VII.2. 2019-2023 Equipment Replacement Plan; Bishop
December 4, 2018 Council Report 2018-127
2018-2022 EQUIPMENT REPLACEMENT PLAN
Proposed Action
Staff recommends adoption of the following motion: Move to adopt the 2019-2023 Equipment Replacement
Plan.
Overview
The equipment replacement plan is a detailed summary of the next five years of a twenty-year replacement
schedule, for equipment of the City of Hopkins. General and Special Revenue (except Arts Center) fund
equipment items are placed in the Equipment Replacement Fund budget which derives its revenues from
service charges to the General and Special Revenue funds, equipment sales and interest earnings. The Arts
Center and Enterprise fund equipment in the plan is placed in the individual fund budgets, in the year in
which the equipment is to be purchased.
Approval of the 2019-2023 allows staff to begin preparation for their purchase. Items that fall under the
Minnesota Statutes Uniform Bidding/Contracting Laws will require further approval by the council before
their purchase.
Staff is recommending adoption of the plan.
Primary Issues to Consider
• What changes have occurred in the equipment replacement plan since last year?
Supporting Information
• 2018-2022 ERP Power Point slides
• 2018-2022 Equipment Replacement Plan
______________________________________
Nick Bishop, CPA
Finance Director
Financial Impact: $ as provided in plan Budgeted: Y/N X N Source: Various
Related Documents (CIP, ERP, etc.): __ERP_________ Notes: ____________________
2019 –2023 Equipment
Replacement Plan
December 4, 2018
Overview
5 year plan, updated annually
Approval authorizes purchases in 2019
Remaining four years are estimated
replacement for information and planning
Would be authorized in subsequent years
Funding Sources
User Department Charges
Increasing by 9% in 2019
Total charges of $533,569 primarily in General
Fund
Tax Levy
$230,000 in 2019
Reduced by $20,000 since preliminary levy
Funding Sources
Directly Funded
Arts Center, HRA and Utility Funds
Uses of Funds in 2019
Activity Center -$16K
Dishwasher
Information Technology -$153K
Network server, computers, Office 365, VPN, E-Mail
Threat Protection, Patching Automation
Uses of Funds in 2019
Police -$258K
Marked patrol vehicles, squad car camera system, data
server and mobile data computers
Streets/Traffic-$230K
Sweeper
Working Capital Projection
Projected balance of $41,007 at end of 2019
Positive balance in future years with levy and
2023 Equipment Certificates
EQUIPMENT REPLACEMENT PLAN
2019-2023
DATE: December 4th, 2018
TO: Honorable Mayor and Members of the City Council
FROM: Mike Mornson, City Manager
SUBJECT: 2019-2023 EQUIPMENT REPLACEMENT PLAN
With this letter, I respectfully submit the 2019-2023 Equipment Replacement Plan. This
five-year planning document represents the combined efforts of city staff and the City
Council.
The Equipment Replacement Plan is a five-year forecast of equipment replacement needs
in the City of Hopkins. It is intended to alert the Council and citizens of equipment
replacement needs that are needed to maintain the efficiency of city services and the
safety of city staff. The first year of the plan becomes the adopted budget, however the
equipment is again re-evaluated before final approval is given for the purchase. The
remaining four years represents estimated replacement needs and the related funding.
The Equipment Replacement Plan does not include proposed capital projects. A
document relating specifically to capital project needs has been developed into a separate
document.
The Equipment Replacement Plan is intended to serve as a planning tool and is therefore
structured to present a meaningful, long-range perspective of the city’s equipment needs
over the next 20 years. At the same time sufficient details on individual pieces of
equipment scheduled for replacement is provided to enable those who review the
information to make informed decisions of the city’s equipment needs over the next
several years.
Please use the information provided to assist in the understanding of the city’s equipment
needs as they relate to the delivery of service to the citizens of Hopkins.
This document was developed by the Finance Department with the assistance of all city
departments. I wish to especially thank all those involved in the development of the
Equipment Replacement Plan, and especially Steve Stadler, Public Works Director, Brent
Johnson, Police Chief, Dale Specken, Fire Chief, Ari Lenz, Assistant City Manager, and
Nick Bishop, Finance Director for their hard work and dedication.
1
2
Page
City Manager's Message 1
Table of Contents 3
Introduction
Background and Summary of Changes from 2017 Plan 6
Cash Flow Statements
Equipment Replacement Fund 10
Five-Year Project Summaries
Projects by Year 12
Department Summary 14
Projects by Department 15
Funding Source Summary 17
Projects by Funding Source 18
Equipment Requests
Individual Equipment Request Details
Activity Center 22
Arts Center 26
Community Services - IT 27
Fire 40
HRA 47
Police 48
Public Works 60
Refuse 71
Water/Sewer 72
Twenty Year Replacement Schedule
Twenty Year Replacement Schedule by Department 76
Equipment Inventory 80
EQUIPMENT REPLACEMENT PLAN
2019-2023
TABLE OF CONTENTS
3
4
INTRODUCTION
5
EQUIPMENT REPLACEMENT PLAN 2019-2023
BACKGROUND AND SUMMARY OF CHANGES FROM 2018 PLAN
Background
The Equipment Replacement Plan is a twenty-year forecast and a five-year plan of equipment needs in
the City of Hopkins. It is intended to inform the Council and citizens of the major equipment needs on
the horizon. The first year of the plan becomes an adopted equipment budget and relates to the operating
budget of the equipment replacement fund, which is approved on an annual basis. The remaining
nineteen years represent an estimate of equipment needs and funding capabilities of the City. Funding
requirements vary from year to year. In order to maintain a fairly consistent levy each year, the twenty-
year schedule is projected with a 3% inflation factor for operating expenses.
The cash flow requirements to fund equipment needs in the equipment replacement fund will experience
a roller coaster effect over the next 20 years given the projected equipment needs and 3% inflation rate.
The intragovernmental charges were increased in 2018 by 10% and will be increased in 2019 by 9%.
Plans are to increase the rate going forward with increases of 9% in 2020-2021 and 6% in 2022-2023.
The majority of items purchased with ERP funds are used by departments within the General Fund
which accounts for the most of the operations of the city. The fund will also implement a tax levy for
2019. The levy being proposed for 2019 is $230,000. It is planned to continue at $250,000 for 2020-
2023.
There have been many changes in technology and the way we operate and as a result there is more
equipment in the plan; however the rate has not increased to accommodate the increase in equipment.
Equipment that was purchased with grants such as digital squad cameras, laptop computers in squad cars
and fire vehicles, and infrared cameras are included in the ERP but the rates have not kept up with the
addition of all these items. In addition society is dictating some of the equipment under consideration.
One of the items that has been under discussion in recent years was police body cameras, which are
currently included in this plan.
The long term viability of the fund remains questionable and will result in difficult decisions regarding
equipment and operations. These issues were addressed as part of the Financial Management Plan
(FMP) first completed in 2014. The FMP establishes funding mechanisms to get the fund to a constant
balance of $750,000. Items that will be considered and/or implemented are rate increases, a tax levy and
issuing equipment certificates.
Equipment Certificates were sold for $590,000 in 2018. This will allow us to replace aging equipment
and spread the payments over 10 years. The required Equipment Certificate payment will be part of the
debt levy in the applicable year. Equipment certificates are next planned as a funding source in 2023.
Each year staff re-evaluates the equipment needs and adjusts the schedule accordingly. Changes to the
plan are reflected in the document. Refurbishments, extended life expectancy and closer cost estimates
of replacements have been incorporated into the plan. The equipment replacement charges in the general
fund represent approximately 3% of total general fund expenditures.
6
The Equipment Replacement Plan’s basic premise is scheduled replacement of present equipment. A
new item must, in the year proposed, be presented in the annual operating budget with a stipulation that
replacement will be necessary in the future. Flexibility of the Equipment Replacement Plan is
established through annual review and revision, if necessary.
Summary of Changes from 2018 Plan
Highlights of changes from last year’s equipment replacement plan for the years 2019-2023:
CS - Activity Center: Dishwasher was added in 2019 at a cost of $16,000. Replacement has been
delayed for several years.
Security system upgrade was added in 2020 at a cost of $20,000.
A/V Replacements and upgrades was added in 2020 at a cost of $62,624.
Kitchen storage projects were added in 2022/2023 for $29,000.
CS - Arts Center: No changes
CS - IT: Virtual privacy network software and equipment were added in 2019 for
$19,000.
E-mail threat protection software was added in in 2019 for $19,390.
Patching automation software was added in 2019 for $30,000.
Community Services: No changes
Fire: No changes
HRA No changes.
Police: The cost of the squad car camera system was increased by $20,000, from
$65,000 to $85,000. This is an improved system that allowed the police
department to eliminate a data server project scheduled for replacement in
2018.
Public Works: Building/Equipment Services
No changes
Parks/Forestry
No Changes
7
Streets/Traffic
No Changes
Refuse
No changes
Sewer
No Changes
Water
Air compressor was added in 2019 for $35,000.
8
CASH FLOW STATEMENT
9
City of Hopkins
Equipment Replacement Fund (602)
Rate Change 9%10%9%9%9%6%6%
ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET
2017 2018 2019 2020 2021 2022 2023
Working Capital Begin Year 1,172,861 (28,845) (69,299) 41,007 173,984 443,107 327,733
Revenues from charges 445,012 489,513 533,569 581,591 633,934 671,970 712,288
Tax Levy 230,000 250,000 250,000 250,000 250,000
Transfer in Debt Service Fund - - - - - -
Interest earnings 1,332 3,000 3,000 3,000 3,000 3,000 3,000
Other revenues (sale of assets)69,883 30,000 35,000 35,000 35,000 35,000 35,000
Enterpirse contribution to software upgrade - - - - - -
Equipment Certificates (Bonds)- 590,000 - - - - 1,600,000
Interfund Loan - -- - - -
Total Revenues 516,227 1,112,513 801,569 869,591 921,934 959,970 2,600,288
Expenditures (excludes Leases & Depr.) 31,929 32,887 33,873 34,890 35,936 37,014 38,125
Fire Truck Financing Pymnts (2009-2018)54,217 54,217 - - - -
Capital Outlay - Equipment 1,631,787 1,065,863 657,390 701,724 616,875 1,038,329 1,604,077
Repayment of Interfund Loan - -
Total Expenses 1,717,933 1,152,967 691,263 736,614 652,811 1,075,343 1,642,202
Working Capital Ending Balance (28,845) (69,299) 41,007 173,984 443,107 327,733 1,285,819
(Unrestricted Net Position)
10
FIVE-YEAR
PROJECT SUMMARIES
11
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
PROJECTS BY YEAR
2019 2023thru
Project Name Department Project #Priority Project Cost
2019
01-ERP-0039Activity Center Dishwasher 5 16,000Comm Svcs - Activity Center
01-ERP-0003CH - Network Server n/a 22,000Comm Svcs - IT
01-ERP-0006Computers n/a 30,000Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 11,000Comm Svcs - IT
01-ERP-0018IT - RSA/Netmotion VPN n/a 19,000Comm Svcs - IT
01-ERP-0019IT - Email Threat Protection n/a 19,390Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 30,000Comm Svcs - IT
01-ERP-0211PD - Network Server n/a 22,000Comm Svcs - IT
01-ERP-0200Marked Patrol Vehicles (7)n/a 98,000Police
01-ERP-0212Squad Car Camera Systems n/a 85,000Police
01-ERP-0219PD - Video Data Server n/a 10,000Police
01-ERP-0220Mobile Data Computers n/a 65,000Police
01-ERP-0311Sweeper n/a 230,000Public Works: Streets/Traffic
01-ERP-0503Air Compressor 2 35,000Water
692,390Total for 2019
2020
01-ERP-0037Activity Center Security System Upgrade 1 20,000Comm Svcs - Activity Center
01-ERP-0041Activity Center A/V Replacement & Upgrade 1 62,624Comm Svcs - Activity Center
01-ERP-0003CH - Network Server n/a 22,000Comm Svcs - IT
01-ERP-0006Computers n/a 31,500Comm Svcs - IT
01-ERP-0014Distribution Network Switches n/a 50,000Comm Svcs - IT
01-ERP-0015Backup Server n/a 66,000Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 22,000Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 10,000Comm Svcs - IT
01-ERP-0211PD - Network Server n/a 22,000Comm Svcs - IT
01-ERP-0008Document Management Scanner (2)n/a 11,300Community Services
01-ERP-0051City Hall Exterior Security Camera System 1 40,000Community Services
01-ERP-0109Extrication Tool (2)n/a 29,000Fire
01-ERP-0200Marked Patrol Vehicles (7)n/a 107,400Police
01-ERP-0218Building Video Server n/a 20,000Police
01-ERP-0219PD - Video Data Server n/a 10,000Police
01-ERP-08014x4 3/4Ton Trucks (2)n/a 85,200Public Works: Parks/Forestry
01-ERP-0810Large Turf Mower n/a 92,700Public Works: Parks/Forestry
701,724Total for 2020
2021
01-ERP-0003CH - Network Server n/a 22,000Comm Svcs - IT
01-ERP-0006Computers n/a 33,075Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 33,000Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 10,000Comm Svcs - IT
01-ERP-0211PD - Network Server n/a 22,000Comm Svcs - IT
01-ERP-0200Marked Patrol Vehicles (7)n/a 161,100Police
Wednesday, November 28, 2018
12
Project Name Department Project #Priority Project Cost
01-ERP-0201Sergeant's Vehicle n/a 57,000Police
01-ERP-0202PSO / Parking Enforcement Vehicle n/a 53,700Police
01-ERP-0305Single Axle Dump Truck (2)n/a 225,000Public Works: Streets/Traffic
01-ERP-0900Refuse Truck (RAP-R) (2)n/a 270,300Refuse
887,175Total for 2021
2022
01-ERP-0038Activity Center Kitchen Storage 5 17,000Comm Svcs - Activity Center
01-ERP-1105Art Center Jaycee Studio Audio Visual n/a 13,500Comm Svcs - Arts Center
01-ERP-0003CH - Network Server n/a 25,000Comm Svcs - IT
01-ERP-0006Computers n/a 34,729Comm Svcs - IT
01-ERP-0009Network Infrastructure Upgrade n/a 23,400Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 44,000Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 10,000Comm Svcs - IT
01-ERP-0211PD - Network Server n/a 25,000Comm Svcs - IT
01-ERP-0105Quick Attack Pumper/Rescue (Rescue 8)n/a 314,500Fire
01-ERP-0109Extrication Tool (2)n/a 30,000Fire
01-ERP-0401HRA Copier n/a 16,500HRA
01-ERP-0200Marked Patrol Vehicles (7)n/a 107,400Police
01-ERP-0203PSO - Utility 4x4 n/a 72,100Police
01-ERP-0221Records Management System n/a 150,000Police
01-ERP-0804Log Truck n/a 163,600Public Works: Parks/Forestry
01-ERP-03031 Ton Dump Truck (2)n/a 53,400Public Works: Streets/Traffic
01-ERP-0309Skid Loader (2)n/a 50,000Public Works: Streets/Traffic
01-ERP-0555Generator (2)n/a 43,000Sewer
1,193,129Total for 2022
2023
01-ERP-0038Activity Center Kitchen Storage 5 12,000Comm Svcs - Activity Center
01-ERP-0003CH - Network Server n/a 26,250Comm Svcs - IT
01-ERP-0004Telephone System n/a 89,600Comm Svcs - IT
01-ERP-0006Computers n/a 36,465Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 44,000Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 10,000Comm Svcs - IT
01-ERP-0211PD - Network Server n/a 26,250Comm Svcs - IT
01-ERP-0109Extrication Tool (2)n/a 32,000Fire
01-ERP-0112Thermal Imaging Camera (2)n/a 15,400Fire
01-ERP-0125Fire Radios - Portable and Mobile Devices n/a 368,000Fire
01-ERP-0126Fire - Fire Helmets n/a 16,000Fire
01-ERP-0127Fire - Lucus Device n/a 18,000Fire
01-ERP-04004x4 3/4 Ton Truck n/a 41,100HRA
01-ERP-0200Marked Patrol Vehicles (7)n/a 117,400Police
01-ERP-0214Tactical Ballistic Vests / Helmets - SWAT 3 76,512Police
01-ERP-0215Police - Portable Radios n/a 290,000Police
01-ERP-0217Taser Replacement n/a 76,000Police
01-ERP-0218Building Video Server n/a 17,000Police
01-ERP-08001/2 Ton Pickup Truck n/a 35,400Public Works: Parks/Forestry
01-ERP-0808Riding Mowers (2)n/a 13,900Public Works: Parks/Forestry
01-ERP-03004x4 1/2 Ton Pickup with Plow n/a 28,900Public Works: Streets/Traffic
01-ERP-0308Front End Loaders (2)n/a 268,600Public Works: Streets/Traffic
1,658,777Total for 2023
GRAND TOTAL 5,133,195
Wednesday, November 28, 2018
13
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
DEPARTMENT SUMMARY
2019 2023thru
Total20192020202120222023Department
Comm Svcs - Activity Center 127,62416,000 82,624 17,000 12,000
Comm Svcs - Arts Center 13,50013,500
Comm Svcs - IT 891,659153,390 223,500 120,075 162,129 232,565
Community Services 51,30051,300
Fire 822,90029,000 344,500 449,400
HRA 57,60016,500 41,100
Police 1,573,612258,000 137,400 271,800 329,500 576,912
Public Works: Parks/Forestry 390,800177,900 163,600 49,300
Public Works: Streets/Traffic 855,900230,000 225,000 103,400 297,500
Refuse 270,300270,300
Sewer 43,00043,000
Water 35,00035,000
692,390 701,724 887,175 1,193,129 1,658,777 5,133,195TOTAL
Tuesday, November 6, 201814
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
PROJECTS BY DEPARTMENT
2019 2023thru
Total20192020202120222023DepartmentProject #Priority
Comm Svcs - Activity Center
01-ERP-0037 20,00020,000Activity Center Security System Upgrade 1
01-ERP-0038 29,00017,000 12,000Activity Center Kitchen Storage 5
01-ERP-0039 16,00016,000Activity Center Dishwasher 5
01-ERP-0041 62,62462,624Activity Center A/V Replacement & Upgrade 1
127,62416,000 82,624 17,000 12,000Comm Svcs - Activity Center Total
Comm Svcs - Arts Center
01-ERP-1105 13,50013,500Art Center Jaycee Studio Audio Visual n/a
13,50013,500Comm Svcs - Arts Center Total
Comm Svcs - IT
01-ERP-0003 117,25022,000 22,000 22,000 25,000 26,250CH - Network Server n/a
01-ERP-0004 89,60089,600Telephone System n/a
01-ERP-0006 165,76930,000 31,500 33,075 34,729 36,465Computersn/a
01-ERP-0009 23,40023,400Network Infrastructure Upgrade n/a
01-ERP-0014 50,00050,000Distribution Network Switches n/a
01-ERP-0015 66,00066,000Backup Server n/a
01-ERP-0017 154,00011,000 22,000 33,000 44,000 44,000IT - Office 365 n/a
01-ERP-0018 19,00019,000IT - RSA/Netmotion VPN n/a
01-ERP-0019 19,39019,390IT - Email Threat Protection n/a
01-ERP-0020 70,00030,000 10,000 10,000 10,000 10,000IT - Patching Automation Software 1
01-ERP-0211 117,25022,000 22,000 22,000 25,000 26,250PD - Network Server n/a
891,659153,390 223,500 120,075 162,129 232,565Comm Svcs - IT Total
Community Services
01-ERP-0008 11,30011,300Document Management Scanner (2)n/a
01-ERP-0051 40,00040,000City Hall Exterior Security Camera System 1
51,30051,300Community Services Total
Fire
01-ERP-0105 314,500314,500Quick Attack Pumper/Rescue (Rescue 8)n/a
01-ERP-0109 91,00029,000 30,000 32,000Extrication Tool (2)n/a
01-ERP-0112 15,40015,400Thermal Imaging Camera (2)n/a
01-ERP-0125 368,000368,000Fire Radios - Portable and Mobile Devices n/a
01-ERP-0126 16,00016,000Fire - Fire Helmets n/a
01-ERP-0127 18,00018,000Fire - Lucus Device n/a
822,90029,000 344,500 449,400Fire Total
HRA
01-ERP-0400 41,10041,1004x4 3/4 Ton Truck n/a
01-ERP-0401 16,50016,500HRA Copier n/a
Tuesday, November 6, 201815
Total20192020202120222023DepartmentProject #Priority
57,60016,500 41,100HRA Total
Police
01-ERP-0200 591,30098,000 107,400 161,100 107,400 117,400Marked Patrol Vehicles (7)n/a
01-ERP-0201 57,00057,000Sergeant's Vehicle n/a
01-ERP-0202 53,70053,700PSO / Parking Enforcement Vehicle n/a
01-ERP-0203 72,10072,100PSO - Utility 4x4 n/a
01-ERP-0212 85,00085,000Squad Car Camera Systems n/a
01-ERP-0214 76,51276,512Tactical Ballistic Vests / Helmets - SWAT 3
01-ERP-0215 290,000290,000Police - Portable Radios n/a
01-ERP-0217 76,00076,000Taser Replacement n/a
01-ERP-0218 37,00020,000 17,000Building Video Server n/a
01-ERP-0219 20,00010,000 10,000PD - Video Data Server n/a
01-ERP-0220 65,00065,000Mobile Data Computers n/a
01-ERP-0221 150,000150,000Records Management System n/a
1,573,612258,000 137,400 271,800 329,500 576,912Police Total
Public Works: Parks/Forestry
01-ERP-0800 35,40035,4001/2 Ton Pickup Truck n/a
01-ERP-0801 85,20085,2004x4 3/4Ton Trucks (2)n/a
01-ERP-0804 163,600163,600Log Truck n/a
01-ERP-0808 13,90013,900Riding Mowers (2)n/a
01-ERP-0810 92,70092,700Large Turf Mower n/a
390,800177,900 163,600 49,300Public Works: Parks/Forestry Total
Public Works: Streets/Traffic
01-ERP-0300 28,90028,9004x4 1/2 Ton Pickup with Plow n/a
01-ERP-0303 53,40053,4001 Ton Dump Truck (2)n/a
01-ERP-0305 225,000225,000Single Axle Dump Truck (2)n/a
01-ERP-0308 268,600268,600Front End Loaders (2)n/a
01-ERP-0309 50,00050,000Skid Loader (2)n/a
01-ERP-0311 230,000230,000Sweepern/a
855,900230,000 225,000 103,400 297,500Public Works: Streets/Traffic Total
Refuse
01-ERP-0900 270,300270,300Refuse Truck (RAP-R) (2)n/a
270,300270,300Refuse Total
Sewer
01-ERP-0555 43,00043,000Generator (2)n/a
43,00043,000Sewer Total
Water
01-ERP-0503 35,00035,000Air Compressor 2
35,00035,000Water Total
GRAND TOTAL 5,133,195692,390 701,724 887,175 1,193,129 1,658,777
Tuesday, November 6, 201816
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
FUNDING SOURCE SUMMARY
2019 thru 2023
TotalSource20192020202120222023
AC - Arts Center Fund 13,50013,500
Equipment Replacement Fund 4,618,395657,390 701,724 616,875 1,038,329 1,604,077
HRA - Housing and Redevelopment Authority 57,60016,500 41,100
RF - Refuse Fund 352,100270,300 81,800
SF - Sanitary Sewer Fund 49,80043,000 6,800
WF - Water Fund 41,80035,000 6,800
692,390 701,724 887,175 1,193,129 1,658,777 5,133,195GRAND TOTAL
Tuesday, November 6, 2018
17
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
PROJECTS BY FUNDING SOURCE
2019 2023thru
TotalSourceProject #Priority 2019 2020 2021 2022 2023
AC - Arts Center Fund
01-ERP-1105 13,50013,500Art Center Jaycee Studio Audio Visual n/a
13,50013,500AC - Arts Center Fund Total
Equipment Replacement Fund
01-ERP-0003 117,25022,000 22,000 22,000 25,000 26,250CH - Network Server n/a
01-ERP-0004 76,00076,000Telephone System n/a
01-ERP-0006 165,76930,000 31,500 33,075 34,729 36,465Computersn/a
01-ERP-0008 11,30011,300Document Management Scanner (2)n/a
01-ERP-0009 23,40023,400Network Infrastructure Upgrade n/a
01-ERP-0014 50,00050,000Distribution Network Switches n/a
01-ERP-0015 66,00066,000Backup Server n/a
01-ERP-0017 154,00011,000 22,000 33,000 44,000 44,000IT - Office 365 n/a
01-ERP-0018 19,00019,000IT - RSA/Netmotion VPN n/a
01-ERP-0019 19,39019,390IT - Email Threat Protection n/a
01-ERP-0020 70,00030,000 10,000 10,000 10,000 10,000IT - Patching Automation Software 1
01-ERP-0037 20,00020,000Activity Center Security System Upgrade 1
01-ERP-0038 29,00017,000 12,000Activity Center Kitchen Storage 5
01-ERP-0039 16,00016,000Activity Center Dishwasher 5
01-ERP-0041 62,62462,624Activity Center A/V Replacement & Upgrade 1
01-ERP-0051 40,00040,000City Hall Exterior Security Camera System 1
01-ERP-0105 314,500314,500Quick Attack Pumper/Rescue (Rescue 8)n/a
01-ERP-0109 91,00029,000 30,000 32,000Extrication Tool (2)n/a
01-ERP-0112 15,40015,400Thermal Imaging Camera (2)n/a
01-ERP-0125 368,000368,000Fire Radios - Portable and Mobile Devices n/a
01-ERP-0126 16,00016,000Fire - Fire Helmets n/a
01-ERP-0127 18,00018,000Fire - Lucus Device n/a
01-ERP-0200 591,30098,000 107,400 161,100 107,400 117,400Marked Patrol Vehicles (7)n/a
01-ERP-0201 57,00057,000Sergeant's Vehicle n/a
01-ERP-0202 53,70053,700PSO / Parking Enforcement Vehicle n/a
01-ERP-0203 72,10072,100PSO - Utility 4x4 n/a
01-ERP-0211 117,25022,000 22,000 22,000 25,000 26,250PD - Network Server n/a
01-ERP-0212 85,00085,000Squad Car Camera Systems n/a
01-ERP-0214 76,51276,512Tactical Ballistic Vests / Helmets - SWAT 3
01-ERP-0215 290,000290,000Police - Portable Radios n/a
01-ERP-0217 76,00076,000Taser Replacement n/a
01-ERP-0218 37,00020,000 17,000Building Video Server n/a
01-ERP-0219 20,00010,000 10,000PD - Video Data Server n/a
01-ERP-0220 65,00065,000Mobile Data Computers n/a
01-ERP-0221 150,000150,000Records Management System n/a
01-ERP-0300 28,90028,9004x4 1/2 Ton Pickup with Plow n/a
01-ERP-0303 53,40053,4001 Ton Dump Truck (2)n/a
01-ERP-0305 225,000225,000Single Axle Dump Truck (2)n/a
01-ERP-0308 268,600268,600Front End Loaders (2)n/a
Tuesday, November 6, 2018
18
TotalSourceProject #Priority 2019 2020 2021 2022 2023
01-ERP-0309 50,00050,000Skid Loader (2)n/a
01-ERP-0311 230,000230,000Sweepern/a
01-ERP-0800 35,40035,4001/2 Ton Pickup Truck n/a
01-ERP-0801 85,20085,2004x4 3/4Ton Trucks (2)n/a
01-ERP-0804 81,80081,800Log Truck n/a
01-ERP-0808 13,90013,900Riding Mowers (2)n/a
01-ERP-0810 92,70092,700Large Turf Mower n/a
4,618,395657,390 701,724 616,875 1,038,329 1,604,077Equipment Replacement Fund Total
HRA - Housing and Redevelopment A
01-ERP-0400 41,10041,1004x4 3/4 Ton Truck n/a
01-ERP-0401 16,50016,500HRA Copier n/a
57,60016,500 41,100HRA - Housing and Redevelopment
Authority Total
RF - Refuse Fund
01-ERP-0804 81,80081,800Log Truck n/a
01-ERP-0900 270,300270,300Refuse Truck (RAP-R) (2)n/a
352,100270,300 81,800RF - Refuse Fund Total
SF - Sanitary Sewer Fund
01-ERP-0004 6,8006,800Telephone System n/a
01-ERP-0555 43,00043,000Generator (2)n/a
49,80043,000 6,800SF - Sanitary Sewer Fund Total
WF - Water Fund
01-ERP-0004 6,8006,800Telephone System n/a
01-ERP-0503 35,00035,000Air Compressor 2
41,80035,000 6,800WF - Water Fund Total
5,133,195692,390 701,724 887,175 1,193,129 1,658,777GRAND TOTAL
Tuesday, November 6, 2018
19
20
EQUIPMENT REQUESTS
21
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Activity Ctr Director
2019 2023thru Department Comm Svcs - Activity Center
Description
Upgrade the present security system, which was installed in 2008.
Project #01-ERP-0037
Priority 1 Urgent
Justification
"It is important that we monitor who is in the Activity Center as well as their activity while here to insure the safety of our participants and staff.
Staff works numerous hours while alone within the building. There is no panic button here to alert the police the staff is in trouble here, therefore
we must rely on security cameras to deter those who might want to do harm to participants or staff, or damage to the building itself. Cameras can at
least help identify the perpetrator if something should happen. Monitoring the outside of the facility would help assure the safety of our staff who
come to work and leave work alone in the dark. It will also help deter and identify those wanting to use our outside trash and recycling bins for
their personal use. Recommendation to complete security upgrades after capital improvements in the facility.
Budget Impact/Other
Useful Life 15-18 yearsProject Name Activity Center Security System Upgrade Category Equipment
Type Equipment
Future
Total Project Cost:$20,000
Total20192020202120222023Expenditures
20,00020,000Equipment
20,000 20,000Total
Total20192020202120222023Funding Sources
20,00020,000Equipment Replacement Fund
20,000 20,000Total
Tuesday, November 6, 2018
22
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Activity Ctr Director
2019 2023thru Department Comm Svcs - Activity Center
Description
Purchase of stainless steel enclosed cabinets for the kitchen over a 2-year span.
Project #01-ERP-0038
Priority 5 Future Consideration
Justification
The Activity Center kitchen presently has open type shelving cages, purchased in 1991. Shelving should be replaced with shelving conducive to
water as some shelves are used for storing silverware and coffee cups directly from the dishwasher. The present shelving is rusting. Enclosed units
are needed to secure items we use for our own kitchen operation from facility use renters, as well as proper storage of equipment from the dirt,
dust, and grim associated with everyday use of the kitchen.
Budget Impact/Other
Useful Life 30 yearsProject Name Activity Center Kitchen Storage Category Equipment
Type Equipment
Future
Total Project Cost:$29,000
Total20192020202120222023Expenditures
29,00017,000 12,000Equipment
17,000 12,000 29,000Total
Total20192020202120222023Funding Sources
29,00017,000 12,000Equipment Replacement Fund
17,000 12,000 29,000Total
Tuesday, November 6, 2018
23
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Activity Ctr Director
2019 2023thru Department Comm Svcs - Activity Center
Description
Replace the current dishwasher when it can no longer be repair or the Hennepin county Health Department no longer approves its use. This project
was previously budgeted, but will not be replaced until the existing system malfuncations.
Project #01-ERP-0039
Priority 5 Future Consideration
Justification
A dishwasher is a required piece of equipment for a functioning commercial kitchen that is needed for the Depot Coffee House operation, Activity
Center events as well as the Activity Center's rental program.
Budget Impact/Other
Useful Life 30 yearsProject Name Activity Center Dishwasher Category Equipment
Type Equipment
Future
Total Project Cost:$16,000
Total20192020202120222023Expenditures
16,00016,000Equipment
16,000 16,000Total
Total20192020202120222023Funding Sources
16,00016,000Equipment Replacement Fund
16,000 16,000Total
Tuesday, November 6, 2018
24
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Activity Ctr Director
2019 2023thru Department Comm Svcs - Activity Center
Description
C o n t i n u e t h i s r e p l a c e m e n t p r o j e c t t h a t b e g a n i n 2 0 1 6 t o r e p l a c e a n d u p g r a d e t h e a u d i o a n d v i s u a l s y s t e m w i t h i n t h e H o p k i n s A c t i v i t y C e n t e r , a r e a
by area, throughout the next 4 years. Note: The gym has already been replaced and upgraded.
Project #01-ERP-0041
Priority 1 Urgent
Justification
The present sound system in this facility was installed in 1980. It was primarily used as a paging system. This replacement and upgrading project
began in 2016. We continue to replace and upgrade the audio/visual system in a new area each year, except 2018, to allow better hearing for our
participants as well amplification devices for speakers, presenters, leaders, and instructors. We add equipment to use the technology now available
for visual enhancements using our present televisions in various areas that are used in presentations, classroom instruction, and recreational
activities. We are recommending delaying the project to corelate with the potential improvements at the Activity Center. We would like to
complete upgrades at once time to ensure all equipment is compatible. There is a concern about the previously upgraded equipment having
compatibility issues if delayed for too many years. We have upgraded sound and visual in the gymnasium and it has made significant
difference in our participant’s ability to hear and see in the programs they participate in. In addition, those who have rented from us and have used
our upgraded equipment say how much it has enhanced their events.
Budget Impact/Other
Useful Life 15-20 yearsProject Name Activity Center A/V Replacement & Upgrade Category Equipment
Type Improvement
Future
Total Project Cost:$62,624
Total20192020202120222023Expenditures
62,62462,624Equipment
62,624 62,624Total
Total20192020202120222023Funding Sources
62,62462,624Equipment Replacement Fund
62,624 62,624Total
Tuesday, November 6, 2018
25
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Arts Center Director
2019 2023thru Department Comm Svcs - Arts Center
Description
Install a projector in a ceiling mount. Wire speakers into the ceiling. Wire input for computer on front wall. Add two microphones. Mount
supporting hardware in rack that fits into closet.
Originally scheduled for the Community Room this project was moved to the Jaycee Studio as they found a greater need for this equipment in that
room.
Project #01-ERP-1105
Priority n/a
Justification
An increasing number of users of this room require media support. Current means of providing this include the use of an oversized A/V cart, cords
stretch across the floor and a large speaker on a stick. We can streamline the appearance and functionality by making these appropriate changes.
These changes also address safety concerns. They will help attract safety concerns. They will help attract and retain rental customers as well as
appropriately support our own activities.
Budget Impact/Other
Move this item from 2014 to 2015.
Useful Life 7 yearsProject Name Art Center Jaycee Studio Audio Visual Category Equipment
Type Equipment
Future
Total Project Cost:$41,100
Total20192020202120222023Expenditures
13,50013,500Equipment
13,500 13,500Total
Total20192020202120222023Funding Sources
13,50013,500AC - Arts Center Fund
13,500 13,500Total
Tuesday, November 6, 2018
26
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2019 2023thru Department Comm Svcs - IT
Description
The network server is the hub of the network. New computers are faster and more reliable.
Project #01-ERP-0003
Priority n/a
Justification
Networking allows user to share information that is stored in a single location, the network server. This is more efficient because the information
does not have to be stored on many different computers. It also makes for better accuracy because as the information changes or is updated, every
user is working with the same data.
Budget Impact/Other
Changes reflect anticipated need for increased storage.
Useful Life 1 yearProject Name CH - Network Server Category Equipment
Type Equipment
Future
Total Project Cost:$627,250
Total20192020202120222023Expenditures
117,25022,000 22,000 22,000 25,000 26,250Equipment
22,000 22,000 22,000 25,000 26,250 117,250Total
Total20192020202120222023Funding Sources
117,25022,000 22,000 22,000 25,000 26,250Equipment Replacement Fund
22,000 22,000 22,000 25,000 26,250 117,250Total
Tuesday, November 6, 2018
27
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2019 2023thru Department Comm Svcs - IT
Description
Includes the PBX, the voice mail systems, and all telephone instruments. Currently there are over 200 extensions served by this system. Also
includes software for the PBX and voice mail systems.
Project #01-ERP-0004
Priority n/a
Justification
Making, receiving and routing telephone calls, storing voice mail messages, and providing telephone based information services (snow line, etc.)
Budget Impact/Other
Variance from 20 year plan - Upgrade to controller in 2009 delays complete replacement to 2015.
Estimate salvage/resale value on replaced item: $
Useful Life 8 yearsProject Name Telephone System Category Equipment
Type Equipment
Future
Total Project Cost:$349,900
Total20192020202120222023Expenditures
89,60089,600Equipment
89,600 89,600Total
Total20192020202120222023Funding Sources
76,00076,000Equipment Replacement Fund
6,8006,800SF - Sanitary Sewer Fund
6,8006,800WF - Water Fund
89,600 89,600Total
Tuesday, November 6, 2018
28
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Finance Director/IT
2019 2023thru Department Comm Svcs - IT
Description
Personal computer purchases and upgrades for the entire City staff. Coordinating personal computer purchases from individual departments to one
fund.
Project #01-ERP-0006
Priority n/a
Justification
Tools enabling staff to perform job responsibilities efficiently and effectively.
Budget Impact/Other
Increase in expenditure a result of supporting more computers than when the original allotment was put in place.
Useful Life 3-5 yearsProject Name Computers Category Equipment
Type Equipment
Future
Total Project Cost:$1,065,769
Total20192020202120222023Expenditures
165,76930,000 31,500 33,075 34,729 36,465Equipment
30,000 31,500 33,075 34,729 36,465 165,769Total
Total20192020202120222023Funding Sources
165,76930,000 31,500 33,075 34,729 36,465Equipment Replacement Fund
30,000 31,500 33,075 34,729 36,465 165,769Total
Tuesday, November 6, 2018
29
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Finance Director/IT
2019 2023thru Department Comm Svcs - IT
Description
Install new and additional network wiring and equipment.
Project #01-ERP-0009
Priority n/a
Justification
Improve capacity, coverage and reliability. Installation will coincide with office space update.
Budget Impact/Other
Variance from 20 year plan - new item to replace substandard network wiring.
Estimate salvage/resale value on replaced item: $
Useful Life 15 yearsProject Name Network Infrastructure Upgrade Category Equipment
Type Equipment
Future
Total Project Cost:$38,400
Total20192020202120222023Expenditures
23,40023,400Equipment
23,400 23,400Total
Total20192020202120222023Funding Sources
23,40023,400Equipment Replacement Fund
23,400 23,400Total
Tuesday, November 6, 2018
30
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2019 2023thru Department Comm Svcs - IT
Description
We have 25 distribution network switches in our enterprise environment along with fiber optic transceivers and direct attach sfp cables to connect
them. Distribution switches connect to the core switches and bring the data to the actual endpoints such as desktops, servers, telephones, and
copiers.
Project #01-ERP-0014
Priority n/a
Justification
Replacement of these switches with current technology is vital to the function of the network as well as the safety of the data being passed through
the switch.
Budget Impact/Other
2016 - New item in ERP
Useful Life 5 yearsProject Name Distribution Network Switches Category Equipment
Type Equipment
Future
Total Project Cost:$107,000
Total20192020202120222023Expenditures
50,00050,000Equipment
50,000 50,000Total
Total20192020202120222023Funding Sources
50,00050,000Equipment Replacement Fund
50,000 50,000Total
Tuesday, November 6, 2018
31
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2019 2023thru Department Comm Svcs - IT
Description
Group of Dell servers to run Dell Rapid Recovery software to backup city computers and servers, along with Windows and VMWare licsensing
required to run the servers.
Project #01-ERP-0015
Priority n/a
Justification
Backup servers are essential to keep the electronic data for the city safe. We have overgrown our current system and are not able to backup
everything that needs to be backed up in a timely manor. Additinally restores on the curent system take hours to days. If we needed to restore a
critical server from backup, we would be looking at an unacceptable amount of downtime.
Budget Impact/Other
Useful Life 3 yearsProject Name Backup Server Category Equipment
Type Equipment
Future
Total Project Cost:$132,000
Total20192020202120222023Expenditures
66,00066,000Equipment
66,000 66,000Total
Total20192020202120222023Funding Sources
66,00066,000Equipment Replacement Fund
66,000 66,000Total
Tuesday, November 6, 2018
32
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2019 2023thru Department Comm Svcs - IT
Description
Transition from the legacy model of Microsoft Office to Office 365. This project would transition 25 percent of our users and devices per year.
Project #01-ERP-0017
Priority n/a
Justification
As we become a more mobile workforce embracing new mobile and remote technology we need to move away from the traditonal office that can
only be installed on a Windows computer and transition to the version of Office that can be used in the cloud and as a mobile app. Unfortunately,
as is becoming common with most enterprise softwre, you can no longer just purchase it out right, you must rent it from the software author. The
cost for Office 365 will now be a yearly ongoing cost. Office 365 is common at other cities, corporations, and educational environments.
Budget Impact/Other
Useful LifeProject Name IT - Office 365 Category Equipment
Type Equipment
Future
Total Project Cost:$154,000
Total20192020202120222023Expenditures
154,00011,000 22,000 33,000 44,000 44,000Equipment
11,000 22,000 33,000 44,000 44,000 154,000Total
Total20192020202120222023Funding Sources
154,00011,000 22,000 33,000 44,000 44,000Equipment Replacement Fund
11,000 22,000 33,000 44,000 44,000 154,000Total
Tuesday, November 6, 2018
33
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2019 2023thru Department Comm Svcs - IT
Description
RSA dual factor authentication and Netmotion VPN software, yearly maintenance, and replacement of RSA tokens every 3 years.
Project #01-ERP-0018
Priority n/a
Justification
This software would replace our current VPN solution with a more stable, always on connection for city owned devices. This enables our remote
devices to channel all of their communication through the city's connection, taking advantage of all of the protection mechanisms we have installed
for our users. Remote devices will also be connected to any patching and backup mechanisms we have in place as well. Occasional VPN users
will also benefit from the increased reliability of the new VPN software. Our current solution can drop users unexpetedly when they are working
on tasks remotely. Hennepin County uses this solution very effectively with their large amount of remote workers. We would like to replicate that
on a much smaller scale.
Budget Impact/Other
Does require yearly maintenance to be added in 2020 to operating budget. Currently $2,300 per year.
Useful Life 5 yearsProject Name IT - RSA/Netmotion VPN Category Equipment
Type Equipment
Future
Total Project Cost:$19,000
Total20192020202120222023Expenditures
19,00019,000Equipment
19,000 19,000Total
Total20192020202120222023Funding Sources
19,00019,000Equipment Replacement Fund
19,000 19,000Total
Tuesday, November 6, 2018
34
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2019 2023thru Department Comm Svcs - IT
Description
FireEye Email threat protection. Advanced antivirus specificly for email. Price is for a 5 year contract.
Project #01-ERP-0019
Priority n/a
Justification
Our current antispam solution does a great job of reducing spam, but a terrible job of removing malicious items from email. This would add an
additional layer of protection to our email. We would send our email through the spam filtering to remove spam, then filter out additional threats
with this solution before email arrives at the user. Email has become the number one vector in which enterprises get hacked because you are
relying on non technical users to spot extremely tricky deceptions. The threat is threefold. We are seeing items that are launched at the Internet at
large, we are seeing items that are specifically targeted at us, and we are seeing items that come from vendors and other people he have established
relationships with when they get hacked. Adding this service will help cut down on the amount of dangerous items that arrive in our inboxes.
Budget Impact/Other
Useful Life 5 yearsProject Name IT - Email Threat Protection Category Equipment
Type Equipment
Future
Total Project Cost:$19,390
Total20192020202120222023Expenditures
19,39019,390Equipment
19,390 19,390Total
Total20192020202120222023Funding Sources
19,39019,390Equipment Replacement Fund
19,390 19,390Total
Tuesday, November 6, 2018
35
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2019 2023thru Department Comm Svcs - IT
Description
Software to automate the delivery of critical and maintenance patches to our enterprise endpoints and yearly maintenance of the software going
forward.
Project #01-ERP-0020
Priority 1 Urgent
Justification
Microsoft software has to be patched the second Tuesday of every month. Adobe software has to be patched every time a critical vulnerability is
discovered, which can be twice in a week in a bad week. Other applications have to be patched as new releases are produced from vendors.
Currently our staff must touch every endpoint for the majority of the software installs. We are using up an inordinate amount of staff time to patch
all of our endpoints only to have to restart the cycle 3 weeks later. Automation of this process would free up staff time to work on other projects
and problems for the city. Approx. two full weeks of 1FTE per month or 960 hours per year saved.
Budget Impact/Other
Useful Life 5 yearsProject Name IT - Patching Automation Software Category Equipment
Type Equipment
Future
Total Project Cost:$70,000
Total20192020202120222023Expenditures
70,00030,000 10,000 10,000 10,000 10,000Equipment
30,000 10,000 10,000 10,000 10,000 70,000Total
Total20192020202120222023Funding Sources
70,00030,000 10,000 10,000 10,000 10,000Equipment Replacement Fund
30,000 10,000 10,000 10,000 10,000 70,000Total
Tuesday, November 6, 2018
36
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2019 2023thru Department Comm Svcs - IT
Description
Computer servers store information and system programs for Police Department.
Project #01-ERP-0211
Priority n/a
Justification
Annual replacement cycle allows development of system storage program. Use of newer servers for heavy use programs while older servers
used for data storage
Budget Impact/Other
Useful Life 3 yearsProject Name PD - Network Server Category Equipment
Type Equipment
Future
Total Project Cost:$632,250
Total20192020202120222023Expenditures
117,25022,000 22,000 22,000 25,000 26,250Equipment
22,000 22,000 22,000 25,000 26,250 117,250Total
Total20192020202120222023Funding Sources
117,25022,000 22,000 22,000 25,000 26,250Equipment Replacement Fund
22,000 22,000 22,000 25,000 26,250 117,250Total
Tuesday, November 6, 2018
37
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact City Clerk
2019 2023thru Department Community Services
Description
Large document (11” x17”) scanner for document management and retention as well as general administrative use.
Purchased two scanners in 2012 at a cost of $10,315 - 1 at scanner station, 1 in City Clerk's office
Current equipment: Canon DR 7550C
Project #01-ERP-0008
Priority n/a
Justification
Scanners are needed for converting paper copies to electronic data to reduce storage space.
Budget Impact/Other
Variance from 20 year plan - Two scanners purchased in 2012 and will be replaced every four years.
Estimate salvage/resale value on replaced item: $500-$1,000
Useful Life 4 yearsProject Name Document Management Scanner (2)Category Equipment
Type Equipment
Future
Total Project Cost:$87,600
Total20192020202120222023Expenditures
11,30011,300Equipment
11,300 11,300Total
Total20192020202120222023Funding Sources
11,30011,300Equipment Replacement Fund
11,300 11,300Total
Tuesday, November 6, 2018
38
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Asst City Manager
2019 2023thru Department Community Services
Description
Expand the current police department security system to ensure a 360 degree view of City Hall.
Project #01-ERP-0051
Priority 1 Urgent
Justification
Currently we do not have a 360 degree view of City Hall. This has made some investigations in the past more difficult when incidents have
occurred right outside of our own facility. It also is a security concern to not have a front view it there ever was an incident in the building. The
cameras will also help us to protect the City’s assets. With the upgrade to the front entrance vestibule and landscaping it makes sense to add new
cameras after the project is complete to ensure full 360 view
Budget Impact/Other
Useful Life 15 yearsProject Name City Hall Exterior Security Camera System Category Equipment
Type Equipment
Future
Total Project Cost:$40,000
Total20192020202120222023Expenditures
40,00040,000Equipment
40,000 40,000Total
Total20192020202120222023Funding Sources
40,00040,000Equipment Replacement Fund
40,000 40,000Total
Tuesday, November 6, 2018
39
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2019 2023thru Department Fire
Description
Quick attack pumper/rescue.
Current vehicle: 2012 Rescue (#104)
Project #01-ERP-0105
Priority n/a
Justification
Would replace Rescue 8 (lite rescue) and use as a utility vehicle. This truck could be used for daytime and nighttime medicals and small fires.
This will reduce having all personnel respond to small fires. It will also let us drop one engine in 2022 but still keep ISO rating.
Budget Impact/Other
Variance from 20 year plan - Useful life change to 10 years.
Reoccurs every 10 years.
Useful Life 10 yearsProject Name Quick Attack Pumper/Rescue (Rescue 8)Category Vehicles
Type Equipment
Future
Total Project Cost:$737,100
Total20192020202120222023Expenditures
314,500314,500Equipment
314,500 314,500Total
Total20192020202120222023Funding Sources
314,500314,500Equipment Replacement Fund
314,500 314,500Total
Tuesday, November 6, 2018
40
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2019 2023thru Department Fire
Description
Hydraulic rescue and extrication tool with spreader, cutters and hydraulic ram.
Project #01-ERP-0109
Priority n/a
Justification
All vehicle and industrial rescue situations which will require patient disentanglement or entrapment. This tool will be added to the purchase of the
quick attack pumper. The tool will be scaled down to a smaller tool, possibly reducing cost.
Budget Impact/Other
Estimate salvage/resale value on replaced item: $1,000
Purchased: 2007
Useful Life 10 yearsProject Name Extrication Tool (2)Category Equipment
Type Equipment
Future
Total Project Cost:$210,800
Total20192020202120222023Expenditures
91,00029,000 30,000 32,000Equipment
29,000 30,000 32,000 91,000Total
Total20192020202120222023Funding Sources
91,00029,000 30,000 32,000Equipment Replacement Fund
29,000 30,000 32,000 91,000Total
Tuesday, November 6, 2018
41
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2019 2023thru Department Fire
Description
Used by our fire companies to locate victims trapped in a smoke filled building. It helps us determine where fire and heat may be hidden allowing
for faster extinguishment.
Note: purchased 2013 & 2017
Project #01-ERP-0112
Priority n/a
Justification
Current camera is ten years old and has been through many hot fires and needs to be replaced. Current camera was purchased with donation money.
Budget Impact/Other
Variance from 20 year plan - department owns 2 cameras.
Reoccuring expenditure.
Estimate salvage/resale value on replaced item: $-0-
Useful Life 10 yearsProject Name Thermal Imaging Camera (2)Category Equipment
Type Equipment
Future
Total Project Cost:$92,900
Total20192020202120222023Expenditures
15,40015,400Equipment
15,400 15,400Total
Total20192020202120222023Funding Sources
15,40015,400Equipment Replacement Fund
15,400 15,400Total
Tuesday, November 6, 2018
42
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2019 2023thru Department Fire
Description
Portable and mobile radios used by the police departments to allow the department to communicate on one frequency.
Fire has 50 portable and 13 mobile radios along with 50 pagers.
Cost in ERP includes portable radios (30), portable radio's encrypted (20), mobile radio's (13), pagers (50), chargers single (60), charger base (3)
plus other needed equipment. Details of all items are on file with Fire and Finance Depts.
Project #01-ERP-0125
Priority n/a
Justification
Provides radios so that the police, fire and public works can communicate on a common radio frequency during an emergency and multiple county
interoperability.
Budget Impact/Other
In 2016 the Fire radios were separated from Police for better accountability. Project was adjusted for current pricing.
2019 - 340,000 FD
2019 - 28,000 PW
Useful Life 5-7 yearsProject Name Fire Radios - Portable and Mobile Devices Category Equipment
Type Equipment
Future
Total Project Cost:$662,075
Total20192020202120222023Expenditures
368,000368,000Equipment
368,000 368,000Total
Total20192020202120222023Funding Sources
368,000368,000Equipment Replacement Fund
368,000 368,000Total
Tuesday, November 6, 2018
43
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2019 2023thru Department Fire
Description
Fire Helmets for firefighters. Helmets are used for safety of personnel at Fire and other Emergency incidents. In 2017, the NFPA and OSHA
Standard changed to recommending helmet change every 10 years.
Project #01-ERP-0126
Priority n/a
Justification
Safety of Firefighters. Current helmets useful life will be up in 2023.
Budget Impact/Other
Reoccuring every 10 years.
Useful Life 10 yearsProject Name Fire - Fire Helmets Category Equipment
Type Equipment
Future
Total Project Cost:$34,000
Total20192020202120222023Expenditures
16,00016,000Equipment
16,000 16,000Total
Total20192020202120222023Funding Sources
16,00016,000Equipment Replacement Fund
16,000 16,000Total
Tuesday, November 6, 2018
44
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact
2019 2023thru Department Fire
Description
Lucus device is used to assist CPR during full arrest. The current device was purchased in 2016 and with changed in technology, it is
recommended to update every 5 years.
Project #01-ERP-0127
Priority n/a
Justification
To continue to serve citizens of Hopkins during medical incidents.
Budget Impact/Other
Reoccurs every 5 years.
Useful LifeProject Name Fire - Lucus Device Category Unassigned
Type Unassigned
Future
Total Project Cost:$75,500
Total20192020202120222023Expenditures
18,00018,000Equipment
18,000 18,000Total
Total20192020202120222023Funding Sources
18,00018,000Equipment Replacement Fund
18,000 18,000Total
Tuesday, November 6, 2018
45
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Unassigned
2019 2023thru Department HRA
Description
4 wheel drive 3/4 ton truck to be used by Public Housing maintenance staff. Includes snow plow.
Current vehicle: 2015 Chevrolet Pickup
Project #01-ERP-0400
Priority n/a
Justification
Transportation for Public Housing Superintendent and snow plowing at various HRA properties around the city.
Budget Impact/Other
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $1,800
Useful Life 8 yearsProject Name 4x4 3/4 Ton Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$148,400
Total20192020202120222023Expenditures
41,10041,100Vehicles
41,100 41,100Total
Total20192020202120222023Funding Sources
41,10041,100HRA - Housing and
Redevelopment Authority
41,100 41,100Total
Tuesday, November 6, 2018
46
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Finance Director
2019 2023thru Department HRA
Description
Color copy machine to service the needs of the HRA. High volume product copier to do a variety of copying tasks.
Current equipment: Imagistics ZB35
Project #01-ERP-0401
Priority n/a
Justification
Daily use to make copies of correspondence, forms and rental documents. Periodically produce documents such as resident newsletters and
marketing. Machine will duplex, sort, collate and staple copies.
Budget Impact/Other
Variance from 20 year plan - New item.
Estimate salvage/resale value on replace item: $ - 0 -
Useful Life 8 yearsProject Name HRA Copier Category Equipment
Type Equipment
Future
Total Project Cost:$50,400
Total20192020202120222023Expenditures
16,50016,500Equipment
16,500 16,500Total
Total20192020202120222023Funding Sources
16,50016,500HRA - Housing and
Redevelopment Authority
16,500 16,500Total
Tuesday, November 6, 2018
47
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2019 2023thru Department Police
Description
Marked patrol vehicles used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties.
Fleet consists of 7 marked patrol vehicles
Project #01-ERP-0200
Priority n/a
Justification
Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for
routine and emergency operations. Vehicles contain secure seating for prisoner transport.
Budget Impact/Other
Variance from 20 year plan - cost modified due to new models of squads which need to be re-outfitted for all equipment.
Estimate salvage/resale value on replaced item: $4,000 each
Useful Life 3 yearsProject Name Marked Patrol Vehicles (7)Category Vehicles
Type Equipment
Future
Total Project Cost:$3,382,600
Total20192020202120222023Expenditures
591,30098,000 107,400 161,100 107,400 117,400Vehicles
98,000 107,400 161,100 107,400 117,400 591,300Total
Total20192020202120222023Funding Sources
591,30098,000 107,400 161,100 107,400 117,400Equipment Replacement Fund
98,000 107,400 161,100 107,400 117,400 591,300Total
Tuesday, November 6, 2018
48
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2019 2023thru Department Police
Description
Marked patrol vehicle used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties.
4 year rotation.
Current vehicle: Ford Utility
Project #01-ERP-0201
Priority n/a
Justification
Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for
routine and emergency operations. Vehicles contain secure seating for prisoner transport.
Budget Impact/Other
Variance from 20 year plan - cost modified due to new model of car which will require all new equipment.
Estimate salvage/resale value on replaced item: $3,500 each
Useful Life 4 yearsProject Name Sergeant's Vehicle Category Vehicles
Type Equipment
Future
Total Project Cost:$400,600
Total20192020202120222023Expenditures
57,00057,000Vehicles
57,000 57,000Total
Total20192020202120222023Funding Sources
57,00057,000Equipment Replacement Fund
57,000 57,000Total
Tuesday, November 6, 2018
49
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2019 2023thru Department Police
Description
Marked patrol vehicle used by PSO Evidence Tech / Parking Enforcement Officer to respond to calls for service, enforce parking laws, and
perform duties associated with evidentiary processes.
Current Vehicle: (1) 2016 Ford Utility
Project #01-ERP-0202
Priority n/a
Justification
Use by parking enforcement officers in the course of their duties enforcing parking regulations in the downtown area.
Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for
routine and emergency operations. Vehicles contain secure seating for prisoner transport.
Budget Impact/Other
Variance from 20 year plan - vehicle was increasd to account for the outfitting and radio
Estimate salvage/resale value on replaced item: $1,500
2016 - Change in replacement schedule due to full time use of vehicle and change of position responsibilities. Next replacement scheduled for
2021 from 2026
Useful Life 5 yearsProject Name PSO / Parking Enforcement Vehicle Category Vehicles
Type Equipment
Future
Total Project Cost:$168,900
Total20192020202120222023Expenditures
53,70053,700Vehicles
53,700 53,700Total
Total20192020202120222023Funding Sources
53,70053,700Equipment Replacement Fund
53,700 53,700Total
Tuesday, November 6, 2018
50
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2019 2023thru Department Police
Description
Four wheel drive marked patrol vehicle used by PSOs to respond to calls for service, handle animal complaints, and perform other duties
associated with department operations.
Current vehicle: 2014 Ford F150 (#212)
Project #01-ERP-0203
Priority n/a
Justification
Vehicle is normally used by public service officers for a wide variety of uses such as transporting animals, prisoners and equipment. The 4 wheel
drive vehicle is also used at times as a patrol vehicle, particularly in the winter in extreme snow conditions.
Budget Impact/Other
Estimate salvage/resale value on replaced item: $5,000
2016 - Variance from 20 year plan - Change in replacement schedule due to full time use of vehicle. Changing useful life from 6 years to 4 years
Useful Life 4 yearsProject Name PSO - Utility 4x4 Category Vehicles
Type Equipment
Future
Total Project Cost:$328,300
Total20192020202120222023Expenditures
72,10072,100Vehicles
72,100 72,100Total
Total20192020202120222023Funding Sources
72,10072,100Equipment Replacement Fund
72,100 72,100Total
Tuesday, November 6, 2018
51
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2019 2023thru Department Police
Description
Squad car camera systems are used to document events inside and outside of the patrol vehicles. The cameras utilize a forward facing camera and a
prisoner transport area camaera.
Body cameras capture interactions between the officers and the public for transparency. Body cameras also capture evidence used in future court
proceedings.
Project #01-ERP-0212
Priority n/a
Justification
The police vehicle cameras are a necessary component of the patrol vehicles. Evidentiary information is collected from the cameras and often used
in court. Cameras also provide a snapshot of an officers interaction with the public so we are able to maintain transparency and public trust with
our operations.
Budget Impact/Other
Integrated camera system - 12 Squad car cameras and 20 body cameras
Squad cameras 6,000/each. Body cameras 1,200/each.
Useful Life 5 yearsProject Name Squad Car Camera Systems Category Equipment
Type Equipment
Future
Total Project Cost:$577,500
Total20192020202120222023Expenditures
85,00085,000Equipment
85,000 85,000Total
Total20192020202120222023Funding Sources
85,00085,000Equipment Replacement Fund
85,000 85,000Total
Tuesday, November 6, 2018
52
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2019 2023thru Department Police
Description
12 Tactical Ballistical Vests worn by members of the Hopkins Police Department SWAT (Special Weapons and Tactics) team. These vests offer a
higher level of protection for officers involved in high risk situations; this protection offers a higher level of ballistic protection compared to regular
duty vests. SWAT team members also require ballistic helmets on the same rotational cycle. Equipment breakdown: 12 vests @ $4,215 =
$50,580. 12 ballistic helmets @ $642 = $7,716. 2 New protective shields @ $2,864 = $5,729. 12 Radio headsets @ $1,042 = $12,500.
Project #01-ERP-0214
Priority 3 Important
Justification
Variance - Change in vendor equipment pricing and SWAT team staffing levels. Current price is reflective of a twelve person (fully staffed)
SWAT team with current vendor pricing.
Budget Impact/Other
2018 - 20,000 increase to reflect current staffing levels and needs.
Useful Life 5 yearsProject Name Tactical Ballistic Vests / Helmets - SWAT Category Equipment
Type Equipment
Future
Total Project Cost:$269,712
Total20192020202120222023Expenditures
76,51276,512Equipment
76,512 76,512Total
Total20192020202120222023Funding Sources
76,51276,512Equipment Replacement Fund
76,512 76,512Total
Tuesday, November 6, 2018
53
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2019 2023thru Department Police
Description
Portable radios used by the police departments to allow the department to communicate on one frequency.
Estimated Replacement Cost
Portable - $4,500 x 50 = $225,000
Plus chargers, shoulder mic's and batteries - $11,300
TOTAL = $236,300
In 2016 we will need to replace the portables as the current model will no longer be supported by Hennepin County.
Project #01-ERP-0215
Priority n/a
Justification
Provides radios so that the police, fire and public works can communicate on a common radio frequency during an emergency and multiple county
interoperability.
Budget Impact/Other
Radio's have a 7-10 year life expectancy. Portables need replacement due to manufacturer issues and county requirements. Increase in cost from
$3,800 to $4,500 per radior. Mobile radios were removed and now will be included with the vehicles as they are replaced.
Estimate salvage/resale value on replaced item: $0
Useful Life 5-7 yearsProject Name Police - Portable Radios Category Equipment
Type Equipment
Future
Total Project Cost:$571,400
Total20192020202120222023Expenditures
290,000290,000Equipment
290,000 290,000Total
Total20192020202120222023Funding Sources
290,000290,000Equipment Replacement Fund
290,000 290,000Total
Tuesday, November 6, 2018
54
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Captain
2019 2023thru Department Police
Description
Tasers can prevent officers and the public from injuries.Taser technology continues to develop and are worn/ carried 24/7. Tasers have a useful life
expectancy of approximately 5 years.
Project #01-ERP-0217
Priority n/a
Justification
Tasers are a crtical tool for Law Enforcement for control purposes during use of force encounters.
Budget Impact/Other
35- X2 Tasers, each officer has their own taser.
Total overall cost each Taser in 2018 = $2166.00 (+ shipping)
Useful Life 4 yearsProject Name Taser Replacement Category Equipment
Type Equipment
Future
Total Project Cost:$202,600
Total20192020202120222023Expenditures
76,00076,000Equipment
76,000 76,000Total
Total20192020202120222023Funding Sources
76,00076,000Equipment Replacement Fund
76,000 76,000Total
Tuesday, November 6, 2018
55
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief/IT
2019 2023thru Department Police
Description
Building Video Server hardware and associated software is used to store video recorded by the cameras in and around the police department
including interview rooms as well as booking. We record approximately 6 TB of video every 2-3 weeks. Large amounts of storage are required for
30 days of archival storage on the server itself.
Project #01-ERP-0218
Priority n/a
Justification
Maintenance agreement with software vendor needs to be renewed every three years. Computer hardware should be refreshed around the same
time to minimize drive failure and take advantage of new storage technology.
Budget Impact/Other
Variance from 20 year plan - Change in replacement schedule and estimated cost. Current equipment was purchased with DTF funding. Beginning
in 2020 it will be funded with ERP funds.
Estimate salvage/resale value on replaced item: $-0-
Useful Life 4 yearsProject Name Building Video Server Category Equipment
Type Equipment
Future
Total Project Cost:$88,000
Total20192020202120222023Expenditures
37,00020,000 17,000Equipment
20,000 17,000 37,000Total
Total20192020202120222023Funding Sources
37,00020,000 17,000Equipment Replacement Fund
20,000 17,000 37,000Total
Tuesday, November 6, 2018
56
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief/IT
2019 2023thru Department Police
Description
The police department video server is used to store evidentiary video and audio data. Rules pertaining to criminal procedure, and laws regarding
data privacy and retention place requirements on the Police Department to store and manage the data for varying lengths of time.
The current data storage solution was designed for squad car video only and is near capacity. The storage solution is also not currently designed to
efficiently back up data and is potentially subject to data loss from environmental factors such as drive failure and unsuited fire suppression systems.
Project #01-ERP-0219
Priority n/a
Justification
The video server will be replaced with a cloud based storage solution after 2020.
Budget Impact/Other
Cost of yearly maintenance for video data storgae server: $10,000.00/year
Server no longer maintained after 2020.
Useful Life 5 yearsProject Name PD - Video Data Server Category Equipment
Type Equipment
Future
Total Project Cost:$135,000
Total20192020202120222023Expenditures
20,00010,000 10,000Equipment
10,000 10,000 20,000Total
Total20192020202120222023Funding Sources
20,00010,000 10,000Equipment Replacement Fund
10,000 10,000 20,000Total
Tuesday, November 6, 2018
57
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief/IT
2019 2023thru Department Police
Description
Mobile Data Computers are used in the squad cars to receive calls for service from dispatch, query information from criminal justice databases, and
facilitate communication between squad cars.
Current equipment: 11 - Data 911 Computers purchased in 2014
Replacement in 2019 for 12 computers.
Project #01-ERP-0220
Priority n/a
Justification
Mobile Data Computers have a limited life expectancy. The computers facilitate the basic response to emergency calls for service to which police
officers respond. Vital information is forwarded to officers via the mobile data computers. Officers complete investigative reports, issue traffic
related warnings and citations, and process arrest incidents from the mobile data computers.
As technology evolves the officers must be able to access information using up to date computers that can process the large amount of data and
applications. Mobile data computers are currently used to host the squad car video camera system and have the potential to be integrated with a
possible body worn camera.
Budget Impact/Other
2016 - Variance from 20 year plan - Change in replacement year to accurately reflect life expectancy in relation to when the computers were
purchased. Change in budgeted amount to reflect past and anticipated costs.
Useful Life 5 yearsProject Name Mobile Data Computers Category Equipment
Type Equipment
Future
Total Project Cost:$290,000
Total20192020202120222023Expenditures
65,00065,000Equipment
65,000 65,000Total
Total20192020202120222023Funding Sources
65,00065,000Equipment Replacement Fund
65,000 65,000Total
Tuesday, November 6, 2018
58
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief/IT
2019 2023thru Department Police
Description
LETG - Records Management System was purchased at the end of 2012. This maintains all police records and reports. Zurcher Technologies
acquired LETG in 2016 unexpectedly.
Project #01-ERP-0221
Priority n/a
Justification
A new RMS system may be needed by 2022.
Budget Impact/Other
Current cost to maintain system is $29,368 anually.
Useful LifeProject Name Records Management System Category Equipment
Type Equipment
Future
Total Project Cost:$150,000
Total20192020202120222023Expenditures
150,000150,000Equipment
150,000 150,000Total
Total20192020202120222023Funding Sources
150,000150,000Equipment Replacement Fund
150,000 150,000Total
Tuesday, November 6, 2018
59
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2019 2023thru Department Public Works: Parks/Forestry
Description
Pickup used by Park Division of Public Works.
Project #01-ERP-0800
Priority n/a
Justification
Budget Impact/Other
Estimate salvage/resale value on replaced item: $
Useful Life 10 yearsProject Name 1/2 Ton Pickup Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$109,400
Total20192020202120222023Expenditures
35,40035,400Vehicles
35,400 35,400Total
Total20192020202120222023Funding Sources
35,40035,400Equipment Replacement Fund
35,400 35,400Total
Tuesday, November 6, 2018
60
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2019 2023thru Department Public Works: Parks/Forestry
Description
Trucks used by Parks Division of Public Works.
Current vehicles: 2012 Ford F350 4X4 (#801) & 2012 Ford F350 4X4 (#802)
Project #01-ERP-0801
Priority n/a
Justification
Snow plowing, hauling, transportation. Units are heavily used.
Budget Impact/Other
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Useful Life 8 yearsProject Name 4x4 3/4Ton Trucks (2)Category Vehicles
Type Equipment
Future
Total Project Cost:$313,800
Total20192020202120222023Expenditures
85,20085,200Vehicles
85,200 85,200Total
Total20192020202120222023Funding Sources
85,20085,200Equipment Replacement Fund
85,200 85,200Total
Tuesday, November 6, 2018
61
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2019 2023thru Department Public Works: Parks/Forestry
Description
Truck is used for hauling brush and logs in the Forestry department.
Current vehicle: 2007 International LP4600 Log Truck (#811)
Project #01-ERP-0804
Priority n/a
Justification
Budget Impact/Other
Variance from 20 year plan - 50% Equipment Replacement/50% Refuse - increase amount to $105,000 to reflect actual cost.
Estimated useful life reduced from 20 to 15 years.
Useful Life 15 yearsProject Name Log Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$268,600
Total20192020202120222023Expenditures
163,600163,600Vehicles
163,600 163,600Total
Total20192020202120222023Funding Sources
81,80081,800Equipment Replacement Fund
81,80081,800RF - Refuse Fund
163,600 163,600Total
Tuesday, November 6, 2018
62
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2019 2023thru Department Public Works: Parks/Forestry
Description
Riding mowers used by Parks Division of Public Works.
Current equipment: 2004 Toro Zero Turn (#826), 2006 Jacobson Rotary Mower (#823)
Project #01-ERP-0808
Priority n/a
Justification
Mowing city parks and right of ways.
Budget Impact/Other
Variance from 20 year plan
Estimate salvage/resale value on replaced item: $600 each
Moved useful life from 8 year to 6
Useful Life 6 yearsProject Name Riding Mowers (2)Category Equipment
Type Equipment
Future
Total Project Cost:$169,000
Total20192020202120222023Expenditures
13,90013,900Equipment
13,900 13,900Total
Total20192020202120222023Funding Sources
13,90013,900Equipment Replacement Fund
13,900 13,900Total
Tuesday, November 6, 2018
63
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2019 2023thru Department Public Works: Parks/Forestry
Description
Large turf mower (11' cutting width) used by Parks Division of Public Works.
Current equipment: 2010 Toro Groundmaster (#825)
Project #01-ERP-0810
Priority n/a
Justification
Required to efficiently mow large parks.
Budget Impact/Other
Variance from 20 year plan - move from 2011 to 2010 due to poor condition of existing mower. Estimated useful life reduced from 10 to 8 years.
Estimate salvage/resale value on replaced item: $3,500
Useful Life 8 yearsProject Name Large Turf Mower Category Equipment
Type Equipment
Future
Total Project Cost:$332,300
Total20192020202120222023Expenditures
92,70092,700Equipment
92,700 92,700Total
Total20192020202120222023Funding Sources
92,70092,700Equipment Replacement Fund
92,700 92,700Total
Tuesday, November 6, 2018
64
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2019 2023thru Department Public Works: Streets/Traffic
Description
Pickup used by various divisions of Public Works.
Current vehicle: #301
Project #01-ERP-0300
Priority n/a
Justification
Light hauling and transportation for supervisors. Maintenance garage service vehicle.
Budget Impact/Other
Variance from 20 year plan - Move up from 2015 to 2013. Replace with 1/2 ton 4x4 pickup. Reduce amount from 33,600 to 21,500..
Estimate salvage/resale value on replaced item: $1,500
Useful Life 10 yearsProject Name 4x4 1/2 Ton Pickup with Plow Category Vehicles
Type Equipment
Future
Total Project Cost:$114,200
Total20192020202120222023Expenditures
28,90028,900Vehicles
28,900 28,900Total
Total20192020202120222023Funding Sources
28,90028,900Equipment Replacement Fund
28,900 28,900Total
Tuesday, November 6, 2018
65
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2019 2023thru Department Public Works: Streets/Traffic
Description
Truck is used in the Street Division of Public Works.
Current vehicles: 2000 Ford F450 (#304) & 2011 Ford F350 (#308)
Project #01-ERP-0303
Priority n/a
Justification
Vehicle used by various departments for street and park maintenance and light hauling.
Budget Impact/Other
Variance from 20 year plan - move back from 2009 to 2010.
Estimated useful life reduced from 12 to 8 years.
Estimate salvage/resale value on replaced item: $3,500
Useful Life 8 yearsProject Name 1 Ton Dump Truck (2)Category Vehicles
Type Equipment
Future
Total Project Cost:$281,600
Total20192020202120222023Expenditures
53,40053,400Vehicles
53,400 53,400Total
Total20192020202120222023Funding Sources
53,40053,400Equipment Replacement Fund
53,400 53,400Total
Tuesday, November 6, 2018
66
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2019 2023thru Department Public Works: Streets/Traffic
Description
Single axle dump truck used by various division of Public Works.
Current vehicles: 2005 Freightliner M2 106 (#312) and 2011 Freightliner MZ-1068 (#311)
Project #01-ERP-0305
Priority n/a
Justification
Vehicle used for heavy hauling, snow plowing and sanding.
Moved single axel dump truck due in 2018 to a tandem axel dump truck in 2018. Done to increase snow hauling and other material hauling
capacity.
Budget Impact/Other
Variance from 20 year plan - Move 1 truck from single axle to tandem axel to increase hauling capacity for snow and road materials.
Estimate salvage/resale value on replaced item: $4,500 each
We will then have 2 single axel (change from 3) dump trucks and 2 (change from 1) tandem axel dump trucks.
Estimated useful life reduced from 17 to 15 years.
Useful Life 15 yearsProject Name Single Axle Dump Truck (2)Category Vehicles
Type Equipment
Future
Total Project Cost:$643,000
Total20192020202120222023Expenditures
225,000225,000Vehicles
225,000 225,000Total
Total20192020202120222023Funding Sources
225,000225,000Equipment Replacement Fund
225,000 225,000Total
Tuesday, November 6, 2018
67
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2019 2023thru Department Public Works: Streets/Traffic
Description
Current equipment: 1991 Caterpillar 928E Loader (#320) & 2005 Caterpillar 938G (#322)
Project #01-ERP-0308
Priority n/a
Justification
Budget Impact/Other
Variance from 20 year plan - None
Estimate salvage/resale value on replaced item: $
Useful Life 15-18 yearsProject Name Front End Loaders (2)Category Equipment
Type Equipment
Future
Total Project Cost:$848,600
Total20192020202120222023Expenditures
268,600268,600Equipment
268,600 268,600Total
Total20192020202120222023Funding Sources
268,600268,600Equipment Replacement Fund
268,600 268,600Total
Tuesday, November 6, 2018
68
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2019 2023thru Department Public Works: Streets/Traffic
Description
Loading trucks, landscape work, snow removal, material handling.
Current equipment: 2004 Bobcat S-1851R Skid Loader (#324) & 2011 Bobcat S650 Skid-Steer Loader (#325)
Project #01-ERP-0309
Priority n/a
Justification
Budget Impact/Other
Variance from 20 year plan - move back from 2010 to 2011.
Estimate salvage/resale value on replaced item: $
Useful life reduced from 12 years to 10.
Useful Life 10 yearsProject Name Skid Loader (2)Category Equipment
Type Equipment
Future
Total Project Cost:$258,900
Total20192020202120222023Expenditures
50,00050,000Equipment
50,000 50,000Total
Total20192020202120222023Funding Sources
50,00050,000Equipment Replacement Fund
50,000 50,000Total
Tuesday, November 6, 2018
69
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2019 2023thru Department Public Works: Streets/Traffic
Description
Street sweeper used by Streets Division for sweeping streets and parking lots.
Current equipment: 2001 Elgin Pelican SE (#327)
Project #01-ERP-0311
Priority n/a
Justification
Street sweeping, event clean-up, spring sand removal.
Budget Impact/Other
Variance from 20 year plan - Move from 2021 to 2019
Estimate salvage/resale value on replaced item: $12,000
Useful life reduced from 15 years to 12.
Useful Life 12 yearsProject Name Sweeper Category Equipment
Type Equipment
Future
Total Project Cost:$345,300
Total20192020202120222023Expenditures
230,000230,000Equipment
230,000 230,000Total
Total20192020202120222023Funding Sources
230,000230,000Equipment Replacement Fund
230,000 230,000Total
Tuesday, November 6, 2018
70
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2019 2023thru Department Refuse
Description
Refuse truck used by Refuse Utility Division of Public Works.
Current vehicle: 2005 Peterbilt Rapid Rail (#901) & 2011 Freightliner Rapid Rail (#900)
Project #01-ERP-0900
Priority n/a
Justification
Residential waste pick up.
Budget Impact/Other
Variance from 20 year plan - increase cost to reflect actual
Estimate salvage/resale value on replaced item: $18,000
Useful Life 10 yearsProject Name Refuse Truck (RAP-R) (2)Category Vehicles
Type Equipment
Future
Total Project Cost:$1,462,600
Total20192020202120222023Expenditures
270,300270,300Vehicles
270,300 270,300Total
Total20192020202120222023Funding Sources
270,300270,300RF - Refuse Fund
270,300 270,300Total
Tuesday, November 6, 2018
71
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2019 2023thru Department Sewer
Description
Portable generator used by Water/Sewer Divisions of Public Works.
2016 - Increase cost from 26k to 36k due to updated information
Current equipment: 1997 Kohler Generator, 2008 Caterpillar C15 (#537)
Project #01-ERP-0555
Priority n/a
Justification
Emergency back up generator for lift stations and pumps, off site power for lights and welding.
Budget Impact/Other
Estimated useful life reduced from 25 to 20 years.
Estimate salvage/resale value on replaced item: $2,500
Useful Life 20 yearsProject Name Generator (2)Category Equipment
Type Equipment
Future
Total Project Cost:$79,000
Total20192020202120222023Expenditures
43,00043,000Equipment
43,000 43,000Total
Total20192020202120222023Funding Sources
43,00043,000SF - Sanitary Sewer Fund
43,000 43,000Total
Tuesday, November 6, 2018
72
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2019 2023thru Department Water
Description
The portable air compressor is used in various parks and other public areas of the city to blow out irrigation lines every fall to prevent the lines
from freezing.
The streets department uses it for jack hammering asphalt and concrete repairs.
Project #01-ERP-0503
Priority 2 Very Important
Justification
Our current 2003 Leroi air compressor was purchased used in 2008 with 1375 hours. The air compressor has met it's lifecycle of 15 years. Would
like to replace another used air compressor.
Budget Impact/Other
Variance from 20 year plan - Move up from 2012 to 2008. Replace 1982 unit with larger capacity due to larger irrigation lines. Purchase new or
slightly used machine.
Estimate salvage/resale value on replaced item : $2,000
2019 - Variance from 20 year plan. Reduced to 15 year average. Will add purchase request for 2019 and move back 15 years for future
consideration.
Useful Life 15 yearsProject Name Air Compressor Category Equipment
Type Equipment
Future
Total Project Cost:$98,100
Total20192020202120222023Expenditures
35,00035,000Equipment
35,000 35,000Total
Total20192020202120222023Funding Sources
35,00035,000WF - Water Fund
35,000 35,000Total
Tuesday, November 6, 2018
73
74
TWENTY-YEAR
REPLACEMENT SCHEDULE
75
12/4/2017 EQUIPMENT REPLACEMENT SCHEDULE
Net General Fund 20 Year Average:1,118,200$
INFLATION FACTOR 3.0%
REPL
EQUIPMENT /VEHICLES YRS 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038
ACTIVITY CENTER
ERP-0032 Sound System 15 13,700
ERP-0035 Floor Scrubber 10 6,700 9,000
ERP-0036 Sound System Replacement 25
ERP-0037 Security System Upgrade 15-18 20,000
ERP-0038 Kitchen Storage 30 17,000 12,000
ERP-0039 Dishwasher 30 16,000
ERP-0041 A/V Replacement & Upgrade 20 62,624
SUBTOTAL 16,000 82,624 17,000 12,000 6,700 13,700 9,000
ARTS CENTER
ERP-1101 Carpet Extractor 10 7,000
ERP-1102 Kitchen Catering Equipment 12 7,100
ERP-1105 Community Room A/V 7 13,500 16,600
ERP-1107 Theater Projection Screen 10 6,700 9,000
ERP-1109 Floor Scrubber 10 10,800
ERP-1112 Surveillance System 5 6,000
13,500 6,700 10,800 7,100 6,000 16,600 7,000 9,000
COMMUNITY SERVICES
ERP-0008 Document Mgmt. Scanner (2)4 11,300 12,700 14,300 16,000 18,100
ERP-0010 Election Booths 20 6,500
ERP-0051 Exterior Security Camera System 15 40,000 65,000
EQUIPMENT SUBTOTAL 51,300 12,700 14,300 6,500 16,000 65,000 18,100
FIRE
ERP-0100 Tele-Squirt E-2 10 1,000,000
ERP-0101 Fire Pumper E-3 20 722,400
ERP-0105 Quick Attack Pumper/Rescue R-8 10 314,500 422,600
ERP-0106 Aerial Truck 20 1,572,000
VEHICLES SUBTOTAL 314,500 722,400 1,000,000 1,572,000 422,600
ERP-0107 Air Compressor 15 54,400
ERP-0108 Breathing Apparatus (45) (SCBA)10 250,000 336,000
ERP-0109 Extrication Tool (2)10 29,000 30,000 32,000 36,900 40,300
ERP-0112 Thermal Imaging Camera (2)10 15,400 17,400 20,700
ERP-0113 Emergency Preparedness Siren 20 38,500
ERP-0114 Floor Scrubber 12 20,300
ERP-0125 Radios-Portable & Mobile 5-7 368,000 431,498 514,700
ERP-0126 Helmets 10 16,000 22,000
ERP-0127 Lucus Device 5 18,000 20,000 24,000 30,000
EQUIPMENT SUBTOTAL 29,000 30,000 449,400 250,000 38,500 37,700 20,000 468,398 54,400 40,300 66,700 850,700 30,000
IT
ERP-0003 City Hall - Network Upgrade 1 22,000 22,000 22,000 25,000 26,250 27,038 27,849 28,684 29,545 30,431 31,344 32,284 33,253 34,250 35,278 36,336 37,426 38,549 39,705 40,897
ERP-0004 Phone System 8 89,600 110,700
ERP-0005 Financial Software 7
ERP-0006 Computers 3-5 30,000 31,500 33,075 34,729 36,465 38,288 40,203 42,213 44,323 46,540 48,867 51,310 53,875 56,569 59,398 62,368 65,486 68,760 72,198 75,808
ERP-0009 Network Infrastructure Upgrade 15 23,400
ERP-0012 Core Network Switch 6 20,000 24,000 27,000
ERP-0014 Distribution Network Switches 5 50,000 57,000 65,000 75,000
ERP-0015 Backup Server 3 66,000 74,000 78,000 82,000 87,000
ERP-0017 Office 365 1 11,000 22,000 33,000 44,000 44,000 45,000 47,000 49,000 51,000 54,000 57,000 60,000 63,000 66,000 69,000 72,000 75,000 78,000 80,000 85,000
ERP-0018 RSA/Netmotion VPN 5 19,000 21,000 24,000 27,000
ERP-0019 Email Threat Protection 5 19,390 21,500 26,500 30,000
ERP-0020 Patching Automation Software 5 30,000 10,000 10,000 10,000 10,000 40,000 10,000 10,000 10,000 10,000 50,000 10,000 10,000 10,000 10,000 60,000 10,000 10,000 10,000 10,000
ERP-0211 Police - Network Server (3)3 22,000 22,000 22,000 25,000 26,250 27,038 27,849 28,684 29,545 30,431 31,344 32,284 33,253 34,250 35,278 36,336 37,426 38,549 39,705 40,897
EQUIPMENT SUBTOTAL 153,390 223,500 120,075 162,129 232,565 239,863 209,900 232,581 164,413 171,401 347,054 274,878 304,081 201,070 290,953 324,040 300,338 347,858 241,609 252,601
POLICE
ERP-0200 Squad 3 98,000 107,400 161,100 107,400 117,400 117,400 117,400 128,000 128,000 128,000 140,000 140,000 140,000 153,200 153,200 153,000 157,000 160,000 165,000 170,000
ERP-0201 Sergeant Vehicle #209 4 57,000 57,000 60,000 72,000 80,000
ERP-0202 Parking Vehicle #211 10 53,700 60,000 65,000
ERP-0203 PSO Utility 4x4 #212 6 72,100 86,100 90,000 92,000
ERP-0205 SWAT Vehicle #240 15 77,900
VEHICLES SUBTOTAL 98,000 107,400 271,800 179,500 117,400 117,400 174,400 274,100 128,000 128,000 200,000 230,000 217,900 153,200 225,200 245,000 157,000 225,000 245,000 170,000
ERP-0208 Computer System 20 200,000
ERP-0212 Mobile Data Computers/Digital Cameras 7 65,000 148,500 148,500 150,000
ERP-0214 Tactical Ballistic Vests (9)5 76,512 45,000 50,000
ERP-0215 Radios-Portable & Mobile 5-7 290,000 310,000 325,000
ERP-0217 Taser Replacement 4 76,000 35,000 38,000 42,000 45,000
ERP-0218 Building Video Server 4 20,000 17,000 17,000 17,000 19,000
ERP-0219 PD - Squad Video Server 5 10,000 10,000
ERP-0220 Data 911 Computers 5 85,000 70,000 75,000 80,000
ERP-0222 Body Worn Camera 5 150,000 165,000 175,000 185,000
EQUIPMENT SUBTOTAL 160,000 30,000 150,000 459,512 218,500 35,000 182,000 45,000 533,500 38,000 17,000 175,000 250,000 272,000 344,000 185,000 45,000
76
REPL
EQUIPMENT /VEHICLES YRS 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038
P.W. BLDG./EQUIPMENT SVCS
ERP-0710 1/2 Ton Truck 10 42,100 47,000
ERP-0711 Vehicle Washer 12 8,300
ERP-0712 4x4 3/4 Ton Pick-up Truck 15 49,800
ERP-0715 PW - Forklift 15 28,000
42,100 8,300 49,800 28,000 47,000
P.W. ENGINEERING
ERP-0700 Engineering Van 10 28,900 38,800
P.W. PARKS & FORESTRY
ERP-0800 1/2 Ton Truck 10 35,400 47,600
ERP-0801 4x4 3/4 Ton Truck 8 85,200 108,000 115,000
ERP-0802 3/4 Ton Utility Truck 10 48,700
ERP-0804 Log Truck (50% w/Refuse)15 81,800
ERP-0805 Aerial Lift 20 228,900
ERP-0806 Tractor 30 52,000
ERP-0807 Truckster 15 17,140 53,200
ERP-0808 Riding Mower (8 13,900 25,300 17,700 32,100 19,000 35,000
ERP-0810 Large Turf Mower (#825)10 92,700 124,600
ERP-0812 Stump Cutter 20 45,000
ERP-0813 Brush Clipper 20 43,700
ERP-0814 Trailer Flatbed 15 10,000 12,500
ERP-0815 Skid Loader 12 45,600 50,000
ERP-0816 Toolcat 8 80,200 101,600
ERP-0817 Grass Seed Applicator 20 17,900
VEHICLES SUBTOTAL 177,900 81,800 49,300 35,300 80,200 17,140 232,600 45,600 313,200 32,100 91,300 206,800 127,500 64,000 85,000
P.W. STREETS/TRAFFIC
ERP-0300 4x4 3/4 Ton Truck/Plow 10 28,900 38,800
ERP-0301 4x4 3/4 Ton Truck/Plow 8 38,500 48,800
ERP-0302 4x2 1 Ton Dump Truck 12 77,800
ERP-0303 1 Ton Dump Truck 12 53,400 49,500 76,100
ERP-0304 1 Ton Boom Truck 17 136,400
ERP-0305 Single Axle Dump Truck 17 225,000 210,600
ERP-0306 Tandem Dump Truck 17 286,000 294,000
ERP-0307 Water Truck 22 201,000
ERP-0308 Front End Loader 15 268,600 268,000
ERP-0309 Skid Loader 12 50,000 59,700 71,300
ERP-0310 Grader 20 167,300
ERP-0311 Sweeper 20 230,000
ERP-0312 Roller 20 82,000
ERP-0313 Striper 12 16,000
ERP-0314 Paver 20 120,000
ERP-0315 Snow Blower 20 117,000
ERP-0316 Trailer 20 4,900
ERP-0317 Sign Machine 10 18,100
ERP-0318 Asphalt Hot Mix Heating Box 12 22,100
ERP-0319 Regenerative Air Sweeper 20 210,000
ERP-0320 Planer 20 18,600
VEHICLES SUBTOTAL 230,000 225,000 103,400 297,500 110,100 167,300 18,100 268,000 269,700 363,000 82,700 219,600 168,800 38,800 550,400 294,000 82,000
HRA
ERP-0400 4x4 3/4 Ton Truck 8 41,100 52,100
ERP-0401 Copier 8 16,500 20,900
SUBTOTAL 16,500 41,100 20,900 52,100
PAVILION
ERP-1000 Ice Resurfacer 12 165,000
ERP-1001 Electric Ice Edger 12 8,900
ERP-1002 Arena Scoreboard 20 12,000
ERP-1003 Floor Scrubber 10 11,600 15,600
ERP-1004 Scissor Lift 15 16,200
SUBTOTAL 11,600 185,900 16,200 15,600
REFUSE
ERP-0900 Refuse Truck (RAP-R)10 270,300 275,200 363,200
ERP-0901 Refuse Truck (Rear-L)10 136,500
ERP-0803 Swap Loader 20 171,000
ERP-0804 Log Truck (50% w/Forestry)20 81,800
SUBTOTAL 270,300 81,800 275,200 363,200 136,500 171,000
77
REPL
EQUIPMENT /VEHICLES YRS 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038
WATER
ERP-0500 1./2 Ton Truck 10 36,000 54,000
ERP-0501 3/4 Ton Utility Truck 10 46,900
ERP-0502 Backhoe 20 153,700
ERP-0503 Air Compressor 20 35,000
SUBTOTAL 35,000 46,900 36,000 153,700 54,000
SEWER
ERP-0550 4x4 3/4 Ton Truck 10 40,300 54,200
ERP-0551 3/4 Ton Utility Truck 10 45,200 54,000
ERP-0552 Jet Vactor 20
ERP-0555 Generator 25 43,000
SUBTOTAL 43,000 40,300 45,200 54,200 54,000
TOTALS 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038
GENERAL FUND-VEHICLES/EQUIP 328,000 285,300 496,800 679,200 464,200 291,700 341,700 1,136,900 1,413,140 2,202,300 608,600 625,900 519,400 744,600 355,300 1,041,000 451,000 399,500 391,000 255,000
GENERAL FUND-OTHER EQUIP 329,390 416,424 120,075 359,129 1,153,477 471,063 459,900 312,781 384,113 250,701 1,357,252 333,078 375,481 432,370 635,653 596,040 1,560,038 559,958 241,609 327,601
HRA - - - 16,500 41,100 20,900 52,100
ARTS CENTER - - - 13,500 6,700 10,800 7,100 6,000 16,600 7,000 9,000
REFUSE - - 270,300 81,800 275,200 363,200 136,500 171,000
PAVILION - - - - 11,600 185,900 16,200 15,600
WATER 35,000 - - - 46,900 36,000 153,700 54,000
SEWER - - - 43,000 40,300 45,200 54,200 54,000
GENERAL FUND TOTAL 657,390 701,724 616,875 1,038,329 1,617,677 762,763 801,600 1,449,681 1,797,253 2,453,001 1,965,852 958,978 894,881 1,176,970 990,953 1,637,040 2,011,038 959,458 632,609 582,601
HRA TOTAL - - - 16,500 41,100 20,900 52,100
ARTS CENTER FUND TOTAL - - - 13,500 6,700 10,800 7,100 6,000 16,600 7,000 9,000
ENTERPRISE FUNDS TOTAL 35,000 - 270,300 124,800 51,900 275,200 278,000 36,000 16,200 363,200 290,200 171,000 69,800 108,000
TOTAL ALL FUNDS 692,390 701,724 887,175 1,193,129 1,658,777 821,363 1,087,600 1,734,781 1,839,253 2,453,001 1,998,652 979,878 1,310,181 1,474,170 1,161,953 1,715,840 2,011,038 1,067,458 632,609 582,601
GENERAL FUND SALVAGE 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000
NET GENERAL FUND 617,390 661,724 576,875 998,329 1,577,677 722,763 761,600 1,409,681 1,757,253 2,413,001 1,925,852 918,978 854,881 1,136,970 950,953 1,597,040 1,971,038 919,458 592,609 542,601
20 YEAR AVERAGES:Total Average
ACTIVITY CENTER ADMINISTRATION 157,024 7,900
IT 4,794,301 239,700
COMMUNITY SERVICES 183,900 9,200
FIRE EQUIPMENT 4,031,500 201,600
FIRE ADMINISTRATION 2,365,098 118,300
POLICE EQUIPMENT 3,664,300 183,200
POLICE ADMINISTRATION 3,139,512 157,000
PUBLIC WORKS ADMINISTRATION
BLDG./EQUIPMENT SERVICES EQUIPMENT 175,200 8,800
ENGINEERING EQUIPMENT 67,700 3,400
PARKS/FORESTRY EQUIPMENT 1,639,740 82,000
STREET EQUIPMENT 3,488,400 174,400
GENERAL FUND VEHICLE/EQUIPMENT 13,066,840 653,300
GENERAL FUND OTHER EQUIPMENT 10,639,835 532,000
GENERAL FUND TOTAL 23,706,675 1,185,300
HRA FUND 130,600 6,500
ARTS CENTER FUND 76,700 3,800
REFUSE FUND 1,298,000 64,900
PAVILION FUND 229,300 11,500
WATER FUND 325,600 16,300
SEWER FUND 236,700 11,800
UTILITY VEHICLES/EQUIPMENT 2,296,900 114,800
26,003,575
78
EQUIPMENT INVENTORY
79
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
FALL, 2018
UNIT #YEAR MAKE MODEL VALUE
FIRE DEPARTMENT
100 2017 PIERCE IMPEL 900,000$
103 2006 PETERBILT 357 420,000
104 2012 FORD F550 248,500
105 2016 FORD F150 25,000
106 2015 FORD EXPLORER RED 47,500
107 2015 FORD EXPLORER BLK 47,500
108 2014 FORD F150 34,000
109 2008 PIERCE AREO XT 874,000
110 2017 FORD EXPLORER 47,500
115 1952 MACK NONE 4,000
POLICE DEPARTMENT
200 2018 FORD UTILITY 49,000$
201 2018 FORD UTILITY 49,000
202 2018 FORD UTILITY 49,000
205 2016 FORD UTILITY 45,000
206 2016 FORD UTILITY 45,000
207 2017 FORD UTILITY 49,000
208 2017 FORD UTILITY 49,000
209 2018 FORD UTILITY 49,000
211 2016 FORD UTILITY 34,000
212 2018 FORD F150 55,000
213 2016 FORD TAURUS 25,000
214 2018 FORD EXPLORER 49,000
216 2011 FORD TAURUS 30,000
218 2013 FORD UTILITY BLUE 40,000
219 2012 FORD TAURUS 28,000
220 2017 FORD EXPLORER 50,000
221 2015 JEEP CHEROKEE 35,000
240 2017 FORD TRANSIT-350 67,000
299 2018 FORD F150 55,000
DWI.2015 FORD UTILITY 41,000
80
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
FALL, 2018
UNIT #YEAR MAKE MODEL VALUE
STREET/TRAFFIC DIVISION
301 2013 FORD F-150 19,500$
302 2018 FORD F350 DRW 54,600
303 2016 FORD F-250 26,500
307 2006 FORD F-350 27,400
308 2011 FORD F-350 20,300
309 2012 FORD F-450 30,300
311 2011 FREIGHTLINER M2-106V 79,400
312 2004 FREIGHTLINER M2-106 98,000
314 1998 FORD LTB500 84,000
315 2017 FREIGHTLINER 114SD 221,700
317 2016 FREIGHTLINER M2-106 69,400
320 1991 CATERPILLAR 928E 90,000
321 2012 CATERPILLAR 924K 177,500
322 2005 CATERPILLAR 938G 157,800
325 2011 BOBCAT S-650 35,100
326 1989 CATERPILLAR 140-G 82,000
327 2001 ELGIN PELICAN SE 105,000
328 2013 ISUZU 435 REGEN SWEEP 145,300
329 2017 BOMAG BW120 SL5 ROLLE 45,900
331 2016 BOBCAT S-650 35,100
337 1994 CATERPILLAR AP200B 17,000
343 2014 SNOWCRETE 84231 71,500
344 1996 SNO-GO WK800 58,000
346 2017 SNO- GO SG WK-800 160,000
348 2014 SPARKS T6202 TRAILER 5,300
350 1993 TOWMASTER T14 TRAILER 4,000
351 2004 TENNANT SWEEPER 3640 10,000
352 2017 FALCON PATCH TRAILER 15,000
ENGINEERING DIVISION
706 2015 FORD TRANSIT 250 24,000$
BUILDING MAINTENANCE & EQUIPMENT SERVICES
700 2015 FORD UTILITY 35,000$
702 2004 FORD F350 18,000
704 2006 FORD F250 18,000
705 2018 FORD F350 30,000
708 2016 FORD TRANSIT 350 29,700
712 2015 FORD UTILITY 35,000
713 2014 FORD UTILITY 30,000
750 2018 CLARK GTS25-FORKLIFT 25,000
81
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
FALL, 2018
UNIT #YEAR MAKE MODEL VALUE
PARKS/FORESTRY DIVISION
800 2013 FORD F-150 23,700$
801 2012 FORD F-350 24,100
803 2004 FORD F-350 17,500
804 1995 CHEVROLET CC31403 45,000
806 2016 FORD TRANSIT 350 29,700
810 1993 INTERNATIONAL LP4700 50,000
811 2006 INTERNATIONAL LOG TRUCK 45,000
812 2010 FREIGHTLINER AERIAL LIFT 130,000
813 2019 FREIGHTLINER M2-106 235,000
816 2014 BOBCAT 5610 50,900
817 2018 BOBCAT 5600 63,300
818 2017 TORO WORKMAN HDX 13,000
820 2004 TORO WORKMAN 3200 15,000
822 2014 TORO MDE 18,000
823 2006 JACOBSON TURFCAT 600 10,000
825 2010 TORO 4100-D 56,500
826 2004 TORO Z587L 8,900
828 2001 DEWEZE ATM-72 21,000
829 2016 TORO 3280-D 10,000
831 2016 RAYCO RG45X 3,400
832 1997 VERMEER SC502 STUMP CTR 15,400
834 2013 VERMEER BRUSH CHIPPER 29,800
835 2016 BOBCAT S70 55,000
843 2007 CARR TRAILER 2,500
844 2010 FELLING FT-6T 6,000
845 1997 REMACKEL DT-D7-E 3,500
846 2001 DRESSEN 8110 2,000
848 2017 LOAD TRAIL TILT DECK 5,400
82
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
FALL, 2018
UNIT #YEAR MAKE MODEL VALUE
HRA
411 2007 CHEVROLET 2500 17,500$
WATER/SEWER
501 2004 CHEVROLET 2500HD 16,000$
502 2017 FORD F-150 SUPERCAB 28,000
503 2015 FORD F-350 24,000
508 2016 FORD TRANSIT CONNECT 25,000
509 2016 FORD F-350 65,000
510 2016 FORD F-350 30,000
531 2017 FREIGHTLINER 114SD 425,400
533 2012 CATERPILLAR 420-EH2 87,700
535 1992 KOHLER GEN/TRL 10,000
537 2010 CATERPILLAR C15 144,300
PAVILION
802 2012 FORD F-350 20,000$
808 2014 ZAMBONI 552 126,000
809 2002 OLYMPIA MILLINEUM 87,800
REFUSE
900 2011 FREIGHTLINER M2-106 201,109$
902 2015 FREIGHTLINER M2-106 232,500
903 2015 PETERBILT REAR LOADER 155,000
83