VII.2. 2018-2022 Capital Improvement Plan; Bishop (CR2017-143)
December 5, 2017 Council Report 2017-143
2018-2022 CAPITAL IMPROVEMENT PLAN
Proposed Action
Staff recommends adoption of the following motion: Move to adopt the 2018-2022 Capital Improvements
Plan.
Adoption of this motion will authorize staff to begin efforts to implement 2018 projects.
Overview
The Capital Improvements Plan is a planning document intended to help the City anticipate major capital
items and to consider the financial impact of proceeding with those planned improvements.
Discussions have been held with the Park Board and City Council, in detailing proposed and necessary
improvements.
Staff is recommending adoption of the plan.
Primary Issues to Consider
• Does adoption of the CIP mean projects will be implemented?
The CIP is a planning document, not an implementation action, and therefore, additional approvals
will be necessary for projects to proceed. Appropriate notifications would also be made for those
projects that have funding implications.
• Are funds available for all projects?
The plan outlines funding implications if all projects are implemented. Necessary funding changes
have been anticipated as part of this plan, and are recommended therein
Supporting Information
• 2018-2022 CIP Power Point slides
• 2018-2022 Capital Improvements Plan
______________________________
Nick Bishop, CPA
Finance Director
Financial Impact: $ projects included in budgets Budgeted: Y/N X N Source: Various
Related Documents (CIP, ERP, etc.): __CIP_________ Notes: ____________________
11/30/2017
1
2018 – 2022 Capital
Improvement Plan
December 5th, 2017
Overview
5 year plan, updated annually
Approval authorizes purchases in 2018
Remaining four years are estimated
replacement for information and planning
Would be authorized in subsequent years
11/30/2017
2
Park Capital Improvement Fund
Funding Sources
Franchise Fees, $295,300 in 2018
Dedication Fees, $390,000
Creekview Apartments
Park Capital Improvement Fund
Major Projects
Pavilion Addition/Warming House, $600,000
Part of $5.7 million project
Central Park Pickleball Courts ‐ $300,000
Park Valley Play Equipment ‐ $100,000
11/30/2017
3
Capital Improvement Fund
Funding Sources
Tax Levy, $75,000 in 2018
Transfers In from other funds
Capital Improvement Fund
Major Project
Activity Center Roof Replacement ‐ $265,000
11/30/2017
4
Municipal State Aid Fund
Advance taken in 2014
Will receive funds again in 2019
Next scheduled project is in 2021
Permanent Improvement
Revolving Fund
Funding Sources
Grants/Other Sources for Blake Road, $6 million
Bond Proceeds, $3.1 million in 2018
Special Assessments, $0.9 million in 2018
11/30/2017
5
Permanent Improvement
Revolving Fund
Major Projects
Blake Road, $7.0 million
+ Utility Improvements
2018 Street Project, $2.3 million
Arts Center
Capital Costs are included in separate fund
Major Projects in 2018
Surveillance System ‐ $47,000
Lobby Carpeting ‐ $52,000
Fund in total projecting a deficit of $17,282
11/30/2017
6
Pavilion
Capital Costs are included in separate fund
Pavilion Upgrade Project ‐ $5.7 million
$3.1 million from Pavilion Fund in 2017/2018
$1.0 million Hopkins Youth Hockey Association
$1.0 million Hopkins School District
$0.6 million Parks Improvement Fund
Fund in total projecting deficit of $31,548
Including $72,000 of Depreciation
Utility Funds
Funded by charges for services
Capital Project Costs in 2018
Water ‐ $1.6 Million
Sewer ‐ $1.075 Million
Storm Sewer ‐ $591,000
City of Hopkins
Park Capital Improvements Fund (301)
ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET
2016 2017 2018 2019 2020 2021 2022
Working Capital Begin Year 258,547 760,900 994,410 432,654 213,781 147,719 287,496
Revenues
Franchise Fees 296,520 295,300 295,300 295,300 295,300 295,300 295,300
Dedication Fees-Oxford Village 40,700 - - - - - -
Dedication Fees-Moline - 180,750 - - -
Dedication Fees-Creekview Apartments - - 390,000 - -
Dedication Fees-Cold Storage - - - 300,000 -
Interest earnings 4,886 7,609 9,944 4,327 2,138 1,477 2,875
Hennepin County Grants 180,000 - - - - - -
Donations 134,689 - - - - - -
Bond Proceeds 1,473,215 1,829,097 - - - - -
Total Revenues 2,130,010 2,312,756 695,244 599,627 297,438 296,777 298,175
Expenditures
Current 12,423 7,000 7,000 7,000 7,000 7,000 7,000
Capital Projects 1,605,234 1,967,246 1,140,000 701,500 246,500 40,000 83,200
Bond Payment Contribution (2015)10,000 10,000 10,000 10,000 10,000 10,000 10,000
Bond Payment Contribution (2016)95,000 100,000 100,000 100,000 100,000 100,000
Bond Payment Contribution (2017)- - - - -
Total Expenditures 1,627,657 2,079,246 1,257,000 818,500 363,500 157,000 200,200
Working Capital Ending Balance 760,900 994,410 432,654 213,781 147,719 287,496 385,471
(Unrestricted Net Position)
City of Hopkins
Capital Improvements Fund (305)
ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET
2016 2017 2018 2019 2020 2021 2022
Working Capital Begin Year 67,621 (245,928) 87,572 (90,052) 96,047 129,007 260,297
Revenues from charges
Tax Levy per FMP 122,409 310,000 100,000 100,000 100,000 100,000 100,000
Interest earnings 187 - 876 (901) 960 1,290 2,603
Other revenues 3,371 - - - - - -
Bond Proceeds - - - - - - -
Transfer In from General Fund 125,000 100,000 100,000 100,000 100,000 100,000 100,000
Transfer In from Enterprise Funds 400,000 - - - - - -
Interfund Loan or Bond Proceeds - - - 500,000 - - -
Total Revenues 650,967 410,000 200,876 699,099 200,960 201,290 202,603
Expenditures
Current 123,530 - - - - - -
Capital Projects 840,986 76,500 378,500 513,000 168,000 45,000 21,761
Repay Interfund Loan 25,000 200,000
Total Expenditures 964,516 76,500 378,500 513,000 168,000 70,000 221,761
Working Capital Ending Balance (245,928) 87,572 (90,052) 96,047 129,007 260,297 241,139
(Unrestricted Net Position)
City of Hopkins
Municipal State Aid Fund (302)
ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET
2016 2017 2018 2019 2020 2021 2022
Working Capital Begin Year 422,235 (253,875) (256,414) (258,978) 138,432 539,816 245,214
Revenues
State MSA Funds, projects 707,492 - - 400,000 400,000 400,000 400,000
Interest Earnings (6,578) (2,539) (2,564) (2,590) 1,384 5,398 2,452
Total Revenues 700,914 (2,539) (2,564) 397,410 401,384 405,398 402,452
Expenditures
CIP State Aid Projects 1,377,024 - - - - 700,000 -
Total Expenditures 1,377,024 - - - - 700,000 -
Working Capital Ending Balance (253,875) (256,414) (258,978) 138,432 539,816 245,214 647,666
(Unrestricted Net Position)
City of Hopkins
Permanent Improving Revolving Fund (501)
ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET
2016 2017 2018 2019 2020 2021 2022
Working Capital Begin Year 442,413 (639,073) 287,536 765,911 1,858,270 3,456,853 4,746,422
Revenues
Tax Levy per FMP 2,124 - - - - - -
Special Assessments (Prepaid)277,807 290,700 900,000 1,250,000 1,885,000 1,885,000 500,000
Grants 443,927 4,049,500 5,954,600 5,704,600 - - -
Investments 6,623 (6,391) 2,875 7,659 18,583 34,569 47,464
Bond Proceeds 4,341,871 16,895,000 3,100,000 5,000,000 3,800,000 3,500,000 1,500,000
Transfer In - Enterprise Funds - 405,000 - - - - -
Total Revenues 5,072,352 21,228,809 9,957,475 11,962,259 5,703,583 5,419,569 2,047,464
Expenditures
Current 26,245 - - - - - -
Residential Street Improvements 4,180,751 8,530,700 2,159,200 3,225,000 3,710,000 3,710,000 1,150,000
8th Avenue Construction 6,335,500
Light Rail Transit Stations - 800,000 - - -
Pedestrian & Bicycle Access Improvements 25,000 25,000 25,000 25,000 25,000
Blake Road Corridor Improvements 5,100,000 6,974,900 6,474,900 - - -
Street Overlay Improvements 336,000 300,000 325,000 350,000 375,000 400,000
Street Sign Management 20,000 20,000 20,000 20,000 20,000
Transfer Out 1,946,842
Total Expenditures 6,153,838 20,302,200 9,479,100 10,869,900 4,105,000 4,130,000 1,595,000
Working Capital Ending Balance (639,073) 287,536 765,911 1,858,270 3,456,853 4,746,422 5,198,886
(Unrestricted Net Position)
Water Fund - Working Capital Projection
ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET
2016 2017 2018 2019 2020 2021 2022
Working Capital Begin Year (176,360) (1,109,720) (867,508) (606,232) (259,195) 190,639 754,937
Revenues
Operating Revenues 1,353,083 1,850,127 1,974,086 2,108,324 2,251,690 2,404,805 2,568,332
Other 173,357 173,000 173,000 176,460 179,989 183,589 187,261
Bond Proceeds 1,777,264 1,700,000 1,600,000 1,760,000 1,500,000 1,500,000 350,000
Total Revenues 3,303,704 3,723,127 3,747,086 4,044,784 3,931,679 4,088,394 3,105,592
Expenditures
Operating Expenditures 1,542,641 1,461,221 1,500,339 1,545,349 1,591,710 1,639,461 1,688,645
Interest/Fiscal Agent Expense 47,423 46,785 42,997 38,073 35,010 30,710 26,160
Capital Outlay 2,306,805 1,700,000 1,600,000 1,768,000 1,510,000 1,500,000 350,000
Bond Payments 145,000 145,000 155,000 155,000 155,000 165,000 165,000
Transfer Out - Bond Payments 189,626 127,909 187,474 191,325 190,125 188,925 192,675
Total Expenses 4,231,495 3,480,915 3,485,810 3,697,747 3,481,845 3,524,096 2,422,480
Inventory Change (2,234)
Bond Premium/Discount Expense (3,335)
Working Capital Ending Balance (1,109,720) (867,508) (606,232) (259,195) 190,639 754,937 1,438,049
(Unrestricted Net Position)
Sewer Fund - Working Capital Projection
ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET
2016 2017 2018 2019 2020 2021 2022
Working Capital Begin Year 385,285 42,211 333,274 636,048 929,309 1,378,997 1,935,905
Revenues
Operating Revenues 2,200,230 2,917,504 3,073,299 3,237,413 3,410,291 3,592,401 3,784,235
Other 24,947 15,000 15,000 15,300 15,606 15,918 16,236
Interest 788 422 3,333 6,360 9,293 13,790 19,359
Intergovernmental Grants 92,190 - - - - - -
Bond Proceeds 609,556 1,026,000 1,000,000 1,000,000 760,000 750,000 250,000
Total Revenues 2,927,711 3,958,926 4,091,632 4,259,074 4,195,190 4,372,109 4,069,830
Expenditures
Operating Expenditures 2,026,760 2,419,300 2,463,271 2,537,169 2,613,284 2,691,683 2,772,433
Interest/Fiscal Agent Expense 36,219 35,730 32,656 29,493 26,068 22,368 18,568
Capital Outlay 917,838 1,026,000 1,075,000 1,103,000 810,000 800,000 275,000
Bond Payments 105,000 105,000 105,000 110,000 110,000 115,000 115,000
Transfer Out - Bond Payments 181,596 81,833 112,931 186,150 186,150 186,150 186,150
Total Expenses 3,267,413 3,667,863 3,788,858 3,965,812 3,745,502 3,815,201 3,367,151
Inventory Change (1,780)
Bond Premium/Discount Expense (1,592)
Working Capital Ending Balance 42,211 333,274 636,048 929,309 1,378,997 1,935,905 2,638,584
(Unrestricted Net Position)
Storm Sewer Fund - Working Capital Projection
ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET
2016 2017 2018 2019 2020 2021 2022
Working Capital Begin Year 755,174 965,966 982,947 1,138,834 1,282,851 1,630,073 1,979,374
Revenues
Operating Revenues 870,620 796,000 796,000 796,000 796,000 796,000 796,000
Other 6,364 6,000 6,000 6,000 6,000 6,000 6,000
Interest 5,833 9,660 9,829 11,388 12,829 16,301 19,794
Intergovernmental Grants - - - - - - -
Bond Proceeds 420,190 900,000 350,000 500,000 700,000 700,000 250,000
Total Revenues 1,303,007 1,711,660 1,161,829 1,313,388 1,514,829 1,518,301 1,071,794
Expenditures
Operating Expenditures 134,192 149,175 169,438 174,521 179,757 185,149 190,704
Interest/Fiscal Agent Expense 25,737
Capital Outlay - Construction 601,269 1,300,000 591,000 740,000 733,000 724,000 250,000
Bond Payments 110,000 115,000 115,000 120,000 120,000 125,000 125,000
Transfer Out - Bond Payments 220,874 130,504 130,504 134,850 134,850 134,850 134,850
Total Expenses 1,092,072 1,694,679 1,005,942 1,169,371 1,167,607 1,168,999 700,554
Inventory Change -
Bond Premium/Discount Expense (143)
Working Capital Ending Balance 965,966 982,947 1,138,834 1,282,851 1,630,073 1,979,374 2,350,614
(Unrestricted Net Position)
Pavilion Fund - Working Capital Projection
ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET
2016 2017 2018 2019 2020 2021 2022
Working Capital Begin Year 20,731 6,329 (410,325) (41,976) (345,554) (616,120) (599,595)
Revenues
Property Taxes 63,519 - - 32,306 32,306 332,306 332,306
Operating Revenues 349,840 397,400 438,000 458,760 467,935 477,294 486,840
Other 5,600 6,700 7,000 7,140 7,283 7,428 7,577
Interest 555 63 (4,103) (420) (3,456) (6,161) (5,996)
Bond Proceeds - - 3,100,000 - - - -
Total Revenues 419,514 404,163 3,540,897 497,786 504,068 810,867 820,727
Expenditures
Operating Expenditures 373,583 458,592 474,723 488,965 503,634 518,743 534,305
Interest/Fiscal Agent Expense 2,157 2,225 1,825 1,400 1,000 600 200
Capital Outlay - Construction 37,875 340,000 2,676,000 41,000 - - 19,000
Bond Payments - - - 250,000 250,000 255,000 255,000
Transfer Out - Bond Payments 20,000 20,000 20,000 20,000 20,000 20,000 20,000
Total Expenses 433,615 820,817 3,172,548 801,365 774,634 794,343 828,505
Bond Premium/Discount Expense (301)
Working Capital Ending Balance 6,329 (410,325) (41,976) (345,554) (616,120) (599,595) (607,373)
(Unrestricted Net Position)
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP
PROJECTS BY YEAR
2018 2022thru
Project Name Department Project #Priority Project Cost
2018
08-CIP-AC018Activity Center - Replace Gymnasium Roof n/a 105,000Comm Svcs - Activity Center
08-CIP-AC024Activity Center - Raspberry Room Roof Replacement n/a 80,000Comm Svcs - Activity Center
09-CIP-AC031Activity Center - Lower Roof Replacement n/a 80,000Comm Svcs - Activity Center
18-CIP-AC007Activity Center - Window Upgrade 2 75,000Comm Svcs - Activity Center
09-CIP-AR027Arts Center - Replace Lobby Carpet n/a 52,000Comm Svcs - Arts Center
13 CIP-CM001Technology Improvement - Council Chambers & Studio n/a 15,000Comm Svcs - Communications
08-CIP-FD019Fire - Replace Carpet and Apparatus Floor Finish n/a 28,500Fire
07-CIP-PV313Pavilion Restroom/Lobby Floor Improvement n/a 35,000Pavilion
07-CIP-PV314Pavilion Overhead Door Improvement n/a 65,000Pavilion
10-CIP-PV317Pavilion - Skate Tile Replacement n/a 75,000Pavilion
10-CIP-PV318Pavilion - Refrigeration Equip & Arena Floor Repl n/a 4,400,000Pavilion
13-CIP-PV324Pavilion Entry and Lobby Door Replacement 3 25,000Pavilion
13-CIP-PV325Pavilion - Paint Exterior Building 1 28,000Pavilion
14-CIP-PV010Pavilion Painting the Arena Ceiling and Bar Joist 1 48,000Pavilion
18-CIP-PD216Kitchen Improvements and Office Furniture n/a 15,000Police
08-CIP-P010Park Valley - Play Equipment n/a 100,000Public Works: Parks
08-CIP-P011Burnes Park - Resurface Tennis Courts n/a 20,000Public Works: Parks
13-CIP-P044Oakes Park - Tennis Courts n/a 20,000Public Works: Parks
13-CIP-P050Pavilion Addion/Warming House n/a 600,000Public Works: Parks
13-CIP-P055Elmo Park - 2-5 Play Equipment n/a 75,000Public Works: Parks
17-CIP-P006Central Park Pickelball Courts 3 300,000Public Works: Parks
01-CIP-S101Residential Street Improvements and Utilities n/a 3,600,000Public Works: Streets/Traffic
13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic
15-CIP-S001Blake Road Corridor Improvements n/a 7,949,900Public Works: Streets/Traffic
16-CIP-S041Street Overlay Improvements n/a 300,000Public Works: Streets/Traffic
16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic
01-CIP-S502Light Rail Transit Stations (3)n/a 620,000Public Works: Transportation
01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 21,000Public Works: Utilities
18-CIP-U016Sewer Lining 2 50,000Public Works: Utilities
16-CIP-R003Shady Oak Beach Improvements 3 75,000Recreation
18,902,400Total for 2018
2019
09-CIP-CH029City Hall Roof Replacement n/a 115,000City Hall Administration
09-CIP-CH030City Hall Lobby Upgrade n/a 260,000City Hall Administration
16-CIP-AC035Activity Center - Former Historical Society Area 1 75,000Comm Svcs - Activity Center
17-CIP-AC039Activity Center - Bathroom Improvements 1 20,000Comm Svcs - Activity Center
18-CIP-AC043Activity Center - Outdoor Signage 2 20,000Comm Svcs - Activity Center
18-CIP-AC044Activity Center - Entry/Receptionist Enhancement 1 10,000Comm Svcs - Activity Center
14-CIP-AR004Arts Center - Remodel Administrative Offices 2 50,000Comm Svcs - Arts Center
17-CIP-AR004Arts Center - Theater Curtains 3 80,000Comm Svcs - Arts Center
13-CIP-PV321Pavilion Mezzanine Rooftop Unit Replacement 1 30,000Pavilion
13-CIP-PV322Pavilion HHS Team Room Rooftop Unit Repl 1 11,000Pavilion
08-CIP-B023Public Works - Replace Overhead Doors n/a 90,000Public Works: Bldg/Equip Serv
Thursday, November 30, 2017
Project Name Department Project #Priority Project Cost
18-CIP-B007PW Exterior Painting n/a 25,000Public Works: Bldg/Equip Serv
05-CIP-P202Central Park Tennis Courts n/a 20,000Public Works: Parks
13-CIP-P056Harley Hopkins Park - Warming House n/a 30,000Public Works: Parks
13-CIP-P057Harley Hopkins Park - Lighting n/a 50,000Public Works: Parks
16-CIP-P002Cottageville Park - Phase III Improvements n/a 450,000Public Works: Parks
17-CIP-P004Downtown Park Rehab 3 100,000Public Works: Parks
17-CIP-P005Oakes Park Cricket Pitch n/a 40,000Public Works: Parks
01-CIP-S101Residential Street Improvements and Utilities n/a 5,575,000Public Works: Streets/Traffic
13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic
15-CIP-S001Blake Road Corridor Improvements n/a 7,449,900Public Works: Streets/Traffic
16-CIP-S041Street Overlay Improvements n/a 325,000Public Works: Streets/Traffic
16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic
01-CIP-S502Light Rail Transit Stations (3)n/a 800,000Public Works: Transportation
01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 22,000Public Works: Utilities
08-CIP-U001Lift Station # 4 n/a 160,000Public Works: Utilities
18-CIP-U016Sewer Lining 2 50,000Public Works: Utilities
16-CIP-R003Shady Oak Beach Improvements 3 35,000Recreation
15,937,900Total for 2019
2020
08-CIP-CH010City Hall - Replace Carpeting n/a 58,000City Hall Administration
17-CIP-AC041Activity Center - Raspberry Room Enhancements 4 25,000Comm Svcs - Activity Center
09-CIP-AR028Art Center - Various Rooms and Hallway (Carpet)n/a 21,500Comm Svcs - Arts Center
16-CIP-AR006Arts Center - Seal Floors in Restroom & Kitchen 1 15,000Comm Svcs - Arts Center
08-CIP-PD016Replace Carpet - Police Station n/a 25,000Police
08-CIP-B021Public Works - Replace Wash Bay Roof n/a 50,000Public Works: Bldg/Equip Serv
09-CIP-B034Public Works Garage Roof Replacement n/a 50,000Public Works: Bldg/Equip Serv
13-CIP-P059Interlachen Park - Lighting n/a 50,000Public Works: Parks
13-CIP-P063Maetzold Field - Pavilion n/a 80,000Public Works: Parks
13-CIP-P066Shady Oak Beach - Picnic Shelter 3 150,000Public Works: Parks
13-CIP-P068Valley Park - Picnic Shelter 3 150,000Public Works: Parks
01-CIP-S101Residential Street Improvements and Utilities n/a 6,660,000Public Works: Streets/Traffic
13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic
16-CIP-S041Street Overlay Improvements n/a 350,000Public Works: Streets/Traffic
16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic
01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 23,000Public Works: Utilities
18-CIP-U016Sewer Lining 2 50,000Public Works: Utilities
16-CIP-R003Shady Oak Beach Improvements 3 50,000Recreation
7,852,500Total for 2020
2021
08-CIP-AR006Arts Center-Replace Office Carpet - Stages Theatre n/a 20,225Comm Svcs - Arts Center
08-CIP-FD123Fire Station - Replace Boilers n/a 45,000Fire
13-CIP-P058Hilltop - Picnic Shelter n/a 40,000Public Works: Parks
01-CIP-S101Residential Street Improvements and Utilities n/a 6,660,000Public Works: Streets/Traffic
01-CIP-S104County Road 3 n/a 2,300,000Public Works: Streets/Traffic
13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic
16-CIP-S041Street Overlay Improvements n/a 375,000Public Works: Streets/Traffic
16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic
01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 24,000Public Works: Utilities
18-CIP-U016Sewer Lining 2 50,000Public Works: Utilities
9,559,225Total for 2021
2022
Thursday, November 30, 2017
Project Name Department Project #Priority Project Cost
08-CIP-AR008Arts Center Carpet: Redepenning Gallery n/a 21,760Comm Svcs - Arts Center
13-CIP-PV323Pavilion Main Level Rooftop Unit Replacement 1 9,500Pavilion
16-CIP-PV328Pavilion - Main Level Rooftop Unit Replacement n/a 9,500Pavilion
13-CIP-P052Central Park - Lighting n/a 75,000Public Works: Parks
01-CIP-S101Residential Street Improvements and Utilities n/a 2,000,000Public Works: Streets/Traffic
13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic
16-CIP-S041Street Overlay Improvements n/a 400,000Public Works: Streets/Traffic
16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic
01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 25,000Public Works: Utilities
16-CIP-R003Shady Oak Beach Improvements 3 25,000Recreation
2,610,760Total for 2022
GRAND TOTAL 54,862,785
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP
DEPARTMENT SUMMARY
2018 2022thru
Total20182019202020212022Department
City Hall Administration 433,000375,000 58,000
Comm Svcs - Activity Center 490,000340,000 125,000 25,000
Comm Svcs - Arts Center 260,48552,000 130,000 36,500 20,225 21,760
Comm Svcs - Communications 15,00015,000
Fire 73,50028,500 45,000
Pavilion 4,736,0004,676,000 41,000 19,000
Police 40,00015,000 25,000
Public Works: Bldg/Equip Serv 215,000115,000 100,000
Public Works: Parks 2,350,0001,115,000 690,000 430,000 40,000 75,000
Public Works: Streets/Traffic 44,169,80011,894,900 13,394,900 7,055,000 9,380,000 2,445,000
Public Works: Transportation 1,420,000620,000 800,000
Public Works: Utilities 475,00071,000 232,000 73,000 74,000 25,000
Recreation 185,00075,000 35,000 50,000 25,000
18,902,400 15,937,900 7,852,500 9,559,225 2,610,760 54,862,785TOTAL
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP
PROJECTS BY DEPARTMENT
2018 2022thru
Total20182019202020212022DepartmentProject #Priority
City Hall Administration
08-CIP-CH010 58,00058,000City Hall - Replace Carpeting n/a
09-CIP-CH029 115,000115,000City Hall Roof Replacement n/a
09-CIP-CH030 260,000260,000City Hall Lobby Upgrade n/a
433,000375,000 58,000City Hall Administration Total
Comm Svcs - Activity Center
08-CIP-AC018 105,000105,000Activity Center - Replace Gymnasium Roof n/a
08-CIP-AC024 80,00080,000Activity Center - Raspberry Room Roof Replacement n/a
09-CIP-AC031 80,00080,000Activity Center - Lower Roof Replacement n/a
16-CIP-AC035 75,00075,000Activity Center - Former Historical Society Area 1
17-CIP-AC039 20,00020,000Activity Center - Bathroom Improvements 1
17-CIP-AC041 25,00025,000Activity Center - Raspberry Room Enhancements 4
18-CIP-AC007 75,00075,000Activity Center - Window Upgrade 2
18-CIP-AC043 20,00020,000Activity Center - Outdoor Signage 2
18-CIP-AC044 10,00010,000Activity Center - Entry/Receptionist Enhancement 1
490,000340,000 125,000 25,000Comm Svcs - Activity Center Total
Comm Svcs - Arts Center
08-CIP-AR006 20,22520,225Arts Center-Replace Office Carpet - Stages Theatre n/a
08-CIP-AR008 21,76021,760Arts Center Carpet: Redepenning Gallery n/a
09-CIP-AR027 52,00052,000Arts Center - Replace Lobby Carpet n/a
09-CIP-AR028 21,50021,500Art Center - Various Rooms and Hallway (Carpet)n/a
14-CIP-AR004 50,00050,000Arts Center - Remodel Administrative Offices 2
16-CIP-AR006 15,00015,000Arts Center - Seal Floors in Restroom & Kitchen 1
17-CIP-AR004 80,00080,000Arts Center - Theater Curtains 3
260,48552,000 130,000 36,500 20,225 21,760Comm Svcs - Arts Center Total
Comm Svcs - Communications
13 CIP-CM001 15,00015,000Technology Improvement - Council Chambers & Studio n/a
15,00015,000Comm Svcs - Communications Total
Fire
08-CIP-FD019 28,50028,500Fire - Replace Carpet and Apparatus Floor Finish n/a
08-CIP-FD123 45,00045,000Fire Station - Replace Boilers n/a
73,50028,500 45,000Fire Total
Pavilion
07-CIP-PV313 35,00035,000Pavilion Restroom/Lobby Floor Improvement n/a
07-CIP-PV314 65,00065,000Pavilion Overhead Door Improvement n/a
10-CIP-PV317 75,00075,000Pavilion - Skate Tile Replacement n/a
10-CIP-PV318 4,400,0004,400,000Pavilion - Refrigeration Equip & Arena Floor Repl n/a
Thursday, November 30, 2017
Total20182019202020212022DepartmentProject #Priority
13-CIP-PV321 30,00030,000Pavilion Mezzanine Rooftop Unit Replacement 1
13-CIP-PV322 11,00011,000Pavilion HHS Team Room Rooftop Unit Repl 1
13-CIP-PV323 9,5009,500Pavilion Main Level Rooftop Unit Replacement 1
13-CIP-PV324 25,00025,000Pavilion Entry and Lobby Door Replacement 3
13-CIP-PV325 28,00028,000Pavilion - Paint Exterior Building 1
14-CIP-PV010 48,00048,000Pavilion Painting the Arena Ceiling and Bar Joist 1
16-CIP-PV328 9,5009,500Pavilion - Main Level Rooftop Unit Replacement n/a
4,736,0004,676,000 41,000 19,000Pavilion Total
Police
08-CIP-PD016 25,00025,000Replace Carpet - Police Station n/a
18-CIP-PD216 15,00015,000Kitchen Improvements and Office Furniture n/a
40,00015,000 25,000Police Total
Public Works: Bldg/Equip Serv
08-CIP-B021 50,00050,000Public Works - Replace Wash Bay Roof n/a
08-CIP-B023 90,00090,000Public Works - Replace Overhead Doors n/a
09-CIP-B034 50,00050,000Public Works Garage Roof Replacement n/a
18-CIP-B007 25,00025,000PW Exterior Painting n/a
215,000115,000 100,000Public Works: Bldg/Equip Serv Total
Public Works: Parks
05-CIP-P202 20,00020,000Central Park Tennis Courts n/a
08-CIP-P010 100,000100,000Park Valley - Play Equipment n/a
08-CIP-P011 20,00020,000Burnes Park - Resurface Tennis Courts n/a
13-CIP-P044 20,00020,000Oakes Park - Tennis Courts n/a
13-CIP-P050 600,000600,000Pavilion Addion/Warming House n/a
13-CIP-P052 75,00075,000Central Park - Lighting n/a
13-CIP-P055 75,00075,000Elmo Park - 2-5 Play Equipment n/a
13-CIP-P056 30,00030,000Harley Hopkins Park - Warming House n/a
13-CIP-P057 50,00050,000Harley Hopkins Park - Lighting n/a
13-CIP-P058 40,00040,000Hilltop - Picnic Shelter n/a
13-CIP-P059 50,00050,000Interlachen Park - Lighting n/a
13-CIP-P063 80,00080,000Maetzold Field - Pavilion n/a
13-CIP-P066 150,000150,000Shady Oak Beach - Picnic Shelter 3
13-CIP-P068 150,000150,000Valley Park - Picnic Shelter 3
16-CIP-P002 450,000450,000Cottageville Park - Phase III Improvements n/a
17-CIP-P004 100,000100,000Downtown Park Rehab 3
17-CIP-P005 40,00040,000Oakes Park Cricket Pitch n/a
17-CIP-P006 300,000300,000Central Park Pickelball Courts 3
2,350,0001,115,000 690,000 430,000 40,000 75,000Public Works: Parks Total
Public Works: Streets/Traffic
01-CIP-S101 24,495,0003,600,000 5,575,000 6,660,000 6,660,000 2,000,000Residential Street Improvements and Utilities n/a
01-CIP-S104 2,300,0002,300,000County Road 3 n/a
13-CIP-S040 125,00025,000 25,000 25,000 25,000 25,000Pedestrian & Bicycle Access Improvements n/a
15-CIP-S001 15,399,8007,949,900 7,449,900Blake Road Corridor Improvements n/a
16-CIP-S041 1,750,000300,000 325,000 350,000 375,000 400,000Street Overlay Improvements n/a
16-CIP-S042 100,00020,000 20,000 20,000 20,000 20,000Street Sign Management n/a
44,169,80011,894,900 13,394,900 7,055,000 9,380,000 2,445,000Public Works: Streets/Traffic Total
Public Works: Transportation
Thursday, November 30, 2017
Total20182019202020212022DepartmentProject #Priority
01-CIP-S502 1,420,000620,000 800,000Light Rail Transit Stations (3)n/a
1,420,000620,000 800,000Public Works: Transportation Total
Public Works: Utilities
01-CIP-U002 115,00021,000 22,000 23,000 24,000 25,000Storm Drainage System Maintenance - Alley Repairs n/a
08-CIP-U001 160,000160,000Lift Station # 4 n/a
18-CIP-U016 200,00050,000 50,000 50,000 50,000Sewer Lining 2
475,00071,000 232,000 73,000 74,000 25,000Public Works: Utilities Total
Recreation
16-CIP-R003 185,00075,000 35,000 50,000 25,000Shady Oak Beach Improvements 3
185,00075,000 35,000 50,000 25,000Recreation Total
GRAND TOTAL 54,862,78518,902,400 15,937,900 7,852,500 9,559,225 2,610,760
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP
FUNDING SOURCE SUMMARY
2018 thru 2022
TotalSource20182019202020212022
AC - Arts Center Fund 238,72552,000 130,000 36,500 20,225
CI - Capital Improvement Fund 1,126,260383,500 508,000 168,000 45,000 21,760
CT - Cable Franchise Fees 50,00015,000 35,000
GU - Other Governmental Units 15,583,0008,004,600 5,728,100 233,500 1,600,000 16,800
MS - Municipal State Aid Streets 700,000700,000
PA - Pavilion Fund 2,736,0002,676,000 41,000 19,000
PDF- Park Dedication Fund 2,211,2001,140,000 701,500 246,500 40,000 83,200
PI - PIR/General Obligation Bonds 11,940,6002,465,300 3,915,300 2,220,000 2,245,000 1,095,000
RF - Refuse Fund 28,00018,000 10,000
SA - Special Assessment 6,420,000900,000 1,250,000 1,885,000 1,885,000 500,000
SF - Sanitary Sewer Fund 4,063,0001,075,000 1,103,000 810,000 800,000 275,000
SU - Storm Sewer Fund 3,038,000591,000 740,000 733,000 724,000 250,000
WF - Water Fund 6,728,0001,600,000 1,768,000 1,510,000 1,500,000 350,000
18,902,400 15,937,900 7,852,500 9,559,225 2,610,760 54,862,785GRAND TOTAL
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP
PROJECTS BY FUNDING SOURCE
2018 2022thru
TotalSourceProject #Priority 2018 2019 2020 2021 2022
AC - Arts Center Fund
08-CIP-AR006 20,22520,225Arts Center-Replace Office Carpet - Stages Theatre n/a
09-CIP-AR027 52,00052,000Arts Center - Replace Lobby Carpet n/a
09-CIP-AR028 21,50021,500Art Center - Various Rooms and Hallway (Carpet)n/a
14-CIP-AR004 50,00050,000Arts Center - Remodel Administrative Offices 2
16-CIP-AR006 15,00015,000Arts Center - Seal Floors in Restroom & Kitchen 1
17-CIP-AR004 80,00080,000Arts Center - Theater Curtains 3
238,72552,000 130,000 36,500 20,225AC - Arts Center Fund Total
CI - Capital Improvement Fund
08-CIP-AC018 105,000105,000Activity Center - Replace Gymnasium Roof n/a
08-CIP-AC024 80,00080,000Activity Center - Raspberry Room Roof Replacement n/a
08-CIP-AR008 21,76021,760Arts Center Carpet: Redepenning Gallery n/a
08-CIP-B021 10,00010,000Public Works - Replace Wash Bay Roof n/a
08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a
08-CIP-CH010 58,00058,000City Hall - Replace Carpeting n/a
08-CIP-FD019 28,50028,500Fire - Replace Carpet and Apparatus Floor Finish n/a
08-CIP-FD123 45,00045,000Fire Station - Replace Boilers n/a
08-CIP-PD016 25,00025,000Replace Carpet - Police Station n/a
09-CIP-AC031 80,00080,000Activity Center - Lower Roof Replacement n/a
09-CIP-B034 50,00050,000Public Works Garage Roof Replacement n/a
09-CIP-CH029 115,000115,000City Hall Roof Replacement n/a
09-CIP-CH030 225,000225,000City Hall Lobby Upgrade n/a
16-CIP-AC035 75,00075,000Activity Center - Former Historical Society Area 1
17-CIP-AC039 20,00020,000Activity Center - Bathroom Improvements 1
17-CIP-AC041 25,00025,000Activity Center - Raspberry Room Enhancements 4
18-CIP-AC007 75,00075,000Activity Center - Window Upgrade 2
18-CIP-AC043 20,00020,000Activity Center - Outdoor Signage 2
18-CIP-AC044 10,00010,000Activity Center - Entry/Receptionist Enhancement 1
18-CIP-B007 25,00025,000PW Exterior Painting n/a
18-CIP-PD216 15,00015,000Kitchen Improvements and Office Furniture n/a
1,126,260383,500 508,000 168,000 45,000 21,760CI - Capital Improvement Fund Total
CT - Cable Franchise Fees
09-CIP-CH030 35,00035,000City Hall Lobby Upgrade n/a
13 CIP-CM001 15,00015,000Technology Improvement - Council Chambers & Studio n/a
50,00015,000 35,000CT - Cable Franchise Fees Total
GU - Other Governmental Units
01-CIP-S104 1,600,0001,600,000County Road 3 n/a
10-CIP-PV318 2,000,0002,000,000Pavilion - Refrigeration Equip & Arena Floor Repl n/a
Thursday, November 30, 2017
TotalSourceProject #Priority 2018 2019 2020 2021 2022
13-CIP-P066 100,000100,000Shady Oak Beach - Picnic Shelter 3
13-CIP-P068 100,000100,000Valley Park - Picnic Shelter 3
15-CIP-S001 11,659,2005,954,600 5,704,600Blake Road Corridor Improvements n/a
16-CIP-R003 123,80050,000 23,500 33,500 16,800Shady Oak Beach Improvements 3
15,583,0008,004,600 5,728,100 233,500 1,600,000 16,800GU - Other Governmental Units Total
MS - Municipal State Aid Streets
01-CIP-S104 700,000700,000County Road 3 n/a
700,000700,000MS - Municipal State Aid Streets Total
PA - Pavilion Fund
07-CIP-PV313 35,00035,000Pavilion Restroom/Lobby Floor Improvement n/a
07-CIP-PV314 65,00065,000Pavilion Overhead Door Improvement n/a
10-CIP-PV317 75,00075,000Pavilion - Skate Tile Replacement n/a
10-CIP-PV318 2,400,0002,400,000Pavilion - Refrigeration Equip & Arena Floor Repl n/a
13-CIP-PV321 30,00030,000Pavilion Mezzanine Rooftop Unit Replacement 1
13-CIP-PV322 11,00011,000Pavilion HHS Team Room Rooftop Unit Repl 1
13-CIP-PV323 9,5009,500Pavilion Main Level Rooftop Unit Replacement 1
13-CIP-PV324 25,00025,000Pavilion Entry and Lobby Door Replacement 3
13-CIP-PV325 28,00028,000Pavilion - Paint Exterior Building 1
14-CIP-PV010 48,00048,000Pavilion Painting the Arena Ceiling and Bar Joist 1
16-CIP-PV328 9,5009,500Pavilion - Main Level Rooftop Unit Replacement n/a
2,736,0002,676,000 41,000 19,000PA - Pavilion Fund Total
PDF- Park Dedication Fund
05-CIP-P202 20,00020,000Central Park Tennis Courts n/a
08-CIP-P010 100,000100,000Park Valley - Play Equipment n/a
08-CIP-P011 20,00020,000Burnes Park - Resurface Tennis Courts n/a
13-CIP-P044 20,00020,000Oakes Park - Tennis Courts n/a
13-CIP-P050 600,000600,000Pavilion Addion/Warming House n/a
13-CIP-P052 75,00075,000Central Park - Lighting n/a
13-CIP-P055 75,00075,000Elmo Park - 2-5 Play Equipment n/a
13-CIP-P056 30,00030,000Harley Hopkins Park - Warming House n/a
13-CIP-P057 50,00050,000Harley Hopkins Park - Lighting n/a
13-CIP-P058 40,00040,000Hilltop - Picnic Shelter n/a
13-CIP-P059 50,00050,000Interlachen Park - Lighting n/a
13-CIP-P063 80,00080,000Maetzold Field - Pavilion n/a
13-CIP-P066 50,00050,000Shady Oak Beach - Picnic Shelter 3
13-CIP-P068 50,00050,000Valley Park - Picnic Shelter 3
16-CIP-P002 450,000450,000Cottageville Park - Phase III Improvements n/a
16-CIP-R003 61,20025,000 11,500 16,500 8,200Shady Oak Beach Improvements 3
17-CIP-P004 100,000100,000Downtown Park Rehab 3
17-CIP-P005 40,00040,000Oakes Park Cricket Pitch n/a
17-CIP-P006 300,000300,000Central Park Pickelball Courts 3
2,211,2001,140,000 701,500 246,500 40,000 83,200PDF- Park Dedication Fund Total
PI - PIR/General Obligation Bonds
01-CIP-S101 7,375,0001,100,000 1,975,000 1,825,000 1,825,000 650,000Residential Street Improvements and Utilities n/a
01-CIP-S502 800,000800,000Light Rail Transit Stations (3)n/a
Thursday, November 30, 2017
TotalSourceProject #Priority 2018 2019 2020 2021 2022
13-CIP-S040 125,00025,000 25,000 25,000 25,000 25,000Pedestrian & Bicycle Access Improvements n/a
15-CIP-S001 1,790,6001,020,300 770,300Blake Road Corridor Improvements n/a
16-CIP-S041 1,750,000300,000 325,000 350,000 375,000 400,000Street Overlay Improvements n/a
16-CIP-S042 100,00020,000 20,000 20,000 20,000 20,000Street Sign Management n/a
11,940,6002,465,300 3,915,300 2,220,000 2,245,000 1,095,000PI - PIR/General Obligation Bonds Total
RF - Refuse Fund
08-CIP-B021 10,00010,000Public Works - Replace Wash Bay Roof n/a
08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a
28,00018,000 10,000RF - Refuse Fund Total
SA - Special Assessment
01-CIP-S101 6,420,000900,000 1,250,000 1,885,000 1,885,000 500,000Residential Street Improvements and Utilities n/a
6,420,000900,000 1,250,000 1,885,000 1,885,000 500,000SA - Special Assessment Total
SF - Sanitary Sewer Fund
01-CIP-S101 2,775,000500,000 500,000 750,000 750,000 275,000Residential Street Improvements and Utilities n/a
01-CIP-S502 150,000150,000Light Rail Transit Stations (3)n/a
08-CIP-B021 10,00010,000Public Works - Replace Wash Bay Roof n/a
08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a
08-CIP-U001 160,000160,000Lift Station # 4 n/a
15-CIP-S001 750,000375,000 375,000Blake Road Corridor Improvements n/a
18-CIP-U016 200,00050,000 50,000 50,000 50,000Sewer Lining 2
4,063,0001,075,000 1,103,000 810,000 800,000 275,000SF - Sanitary Sewer Fund Total
SU - Storm Sewer Fund
01-CIP-S101 2,575,000350,000 600,000 700,000 700,000 225,000Residential Street Improvements and Utilities n/a
01-CIP-S502 120,000120,000Light Rail Transit Stations (3)n/a
01-CIP-U002 115,00021,000 22,000 23,000 24,000 25,000Storm Drainage System Maintenance - Alley Repairs n/a
08-CIP-B021 10,00010,000Public Works - Replace Wash Bay Roof n/a
08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a
15-CIP-S001 200,000100,000 100,000Blake Road Corridor Improvements n/a
3,038,000591,000 740,000 733,000 724,000 250,000SU - Storm Sewer Fund Total
WF - Water Fund
01-CIP-S101 5,350,000750,000 1,250,000 1,500,000 1,500,000 350,000Residential Street Improvements and Utilities n/a
01-CIP-S502 350,000350,000Light Rail Transit Stations (3)n/a
08-CIP-B021 10,00010,000Public Works - Replace Wash Bay Roof n/a
08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a
15-CIP-S001 1,000,000500,000 500,000Blake Road Corridor Improvements n/a
6,728,0001,600,000 1,768,000 1,510,000 1,500,000 350,000WF - Water Fund Total
54,862,78518,902,400 15,937,900 7,852,500 9,559,225 2,610,760GRAND TOTAL
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact City Manager
2018 2022thru Department City Hall Administration
Description
Replace carpeting
Project #08-CIP-CH010
Priority n/a
Justification
Budget Impact/Other
Useful LifeProject Name City Hall - Replace Carpeting Category Bldgs: Administrative Offices
Type Improvement
Future
Total Project Cost:$58,000
Total20182019202020212022Expenditures
58,00058,000Construction/Maintenance
58,000 58,000Total
Total20182019202020212022Funding Sources
58,00058,000CI - Capital Improvement Fund
58,000 58,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department City Hall Administration
Description
Build up roof on City Hall and Council Chambers
Project #09-CIP-CH029
Priority n/a
Justification
Existing roof was installed in 1994, estimated replacement due in 2019
Budget Impact/Other
Useful Life 25 yearsProject Name City Hall Roof Replacement Category Bldg: City Hall
Type Improvement
Future
Total Project Cost:$115,000
Total20182019202020212022Expenditures
115,000115,000Construction/Maintenance
115,000 115,000Total
Total20182019202020212022Funding Sources
115,000115,000CI - Capital Improvement Fund
115,000 115,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Asst City Manager
2018 2022thru Department City Hall Administration
Description
Upgrade of City Hall Lobby, Entrance and Council Chambers.
Timeline
2017- Architect would complete design and cost estimate. (in-progress)
2018 - Depending on final design, scope and cost estimate construction will either take place in 2018 or 2019. It may also be phased.
City Hall Lobby and Internal Entrance Upgrade
Originally proposed as part of the 2007 City Hall upgrade/Carpet project by Public Works. Project would include updating the entire lobby area
and basic upgrades to match in the front entrance area.
City Hall Exterior Entrance
Facelift for the front of City Hall, removing large concrete structure and upgrading front of building including signage.
Council Chambers Upgrade
Renovation of the Council Chambers including updating wall décor, carpeting, audience chairs, and dias to meet current needs.
Project #09-CIP-CH030
Priority n/a
Justification
At the end of 2015, we eliminated the front desk receptionist positions, saving us over $40,000 annually. However, the front desk was never
updated to meet needs. The current lobby arrangement is both confusing for our customers about where to go for assistance and non-functional for
our staff. Visability and use are difficult due to current configuration. This makes it difficult for us to continue to provide high quality, friendly
customer service.
City Hall has not had an upgrade since 1989. Current facilities are outdated and in need of facelift.
City Hall Lobby
Existing lobby is dated, ceiling tiles have yellowed and wall paper has numerous stains from years of service. Existing reception area does not
functionally meet the demands of the position and requires dual workstations for working.
City Hall Exterior Entrance
Front of the building overhang and entrance is still the original 1960's design and is due for an upgrade to better meet our goals and to set an
example for the community.
Council Chambers Upgrade
Current chamber is dated and due for a facelift. The current dias lacks storage space for necessary items such as microphones, ADA accessibility
items, remotes, keyboards and general staff documents, additionally there is not large enough to seat staff that are currently expected to attend the
meeting.
Useful Life 20 yearsProject Name City Hall Lobby Upgrade Category Bldg: City Hall
Type Improvement
Future
Total Project Cost:$275,000
Total20182019202020212022Expenditures
260,000260,000Construction/Maintenance
260,000 260,000Total
Total20182019202020212022Funding Sources
225,000225,000CI - Capital Improvement Fund
35,00035,000CT - Cable Franchise Fees
260,000 260,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Asst City Manager
2018 2022thru Department City Hall Administration
Budget Impact/Other
Variance from 20-year plan: Move project from 2016 to 2018 and adjust cost from $110,000 to $150,000.
Technology upgrades in the Council Chambers should be included in the same time. One designer for all parts of the project would help ensure a
cohesive design. Upgrading at once would reduce inconvenience period for residents and staff and may have additional cost savings.
2017 - Upgrading at once would reduce inconvenience period for residents and staff and may have additional cost savings. We are working on
getting better estimates in 2017. Depending on the results this project may be pushed back to 2019.
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Comm Svcs - Activity Center
Description
Existing roof was installed in 1989 and is at the end of its projected useful life. Portion is cost share with Raspberry Ridge Condo Assn.
Project #08-CIP-AC018
Priority n/a
Justification
Roof was installed in 1989 and is at the end of its 25 year useful life.
Budget Impact/Other
Roof in good condition - move project from 2014 to 2016 and re-evaluate in 2 years. Moved again from 2016 to 2018 and all roof components
will be done with one contract for better bids.
Useful Life 25 yearsProject Name Activity Center - Replace Gymnasium Roof Category Buildings: Activity Center
Type Improvement
Future
Total Project Cost:$105,000
Total20182019202020212022Expenditures
105,000105,000Construction/Maintenance
105,000 105,000Total
Total20182019202020212022Funding Sources
105,000105,000CI - Capital Improvement Fund
105,000 105,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact PW Director
2018 2022thru Department Comm Svcs - Activity Center
Description
Built up asphalt roofing system covering Raspberry Rooms, Craft Room and Hallways at the Activity Center
Project #08-CIP-AC024
Priority n/a
Justification
Existing roof was replaced in 1992, Expected life is 25 years.
Budget Impact/Other
Inspection, repair and upkeep of roofing systems prevent deterioration of interior building structure and damage to interior components of building.
Variance from 20 year plan: Moved from 2016 to 2018 and all roof components will be done with one contract for better bids.
Useful LifeProject Name Activity Center - Raspberry Room Roof Replacement Category Buildings: Activity Center
Type Improvement
Future
Total Project Cost:$80,000
Total20182019202020212022Expenditures
80,00080,000Construction/Maintenance
80,000 80,000Total
Total20182019202020212022Funding Sources
80,00080,000CI - Capital Improvement Fund
80,000 80,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact PW Director
2018 2022thru Department Comm Svcs - Activity Center
Description
Built up Roof on Activity Center Raspberry Rooms and Hallway.
Project #09-CIP-AC031
Priority n/a
Justification
Existing roof was installed in 1992, estimated replacement due in 2017.
Budget Impact/Other
Variance from 20 year plan: Moved from 2017 to 2018 and all roof components will be done with one contract for better bids.
Useful Life 25 yearsProject Name Activity Center - Lower Roof Replacement Category Buildings: Activity Center
Type Improvement
Future
Total Project Cost:$80,000
Total20182019202020212022Expenditures
80,00080,000Construction/Maintenance
80,000 80,000Total
Total20182019202020212022Funding Sources
80,00080,000CI - Capital Improvement Fund
80,000 80,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Activity Ctr Director
2018 2022thru Department Comm Svcs - Activity Center
Description
Improve the looks and function of the former Historical Society area. Reconfigure walls, storage, sinks and cabinets, tables, chairs, audio visual,
lighting, floor covering, wall covering, etc.
Project #16-CIP-AC035
Priority 1 Urgent
Justification
Once the Historical Society moves to its new home on Mainstreet the Hopkins Activity Center will expand its program offers into this additional
space. Room improvements will be made including lighting, sound system, acoustics, media, office and room configurations, wall and floor
covering.
Budget Impact/Other
Variance from 20 year plan - New item
2017 - Increased budget from $50,000to $75,000
Useful LifeProject Name Activity Center - Former Historical Society Area Category Buildings: Activity Center
Type Improvement
Future
Total Project Cost:$75,000
Total20182019202020212022Expenditures
75,00075,000Construction/Maintenance
75,000 75,000Total
Total20182019202020212022Funding Sources
75,00075,000CI - Capital Improvement Fund
75,000 75,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Activity Ctr Director
2018 2022thru Department Comm Svcs - Activity Center
Description
Improve both the men's and women's bathrooms with new wallcoverings, flooring, ceiling tiles, lighting, vanities, stall enclosures, dispensers,
toilets.
Project #17-CIP-AC039
Priority 1 Urgent
Justification
The bathrooms have not had any improvements since the 1990 building improving project except for touch up painting of the walls and stall walls.
The stall walls are scratched and chipped. The ceiling tiles are not within code. The dispensers need to be replaced due to their sharp edges.
Toilets could be taller to accommodate the primary population we serve here.
Budget Impact/Other
Useful Life 20 yearsProject Name Activity Center - Bathroom Improvements Category Buildings: Activity Center
Type Improvement
Future
Total Project Cost:$20,000
Total20182019202020212022Expenditures
20,00020,000Construction/Maintenance
20,000 20,000Total
Total20182019202020212022Funding Sources
20,00020,000CI - Capital Improvement Fund
20,000 20,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Activity Ctr Director
2018 2022thru Department Comm Svcs - Activity Center
Description
Reconfigure this room to be used as an room for our numerous dance activities, as well as yoga, Tia Chi, Qigong, meeting space, etc. We would be
making a wall in this room which will make a hallway and therefore have a legal exit for gym participants in case of an emergency.
Project #17-CIP-AC041
Priority 4 Less Important
Justification
Right now anyone exiting the east side of the gym is exiting into a classroom and not a hallway. Therefore the number of people we can
accommodate in the Multi-purpose/Gym is lower because we do not have the proper exits to accommodate bigger numbers of people using the
gym. Making these changes will reconfigure the room to accommodate existing and new programing.
Budget Impact/Other
Useful LifeProject Name Activity Center - Raspberry Room Enhancements Category Buildings: Activity Center
Type Improvement
Future
Total Project Cost:$25,000
Total20182019202020212022Expenditures
25,00025,000Construction/Maintenance
25,000 25,000Total
Total20182019202020212022Funding Sources
25,00025,000CI - Capital Improvement Fund
25,000 25,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact PW Director
2018 2022thru Department Comm Svcs - Activity Center
Description
Replace all lower windows and frame work on east and the west sides, along with north windows for the office and historical society area. Replace
all out door window trim-the trim is faded and outdated.
Project #18-CIP-AC007
Priority 2 Very Important
Justification
The windows are drafty and have not been replaced for 30+ years.
The new windows would be much more energy efficient.
Budget Impact/Other
Useful Life 30 yearsProject Name Activity Center - Window Upgrade Category Buildings: Activity Center
Type Unassigned
Future
Total Project Cost:$75,000
Total20182019202020212022Expenditures
75,00075,000Construction/Maintenance
75,000 75,000Total
Total20182019202020212022Funding Sources
75,00075,000CI - Capital Improvement Fund
75,000 75,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Asst City Manager
2018 2022thru Department Comm Svcs - Activity Center
Description
Upgrade of the current sign at the corner of 1st St N. and 14th Ave N. to a single sided LED display sign.
Project #18-CIP-AC043
Priority 2 Very Important
Justification
City facilities are upgrading their outside signage to LED display signs. The sign draws people to the facility and the activities that occur within the
facility or the community. As we continue to find ways to market the Hopkins Activity Center this would be a very helpful visual tool to market the
Activity Center's existence as well as advertising the activities that happen within the Activity Center's mission.
Budget Impact/Other
2018 - New Item
Useful Life 20 yearsProject Name Activity Center - Outdoor Signage Category Buildings: Arts Center
Type Improvement
Future
Total Project Cost:$20,000
Total20182019202020212022Expenditures
20,00020,000Construction/Maintenance
20,000 20,000Total
Total20182019202020212022Funding Sources
20,00020,000CI - Capital Improvement Fund
20,000 20,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Asst City Manager
2018 2022thru Department Comm Svcs - Activity Center
Description
Remove the service counter in the office to the hallway and build a slightly curved receptionist area just a bit into the hallway so that when people
enter the facility the see our receptionist right away.
Project #18-CIP-AC044
Priority 1 Urgent
Justification
Our goal here is the make people feel welcome and served well. Having our receptionist visable as people enter the building would help
accomplish this. It will also relieve some of the congestion in the office. It will also help keep the building more secure with someone more visable
at the entryway.
Budget Impact/Other
2018 - New Item
Useful Life 20 yearsProject Name Activity Center - Entry/Receptionist Enhancement Category Buildings: Activity Center
Type Improvement
Future
Total Project Cost:$10,000
Total20182019202020212022Expenditures
10,00010,000Construction/Maintenance
10,000 10,000Total
Total20182019202020212022Funding Sources
10,00010,000CI - Capital Improvement Fund
10,000 10,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Arts Center Director
2018 2022thru Department Comm Svcs - Arts Center
Description
Remove and replace carpet and carpet base in Stages Theatre offices, ticket office and Facility Manager's office, and coat room and Arts Director
office.
260 sq. yards x $48/yard = $12,480
Project #08-CIP-AR006
Priority n/a
Justification
Carpet is 13 years old as of 2010. Carpet will have exceeded its useful life. Carpet has separated from backing which has caused it to wrinkle and
it can no longer be cleaned in these areas.
Added Arts Director office (Susan's) guests do come in. It is visible to public - same vintage as facility office.
Budget Impact/Other
Note: Repeat project in 2021 at $20,225
Useful Life 10 yearsProject Name Arts Center-Replace Office Carpet - Stages Theatre Category Buildings: Arts Center
Type Improvement
Future
Total Project Cost:$37,225
Total20182019202020212022Expenditures
20,22520,225Construction/Maintenance
20,225 20,225Total
Total20182019202020212022Funding Sources
20,22520,225AC - Arts Center Fund
20,225 20,225Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Arts Center Director
2018 2022thru Department Comm Svcs - Arts Center
Description
Remove and replace carpet and carpet base in Redepenning Gallery.
Gallery flooring to be replaced with wood or wood laminate.
JC Studio dressing room to be done with other dressing room in 2013. Coat room in 2012 with Stages office.
ESTIMATED PROJECT SCHEDULE: Future - Repeat project in 2022.
Project #08-CIP-AR008
Priority n/a
Justification
Carpet is 13 years old as of 2009. Carpet will have exceeded its useful life.
Budget Impact/Other
Change from $8,700 to $9,800 to reflect change in product from carpet to wood or wood laminate for the art gallery. Wood flooring to be done
2011, coat room carpet to be done in 2012 with Stages office (was listed twice). Changed future cost to reflect wood floor pricing.
Useful Life 10 yearsProject Name Arts Center Carpet: Redepenning Gallery Category Buildings: Arts Center
Type Improvement
Future
Total Project Cost:$37,760
Total20182019202020212022Expenditures
21,76021,760Construction/Maintenance
21,760 21,760Total
Total20182019202020212022Funding Sources
21,76021,760CI - Capital Improvement Fund
21,760 21,760Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Arts Center Director
2018 2022thru Department Comm Svcs - Arts Center
Description
Replace the lobby carpet including staircases, second floor, elevator floor, coat room and dance studio dressing room.
ESTIMATED PROJECT SHCEDULE: Future 2018
Project #09-CIP-AR027
Priority n/a
Justification
The Lobby carpet will be at the end of it's useful life in a high traffic area like the lobby.
Budget Impact/Other
Useful Life 10 yearsProject Name Arts Center - Replace Lobby Carpet Category Buildings: Arts Center
Type Improvement
Future
Total Project Cost:$52,000
Total20182019202020212022Expenditures
52,00052,000Construction/Maintenance
52,000 52,000Total
Total20182019202020212022Funding Sources
52,00052,000AC - Arts Center Fund
52,000 52,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Arts Center Director
2018 2022thru Department Comm Svcs - Arts Center
Description
Remove and replace carpet and carpet base in the Community Room, Green Room, West Main Floor Hallway, Conference Room and Dance
Studio Dressing Rooms of the Art Center.
330 Sq. Yards x $48/yard = $15,840.
ESTIMATED PROJECT SCHEDULE: Future - Repeat project in 2020 @ $21,500
Project #09-CIP-AR028
Priority n/a
Justification
Most of this project was approved for 2008, but scheduling constraints pushed the project to 2009.
The carpet to be replaced is the original carpet - 13 years old -= and there are "runs" down to the carpet backing in the Community Room, Green
Room and Hallway.
The Community Room carpet loos especially poor, which as a result reflect poorly on the room when shown to perspective customers.
Budget Impact/Other
Useful LifeProject Name Art Center - Various Rooms and Hallway (Carpet)Category Buildings: Arts Center
Type Improvement
Future
Total Project Cost:$37,500
Total20182019202020212022Expenditures
21,50021,500Construction/Maintenance
21,500 21,500Total
Total20182019202020212022Funding Sources
21,50021,500AC - Arts Center Fund
21,500 21,500Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Arts Center Co-Director
2018 2022thru Department Comm Svcs - Arts Center
Description
Remodel administrative offices on second floor, moving the conference room to room 206 and combing room 204 and 205 into one office area.
Adding one work station.
Project #14-CIP-AR004
Priority 2 Very Important
Justification
While this does not significantly increase office square footage, it does create a more flexible space that will accommodate the addition on one
more work station. This in in anticipation for the need for an additional office worker, whether paid or volunteer, within two years.
Budget Impact/Other
Variance in 20 year plan - move project from 2018 to 2019.
Useful LifeProject Name Arts Center - Remodel Administrative Offices Category Buildings: Arts Center
Type Improvement
Future
Total Project Cost:$50,000
Total20182019202020212022Expenditures
50,00050,000Construction/Maintenance
50,000 50,000Total
Total20182019202020212022Funding Sources
50,00050,000AC - Arts Center Fund
50,000 50,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Arts Center Co-Director
2018 2022thru Department Comm Svcs - Arts Center
Description
Sani Glaze restrooms off lobby and in Green Room (floors and walls). Sani Glaze floor in the catering kitchen.
Maintenance of floors each year
Project #16-CIP-AR006
Priority 1 Urgent
Justification
Process makes it easier to keep these areas clean and attractive.
Budget Impact/Other
Originallin in 2012 CIP and then cancelled. Re-worked for 2016.
Completed 2016
Useful LifeProject Name Arts Center - Seal Floors in Restroom & Kitchen Category Buildings: Arts Center
Type Improvement
Future
Total Project Cost:$25,000
Total20182019202020212022Expenditures
15,00015,000Construction/Maintenance
15,000 15,000Total
Total20182019202020212022Funding Sources
15,00015,000AC - Arts Center Fund
15,000 15,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Arts Center Director
2018 2022thru Department Comm Svcs - Arts Center
Description
Replace main Theater front curtains
Project #17-CIP-AR004
Priority 3 Important
Justification
Due to age of curtains, estimating they will need to be reaplced in 2019
Budget Impact/Other
Useful Life 15 yearsProject Name Arts Center - Theater Curtains Category Buildings: Arts Center
Type Improvement
Future
Total Project Cost:$80,000
Total20182019202020212022Expenditures
80,00080,000Construction/Maintenance
80,000 80,000Total
Total20182019202020212022Funding Sources
80,00080,000AC - Arts Center Fund
80,000 80,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Asst City Manager
2018 2022thru Department Comm Svcs - Communication
Description
2014 - Installation of surge protection and uninterruptible power supplies in the studio.
2015 - Upgrade equipment in the Council Chamber presentation table
2016 - Replace current document camera with high resolution camera.
2017 - Projection system
2018 - Sound system
2019 - Council chamber cameras
Project #13 CIP-CM001
Priority n/a
Justification
2014 - current and future technology improvements are processor based and are sensitive to power fluctuations
2015 - The current presentation switching configuration requires the control room operator to determine what is presented to the room.
Presenters do not have much control over their presentations and outside presenters need to use the City computer system.
The new equipment will allow the presenter to use their own equipment which will simplify the process while protecting the City's
computer network.
2016 - The existing camera is standard definition. The new camera will be high resolution
2017 - Current projectors are 10 years old and low resolution.
2018 - Current ceiling speakers are old and need to be replaced. Lobby speakers have no volume control.
2019 - Current cameras will be 15 years old by 2019 and are standard definition. Replace with high definition cameras.
Budget Impact/Other
Useful Life 10 yearsProject Name Technology Improvement - Council Chambers & Studio Category Bldg: City Hall
Type Improvement
Future
Total Project Cost:$95,000
Total20182019202020212022Expenditures
15,00015,000Communications
15,000 15,000Total
Total20182019202020212022Funding Sources
15,00015,000CT - Cable Franchise Fees
15,000 15,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Fire Chief
2018 2022thru Department Fire
Description
Replace carpet and apparatus floor finish systems.
Carpet to be done in 2016 at an estimated cost of $28,000
Flooring to be done in 2018 at an estimated cost of $28,000
Project #08-CIP-FD019
Priority n/a
Justification
Planned replacement at end of estimated 10 year useful life. Classroom and 2nd and 3rd Floor entryway and lounge replacement, due to excessive
use of classroom and lounge.
FD spoke with Steve Stadler and he was ok with moving it up to 10 years from 15 years.
Budget Impact/Other
Original plan replacement was 15 years. Due to excessive use of classroom and lounge the life was moved to 10 years.
Variance from 20 year plan: move floor portion of the project from 2016 to 2018.
Useful Life 10 yearsProject Name Fire - Replace Carpet and Apparatus Floor Finish Category Buildings: Fire Facilities
Type Improvement
Future
Total Project Cost:$56,500
Total20182019202020212022Expenditures
28,50028,500Construction/Maintenance
28,500 28,500Total
Total20182019202020212022Funding Sources
28,50028,500CI - Capital Improvement Fund
28,500 28,500Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Fire Chief
2018 2022thru Department Fire
Description
Replace boilers
Project #08-CIP-FD123
Priority n/a
Justification
Budget Impact/Other
Useful LifeProject Name Fire Station - Replace Boilers Category Buildings: Fire Facilities
Type Improvement
Future
Total Project Cost:$45,000
Total20182019202020212022Expenditures
45,00045,000Construction/Maintenance
45,000 45,000Total
Total20182019202020212022Funding Sources
45,00045,000CI - Capital Improvement Fund
45,000 45,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Pavilion Manager
2018 2022thru Department Pavilion
Description
Remove current epoxy floor coating from the restroom floors and install ceramic floor tile in restrooms, lobby and entry to the Pavilion
Project #07-CIP-PV313
Priority n/a
Justification
The current restroom coating is worn and chipping out, ceramic tile would improve aesthetics and provide a more sanitary surface.
Budget Impact/Other
Variance from 20 year plan - this project originally rescheduled for 2017 has moved back to 2018 and costs decreased from $45,000 to $35,000
Useful Life 15 yearsProject Name Pavilion Restroom/Lobby Floor Improvement Category Bldgs: Pavillion
Type Improvement
Future
Total Project Cost:$87,000
Total20182019202020212022Expenditures
35,00035,000Construction/Maintenance
35,000 35,000Total
Total20182019202020212022Funding Sources
35,00035,000PA - Pavilion Fund
35,000 35,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Pavilion Manager
2018 2022thru Department Pavilion
Description
Remove and block in four of the six overhead doors on the west side of the Pavilion's arena with a portion to windows or glass block to allow for
natural light in
the arena. Install automatic openers on the remaining four overhead doors in the arena.
Project #07-CIP-PV314
Priority n/a
Justification
Currently the overhead doors are seldom utilized and the removal and installation of glass block or windows will decrease the need for arena
lighting and add to
the arena aesthetics.
Saving repairs and maintenance of the removed doors. Pavilion user groups have asked for this project.
Budget Impact/Other
Variance from 20 year plan - project costs increased from $40,000 to $65,000 and moved from 2016 to 2018.
Potential savings on utilities and greater satisfaction from user groups with arena aesthetics.
Useful Life 30 yearsProject Name Pavilion Overhead Door Improvement Category Bldgs: Pavillion
Type Improvement
Future
Total Project Cost:$65,000
Total20182019202020212022Expenditures
65,00065,000Construction/Maintenance
65,000 65,000Total
Total20182019202020212022Funding Sources
65,00065,000PA - Pavilion Fund
65,000 65,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Pavilion Manager
2018 2022thru Department Pavilion
Description
Replace the Pavilions 5,000 Square Feet of Skate Tile.
Project #10-CIP-PV317
Priority n/a
Justification
The skate tile is on a 15 year replacement cycle, the tile was last replaced in 2005. Given the volume of traffic and the wear shown since installation
replacement is recommended by 2020. Also if dasher board system is replaced potential cutting and patching may occur adding expense to that
project. If skate replacement is schedule to coincide with dasher board replacement it has savings potential for both projects.
Budget Impact/Other
Variance from 20 year plan - project moved up from 2020 to 2018. Cost remains the same.
Useful Life 15Project Name Pavilion - Skate Tile Replacement Category Bldgs: Pavillion
Type Improvement
Future
Total Project Cost:$75,000
Total20182019202020212022Expenditures
75,00075,000Construction/Maintenance
75,000 75,000Total
Total20182019202020212022Funding Sources
75,00075,000PA - Pavilion Fund
75,000 75,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Pavilion Manager
2018 2022thru Department Pavilion
Description
Replace the current R22 direct refrigeration system with a new indirect system using a environmental friendly refrigerant at a estimated cost of
$1,575,000 .
Remove existing concrete arena floor and refrigeration piping and replace new piping and concrete at a estimated cost of $500,000.
Remove the existing arena dasher boards and replace with a new board system at a estimated cost of $175,000.
Project #10-CIP-PV318
Priority n/a
Justification
The existing refrigeration system, arena floor, and dasher boards were installed when the building was built in 1990. Due to a federal mandate R22
refrigerate will not be manufactured after 2020, all new refrigeration equipment must use a ozone-friendly refrigerant. Manaufactureers have started
to cease production of some of the replacement parts for our current R22 system making parts expensive and difficult to find. Due to the age of the
arena floors piping it will start to develop leaks leading to costly repairs and may not readily accommodate a new type of refrigerant. The dasher
boards would need to be removed to allow for the arena floor replacement. Reinstallation of the current boards would be more difficult due to the
damage to the anchors that would occur during removal. The boards show signs of wear and bending from years of use and are in need of
replacement.
Budget Impact/Other
Variance from 20 year plan - cost increased from $1,225,000 to $2,400,000 and project moved from 2020 to 2018.
Possible resale of the existing dasher boards may offset some of the cost of a new dasher system.
Useful Life 15 yearsProject Name Pavilion - Refrigeration Equip & Arena Floor Repl Category Bldgs: Pavillion
Type Improvement
Future
Total Project Cost:$4,400,000
Total20182019202020212022Expenditures
4,400,0004,400,000Construction/Maintenance
4,400,000 4,400,000Total
Total20182019202020212022Funding Sources
2,000,0002,000,000GU - Other Governmental
Units
2,400,0002,400,000PA - Pavilion Fund
4,400,000 4,400,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Pavilion Manager
2018 2022thru Department Pavilion
Description
Purchase and installation of (3) rooftop HVAC units that supply heating and cooling to the Pavilions Mezzanine
Project #13-CIP-PV321
Priority 1 Urgent
Justification
The current units were installed in 2003 and are at the end of their useful life.
Budget Impact/Other
Variance from 20 year plan - move project from 2018 to 2018 and increase cost from $24,500 to $30,000
Useful Life 15 yearsProject Name Pavilion Mezzanine Rooftop Unit Replacement Category Bldgs: Pavillion
Type Improvement
Future
Total Project Cost:$30,000
Total20182019202020212022Expenditures
30,00030,000Construction/Maintenance
30,000 30,000Total
Total20182019202020212022Funding Sources
30,00030,000PA - Pavilion Fund
30,000 30,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Pavilion Manager
2018 2022thru Department Pavilion
Description
Purchase and installation of (1) rooftop HVAC unit that supply's heating and cooling to the High School Hockey Team Rooms.
Project #13-CIP-PV322
Priority 1 Urgent
Justification
The current unit was installed in 2004 and is at the end of its useful life.
Budget Impact/Other
Varfiance from 20 year plan - increase cost from $9,500 to $11,000
Useful Life 15 yearsProject Name Pavilion HHS Team Room Rooftop Unit Repl Category Bldgs: Pavillion
Type Improvement
Future
Total Project Cost:$11,000
Total20182019202020212022Expenditures
11,00011,000Construction/Maintenance
11,000 11,000Total
Total20182019202020212022Funding Sources
11,00011,000PA - Pavilion Fund
11,000 11,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Pavilion Manager
2018 2022thru Department Pavilion
Description
Purchase and installation of (1) rooftop HVAC unit that supply's heating and cooling to the Pavilions Main Level (Office, Bathrooms, Warming
Room and Concessions).
Project #13-CIP-PV323
Priority 1 Urgent
Justification
The current unit was installed in 2007 and is at the end of its useful life.
Budget Impact/Other
Useful Life 15 yearsProject Name Pavilion Main Level Rooftop Unit Replacement Category Bldgs: Pavillion
Type Improvement
Future
Total Project Cost:$9,500
Total20182019202020212022Expenditures
9,5009,500Construction/Maintenance
9,500 9,500Total
Total20182019202020212022Funding Sources
9,5009,500PA - Pavilion Fund
9,500 9,500Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Pavilion Manager
2018 2022thru Department Pavilion
Description
Purchase and install (10) doors, closers, and push bars to replace the current doors at the entrance to the Pavilion.
Project #13-CIP-PV324
Priority 3 Important
Justification
The current doors were installed when the facility was built in 1990 and have exceeded their useful life.
Budget Impact/Other
Variance from 20 year plan - cost increased from $7,000 to $25,000
Useful Life 25 yearsProject Name Pavilion Entry and Lobby Door Replacement Category Bldgs: Pavillion
Type Improvement
Future
Total Project Cost:$25,000
Total20182019202020212022Expenditures
25,00025,000Construction/Maintenance
25,000 25,000Total
Total20182019202020212022Funding Sources
25,00025,000PA - Pavilion Fund
25,000 25,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Pavilion Manager
2018 2022thru Department Pavilion
Description
Hire a painting contractor to pain the Pavilions exterior.
Project #13-CIP-PV325
Priority 1 Urgent
Justification
The exterior block of the facility has not been painted since the facility was built and the current paint is faded and chipped in areas.
Budget Impact/Other
Variance from 20 year plan - costs increased from $22,000 to $28,000
Useful Life 25 yearsProject Name Pavilion - Paint Exterior Building Category Bldgs: Pavillion
Type Improvement
Future
Total Project Cost:$28,000
Total20182019202020212022Expenditures
28,00028,000Construction/Maintenance
28,000 28,000Total
Total20182019202020212022Funding Sources
28,00028,000PA - Pavilion Fund
28,000 28,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Pavilion Manager
2018 2022thru Department Pavilion
Description
Hire a painting contractor to clean, prep, and paint the roof deck, bar joist, and arena walls.
Project #14-CIP-PV010
Priority 1 Urgent
Justification
The current coating was painted when the facility was built and is in need of recoating to protect roof deck and bar joist from rust.
Budget Impact/Other
Variance from 20 year plan - costs were increased from $40,000 to $48,000
Useful Life 25 yearsProject Name Pavilion Painting the Arena Ceiling and Bar Joist Category Bldgs: Pavillion
Type Improvement
Future
Total Project Cost:$48,000
Total20182019202020212022Expenditures
48,00048,000Construction/Maintenance
48,000 48,000Total
Total20182019202020212022Funding Sources
48,00048,000PA - Pavilion Fund
48,000 48,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Pavilion Manager
2018 2022thru Department Pavilion
Description
Purchase and installation of (1) rooftop HVAC unit that supply's heating and cooling to the Pavilions Main Level (Office, Bathrooms, Warming
Room, Lobby, and Concessions).
Project #16-CIP-PV328
Priority n/a
Justification
The current unit was installed in 2007 and is at the end of its useful life.
Budget Impact/Other
Variance from 20 year plan - New item
Useful Life 15 yearsProject Name Pavilion - Main Level Rooftop Unit Replacement Category Bldgs: Pavillion
Type Improvement
Future
Total Project Cost:$9,500
Total20182019202020212022Expenditures
9,5009,500Construction/Maintenance
9,500 9,500Total
Total20182019202020212022Funding Sources
9,5009,500PA - Pavilion Fund
9,500 9,500Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Police Chief
2018 2022thru Department Police
Description
Replace Police Station Carpeting
Project #08-CIP-PD016
Priority n/a
Justification
Planned replacement at end of estimated 10 year useful life. This is a 24hour/day work center that requires the shorter carpet replacement cycle.
Carpet replacement not needed as much as kitchen/office furniture. Moved out to 2020 rather than 2018.
Budget Impact/Other
Carpet replacement was scheduled at $40,000 for 2018. Moved to 2020 and lowered amount to $25,000.00
Useful Life 10 yearsProject Name Replace Carpet - Police Station Category Buildings: Police Department
Type Improvement
Future
Total Project Cost:$25,000
Total20182019202020212022Expenditures
25,00025,000Construction/Maintenance
25,000 25,000Total
Total20182019202020212022Funding Sources
25,00025,000CI - Capital Improvement Fund
25,000 25,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Police Chief
2018 2022thru Department Police
Description
Replace kitchen chairs and tables. Replace kitchen countertop. Replace needed office furniture within police department.
Project #18-CIP-PD216
Priority n/a
Justification
24 hour day work center. Kitchen and office furniture is in need of replacement and/or repair.
Budget Impact/Other
Lowered planned carpet replacemenet from 18-CIP-PD215 by $15,000 to cover expense. Pushed out carpet replacement to 2020.
Useful Life 10 yearsProject Name Kitchen Improvements and Office Furniture Category Buildings: Police Department
Type Improvement
Future
Total Project Cost:$15,000
Total20182019202020212022Expenditures
15,00015,000Equipment
15,000 15,000Total
Total20182019202020212022Funding Sources
15,00015,000CI - Capital Improvement Fund
15,000 15,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Facilities Director
2018 2022thru Department Public Works: Bldg/Equip Ser
Description
Replace Wash Bay Roof
Project #08-CIP-B021
Priority n/a
Justification
Budget Impact/Other
Useful LifeProject Name Public Works - Replace Wash Bay Roof Category Buildings: Public Works
Type Improvement
Future
Total Project Cost:$50,000
Total20182019202020212022Expenditures
50,00050,000Construction/Maintenance
50,000 50,000Total
Total20182019202020212022Funding Sources
10,00010,000CI - Capital Improvement Fund
10,00010,000RF - Refuse Fund
10,00010,000SF - Sanitary Sewer Fund
10,00010,000SU - Storm Sewer Fund
10,00010,000WF - Water Fund
50,000 50,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Facilities Director
2018 2022thru Department Public Works: Bldg/Equip Ser
Description
Replace overhead doors
Project #08-CIP-B023
Priority n/a
Justification
Budget Impact/Other
Useful LifeProject Name Public Works - Replace Overhead Doors Category Buildings: Public Works
Type Improvement
Future
Total Project Cost:$90,000
Total20182019202020212022Expenditures
90,00090,000Construction/Maintenance
90,000 90,000Total
Total20182019202020212022Funding Sources
18,00018,000CI - Capital Improvement Fund
18,00018,000RF - Refuse Fund
18,00018,000SF - Sanitary Sewer Fund
18,00018,000SU - Storm Sewer Fund
18,00018,000WF - Water Fund
90,000 90,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Facilities Director
2018 2022thru Department Public Works: Bldg/Equip Ser
Description
Built up roof on Wash Bay and Eastern third of Maintenance Shop.
Project #09-CIP-B034
Priority n/a
Justification
Existing roof was installed in 1995, estimated replacement due in 2020.
Budget Impact/Other
Useful Life 25 yearsProject Name Public Works Garage Roof Replacement Category Buildings: Public Works
Type Improvement
Future
Total Project Cost:$50,000
Total20182019202020212022Expenditures
50,00050,000Construction/Maintenance
50,000 50,000Total
Total20182019202020212022Funding Sources
50,00050,000CI - Capital Improvement Fund
50,000 50,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact PW Director
2018 2022thru Department Public Works: Bldg/Equip Ser
Description
Painting of all the exterior walls on the Excelsior side and of the office area on the west side of the building
Project #18-CIP-B007
Priority n/a
Justification
This area has not been painted in 20+ years, this is all of the original building. The Excelsior side is very faded, chipped and peeling.
Budget Impact/Other
Useful LifeProject Name PW Exterior Painting Category Unassigned
Type Unassigned
Future
Total Project Cost:$25,000
Total20182019202020212022Expenditures
25,00025,000Construction/Maintenance
25,000 25,000Total
Total20182019202020212022Funding Sources
25,00025,000CI - Capital Improvement Fund
25,000 25,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Parks
Description
Remove and replace blacktop tennis court surfaces at Central Park.
Recoat and restripe for tennis.
Repairs are next scheduled for 2019 and again in 2026
Total reconstruction due in 2033 - 4 courts
Project #05-CIP-P202
Priority n/a
Justification
New courts paved in 2008. Periodic court surface rehab is needed to ensure a quality play surface. Play surface was last repaired in 2012.
Budget Impact/Other
Useful Life 20 yearsProject Name Central Park Tennis Courts Category Parks/Fores/Pav.: Neighborhoo
Type Improvement
Future
Total Project Cost:$595,000
Total20182019202020212022Expenditures
20,00020,000Construction/Maintenance
20,000 20,000Total
Total20182019202020212022Funding Sources
20,00020,000PDF- Park Dedication Fund
20,000 20,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact PW Director
2018 2022thru Department Public Works: Parks
Description
Replace park play equipment
Project #08-CIP-P010
Priority n/a
Justification
Park Valley play equipment was installed in 1990.
Upgrade of park play equipment after 20 - 25 years of use.
Budget Impact/Other
Moved from 2014 to 2018 and increased cost from $45,000 to $60,000.
Useful LifeProject Name Park Valley - Play Equipment Category Parks/Fores/Pav.: Comm. Facil.
Type Improvement
Future
Total Project Cost:$100,000
Total20182019202020212022Expenditures
100,000100,000Construction/Maintenance
100,000 100,000Total
Total20182019202020212022Funding Sources
100,000100,000PDF- Park Dedication Fund
100,000 100,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Facilities Director
2018 2022thru Department Public Works: Parks
Description
Crack seal and apply new surface color coat to Burnes Park tennis courts.
Periodic repairs needed to ensure quality safe playing surface.
Project #08-CIP-P011
Priority n/a
Justification
Work needed to restore asphalt surface condition and extend life of tennis courts.
Budget Impact/Other
Work last done in 2009 - periodically needs repairs.
Useful LifeProject Name Burnes Park - Resurface Tennis Courts Category Parks/Fores/Pav.: Comm. Facil.
Type Improvement
Future
Total Project Cost:$30,000
Total20182019202020212022Expenditures
20,00020,000Construction/Maintenance
20,000 20,000Total
Total20182019202020212022Funding Sources
20,00020,000PDF- Park Dedication Fund
20,000 20,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Parks
Description
Repair tennis courts - $20,000
2025 - Tennis Courts Reconstruct = $180,000 (2 courts)
Project #13-CIP-P044
Priority n/a
Justification
Periodic repairs needed to ensure quality safe playing surface
Budget Impact/Other
Added to CIP in 2013
Moved up $180,000 portion of the project from 2025 to 2023.
Useful LifeProject Name Oakes Park - Tennis Courts Category Parks/Fores/Pav.: Comm. Facil.
Type Improvement
Future
Total Project Cost:$200,000
Total20182019202020212022Expenditures
20,00020,000Construction/Maintenance
20,000 20,000Total
Total20182019202020212022Funding Sources
20,00020,000PDF- Park Dedication Fund
20,000 20,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Parks
Description
Pavilion addition and warming house
Site work
Project #13-CIP-P050
Priority n/a
Justification
Replace existing 60 year old warming house
Budget Impact/Other
Useful LifeProject Name Pavilion Addion/Warming House Category Parks/Fores/Pav.: Comm. Facil.
Type Improvement
Future
Total Project Cost:$600,000
Total20182019202020212022Expenditures
600,000600,000Construction/Maintenance
600,000 600,000Total
Total20182019202020212022Funding Sources
600,000600,000PDF- Park Dedication Fund
600,000 600,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact
2018 2022thru Department Public Works: Parks
Description
Upgrade lighting
Project #13-CIP-P052
Priority n/a
Justification
New energy efficent athletic field sport lighting is needed.
Budget Impact/Other
2018 - Increase estimated expense from $50,000 to $75,000.
Useful LifeProject Name Central Park - Lighting Category Unassigned
Type Improvement
Future
Total Project Cost:$75,000
Total20182019202020212022Expenditures
75,00075,000Construction/Maintenance
75,000 75,000Total
Total20182019202020212022Funding Sources
75,00075,000PDF- Park Dedication Fund
75,000 75,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Parks
Description
Play equipment
Project #13-CIP-P055
Priority n/a
Justification
Budget Impact/Other
2018 - Increase estimated expense from $50,000 to $75,000.
Useful LifeProject Name Elmo Park - 2-5 Play Equipment Category Parks/Fores/Pav.: Comm. Facil.
Type Improvement
Future
Total Project Cost:$75,000
Total20182019202020212022Expenditures
75,00075,000Construction/Maintenance
75,000 75,000Total
Total20182019202020212022Funding Sources
75,00075,000PDF- Park Dedication Fund
75,000 75,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Parks
Description
Warming House maintenance/repair
Project #13-CIP-P056
Priority n/a
Justification
Budget Impact/Other
Useful LifeProject Name Harley Hopkins Park - Warming House Category Parks/Fores/Pav.: Comm. Facil.
Type Improvement
Future
Total Project Cost:$30,000
Total20182019202020212022Expenditures
30,00030,000Construction/Maintenance
30,000 30,000Total
Total20182019202020212022Funding Sources
30,00030,000PDF- Park Dedication Fund
30,000 30,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Parks
Description
Lighting
Project #13-CIP-P057
Priority n/a
Justification
Budget Impact/Other
Useful LifeProject Name Harley Hopkins Park - Lighting Category Parks/Fores/Pav.: Comm. Facil.
Type Improvement
Future
Total Project Cost:$50,000
Total20182019202020212022Expenditures
50,00050,000Construction/Maintenance
50,000 50,000Total
Total20182019202020212022Funding Sources
50,00050,000PDF- Park Dedication Fund
50,000 50,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Parks
Description
Picnic Shelter
Project #13-CIP-P058
Priority n/a
Justification
Budget Impact/Other
Useful LifeProject Name Hilltop - Picnic Shelter Category Parks/Fores/Pav.: Comm. Facil.
Type Improvement
Future
Total Project Cost:$40,000
Total20182019202020212022Expenditures
40,00040,000Construction/Maintenance
40,000 40,000Total
Total20182019202020212022Funding Sources
40,00040,000PDF- Park Dedication Fund
40,000 40,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Parks
Description
Lighting
Project #13-CIP-P059
Priority n/a
Justification
Budget Impact/Other
Useful LifeProject Name Interlachen Park - Lighting Category Parks/Fores/Pav.: Comm. Facil.
Type Improvement
Future
Total Project Cost:$50,000
Total20182019202020212022Expenditures
50,00050,000Construction/Maintenance
50,000 50,000Total
Total20182019202020212022Funding Sources
50,00050,000PDF- Park Dedication Fund
50,000 50,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Parks
Description
Warming House - Roofing, timber structure maintenance, restroom upgrades.
Project #13-CIP-P063
Priority n/a
Justification
Budget Impact/Other
Useful LifeProject Name Maetzold Field - Pavilion Category Parks/Fores/Pav.: Comm. Facil.
Type Improvement
Future
Total Project Cost:$80,000
Total20182019202020212022Expenditures
80,00080,000Construction/Maintenance
80,000 80,000Total
Total20182019202020212022Funding Sources
80,00080,000PDF- Park Dedication Fund
80,000 80,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Parks
Description
Replace/Rehab existing picnic shelter.
Project #13-CIP-P066
Priority 3 Important
Justification
Existing picnic shelter is 30+ years old and deteriorated.
Budget Impact/Other
Useful LifeProject Name Shady Oak Beach - Picnic Shelter Category Parks/Fores/Pav.: Comm. Facil.
Type Improvement
Future
Total Project Cost:$150,000
Total20182019202020212022Expenditures
150,000150,000Construction
150,000 150,000Total
Total20182019202020212022Funding Sources
100,000100,000GU - Other Governmental
Units
50,00050,000PDF- Park Dedication Fund
150,000 150,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Parks
Description
Replace two existing picnic shelters.
Project #13-CIP-P068
Priority 3 Important
Justification
The two existing park shelters are 30+ years old and require replacement.
Budget Impact/Other
Useful LifeProject Name Valley Park - Picnic Shelter Category Parks/Fores/Pav.: Comm. Facil.
Type Improvement
Future
Total Project Cost:$150,000
Total20182019202020212022Expenditures
150,000150,000Construction
150,000 150,000Total
Total20182019202020212022Funding Sources
100,000100,000GU - Other Governmental
Units
50,00050,000PDF- Park Dedication Fund
150,000 150,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Parks
Description
Improvements to the area around the creek bound by Blaker Road, Lake St and Minnehaha Creek
Project #16-CIP-P002
Priority n/a
Justification
Budget Impact/Other
2018 - Moved project from 2018 to 2019.
Useful LifeProject Name Cottageville Park - Phase III Improvements Category Parks/Fores/Pav.: Comm. Facil.
Type Improvement
Future
Total Project Cost:$450,000
Total20182019202020212022Expenditures
450,000450,000Construction/Maintenance
450,000 450,000Total
Total20182019202020212022Funding Sources
450,000450,000PDF- Park Dedication Fund
450,000 450,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact PW Director
2018 2022thru Department Public Works: Parks
Description
Rehab Downtown Park landscaping & lighting
Project #17-CIP-P004
Priority 3 Important
Justification
Heavily used urban park needs renewal of features.
Budget Impact/Other
2018 - New Item
Useful Life 25 yearsProject Name Downtown Park Rehab Category PW - Parks
Type Improvement
Future
Total Project Cost:$100,000
Total20182019202020212022Expenditures
100,000100,000Construction/Maintenance
100,000 100,000Total
Total20182019202020212022Funding Sources
100,000100,000PDF- Park Dedication Fund
100,000 100,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact PW Director
2018 2022thru Department Public Works: Parks
Description
Install artificial turf cricket pitch area
Project #17-CIP-P005
Priority n/a
Justification
Oakes park has been a heavily used location for cricket league and tournament play. An improved, easier to maintain pitch area is needed.
Budget Impact/Other
2018 - New Item
Useful Life 10 yearsProject Name Oakes Park Cricket Pitch Category PW - Parks
Type Improvement
Future
Total Project Cost:$40,000
Total20182019202020212022Expenditures
40,00040,000Construction/Maintenance
40,000 40,000Total
Total20182019202020212022Funding Sources
40,00040,000PDF- Park Dedication Fund
40,000 40,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact PW Director
2018 2022thru Department Public Works: Parks
Description
Construct six (6) new pickelball courts.
Project #17-CIP-P006
Priority 3 Important
Justification
High demand recreational activity attractive to all age groups and expected to remain popular for long term.
Budget Impact/Other
2018 - New Item
Useful Life 25 yearsProject Name Central Park Pickelball Courts Category PW - Parks
Type Improvement
Future
Total Project Cost:$300,000
Total20182019202020212022Expenditures
300,000300,000Construction/Maintenance
300,000 300,000Total
Total20182019202020212022Funding Sources
300,000300,000PDF- Park Dedication Fund
300,000 300,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Streets/Traffic
Description
Locations to be determined consistent with the street reconstruction program. Program includes reconstruction of deteriorated water main, sanitary
sewer and storm sewer in conjunction with street improvement projects. Utility improvements are consistent with the Storm Water Management
Plan, Water and Sewer Utility Master Plan, and televised inspections.
2018: Northeast Hopkins Reconstruction Project.
2019: Cambridge Street/Hiawatha Avenue/Lake Street Reconstruction Project
2020-2021: Interlachen Park Reconstruction Project
2022: 6th Ave South/7th Ave South
Project #01-CIP-S101
Priority n/a
Justification
In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installed new. In most cases, water
main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The costs assume the city funding 100% of major storm
sewer, water main, and sanitary sewer improvements.
Budget Impact/Other
Public Hearing - year prior to planned construction
Plans and specifications - year prior to planned construction
Bid - year of planned construction
Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections.
Consistent with the City Council adopted Roadway Improvement Policy, Street Ratings, Pavement Management Program, Storm Water
Management Plan, Water and Sewer Utility Master Plan, and televised inspections.
Useful Life UnassignedProject Name Residential Street Improvements and Utilities Category Trans: Streets
Type Improvement
Future
Total Project Cost:$39,734,000
Total20182019202020212022Expenditures
24,495,0003,600,000 5,575,000 6,660,000 6,660,000 2,000,000Construction/Maintenance
3,600,000 5,575,000 6,660,000 6,660,000 2,000,000 24,495,000Total
Total20182019202020212022Funding Sources
7,375,0001,100,000 1,975,000 1,825,000 1,825,000 650,000PI - PIR/General Obligation
Bonds
6,420,000900,000 1,250,000 1,885,000 1,885,000 500,000SA - Special Assessment
2,775,000500,000 500,000 750,000 750,000 275,000SF - Sanitary Sewer Fund
2,575,000350,000 600,000 700,000 700,000 225,000SU - Storm Sewer Fund
5,350,000750,000 1,250,000 1,500,000 1,500,000 350,000WF - Water Fund
3,600,000 5,575,000 6,660,000 6,660,000 2,000,000 24,495,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Streets/Traffic
Description
County Road 3 from Shady Oak Road to Meadowbrook Road.
Lighting, landscaping, street, etc. improvements along Excelsior Boulevard from the east to west city limits.
GO Bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by
economic development, grant funds, and, as a last resort, general city revenue
Segment 1: Construction - 1998/1999
Segment 2: Planning - 2004; bidding and construction (median upgrades only) - 2005
Segment 3: Planning and acquisition - 1999/2001, bidding/construction - 2002/2003/2004
Segment 4: Planning and acquisition - Not in County funding plan
TIF funded work includes the following:
A signalized intersection will be constructed at Monroe Avenue. A second intersection will also be built at Jackson Ave/St. Louis Street. There
will also be a reconfiguration of Monroe Avenue and Milwaukee south of Excelsior Boulevard. This work is being completed in conjunction with
the reconstruction of Excelsior Boulevard from Highway 169 to Blake Road. The intersection is being constructed to facilitate redevelopment of
the SuperValu north annex site.
Project #01-CIP-S104
Priority n/a
Justification
Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in all four segments of County Road 3:
- Segment 1 from Shady Oak Road to 11th Avenue S.; upgrade existing undivided roadway, upgrade 11th Avenue intersection to meet future
needs, implement beautification program--completed in 1998
- Segment 2 from 11th Avenue S. to Hwy 169; median pavers construction
- Segment 3 from Highway 169 to Blake Road; upgrade existing narrow undivided roadway, resolve safety issues at railroad crossing, improve
north-south access, account for future LRT access, address redevelopment needs, add integration for full access at Jackson Avenue.
- Segment 4 from Blake Road to Meadowbrook Road; upgrade roadway, implement beautification program.
Budget Impact/Other
GO bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by
economic development, grant funds, and, as a last resort, general city revenue.
Segment 1: Construction - 1998/1999
Segment 2: Planning - 2005; bidding and construction (median upgrades only) - 2006
Segment 3: Planning and acquisition - 1999/2000; bidding/construction - 2003/2004
Segment 4: Planning and acquisition - Not in County Funding Plan
Consistent with Hennepin County CIP and City Council action.
Useful Life UnassignedProject Name County Road 3 Category Trans: Streets
Type Improvement
Future
Total Project Cost:$2,300,000
Total20182019202020212022Expenditures
2,300,0002,300,000Construction/Maintenance
2,300,000 2,300,000Total
Total20182019202020212022Funding Sources
1,600,0001,600,000GU - Other Governmental
Units
700,000700,000MS - Municipal State Aid
Streets
2,300,000 2,300,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact PW Director
2018 2022thru Department Public Works: Streets/Traffic
Description
Painting bike lanes, constructing trails and sidewalks, adding safety improvements
Project #13-CIP-S040
Priority n/a
Justification
Council recently adopted plan to increase pedestrian and bicycle access and safety. These improvements begin to implement that plan.
Budget Impact/Other
Useful Life 20 yearsProject Name Pedestrian & Bicycle Access Improvements Category Trans: Streets
Type Improvement
Future
Total Project Cost:$225,000
Total20182019202020212022Expenditures
125,00025,000 25,000 25,000 25,000 25,000Construction/Maintenance
25,000 25,000 25,000 25,000 25,000 125,000Total
Total20182019202020212022Funding Sources
125,00025,000 25,000 25,000 25,000 25,000PI - PIR/General Obligation
Bonds
25,000 25,000 25,000 25,000 25,000 125,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact PW Director
2018 2022thru Department Public Works: Streets/Traffic
Description
Blake Road,from Excelsior Blvd to state trunk Highway 7, will be reconstructed to enhance accommodations for pedestrians, bicycles, and buses,
improve access to adjacent neighborhoods, provide the necessary infrastructure to support redevelopment and enhance economic growth along the
corridor, improve and enhance traffic flow at major intersections/interchanges, and provide for access to the planned SWLRT Blake Station.The
roadway will be improved and pedestrian facilities will be constructed south of Excelsior Blvd to the city limit.
Project #15-CIP-S001
Priority n/a
Justification
Blake road is a heavily travelled thoroughfare and currently a county road between Excelsior Boulevard and TH7. The construction of a SWLRT
station at Blake Road will increase traffic and present significant redevelopment opportunity along the corridor. Many traffic issues exist along
Blake Road including lack of pedestrian accommodations, congestion and poor access.
The City of Hopkins completed a study in partnership with the cities of Edina and St. Louis Park, Hennepin County, MNDOT, the Minnehaha
Creek Watershed District, Three Rivers Park District, and the SWLRT project office to develop a plan for the future transportation needs of the
corridor. Final design of the project began in 2016 and construction is scheduled to begin in 2018.
Budget Impact/Other
Consistent with the City Council adopted roadway improvement policy.
Useful LifeProject Name Blake Road Corridor Improvements Category Trans: Streets
Type Improvement
Future
Total Project Cost:$18,398,600
Total20182019202020212022Expenditures
15,399,8007,949,900 7,449,900Construction/Maintenance
7,949,900 7,449,900 15,399,800Total
Total20182019202020212022Funding Sources
11,659,2005,954,600 5,704,600GU - Other Governmental
Units
1,790,6001,020,300 770,300PI - PIR/General Obligation
Bonds
750,000375,000 375,000SF - Sanitary Sewer Fund
200,000100,000 100,000SU - Storm Sewer Fund
1,000,000500,000 500,000WF - Water Fund
7,949,900 7,449,900 15,399,800Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Streets/Traffic
Description
Location to be determined based on Pavement Management Program. Program includes mill and overlay of deteriorated pavements to extend the
useful life of the street. Streets for this method of rehabilitation have usually been rehabilitated or reconstructed within the last 20 years.
Project #16-CIP-S041
Priority n/a
Justification
Properly timed mill and overlay projects can significantly extend the life of a street and delay the need for reconstruction. Mill and overlay
projects also require less disturbance and are shorter in duration than reconstruction, which results in less impact of the traveling public.
Budget Impact/Other
Annual pavement rehabilitation category.
Useful LifeProject Name Street Overlay Improvements Category Trans: Streets
Type Improvement
Future
Total Project Cost:$2,275,000
Total20182019202020212022Expenditures
1,750,000300,000 325,000 350,000 375,000 400,000Construction/Maintenance
300,000 325,000 350,000 375,000 400,000 1,750,000Total
Total20182019202020212022Funding Sources
1,750,000300,000 325,000 350,000 375,000 400,000PI - PIR/General Obligation
Bonds
300,000 325,000 350,000 375,000 400,000 1,750,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Streets/Traffic
Description
Replacement of aged regulatory and warning signs that have lost minimum retroreflectivity and replacement of posts, when needed.
Project #16-CIP-S042
Priority n/a
Justification
The city is required to have a sign management program which includes a sign replacement strategy to ensure regulatory and warning signs provide
adequate retroreflectivity. Sign replacement cycle is 8 years. Estimated costs assume sign replacements by contract. Parking signs will be
replaced as needed due to age, fading, etc. Sign inventory data base will be updated to reflect install date/sign age.
Budget Impact/Other
Useful LifeProject Name Street Sign Management Category Trans: Streets
Type Improvement
Future
Total Project Cost:$140,000
Total20182019202020212022Expenditures
100,00020,000 20,000 20,000 20,000 20,000Construction/Maintenance
20,000 20,000 20,000 20,000 20,000 100,000Total
Total20182019202020212022Funding Sources
100,00020,000 20,000 20,000 20,000 20,000PI - PIR/General Obligation
Bonds
20,000 20,000 20,000 20,000 20,000 100,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Transportation
Description
Supplemental improvements to 3 Light Rail Transit (LRT) station areas in the proposed locations, which includes accomodations for the relocation
of proposed storm water facilities, extension of municipal utilities, traffic signal adjustments and other miscellaneous aesthetic items.
Project #01-CIP-S502
Priority n/a
Justification
Three stations along the Southwest Corridor in Hopkins. The proposed expenditures would be in addition to the funds expended by the
Metropolitan Council. The additional funds would be used to ensure the stations are high quality in appearance, and maximize redevelopment
potential in the station areas. These improvements came out of recent transit oriented development planning recommendations.
Budget Impact/Other
Dependent on Metropolitan Council plans.
Consistent with LRT and station plans.
Useful Life UnassignedProject Name Light Rail Transit Stations (3)Category Trans: Streets
Type Improvement
Future
Total Project Cost:$1,420,000
Total20182019202020212022Expenditures
1,420,000620,000 800,000Construction/Maintenance
620,000 800,000 1,420,000Total
Total20182019202020212022Funding Sources
800,000800,000PI - PIR/General Obligation
Bonds
150,000150,000SF - Sanitary Sewer Fund
120,000120,000SU - Storm Sewer Fund
350,000350,000WF - Water Fund
620,000 800,000 1,420,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Utilities
Description
Annual concrete repairs and patching of existing alleys.
Project #01-CIP-U002
Priority n/a
Justification
Annual alley pavement concrete slab repairs are needed.
Budget Impact/Other
Consistent with the Storm Water Management Plan.
Useful Life UnassignedProject Name Storm Drainage System Maintenance - Alley Repairs Category Utilities: Municipal Sanitary Se
Type Improvement
Future
Total Project Cost:$283,000
Total20182019202020212022Expenditures
115,00021,000 22,000 23,000 24,000 25,000Construction/Maintenance
21,000 22,000 23,000 24,000 25,000 115,000Total
Total20182019202020212022Funding Sources
115,00021,000 22,000 23,000 24,000 25,000SU - Storm Sewer Fund
21,000 22,000 23,000 24,000 25,000 115,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Public Works Director
2018 2022thru Department Public Works: Utilities
Description
Rehabilitate LS No. 4
Project #08-CIP-U001
Priority n/a
Justification
Lift station No. 4 was identified for rehab in the 2007 comprehensive utility plan
Regular major maintenance identified in the 2007 comprehensive utility plan.
Budget Impact/Other
Useful LifeProject Name Lift Station # 4 Category Utilities: Municipal Sanitary Se
Type Improvement
Future
Total Project Cost:$160,000
Total20182019202020212022Expenditures
160,000160,000Construction/Maintenance
160,000 160,000Total
Total20182019202020212022Funding Sources
160,000160,000SF - Sanitary Sewer Fund
160,000 160,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact
2018 2022thru Department Public Works: Utilities
Description
This will help us line our sanitary sewers to eliminate infiltration root intrusion and avoid expensive repairs and sewer backups.
Project #18-CIP-U016
Priority 2 Very Important
Justification
We have an old collection system that needs immediate attention. Continuously cleaning the sewer does not stop roots or infiltration from going
into the pipes, we need a more permanent fix. The majority of our sanitary sewer pipe is made out of clay pipe and has reached its life expectancy.
Budget Impact/Other
Useful LifeProject Name Sewer Lining Category Utilities: Municipal Sanitary Se
Type Improvement
Future
Total Project Cost:$200,000
Total20182019202020212022Expenditures
200,00050,000 50,000 50,000 50,000Construction/Maintenance
50,000 50,000 50,000 50,000 200,000Total
Total20182019202020212022Funding Sources
200,00050,000 50,000 50,000 50,000SF - Sanitary Sewer Fund
50,000 50,000 50,000 50,000 200,000Total
Thursday, November 30, 2017
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN - CIP Contact Joint Recreation Dir.
2018 2022thru Department Recreation
Description
The joint recreation agreement in place between the cities of Hopkins and Minnetonka provides for the sharing of operational and maintenance
expenses for Shady Oak Beach. These expenses are split 33% city of Hopkins and 67% city of Minnetonka. Shady Oak Beach is operated from
June - August annually; however the park is available for use year round.
Project #16-CIP-R003
Priority 3 Important
Justification
Since last undergoing a renovation in 1998, Shady Oak Beach contiues to be a primary park destination for residents of Hopkins and Minnetonka.
Scheduled items are intended to keep the park in excellent appearence, establish a gateway to the park, and to provide park users with a quality
recreational experience. 2018: Construction of a monument sign that features the park entrance. 2019: Preventative interior and exterior building
maintenance, interior and exterior lighting upgrades, and irrigation improvements. 2020: Water play inflatable amenities. 2022: Miscellaneous
building components.
Budget Impact/Other
Variance from 20 year plan - New item
Useful Life 10-20 yearsProject Name Shady Oak Beach Improvements Category PW - Parks
Type Improvement
Future
Total Project Cost:$275,000
Total20182019202020212022Expenditures
185,00075,000 35,000 50,000 25,000Construction/Maintenance
75,000 35,000 50,000 25,000 185,000Total
Total20182019202020212022Funding Sources
123,80050,000 23,500 33,500 16,800GU - Other Governmental
Units
61,20025,000 11,500 16,500 8,200PDF- Park Dedication Fund
75,000 35,000 50,000 25,000 185,000Total
Thursday, November 30, 2017