VI.1. Adopt Resolution 2018-009 and Authorizing Assignment of Construction Contracts – Pavilion Expansion and Renovation Project, City Project 2017-008; StadlerG�TY pF
January 30, 2018 yo P K � N s Council Report 2018-013
Adopt Resolution 2018-009, Awarding and authorizing assignment of construction
contracts — Pavilion Expansion and Renovation project, City project no. 2017-008
Proposed Action.
Staff recommends adoption of the following motion: Move that Council adopt
Resolution 2018-009, awarding construction contracts and authorizing assignment of
contracts to RJM Construction — Pavilion Expansion and Renovation pro'�ect.
Overview.
A bid opening was held on Tuesday, January 9 for the Hopkins Pavilion Expansion and
Renovation project. There was great bidder interest in our project and virtually all 15 bid
categories received multiple bids. Additionally, RJM Construction has received quotes
on the other 14, smaller work categories. RJM Construction has completed their bids
and quotes analysis and has provided recommendations for award — see attached
letter. Staff is requesting that City Council adopt Resolution 2018-009, which awards
each �f the cor��iructi�n c�niraci� and al�� a��ig�� the�e contract� �� the City'�
construction manager, RJM Construction. The assignment of contracts will be done via
an Assignment of Prime Contracts document, which is exhibit B to the resolution. In
accordance with our agreement with RJM Construction, they are acting as Construction
Manager—At Risk for the City and, as such, have submitted a guaranteed maximum
price for this project at $5,063,184.00. When including all other associated costs, this
brings the total project cost to: $5,841,251.17
Primary.lssues to Consider. - - -
• Breakdown of Total Project Costs
Supportinq information.
• Resolution 2018-009
• RJM Construction letter — Recommendations for Award of Contract
• GMP pricing breakdown
• Project sc edule summary
.�
��
�_ �w��
�� ��a�
4 .
� �s
� ��
�
Steven J. Stadler, Public Works Director
Financial Impact: $ 5,841,251.17 Budgeted: Y/N Y Source: multiple — see notes
Related Documents (CIP, ERP, etc.): multiple CI�' proiects incorporated into proje�
Notes: Gen Fund, Pavilion Fund, Park Impr Fund, HYHA, Hopkins School District
Council Report 2018-013
Page 2
Analysis of Issues
• Breakdown of Total Project Costs
o Guaranteed Maximum Price (GMP): $5,063,184.00
o Design Fee: $408,200
o Direct Owner purchase items: $281,054.05
■ Dasher Boards ($148,190.26)
■ Skate Tile ($77,164.85)
■ Locker Room benches & hooks ($20,698.94)
■ Allowances for furniture, phone/data,& signage ($35,000)
o Legal fees: $10, 000 (est)
o SAC/WAC fees: $32, 305
o Asbestos/HM Abatement (warming house demo): $20,000 (est)
o Survey/geo-tech: $12,900
o Xcel Energy electrical relocation work: $6,108.12
o Builder's Risk Insurance: $7,500 (est)
o C�wner's contingency: $0.00
• Total Project Cost = $5, 841,251.17*
*This projected cost is 2.4% above our original total project estimate of $5.7M.
_
_
_ _ _ _ _ __ _
�
;
CITY OF HOPKINS, MIl�INESOTA
RESOLUTION NO. 2018-009
A RESOLUTION AWARDING A,ND AUTHORIZING
ASSIGI�fMENT OF CONSTRUCTION CONTRACTS FOR T'HE
HOPKINS PAVILION EXPANSION A�ND RENOVATION PROJECT
VVHEREAS, the city of Hopkins (the "City") has worked with Stevens Engineers, 292 Design Group
Architects, and R:JM Construction Management Services Corporation ("I�;JM") on design plans and
specifications for the expansion and renovation of the Hopkins Pavilion (the "Proj ect"); and
ti'VHEREAS, on October 17, 2017, the City hired R:JM as its construction manager for the Project; and
�'VHEREAS, pursuant to an advertisement for bids for the Proj ect, bids were received for 15 bid
categories, opelled, and tabulated according to law; and
W�-IEREAS, price quotations were also obta.ined for quote categories, according to law; and
�%'VHEREAS, at this time, R:JM is recommending the award and assignment of prime contracts, as
related to the bid categories and the quote categories contained in the attached E�ibit A, in each respective
category.
1�TO�T, T��FO�, �E IT �SO�'�ED �Y T� CITY �O�C�L OF �'� CIT�' OF ]H[OP��TS
AS FOLLOWS:
1. The recitals set forth in the preamble to this Resolution and the exhibits attached to this
Resolution are incorporated into this Resolution as if fully set forth herein.
2. Each prime contract recommended by l�:JM, as contained in E�ibit A attached hereto, is awarded.
City staff is directed to execute construction agreements with the contractors listed in E�ibit A.
- - 3. Upon the execution of each prime contract, and once all associated bonds and insurance certiiicates
are secured for each, the City Council further approves the assignment of said prime contracts to R:JM,
and the mayor and the city manager are thereafter authorized to effectuate said assignment by
executing the Assignment of 1'rime Contracts document in the form conta.ined in Exhibit B attached
hereto.
Approved this 5� day of February, 2018, by the City Council of the City of Hopkins, Minnesota.
CITY OF HOPI�:Il�TS, P!IINI�TESOTA
Attest:
Molly Cummings, Mayor
Amy Domeier, City Clerk
E�:HIBIT A
Recommendations for Award of Prime Contracts
BID CATEGORY
2A — Demolition
Kellington Construction, Inc.
807 Broadway Street, NE, Suite 185
Minneapolis, l�ZN 55413
3A — Concrete; 4A — Masonry
Steenberg-Watrud Construction, LLC
10967 Clark Road
Inver Grove Heights, l��N 5 5 077
6A — Carpentry �
George F. Cook Construction Co.
23 00 Nevada Ave. N., Suite� 200
Golden �I alle�,1��T 5 5427
7B — Roofing
B&B Sheet Metal & Roofing, Inc.
210 Centennial Drive
Buffalo, l�IN 55313
AWARD AMOUNT
$149,270.00
$S 10,000.00
$221,150.00
$266,700.00
7C — Metal Wall Panels $151,542.00 ;
,
Flynn Midwest LP '
_ _ _ _ _ __ . _ _ _ __ _ . _ _ __. __ _ �
15525 32 �
nd Avenue North �
�
�
Plymouth, I��IN S 5447 . ;
�
8 A— Aluminum Entranc e s
Brin Contract Glazing
23 00 North 2
nd Street
Minneapolis, l�'IN 55411
9A — Gypsum Board Assembly
RTL Construction, Inc.
4000 Valley Industrial Blvd. S.
Shakopee, l��IN 55379
9E — Painting
Decor-Tec, Inc.
2812 Washington Ave. N. St
I�
$189,700.00
$81,100.00
$219,890.00
13 A— Ice Refrigeration Systems
Cimco Refrigeration Inc
2502 Commerical Park Drive
Mobile, AL 3 6606
22A Plumbing Systems
Modern Piping, Inc.
9124 Isanti St.
Blaine,1�1N 55449
23A HVAC Systems
General Sheet Metal Company, LLC
23 3 0 Louisiana Avenue North
Golden Valley, l�ZN 55427
26A Electrical Systems
Manor Electric, Inc.
5350 Pioneer Creek Drive, Suite 3
10�[aple Plain, l�'IleT � 5 3 5 9
31 A Earthwork & Utilities
Rachel Contracting, Inc.
4125 Napier Court NE
St. Michael, l�'IN 5 5 3 76
$1,25 8,900.00
$274,000.00
$313,458.00
$260,350.00
$179,470.00
31B Aggregate Piers $94,000.00
_ Foundation Service Corporation . _ . `
_ . _ _ . _ _ _. _ _ �
PO Box 120 `
�
Hudson, IA 50643 '
�
;
,
QUOTE CATEGORY AWARD AMUUNT �
�
Surveying $6,137.50 c
Westwood � ��
�
,
7699 Anagram Drive c
,
Eden Prairie, l�'IN 5 5 3 44 �
a_
Final Cleaning
Prime Construction Solutions
93 63 Penn Ave S
Minneapolis, l�'IN 55431 �
3 B Precast Structural Concrete
Molin
415 Lilac Street
515017v2 DTA HP145-21
A-2
$7,363.75
$66,033.00
Lino Lakes,1�7N 5 5 014
SA Structural Steel & Misc. Metals — Mtl
Briese Iron Works Inc
7010 Dresser Drive NE
Rochester, l��N 55906
SB Structural Steel & Misc Metals — Installation
Bald Eagle Erectors
73 09 Lake Drive
Llno Lakes, l��N 55014 �
7A Waterproofing
Kremer Davis
132 Osborne Road NE
Minneapolis, l��N 55432
8B Overhead and Sectional Doors
Crawford Door Sales Co.
P.O. Box 18143 �
West St. Paul, I��.I�T 5 511 �
9B Tiling
Twin City Tile & Marble
990 Lone Oak Road, Suite 160
Eagan, l��N 5 5121
$48,500.00
$34,300.00
$5,680.00
$15,860.00
$24,250.00
9C Acoustical Cellln s $9,960.00 ''
. ..
g � ''
, r
_ _ Kirk Acoustic Inc _ . _ _ _ _ . _ ;
395 Bridgepoint Way South '
�
St. Paul, I�ZN 55075 '
9D Flooring
S onus Interiors
6325 Sardburg Road
Golden Valley, l�'IN 55427
l 0A S ignage
Spectrum Sign Systems Inc
9278 Isanti Street NE
Blaine, l�ZN 55449
12A Roller Shades
American Drapery Systems
676 Mendelssohn Ave N
Golden Valley,1�1N 55427
515017v2 DTA HP145-21 A-3
$11,000.00
$20,125.00
$2,3 92.43
21A Fire Sprinkler $15,000.00
S ervice Fire Protection, Inc
340 Ponridge Circle
Wayzata, l�'IN 5 5 3 91
32B Concrete Sidewalks/Curb and Gutter $20,290.00
North Country Concrete
23 03 5 Ulysses Street NE
East Bethel, l�'IN 55005
515017v2 DTA HP145-21 A-4
Assi�nment of Prime Contracts
THIS AS SIGNMENT is made and effective this day of , 2018, by the
City of Hopkins, Minnesota, a municipal corporation ("City" or "Owner") to RJM Construction
Management Services Corporation, a Minnesota corporation ("Construction Manager").
RECITALS
A. City and Construction Manager have entered into that certain agreement entitled
Standard Form of Agreement between Owner and Construction Manager, A 13 3 TM 2009, as
modified and A201-2007, as modified ("CM Agreement") regarding the project described therein
("Proj ect") and the Construction Manager's right therein to propose to the City a Guaranteed
Maximum Price ("GMP") to carry out its services as a CM at risk with a GMP.
B. The Work for Construction of the Proj ect has been competitively bid or quoted
pursuant to Minnesota law, and City has awarded separate contracts to the Prime Contractors. Each
Prime Contractor has entered into a written agreement in form AIA A101-2007, as modified, and
A20 i-2007, as modi�ied, setting �orth the terms and conditions of the Work, together with all other
plans, specifications, and general conditions as set forth in the Prime Contract (individually, a
"Prime Contract" and collectively, the "Prime Contracts"). A List of the Proj ect Prime Contracts
awarded is attached hereto as Exhibit A.
C. The Construction Manager has proposed and the City has accepted a GMP under
the terms and conditions of the CM Agreement and related documents.
- D. -- Both the Owner-Prime Contractor agreement -and the CM Agreement a11ow- the - -- �
assignment of the Prime Contracts by Owner to Construction Manager. �
NOW THEREFORE, for valuable consideration, the receipt and sufficiency of which is
hereby acknowledged, the parties agree to the following:
1. The Recitals are made a part of this Agreement.
2. Except for the rights and obligations reserved to City in sections 4 and 7 below,
City assigns all its rights, benefits, remedies, duties, and obligations under the Prime Contracts to
Construction Manager, who hereby assumes such assigned rights, benefits, remedies, duties, and
obligations.
3. By this Assignment, Owner agrees to make payments to Construction Manager for
the Work described in the Prime Contracts, subj ect to the terms of the Prime Contracts. City agrees
to provide to Construction Manager all services or information required by the Prime Contracts
and, with respect to the Construction Manager, retains all duties owed by Owner to Prime
Contractors under the Prime Contracts.
CI
4. City, with respect to Construction Manager, reserves its right (and related
obligations), to be exercised in consultation with Construction Manager and subj ect to time and
price adjustments contemplated by the CM Agreement and the Prime Contracts, to order changes
to and finally approve the Work. OWner further agrees to assign to Construction Manager the rights
and obligations arising out of such change orders, provided, however, Owner agrees to compensate
Construction Manager for the agreed-upon cost of such changes(s) and the Cost of Construction
Manager's additional services. Owner's rights, benefits, and obligations under resulting Change
Orders, subj ect to the same reservations as set forth in the immediately preceding sentence, wi11
be deemed assigned to and assumed by Construction Manager.
5. Construction Manager agrees that in return for the Assignment of Prime Contracts
referenced herein, it shall accept the City's rights, and agrees it shall be responsible to Prime
Contractors for the City' s responsibilities, including full payment, for amounts due Prime
Contractors under the Prime Contracts. Construction Manager's obligation to pay the Prime
Contractors is conditioned upon Construction Manager receiving payment from Owner for the
work for which Prime Contractor requests or claims a payment is due, subj ect to terms of the Prime
Contractor agreement.
6. Construction Manager further agrees that it shall indemnify and hold City harmless
from any and all claims, costs, dispuies, requests for equitable adjustment or any other additional
recovery sought by a Prime Contractor under its Prime Contract due to the errors, negligence, or
breach of contract of Construction Manager or its subcontractors. This indemnification and hold
harmless will not apply to the extent any such claims, costs, disputes, requests, or attempted
recoveries arise from the City's failure to perform its obligations under the CM Agreement or this
Assignment or from any delay by the City in exercising rights reserved to it under this Assignment.
7. City retains its continued ownership in the Proj ect and land, the right to enforce all
---- City-issued permits and City ordinances relevant to the Proj ect, and all police povver authority over
the Proj ect area and persons working in or affected by the Proj ect.
IN WITNESS WI�EREOF, the undersigned parties have executed this Assignment
effective the date first above written.
[Szgnatu�e page to followJ
515017v2 DTA HP145-21 A-2
RJM CONSTRUCTION MANAGEMENT
SERVICES CORPORATION
Construction Manager
Date: By:
Date:
Date:
515017v2 DTA HP145-21 A-3
Its :
CITY OF HOPKINS
Owner
By:
Its : Mayor, Molly Cummings
By•
.
Its : City 1Vianager, li�iichael IViornson
�
�
BID CATEGORY
2A — Demolition
Kellington Construction, Inc.
807 Broadvvay Street, NE, Suite 185
Minneapolis,1�7N 5 5413
3A — Concrete; 4A — Masonry
Steenberg-Watrud Construction, LLC
10967 Clark Road
Inver Grove Heights,1�7N 55077
6A — Carpentry
George F. Cook Construction Co.
23 00 Nevada Ave. N., Suite 200
Golden Valley, l�'IN 55427
7B — Roofing
B&B Sheet Metal & Roofing, Inc.
210 Centennial Drive
Buffalo, l�'IN 55313
EXHIBIT A
List of Prime Contracts
AWARD AMOUNT
$149,270.00
$510,000.00
$221,150.00
$266,700.00
7C — Metal Wall Panels $151,542.00 , 4
Flynn Midwest LP � �
15525 32 �
_ __ _ _ _ _ . _ _ _ . _
. __ . __
nd Avenue North �
Plymouth, l�'IN 55447
,
�
8A — Aluminum Entrances - $189 700.00 �
� �
Brin Contract Glazing �
,
;
2300 North 2 �
f
nd Street �
�
�
Minneapolis,1�2N 5 5411 ;
9A — Gypsum Board Assembly
RTL Construction, Inc.
4000 Valley Industrial Blvd. S.
Shakopee, l��N 55379
9E — Painting
Decor-Tec, Inc.
2812 Washington Ave. N. St
Minneapolis, I�IN
A-1
$81,100.00
$219,890.00
13A — Ice Refrigeration Systems
Cimco Refrigeration Inc
2502 Commerical Park Drive
Mobile, AL 3 6606
22A Plumbing Systems
Modern Piping, Inc.
9124 Isanti St.
Blaine, l�'IN 5 5449
23A HVAC Systems
General Sheet Metal Company, LLC
23 3 0 Louisiana Avenue North
Golden Valley, l�ZN 55427
26A Electrical Systems
Manor Electric, Inc.
5 3 5 0 Pioneer Creek Drive, Suite 3
Maple Plain, l�'IN 55359
31 A Earthwork & Utilities
Rachel Contracting, Inc.
4125 Napier Court NE
St. Michael, I��N 55376
31 B Aggregate Piers
Foundation Service Corporation
_ _ . PO Box 120 _ _ _
�-Iudson, IA 50643
QUOTE CATEGORY
Surveying
Westwood
7699 Anagram Drive
Eden Prairie, l��N S 5 3 44
Final Cleaning
Prime Construction Solutions
93 63 Penn Ave S
Minneapolis, l�IN 55431
3B Precast Structural Concrete
Molin
415 Lilac Street
Lino Lakes, l��N 5 S 014
$1,258,900.00
$274,000.00
$313,45 8.00
$260,350.00
$179,470.00
$94,000.00
_ _ _ _ _ _ _
�
, c
AWARD AMOUNT
515017v2 DTA HP145-21 A_2
$6,137.50
$7,363.75
$66,033.00
SA Structural Steel & Misc. Metals — Mtl
Briese Iron Works Inc
7010 Dresser Drive NE
Rochester, l�'IN 55906
$48,500.00
SB Structural Steel & Misc Metals — Installation $34,300.00
Bald Eagle Erectors
73 09 Lake Drive
Lino Lakes, l�'IN 55014
7A Waterproofing
Kremer Davis
13 2 O sb orne Ro ad NE
Minneapolis,1�7N 55432
8B Overhead and Sectional Doors
Crawford Door Sales Co.
P.O. Box 18143
West St. Paul, l�'IN 55118
9B Tiling
Twin City Tile & Marble
990 Lone Oak Road, Suite 160
Eagan, l�ZN 5 5121
$5,680.00
$15,860.00
$24,250.00
9C Acoustical Ceilings $9,960.00 �
Kirk Acoustic Inc r
. 395 Brid e oint Wa South _ _ _ . _ _ _ _ _ _ �
gp Y
St. Paul l��N 55075 �
� �
9D Flooring
S onus Interiors
6325 Sardburg Road
Golden Valley, I�'IN 55427
l0A Signage
Spectrum Sign Systems Inc
9278 Isanti Street NE
Blaine, l�IN 5 5449
12A Roller Shades
American Drapery Systems
676 Mendelssohn Ave N
Golden Valley, l�'IN 55427
515017v2 DTA HP145-21 A-3
$11,000.00
$20,125.04
$2,3 92.43
21A Fire Sprinkler $15,000.00
S ervice Fire Protection, Inc
340 Ponridge Circle
Wayzata, l�'IN 55391
32B Concrete Sidewalks/Curb and Gutter $20,290.00
North Country Concrete -
23 03 5 Ulysses Street NE
East Bethel, l��N 55005
515017v2 DTA HP145-21 A-q„
January 3 0, 2018
Steve Stadler
City of Hopkins
1010 1 st Street South
Hopkins, l��T 5 5 3 43
RE: City of Hopkins Pavilion Expansion
Recommendations fox Award of Contract
Dear Mr. Stadler;
I
.�����, �������,� �
. ;
. �
_ ,
. _ �
On Janu.ar°y 9, 2018 bids were received at the City of Hopkins for th� Pavilion Expanszon �
Proj ect. A total of nulnber of ninety one (91) bids were received for fifteen (15) bid E
categories. A iota� o.fr ii%y �wo (52) quotes were �eceived fo�° the 1� quote categories. ;
Attached is a bid summary by trade for each bid category. We are recornmending award �
�
. �
for 29 Prime Contracts. The recommended contracts include the acceptance of Alternate �
�
#l. �
RJM has completed its revieW of the bids. We recommend to the City Council that the�
approve the ayvard of the contracts as follows : �
BID CATEGORY
2A -- Demolition
Kellington �onstruction, Inc.
807 Broadway Street, NE, Suite 1$5
Minneapolis, MN 55413
3A. -- Concrete; 4A — Masonry�
Steenbe�g-Watrud Const�ruct�on, LLC
10967 Clark Road
Inver Grove Heights, l�ZN 55077
6A — Carpent�y� �
George F. Cook Construction Co.
23 00 Nevada Ave. N., Suite 200
Golden Valley, �IN 55427
AWARD AMOUNT
$149,270.00
$510,000.00
$221,150.00
�
�'
.'��� ��/
� ����
. �
. . �
�
. ,
. ;
7B -- Roofing $266,700.00 � �
B&B Sheet Meta1 & Roofing, Inc. �
210 Centennia� Drive �
Buffalo, I�IN 5 5313
7C — Metal Wal1 Panels $151,542.00
F� nn Midwest LP �
y
� 15525 32 . �
nd Avenue North . �
i'
P�ymouth,l�1N 55447 . ;
�
�
�
�
s
8A — Aluminum Entrances $189,700.00 �
,
B�in Contract Glazing �
23 00 North 2 . �
__ .__ ..
€
_ _ . _ _. _ . _ _ --_ _ _
nd Street . �
Minneapolis,1�2N 55411 �
� �
i
9A — Gypsum Board Assembly $81,IOO.OQ ;
E
RTL Construction, Inc. C
4000 Valley Industrial Blvd. S. �
Shakopee,ll�N 55379 - �
;
�
1
9E — Painting $219,890.00 � i
Decor-Tec, Inc. � �
�
. ,
2812 Washington Ave. N. St �
,
Minneapolis; l�� 5541.1-43 02 �
�
�
�
13A. -- Ice Refri eration S stems $1 25 8 900.00 . �
g Y . > > ;
Cimco Refrigeration Inc �
2502 Commerical Park Drive �
Mobile, AL 3 6606 �
r
�
c
� 22A Plumbing Systems $274,000.00 � �
Modern Piping, Inc. � ,
�
9124 Isanti St. �
B Iaine, �ZN 5 5449 � - €
�
�
�
. r
23A HVAC Systems $313,458.00 �
�
General Sheet Metal Company, LLC '
2330 Louisiana Avenue North i
Golden Valley, l�IN 55427 �
26A Electrical Systems
Manor Electric, Inc.
5350 Pioneer Creek Drive, Suite 3
Maple Plain, I��T 55359
31 A Earthwork & Utilities
Rachel Contracting, Inc.
4125 Napier Court NE
St. Michael, l��T 55376
$260,35Q.00
$179,470.00
i
�
r
t
,,���� — �����,�' ;
� a
I
. ;
31B Aggregate Piers $94,000.00 � ;;
1
Foundation Serv�ce Corporation � �
PD Box 120 � "
. I
Hudson, IA 50643 `'
___ _ ._ ____ _ . . _ _ _
_ _ _ . ._ . . _ _ ;
,
QUOTE CATEGORY AWARD AMOUNT
�
i
. � � �
S urveying $ 6,13 7. 5 0 �
'V�I�estwood �
. �
7699 A,nagram Drlve t
. Eden Prairie, l��t 55344 I'
Fina� Cleaning
Prxme Construction Solutions
93 63 Penn Ave S
Minneapolis, MN 55431
3B Precast Structural Concrete
Moli�
415 Li1ac Street
Lino Lakes, l�IN 55014
$7,3 63 .75
, $66,033.00
� SA. Structural Steel & Misc. Metals -- Mtl
B�iese Iron Works Inc
7010 Dresser Drive NE
Rochester, l��N 55906 -
SB Structural Steel & Misc Metals — Installation
Bald Eagle Erectors
73 09 Lake Drive
Lino Lakes,l�1N 55014
$48,500.00
$34,300.00
...... .... ...... ... ........ . ... . . . . . .. .. . .. ....... ... .. ... ...... . . ... ... . .. .. .... ... ....... .... .... .. .... ....... .. ... . . .... ... .. .. . . ._.. .. . . . . ... ........ . .... ... .. ... .. ... . . ........ ........ . ...... . . .. . .. . .. ... .. ...... . . .. . ..�I
�(
I
�.,��� ���� �
/ . � � � /,��' �
, ,
�
_ . ;
. E
, _._ . � ,
�
, _. �
F
_ ' . � �
.. j
{
�
' �
�
� �F
�
+�ah�S�T'��tTi.C��11 ;
7A Waterproofing
Kremer Davis
132 Osborne Road I�TE
Minneapolis,1�2N 55432
$5,680.00
8B Overhead and Sectional Doors $15,860.00 �
Crawford Door SaXes Co.
P.O. Box 18143
West St. Paul, MN 55118
_ 9B Tiling $24,250.00
Twin City Tile & Marble
990 Lone Oak Road, Suite 160 �
Eagan, MN 5 S 121
9C Acoustical Ceilings $9,960.00
I��k �.coust�c �c
395 Bridgepoint Way South
St. Paul, l��T 55075
9D Flooring $11,000.00
� S onus Interiors
6325 Saxdburg Road
. Golden Valley, l��T 55427
1 OA Signage
Spec�rum. Sign Systems Inc
927 8 Is anti Street T1E
Blaine, I�IN 55449
1�2A Roller Shades
American Drapery Systems
676 Mendelssohn Ave N
Golden Valley, l�IN 55427
21A Fire Sprinkler
Service Fire Protection, Inc
340 Ponridge Circle
Wayzata, MN 5 5 3 91
32B Concrete Sidewalks/Curb and Guiter
North Country Concrete
$20,125.00
$2,392.43
$15,000.00
$20,290.00
�
_ .. ,
. . ... . ....... .. ... .... .... ..... .. ... ..... ... ... ..... . .. . . . . .. ..... ... 1.
f
�
r,�,��, i
/� _ �%,�/����'�
�
...... �
. �
�
�
i
� �
I
�
i
���]N�T1��1tTt,Q[� ;
32D Seeding and Plants $0.�0
*�to be bxd at a later date
If you should �iave any questions, please contac� by phone at 952-837-8614.
� Sincerely,
Brad B ar�ckman
Vice P�esident - Community
_ _ . _ _ _ __ ._ . _ __ ___ . __ _ _
__
CC: . _ '
� �
� Justin Johnson — R:JM Construction � I�������
�
..__ ..__ . ._. _ ._.�... . ..... .... .. . _.. ...... ...... ...... ...... . _. . .. ._.. . . ..._.. ...... ... .. _ .... _.___.._ _ ..._.. ...... ... _ ..... . _.. .... . _ _ . .._ _.... . .. .. . _ . . .. ..._.. ... .. .. . _.. . _... ...... . _... . . ... .. ... _ ..... .... .. .. ... 4.
!
.�_ ..., Z . �-t
i
Ca1�ST�'#JCTit�N
:STIMATE DATE: January 31, 2018
�ROJECT: Hopkins Pavilion
�RCHiTECT: 292 Design & Stevens Engineering
)RAWING DATE: December 20, 2017 ,
� Apparent Low - Bid
DESCRtPTION Sub Contractors Amount
, ,,..„, �,,,�,. ,.-: - ,'"x-- ,f y .,� ,�,�y `` �"���.,�` -��"��-'�-� .;��. ���--�-�..'-� -W�`�"''� -
���+ �r/_�.�,t,/ f� �JI. .
//J��M�rG70� �✓�.SG.�I � �: � r� ��� �'�� �� �✓ ��.�� ���� �����r� �,��-1�=��r���
� , .� , .,, „�r. _ .: , ,,. , _ ,>r_, .,.., ,,. ,Y: ,,,� s r, -. �- � �^�,� a' a���.•_. ��-��-�.�-�, r�� �� '''� ��
� � � � , w
., ,�i �v � .:,r^'� ...�..c�^�-�,. _a,�mfi ..�� .,...., .:
. ,u�,` , _ .:.. , ' _ _ �
1A - Survey Westuvood $6,�.38
1B - Final Cleaning " Prime $7,364
2A - Demolifiion (Excludes site Demolition) I<ellington Construction $149,270
3A - Concrefie :Systems Steenberg 3A & 4A $510,000
3B - Precast Structural Concrete Plank Molin Concrete $66,033
4A - Masonry Systems Steenberg 3A & 4A $0
7A - Wa�erproofing Kremer Davis , $5,680
5A - Steel Material Briese Iron Works $48,500
5B - Steel Labor Bald �agle Erectors $34,300
6A � Carpentry and Specialties George F Cook Constructio $221,15Q
7�B - Roofing B& B Sheetmeta) and Roofi $266,700
7C - Metal Wall Panels � Fiynn Midwest $151,542
8A - Aluminum EntrancesjStorefronts Brin Contract Glazing $189,700
8C - Sectional Doors Crawford Doors $15,860
9A - Gypsum Board Systems RTL Construction $81,1�0
9E - Painting Decor Tec $219,890
9B - Tiling Twin City T& M $21,600
9C - Acoustical Ceilings Kirk Acoustics $9,960
9D - Flooring Sonus Interiors $11,000
13 - Ice Rink Systems _ . Cimco ._ _ _ _ ___ _$1,258,900
ZOA -- Signage . . . ~ . Spectrum � . . $20;125
12A - Roller• Shades American Drapery Systems $2,393
31B - Rammed Aggregate Piles Foundation Service Corp $94,000
21A - Fire Sprinkler Service Fire Protection $15,000
22A - Plumbing and Piping Systems Modern Piping $274,000
23A - HVAC and Control Sys�ems General Sheet Metal $313,458
26A - Elec�rica) Manor Electric $260,350
31A - Earthworkf U�ilities Rachel Contracting $179,470
32B - Concreie Curb and Gu�ter North �oun�ry Concrete $20,290
32D - Seeding and Plants Allo�wance $50,000
General Requirements $51,306
Genera) Conditions $166,531
Genera) Liability lnsurance $45,�62
Builders Risk Insurance $0
Building Permit $2,532
Bond � $47,692
, � .+ } �� � � � �Q.�{��� f,,,���
f.�y ' / � ■,,..:.��+'.'r ,s�. ry-r/'� ,-,�,,,+3 "-.: � �' �; "� � '"� �'"�.-,- -�r,�, �- n�,:-..' � �, a*"'� �. .�-,-.�-,��;�r'�.�.%z„���,",� ,, t -�-.a� h y',��`�
S' ��QLM�,Ir��,.SI�NL+���I� �.rOJ�S � '�� ` '� cy:a����`��a��' '��`'�� � ��� ��;����/����^'K- �V�����Y.,
;rr � .,, �„ ,,,�.r.-,�. _�"m,�-� ,r , . �,,;,� ��� ,.„.�' , �._.. �--. -��..� ,�,�:7'r�. � ,�.,;:, _ r _,- . �>:., %4" . _, c,_:.� ,u��"�s. �.� „ �,�,r�� , w.-.,�`" :��;,_ �,�a'"%,� µ<.,. � ������ .,.._,,. � _�� :�'✓+�r�z„;s.=� �'��,s.'�,�i��.
.� "^"��;:"�:`'� �
Escalafiion $0
Design/Estimati�ng Contingency $0
Contingency $�.34,873
Contractors Fee $11.1,415
�, � ,. �� �� �, ;�� ;� �
�
��:�� �� _- .
�
�� ���� � � �,
,
.. _ �
�� ��
Total �ons�t�ruction�Co t � = � � ���� !������,��w
�..��� � .. _ ,^��_��'��� _G. _ , a �� , _ . ��� . . , ., . -. � ;, _.�� � � T��-� �.�..-�.Y
� ; �� ��� �
� ,
� , �
�
ATTACHMENT �
RJM Construction
Golden Va1�ey, Mi.nnesota .
. ;
SECTION 010410 � SCHEDUL�
PART 1- GENERAL
1.01 DESCRIPTION
' A. This Section includes:
1. Project Sche;du(ing Informatio�
1.02- PROJECTSCH�DULEADM(N(STRATOR .
1.�3 SCHEDULE
,
� � � . ..� .. � •- � i � . V � � �.
4
Hopkins Pavilio� Addition & Renovation .
Hopkins, Minnesota
,
A. The project is scheduled to star� March of 2018 with substantial completion September 10, 2018. � �
Below is a breakdown of approximate milestone dates: �
G
1. Xcel E(eciric overhead line relocation -� 2/25/18 to 3/4/18 �
,
Z. Xcel Electric belowgrade relocat�on -2/z5/ss to 31�118 `
3. Ice out - 2 24 1� . �
. 1 I �
�
� 4. Remove evaporative cooier -- 2%25/18 �
�
� � - 5. New�sanitary utility.line �temp feed existing restrooms) �- --�- - � -�-�-�-�---���-- --�-�----�----�--��-.-�-�_.--�-..--�- --�-� .. -
a. Potential shutdown 2/25/�8 to 3�4/18
6. Strip pavement a� nor�h parking/drive area - 3%5j18
7., Rernove vvater utility to warming house � 3/6/�8
8. Remove existing saniiary utility line warming house/parkir�g lot - 3/6/�.8 �
,
,
9. Remove storm sewer at north parking area � 3/7/18 �
10. Foundations at new Refrigeration Room -- 3��.2f �.8
,
11. Derno existing warming house -- 3/15/�8
i
12. Foundations at Team rooms/1lVarming House -- 3/19/1� �
,
f
�
�.3. Complete ref�igeration room shell - 4/13/�8 r
,
14. Refrigeration underground/slab--4/16�18 � ''
i
15. Refirigeration equipment -- �/23/�8 �
_ _ �
16. Dry fiioor activities �omplet� - 5/5/�.8
�.7. Demo existing rink -- 5f 7%�.8 . E
�
�
18. Interiordemoli�tion atteam rooms/restrooms-5/7f1S
�9. Complete Team Room�Warming House Exterior Shell -- 6f S/18 '
,
20. Pour new rink/ cure slab---6j18%�.8 i
�
21. Paint roof deck/structure -- 7/23j18 . � ,
22. Rinkequipmentstar�--up--8%20f18
c
23. Dasher board installation -- 8/27/18 � . '
;
24. Interior buildout/remodel new Team Room/Warming House complete -- 8/31/�S �
(
% I
25. Punch Lisi and Final Clean - 9/3/1.8 to 9/7/18 �
�
,
26. Final inspections -- 9/3/�.8 to 9f 7/18 . � '
�
�
27. M a ke i ce -- 9/3��.8 �0 9/7/18 �
,
, 28. Occupancy-9f�.Of18 , �
E
2�, Star� skating - 9/10/18
B. If a Coniractorfailsto provide adequa�te crewsizes�o meettheschedule orfailsto expedite
mat�rials/equipment as needed to meet the schedu�e, ihe Cons�ruction Manager, wifih the Owner's
� approval, will have the right �ro instruct the Constrac�or to provide overtime or other provisions as
needed, �t the Contractor's soie expense, to expedite schedule accordingly.
C. Alternates, if aceepted, will be scheduled within the time limits of the base bid schedule, and will be
issued in �hefinal construction schedule.