VII.4. 2021-2025 Capital Improvement Plan (CIP); Bishop November 17, 2020 Council Report 2020-087 2021-2025 CAPITAL IMPROVEMENT PLAN (CIP) Proposed Action Staff recommends adoption of the following motion: Move to adopt the 2021-2025 Capital Improvements Plan. Overview The Capital Improvements Plan is a planning document intended to help the City anticipate major capital items and to consider the financial impact of proceeding with those planned improvements. Discussions have been held with City Council, in detailing proposed and necessary improvements. Staff is recommending adoption of the plan. Primary Issues to Consider • Does adoption of the CIP mean projects will be implemented? The CIP is a planning document, not an implementation action, and therefore, additional approvals will be necessary for most projects to proceed. Appropriate notifications would also be made for those projects that have funding implications. • Are funds available for all projects? The plan outlines funding implications if all projects are implemented. Necessary funding changes have been anticipated as part of this plan, and are recommended therein Supporting Information • Overview of Park Improvement, Capital Improvement and Permanent Improvement Revolving Funds • 2021 Budget Preparation Schedule • 2021-2025 Capital Improvements Plan ______________________________ Nick Bishop, CPA Finance Director Financial Impact: $ projects included in budgets Budgeted: Y/N X N Source: Various Related Documents (CIP, ERP, etc.): __CIP_________ Notes: ____________________ Park Improvement Fund The main sources of revenue for park improvements are franchise fees and park dedication fees. Annually, the City receives approximately $305,000 in gas and electric franchise fees used for the purposes of park improvements. Park dedication fees are received from developers as land is platted for development. They can provide a significant source of revenue for the fund, but are also uncertain and outside the direct control of the City. There are no park dedication fees projected in 2021 or 2022. In 2021, the Park Improvement Fund has projected revenues of $305,592 and projected expenditures of $350,300. The projected expenditures include capital projects and debt service payments. Downtown Park Rehab, Central Park Picnic Shelter Rehab and Central Park East Play Equipment projects have been delayed. The Maetzold Field pavilion project originally scheduled in 2021 was completed in 2020. CARES Act funds were utilized based on Hopkins School District using the park and facility for outdoor learning. The fund is projected to increase its fund balance by $5,292 and end 2021 with a fund balance of $62,322. 2021 2022 Beginning Fund Balance 57,030 62,322 Revenues & Other Financing Sources Franchise Fees 305,022 305,022 Park Dedication Fees - - Interest Earnings 570 623 Total Revenue & Other Financing Sources 305,592 305,645 Expenditures & Other Financing Uses Current Expenditures 7,000 7,000 Capital Projects Maetzold Field - Pavilion - - Shady Oak Beach - Picnic Shelter 30,000 60,000 Shady Oak Beach Improvements 3,300 8,200 Downtown Park Rehab - 35,000 Central Park Picnic Shelters Rehab - 50,000 Central Park East Play Equipment Replacemen - 75,000 Debt Service Transfers Cottageville Park Bonds 110,000 110,000 Burnes Park Bonds 150,000 - Total Expenditures and Other Financing Sources 300,300 345,200 Increase (Decrease) in Fund Balance 5,292 (39,555) Projected Ending Fund Balance 62,322 22,767 Park Improvement Fund - Projected Cash Flows 2 Capital Improvement Fund This fund accounts for capital improvements at the Activity Center, City Hall/Police Station, Fire Station and Public Work Building. Its two funding sources are franchise fees from gas and electric utilities and a property tax levy. In 2021, the Capital Improvement Fund has projected revenues of $363,494 and projected expenditures of $360,000. The projected expenditure is debt service transfers for the City Hall renovation project. The Activity Center – Facility Improvement Project has been delayed. The fund is projected to increase its fund balance by $3,470 and end 2021 with a fund balance of $202,908. 2021 2022 Beginning Fund Balance 199,438 202,932 Revenues & Other Financing Sources Tax Levy - 200,000 Franchise Fees 361,500 361,500 Interest Earnings 1,994 2,029 Total Revenue & Other Financing Sources 363,494 563,529 Expenditures & Other Financing Uses Current Expenditures Capital Projects Activity Center - Facility Improvements - 10,000 Activity Center - Replace Gynmasium Roof - 105,000 Public Works - Replace Overhead Doors - 18,000 Fire Station - Replace Boilers - 45,000 Activity Center - Gym Acoustic Panels - 15,000 Debt Service Transfers - City Hall 360,000 360,000 Total Expenditures and Other Financing Sources 360,000 553,000 Increase (Decrease) in Fund Balance 3,494 10,529 Projected Ending Fund Balance 202,932 213,461 Capital Improvement Fund - Projected Cash Flows 3 Permanent Improvement Revolving Fund The Permanent Improvement Revolving Fund is used to account for street improvements, which can include streets, walkways, trails, traffic signs, traffic signals, vehicular parking and street lighting. The primary funding sources are debt and special assessments. Previous projects have received grants or funding from other governmental entities. In, 2021, the Permanent Improvement Revolving Fund is projected to receive $4,102,500 of bond proceeds. The major expenditures of the fund are the second portion of the Interlachen Street Reconstruction project and a mill and overlay project in the Knollwood neighborhood. All the underlying utilities are replaced during each street reconstruction project and related costs and bond proceeds are recorded in those funds. 2021 2022 Beginning Fund Balance 212,103 220,174 Revenues & Other Financing Sources Special Assessments (Prepaid)- Interest Earnings 8,071 6,051 Bond Proceeds 4,102,500 1,595,000 Total Revenue & Other Financing Sources 4,110,571 1,601,051 Expenditures & Other Financing Uses Current Expenditures Capital Projects Interlachen Park Street Reconstruction 3,232,500 - 6th Ave South/7th Ave South - 1,150,000 Pedestrian & Bicycle Access Improvements 25,000 25,000 Street Rehabilitation (Mill & Overlay)725,000 400,000 Street Sign Management 20,000 20,000 Street Lighting Upgrades - - Trail Segments 100,000 - Total Expenditures and Other Financing Sources 4,102,500 1,595,000 Increase (Decrease) in Fund Balance 8,071 6,051 Projected Ending Fund Balance 220,174 226,225 Permanent Improvement Revolving - Projected Cash Flows FUTURE ACTION: 2021 Budget Preparation Schedule The following table outlines the tentative schedule for discussions on important aspects of the City’s Budget. Meeting Date Meeting Type Subject Details October 6 Regular Meeting Financial Management Plan (FMP) Update -Overview of the FMP, prior tax increases and debt October 13 Work Session Review Capital Improvement Plan (CIP) and Equipment Replacement Plan (ERP) -Park Dedication Fund -Capital Improvement Levy (City Buildings) -Permanent Improvement Revolving Fund (Street Projects) -Equipment Replacement Levy October 20 Regular Meeting Quarterly Financial Report November 4 (Wednesday) Regular Meeting Review Options for 2021 Tax Levy -Review reduced levy options for 2021 November 10 Work Session Review Special Revenue Budgets, Activity Center Budget, Enterprise Fund Budgets and Utility Rates -Chemical Assessment -Activity Center -Economic Development -Sewer -Parking -Storm Sewer -Communications -Refuse -Depot -Pavilion -Arts Center -Water November 17 Regular Meeting Approve CIP, ERP & Utility Rates November 30 (Monday) Regular Meeting Truth in Taxation Hearing -Overview of 2021 Budget and Tax Levy -Public Comment December 1 Regular Meeting Approve Final Budget & Tax Levy -Final Comments from Council on Budget -Could be approved if appropriate December 15 Regular Meeting Approve Final Budget & Tax Levy -Last scheduled meeting to approve City of Hopkins Capital Improvement Plan 2021 – 2025 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY YEAR 2021 2025thru Project Name Department Project # Priority Project Cost 2021 19-CIP-AR001Arts Center - Carpeting 2 22,000Comm Svcs - Arts Center 19-CIP-AR003Arts Center - Tile Flooring n/a 15,000Comm Svcs - Arts Center 19-CIP-AR005Arts Center - Key Card Exterior & Interior Access 2 20,000Comm Svcs - Arts Center 13-CIP-P066Shady Oak Beach - Picnic Shelter 3 30,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 9,390,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 725,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S001Central Business District Lighting Upgrades n/a 100,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 110,000Public Works: Streets/Traffic 20-CIP-S006Trail Segment - Bellgrove n/a 100,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 24,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 50,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 10,000Recreation 10,641,000Total for 2021 2022 08-CIP-AC018Activity Center - Replace Gymnasium Roof n/a 105,000Comm Svcs - Activity Center 19-CIP-AC045Activity Center - Facility Improvements n/a 10,000Comm Svcs - Activity Center 19-CIP-AC048Activity Center - Gym Acoustical Panels n/a 15,000Comm Svcs - Activity Center 19-CIP-AR005Arts Center - Key Card Exterior & Interior Access 2 20,000Comm Svcs - Arts Center 19-CIP-AR006Arts Center - Fire Panel 2 30,000Comm Svcs - Arts Center 08-CIP-FD123Fire Station - Replace Boilers n/a 45,000Fire 08-CIP-B023Public Works - Replace Overhead Doors n/a 90,000Public Works: Bldg/Equip Serv 13-CIP-P066Shady Oak Beach - Picnic Shelter 3 180,000Public Works: Parks 17-CIP-P004Downtown Park Rehab 3 35,000Public Works: Parks 20-CIP-P071Central Park Picnic Shelters Rehab n/a 50,000Public Works: Parks 20-CIP-P072Central Park East Play Equipment Replacement n/a 75,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 2,375,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 400,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S001Central Business District Lighting Upgrades n/a 40,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 190,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 25,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 52,500Public Works: Utilities 19-CIP-U017Trunk Water Main Rehabilitation 2 3,955,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 25,000Recreation 7,762,500Total for 2022 2023 08-CIP-AC024Activity Center - Raspberry Room Roof Replacement n/a 80,000Comm Svcs - Activity Center 09-CIP-AC031Activity Center - Lower Roof Replacement n/a 80,000Comm Svcs - Activity Center Thursday, November 12, 2020 Project Name Department Project # Priority Project Cost 19-CIP-AC045Activity Center - Facility Improvements n/a 175,000Comm Svcs - Activity Center 19-CIP-AR007Arts Center - Roof Replacement 2 150,000Comm Svcs - Arts Center 20-CIP-PV333Pavilion - Mezzanine Flooring Replacement 3 90,000Pavilion 13-CIP-P044Oakes Park - Tennis Courts n/a 130,000Public Works: Parks 16-CIP-P002Minnehaha Creek Overlook - Blake Rd/Lake St Pedest n/a 400,000Public Works: Parks 17-CIP-P004Downtown Park Rehab 3 200,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 6,493,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 425,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 200,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 26,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 55,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 10,000Recreation 8,559,000Total for 2023 2024 08-CIP-B121Fire Station: Replace 25 Ton AHU n/a 82,000Fire 20-CIP-PV334Pavilion - Arena Exit Door Replacement 3 105,000Pavilion 01-CIP-S101Residential Street Improvements and Utilities n/a 6,500,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 450,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 90,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 27,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 60,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 10,000Recreation 7,369,000Total for 2024 2025 08-CIP-CH011City Hall- Site Landscaping Improvement n/a 100,000City Hall Administration 08-CIP-PD215City Hall Police Station Rooftop n/a 240,000Police 01-CIP-S101Residential Street Improvements and Utilities n/a 7,542,000Public Works: Streets/Traffic 01-CIP-S104County Road 3 n/a 2,300,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 100,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 475,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 225,000Public Works: Streets/Traffic 20-CIP-S005Minnetonka Mills/5th St N Signal Replacement 5 600,000Public Works: Streets/Traffic 16-CIP-R003Shady Oak Beach Improvements 3 10,000Recreation 11,612,000Total for 2025 GRAND TOTAL 45,943,500 Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP DEPARTMENT SUMMARY 2021 2025thru Total2021 2022 2023 2024 2025Department City Hall Administration 100,000100,000 Comm Svcs - Activity Center 465,000130,000 335,000 Comm Svcs - Arts Center 257,00057,000 50,000 150,000 Fire 127,00045,000 82,000 Pavilion 195,00090,000 105,000 Police 240,000240,000 Public Works: Bldg/Equip Serv 90,00090,000 Public Works: Parks 1,100,00030,000 340,000 730,000 Public Works: Streets/Traffic 39,030,00010,470,000 3,050,000 7,163,000 7,085,000 11,262,000 Public Works: Utilities 4,274,50074,000 4,032,500 81,000 87,000 Recreation 65,00010,000 25,000 10,000 10,000 10,000 10,641,000 7,762,500 8,559,000 7,369,000 11,612,000 45,943,500TOTAL Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY DEPARTMENT 2021 2025thru Total2021 2022 2023 2024 2025Department Project # Priority City Hall Administration 08-CIP-CH011 100,000100,000City Hall- Site Landscaping Improvement n/a 100,000100,000City Hall Administration Total Comm Svcs - Activity Center 08-CIP-AC018 105,000105,000Activity Center - Replace Gymnasium Roof n/a 08-CIP-AC024 80,00080,000Activity Center - Raspberry Room Roof Replacement n/a 09-CIP-AC031 80,00080,000Activity Center - Lower Roof Replacement n/a 19-CIP-AC045 185,00010,000 175,000Activity Center - Facility Improvements n/a 19-CIP-AC048 15,00015,000Activity Center - Gym Acoustical Panels n/a 465,000130,000 335,000Comm Svcs - Activity Center Total Comm Svcs - Arts Center 19-CIP-AR001 22,00022,000Arts Center - Carpeting 2 19-CIP-AR003 15,00015,000Arts Center - Tile Flooring n/a 19-CIP-AR005 40,00020,000 20,000Arts Center - Key Card Exterior & Interior Access 2 19-CIP-AR006 30,00030,000Arts Center - Fire Panel 2 19-CIP-AR007 150,000150,000Arts Center - Roof Replacement 2 257,00057,000 50,000 150,000Comm Svcs - Arts Center Total Fire 08-CIP-B121 82,00082,000Fire Station: Replace 25 Ton AHU n/a 08-CIP-FD123 45,00045,000Fire Station - Replace Boilers n/a 127,00045,000 82,000Fire Total Pavilion 20-CIP-PV333 90,00090,000Pavilion - Mezzanine Flooring Replacement 3 20-CIP-PV334 105,000105,000Pavilion - Arena Exit Door Replacement 3 195,00090,000 105,000Pavilion Total Police 08-CIP-PD215 240,000240,000City Hall Police Station Rooftop n/a 240,000240,000Police Total Public Works: Bldg/Equip Serv 08-CIP-B023 90,00090,000Public Works - Replace Overhead Doors n/a 90,00090,000Public Works: Bldg/Equip Serv Total Public Works: Parks 13-CIP-P044 130,000130,000Oakes Park - Tennis Courts n/a Thursday, November 12, 2020 Total2021 2022 2023 2024 2025Department Project # Priority 13-CIP-P066 210,00030,000 180,000Shady Oak Beach - Picnic Shelter 3 16-CIP-P002 400,000400,000Minnehaha Creek Overlook - Blake Rd/Lake St Pedest n/a 17-CIP-P004 235,00035,000 200,000Downtown Park Rehab 3 20-CIP-P071 50,00050,000Central Park Picnic Shelters Rehab n/a 20-CIP-P072 75,00075,000Central Park East Play Equipment Replacement n/a 1,100,00030,000 340,000 730,000Public Works: Parks Total Public Works: Streets/Traffic 01-CIP-S101 32,300,0009,390,000 2,375,000 6,493,000 6,500,000 7,542,000Residential Street Improvements and Utilities n/a 01-CIP-S104 2,300,0002,300,000County Road 3 n/a 13-CIP-S040 200,00025,000 25,000 25,000 25,000 100,000Pedestrian & Bicycle Access Improvements n/a 16-CIP-S041 2,475,000725,000 400,000 425,000 450,000 475,000Street Rehabilitation Improvements n/a 16-CIP-S042 100,00020,000 20,000 20,000 20,000 20,000Street Sign Management n/a 20-CIP-S001 140,000100,000 40,000Central Business District Lighting Upgrades n/a 20-CIP-S002 815,000110,000 190,000 200,000 90,000 225,000City Street Lighting Upgrades n/a 20-CIP-S005 600,000600,000Minnetonka Mills/5th St N Signal Replacement 5 20-CIP-S006 100,000100,000Trail Segment - Bellgrove n/a 39,030,00010,470,000 3,050,000 7,163,000 7,085,000 11,262,000Public Works: Streets/Traffic Total Public Works: Utilities 01-CIP-U002 102,00024,000 25,000 26,000 27,000Storm Drainage System Maintenance - Alley Repairs n/a 18-CIP-U016 217,50050,000 52,500 55,000 60,000Sewer Lining 2 19-CIP-U017 3,955,0003,955,000Trunk Water Main Rehabilitation 2 4,274,50074,000 4,032,500 81,000 87,000Public Works: Utilities Total Recreation 16-CIP-R003 65,00010,000 25,000 10,000 10,000 10,000Shady Oak Beach Improvements 3 65,00010,000 25,000 10,000 10,000 10,000Recreation Total GRAND TOTAL 45,943,50010,641,000 7,762,500 8,559,000 7,369,000 11,612,000 Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP FUNDING SOURCE SUMMARY 2021 thru 2025 TotalSource2021 2022 2023 2024 2025 AC - Arts Center Fund 257,00057,000 50,000 150,000 CI - Capital Improvement Fund 950,000193,000 335,000 82,000 340,000 GU - Other Governmental Units 2,063,6006,700 136,800 6,700 306,700 1,606,700 MS - Municipal State Aid Streets 1,200,000500,000 700,000 PA - Pavilion Fund 195,00090,000 105,000 PDF- Park Dedication Fund 601,40033,300 228,200 333,300 3,300 3,300 PI - PIR/General Obligation Bonds 18,021,0004,152,000 2,775,000 3,240,000 3,559,000 4,295,000 RF - Refuse Fund 18,00018,000 SA - Special Assessment 4,702,0001,600,000 500,000 1,050,000 546,000 1,006,000 SF - Sanitary Sewer Fund 6,395,5001,757,000 965,500 1,418,000 728,000 1,527,000 SU - Storm Sewer Fund 3,602,000964,000 428,000 506,000 1,094,000 610,000 WF - Water Fund 7,938,0002,071,000 2,468,000 1,430,000 445,000 1,524,000 10,641,000 7,762,500 8,559,000 7,369,000 11,612,000 45,943,500GRAND TOTAL Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY FUNDING SOURCE 2021 2025thru TotalSource Project # Priority 2021 2022 2023 2024 2025 AC - Arts Center Fund 19-CIP-AR001 22,00022,000Arts Center - Carpeting 2 19-CIP-AR003 15,00015,000Arts Center - Tile Flooring n/a 19-CIP-AR005 40,00020,000 20,000Arts Center - Key Card Exterior & Interior Access 2 19-CIP-AR006 30,00030,000Arts Center - Fire Panel 2 19-CIP-AR007 150,000150,000Arts Center - Roof Replacement 2 257,00057,000 50,000 150,000AC - Arts Center Fund Total CI - Capital Improvement Fund 08-CIP-AC018 105,000105,000Activity Center - Replace Gymnasium Roof n/a 08-CIP-AC024 80,00080,000Activity Center - Raspberry Room Roof Replacement n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 08-CIP-B121 82,00082,000Fire Station: Replace 25 Ton AHU n/a 08-CIP-CH011 100,000100,000City Hall- Site Landscaping Improvement n/a 08-CIP-FD123 45,00045,000Fire Station - Replace Boilers n/a 08-CIP-PD215 240,000240,000City Hall Police Station Rooftop n/a 09-CIP-AC031 80,00080,000Activity Center - Lower Roof Replacement n/a 19-CIP-AC045 185,00010,000 175,000Activity Center - Facility Improvements n/a 19-CIP-AC048 15,00015,000Activity Center - Gym Acoustical Panels n/a 950,000193,000 335,000 82,000 340,000CI - Capital Improvement Fund Total GU - Other Governmental Units 01-CIP-S101 300,000300,000Residential Street Improvements and Utilities n/a 01-CIP-S104 1,600,0001,600,000County Road 3 n/a 13-CIP-P066 120,000120,000Shady Oak Beach - Picnic Shelter 3 16-CIP-R003 43,6006,700 16,800 6,700 6,700 6,700Shady Oak Beach Improvements 3 2,063,6006,700 136,800 6,700 306,700 1,606,700GU - Other Governmental Units Total MS - Municipal State Aid Streets 01-CIP-S101 500,000500,000Residential Street Improvements and Utilities n/a 01-CIP-S104 700,000700,000County Road 3 n/a 1,200,000500,000 700,000MS - Municipal State Aid Streets Total PA - Pavilion Fund 20-CIP-PV333 90,00090,000Pavilion - Mezzanine Flooring Replacement 3 20-CIP-PV334 105,000105,000Pavilion - Arena Exit Door Replacement 3 195,00090,000 105,000PA - Pavilion Fund Total Thursday, November 12, 2020 TotalSource Project # Priority 2021 2022 2023 2024 2025 PDF- Park Dedication Fund 13-CIP-P044 130,000130,000Oakes Park - Tennis Courts n/a 13-CIP-P066 90,00030,000 60,000Shady Oak Beach - Picnic Shelter 3 16-CIP-P002 200,000200,000Minnehaha Creek Overlook - Blake Rd/Lake St Pedest n/a 16-CIP-R003 21,4003,300 8,200 3,300 3,300 3,300Shady Oak Beach Improvements 3 17-CIP-P004 35,00035,000Downtown Park Rehab 3 20-CIP-P071 50,00050,000Central Park Picnic Shelters Rehab n/a 20-CIP-P072 75,00075,000Central Park East Play Equipment Replacement n/a 601,40033,300 228,200 333,300 3,300 3,300PDF- Park Dedication Fund Total PI - PIR/General Obligation Bonds 01-CIP-S101 11,751,0003,072,000 650,000 2,170,000 2,974,000 2,885,000Residential Street Improvements and Utilities n/a 13-CIP-S040 200,00025,000 25,000 25,000 25,000 100,000Pedestrian & Bicycle Access Improvements n/a 16-CIP-P002 200,000200,000Minnehaha Creek Overlook - Blake Rd/Lake St Pedest n/a 16-CIP-S041 2,475,000725,000 400,000 425,000 450,000 475,000Street Rehabilitation Improvements n/a 16-CIP-S042 100,00020,000 20,000 20,000 20,000 20,000Street Sign Management n/a 17-CIP-P004 200,000200,000Downtown Park Rehab 3 19-CIP-U017 1,450,0001,450,000Trunk Water Main Rehabilitation 2 20-CIP-S001 140,000100,000 40,000Central Business District Lighting Upgrades n/a 20-CIP-S002 815,000110,000 190,000 200,000 90,000 225,000City Street Lighting Upgrades n/a 20-CIP-S005 590,000590,000Minnetonka Mills/5th St N Signal Replacement 5 20-CIP-S006 100,000100,000Trail Segment - Bellgrove n/a 18,021,0004,152,000 2,775,000 3,240,000 3,559,000 4,295,000PI - PIR/General Obligation Bonds Total RF - Refuse Fund 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 18,00018,000RF - Refuse Fund Total SA - Special Assessment 01-CIP-S101 4,702,0001,600,000 500,000 1,050,000 546,000 1,006,000Residential Street Improvements and Utilities n/a 4,702,0001,600,000 500,000 1,050,000 546,000 1,006,000SA - Special Assessment Total SF - Sanitary Sewer Fund 01-CIP-S101 5,765,0001,707,000 500,000 1,363,000 668,000 1,527,000Residential Street Improvements and Utilities n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 18-CIP-U016 217,50050,000 52,500 55,000 60,000Sewer Lining 2 19-CIP-U017 395,000395,000Trunk Water Main Rehabilitation 2 6,395,5001,757,000 965,500 1,418,000 728,000 1,527,000SF - Sanitary Sewer Fund Total SU - Storm Sewer Fund 01-CIP-S101 3,312,000940,000 225,000 480,000 1,067,000 600,000Residential Street Improvements and Utilities n/a 01-CIP-U002 102,00024,000 25,000 26,000 27,000Storm Drainage System Maintenance - Alley Repairs n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 19-CIP-U017 160,000160,000Trunk Water Main Rehabilitation 2 20-CIP-S005 10,00010,000Minnetonka Mills/5th St N Signal Replacement 5 Thursday, November 12, 2020 TotalSource Project # Priority 2021 2022 2023 2024 2025 3,602,000964,000 428,000 506,000 1,094,000 610,000SU - Storm Sewer Fund Total WF - Water Fund 01-CIP-S101 5,970,0002,071,000 500,000 1,430,000 445,000 1,524,000Residential Street Improvements and Utilities n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 19-CIP-U017 1,950,0001,950,000Trunk Water Main Rehabilitation 2 7,938,0002,071,000 2,468,000 1,430,000 445,000 1,524,000WF - Water Fund Total 45,943,50010,641,000 7,762,500 8,559,000 7,369,000 11,612,000GRAND TOTAL Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Asst City Manager 2021 2025 thru Department City Hall Administration Description Site Landscaping Improvement Project #08-CIP-CH011 Priority n/a Justification Budget Impact/Other Useful LifeProject Name City Hall- Site Landscaping Improvement Category Bldgs: Administrative Offices Type Improvement Future Total Project Cost:$100,000 Total2021 2022 2023 2024 2025Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total2021 2022 2023 2024 2025Funding Sources 100,000100,000CI - Capital Improvement Fund 100,000 100,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2021 2025 thru Department Comm Svcs - Activity Center Description Existing roof was installed in 1989 and is at the end of its projected useful life. Portion is cost share with Raspberry Ridge Condo Assn. Project #08-CIP-AC018 Priority n/a Justification Roof was installed in 1989 and is at the end of its 25 year useful life. Budget Impact/Other Move from 2021 to 2022. Useful Life 25 yearsProject Name Activity Center - Replace Gymnasium Roof Category Buildings: Activity Center Type Improvement Future Total Project Cost:$105,000 Total2021 2022 2023 2024 2025Expenditures 105,000105,000Construction/Maintenance 105,000 105,000Total Total2021 2022 2023 2024 2025Funding Sources 105,000105,000CI - Capital Improvement Fund 105,000 105,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2021 2025 thru Department Comm Svcs - Activity Center Description Built up asphalt roofing system covering Raspberry Rooms, Craft Room and Hallways at the Activity Center Project #08-CIP-AC024 Priority n/a Justification Existing roof was replaced in 1992. Following inspection in 2018, move out to 2023. Budget Impact/Other Inspection, repair and upkeep of roofing systems prevent deterioration of interior building structure and damage to interior components of building. Variance from 20 year plan: Moved from 2018 to 2023 and all roof components will be done with one contract for better bids. Useful Life 25 yearsProject Name Activity Center - Raspberry Room Roof Replacement Category Buildings: Activity Center Type Improvement Future Total Project Cost:$80,000 Total2021 2022 2023 2024 2025Expenditures 80,00080,000Construction/Maintenance 80,000 80,000Total Total2021 2022 2023 2024 2025Funding Sources 80,00080,000CI - Capital Improvement Fund 80,000 80,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2021 2025 thru Department Comm Svcs - Activity Center Description Built up Roof on Activity Center Raspberry Rooms and Hallway. Project #09-CIP-AC031 Priority n/a Justification Existing roof was installed in 1992. Budget Impact/Other Variance from 20 year plan: Moved from 2018 to 2023 and all roof components will be done with one contract for better bids. Useful Life 25 yearsProject Name Activity Center - Lower Roof Replacement Category Buildings: Activity Center Type Improvement Future Total Project Cost:$80,000 Total2021 2022 2023 2024 2025Expenditures 80,00080,000Construction/Maintenance 80,000 80,000Total Total2021 2022 2023 2024 2025Funding Sources 80,00080,000CI - Capital Improvement Fund 80,000 80,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Asst City Manager 2021 2025 thru Department Comm Svcs - Activity Center Description Several projects have been proposed in previous CIPs. With the unknowns of the future of the Historical Society, we would like to combine several projects into one larger project and complete a facility needs assessment in 2022. Project dependent on status of Historical Society. Project #19-CIP-AC045 Priority n/a Justification The project would aim to update several areas of the facility that have not been updated since 1990 (some areas were renovated in 2012) and address a few larger concerns: use of former historical society area, eastside room configurations (increases maximum capacity of the gymnasium), office/reception enhancements. We will spend 2021 gathering data on current programming usage, 2022 developing a plan and 2023 would be construction. We would also suggest to correlate AV updates to the facility with the project. Budget Impact/Other Useful Life 30 yearsProject Name Activity Center - Facility Improvements Category Buildings: Activity Center Type Improvement Future Total Project Cost:$185,000 Total2021 2022 2023 2024 2025Expenditures 185,00010,000 175,000Construction 10,000 175,000 185,000Total Total2021 2022 2023 2024 2025Funding Sources 185,00010,000 175,000CI - Capital Improvement Fund 10,000 175,000 185,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Activity Ctr Director 2021 2025 thru Department Comm Svcs - Activity Center Description Install additional acoustical panels in the gymnasium to enhance our guests hearing experiences when attending classes, lectures, health fairs, dinners, and recreational events. Project #19-CIP-AC048 Priority n/a Justification We added 1 row of acoustical panels on the gym walls in 2017. Even though the panels have helped in the sound issues in the gym, more assistance is needed. Another row of acoustical panels will help our older participants when trying to listen to instructors, speakers, individual conversation at health fairs and dinners, enjoying musical and recreational events. Budget Impact/Other Useful Life 30 yearsProject Name Activity Center - Gym Acoustical Panels Category Buildings: Activity Center Type Improvement Future Total Project Cost:$15,000 Total2021 2022 2023 2024 2025Expenditures 15,00015,000Construction 15,000 15,000Total Total2021 2022 2023 2024 2025Funding Sources 15,00015,000CI - Capital Improvement Fund 15,000 15,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Asst City Manager 2021 2025 thru Department Comm Svcs - Arts Center Description 2019: Replace Arts Center's carpeting in spaces (Community room/Conference room/Green Room.) Expected life span: 8-10 years Estimate: $30,000 2020: Various rooms as needed Estimated life span: 8-10 years Estimate: $22,000 2021: Replace office carpet (Stages) Estimated life span: 8-10 years Estimate: $22,000 Project #19-CIP-AR001 Priority 2 Very Important Justification Based on wear, replace in areas needed in order to maintain overall appearance of the Center. Budget Impact/Other Presentability of Center - appealing to customers Useful Life 10 yearsProject Name Arts Center - Carpeting Category Buildings: Arts Center Type Improvement Future Total Project Cost:$74,000 Total2021 2022 2023 2024 2025Expenditures 22,00022,000Construction/Maintenance 22,000 22,000Total Total2021 2022 2023 2024 2025Funding Sources 22,00022,000AC - Arts Center Fund 22,000 22,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2021 2025 thru Department Comm Svcs - Arts Center Description 2020: Re-seal floors - Kitchen & restrooms Estimated life span: 5years Estimate: $15,000 Annual maintenance done yearly at a cost of $2000 Project #19-CIP-AR003 Priority n/a Justification In order to keep tile flooring and grout looking clean and protected. Budget Impact/Other Presentability of Center - appealing to customers Useful Life 5 yearsProject Name Arts Center - Tile Flooring Category Buildings: Arts Center Type Improvement Future Total Project Cost:$15,000 Total2021 2022 2023 2024 2025Expenditures 15,00015,000Construction/Maintenance 15,000 15,000Total Total2021 2022 2023 2024 2025Funding Sources 15,00015,000AC - Arts Center Fund 15,000 15,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Asst City Manager 2021 2025 thru Department Comm Svcs - Arts Center Description Retrofitting Center exterior HCA and Stages staff entrances with keycard access. The estimate for the work to equip HCA back entrance, Stages back entrance, and Green Room street entrance is $18,000 (2019.) Retrofitting interior doors over a series of 2-3 years and software upgrades is estimated at $20,000 each year (2020 - 2022) Project #19-CIP-AR005 Priority 2 Very Important Justification Installing keycard access would allow better control of who is allowed to enter the building as well as the ability to track who is in the building. Stages Theatre Company has many staff members, and many who are contracted, working as needed on a project. The contracted employees are given keys when needed, however, from a building management standpoint, it is difficult to track and make sure that people don't have access to the building that shouldn't. Long-term the goal is to key all interior office and room doors with the same system, primarily to be able to keep key situation under better control and to allow for a safe lock-down procedure if ever needed. Budget Impact/Other Useful LifeProject Name Arts Center - Key Card Exterior & Interior Access Category Buildings: Arts Center Type Improvement Future Total Project Cost:$78,000 Total2021 2022 2023 2024 2025Expenditures 40,00020,000 20,000Construction/Maintenance 20,000 20,000 40,000Total Total2021 2022 2023 2024 2025Funding Sources 40,00020,000 20,000AC - Arts Center Fund 20,000 20,000 40,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2021 2025 thru Department Comm Svcs - Arts Center Description Replacing fire panel. Project #19-CIP-AR006 Priority 2 Very Important Justification Current system is outdated and obselete. Additional cost has occurred when needed to repair due to age. Budget Impact/Other Moved from 2020 to 2022 Useful LifeProject Name Arts Center - Fire Panel Category Buildings: Arts Center Type Improvement Future Total Project Cost:$30,000 Total2021 2022 2023 2024 2025Expenditures 30,00030,000Construction 30,000 30,000Total Total2021 2022 2023 2024 2025Funding Sources 30,00030,000AC - Arts Center Fund 30,000 30,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2021 2025 thru Department Comm Svcs - Arts Center Description Replacement of Roof Project #19-CIP-AR007 Priority 2 Very Important Justification Facility originally built in 1997. Budget Impact/Other Useful LifeProject Name Arts Center - Roof Replacement Category Buildings: Arts Center Type Improvement Future Total Project Cost:$150,000 Total2021 2022 2023 2024 2025Expenditures 150,000150,000Construction 150,000 150,000Total Total2021 2022 2023 2024 2025Funding Sources 150,000150,000AC - Arts Center Fund 150,000 150,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2021 2025 thru Department Fire Description Replace 35 ton Air Handling Unit Project #08-CIP-B121 Priority n/a Justification Budget Impact/Other Useful LifeProject Name Fire Station: Replace 25 Ton AHU Category Buildings: Fire Facilities Type Improvement Future Total Project Cost:$82,000 Total2021 2022 2023 2024 2025Expenditures 82,00082,000Construction/Maintenance 82,000 82,000Total Total2021 2022 2023 2024 2025Funding Sources 82,00082,000CI - Capital Improvement Fund 82,000 82,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2021 2025 thru Department Fire Description Replace boilers Project #08-CIP-FD123 Priority n/a Justification Budget Impact/Other Move from 2021 to 2022. Useful LifeProject Name Fire Station - Replace Boilers Category Buildings: Fire Facilities Type Improvement Future Total Project Cost:$45,000 Total2021 2022 2023 2024 2025Expenditures 45,00045,000Construction/Maintenance 45,000 45,000Total Total2021 2022 2023 2024 2025Funding Sources 45,00045,000CI - Capital Improvement Fund 45,000 45,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2021 2025 thru Department Pavilion Description Replace the mezzanine vinyl tile with rubber flooring. Project #20-CIP-PV333 Priority 3 Important Justification Current flooring has cracks, gouges, and severe wear areas. Rubber floor is easier maintain and is more durable and versitle than vinyl tile. Budget Impact/Other Useful Life 20 yearsProject Name Pavilion - Mezzanine Flooring Replacement Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$90,000 Total2021 2022 2023 2024 2025Expenditures 90,00090,000Construction/Maintenance 90,000 90,000Total Total2021 2022 2023 2024 2025Funding Sources 90,00090,000PA - Pavilion Fund 90,000 90,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2021 2025 thru Department Pavilion Description Replace the arena exit doors, frames, hinges, and closers. Project #20-CIP-PV334 Priority 3 Important Justification The frames and hardware are original, installed during the construction of the facility. Frames are rusting and hardware is failing. Budget Impact/Other Useful Life 15-20 yearsProject Name Pavilion - Arena Exit Door Replacement Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$105,000 Total2021 2022 2023 2024 2025Expenditures 105,000105,000Construction/Maintenance 105,000 105,000Total Total2021 2022 2023 2024 2025Funding Sources 105,000105,000PA - Pavilion Fund 105,000 105,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2021 2025 thru Department Police Description Project #08-CIP-PD215 Priority n/a Justification Budget Impact/Other Useful LifeProject Name City Hall Police Station Rooftop Category Buildings: Police Department Type Improvement Future Total Project Cost:$240,000 Total2021 2022 2023 2024 2025Expenditures 240,000240,000Construction/Maintenance 240,000 240,000Total Total2021 2022 2023 2024 2025Funding Sources 240,000240,000CI - Capital Improvement Fund 240,000 240,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2021 2025 thru Department Public Works: Bldg/Equip Ser Description Replace overhead doors Project #08-CIP-B023 Priority n/a Justification Budget Impact/Other Inspected in 2019, will move from 2020 to 2022. Useful LifeProject Name Public Works - Replace Overhead Doors Category Buildings: Public Works Type Improvement Future Total Project Cost:$90,000 Total2021 2022 2023 2024 2025Expenditures 90,00090,000Construction/Maintenance 90,000 90,000Total Total2021 2022 2023 2024 2025Funding Sources 18,00018,000CI - Capital Improvement Fund 18,00018,000RF - Refuse Fund 18,00018,000SF - Sanitary Sewer Fund 18,00018,000SU - Storm Sewer Fund 18,00018,000WF - Water Fund 90,000 90,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Parks Description Repair tennis courts - $20,000 2023 - Tennis Courts Reconstruct = $130,000 (2 courts) Project #13-CIP-P044 Priority n/a Justification Periodic repairs needed to ensure quality safe playing surface Budget Impact/Other Revised estimated costs to $130k (from $180k) Useful LifeProject Name Oakes Park - Tennis Courts Category Parks/Fores/Pav.: Comm. Facil. Type Improvement Future Total Project Cost:$150,000 Total2021 2022 2023 2024 2025Expenditures 130,000130,000Construction/Maintenance 130,000 130,000Total Total2021 2022 2023 2024 2025Funding Sources 130,000130,000PDF- Park Dedication Fund 130,000 130,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Parks Description Replace/Rehab existing picnic shelter. Project #13-CIP-P066 Priority 3 Important Justification Existing picnic shelter is 30+ years old and deteriorated. Budget Impact/Other Useful LifeProject Name Shady Oak Beach - Picnic Shelter Category Parks/Fores/Pav.: Comm. Facil. Type Improvement Future Total Project Cost:$210,000 Total2021 2022 2023 2024 2025Expenditures 30,00030,000Planning/Design 180,000180,000Construction 30,000 180,000 210,000Total Total2021 2022 2023 2024 2025Funding Sources 120,000120,000GU - Other Governmental Units 90,00030,000 60,000PDF- Park Dedication Fund 30,000 180,000 210,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Parks Description Improvements to the area adjacent to Minnehaha Creek, Blake Road and Lake Street to include a creek overlook area, creek interpretation/education feature, pedestrian plaza area to match the Blake Road corridor improvements. Project #16-CIP-P002 Priority n/a Justification City is committed to upgrade this area via a cooperative agreement with the Minnehaha Creek Watershed District. The area needs to be upgraded commensurate with the Cottageville Park improvements, Blake Road corridor upgrades and upcoming Cold Storage site redevelopment. Budget Impact/Other Useful LifeProject Name Minnehaha Creek Overlook - Blake Rd/Lake St Pedest Category Parks/Fores/Pav.: Comm. Facil. Type Improvement Future Total Project Cost:$400,000 Total2021 2022 2023 2024 2025Expenditures 400,000400,000Construction/Maintenance 400,000 400,000Total Total2021 2022 2023 2024 2025Funding Sources 200,000200,000PDF- Park Dedication Fund 200,000200,000PI - PIR/General Obligation Bonds 400,000 400,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2021 2025 thru Department Public Works: Parks Description A general upgrade of this urban-setting park to include: lighting, landscaping, signage. Plus, the addition of some play equipment for 2-5 yr olds. Project #17-CIP-P004 Priority 3 Important Justification This is a heavily used urban park serving the city's central business district which has a growing population due to redevelopments and increased housing. Park has not been upgraded for several decades, is used as a venue for entertainment and is in need of revitalization. Budget Impact/Other Useful Life 25 yearsProject Name Downtown Park Rehab Category PW - Parks Type Improvement Future Total Project Cost:$235,000 Total2021 2022 2023 2024 2025Expenditures 35,00035,000Planning/Design 200,000200,000Construction/Maintenance 35,000 200,000 235,000Total Total2021 2022 2023 2024 2025Funding Sources 35,00035,000PDF- Park Dedication Fund 200,000200,000PI - PIR/General Obligation Bonds 35,000 200,000 235,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Parks Description Replace roofing & fascia boards, clean and stain wood columns, glu-lam beams and tongue/groove roof deck boards, replace concrete floor slab and turf restoration for both Central Park picnic shelters Project #20-CIP-P071 Priority n/a Justification The picnic shelter are 30+ years old, look drab, concrete floor slabs are heaved and cracked. Rehab will restore the appearance and function of these picnic shelters. Budget Impact/Other Useful Life 15 yearsProject Name Central Park Picnic Shelters Rehab Category Parks/Forestry Type Improvement Future Total Project Cost:$50,000 Total2021 2022 2023 2024 2025Expenditures 50,00050,000Construction/Maintenance 50,000 50,000Total Total2021 2022 2023 2024 2025Funding Sources 50,00050,000PDF- Park Dedication Fund 50,000 50,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2021 2025 thru Department Public Works: Parks Description Replace existing play equipment with a new play set, including demolition, new EWF safety surfacing. Project #20-CIP-P072 Priority n/a Justification The existing play equipment is 30 years old and needs replacement. Budget Impact/Other Useful LifeProject Name Central Park East Play Equipment Replacement Category Parks/Forestry Type Improvement Future Total Project Cost:$75,000 Total2021 2022 2023 2024 2025Expenditures 75,00075,000Construction/Maintenance 75,000 75,000Total Total2021 2022 2023 2024 2025Funding Sources 75,00075,000PDF- Park Dedication Fund 75,000 75,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Streets/Traffic Description Locations to be determined consistent with the street reconstruction program. Program includes reconstruction of deteriorated water main, sanitary sewer and storm sewer in conjunction with street improvement projects. Utility improvements are consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. 2020-2021: Interlachen Park Reconstruction Project 2022: 6th Ave South/7th Ave South 2023: Central Avenues Reconstruction 2024: 17th Avenue 2025-2027: Central Avenues Reconstruction (East) Project #01-CIP-S101 Priority n/a Justification In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installed new. In most cases, water main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The costs assume the city funding 100% of major storm sewer, water main, and sanitary sewer improvements. Budget Impact/Other Public Hearing - year prior to planned construction Plans and specifications - year prior to planned construction Bid - year of planned construction Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections. Consistent with the City Council adopted Roadway Improvement Policy, Street Ratings, Pavement Management Program, Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. Useful Life UnassignedProject Name Residential Street Improvements and Utilities Category Trans: Streets Type Improvement Future Total Project Cost:$65,284,000 Total2021 2022 2023 2024 2025Expenditures 32,300,0009,390,000 2,375,000 6,493,000 6,500,000 7,542,000Construction/Maintenance 9,390,000 2,375,000 6,493,000 6,500,000 7,542,000 32,300,000Total Total2021 2022 2023 2024 2025Funding Sources 300,000300,000GU - Other Governmental Units 500,000500,000MS - Municipal State Aid Streets 11,751,0003,072,000 650,000 2,170,000 2,974,000 2,885,000PI - PIR/General Obligation Bonds 4,702,0001,600,000 500,000 1,050,000 546,000 1,006,000SA - Special Assessment 5,765,0001,707,000 500,000 1,363,000 668,000 1,527,000SF - Sanitary Sewer Fund 3,312,000940,000 225,000 480,000 1,067,000 600,000SU - Storm Sewer Fund 5,970,0002,071,000 500,000 1,430,000 445,000 1,524,000WF - Water Fund 9,390,000 2,375,000 6,493,000 6,500,000 7,542,000 32,300,000Total Thursday, November 12, 2020 Highway 7 Highway 169Highway 7 Highway 169Excelsior Blvd Minnetonka Blvd Shady Oak RdHopkins CrossroadsHopkins Crossroads1st St N 11th Ave SMainstreet 7th St S Smetana Rd 3rd St N 2nd St NE2nd St N 5th Ave NCambridge St 12th Ave N6th St S Lake St NE Boyce St15th Ave N14th Ave N9th Ave N11th Ave N2nd Ave S8th Ave N5th St S 10th Ave NFeltl Rd7th Ave N17th Ave N19th Ave N18th Ave N6th Ave NGoodrich St1st St S Nolan DrOakridge RdBirch PlAnn Ln 16th Ave N20th Ave NAshley RdManitoba Rd Meadowbrook RdBlake Rd SHolly RdAtwater StPowell Rd3rd St S Preston LnTyler Ave NLoring Rd Lincoln Dr5th Ave SHarrison Ave SMonroe Ave SDivision St Hawthorne RdW e s t b r o o k e W a y Cotta g e L n Oxford St 13th Ave NSpruce RdAlthea LnHomedale Rd8th Ave SLake St Ext Sandra Ln 21st Ave NVan Buren Ave S17th Ave SK-Tel Dr Hiawatha Ave Feltl CtPark Ln2nd St S Merilane Adams AveHill St 12th Ave S13th Ave SMill Rd19th Ave S8th St S18th Ave S9th Ave S7th Ave SValley WayEdgemoor DrFai r w a y D r Milwauk e e St 6th Ave SBridle L n Campbell DrAnnaway DrOak Ridge Tr Washington Ave N Wayside Rd W Minnetonka M i l l s R d Cottage Downs Oakvale Rd S 37th St W 5th St N Oakvale Rd N East Saint A l b a n s R d Opportunity Ct4th St N Herman TerVan Buren Ave NOakglen DrMonroe Ave NBradford R d Texas AveHazel Ln7th St W Saint L o ui s St John StOakton Dr 20th Ave S47th St W Wilshire Walk Fletcher Pl Burnes DrSweet Briar LnLake St W Griffit St10th Ave SOak Dr L n Highway 7 Frontage Rd Smetana Dr16th Ave S15th Ave SIndependence Ave SGettysburg Ave SPompano DrCrawford RdJackson Ave SRobinwood Ter Saint Johns Rd Oakton RdgRobinwood Ln Cre e k L n Cedar Pointe Dr SEast Park Valley DrDeer Ridge Ln Ho l l y h o c k L nAutumnwood LnCedar CrossingWest Park Valley DrDrillane RdHedberg DrGethsemane RdWebster Pl Honeywood LnWoodhil l C t Oak Dr L a n e Madison Ave SJefferson Ave SAbbie Ln Meadowbrook LnAq u i l a A v e S Landmark Trail N 34th Circle WPierce AveOld Settlers Trail Arthur StLandmark Tr S Dearborn CtNine M i le Cove E N Van Buren TrailTrailwood SOak Ridge PlaceEdgebro o k Dr Nine Mile Cove SOak Park Ln 14th Ave SPioneer Rd Robinwood Ter Althea Ln5th St S 6th Ave S7th St S 2nd St S16th Ave N2nd St N 13th Ave S12th Ave S4th St N Smetana Dr15th Ave S5th Ave S8th Ave S2nd St S 3rd St N 9th Ave SHighway 7 Frontage Rd Tyler Ave N7th Ave S6th St S Legend 2020 Reconstruct 2020 Mill and Overlay 2021 Reconstruct 2021 Mill and Overlay 2022 Reconstruct 2022 Mill and Overlay 2023 Reconstruct 2023 Mill and Overlay 2024 Reconstruct 2024 Mill and Overlay 2025-2027, Construction City Parking Mill and Overlay ST. LOUIS PARK ST. LOUIS PARKEDINAMINNETONKAMINNETONKA EDINA MINNETONKA MINNETONKATHE CITY OF HOPKINS, MINNESOTA HENNEPIN COUNTY 2020 - 2027 Capital Improvement Projects Revised 7/15/2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Streets/Traffic Description County Road 3 from Shady Oak Road to Meadowbrook Road. Lighting, landscaping, street, etc. improvements along Excelsior Boulevard from the east to west city limits. GO Bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue Project has been delayed pending county funding for remaining 4th segement. Project #01-CIP-S104 Priority n/a Justification Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in remaining segment of County Road 3. - Segment 4 from Blake Road to Meadowbrook Road; upgrade roadway, implement beautification program. Budget Impact/Other GO bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue. Segment 4: Planning and acquisition - Not in County Funding Plan, when funded city will complete our portion. Consistent with Hennepin County CIP and City Council action. Useful Life UnassignedProject Name County Road 3 Category Trans: Streets Type Improvement Future Total Project Cost:$2,300,000 Total2021 2022 2023 2024 2025Expenditures 2,300,0002,300,000Construction/Maintenance 2,300,000 2,300,000Total Total2021 2022 2023 2024 2025Funding Sources 1,600,0001,600,000GU - Other Governmental Units 700,000700,000MS - Municipal State Aid Streets 2,300,000 2,300,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2021 2025 thru Department Public Works: Streets/Traffic Description Painting bike lanes, constructing trails and sidewalks, safety improvements and other general pedestrian and bicycle improvements to the system. 2020: ADA Upgrades in the Central Business District 2021: Upgrade of the 11th Avenue South pedestrian crossings in the Westbrooke Area to pedestrian activated RRFB. Project #13-CIP-S040 Priority n/a Justification Council adopted plan to increase pedestrian and bicycle access and safety, these improvements begin to implement that plan. The existing overhead flushers provide very little benefit. Pedestrian activated rectangular rapid flushing beacons (RRFB) have shown to provide very high compliance for motorists and increases pedestrian safety and comfort. Budget Impact/Other Useful Life 20 yearsProject Name Pedestrian & Bicycle Access Improvements Category Trans: Streets Type Improvement Future Total Project Cost:$375,000 Total2021 2022 2023 2024 2025Expenditures 200,00025,000 25,000 25,000 25,000 100,000Construction/Maintenance 25,000 25,000 25,000 25,000 100,000 200,000Total Total2021 2022 2023 2024 2025Funding Sources 200,00025,000 25,000 25,000 25,000 100,000PI - PIR/General Obligation Bonds 25,000 25,000 25,000 25,000 100,000 200,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Streets/Traffic Description Location to be determined based on Pavement Management Program. Program includes mill and overlay of deteriorated pavements to extend the useful life of the street. Streets for this method of rehabilitation have usually been rehabilitated or reconstructed within the last 20 years. 2020: 1st St N, North CBD Avenues 2021: Knollwood Neighborhood 2022: 1st St. N, Lot 700, Maetzold Field Lot 2023: 2nd Ave S. 2024: 1st St. S, South CBD Avenues Project #16-CIP-S041 Priority n/a Justification Properly timed mill and overlay projects can significantly extend the life of a street and delay the need for reconstruction. Mill and overlay projects also require less disturbance and are shorter in duration than reconstruction, which results in less impact of the traveling public. Budget Impact/Other Annual pavement rehabilitation category. Useful LifeProject Name Street Rehabilitation Improvements Category Trans: Streets Type Improvement Future Total Project Cost:$3,975,000 Total2021 2022 2023 2024 2025Expenditures 2,475,000725,000 400,000 425,000 450,000 475,000Construction/Maintenance 725,000 400,000 425,000 450,000 475,000 2,475,000Total Total2021 2022 2023 2024 2025Funding Sources 2,475,000725,000 400,000 425,000 450,000 475,000PI - PIR/General Obligation Bonds 725,000 400,000 425,000 450,000 475,000 2,475,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Streets/Traffic Description Replacement of aged regulatory and warning signs that have lost minimum retroreflectivity and replacement of posts, when needed. Project #16-CIP-S042 Priority n/a Justification The city is required to have a sign management program which includes a sign replacement strategy to ensure regulatory and warning signs provide adequate retroreflectivity. Sign replacement cycle is 8 years. Estimated costs assume sign replacements by contract. Parking signs will be replaced as needed due to age, fading, etc. Sign inventory data base will be updated to reflect install date/sign age. Budget Impact/Other Useful LifeProject Name Street Sign Management Category Trans: Streets Type Improvement Future Total Project Cost:$200,000 Total2021 2022 2023 2024 2025Expenditures 100,00020,000 20,000 20,000 20,000 20,000Construction/Maintenance 20,000 20,000 20,000 20,000 20,000 100,000Total Total2021 2022 2023 2024 2025Funding Sources 100,00020,000 20,000 20,000 20,000 20,000PI - PIR/General Obligation Bonds 20,000 20,000 20,000 20,000 20,000 100,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2021 2025 thru Department Public Works: Streets/Traffic Description Upgrade existing lighting in the Central Business District to newer LED fixtures, replace light poles and electrical service feed cabinets, as needed. 2021: Mainstreet East of 5th Ave - 20 fixtures 10th, 11th and 12th Ave N & S of Mainstreet - 52 fixtures Parking Lots 500 and 600 - 15 fixtures 2022: 7th, 8th and 9th Ave N & S of Mainstreet - 28 fixtures Parking Lots 700 and 750 - 8 fixtures Project #20-CIP-S001 Priority n/a Justification There is a need to continue the upgrade of lighting in the Central Business District. The Mainstreet lights were all upgraded to LED fixtures in 2015. An upgrade to LED fixtures will provide energy savings, maintenance savings and create a more uniform lighting appearance throughout the downtown area. Budget Impact/Other Useful LifeProject Name Central Business District Lighting Upgrades Category Trans: Street Lights Type Improvement Future Total Project Cost:$140,000 Total2021 2022 2023 2024 2025Expenditures 140,000100,000 40,000Construction 100,000 40,000 140,000Total Total2021 2022 2023 2024 2025Funding Sources 140,000100,000 40,000PI - PIR/General Obligation Bonds 100,000 40,000 140,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Streets/Traffic Description Street lighting upgrades are needed to replace deteriorated poles, electrical feedpoints and old, energy inefficent fixtures. 2021: Feltl Court street lighting: replace 10 lights, poles and electrical feedpoint. 2022: 11th Ave S, south of 7th St S, replace 18 poles and fixtures and one electrical feedpoint. 2023: Hobby Acres neighborhood streets, replace 17th poles and fixtures to match Xcel Energy upgraded poles/lights and three electrical feedpoints. 2024: Westbrooke Way street lighting, upgrade 22 lights, poles and wiring via new Xcel Energy agreement to replace expired 30-year agreement 2025: Excelsior Boulevard street lighting, upgrade lighting to LED fixtures via Xcel Energy upgrade program. Project #20-CIP-S002 Priority n/a Justification A replacement plan is needed as these lighting and electrical feed systems are reaching the end of their useful life, with out-dated electrical cabinets, poles and bases and old, energy inefficent light fixtures. Budget Impact/Other Useful LifeProject Name City Street Lighting Upgrades Category Trans: Street Lights Type Improvement Future Total Project Cost:$815,000 Total2021 2022 2023 2024 2025Expenditures 815,000110,000 190,000 200,000 90,000 225,000Construction 110,000 190,000 200,000 90,000 225,000 815,000Total Total2021 2022 2023 2024 2025Funding Sources 815,000110,000 190,000 200,000 90,000 225,000PI - PIR/General Obligation Bonds 110,000 190,000 200,000 90,000 225,000 815,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2021 2025 thru Department Public Works: Streets/Traffic Description Replacement and upgrading of traffic signal infrastructure including poles, mast arms, cabinets and controls, signal heads, pedestrian heads, and push ?? The work will also include upgrading the pedestrian ramps and crossings to meet ADA standards. 2024: Removal and replacement of signal and ADA upgrades Project #20-CIP-S005 Priority 5 Future Consideration Justification The existing signal is old and reaching the end of it's service life. Pedestrian crossing and ADA improvements should be completed as there are increased levels of both pedestrian and vehicular traffic through the intersection since the development of the Excelsior Crossings office park and improvements to Burnes Park. Budget Impact/Other Useful LifeProject Name Minnetonka Mills/5th St N Signal Replacement Category Trans: Sign/Signals Type Improvement Future Total Project Cost:$600,000 Total2021 2022 2023 2024 2025Expenditures 600,000600,000Construction/Maintenance 600,000 600,000Total Total2021 2022 2023 2024 2025Funding Sources 590,000590,000PI - PIR/General Obligation Bonds 10,00010,000SU - Storm Sewer Fund 600,000 600,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact 2021 2025 thru Department Public Works: Streets/Traffic Description Trail in Bellgrove Neighborhood Project #20-CIP-S006 Priority n/a Justification Budget Impact/Other Useful LifeProject Name Trail Segment - Bellgrove Category Unassigned Type Unassigned Future Total Project Cost:$100,000 Total2021 2022 2023 2024 2025Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total2021 2022 2023 2024 2025Funding Sources 100,000100,000PI - PIR/General Obligation Bonds 100,000 100,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Utilities Description Annual concrete repairs and patching of existing alleys. Project #01-CIP-U002 Priority n/a Justification Annual alley pavement concrete slab repairs are needed. Budget Impact/Other Consistent with the Storm Water Management Plan. Useful Life UnassignedProject Name Storm Drainage System Maintenance - Alley Repairs Category Utilities: Municipal Sanitary Se Type Improvement Future Total Project Cost:$336,000 Total2021 2022 2023 2024 2025Expenditures 102,00024,000 25,000 26,000 27,000Construction/Maintenance 24,000 25,000 26,000 27,000 102,000Total Total2021 2022 2023 2024 2025Funding Sources 102,00024,000 25,000 26,000 27,000SU - Storm Sewer Fund 24,000 25,000 26,000 27,000 102,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Utilities Description This will help us line our sanitary sewers to eliminate infiltration root intrusion and avoid expensive repairs and sewer backups. Project #18-CIP-U016 Priority 2 Very Important Justification We have an old collection system that needs immediate attention. Continuously cleaning the sewer does not stop roots or infiltration from going into the pipes, we need a more permanent fix. The majority of our sanitary sewer pipe is made out of clay pipe and has reached its life expectancy. Budget Impact/Other Useful LifeProject Name Sewer Lining Category Utilities: Municipal Sanitary Se Type Improvement Future Total Project Cost:$367,500 Total2021 2022 2023 2024 2025Expenditures 217,50050,000 52,500 55,000 60,000Construction/Maintenance 50,000 52,500 55,000 60,000 217,500Total Total2021 2022 2023 2024 2025Funding Sources 217,50050,000 52,500 55,000 60,000SF - Sanitary Sewer Fund 50,000 52,500 55,000 60,000 217,500Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Utilities Description Program includes rehabilitatation of trunk water mains around the city. Staff has conducted some non-destructive condition assessment testing of various trunk lines around the city. The testing determines a level of deterioration based on a calculated reduction of thickness of the pipe wall. Review of how critical the line is, break records, pipe age, and soil conditions are also considered in determining projects. 2022: Replacement of trunk main along North TH 7 Service Drive from Oakridge Road to west of Hopkins Crossroad and trunk main from Water Treatment Plant to North Service Drive. Project #19-CIP-U017 Priority 2 Very Important Justification Trunk water mains are large diameter, high capacity lines that are critical to supply water to and from the water treatment plant, water towers, and distribution lines around the city and cannot easily be taken out of service. Public Works staff has been managing the trunk main system as a standalone asset, as these mains cannot always be included for rehabilitation with street reconstruction projects. Much of the city's trunk system was constructed over 50 years ago and is approaching the end of it's service life. Budget Impact/Other Useful LifeProject Name Trunk Water Main Rehabilitation Category Utilities: Municipal Water Syst Type Improvement Future Total Project Cost:$3,955,000 Total2021 2022 2023 2024 2025Expenditures 3,955,0003,955,000Construction/Maintenance 3,955,000 3,955,000Total Total2021 2022 2023 2024 2025Funding Sources 1,450,0001,450,000PI - PIR/General Obligation Bonds 395,000395,000SF - Sanitary Sewer Fund 160,000160,000SU - Storm Sewer Fund 1,950,0001,950,000WF - Water Fund 3,955,000 3,955,000Total Thursday, November 12, 2020 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2021 2025 thru Department Recreation Description The joint recreation agreement in place between the cities of Hopkins and Minnetonka provides for the sharing of operational and maintenance expenses for Shady Oak Beach. These expenses are split 33% city of Hopkins and 67% city of Minnetonka. Shady Oak Beach is operated from June - August annually; however the park is available for use year round. 2021: Dock maintenance ($10,000) 2022: Miscellaneous building components, i.e. installation of energy efficient lighting in restrooms/gate area, patio tables and chairs ($15,000); inflatables replacement ($10,000) 2023: Miscellaneous building maintenance ($10,000) 2024: Inflatable replacement ($10,000) 2025: Miscellaneous building maintenance ($10,000) Project #16-CIP-R003 Priority 3 Important Justification Since last undergoing a renovation in 1998, Shady Oak Beach contiues to be a primary park destination for residents of Hopkins and Minnetonka. Scheduled items are intended to keep the park in excellent appearence, establish a gateway to the park, and to provide park users with a quality recreational experience. 2020: Water play inflatable amenities 2021: Dock maintenance and replacement of picnic shelter 2022: Miscellaneous building components 2023: Miscellaneous building maintenance 2024: Miscellaneous building components Budget Impact/Other Useful Life 10-20 yearsProject Name Shady Oak Beach Improvements Category PW - Parks Type Improvement Future Total Project Cost:$350,000 Total2021 2022 2023 2024 2025Expenditures 65,00010,000 25,000 10,000 10,000 10,000Construction/Maintenance 10,000 25,000 10,000 10,000 10,000 65,000Total Total2021 2022 2023 2024 2025Funding Sources 43,6006,700 16,800 6,700 6,700 6,700GU - Other Governmental Units 21,4003,300 8,200 3,300 3,300 3,300PDF- Park Dedication Fund 10,000 25,000 10,000 10,000 10,000 65,000Total Thursday, November 12, 2020 2021 –2025 Capital Improvement Plan November 17, 2020 Overview 5 year plan, updated annually Integrated with Financial Management Plan Overview Funds Included in FMP: Park Dedication Capital Improvement Permanent Improvement Revolving Arts Center Pavilion Directly Funded Water Sanitary Sewer Storm Sewer Refuse Park Dedication Funding Sources Franchise Fees, $305,022 in 2021 Dedication Fees, nothing projected in 2021 Bond Proceeds, nothing planned in 2021 Park Dedication $300,300 of payments in 2021 Capital Projects of $33,300 Shady Oak Picnic Shelter -$30,000 Shady Oak Beach Improvements -$3,300 Park Dedication Removed $180,000 of Capital Projects in 2021 Maetzold Field Pavilion -$20,000 (completed with CARES) Downtown Park Rehab -$35,000 (Delayed) Central Park Picnic Shelter Rehab -$50,000 (Delayed) Central Park East Play Equipment -$75,000 (Delayed) Park Dedication Bond Payments of $260,000 Cottageville, Valley & Oakes Park -$110,000 Burnes Park Bonds -$150,000 Skate Park Contribution of $7,000 End 2021 with fund balance of $62,322 Capital Improvement Funding Sources (Not Finalized) Based on a 2021 Levy of $17,788,384, a $258,700 or 1.48% increase No tax levy in 2021 Franchise Fees, $361,500 in 2021 Bond Proceeds, none planned Capital Improvement Activity Center Remodel -$175,000 (Delayed) Historical Society Area Eastside room configuration Office/reception enhancements Capital Improvements Bond Payments of $360,000 City hall Projected to end 2021 with $202,932 fund balance Permanent Improvement Funding Sources Bond Proceeds, $4.1 Million in 2021 Paid by tax levy, special assessments o Utility portions recorded in Water, Sewer & Storm Sewer Funds Grant funding received in prior years Permanent Improvement Capital Projects $4,102,500 Second ½ of Interlachen Street Project $3.2 million Mill and Overlay in Knollwood Neighborhood - $725,000 Pedestrian & Bicycle Access, Street Rehabilitation and Sign Management -$145K Permanent Improvement Capital Projects $4,102,500 (continued) Pedestrian & Bicycles Access Improvements - $25,000 Street Sign Maintenance -$20,000 Trail Segments -$100,000 Permanent Improvement Major Projects in 2022 6th Ave South/7th Ave South -$2,375,000 Tax Levy -$650,000 (PIR Portion) Special Assessments -$500,000 (PIR Portion) Sanitary Sewer -$500,000 Storm Sewer -$225,000 Water -$500,000 Permanent Improvement Major Projects in 2022 (Continued) Trunk Water Main Rehabilitation PIR/Tax Levy -$1,450,000 Sanitary Sewer -$395,000 Storm Sewer Fund -$160,000 Water Fund $1,950,000 Mill & Overlay -$400,000 1st St. N, Lot 700, 10 Ave N, 2nd Ave S