CUP 95-01 \ t Y O
G �'
. �;�
^ y 5
March 10, 1995 ° P ,c � � Planning Report CUP95-1
CONDITIONAL USE PERMIT--RL. JOHNSON PROPERTY
Proposed Action.
Staff recommends the following motion: Move to ap�rove Resolution RZ95-5
recommending a�proval of a Conditional Use Permit by R.L. Johnson for construction of an
office/warehouse at the 13-acre site located south of the Hennepin County Re�ional Railroad
right-of-way.
Overview.
At the last Zoning and Planning meeting the Commission continued this item to a special
meeting on March 14. The item was continued to allow time for the City's traf�c consultant,
Benshoof and Associates, to deternune if additional right-of-way will be needed in the future
for l lth Avenue and to revise the site plan as relates to certain other matters. In response to
the Zoning and Planning action, Benshoof and Associates has completed a three-lane roadway
concept for l lth Avenue that they feel will accommodate future traffic needs. In order to
construct this roadway improvement, only a small additional right-of-way is required to be
taken from the R.L. Johnson property. (An additional four feet needs to be taken from the
north property line and tapering to zero for one hundred seventy feet.) Stai�will be requiring
an easement from the applicant for this additional right-of-way. This easement will not
significantly affect the site plan as proposed by the applicant.
--�
The applicant has also supplied the Staff with a revised landscape plan based on the
recommendations of the Staff. The revised landscaped plan complies with all the previous
recommendations of the Staff. The revised landscape plan details 61 additional trees added to
the site over what was previously shown, for a total of 216 trees. The Zoning Ordinance
requires 262 trees for the site. However, this is not practical without removing parking. Staff
finds the new landscape plan acceptable with the condition that all the trees have a minimum
size of 2.5 inches. The applicant will be planting ivy on the fence surrounding the N.U.R.P.
Pond to help screen the pond.
The lighting on the front of the building adjacent to l lth Avenue has been adjusted with low
level lighting, as recommended by Staff.
SuppoCting Documents.
o Three-Lane Roadway Concept
o Revised Landscape Plan
o Resolution RZ95-5
o Staff report dated February 17, 1995
Nancy 5. Anderson, AICP
--.
Planner
—
CITY OF HOPKINS
Hennepin County, Minnesota
RESOLUTION NO: RZ95-5
RESOLUTION MAKING FINDINGS OF FACT AND RECOMIV�NDING
APPROVAL OF AN APPLICATION FOR A CONDITIONAL USE PERMIT
TO CONSTRUCT AN OFFICE/WAREHOUSE
WHEREAS, an application for Conditional Use Permit CUP95-1 made by R.L. Johnson to
construct an office/warehouse on the 13-acre site is recommended for approval.
WI-�REAS, the procedural history of the application is as follows.
1. That an application for Conditional Use Pernut CUP95-1 was filed with the City of
Hopkins on January 27, 1995.
2. That the Hopkins Planning Commission, pursuant to published and mailed notices, held a
` public hearing on the application and reviewed such application on February 28, 1995,
and March 14, 1995; all persons present at the hearing were given an opportunity to be
heard.
3. That the written comments and analysis of the City Staff and the Planning Commission
were considered.
4. A legal description of the subject property is as follows.
Block 38, West Minneapolis and that part of Lot 4 lying southwesterly of a
line running from a point in the northwesterly line Lot 4 distance 990
02/100 feet Northeasterly from northwest corner thereof to a point in
southeasterly line of Lot 4 distance 1360 84/100 feet northeasterly from the
most southerly corner of said Block 38 including adjacent vacant street,
Auditor's Subdivision No. 195.
NOW THEREFORE, BE IT RESOLVED that the application for Conditional Use Permit
CUP95-1 is hereby recommended for approval based on the following Findings of Fact.
1. That an office/warehouse is permitted in the I-2 zoning district.
2. That the applicant meets the requirements for a conditional use permit to construct
� a building.
Page 2
BE IT FURTHER RESOLVED, that application for CUP95-1 is hereby recommended for
approval based on the following conditions.
�
1. That the development is constructed as per the plans submitted.
2. That the trash compactor is screened in accordance with a plan acceptable to Staff.
3. That the area designated on the site plan for future parking shall be converted to parking
in a manner acceptable to the City of Hopkins within 180 days of written notice by the
City, based solely upon the discretion of the City.
4. That the Watershed District approves the applicant's proposal.
5. That the subject property is platted by October 1, 1995.
6. That the design of the middle driveway is revised in accordance with a plan acceptable to
City Staff.
7. That the applicant pays all costs incurred by the City to review the applicant's traffic study
within 30 days of notification by the City.
8. That a sidewalk is added along l lth Avenue in accordance with specifications acceptable
to Staff.
9. That the applicant submits a11 storm sewer discharge and ponding calculations for City
Staff review, and they are acceptable to Staff.
10. That a11 deciduous trees as detailed on the landscape plan have a minimum size of 2.5
inches.
11. That the applicant provides the City with an easement and prepares the easement
document acceptable to the City for the following additional right-of-way as
approximately described.
o four feet starting at the northwest property corner of the subject
site and tapering to zero along the west property line for one '-"
hundred seventy feet south of the northwest property line
Adopted this 14th day of March 1995
Dan Johnson, Chairperson
L
VtOSINNIIN W*1011
SPINNYM ONY SH13NtDN3 NOILv1HONN,81 IMIOF Y)N-IAV 111til
S31vi)ossv
-W )w JOOHSNJ9
M
U9,NV Id 1(101V1 AVM(IV
19 sms—
N
=-71
I
L
I
F-
Li
j
C--)
(D
L -Li
(D
L -Li
:6*17
* V,
Z9t
+ti
171 4
�y fll'
I
• � t Y O
G �
• `��
�� ti 5
February 24, 1995 ° p K � `� Planning Report CUP95-1
CONDITIONAL USE PERMIT--RL. JOHNSON PROPERTY
Proposed Action.
Staff recommends the following motion: Move to approve Resolution RZ95-5
recommending annroval of a Conditional Use Permit by R.L. Johnson for construction of an
office/warehouse at the 13-acre site located south of the Hennepin Countv Regional Railroad
ri�ht-of-wa,y.
Overview.
The applicant, R.L. Johnson, is proposing to construct a 261,200 square foot
office/warehouse on the vacant property located at 401 l lth Avenue South. This property is
approximately 13 acres in size and zoned I-2, General Industrial.
The applicant has stated the tenant would be Rainbow Signs. They are a firm that develops,
manufactures, sells, assembles, and stores major promotional printing packages. The
proposed building will be utilized as follows.
0 24,000 square feet of office
0 60,000 square feet of production
--�
0 177,200 square feet of warehouse
The office area will be on the west side of the building along 11 th Avenue, with the
production and wazehouse areas behind the office area.
The applicant has previously received approval by the HRA of a Tax Increment Financing
application for this project.
Primarv Issues to Consider.
o What is the zoning of the property, and how has the Comprehensive Plan
designated the subject site?
o What are the specifics of the site plan?
Supporting Documents.
o Analysis of Issues
o Site Plans
o Resolution RZ95-5
o Summary of Traffic Report
,I
Nancy S Anderson, AICP
Planner
�
CUP95-1
^ Primary Issues to Consider.
o What is the zoning of the property, and how has the Comprehensive Plan
designated the subject site?
The subject property is zoned I-2, General Industrial. The Comprehensive Plan has
designated the site as business park. The development is in compliance with these documents
as relates to the proposed use.
o What are the specifics of the site plan?
Building Orientation
The main orientation of the building is toward l lth Avenue. The office area will be on the
west side of the building, facing l lth Avenue. This side of the building will provide the main
access points for customers and employees. Visually, this area will have a significant amount
of glass with a large entry atrium. The warehouse and production areas are located toward
the easterly portion of the site. The loading docks for the building will primarily be located on
the south side of the building. With the large SuperValu warehouse building directly to the
south, visibility of the dock area will be minimal.
Landscaping
�
The applicant has submitted a landscape plan that shows substantial landscaping in the area
abutting l lth Avenue. The applicant is also proposing to landscape a portion of the Hennepin
County Regional Railroad Authority right-of-way along the northerly property line. The
Zoning Ordinance requires 262 trees for this site. The site plan details 155 trees. Staff, in its
review of the landscape plan, feels that with the size of the building and the required parking it
would probably be difficult to provide suf�cient trees to meet the ordinance requirements. The
Zoning Ordinance contains a clause stating that if a development cannot provide all of the
landscaping without removing off-street parking, a waiver can be granted for a lessor number
of trees. Staff would agree that an additional 106 trees probably cannot be added to the site
without removing a number of parking spaces.
Trees on the north side of the site are proposed to be planted on the property of the Hennepin
County Regional Railroad Authority. The applicant will have to secure permission from the
Hennepin County Regional Railroad Authority for the proposed plantings.
In addition to the proposed trees there are a variety of low level plantings identified. Shrubs
and perennials will be integrated within the trees on the east side of the building. Prairie
grasses and wildflowers will be located on the east and south sides of the site.
On the basis of Staffs review of the landscape plan, it is being recommended that, as a
---�
condition of approval, a revised landscape plan be submitted which details the following.
CUP95-1
o additional trees sunounding the N.U.R.P. pond
o reduced spacing between the shade trees along l lth Avenue �
o additional evergreen trees throughout the site
o construction of a softer edge to the N.U.R.P. pond and a layer of planting
between the pond and l lth Avenue
o wildflower and prairie grass planting on the slopes at the east and south sides
which is mulched to control erosion during seed establishment
o utilization of more varieties of evergreen shrub species
o revision of the lighting plan adjacent to llth Avenue with more low level
lighting
o substitution of Ponderosa pine for Scotch pine
o additional tree plantings on the north and southwestern sides of the site
o a condition that if the applicant does not secure approval to plant on the
HCRRA property, that a revised landscape plan must be submitted to Staff
Drainage
The City Engineering department has reviewed the preliminary site plan. Overall, the drainage
plan was found to be acceptable. A storm water retention pond (N.U.R.P.) will be located on
the southwest corner of the site. The drainage plan will also need to be reviewed and
approved by the Watershed District.
Parking
The preliminary site plan details 385 parking spaces. The Zoning Ordinance requires 385 �
parking spaces. At this time the applicant has requested permission to delay construction of
78 of these spaces. This request is based on the fact that the proposed tenant presently does
not need the amount of spaces required in the Zoning Ordinance. The applicant will maintain
a sodded area in the northeast and southwest portion of the site which could be converted to
parking spaces if there is additional demand in the future. Staff finds this arrangement
acceptable.
Fire Marshal
The Fire Marshal has reviewed the preliminary plans. He determined that the plans as
submitted are acceptable from a fire/safety standpoint.
Trash Collection
The site plan indicates a compactor on the south site of the property. No details of screening
for the compactor have been included. The Zoning Ordinance requires that the compactor
area be enclosed. Staff recommends that a condition is added to the Resolution that the
applicant submit a plan detailing the screening for the trash compactor and that the screening
be acceptable to Staff.
�
. CUP95-1
--.,
Access/Traffic
Access to the project will be from 1 lth Avenue. There will be three access points into the site
from 1 lth Avenue. Of the three access points into the site, the center and the southerly access
points will be the main access points to the employee/customer parking area. The northerly
access point will be used primary for the perimeter road that sunounds the site.
In conjunction with this development, a traffic study was completed by the applicant which
analyzed the following.
o impacts of the proposed access points on l lth Avenue
o impacts on l lth Avenue
o the impact to the intersection of County Road 3 and l lth Avenue
o internal circulation
The following are the main conclusions of the study.
o Eleventh Avenue will function adequately with the additional traffic from the
proposed development and future traffic on llth Avenue without additional
right-of-way.
o The intersection at County Road 3 and llth Avenue will function at an
acceptable level with the proposed development.
^ o The access points into the site will function at an acceptable level.
The plan as submitted does not detail a sidewalk along llth Avenue. As a condition of
approval, Staff would recommend that a sidewalk is constructed along llth Avenue in
accordance with specifications acceptable to the City Engineer.
Ezterior
The exterior of the office area facing l lth Avenue will have a substantial number of windows.
The exterior facing material in this area will have a smooth, stone-like appearance. The color
has not been identified, but the applicant has stated that it will be a neutral or earthtone color.
The south and north e�eriors of the warehouse will be a pre-cast wall panel with several
smooth bands to break up the solid wall that will complement the office area. The exterior of
the east side of the building will be pre-cast wall panels. The applicant will have samples of
the exterior material at the meeting.
Strategic Plan
The following is a goal in the City's Economic Development Strategic Plan.
Foster the development/redevelopment of property along County Road 3,
.--�
including consideration for a business park and/or major retail uses.
CUP95-1
The proposed development would appear to meet this goal in the Strategic Plan
�
Zoning Ordinance Requirements
o Setback of 20 feet on all sides. The site plan indicates 20 feet or more for a setback
area on all sides.
o The ordinance also requires a floor area ratio (F.A.R.) of.60. The proposed building
will have a .46 F.A.R.
o The maximum allowed height is 45 feet. The warehouse area will be 26 feet in height,
and the highest point of the office will be 33 feet.
Loading Docks
The preliminary site plan shows fifteen loading docks. Twelve docks will be on the south
side of the building and three docks on the north side of the building. The Zoning Ordinance
requires seven loading docks. The loading docks on the north side of the building should have
minimal visibility from l lth Avenue and County Road 3 due to the fact that the elevation in
this area is lower than the property to the north of the site. The loading docks to the south
should have minimal visibility from the adjacent roadway because of the large SuperValu
warehouse building directly south of the subject site.
Alternatives
1. Recommend approval of the conditional use permit. By recommending approval of the V
conditional use permit, the City Council will consider a recommendation of approval.
2. Recommend denial of the conditional use permit. By recommending denial of the
conditional use permit, the City Council will consider a recommendation of denial. If the
Planning Commission considers this alternative, findings will have to be identified that
support this alternative.
3. Continue for further information. If the Planning Commission indicates that further
information is needed, the item should be continued. The Planning Commission should be
aware that any continuation could create a problem with the applicant's schedule, which is
based upon the tenant's needs.
�
--�
CITY OF HOPKINS
Hennepin County, Minnesota
RESOLUTION NO: RZ95-5
RESOLUTION MAKING FIl�IDINGS OF FACT AND RECOMNIENDING
APPROVAL OF AN APPLICATION FOR A CONDITIONAL USE PERMIT
TO CONSTRUCT AN OFFICE/WAREHOUSE
WI�REAS, an application for Conditional Use Permit CUP95-1 made by R.L. Johnson to
construct an office/warehouse on the 13-acre site is recommended for approval.
WHEREAS, the procedural history of the application is as follows.
1. That an application for Conditional Use Pernut CUP95-1 was filed with the City of
Hopkins on January 27, 1995.
2. That the Hopkins Planning Commission, pursuant to published and mailed notices, held a
-- public hearing on the application and reviewed such application on February 28, 1995; all
persons present at the hearing were given an opportunity to be heard.
3. That the written comments and analysis of the City Staff and the Planning Commission
were considered.
4. A legal description of the subject property is as follows.
Block 38, West Minneapolis and that part of Lot 4 lying southwesterly of a
line running from a point in the northwesterly line Lot 4 distance 990
02/100 feet Northeasterly from northwest corner thereof to a point in
southeasterly line ofLot 4 distance 1360 84/100 feet northeasterly from the
most southerly corner of said Block 38 including adjacent vacant street,
Auditor's Subdivision No. 195.
NOW TI�REFORE, BE IT RESOLVED that the application for Conditional Use Permit
CUP95-1 is hereby recommended for approval based on the following Findings ofFact.
1. That an office/warehouse is pernutted in the I-2 zoning district.
2. That the applicant meets the requirements for a conditional use permit to construct
a building.
---�
Page 2
BE IT FURTHER RESOLVED, that application for CUP95-1 is hereby recommended for
approval based on the following conditions. �
1. That the development is constructed as per the plans submitted.
2. That the trash compactor is screened in accordance with a plan acceptable to Staf£
3. That a revised landscape plan be submitted to Staff and found acceptable that includes the
following.
o additional trees sunounding the N.U.R.P. pond
o reduced spacing between the shade trees along l lth Avenue
o additional evergreen trees throughout the site
o construction of a softer edge to the N.U.R.P. pond and a layer of planting between
the pond and l lth Avenue
o wildflower and prairie grass planting on the slopes at the east and south sides
which is mulched to control erosion during seed establishment
o utilization of more varieties of evergreen shrub species
o revision of the lighting plan adjacent to l lth Avenue with more low level lighting
o substitution of Ponderosa pine for Scotch pine
o additional tree plantings on the north and southwestern sides of the site
o a condition that if the applicant does not secure approval to plant on the HCRRA
property, that a revised landscape plan must be submitted to Staff
4. That 317 parking spaces be provided with proof of the ability to provide an additional 78
spaces within 180 days of written notice by the City of Hopkins if deternuned necessary
and appropriate by the City at anytime in the future based upon the sole discretion of the
City. �-'
5. That the Watershed District approves the applicant's proposal.
6. That the subject property is platted at a future date.
7. That the design of the middle driveway is revised in accordance with a plan acceptable to
Staff.
8. That the applicant pays all costs incuned by the City to review the applicant's traffic study.
9. That a sidewalk is added along l lth Avenue in accordance with specifications acceptable
to Staff.
10. That the applicant submit all storm sewer discharge and ponding calculations for City Staff
review and they are acceptable to Staff.
Adopted this 28th day of February 1995.
Dan Johnson, Chairperson
�
TO
i rer
IL
I
m
z
Ova z (D
5Z
CL �
w z
F-3
U5 a.
JILILLU 1,
� � T Y �
G �
C��
�� ti 5
February 17, 1995 ° P K � � Planning Report CUP95-1
CONDITIONAL USE PERMIT--RL. JOHNSON PROPERTY
Proposed Action. .
Staf� recommends the following motion: Move to �prove Resolution RZ95-5
recommending a�proval of a Conditional Use Permit by R.L. Johnson for construction of an
office/warehouse at the 13-acre site located south of the Hennepin Count�gional Railroad
right-of-waX.
Overview.
The applicant, R.L. Johnson, is proposing to construct a 261,200 square foot
office/warehouse on the vacant property located at 401 l lth Avenue South. This property is
appro�mately 13 acres in size and zoned I-2, General Industrial.
The applicant has stated the tenant would be Rainbow Signs. They are a firm that develops,
manufactures, sells, assembles, and stores major promotional printing packages. The
proposed building will be utilized as follows.
0 24,000 square feet of office
0 60,000 square feet of production
0 177,200 square feet of warehouse
�
The office area will be on the west side of the building along 11 th Avenue, with the
production and warehouse areas behind the office area.
The applicant has previously received approval by the HRA of a Tax Increment Financing
application for this project.
Primarv Issues to Consider.
o What is the zoning of the property, and how has the Comprehensive Plan
designated the subject site?
o What are the specifics of the site plan?
Supportin� Documents.
o Analysis of Issues
o Site Plans
o Resolution RZ95-S
o Summary of Traffic Report
u � �
Nancy . Anderson, AICP
Planner
�
v�., ♦� ��,;: , T� .
� 1 -' � T1 ��? � S n. �... .�.;,,y lb"� .- �'F .
1 Y v �!��y. �'� �(�..
l +S P�t. i'?� � .} `\1, M +
� . ' �. �_ 4. � S �SA,-`�,\ti- � - � 4i'�yN,'ti.� � ,�'F���N \ �
�6.�4 � 5
. ' _ ' � ..c�,� \iSF.'�} ��l '�M1.
. . � L t��.�`*"u� �1`1- �C. ��ti ' ���'.�+, Kv y"�Y M y �
.� ��tr' �3. . �..y i r�'.. �•� ��n 'K��� �,a'}$ �Kt �
'� �- M!'4 5 .
I . . . __. f;a�� �.;,�..� � qY,. �c:�S' ,�, M.�.. ;� , iA'" -
�i .�S'_ • r-P a } �,
.aw �i-�$�:ii��.A.�`t�ia_�' f�:
CUP95-1
'� Primary Issues to Consider.
o What is the zoning of the property, and how has the Comprehensive Plan
designated the subject site?
The subject property is zoned I-2, General Industrial. The Comprehensive Plan has
designated the site as business park. The development is in compliance with these documents
as relates to the proposed use.
o What are the specifics of the site plan?
Building Orientation
The main orientation of the building is toward 1 lth Avenue. The office axea will be on the
west side of the building, facing 1 lth Avenue. This side of the building will provide the main
access points for customers and employees. Visually, this area will have a significant amount
of glass with a large entry atrium. The warehouse and production areas are located toward
the easterly portion of the site. The loading docks for the building will primarily be located on
the south side of the building. With the large SuperValu warehouse building directly to the
south, visibility of the dock area will be minimal.
Landscaping
�
The applicant has submitted a landscape plan that shows substantial landscaping in the area
abutting l lth Avenue. The applicant is also proposing to landscape a portion of the Hennepin
County Regional Railroad Authority right-of-way along the northerly property line. The
Zoning Ordinance requires 262 trees for this site. The site plan details 155 trees. Staff, in its
review of the landscape plan, feels that with the size of the building and the required parking it
would probably be difficult to provide sufficient trees to meet the ordinance requirements. The
Zoning Ordinance contains a clause stating that if a development cannot provide all of the
landscaping without removing off-street parking, a waiver can be granted for a lessor number
of trees. Staff would agree that an additional 106 trees probably cannot be added to the site
without removing a number of parking spaces.
In addition to the proposed trees there are a variety of low level plantings identified. Shrubs
and perennials will be integrated within the trees on the east side of the building. Prairie
grasses and wildflowers will be located on the east and south sides of the site.
On the basis of Staffs review of the landscape plan, it is being recommended that, as a
condition of approval, a revised landscape plan be submitted which details the following.
o additional trees surrounding the N.U.R.P. pond
o reduced spacing between the shade trees along 11 th Avenue
o additional evergreen trees throughout the site
,--.
CUP95-1
^ o construction of a softer edge to the N.U.R.P. pond and a layer of planting
between the pond and 11 th Avenue
o wildflower and prairie grass planting on the slopes at the east and south sides
which is mulched to control erosion during seed establishment
o utilization of more varieties of evergreen shrub species
o revision of the lighting plan adjacent to llth Avenue with more low level
lighting
o substitution of Ponderosa pine for Scotch pine
o additional tree plantings on the north and southwestern sides of the site
o a condition that if the applicant does not secure approval to plant on the
HCRRA property, that a revised landscape plan must be submitted to Staff
Drainage
The City Engineering department has reviewed the preliminary site plan. Overall, the drainage
plan was found to be acceptable. A storm water retention pond (N.U.R.P.) will be located on
the southwest corner of the site. The drainage plan will also need to be reviewed and
approved by the Watershed District.
Parking
The preliminary site plan details 385 parking spaces. The Zoning Ordinance requires 385
,.., parking spaces. At this time the applicant has requested permission to delay construction of
78 of these spaces. This request is based on the fact that the proposed tenant presently does
not need the amount of spaces required in the Zoning Ordinance. The applicant will maintain
a sodded area in the northeast and southwest portion of the site which could be converted to
parking spaces if there is additional demand in the future. Staff finds this arrangement
acceptable.
Fire Marshal
The Fire Marshal has reviewed the preliminary plans. He determined that the plans as
submitted are acceptable from a fire/safety standpoint.
Trash Collection
The site plan indicates a compactor on the south site of the property. No details of screening
for the compactor have been included. The Zoning Ordinance requires that the compactor
area be enclosed. Staff recommends that a condition is added to the Resolution that the
applicant submit a plan detailing the screening for the trash compactor and that the screening
be acceptable to Staff.
��
CUP95-1
�
Access/Traffic
Access to the project will be from l lth Avenue. There will be three access points into the site
from 11 th Avenue. Of the three access points into the site, the center and the southerly access
points will be the main access points to the employee/customer parking area. The northerly
access point will be used primary for the perimeter road that sunounds the site.
In conjunction with this development, a traffic study was completed by the applicant which
analyzed the following.
o impacts of the proposed access points on l lth Avenue
o impacts on l lth Avenue
o the impact to the intersection of County Road 3 and l lth Avenue
o internal circulation
The following are the main conclusions of the study.
o Eleventh Avenue will function adequately with the additional traffic from the
proposed development and future traffic on llth Avenue without additional
right-of-way.
o The intersection at County Road 3 and llth Avenue will function at an
acceptable level with the proposed development.
"� o The access points into the site will function at an acceptable level.
The plan as submitted does not detail a sidewalk along 11 th Avenue. As a condition of
approval, Staff would recommend that a sidewalk is constructed along llth Avenue in
accordance with specifications acceptable to the City Engineer.
Egterior
The exterior of the office area facing l lth Avenue will have a substantial number of windows.
The exterior facing material in this area will have a smooth, stone-like appearance. The color
has not been identified, but the applicant has stated that it will be a neutral or earthtone color.
The south and north exteriors of the warehouse will be a pre-cast wall panel with several
smooth bands to break up the solid wall that will complement the oi�ice area. The exterior of
the east side of the building will be pre-cast wall panels. The applicant will have samples of
the exterior material at the meeting.
Strategic Plan
The following is a goal in the City's Economic Development Strategic Plan.
Foster the development/redevelopment of property along County Road 3,
,--.
including consideration for a business park and/or major retail uses.
CUP95-1
^ The proposed development would appear to meet this goal in the Strategic Plan
Zoning Ordinance Requirements
o Setback of 20 feet on all sides. The site plan indicates 20 feet or more for a setback
area on a11 sides.
o The ordinance also requires a floor area ratio (F.A.R.) of.60. The proposed building
will have a .46 F.A.R.
o The maximum allowed height is 45 feet. The warehouse area will be 26 feet in height,
and the highest point of the office will be 33 feet.
Loading Docks
The preliminary site plan shows fifteen loading docks. Twelve docks will be on the south
side of the building and three docks on the north side of the building. The Zoning Ordinance
requires seven loading docks. The loading docks on the north side of the building should have
minimal visibility from llth Avenue and County Road 3 due to the fact that the elevation in
this area is lower than the property to the north of the site. The loading docks to the south
should have minimal visibility from the adjacent roadway because of the large SuperValu
warehouse building directly south of the subject site.
�
Alternatives
1. Recommend approval of the conditional use pernut. By recommending approval of the
conditional use permit, the City Council will consider a recommendation of approval.
2. Recommend denial of the conditional use permit. By recommending denial of the
conditional use permit, the City Council will consider a recommendation of denial. If the
Planning Commission considers this alternative, findings will have to be identified that
support this alternative.
3. Continue for further information. If the Planning Commission indicates that further
information is needed, the item should be continued. The Planning Commission should be
aware that any continuation could create a problem with the applicant's schedule, which is
based upon the tenant's needs.
--�
. . i =
Tbe HNTB Cornpa�icr Interoffice
3400 W.66th Stfeet,Suiie 250 Mlnneapolfs,Mlnnesotd 55435,(612)920-4666/FAX (612)926-017� Co rres p o n d e n ce
--'� -
T0: Charles E.Youngquis�Jr., R L.Johnson Company Date: lanuary 25, 1995
FfOf11: Steve Manhart,Senior Traffic Engineer�
Subject: Traffic Analysis—Proposed DeveloQment in Hopidns,MN
HNTB Corporation has completed its analysis of the t�affic impacu of the proposed office/production/stora;e
development being considereci for the east side of l lth Avenue South between 500 and 1400 feet south of the intersection
with C.S.AIi 3 (Exceisior Boulevard) in Hopkins, Minnesora. The following is a repon of che findings for each item
HNTB was asked to investig3te:
• �g Traffic Conditiorzs
HNTB has performe��affic councs of uunin;movements at the inr�rseccion of C.S.A.K 3 (Excelsior
Boulevard)and llth Avenue South during the morning and aftemoon pealc hours. Momin;pea�:hour
uunin;movemen[counts were conducted at the incersection of C.S.AH 3 and llth Avenue South on
Friday moming,January 20, I995. In addidon, turning movemenc coun�s were conducted Wednesday
afternoon,January 19, 1995,between 3:30 pm.and 6:00 p.m
The morning�f'ic counts indicated that am.peak hour occurred between 7:00 and 8:00 a.m. During
that period, 1710 vehicles we� recorded using the intezsecdon. OE tha[ total, 3% was identified as
� being heavy vehicles (semis, buses, etcJ. Figure 1 illustrates che aiming movemen[s of che
inte�section during the moming pealc hour. Table 1 lists the �ic coim�s for each movement by
fifteen minute increments.
The aftemoon peak hour for the intersection was identified as tl�e period between 4:.;0 p.m. and�:30
p.m. During that bour period, ?S�1 vehicies were tallied movin; chcoug.h the in[ersection. Of that
wtal, 3% was identified as being heavy vehicles (semis, buses, etc.). Table 2 lisu the traffic volume
counts for eac3i movement by fifteen-minute increments. Figure 2 �hically illustraces the total
midday peak hour turning movements for the inte�ecuon.
According to informacion received from the developer, rhe office!lproduction/storage develoomen[will
have split producrion shifts. The moming shift will be;in at 7:30 a.m., and will end at 3:30 p.m.The
evening shift will begin at 3:50 p.m„and will end at midnigh�
'I3erefore, to analyze the impacts of the shift change, HN'I'B conducted traffic counts of the
intersection of C.S.AH.3 and llth Avenue Sou�h betwe�n 3:30 and 4:30 p�. Table 3 lists the uafFc
vol�es for each auning movement by fifteen-minute incremenrs. F;ure 3 ��aphically shows the
existin;traffic coun[s for the in[ersecrion during that hour.
• Traffic Imnacts of Provosed Develo�ient
HNI'B Corporadon has determined the traffic impacu of the proposed development on llth Avenue
South, and on the intersecaon itself during the a.m. peak hour, p.m. peak hour, and durin; the shift
change.
�
Traffic Impacu-RL.Johnson Co.Developmenr,Hopkins,�IN
, 0?CL5I95 Page 9.
According to observaaons made of l lth Avenue South di�cdy in front of the pmposed developmenc
"'� during the moming peal:hour. di�ctional traffic demand is generally spiit 49% northbound and 51%
southbound This direcrional spli[ shall be used to reflect directional demand of the proposed
development t�affic.
In analyzing the traffic and parking demands of tbe proposed site, certain assumpaons were made
about the traffic pau,ems for the proposed driveways. Because employee paricing will be designate�to
spaces in the west and southwest corner of the properry, the primary access Poir►ts for employees will
be at the major driveway in the center of the properry and at the southwest driveway. T1ie northwest
driveway is assumed to be a minor access used primarilY for perimersr access around the propeny.
Using these ass�ptions, the following percentages were assigned co each of the driveways [o reflect
the�affic generacing demand:
TABLE 5.
DIRECTIONAL SPLTT OF DEVELOPMENT TRIP GF.�`lERATION
Norrhbound Southbound
Traffic Traffic
A�I Pe�k of C',enerator-
Northwest Driveway 2% 10%
Center Driveway 38% 70%
Sourhwest Driveway 60�7o ZO%
� P Tvf Pe�k of C',enerator-
Northwest Driveway 20% 0%
^ Center Driveway ��% 45%
Southwest Driveway 10% �5%
HNTB has applied the precedin;percentages�o ttie trip;eneration from Table 4. The a.m.peal:hour
for the generator was ass�ed to coincide with the existing peak hour for llth Avenue South (7:00 -
8:00 a.m.). However, due to the production shift change at 3:30 p.m., the pm. peak hour of the
generator was assumed to be 3:30-4:30 p.m. Furthermore, as a worst case, ic was assumed that 130
employees would be leaving in t6at peak hour. while 50 night shift employees would be arrivin;.
Fgures 4 and 5 illustrat�the a.m.and p.m.peak hour impacu from the development on the driveways
at l lth Street South. Table 6lists the�affic splits for each peak hour.
Incorpotarin�these traffic splits,HNTB projected ua�c far llth Avenue South and the driveways for
the proposed development HNTB utilized these n�be� to assess the capaciry, or Level of Service
(LOS),at each driveway inte�ection with llth Avenue South, as well as at the signalized incersection
of llth Avenue South and C.S.AH.3. (Level of Service is a lesxer designaaon that describes a range
of tiaffic operating condidons on a pazticular rype of roadway faciliry — from "A" designating "free
flow", to"F'designating"gridlocl�',wi[h acc�ptable aaffic condidons being LOS-D or better.)
Levels of service have been computed for the driveway intersections using the I�'ighwaY Capaciry
Software developed by the Federal H'i,Qhway Aclminisuation. In the morning peak hour, each
driveway incersection wili operate ac LOS-C or bettPr. In the af[emoon durin; the shift change, the
driveway intetsections would operate at LOS-B or better. The Appendix lisu the outQut of these
ca.paciry analyses.
�
Traffic Impacts-RL.Johnson Co. Developmen4 Hopi:ins,;vIN
, Cl/��/95 Page I4.
---,
The location of the northwestem driveway approximately 180 feet south of the Wendy's driveway
appears to be adequa[e as shown. Projected tiaffic volumes indicate IimitEd t�affic usage for this
driveway. The alignment of the driveway with the perimeter road would allow easy access for truc�:
traffic, thus preciuding difficult driving maneuvers for truck drivers (inciuding emergency vehicle
operators).
• Summarv of Findtr�s
The following is a summary of the findings of this traffic snidy for the RL.Johnson development of a
proposed officeJproducuon/stora;e building being conside�d for the easc side of llth Avenue South
between 500 and 1400 feet south of the intersection with C.S.A.Fi 3 (Excelsior Boulevard) in
Hopldns,Minnesota:
1. The a.m.peak of the generator(R.L.Johnson Development)will coincide with the a.m.peak
hour of the existing background�affic in the area (7:00 - 8:00 am.). The p.m.peal:of the
generator will occar at the shift cban;e (3:30 -4:30 p.m.)> which is an hour earlier than rhe
existing p.m. peal: hour of the background a�affic (4:30 - 530 p.m.?. Therefore, the a.m.
peak hour will be the caidcal time period for development uaffic.
2. The development wiIl have 165 permanent + 15 seasonal employees, wich 50 of those
woridng[he ni�ht shift 'Iherefore, 130 employers were assumed durin;the aidcal moming
peak hour. To study a wo�st case traffic scenario durin; the p�.peal:hour, 130 employees
were calculated to leave while 50 ni,ght shih employees arrived
3. The development t�affic was distributed becween the three driveways and onto llth Avenue
Sou[h. 'Ibe �m. peak tia�c capaciry with the development would operate a[ LOS-C or
� better at each of the driveways, while the p.m, pealc (at the shih chanJe) would opezate at
LOS-B or better.
4. Ca{�ac�ty analysis of rhe si;nalized intersection at l lth Avenue South and C.S.AI� 3 during
the a.m.peal:and the p.m.peak of the senerator indicates thac the RL.Johnson development
will not si;nificandy impact the operaaon. This inteisection could operate at LOS-B+ or
better durin;the time periods.
5. The RL. 7ohnson development wiIl not significandy impact, nor be significandy impact�d
by, the proposed fast food restaurant development �mder consideration for the parcel
immedia[eIy to the north. The RL_ 7o6nson development would primarily keep employees
on-site for luncfi. While the Tim Horton's restaurant may divert a n�ber of pass-by t�affic
during the a.m.pealc hour, the lar;er demand durin; the p.m. pealc hour for Wendy's would
not coincide wich the shift change at the RL.Johnson developmenc
6. The northwestem driveway into the RL. Johnson site should be preserved at its current
location. Althou�h approx.ima[ely 180 feec south of the proposed Wendy's driveway, traffic
demand is projecred to be lig.6c However, rhe driveway is needed at the locadon shown to
provicie perimeter road acc�s for semi-trucks (and emergency vehicles). The central
driveway would be the primary passenger vetucle access for the site.
� �
— —_; ,...,� ���e-�oiB�o�6bF6-bzs � I��� (�s�)I��pi.J �J�� �z
1�.��'1 S H19
� ► � zi � i �i I iQoi '600� ; z1 � � � ,
. , .
� � � ol � I � i I t9) I(L) I � �I � ► ( _
. ► i i Z5 ' �5 I I �� � - -,Slo� -
� � � I 6 91 � I 8 � I S�� U��b� � 6�'�
� � I 8 LI I I I I �"_� I I �i
� � I L � 91 � � - - -� �
� 2 J
I I � � � � 81 � I � 9 � � LI '� •
( 6J1) . i i I 9� I 61 � i � s � � g� /� O�
� S � � OZ I � � � � �
� � � � � 61 /i
b II fZ I �
� £ � �. Oz�
OOB � � i i ZZ � I I Z I �'� .
5�l � � � � I � �Z i � I �� � / 9 (Il ,
� � I tZ � �/
� � �-— ———'L——�——� � ZD/l 90// O///
. - r i- -- - - - - - - - - -�- _
� � -�£---�� —�S 1�
- , � ��� �
. _ . � � � z / � 'a� �
� �
I I I �� �(� �
. �6� � � (� ��
I I �-
� i � £
�
�. lo� � .
rj ' �.-
. y �
� �o
da ► s ,
-�� � _ -
�d i . � � � .
i o �
,d� ; � �
��� . i S C .
�� � io � � � r� �1S
«� � � i � 0 - S
: c5� c, � f� D
� o �
N � ���
_ \ � M �
�� �, � �ys�
i _ . �1� • �
\ , 0 9,�1
Q � � o ., coq =
c„ . .
. i lo� W �
� - (�) (�)
' � (ti) (LI) `
n�a (9)�
f Z) �8) � (I I) �
. ddW NOt111�01 oZ„ � Z►
I, E.
L01 31If1S
NV -1d 210013
9 _Vj'
19>
VIOTMW 'SM
ns
snivo3a lot
IS SNIAcJOH] HItKIN I tot Juns
0) NBSNH�r -1 NmD
I
qI
-1 -0
C/Z
U)
z
Z F -
w
mw
14
i
IM