RZ99-05 " CITY OF HOPKINS
Hennepin County, Minnesota
RESOLUTION NO: RZ99-5
RESOLUTION MAKING FINDINGS OF FACT AND
RECONIlVIENDING APPROVAL OF A CONDITIONAL USE PERNIIT
TO CONSTRUCT AN OFFICE BUII,DING
WHEREAS, an application for Conditional Use Permit CUP99-2 has been made by Frana and
Sons;
WHEREAS, the procedural history of the application is as follows:
1. That an application for a conditional use permit was made by Frana and Sons on
Apri123, 1999;
2. That the Hopkins Zoning and Planning Commission, pursuant to mailed and
published notice, held a public hearing on the application and reviewed such
application on May 25, 1999: all persons present were given an opportunity to be
heard;
�
3. That the written comments and analysis of City staff were considered; and
4. A legal description of the subject property is as follows:
Lot Thirty (30) of Block one (1) in Park Valley second Addition, Hennepin
County, according to the plat thereof on file and of record in the office of the
County Recorder, Hennepin County, Minnesota, Except that part taken for road.
Lot Thirty-one(31)of Block one(1) in Park Valley Second Addition, Hennepin
County, Minnesota, according to the plat thereof on file and of record in the office
of the County Recorder, Hennepin County Minnesota; Except that part taken for
road as per pocument Number 1094574.
The West eight feet of the East 350 feet of the South 230.28 feet of the North
2607 feet of the East one-fourth of Section 25, Township 117, Range 22,
Hennepin County, Minnesota; Except that part taken for road as per pocument
Number 1094574.
That part of the Southeast Quarter of the Northeast Quarter, Section 25, Township
117, Range 22, Hennepin County, Minnesota, described as follows: Commencing
at the Southeast corner of the Northeast Quarter of said Section 25, thence on an
assumed bearing of North 89 degrees 45 minutes 46 seconds West along the
South line of said Northeast quarter a distance of 328.65 feet; thence North 0
-- degrees 32 minutes 12 seconds East a distance of 73.00 feet to the actual point of
beginning; thence South 29 degrees 45 minutes 46 seconds East a distance of
30.00 feet; thence Easterly and Northeasterly a distance of 50.03 feet along a
tangential curve to the left having a radium of 36.00 feet and a central angle of 79
degrees 37 minutes 42 seconds; thence North 10 degrees, 36 minutes 32 seconds
�' East, tangent to said curve, a distance of 156.98 feet to a line drawn Westerly,
perpendicular to the East line of said Northeast Quarter, from a point on said East
line 2376.72 feet South from the Northeast corner of said Northeast Quarter,
thence Westerly along said perpendicular line a distance of 115.27 feet to a point
342.00 feet Westerly along said perpendicular line from the East line of said
Northeast Quarter; thence Southerly, along a line which intersects the South line
of said Northeast Quarter; thence Southerly, along a line which intersects the
South line of said Northeast Quarter at a point 342.00 feet Westerly from the
Southeast corner of said Northeast quarter, to a line bearing North 89 degrees 45
minutes 46 seconds West from the actual point of beginning; thence South 89
degrees 45 minutes 46 seconds East a distance 15.98 feet to the actual point of
beginning.
NOW, THEREFORE, BE IT RESOLVED that the application for Conditional Use Permit
CUP99-2 is hereby recommended for approval based on the following Findings of Fact:
1. That the proposed building meets the requirements for a conditional use permit.
BE IT FURTHER RESOLVED that application for Conditional Use Permit CUP99-2 is hereby
recommended for approval based on the following conditions:
1. That the developer submits a storm water management plan and the plan is approved by
— staff.
2. The grading and utility plan needs to be revised. No erosion control measures are
shown, no information or detail concerning storm structures is shown, no public utilities
or proposed hookups are shown.
3. Water and sanitary sewer are located within the subject property. These need to be
located, shown on this plan, and the City will require a utility easement.
4. A watershed district permit is required.
5. Handicapped van accessible parking spaces, access aisles or curb ramps will have to be
added in the parking area and underground garage
6. The exit on the east side of the office area is not handicap accessible and there may be a
dead end corridor in the office area. These items should be reviewed when actual
construction drawings are prepared.
7. That the trash pick-up and deliveries are limited to between 8:00 a.m. and 5:00 p.m.
8. That additional trees are added to the berm on the west side of Second Avenue, subject to
Public Works approval.
Adopted this 25th of May, 1999.
�
�
_ �..
Randy En el, C air
�