-S001 Project # Useful Life Blake Road Corridor Improvements Project Name Category PW - Parks FuturePriorityn/a Total Project Cost:$10,000,000 Description Blake Road from Interlachen Boulevard (Edina) to north of TH7 (St. Louis Park) will be reconstructed to enhance accommodations for pedestrians, bicycles, and buses, improve access to adjacent neighborhoods, provide the necessary infrastructure to support redevelopment and enhance economic growth along the corridor, improve and enhance traffic flow at major intersections/interchanges, and provide for access to the planned SWLRT Blake Station. Justification Blake road is a heavily travelled thoroughfare and currently a county road between Excelsior Boulevard and TH7. The construction of a SWLRT station at Blake road will increase traffic and present significant redevelopment opportunity along the corridor. Many traffic issues exist along Blake road including lack of pedestrian accommodations, congestion and poor access. The City of Hopkins is currently leading a study in partnership with the cities of Edina and St. Louis Park, Hennepin County, MNDOT, the Minnehaha Creek Watershed District, Three Rivers Park District, and the SWLRT project office to develop a plan for the future transportation needs of the corridor ExpendituresTotal 20152016201720182019 Construction/Maintenance 1,000,0009,000,00010,000,000 Total Funding Sources20152016201720182019Total GU - Other Governmental 750,0008,000,0008,750,000 Units 250,000600,000850,000 PI - PIR/General Obligation Bonds SF - Sanitary Sewer Fund 150,000150,000 250,000250,000 WF - Water Fund Total Budget Impact/Other Consistant with the City Council adopted roadway improvement policy. Thursday, July 10, 2014 136 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Streets/Traffic Cit of Hokins MN yp, Contact PW Director Type Improvement 15-CIP-S039 Project # Useful Life 2015 Street Overlay Project Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$175,000 Description 2015-2, 500LF of mill and overlay along Oakridge Road from TH 7 to the city limit. Justification Maintain streets that are in need of work but do not need to be reconstructed. Mill and overlay is needed to rehabilitate the deteriorating pavement of this heavily travelled roadway. Hopkins is partnering with Minnetonka to improve the roadway along the entire length. ExpendituresTotal 20152016201720182019 Construction 175,000175,000 Total Funding Sources20152016201720182019Total 175,000175,000 PI - PIR/General Obligation Bonds Total Budget Impact/Other New item added in 2014 for 2015 Thursday, July 10, 2014 137 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Transportation Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S502 Project # Useful Life Unassigned Light Rail Transit Stations (3) Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$500,000 Description Supplemental improvements to 3 Light Rail Transit (LRT) station areas in the proposed locations. Justification The HCRRA proposes to construct three stations along the Southwest Corridor. The proposed expenditures would be in addition to the funds expended by the HCRRA. The additional funds would be used to ensure the stations are high quality in appearance. ExpendituresTotal 20152016201720182019 Construction/Maintenance 500,000500,000 Total Funding Sources20152016201720182019Total 500,000500,000 TF - Tax Increment Financing Total Budget Impact/Other Dependent on HCRRA plans. Consistent with plans for LRT stops in Hopkins by Hennepin County. Thursday, July 10, 2014 138 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Transportation Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-S503 Project # Useful Life Unassigned Eighth Avenue LRT Corridor Project Name Category Trans: Streets FuturePriorityn/a Total Project Cost:$3,700,000 Description Eighth Avenue from County Road 3 to Mainstreet and access modifications along 2nd Street South. Design and construction of pedestrian improvements, streetscape improvements, street reconstruction, utility improvements and drainage improvements. Justification The city desires to create a vibrant corridor between the proposed SWLRT station at Excelsior Boulevard and historic downtown Hopkins, that will accommodate pedestrians and bicycles as well as vehicles. ExpendituresTotal 20152016201720182019 Construction/Maintenance 3,700,0003,700,000 Total Funding Sources20152016201720182019Total 2,300,0002,300,000 GU - Other Governmental Units 100,000100,000 SF - Sanitary Sewer Fund 150,000150,000 SU - Storm Sewer Fund 1,000,0001,000,000 TF - Tax Increment Financing 150,000150,000 WF - Water Fund Total Budget Impact/Other Dependent on Metropolitan Council SWLRT plans Thursday, July 10, 2014 139 140 Utilities 141 142 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-U002 Project # Useful Life Unassigned Storm Drainage System Maintenance - Alley Repairs Project Name Category Utilities: Municipal Sanitary S FuturePriorityn/a Total Project Cost:$211,000 Description 2015-2019 Concrete alley repairs Justification Annual alley pavement concrete slab repairs are needed. PriorExpendituresTotal 20152016201720182019 Construction/Maintenance 20,00021,00021,00021,00022,000105,000 106,000 TotalTotal PriorFunding Sources20152016201720182019Total 20,00021,00021,00021,00022,000105,000 106,000 SU - Storm Sewer Fund TotalTotal Budget Impact/Other Consistent with the Storm Water Management Plan. Thursday, July 10, 2014 143 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Public Works Director Type Improvement 01-CIP-U003 Project # Useful Life Unassigned Storm Water Management Projects Project Name Category Utilities: Storm Sewer FuturePriorityn/a Total Project Cost:$1,230,000 Description 2014: Provide outlet pipe to Shady Oak Pond into CSAH 61 storm drainage piping in conjunction with Shady Oak Road reconstruction - $230,000 -- MOVE to 2015 2014: Cottageville Park stormwater improvemetns - $650,000 Justification Shady Oak Pond has no outlet and floods streets and residential property if not pumped. Consistent with City Council approved action plan of October 21, 1997, the City's Storm Management Plan, and Shady Oak Road reconstruction timetable. PriorExpendituresTotal 20152016201720182019 Construction/Maintenance 230,000230,000 1,000,000 TotalTotal PriorFunding Sources20152016201720182019Total 230,000230,000 1,000,000 SU - Storm Sewer Fund TotalTotal Budget Impact/Other Consistent with City Council approved Action Plan of October 21, 1997, the City's Storm Management Plan, and Shady Oak Road reconstruction timetable. Thursday, July 10, 2014 144 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Public Works Director Type Improvement 08-CIP-U001 Project # Useful Life Lift Station # 4 Project Name Category Utilities: Municipal Sanitary S FuturePriorityn/a Total Project Cost:$160,000 Description Rehabilitate LS No. 4 Justification Lift station No. 4 was identified for rehab in the 2007 comprehensive utility plan Regular major maintenance identified in the 2007 comprehensive utility plan. ExpendituresTotal 20152016201720182019 Construction/Maintenance 160,000160,000 Total Funding Sources20152016201720182019Total 160,000160,000 SF - Sanitary Sewer Fund Total Budget Impact/Other Thursday, July 10, 2014 145 CAPITAL IMPROVEMENT PLAN 20152019 thru DepartmentPublic Works: Utilities Cit of Hokins MN yp, Contact Facilities Director Type Improvement 08-CIP-U010 Project # Useful Life St. Louis Park Emergency Connection Project Name Category Utilities: Municipal Sanitary S FuturePriorityn/a Total Project Cost:$211,000 Description St. Louis Park emergency connection. Justification Items identified in 2007 comprehensive utility plan to provide safe and reliable water. ExpendituresTotal 20152016201720182019 Construction/Maintenance 211,000211,000 Total Funding Sources20152016201720182019Total 211,000211,000 WF - Water Fund Total Budget Impact/Other Thursday, July 10, 2014 146