Loading...
Memo - Excelsior Streetscape - 2005 Public Works Department MelllOranduln From: Honorable Mayor and Members of the City Council Jim Genellie, Acting City Manager ~ Steven J. Stadler, Public Works Director To: Copy: Date: January 7, 2005 Subject 2005 Excelsior Blvd Streetscape project Background: The 2005-2009 CIP includes a budget of $750,000 for Excelsior Boulevard, Phase III streetscape improvements. In August, 2004 City Council authorized a design services agreement with Hoisington-Koegler Group, Inc. (HKG). In mid-October a public meeting notice explaining the proposed 2005 project was mailed to all ~roperty owners and businesses along the north side of Excelsior Boulevard between 9 h Avenue and Jackson Avenue. To-date, HKG has completed schematic-level design and a preliminary cost estimate - both are attached. The design is based on streetscape elements similar to the previous two phases of Excelsior Blvd improvements. The cost estimate is based on the Phase IIlandscape/streetscape & lighting costs. Current Status: Staff is concerned about proceeding with this project in 2005 for the following reasons: . Cost. HKG's preliminary project cost estimate is $1,677,750. This equates to additional city funding, above what's budgeted in the CIP, of $707,750. This assumes overall Hennepin County participation at 25%, or $420,000. There is a large outstanding city payment to Hennepin County that has not yet been billed for Excelsior Blvd, Phase II reconstruction and the associated property acquisition. The Finance and Public Works directors would like to be assured of the amount and timing of that billing before we attempt to budget for an additional $700,000 for the streetscape project. . Scope. The scope of the project is no longer certain as Metro Transit is reconsidering its park-n-ride project due to declining demand for the circulator bus routes. City and Metro Transit staff are scheduled to meet on Tuesday, 1/11 to discuss the park-n-ride project. . Timing. This is a concern but we could still manage to construct the improvements in 2005. The concern is that staff doesn't have confirmation yet from Xcel Energy on the timing of undergrounding existing overhead electrical lines. Assuming they could meet our construction schedule, we would be advertising the project in March/April '05 and awarding in May '05. This is about 2 months delay from what we'd originally planned to advertise and award and could result in higher bid prices. Staff recommendation: City Council approve moving this project to 2006 to allow staff time to work out: . Impact of the increased project cost on our PIR & MSA working capital budgets and bonding needs . Confirm Xcel Energy schedule and costs . Confirm the project scope Eel'S ESTIMATE ITEM DESCR!PTION SAMPLE AREA TABULATION CORRIDOR AREA TOTALS UNIT r QTY. T UNIT PRICE 1 TOTAL IT SF I COST -, NOTES I , " .. " , '" " ,. ,..0; . - . SAMPLE AREA = 200FT X 16FT= 320051 DEMO DEMO SF 800.00 $ 0.60 $ 480.00 4ft bit. Walk PAVEMENT 4" CONCRETE WALK 15" CLASS 5 BASE SF 1200.00 $ 3.50 $ 4,200.00 6ft wide l/GHTlNGIELECT LIGHTS AND ASSOCIATED WIRING EACH 2.00 $ 5,000,00 $ 10,000.00 PLANTINGS SELECT TOPSOIL BORROW (GV) CY 37.00 $ 21.00 $ 777.00 assume 6" SOD SF 2000.00 $ 1.00 $ 2,000.00 2.5 CAL TREE EACH 5.00 $ 350.00 $ 1,750.00 IRRIGA T/ON SPRAY SF 2000.00 $ 1.00 $ 2,000.00 DRAIN PIPE LF 200,00 $ 1.00 $ 200,00 3200SF SAMPLE TOTAL SF 3200.00 $ 6.69 $ 21,407.00 69904.00 $ 467,635.92 SAMPLE AREA = 200FT X 16FT= 320051 DEMO DEMO SF 800.00 $ 0.60 $ 480.00 LlGHTINGIELECT LIGHTS AND ASSOCIATED WIRING EACH 2.00 $ 5,000.00 $ 10,000.00 PLANT/NGS SELECT TOPSOIL BORROWlcV) CY 37.00 $ 21.00 $ 777.00 SOD SF 2000.00 $ 1.00 $ 2,000.00 IRRIGA TION SPRAY SF 2000.00 $ 1.00 $ 2,000.00 DRAIN PIPE LF 200.00 $ 1.00 $ 200.00 3200SF SAMPLE TOTAL SF 3200.00 $ 4.83 $ 15,457.00 28000.00 $ 135,248.76 TYPE 2: MEDIAN & PORKCHOP TYPE A SAMPLE = 2221 SF paved DEMO DEMO SF 2221.00 $ 0.60 $ 1,332.60 PAVEMENT 50% 4" CONCRETE WALK 15" CLASS 5 BASE SF 1111,00 $ 3.50 $ 3,888.50 50% UNIT -PA VERSIBASEfSANDIF ABRIC SF 1111.00 $ 7.50 $ 8,332.50 2221SF SAMPLE TOTAL SF 2221.00 $ 6.10 $ 13,553.60 9174.00 $ 55,984.12 mE,l2':PLAtltEltMlatlIAN,!l<PPij~~\olQ"''O''''E;I:f'') ",. '.. ..... ...:.e..',.....) .;i.'.'" '.. ')"" ..' .'.~" <,...'.......,;. ,,:.,,),.?,.;,...;.....: SAMPLE = 1oo00SF with 2780SF nlantlngsl7220\3llved DEMO DEMO SF 10000.00 $ 0.60 $ 6,000.00 4ft bit. Walk PAVEMENT 50% 4" CONCRETE WALK 15" CLASS 5 BASE SF 3610.00 $ 3.50 $ 12,635.00 50% UNIT-PA VERSIBASElSANDIF ABRIC SF 361000 $ 7.50 $ 27,075.00 PLANTlNGS SELECT TOPSOIL BORROW (eV) cy 206.00 $ 21.00 $ 4,326.00 ASSUME 2FT 80%. SHRUBS SF 2224.00 $ 5.00 $ 11,120.00 20% PERENNIALS SF 556.00 $ 12.00 $ 6,672.00 IRRIGATION DRIP IRRIGATION SF 2780.00 $ 1.40 $ 3,892.00 SLEEVING LS $ 9,000.00 DRAIN PIPE LF 200.00 $ 1.00 $ 200.00 10000SF SAMPLE TOTAL SF 10000.00 $ 8.09 $ 80,920.00 17828.00 $ 144,264.18 LANDSCAPE A 107/2005 HII d phase 3 ex3coSt3ex3cos/3 Excels LANDSCAPE AeECTS ESTIMATE 107/2005 ~ HK ~ u I UNIT ~ I d phase 3 I Excels r NOTES CORRIDOR AREA TOTALS SF T COST SAMPLE AREA TABULATION I UNIT PRICE I TOTAL 6,000.00 9,527.00 20,4151i0 7,077.00 18,225.00 10,932.00 7,000,00 6,378.40 5,000.00 20000 $ $" $" $ $ $" $ $ $" $" 0.60 3.50 7,50 21,00 "5.00 12.iJo 350.00 1M 5,600.00 " 1.00 QTY. 10000.00 $ 2722.00 $ 2722.00 $ 337.00 $ 3645.00 $ 911.00 $ 20.00 $ 4556.00 $ 1.00 $ 200.00 $ SF SF SF CY SF SF EACH SF LS LF ITEM DESCRIPTION ACTUAL MEDIAN = 10,ooOSF with 4558sf plantinQs/5444sf paved DEMO I DEMO PA VEMENT 1 50% 4" CONCRETE WALK /5" CLASS 5 BASE 50% UNIT-PAVERS/BASE/SAND/FABRIC SELECT TOPSOIL BORROW (CV) SHRUBS PERENNIALS TREE DRIP IRRIGATION SLEEVING DRAIN PIPE 80% 20% PLANTlNGS IRRIGA TlON 90,754.40 10000.001 $ 90,754.40 $ 9.08 10000.001 $ SF 10,000SF ACTUAL MEDIAN TOTAL 1~ i1t.~._!~~II'tlf~"IJl:?i ASSUME 40% COVERAGE 2,100.00 2,331.00 7,500.00 5,250.00 750.00 3,000.00 $ $" $" $" $" $" 0.35 21.00 5.00 350.00 0.50 D.5o' 6000.00 $ 111.00 $ 1500.00 $ 15.00 $ 1500.00 $ 6000.00 $ SF CY SF EACH SF SF m>lllII__l:ij ,Ii~ """"'" SAMPLE = 6000SFplanted OVER 40% OF AREA (101,104SF) DEMO DEMO/CLEAR AND GRUB PLANTlNGS SELECT TOPSOIL BORROW (CV) SHRUBS TREE PRAIRIE SEED MIX INSTALLATION SPRAY /RR/GA TlON OF EXISTING LENGTH 3% 141,085.41 575.00 1,980.00' 15,000.:.00 40443.001 $ 150,000.00 7,500.00 ALONG CORRIDOR 15,750.:.00 AT PARKINGLOT AT 8TH, D1WN GATEWAY 30,000.00 18,000.00 3,800.00 15,000.00 $ $' $' $' $' $' $' $' $' $' $' $' 500.00 18.00 1.00 20,931.00 $ 3.49 1.15 110.00 15,000,00 6000.00' $ $ $" $" SF LF EACH LS 8000SF SAMPLE TOTAL DEMO OLD CURB/GUTTER REMOVE L1GHTPOLES REMOVE AND RE-INSTALL GUARDRAIL DEMO r,iIlSc 1.00 500.00 75D.OO 150,000.00 15,00 21.00 $ $" $" LS LF SFF UNDERGROUND UTILITIES CURB & GUTTER PATCHING MODULAR RETAINING WALL OTHER 1.00 20.00 2.00 6.00 30,000.00 aoo:oo 1,900.00 2,500.00 $ $" $" $" LS EACH EACH EACH SIGNAGE AND ASSOC. LANDSCAPING BOLLARDS BENCHES (@ BUS STOPS) BANNER POLES AMENITIES AT INTERSECTIONS 255,805.00 $ TOTAL 1,290,577.78 $ I I HARD COST TOTAL (CONSTRUCTION AND LABORl 103,246.22 154,869,33 129,057.78 387,173.33 $ $" $" $' MOBILIZATION @ 8% DESIGN/ADMIN @ 12% CONTINGENCY@10% SOFT COSTS 1,877,751.09 $ TOTAL PROJECT"PROJECTED TOTAL I I This represents an opinion of probable construction costs and not to be construed as actual costs Unit costs based on erevious streetscape phases and other recent streetscape projects T ex3cost3ex3cost3 0712005 hase 3 ITEM DESCRIPTION SAMPLE AREA TABULATION CORRIDOR AREA TOTALS UNIT QTY. I UNIT PRICE I TOTAL SF I COST NOTES Quantities and streetscape-iVpes based on continuing the quality and design sMes of previous Excelsior Blvd phases I I ex3cost3ex3cost3 HK' LANDSCAPE A.Eel'S ESTIMATE .. '" \, 'd; "tff.' ~ i ,. ~ b) . , ,.".,. . ~.:l llO~!Q r r~"0i' II --- ::.-------:: T'lPE:\ SOUT"" ROW EXCE\...S\OR 6\..."0. pt\ASE 3: PREl.ltAlNJi'R'I COST """,,,"'ISIS T'lPE 2 tlIEO\ANS --= TIP'" :l: ",,,,OWl II: Wptallll\"9\a11ted "",<11""- 50150 conclP""'" ",1>< '13""" ~ 'I' IS _Un.:t,/plcailtO'N- \11<1.11911\ pre!l8red bY' t\<>""l1\I\O'\ !(oe9\e' G'ouP, \n(; NO'l.,.nbef 1't, 2004 CAPITAL IMPROVEMENTS PLAN City of Hopkins, MN Ol-CIP-S109 2005 thru 2009 Contact PW Director Department Public Works: StreetslIraffic Type Improvement Useful Life Project # Project Name Excelsior Boulevard Streetscape Improvements Category Trans: Streets Priority nla Total Project Cost $750,000 Description I Excelsior Boulevard from 9th Avenue South to Highway 169 Street lighting, landscaping, pedestrian improvements along Excelsior Boulevard. Justification I Work is needed to bring the function and appearance of this segment of Excelsior Boulevard up to standards of previously completed segments. Prior Expenditures 2005 2006 2007 2008 2009 Total 0] Construction/Maintenance 750,000 750,000 [, Total Total 750,000 750,000 ,I :! Ii ! ~r M C , Prior Funding Sources 2005 2006 2007 2008 2009 Total ~ ~ o I GU - Other Governmental Unit 200,000 200,000 ~ I' MS - Municipal State Aid Stree 550,000 550,000 , Tot~l i' ~ ' Total 750,000 750,000 " r Operational Impact:lOther I 2004: Planning/design 2005: Install lighting and north side improvements 2005: Construct south side improvements Consistent with CSAH 3 Corridor Study recommendations, within guidelines of Hennepin County Roadside Enhancement Partnership program. Will be desilIDedlcoilstructed in consideration of Metro Transit future transit station/nark and ride imnTOvements. I ! I'.' J I Ii - ! 11.- , !,~ 100 Friday, July 09, 2004 ~