Loading...
CR 92-05 � ��-� � �. 7 s-s CITY OF HOPKINS ZONING APPLICATION S MU MARY FORM �� � �a ��� Application Nu�ber P.I .D.#: Applicant ' s Name (Last , First) Owaer (it other than applicant) /,�.9�,� �� , ��x� �N•� D�L �b C%��e,,>.��� c-{a. Mailing Address (Street , City, . State , Zip Code) _02��7 a �Si� v�,�. ,���� .�,�t, , Sa.�-�`��3, ��lG�, 11��v, S5'/�� , Phone Number: (Day) �.Sv7- y'/Co/ (Evening) Property Address S`3 O �l- �/�C J�o�l7 , APPLICABLE CURRENT ZONING DISTRICT(S) TYPE OF ZONING REQIIEST [ ] R-1-A [ ] R-2 [ ] B-1 ['�] Concept Review �r1� � [ ] R-1-B [ ] R-3 [ ] B-2 [ ] Conditional Use Permit [� 1 R-1 -C L 7 R-� ��7 B-3 [ � Yariance [ -1-D [ ] R-5 � 7 I-1 L 7 Zoning District Change [ �.-1-E [ ] R-6 [ ] I-2 [ ] Subdivision Approval � [ ] Ordinance Amendment • [ J Other . � I hereby certify With my signature that all data contained herein as Well as all supporting data are true and correct to the best of my knoWledge: �' ,t7 q,7 �Ll '�Ap licants ignature Date 7 c, r�a-ct!�T L b : �i�!�0 5 c=/.� 7/%� �� 1 ^-` <Z�/3/�✓ ,Et�ir�/ �r�`'���.tr�� _ — 9 Owners Si ature Date ADMINISTRATIVE DATA SUMMARY [ � Proper addendum to application Application received: _ ] Detailed plans submitted _ ] Written pro�ect description submitted Fee Paid: Referred to City PLANNING "COMMISSION ACTION Engineer: lpproved: without modifications Referred to City ( ] with modifications Attorney �enied [ ] Referred to Watershed District �ate: Date of Public Hearing Notice COUNCIL ACTION Date of Public ►p.p�vved: without modifications Hearing [ ] with modifications �enied: [ ] ►ate• RESOLUTI�N N0: \ t Y O G �` ti 5 �` March 20, 1992 � P K ` � Planning Report ZCR92-5 CONCEPT REVIEW - FINA GAS BTATION Proposed Action. This is a concept review which requires no action. Any comments from the Planning Commission will be helpful to the applicant in determining how to proceed with this project. Overview. Fina is proposing to raze their existing station at 530 Blake Road and construct a new gas station. This new facility will consist of a 1600 square foot convenience store, a car wash and four gas pumps. This is a concept review, so many of the details of the final plan are not shown on the preliminary plan. The Commission should review the preliminary plan and identify broad areas of concern on the site plan. Primary Issues to Consider. o What is the site zoned? � o What is the site designated in the Comprehensive Plan? o What are the specifics of the preliminary site plan? o What is the timing of the proposed development? o What recommendations does staff have? Supportinq Documents. o Detailed Background o Analysis of Issues o Site Plan Nanc S. Anderson Planner � � ' ZCR92-5 Page 2 �' Primary Issues to Consider. o What is the site zoned? The site is zoned B-3, General Business. A gas station is allowed with a conditional use permit. o What is the site desiqnated in the Comprehensive Plan? The Comprehensive Plan has designated the subject site as Commercial. A gas station is an acceptable use for a commercial designation. o What are the specifics of the preliminary site plan? site orientation The site will be oriented to Blake Road. The pumps will be located on the Blake Road side of the site. A car wash is proposed on the north end of the site. access The access points will remain the same. The are two access points from Cambridge and one from Blake Road. Two of the access points are also used by the adjacent businesses. Because the access point from Blake Road will remain the �- same, the County does not have to approve this access. landscapinq The preliminary site plan shows the required 10 trees. The staff has told the applicant that additional landscaping will be required. The applicant will submit a complete landscape plan with the conditional use permit application. parkinq The preliminary site plan shows 5 parking spaces. The Ordinance requires 4 spaces. trash A trash enclosure is located on the northwest side of the site. This enclosure will screen the dumpster from all four sides. car wash A car wash is proposed on the north side of the site. Stacking for the car wash will be on the west side of the building. The staff has a concern that on a busy day the car stacking would block the parking spaces on the east end of the site. �� • ZCR92-5 Page 3 buildinq exterior '� The applicant is proposing a rock face block exterior. The applicant has been advised to bring a sample to the meeting. The staff has been encouraging the use of brick on structures of this type. setbacks The preliminary site plan appears to have the required setbacks. o �hat is the timinq of the project? If the applicant gets a favorable review they will proceed with the project. The project will require a conditional use permit. o �hat recommendations does the staff have? The construction of a new gas station will be an improvement to the site. In this case, because the site will be put to the same use and surrounded by commercial use, there is less concerns than if the site had to be rezoned or if the site abutted a residential are. With this preliminary site plan, the staff would recommend the following: - the retaining wall along Blake be reconstructed with �� keystone. . - a concrete sidewalk installed along Blake. - an irrigation system installed in all sodded areas. - that the applicant explore the use of brick on the building - provide staff with information on usage of the car wash during peak hours �� 0 0 c 0 BLAKE ROAD-NOL Z-9 cn+ � FINA OIL AND CHEMICAL COMPANY 1111mlIT 530 BLAKE ROAD 8850 NORTH CENTRAL EXPRESSWAY HOPKINS, MN, DALLAS. TEXAS 75208