Loading...
VII.1. Sanctuary at Oak Ridge Development; LindahlJune 18, 2018 City Council Report 2018-078 Sanctuary at Oak Ridge Development Proposed Action: Staff recommends the City Council approve the following motions: •Move to adopt Resolution 2018-056 approving Comprehensive Plan amendment for the Sanctuary at Oak Ridge Development. •Move to adopt Resolution 2018-057 approving the First Reading of Ordinance 2018-1133 rezoning the Sanctuary at Oak Ridge development from R-5, High Density Multiple Family to R-1-D, Single Family Low Density with a Planned Unit Development (PUD) •Move to adopt Resolution 2018-058 approving the Preliminary Plat for Sanctuary at Oak Ridge Overview The applicant, Anderson Engineering, requests various applications to allow development of a 4 lot single family subdivision. The subject property is owned by Janet Griffing and located south of Oak Ridge Golf Course, north of Highway 7, west of the Oak Ridge Place condominium building and east of the Eisenhower Community Center. The site is currently guided and zoned for high density residential development similar to the adjacent Oak Ridge Place building and received approval for a 4-story 27 unit building in 2007. According to the applicant, development of the site under the 2007 approvals is complicated by its relatively small size, rectangular shape, topography, limited access and location abutting a wetland. In March of this year, the Planning & Zoning Commission and City Council reviewed and generally supported a concept plan for this development subject to approval by the Minnehaha Creek Watershed District, the applicant’s participation in a planned unit development agreement, and reaching an agreement with the neighboring Oak Ridge Place HOA on maintenance of any shared amenities. Based on the findings detailed below, both the Planning & Zoning Commission and staff recommends approval of this request. Primary Issues to Consider ●Background ●Comprehensive Plan Amendment ●Rezoning ●Planned Unit Development ●Subdivision Design ●HOA Documents Supporting Documents ●Resolution 2018-056 approving Comprehensive Plan Amendment ●Resolution 2018-057 approving the First Reading of Ordinance 2018-1133 •Ordinance 2018-1133 •Resolution 2018-058 approving the Preliminary Plat ●Letter from Oak Ridge Place HOA ●Letter from MCWD ●Applicant’s Narrative ●Plans ●Engineering Comments Financial Impact: $ N/A Budgeted: Y/N ____ Source: _____________ Related Documents (CIP, ERP, etc.): _________________________________________ Notes: City Council Report 2018-078 Page 2 BACKGROUND Development Proposal. The subject property is currently vacant land. Development of the site is complicated by its relatively small size, rectangular shape, topography, limited access and location abutting a wetland. In 2005, the property received development approvals to allow construction of a 16 unit multiple family condominium building. In 2007, those approvals were revised to allow a 4-story 27 unit multiple family condominium building. In each case, the approvals included a variance to allow a lot without frontage on a public right-of-way and was subject to approval from the Watershed District. According to the applicant, the complications noted above make development of the site under its current approvals too costly. The proposed development would subdivide the existing 1.19 acre property into four single family lots requiring both preliminary and final plat approvals. According to the applicant, the lots would likely contain single level homes with walkout basements marketed to empty nesters. The proposed use and many of the dimensional standards would not comply with the current High Density Residential future land use designation or R-5, High Density Multiple Family zoning classification and require both a comprehensive plan amendment and rezoning. Access to the site would come through a shared access easement across Oak Ridge Place, which is a private road. Individual access from the three northern lots would come from a shared driveway while the site furthest south would have its own driveway. The site design is further complicated by an existing water line, which is not located in the adjacent easement. This water line must be relocated within the easement in such a way as to minimize the loss of adjacent trees. Authorization of this application requires the following approvals: • Comprehensive plan amendment from High Density Residential to Low Density Residential • Rezoning from R-5, High Density Multiple Family to R-1-D, Single Family Low Density with a Planned Unit Development (PUD) • Subdivision approval of both preliminary and final plats • Execution of a Planned Unit Development Agreement • Execution of a Development Agreement In addition to the City approvals detailed above, the proposed project also must receive approval from the Minnehaha Creek Watershed District (MCWD). To date, the applicant has received approval from the MCWD to reclassify the adjacent wetland but has yet to receive final approval for grading or stormwater management. The applicant will have an update on the status of their MCWD application during the City Council meeting. However, staff recommends a condition of any City approval require the applicant to receive all necessary approvals from the MCWD. Planning & Zoning Commission Review. The Planning & Zoning Commission held a public hearing to review Planning Application 2018-05 during their regular meeting on May 22, 2018. After hearing a summary presentation from staff, the Commission opened the public hearing for comments. In summary, comments came from residents of the neighboring Oak Ridge Place condominium building and emphasized their opposition to the proposal. The primary representatives of Oak Ridge Place were Homeowners Association President Marles Frankman and their Attorney Daniel Greenstein. Both reviewed the detailed list of their concerns and their petition against the development (see attached letter and petition). Overall, their concerns focused on the type and value of the proposed homes, potential nuisance issues, coordination of any shared amenities and the City’s process to review the development. Several other residents of Oak Park Place spoke in support of these same concerns. City Council Report 2018-078 Page 3 City Planner Jason Lindahl responded to many of the concerns and urged the applicant and Oak Ridge Place residents to work together to address their concerns; however, most of the issues went beyond the City’s review authority for this development. Commissioners Warden and Daly supported staff’s suggestion that the applicant and Oak Ridge Place residents meet to address their concerns and suggested the application be continued. Finding no motion to support that suggestion, the Commission voted 4-2 to recommend the City Council approve the proposed development. Commissioner Daly and Warden voted against based on their position that the applicant and residents of Oak Ridge Place needed more time come to a consensus. Neighborhood Meeting. The City’s public engagement process for this development goes above and beyond the typical statutory requirements for a public hearing and review by the Planning & Zoning Commission and approval by the City Council. It also requires the applicant to host a neighborhood meeting before the public hearing to explain the project, answer questions and take any comments. This meeting took place on May 14 in room 209 of the Eisenhower Community Center. City Planner Lindahl attended the meeting as an observer. The developer’s notes from this meeting along with a comment letter from the Oak Ridge Place HOA are attached for your reference. During the meeting, residents of Oak Ridge Place stated their concerns about the type of housing, construction process, access, parking, wetland, homeowners’ association documents, storm water management and the proposed pedestrian trail. The developer addressed many of these questions during the neighborhood meeting and agreed to continue to work with the neighbors to address their concerns. Concept Plan Review Comments. The Planning & Zoning Commission held a public hearing to review the concept plan for this development (Planning Application 2018-04) during their regular meeting on March 27, 2018. During the meeting, the Commission heard a summary presentation from staff as well as comments from the applicant and neighbors. Comments from the neighbors came from Evelyn Emerson and Betty Clark with the Oak Ridge Condominium Associations related to density, access, traffic construction noise and guest parking. The applicant stated they need a minimum of four units to make the project economically viable, but would work on their design to address the other concerns. The Commission generally supported the design but agreed with the neighbors’ concerns. The Commission directed the applicant to revise the concept plan to address the neighbors’ concerns and the issues raised by staff. The City Council reviewed the concept plan during their April 3, 2018 meeting and agreed with the recommendation of the Planning & Zoning Commission. Comprehensive Plan Amendment The proposed development requires a comprehensive plan amendment to re-guide the future land use classification for the subject property from HRD – High Density Residential to LDR – Low Density Residential. Amendments to the Comprehensive Plan are considered legislative actions, meaning that the City is formulating public policy. The City may amend the Comprehensive Plan after a public hearing before the Planning Commission and a two-thirds majority (4 out of 5 votes) by the City Council. These applications also require notification to the surrounding communities and approval by the Metropolitan Council. The City adopted the current Comprehensive Plan in 2009. This document includes the Future Land Use Map, which guide the future use of the subject property as HDR – High Density Residential. Re-guiding the subject property to LDR – Low Density Residential is consistent with the surrounding land use pattern. As LDR – Low Density Residential, the subject property City Council Report 2018-078 Page 4 will be both a compatible use with the golf course and single family uses to the north and good transition between Eisenhower Community Center to the west and the condominium and church uses to the east. State law requires local governments to inform surrounding communities of any Comprehensive Plan amendments and allow a 60 days comment period. The City will distribute notice of the proposed Comprehensive Plan amendment to surrounding local governments after action by the City Council. All comments received within the 60 days review period will be included with the formal Comprehensive Plan amendment application submitted to the Met Council after final action by the City Council. Rezoning Rezoning applications are considered quasi-judicial actions. In such cases, the City is acting as a judge to determine if the regulations within the Comprehensive Plan, Zoning Ordinance or Subdivision Ordinances are being followed. Generally, if this application meets the City's established requirements, they should be approved. The criteria to weigh when considering a rezoning application are detailed below. Based on these findings, staff recommends approval of the requested rezoning from R-5, High Density Multiple Family to R-1-D, Single Family Low Density with a Planned Unit Development (PUD). Consistency with the Comprehensive Plan. Rezoning the subject property from R-5, High Density Multiple Family to R-1-D, Single Family Low Density with a Planned Unit Development (PUD) would be consistent with the proposed LDR – Low Density Residential future land use category. In addition, staff finds the goals and policies from the comprehensive plan listed below support rezoning the subject property to low density residential. • Protect residential neighborhoods • Maintain appropriate transitions between land uses • Retain and enhance detached single-family homes • Encourage the development of owner-occupied housing • Continue to strive for a mix of housing that accommodates a balance of all housing needs Compatibility with Present and Future Land Uses. Rezoning the subject property to R-1-D is consistent with both present and future land uses of surrounding properties. These uses are detailed in the table below. The existing land use that surround the subject property include the Oak Ridge Golf Course (north), open space/wetland (south), Oak Ridge Place condominium building and a church (east) and the Eisenhower Community Center (west). Future land use designations are private open space (north), institutional (south), high density residential and institutional (east), and institutional (west). Surrounding Existing and Future Land Uses Analysis Location Existing Future North Golf Course Private Open Space South Open Space Institutional East High Density Residential & Church High Density Residential & Institutional West Eisenhower Community Center Institutional City Council Report 2018-078 Page 5 Conformance with New Zoning Standards. The zoning regulations for the R-1-D district include both development and dimensional regulations. Development regulations address items like exterior materials, vehicle access & parking, and landscaping. Dimensional regulations look at setbacks, lot area, lot width and density. Review of these development regulations is provided below while dimensional standards are addressed in the following Planned Unit Development section. Exterior Building Materials. The Zoning Ordinance requires exterior materials to be compatible with adjacent and neighboring structures and uses. In this case, the exterior materials of the adjacent multifamily residential and institutional building are primarily brick while the single family dwellings in the R-1-D district are an even mix of brick and siding. The applicant intends to meet this standard with a mix of siding, brick, stone or stone veneer exterior materials. According to the applicant, all homes will be subject to an architectural review committee as required by the homeowners’ association. Access and Parking. As designed, access to the site would come from Oak Ridge Place through an existing shared access easement across this private road. Individual access to the three northern lots would come from a shared 20’ driveway while the site furthest south would have its own driveway. Off-street parking for each unit will be provided through an attached garage and driveway. Each unit must have a minimum two stall garage with a minimum 20’ setback to provided adequate access and maneuvering area. While there is no requirement for single family homes to provide guest parking, the neighbors have concerns that future guests will park in their parking lot. The applicant’s plans illustrate parallel guest parking within the shared 20’ private driveway; however, staff finds there is not sufficient space for maneuvering and parallel guest parking within the 20’ private driveway. According to the applicant, they made repeated attempts to contact the neighboring church about the possibility of shared guest parking but were unable to reach them. It should also be noted that the Fire Department reviewed this design and finds it acceptable. A cross-access easement will be provided for City vehicles to utilize the shared driveway for entrance and egress of the well site. Trash collection is anticipated at the end of the shared driveway for Lots 2-4, and driveway entrance at Lot 1. Details about the trash collection process is provided in the HOA documents. Landscaping. The standards for landscaping are detailed in Section 555.19 and require residential development provide the greater of 1 tree for every 1,0000 square feet of gross building area or 1 tree for every 50 linear feet of perimeter. In this case, the landscaping requirement would be based on the site perimeter which is 1,132 linear feet requiring 23 trees. The proposed landscape plan exceeds this standard and illustrates a total of 27 trees and 44 plants. These plantings are primarily focused along the shared private driveway and should provide buffering screening between the proposed development and the Oak Ridge Place building to the east. In addition, the applicant proposes to save 3 large existing trees on Lot 4 bordering the golf course. Deciduous trees shall have a diameter of at least 2.5 inches, coniferous trees shall be at least 6 feet in height and shrubs shall be at least 24 inches in height. Staff recommends a condition of approval require the applicant to provide a landscaping letter of credit equal to 1.5 times the value of the all proposed landscaping. City Council Report 2018-078 Page 6 Planned Unit Development The purpose of a planned unit development is to allow flexibility from traditional development standards in return for a higher quality development. Typically, the City looks for a developer to exceed other development standards, building code requirements or goals of the Comprehensive Plan in exchange for the flexibility offered by a PUD. A list of items to consider when evaluating the use of a planned unit development for this site could include, but is not limited to, the items listed below. According to the applicant, development of the site is complicated by its relatively small size, rectangular shape, topography, limited access and location abutting a wetland. Staff recommends using a planned unit development in this case to address both the unique complexities of the site and the resulting differences between the R-1-D zoning standards and the proposed design. ● Architectural design and building materials ● Natural resource protection and storm water management ● Pedestrian and bicycle facilities ● Energy conservation and renewable energy ● Open space and public art ● Buffering and landscaping The flexibility from the typical R-1-D zoning regulations necessary for the proposed development design is detailed in the table below. In exchange for this flexibility, the applicant proposes to increase the natural resource protection and the open space offered by the development. Specifically, the applicant will increase the average buffer around the adjacent wetland from 30 to 40 feet and increase the park dedication from $4,000 to $27,000. Staff finds these development enhancements consistent with the natural resource protection and open space policies in the comprehensive plan. PUD Deviations from the R-1-D Zoning Regulations Standard R-1-D District Proposed PUD Design Front Setback 35’ 30’ House 25’ Garage Side Setback 10’ – 14’ 6’ Rear Setback 40’ 20’ Manage 2 Wetland Buffer 30’ Average 40’ Average Minimum Lot Width 100’ 60’ Density 2 Units/Acre 3.1 Units/Acre Subdivision Design The applicant proposes to subdivide the existing 1.19 acre property into four single family lots and 1 outlot for stormwater management. Subdivision of this property would require approval of both a preliminary and final plat. The table below compares the characteristics of the proposed single family lots with the zoning standards of the R-1-D zoning district. This design is acceptable under the Planned Unit Development zoning (see details above). City Council Report 2018-078 Page 7 Sanctuary at Oak Ridge Lot Comparison with R-1-D Zoning Standards Lot Lot Area Lot Width Lot Depth Standard Proposed Standard Proposed Standard Proposed 1 20,000 sq. ft. 7,075 sq. ft. 100’ 60’ N/A 104’* 2 20,000 sq. ft. 9,692 sq. ft. 100’ 60’ N/A 161.5’* 3 20,000 sq. ft. 12,926 sq. ft. 100’ 60’ N/A 215’* 4 20,000 sq. ft. 19,194 sq. ft. 100’ 60’ N/A 244.5’* *indicates average lot width or depth Park Dedication. With any subdivision, the City has the ability to collect park dedication in the form of land or a fee. The standard park dedication fee for single family residential subdivisions is $1,000 per unit. As part of the developer’s contribution to the PUD, they have agreed to pay a park dedication fee based on the original 27 unit apartment building or $27,000 (see PUD section above). Pedestrian and Bicycle Access. The City has the authority to require pedestrian and bicycle facilities/trails as part of the subdivision process. The applicant had originally proposed a pedestrian and bicycle trail extending south from the development and connecting to the existing trail along the Highway 7 Frontage Road. This trail was opposed by the Oak Ridge Place HOA and has been removed by the developer. Staff is agreeable to this in this case because the proposed trail would not fill a gap in the City’s trail system. Wetland Review To date, the applicant has received approval from the Minnehaha Creek Watershed District to reclassify the adjacent wetland from Preserve Management Class requiring a 75’ buffer setback to Manage 2 requiring a 30’ buffer setback. As part of the developer’s contribution to the PUD, they have agreed to enhance the natural resource protection offered by the proposed development by increasing the buffer around the adjacent wetland to 40 feet (see PUD section above). Engineering Comments The Engineering Department has completed review of the plans for the Sanctuary at Oak Ridge Place development by Anderson Engineering and offers the following comments: The Engineering Department has completed a review of documents related to zoning application for the Oaks Ridge property. • The existing water raw line extending westward out of the City Well House shall be relocated utilizing trenchless methods to minimize tree loss. Minimize number of bends, this may involve moving the connection to existing. • The 1” water line for well priming shall be protected or relocated. • The existing drive aisle width shall be maximized, this may involve minor changes to proposed retaining wall locations. • Protect all existing curb and trees for utility connections. • Outlot B should be eliminated or dedicated to the City. • Stormwater treatment and wetland protection shall be required per the Minnehaha Creek Watershed district. • Access drive shall be private, but be capable of allowing access for garbage trucks and access to City owned well. Show turning movements for garbage truck and three axle dump truck. Pavement section shall be designed to handle truck loading. • All water and sewer utilities shall be private. City Council Report 2018-078 Page 8 • All geotechnical investigation drill and bore holes shall be restored. • All manhole investigations in paved areas shall be patched. It should be noted that the Minnehaha Creek Watershed district has sent the applicant a letter indicating their erosion control and storm water management application is incomplete and they need more information to review their application. This indicates the applicant has yet to meet the Watershed District’s requirements and their approval could be delayed. Homeowners Association Documents According to the applicant, project amenities and shared elements (utilities, driveway, etc.) will be maintained by an HOA Association specifically created for the development. A copy of the Draft HOA Declaration is attached for your reference. All construction within the development will be subject to the rules and regulations provided by the HOA. The neighboring association specifically requested the establishment of an HOA for this development to set standards, provide financial wherewithal for maintenance, include architectural controls, and allow for enforcement of provisions. Outlot A as well as area covered by Limited Common Area Easements will be under the control of the Association. The City Attorney has reviewed this document and found it acceptable. Value of New Construction The applicant’s narrative includes information about the value of new construction in Hopkins. According to the applicant, the current shortage of new single family housing in Hopkins supports this development. A Brokers Opinion of Probable Sales Value, including area housing comps support a value of homes in the $800,000 plus range. This price point supports the high architectural design standards we will maintain for these homes. CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO: 2018-056 A RESOLUTION APPROVING A COMPREHENSIVE PLAN AMENDMENT AMENDING THE FUTURE LAND USE CLASSIFCATIN FOR THE SANCTUARY AT OAK RIDGE DEVELOPMENT FROM HDR – HIGH DENSITY TO LDR – LOW DENSITY RESIDENTIAL WHEREAS, the City of Hopkins received an application from Anderson Engineering of Minnesota, LLC to amend the Comprehensive Plan for the subject properties from HDR – High Density Residential to LDR – Low Density Residential; and, WHEREAS, the subject properties are legally described as follows: Lot 2, Block 1, Oak Ridge Place 2nd Addition, Hennepin County, Minnesota. Outlots A & B, Oak Ridge Place 2nd Addition, Hennepin County, Minnesota. WHEREAS, the procedural history of the application is as follows: 1. That an application to amend the Comprehensive Plan was received by the city on April 27, 2018; and 2. That the Hopkins Planning & Zoning Commission, pursuant to mailed and published notice, held a public hearing on the application and reviewed such application on May 22, 2018: all persons present were given an opportunity to be heard; and, 3. That the written comments and analysis of City staff were considered; 4. That the Hopkins Planning & Zoning Commission voted 4-2 to recommend the City Council approve this request; and 5. That the Hopkins City Council reviewed this application during their June 18, 2018 meeting and agreed with the findings of the Planning & Zoning Commission. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Hopkins hereby approves a Comprehensive Plan amendment amending the Future Land Use designation for the above referenced subject properties from HDR – High Density Residential to LDR – Low Density Residential based on the findings detailed the City Council Report 2018. BE IT FURTHER RESOLVED that this application for amending the Comprehensive Plan is hereby approved subject to the following condition: 1. Approval of the Comprehensive Plan amendment by the Metropolitan Council. Adopted by the City Council of the City of Hopkins this 18th day of June 2018. _______________________ Molly Cummings, Mayor ATTEST: ______________________ Amy Domeier, City Clerk CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO: 2018-057 A RESOLUTION APPROVING THE FIRST READING OF ORDINANCE 2018-1133 REZONING THE SANCTUARY AT OAK RIDGE DEVELOPMENT FROM R-5, HIGH DENSITY MULTIPLE FAMILY TO R-1-D, SINGLE FAMILY LOW DENSITY WITH A PLANNED UNIT DEVELOPMENT WHEREAS, the City of Hopkins received an application from Anderson Engineering of Minnesota, LLC to rezone the subject properties from R-5, High Density Multiple Family to R-1-D, Single Family Low Density with a Planned Unit Development (PUD); and, WHEREAS, the subject properties are legally described as follows: Lot 2, Block 1, Oak Ridge Place 2nd Addition, Hennepin County, Minnesota. Outlots A & B, Oak Ridge Place 2nd Addition, Hennepin County, Minnesota. WHEREAS, the procedural history of the application is as follows: 1.That an application to rezone the subject properties was received by the city on April 27, 2018; and 2.That the Hopkins Planning & Zoning Commission, pursuant to mailed and published notice, held a public hearing on the application and reviewed such application on May 22, 2018: all persons present were given an opportunity to be heard; and, 3.That the written comments and analysis of City staff were considered; 4.That the Hopkins Planning & Zoning Commission voted 4-2 to recommend the City Council approve this request; and 5.That the Hopkins City Council reviewed this application during their June 18, 2018 meeting and agreed with the findings of the Planning & Zoning Commission. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Hopkins hereby approves the first reading of Ordinance 2018-1133 rezoning the subject properties from R-5, High Density Multiple Family to R-1-D, Single Family Low Density with a Planned Unit Development (PUD) based on the findings detailed the City Council Report 2018. BE IT FURTHER RESOLVED that application for amending the Comprehensive Plan is hereby approved subject to the following conditions: 1. Approval of the Comprehensive Plan amendment by the City of Hopkins. 2. Approval of the Comprehensive Plan amendment by the Metropolitan Council. Adopted by the City Council of the City of Hopkins this 18th day of June 2018. _______________________ Molly Cummings, Mayor ATTEST: ______________________ Amy Domeier, City Clerk CITY OF HOPKINS Hennepin County, Minnesota ORDINANCE NO. 2018-1133 AN ORDINANCE REZONING THE SANCTUARY AT OAK RIDGE DEVELOPMENT FROM R-5, HIGH DENSITY MULTIPLE FAMILY TO R-1-D, SINGLE FAMILY LOW DENSITY WITH A PLANNED UNIT DEVELOPMENT THE COUNCIL OF THE CITY OF HOPKINS DOES HEREBY ORDAIN AS FOLLOWS: That the present zoning classification of R-5, High Density Multiple Family, upon the following described premises is hereby repealed, and in lieu thereof, said premises are hereby zoned R-1- D, Single Family Low Density. The legal description of the properties to be rezoned is as follows: Lot 2, Block 1, Oak Ridge Place 2nd Addition, Hennepin County, Minnesota. Outlots A & B, Oak Ridge Place 2nd Addition, Hennepin County, Minnesota. First Reading: June 18, 2018 Second Reading: July 17, 2018 Date of Publication: July 26, 2018 Date Ordinance Takes Effect: July 26, 2018 ______________________ Molly Cummings, Mayor ATTEST: _______________________ Amy Domeier, City Clerk APPROVED AS TO FORM AND LEGALITY: ____________________ ______________ City Attorney Signature Date CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO: 2018-058 A RESOLUTION APPROVING THE PRELIMINAR PLAT FOR THE SANCTUARY AT OAK RIDGE DEVELOPMENT WHEREAS, the City of Hopkins received a preliminary plat application from Anderson Engineering of Minnesota, LLC for the Sanctuary at Oak Ridge development; and, WHEREAS, the subject properties are legally described as follows: Lot 2, Block 1, Oak Ridge Place 2nd Addition, Hennepin County, Minnesota. Outlots A & B, Oak Ridge Place 2nd Addition, Hennepin County, Minnesota. WHEREAS, the procedural history of the application is as follows: 1.That an application for a preliminary plat of the subject properties was received by the city on April 27, 2018; and 2.That the Hopkins Planning & Zoning Commission, pursuant to mailed and published notice, held a public hearing on the application and reviewed such application on May 22, 2018: all persons present were given an opportunity to be heard; and, 3.That the written comments and analysis of City staff were considered; 4.That the Hopkins Planning & Zoning Commission voted 4-2 to recommend the City Council approve this request; and 5.That the Hopkins City Council reviewed this application during their June 18, 2018 meeting and agreed with the findings of the Planning & Zoning Commission. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Hopkins hereby approves the preliminary plat for the Sanctuary at Oak Ridge based on the findings detailed the City Council Report 2018. BE IT FURTHER RESOLVED that application for preliminary plat of the Sanctuary at Oak Ridge is hereby approved subject to the following conditions: 1. Approval of the Comprehensive Plan amendment by the City of Hopkins. 2. Approval of the Comprehensive Plan amendment by the Metropolitan Council. 3. Approval of rezoning the subject properties to R-1-D, Single Family Low Density PUD 4. Execution of a Planned Unit Development/Development Agreement. 5. Conformance with all conditions of the City Engineer listed in the June 18, 2018 staff report. 6. Conformance with all requirements of the Minnehaha Creek Watershed District. 7. The applicant must provide evidence of current title, in the form of a commitment for title insurance, subject to the review and approval of the City Attorney. 8. Formation of an HOA to management and maintain shared amenities in a form satisfactory to both City staff and the City Attorney. 9. Payment of all applicable development fees and expense incurred by the City in relation to this development and resolution. Adopted by the City Council of the City of Hopkins this 18th day of June 2018. _______________________ Molly Cummings, Mayor ATTEST: ______________________ Amy Domeier, City Clerk May 15, 2018 Airborne Construction One, LLC c/o Roger Anderson 13605 1st Avenue North, Suite 100 Plymouth, MN 55441 RE: MCWD Permit Application #18-248: Sanctuary at Oak Ridge Dear Mr. Anderson, Thank you for submitting an application for a Minnehaha Creek Watershed District permit for erosion control and stormwater management located at the property with PID 24-117-22-12-0096 and 24-117-22-12-0097 Avenue in the City of Hopkins. The application was received on May 5, 2018. After review of the application materials submitted, the proposed project triggers the erosion control and stormwater management rules. Additional information is required to complete the application and is outlined below. Based on additional information needed, the application is incomplete. Permit applications that do not require a variance or exception to District Rules require a public notice to all properties within 600 feet of the subject property, which includes a 14 day comment period allowing members of the public to receive further information and/or request a public hearing. If a public hearing is requested, it will be scheduled on the first available Board meeting after the application is determined by staff to be complete. Applications that require a variance or exception to District Rules require approval of the District Board of Managers which also includes the public notification process. Following the completion of the public process and the District’s determination that the permit application is complete you will receive written notice of conditional approval. This notice will list the conditions of the approval that will need to be complete prior to the permit being issued. Please submit the following information: Erosion Control: The District’s Erosion Control rule is triggered for any project proposing disturbance in excess of 5,000 square feet or 50 cubic yards of cut or fill. Because the project as proposed will disturb 0.71 acres and 450 cubic yards, the District’s Erosion Control rule is triggered. Please submit the following information to fulfill the criteria of the rule: 1. Signed copy of the Erosion Control Supplemental Form (attached); 2. The location(s) of concrete washout sites; 3. Perimeter control down gradient of all disturbance; a. Current plan does not provide perimeter control for installation of rock trenches 4. Perimeter control that conforms to the standards of the Minnesota Stormwater Manual and MnDOT standard specs, including: a. Perimeter control designed for slopes on site, including redundant controls and j-hooks as needed. Stormwater Management: The District’s Stormwater Management rule is triggered for any project creating new or replace existing impervious surface or change the contours of a parcel of land in a way that affects the direction, peak rate, volume, or water quality of runoff flows from the parcel. The project is proposing the replacement of 5,397 square feet of impervious area with 19,700 square feet of impervious area. The stormwater management rule is triggered and phosphorus, rate, and volume control must be provided for the entire site’s impervious area. Please submit the following information to fulfill the criteria of the rule: 1. Plans and modeling demonstrating no increase in the runoff rates for the 1, 10, and 100 year storm events a. Current stormwater report and hydroCAD report are inconsistent for the 1 year event b. Consider enlarging the proposed BMPs or reducing the diameter of outlets to reduce runoff rates c. If rates cannot be reduced for all storm events, a variance application is required. The variance application and variance rule are attached. 2. Revised plans in conformance with the MN Stormwater Manual, including: a. Revised detail for infiltration trench, see attached detail from stormwater manual Wetland Protection The buffer provision of the District’s Wetland Protection Rule is triggered whenever the Stormwater Management Rule is triggered and buffer must be provided down gradient of disturbance. Thirty foot buffers must be provided. To fulfill the criteria of the rule, please provide: 1. Calculation of the total buffer area required by applying a uniform 30-foot buffer 2. Calculation of the total provide buffer a. Please note that the rock trenches may not be located within the buffer As we review your submittals, we may find the need to request additional information, and will so inform you. Please be advised that MCWD will retain the application and supporting materials submitted for one year from the date of this letter. After that, the application will be closed and a new application and supporting materials will need to be submitted to initiate the MCWD permit-review process. If you have any questions please contact me at eshowalter@minnehahacreek.org or 952-641-4518. Sincerely, Elizabeth Showalter Permitting Technician CC: Nate Stanley, City of Hopkins Sanctuary at Oak Ridge Hopkins, MN Rev. Jun 14, 2018 P a g e 1 | 5 PROJECT NARRATIVE SANTUARY AT OAK RIDGE Hopkins, MN As the developer of the propose Sanctuary at Oak Ridge, we offer the following information to assist in your plan review. Applications The following permits and approvals are sought for this project: · Comprehensive Plan Amendment · Rezoning from R-5 High Density to R-1-D Residential District, consistent with adjacent zoning to the north. · Preliminary and Final Plat · Planned Unit Development (P.U.D.) The Concept Plan for the development was presented to both the Planning Commission and City Council at earlier meetings, receiving a positive response. We have since received feedback from neighbors, and made changes as a result. Project Background A 27-unit, 4-story condominium project was approved for this site in 2007. Due to market and site constraints, the project was not constructed, and the property owner has since exhausted all avenues in sale of the property to multi-family developers (see attached Colliers International letter). The site is more aptly suited for single-family homes, as the size, geometry and topography of the site can be better addressed with this type of housing unit, thus the request for re-zoning. The 2007 project approvals resulted in easements being filed, allowing this parcel access and utility rights within the existing / adjacent Oak Ridge Place private road. Oak Ridge Place condominiums abuts the project to the east, and shares the access drive with the proposed lots. City of Hopkins Well House No. 5 is located at the northeast corner of this parcel. Project Description Overview Four (4) single family homes are proposed on the 1.3-acre parcel, with Oak Ridge Place providing roadway and utility access to the proposed home sites. The triangular parcel includes a 20-foot strip of land – we call it the “panhandle” - extending south to the Highway 7 frontage road. The project incorporates a shared driveway access for the northerly three lots due to a boulder wall and topographical elevation change along the northeast part of the site. The most southerly lot will have a driveway access directly onto Oak Ridge Place. It should be noted that the shared driveway has been relocated about 15-feet further south from its originally designed location after receipt of neighbor concern over the proximity to the existing condominium garage access. The shared driveway is now located approximately 70-feet from the garage access. All four of the home sites will “front” along Oak Ridge Place, with walk-out lower-levels oriented toward the large pond/wetland bordering the west side of the parcel, with landscape enhancements proposed in the “panhandle” (Outlot A) of the parcel. Sanctuary at Oak Ridge Hopkins, MN Rev. Jun 14, 2018 P a g e 2 | 5 Neighborhood Meetings We have had a neighborhood meeting for this development as directed by the City, which was held at the Eisenhower Community Center. Approximately 8 homeowners from the Oak Ridge Place Condominium Assoc. were present. The notes of the meeting are available thru the City Planner. We also have met with the Condo Association Board twice to explain the project and receive their input. Generally, the Association is opposed to the project. We had originally proposed some PUD amenities and landscape items in our proposal, but these have been eliminated as a result of input from the Oak Ridge Place Association. Utilities The sewer and water services to these lots will be extended from the private lines located in Oak Ridge Place, with new main lines proposed in the shared driveway. Electric, gas, and communications lines exist in Oak Ridge Place to serve the four new lots, and within the 20-foot wide strip of land that creates the parcel “panhandle”. Existing electric lines exist through the parcel that will require relocation, as this was previously installed outside of existing public easements. A dead-end electric pole exists on the southeast corner of the parcel triangle as will be removed as part of this development. New service to the homes will be underground. A 12-inch raw water line heading west from the City Well No. 5 was installed outside of a prescribed 20-foot wide public easement, and will require relocation into said easement along the north property line. This work will require coordination with the City Water Department regarding service disruption, etc. A 1-inch waterline exists along the east property line serving the City well house for priming the well pump. This line may remain, or be reconnected to the water lines serving the four lots. If this line is left in place, public easement will be needed over the “panhandle” to accommodate continued public access, and disruptions will need to be coordinated during utility construction for the new lots. Stormwater management will be provided with low-impact development best-management practices (BMPs), including a raingarden that receives run-off from the private driveway and front yards of the new homes. It also collects some water from the condominium site. In addition, run-off from the new homes will be captured in rear yard infiltration trenches spanning the rear yards. These will designed/sized and installed during home construction, based upon the final house design. The MCWD permit requirements have been followed for the design of the stormwater system, and a permit application and supporting documentation has been submitted to the MCWD for their review. Public Safety, Access, Parking & Trash Collection Oak Ridge Place will serve as the fire lane and access for the proposed lots. The shared driveway is meant to accommodate private access to the home sites only, and provide for some off-street parking for guests. Neighboring properties have been approached to discuss potential shared parking; however, these discussions are currently on-going. A parking exhibit is included in the back of this narrative to illustrate off-site parking capacity currently available to these proposed four homes. A cross-access easement will be provided for City vehicles to utilize the shared driveway for entrance and egress of the well site. Trash collection is anticipated at the end of the shared driveway for Lots 2-4, and driveway entrance at Lot 1. Construction Construction of the project will include installation of the sewer, water, driveway, drainage and P.U.D. amenities required for the new homes. Landscape amenities construction will be staged to avoid disturbance during the house construction. Lot grading will be completed by the homebuilders based upon the final house plan for each individual lot, allowing for greater preservation of existing trees. Silt fence will be installed throughout the site prior to construction to delineate construction limits, protect trees, and keep construction out of preservation and buffer areas. Sanctuary at Oak Ridge Hopkins, MN Rev. Jun 14, 2018 P a g e 3 | 5 Planned Unit Development (PUD) This project is designed as a P.U.D. to obtain flexibility in the proposed underlying zoning district. In exchange, the project offers amenities and higher design standards to meet City goals. The variations proposed are outlined below, with amenities and design upgrades described thereafter. Proposed Flexibility from Standards The table below shows the underlying zoning requirements as they relate to the proposed subdivision, and the basis for the proposed design. Proposed lot area, width, and front yard setbacks are all based upon those allowed in other single family districts. Proposed side yards are based upon current City requirements for garage side yards, and standard drainage /utility widths needed along lot lines. P.U.D. Amenities and Design This project proposes a high-quality single family development of four new single-family home sites and incorporates extensive landscaping, preservation of trees, low-impact development practices for storm water management, and extended buffers for wetland protection. Further description is as follows: These four, single-family residential homes will provide a cottage-style vernacular to the neighborhood. Because the target market for these four homes is “empty nesters”, aesthetics will be important along with durable materials will be desired. Besides brick and wood siding as seen on adjacent properties, these homes will include up-graded aesthetics by use of natural and cultured stones, stone veneer and a multitude of natural and manufactured siding products with strong aesthetic appeal. Colors of all materials will be neutral with grays, tans and browns to blend into the surrounding neighborhood. All new home plans will be subject to an HOA architectural review committee for approval. Images of houses, typical of what may be constructed here, are included as an attachment to this narrative. A large pond / wetland exists west of the four residential lots. The Minnehaha Creek Watershed District requires that a 30-ft average width buffer be placed adjacent to the waterbody. Our plan calls for a buffer exceeding the watershed requirements - and includes preservation of many significant trees. This added protection goes toward the City’s goal for natural resource protection, open spaces, and buffering / landscaping. In addition, it affords these home sites a natural rear yard setting. The proposed development employs a low impact design to conserve energy and limit disturbance to the surrounding natural resources. The homes that will be built are intended to have walkout basements that situate nicely on the existing downslope, limiting excavation needs. Stormwater runoff will be collected and filtrated through a raingarden basin and rock trenches to treat and promote infiltration and Sanctuary at Oak Ridge Hopkins, MN Rev. Jun 14, 2018 P a g e 4 | 5 groundwater recharge. These efforts go toward the City’s goal of natural resource protection and stormwater management. The existing property has excellent vegetative cover consisting of large canopy trees, understory buffer near the wetland and maintained groundcover. Because this development is designed to be low impact, the home sites will be custom-graded by the home builder for each specific home plan. This offers the home owners and builder the opportunity to preserve significant trees located on or near each building site. In addition, this eliminates energy waste and reduces pollution by eliminating redundant excavation and earthwork. In addition to preserving existing vegetation, the new development will provide include the required tree plantings to buffer the surrounding neighborhood from this development, and offer a nice aesthetic along the entrance and within the site Along with the trees, numerous shrubs and perennials are proposed at the shared driveway entrance, per the Landscape Plan (sheet L1). Additional landscaping will be provided by each homeowner. The resulting landscaping for this project far exceeds the current standards, and goes towards achieving the City’s goal for maximizing landscaping, open spaces, high-quality architectural aesthetics. Proposed Home Owners Association (HOA) The project amenities and shared elements (utilities, driveway, etc.) will be maintained by an HOA Association specifically created for the development. A copy of the Draft HOA Declaration is included in this submittal. All construction within the development will be subject to the rules and regulations provided by the HOA. The neighboring association specifically requested the establishment of an HOA for this development to set standards, provide financial wherewithal for maintenance, include architectural controls, and allow for enforcement of provisions. Outlot A as well as area covered by Limited Common Area Easements will be under the control of the Association. This document is provided for review by the City Attorney, as required for the development approval. When the project moves ahead, additional documents will be prepared as needed to complete the establishment of the HOA. Site Parking One of the concerns of the neighbors is the limited off-street parking available for the site. No parking is allowed on Oak Park Place, the access to the site. The City has no requirement for off-street parking for single family homes. In addition to the three car garages, we will have available the garage aprons, and the access drive during parties and at other busy times. This will provide room for approximately 20 outside spaces for vehicles in private driveways and the access drive for four units. An exhibit showing this parking arrangement is attached. We have also attempted many times to contact the adjacent church to see if parking could be shared with them on their lot, but have been unable to make contact. For reference, it should be noted the neighboring condominium has 29 outside parking for 18 units. It is also noted that these spaces do not meet the usual City guidelines for public parking, per staff, but they are provided for private use by only the unit owners, and are controlled by the HOA. Value of New Construction The current shortage of new single family housing in Hopkins supports this development. A Brokers Opinion of Probable Sales Value, including area housing comps support a value of homes in the $800,000 plus range. This price point supports the high architectural design standards we will maintain for these homes. A few sample elevations of homes currently being considered are attached. These elevations and plans show a variety of home styles and layouts typical of the current market. Any new homes will be subject homes to the additional rules and architectural standards described in the HOA architectural design guidelines. Sanctuary at Oak Ridge Hopkins, MN Rev. Jun 14, 2018 P a g e 5 | 5 In conclusion, we request that the City consider the multiple creative benefits proposed for this project and seek your approval of the applications submitted. Attachments: 1. Colliers International letter 2. Off-street Parking Exhibit 3. Brokers Opinion and Sample Houses 4. Draft HOA Documents Minneapolis - St. Paul 4350 Baker Road, Suite 400 Minnetonka, MN 55343 www.colliers.com MAIN +1 952 897 7700 FAX +1 952 897 7704 Dear City of Hopkins, I am writing on behalf of my client, JC Financial. I have been working to sell the Oak Ridge Land Parcel for the last year. In that time, we have run it past every active multifamily developer in the Twin Cities. As part of our marketing strategy, we were listed as “Unpriced”, with the intention of attracting all possible offers. We received very similar feedback from the medium/large developers: · The usable acreage is too small to be efficiently developed into multifamily. · The irregular parcel shape makes development too challenging and costly. · The site necessitates underground parking, which will be too costly with the adjacent wetland. · The topography varies too much for a large single structure development. · The watershed and Oak Ridge restrictions add too many layers of complication on the front end. The parcel ended up attracting the attention of some small, first-time developers due to it being in Hopkins and next to the country club. Over the summer we went under contract twice with small boutique developers who thought that they could solve the problems that kept the big players away. Both groups ended up terminating their purchase agreements due to an inability resolve those issues. I have been very pleased with the fresh approach that Anderson Engineering has taken to the site. Their team has been able to solve the problems that others could not. I am hopeful that The City of Hopkins will acknowledge the untapped potential of this parcel as a single-family subdivision, and give Anderson Engineering the nod of approval. Feel free to reach out to me with any questions regarding my above statements. Thank you, B Brady DeVore 612-240-3757 | brady.devore@colliers.com N 0 40' 80' 14916 4/27/2018 ENGINEERING ANDERSON SANCTUARY AT OAK RIDGE HOPKINS, MN P PARKING EXHIBIT PRESERVE EXISITING VEGETATION ALONG OAK RIDGE PLACEOAK RIDGE PLACEHIGHWAY 7 SERVICE ROAD STORMWATER DETENTION WETLAND BUFFER LOT 1 LOT 2LOT 3LOT 4 RETAINING WALL WITH LANDSCAPING EXISTING CITY TRAIL EXISTING POND IND. SCHOOL DISTRICT NO. 270 EISENHOWER COMMUNITY CENTER PARKING LOT OAK RIDGE PLACE CONDOMINIUMSOAK RIDGE GOLF COURSE N 0 20Scale 40 JUNE 11, 2018 CITY OF HOPKINS WELLHOUSESanctuary at Oak Ridge OUTLOT A SHEET INDEX LOCATION MAP N.T.S.SANCTUARY AT OAK RIDGE HOPKINS, MN PRELIMINARY & FINAL PLAT & P.U.D. PLAN SHEET SHEET TITLE C1 COVER SHEET C2 SURVEY C3 FINAL PLAT C4 EASEMENT EXHIBIT C5 FINAL P.U.D. PLAN C6 GRADING, DRAINAGE, & EROSION CONTROL PLAN C7 UTILITY PLAN C8 DETAILS C9 DETAILS C10 DETAILS L1 LANDSCAPE PLAN L2 LANDSCAPE DETAILS NOT FOR CONSTRUCTION ENGINEERING Anderson Engineering of Minnesota, LLC 13605 1st Avenue North Suite 100 Plymouth, MN 55441 763-412-4000 (o) 763-412-4090 (f) www.ae-mn.com ENGINEERING ARCHITECTURE LAND SURVEYING ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE ANDERSON SANCTUARY AT OAK RIDGE HOPKINS, MN C1COVER SHEET N PROJECT SITE SITE HIGHWAY 7MN 7 SERVICE ROAD CONDOS OAK RIDGE ROADCHURCH AREA MAP N.T.S. LOT 1 LOT 2 LOT 3 LOT 4 IND. SCHOOL DISTRICT NO. 270 EISENHOWER COMM. CTR. KOREAN EVANGELICAL UNITED METHODIST CHURCH 717 HWY 7 OAK RIDGE PLACE CONDOMINIUMS 555 OAK RIDGE PLACE OUTLOT B CITY OF HOPKINS WELLHOUSE OAK RIDGE PLACE HIGHWAY 7 SERVICE ROADOAK RIDGE PRIVATE GOLF COURSEN HWY 7HOPKINS CROSSROADSHWY 1 6 9 OUTLOT A N0 20' 40' OUTLOT B NOT TO SCALE1 C2SURVEYNOT FOR CONSTRUCTION ENGINEERING Anderson Engineering of Minnesota, LLC 13605 1st Avenue North Suite 100 Plymouth, MN 55441 763-412-4000 (o) 763-412-4090 (f) www.ae-mn.com ENGINEERING ARCHITECTURE LAND SURVEYING ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE ANDERSON SANCTUARY AT OAK RIDGE HOPKINS, MN 20'R15'R8'20'6' 24' R3' R15' R35'10' 20' 6'6' 162' 242' 188' 135' 40' 85' 247' 107' 79' 79' 20' 60' 60' 41' 20' 10' 10' 20' 20' R50' 78' 73' 303' 68' 90'NOT FOR CONSTRUCTION ENGINEERING Anderson Engineering of Minnesota, LLC 13605 1st Avenue North Suite 100 Plymouth, MN 55441 763-412-4000 (o) 763-412-4090 (f) www.ae-mn.com ENGINEERING ARCHITECTURE LAND SURVEYING ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE ANDERSON SANCTUARY AT OAK RIDGE HOPKINS, MN C5FINAL P.U.D. PLANN0 20' 40' LEGEND PROPERTY LIMITS CONSTRUCTION LIMITS ADJACENT PROPERTY BUILDING SETBACK DRAINAGE AND UTILITY EASEMENT PROPOSED CONCRETE C&G PROPOSED CONCRETE PAVEMENT PROPOSED BITUMINOUS PAVEMENT 4" WIDE WHITE STRIPING BOULDER ROCK RETAINING WALL (TO MATCH EXISTING) EXISTING: LEGAL DESCRIPTION: Lot 2 and Outlots A & B, Block 1, OAK RIDGE PLACE 2ND ADDITION, according to the recorded plat thereof, Hennepin County, Minnesota. ZONING: R-5, HIGH DENSITY MULTI-FAMILY GUIDED LAND-USE (COMP. PLAN): HIGH-DENSITY RESIDENTIAL (HDR) EXISTING PARCEL AREAS: LOT 2 51,896 SF (1.19 AC) OUTLOT A 4,750 SF (0.11 AC) OUTLOT B 9 SF (0.002 AC) TOTAL 56,655 SF (1.30 AC) WETLAND AREA WITHIN PARCEL: 6,551 SF (0.15 AC) PROPOSED: ZONING: R-1D PROPOSED P.U.D. SETBACKS: FRONT*: 30' (HOUSE), 25' (GARAGE) SIDE: 6' REAR: 20' *FRONT IS ASSUMED ALONG THE PRIVATE / SHARED DRIVE. PROPOSED LOTS: TOTAL LOT AREA BUILDABLE AREA LOT 1: 7,075 SF 2,770SF LOT 2: 9,692 SF 3,530 SF LOT 3:12,926 SF 3,420 SF LOT 4:19,194 SF 5,060 SF OUTLOT A: 7,759 SF N/A OUTLOT B*: 9 SF N/A TOTAL 56,655 SF *OUTLOT B TO BE DEDICATED TO THE CITY GROSS DENSITY: 4 UNITS / 1.30 AC = 3.1 UNITS PER ACRE NET DENSITY (LESS WETLANDS): 4 UNITS / 1.15 AC = 3.5 UNITS PER ACRE WETLAND BUFFER: WETLAND SETBACKS: 24' TO 30' AVG., 15' MIN. (MEDIUM QUALITY) PER MCWD PROPOSED BUFFER AREA = 10,178 SF AVERAGE WETLAND SETBACK = 10,178 SF / 257 LF = 39.6' WIDTH SITE DATA RETAINING WALL RAINGARDEN WETLAND BUFFER MONUMENT (TYP.) WETLAND BUFFER DELINEATED WETLAND SHARED DRIVEWAY KEY NOTES FRONT YARD SETBACK 30' HOUSE AND 25' GARAGE TYP. SIDE YARD SETBACK 6' TYP. REAR YARD SETBACK 20' TYP. UNLESS WETLAND BUFFER DICTATES OAK RIDGE PLACE IS THE FIRE LANE FOR PROPOSED LOTS 1-4 1 1 2 4 2 3 DRAINAGE AND UTILITY EASEMENT OAK RIDGE PLACE (PRIVATE ROAD)HIGHWAY 7 SERVICE DRIVEEXISTING ACCESS AND UTILITY EASEMENT (SEE SURVEY) 3 4 PROPOSED P.U.D. VARIATIONS FROM STANDARDS ITEM R-1-D PROPOSED PUD BASIS OF PROPOSED VARIATION LOT AREA 20,000 SF 7,075 MIN., 12,222 AVG. R1-B=8,000 SF, R1-C=12,000 SF LOT WIDTH 100 60 R1-B STANDARD FRONT YARD 35 30 (HOUSE), 25 (GARAGE)R1-B AND R1-C=30', R1-A=25' SIDE YARD, 1-STY 10, 5*6 STANDARD SIDEYARD D/U EASEMENT WIDTH SIDE YARD, 2-STY 12, 5*6 STANDARD SIDEYARD D/U EASEMENT WIDTH REAR YARD 40 20 N/A - WETLAND BUFFER GOVERNS REAR SETBACKS MAX. PERCENT BLDG COVERAGE 35 35 N/A - NO VARIATIONS PROPOSED MIN. DWELLING FLOOR AREA 1,200 1,200 N/A - NO VARIATIONS PROPOSED * ATTACHED GARAGE SIDE YARD SHALL BE MINIMUM OF 5-FT, AND CANNOT BE CONVERTED TO LIVING SPACE. NOTE: PROPOSED SETBACKS ASSUME FRONTAGE ALONG OAK RIDGE PLACE (PRIVATE ROAD). INFILTRATION TRENCH (TYP.) EX. GARAGE ACCESS OUTLOT B 25'30' 9659669659 6 4 964965 965 964958 958 957 956960959958 961965.5FL 9 6 5 . 1 96 5 . 5 965.5935.8±965.2FL 964.5FL 9 6 4 . 3 964.7 9 6 4 . 6 MATCH FL 963.9 FL 964.5F L 9 6 4 . 1 FL 964.296 5 . 0 TW 966.1 BW 964.5± TW 966.0 BW 963.1± FL 964.7 HP 964.1 R. 960.4 R. 964.3 R. 965.2 BW 964.6 TC 961.3 TC 960.8 TW 965.0 BW 964.7 TW 964.0 BW 963.3 TW 965.2 BW 964.6 NOT FOR CONSTRUCTION ENGINEERING Anderson Engineering of Minnesota, LLC 13605 1st Avenue North Suite 100 Plymouth, MN 55441 763-412-4000 (o) 763-412-4090 (f) www.ae-mn.com ENGINEERING ARCHITECTURE LAND SURVEYING ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE ANDERSON SANCTUARY AT OAK RIDGE HOPKINS, MN PROPERTY LIMITS CONSTRUCTION LIMITS EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR EXISTING SPOT ELEVATION DRAINAGE ARROW PROPOSED RETAINING WALL PROPOSED CONCRETE C&G SILT FENCE BIO-ROLL INLET SEDIMENT PROTECTION ROCK CONSTRUCTION ENTRANCE SPOT ELEVATION FLOW LINE OF CURB HIGH POINT RIM ELEVATION TOP OF WALL BOTTOM OF WALL 966 965 966 965 HP 800.1 FL 800.1 R 800.1 800.1 TW 800.1 BW 800.1 C6 GRADING, DRAINAGE, & EROSION CONTROL PLANN0 20' 40' LEGEND 50' MIN.2.0% TYP . 0.6%0.6% 2.0% 4.1%10%5% OAK RIDGE PLACE 1. CONTRACTOR IS RESPONSIBLE FOR INSTALLATION, MAINTENANCE AND REMOVAL OF ALL APPLICABLE EROSION & SEDIMENT CONTROL ITEMS. 2. SPECIFIED EROSION/SEDIMENT CONTROL MEASURES ARE THE MINIMUM. ADDITIONAL PRACTICES MAY BE REQUIRED DURING THE COURSE OF CONSTRUCTION. 3. TOTAL DISTURBED AREA IS EQUAL TO 0.62 ACRES. AN NPDES PERMIT WILL NOT BE REQUIRED. 4. PROPOSED SPOT ELEVATION ARE TO TOP OF FINISHED SURFACE UNLESS OTHERWISE NOTED. 5. TAKE ALL NECESSARY PRECAUTIONS TO PROTECT EXISTING UTILITIES. LOCATIONS OF UTILITIES SHOWN BASED ON SURVEY AND AS-BUILT INFORMATION AND MAY NOT REPRESENT ACTUAL CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR UTILIZING UTILITY LOCATES PRIOR TO STARTING ANY WORK. 6. CONCRETE WASHOUT TO BE OFFSITE OR CONTAINED ON TRUCK. CONTRACTOR NOTES: INSTALL SILT FENCE / BIO-ROLL AS PERIMETER CONTROL AROUND SITE INSTALL INLET PROTECTION (TYP.) INSTALL ROCK CONSTRUCTION ENTRANCE PROTECT EXISTING UTILITIES IN-PLACE THROUGHOUT CONSTRUCTION REMOVE EXISTING WALL AS NEEDED FOR CONSTRUCTION OF PROPOSED RETAINING WALL. KEY NOTES: 1 2 3 4 3 2 1 1 1 C8 3 C8 2 C8 CONSTRUCTION LIMITS 4 WETLAND BUFFER STORM WATER POLLUTION PREVENTION PLAN NOTES: 1. GRADING CONTRACTORS SHALL VERIFY LOCATIONS AND ELEVATIONS OF ALL UNDERGROUND UTILITIES WITH THE RESPECTIVE UTILITY COMPANIES PRIOR TO CONSTRUCTION. 2. ALL EROSION CONTROL MEASURES CALLED FOR ON THESE PLANS AND SPECIFICATIONS, WHICH MAY INCLUDE SILT FENCE, SEDIMENTATION BASINS OR TEMPORARY SEDIMENT TRAPS, SHALL BE CONSTRUCTED AND SERVICEABLE IN THE FOLLOWING ORDER: A. ROCK CONSTRUCTION ENTRANCES A MINIMUM OF 50 FEET B. SILT FENCE C. TEMPORARY CULVERTS D. TEMPORARY SEDIMENTATION BASINS AND OUTFALL FACILITIES E. SORMWATER POND CONSTRUCTION F. COMMON EXCAVATION AND EMBANKMENT (GRADING) G. SEED AND MULCH OR SOD H. BIO-ROLL BARRIERS IN FINISHED GRADED AREAS I. INLET AND OUTLET FACILITIES SUBSEQUENT TO STORM SEWER WORK 3. GRADING CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY AND NPDES PHASE II PERMITTING REQUIREMENTS AS WELL AS EROSION CONTROL MEASURES AS MAY BE SHOWN ON THESE PLANS OR SPECIFICATIONS. GRADING CONTRACTOR SHALL IMPLEMENT ANY ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED TO PROTECT ADJACENT PROPERTY. 4. ALL EROSION CONTROL FACILITIES SHALL BE MAINTAINED BY THE CONTRACTOR DURING GRADING OPERATIONS. ANY TEMPORARY FACILITIES WHICH ARE TO BE REMOVED AS CALLED FOR ON THESE PLANS AND SPECIFICATIONS SHALL BE REMOVED BY THE GRADING CONTRACTOR WHEN DIRECTED BY THE ENGINEER. THE GRADING CONTRACTOR SHALL RESTORE THE SUBSEQUENTLY DISTURBED AREA IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. 5. THE GRADING CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER SO THAT CERTIFICATION OF ALL CONTROLLED FILLS WILL BE FURNISHED TO THE OWNER DURING AND UPON COMPLETION OF THE PROJECT. 6. ALL DISTURBED AREAS, EXCEPT AREAS TO BE PAVED AND/OR SPECIFICALLY DESIGNED BY A LANDSCAPE PLAN, SHALL BE COVERED WITH A MINIMUM 6" OF TOP SOIL OR AS INDICATED IN SPECIFICATIONS OR LANDSCAPING PLAN. ALL DISTURBED AREAS SHALL BE SEEDED & MULCHED AT THE PRESCRIBED RATES WITHIN 72 HOURS OF FINAL GRADING UNLESS OTHERWISE NOTED. SEED MIX:MNDOT NO. 25-141 59# / ACRE MULCH:TYPE 1 2 TONS / ACRE (DISK ANCHORED) FERTILIZER: TYPE 3 22-5-10 350# / ACRE ALL EXPOSED SOIL AREAS WITH A CONTINUOUS POSITIVE SLOPE WITHIN 200 LINEAL FEET OF ANY SURFACE WATER, MUST HAVE TEMPORARY EROSION PROTECTION OR PERMANENT COVER FOR THE EXPOSED SOIL AREAS YEAR ROUND, ACCORDING TO THE FOLLOWING TABLE OF SLOPES AND TIME FRAMES: TYPE OF SLOPE TIME (Maximum time an area can remain open when the area is not actively being worked) STEEPER THAN 3:1 7 DAYS 10:1 TO 3:1 4 DAYS FLATTER THAN 10:1 21 DAYS 7. THE EXISTING TOPOGRAPHY AND CONTOUR ELEVATIONS SHOWN ON THE PLAN WERE TAKEN FROM A PLAN FURNISHED BY OWNER. 8. CONTRACTORS GRADING AND EROSION CONTROL OPERATIONS SHALL TAKE PLACE WITHIN THE CONSTRUCTION LIMITS. 9. IT IS REQUIRED THAT SOILS TRACKED FROM THE SITE BY MOTOR VEHICLES BE CLEANED DAILY FROM PAVED ROADWAY SURFACES THROUGHOUT THE DURATION OF CONSTRUCTION. 10. PROVIDE TEMPORARY SEDIMENTATION BASINS AS DIRECTED BY THE ENGINEER. 11. ALL REQUIREMENTS OF THE LOCAL WATERSHED DISTRICT SHALL BE SATISFIED PER THE APPROVED PERMIT. 12. ALL EROSION & SEDIMENT CONTROL MEASURES SHOWN ON THIS PLAN AND IMPLEMENTED IN THE FIELD AS DIRECTED BY THE ENGINEER SHALL CONFORM TO THE MPCA'S "PROTECTING WATER QUALITY IN URBAN AREAS: BEST MANAGEMENT PRACTICES FOR MINNESOTA". 13. DEWATERING AND / OR BASIN DRAINING DISCHARGE SHALL BE DIRECTED TO SEDIMENTATION BASINS WHEREVER POSSIBLE. ALL DISCHARGE POINTS SHALL BE ADEQUATELY PROTECTED FROM EROSION & SCOUR THROUGH USE OF APPROVED ENERGY DISSIPATION DEVICES. 14. ALL SOLID WASTE / CONSTRUCTION DEBRIS SHALL BE DISPOSED OF IN ACCORDANCE WITH MPCA REQUIREMENTS. HAZARDOUS MATERIALS SHALL BE STORED / DISPOSED OF IN COMPLIANCE WITH MPCA REGULATIONS. 15. CONTRACTOR SHALL USE RAPID STABILIZATION METHODS PER MNDOT 2575 AS NEEDED DURING THE COURSE OF THE WORK TO MAINTAIN CONFORMANCE WITH THE CITY AND NPDES II PERMIT REQUIREMENTS. THIS WORK SHALL CONSIST OF OPERATIONS NECESSARY TO RAPIDLY STABILIZE SMALL CRITICAL AREA, TO PREVENT OFF SITE SEDIMENTATION AND / OR TO COMPLY WITH PERMIT REQUIREMENTS. THE WORK MAY BE PERFORMED AT ANY TIME DURING THE CONTRACT AND DURING NORMAL WORKING HOURS. THIS WORK WILL BE CONDUCTED ON SMALL AREAS THAT MAY OR MAY NOT BE ACCESSIBLE WITH NORMAL EQUIPMENT. THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE APPLICABLE MNDOT STANDARDS SPECIFICATIONS, THE DETAILS SHOWN IN THE PLANS, AND THE FOLLOWING: THERE ARE FIVE STABILIZATION METHODS APPROVED FOR THESE OPERATIONS. THESE METHODS MAY BE CONDUCTED INDEPENDENTLY OR IN COMBINATION. METHOD RAPID STABILIZATION 1 TYPE 1 MULCH WITH DISC ANCHORING 2 TYPE 3 MULCH WITH TYPE HYDRAULIC MULCH 3 TYPE HYDRAULIC MULCH WITH SEED MIXTURE 22-11 4 CATEGORY 3 EROSION CONTROL BLANKET WITH SEED MIXTURE 5 RIPRAP CLASS II WITH GEOTEXTILE TYPE III THESE EFFORTS WILL BE INCIDENTAL TO THE EROSION CONTROL BID ITEM. 16. CHANGE OF COVERAGE: FOR STORM WATER DISCHARGES FROM CONSTRUCTION PROJECTS WHERE THE OWNER OR OPERATOR CHANGES, (E.G., AN ORIGINAL DEVELOPER SELLS PORTIONS OF THE PROPERTY TO VARIOUS BUILDERS) THE NEW OWNER OR OPERATOR MUST SUBMIT A SUBDIVISION REGISTRATION WITHIN 7 DAYS OF ASSUMING TRANSFERS, SALE OR CLOSING ON THE PROPERTY. 17. INDIVIDUAL SITE BUILDERS SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL NECESSARY EROSION CONTROL MEASURES AS MAY BE REQUIRED. REQUIRED ECM'S SHALL CONSIST OF BUT NOT BE LIMITED TOT HE FOLLOWING: A. STAKED FIBER LOG ROLLS AT BACK OF ALL CURB EXCEPT AT CONSTRUCTION / DRIVEWAY ENTRANCE. B. SILT FENCE ON ALL DOWN GRADIENT SLOPES FROM CONSTRUCTION AREA. SILT FENCE SHALL HAVE THE BOTTOM DUG IN WITH SOIL FIRMLY COMPACTED. C. ROCK CONSTRUCTION ENTRANCE HAVING 1" TO 2" CLEAR ROCK OVER GEOTEXTILE FABRIC. D. STREET CLEANING AS MAY BE REQUIRED SHOULD VEHICLE TRACKING OCCUR. INDIVIDUAL SITE BUILDERS ARE REQUIRED TO MAINTAIN ECM'S UNTIL SUCH TIME AS INDIVIDUAL YARDS/VEGETATION ARE ESTABLISHED. 18. CONTRACTOR SHALL PROVIDE A TEMPORARY SEDIMENTATION BASIN ON SITE FOR CONSTRUCTION WASH OUT USE. TEMPORARY BASIN SHALL BE LOCATED AS TO PROVIDE EASY ACCESS FOR CONSTRUCTION VEHICLES AND CONCRETE TRUCKS AS NECESSARY. 19. INLET SEDIMENTATION CONTROL IS TO BE PROVIDED TO ALL STORM SEWER CATCH BASIN THROUGHOUT CONSTRUCTION . MEASURES APPLIED SHALL COMPLY WITH BEST MANAGEMENT PRACTICES FOR MINNESOTA AND APPLICATION OF NPDES PHASE II AS APPROPRIATE FOR PHASE OF CONSTRUCTION. 20. CONTRACTOR SHALL PREVENT SOIL LOSS DURING CONSTRUCTION DUE TO WIND EROSION THROUGHOUT CONSTRUCTION. DUST SHALL BE SUPPRESSED THOUGH THE APPLICATIONS OF WATER, AS DEEMED NECESSARY BY THE CONTRACTOR, OR THROUGH EQUIVALENT BMP'S AS APPROVED BY THE ENGINEER. 21. IF LEED ACCREDITATION IS APPLICABLE, CONTRACTOR SHALL DOCUMENT THE IMPLEMENTATION OF THE EROSION AND SEDIMENTATION CONTROL PLAN THROUGH DATE-STAMPED PHOTOS AND INSPECTION LOGS / REPORTS. REPORTS SHALL INCLUDE AT A MINIMUM DESCRIPTION OF ALL EMPLOYED BMP'S (INCLUDING BOTH MEASURES TO PREVENT SOIL LOSS DUE TO RUNOFF AND SOIL LOSS DUE TO WIND EROSION), BMP'S DEEMED UNNECESSARY DUE TO SITE CONDITIONS, CORRECTIVE ACTIONS TAKEN IN RESPONSE TO PROBLEMS, AND ANY ADDITIONAL INFORMATION RELEVANT TO THE CONDITION OF THE EROSION AND SEDIMENT CONTROL PLAN AS IT WAS ESTABLISHED AT THE TIME OF CONSTRUCTION. STORMWATER POLLUTION PREVENTION PLAN SCHEDULE OF INSTALLATION & MAINTENANCE ITEM INSTALLATION INSPECTION & MAINTENANCE REMOVAL SILT FENCE PRIOR TO COMMENCEMENT OF EARTHWORK OPERATIONS. INSPECT & MAINT. AFTER EACH RUN-OFF EVENT. REMOVE SEDIMENTS AS REQUIRED. AFTER TRIBUTARY DRAINAGE AREA IS RESTORED. ROCK CONST. ENTRANCE PRIOR TO COMMENCEMENT OF EARTHWORK OPERATIONS. INSPECT REGULARLY. MAINTAIN AS NEEDED.PRIOR TO PAVING. OUTLET SKIMMER STRUCTURE AFTER POND GRADING IS COMPLETED. INSPECT REGULARLY. MAINTAIN AS NEEDED.PERMANENT. RIP-RAP & FILTER UPON COMPLETION OF POND GRADING, CONC. SWALE CONST. AND OUTLET INSTALLATION. INSPECT & MAINTAIN AT LEAST ANNUALLY AND AFTER HEAVY RAINFALL EVENT. PERMANENT. DETENTION POND DURING EARTHWORK OPERATIONS. AFTER HEAVY RAINFALL EVENTS. REMOVE SEDIMENTS AS NEEDED. PERMANENT. SEED & MULCH AFTER POND GRADING IS COMPLETED. INSPECT & MAINTAIN AFTER HEAVY RAINS. REPLACE WASH-OUT AREAS IMMEDIATELY NO REMOVAL NECESSARY. INLET PROTECTION UPON INLET CONSTRUCTING WHEN 1/3 CAPACITY OF BMP IS REACHED AFTER TRIBUTARY AREAS ARE FULLY RESTORED SAWCUT LINE CONSTRUCTION LIMITS 5 5 POND / WETLAND (MANAGE 2 CLASSIFICATION) NWL = 940.7 RAINGARDEN BOT ELEV. = 955 . 5 TOP OF BERM @ 958.3 TREE PROTECTION (TYP.)4 C8 SITE BENCHMARK T.N.H. = 968.45 TYPICAL EROSION CONTROL FOR ROCK TRENCH INSTALLATION TO INCLUDE BIO-ROLL AND SILT FENCE 1 1 INSTALL SILT FENCE AT 956 CONTOUR SEEDING COMPLETION. NO HEAVY EQUIPMENT TO BE USED AFTER INSTALLATION OF DRAINTILE NOT FOR CONSTRUCTION ENGINEERING Anderson Engineering of Minnesota, LLC 13605 1st Avenue North Suite 100 Plymouth, MN 55441 763-412-4000 (o) 763-412-4090 (f) www.ae-mn.com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± EXIST. WM6 6 NEW BITUMINOUS PAVEMENT (TYP.) ROCK TRENCH (TYP.) 7 C9 7 C8 6 C8 6 C8 6 C9 10 CB-5 R. 960.4 I. 957.9 SUMP 955.9 CBMH-2 R. 958.3 I. 953.5 FES-4 I. 957.0 22LF - 12" HDPE @ 4.1% ROCK TRENCH (TYP.)6 C9 ROCK TRENCH (TYP.)6 C9 ROCK TRENCH (TYP.)6 C9 11 11 11 STRUCTURE SCHEDULE STRUCTURE SIZE CASTING NOTES FES-1 12" W/ TRASH GUARD -3 CY CL III RIP-RAP CBMH-2 48" ROUND R-4342 SEE DETAIL 4/C9 FES-3 12" W/ TRASH GUARD -3 CY CL III RIP-RAP FES-4 12" W/ TRASH GUARD -5 CY CL III RIP-RAP CB-5 2'x3' BOX R-3067 2' SUMP 8 12 12 POWER POLE TO BE REMOVED. COORDINATE W/ UTILITY COMPANY PRESERVE TREES TO MAX. EXTENT PASSIBLE FES-3 I. 956.7 5 C8 8 UNDERGROUND ELECTRICAL LINE TO BE RELOCATED. COORDINATE W/ UTILITY COMPANY RAINGARDEN 6 6 NO HEAVY EQUIPMENT TO BE USED AFTER INSTALLATION OF DRAINTILE NOT FOR CONSTRUCTION ENGINEERING Anderson Engineering of Minnesota, LLC 13605 1st Avenue North Suite 100 Plymouth, MN 55441 763-412-4000 (o) 763-412-4090 (f) www.ae-mn.com ENGINEERING ARCHITECTURE LAND SURVEYING ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE ANDERSON SANCTUARY AT OAK RIDGE HOPKINS, MN C8DETAILS SCALE:1 EROSION CONTROL FENCE NTS SCALE:2 CONSTRUCTION ROCK ENTRANCE NTS SCALE:3 INLET PROTECTION SEDIMENT FILTER SACK NTS NOTE: DEPENDING UPON CONFIGURATION, ATTACH FABRIC TO WIRE MESH WITH HOG RINGS, STEEL POSTS WITH TIE WIRES, OR WOOD POSTS WITH STAPLES. DIRECTION OF RUNOFF FLOW 2' MIN ENGINEERING FABRIC FABRIC ANCHORAGE TRENCH BACKFILL WITH TAMPED NATURAL SOILMETAL OR WOOD POST OR STAKE WIRE MESH REINFORCEMENT (OPTIONAL) TYPICAL INSTALLATION NATURAL SOIL 6" MIN. 6" MIN. HARD SURF A C E PUBLI C R O A D 50' M I N I M U M AS REQUIRE D 6" MINIMUM 1"-2" WASHED ROCK 1" (25 mm) REBAR FOR BAG REMOVAL FROM INLET EXPANSION RESTRAINT [1/4" (6 mm) NYLON ROPE, 2" (51 mm) FLAT WASHERS] 2 EACH DUMP STRAPS DUMP STRAP SILT SACK 4'-0"EQ EQ ZONE A: DIA=1/2X ZONE B: DIA=X ZONE C: DIA=2X PLAN VIEW ELEVATION VIEW FENCING/ROOT PROTECTION 6' HIGH CHAIN LINK FENCING SHALL BE PROVIDED AND MAINTANED AT THE DRIPLINE OF EACH TREE OR AROUND A GROUP OF TREES AT THE DRIPLINE OF OUTSIDE TREES. THE ENGINEER'S APPROVAL IS REQUIRED FOR USE/ACCESS WITHIN ZONE B. PERMISSION FOR USE/ACCESS REQUIRES SURFACE PROTECTION FOR ALL UNFENCED, UNPAVED SURFACES WITHIN ZONE B AT ALL TIMES. * SURFACE PROTECTION MEASURES 1. MULCH LAYER, @ 6"-8"DEPTH 2. 3/4" PLYWOOD 3. STEEL PLATES X TRENCHING / EXCAVATION ZONE A (CRITICAL ROOT ZONE) [DEFINED AS DRIPLINE DIAMETER MULTIPLIED BY 0.5] 1. NO DISTURBANCE ALLOWED WITHOUT SITE-SPECIFIC INSPECTION AND APPROVAL OF METHODS TO MINIMIZE ROOT DAMAGE 2. SEVERANCE OF ROOTS LARGER THAN 2 INCHES IN DIAMETER REQUIRES AN ENGINEER'S APPROVAL 3. TUNNELLING REQUIRED TO INSTALL LINES 3 FEET BELOW GRADE OR DEEPER ZONE B (DRIPLINE (DEFINE)) [MAXIMUM WIDTH OF BRANCH EXTENSION ON TREE] 1. OPERATION OF HEAVY EQUIPMENT AND/OR STOCKPILING OF MATERIALS SUBJECT TO (SPECIFY INDIVIDUAL) APPROVAL 2. SURFACE PROTECTION MEASURES REQUIRED TRENCHING ALLOWED AS FOLLOWS: - EXCAVATION BY HAND OR WITH HAND-DRIVEN TRENCHER MAY BE REQUIRED - LIMIT TRENCH WIDTH. DO NOT DISTURB ZONE A (CRITICAL ROOT ZONE) MAINTAIN 2/3 OR MORE OF ZONE B (DRIPLINE) IN UNDISTURBED CONDITION 3. TUNNELLING MAY BE REQUIRED FOR TRENCHES DEEPER THAN 3 FOOT 4.USE OF PNEUMATIC AIR WAND AND EXCAVATION MAY BE CONSIDERED WHERE THE TRENCH DEPTH DOES NOT EXCEED 4 FEET ZONE C (ABSORBING ROOT ZONE) [DEFINED AS DRIPLINE DIAMETER MULTIPLIED BY 2.0] 1. OPERATION OF HEAVY EQUIPMENT AND OR STOCKPILING OF MATERIALS SUBJECT TO (SPECIFY INDIVIDUAL) APPROVAL 2. SURFACE PROTECTION MEASURES MAY BE REQUIRED AND IS TO BE DETERMINED BY (SPECIFY INDIVIDUAL) TRENCHING WITH HEAVY EQUIPMENT ALLOWED AS FOLLOWS: - MINIMIZE TRENCH WIDTH - MAINTAIN 2/3 OR MORE OF ZONE C IN UNDISTURBED CONDITION - OR AS SPECIFIED BY (SPECIFY INDIVIDUAL) SCALE:4 TREE PROTECTION DETAIL NTS SCALE:6 ASPHALT PAVEMENT SECTION & CONC. G&G NTS SCALE:7 HYDRANT AND GATE VALVE INSTALLATION NTSSCALE:5 FILTRATION BASIN SECTION DETAIL NTS RAINGARDEN PERENNIALS: PLANT QUANTITY SHALL COVER ENTIRE RAINGARDEN AREA AND INCLUDE THE FOLLOWING VARIETIES: 50% PRAIRIE DROPSEED 20% BLUE FLAG IRIS 15% YELLOW CONEFLOWER NOTE: SIZING / SPACING: 2" PLUGS, MIN 18" ON CENTER FOR PERENNIALS. FLOW12" HDPE 6"ALVAGED I TOPSOIL SCARIFIED & UNCOMPACTED (TYP.) 12" 6" CORRUGATED PE DRAINAGE TUBING W/ SOCK (MN/DOT SPEC. 3278) - SEE PLAN FOR LOC. & SIZE COARSE FILTER AGGREGATE (MN/COT SPEC. 3149.2H) GEOTEXTILE SEPARATOR FABRIC 24" 3:1 M A X . BOLDER RETAINING WALL DESIGNED BY OTHERS SEE PLAN FOR 6" RISER LOCATIONS BOT. ELEV. 955.5 12" 24" THICK PLANTING MEDIUM: 70% HOMOGENEOUS SAND (AASHTO M-6, OR ASTM C-33) 30% ORGANIC LEAF COMPOST TOP BERM ELEV. 958.3 VARIES - SEE PLAN NOTE: OUTLET FROM RAINGARDEN SHALL TRANSITION TO SOLID 8" PVC TO OUTLET LOCATION (RIP RAP) - SEE PLAN. 15% PRAIRIE PHLOX 12" FES W/ CL III RIP RAP I. 957.0 FLOW 12" HDPE SEE SHEET C7 FOR CASTING SEE SHEET C7 FOR CASTING 3" SHREDDED HARWOOD MULCH 24" X 36" CBRAINGARDEN OUTLET STRUCTURE W/ WEIR WALL (SEE DETAIL 4/C9 FOR MORE INFORMATION) NOT FOR CONSTRUCTION ENGINEERING Anderson Engineering of Minnesota, LLC 13605 1st Avenue North Suite 100 Plymouth, MN 55441 763-412-4000 (o) 763-412-4090 (f) www.ae-mn.com ENGINEERING ARCHITECTURE LAND SURVEYING ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE ANDERSON SANCTUARY AT OAK RIDGE HOPKINS, MN C9DETAILS SCALE:1 TYPCIAL SAN. & WM SERVICE CONNECTION NTS 12" 6" GRANULAR BORROW MnDOT SPEC3149A MOD. COMPACTED BACKFILL DIA+12" MIN. COMPACTED BACKFILL 12" COARSE FILTER AGGR. MnDOT SPEC. 3149H MOD. DIA+12" MIN. IMPROVED PIPE FOUNDATION PIPE FOUNDATION IMPROVEMENT MATERIAL (3149H MOD.) CONSIDERED INCIDENTAL WITH COST OF PIPE AND GRANULAR BORROW MATERIAL (3149A MOD.) IN THIS AREA ROOF DRAINAGE VARIE S 3" THICK ROCK MULCH NON-WOVEN GEOTEXTILE FABRIC WRAPPED TRENCH (ALL SIDES) 1"-3" CLEAN CRUSHED ROCK WITH 40% VOIDS 1.8' 5' SCALE:2 STANDARRD SANITARY MANHOLE NTS SCALE:3 2'x3' CATCH BASIN NTS SCALE:4 FILTRATION BASIN OUTLET STRUCTURE NTS SCALE:6 INFILTRATION TRENCH (REAR YEARDS) NTS SCALE:7 RIP-RAP AT FES NTSSCALE:5 PIPE BEDDING DETAIL NTS SILT FENCE4"x4" WETLAND BUFFER POSTWETLAND BUFFERRESIDENTIAL YARDS INSTALL SEDIMENT PROTECTION UNTIL UPLAND AREAS ARE RE-VEGETATED LOWEST FLOOR SEED DISTURBED BUFFER AREAS WITH MNDOT MIX NO 33-171 NOTE: FINAL SIZE DETERMINED WITH FINAL HOUSE PLAN. TRENCHES INSTALLED BY HOME BUILDER INSTALL EDGE BOTH SIDES INTEGRALLY CAST SLEEVE SEAL POSITIVE MECHANICAL SEAL OR CASTING SHALL BE NEENAH R-1642 WITH TYPE "C" COVER OR APPROVED EQUAL. SEE SPECIFICATION FOR CASTING ADJUSTMENT PROCEDURE IN ROADWAY BRING GROUND ELEVATION TO TOP OF CASTING OR AS DIRECTED BY THE ENGINEER. PRECAST CONCRETE ADJUSTING RINGS. RINGS SHALL BE SET IN A FULL MORTAR BED AND GROUTED ON THE OUTSIDE ONLY PRIOR TO BACK FILLING. NO GROUT SHALL BE PLACED ON THE INSIDE FACE OF RINGS. MAXIMUM OF 12" (RINGS AND MORTAR) BETWEEN BOTTOM OF CASTING AND TOP OF CONE SECTION. PRECAST REINFORCED CONCRETE MANHOLE, ASTM C-478 SEE JOINT DETAIL BOTTOM RISER WITH 6" INTEGRAL BASE MANHOLE NOTES: 1) MANHOLES WILL BE INSTALLED WITH BELL END FACING UP FOR UNIFORMITY. 2) REINFORCING SHALL BE A MINIMUM OF A SINGLE LINE WIRE FABRIC HAVING AN AREA OF NOT LESS THAN 0.12 SQUARE INCHES PER FOOT OF HEIGHT. SLEEVE NOTES: 1) SHIM OR ADAPTER FOR "NON-STANDARD" PIPE ALLOWABLE. 2) FLEXIBLE SLEEVE SHALL BE A NEOPRENE MATERIAL MEETING THE REQUIREMENTS OF ASTM C-443 OR THE FOLLOWING ELASTOMER EPOM: TENSILE STRENGTH 1500 P.S.I. MIN. (DIE C. ASTM D 412 ELONGATION OF RUPTURE 450% MIN. (DIE C. SATM D 412) COMPRESSION SET 25% MAX. (22 HRS. @ 70 C. ASTM D 395, METHOD B DUROMETER 50 ± 5 (ASST. D 2240) 3) FLEXIBLE SLEEVE DIMENSIONS SHALL CONFORM TO PRODUCERS STANDARDS. 6" 4'-0" 5" MANHOLE STEPS 16" O.C.VARIABLE4'-0" 27" INTERNAL EXPANDING LOCKING BAND (NON-CORROSION RESISTANT STEEL) CRETEX TYPE 477-1 INLET 6" PRECAST REINFORCED CONCRETE 3" VARIES 36" 24" 8" 4" 31"43"6" 17- 3 / 4 "35-1/4"NOTES: DIRECTION OF MAJOR FLOW(TYPE V GRATE) PREFORMED OR CORE DRILLED HOLES REQUIRED FOR SUBDRAIN CONNECTIONS. GROUT INSIDE AND OUT AROUND SUBDRAIN. TRIM DRAIN TILE BACK TO WALL. DOGHOUSES SHALL BE GROUTED ON BOTH THE OUTSIDE AND INSIDE. VARIABLE THICKNESS HDPE ADJUSTING RINGS AS REQUIRED. MINIMUM OF 4" ADJUSTMENT AND MAXIMUM OF 12" ADJUSTMENT. USE LARGER ADJUSTMENT RINGS TO MINIMIZE THE NUMBER OF JOINTS. INCLUDE MIN. 1-2" RING IMMEDIATELY UNDER THE CASTING. THERE CAN BE NO MORE THAN 3" OF OFFSET IN ANY DIRECTION IN THE ADJUSTING RING PLACEMENT. APPLY POLYURETHANE SEALANT BETWEEN THE FIRST RING AND THE STRUCTURE AND BETWEEN THE UPPER RING AND THE CASTING. DON'T APPLY SEALANT TO THE MIDDLE JOINTS. WRAP THE OUTSIDE OF THE RINGS WITH A NON-WOVEN GEOTEXTILE FABRIC. USE 4 FOOT DIAMETER CATCH BASIN MANHOLE WHEN DEPTH EXCEEDS 4.5 FEET. 4'-0" MINIMUM BUILD WITH CASTING & RINGS IF STRUCTURE BASE IS LESS THAN 48" BELOW FINISHED GRADE, PLACE GRANULAR MATERIAL UNDER STRUCTURE, FOR A MINIMUM OF 48" BELOW FINISHED GRADE. NOTE: 1. EXPANSION MATERIAL TO BE PLACED IN FIRST CURB JOINT, BOTH SIDES OF CATCH BASIN. 2. RECESS CATCH BASINS 2" BELOW GUTTER GRADE LINE. 3. FOR SURMOUNTABLE CURB, PROVIDE FACE OF CURB TRANSITION EXTENDING 10' ON EACH SIDE OF CATCH BASIN TO MATCH CASTING. 12" HDPE TO FES-1 INV. 953.5 8" CORRUGATED DUAL WALL HDPE INV. 956.5 PRECAST WEIR INSERT KEYWAY CAST INTO MANHOLE (SEE INSET) PLAN GROUT TO INVERT REINFORCE W/ 1/2" REBAR OR MESH PER PRECAST SUPPLIERS DESIGN NOTES: 1. CONNECT DRAINTILE DOWNSTREAM OF CONCRETE WEIR 6" PERFERATED UNDERDRAIN CONNECT DOWNSTREAM OF WEIR SCALE:8 RIP-RAP AT FES NTS NOT FOR CONSTRUCTION ENGINEERING Anderson Engineering of Minnesota, LLC 13605 1st Avenue North Suite 100 Plymouth, MN 55441 763-412-4000 (o) 763-412-4090 (f) www.ae-mn.com ENGINEERING ARCHITECTURE LAND SURVEYING ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE ANDERSON SANCTUARY AT OAK RIDGE HOPKINS, MN C10DETAILS 9659669659 6 4 964965 965 964958 958 957 956960959958 9612 GTH 3 PGD 1 AFJ 1 PNI 3 QRU 3 PGD 6 PLDNWL 11 CKF 12 NWL 5 CKF 3 PLD 34 JSE 1 AFJ PGD 7 PGD 3 1AFJ1COC AFJ 1 NOT FOR CONSTRUCTION ENGINEERING Anderson Engineering of Minnesota, LLC 13605 1st Avenue North Suite 100 Plymouth, MN 55441 763-412-4000 (o) 763-412-4090 (f) www.ae-mn.com ENGINEERING ARCHITECTURE LAND SURVEYING ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE ANDERSON SANCTUARY AT OAK RIDGE HOPKINS, MN NEW SOD WITH IRRIGATION NATIVE SEED MIX MN 33-262 3" DP SHREDDED HARDWOOD MULCH WITHOUT FABRIC COMMERCIAL GRADE POLY EDGER L1LANDSCAPE PLANN0 20' 40' LEGEND 1 2 CREDITS NOTES 1. ALL PLANTING WITHIN PROPERTY LIMITS SHALL RECEIVE IRRIGATION (SEE L2 FOR IRRIGATION NOTES) ZONING REQUIREMENTS: ZONING: R-5, HIGH DENSITY MULTI-FAMILY GUIDED LAND-USE (COMP. PLAN): HIGH-DENSITY RESIDENTIAL (HDR) MCWD NEW TREE CREDIT: 40 2 1 1 1 CONSTRUCTION LIMITS PLANTING SCHEDULE PROTECT EXISTING VEGETATION & TREES (TYP.) CITY REQUIREMENTS ONE (1) 2-1/2" CALIPER DECIDUOUS TREE OR 6' IN HEIGHT CONIFEROUS TREE FOR EVERY 50' OF PERIMETER. REQUIRED: 1,130.62' / 50 = 22.61 (23 TREES) PROVIDED: DECIDUOUS TREES = 10 CONIFEROUS TREES = 17 TOTAL = 27 TREES CODE QTY COMMON NAME CONT CAL SIZE REMARKS AFJ 4 AUTUMN BLAZE MAPLE B&B 2 - 1/2" CAL. ACER X FREEMANII `JEFFSRED` COC 1 COMMON HACKBERRY B&B 2 - 1/2" CAL. CELTIS OCCIDENTALIS GTH 2 NORTHERN ACCLAIM THORNLESS HONEY LOCUST B&B 2 - 1/2" CAL. GLEDITSIA TRIACANTHOS INERMIS 'HARVE' TM PGD 16 BLACK HILLS SPRUCE B&B 6` HT. PICEA GLAUCA `DENSATA` PNI 1 AUSTRIAN BLACK PINE B&B 6` HT. PINUS NIGRA QRU 3 RED OAK B&B 2 - 1/2" CAL. QUERCUS RUBRA SHRUBS CODE QTY COMMON NAME CONT REMARKS CKF 15 FEATHER REED GRASS 3 GAL. CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER` JSE 4 SEA GREEN JUNIPER 5 GAL. JUNIPERUS X MEDIA `SEA GREEN` NWL 16 WALKERS LOW CATMINT 3 GAL. NEPETA X FAASSENII `WALKERS LOW` PLD 9 DWARF NINEBARK 5 GAL. PHYSOCARPUS OPULIFOLIUS `LITTLE DEVIL` TM NOT FOR CONSTRUCTION ENGINEERING Anderson Engineering of Minnesota, LLC 13605 1st Avenue North Suite 100 Plymouth, MN 55441 763-412-4000 (o) 763-412-4090 (f) www.ae-mn.com ENGINEERING ARCHITECTURE LAND SURVEYING ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE ANDERSON SANCTUARY AT OAK RIDGE HOPKINS, MN L2LANDSCAPE DETAILS SCALE:1 SHRUB BED SPACING (TYP.) N.T.S.SCALE:3 DECIDUOUS SHRUB PLANTING (TYP.) N.T.S.SCALE:4 EVERGREEN TREE PLANTING (TYP.) N.T.S.SCALE:5 DECIDUOUS TREE PLANTING (TYP.) N.T.S. SCALE:2 EVERGREEN SHRUB PLANTING (TYP.) N.T.S. NOTE: - KEEP MULCH APPX. 2" OFF PLANT TRUNK OR STEM - SEE PLANT SCHEDULE FOR EACH PLANT'S APPROPRIATE O.C. SPACING EDGE OF GROUNDCOVER AREA/WALK EDGE DISTANCE FROM EDGE IS 12 THE SPECIFIED O.C. SPACING TRIANGULAR SPACE, AT SPECIFIED O.C. DISTANCE - EQUIDISTANT PLANT CENTER MULCH ROOTBALL PLANTING SOIL NATIVE SOIL 3x ROOT BALL 2" NOTE: -3" DP. SHREDDED HARDWOOD MULCH SHALL BE USED IN ALL LANDSCAPE PLANTINGS AREAS AND UNDER TREES ISOLATED FROM PLANTING AREAS UNLESS IDENTIFIED OTHERWISE. UNDISTURBED OR COMPACTED SOIL PLANTING SOIL MOUND MIN. 6" REMOVE BURLAP, TWINE, ROPE AND WIRE FROM TOP HALF OF ROOTBALL FINISHED GRADE LAWN OR PLANTING BED EDGE (SPADE EDGE IN ALL LAWN AREAS) 6' MIN. DIA. EARTH SAUCER 3" HEIGHT TAMPED WATER BASIN AT EDGE OF EARTH SAUCER TREE TIE SECURED TO DUCKBILL ANCHOR WITH TURNBUCKLE. SECURE TO TREE WITH ANTI-CHAFFING MATERIAL. ALLOW FOR MOVEMENT OF TREE. MULCH SINGLE STRAIGHT LEADER CENTER TREE IN HOLE, UPRIGHT AFTER EXPOSING TREE ROOT FLAIR, PLANT SO ROOT FLAIR IS AT 2" ABOVE ADJACENT FINISH GRADE NOTE: -3" DP. SHREDDED HARDWOOD MULCH SHALL BE USED IN ALL LANDSCAPE PLANTINGS AREAS AND UNDER TREES ISOLATED FROM PLANTING AREAS UNLESS IDENTIFIED OTHERWISE. 3x ROOT BALL 2"12"-18"CENTER TREE IN HOLE, UPRIGHT SINGLE STRAIGHT LEADER TREE TIE SECURED TO STAKE. SECURE TO TREE WITH ANTI-CHAFFING MATERIAL. ALLOW FOR MOVEMENT OF TREE. WRAP TREE WITH TREE WRAPPING MATERIAL AS SPECIFIED TO 1ST BRANCH LAWN OR PLANTING BED EDGE (SPADE EDGE IN ALL LAWN AREAS) 6" MIN. DIA. EARTH SAUCER (2) TREE STAKES DRIVEN A MIN. 2' BELOW GRADE (NW & SW) MULCH 3" HEIGHT TAMPED WATER BASIN AT EDGE OF EARTH SAUCER FINISHED GRADE REMOVE BURLAP, TWINE, ROPE AND WIRE FROM TOP HALF OF ROOTBALL PLANTING SOIL MOUND MIN. 6" UNDISTURBED OR COMPACTED SOIL AFTER EXPOSING TREE ROOT FLAIR, PLANT SO ROOT FLAIR IS AT 2" ABOVE ADJACENT FINISH GRADE MIN.6" LAWN SURFACE UNDISTURBED OR COMPACTED SOIL PLANTING SOIL LINE OF PLANTING PIT WHEN PLANTED INDIVIDUALLY UNDISTURBED OR COMPACTED SOIL MULCH PAVED SURFACE, IF APPLICABLE MIN. 6" 3' MIN. TO PAVED SURFACES PLANTING SOIL MULCH PAVED SURFACE, OR LAWN UNDISTURBED OR COMPACTED SOIL 1. LANDSCAPE CONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID TO BECOME COMPLETELY FAMILIAR WITH SITE CONDITIONS. 2. NO PLANTING WILL BE INSTALLED UNTIL ALL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN IMMEDIATE AREA. 3. IT IS THE RESPONSIBILITY OF THE OWNER & CONTRACTOR TO IDENTIFY ALL UNDERGROUND CABLES, CONDUITS, WIRES, ETC., ON THE PROPERTY. 4. THE CONTRACTOR IS RESPONSIBLE FOR COMPLETE MAINTENANCE OF THE PLANT MATERIAL (WATERING, SPRAYING, FERTILIZING, MOWING, ETC.) UNTIL THE WORK HAS BEEN ACCEPTED, BY THE OWNER. 5. IF THERE IS A DISCREPANCY BETWEEN THE NUMBER OF PLANTS SHOWN ON THE PLAN AND THE NUMBER OF PLANTS SHOWN IN THE PLANT SCHEDULE, THE NUMBER OF PLANTS SHOWN ON THE PLAN WILL TAKE PRECEDENCE. 6. ALL CONTAINER MATERIAL TO BE GROWN IN CONTAINER A MINIMUM OF 6 MONTHS. 7. ALL MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN. 8. REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO THE OWNER. 9. GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR. DECIDUOUS TREES WILL BE GUARANTEED FOR TWO CALENDAR YEARS FROM TIME OF PROVISIONAL ACCEPTANCE. 10. ALL PROPOSED PLANTS SHALL BE LOCATED CAREFULLY AS SHOWN ON THE PLANS AND SHALL BE APPROVED BY OWNERS REPRESENTATIVE BEFORE THEY ARE INSTALLED. 11. CONTRACTOR CAN SUBSTITUTE MACHINE MOVED MATERIAL USING APPROPRIATE SIZE TREE SPADE FOR B & B WITH OWNERS REPRESENTATIVE APPROVAL. 12. LANDSCAPE CONTRACTOR SHALL ENSURE THAT NEW TREES MOVED ONTO THE SITE ARE DUG FROM SIMILAR SITES WITH SIMILAR SOILS TO THE SOILS OF THIS PROJECT (HEAVY TO HEAVY, LIGHT TO LIGHT. HEAVY TO LIGHT SOILS). 13. LANDSCAPE CONTRACTOR IS REQUIRED TO PROVIDE OWNER WITH MAINTENANCE INFORMATION DURING GUARANTEE PERIOD RELATING TO WATERING, FEEDING, PRUNING, PEST CONTROL, AND RELATED ITEMS. THIS WILL BE PREPARED AND DELIVERED TO OWNER AFTER PROVISIONAL INSPECTION APPROVAL HAS BEEN GIVEN BY OWNERS REPRESENTATIVE. 14. BREATHABLE SYNTHETIC FABRIC TREE WRAP: WHITE IN COLOR, IN 3 INCH WIDE ROLLS. MATERIAL SHALL BE SPECIFICALLY MANUFACTURED FOR TREE WRAPPING. TREE WRAP SHALL BE SECURED TO THE TRUNK USING BIO-DEGRADABLE TAPE SUITABLE FOR NURSERY USE AND WHICH IS EXPECTED TO DEGRADE IN SUNLIGHT IN LESS THAN 2 YEARS AFTER INSTALLATION. WRAP ALL TREES, EXCEPT HACKBERRY TREE SHALL BE PROTECTED PRIOR TO 12/1. 15. POLY EDGER UNLESS SPECIFIED OTHERWISE, SHALL BE BLACK VINYL STYLE EDGER. 16. ALL PLANTING AREAS SPECIFIED SHALL RECEIVE 3” DEPTH 1”TO 1-1/2” SHREDDED HARDWOOD MULCH BE INSTALLED WITHOUT LANDSCAPED FABRIC AS INDICATED ON THE PANS & DETAILS. 17. ALL TREES PLANTED INDEPENDENTLY OF SPECIFIED BEDS SHALL RECEIVE 3" DEEP SHREDDED HARDWOOD MULCH WITHOUT FABRIC. 18. ALL PLANTINGS SHALL RECEIVE FERTILIZER AND APPLIED AT THE RATE INDICATED BY THE MANUFACTURER. FERTILIZER SHALL BE GENERAL PURPOSE 10-10-10. 19. DECIDUOUS SHRUBS SHALL HAVE MINIMUM OF FIVE (5) CANES AT SPECIFIED HEIGHT NOTED IN PLANT SCHEDULE. 20. IF THE CONTRACTOR FEELS AN ERROR HAS BEEN MADE REGARDING SPACING OR HARDINESS OF A SPECIES OF PLANT MATERIAL INDICATED ON THE PLAN, NOTIFY THE LANDSCAPE ARCHITECT PRIOR TO THE INSTALLATION OF PLANT MATERIAL. 21. ALL NEWLY INSTALLED PLANT MATERIAL SHALL BE PLANTED IN WELL-DRAINED AREAS. CONTRACTOR SHALL AVOID INSTALLING ANY PLANT MATERIAL IN DRAINAGE SWALES OR WET & POORLY DRAINED AREAS. 22. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE REMOVAL OF ALL TREE STAKES, GUYS, STRAPS AND TRUNK PROTECTION MEASURES FOLLOWING THE COMPLETION OF THE WARRANTEE PERIOD OR AS DIRECTED BY THE OWNER. 23. THE PRACTICE OF STAKING SHOULD NOT ALLOW NAILS, SCREWS, WIRES, ETC. TO PENETRATE THE OUTER SURFACE OF THE TREES. 24. THE CONTRACTOR SHALL MEET WITH THE OWNER ON SITE WHEN THEY FEEL THE PROJECT IS COMPLETE ACCORDING TO THE CONTRACT DOCUMENTS. IF ALL WORK IS SATISFACTORY AND COMPLETE ACCORDING TO THE CONDITIONS OF THE CONTRACT DOCUMENTS, THEN THE OWNER MUST DECLARE THE PROJECT COMPLETE. THIS DECLARATION WILL CONSTITUTE AS THE BEGINNING OF THE WARRANTEE PERIOD FOR ALL PLANT MATERIAL. THE OWNER SHALL PROVIDE A LETTER WITH SIGNATURE STATING THE DATE OF ACCEPTANCE. GENERAL LANDSCAPE NOTES:GENERAL IRRIGATION NOTES: 1. PRIOR TO CONSTRUCTION, VERIFY WITH THE GENERAL CONTRACTOR AND ALL LOCAL UTILITY COMPANIES TO LOCATE EXACT LOCATIONS OF UNDERGROUND UTILITIES. 2. THE IRRIGATION SHALL BE DESIGN/BUILD SYSTEM BY THE CONTRACTOR. THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AN IRRIGATION LAYOUT PLAN AND SPECIFICATIONS AS PART OF THE SCOPE OF WORK WHEN BIDDING. THESE SHALL BE APPROVED BY THE OWNER PRIOR TO ORDER AND/OR INSTALLATION. 3. VALVE AND CIRCUITS SHALL BE SEPARATED BASED ON WATER USE, SO THAT TURF AREAS ARE WATERED SEPARATELY FROM SHRUB AND GROUND COVER AREAS. IRRIGATION HEADS IN TURF AREAS SHALL BE VALVED SPEARATELY FROM SHRUB AMD GROUND COVER AREAS. IT IS RECOMMENDED THAT FULL SUN AND SHADY AREAS TO BE VALVED SEPARATELY AS WELL AS HIGH RUN-OFF AND LOW RUN-OFF AREAS TO BE VALVED SEPARATELY. 4. CONFIRM LIMITS OF IRRIGATION, EXISTING AND FUTURE HARDSCAPE AND BUILDING LOCATIONS PRIOR TO THE DESIGN OF THE IRRIGATION SYSTEM. 5. CONTRACTOR SHALL VERIFY WATER SOURCE LOCATION AND PRESSURE AND SUPPLY A SYSTEM THAT PROVIDES FULL AND COMPLETE COVERAGE TO ALL AREAS TO BE IRRIGATED. 6. SYSTEM SHOULD BE DESIGNED TO OPERATE AT UP TO 300 GPM @ 90 PSI TO COMPLETE WATER SCHEDULES WITHIN 12-HOURS MAXIMUM. 7. RAIN SENSORS AND OTHER WATER SAVING TECHNOLOGIES SHALL BE INCLUDED WITHIN THE IRRIGATION DESIGN. 8. PROVIDE THE OWNER WITH AN OPERATING SCHEDULE THAT WORKS WITH THE APPROVED LAYOUT PLAN AND IDENTIFY ANY FIELD ADJUSTMENTS PRIOR TO PROJECT COMPLETION. 9. AVOID OVER-SPRAY ONTO ROADS, SIDEWALKS, SIGNS AND PARKING AREAS. SPRINKLER ARCS SHALL BE DETERMINED ON SITE BY THE IRRIGATION INSTALLER TO PROVIDE THE MAXIMUM COVERAGE POSSIBLE. CAREFULLY ADJUST THE ARCS AND RADIUS OF EACH SPRINKLER TO PROVIDE HEAD-TO-HEAD COVERAGE. 10. WITHIN EXTREME SLOPED AREAS: 10.1. INSTALL STATIONS SEPARATELY FOR TOP AND BOTTOM OF SLOPED AREAS 10.2. INSTALL LATERAL PIPES PARALLEL TO SLOPE 10.3. IF SLOPE IS TOO EXTREME FOR MACHINERY, INSTALL LATERAL PIPES SAFELY AND TEE-FEED INDIVIDUAL SPRINKLERS VIA DOWNHILL PIPING PERPENDICULAR TO FEED LINE 11. LOCATE VALVE BOXES AWAY FROM ROAD/CURB SO THEY ARE LESS VISUAL WHERE APPLICABLE. 12. DO NOT TRENCH THROUGH THE ROOT BALLS OF NEW PLANTINGS. 13. MAINLINE PIPING BENEATH TRAFFIC AREAS SHALL BE INSTALLED WITH A MINIMUM EARTH COVER OF 30-INCHES FROM BOTTOM OF ROAD SUB-GRADE AND CONTAIN SLEEVES NOT LESS THAN TWO NOMINAL DIMENSIONS GREATER THAT THE PIPE PASSING THROUGH. 14. IRRIGATION INSTALLER SHALL FURNISH AND INSTALL SLEEVE MATERIAL UNDER ALL ROADWAYS, WALKS AND DRIVEWAYS WHERE NECESSARY 15. TOP OF MAINLINES SHALL BE AT LEAST 30-INCHES BELOW GRADE IN TURF AREAS. 16. TOP OF LATERAL LINES SHALL BE AT LEAST 18-INCHES BELOW GRADE. 17. MAINLINE PRESSURE PIPE FITTINGS 3-INCHES AND LARGER SHALL BE PUSH ON GASKET JOINED AND SHALL HAVE MECHANICAL JOINT RESTRAINTS. MAINLINE PRESSURE PIPE FITTINGS 2.5-INCHES AND SMALLER SHALL BE GLUED AND SHALL HAVE CONCRETE THRUST BLOCKS AT FITTINGS THAT COMPRISE CHANGE IN DIRECTION. 18. OTHERS SHALL FURNISH, INSTALL AND BRING 24-INCHES ABOVE GRADE A MUNICIPAL POTABLE STUB FOR IRRGATION, COORDINATE WITH GENERAL CONTRACTOR. 19. INSTALLER IS RESPONSIBLE FOR FURNISHING AND INSTALLING THE BACKFLOW PREVENTOR, WATER METER AND BOOSTER PUMP, IF APPLICABLE. 20. IRRIGATION CONTROL WIRE SHALL BE DIGITAL TWO-WIRE, UL LISTED FOR DIRECT BURIAL. 21. CONNECT ALL ELECTRICAL WIRING IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE AND ALL APPLICABLE LOCAL ELECTRIC UTILITY CODES INCLUDING: 21.1. ALL LOW VOLTAGE IRRIGATION CONTROL WIRE SHALL BE INSTALLED WITH THE MAINLINE PIPE WHERE POSSIBLE 21.2. DO NOT LOOP THE LOW VOLTAGE IRRIGATION CONTROL WIRE PATH. 21.3. SNAKE WIRE AT BOTTOM OF TRENCH BENEATH MAINLINE. 21.4. PROVIDE 18-INCH OF SLACK CONTROL WIRE AT ALL CHANGES IN DIRECTION. 21.5. PROVIDE 24-INCH OF SLACK CONTROL WIRE AT EACH REMOTE CONTROL VALVE COILED INSIDE VALVE BOX. 21.6. ALL WIRE SPLICES SHALL BE WATERTIGHT CONNECTORS AND CONTAINED IN VALVE BOX. 21.7. ALL WIRING BENEATH HARDSCAPES SHALL BE CONTAINED IN SLEEVING, SEPARATE FROM PIPING. ELECTRICAL SLEEVES ARE TO BE SIZED APPROPRIATELY FOR EASE OF WIRE INSTALLATION AND REPAIR. 21.8. ALL WIRING SHALL BE INDENTIFIED AT EACH END TO PROVIDE INDICATION AS TO WHICH LOCATION THE WIRE IS CONNECTED. 21.9. GROUNDING PER MANUFACTURER'S RECOMMENDATION OR LOCAL ELECTRICAL CODE. 22. SCHEDULE AND PROGRAM CONTROLLER AND VALVES FOR APPROPRIATE LANDSCAPE WATER REQUIREMENTS. 1. SOD SHALL BE HIGHLAND SOD, 30" X 100' ROLLS PREFERRED WHERE APPLICABLE, TO BE LAID PARALLEL TO THE CONTOURS AND HAVE STAGGERED JOINTS. ON SLOPES STEEPER THAN 3:1 OR DRAINAGE SWALES, THE SOD SHALL BE STAKED INTO THE GROUND. SCARIFY THE EXISTING GRADES WITH FIELD CULTIVATOR TO A MIN. DEPTH OF 12" PRIOR TO PLACING OF TOPSOIL AND FINISH GRADING FOR SOD. IMMEDIATELY PRIOR TO PLACING SOD, CONTRACTOR SHALL APPLY 10-6-4 FERTILIZER AT THE RATE OF 10 POUNDS PER 1000 SQ. FT. 2. PLANTING SOIL REQUIRED: MIXTURE TO INCLUDE 45% TOPSOIL, 45% PEAT OR MANURE AND 10% SAND. ALL TREE, SHRUB AND PERENNIAL PLANTINGS SHALL RECEIVE 8” DEPTH OF PLANTING SOIL MIXTURE. ALL SODDED AREAS TO RECEIVE 4” DEPTH OF PLANTING SOIL MIXTURE. ALL SEEDED AREAS TO RECEIVE 2” DEPTH OF PLANTING SOIL MIXTURE. 3. ALL SODDED AREAS SHALL HAVE 6" MINIMUM DEPTH OF TOPSOIL. 4. ALL AREAS SPECIFIED AS 'NATIVE SEED MIX' TO BE SEEDED WITH MNDOT MIX 33-262. BROAD CAST, DRILL AND/OR HYDROSEED AT A RATE OF 44 LBS./AC. WITH 2 TONS SHREDDED AND PUNCHED IN PLACE STRAW PER ACRE. SEED MIX SHALL BE ABLE TO WITHSTAND PERIODIC FLOODING. GENERAL SODDING, SEEDING TOPSOIL NOTES: June 12, 2018 Sanctuary at Oak Ridge Engineering Review The Engineering Department has completed a review of documents related to zoning application for the Oaks Ridge property. Documents Reviewed  Preliminary & Final Plat & P.U.D. Plan  Associated narrative Comments  The existing water raw line extending westward out of the City Well House shall be relocated utilizing trenchless methods to minimize tree loss. Minimize number of bends, this may involve moving the connection to existing.  The 1” water line for well priming shall be protected or relocated.  The existing drive aisle width shall be maximized, this may involve minor changes to proposed retaining wall locations.  Protect all existing curb and trees for utility connections.  Outlot B should be eliminated or dedicated to the City.  Stormwater treatment and wetland protection shall be required per the Minnehaha Creek Watershed district.  Access drive shall be private, but be capable of allowing access for garbage trucks and access to City owned well. Show turning movements for garbage truck and three axle dump truck. Pavement section shall be designed to handle truck loading.  All water and sewer utilities shall be private.  All geotechnical investigation drill and bore holes shall be restored.  All manhole investigations in paved areas shall be patched. Eric Klingbeil, P.E. Assistant City Engineer