Loading...
VII.1. Site Plan and Fence Setback Variance for the Southwest LRT OMF; Lindahl (CR2017-008)January 3, 2016 City Council Report 2017-008 Site Plan and Fence Setback Variance for the Southwest LRT Operations and Maintenance Facility Proposed Action: Staff recommends approval of the following motions: • Move to adopt City Council Resolution 2017-001, approving the site plan for the Southwest Light Rail Transit Operations and Maintenance Facili , subject to the conditions. • Move to adopt City Council Resolution 2017-002, approving a fence setback variance for the Southwest Light Rail Transit Operations and Maintenance Facility subject to the conditions. Overview The applicant, the Southwest Light Rail Transit Office of Metropolitan Transit, requests site plan approval and a fence setback variance. This request will also require administrative subdivision, street vacation and right-of-way dedication approvals prior to receiving a building permit. These applications are on hold until the applicant can fully acquire the properties and provide a final legal description for the consolidated parcel. These approvals will allow the applicant to redevelop the four existing properties located at 1600 - 5th Street South, 544 -16th Avenue South, 610 - 16th Avenue South and 1515 - 6th Street South into one lot that will contain the operations and maintenance facility for the Southwest LRT line between Eden Prairie and Downtown Minneapolis. Both the Planning and Zoning Commission and staff recommend approval of the site plan and fence setback variance applications and will continue to work with the applicant on the remaining applications. Primary Issues to Consider • Planning & Zoning Commission Action • Background • Legal Authority • Subdivision Review • Site Plan Review • Fence Setback Variance Review Supporting Documents • City Council Resolution 2017-001 Approving Site Plan • City Council Resolution 2017-002 Approving Fence Setback Variance • Applicant's Narrative • Plans and Building Elevations Jason Lindahl, AICP City Planner Financial Impact: S N/A Budgeted: Y/N Source: Related Documents (CIP, ERP, etc.): Notes: City Council Report 2017-008 Page 2 Primary Issues to Consider Planning & Zoning Commission Action. On December 20, 2016, the Planning & Zoning Commission held a public hearing on Planning Application 16 -22 -SP reviewing the site plan and fence front yard setback applications from the Southwest Light Rail Transit Office of Metropolitan Transit. After hearing presentations from both City and Met Council staff, the Commission held a public hearing with one participant. Ms. Lisa Moe of Stuart Companies presented their concerns about external impact from the Operations and Maintenance Facility on the Greenfield, Deer Ridge and Raspberry Woods apartment properties. Assistant Director for Design and Land Use for the LRT project Ryan Kronzer stated that his office is aware of these issues and is working with Stuart Companies through the Environmental Impact Statement process to address these concerns. In addition to these comments, the Planning & Zoning Commissioners asked questions about exterior lighting, the amount and design of off-street parking and the proposed fence. Planner Lindahl stated the applicant's exterior lighting plan does not meet the City's lighting standards but was designed under the Federal Transit Authority's design requirements. Staff will work with the applicant to resolve these conflicts to the extent possible. Planner Lindahl also explained the site meets the City's minimum off-street parking standards but the Commission could request the applicant consider a proof of parking design instead of constructing all the parking. Planner Lindahl stated that City staff and the applicant had spent a considerable amount of time negotiating the fence design and believed it was the best possible combination of mitigation characteristics. Commissioner McNeil asked if the applicant could install boulevard trees to help minimize the visual impact from the street. The applicant replied they would consider it if there is adequate room in the boulevard. At the conclusion of the public hearing, the Commission recommended the City Council approve the Site Plan by a vote of 4-2, with Commissioners Warden and Newhouse voting against. The Commission also recommended the City Council approve the fence front yard setback variance 5-1, with Commissioner Newhouse voting against. Background. The applicant is proposing to develop a light rail maintenance facility with up to 30 Light Rail Vehicles (LRVs), to be known as Hopkins Operations and Maintenance Facility. This proposal received concept plan approval from both the Planning & Zoning Commission and the City Council at the end of 2015. The proposed development will provide LRV maintenance area, LRV washing and sanding area, 9 garage spaces for non -revenue vehicles, parts and storage area and office space. The site will house approximately 160 full-time equivalent administrative, safety and security, rail maintenance, right-of-way maintenance, store keeper, and LRV operator employees operating on a 24-7, three -shift schedule. Legal Authority. The applicant's site plan and variance applications are both considered quasi- judicial actions. As such cases, the City is acting as a judge to determine if the regulations within the Comprehensive Plan, Zoning Ordinance and Subdivision Ordinance are being followed. Generally, if the applications meet these requirements they are approved. The applicable standards for these applications, along with staff's findings for each, are detailed in the "Primary Issues to Consider" section below. Subdivision Design. Standards for reviewing subdivision requests are outlined in Section 500 of the City Code. This development will require the applicant to go through the City's City Council Report 2017-008 Page 3 administrative subdivision process to consolidate the four existing properties and a portion of K -Tel Drive into one new property. This process is on hold, awaiting final legal descriptions from the applicant. When complete, it will combine the properties at 1600 - 5th Street South, 544 - 16th Avenue South, 610 - 16th Avenue South and 1515 - 6th Street South into one new 14.9 -acre property that will contain the new Southwest Light Rail Transit operations and maintenance facility. Consolidating the existing properties can be approved through the administrative subdivision regulations by staff once final legal descriptions are provided. Prior to this administrative subdivision approval by staff, the applicant must receive approval from the City Council to vacate portions of K -Tel Drive, 6``' Street South and Wh Avenue South. As noted by the City Engineer below, the applicant must also dedicate public right-of-way 51/2 Street South and the extension of 6`" Street South. As a result, the site plan will include conditions of approval that the applicant complete the administrative subdivision, vacation and right-of-way dedication processes prior to receiving a building permit. Site Plan Review. Standards for reviewing a site plan application are detailed in Section 526 of the City Code. This section establishes site plan review procedures and provides regulations pertaining to the enforcement of site design standards consistent with the requirements of this section. These procedures are established to promote high quality development to ensure the long-term stability of residential neighborhoods and enhance the built and natural environment within the City as new development and redevelopment activities occur. Given the potential timeline for this project, it should be noted that a site plan approval expires one year after it has been granted unless the use for which the approval had been granted is in effect. Extensions may be granted provided the applicant submit a letter to the Planning department requesting an extension 30 days before the expiration of said approval. The Planning Department may grant the extension if it is determined that construction will be commenced within the one-year extension period. Only one such extension may be granted. A second request for a time extension shall be presented to the City Council for consideration. Land Use and Zoning Standards. The land use and zoning designations are consistent with the proposed operations and maintenance facility use. The subject property is guided Industrial by the Comprehensive Plan and zoned I-2, General Industrial. According to the Comprehensive Plan, the Industrial land use classification includes manufacturing, warehouse or distribution facilities. By comparison, the I-2, General Industrial, district allows for the more specific Government Buildings and Structures use. The proposed operations and maintenance facility will function and have similar characteristic as the uses allowed under both the land use and zoning designations. It should also be noted that the proposed operations and maintenance facility is consistent with the Shady Oak Station Area Development Plan accepted by both the Cities of Hopkins and Minnetonka in April of 2016. Lot and Building Standards. As noted above, the subject property is zoned I-2, General Industrial. The lot and building standards for the proposed site are detailed in the table below. The site meets all of the lot and building standards for the I-2, General Industrial, district. City Council Report 2017-008 Page 4 Lot & Building Standards for the I-2 General Industrial District Standard Required Proposed Status Front Setback 20 feet 340 feet Conforming Side Setback (east) 20 feet 23 feet Conforming Side Setback (west) 20 feet 47 feet Conforming Rear Setback 20 feet 265 feet Conforming Maximum Height 45 feet 43' 7" Conforming Minimum Lot Area 12,000 square feet 718,304 square feet 16.49 Acres) Conforming Minimum Lot Width 100 feet 386 Feet Conforming Minimum Lot Depth 120 feet 957.5 feet Conforming Exterior Building Materials. The I-2, General Industrial, district does not provide detailed exterior building materials requirements. However, the applicant has worked with an architect to design the site and building to exceed the City's typical industrial design expectations. According to the applicant, the building design is organized as four sections (from east to west): LRV storage area, office area, maintenance area and sanding/washing area. Despite constraints imposed by the strict track design's geometric configurations, the applicant has attempted to mitigate both visual and physical impact the proposed development might have on the immediate neighbors. For this, the overall building appearance avoids being one giant -box building, resulting in more appropriate building scale within the neighborhood. The proposed design consists of four main building materials: precast concrete, black aluminum panel, translucent and transparent panels. The use and placement of these materials are articulated by the program needs, in addition to an attempt to have the overall building appearance fit in the surrounding neighborhood and building scale. In addition to the main building, the site also includes an outdoor storage area located behind the building on the south side of the site. The area is completely surrounded by 20 -foot, precast concrete panels with a design similar to the principal building, and is partially covered by a roof. According to the applicant, this area is necessary for storing long stock items such as electric poles. Access and Parking. As designed and shown on the applicant site plan, the site will have an acceptable access and amount of off-street parking. Access to the proposed development site will come from both 5th Street South and the proposed extension of 6th Street South. The entrance from 5`'' Street South will provide both visitor and employee access to the building's main entrance and the northern off-street parking area. The entrance from the proposed extension of 6t' Street South will provide employee access to the southern off-street parking area and outdoor storage area behind the building. It should be noted that the City Engineer is recommending a condition of approval require the applicant to dedicate public right-of-way to the City of Hopkins for both 51/2 Street South and the proposed extension of 6`" Street South. As mentioned above, the site includes both northern and southern off-street parking areas. The northern parking area accessed from 5t1 Street South contains 88 stalls, including 5 disability stalls and 2 stalls with access to vehicle charging stations. The southern parking area contains 21 additional stalls. All totaled, the site will provide 109 off-street parking stalls, 8 bicycle spaces City Council Report 2017-008 Page 5 and 4 motorcycle parking stalls. Based on the City off-street parking standards, staff finds the proposed off-street parking is sufficient. Pedestrian Circulation. Pedestrian circulation is an important part of redeveloping the area around the Shady Oak Station including the OMF site. Once reconstructed, there will be a sidewalk on the south side of 5`'' Street North that will provide direct pedestrian access to the OMF's front door as well as the City's overall sidewalk and trail network. According to the applicant, these sidewalks are expected to be used by train operators accessing the site from the Shady Oak Station. Landscaping. The applicant's landscape plan meets the City's minimum planting requirements. The plan includes a mixture of 37 deciduous and 19 ornamental trees, 27 deciduous shrubs, 190 perennials and 177 ornamental grasses, adding up to 367 total plantings. The majority of the plantings are located on the north side of the site to enhance its appearance from the street and improve the pedestrian experience along 5`' Street South and the internal sidewalk leading to the main entrance. Staff recommends a condition of approval require the applicant to provide a landscape security in the form of a letter of credit equal to 1.5 times the value of the proposed plantings. The letter of credit shall be provided prior to the issuance of any building permit and shall be valid for a period of time equal to two growing seasons after the date of installation of the landscaping. Signage. The applicant's plan calls for a ground sign located east of the access from 5`" Street South. This plan appears consistent with the size and setback standards for ground signs in the I-2 zoning district. It should be noted that ground signs shall not be located within the 25' site triangle of the access and must be approved through a separate administrative sign permit. Exterior Lighting. The applicant has submitted an exterior lighting plan that does not meet the City's minimum standards. According to the applicant, the exterior lighting plan was created under the Federal Transit Authority's (FTA) design requirements. Staff will work with the applicant to resolve these conflicts to the extent possible. Staff recommends that a condition of approval require the applicant to receive approval of their exterior lighting plans and light fixture details prior to issuance of a building permit. Trash Enclosure. The applicant's plans illustrate several trash enclosures adjacent to the outdoor storage area south of the principal building. The proposed enclosures meet the City's minimum requirements except they do not include gates and the ferrous and non-ferrous dumpster area does not include a southern wall. Staff recommends a condition of approval require the applicant revise their plan to provide gates on all trash enclosures and the addition of a southern wall to completely enclose the ferrous and non-ferrous dumpsters. Engineering Standards. The City Engineer has reviewed the proposed site plan and draft subdivision information and offers the following comments: • Public right-of-way should be dedicated over the new streets and cul-de-sacs for 51/2 Street South and the extension from 6th Street South. • The existing 9" VCP line must be replaced with new PVC from MN 803 to the existing manhole in 5th Street South. • The sanitary sewer service for 1520 - 5th Street South should be reconfigured to extend City Council Report 2017-008 Page 6 • directly to 5th Street South. This service line should also be upsized to 6 -inch diameter. The current plans propose to bring the service into MH 803, which will be a private manhole. • The new route of the 12 -inch water main through the OMF site shall be covered with a 30 -foot public utility easement. • The water mains proposed to serve the OMF site shall be private; the Metropolitan Council will be responsible for ownership and maintenance of the 8 -inch and 6 -inch lines serving the site. The 12 -inch water main will remain a public line. This information should be shown on the plans. • The new 12 -inch water main extension from 51/ Street southward to the existing water main should have a minimum of 10 -feet separation from the OMF property line. • The water service line to 1520 - 5th Street South should be reconfigured to extend directly to 5th Street South. The service line shall also be upsized to a 6 -inch diameter line. The valve for this line shall be placed within the pavement of 5th Street South. • The new streets shall be 36 feet wide curb face to curb face. Curb and street section shall be per City of Hopkins standards. • Cul-de-sacs shall be 80 feet in diameter. • The storm sewer extending from 5th Street South into the OMF site shall be private; the Metropolitan Council will be responsible for ownership and maintenance. • The Metropolitan Council will be responsible for ownership and maintenance of all storm water BMPs installed for the OMF facility. Fence Variance. The applicant requests a variance to allow a perimeter security fence that fails to meet the front yard setback standards for fences in industrial districts. The proposed fence would mostly be located directly along the 5h Street South property line, but would have increased setbacks at the northeast and northwest corners of the site. This placement is necessary to provide security around the overall site and the track access corridor. To mitigate the reduced front yard setback, the applicant has agreed to lessen the impact of the fence by decreasing the height of the fence from eight to six feet, providing a higher quality ornamental fence, increasing the visual appearance of the ornamental fence by providing three different types of fence panels, increasing the fence setback in the northeast and northwest corners of the property where practical and installing additional landscaping. An eight -foot chain link fence will enclose the balance of the site. Standards for reviewing a variance are detailed in Minnesota Statute 462.357, Subdivision 6. Variances may be granted when the applicant for the variance establishes that there are practical difficulties in complying with the zoning ordinance. "Practical difficulties," as used in connection with the granting of a variance can be determined by addressing the five statements listed below. Economic considerations alone do not constitute practical difficulties. In this case, staff recommends approval of the fence setback variance based on the findings listed below. • The variance request is in harmony with the purposes and intent of the ordinance. Finding: The purpose and intent of the fence setback standard is to lessen the perceived impact of the fence on those in the adjacent public right-of-way and the surrounding property owners. In this case, staff finds these changes bring the proposed fence in harmony with the purpose and intent of the fence setback standard. City Council Report 2017-008 Page 7 • The variance is consistent with the Comprehensive Plan. Finding: The subject property is guided Industrial by the Comprehensive Plan. The Industrial land use classification includes manufacturing, warehouse or distribution facilities. The proposed operation and maintenance facility will function and have similar characteristic as the uses allowed under the Industrial land use classification and recently approved Shady Oak Station Area Development Plan. Staff finds the proposed fence setback variance is necessary to accommodate the proposed perimeter security fence. • Granting of the variance allows reasonable use of the property. Finding: Based on the land use and fence design information detailed above, staff finds the proposed perimeter security fence is a necessary and reasonable use for the property. • There are unique circumstances to the property which are not created by the landowner. Finding: The proposed light rail operation and maintenance facility inherently includes large open areas necessary to maneuver rail vehicles that transport the public. A perimeter fence is necessary to ensure both the security of these areas and the safety of the public at large. Therefore, staff finds there are unique circumstances to the subject property that necessitate the proposed fence variance that are not created by the landowner. • Granting of the variance does not alter the essential character of the locality. Finding: Given the fence design mitigation measures detailed above, granting the requested fence setback variance will not alter the character of the surrounding neighborhood. Alternatives 1. Approve the site plan and fence setback variance applications. By approving these applications, the applicant may redevelop the site with the Southwest LRT Operations and Maintenance Facility. 2. Deny the site plan and fence setback variance applications. By denying these applications, the applicant would not have City approval to redevelop the City with the Southwest LRT Operations and Maintenance Facility. If the City Council considers this option, findings will need to be identified that support this alternative. 3. Continue for further information. If the City Council indicates that further information is needed, the items should be continued. CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO: 2017-001 A RESOLUTION APPROVING THE SITE PLAN FOR THE SOUTHWEST LIGHT RAIL TRANSIT OPERATIONS AND MAINTENANCE FACILITY WHEREAS, the Southwest Light Rail Transit Office of Metropolitan Transit initiated a site plan application for the properties currently known as 1600 - 5th Street South, 544 - 16th Avenue South, 610 - 16th Avenue South and 1515 - 6th Street South; WHEREAS, these properties are legally described as Lots 1, 2, and 3, Block 2 and Outlot A, South Hopkins Industrial Park, on file and of record in the Registrar of Titles and County Recorder, Hennepin County, Minnesota; WHEREAS, the procedural history of the application is as follows: 1. That a site plan application was initiated by the applicant on November 25, 2016; 2. That the Hopkins Planning and Zoning Commission, pursuant to published and mailed notice, held a public hearing on the application and reviewed such application on December 20, 2016: all persons present were given an opportunity to be heard; and, 3. That the written comments and analysis of City staff were considered. WHEREAS, the Planning & Zoning Commission and staff recommended approval of the site plan based on the findings outlined in the staff report dated December 20, 2016. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Hopkins hereby approves the site plan application for the Southwest Light Rail Transit Operations and Maintenance Facility, subject to the conditions listed below. 1. Issuance of a building permit. 2. Approval of a fence front yard setback variance by the City Council. 3. Approval of necessary street vacation and right-of-way dedication processes by the City Council prior to issuance of a building permit. 4. Approval of the administrative subdivision by staff prior to issuance of a building permit. 5. Approval of an exterior lighting plan prior to issuance of a building permit. 6. Approval of a grading permit from the Nine Mile Creek Watershed District prior to issuance of a building permit. 7. Submission of a landscape security in a form acceptable to the City Attorney equal to 1.5 times the value of the proposed plantings. The letter of credit shall be provided prior to the issuance of any building permit and shall be valid for a period of time equal to two growing seasons after the date of installation of the landscaping. 8. All exterior signage shall be approved through a separate sign permit. 9. Conformance with all conditions of the City Engineer listed in the December 20, 2016, staff report. 10. Installation of gates on all trash enclosures and the addition of a southern wall to completely enclose the ferrous and non-ferrous dumpsters. Adopted this 3rd day of January 2017. Molly Cummings, Mayor ATTEST: Amy Domeier, City Clerk CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO: 2017-002 A RESOLUTION APPROVING A FENCE FRONT YARD SETBACK VARIANCE FOR THE SOUTHWEST LIGHT RAIL TRANSIT OPERATIONS AND MAINTENANCE FACILITY WHEREAS, the Southwest Light Rail Transit Office of Metropolitan Transit initiated an application for a fence front yard setback variance for the properties currently known as 1600 - 5th Street South, 544 - 16th Avenue South, 610 - 16th Avenue South and 1515 - 6th Street South; WHEREAS, these properties are legally described as Lots 1, 2, and 3, Block 2 and Outlot A, South Hopkins Industrial Park, on file and of record in the Registrar of Titles and County Recorder, Hennepin County, Minnesota; WHEREAS, the procedural history of the application is as follows: 1. That an application for a fence front yard setback variance was initiated by the applicant on November 25, 2016; 2. That the Hopkins Planning and Zoning Commission, pursuant to published and mailed notice, held a public hearing on the application and reviewed such application on December 20, 2016: all persons present were given an opportunity to be heard; and, 3. That the Planning & Zoning Commission considered written comments and analysis outlined in a staff report dated December 20, 2016. WHEREAS, the Planning & Zoning Commission and staff recommended the City Council approve the variance subject to conditions and based on the following Findings of Fact: 1. The variance request is in harmony with the purposes and intent of the ordinance. 2. The variance is consistent with the Comprehensive Plan. 3. Granting of the variance allows reasonable use of the property. 4. There are unique circumstances to the property which are not created by the landowner. 5. Granting of the variance does not alter the essential character of the locality. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Hopkins hereby approves the fence front yard setback variance for the Southwest Light Rail Transit Operation and Maintenance Facility, subject to the following conditions: 1. Approval of the associated site plan and conformance with all conditions. 2. Decrease the height of the fence from eight to six feet. 3. Provide a higher quality ornamental fence. 4. Increase the visual appearance of the ornamental fence by providing three different types of fence panels. 5. Increase the fence setback in the northeast and northwest corners of the property where practical and install additional landscaping. Adopted this 3rd day of January 2017. ATTEST: Amy Domeier, City Clerk Molly Cummings, Mayor • E 1 21� Green line LRT Extension Site Plan Review Application Project Narrative Southwest Project Office (Applicant) Operations and Maintenance Facility 1600 5L^ Street South (Project) City of Hopkins Planning Commission Submitted on November 28, 2016 www.swirt.org 6465 Wayzata Boulevard, Suite 500 • St. Louis Park, MN 55426 • Main: 612-373-3800 • Fax: 612-373-3899 .�� Green Une LRT Extension Request: In accordance with Section 526.00 of the City of Hopkins Zoning Code, the applicant, Southwest Project Office (SPO) seeks a Site Plan approval to allow the development of a light rail maintenance facility, part of Southwest Light Rail Project. The proposed development is located on the 16.49 acre site at southwest corner of 5th Street South and 16th Avenue South. Project/Site Information: Location: (Proposed) 1600 51h Street South Hopkins, MN 55343 Zoning District: 1-2: General Industrial Parcel Area: 16.49 acre Building Area: 162,356 square feet Building Height: Single story sections at east and west ends: 26 feet to the top of parapet; 2 story section in the middle: 43 feet 7 inches to the top of parapet; Rooftop mechanical unit roof screen on top of the 2 story section: 58 feet to the top of screen. Parking: 88 parking stalls in the north loop; 21 parking stalls in the south loop. Property Description: The 16.49 acre proposed development site consists of (4) Parcels located southwest of 5th Street South and 16" Avenue South and (1) parcel south of 6th Street South. The proposed site also includes 0.19 acre of existing 51h Street South at northwest corner, 1.069 acre of total vacation of existing 1611 Avenue South, and 0.47 acre partial acquisition of parcel between 15th Avenue South and 161h Avenue South. The proposed development site is on re -aligned 5th Street South to the north, the City of Minnetonka/Hopkins boundary to the west, Canadian Pacific Bass Lake Spur to the south and 151h Avenue South to the East. Project Description: The applicant is proposing to develop a light rail maintenance facility with up to (30) Light Rail Vehicle (LRV) to be known as Hopkins Operations and Maintenance Facility. The proposed development will provide LRV maintenance area, LRV washing and sanding area, (9) garage spaces for non -revenue vehicles, parts store area and office area. The facility will be staffed as follows: administrative, safety and security personnel, rail maintenance, right-of-way maintenance, store keeper, and LRV operators. The approximate numbers of full time equivalent is (160) with a 3 -shift schedule except administrative and store keeper positions. The proposed facility is expected to be in operation 24 -hours a day as most of maintenance activities are performed during off -hours. www.swirt.org 6465 Wayzata Boulevard, Suite 500 a St. Louis Park, MN 55426 9 Main: 612-373-3800 a Fax: 612-373-3899 Green Lino LRf Extension ` / Access to the proposed development site are provided on 5th Street South and proposed 6th Street South extension. Vehicular access on St" Street South for employees and visitors and 6th Street South will be mainly for employees and work-related vehicles. There is a pedestrian access on 5th Street South which is expected to be used mostly by train operators for shift changes at the proposed Shady Oak Station. There is proposed pedestrian sidewalk access from 51h Street South directly to the proposed Shady Oak Station. The proposed development includes a perimeter fence that marks the boundary of OMF. The proposed design includes six-foot painted steel ornamental fence facing 5" Street South and eight -foot chain link fence on the rest of the perimeter. All of access points referenced above will include a gate that matches the fence design for safety reasons. The fence facing 5th Street South proposed to be located in the front yard abutting a right-of-way and the applicant seeking variance for this in a separate application. The proposed fence design is consistent with the proposed building design and it is ornate in nature with architectural finish and higher grade of material while the design allows for a visual connection to the front yard area. On-site parking facilities are located within the interior of the site, inside of both north and south loops. There will be (109) parking stalls and (2) loading spaces at the north face of the building. The site's proposed surface parking facilities are intended to minimize impact on neighboring properties by orienting parking spaces within the interior of the site. The building design is organized as (4) building volume: (from east to west) LRV storage area, office area, maintenance area and sanding/washing area. Despite constrains imposed by the strict track design's geometric configurations, the applicant has attempted to mitigate both visual and physical impact the proposed development might have on the immediate neighbors. For this, the overall building appearance avoids to be one giant -box building, resulting in more appropriate building scale within the context. The proposed design consist of (4) main building materials: precast concrete, black aluminum panel, translucent and transparent panels. The use and placement of these materials are articulated by the program needs in addition to an attempt to achieve the overall building appearance to fit in the surrounding building scale. The applicant also proposes to utilize significant amount of translucent and transparent panels. The proposed development includes exterior storage area with precast concrete screen that includes a partial roof for the rack space. This storage area screen is 20 feet to the top of screen wall and is required for storing a long stock item such as electric poles. In conclusion, the applicant seeks approval of the project as proposed. The project team looks forward to meeting with the Planning Commissioners on December 20, 2016 to further discuss the project. www.swlrt.org 6465 Wayzata Boulevard, Suite 500 • St. Louis Park, MN 55426 • Main: 612-373-3800 • Fax: 612-373-3899 II I I ■■■"� j I I IF � l I -__.�,1 ■ 5 POOH 7 SNP 0�' , r� ■ = o 6TH SI S. 00 i - ' I J i , -- . , I, -I - OEM'JL 1 I I ' .........................-- ....... I ................. SITE CONTEXT- NEIGHBORHOOD SITE PLAN - -„ I,oINPRO(-;RF_5, ■ LIGHT INDUSTRIAL i..._. COMMERCIAL RESIDENTIAL/ CIVIC/ EDUCATIONAL OPEN PARK SPACE/ LANDFILL LAKES + STREAMS OMF BUILDING FOOTPRINT ■ SWLRTSTATIONS SWLRT EXTENSION EXISTING FREIGHT LINE EXISTING TRAILS SUTHWEST - n2 Gie• irc LNT FAension ,,� 1 C: TRAIN YARD CONCEPT- SITE PLAN \,v, 1 'T 111 1111111111111 SOUTHWES •� 1� Gwen line L"NTE*Imuiou 1. METRO TRANSIT/ SAFETY YELLOW PRECAST CONCRETE BLACK ALUMINUM PALETTE -BUILDING MATERIALS +lV0I l I\ II•I PFl, , .i POLYCARBONATE PANELS GLASS FDFN PRAIRIE I hAINNETONKA I EDINA I HOPKIT E, I ST. LOUIS PARK I MINNEAPOLIS I' • ,1� lI' Grum l+nu LRT knm+uion , r EDEN PRAIRIE I MINNETONK.A 1 EDINA I HOPKINS I ST, LOUIS PARK I MINNEAPOLIS�;t�QWIER00V9907L w I( I -1 �' 3r p Iy Yi �i •i.1 Iii IIII161 111 , JI r: I 1111111111 111111111 EDEN PRAIRIE I MINNETONKA I EDINA I HOPKINS I ST. LOUIS PARK I MINNEAPOLIS Ir, EDEN PRAIRIE I MINNETONF' FDINA I HOPKINS I SF. LOUIS PARK I MINNEAPOLIS IN10■ILTATAMi� nil 3 -Aa "I iq1 4 EDFN PRAIRIE I MINNE_TONKA I EDINA I HOPKINS I ST. LOUIS PARK I MINNEAPOLIS 1�1�1�■\�1�IIrl�)� ENTRY VIEW -MAIN ENTRANCE SOUTHWEST INTERIOR VIEW - TOWARDS MAIN ENTRANCE "' 'K IN PROGI i- n G SOUTHWEST SOUTHEAST VIEW - FROM SERVICE ENTRANCE LOOKING WEST V,' N. IN PROGRE SOUTHWEST it FDFN PRAIRIE I MINNETONKA I FUNA i HOPRIMS I Si_ LOUIS PARK 11.9MM-ArouS � V � !ry 47 e Y }�} J EDEN PRAIRIE I MINNETONKA 1 EDINA I HOPKINS I ST. LOUIS PARK I MINNEAPOLIS WEST VIEW —FROM K -TEL DR. ACROSS POND 'I; KIN PRCn.; 'E <,,, SOUTHWEST z4 !, -2 1 1 . 21 EDEN PRAIRIE 1 MINNETONKA I EDINA I HOPKINS I ST. LOUIS PARK ( MINNEAPOLIS on c s S 1'37'50 - —Y333.47- - S 1'4649" W moo. Op On Existing Existing Building , - - Existing —1 I BuildingExisting i Building I - Building Existing Budding I N f � / D QCT -0\�._� -- _ t � IPF 1 G N i'33 29_" E 687.23X. I /2- ------ 16TH AVE. S - - — I CA \ « ♦i ,I YI - t . ,i,�—�—la R's a..' � I Existing 3f l 7 \ S y I I f• Buildingdjll I 66 ,4 Jp Ul, -1 �` A Oil,u l f EA 9 it a ae-s �I gill' N �0�11I 'u rye. i�i 1k 11 Be \ 1 \ \ \\ 1 a b--—=—_� _______-- \ad' }«'I' li 51R0'06"W- 15TH AVE. S :___ -----�: ry`o ■ LEGEND `IK 1/3- Denotes Found Monument 0 30 60 0 HORIZONTAL SCALE IN FEET E uw I�amda duly by us, and sun ,ortun a dimot fuerv�m Wille Sum W MSresols. 0- 39.2 z:____�_ �`f=JiY i 1---- -------------- (, Jl �III- ' 'rFl N 1'2Q'12" E 32290 �/ I m _ P Existing/ "> Building -T NEXISTINO LEGAL DESCRIPTION Lots 1, 2 and 3 Block 2 and OUTLOT A, SOUTH HOPKINS INDUSTRIAL PARK, on file and of record in the Registrar of Titles and County Recorder, Hennepin County Minnesota. ■AREA EXISTING 649,0981 square feet or 14.93 acres ��� CRANI /r'1�`O� engineering.,, SOUTHWEST"tj METROPOLITAN C O U N C I L NNOTES 1. Rani Engineering has made no investigation or independent search for easements of record, encumbrances, restrictive covenants, ownership title evidence, or any other facts that an accurate and current title search may disclose. CERTIFICATE OF SURVEY - - (Existing Conditions) OMF FACILITY-HOPKINS MN OF eNPETNNMe 2 SURVEY 0MF-SUR-BNDY-PLN-001 12228.97 ` wr 312.81. ____ t --. --- --- - __ - -117-22 EI 9 - _ o Q ni \ S 7.3750" E - --- _-- PROPI co OS�D ODerations _ — \ Maintenance Facility I - I ` \ LL _ _ (OMF) A A A \ \ IIII �:A� 1 _ NE Cor�k.4 L \ \ \ \ CRENER r I/Y.-ADD. TO W. MPLS.26fh St. So.(To be Vacated) Pe \ In Vr ®TH167H AVE. S(To be Vacoted) f \ N 1'33.29" i 61�730 IPr sEs eaa_ I NW Co,. S FIRST 66 ADD. TOO ' LP. I \ �9 t CRENFl– W . MPISI \ Ss t - I LP _ \ .L 6 1 S'Iy extera' of t t6th he East So.e of 'y _ - I --I - \ Avenue South LP. CREMERS I--- = 1 � FlRST ADD. TO W. MPLS. (n I !9 '�. C' I APF 1' \ elo m 1r /ZIP$ I \ m I 1n I I II – I I � J \ I / \ S120'06"W 15TH AVE. S \ / \ 1 39.20 – - \ / \ m _ �— — T —1 f IPr 1/Y \ OI — u O \ \ \ N 120'12" E 327.90 I p o I I 1 1 I 1 ml M! by me or ura.r my aeon SU,Xsw mn ana aaly Licensed Land Surveyor unaere! Mw{ CERTIFICATE OF SURVEY S�wmlrvwsbta. _COM A= = RgABNA (Proposed Improvements) 2 ,ROBEI,T- SOUT® OMF FACILITY-HOPKINS MN OF nens UC.NO.: suxz METROPOLITAN 9Y: CXECKEa BY: SJR DISCIPLINE: SHEET NAME: 9 RPW ATE; 11/28/Te SURVEY OMF-SUR-BNDY-PLN-002 L ■PROPOSED I ■AREA Lots 1, 2 and 3 Block 2 and OUTLOT A, SOUTH HOPKINS INDUSTRIAL AND ALSO: PROPOSED �p Qe� PARK, on file and of record in the Registrar of Titles and County Recorder, Hennepin County Minnesota. That part of 6th Street South dedicated in the Plot of SOUTH S 702,2733 square feet or 16.1± acres n f the INDUSTRIAL PARK, Hennepin County Minnesota: which lies westerly of the southerly extension of the east right of way line of 16th Avenue South as ■LEGEND— AND ALSO: dedicated in the Plat of L.P. CREVIER'S FIRST ADDITION TO WEST ■NOTES 16th Avenue South as dedicated In the Plat of CnesotaS FlRST MINNEAPOLIS. Hennepin County, Minnesota (to be vacated). 1. Rani Engineering has made no investigation or independent search for a 0 30 60 120 `IPF Denotes Found Monument ADDITION WEST Hennepin County, Minnesota lying y. easements record, encumbrances, restrictive covenants, ownership I/2' of drawn between southerly of a line drawn between the northwest corner of Block 3 and AND ALSO: title evidence. e, any other foals that an accurate and current title HORIZONTAL the northeast comer of Block 4, said Plat of L.P. CRENER'S FIRST ADDITION (to be vacated). A portion of LEL DRIVE as dedicated1.lokin NAPCO INDUSTRIAL PARK, (to be search may disclose. cl 2. Proposed property boundary and information shown hereon SCALE IN FEET vacated) and a portion of Lot 1, Block 1 NAPCO INDUSTRIAL PARK, Hennepin a only. The street are for informational purposes only The street vacations and land County Minnesota. (The actual legal description of this parcel to be provided acquisitions are currently in–process and ongoing. Final legal by others) descriptions and boundary lines are yet to be determined and may differ slightly than shown hereon. M! by me or ura.r my aeon SU,Xsw mn ana aaly Licensed Land Surveyor unaere! Mw{ CERTIFICATE OF SURVEY S�wmlrvwsbta. _COM A= = RgABNA (Proposed Improvements) 2 ,ROBEI,T- SOUT® OMF FACILITY-HOPKINS MN OF nens UC.NO.: suxz METROPOLITAN 9Y: CXECKEa BY: SJR DISCIPLINE: SHEET NAME: 9 RPW ATE; 11/28/Te SURVEY OMF-SUR-BNDY-PLN-002 L I 7 --- < `---------- ... N 1t SECTOR 3 �\ \ \+• \ / �Y.� \ \ ',.�j '\\ _ O` , 30 D. 120 7, \� SC� IN FEET 2416+ �� 2 00 �t7 tv_: '' \ `•• ��,� 2418+002419+-24-1+00. 'C e 610 16TH AVE S I i 544 16TH AVE S i I �♦ \/� j �, % I 1 1600 5TH STS fr = .. I N ♦ N 1 \ I 1\ 1 Ulo 16TH AVE i 1515 6TH STS r-- -- -- — f — —�— r PROPOSED l I r CONSTRUCTION UMIT51'I !� •510 15TH AVE S I CCOONNSSTORUUCCIION UMITS I I \ ----------- �, i I III I ; L 1520 5TH ST S I , 1 I 111 ¢� i f II ° d --__I . ._, ---------- -------------- J, ------------- T -------------{' ,. SECTOR 1TT f I '_ @ -p� , I n L_ -J �! , -, I T NO.GATE G WNCNFCK DESw IlEVI610N,aGaNRTAL OPERATIONS & MAINTENANCE FACILITY - V1 SHEET 1/ \ 1� I Engineering. Surveying REMOVAL PLAN _-�: �;'� Landscape ArcllitecWre ,t OVERALL `/ SOUTHWEST OF MEMPOLuAN C 0 U N C I L 90% SUBMISSION - 05126/16n15CIPLINF: SHEET NAME 22'3 CIVIL OMF-CIV-RMV-001 3� j-4� j ---3----j j---4� j --3---j �--4--j j --3---j s ELEVATION A052 SCALE: 3"=1'-0" WHE 1 1/2" = 1'-0" V 6� ��' 179.25° O'- 3 3/4" M 0 0'- 3 3/4" 0'- 3 3/4" 1/2" 51 w 0 a PLAN @ FENCE SUPPORTS AQ52 SCALE: 3" = 1'-0" WHEN PRINTED AT 22"X34" 1 1/2" = V-0" WHEN PRINTED AT 11 "X17" Mn BAN SHEET MODIFICATION: OA DENom MONFIMON TO STANDARD SHEET DIA. STANDARD T AT POST TOP OF CONCRETE ------------ SEE A& FOR dill BIR 01 GWN� BSE APPIRGA6 OR 10'-0' MAX SPG. (TYP.) INSIDE FACE OF FENCE �2*AY CLWP FENCE POST 111' NOM. DIA. INSIDE FACE OF PENCE STANDARD PIPE I2 WAY CLAMP (BEND AS nEIOWV FOR JUNCTION '%') FENCE POST �1A' NON. DIA. STANDARD PIPE Lmgcc�iION 2 m1wr PLAN BE GRAM ELEVATION JUNCTION 'X' REYTBETr. APPROVED: V-0' MAIC SPG. SECTg1 B -B DETAIL 'A' PROECTON PNCE NUT t ON OUTSIDE. ,UNCTION 'Y' ,-JE w DIA RAL ENO CASTING I_ ICARPoACE BOLT EOUAL i(e • 111' END M CLAMP I ECTON u MAk CE POST PNO E if' DIA. BI I_ RICE NUT AND "II LOER ON ouTSCIE.TsoE JUNCTION 'Z' O CAP POST : EN INTERMEDIATE POSTS,- (TYP.) FOR POST REOUIREMENTS SEE OETML 6905 END POSTS: FOR POST REQUIREMENTS ML 'A' SEE DETAIL 8905 PIPE BRACE AT ENDS ONLY TDP AND BOTTTOM RAL: 171' NOM. DIA. STANDARD RPE 2.27 M. PER FT. QA TYPICAL SECTION THROUGH FENCE INTERMEDIATE POST SHOWN CONTINUOUSLY GROUND ALL METAL RAUNG$ SE: THE SPEOIAL PROVISIONS. REEFER TO TRE ELECTRICAL PLANS AND ELECTRICAL SPECIAL PRONSIONS FOR DETAILS REGARDING BONDING MULTPIE ELECTRICAL GROUNDING SYSTEMS THE-SENKR5 OF-BIBR.tl!! eB . FOR POST REQUIREMENTS SEE DETAIL 8905 'FENCE POST ANC OIRAGE'. PENCE POSTS AND PENCE POST ANCHORAI£S SHAW BE SET VERTICAL- UNLESS OTHERWSE NOTED. It OF FENCE POST ANI>O RAF 9RALL BE A MINIMUM OF 12' FRON JOINTS END POSTS AND BRAONG SNNL BE AT 500 FT. MAV" INTERVALS. PROMDE WRE TES WTR 9 GA (0.14B' CORE) AWMINUM PER ASTM B 211. I V-,. 44'A y USE ME W..� PER _._-.........- " lY' STANDARD PIPE SHE SPECI� FOR NASI R. ENIS NOT INCLUDm ON T115 T. NIB ER BASIS SHEET. NIB T 1 ' DIA STAtOAAD PIPE SLEEVE. T-0' LGNG (TYPJ OO PROMDE PIPE SLEEK IN SPAN BETMVN THE VERTICAL POSTS AT MINT UON VENT. SEE ALPERSTRUCNRE SHEETS FOR EXPANSION JOINT LOCATION. f #E• pA.I Q CARPoA4. LTB -'�-^ PIPE SLEEVE DETAIL Q Q F-s-assa7a MIRED BY 04/29/2016111II.c: Or a14K IRK FENCE NALE: aom UC. A=TOM 961:41 O�I�GEe�ls 90% SUBMISSION - 05/26/16 METROPOLITAN C 0 U N 0 I L SOUTHWEST MMNM RN. FlG. 5-397.119 MOD. . °P°RObED`I BRIDGE NO. OPERATIONS & MAINTENANCE FACILITY - V1 URBAN DESIGN DETAILS CHAIN LINK FENCE 1 CIVIL 97 OF 223 JA \.. WETLAND -------------- MTA-MTA-12 \ , `.� - MTA-MTA-12 \\ \ c TPSS-SW320 (NIC) __ __________NWL=901.00 -- ---- '.n-- - HWL-901.80.___---- _ \ \ SIGNAL BUNGALOW 0 30 B-�_ 120 _____ __ �_ ___<\ \ (NIC) 'SIGNAL BUNGALOW-_' __—_ ------------- _ _—__—__— t r-----K�� - -- -- '�-- T------_.��..-_T�a �- ..�� --_ -- -- --- - y�_ —_ 1� NORIZ TAL •� .t 2t9c1v5 � �\�+00 24Q +00.2FOB Y 241'1 SCALE IN FEET 2"6 __'- �..•�,4 00 24!E, 00-1119+0'7 2a ;_JO 2¢21+Jp _ TRACK WEST BMP . ♦ i I��Y2-� \-- _____ 205 T _ _ \ 'I, J ♦ _ _. _ __ rk 1RAGK 55 __ - _ TRACK S4 ♦ i \ ``.\\. I I i I 1 BMP 201 I ! - iI-. -. ___ _ OL TRACK 52 _ _._ _I_ - _ 1` BMP ��♦, IIS \ N'�,.�\ j ! - __ ___ �_. ___ _ - - SCREENED - ------�TRACKS7-- - - - - ---I-- -- 204 STORAGE OPERATIONS & ! i MAINTENANCE a \ 1 FACILITY ` I y \ � \3\ \ � ' i 21 ' 134.272 SF @ TRACK M1 _ __ 'L TRACK M3 •• ce y B \ I — — o , \ - -- ---- -- ------ r ` 1= rL TRACK M4\\ I 1 In I dll --------- Cim--------------------- \ • \ _.. _ @TRACK CW f ---------1RACK EA RUNNER H ' r _ r Z _ , r II SIGNAL BUNGALOWI ° r27 1 { /.``—.__ �__ ♦ (NIC) 7O .\ .:;o 00 i I I I BMP 202 1 t I \ `0�9>XY I � I n / I 20 >_ sry 1 I a ' I1 I, I I \ _�J I kpui 15TH AVE S V V -- L----------11----�--—��-1'�-- — -- ---------1---------=--------- SECTOR 3 \ \ :— SECTOR 2 _ _ F SECTOR 1 T I II!° e NO. DATE 011AWNCHECKPIESIGNINEYISWINISUMMu. OPERATIONS & MAINTENANCE FACILITY - V1 SHE' A=COM Engineering•Surveying SITE PLAN 106 ;1 Landscape Architecture N- SOUTHWESTTT OVERALL METROPOOF LITAN C O U N C I L 90% SUBMISSION - 05/26/16 DISCIPLINE: HEET NAME J 229 CIVIL OMP-CIV-PLN-001 a \ \ WETLAND /ate _ MTA -MTA -12 \\ � \ a �• --. 2 BEGIN 4' L=898.00 \ \\ \\ .. \t 0 30 60 120 - CHAINLINK L=901.80 a - \ \ END 8' 2 BEGIN 8' END �. 98 FENCE \\ \ \ CHAINLINK 2 1 1- _ CE 98 ' SITE FENCE — +r------ - ` \ FEN — 98 — 96 -- AF LINKDECORATIVE ENCE — — - =- 1405+ .t \� I TRACK-- CHAINLINK FENCE 98 \ /� TRA K 54 •m _� ,6 / \ x0?:___®vvtY::}iio °e 7L•., , !t TRA K Si BMP 207 `M2 K TRA -- -- - • ;, easy rt TRA K M1 PEDESTRIAN CATEy ,Y .............. m r I q• _ I v 1 3 Ct I CHAINLINK •::. �:::• • • m e e„ ?c I. � (T .1 I 1 r FENCE \ ....,...... yi: :;, •`-I-- --- CK 3 t's'a.Y'r. q.{. Q.T. A• "`° V ? t I`.,Y. I � � • ACK M4 1 o t END 4' 2 r{ TR CW ® •• SLIDING GATE r ;.. m ' CHAINLINK .de.°. A 98' FENCE K9 \ EX 3 BEGIN 8 tr..s... ACK ftAST 1. _ _ __ __--- .r. ....... ..Y.. ROW CHAINLINK... d.Y ° Yw. {a 3"d7:si^- I t{a FENCE ..... :a•:.:. •xr ...:. .................. :o, I ztz a SLIDING GATE g' �Ejj( - - � 8• 2 _ -- - !{! °pj END 8' 2 � T BEGIN I ::::............ ............ a" ^"^"" CHAINLINK ROW °?2rgppa;iiai^ iEiiiEli;„ : r.. : ........• � 9 2 . — S Z CHAINLINK DECORATIVE a I r '�� a �yE.; CHAFE'UNKNCE 98 FENCE o..... ^ !!;,^.,�w,^.,.•^.,.;T•.1•d1 I T- — 1 II{I ....II I FENCE 98 96 SITE ,i CE s� \ dYYdb 9iYy '•'rg{;eiei etisv:?{: evvYi{a{{{{�`�F:•ve i. I �'�I ........». ..::FiF?°}i}}}ic;?{ep }}y^FSe{ti?L?:t?: ff � � ay i `� {ti iv }'irry+9•: v v I %5'70 I� • i{•e?e{sFi _ � I � \.:;001ABMP 202 I t 'N..•k{dnsx5?? :,.a {:sr:::.Y ybt: • 1 .:;001A O,:::J.•i:{e.{s:{n:::•a{:i:}ti{i:::::::v;::::Y.Yn: a:::v :• '�.,1F• \r\ ._\. _- \ t....e }'..orn( 1 rse, 2 0 €ic� : L sTy �. ..A ............... 4........4........:..e. •. -. I ` � �._e-�-v�•�:::::::1{i}G{{.'.{{tid{t9'iAJ: 0.. 0 00 B:RP.'aF:1a.Y.••:Jb9:.•ft:1:E...: d: , is I � °° I s%• � I `� B..:.....:ri$Y:: ;.;.;........... a...°:::::°°:7{tea;:.:Y ;:: {: •: cn I m ti '\ a \. \ !Y"`l°drY•rdr99?�S.Y. 99o :4. o.9. {{{t{ .•.... n sv : I.} N : v - .....:.....•:e {eqs aB,::Y.Y;•Y:d.Y.t.::• 9Y:r.:9:x:•:9g;:v ........Y t•,t .........: ...........»............ . . ............ —�- — ----- —_1 daAv.:.:..:Y.::.: :.Y:..:.. :: dYd:Y. ............0. L 15TH AVE S..... ..................... _ , - - i - - q. ROW �R SE�TOR2 ROW SECTOR? -- -- - --- - - L-------- -- --- ----- 1---- }-- i-- --- r I L_ y - I I I NO. OAIE WN CHECK ESION REVISION/SUBMITTAL CILITY - V1 SHEET OPERATIONS &MAINTENANCE FA /� � LANDSCAPE PLAN 110 A=COM VINI soUTHwEs OVERALL OF METROPOLITAN ' C O U N C I L 90% SUBMISSION - 05/26/16 BlsaruxE: sNUE*Nnme 223 LANDSCAPE ARCH OMF-LAN-PLN -001 /'� \ 0 3060 0 `\HORIZONTAL SCALE IN FEET I I ` r e UNNER �— - — T ----- — '\ -- `�, � � s • - - - K WE57 R� ♦ � � i I s �, -A — - ---- — gTRACK S4 - - _._ — __ — •IMP`205 \ I; I n�. BMP 201 6 '--� --_I-- _____ %TRACKS2_ - I \ • I I NW \ I __ ___. - --__� _BMP - TRACK Sl __ _ _._ �-•'�� �_ 204 \ \ I II STORAGE OPERATIONS & MAINTENANCE FACILITY 2 FFE = 907.13 • m-- 11 i ♦ ��__ ___� _ _ r.___•_�_ _ TR_ACK_M3 _ �� IG CKM4\\ ♦ "� q 1RAM4\ �— �— 00 % TRACK CW ♦♦\ •��\`» T� I m ti ..�\ { Rig (i TRACK EA RUNNER • • • • S i :—s —�- li`� oc �1 k I11 � \�\ �'S'4,__ SHEET 3 ,�---I--+—I-- SHEETS 1&2 `'t L x I �I fl x ' _ ST c LnL -LnI I! 15TH AVE S—— � i..�_ '� I I 1 T\ rt�a✓��'� /1 _. _,- _.m-_-- -. _ -. I—r-..---_.------ I_ nl _ 'i NG. IMIDE ,.„C„ELN E8X3N NEVYaNINlaUBMRTAL OPERATIONS & MAINTENANCE FACILITY - V1 SHEF— E • w M� 117 Engineerirg•Surveying UTILITY PLAN =co 126 �T) `/ L) Landscape ArchitecWre OVERALL SOUTHWEST OF 4; METROPOLITAN m DISCIPLINE: BEAME: 22390% SUBMISSION - 05/26/16 -CIV-UTL-001 - - WETLAND MTA -MTA -12 NWL=898.00 f --\ _____ __HWL=901.80. - -- -�� � --- �.a�-�T '.i.�.—� �------ - — — � ---�— ,0. AOR' OIAL 120 30 '�{ --- -7^-------� _ - SCALE - IN` EET -------- if—TF t TRACK WEST RUNNER r-- - _�-�.��_ -_ RACK 53 rk TRAY 52 .1 r .. TRACK Sl TnRREEANEO_-_ i I OPERATIONS & � ___ -_- __—�"- t ---�- �--- , 1 V •`I11) �� t• MAINTENANCE FACILITYLL— FFE 907.13 TRA& Ml TRACK M2 -�-- - _ TRAK M3 TRACK M 9 _ @ TRACK CW -AL TRAK EAST RUNNER -�•'F - - _ti—: _.�_ _ _ _ _. .__�. I n \ G v\ 9B9y�09Ga s,�, I I \ 1 ,`\ '� \ �o�i,• BMP 202 - 15, \.fn 0 Ln x I / Ln - — � � � ; � I � • �� � ,ice . \ I � \ >` --rte_ ��r — F`��- =_ - — � � • 15TH AVE S — in --------------- L-----------1----�-- 1- - � SEN� OR 3 \ SEC T ._ — \ X\ \ / — =-- -- NO. Mn CHECH e816N REV1apN, WaMHTAL / OPERATIONS & MAINTENANCE FACILITY - V1 SHEET A=COM Engineering.Surveying �. GRADING PLAN 127 �7 Lan4ecaPeAchitecura OVERALL SOUTHWES of METROPOLFTAN . C 0 U K C I L 90% SUBMISSION - 05126116 DISCIPLINE SHEET NAME: 223 CIVIL OMF-CIV-GRD-001 J \ �y s A` MTA -MTA -12 WETLAN\\ \\\ �C ___ _ _ tee. y_�„J�j ' - H 908 80 - - ....k i •k,' ��-rll�+M\tel„—'+_�.�w.+1� ---------- 7-1 d � Q _-- 120 � � SCRLE30RI N/ -FEET fit BMP 205 S_3 _ _ _ _ E TRACK S2 _ TRACK $1 IF � _ 204 OPERATIONS & MAINTENANCE FACILITY FFE 907.13 TRACK MI - _ _ -- T x q. TRACK M2� y � -\ ----- - - � TRACK M3 TRACK 4 a TRACK CW \— Y TRACK EAST RUNNER a 1p I� 0 I � BMP 202 - �/ { I ��/S s t i v '\ i �,�� ► 1 ✓ \ \ - ----�- - _ _1-TH AVE S - L---------- -------�1-----�- _---=1----------1 ----- SECTOR 3� \\ \ SECTOR 2 y SECTOR 1T--_ r--� s r ✓. _ _ W. IMTE IMM pNEpNMW NE°fiON,6U°MMITRL OPERATIONS EE MAINTENANCE FACILITY - V1 SHE' A=COM � til I Engineedng.Surveying STORM SEWER PLAN 134 0 LentlscapeArchkecWre/ , OVERALL B � SOUTHWEST OF METROPOLITAN C 0 U N C I L DISCIPLINE: SHEET NAME' 90% SUBMISSION - 05/26/16 CIVIL OMFSTM-PLN-001 223 I )--I---- T ----I--- I -L, I � I I I LEVELTNJ � Elm: - � EL tII1II-V E ELoxE EL 1 \------------------------;, --------------------------- %i-� OVERALL NORTH ELEVATION A'JOO SCALE'. IW -1'4- NMENPRINTEDATZIXJP' 19P -1'-P WHEN PRINTED AT 11'X1T 1 1 1 1 A30 - ELEVATION T T T T T T T T( 10 11-111 - 16 ' 17 - 1F- 18 T TIT 1w/ 27283132 T T --------------------------------- ----- —\ ----------------------------------------------------j- I I I I I f- OVERALL WEST ELEVATION AJOD SCP1E: iA2'=tY WHEN PRI MED AT iYX39" LdTD' WH EN PR v v III I III I all all III LL 111, 111 1111111 1 oil on Ie �Isl�l�l�l�lelel�lr �Ir1�61�1�lrlrnnnnlrl�l�l�61�61r9d�661�1�1�1�1�1�1�1�h1�6h61111I1I C!!-J9lC.t!!19-J—�—ICC-.�J�1!9!!Lnn!11!!IRlwnu�pE�x�,c�ull!!Ilxmmll_ �°�"�""'�.'"�"'�"1111 1111111111111 SNOW XC'OM KREILICH LLLD ARCHITECTS METRO OUTAN SOUTHWES 90% SUBMISSION - 05/26/16 LEVELg E EL tOp-PSI IEY�ELT_T I$ -EL1T$-U't� _IEVEL�ONE � EL fOV-4 V OVERALLELg ON GENERAL NOTES SEE ENIAkGEO ELEVATION VIEWS FOR MATERI&p SMIPTIONS PND TYPE DESIGNATIONS v A 1 13 C D F G H J K 4 M IQY PtgN-SCALE N.T.S. t�w HORIZONTAL SCALE IN FEET OPERATIONS & MAINTENANCE FACILITY - V2A SHtt ARCHITECTURE 102 OVERALL EXTERIOR ELEVATIONS OF ISCI LINE: SHEETNAME: 347 ARCHITECTURE OMF-ARC-ELV A300 - .........................rtmr�r mono .-_ rrrnnrrrrnrrnrnrmnnunnrrrrrrrnrr'I�IIE (_'� j�I �I�I��IiICIiICIi — 111111111111111111111111111111111111111�111111111111111111111111111111 �r ----------------------------------------------------j- I I I I I f- OVERALL WEST ELEVATION AJOD SCP1E: iA2'=tY WHEN PRI MED AT iYX39" LdTD' WH EN PR v v III I III I all all III LL 111, 111 1111111 1 oil on Ie �Isl�l�l�l�lelel�lr �Ir1�61�1�lrlrnnnnlrl�l�l�61�61r9d�661�1�1�1�1�1�1�1�h1�6h61111I1I C!!-J9lC.t!!19-J—�—ICC-.�J�1!9!!Lnn!11!!IRlwnu�pE�x�,c�ull!!Ilxmmll_ �°�"�""'�.'"�"'�"1111 1111111111111 SNOW XC'OM KREILICH LLLD ARCHITECTS METRO OUTAN SOUTHWES 90% SUBMISSION - 05/26/16 LEVELg E EL tOp-PSI IEY�ELT_T I$ -EL1T$-U't� _IEVEL�ONE � EL fOV-4 V OVERALLELg ON GENERAL NOTES SEE ENIAkGEO ELEVATION VIEWS FOR MATERI&p SMIPTIONS PND TYPE DESIGNATIONS v A 1 13 C D F G H J K 4 M IQY PtgN-SCALE N.T.S. t�w HORIZONTAL SCALE IN FEET OPERATIONS & MAINTENANCE FACILITY - V2A SHtt ARCHITECTURE 102 OVERALL EXTERIOR ELEVATIONS OF ISCI LINE: SHEETNAME: 347 ARCHITECTURE OMF-ARC-ELV A300 jI ——�I —k� .OPE I TO. PRECAST CONCR_E,�TE I I — � — - � k _ _ _ _ _ _ _ _ _ _ _ ITI T.O. PRECAST CONCRETE � t3q p tt ❑ I Setts I I I - .. T.O. PRECAST CONCRETE EW _ _ _ IYELTAO _ h EL t]2 -C 1 - TO.ODOR III EL iR0'-°' EW34 I F R I F I F J" I it I. TO. MP � II 1 EL tOS-0 I tv OOCKSEAL E EO F E IE� :AD/H TO MECH SC�REENN tES-P' IF F TO. PRECAST CRETE 7 LO. PRECAST CONCRET� W O. FRECAST CONCRETE 135 _ _ LEVEL TNO h EL tai -o' TDOOR EL 10 Co EXTERIOR ELEVATION KEYNOTE LEGEND EXTERIOR ELEVATION GENERAL NOTES A SUILDINGHEIOM DIMENSIONS ARE MEASURED FROM DATUM LINE IY4 IEC t W -(1'I VERIFY ALL SL<&P.ECK HEIGHTS. SLOFES, AN EI-EVATICFS ON FLOOR BANS. SECTIONS. AND DETAILS S. PAW ALL EXP0.5ED METAL FLASHING TO MATCH COLOR OF ADJACENT SURFACE UNLESS NOTED OTHERWISE. PROMOS FUSHMG FOR ALL ITEMS PENETRATING EXTERIOR WALL CONSTRUCTION r TRANSWCENTPOLYCPRSONATERANEL L� CLEAR GLKING IGL-$ilI "044��� 11 m ILm���II�II�II��IIIIIIIIIIIL°IIIIIIIINIIIIII�II�III�IIIIIIIIIIARCHITECTURE II!�I�Il�ll�lllllll��lhnlill�llll�ll�lilll�lBNIIIh�II�II�II�NIhIII�IIIIIII� ----SNOW - =====AjL=CoM KREILICH ==ARCHITECTS•ENLARGED EXTERIOR ELEVATIONS NORTH _____ • • • _�___ 1 • jjjjj��ftjjmam L_ Fi G TR J K Ki L M _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ TO. MECH SCREEN I I I I I I I 5 T_O. PRECAST CORDA D7 07 5 is EO ED Di TO PRECASTCONC� I tB I I I 15 I ❑ ❑ _ _ T.O. PRECASTCON�C _ _ _ _ ❑ tP' {. EL tYS- VST i.. / _ - i.0. DOOR I FB I I � I it oil, I � i � -_ iCA � F F $ I .O. na'. U i. ED _ T.O.M�P EL. t00' -P V � EWJA EW3A I _ _LEVEL ONE 4F, EL ibb'-b 41 ED lb C9 ED I p W ED ENLARGED SOUTH ELEVATION - AREA J / L SCALE t9'=t'4' WHEN PRINTED AT ''YY M 1116-=1-0 WHEN PRINTED AT 11'%1P EXTERIOR ELEVATION KEYNOTE LEGEND KEYNOTE DESCRIPTION (K EXPOSEDPAINTEDSTEEL 6TAIR DMERIOR ELEVATION GENERAL NOTES A BURWNG HEIGHT DIMENSIONSARE MEASURED FROM DATUM UNE"' TEL .t f)VERIFYAU-SL DECK HEIGHTS. SLOPES, AND ELEVATIONS ON FLOOR FWAS. SECTIONS AND DETAILS O GNNT AU- E.V OSED BCTALFUSMNG TO MATCH COLOR OF A01ACENT SURFACE UNLESS NOTED OTHERMCM FROVIDE FLASHING FORALL MEMS PENETRATING EXTERIOR WALL CONSTRUCTION TRANSLUCENT POLYCARBONATE PANFL I—• CLEAR GLAZING LGL-1(TII I I i g2 VN71 E1 D A B C D s _T ENLARGED SOUTH ELEVATION - AREA A / E N HORIZONTAL A302 SCALE: 1/19=IV EEENFliIMEDAT�X ' IIEYPLA4.SCALE:NTB SCALE IN EXlrT ND DATE_ DRAWN CHECK DESIGN R SIDN,S BMI T OPERATIONS & MAINTENANCE FACILITY - V2A SHEET A SNOW ARCHITECTURE 104 /„L KREILICH QO ENLARGED EXTERIOR ELEVATIONS ARCHITECTS MEIAOPOLITAN SOUTHWEST of SOUTH �_ gSCIPLINE SHEET NAM 90% SUBMISSION - 05/26/16 ARCHITECTURE OMIF-ARC-ELV A302 347 0 0 m in III _ IIII�III,IIIpII�INIjjI�^'IIIIIIIIInIIIICIIII�Vlllll�l!°' IIII II1011111 ��iii�IIG^nlllll ronim1��i - MI -H 111- +J Iq 14P Ii K 11114 11 W 1114 _ METOL PgNEL 5R1 h I I I I I I I I I I I; _ LEV13�_O�NE � I I I I I I I I I I El ,oa-v'V ARGED EAST ELEVATION - AREA M EXTERIOR ELEVATION KEYNOTE LEGEND NETNOTEI DESCRIPTION w E%PoSEO PANTED STEEL STAIR p] O.CS. NONAgIpGING SECTIDNINSIMATOR-SEE SVSTEM6 DRAWINGS OB Wtl-BEE MECH m CR,, -SEE MECH 10 GRAVRY ROOF VENTLLATOR BEYOND - SEE MECH tt FAN POSER ROOF VENTIUTOR BEYOND - SEE MECH 15 DUCT TAP BETONDSEE MECH ED E ERIOR DOOR- SEE PLAN I SEE SCHEDULE RFS MECHANCALBCREEN AINL-SEEELEVATIONS BMF, SID PED SKYLIGHT BEYOND-8EE RCOFPW.11 EXTERIOR ELEVATION GENERAL NOTES ABUILDNGHEIGI-TDIMENSIONSARE MEASURED FROM DATUM LINE O'D' (EL. ID)VI. VERIFYALL SVBDECK HE)GHTS, SLOPES, AND EIEVATI ONS ON FLOOR PI -ANS, SECTIONS, AND DETAILS B PAINT ALL EXPOSED META -FLASHING TO MATCH COLOR OF ACUMMENT SURFACE UNLESS ACTED OTHERWISE. PROVIDE RASHING FOR ALL TE ME PENETRATING E ERIOR WAU_ CONST RUCTION r� I TRANSLUCENT FCLYCPRBCNgTE PANEL Imo' L CLEOR GL/SINGIGL-t(TII LEVEL ONE A B G H EL mP-0 L �—j 12 J K 4Q S' i,fi, %i� ENLARGED EAST ELEVATION - AREA L i" _ _ HORIZON ',{D$ TAL ASCALE. VB"=Y-V—EN PRINTED AT ]2%Sp" - KEYPIAN-SCALE NTS fns'=1'-TMMENPRINTEDATIVXIT SCALE IN FEET NO DATE DRAWN GHEGK DE9DN REV181DNN SUBMITTAL OPERATIONS & MAINTENANCE FACILITY - V2A SHEr�` g _COM SNOW ARCHITECTURE J347 /"ice KREILICH Q� ENLARGED EXTERIOR ELEVATIONS ARCHITECTS METROPOLITAN SOUTHWES o. CONNOTE _ EAST DISCIPLINE: SHEETNFME: 90% SUBMISSION - 05126/16 ARCHITECTURE OMF-ARC-ELV A303 ENLARGED EAST A BUILDING HEIGHT DIMENSIONS ME MEAAIREO FROM DATUM LINE BV' (EL 1017-0). VERIFY ALL SLMDECK HEIGW? SLOPES, AND ELEVATIONS ON FLOOR P . SECTIONS, AND CETPRS B. PAW ALL EXPOSED METPL FLASHING TO MATCH COLOR OF P ACENI SURFACE UNLESS NOTED OTHERJASE. PROVIDE FIASHING FOR N -L ITEMS PENETRATING F ERIOR NP CONSTRUCTION. TRAMSLUCEM POLYCARBONATE PPNEL CLEMC ING [GL-1(T)I A 1 B C D F G H J K L N 0 0 KEv PLAN- SCALE ry T s 4' 86, HORIZONTAL SCALE IN FEET OPERATIONS & MAINTENANCE FACILITY - V2A -� SNOW ARCHITECTURE /�COM ARCHITECTS ECTS =�-- SOUTHWEST�`-ll� ENLARGED EXTERIOR ELEVATIONS MMOYOLITAN 0 0 0 N C I l ��_ EAST 2 90% SUBMISSION - 05/26/16 ARCHITECTURE 106 OF V I A304 347 EXTERIOR ELEVATION KEYNOTE LEGEND KEYNOTE DESCRIPTION 0 WH -SEE MECH DO IXiWl-SEE MECH 10 GRAVY'ROOFVENTIIATORBEYOND-SEEMECH tt FANFTMERR00FVENTIIATORBEYOND-SEEMECH -14 VENT BEYOND - SEE PWMB 15 DUCTTAPBEYOND-SEEMEOH ED EXTERIOR DOOR- SEE PLAN I SEE SCHEDULE A BUILDING HEIGHT DIMENSIONS ME MEAAIREO FROM DATUM LINE BV' (EL 1017-0). VERIFY ALL SLMDECK HEIGW? SLOPES, AND ELEVATIONS ON FLOOR P . SECTIONS, AND CETPRS B. PAW ALL EXPOSED METPL FLASHING TO MATCH COLOR OF P ACENI SURFACE UNLESS NOTED OTHERJASE. PROVIDE FIASHING FOR N -L ITEMS PENETRATING F ERIOR NP CONSTRUCTION. TRAMSLUCEM POLYCARBONATE PPNEL CLEMC ING [GL-1(T)I A 1 B C D F G H J K L N 0 0 KEv PLAN- SCALE ry T s 4' 86, HORIZONTAL SCALE IN FEET OPERATIONS & MAINTENANCE FACILITY - V2A -� SNOW ARCHITECTURE /�COM ARCHITECTS ECTS =�-- SOUTHWEST�`-ll� ENLARGED EXTERIOR ELEVATIONS MMOYOLITAN 0 0 0 N C I l ��_ EAST 2 90% SUBMISSION - 05/26/16 ARCHITECTURE 106 OF V I A304 347 s a 0 i z,l Q 31 1. 32 KEYNOTE LNGHE_ OD ti _10 . METAL PANE�L \ 1' GLPZING �61LLh W OCS.NONSRIDGING SECTION IN6IAgTCR-SEE SYSTEMS DRAv NGS I I I I I I I I I JI ARrFTI FACT FI M/ATI(Nd - ARFA I -I _ _TO METPL PANEL n LEVELLEVEL IWO2 PRECAST RETAINING WALL EXTERIOR ELEVATION GENERAL NOTES q BUILDING HEIGHT DIMENSIONS ME MEASURED FROMDATUM LINE 9d (EL.'C".) VERIFY ALL SEARDECN HEIGHTS, SLOPES. AND ELEVATION$ ON FLOOR PLANS, SECTIONS, AND DETAILS. B PAINT qLL E%POBEO METPLFVSHING TO MATCH COLOROFADJACEM SURFACE UNLESS NOTED OTHER✓MISE. FROM FUSHING LL FCRA ITEMS PENETRATING EMEROR WALL CONSTflWTON _1 TRMSWCEM POLYCARBONATE PANEL CIEMGWINGIGL-HT)1 _ LEVEL ONE EL.;.-v� A B C I D F G H ENLARGED EAST ELEVATION - AREA E A3O$ SCALE: W=t'U' WHENPRINTEDATV%SP J K 11W=t'-P' NhIEN RiINTEDAT II XlT' - HORIZONTAL w�-�_ SNOW ) =COM KREILICH ��� ARCHITECTS- ��oPouTAN SOUTHWEST o J — 90% SUBMISSION - 05/26/16 KEY PIAN - SCALE N. TS. SCALE IN FEET OPERATIONS & MAINTENANCE FACILITY - V2A SHE' ARCHITECTURE 707 ENLARGED EXTERIOR ELEVATIONS OF EAST 3 ISCHPLIN SHM ARCHITECTURE I A OMF-ARC-ELV A305 347 EXTERIOR ELEVATION KEYNOTE LEGEND KEYNOTE DESCRIPTION W OCS.NONSRIDGING SECTION IN6IAgTCR-SEE SYSTEMS DRAv NGS t0 GRAVffYflOOF VENTRATOR BEYOND - SEE MEDIA 11FANPOMERROOFVOR BEYOND -SEE MESH ED E%TERIIXl WOR -BEE /SEE SCHEDULE RFS MEOHMIOALSCREENWALL� SEE ELEVATIONS EXTERIOR ELEVATION GENERAL NOTES q BUILDING HEIGHT DIMENSIONS ME MEASURED FROMDATUM LINE 9d (EL.'C".) VERIFY ALL SEARDECN HEIGHTS, SLOPES. AND ELEVATION$ ON FLOOR PLANS, SECTIONS, AND DETAILS. B PAINT qLL E%POBEO METPLFVSHING TO MATCH COLOROFADJACEM SURFACE UNLESS NOTED OTHER✓MISE. FROM FUSHING LL FCRA ITEMS PENETRATING EMEROR WALL CONSTflWTON _1 TRMSWCEM POLYCARBONATE PANEL CIEMGWINGIGL-HT)1 _ LEVEL ONE EL.;.-v� A B C I D F G H ENLARGED EAST ELEVATION - AREA E A3O$ SCALE: W=t'U' WHENPRINTEDATV%SP J K 11W=t'-P' NhIEN RiINTEDAT II XlT' - HORIZONTAL w�-�_ SNOW ) =COM KREILICH ��� ARCHITECTS- ��oPouTAN SOUTHWEST o J — 90% SUBMISSION - 05/26/16 KEY PIAN - SCALE N. TS. SCALE IN FEET OPERATIONS & MAINTENANCE FACILITY - V2A SHE' ARCHITECTURE 707 ENLARGED EXTERIOR ELEVATIONS OF EAST 3 ISCHPLIN SHM ARCHITECTURE I A OMF-ARC-ELV A305 347 76 16 14 t3 12 11 10 9.3 I n TO MECHSCREEENN i RFsw 2 ,s I I 06 i ,o i i I TO METAL PANEL EWJS i GLAZING HEPD I I' 1 Eo F- II TO METAL PANEL EJ �� f -WI - IE 1E o T _ _ _I JEwul—� _ _ _ _T _ _ _ _ EL ,n -a' LLJJ [j,A11NG SILL/GIPZING HEeD Mill DNE Ewu l _ � _ GVSJNG SILL /GLAZING HE�pD � EWK I I I � ,/0.2071 I I 2,1110[8 ELL log V-141, 1, r ENLARGED WES 11 4 ELEVATION - AREA B A3B6 $CglE. ,9-i-0 WHENPRI OATT 1115'= f-0' KHEN PRIMED qT 11W flX,i I I I I I I I I I nl I I I I I I I I I I I I I I I Gu3IrvG�HE�ro � FJ4I 1 ,1 ,DTO METALPANEL rl 1W' "-'^'IA�4,4 tEVELrvm �. 1 -4 Gl4ZINGTAETPL PA I I I FED LEVEL ONE EL,W-v Y w ENLARGED WEST ELEVATION - AREA A �A306J SGIE' ,.B - V, WHENPRINTEDAT'VX% ,MC. V -P VAIEN PtIWED AT,T%,T' EXTERIOR ELEVATION KEYNOTE LEGEND KEYNOTEDESCRIPTIgJ W E%POSEOPNNTEp STEEL STgIR EXTERIOR ELEVATION GENERAL NOTES A BLAWINGHEIGHT DIMENSIONSAREMEASHRED FROM DATUM LINEO'A' (EL,W-P).VERIFVALLS,AfiNECKHE T5,5LOPES,AND ELEVATIONS ON FLOOR PLANS, SECTIONS, AND DETAILS. O. PAWALLEXPOSED METAL FL ING TO MATCH OR OF ADJACENT SLRFACE UNLESS NOTED OTIERJASE. PROVIDE FLASHING FOR PLL REMS PENETRATMG EXTERIOR WALL CONSTRUCTION. �l TRPN L CENT POLYCARSONATE PANEL — CLEMG NGIGL-,(T)j v v A I B I C I D F G H K �6 HORIZONTAL KEY PLAN. SCALE. ars. SCALE IN FEET o V 3 I"�'®M KRCEILICH �-G ARCHITECTS METROPOLITAN SOUTHWEST'S a OPERATIONS & MAINTENANCE FACILITY - V2A ARCHITECTURE ENLARGED EXTERIOR ELEVATIONS WEST 1 sHtt l 108 OF 347 90% SUBMISSION - 05/26/16 DISCIPLINE: ARCHITECTURE SUFE NAMOMF-ARC-ELV A306 32 11 0. 10 29 OPERATIONS &MAINTENANCE FACILITY - V2A ARCHITECTURE ENLARGED EXTERIOR ELEVATIONS WEST 2 gym) �Zr) 26 25 I,� 900A SUBMISSION - 05/26/16 c uNE. ARCHITECTURE 10 A307 I- TO. METAL PANEL GUSING NE. P➢ 39' 0 R' 1 I „ IPD - � 2.0. METAL PANEL � EWJA // Ip. I _METAL PANEL G_ _ ILL Ts_ _ILL ti I GLKING GILLMEPD� �� _ ED EW39 I 1 _LEVELON W i EL,W-D' /'2 ENLARGED WEST ELEVATION - AREA D A307 SCALE :19'=,'U' WHEN PRINTEDAT'MW 1/iS'=1'-0WHENMIMEDATII'X,t' n AREA TO METAL PANEL /� -t4 1' GIPIINGHEAD Q IM _JV T O. METAL PANEL LEVEL TW'O h JNGHEAD M1� C DNGSLL LEV_E_LLO�NE - EL,Ob-per EXTERIOR ELEVATION KEYNOTE LEGEND j KEYNOTE DESCRIPTION W OGS NONERIDGING SECTION INSLMTOR - SEE SYSTEMS DRANNGS 0 WH -SEE MECH W ORV& SEE MEDIA 10GRAVITYROOFVEMILATORSEYOND-SEE MECH 11 FAN POWER ROOF VEMIIATOR BEYOND -SEE MECH ED EMERIOR WOR -SEE PLAN/GEE SCHEWLD 51(T -t SLOPEDSRTLIGHTSEVOND-SEE ROOF PLWS DOM ED GI(TLIGHT BEYOND -SEE RCOFP N' EXTERIOR ELEVATION GENERAL NOTES A BUILDINGHEIGM DIMENSIONSARE MEASURED FROM DATUM LINE O'D' (EL 1 W -D'). VERIFYgLL SLAHNECN HEIGMG, SLOPES, AND EUEVATIONS ON FLOOR PLANS, SECTIONS, AND DETAILS. B. PAINT ALL EYPOSED METAL FLASHING TO MATCH COLOR OFADJACENT SDRFME UNLESS NOTED OTHERWISE PROVIDE FLASI9NG FOR ALL RE MS PEN ETRATNO E)MERIOR WALL CONSIRUCTION. TRANSLUCENT POLYCARBONATE PANEL CLEAR GLAZ IGL-0(7)I v v A 1 B 1 C I D FG H J K. NEV PIJW- scALe. x.rs HORIZONTAL SCALE IN FEET aLCOM KRCEILICH ARCHITECTS THW SOUa Nous. OPERATIONS &MAINTENANCE FACILITY - V2A ARCHITECTURE ENLARGED EXTERIOR ELEVATIONS WEST 2 109 of 347 900A SUBMISSION - 05/26/16 c uNE. ARCHITECTURE $NEE OMF ARC-ELV A307 s SCALEf9 llt6. TO METAL PPN_ EL_n I TO. METALPANEL MV S' LEVEL TWO _ EL 14 R METAL- PANELSILL n W I _ _LEVEL CNE � ELf00' V T I I I I I I I I I I n e'er' q ES � 29 TIT I I I I EJ I f0 SCALEf9 llt6. TO METAL PPN_ EL_n I TO. METALPANEL MV S' LEVEL TWO _ EL 14 R METAL- PANELSILL n W I _ _LEVEL CNE � ELf00' V T I I I I I I I I I I n e'er' n EW]B EXTERIOR ELEVATION KEYNOTE LEGEND OE NEYNON TIT 0) ION INS DCS. NONARIDGING SECTION INBLIATOR - $EE SYBTEMB pRgWINGS EWJB f0 GRAVITY RODFVENTILATOR BEYOW-3EE MECH fl FAN POWER ROOF VENTIIgiOR PtI'OND-SEE MECH 1, DUCTTAP BEYOND -EEE MEiE I I I Ewzr. I E%iERIOR OCOR-SEE PIAN/SEE SC1EDUlE I I I � I SCALEf9 llt6. TO METAL PPN_ EL_n I TO. METALPANEL MV S' LEVEL TWO _ EL 14 R METAL- PANELSILL n W I _ _LEVEL CNE � ELf00' V T I I I I I I I I I I n e'er' EXTERIOR ELEVATION KEYNOTE LEGEND OE NEYNON TIT 0) ION INS DCS. NONARIDGING SECTION INBLIATOR - $EE SYBTEMB pRgWINGS f0 GRAVITY RODFVENTILATOR BEYOW-3EE MECH fl FAN POWER ROOF VENTIIgiOR PtI'OND-SEE MECH 1, DUCTTAP BEYOND -EEE MEiE ., 0, ED E%iERIOR OCOR-SEE PIAN/SEE SC1EDUlE .TWD SILL IXJE h O-0' EXTERIOR ELEVATION GENERAL NOTES A BUILDING HEIGHT DIMENSIONSARE MEASURED FROM DATUM LINE VU (EL 100'D'). VERIFYALL SL<&➢ECR HEIGHTS, KOF'ES, AND EIEVATIDNS ON FLOOR PLANS SECTIONS, AND DETAILS. B PAFLASHING INT All EXPOSED METAL TO MATCH COLOR OF ADJACENT SURFACE UNLESSNOTED OTHERWISE. PROMDEFLASHING FOR AIL ITEMS PENETRATNJG EXTERIOR WALLCONSTRUCTION -. TRANSLUCENT POLYCARBONATE PANEL CuEARC INGIGL-1(T)) 3 I I I I I I I I I ffi I I I I A I 9 D O �FH ENLARGED WEST ELEVATION - AREA L o q �e A908 SCALE VW= -0'' WHENPRINEDATIIMEN PRINTED AT N'.XIr �I HORIZONTAL KEYPLAN-SCAL£N.TS SCALE IN FEET NO DJ.ATE WN CHECK DESIGN REVISION/SUBMI AL OPERATIONS & MAINTENANCE FACILITY - V2A SHEET w —�O� SNOW ARCHITECTURE 110 /`� ARCHIL CTS METROPOLITAN SOUTHWES �o ENLARGED EXTERIOR ELEVATIONS OF WEST 3 a 90% SUBMISSION - 05/26/16 a5C1'� E' """E 347 % ARCHITECTURE OMF ARC-ELV A308 b A � T : B4GEA STORM.E PASA --------------- EDGE OF ROOF J OVERHANG ABOVE RAINCHNN- TYPIC& AT SCUPPERS SEE LANDSCPPE DRAWINGS FOR PLANTINGS 20' B' IW V 20 W PANELS AT 8'-0" .-o r C ECGEOFRCOFJ SCREENED SEE STRUCTURALFOR OVERHANGABOVE STORAGE AREA 1a' HSS AND CONCRETE COLUMN PIER BELOW WEUDNGGAS STO E AREA EDGE OF ROOF OVERHA"OPBDVE PPLETTERACKSANO IPRGE ITEM STORAGE RACKS SEEINDUSTflIR .1 iYARD RECYCLING -------------------------------------------------------------------------- -- - -.r❑Ol f61 fbl r SOUTH PARKING LOT 21 STALLS ❑ I -Ml= 0 YARD -NON-FERROUS METPLS DUMPETER-NIC 20 YA40-FERROUS METp1$DUMPETER -NIC S' HIGH PRECAST CONCRETE SCREENWA W -v' <EOPANEL5 b llEllCTRhCZFCR SITE LIGHTING t1Tri GRAVELECE55 SJ I -I PATHSEE CML SEE SITE PLAN I (' TRACH DRAWINGS FOR YARD LAYOUT 12 SCREENED STORAGE AREA PLAN AT01 SCNE' 1M -TU' WHENPRINTEDAT2I%'N' w _MM SNOW /r1�\.V KREILICI-IIC � ARCHITECTS nraoxouuN SOUTHWES ado J 90% SUBMISSION - 05/26/16 HORIZONTAL SCALE IN FEET OPERATIONS & MAINTENANCE FACILITY - V2A SHE' ARCHITECTURE 185 SCREENED STORAGE OF PLAN E: � GMF -ARC -PLN A701 JY A710 A71D IM SOUTH PARKING LOT 21 STALLS ❑ I -Ml= 0 YARD -NON-FERROUS METPLS DUMPETER-NIC 20 YA40-FERROUS METp1$DUMPETER -NIC S' HIGH PRECAST CONCRETE SCREENWA W -v' <EOPANEL5 b llEllCTRhCZFCR SITE LIGHTING t1Tri GRAVELECE55 SJ I -I PATHSEE CML SEE SITE PLAN I (' TRACH DRAWINGS FOR YARD LAYOUT 12 SCREENED STORAGE AREA PLAN AT01 SCNE' 1M -TU' WHENPRINTEDAT2I%'N' w _MM SNOW /r1�\.V KREILICI-IIC � ARCHITECTS nraoxouuN SOUTHWES ado J 90% SUBMISSION - 05/26/16 HORIZONTAL SCALE IN FEET OPERATIONS & MAINTENANCE FACILITY - V2A SHE' ARCHITECTURE 185 SCREENED STORAGE OF PLAN E: � GMF -ARC -PLN A701 JY l_ PND REIN LHVN 1'-9 WHEN PRINTEDAT V X31' =1'-D' NMEN MIWEDAT lI X17 A]N SCALE'. IV -1'-0' WHEN PRINTED AT II W 1116'= P -P MEN PRINTED AT 11'%iT' DUMPSTER(NI C) O EL P4E1.-0 T.O. SCREEN EL 1oIN L4 FERROUS METAL DUMPSTER IN I C) METAL SCUPPER AND UMNSUTATED PRECAST METAL SCUPPER AND DIMPSTER SCREENED STORAGE ONCRETATEOLPANELT CONCRETE WALLPANELS RAINCHNN CONCRETE WALL PANELS RANCHAIN SCREEN WALL CONLRETEWPLL META -SCUPPER BEYOND BEYOND I SCREEN WALL \ / \ NTO BALLAST TORAGE BEYOND SCALE'. IV -1'-0' WHEN PRINTED AT II W 1116'= P -P MEN PRINTED AT 11'%iT' DUMPSTER(NI C) O EL P4E1.-0 T.O. SCREEN EL 1oIN L4 FERROUS METAL DUMPSTER IN I C) I ONCRETATEOLPANELT CONCRETE WALLPANELS SCALE'. IV -1'-0' WHEN PRINTED AT II W 1116'= P -P MEN PRINTED AT 11'%iT' DUMPSTER(NI C) O EL P4E1.-0 T.O. SCREEN EL 1oIN L4 FERROUS METAL DUMPSTER IN I C) FERROUS METAL J DUMPSTER(N.IO.) a SCREED \ATDZ 6041E NON-FERROUS METAL DUMP6TER IN.I C) TO TD PAIL EXTERIOR ELEVATION KEYNOTE LEGEND EL 1'11Y -P' IQYNOTE DESCRIPTION PE EL1W-P' TO PSA EL EL 123U Y TONIN J_ E 1PB4' _ IfVE�L ONE EL tOPR' V O PAN EL 1]P -P' EXTERIOR ELEVATION GENERAL NOTES A BUILDING HEIGHT DIMENSIONS ARE MEASURED FROM DATUM LITE O'O" (EL ISS Y) YERIFYKL SLP&DECK FIGHTS, 9.OPES, ANO ELE VATDNS ON FLOOR PLANS. SECTIONS, AND DETAILS. B. PAIM ALL EXPOSED METAL FLASHING TO MATCH COLOR OF ADIACENT SURFACE UNLESS NOTED OTHERNISE PRONOE FLASHING FOR ILL ITEMS PENETRATNO EXTEROR WALL Cpl6TRUCTON L . TRANSLUCENT POLYCARBONATE PANEL CCLEAR GLALNG(GLA(T)1 NO DATE DRAWN CHECKIDESGNI REN,6ION,SIIBMITTN. OPERATIONS & MAINTENANCE FACILITY - V2A SHEET SNOW ARCHITECTURE 186 a=CoM KREILICH Q SCREENED STORAGE ARCHITECTS lr OPOLTAN SOUTHW o ELEVATIONS OF gSCIPLINE SHEET NAME: 347 90% SUBMISSION - 05/26/16 ARCHITECTURE OMF-ARC-ELV A702 J UNINSULATED PRECAST CONCRETE WALL PANELS META -SCUPPER AND RAIN CHAIN BEYOND DUMPSTER SCREEN WALL FERROUS METAL J DUMPSTER(N.IO.) a SCREED \ATDZ 6041E NON-FERROUS METAL DUMP6TER IN.I C) TO TD PAIL EXTERIOR ELEVATION KEYNOTE LEGEND EL 1'11Y -P' IQYNOTE DESCRIPTION PE EL1W-P' TO PSA EL EL 123U Y TONIN J_ E 1PB4' _ IfVE�L ONE EL tOPR' V O PAN EL 1]P -P' EXTERIOR ELEVATION GENERAL NOTES A BUILDING HEIGHT DIMENSIONS ARE MEASURED FROM DATUM LITE O'O" (EL ISS Y) YERIFYKL SLP&DECK FIGHTS, 9.OPES, ANO ELE VATDNS ON FLOOR PLANS. SECTIONS, AND DETAILS. B. PAIM ALL EXPOSED METAL FLASHING TO MATCH COLOR OF ADIACENT SURFACE UNLESS NOTED OTHERNISE PRONOE FLASHING FOR ILL ITEMS PENETRATNO EXTEROR WALL Cpl6TRUCTON L . TRANSLUCENT POLYCARBONATE PANEL CCLEAR GLALNG(GLA(T)1 NO DATE DRAWN CHECKIDESGNI REN,6ION,SIIBMITTN. OPERATIONS & MAINTENANCE FACILITY - V2A SHEET SNOW ARCHITECTURE 186 a=CoM KREILICH Q SCREENED STORAGE ARCHITECTS lr OPOLTAN SOUTHW o ELEVATIONS OF gSCIPLINE SHEET NAME: 347 90% SUBMISSION - 05/26/16 ARCHITECTURE OMF-ARC-ELV A702 J