Loading...
CR2002-175-central park S Sewer c.\TY OF . ~ October 31, 2002 HOPKINS Council Report 2002-175 . Approve Change Order NO.1 - Central Park Storm Sewer Improvements - City Project 01-12 Proposed Action Staff recommends adoption of the following motion: Move that Council approve Chanqe Order No. 1 as it relates to the Central Park Storm Sewer Improvement Project. City Proiect 01-12. Overview Construction on this project is virtually complete as only minor punch list items and seed growth remain. Unfortunately, during construction of this project, we encountered some of the trash debris from the old City dumpsite and also ran into conflicts on two of the watermain crossings for the relocated storm sewer line. These unknowns have necessitated added costs to the project. Change Order No. 1 represents the added project costs of the necessary changes. Staff is now recommending and requesting formal approval of Change Order NO.1 in the amount of $9,026.54. . Primary Issues to Consider . Nature and Cost of Change Order Item During construction of the project improvements it became evident that the installation of new storm sewer line on this project would require lowering of two (ice pavilion and warming house) of the watermain service crossings and removal of some contaminated soils from the City's old dumpsite. Staff directed the contractor to perform this work per the contract on a time and material basis. The total cost of these three items was $9,026.54, which staff feels is a fair and justified cost. Because the project is basically complete, staff does not anticipate any other change orders for this project and this change order is within the 10% contingency that was figured may be necessary for the project when it was awarded on June 18,2002. Supportinq Information . Change Order NO.1 . Engineer's Description and Reasons for Change Order Ji;;;:&,1jr . Steven G. Bot, Assistant City Engineer Financial Impact: $ 9,026.54 Budgeted: Y/N L Source: Storm Sewer Utilitv Fund Related Documents (CIP, ERP, etc.): Notes: CHANGE ORDER . 10901 Red Circle Drive, Suite 200, Minnetonka, MN 55343-9301 952.912.2600 800.734.6757 952.912.2601 FAX City of Hopkins, Minnesota October 23,2002 OWNER DATE City Project No. 01-12 1 OWNER'S PROJECT NO. CHANGE ORDER NO. Central Park Storm Sewer Re-route A-HOPKN0203.02 PROJECT DESCRIPTION SEH FILE NO. The following changes shall be made to the contract documents: Description: Add into the project the following: 1. Offset the 6" water service to the Hopkins Pavilion due to conflict with the new 24" RCP Storm Sewer 2. Offset the 6" water service to the park warming house due to conflict with the new 24" RCP Storm Sewer 3. Disposal of contaminated soils as directed by City personnel and replacement with offsite materia1. Former landfill site material not allowed to be placed back in the trench area after installation of the 24" RCP Storm Sewer. Purpose of Change Order: Add $3,390.72 to the contract per contractor correspondence dated October 23,2002 and supplemental supporting documentation (pavilion service offset). Add $2,875.68 to the contract per contractor correspondence dated October 23, 2002 and supplemental . supporting documentation (wanning house service offset). Add $2,760.14 to the contract per contractor correspondence dated August 15, 2002 and supplemental supporting documentation (excavation and removal of contaminated soils). Basis of Cost: t8l Actual o Estimated Attachments (list supporting documents) Contractor correspondence and billings. Contract Status Time Cost Original Contract August 31, 2002 $109,131. 00 Net Change Prior C. 0. 's...:.. to-=- N/A 0 Change this C.o. N/A $9,026.54 Revised Contract Au $118,157.54 Recommended for Approval: Short Elliott Hendrickson Inc. by Duane D. Cramer Approved for Owner: B~ BY City of Hopkins, Minnesota TITLE TITLE . Distribution Contractor 2 Owner 1 Project Representative 1 SEH Office 1 \\h'T AUTOMP\clerical\CIVlLlProjeotsIHOPKJNSIHOPKN0203\ch.nge Order I. doc 2101 Short Elliott Hendrickson Inc. . Your Trusled Resource . Equal Opportunity Employer From. Metro Utilitie~. Inc. 763553.1511 To' Dw~ne Cr~mer Si::H D31;: ]0/23/02 Tim;: 103:5.1 PM P~gQ 1 or:;: -. ; October 23, 2002 .. VIA FAX'" (F(Jl/ow~d by moil) 952912-2601 Mr. Duane Cramer SHORT ELLIOTI HENDRICKSON, INC. 10901 RED CIRCLE DRIVE, #200 MlNNETONKA,:MN 55343 Re: Central Park Storm Sewer Re-Routing RHopkins, :MN REVISED Change Order Request 3002/3390.72 Mr. Cramer, . I am requesting a change order in the amount of 53,390.72 as Extra to Contract for additional cost to off-set the existing 6" Wliter Line servini the pravillion due a contlict with the new Storm Sewer. Costs are as follows (incl, Sale Tax): 4 Ea 6" Bends 243.84 8 Ea 6" Mega-Lugs 241.37 48 Ea Stainless Steel Bolts &: Nuts 297.52 16 Lf . 6" DIP 178-,58 5 Ea Sheets 2" Insulation - 143.14 4 Hrs Backhoe & Operator 660,00 2 Hrs Loader & Operator 240.00 16 Hrs Labor 944,00 Total Cost 2,948.45 Add 15% Overhead & Profit 442.27 Total ChsDge Order Amount .~ S 3,390.72 PlefL?C forward the: necessary documentation for the above change at your earliest convenience. as this work has been completed, Should you have .any questions or need additional information, please contact me. Sincerely, . VaJ..e, Vc:t.n.N urd.ent METRO UTILITIES, INC. DVN :sjc METRO UTILITlESJ INC. 3025 HAFfSOFl LANE, SiE. #'221 PLYMOUTH, MN 65447 (763) 553-1911 FAX (783) 553.2011 , -------. - ...--- From: Metro Utilitie::, Inc. 763553.1911 To Du::n6 C'-=I';l,;rSEH D::t,; 10/23/02 Tim.: 1:03:5.:1 PM Page 2 oi 2 . . October 23,2002 U VIA FAX.. {Followed by mail) 9'2912-2601 Mr. Duane Cramer SHORT ELLIOTT HENDRlCKSON, INC. 10901 RED CIRCLE DRIVE, #200 MINNETONKA, MN 55343 Re: Central Park Stann Sewer Re-Routing ~Hopkins. MN REv/<-f;ED Change Order Request 3001/2875. 68 Mr, Cramert e I am requesting a chmlge order in the aqlOWlt of Si,87S.68 as Extra to Contract fo'r additional cost to off-set the existing 6U Water Line west of the wannini house due to a conflict with the new Stonn Sewer. Costs are as follows (incl. Sale Ttu:): 4 Ea 6" Bends 243.84 g Ea 6" MegaRLugs 241.3 7 48 Ea Stainless Steel Bolts It !{uts 297.52 10 Lf 6" DIP 111.61 2 Ea Sheets 2') Insulation 57.25 4 Hrs Backhoe & Qperator 660.00 2 Hrs Loader & Operator 240.00 11 Hrs Labor 649.00 Total Cost 2,500.59 Add 15% Overhead & Profit 375 09 Total ChaDge Order Amount S 2,875.68 Please forward the necessary documentation for the above change at your earltest convenience, as this work has been completed. Should you have any questions or need additional infonnation, please contact me. Sincerely, . Va.l& VanNUf"'~ METRO UTILITIES, INC. . DVN:sjc METRO UTlLmES, INC. 3025 HARBOR LANE. STE. #221 PLYMOUTH, MN 65447 (763) 6&.1911 FAX (783) 553-2011 From: Matro Utilitia.. IMe 763553-1911 To: Ou~n;; Cr~mor SEH D~ta: 10/11/02 Tlma 11:.15:04 AM Po go 2 of 0 FrQrn: OAVII!S ~TER SaUIPM! To: TVl/He3SS3:l011 ST!VI! Msgill12150e,O.1 10/1 1aoC:oi 11:12:40 P.g. 2 01 2 . ii!W!~i~W CRSH ~A~ES - MI~NERPOLI9 l~!!~]l~l~ ?~~IE~l~~T~GEE~~IPMENT/B~ ;;.;~~i if:iil ml!!~i;!1 a6~4 1 T RVE N @m!ii![' 8u~iNE, MN ""''''"";IJ LINE, MN IlIill :j:~!!il :i:lili~lll! 55449 jl)~iiii 55449 i!'i!!ilil!! IllUiIIlllI1 ijji;1 ~i!i! TellighollS: 900-844-8334 18 FT 6 PUSH ON CL52 DI PIPE 10.48 188.64 1 ER 6 X 45 MJ 01 sa 8END 57.24 57.24 1 ER 6 X 22 MJ 01 58 SEND 57.Z4 57.24 1 ER 6 X 90 MJ DI 58 SEND 62.:35 62. :35 64 BoF Z"X4'Xe' UTI L ITY INS 648F SHEET .4Z 26.68 1 ER 6 MJ MEGA L..UG FOR DIP 28.3::1 28.~J 1 e:~ 3/4 -10 S5 HERVY HEX NUT I. 96 1. :18 1 ER :3/4 X 3-1/2 MJ 55 T-SOLT :3.84 3.84 Sp i1C I a I I nill t ruct loni ~TTN: STEVE . . Su b t 0 l a I : Ll26.50 Tax; .00 From: M~tro Utiliti~s, Inc, 763333.1911 To: Du<;n~ Cr<;m~r SEH D<;ta, 10/11/02 Tim~ 1 l.oi,S' 04 AM P::igi"r 6 of 6 . . '. ,- August 15, 2002 U VIA FAX'" (Followed by mail) 9529 I 2.1601 'Mr. Duane Cramer SHORT ELLIOTT HENDRICKSON. INC. t 090 1 RED CIRCLE DRIVE, #200 MINNETONKA, MN 55343 Re: Central Park Stonn Sewer Re-Routing RHopkins, MN Change Order Request 3003/2760.14 . Mr. Cramer, I am requesting a change order in the amount of S2J760.14 as Extra to Contract for additional cost to excavate contamina.ted soils as directed by City personeL The soils were excavated and put in a pile. We were then directed to move the pile. 1 Load was trucked to a landfill in Elk River, and 5 Loads of replacement fill was trucked in, Following is a breakdown of these casts: 1 Ea Landfill Dump Fee 1,026.12 8 Hrs Trucking 536.00 6 Hrs Loader & Operator 720.00 2 Hrs Labor 118.00 T otaI Cost 2,400.12 Add 10% Overhead & Profit 320 02 Total Change Order Amount $ 2,760.14 Please fOIWard the necessary documentation for the above change at your earliest convenience. as this work has been completed, Should you have any questions or need additional information, please: contact me. Sincerely, VcU.e- VrM1.N urdet1.t . METRO UTILITIES, INC. DVN :sjc METRO UTILlnESJ INC. 3025 HARBOR LANE, STE. #221 PLYMOUTH, MN 55447 (76.9) 553.1911 f:AX (783) 553-2011 ;:-rom: M~tro Utillti~E, Inc 763553.1S11 To' DU2n~ Cr=m~rSEH D2ta: 10/11/02 Tima: 114e,:C'4 AM . F3 ga 3 of 6 r -.. . .- . In UE:R LANDF!lL TICKET: 252782 C:2460 IIWY .L 6'3 N~l D~TE: 07/30/2002 ELK R r v E R l MN 553.10 TI ME J 17 I ~0 - 17 I 10 612-4i.t 1 .. 2 :t[:,:1 mdvl'! Sahlyl CUSTDMfi:f/ ~ ~;i..,;'i\: :':::\::IH [LISTCil'1'1Er( I3ENEH~n l.!P; :-.'., ~.,.:, }~I.'p GWJ5S: ~)lllL;~c:!ll LB S TRHE, 2Z:'32!l1 LBS COUNTY/O~IG!N: HEN I ~ENNEPJN NEi: 2:730~ L.BS TRUCK 1 RD DUP1J4 LICENSE: ROUTE: NR. I Non Apn MANIFEST: GRID~ Ut~~R 14C ' TYPE~NA / Non ~pp P. O. : COMMENT I WASTE QURNTITY peT UNIT R~TE "MOUUl /llSr:.r 1 UNI rrlSlJ"Ti'fN"" _.......-"n-:-;:.l'll(J--nm-.~~r-ss:w--.-r-.--7'5::::-:.-z;F._n.__. MINN SAU':S ~~ ~;"'I!~l" LINER nON) FULL TRX $ 129.03 t<lI NN C LE m.J iA'.' L ,( NE: fi (T ON) , 90.91 COUNTY r(.i~{ UNER nON) s 8. 19 CITY TA~ ~INVR (TON) i 45.45 Tot!ll Tax:S , 27:9..54 Totall~ $ 102E..12 CASH .i tJ : , i \ 0':"" ~:~ i':lmNGE~: '" 0.00 CHECf<: 12127 1 N: wrJt" B: SC~LE3-104 OUT: lOO/ll aER: B: 6941 CKN7 ~lANUAL RL:!1S0H :._...._~---_.__._-----_. .