2018-009 Awarding and Authorizing Assignment of Construction Contracts for the Hopkins Pavilion Expansion and Renovation Project CITY OF HOPKINS,MINNESOTA
RESOLUTION NO.2018-009
A RESOLUTION AWARDING AND AUTHORIZING
ASSIGNMENT OF CONSTRUCTION CONTRACTS FOR
HOPKINS PAVILION EXPANSION AND RENOVATION PROJECT
WHEREAS,the city of Hopkins(the"City")has worked with Stevens Engineers,292 Design Group
Architects, and RJM Construction Management Services Corporation ("RIM") on design plans and
specifications for the expansion and renovation of the Hopkins Pavilion(the"Project");and
WHEREAS,on October 17,2017,the City hired RJM as its construction manager for the Project;and
WHEREAS, pursuant to an advertisement for bids for the Project, bids were received for 15 bid
categories,opened,and tabulated according to law;and
WHEREAS,price quotations were also obtained for quote categories,according to law;and
WHEREAS, at this time, RJM is recommending the award and assignment of prime contracts, as
related to the bid categories and the quote categories contained in the attached Exhibit A, in each respective
category.
NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HOPKINS
AS FOLLOWS:
1. The recitals set forth in the preamble to this Resolution and the exhibits attached to this
Resolution are incorporated into this Resolution as if fully set forth herein.
2. Each prime contract recommended by RJM, as contained in Exhibit A attached hereto, is awarded.
City staff is directed to execute construction agreements with the contractors listed in Exhibit A.
3. Upon the execution of each prime contract, and once all associated bonds and insurance certificates
are secured for each,the City Council further approves the assignment of said prime contracts to RJM,
and the mayor and the city manager are thereafter authorized to effectuate said assignment by
executing the Assignment of Prime Contracts document in the form contained in Exhibit B attached
hereto.
Approved this 5th day of February,2018,by the City Council of the City of Hopkins,Minnesota.
CITY OF HOPKINS,MINNESOTA
Attest: /1 G6,/(11" ,1,1.
Molly Ci mmings,Mayor
6V/Y/ 12A
Amy Domeier,City Clerk
EXHIBIT A
Recommendations for Award of Prime Contracts
BID CATEGORY AWARD AMOUNT
2A—Demolition $149,270.00
Kellington Construction, Inc.
807 Broadway Street,NE, Suite 185
Minneapolis, MN 55413
3A—Concrete; 4A—Masonry $510,000.00
Steenberg-Watrud Construction, LLC
10967 Clark Road
Inver Grove Heights, MN 55077
6A—Carpentry $221,150.00
George F. Cook Construction Co.
2300 Nevada Ave.N., Suite 200
Golden Valley, MN 55427
7B—Roofmg $266,700.00
B&B Sheet Metal &Roofmg, Inc.
210 Centennial Drive
Buffalo,MN 55313
7C—Metal Wall Panels $151,542.00
Flynn Midwest LP
15525 32
nd Avenue North
Plymouth, MN 55447
8A—Aluminum Entrances $189,700.00
Brin Contract Glazing
2300 North 2
nd Street
Minneapolis,MN 55411
9A—Gypsum Board Assembly $81,100.00
RTL Construction, Inc.
4000 Valley Industrial Blvd. S.
Shakopee, MN 55379
9E—Painting $219,890.00
Décor-Tec, Inc.
2812 Washington Ave. N. St
A-1
13A—Ice Refrigeration Systems $1,258,900.00
Cimco Refrigeration Inc
2502 Commerical Park Drive
Mobile,AL 36606
22A Plumbing Systems $274,000.00
Modem Piping,Inc.
9124 Isanti St.
Blaine,MN 55449
23A HVAC Systems $313,458.00
General Sheet Metal Company, LLC
2330 Louisiana Avenue North
Golden Valley, MN 55427
26A Electrical Systems $260,350.00
Manor Electric, Inc.
5350 Pioneer Creek Drive, Suite 3
Maple Plain,MN 55359
31A Earthwork&Utilities $179,470.00
Rachel Contracting, Inc.
4125 Napier Court NE
St. Michael,MN 55376
31B Aggregate Piers $94,000.00
Foundation Service Corporation
PO Box 120
Hudson, IA 50643
QUOTE CATEGORY AWARD AMOUNT
Surveying $6,137.50
Westwood
7699 Anagram Drive
Eden Prairie,MN 55344
Final Cleaning $7,363.75
Prime Construction Solutions
9363 Penn Ave S
Minneapolis, MN 55431
3B Precast Structural Concrete $66,033.00
Molin
415 Lilac Street
515017v2 DTA HP145-21 A-2
Lino Lakes,MN 55014
5A Structural Steel &Misc. Metals—Mtl $48,500.00
Briese Iron Works Inc
7010 Dresser Drive NE
Rochester, MN 55906
5B Structural Steel &Misc Metals—Installation $34,300.00
Bald Eagle Erectors
7309 Lake Drive
Lino Lakes,MN 55014
7A Waterproofing $5,680.00
Kremer Davis
132 Osborne Road NE
Minneapolis, MN 55432
8B Overhead and Sectional Doors $15,860.00
Crawford Door Sales Co.
P.O. Box 18143
West St. Paul, MN 55118
9B Tiling $24,250.00
Twin City Tile &Marble
990 Lone Oak Road, Suite 160
Eagan, MN 55121
9C Acoustical Ceilings $9,960.00
Kirk Acoustic Inc
395 Bridgepoint Way South
St. Paul, MN 55075
9D Flooring $11,000.00
Sonus Interiors
6325 Sardburg Road
Golden Valley, MN 55427
10A Signage $20,125.00
Spectrum Sign Systems Inc
9278 Isanti Street NE
Blaine, MN 55449
12A Roller Shades $2,392.43
American Drapery Systems
676 Mendelssohn Ave N
Golden Valley, MN 55427
515017v2 DTA HP145-21 A-3
21A Fire Sprinkler $15,000.00
Service Fire Protection, Inc
340 Ponridge Circle
Wayzata, MN 55391
32B Concrete Sidewalks/Curb and Gutter $20,290.00
North Country Concrete
23035 Ulysses Street NE
East Bethel,MN 55005
515017v2 DTA HP145-21 A-4
EXHIBIT B
Assignment of Prime Contracts
THIS ASSIGNMENT is made and effective this day of , 2018, by the
City of Hopkins, Minnesota, a municipal corporation ("City" or "Owner") to RJM Construction
Management Services Corporation, a Minnesota corporation("Construction Manager").
RECITALS
A. City and Construction Manager have entered into that certain agreement entitled
Standard Form of Agreement between Owner and Construction Manager, A133TM_2009, as
modified and A201-2007,as modified("CM Agreement")regarding the project described therein
("Project") and the Construction Manager's right therein to propose to the City a Guaranteed
Maximum Price("GMP")to carry out its services as a CM at risk with a GMP.
B. The Work for Construction of the Project has been competitively bid or quoted
pursuant to Minnesota law,and City has awarded separate contracts to the Prime Contractors.Each
Prime Contractor has entered into a written agreement in form AIA A101-2007, as modified, and
A201-2007,as modified,setting forth the terms and conditions of the Work,together with all other
plans, specifications, and general conditions as set forth in the Prime Contract (individually, a
"Prime Contract" and collectively, the "Prime Contracts"). A List of the Project Prime Contracts
awarded is attached hereto as Exhibit A.
C. The Construction Manager has proposed and the City has accepted a GMP under
the terms and conditions of the CM Agreement and related documents.
D. Both the Owner-Prime Contractor agreement and the CM Agreement allow the
assignment of the Prime Contracts by Owner to Construction Manager.
NOW THEREFORE, for valuable consideration, the receipt and sufficiency of which is
hereby acknowledged, the parties agree to the following:
1. The Recitals are made a part of this Agreement.
2. Except for the rights and obligations reserved to City in sections 4 and 7 below,
City assigns all its rights, benefits, remedies, duties, and obligations under the Prime Contracts to
Construction Manager, who hereby assumes such assigned rights, benefits, remedies, duties, and
obligations.
3. By this Assignment, Owner agrees to make payments to Construction Manager for
the Work described in the Prime Contracts,subject to the terms of the Prime Contracts. City agrees
to provide to Construction Manager all services or information required by the Prime Contracts
and, with respect to the Construction Manager, retains all duties owed by Owner to Prime
Contractors under the Prime Contracts.
B-1
4. City, with respect to Construction Manager, reserves its right (and related
obligations), to be exercised in consultation with Construction Manager and subject to time and
price adjustments contemplated by the CM Agreement and the Prime Contracts, to order changes
to and finally approve the Work.Owner further agrees to assign to Construction Manager the rights
and obligations arising out of such change orders,provided,however,Owner agrees to compensate
Construction Manager for the agreed-upon cost of such changes(s) and the Cost of Construction
Manager's additional services. Owner's rights, benefits, and obligations under resulting Change
Orders, subject to the same reservations as set forth in the immediately preceding sentence, will
be deemed assigned to and assumed by Construction Manager.
5. Construction Manager agrees that in return for the Assignment of Prime Contracts
referenced herein, it shall accept the City's rights, and agrees it shall be responsible to Prime
Contractors for the City's responsibilities, including full payment, for amounts due Prime
Contractors under the Prime Contracts. Construction Manager's obligation to pay the Prime
Contractors is conditioned upon Construction Manager receiving payment from Owner for the
work for which Prime Contractor requests or claims a payment is due,subject to terms of the Prime
Contractor agreement.
6. Construction Manager further agrees that it shall indemnify and hold City harmless
from any and all claims, costs, disputes, requests for equitable adjustment or any other additional
recovery sought by a Prime Contractor under its Prime Contract due to the errors, negligence, or
breach of contract of Construction Manager or its subcontractors. This indemnification and hold
harmless will not apply to the extent any such claims, costs, disputes, requests, or attempted
recoveries arise from the City's failure to perform its obligations under the CM Agreement or this
Assignment or from any delay by the City in exercising rights reserved to it under this Assignment.
7. City retains its continued ownership in the Project and land,the right to enforce all
City-issued permits and City ordinances relevant to the Project,and all police power authority over
the Project area and persons working in or affected by the Project.
IN WITNESS WHEREOF, the undersigned parties have executed this Assignment
effective the date first above written.
[Signature page to follow]
515017v2 DTA HP145-21 A-2
RJM CONSTRUCTION MANAGEMENT
SERVICES CORPORATION
Construction Manager
Date: By:
Its:
CITY OF HOPKINS
Owner
Date: By:
Its: Mayor, Molly Cummings
Date: By:
Its: City Manager,Michael Momson
515017v2 DTA HP145-21 A-3
EXHIBIT A
List of Prime Contracts
BID CATEGORY AWARD AMOUNT
2A—Demolition $149,270.00
Kellington Construction, Inc.
807 Broadway Street,NE, Suite 185
Minneapolis,MN 55413
3A—Concrete; 4A—Masonry $510,000.00
Steenberg-Watrud Construction, LLC
10967 Clark Road
Inver Grove Heights, MN 55077
6A—Carpentry $221,150.00
George F. Cook Construction Co.
2300 Nevada Ave.N., Suite 200
Golden Valley, MN 55427
7B—Roofing $266,700.00
B&B Sheet Metal &Roofing, Inc.
210 Centennial Drive
Buffalo, MN 55313
7C—Metal Wall Panels $151,542.00
Flynn Midwest LP
15525 32
nd Avenue North
Plymouth,MN 55447
8A—Aluminum Entrances $189,700.00
Brin Contract Glazing
2300 North 2
nd Street
Minneapolis, MN 55411
9A—Gypsum Board Assembly $81,100.00
RTL Construction, Inc.
4000 Valley Industrial Blvd. S.
Shakopee,MN 55379
9E—Painting $219,890.00
Décor-Tec, Inc.
2812 Washington Ave.N. St
Minneapolis,MN
A-1
13A—Ice Refrigeration Systems $1,258,900.00
Cimco Refrigeration Inc
2502 Commerical Park Drive
Mobile,AL 36606
22A Plumbing Systems $274,000.00
Modern Piping, Inc.
9124 Isanti St.
Blaine, MN 55449
23A HVAC Systems $313,458.00
General Sheet Metal Company, LLC
2330 Louisiana Avenue North
Golden Valley, MN 55427
26A Electrical Systems $260,350.00
Manor Electric, Inc.
5350 Pioneer Creek Drive, Suite 3
Maple Plain, MN 55359
31A Earthwork&Utilities $179,470.00
Rachel Contracting, Inc.
4125 Napier Court NE
St. Michael,MN 55376
31B Aggregate Piers $94,000.00
Foundation Service Corporation
PO Box 120
Hudson, IA 50643
QUOTE CATEGORY AWARD AMOUNT
Surveying $6,137.50
Westwood
7699 Anagram Drive
Eden Prairie,MN 55344
Final Cleaning $7,363.75
Prime Construction Solutions
9363 Penn Ave S
Minneapolis,MN 55431
3B Precast Structural Concrete $66,033.00
Molin
415 Lilac Street
Lino Lakes, MN 55014
515017v2 DTA HP145-21 A-2
5A Structural Steel&Misc. Metals—Mtl $48,500.00
Briese Iron Works Inc
7010 Dresser Drive NE
Rochester, MN 55906
5B Structural Steel&Misc Metals—Installation $34,300.00
Bald Eagle Erectors
7309 Lake Drive
Lino Lakes,MN 55014
7A Waterproofing $5,680.00
Kremer Davis
132 Osborne Road NE
Minneapolis, MN 55432
8B Overhead and Sectional Doors $15,860.00
Crawford Door Sales Co.
P.O. Box 18143
West St. Paul,MN 55118
9B Tiling $24,250.00
Twin City Tile &Marble
990 Lone Oak Road, Suite 160
Eagan,MN 55121
9C Acoustical Ceilings $9,960.00
Kirk Acoustic Inc
395 Bridgepoint Way South
St. Paul, MN 55075
9D Flooring $11,000.00
Sonus Interiors
6325 Sardburg Road
Golden Valley,MN 55427
10A Signage $20,125.00
Spectrum Sign Systems Inc
9278 Isanti Street NE
Blaine,MN 55449
12A Roller Shades $2,392.43
American Drapery Systems
676 Mendelssohn Ave N
Golden Valley,MN 55427
515017v2 DTA HP145-21 A-3
21A Fire Sprinkler $15,000.00
Service Fire Protection, Inc
340 Ponridge Circle
Wayzata, MN 55391
32B Concrete Sidewalks/Curb and Gutter $20,290.00
North Country Concrete
23035 Ulysses Street NE
East Bethel,MN 55005
515017v2 DTA HP145-21 A-4