Loading...
VII.3. 2019-2023 Capital Improvement Plan; Bishop December 4, 2018 Council Report 2018-128 2019-2023 CAPITAL IMPROVEMENT PLAN Proposed Action Staff recommends adoption of the following motion: Move to adopt the 2019-2023 Capital Improvements Plan. Adoption of this motion will authorize staff to begin efforts to implement 2019 projects. Overview The Capital Improvements Plan is a planning document intended to help the City anticipate major capital items and to consider the financial impact of proceeding with those planned improvements. Discussions have been held with the Park Board and City Council, in detailing proposed and necessary improvements. Staff is recommending adoption of the plan. Primary Issues to Consider • Does adoption of the CIP mean projects will be implemented? The CIP is a planning document, not an implementation action, and therefore, additional approvals will be necessary for most projects to proceed. Appropriate notifications would also be made for those projects that have funding implications. • Are funds available for all projects? The plan outlines funding implications if all projects are implemented. Necessary funding changes have been anticipated as part of this plan, and are recommended therein Supporting Information • 2019-2023 CIP Power Point slides • 2019-2023 Capital Improvements Plan ______________________________ Nick Bishop, CPA Finance Director Financial Impact: $ projects included in budgets Budgeted: Y/N X N Source: Various Related Documents (CIP, ERP, etc.): __CIP_________ Notes: ____________________ 2019 –2023 Capital Improvement Plan December 4th, 2018 Overview 5 year plan, updated annually Approval authorizes purchases in 2019 Remaining four years are estimated replacement for information and planning Would be authorized in subsequent years Park Capital Improvement Fund Funding Sources Franchise Fees, $295,300 in 2019 Dedication Fees, $1,000,000 Cold Storage Site Park Capital Improvement Fund $296,500 of Projects in 2019 Park Lighting Upgrade -$250,000 Oakes Park Cricket Pitch -$25,000 Central Park Tennis Courts -$10,000 Shady Oak Beach Maintenance -$11,500 $35,000 split 67%/33% between Minnetonka/Hopkins Park Capital Improvement Fund Projected balance of $1,020,714 at end of 2019 Dependent on timing of Cold Storage dedication fees Capital Improvement Fund Funding Sources Tax Levy, $100,000 in 2018 (as high as $310,000 in 2017) Franchise Fees, $360,000 in 2019 Capital Improvement Fund $4,387,000 of projects in 2019 City Hall Project -$4,245,000 Also funded by Communications Fund Public Works Building -$90,000 Activity Center -$30,000 City Hall Roof Stairs -$22,000 Capital Improvement Fund Projected balance of $63,853 at end of 2019 Municipal State Aid Fund Received funds in 2018 Next scheduled project is 2023 Projected balance of $62,254 at end of 2019 Permanent Improvement Revolving Fund Funding Sources Bond Proceeds -$6,000,000 Paid with Tax Levy and Special Assessments Grants -$5,325,455 Prepaid Special Assessments -$180,000 Permanent Improvement Revolving Fund $11,563,785 of projects in 2019 2nd Half of Blake Road -$7,683,785 Residential Street Improvements -$3,510,000 Street Overlay -$325,000 Pedestrian & Bicycle Access -$25,000 Street Signs -$20,000 Permanent Improvement Revolving Fund Projected balance of $210,346 at end of 2019 Arts Center Capital Costs are included in separate fund $99,100 of projects in 2019 Fund in total projecting a deficit of $17,018 Pavilion Capital Costs are included in separate fund $88,000 of projects in 2019 Fund in total projecting deficit of $116,134 Including $100,000 of Depreciation Utility Funds Funded by charges for services Capital Project Costs in 2019 Water -$1.83 Million Sewer -$1.25 Million Storm Sewer -$852,000 CAPITAL IMPROVEMENT PLAN 2019-2023 DATE: December 4th, 2018 TO: Honorable Mayor and Members of the City Council FROM: Mike Mornson, City Manager SUBJECT: 2019-2023 CAPITAL IMPROVEMENT PLAN With this letter I respectfully submit the 2019-2023 Capital Improvement Plan. This five- year planning document represents the combined efforts of city staff, advisory commissions, citizens and the City Council. The Capital Improvement Plan is a five-year forecast of project needs in the City of Hopkins. It is intended to alert the Council and citizens to the major capital needs on the horizon. The first year of the plan becomes an adopted capital budget and relates almost completely to the operating budget that is approved on a yearly basis. The remaining four year represents an estimate of project needs and funding capabilities of the city. This plan does not include proposed equipment purchases. A document relating specifically to equipment replacement needs has been developed into a separate document. The Capital Improvement Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city’s capital programming needs. At the same time, sufficient projected detail is provided to enable those who review the information to make informed decisions on the programming of projects over the next several years. Please use the information provided to formulate plans, projects and questions. The Capital Improvement Plan can serve the community best by provoking thoughts and actions. This document was developed by the Finance Department with assistance of all city departments. I want to especially thank all those involved in the development of the Capital Improvement Plan and especially Steve Stadler, Public Works Director, Nate Stanley, City Engineer, Kersten Elverum, Planning and Economic Development Director, Ari Lenz, Assistant City Manager and Nick Bishop, Finance Director for their hard work and dedication. 1 2 Page City Manager's Message 1 Table of Contents 3 Introduction Introduction and Purpose 6 Program Descriptions Utilities Program 7 Transportation Program 8 Parks, Forestry, and Pavilion Program 10 General Public Buildings Program 11 Economic Development 13 Sources of Funding Sources of Funding 16 Funding Source Abreviations 19 Summary of Impacts on Major Funding Sources 22 Cash Flow Statements Park Capital Improvement Fund 26 Capital Improvement Fund 27 Municipal State Aid Fund 28 Permanent Improvement Revolving Fund (PIR)29 Water Utility Fund 30 Sewer Utility Fund 31 Storm Sewer Utiltiy Fund 32 Pavilion - Ice Arena Fund 33 Five-Year Project Summaries Projects by Year 36 Department Summary 39 Projects by Department 40 Funding Source Summary 42 Projects by Funding Source 43 Project Descriptions & Narratives General Public Buildings 49 Parks & Recreation 81 Streets 93 Utilities 101 CAPITAL IMPROVEMENT PLAN 2019-2023 TABLE OF CONTENTS 3 4 Introduction 5 INTRODUCTION AND PURPOSE The Capital Improvement Plan is a flexible plan based upon long-range physical planning and financial projections, which schedules the major public improvements that may be incurred by the City over the next five years. Flexibility of the Capital Improvement Plan is established through annual review, and revision if necessary. The annual review assures that the program will become a continuing part of the budgetary process and that it will be consistent with changing demands as well as changing patterns in cost and financial resources. Funds are appropriated only for the first year of the program, which is then included in the annual budget. The Capital Improvement Plan serves as a tool for implementing certain aspects of the City's comprehensive plan; therefore, the program describes the overall objectives of City development, the relationship between projects with respect to timing and need, and the City's fiscal capabilities. The Capital Improvement Plan can help assure: 1. A systematic approach to planning and initiating capital projects affording the opportunity to plan the location, timing, and financing of needed public improvements; 2. The development of a realistic program of capital spending within the City's projected fiscal capability to finance such projects, avoiding sharp change in the tax levy or bonded indebtedness; 3. The coordination of public and private improvement projects permitting adequate time for design and engineering to eliminate duplication of effort and expense; 4. The expenditure of public funds that is compatible with the City's adopted Comprehensive Plan; 5. That the public is kept informed of the proposed future projects and expenditures; 6. That private investors are aware of the City's long-range development program so that they may guide their development in a way that is compatible with the City's program; 7. Aid in achieving federal and/or state participation by providing the necessary planning and lead time necessary for a successful application in addition to meeting prerequisites needed for certain federal and state grants. 6 PROGRAM DESCRIPTIONS In order to effectively plan for and manage the projects contained in a Capital Improvement Plan, it is necessary to group similar activities into "Program Categories". The City of Hopkins' activities are divided into four program categories which are 1) Utilities, 2) Transportation, 3) Parks, Forestry and Pavilion, and 4) General Public Buildings. The City also includes an outline of proposed expenditures for unscheduled projects. Program categories are explained in the following sections. UTILITIES PROGRAM Program Description: The Utilities Program includes the municipal water, municipal sanitary sewer, storm sewer and refuse systems. Program Goal: Provide reliable, efficient, and safe utility service to all parts of the City with a minimum of adverse effects on the environment. Subprograms: Water, sanitary sewer, storm sewer, and refuse service. I. Municipal Water System Subprogram (WA) A. Subprogram Goal: The goal of the Municipal Water System subprogram is to provide water in sufficient quantities at sufficient pressure, with a high degree of reliability and safety to all parts of the City so as to satisfy the normal demands of the general public for water while at the same time providing sufficient reserves in case of fire emergency or power outages. B. Objectives: 1. Water quality shall meet the purity standards of the Minnesota Department of Health. 2. Any hydrant on the system shall, under maximum condition, deliver no less than 500 gallons per minute with a residual pressure of 20 pounds per square inch. 3. The system shall be looped to provide maximum reliability. 4. The supply and storage system shall be designed and maintained to have maximum reliability. 7 II. Municipal Sanitary Sewer Subprogram (SA) A. Subprogram Goal: The goal of the Municipal Sanitary Sewer subprogram is to promote a healthful environment by collecting all sewage from existing and projected development in a sanitary and economic manner. B. Objectives: 1. Provide sewer lines of adequate size and grade to collect and transmit all discharge sewage. 2. Prevent sewage from overflowing into the natural environment. 3. Prevent sewage back-ups. 4. Encourage or promote connection of all generators of sewage to the Municipal system. 5. Meet the effluent and infiltration standards of the Metropolitan Waste Control Commission. III. Storm Sewer Subprogram (SS) A. Subprogram Goal: Manage and control surface and ground waters in order to protect the man-made and natural environment in a safe and efficient manner. B. Objectives: 1. Prevent flooding. 2. Prevent damage to property due to erosion. 3. Meet water quality standards established by the controlling regulatory law or authority. TRANSPORTATION PROGRAM Program Description: This program includes streets, walkways, traffic signs and signals, vehicular parking facilities, and street lighting. Program Goal: Provide for the safe and efficient movement of people and goods throughout the city. 8 Subprograms: Streets, Walkways/Sidewalks, Signs/Signals, Parking Facilities, and Street Lights. I. Streets Subprogram (ST) A. Subprogram Goal: The goal of the Streets subprogram is to provide safe, convenient, economic public streets to best facilitate the movement of vehicular traffic. B. Objectives: 1. Streets should be constructed with permanent surfaces, concrete curb and gutter, and with ancillary storm drainage, to standards established by the City. 2. Streets should be of a size and load capacity consistent with their functional classifications. 3. Timely major repair to preserve the basic capital investment in streets. II. Walkways/Sidewalks Subprogram (WS) A. Subprogram Goal: To provide a safe and convenient pedestrian system with incidental recreational benefits. III. Signs/Signals Subprogram (SI) A. Subprogram Goal: The goal of the Signs/Signals subprogram is to provide an efficient and orderly system of street and traffic signing so as to promote safe, convenient travel throughout the City. B. Objectives: 1. Signs and signals should be installed in conformity with the Minnesota Manual on Uniform Traffic Control Devices. 2. Periodic surveys and studies should be made to document the effectiveness of City signing patterns. IV. Parking Facilities Subprogram (PA) A. Subprogram Goal: To provide such supporting facilities as will promote maximum use of public parking spaces by employers, employees, customers, and visitors. 9 B. Objectives: 1. Provide parking facilities for present and anticipated needs of the City of Hopkins. V. Street Lights Subprogram (SL) A. Subprogram Goal: To provide a system of street lighting within the City that will promote safe and convenient vehicular and pedestrian travel on City Streets. B. Objectives: 1. To provide lighting at each street intersection within the City. 2. To provide mid-block street lighting in conformance with the City's street lighting policy, in order to provide equitable, cost efficient lighting. 3. To continually update the system so as to provide energy and cost efficient lighting. PARKS, FORESTRY AND PAVILION PROGRAM Program Description: This program includes community parks, neighborhood parks, open spaces, recreational structures and facilities. Program Goal: The goal of the Park and Recreation Program is to provide facilities for safe, stimulating, and comprehensive leisure time activities of Hopkins citizens. Subprograms: Neighborhood Facilities, Community Facilities I. Neighborhood Facilities Subprogram (NF) A. Subprogram Goals: To acquire ownership or use rights of park sites located to provide convenient walking access to all Hopkins citizens and to develop such sites to provide optimum recreational serviceability consistent with the preservation and enhancement of pleasing aesthetic qualities. B. Objectives: 1. Acquire property or use rights on those neighborhoods that do not have convenient walking access to neighborhood park facilities. 2. Develop neighborhood park facilities to meet the needs of various user groups. 10 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Preserve and enhance the aesthetic qualities of neighborhood parks. II. Community Facilities Subprogram (CF) A. Subprogram Goals: The goal of the Community Facilities subprogram is to develop, or acquire ownership or use rights of sites which serve the entire City and to provide facilities that serve community-wide needs. B. Objectives: 1. Acquire sites that have valuable and unique natural characteristics to preserve irreplaceable community resources. 2. Preserve by acquisition, gift, or other arrangement properties that have valuable historic-cultural qualities. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Construct or acquire structures and facilities necessary to meet the changing needs of the community. GENERAL PUBLIC BUILDINGS PROGRAM Program Description: The General Public Buildings Program includes all municipal buildings except those provided for in the Utility and Park Facilities Program. Program Goal: Provide buildings that are adequate and convenient for the efficient accommodation of City functions. Subprograms: Administrative Offices, Maintenance Facilities, Fire Facilities, Community Center. I. Administrative Offices Subprogram (AO) A. Subprogram Goal: The goal of the Administrative Offices subprogram is to provide facilities for the efficient and safe conduct of legislative and administrative functions of the City. 11 B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of the City services. II. Maintenance Facilities Subprogram (MF) A. Subprogram Goal: The goal of the Maintenance Facilities subprogram is to provide facilities for the efficient and safe conduct of City maintenance functions. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of City services. III. Fire Facilities Subprogram (FF) A. Subprogram Goal: To provide a fire station, or stations, for storage of Fire Department equipment and for the training and meetings of volunteer fire fighters to provide prompt and efficient protection to life and property. B. Objectives: 1. Provide a maximum four-minute daytime and three-minute nighttime response to all points within the City. 2. Meet objective 1 through the use of volunteers. IV. Community Center Subprogram (CC) A. Subprogram Goal: To provide a community facility, or facilities, which meet the social, recreational, and cultural needs of all citizens, particularly senior citizens. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repairs. 12 2. Construct or acquire structures and facilities necessary to meet the changing needs of the City. 3. Upgrade facilities as necessary to provide for efficient, safe, and effective provision of City services. ECONOMIC DEVELOPMENT PROGRAM Program Description: This program includes redevelopment projects that have been identified through adopted plans and goals of the City of Hopkins. Program Goal: To facilitate the redevelopment of key sites in order to achieve the state objectives of the project. Objectives: 1. Elimination of blight or blighting conditions 2. Creation of jobs 3. Increase property value(s) 4. Catalyst of additional redevelopment 5. Environmental clean-up 6. Increase transit-oriented development around LRT stations 13 14 Sources of Funding 15 SOURCES OF FUNDING In order to fund the anticipated Capital Improvements, the City must draw upon a variety of sources. Many of these sources have a specific or "dedicated" purpose (i.e., the water utility fund will finance water main installation but not a street overlay). Therefore, it is important to identify the uses and limitations of the various revenue sources. CURRENT REVENUES - GENERAL FUND (CR) This represents funding from current year revenue collections in the General Fund that support operations and capital outlay expenditures. Revenue sources include property tax levies, state aid payments, and various permit and license fees. This source of funding is generally used only for operations and small capital purchases. GENERAL FUND RESERVES (GR) Reserves of the general fund are the funds remaining after subtracting cash flow and emergency amounts from the City's cash balance, sometimes referred to as "fund balance". The use of General Fund Reserves is not recommended for Capital Improvements without significant staff and Council review. COMMUNICATION (formerly Cable TV) FUND (CT) This funding source consists of franchise fees received from the local Cable TV company, in excess of the amounts earmarked for the access programming and commission budgets. Expenditures are limited to cable-related facilities, or must have a cable related purpose. ECONOMIC DEVELOPMENT FUND (ED) This funding source was established by the Housing and Redevelopment Authority (HRA) and the City of Hopkins, to provide funding for the purpose of promoting development and redevelopment within the City. The Economic Development fund is a revolving fund administered by the HRA, intended to provide an ongoing funding source used to reduce or extend the long term debt involved with development and redevelopment activities. The HRA reviews all proposed uses of this fund on an individual basis. GRANT-IN-AID (GA) This is aid received from either the Federal or State government. In many cases, grants are made on matching basis, which means the City shares a portion of the costs of the project being funded. 16 MUNICIPAL STATE AID STREETS (MS) This funding source represents funds received from the State of Minnesota to support construction and maintenance of State Aid classified municipal streets. State law defines the types and limits of State Aid Streets expenditures. PERMANENT IMPROVEMENT REVOLVING/GENERAL OBLIGATION BONDS (PI) Improvements with a life of several years may be financed from the proceeds of a General Obligation Bond Issue. Law limits the total debt that can be incurred under this method of financing. With some exception, General Obligation Bonds are generally subject to a referendum process. Examples of projects, which may not require a referendum, are those financed through the use of special assessments where at least 20 percent of the project cost is assessed to the benefiting property owners. The remaining portion not assessed can be financed through general obligation bonds repaid by a tax levy. PRIVATE SECTOR FUNDING (PF) This funding source consists primarily of payments made by developers for the purchase of land, the installation of water, sewer, or streets or other related expenditures. It can also refer to donations made to the City by individuals or groups. OTHER GOVERNMENTAL UNITS (GU) These are funds received from Hennepin County, adjacent communities, etc. for projects that also benefit a jurisdiction other than the City of Hopkins. REVENUE BONDS (RB) These are bonds issued for improvements made for specific revenue producing facility or operation. The debt incurred is repaid from the revenue generated by the facility. If the revenue generated is insufficient, then the difference becomes an annual obligation of the taxpayers and becomes an additional tax levy. These are generally not subject to referendum. REAL ESTATE SALES FUND (RE) This funding source consists primarily of funds built up from the sale of City owned property. To date, the fund has been used for building improvements. Because the sale of both general City property and park/recreation property are accumulated into this fund, earmarking a portion for recreational purposes may be justified. 17 SPECIAL ASSESSMENT (SA) A number of projects may be realistically financed using Special Assessment to pay the ultimate cost. Almost any project can potentially be financed using the assessment process. In each case it is necessary to make a determination that the assessed property will benefit by the amount of the assessment. The cost of street reconstruction is shared by the property owner and the City. Special assessments to individual properties are capped per city policy. Concurrent improvement costs to the utility systems are assumed by the respective utility funds. TAX INCREMENT FINANCING (TF) This funding source results from the tax value of new development that is "incrementally" greater than the existing tax value. Typically, bonds are sold based on the assumption that the higher tax receipts will retire the bonds. However, the use of TIF funds through a "pay as you go" method has become more common. This type of funding can be used for public improvements within a redevelopment district to support the goals of redevelopment, specifically the elimination of blighted conditions. Approval of the Hopkins HRA should be anticipated prior to the commitment of these funds. State law strictly regulates the use of these funds. WATER FUNDS (WF) Water funds consist of revenue generated from the sale of water. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. SANITARY SEWER FUNDS (SF) Sanitary sewer funds consist of revenue generated from charges made for sewage disposal. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. STORM SEWER UTILITY REVENUES (SU) Storm sewer funds consist of revenue generated by charging storm water drainage fee to parcels of land for the availability and use of municipal storm sewer facilities. Expenditures from this funding source are related to drainage facilities. PAVILION FUND (PA) Pavilion Funds consist of revenues generated from rental fees collected from users of the Pavilion. These funds are utilized to pay for operating, and capital expenditures. 18 Funding Sources Communication (formerly Cable TV) Fund CT Current Revenues – General Fund CR General Fund Reserves GR Economic Development Fund ED Grant-In-Aid GA Housing and Redevelopment Authority HRA Municipal State-Aid Streets MS Other Government Units GU Park Dedication Fund PDF Pavilion Fund PA Permanent Improvement Revolving/General Obligation Bonds PI Private Sector Funds PF Real Estate Sales Fund RE Revenue Bonds RB Sanitary Sewer Fund SF Special Assessment SA Storm Sewer Fund SU Tax Increment Financing TF Water Fund WF 19 20 Summary of Impacts on Major Funding Sources 21 SUMMARY OF PROJECT IMPACTS ON MAJOR FUNDING SOURCES CURRENT REVENUES/GENERAL FUND RESERVES Expenditures for 2019 are budgeted at an increase of 7.26% over the 2018 budget. The 2019 budget has no levy limits and the City will receive approximately $556,000 in LGA. The tax levy is the major source of revenues (82%) for the General Fund and therefore presents a challenge when levy limits are in place. Fund balance in the General Fund totals $5,852,287 at the end of 2017 and is projected to remain at that level for 2018 or increase slightly. The State Auditor’s Office recommends no less than five month of operating expenditures in reserves. For 2018 five months of expenditures would total $6,004,366 or 41.7%. At January 1, 2018 the unassigned fund balance was at 40.6% of budgeted expenditures. PERMANENT IMPROVEMENT REVOLVING FUND, (P.I.R.) - G.O. DEBT Funding from bonds is used to reimburse the P.I.R. fund for public improvement projects, which have been previously expended. The debt is funded by special assessment collections and city tax levies over a ten to fifteen year period. Bonds totaling $6,125,000 were sold in 2018 to fund the portions of Blake Road and 2018 street improvement projects. The next bond sale is scheduled for 2019 and will be for the 2019 street improvement project and the City’s portion of Blake Road Corridor Improvements. These bonds are expected to total approximately $6,000,000. The P.I.R. fund has completed substantial projects over the last five years and this pace is expected to continue with scheduled projects for 2019 totaling $4,650,300 and future projects in the years 2019-2023 totaling over $20 million. Projects scheduled for 2019 include the Cambridge and Oxford street reconstruction projects, pedestrian and bicycle access improvements, Blake Road corridor improvements along with street overlay and street sign management programs. The funding is provided for these projects by special assessments, PIR/Bonding and grants. In the years 2019-2023 as mentioned above, the city has an aggressive residential street improvement schedule planned, all of which will require bonding. MUNICIPAL STATE AID FUND Funding for municipal state aid road projects comes from state MSA funding and is drawn down as projects are done. State funding is not sufficient for current planned projects as the City has been aggressive in doing MSA projects. In the queue for reimbursement is a request for is the Shady Oak project. In late 2014 we received an advance on the Shady Oak project which essentially cleared up our receivable backlog for Excelsior Blvd and Minnetonka Mills Road. This leaves Shady Oak Road as the only project in the funding queue. Currently the only MSA project scheduled is lighting, landscaping and street improvements on County Road 3 from Shady Oak Road to Meadowbrook Road. This is programed for 2023. 22 CAPITAL IMPROVEMENT FUND The Capital Improvement Fund received only tax levy support from 2005 through 2018. Gas and electric franchise fees were increased beginning in 2019, to support the capital improvement fund. The franchise fees are expected to generate $360,000 annually for the fund. The fund will continue to receive tax levy support. Projects scheduled in 2019 total $4,387,000. The majority of the project cost in 2019 is $4,245,000 to renovate City Hall, with an additional $150,000 of the projects budget coming from the communication fund. PARK IMPROVEMENT FUND The source of funding for this fund is development fees charged to developers for park development, in addition to franchise fees from gas and electric services. The franchise fees are expected to supply approximately $295,000 to the fund for much needed park projects. Developer payments are uncertain as they are dependent on future development and redevelopment in the city, however there is one project that could result is significant developer fees in the next year. The development of the cold storage site at 325 Blake Road is budgeted to receive $1,000,000 in dedication fees Projects scheduled for 2019 total $296,500 and include a lighting upgrade at Harley Hopkins, Interlachen, Valley and Hilltop Park. WATER FUND Implementing the rates as proposed in the Utility Master Plan (UMP) in 2019 along with a bond sale in 2019 provide the funding needed for projects scheduled for 2019. Bonds will need to be sold each year thereafter in which there are water projects associated with the residential street improvement program. Projects planned for 2019 total $1,830,000 and include water main improvements done in conjunction with the residential street improvement projects (Cambridge/Oxford), Blake Road and Southwest Light Rail. The City along with their financial advisor prepared a comprehensive rate study which was implemented on January 1, 2017. Rates will be increased again of January 1, 2019 based on the plan. The new tiered rate structure was a significant change from past practice. Tiered rates allow the city to comply with MN Department of Natural Resource requirements for conservation pricing of rates and provide funds for operations, debt service and capital outlay. SANITARY SEWER FUND Implementing the rates as proposed in the Utility Master Plan (UMP) in 2019 along with a bond sale in 2019 provide the funding needed for projects scheduled for 2019. Bonds will need to be sold each year thereafter in which there are sanitary sewer projects associated with the residential street improvement program. Projects planned for 2019 total $1,250,000 in sewer main improvements done in conjunction with the residential street improvement projects (Cambridge/Oxford), Blake Road and Southwest Light Rail. 23 The City along with their financial advisor prepared a comprehensive rate study which was implemented on January 1, 2017. Rates will be increased again on January 1, 2019 based on the plan. This rate increase will provide funds for operations, debt service and capital outlay. STORM SEWER FUND Bonds will be sold in 2019 for the 2019 storm water management project. These bonds issues along with current revenues should provide the needed funding for scheduled projects. Bonds will need to be sold in 2019 and each year thereafter in which there are storm sewer projects associated with the residential street improvement program. Projects planned for 2019 total $852,000 in storm sewer improvements done in conjunction with the residential street improvement projects (Cambridge/Oxford), Blake Road and Southwest Light Rail. The most recent rate increase pursuant to the 2007 Utility Master Plan was done in 2009. This rate increase is expected to support the storm sewer system well into the future and currently no additional rates increases are proposed. PAVILION FUND This facility completed a significant upgrade project in 2018, with a total project cost of approximately $5,700,000. The new expanded facility has a new refrigeration system and was expanded to better meet the needs of the community. The project received contributions from the Park Improvement Fund along with outside organizations. A bond was issued for the remaining costs of approximately $3,200,000. The fund will begin to receive tax levy support in 2019 to pay ongoing debt service costs. A Financial Management Plan was developed in 2014 to address the growing capital needs of the Pavilion along with other funds. A levy was put in place for 2015 and 2016 to address the growing capital needs and will be continued in 2019 based on the additional debt service requirements related to the 2018 project. 24 Cash Flow Statements 25 City of Hopkins Park Capital Improvements Fund (301) ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2017 2018 2019 2020 2021 2022 2023 Working Capital Begin Year 760,900 1,088,355 137,539 1,020,714 442,721 625,448 565,548 Revenues Franchise Fees 300,805 295,300 295,300 295,300 295,300 295,300 295,300 Dedication Fees-Oxford Village - - - - - - - Dedication Fees-Moline 180,750 - - - - - - Dedication Fees-Cold Storage - - 1,000,000 - - - - Interest earnings 5,246 10,884 1,375 10,207 4,427 - - Bond Proceeds 1,829,097 - - 1,300,000 - - Total Revenues 2,315,898 306,184 1,296,675 305,507 1,599,727 295,300 295,300 Expenditures Current - 7,000 7,000 7,000 7,000 7,000 7,000 Capital Projects 1,883,443 1,140,000 296,500 766,500 1,300,000 108,200 130,000 Bond Payment Contribution (2015)10,000 10,000 10,000 10,000 10,000 10,000 10,000 Bond Payment Contribution (2016)95,000 100,000 100,000 100,000 100,000 105,000 110,000 Bond Payment Contribution (Central Park)- - - - - 125,000 125,000 Total Expenditures 1,988,443 1,257,000 413,500 883,500 1,417,000 355,200 382,000 Working Capital Ending Balance 1,088,355 137,539 1,020,714 442,721 625,448 565,548 478,848 (Unrestricted Net Position) 26 City of Hopkins Capital Improvements Fund (305) ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2017 2018 2019 2020 2021 2022 2023 Working Capital Begin Year (245,928) (145,647) (254,147) 63,853 411,603 921,603 1,256,603 Revenues from charges Tax Levy per FMP 303,050 75,000 100,000 300,000 150,000 100,000 100,000 Interest earnings - - - - - - - Other revenues 609 - - - - - - Bond Proceeds - - - - - - - Franchise Fees - - 360,000 360,000 360,000 360,000 360,000 Interfund Loan or Bond Proceeds - 200,000 - - - - - City Hall Bond Proceeds - - 4,245,000 - - - - Total Revenues 303,659 275,000 4,705,000 660,000 510,000 460,000 460,000 Expenditures Current 9,118 - - - - - Capital Projects 194,260 383,500 4,387,000 312,250 150,000 15,000 160,000 City Hall Debt Service 360,000 360,000 360,000 360,000 Total Expenditures 203,378 383,500 4,387,000 312,250 - 125,000 125,000 Working Capital Ending Balance (145,647) (254,147) 63,853 411,603 921,603 1,256,603 1,591,603 (Unrestricted Net Position) 27 City of Hopkins Municipal State Aid Fund (302) ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2017 2018 2019 2020 2021 2022 2023 Working Capital Begin Year (253,875) (650,590) 62,254 552,073 1,041,892 1,542,130 1,542,130 Revenues State MSA Funds, projects - 489,819 489,819 489,819 489,819 489,819 489,819 Community Works Grant - County 223,025 Interest Earnings - - - - 10,419 - - Total Revenues - 712,844 489,819 489,819 500,238 - - - - Expenditures CIP State Aid Projects 396,715 - - - - - 700,000 Total Expenditures 396,715 - - - - - 700,000 Working Capital Ending Balance (650,590) 62,254 552,073 1,041,892 1,542,130 1,542,130 842,130 (Unrestricted Net Position) 28 City of Hopkins Permanent Improving Revolving Fund (501) ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2017 2018 2019 2020 2021 2022 2023 Working Capital Begin Year (639,073) 197,261 210,346 533,264 626,597 617,863 622,863 Revenues Tax Levy per FMP 4,399 - - - - - - Special Assessments (Prepaid)741,370 290,700 180,000 250,000 377,000 100,000 210,000 Grants 2,480,548 5,954,600 5,704,600 - - - - Investments 40,983 1,973 2,103 5,333 6,266 - - Bond Proceeds 8,546,154 3,244,912 6,000,000 5,700,000 4,700,000 1,500,000 3,500,000 - - - - - - - Total Revenues 11,813,454 9,492,185 11,886,703 5,955,333 5,083,266 1,600,000 3,710,000 Expenditures Current - - - - - - - Residential Street Improvements 5,347,000 2,159,200 3,510,000 4,592,000 4,672,000 1,150,000 3,220,000 8th Avenue Construction 4,451,317 - - - - - - Light Rail Transit Stations 10,888 - - 800,000 - - - Pedestrian & Bicycle Access Improvements - 25,000 25,000 100,000 25,000 25,000 25,000 Blake Road Corridor Improvements 1,167,915 6,974,900 7,683,785 - - - - Street Overlay Improvements - 300,000 325,000 350,000 375,000 400,000 425,000 Street Sign Management - 20,000 20,000 20,000 20,000 20,000 20,000 - - - - - - - Total Expenditures 10,977,120 9,479,100 11,563,785 5,862,000 5,092,000 1,595,000 3,690,000 Working Capital Ending Balance 197,261 210,346 533,264 626,597 617,863 622,863 642,863 (Unrestricted Net Position) 29 City of Hopkins Water Utility Fund (703) ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2017 2018 2019 2020 2021 2022 2023 Working Capital Begin Year (1,109,720) (874,824) (668,549) (601,748) (527,846) (392,168) (159,858) Revenues Operating Revenues 1,690,426 1,974,086 1,993,826 2,129,407 2,274,206 2,428,852 2,594,014 Other 147,158 173,000 174,730 178,225 181,789 185,425 189,133 Bond Proceeds 2,092,903 1,600,000 1,800,000 1,650,000 2,070,000 2,450,000 1,430,000 1,307 Total Revenues 3,931,794 3,747,086 3,968,556 3,957,631 4,525,995 5,064,277 4,213,148 Expenditures Operating Expenditures 1,449,904 1,500,339 1,532,956 1,578,945 1,626,313 1,675,102 1,675,102 Interest/Fiscal Agent Expense 62,709 42,997 78,000 92,040 100,324 102,330 51,851 Capital Outlay 1,866,978 1,600,000 1,830,000 1,669,000 2,071,000 2,450,000 1,430,000 Bond Payments 145,000 210,000 228,300 269,394 293,639 299,512 299,512 Transfer Out - Bond Payments 172,910 187,474 232,500 274,350 299,042 305,022 305,022 Total Expenses 3,697,501 3,540,810 3,901,756 3,883,729 4,390,318 4,831,967 3,761,488 Inventory Change 4,977 Bond Premium/Discount Expense (4,374) Working Capital Ending Balance (874,824) (668,549) (601,748) (527,846) (392,168) (159,858) 291,802 (Unrestricted Net Position) 30 City of Hopkins Sewer Utility Fund (707) ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2017 2018 2019 2020 2021 2022 2023 Working Capital Begin Year 42,211 278,565 638,447 665,737 711,473 825,351 1,015,691 Revenues Operating Revenues 2,682,702 3,073,299 3,104,032 3,269,787 3,444,394 3,628,325 3,822,077 Other 15,701 15,000 15,000 15,300 15,606 15,918 16,236 Interest 2,729 2,786 - 6,657 7,115 8,254 10,157 Intergovernmental Grants - - - - - - - Bond Proceeds 2,391,886 1,025,000 1,175,000 1,500,000 1,700,000 875,000 1,350,000 Total Revenues 5,093,018 4,116,084 4,294,032 4,791,745 5,167,115 4,527,496 5,198,471 Expenditures Operating Expenditures 2,123,730 2,430,615 2,591,642 2,669,391 2,749,473 2,831,957 2,916,916 Interest/Fiscal Agent Expense 54,405 32,656 61,750 72,865 79,423 81,011 81,011 Capital Outlay 2,456,644 1,075,000 1,250,000 1,575,000 1,757,000 947,500 1,418,000 Bond Payments 105,000 105,000 164,600 194,228 211,709 215,943 215,943 Transfer Out - Bond Payments 131,833 112,931 198,750 234,525 255,632 260,745 260,745 Total Expenses 4,871,612 3,756,202 4,266,742 4,746,009 5,053,237 4,337,156 4,892,615 Inventory Change 19,868 Bond Premium/Discount Expense (4,920) Working Capital Ending Balance 278,565 638,447 665,737 711,473 825,351 1,015,691 1,321,547 (Unrestricted Net Position) 31 City of Hopkins Storm Sewer Utility Fund (740) ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2017 2018 2019 2020 2021 2022 2023 Working Capital Begin Year 965,966 1,393,731 1,772,989 2,062,781 2,311,134 2,549,251 2,766,460 Revenues Operating Revenues 828,709 796,000 779,332 779,332 779,332 779,332 779,332 Other 5,553 6,000 6,000 6,000 6,000 6,000 6,000 Interest 8,383 8,200 8,200 20,628 23,111 25,493 27,665 Intergovernmental Grants - - - - - - - Bond Proceeds 1,076,681 575,000 800,000 820,000 950,000 385,000 480,000 Total Revenues 1,919,326 1,385,200 1,593,532 1,625,960 1,758,443 1,195,825 1,292,997 Expenditures Operating Expenditures 178,267 147,097 109,640 112,929 116,317 119,807 123,401 Interest/Fiscal Agent Expense 23,237 22,341 56,000 66,080 72,027 73,468 73,468 Capital Outlay - Construction 1,019,188 591,000 852,000 861,000 964,000 410,000 506,000 Bond Payments 115,000 115,000 122,100 144,078 157,045 160,186 160,186 Transfer Out - Bond Payments 155,504 130,504 164,000 193,520 210,937 215,156 215,156 Total Expenses 1,491,196 1,005,942 1,303,740 1,377,607 1,520,326 978,616 1,078,210 Inventory Change - Bond Premium/Discount Expense (365) Working Capital Ending Balance 1,393,731 1,772,989 2,062,781 2,311,134 2,549,251 2,766,460 2,981,246 (Unrestricted Net Position) 32 City of Hopkins Pavilion Fund (308) & (747) ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2017 2018 2019 2020 2021 2022 2023 Working Capital Begin Year 6,329 1,183,690 115,408 (60,126) (409,198) (362,032) (323,650) Revenues Property Taxes (257) - 40,383 40,383 340,383 340,383 490,383 Operating Revenues 464,371 397,400 471,720 493,154 503,017 513,078 523,339 Other 5,578 6,700 7,280 7,426 7,574 7,726 7,880 Interest 501 11,837 - - - - - Bond Proceeds - 3,285,000 - - - - - Contributions to Pavilion Upgrade 1,500,000 500,000 Total Revenues 1,970,193 4,200,937 519,383 540,963 850,975 861,186 1,021,603 Expenditures Operating Expenditures 436,497 380,948 482,146 496,610 511,509 526,854 542,660 Interest/Fiscal Agent Expense 1,747 1,800 53,371 97,425 91,700 85,750 79,775 Capital Outlay - Construction 334,287 4,864,670 88,000 100,000 - - - Bond Payments (Pavilion Remodel Project)- - 50,000 175,000 180,000 190,000 195,000 Transfer Out - Bond Payments (Zamboni)20,000 21,800 21,400 21,000 20,600 20,200 - Total Expenses 792,531 5,269,218 694,917 890,035 803,809 822,804 817,435 Bond Premium/Discount Expense (301) Working Capital Ending Balance 1,183,690 115,408 (60,126) (409,198) (362,032) (323,650) (119,482) (Unrestricted Net Position) 33 34 Five Year Project Summaries 35 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY YEAR 2019 2023thru Project Name Department Project #Priority Project Cost 2019 09-CIP-CH030City Hall Lobby Upgrade 1 4,395,000City Hall Administration 19-CIP-CH037City Hall - Roof to Roof Transition Stairs (2)1 22,000City Hall Administration 17-CIP-AC039Activity Center - Bathroom Improvements n/a 20,000Comm Svcs - Activity Center 19-CIP-AC045Activity Center - Facility Improvements n/a 10,000Comm Svcs - Activity Center 18-CIP-AR008Arts Center - Building Automation System 1 30,000Comm Svcs - Arts Center 19-CIP-AR001Arts Center - Carpeting 2 30,000Comm Svcs - Arts Center 19-CIP-AR002Arts Center - Outdoor Signage/lighting 2 10,000Comm Svcs - Arts Center 19-CIP-AR004Arts Center - Water Fountain Replacement 5 11,100Comm Svcs - Arts Center 19-CIP-AR005Arts Center - Key Card Exterior & Interior Access 2 18,000Comm Svcs - Arts Center 13-CIP-PV321Pavilion Mezzanine Rooftop Unit Replacement 1 45,000Pavilion 13-CIP-PV322Pavilion HHS Team Room Rooftop Unit Repl 1 15,000Pavilion 19-CIP-PV332Pavilion - Pav/Cent Park Sound System 2 28,000Pavilion 08-CIP-B021Public Works - Replace Wash Bay Roof n/a 50,000Public Works: Bldg/Equip Serv 09-CIP-B034Public Works Garage Roof Replacement n/a 50,000Public Works: Bldg/Equip Serv 18-CIP-B007PW Exterior Painting n/a 25,000Public Works: Bldg/Equip Serv 19-CIP-B008Public Works - Fuel Dispenser Replacement n/a 20,000Public Works: Bldg/Equip Serv 05-CIP-P202Central Park Tennis Courts n/a 10,000Public Works: Parks 17-CIP-P005Oakes Park Cricket Pitch n/a 25,000Public Works: Parks 19-CIP-P002Park Lighting Upgrade n/a 250,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 5,575,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 15-CIP-S001Blake Road Corridor Improvements n/a 7,449,900Public Works: Streets/Traffic 16-CIP-S041Street Overlay Improvements n/a 325,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 01-CIP-S502Light Rail Transit Stations (3)n/a 620,000Public Works: Transportation 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 22,000Public Works: Utilities 08-CIP-U001Lift Station # 4 n/a 160,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 50,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 35,000Recreation 19,346,000Total for 2019 2020 18-CIP-AC043Activity Center - Outdoor Signage n/a 22,000Comm Svcs - Activity Center 19-CIP-AC045Activity Center - Facility Improvements n/a 175,000Comm Svcs - Activity Center 17-CIP-AR004Arts Center - Theater Curtains 3 80,000Comm Svcs - Arts Center 19-CIP-AR001Arts Center - Carpeting 2 22,000Comm Svcs - Arts Center 19-CIP-AR005Arts Center - Key Card Exterior & Interior Access 2 20,000Comm Svcs - Arts Center 19-CIP-AR006Arts Center - Fire Panel 2 30,000Comm Svcs - Arts Center 19-CIP-FD001Fire - Garage Door Openers 2 24,000Fire 19-CIP-PV330Pavilion - Indoor Turf System Replacement 2 90,000Pavilion 19-CIP-PV331Pavilion - Arena Lighting Replacement 2 10,000Pavilion 08-CIP-PD016Replace Carpet - Police Station n/a 73,250Police 08-CIP-B023Public Works - Replace Overhead Doors n/a 90,000Public Works: Bldg/Equip Serv 13-CIP-P066Shady Oak Beach - Picnic Shelter 3 150,000Public Works: Parks Tuesday, November 27, 2018 36 Project Name Department Project #Priority Project Cost 13-CIP-P068Valley Park - Picnic Shelter 3 150,000Public Works: Parks 16-CIP-P002Cottageville Park - Phase III Improvements n/a 450,000Public Works: Parks 17-CIP-P004Downtown Park Rehab 3 100,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 8,570,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 100,000Public Works: Streets/Traffic 16-CIP-S041Street Overlay Improvements n/a 350,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 01-CIP-S502Light Rail Transit Stations (3)n/a 800,000Public Works: Transportation 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 23,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 50,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 50,000Recreation 11,449,250Total for 2020 2021 08-CIP-AC018Activity Center - Replace Gymnasium Roof n/a 105,000Comm Svcs - Activity Center 19-CIP-AR001Arts Center - Carpeting 2 22,000Comm Svcs - Arts Center 19-CIP-AR003Arts Center - Tile Flooring n/a 15,000Comm Svcs - Arts Center 19-CIP-AR005Arts Center - Key Card Exterior & Interior Access 2 20,000Comm Svcs - Arts Center 08-CIP-FD123Fire Station - Replace Boilers n/a 45,000Fire 19-CIP-P001Central Park Improvements n/a 1,300,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 9,390,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Overlay Improvements n/a 375,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 24,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 50,000Public Works: Utilities 11,391,000Total for 2021 2022 19-CIP-AC048Activity Center - Gym Acoustical Panels n/a 15,000Comm Svcs - Activity Center 19-CIP-AR005Arts Center - Key Card Exterior & Interior Access 2 20,000Comm Svcs - Arts Center 13-CIP-P063Maetzold Field - Pavilion n/a 100,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 2,375,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Overlay Improvements n/a 400,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 25,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 52,500Public Works: Utilities 19-CIP-U017Trunk Water Main Rehabilitation 2 3,955,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 25,000Recreation 7,012,500Total for 2022 2023 08-CIP-AC024Activity Center - Raspberry Room Roof Replacement n/a 80,000Comm Svcs - Activity Center 09-CIP-AC031Activity Center - Lower Roof Replacement n/a 80,000Comm Svcs - Activity Center 19-CIP-AR007Arts Center - Roof Replacement 2 150,000Comm Svcs - Arts Center 13-CIP-P044Oakes Park - Tennis Courts n/a 130,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 6,493,000Public Works: Streets/Traffic 01-CIP-S104County Road 3 n/a 2,300,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Overlay Improvements n/a 425,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 26,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 55,000Public Works: Utilities Tuesday, November 27, 2018 37 Project Name Department Project #Priority Project Cost 9,784,000Total for 2023 GRAND TOTAL 58,982,750 Tuesday, November 27, 2018 38 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP DEPARTMENT SUMMARY 2019 2023thru Total20192020202120222023Department City Hall Administration 4,417,0004,417,000 Comm Svcs - Activity Center 507,00030,000 197,000 105,000 15,000 160,000 Comm Svcs - Arts Center 478,10099,100 152,000 57,000 20,000 150,000 Fire 69,00024,000 45,000 Pavilion 188,00088,000 100,000 Police 73,25073,250 Public Works: Bldg/Equip Serv 235,000145,000 90,000 Public Works: Parks 2,665,000285,000 850,000 1,300,000 100,000 130,000 Public Works: Streets/Traffic 44,327,90013,394,900 9,040,000 9,810,000 2,820,000 9,263,000 Public Works: Transportation 1,420,000620,000 800,000 Public Works: Utilities 4,492,500232,000 73,000 74,000 4,032,500 81,000 Recreation 110,00035,000 50,000 25,000 19,346,000 11,449,250 11,391,000 7,012,500 9,784,000 58,982,750TOTAL Thursday, November 8, 201839 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY DEPARTMENT 2019 2023thru Total20192020202120222023DepartmentProject #Priority City Hall Administration 09-CIP-CH030 4,395,0004,395,000City Hall Lobby Upgrade 1 19-CIP-CH037 22,00022,000City Hall - Roof to Roof Transition Stairs (2)1 4,417,0004,417,000City Hall Administration Total Comm Svcs - Activity Center 08-CIP-AC018 105,000105,000Activity Center - Replace Gymnasium Roof n/a 08-CIP-AC024 80,00080,000Activity Center - Raspberry Room Roof Replacement n/a 09-CIP-AC031 80,00080,000Activity Center - Lower Roof Replacement n/a 17-CIP-AC039 20,00020,000Activity Center - Bathroom Improvements n/a 18-CIP-AC043 22,00022,000Activity Center - Outdoor Signage n/a 19-CIP-AC045 185,00010,000 175,000Activity Center - Facility Improvements n/a 19-CIP-AC048 15,00015,000Activity Center - Gym Acoustical Panels n/a 507,00030,000 197,000 105,000 15,000 160,000Comm Svcs - Activity Center Total Comm Svcs - Arts Center 17-CIP-AR004 80,00080,000Arts Center - Theater Curtains 3 18-CIP-AR008 30,00030,000Arts Center - Building Automation System 1 19-CIP-AR001 74,00030,000 22,000 22,000Arts Center - Carpeting 2 19-CIP-AR002 10,00010,000Arts Center - Outdoor Signage/lighting 2 19-CIP-AR003 15,00015,000Arts Center - Tile Flooring n/a 19-CIP-AR004 11,10011,100Arts Center - Water Fountain Replacement 5 19-CIP-AR005 78,00018,000 20,000 20,000 20,000Arts Center - Key Card Exterior & Interior Access 2 19-CIP-AR006 30,00030,000Arts Center - Fire Panel 2 19-CIP-AR007 150,000150,000Arts Center - Roof Replacement 2 478,10099,100 152,000 57,000 20,000 150,000Comm Svcs - Arts Center Total Fire 08-CIP-FD123 45,00045,000Fire Station - Replace Boilers n/a 19-CIP-FD001 24,00024,000Fire - Garage Door Openers 2 69,00024,000 45,000Fire Total Pavilion 13-CIP-PV321 45,00045,000Pavilion Mezzanine Rooftop Unit Replacement 1 13-CIP-PV322 15,00015,000Pavilion HHS Team Room Rooftop Unit Repl 1 19-CIP-PV330 90,00090,000Pavilion - Indoor Turf System Replacement 2 19-CIP-PV331 10,00010,000Pavilion - Arena Lighting Replacement 2 19-CIP-PV332 28,00028,000Pavilion - Pav/Cent Park Sound System 2 188,00088,000 100,000Pavilion Total Police 08-CIP-PD016 73,25073,250Replace Carpet - Police Station n/a Thursday, November 8, 201840 Total20192020202120222023DepartmentProject #Priority 73,25073,250Police Total Public Works: Bldg/Equip Serv 08-CIP-B021 50,00050,000Public Works - Replace Wash Bay Roof n/a 08-CIP-B023 90,00090,000Public Works - Replace Overhead Doors n/a 09-CIP-B034 50,00050,000Public Works Garage Roof Replacement n/a 18-CIP-B007 25,00025,000PW Exterior Painting n/a 19-CIP-B008 20,00020,000Public Works - Fuel Dispenser Replacement n/a 235,000145,000 90,000Public Works: Bldg/Equip Serv Total Public Works: Parks 05-CIP-P202 10,00010,000Central Park Tennis Courts n/a 13-CIP-P044 130,000130,000Oakes Park - Tennis Courts n/a 13-CIP-P063 100,000100,000Maetzold Field - Pavilion n/a 13-CIP-P066 150,000150,000Shady Oak Beach - Picnic Shelter 3 13-CIP-P068 150,000150,000Valley Park - Picnic Shelter 3 16-CIP-P002 450,000450,000Cottageville Park - Phase III Improvements n/a 17-CIP-P004 100,000100,000Downtown Park Rehab 3 17-CIP-P005 25,00025,000Oakes Park Cricket Pitch n/a 19-CIP-P001 1,300,0001,300,000Central Park Improvements n/a 19-CIP-P002 250,000250,000Park Lighting Upgrade n/a 2,665,000285,000 850,000 1,300,000 100,000 130,000Public Works: Parks Total Public Works: Streets/Traffic 01-CIP-S101 32,403,0005,575,000 8,570,000 9,390,000 2,375,000 6,493,000Residential Street Improvements and Utilities n/a 01-CIP-S104 2,300,0002,300,000County Road 3 n/a 13-CIP-S040 200,00025,000 100,000 25,000 25,000 25,000Pedestrian & Bicycle Access Improvements n/a 15-CIP-S001 7,449,9007,449,900Blake Road Corridor Improvements n/a 16-CIP-S041 1,875,000325,000 350,000 375,000 400,000 425,000Street Overlay Improvements n/a 16-CIP-S042 100,00020,000 20,000 20,000 20,000 20,000Street Sign Management n/a 44,327,90013,394,900 9,040,000 9,810,000 2,820,000 9,263,000Public Works: Streets/Traffic Total Public Works: Transportation 01-CIP-S502 1,420,000620,000 800,000Light Rail Transit Stations (3)n/a 1,420,000620,000 800,000Public Works: Transportation Total Public Works: Utilities 01-CIP-U002 120,00022,000 23,000 24,000 25,000 26,000Storm Drainage System Maintenance - Alley Repairs n/a 08-CIP-U001 160,000160,000Lift Station # 4 n/a 18-CIP-U016 257,50050,000 50,000 50,000 52,500 55,000Sewer Lining 2 19-CIP-U017 3,955,0003,955,000Trunk Water Main Rehabilitation 2 4,492,500232,000 73,000 74,000 4,032,500 81,000Public Works: Utilities Total Recreation 16-CIP-R003 110,00035,000 50,000 25,000Shady Oak Beach Improvements 3 110,00035,000 50,000 25,000Recreation Total GRAND TOTAL 58,982,75019,346,000 11,449,250 11,391,000 7,012,500 9,784,000 Thursday, November 8, 201841 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP FUNDING SOURCE SUMMARY 2019 thru 2023 TotalSource20192020202120222023 AC - Arts Center Fund 478,10099,100 152,000 57,000 20,000 150,000 CI - Capital Improvement Fund 5,024,2504,387,000 312,250 150,000 15,000 160,000 CT - Cable Franchise Fees 150,000150,000 GU - Other Governmental Units 7,478,4005,728,100 133,500 16,800 1,600,000 MS - Municipal State Aid Streets 700,000700,000 PA - Pavilion Fund 188,00088,000 100,000 PDF- Park Dedication Fund 2,601,200296,500 766,500 1,300,000 108,200 130,000 PI - PIR/General Obligation Bonds 16,339,3003,400,300 4,262,000 3,492,000 2,545,000 2,640,000 RF - Refuse Fund 33,00015,000 18,000 SA - Special Assessment 6,000,0001,250,000 1,600,000 1,600,000 500,000 1,050,000 SF - Sanitary Sewer Fund 6,947,5001,250,000 1,575,000 1,757,000 947,500 1,418,000 SU - Storm Sewer Fund 3,593,000852,000 861,000 964,000 410,000 506,000 WF - Water Fund 9,450,0001,830,000 1,669,000 2,071,000 2,450,000 1,430,000 19,346,000 11,449,250 11,391,000 7,012,500 9,784,000 58,982,750GRAND TOTAL Thursday, November 8, 2018 42 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY FUNDING SOURCE 2019 2023thru TotalSourceProject #Priority 2019 2020 2021 2022 2023 AC - Arts Center Fund 17-CIP-AR004 80,00080,000Arts Center - Theater Curtains 3 18-CIP-AR008 30,00030,000Arts Center - Building Automation System 1 19-CIP-AR001 74,00030,000 22,000 22,000Arts Center - Carpeting 2 19-CIP-AR002 10,00010,000Arts Center - Outdoor Signage/lighting 2 19-CIP-AR003 15,00015,000Arts Center - Tile Flooring n/a 19-CIP-AR004 11,10011,100Arts Center - Water Fountain Replacement 5 19-CIP-AR005 78,00018,000 20,000 20,000 20,000Arts Center - Key Card Exterior & Interior Access 2 19-CIP-AR006 30,00030,000Arts Center - Fire Panel 2 19-CIP-AR007 150,000150,000Arts Center - Roof Replacement 2 478,10099,100 152,000 57,000 20,000 150,000AC - Arts Center Fund Total CI - Capital Improvement Fund 08-CIP-AC018 105,000105,000Activity Center - Replace Gymnasium Roof n/a 08-CIP-AC024 80,00080,000Activity Center - Raspberry Room Roof Replacement n/a 08-CIP-B021 10,00010,000Public Works - Replace Wash Bay Roof n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 08-CIP-FD123 45,00045,000Fire Station - Replace Boilers n/a 08-CIP-PD016 73,25073,250Replace Carpet - Police Station n/a 09-CIP-AC031 80,00080,000Activity Center - Lower Roof Replacement n/a 09-CIP-B034 50,00050,000Public Works Garage Roof Replacement n/a 09-CIP-CH030 4,245,0004,245,000City Hall Lobby Upgrade 1 17-CIP-AC039 20,00020,000Activity Center - Bathroom Improvements n/a 18-CIP-AC043 22,00022,000Activity Center - Outdoor Signage n/a 18-CIP-B007 25,00025,000PW Exterior Painting n/a 19-CIP-AC045 185,00010,000 175,000Activity Center - Facility Improvements n/a 19-CIP-AC048 15,00015,000Activity Center - Gym Acoustical Panels n/a 19-CIP-B008 5,0005,000Public Works - Fuel Dispenser Replacement n/a 19-CIP-CH037 22,00022,000City Hall - Roof to Roof Transition Stairs (2)1 19-CIP-FD001 24,00024,000Fire - Garage Door Openers 2 5,024,2504,387,000 312,250 150,000 15,000 160,000CI - Capital Improvement Fund Total CT - Cable Franchise Fees 09-CIP-CH030 150,000150,000City Hall Lobby Upgrade 1 150,000150,000CT - Cable Franchise Fees Total GU - Other Governmental Units 01-CIP-S104 1,600,0001,600,000County Road 3 n/a 13-CIP-P066 100,000100,000Shady Oak Beach - Picnic Shelter 3 15-CIP-S001 5,704,6005,704,600Blake Road Corridor Improvements n/a 16-CIP-R003 73,80023,500 33,500 16,800Shady Oak Beach Improvements 3 Thursday, November 8, 2018 43 TotalSourceProject #Priority 2019 2020 2021 2022 2023 7,478,4005,728,100 133,500 16,800 1,600,000GU - Other Governmental Units Total MS - Municipal State Aid Streets 01-CIP-S104 700,000700,000County Road 3 n/a 700,000700,000MS - Municipal State Aid Streets Total PA - Pavilion Fund 13-CIP-PV321 45,00045,000Pavilion Mezzanine Rooftop Unit Replacement 1 13-CIP-PV322 15,00015,000Pavilion HHS Team Room Rooftop Unit Repl 1 19-CIP-PV330 90,00090,000Pavilion - Indoor Turf System Replacement 2 19-CIP-PV331 10,00010,000Pavilion - Arena Lighting Replacement 2 19-CIP-PV332 28,00028,000Pavilion - Pav/Cent Park Sound System 2 188,00088,000 100,000PA - Pavilion Fund Total PDF- Park Dedication Fund 05-CIP-P202 10,00010,000Central Park Tennis Courts n/a 13-CIP-P044 130,000130,000Oakes Park - Tennis Courts n/a 13-CIP-P063 100,000100,000Maetzold Field - Pavilion n/a 13-CIP-P066 50,00050,000Shady Oak Beach - Picnic Shelter 3 13-CIP-P068 150,000150,000Valley Park - Picnic Shelter 3 16-CIP-P002 450,000450,000Cottageville Park - Phase III Improvements n/a 16-CIP-R003 36,20011,500 16,500 8,200Shady Oak Beach Improvements 3 17-CIP-P004 100,000100,000Downtown Park Rehab 3 17-CIP-P005 25,00025,000Oakes Park Cricket Pitch n/a 19-CIP-P001 1,300,0001,300,000Central Park Improvements n/a 19-CIP-P002 250,000250,000Park Lighting Upgrade n/a 2,601,200296,500 766,500 1,300,000 108,200 130,000PDF- Park Dedication Fund Total PI - PIR/General Obligation Bonds 01-CIP-S101 11,144,0002,260,000 2,992,000 3,072,000 650,000 2,170,000Residential Street Improvements and Utilities n/a 01-CIP-S502 800,000800,000Light Rail Transit Stations (3)n/a 13-CIP-S040 200,00025,000 100,000 25,000 25,000 25,000Pedestrian & Bicycle Access Improvements n/a 15-CIP-S001 770,300770,300Blake Road Corridor Improvements n/a 16-CIP-S041 1,875,000325,000 350,000 375,000 400,000 425,000Street Overlay Improvements n/a 16-CIP-S042 100,00020,000 20,000 20,000 20,000 20,000Street Sign Management n/a 19-CIP-U017 1,450,0001,450,000Trunk Water Main Rehabilitation 2 16,339,3003,400,300 4,262,000 3,492,000 2,545,000 2,640,000PI - PIR/General Obligation Bonds Total RF - Refuse Fund 08-CIP-B021 10,00010,000Public Works - Replace Wash Bay Roof n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 19-CIP-B008 5,0005,000Public Works - Fuel Dispenser Replacement n/a 33,00015,000 18,000RF - Refuse Fund Total SA - Special Assessment 01-CIP-S101 6,000,0001,250,000 1,600,000 1,600,000 500,000 1,050,000Residential Street Improvements and Utilities n/a Thursday, November 8, 2018 44 TotalSourceProject #Priority 2019 2020 2021 2022 2023 6,000,0001,250,000 1,600,000 1,600,000 500,000 1,050,000SA - Special Assessment Total SF - Sanitary Sewer Fund 01-CIP-S101 5,577,000500,000 1,507,000 1,707,000 500,000 1,363,000Residential Street Improvements and Utilities n/a 01-CIP-S502 150,000150,000Light Rail Transit Stations (3)n/a 08-CIP-B021 10,00010,000Public Works - Replace Wash Bay Roof n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 08-CIP-U001 160,000160,000Lift Station # 4 n/a 15-CIP-S001 375,000375,000Blake Road Corridor Improvements n/a 18-CIP-U016 257,50050,000 50,000 50,000 52,500 55,000Sewer Lining 2 19-CIP-B008 5,0005,000Public Works - Fuel Dispenser Replacement n/a 19-CIP-U017 395,000395,000Trunk Water Main Rehabilitation 2 6,947,5001,250,000 1,575,000 1,757,000 947,500 1,418,000SF - Sanitary Sewer Fund Total SU - Storm Sewer Fund 01-CIP-S101 3,065,000600,000 820,000 940,000 225,000 480,000Residential Street Improvements and Utilities n/a 01-CIP-S502 120,000120,000Light Rail Transit Stations (3)n/a 01-CIP-U002 120,00022,000 23,000 24,000 25,000 26,000Storm Drainage System Maintenance - Alley Repairs n/a 08-CIP-B021 10,00010,000Public Works - Replace Wash Bay Roof n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 15-CIP-S001 100,000100,000Blake Road Corridor Improvements n/a 19-CIP-U017 160,000160,000Trunk Water Main Rehabilitation 2 3,593,000852,000 861,000 964,000 410,000 506,000SU - Storm Sewer Fund Total WF - Water Fund 01-CIP-S101 6,617,000965,000 1,651,000 2,071,000 500,000 1,430,000Residential Street Improvements and Utilities n/a 01-CIP-S502 350,000350,000Light Rail Transit Stations (3)n/a 08-CIP-B021 10,00010,000Public Works - Replace Wash Bay Roof n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 15-CIP-S001 500,000500,000Blake Road Corridor Improvements n/a 19-CIP-B008 5,0005,000Public Works - Fuel Dispenser Replacement n/a 19-CIP-U017 1,950,0001,950,000Trunk Water Main Rehabilitation 2 9,450,0001,830,000 1,669,000 2,071,000 2,450,000 1,430,000WF - Water Fund Total 58,982,75019,346,000 11,449,250 11,391,000 7,012,500 9,784,000GRAND TOTAL Thursday, November 8, 2018 45 46 Project Descriptions And Narratives 47 48 General Public Buildings 49 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Asst City Manager 2019 2023thru Department City Hall Administration Description Full City Hall renovation, combined with other planned maintenance items that were previously shown seperately (lobby and council chambers, roof and carpet replacement). We are recommending to add window replacement to the project from a facility preservation and energy efficiency perspective. Other projects being considered include landscaping & ADA ramping, roof replacement & skylight addition and an indoor/outdoor space. Project #09-CIP-CH030 Priority 1 Urgent Justification Staff has been working with Wold Architects to develop schematic design for City Hall renovations. City Hall was originally developed in 1964 and renovated in 1989. Major changes in operations have occurred over the past 30 years and the City has decided to do one large remodel. There were several minor projects previously planned in the CIP (lobby replacement, council chamber equipment upgrades, city hall roof, city hall carpet), these projects have all been combined into this request. We are also requesting window replacement as an energy efficiency and facility maintenance request. Budget Impact/Other Project is planned for one major project to help reduce the impact on the organization but their will be a significant impact on operations. Public access will need to be temporarily modified during construction and there will be staff relocations necessary during the project. There are limitations and concerns about the impact of the project during the presidential election that have led us to request the project in 2019. This includes bond issuance and interest of $125,000 Useful Life 20 yearsProject Name City Hall Lobby Upgrade Category Bldg: City Hall Type Improvement Future Total Project Cost:$4,395,000 Total20192020202120222023Expenditures 4,395,0004,395,000Construction/Maintenance 4,395,000 4,395,000Total Total20192020202120222023Funding Sources 4,245,0004,245,000CI - Capital Improvement Fund 150,000150,000CT - Cable Franchise Fees 4,395,000 4,395,000Total Wednesday, November 28, 2018 50 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2019 2023thru Department City Hall Administration Description Roof to Roof transition stairs (2) are needed. Currently, the maintenance staff must use step ladders to get to the different levels of the roof top of the City Hall/Police building. Project #19-CIP-CH037 Priority 1 Urgent Justification Safety concerns with the different levels of the roof and the maintenance crews needing to provide service to our roof tops and mechanical equipment. Often the maintenance staff or contractors are needing to carry tool, equipment, and supplies to the different levels on the roof, with needing to this, it is unsafe to climb ladders. Providing roof transistion stairs will give the maintenance personnel a safe and secure way to transition from one level to the next. Budget Impact/Other Useful Life 25 yearsProject Name City Hall - Roof to Roof Transition Stairs (2)Category Bldg: City Hall Type Improvement Future Total Project Cost:$22,000 Total20192020202120222023Expenditures 22,00022,000Construction/Maintenance 22,000 22,000Total Total20192020202120222023Funding Sources 22,00022,000CI - Capital Improvement Fund 22,000 22,000Total Wednesday, November 28, 2018 51 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2019 2023thru Department Comm Svcs - Activity Center Description Existing roof was installed in 1989 and is at the end of its projected useful life. Portion is cost share with Raspberry Ridge Condo Assn. Project #08-CIP-AC018 Priority n/a Justification Roof was installed in 1989 and is at the end of its 25 year useful life. Budget Impact/Other Roof in good condition - move project from 2014 to 2016 and re-evaluate in 2 years. Moved again from 2016 to 2018 and all roof components will be done with one contract for better bids. Move again from 2018 to 2021. Useful Life 25 yearsProject Name Activity Center - Replace Gymnasium Roof Category Buildings: Activity Center Type Improvement Future Total Project Cost:$105,000 Total20192020202120222023Expenditures 105,000105,000Construction/Maintenance 105,000 105,000Total Total20192020202120222023Funding Sources 105,000105,000CI - Capital Improvement Fund 105,000 105,000Total Wednesday, November 28, 2018 52 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2019 2023thru Department Comm Svcs - Activity Center Description Built up asphalt roofing system covering Raspberry Rooms, Craft Room and Hallways at the Activity Center Project #08-CIP-AC024 Priority n/a Justification Existing roof was replaced in 1992. Following inspection in 2018, move out to 2023. Budget Impact/Other Inspection, repair and upkeep of roofing systems prevent deterioration of interior building structure and damage to interior components of building. Variance from 20 year plan: Moved from 2018 to 2023 and all roof components will be done with one contract for better bids. Useful Life 25 yearsProject Name Activity Center - Raspberry Room Roof Replacement Category Buildings: Activity Center Type Improvement Future Total Project Cost:$80,000 Total20192020202120222023Expenditures 80,00080,000Construction/Maintenance 80,000 80,000Total Total20192020202120222023Funding Sources 80,00080,000CI - Capital Improvement Fund 80,000 80,000Total Wednesday, November 28, 2018 53 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2019 2023thru Department Comm Svcs - Activity Center Description Built up Roof on Activity Center Raspberry Rooms and Hallway. Project #09-CIP-AC031 Priority n/a Justification Existing roof was installed in 1992. Budget Impact/Other Variance from 20 year plan: Moved from 2018 to 2023 and all roof components will be done with one contract for better bids. Useful Life 25 yearsProject Name Activity Center - Lower Roof Replacement Category Buildings: Activity Center Type Improvement Future Total Project Cost:$80,000 Total20192020202120222023Expenditures 80,00080,000Construction/Maintenance 80,000 80,000Total Total20192020202120222023Funding Sources 80,00080,000CI - Capital Improvement Fund 80,000 80,000Total Wednesday, November 28, 2018 54 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Activity Ctr Director 2019 2023thru Department Comm Svcs - Activity Center Description Improve both the men's and women's bathrooms with new wallcoverings, flooring, ceiling tiles, lighting, vanities, stall enclosures, dispensers, toilets. Project #17-CIP-AC039 Priority n/a Justification The bathrooms have not had any improvements since the 1990 building improving project except for touch up painting of the walls and stall walls. The stall walls are scratched and chipped. The ceiling tiles are not within code. The dispensers need to be replaced due to their sharp edges. Toilets could be taller to accommodate the primary population we serve here. Budget Impact/Other Useful Life 20 yearsProject Name Activity Center - Bathroom Improvements Category Buildings: Activity Center Type Improvement Future Total Project Cost:$20,000 Total20192020202120222023Expenditures 20,00020,000Construction/Maintenance 20,000 20,000Total Total20192020202120222023Funding Sources 20,00020,000CI - Capital Improvement Fund 20,000 20,000Total Wednesday, November 28, 2018 55 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Activity Ctr Director 2019 2023thru Department Comm Svcs - Activity Center Description Upgrade of the current sign at the corner of 1st St N. and 14th Ave N. to a single sided LED display sign. Project #18-CIP-AC043 Priority n/a Justification City facilities are upgrading their outside signage to LED display signs. The sign draws people to the facility and the activities that occur within the facility or the community. As we continue to find ways to market the Hopkins Activity Center this would be a very helpful visual tool to market the Activity Center's existence as well as advertising the activities that happen within the Activity Center's mission. Budget Impact/Other 2018 - New Item Useful Life 20 yearsProject Name Activity Center - Outdoor Signage Category Buildings: Arts Center Type Improvement Future Total Project Cost:$22,000 Total20192020202120222023Expenditures 22,00022,000Construction/Maintenance 22,000 22,000Total Total20192020202120222023Funding Sources 22,00022,000CI - Capital Improvement Fund 22,000 22,000Total Wednesday, November 28, 2018 56 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Activity Ctr Director 2019 2023thru Department Comm Svcs - Activity Center Description Several projects have been proposed in previous CIPs. With the unknowns of the future of the Historical Society, we would like to combine several projects into one larger project and complete a facility needs assessment in 2019. Project #19-CIP-AC045 Priority n/a Justification "The project would aim to update several areas of the facility that have not been updated since 1990 (some areas were renovated in 2012) and address a few larger concerns: use of former historical society area, eastside room configurations (increases maximum capacity of the gymnasium), office/reception enhancements. We will spend 2018 gathering data on current programming usage, 2019 developing a plan and 2020 would be construction. We would also suggest to correlate AV updates to the facility with the project. " Budget Impact/Other Useful Life 30 yearsProject Name Activity Center - Facility Improvements Category Buildings: Activity Center Type Improvement Future Total Project Cost:$185,000 Total20192020202120222023Expenditures 185,00010,000 175,000Construction 10,000 175,000 185,000Total Total20192020202120222023Funding Sources 185,00010,000 175,000CI - Capital Improvement Fund 10,000 175,000 185,000Total Wednesday, November 28, 2018 57 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Activity Ctr Director 2019 2023thru Department Comm Svcs - Activity Center Description "Install additional acoustical panels in the gymnasium to enhance our guests hearing experiences when attending classes, lectures, health fairs, dinners, and recreational events. " Project #19-CIP-AC048 Priority n/a Justification We added 1 row of acoustical panels on the gym walls in 2017. Even though the panels have helped in the sound issues in the gym, more assistance is needed. Another row of acoustical panels will help our older participants when trying to listen to instructors, speakers, individual conversation at health fairs and dinners, enjoying musical and recreational events. Budget Impact/Other Useful Life 30 yearsProject Name Activity Center - Gym Acoustical Panels Category Buildings: Activity Center Type Improvement Future Total Project Cost:$15,000 Total20192020202120222023Expenditures 15,00015,000Construction 15,000 15,000Total Total20192020202120222023Funding Sources 15,00015,000CI - Capital Improvement Fund 15,000 15,000Total Wednesday, November 28, 2018 58 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2019 2023thru Department Comm Svcs - Arts Center Description Replace main Theater front curtains Project #17-CIP-AR004 Priority 3 Important Justification Due to age of theater curtains, I am suggesting replacement. They have become frayed at the bottom. Estimated cost based on online research. Budget Impact/Other Useful Life 15 yearsProject Name Arts Center - Theater Curtains Category Buildings: Arts Center Type Improvement Future Total Project Cost:$80,000 Total20192020202120222023Expenditures 80,00080,000Construction/Maintenance 80,000 80,000Total Total20192020202120222023Funding Sources 80,00080,000AC - Arts Center Fund 80,000 80,000Total Wednesday, November 28, 2018 59 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2019 2023thru Department Comm Svcs - Arts Center Description Integrate Arts Center, Heating, Ventilation, and Air Conditioning systems (HVAC) into our building automation system. Project #18-CIP-AR008 Priority 1 Urgent Justification Centralize the control of the buildings HVAC system, the objectives are to improve occupant comfort, efficient operation of the building systems, reduction in operating costs, and improved life cycle of utilities. With the upgraded roof top units installed in 2017, this would be the time to get the Arts Center integrated into our system with these moden units. Budget Impact/Other Useful LifeProject Name Arts Center - Building Automation System Category Buildings: Arts Center Type Improvement Future Total Project Cost:$30,000 Total20192020202120222023Expenditures 30,00030,000Construction/Maintenance 30,000 30,000Total Total20192020202120222023Funding Sources 30,00030,000AC - Arts Center Fund 30,000 30,000Total Wednesday, November 28, 2018 60 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2019 2023thru Department Comm Svcs - Arts Center Description 2019: Replace Arts Center's carpeting in spaces (Community room/Conference room/Green Room.) Expected life span: 8-10 years Estimate: $30,000 2020: Various rooms as needed Estimated life span: 8-10 years Estimate: $22,000 2021: Replace office carpet (Stages) Estimated life span: 8-10 years Estimate: $22,000 Project #19-CIP-AR001 Priority 2 Very Important Justification Based on wear, replace in areas needed in order to maintain overall appearance of the Center. Budget Impact/Other Presentability of Center - appealing to customers Useful Life 10 yearsProject Name Arts Center - Carpeting Category Buildings: Arts Center Type Improvement Future Total Project Cost:$74,000 Total20192020202120222023Expenditures 74,00030,000 22,000 22,000Construction/Maintenance 30,000 22,000 22,000 74,000Total Total20192020202120222023Funding Sources 74,00030,000 22,000 22,000AC - Arts Center Fund 30,000 22,000 22,000 74,000Total Wednesday, November 28, 2018 61 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2019 2023thru Department Comm Svcs - Arts Center Description Larger outdoor signage for front of building : Hopkins Center for the Arts, incorporating logo and special lighting. Estimated cost: $10,000 Project #19-CIP-AR002 Priority 2 Very Important Justification As we strengthen the identity of the Center, the initial impact/identification is vital. Currently the Center's signage above the front entrance is obstructed by trees, making Stages Theatre Company the most visable. Improvements would include larger signage, placed in a more visible location, and possibly incorporating the logo and adding accent lighting to the front of the building. Budget Impact/Other Useful Life 20 yearsProject Name Arts Center - Outdoor Signage/lighting Category Buildings: Arts Center Type Improvement Future Total Project Cost:$10,000 Total20192020202120222023Expenditures 10,00010,000Construction 10,000 10,000Total Total20192020202120222023Funding Sources 10,00010,000AC - Arts Center Fund 10,000 10,000Total Wednesday, November 28, 2018 62 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2019 2023thru Department Comm Svcs - Arts Center Description 2020: Re-seal floors - Kitchen & restrooms Estimated life span: 5years Estimate: $15,000 Annual maintenance done yearly at a cost of $2000 Project #19-CIP-AR003 Priority n/a Justification In order to keep tile flooring and grout looking clean and protected. Budget Impact/Other Presentability of Center - appealing to customers Useful Life 5 yearsProject Name Arts Center - Tile Flooring Category Buildings: Arts Center Type Improvement Future Total Project Cost:$15,000 Total20192020202120222023Expenditures 15,00015,000Construction/Maintenance 15,000 15,000Total Total20192020202120222023Funding Sources 15,00015,000AC - Arts Center Fund 15,000 15,000Total Wednesday, November 28, 2018 63 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2019 2023thru Department Comm Svcs - Arts Center Description Replace Arts Center's water fountains to include water bottle filling stations. 4 stations @ $2400 each. Plumbing work estimate: $1500 Total estimated cost: $11,100 Project #19-CIP-AR004 Priority 5 Future Consideration Justification The current fountains make it difficult to fill anything taller than a coffee mug completely. Adding the water bottle filling station promotes reusuable containers instead of purchasing bottled water. Budget Impact/Other Increased service to customers Useful Life 20 yearsProject Name Arts Center - Water Fountain Replacement Category Buildings: Arts Center Type Improvement Future Total Project Cost:$11,100 Total20192020202120222023Expenditures 11,10011,100Construction/Maintenance 11,100 11,100Total Total20192020202120222023Funding Sources 11,10011,100AC - Arts Center Fund 11,100 11,100Total Wednesday, November 28, 2018 64 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2019 2023thru Department Comm Svcs - Arts Center Description Retrofitting Center exterior HCA and Stages staff entrances with keycard access. The estimate for the work to equip HCA back entrance, Stages back entrance, and Green Room street entrance is $18,000 (2019.) Retrofitting interior doors over a series of 2-3 years and software upgrades is estimated at $20,000 each year (2020 - 2022) Project #19-CIP-AR005 Priority 2 Very Important Justification Installing keycard access would allow better control of who is allowed to enter the building as well as the ability to track who is in the building. Stages Theatre Company has many staff members, and many who are contracted, working as needed on a project. The contracted employees are given keys when needed, however, from a building management standpoint, it is difficult to track and make sure that people don't have access to the building that shouldn't. Long-term the goal is to key all interior office and room doors with the same system, primarily to be able to keep key situation under better control and to allow for a safe lock-down procedure if ever needed. Budget Impact/Other Useful LifeProject Name Arts Center - Key Card Exterior & Interior Access Category Buildings: Arts Center Type Improvement Future Total Project Cost:$78,000 Total20192020202120222023Expenditures 78,00018,000 20,000 20,000 20,000Construction/Maintenance 18,000 20,000 20,000 20,000 78,000Total Total20192020202120222023Funding Sources 78,00018,000 20,000 20,000 20,000AC - Arts Center Fund 18,000 20,000 20,000 20,000 78,000Total Wednesday, November 28, 2018 65 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2019 2023thru Department Comm Svcs - Arts Center Description Replacing fire panel. Project #19-CIP-AR006 Priority 2 Very Important Justification Current system is outdated and obselete. Additional cost has occurred when needed to repair due to age. Budget Impact/Other Useful LifeProject Name Arts Center - Fire Panel Category Buildings: Arts Center Type Improvement Future Total Project Cost:$30,000 Total20192020202120222023Expenditures 30,00030,000Construction 30,000 30,000Total Total20192020202120222023Funding Sources 30,00030,000AC - Arts Center Fund 30,000 30,000Total Wednesday, November 28, 2018 66 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2019 2023thru Department Comm Svcs - Arts Center Description Replacement of Roof Project #19-CIP-AR007 Priority 2 Very Important Justification Facility originally built in 1997. Budget Impact/Other Useful LifeProject Name Arts Center - Roof Replacement Category Buildings: Arts Center Type Improvement Future Total Project Cost:$150,000 Total20192020202120222023Expenditures 150,000150,000Construction 150,000 150,000Total Total20192020202120222023Funding Sources 150,000150,000AC - Arts Center Fund 150,000 150,000Total Wednesday, November 28, 2018 67 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2019 2023thru Department Fire Description Replace boilers Project #08-CIP-FD123 Priority n/a Justification Budget Impact/Other Useful LifeProject Name Fire Station - Replace Boilers Category Buildings: Fire Facilities Type Improvement Future Total Project Cost:$45,000 Total20192020202120222023Expenditures 45,00045,000Construction/Maintenance 45,000 45,000Total Total20192020202120222023Funding Sources 45,00045,000CI - Capital Improvement Fund 45,000 45,000Total Wednesday, November 28, 2018 68 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Fire Chief 2019 2023thru Department Fire Description Garage Door Openers for all station doors Project #19-CIP-FD001 Priority 2 Very Important Justification Door will be 16 years old in 2020. With constant use of the door the recommended life is 10 years. Budget Impact/Other Useful Life 10 yearsProject Name Fire - Garage Door Openers Category Buildings: Fire Facilities Type Improvement Future Total Project Cost:$24,000 Total20192020202120222023Expenditures 24,00024,000Construction/Maintenance 24,000 24,000Total Total20192020202120222023Funding Sources 24,00024,000CI - Capital Improvement Fund 24,000 24,000Total Wednesday, November 28, 2018 69 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2019 2023thru Department Pavilion Description Purchase and installation of (3) rooftop HVAC units that supply heating and cooling to the Pavilion Mazzanine Project #13-CIP-PV321 Priority 1 Urgent Justification The current units were installed in 2003 and are at the end of their useful life. All three units are in need of costly repairs if not replaced. Budget Impact/Other Variance from 20 year plan- increase cost from $30,000 to $45,000 Useful Life 15 yearsProject Name Pavilion Mezzanine Rooftop Unit Replacement Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$45,000 Total20192020202120222023Expenditures 45,00045,000Construction/Maintenance 45,000 45,000Total Total20192020202120222023Funding Sources 45,00045,000PA - Pavilion Fund 45,000 45,000Total Wednesday, November 28, 2018 70 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2019 2023thru Department Pavilion Description Purchase and installation of (1) rooftop HVAC unit that supply's heating and cooling to the High School Team Rooms. Project #13-CIP-PV322 Priority 1 Urgent Justification The current unit was installed in 2004 and is at the end of its useful life. Budget Impact/Other Variance from 20 year plan-increase from $11,000 to $15,000 and move from 2019 to 2020 Useful Life 15 yearsProject Name Pavilion HHS Team Room Rooftop Unit Repl Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$15,000 Total20192020202120222023Expenditures 15,00015,000Construction/Maintenance 15,000 15,000Total Total20192020202120222023Funding Sources 15,00015,000PA - Pavilion Fund 15,000 15,000Total Wednesday, November 28, 2018 71 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2019 2023thru Department Pavilion Description Purchase of a turf system for the Pavilion's arena turf programs. Project #19-CIP-PV330 Priority 2 Very Important Justification The current system was purchased in 1998 and has exceeded its useful life. Seams have begun to fray, the velcro is worn, and areas torn have been patched. Budget Impact/Other Useful Life 15 yearsProject Name Pavilion - Indoor Turf System Replacement Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$90,000 Total20192020202120222023Expenditures 90,00090,000Construction/Maintenance 90,000 90,000Total Total20192020202120222023Funding Sources 90,00090,000PA - Pavilion Fund 90,000 90,000Total Wednesday, November 28, 2018 72 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2019 2023thru Department Pavilion Description Replace the (60) T8 High Bay Lighting Fixtures used to light the arena with more energy efficient LED High Bay Fixtures. Project #19-CIP-PV331 Priority 2 Very Important Justification LED lighting is more energy effcient and needs less maintenance. Several times a year we are replacing T8 bulbs and ballasts that burn out. LED bulbs last longer and will require less energy and have a much longer life cycle. Budget Impact/Other Useful Life 15-20 yearsProject Name Pavilion - Arena Lighting Replacement Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$10,000 Total20192020202120222023Expenditures 10,00010,000Construction/Maintenance 10,000 10,000Total Total20192020202120222023Funding Sources 10,00010,000PA - Pavilion Fund 10,000 10,000Total Wednesday, November 28, 2018 73 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2019 2023thru Department Pavilion Description Upgrade current sound system components and add to the system to allow for music and annoucments to be heard in the outdoor skating areas and park. Project #19-CIP-PV332 Priority 2 Very Important Justification The current system has not beeen upgraded since 2002 and does not currently allow for areas to operate independately. This upgrade would allow for inside arena announcing, lobby music, and outside rink music simultaneously. Budget Impact/Other Useful Life 15 yearsProject Name Pavilion - Pav/Cent Park Sound System Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$28,000 Total20192020202120222023Expenditures 28,00028,000Construction/Maintenance 28,000 28,000Total Total20192020202120222023Funding Sources 28,00028,000PA - Pavilion Fund 28,000 28,000Total Wednesday, November 28, 2018 74 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Police Chief 2019 2023thru Department Police Description Replace Police Station Carpeting Project #08-CIP-PD016 Priority n/a Justification Planned replacement at end of estimated 10 year useful life. This is a 24hour/day work center that requires the shorter carpet replacement cycle. Carpet replacement not needed as much as kitchen/office furniture. Moved out to 2020 rather than 2018. Budget Impact/Other Received estimate in 2018 for project, costs $69k & added 2 years of inflation @ 3% in 2020. Useful Life 10 yearsProject Name Replace Carpet - Police Station Category Buildings: Police Department Type Improvement Future Total Project Cost:$73,250 Total20192020202120222023Expenditures 73,25073,250Construction/Maintenance 73,250 73,250Total Total20192020202120222023Funding Sources 73,25073,250CI - Capital Improvement Fund 73,250 73,250Total Wednesday, November 28, 2018 75 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2019 2023thru Department Public Works: Bldg/Equip Ser Description Replace Wash Bay Roof Project #08-CIP-B021 Priority n/a Justification Budget Impact/Other Move project from 2020 to 2019. Useful LifeProject Name Public Works - Replace Wash Bay Roof Category Buildings: Public Works Type Improvement Future Total Project Cost:$50,000 Total20192020202120222023Expenditures 50,00050,000Construction/Maintenance 50,000 50,000Total Total20192020202120222023Funding Sources 10,00010,000CI - Capital Improvement Fund 10,00010,000RF - Refuse Fund 10,00010,000SF - Sanitary Sewer Fund 10,00010,000SU - Storm Sewer Fund 10,00010,000WF - Water Fund 50,000 50,000Total Wednesday, November 28, 2018 76 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2019 2023thru Department Public Works: Bldg/Equip Ser Description Replace overhead doors Project #08-CIP-B023 Priority n/a Justification Budget Impact/Other Moved from 2019 to 2020 Useful LifeProject Name Public Works - Replace Overhead Doors Category Buildings: Public Works Type Improvement Future Total Project Cost:$90,000 Total20192020202120222023Expenditures 90,00090,000Construction/Maintenance 90,000 90,000Total Total20192020202120222023Funding Sources 18,00018,000CI - Capital Improvement Fund 18,00018,000RF - Refuse Fund 18,00018,000SF - Sanitary Sewer Fund 18,00018,000SU - Storm Sewer Fund 18,00018,000WF - Water Fund 90,000 90,000Total Wednesday, November 28, 2018 77 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2019 2023thru Department Public Works: Bldg/Equip Ser Description Built up roof on Wash Bay and Eastern third of Maintenance Shop. Project #09-CIP-B034 Priority n/a Justification Existing roof was installed in 1995, estimated replacement due in 2019. Budget Impact/Other Move PW washbay roof replacement up 1 year from 2020 to 2019. Useful Life 25 yearsProject Name Public Works Garage Roof Replacement Category Buildings: Public Works Type Improvement Future Total Project Cost:$50,000 Total20192020202120222023Expenditures 50,00050,000Construction/Maintenance 50,000 50,000Total Total20192020202120222023Funding Sources 50,00050,000CI - Capital Improvement Fund 50,000 50,000Total Wednesday, November 28, 2018 78 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Bldg/Equip Ser Description Painting of all the exterior walls on the Excelsior side and of the office area on the west side of the building Project #18-CIP-B007 Priority n/a Justification This area has not been painted in 20+ years, this is all of the original building. The Excelsior side is very faded, chipped and peeling. Budget Impact/Other Useful LifeProject Name PW Exterior Painting Category Buildings: Public Works Type Unassigned Future Total Project Cost:$25,000 Total20192020202120222023Expenditures 25,00025,000Construction/Maintenance 25,000 25,000Total Total20192020202120222023Funding Sources 25,00025,000CI - Capital Improvement Fund 25,000 25,000Total Wednesday, November 28, 2018 79 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2019 2023thru Department Public Works: Bldg/Equip Ser Description Unleaded and Diesel fuel dispensers at Public Works over due for replacement. Project #19-CIP-B008 Priority n/a Justification Existing fuel dispensers were installed in 2004, with a 12 year useful life, the fuel dispensers are 2 years past due for replacements. These fuel dispensers provide fuel to all city departments including Fire and Police. Must have the ability to provide dependable fuel service 24/7 365. Budget Impact/Other Useful Life 10 - 12 yearsProject Name Public Works - Fuel Dispenser Replacement Category Buildings: Public Works Type Improvement Future Total Project Cost:$20,000 Total20192020202120222023Expenditures 20,00020,000Construction/Maintenance 20,000 20,000Total Total20192020202120222023Funding Sources 5,0005,000CI - Capital Improvement Fund 5,0005,000RF - Refuse Fund 5,0005,000SF - Sanitary Sewer Fund 5,0005,000WF - Water Fund 20,000 20,000Total Wednesday, November 28, 2018 80 Parks and Recreation 81 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Parks Description Clean, recoat and restripe for tennis. Repairs are next scheduled in 2026 Total reconstruction due in 2033 - 4 courts Project #05-CIP-P202 Priority n/a Justification New courts paved in 2008. Periodic court surface rehab is needed to ensure a quality play surface. Play surface was last repaired in 2012. Budget Impact/Other Useful Life 20 yearsProject Name Central Park Tennis Courts Category Parks/Fores/Pav.: Neighborhoo Type Improvement Future Total Project Cost:$585,000 Total20192020202120222023Expenditures 10,00010,000Construction/Maintenance 10,000 10,000Total Total20192020202120222023Funding Sources 10,00010,000PDF- Park Dedication Fund 10,000 10,000Total Wednesday, November 28, 2018 82 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Parks Description Repair tennis courts - $20,000 2023 - Tennis Courts Reconstruct = $130,000 (2 courts) Project #13-CIP-P044 Priority n/a Justification Periodic repairs needed to ensure quality safe playing surface Budget Impact/Other Revised estimated costs to $130k (from $180k) Useful LifeProject Name Oakes Park - Tennis Courts Category Parks/Fores/Pav.: Comm. Facil. Type Improvement Future Total Project Cost:$150,000 Total20192020202120222023Expenditures 130,000130,000Construction/Maintenance 130,000 130,000Total Total20192020202120222023Funding Sources 130,000130,000PDF- Park Dedication Fund 130,000 130,000Total Wednesday, November 28, 2018 83 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Parks Description Warming House - Roofing, timber structure maintenance, restroom upgrades. Project #13-CIP-P063 Priority n/a Justification Budget Impact/Other 2019 - Moved project from 2020 to 2022 w/ $20k increase in expenditures Useful LifeProject Name Maetzold Field - Pavilion Category Parks/Fores/Pav.: Comm. Facil. Type Improvement Future Total Project Cost:$100,000 Total20192020202120222023Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total20192020202120222023Funding Sources 100,000100,000PDF- Park Dedication Fund 100,000 100,000Total Wednesday, November 28, 2018 84 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Parks Description Replace/Rehab existing picnic shelter. Project #13-CIP-P066 Priority 3 Important Justification Existing picnic shelter is 30+ years old and deteriorated. Budget Impact/Other Useful LifeProject Name Shady Oak Beach - Picnic Shelter Category Parks/Fores/Pav.: Comm. Facil. Type Improvement Future Total Project Cost:$150,000 Total20192020202120222023Expenditures 150,000150,000Construction 150,000 150,000Total Total20192020202120222023Funding Sources 100,000100,000GU - Other Governmental Units 50,00050,000PDF- Park Dedication Fund 150,000 150,000Total Wednesday, November 28, 2018 85 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Parks Description Rehab or replace two existing picnic shelters. Project #13-CIP-P068 Priority 3 Important Justification The two existing park shelters are 30+ years old and require replacement/rehab. Budget Impact/Other Useful LifeProject Name Valley Park - Picnic Shelter Category Parks/Fores/Pav.: Comm. Facil. Type Improvement Future Total Project Cost:$150,000 Total20192020202120222023Expenditures 150,000150,000Construction 150,000 150,000Total Total20192020202120222023Funding Sources 150,000150,000PDF- Park Dedication Fund 150,000 150,000Total Wednesday, November 28, 2018 86 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Parks Description Improvements to the area around the creek bound by Blaker Road, Lake St and Minnehaha Creek Project #16-CIP-P002 Priority n/a Justification Budget Impact/Other 2019 - Moved project from 2019 to 2020. Useful LifeProject Name Cottageville Park - Phase III Improvements Category Parks/Fores/Pav.: Comm. Facil. Type Improvement Future Total Project Cost:$450,000 Total20192020202120222023Expenditures 450,000450,000Construction/Maintenance 450,000 450,000Total Total20192020202120222023Funding Sources 450,000450,000PDF- Park Dedication Fund 450,000 450,000Total Wednesday, November 28, 2018 87 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2019 2023thru Department Public Works: Parks Description Rehab Downtown Park landscaping & lighting Project #17-CIP-P004 Priority 3 Important Justification Heavily used urban park needs renewal of features. Budget Impact/Other Useful Life 25 yearsProject Name Downtown Park Rehab Category PW - Parks Type Improvement Future Total Project Cost:$100,000 Total20192020202120222023Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total20192020202120222023Funding Sources 100,000100,000PDF- Park Dedication Fund 100,000 100,000Total Wednesday, November 28, 2018 88 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2019 2023thru Department Public Works: Parks Description Install artificial turf cricket pitch area Project #17-CIP-P005 Priority n/a Justification Oakes park has been a heavily used location for cricket league and tournament play. An improved, easier to maintain pitch area is needed. Budget Impact/Other 2018 - New Item Useful Life 10 yearsProject Name Oakes Park Cricket Pitch Category PW - Parks Type Improvement Future Total Project Cost:$25,000 Total20192020202120222023Expenditures 25,00025,000Construction/Maintenance 25,000 25,000Total Total20192020202120222023Funding Sources 25,00025,000PDF- Park Dedication Fund 25,000 25,000Total Wednesday, November 28, 2018 89 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Parks Description Improve quality of recreation opportunities, access and appearance of this large community park. Improvements include: new play & exercise features, new trails and trail lighting, new community plaza area, reconfigured traffic lanes & parking, new park entrance features and picnic shelteres. Upgrade the existing 20+ year old metal halide softball field lighting to new LED fixtures. Project #19-CIP-P001 Priority n/a Justification As a community park, there is a need for more general family recreational attractions and to connect the new Pavilion Addition/community building to the park and eliminate the current drive-thru land in order to help make connection via a new community multi-purpose plaza area. The existing softball field lighting fixtures are near the end of life span and do not provide adequate lighting levels for tournament level play. Budget Impact/Other Useful Life 30 yearsProject Name Central Park Improvements Category PW - Parks Type Improvement Future Total Project Cost:$1,300,000 Total20192020202120222023Expenditures 1,300,0001,300,000Construction 1,300,000 1,300,000Total Total20192020202120222023Funding Sources 1,300,0001,300,000PDF- Park Dedication Fund 1,300,000 1,300,000Total Wednesday, November 28, 2018 90 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Parks Description Improve the quality of lighting, including lighting levels and efficency at Harley Hopkins, Interlachen, Valley & Hilltop Park. Project #19-CIP-P002 Priority n/a Justification The current lighting is old, deteriorated, energy inefficent halogen with poles and/or wiring at or near the end of their useful lives. Budget Impact/Other Useful Life 20 yearsProject Name Park Lighting Upgrade Category PW - Parks Type Improvement Future Total Project Cost:$250,000 Total20192020202120222023Expenditures 250,000250,000Construction 250,000 250,000Total Total20192020202120222023Funding Sources 250,000250,000PDF- Park Dedication Fund 250,000 250,000Total Wednesday, November 28, 2018 91 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2019 2023thru Department Recreation Description The joint recreation agreement in place between the cities of Hopkins and Minnetonka provides for the sharing of operational and maintenance expenses for Shady Oak Beach. These expenses are split 33% city of Hopkins and 67% city of Minnetonka. Shady Oak Beach is operated from June - August annually; however the park is available for use year round. Project #16-CIP-R003 Priority 3 Important Justification Since last undergoing a renovation in 1998, Shady Oak Beach contiues to be a primary park destination for residents of Hopkins and Minnetonka. Scheduled items are intended to keep the park in excellent appearence, establish a gateway to the park, and to provide park users with a quality recreational experience. 2018: Construction of a monument sign that features the park entrance. 2019: Preventative interior and exterior building maintenance, interior and exterior lighting upgrades, and irrigation improvements. 2020: Water play inflatable amenities. 2022: Miscellaneous building components. Budget Impact/Other Variance from 20 year plan - New item Useful Life 10-20 yearsProject Name Shady Oak Beach Improvements Category PW - Parks Type Improvement Future Total Project Cost:$275,000 Total20192020202120222023Expenditures 110,00035,000 50,000 25,000Construction/Maintenance 35,000 50,000 25,000 110,000Total Total20192020202120222023Funding Sources 73,80023,500 33,500 16,800GU - Other Governmental Units 36,20011,500 16,500 8,200PDF- Park Dedication Fund 35,000 50,000 25,000 110,000Total Wednesday, November 28, 2018 92 Streets, Traffic & Transportation 93 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Streets/Traffic Description Locations to be determined consistent with the street reconstruction program. Program includes reconstruction of deteriorated water main, sanitary sewer and storm sewer in conjunction with street improvement projects. Utility improvements are consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. 2019: Cambridge Street/Hiawatha Avenue/Lake Street Reconstruction Project 2020-2021: Interlachen Park Reconstruction Project 2022: 6th Ave South/7th Ave South 2023: Central Avenues Reconstruction Project #01-CIP-S101 Priority n/a Justification In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installed new. In most cases, water main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The costs assume the city funding 100% of major storm sewer, water main, and sanitary sewer improvements. Budget Impact/Other Public Hearing - year prior to planned construction Plans and specifications - year prior to planned construction Bid - year of planned construction Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections. Consistent with the City Council adopted Roadway Improvement Policy, Street Ratings, Pavement Management Program, Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. Useful Life UnassignedProject Name Residential Street Improvements and Utilities Category Trans: Streets Type Improvement Future Total Project Cost:$51,242,000 Total20192020202120222023Expenditures 32,403,0005,575,000 8,570,000 9,390,000 2,375,000 6,493,000Construction/Maintenance 5,575,000 8,570,000 9,390,000 2,375,000 6,493,000 32,403,000Total Total20192020202120222023Funding Sources 11,144,0002,260,000 2,992,000 3,072,000 650,000 2,170,000PI - PIR/General Obligation Bonds 6,000,0001,250,000 1,600,000 1,600,000 500,000 1,050,000SA - Special Assessment 5,577,000500,000 1,507,000 1,707,000 500,000 1,363,000SF - Sanitary Sewer Fund 3,065,000600,000 820,000 940,000 225,000 480,000SU - Storm Sewer Fund 6,617,000965,000 1,651,000 2,071,000 500,000 1,430,000WF - Water Fund 5,575,000 8,570,000 9,390,000 2,375,000 6,493,000 32,403,000Total Wednesday, November 28, 2018 94 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Streets/Traffic Description County Road 3 from Shady Oak Road to Meadowbrook Road. Lighting, landscaping, street, etc. improvements along Excelsior Boulevard from the east to west city limits. GO Bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue Project has been delayed pending county funding for remaining 4th segement. Project #01-CIP-S104 Priority n/a Justification Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in remaining segment of County Road 3. - Segment 4 from Blake Road to Meadowbrook Road; upgrade roadway, implement beautification program. Budget Impact/Other GO bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue. Segment 4: Planning and acquisition - Not in County Funding Plan, when funded city will complete our portion. Consistent with Hennepin County CIP and City Council action. Useful Life UnassignedProject Name County Road 3 Category Trans: Streets Type Improvement Future Total Project Cost:$2,300,000 Total20192020202120222023Expenditures 2,300,0002,300,000Construction/Maintenance 2,300,000 2,300,000Total Total20192020202120222023Funding Sources 1,600,0001,600,000GU - Other Governmental Units 700,000700,000MS - Municipal State Aid Streets 2,300,000 2,300,000Total Wednesday, November 28, 2018 95 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2019 2023thru Department Public Works: Streets/Traffic Description Painting bike lanes, constructing trails and sidewalks, safety improvements and other general pedestrian and bicycle improvements to the system. 2020: Upgrade of the 11th Avenue South pedestrian crossings in the Westbrooke Area to pedestrian activated RRFB. Project #13-CIP-S040 Priority n/a Justification Council adopted plan to increase pedestrian and bicycle access and safety, these improvements begin to implement that plan. The existing overhead flushers provide very little benefit. Pedestrian activated rectangular rapid flushing beacons (RRFB) have shown to provide very high compliance for motorists and increases pedestrian safety and comfort. Budget Impact/Other Useful Life 20 yearsProject Name Pedestrian & Bicycle Access Improvements Category Trans: Streets Type Improvement Future Total Project Cost:$325,000 Total20192020202120222023Expenditures 200,00025,000 100,000 25,000 25,000 25,000Construction/Maintenance 25,000 100,000 25,000 25,000 25,000 200,000Total Total20192020202120222023Funding Sources 200,00025,000 100,000 25,000 25,000 25,000PI - PIR/General Obligation Bonds 25,000 100,000 25,000 25,000 25,000 200,000Total Wednesday, November 28, 2018 96 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2019 2023thru Department Public Works: Streets/Traffic Description Blake Road,from Excelsior Blvd to state trunk Highway 7, will be reconstructed to enhance accommodations for pedestrians, bicycles, and buses, improve access to adjacent neighborhoods, provide the necessary infrastructure to support redevelopment and enhance economic growth along the corridor, improve and enhance traffic flow at major intersections/interchanges, and provide for access to the planned SWLRT Blake Station.The roadway will be improved and pedestrian facilities will be constructed south of Excelsior Blvd to the city limit. Project #15-CIP-S001 Priority n/a Justification Blake road is a heavily travelled thoroughfare and currently a county road between Excelsior Boulevard and TH7. The construction of a SWLRT station at Blake Road will increase traffic and present significant redevelopment opportunity along the corridor. Many traffic issues exist along Blake Road including lack of pedestrian accommodations, congestion and poor access. The City of Hopkins completed a study in partnership with the cities of Edina and St. Louis Park, Hennepin County, MNDOT, the Minnehaha Creek Watershed District, Three Rivers Park District, and the SWLRT project office to develop a plan for the future transportation needs of the corridor. Construction began in 2018 and will be completed in 2019. Budget Impact/Other Consistent with the City Council adopted roadway improvement policy. Useful LifeProject Name Blake Road Corridor Improvements Category Trans: Streets Type Improvement Future Total Project Cost:$18,398,600 Total20192020202120222023Expenditures 7,449,9007,449,900Construction/Maintenance 7,449,900 7,449,900Total Total20192020202120222023Funding Sources 5,704,6005,704,600GU - Other Governmental Units 770,300770,300PI - PIR/General Obligation Bonds 375,000375,000SF - Sanitary Sewer Fund 100,000100,000SU - Storm Sewer Fund 500,000500,000WF - Water Fund 7,449,900 7,449,900Total Wednesday, November 28, 2018 97 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Streets/Traffic Description Location to be determined based on Pavement Management Program. Program includes mill and overlay of deteriorated pavements to extend the useful life of the street. Streets for this method of rehabilitation have usually been rehabilitated or reconstructed within the last 20 years. Project #16-CIP-S041 Priority n/a Justification Properly timed mill and overlay projects can significantly extend the life of a street and delay the need for reconstruction. Mill and overlay projects also require less disturbance and are shorter in duration than reconstruction, which results in less impact of the traveling public. Budget Impact/Other Annual pavement rehabilitation category. Useful LifeProject Name Street Overlay Improvements Category Trans: Streets Type Improvement Future Total Project Cost:$2,700,000 Total20192020202120222023Expenditures 1,875,000325,000 350,000 375,000 400,000 425,000Construction/Maintenance 325,000 350,000 375,000 400,000 425,000 1,875,000Total Total20192020202120222023Funding Sources 1,875,000325,000 350,000 375,000 400,000 425,000PI - PIR/General Obligation Bonds 325,000 350,000 375,000 400,000 425,000 1,875,000Total Wednesday, November 28, 2018 98 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Streets/Traffic Description Replacement of aged regulatory and warning signs that have lost minimum retroreflectivity and replacement of posts, when needed. Project #16-CIP-S042 Priority n/a Justification The city is required to have a sign management program which includes a sign replacement strategy to ensure regulatory and warning signs provide adequate retroreflectivity. Sign replacement cycle is 8 years. Estimated costs assume sign replacements by contract. Parking signs will be replaced as needed due to age, fading, etc. Sign inventory data base will be updated to reflect install date/sign age. Budget Impact/Other Useful LifeProject Name Street Sign Management Category Trans: Streets Type Improvement Future Total Project Cost:$160,000 Total20192020202120222023Expenditures 100,00020,000 20,000 20,000 20,000 20,000Construction/Maintenance 20,000 20,000 20,000 20,000 20,000 100,000Total Total20192020202120222023Funding Sources 100,00020,000 20,000 20,000 20,000 20,000PI - PIR/General Obligation Bonds 20,000 20,000 20,000 20,000 20,000 100,000Total Wednesday, November 28, 2018 99 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Transportation Description Supplemental improvements to 3 Light Rail Transit (LRT) station areas in the proposed locations, which includes accomodations for the relocation of proposed storm water facilities, extension of municipal utilities, traffic signal adjustments and other miscellaneous aesthetic items. Project #01-CIP-S502 Priority n/a Justification Three stations along the Southwest Corridor in Hopkins. The proposed expenditures would be in addition to the funds expended by the Metropolitan Council. The additional funds would be used to ensure the stations are high quality in appearance, and maximize redevelopment potential in the station areas. These improvements came out of recent transit oriented development planning recommendations. Budget Impact/Other Dependent on Metropolitan Council plans. Consistent with LRT and station plans. Useful Life UnassignedProject Name Light Rail Transit Stations (3)Category Trans: Streets Type Improvement Future Total Project Cost:$1,420,000 Total20192020202120222023Expenditures 1,420,000620,000 800,000Construction/Maintenance 620,000 800,000 1,420,000Total Total20192020202120222023Funding Sources 800,000800,000PI - PIR/General Obligation Bonds 150,000150,000SF - Sanitary Sewer Fund 120,000120,000SU - Storm Sewer Fund 350,000350,000WF - Water Fund 620,000 800,000 1,420,000Total Wednesday, November 28, 2018 100 Utilities 101 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Utilities Description Annual concrete repairs and patching of existing alleys. Project #01-CIP-U002 Priority n/a Justification Annual alley pavement concrete slab repairs are needed. Budget Impact/Other Consistent with the Storm Water Management Plan. Useful Life UnassignedProject Name Storm Drainage System Maintenance - Alley Repairs Category Utilities: Municipal Sanitary Se Type Improvement Future Total Project Cost:$309,000 Total20192020202120222023Expenditures 120,00022,000 23,000 24,000 25,000 26,000Construction/Maintenance 22,000 23,000 24,000 25,000 26,000 120,000Total Total20192020202120222023Funding Sources 120,00022,000 23,000 24,000 25,000 26,000SU - Storm Sewer Fund 22,000 23,000 24,000 25,000 26,000 120,000Total Wednesday, November 28, 2018 102 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Utilities Description Rehabilitate LS No. 4 Project #08-CIP-U001 Priority n/a Justification Lift station No. 4 was identified for rehab in the latest comprehensive utility plan Budget Impact/Other Useful LifeProject Name Lift Station # 4 Category Utilities: Municipal Sanitary Se Type Improvement Future Total Project Cost:$160,000 Total20192020202120222023Expenditures 160,000160,000Construction/Maintenance 160,000 160,000Total Total20192020202120222023Funding Sources 160,000160,000SF - Sanitary Sewer Fund 160,000 160,000Total Wednesday, November 28, 2018 103 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Utilities Description This will help us line our sanitary sewers to eliminate infiltration root intrusion and avoid expensive repairs and sewer backups. Project #18-CIP-U016 Priority 2 Very Important Justification We have an old collection system that needs immediate attention. Continuously cleaning the sewer does not stop roots or infiltration from going into the pipes, we need a more permanent fix. The majority of our sanitary sewer pipe is made out of clay pipe and has reached its life expectancy. Budget Impact/Other Useful LifeProject Name Sewer Lining Category Utilities: Municipal Sanitary Se Type Improvement Future Total Project Cost:$307,500 Total20192020202120222023Expenditures 257,50050,000 50,000 50,000 52,500 55,000Construction/Maintenance 50,000 50,000 50,000 52,500 55,000 257,500Total Total20192020202120222023Funding Sources 257,50050,000 50,000 50,000 52,500 55,000SF - Sanitary Sewer Fund 50,000 50,000 50,000 52,500 55,000 257,500Total Wednesday, November 28, 2018 104 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2019 2023thru Department Public Works: Utilities Description Program includes rehabilitatation of trunk water mains around the city. Staff has conducted some non-destructive condition assessment testing of various trunk lines around the city. The testing determines a level of deterioration based on a calculated reduction of thickness of the pipe wall. Review of how critical the line is, break records, pipe age, and soil conditions are also considered in determining projects. 2022: Replacement of trunk main along North TH 7 Service Drive from Oakridge Road to west of Hopkins Crossroad and trunk main from Water T r e a t m e n t P l a n t t o N o r t h S e r v i c e D r i v e . Project #19-CIP-U017 Priority 2 Very Important Justification Trunk water mains are large diameter, high capacity lines that are critical to supply water to and from the water treatment plant, water towers, and d i s t r i b u t i o n l i n e s a r o u n d t h e c i t y a n d c a n n o t e a s i l y b e t a k e n o u t o f s e r v i c e . P u b l i c W o r k s s t a f f h a s b e e n m a n a g i n g t h e t r u n k m a i n s y s t e m a s a standalone asset, as these mains cannot always be included for rehabilitation with street reconstruction projects. Much of the city's trunk system was constructed over 50 years ago and is approaching the end of it's service life. Budget Impact/Other Useful LifeProject Name Trunk Water Main Rehabilitation Category Utilities: Municipal Water Syst Type Improvement Future Total Project Cost:$3,955,000 Total20192020202120222023Expenditures 3,955,0003,955,000Construction/Maintenance 3,955,000 3,955,000Total Total20192020202120222023Funding Sources 1,450,0001,450,000PI - PIR/General Obligation Bonds 395,000395,000SF - Sanitary Sewer Fund 160,000160,000SU - Storm Sewer Fund 1,950,0001,950,000WF - Water Fund 3,955,000 3,955,000Total Wednesday, November 28, 2018 105