Memo- Capital Improvement Plan (CIP)
CITY OF HOPKINS
I FINANCE DEPARTMENT I
MEMORANDUM
Date: June 8, 2006
To: Mayor & City Council
From: Christine Harkess, Finance Director
Subject: Capital Improvement Plan (C.I.P.)
Attached is the proposed CIP, which has undergone several staff revisions. At the work session
we will review the 2007-2011 document and incorporate any changes from that discussion prior
to presenting the plan to the public at the July 18, 2006 council meeting.
The CIP consists of four parts -
1. The narrative and cash flow statements
2. Projects summarized in a number of different ways - by year, by department, by funding
source, etc
3. Individual project sheets providing a description of the project, justification, and funding
source.
4. Map showing the projects color coded by year scheduled
DRAFT
CITY OF HOPKINS
2007 -2011
CAPITAL IMPROVEMENT
PLAN
June 6, 2006
SUMMARY OF IMPACTS ON MAJOR FUNDING SOURCES
CURRENT REVENUES/GENERAL FUND RESERVES
Expenditures for 2006 are budgeted at a .38% decrease over the 2005 budget due to a
one-time transfer in 2005 to the 2002 HRA Leased Revenue Bond Fund. The tax levy is
the major source of revenues (82%) for the General Fund and therefore would need to
increase if general fund operating and capital expenditures increase in 2007. Annually
the legislature debates the future of tax levy limits however they were not reinstated for
2007.
Reserves in the General Fund total $4,311,195 at the end of 2005 and are projected to
remain at that level for 2006. ,The city requires funds totaling approximately 40% of
expenditures on hand for cash flow since tax revenues are received twice a year, in June
and December. For 2006 this amounts to $3,555,315. At January 1, 2006 the fund
balance was at 48.5% of budgeted expenditures.
PERMANENT IMPROVEMENT REVOLVING FUND. (P.I.R.) - G.O. DEBT
Funding from bonds is used to reimburse the P.I.R. fund for public improvement projects,
which have been previously expended. The debt is funded by special assessment
collections and city tax levies over an eight to ten year period. In 2006, the levy for
permanent improvement revolving debt was $147,000. In 2007, the levy for debt will
again be $147,000. The outstanding debt is from 1992, (refunded in 2001), 1999 and
2002. The P.I.R. fund has completed substantial projects over the last three years totaling
over $1.69 million. This pace is expected to continue into the future with scheduled
2006 projects totaling $1.75 million. Projects scheduled for 2007 include residential
street improvements on Drillane & 19th Ave N and street overlay projects on 1ih_16th
Ave N and Blake Road. Theses projects total $1,440,000 and special assessments,
$400,000; PIR/Bonding, $900,000; and Municipal State Aid Funding, $140,000, provide
the required funding.
In the years 2008-2011 the city has an aggressive residential street improvement schedule
planned in addition to major improvements to County Road 61 - Shady Oak Road,
totaling $6.98 million of which $3.03 million will be assessed. This will require
additional bonding in 2008 and 2010 to fund these projects.
MUNIClPAL STATE AID FUND
Funding is insufficient for the projects listed in the ClP document in 2007 and beyond
unless anticipated project costs are delayed or the city borrows funds from the state.
Other factors impacting this fund is an outstanding obligation to Hennepin County
totaling approximately $2,370,000 for the city's share of County Road 3 Phase I
improvements completed in 2001. The city has not yet been billed for these costs.
Residential street improvements totaling $140,000 are scheduled for 2007 and the County
Road 3 Phase 4 project, a substantial project that is being conducted jointly with
Hennepin County originally scheduled for the 2009 construction season has been pushed
back to 2011. In order to fund these projects the city will be requesting an advance on
future allotments from the state to cover these projects costs. The advance is similar to
borrowing from the state at market or below current interest rates. It is proj ected that the
city will need to borrow approximately $1,500,000 from the state in 2007. Debt
payments for these borrowings will come out of future dollars allotted to the city.
CAPITAL IMPROVEMENT FUND
Funding for this fund is dependent on future infrastructure improvements (parking
facilities) and maintenance needs of city facilities. Past funding has been transfers from
the general fund. A $25,000 levy for capital improvements was established for 2005 with
annual increases planned for future years. To supplement the tax levy, future transfers
are also budgeted from the general fund to adequately provide for scheduled projects.
Projects scheduled in 2007 include city hall interior improvements and HV AC upgrade.
PARK. IMPROVEMENT FUND
The source of funding for this fund is development fees charged to developers for park
development. Future funds are dependent on future development and redevelopment in
the city. The County Road 3 beautification project has been pushed out to 2008 when
funds will more likely be available for this type of project. Projects scheduled for 2007
include Central Park ball field #2 landscaping repairs - $25,000, and replacement of park
shelter roofs in Oakes, Valley and Maetzold Parks - $20,000. The redevelopment of the
North Annex property is expected to generate significant developer fees over the next 3-
4 years. The Park Board will be evaluating city parks and developing a long-range plan
for the city's park system.
WATER FUND
Several large facility upgrades completed between 1999 and 2001 require rate increases
in the future to help pay for bonds issued. In addition, the public works facility
improvement project will cost the water enterprise $45,000 a year for twenty years.
Increased operating costs and improvements to water facilities prompted a rate increase
in 2005 from $1.20 per 1,000 gallons to $1.40 per 1,000 gallons. As part of the annual
budget process the city evaluates the utility rates to ensure adequate funding for both
operations and capital needs. The next rate increase is currently scheduled for 2010,
however, could come sooner depending on the funds cash flow needs. The increases in
the rate are necessary for operations, to maintain the planned projects and to payoff
bonds that were issued to provide funding for water improvement proj ects.
Projects planned for 2007 include $75,000 in water main improvements done In
conjunction with the scheduled residential street improvement projects.
SANITARY SEWER FUND
The current revenues and working capital balance will cover the projected operating and
capital costs through 2006. Projects planned for 2007 include $75,000 in sewer main
improvements done in conjunction with scheduled residential street improvement
projects and the replacement of lift station #1, which has been in operation since 1957. In
addition to the scheduled capital expenditures, the Metropolitan Waste Control
Commission is projecting increases in its disposal charges to local governments. The
public works facility improvement project will cost the sewer enterprise fund $50,000 a
year for twenty years. Increased operating costs and improvements to sewer facilities
prompted a rate increase in 2006 from $2.25 per 1,000 gallons to $2.50 per 1,000 gallons.
Looking further into the future the city may need to increase rates every two to three
years to keep pace with disposal costs and infrastructure needs. It is anticipated that we
will need to bond in 2007 to fund future scheduled projects.
REFUSE FUND
A rate increase was approved for 2005 and was the first rate increase since 1995. Absent
a new fee for brush, yard waste and leaf collection, refuse disposal rates will need to
increase every four years to offset costs. A planned rate increase in recycling rates is
scheduled for 2007 raising the fee from $2.75 to $3.25 to fund increased operating costs
in the recycling program. The public works facility improvement project will cost the
refuse enterprise $25,000 a year for twenty years.
STORM SEWER FUND
The storm sewer utility issued bonds in 2003 to help cover infrastructure costs that were
incurred prior to 2003. The current revenues and working capital balance will cover the
proj ected operating and capital costs over the next several years. Proj ects scheduled for
2007 include $158,000 in storm sewer improvements done in conjunction with the
scheduled residential street improvement and concrete alley projects. In addition,
$15,000 of storm drainage maintenance costs are scheduled. The public works facility
improvement project will cost the storm sewer enterprise $25,000 a year for twenty years.
Increased operating costs and improvements to the storm sewer system prompted a rate
increase in 2006 from $4.00 per residential equivalency factor to $4.50 per residential
equivalency factor. This represented a 12.5% increase in rates, which were last raised in
1999.
PAVILION FUND
An addition to the capital improvement plan is the Pavilion Fund. This facility built in
1990 is starting to need repairs and replacement to areas that are heavily used. Scheduled
for 2007 is replacement of the skate tile, which is 16 years old and adding skate tile to a
portion of the lobby and ceramic tile for the remaining lobby area. The building has had
several additions and improvements over the years that are being paid by the users of
those areas through long-term lease arrangements.
Current working capital is not sufficient to fund anticipated needs therefore alternative
funding sources will need to be explored. As part of the 2007 budget process this issue
will be explored in-depth as infrastructure needs of the Pavilion continue to increase as
the building ages and facility use remains in high demand.
TAX INCREMENT FINANCING FUNDS
Considering all tax increment districts, as a whole, cash on hand, proj ected increments
and loan repayments are sufficient to cover TIF project expenditures. The state has
provided municipalities with a pooling tool to accommodate short-term deficiencies
within its' districts. The city will be allowed to pool its' districts tax increment revenues
to cover outstanding debt. Currently none of the city's districts are projected to have
shortfalls.
Cash Flow Statements
Five Year
Project Summaries
City of Hopkins, MN
CAPITAL IMPROVEMENTS PLAN
2007 thru 2011
PROJECTS BY YEAR
Project Name Department Project # Priority Project Cost
2007 I
North Annex Redevelopment Project Development 01-CIP-D402 0 3,300,000
Block 64 Redevelopment Project Development 06-CIP-D404 0 4,000,000
Marketplace and Main Development 07-CIP-D405 0 2,700,000
City Hall Carpet Replacement Public Works: Bldg/Equip Serv 05-CIP-B305 0 95,000
City Hall HVAC Upgrade Public Works: Bldg/Equip Serv 07-CIP-B312 0 76,000
Pavilion Skate Tile Replacement/Lobby Improvement Public Works: Bldg/Equip Serv 07-CIP-B313 0 52,000
Central Park Ballfield #2 Public Works: Parks 07-CIP-P217 0 25,000
Park Shelter Roofs Public Works: Parks 07-CIP-P218 0 20,000
Residential Street Improvements Public Works: StreetsfTraffic 01-CIP-S101 0 1,440,000
Residential Street Improvements-Utilities Public Works: StreetsfTraffic 01-CIP-S102 0 250,000
Citywide Concrete Alleys Public Works: StreetsfTraffic 01-CIP-S103 0 40,000
Storm drainage system maintenance Public Works: Utilities 01-CIP-UOO2 0 15,000
Upgrade of sanitary sewer lift station #1 Public Works: Utilities 04-CIP-UOO7 0 200,000
Total for 2007 12,213,000
2008 I
Redevelopment, East Excelsior Boulevard Development 01-CIP-D401 0 4,000,000
North Annex Redevelopment Project Development 01-CIP-D402 0 3,300,000
Block 64 Redevelopment Project Development 06-CIP-D404 0 3,000,000
City Hall Boiler Additions Public Works: Bldg/Equip Serv 05-CIP-B307 0 23,000
Activity Center Window Replacement Public Works: Bldg/Equip Serv 05-CIP-B308 0 5,200
Arts Center Carpet Second Floor Lobby Public Works: Bldg/Equip Serv 07-CIP-B316 0 21,000
Pavilion Community Message Sign Public Works: Parks 02-CIP-P210 3 35,000
Co Rd 3 Beautification Corridor Public Works: Parks 02-CIP-P213 1 80,000
Central Park Tennis Courts Public Works: Parks 05-CIP-P202 0 50,000
Residential Street Improvements Public Works: StreetslTraffic 01-CIP-S101 0 1,500,000
Residential Street Improvements-Utilities Public Works: StreetsfTraffic 01-CIP-S102 0 250,000
Citywide Concrete Alleys Public Works: StreetsfTraffic 01-CIP-S103 0 40,000
Municipal State Aid Road Improvements Public Works: StreetsfTraffic 02-CIP-S116 0 1,480,000
Storm drainage system maintenance Public Works: Utilities 01-CIP-UOO2 0 2,015,000
5th Street South Culvert Replacement Public Works: Utilities 05-CIP-UOO8 0 550,000
Total for 2008 16,349,200
2009 I
North Annex Redevelopment Project Development 01-CIP-D402 0 3,400,000
Residential Street Improvements Public Works: StreetsfTraffic 01-CIP-S101 0 1,100,000
Residential Street Improvements-Utilities Public Works: StreetslTraffic 01-CIP-S102 0 250,000
Citywide Concrete Alleys Public Works: StreetsfTraffic 01-CIP-S103 0 40,000
County Road 61 (Shady Oak Road) Public Works: StreetslTraffic 01-CIP-S106 0 2,879,700
Storm drainage system maintenance Public Works: Utilities 01-CIP-UOO2 0 16,000
Storm Water Management Projects Public Works: Utilnies 01-CIP-UOO3 0 200,000
Total for 2009 7,885,700
Tuesday, June 06, 2006
Project Name Department Project # Priority Project Cost
2010 I
Pavilion Overhead Door Improvement Public Works: Bldg/Equip Serv 07-CIP-B314 0 35,000
Arts Center Carpet: Comm Rm, Green Rm, Hallway Public Works: Bldg/Equip Serv 07-CIP-B317 0 15,000
Shady Oak Beach Water Play Area Renovation Public Works: Parks 07-CIP-P219 0 540,000
Residential Street Improvements Public Works: StreetslTraffic 01-CIP-S101 0 1,600,000
Residential Street Improvements-Utilities Public Works: StreetslTraffic 01-CIP-S102 0 250,000
County Road 61 (Shady Oak Road) Public Works: StreetslTraffic 01-CIP-S106 0 1,950,000
Reconstruct Parking Lot 200 Public Works: StreetslTraffic 06-CIP-S118 0 200,000
Storm drainage system maintenance Public Works: Utilities 01-CIP-UOO2 0 16,000
Total for 2010 4,606,000
2011 I
Residential Street Improvements Public Works: StreetslTraffic 01-CIP-S101 0 1,600,000
Residential Street Improvements-Utilities Public Works: StreetslTraffic 01-CIP-S102 0 250,000
County Road 3 Public Works: StreetslTraffic 01-CIP-S104 0 2,300,000
Storm drainage system maintenance Public Works: Utilities 01-CIP-UOO2 0 17,000
Total for 2011 4,167,000
GRAND TOTAL 45,220,900
Tuesday, June 06, 2006
City of Hopkins, MN
CAPITAL IMPROVEMENTS PLAN
2007 thru 2011
CATEGORY SUMMARY
Category 2007 2008 2009 2010 2011 Total Future
Buildings: Administrative Offices 171,000 23,000 194,000
Buildings: Arts Center 21,000 15,000 36,000
Buildings: Community Center 5,200 5,200
Economic Development 10,000,000 10,300,000 3,400,000 23,700,000
Parks/Forestry/Pavilion: Community Facil 97,000 115,000 35,000 247,000 220,000
Parks/Forestry/Pavilion: Neighborhood F 50,000 50,000
Trans: Parking Facilities 200,000 200,000
Trans: Streets 1,730,000 3,270,000 4,269,700 3,800,000 4,150,000 17,219,700 1,250,000
Unassigned 540,000 540,000
Utilities: Municipal Sanitary Sewer 215,000 2,015,000 16,000 16,000 17,000 2,279,000
Utilities: Storm Sewer 550,000 200,000 750,000
GRAND TOTAL 12,213,000 16,349,200 7,885,700 4,606,000 4,167,000 45,220,900 1,470,000
Tuesday, June 06, 2006
City of Hopkins, MN
CAPITAL IMPROVEMENTS PLAN
2007 thru 2011
CATEGORY SUMMARY BY DEPARTMENT
Department
Category 2007 2008 2009 2010 2011 Total Future
IDevelopment I
Economic Development 10,000,000 10,300,000 3,400,000 23,700,000
Department Total 10,000,000 10,300,000 3,400,000 23,700,000
IPublic Works: Bld2/Equip Serv I
Buildings: Administrative Offices 171,000 23,000 194,000
Buildings: Arts Center 21,000 15,000 36,000
Buildings: Community Center 5,200 5,200
Parks/Forestry/Pavilion: Community Facilities 52,000 35,000 87,000 220,000
Department Total 223,000 49,200 50,000 322,200 220,000
IPublic Works: Parks I
Parks/Forestry/Pavilion: Community Facilities 45,000 115,000 160,000
Parks/Forestry/Pavilion: Neighborhood Facilities 50,000 50,000
Unassigned 540,000 540,000
Department Total 45,000 165,000 540,000 750,000
IPublic Works: Streets/Traffic I
Trans: Parking Facilnies 200,000 200,000
Trans: Streets 1,730,000 3,270,000 4,269,700 3,800,000 4,150,000 17,219,700 400,000
Department Total 1,730,000 3,270,000 4,269,700 4,000,000 4,150,000 17,419,700 400,000
IPublic Works: Transportation ,
Trans: Streets 850,000
Department Total 850,000
IPublic Works: Utilities ,
Utilities: Municipal Sanitary Sewer 215,000 2,015,000 16,000 16,000 17,000 2,279,000
Utilities: Storm Sewer 550,000 200,000 750,000
Department Total 215,000 2,565,000 216,000 16,000 17,000 3,029,000
GRAND TOTAL 12,213,000 16,349,200 7,885,700 4,606,000 4,167,000 45,220,900 1,470,000
Tuesday, June 06, 2006
City of Hopkins, MN
CAPITAL IMPROVEMENTS PLAN
2007 thru 2011
PROJECTS BY CATEGORY
Category Project# Priority 2007 2008 2009 2010 2011 Total
IBuildings: Administrative Offices ,
City Hall Carpet Replacement 05-CIP-B305 0 95,000 95,000
City Hall Boiler Additions 05-CIP-B307 0 23,000 23,000
City Hall HVAC Upgrade 07 -CIP-B312 0 76,000 76,000
Buildings: Administrative Offices Total 171,000 23,000 194,000
IBuildings: Arts Center I
Arts Center Carpet Second Floor Lobby 07-CIP-B316 0 21,000 21,000
Arts Center Carpet: Comm Rm, Green Rm, Hallway 07-CIP-B317 0 15,000 15,000
Buildings: Arts Center Total 21,000 15,000 36,000
IBuildings: Community Center I
Activity Center Window Replacement 05-CIP-B308 0 5,200 5,200
Buildings: Community Center Total 5,200 5,200
IEconomic Development I
Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 4,000,000 4,000,000
North Annex Redevelopment Project 01-CIP-D402 0 3,300,000 3,300,000 3,400,000 10,000,000
Block 64 Redevelopment Project 06-CIP-D404 0 4,000,000 3,000,000 7,000,000
Marketplace and Main 07 -CIP-D405 0 2,700,000 2,700,000
Economic Development Total 10,000,000 10,300,000 3,400,000 23,700,000
!ParksIForestrylPavilion: Community F I
Pavilion Community Message Sign 02-CIP-P210 3 35,000 35,000
Co Rd 3 Beautification Corridor 02-CIP-P213 1 80,000 80,000
Pavilion Skate Tile ReplacemenULobby Improvement 07-CIP-B313 0 52,000 52,000
Pavilion Overhead Door Improvement 07-CIP-B314 0 35,000 35,000
Central Park Ballfield #2 07-CIP-P217 0 25,000 25,000
Park Shelter Roofs 07-CIP-P218 0 20,000 20,000
Parks/Forestry/Pavilion: Community 97,000 115,000 35,000 247,000
Facilities Total
.parksIForestrYlPaVilion: Neighborhoodl
Central Park Tennis Courts 05-CIP-P202 0 50,000 50,000
Friday, June 09,2006
Category Project# Priority 2007 2008 2009 2010 2011 Total
Parks/Forestry/Pavilion: Neighborhood 50,000 50,000
Facilities Total
ITrans: Parking Facilities I
Reconstruct Parking Lot 200 06-CIP-S118 0 200,000 200,000
Trans: Parking Facilities Total 200,000 200,000
ITrans: Streets I
Residential Street Improvements 01-CIP-S101 0 1,440,000 1,500,000 1,100,000 1,600,000 1,600,000 7,240,000
Residential Street Improvements-Utilities 01-CIP-S102 0 250,000 250,000 250,000 250,000 250,000 1,250,000
Citywide Concrete Alleys 01-CIP-S103 0 40,000 40,000 40,000 120,000
County Road 3 01-CIP-S104 0 2,300,000 2,300,000
County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,879,700 1,950,000 4,829,700
Municipal State Aid Road Improvements 02-CIP-S116 0 1,480,000 1,480,000
Trans: Streets Total 1,730,000 3,270,000 4,269,700 3,800,000 4,150,000 17,219,700
IUnassigned I
Shady Oak Beach Water Play Area Renovation 07-CIP-P219 0 540,000 540,000
Unassigned Total 540,000 540,000
.Utilities: Municipal Sanitary Sewer I
Storm drainage system maintenance 01-CIP-U002 0 15,000 2,015,000 16,000 16,000 17,000 2,079,000
Upgrade of sanitary sewer lift station #1 04-CIP-U007 0 200,000 200,000
Utilities: Municipal Sanitary Sewer Total 215,000 2,015,000 16,000 16,000 17,000 2,279,000
IUtilities: Storm Sewer I
Storm Water Management Projec~ 01-CIP-U003 0 200,000 200,000
5th Street South Culvert Replacement 05-CIP-U008 0 550,000 550,000
Utilities: Storm Sewer Total 550,000 200,000 750,000
GRAND TOTAL 12,213,000 16,349,200 7,885,700 4,606,000 4,167,000 45,220,900
Friday, June 09, 2006
City of Hopkins, MN
CAPITAL IMPROVEMENTS PLAN
2007 thru 2011
DEPARTMENT SUMMARY
Department 2007 2008 2009 2010 2011
Development 10,000,000 10,300,000 3,400,000
Public Works: Bldg/Equip Serv 223,000 49,200 50,000
Public Works: Parks 45,000 165,000 540,000
Public Works: StreetsfTraffic 1,730,000 3,270,000 4,269,700 4,000,000 4,150,000
Public Works: Utilities 215,000 2,565,000 216,000 16,000 17,000
GRAND TOTAL 12,213,000 16,349,200 7,885,700 4,606,000 4,167,000
Total
23,700,000
322,200
750,000
17,419,700
3,029,000
45,220,900
Tuesday, June 06, 2006
City of Hopkins, MN
CAPITAL IMPROVEMENTS PLAN
2007 thru 2011
PROJECTS BY DEPARTMENT
Department Project# Priority 2007 2008 2009 2010 2011 Total
IDevelopment I
Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 4,000,000 4,000,000
North Annex Redevelopment Project 01-CIP-D402 0 3,300,000 3,300,000 3,400,000 10,000,000
Block 64 Redevelopment Project 06-CIP-D404 0 4,000,000 3,000,000 7,000,000
Marketplace and Main 07-CIP-D405 0 2,700,000 2,700,000
Development Total 10,000,000 10,300,000 3,400,000 23,700,000
[Public Works: Bldg/Equip Serv I
City Hall Carpet Replacement 05-CIP-B305 0 95,000 95,000
City Hall Boiler Additions 05-CIP-B307 0 23,000 23,000
Activity Center Window Replacement 05-CIP-B308 0 5,200 5,200
City Hall HVAC Upgrade 07-CIP-B312 0 76,000 76,000
Pavilion Skate Tile Replacement/Lobby Improvement 07-CIP-B313 0 52,000 52,000
Pavilion Overhead Door Improvement 07-CIP-B314 0 35,000 35,000
Arts Center Carpet Second Floor Lobby 07-CIP-B316 0 21,000 21,000
Arts Center Carpet: Comm Rm, Green Rm, Hallway 07-CIP-B317 0 15,000 15,000
Public Worl<s: BldglEquip Serv Total 223,000 49,200 50,000 322,200
IPublic Works: Parks I
Pavilion Community Message Sign 02-CIP-P210 3 35,000 35,000
Co Rd 3 Beautification Corridor 02-CIP-P213 1 80,000 80,000
Central Park Tennis Courts 05-CIP-P202 0 50,000 50,000
Central Park Ballfield #2 07-CIP-P217 0 25,000 25,000
Park Shelter Roofs 07-CIP-P218 0 20,000 20,000
Shady Oak Beach Water Play Area Renovation 07-CIP-P219 0 540,000 540,000
Public Worl<s: Parks Total 45,000 165,000 540,000 750,000
!Public Works: Streets/Traffic I
Residential Street Improvements 01-CIP-S101 0 1,440,000 1,500,000 1,100,000 1,600,000 1,600,000 7,240,000
Residential Street Improvements-Utilities 01-CIP-S102 0 250,000 250,000 250,000 250,000 250,000 1,250,000
Citywide Concrete Alleys 01-CIP-S103 0 40,000 40,000 40,000 120,000
County Road 3 o 1-CIP-S 104 0 2,300,000 2,300,000
County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,879,700 1,950,000 4,829,700
Municipal State Aid Road Improvements 02-CIP-S116 0 1,480,000 1,480,000
Reconstruct Parking Lot 200 06-CIP-S118 0 200,000 200,000
Public Worl<s: Streets/Traffic Total 1,730,000 3,270,000 4,269,700 4,000,000 4,150,000 17,419,700
~UbIlC Works: UtUltles ,
Storm drainage system maintenance 01-CIP-U002 0 15,000 2,015,000 16,000 16,000 17,000 2,079,000
Storm Water Management Projects 01-CIP-U003 0 200,000 200,000
Friday, June 09, 2006
Department Project# Priority 2007 2008 2009 2010 2011 Total
Upgrade of sanitary sewer lift station #1 04-CIP-U007 0 200,000 200,000
5th Street South Culvert Replacement 05-CIP-UOOB 0 550,000 550,000
Public Worl<s: Utilities Total 215,000 2,565,000 216,000 16,000 17,000 3,029,000
GRAND TOTAL 12,213,000 16,349,200 7,885,700 4,606,000 4,167,000 45,220,900
Friday, June 09, 2006
City of Hopkins, MN
CAPITAL IMPROVEMENTS PLAN
2007 thru 2011
PROJECTS BY CATEGORY AND DEPARTMENT
Department
Category 2007 2008 2009 2010 2011 Total Future
IDevelopment I
Economic Deve/oDment
Redevelopment, East Excelsior Boulevard 4,000,000 4,000,000
North Annex Redevelopment Project 3,300,000 3,300,000 3,400,000 10,000,000
East CBO Project
Block 64 Redevelopment Project 4,000,000 3,000,000 7,000,000
Marketplace and Main 2,700,000 2,700,000
Category Sub-Total 10,000,000 10,300,000 3,400,000 23,700,000
Department Total: 10,000,000 10,300,000 3,400,000 23,700,000
IFire I
Buildinas: Fire Facilities
Fire Station
Category Sub-Total
Department Total:
IPolice I
Buildinas: Police DeDartment
Police Station Remodeling
Category Sub-Total
Department Total:
IPublic Works: BldglEquip Serv I
Buildinas: Administrative Offices
City Hall Wall Covering Replacement
City Hall Carpet Replacement 95,000 95,000
City Hall Boiler Addttions 23,000 23,000
Building Maintenance Office and Shop Upgrade
City Hall Site Improvements
City Hall HVAC Upgrade 76,000 76,000
Category Sub-Total 171,000 23,000 194,000
Buildinas: Arts Center
Carpet, Arts Center Lobby
Arts Center Carpet Second Floor Lobby 21,000 21,000
Arts Center Carpet: Comm Rm, Green Rm, Hallway 15,000 15,000
Category Sub-Total 21,000 15,000 36,000
Buildinas: Communitv Center
Friday, June 09, 2006
Department
Category 2007 2008 2009 2010 2011 Total Future
Historical Society Roof Replacement
Activity Center Window Replacement 5,200 5,200
Category Sub-Total 5,200 5,200
Buildinas: Maintenance Facilities
Public Works Storage Facility
Public Works Remodeling
Category Sub-Total
ParkslForestrvlPavilion: Community Faciliti
Pavilion Skate Tile Replacement/Lobby Improvement 52,000 52,000
Pavilion Overhead Door Improvement 35,000 35,000
Pavilion Roof Replacement 220,000
Category Sub-Total 52,000 35,000 87,000 220,000
Department Total: 223,000 49,200 50,000 322,200 220,000
IPublic Works: Parks I
ParkslForestrvlPavilion: Community Faciliti
Shady Oak Beach Redevelopment
Downtown Park Improvements
Citywide Trail Connections
Pavilion Community Message Sign 35,000 35,000
Placement of 10-12 Bicycle Racks
Co Rd 3 Beautification Corridor 80,000 80,000
Burnes Park Play Equipment
Central Park Ballfield #2 25,000 25,000
Park Shelter Roofs 20,000 20,000
Category Sub-Total 45,000 115,000 160,000
ParkslForestrvlPavilion: Neiahborhood Facil
Valley Park Improvements
Handicapped Accessible Pllayground
Central Park Tennis Courts 50,000 50,000
Category Sub-Total 50,000 50,000
Unassianed
Shady Oak Beach Water Play Area Renovation 540,000 540,000
Category Sub-Total 540,000 540,000
Department Total: 45,000 165,000 540,000 750,000
IPublic Works: Streets/Traffic I
Trans: Parkin a Facilities
City Parking Lot Improvements
Reconstruct Parking Lot 200 200,000 200,000
Category Sub-Total 200,000 200,000
Trans: SianlSianals
City-wide Sign Master Plan
Category Sub-Total
Trans: Streets
Friday, June 09, 2006
Department
Category 2007 2008 2009 2010 2011 Total Future
Sixth Street South (11th to 12th Avenue South) 400,000
Residential Street Improvements 1,440,000 1,500,000 1,100,000 1,600,000 1,600,000 7,240,000
Residential Street Improvements-Utilities 250,000 250,000 250,000 250,000 250,000 1,250,000
Citywide Concrete Alleys 40,000 40,000 40,000 120,000
County Road 3 2,300,000 2,300,000
Fifth Avenue
County Road 61 (Shady Oak Road) 2,879,700 1,950,000 4,829,700
Rebuild/redesign 11th Avenue South
Streetscape Improvements, 11th Avenue South
Excelsior Boulevard Streetscape Improvements
Hwy 717th Ave/CSAH 73 Intersection Improvements
CSAH 73/CSAH 5 Intersection
Minnetonka Boulevard (CSAH 5) Corridor Improvement
Municipal State Aid Road Improvements 1,480,000 1,480,000
Co Rd 3 Boulevard Irrigation
Category Sub-Total 1,730,000 3,270,000 4,269,700 3,800,000 4,150,000 17,219,700 400,000
Department Total: 1,730,000 3,270,000 4,269,700 4,000,000 4,150,000 17,419,700 400,000
IPublic Works: Transportation .
Trans: Streets
Light Rail Transit Stations (2) 150,000
Ninth Avenue LRT Corridor 700,000
Category Sub-Total 850,000
Department Total: 850,000
iPublic Works: Utilities ,
Utilities: MuniciDal Sanitarv Sewer
Reconstruct sanitary sewer Lift Station #7
Storm drainage system maintenance 15,000 2,015,000 16,000 16,000 17,000 2,079,000
Upgrade of sanitary sewer lift station #1 200,000 200,000
Category Sub-Total 215,000 2,015,000 16,000 16,000 17,000 2,279,000
Utilities: MuniciDal Water System
Repaint Water Towers
Watermeter Radio Read System
Excelsior Boulevard Utility Improvements
Category Sub-Total
Utilities: Storm Sewer
Storm Water Management Projects 200,000 200,000
5th Street South Culvert Replacement 550,000 550,000
Category Sub-Total 550,000 200,000 750,000
Department Total: 215,000 2,565,000 216,000 16,000 17 ,000 3,029,000
GRAND TOTAL 12,213,000 16,349,200 7,885,700 4,606,000 4,167,000 45,220,900 1,470,000
Friday, June 09, 2006
Department
Category 2007 2008 2009 2010 2011 Total Future
Sixth Street South (11th to 12th Avenue South) 400,000
Residential Street Improvements 1,440,000 1,500,000 1,100,000 1,600,000 1,600,000 7,240,000
Residential Street Improvements-Utilities 250,000 250,000 250,000 250,000 250,000 1,250,000
Citywide Concrete Alleys 40,000 40,000 40,000 120,000
County Road 3 2,300,000 2,300,000
Fifth Avenue
County Road 61 (Shady Oak Road) 2,879,700 1,950,000 4,829,700
Rebuild/redesign 11th Avenue South
Streetscape Improvements, 11th Avenue South
Excelsior Boulevard Streetscape Improvements
Hwy 7 17th Ave/CSAH 73 Intersection Improvements
CSAH 73/CSAH 5 Intersection
Minnetonka Boulevard (CSAH 5) Corridor Improvement
Municipal State Aid Road Improvements 1,480,000 1,480,000
Co Rd 3 Boulevard Irrigation
Category Sub-Total 1,730,000 3,270,000 4,269,700 3,800,000 4,150,000 17,219,700 400,000
Department Total: 1,730,000 3,270,000 4,269,700 4,000,000 4,150,000 17,419,700 400,000
IPublic Works: Transportation I
Trans: Streets
Light Rail Transit Stations (2) 150,000
Ninth Avenue LRT Corridor 700,000
Category Sub-Total 850,000
Department Total: 850,000
_UbIiC Works: Utilities I
Utilities: MuniciDal Sanitarv Sewer
Reconstruct sanitary sewer Lift Station #7
Storm drainage system maintenance 15,000 2,015,000 16,000 16,000 17,000 2,079,000
Upgrade of sanitary sewer lift station #1 200,000 200,000
Category Sub-Total 215,000 2,015,000 16,000 16,000 17,000 2,279,000
Utilities: MuniciDal Water Svstem
Repaint Water Towers
Watermeter Radio Read System
Excelsior Boulevard Utility Improvements
Category Sub-Total
Utilities: Storm Sewer
Storm Water Management Projects 200,000 200,000
5th Street South Culvert Replacement 550,000 550,000
Category Sub-Total 550,000 200,000 750,000
Department Total: 215,000 2,565,000 216,000 16,000 17 ,000 3,029,000
GRAND TOTAL 12,213,000 16,349,200 7,885,700 4,606,000 4,167,000 45,220,900 1,470,000
Tuesday, June 06,2006
City of Hopkins, MN
CAPITAL IMPROVEMENTS PLAN
2007 thru 2011
PROJECTS BY DEPARTMENT AND EXPENDITURE TYPE
Department Project# Priority 2007 2008 2009 2010 2011 Total
IConstruction/Maintenance ,
DeveloDment
Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 4,000,000 4,000,000
North Annex Redevelopment Project 01-CIP-D402 0 3,300,000 3,300,000 3,400,000 10,000,000
Block 64 Redevelopment Project 06-CIP-D404 0 4,000,000 3,000,000 7,000,000
Marketplace and Main 07 -CIP-D405 0 2,700,000 2,700,000
Development Total 10,000,000 10,300,000 3,400,000 23,700,000
Public Works: Blde/EouiD Serv
City Hall Carpet Replacement 05-CIP-B305 0 95,000 95,000
City Hall Boiler Additions 05-CIP-B307 0 23,000 23,000
Activity Center Window Replacement 05-CIP-B308 0 5,200 5,200
City Hall HVAC Upgrade 07-CIP-B312 0 76,000 76,000
Pavilion Skate Tile Replacement/Lobby Improvement 07-CIP-B313 0 52,000 52,000
Pavilion Overhead Door Improvement 07-CIP-B314 0 35,000 35,000
Arts Center Carpet Second Floor Lobby 07-CIP-B316 0 21,000 21,000
Arts Center Carpet: Comm Rm, Green Rm, Hallway 07 -CIP-B317 0 15,000 15,000
Public Works: Bldg/Equip Serv Total 223,000 49,200 50,000 322,200
Public Works: Parks
Pavilion Community Message Sign 02-CIP-P210 3 35,000 35,000
Co Rd 3 Beautification Corridor 02-CIP-P213 1 80,000 80,000
Central Park Tennis Courts 05-CIP-P202 0 50,000 50,000
Central Park Ballfield #2 07 -CIP-P217 0 25,000 25,000
Park Shelter Roofs 07 -CIP-P218 0 20,000 20,000
Shady Oak Beach Water Play Area Renovation 07 -CIP-P219 0 540,000 540,000
Public Works: Parks Total 45,000 165,000 540,000 750,000
Public Works: Streets/Traffic
Residential Street Improvements 01-CIP-S101 0 1,440,000 1,500,000 1,100,000 1,600,000 1,600,000 7,240,000
Residential Street Improvements-Utilities 01-CIP-S102 0 250,000 250,000 250,000 250,000 250,000 1,250,000
Citywide Concrete Alleys 01-CIP-S103 0 40,000 40,000 40,000 120,000
County Road 3 01-CIP-S104 0 2,300,000 2,300,000
County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,879,700 1,950,000 4,829,700
Municipal State Aid Road Improvements 02-CIP-S116 0 1,480,000 1,480,000
Reconstruct Parking Lot 200 06-CIP-S118 0 200,000 200,000
Public Works: Streets/Traffic Total 1,730,000 3,270,000 4,269,700 4,000,000 4,150,000 17,419,700
Friday, June 09, 2006
Department Project# Priority 2007 2008 2009 2010 2011 Total
Public Works: Utilities
Storm drainage system maintenance 01-CIP-U002 0 15,000 2,015,000 16,000 16,000 17,000 2,079,000
Storm Water Management Projects 01-CIP-U003 0 200,000 200,000
Upgrade of sanitary sewer lift station #1 04-CIP-U007 0 200,000 200,000
5th Street South Culvert Replacement 05-CIP-U008 0 550,000 550,000
Public Works: Utilities Total 215,000 2,565,000 216,000 16,000 17;000 3,029,000
Construction/Maintenance Total 12,213,000 16,349,200 7,885,700 4,606,000 4,167,000 45,220,900
GRAND TOTAL 12,213,000 16,349,200 7,885,700 4,606,000 4,167,000 45,220,900
Friday, June 09, 2006
City of Hopkins, MN
CAPITAL IMPROVEMENTS PLAN
2007 thru 2011
FUNDING SOURCE SUMMARY
Source 2007 2008 2009 2010 2011 Total
CI - Capital Improvement Fund 171,000 49,200 215,000 435,200
GU - Other Governmental Units 2,520,000 2,010,000 1,860,000 1,600,000 7,990,000
MS - Municipal State Aid Streets 140,000 750,000 721,000 700,000 2,311,000
PA - Pavilion Fund 52,000 17,500 35,000 104,500
PDF- Park Dedication Fund 45,000 130,000 180,000 355,000
PF - Private Sector Funds 17,500 17,500
PI - PIRlGeneral Obligation Bonds 900,000 1,000,000 750,000 1,200,000 1,000,000 4,850,000
SA - Special Assessment 432,000 1,082,000 530,700 850,000 600,000 3,494,700
SF - Sanitary Sewer Fund 275,000 95,000 75,000 75,000 75,000 595,000
SU - Storm Sewer Fund 123,000 253,000 324,000 116,000 117,000 933,000
TF - Tax Increment Financing 10,000,000 10,300,000 3,400,000 23,700,000
WF - Water Fund 75,000 135,000 75,000 75,000 75,000 435,000
GRAND TOTAL 12,213,000 16,349,200 7,885,700 4,606,000 4,167,000 45,220,900
Fnday, June 09, 2006
City of Hopkins, MN
CAPITAL IMPROVEMENTS PLAN
2007 thru 2011
PROJECTS BY FUNDING SOURCE
Source Pro.iect# Priority 2007 2008 2009 2010 2011 Total
ICI - Capital Improvement Fund I
City Hall Carpet Replacement 05-C/P-B305 0 95,000 95,000
City Hall Boiler Additions 05-C/P-B307 0 23,000 23,000
Activity Center Window Replacement 05-C/P-B30B 0 5,200 5,200
Reconstruct Parking Lot 200 06-C/P-S11B 0 200,000 200,000
City Hall HVAC Upgrade 07-C/P-B312 0 76,000 76,000
Arts Center Carpet Second Floor Lobby 07-C/P-B316 0 21,000 21,000
Arts Center Carpet: Comm Rm, Green Rm, Hallway 07-C/P-B317 0 15,000 15,000
CI - Capital Improvement Fund Total 171,000 49,200 215,000 435,200
IGU - Other Governmental Units I
County Road 3 01-C/P-S104 0 1,600,000 1,600,000
County Road 61 (Shady Oak Road) 01-C/P-S106 0 2,010,000 1,500,000 3,510,000
Storm drainage system maintenance 01-C/P-U002 0 2,000,000 2,000,000
5th Street South Culvert Replacement 05-C/P-UOOB 0 520,000 520,000
.hadY Oak Beach Water Play Area Renovation 07-C/P-P219 0 360,000 360,000
GU - Other Governmental Units Total 2,520,000 2,010,000 1,860,000 1,600,000 7,990,000
IMS - Municipal State Aid Streets I
Residential Street Improvements 01-C/P-S101 0 140,000 140,000
County Road 3 01-C/P-S104 0 700,000 700,000
County Road 61 (Shady Oak Road) 01-C/P-S106 0 721,000 721,000
Municipal State Aid Road Improvements 02-C/P-S116 0 750,000 750,000
MS - Municipal State Aid Streets Total 140,000 750,000 721,000 700,000 2,311,000
Ip A - Pavilion Fund I
Pavilion Community Message Sign 02-C/P-P210 3 17,500 17,500
Pavilion Skate Tile Replacement/Lobby Improvement 07-C/P-B313 0 52,000 52,000
Pavilion Overhead Door Improvement 07-C/P-B314 0 35,000 35,000
P A - Pavilion Fund Total 52,000 17,500 35,000 104,500
IPDF - Park Dedication Fund I
Co Rd 3 Beautification Corridor 02-C/P-P213 1 80,000 80,000
Central Park Tennis Courts 05-C/P-P202 0 50,000 50,000
Central Park Ballfield #2 07-C/P-P217 0 25,000 25,000
Park Shelter Roofs 07-C/P-P218 0 20,000 20,000
Shady Oak Beach Water Play Area Renovation 07-C/P-P219 0 180,000 180,000
Friday, June 09, 2006
Source Project# Priority 2007 2008 2009 2010 2011 Total
PDF- Park Dedication Fund Total 45,000 130,000 180,000 355,000
[PF - Private Sector Funds I
Pavilion Community Message Sign 02-CIP-P210 3 17,500 17,500
PF - Private Sector Funds Total 17,500 17,500
IPI - PIRIGeneral Obligation Bonds I
Residential Street Improvements 01-CIP-S101 0 900,000 900,000 650,000 1,000,000 1,000,000 4,450,000
County Road 61 (Shady Oak Road) 01-CIP-S106 0 100,000 200,000 300,000
Municipal State Aid Road Improvements 02-CIP-S116 0 100,000 100,000
PI - PIRIGeneral Obligation Bonds Total 900,000 1,000,000 750,000 1,200,000 1,000,000 4,850,000
ISA - Special Assessment I
Residential Street Improvements 01-CIP-S101 0 400,000 600,000 450,000 600,000 600,000 2,650,000
Citywide Concrete Alleys 01-CIP-S103 0 32,000 32,000 32,000 96,000
County Road 61 (Shady Oak Road) 01-CIP-S106 0 48,700 250,000 298,700
Municipal State Aid Road Improvements 02-CIP-S116 0 450,000 450,000
SA - Special Assessment Total 432,000 1,082,000 530,700 850,000 600,000 3,494,700
ISF - Sanitary Sewer Fund I
Residential Street Improvements-Utilities 01-CIP-S102 0 75,000 75,000 75,000 75,000 75,000 375,000
.uniciPal State Aid Road Improvements 02-CIP-S116 0 20,000 20,000
Upgrade of sanitary sewer lift station #1 04-CIP-U007 0 200,000 200,000
SF - Sanitary Sewer Fund Total 275,000 95,000 75,000 75,000 75,000 595,000
[SU - Storm Sewer Fund I
Residential Street Improvements-Utilnies 01-CIP-S102 0 100,000 100,000 100,000 100,000 100,000 500,000
Citywide Concrete Alleys 01-CIP-S103 0 8,000 8,000 8,000 24,000
Storm drainage system maintenance 01-CIP-U002 0 15,000 15,000 16,000 16,000 17,000 79,000
Storm Water Management Projects 01-CIP-U003 0 200,000 200,000
Municipal State Aid Road Improvements 02-CIP-S116 0 130,000 130,000
SU - Storm Sewer Fund Total 123,000 253,000 324,000 116,000 117,000 933,000
ITF - Tax Increment Financing I
Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 4,000,000 4,000,000
North Annex Redevelopment Project 01-CIP-D402 0 3,300,000 3,300,000 3,400,000 10,000,000
Block 64 Redevelopment Project 06-CIP-D404 0 4,000,000 3,000,000 7,000,000
Marketplace and Main 07-CIP-D405 0 2,700,000 2,700,000
TF - Tax Increment Financing Total 10,000,000 10,300,000 3,400,000 23,700,000
IWF - Water Fund I
Residential Street Improvements-Utilities 01-CIP-S102 0 75,000 75,000 75,000 75,000 75,000 375,000
.uniciPal State Aid Road Improvements 02-CIP-S116 0 30,000 30,000
5th Street South Culvert Replacement 05-CIP-UOOB 0 30,000 30,000
Friday, June 09, 2006
Source
Pro.iect# Priority
2007
2008
2009
2010
2011
Total
WF - Water Fund Total
75,000
135,000
75,000
75,000
75,000
435,000
GRAND TOTAL
12,213,000 16,349,200 7,885,700 4,606,000 4,167,000
45,220,900
Friday, June 09, 2006
City of Hopkins, MN
CAPITAL IMPROVEMENTS PLAN
2007 thru 2011
PROJECTS & FUNDING SOURCES BY DEPARTMENT
Department Project# Priority 2007 2008 2009 2010 2011 Total
IDevelopment I
Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 4,000,000 4,000,000
North Annex Redevelopment Project 01-CIP-D402 0 3,300,000 3,300,000 3,400,000 .10,000,000
Block 64 Redevelopment Project 06-CIP-D404 0 4,000,000 3,000,000 7,000,000
Marketplace and Main 07-CIP-D405 0 2,700,000 2,700,000
Development Total 10,000,000 10,300,000 3,400,000 23,700,000
IPublic Works: Bldg/Equip Serv I
City Hall Carpet Replacement 05-CIP-B305 0 95,000 95,000
City Hall Boiler Additions 05-CIP-B307 0 23,000 23,000
Activity Center Window Replacement 05-CIP-B308 0 5,200 5,200
City Hall HVAC Upgrade 07-CIP-B312 0 76,000 76,000
Pavilion Skate Tile Replacement/Lobby Improvement 07-CIP-B313 0 52,000 52,000
Pavilion Overhead Door Improvement 07-CIP-B314 0 35,000 35,000
Arts Center Carpet Second Floor Lobby 07-CIP-B316 0 21,000 21,000
Arts Center Carpet: Comm Rm, Green Rm, Hallway 07-CIP-B317 0 15,000 15,000
Public Works: Bldg/Equip SelV Total 223,000 49,200 50,000 322,200
IPublic Works: Parks ,
Pavilion Community Message Sign 02-CIP-P210 3 35,000 35,000
Co Rd 3 Beautification Corridor 02-CIP-P213 1 80,000 80,000
Central Park Tennis Courts 05-CIP-P202 0 50,000 50,000
Central Park Ballfield #2 07 -CIP-P217 0 25,000 25,000
Park Shelter Roofs 07 -CIP-P218 0 20,000 20,000
Shady Oak Beach Water Play Area Renovation 07-CIP-P219 0 540,000 540,000
Friday, June 09,2006
Department
Project# Priority 2007
2008
2009
2010
2011
Total
Public Works: Parks Total
45,000
165,000
540,000
750,000
IPublic Works: Streets/Traffic I
Residential Street Improvements 01-CIP-S101 0 1,440,000 1,500,000 1,100,000 1,600,000 1,600,000 7,240,000
Residential Street Improvements-Utilities 01-CIP-S102 0 250,000 250,000 250,000 250,000 250,000 1,250,000
Citywide Concrete Alleys 01-CIP-S103 0 40,000 40,000 40,000 120,000
County Road 3 01-CIP-S104 0 2,300,000 2,300,000
County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,879,700 1,950,000 4,829,700
Municipal State Aid Road Improvements 02-CIP-S116 0 1,480,000 1,480,000
Reconstruct Parking Lot 200 06-CIP-S118 0 200,000 200,000
Public Works: Streets/Traffic Total 1,730,000 3,270,000 4,269,700 4,000,000 4,150,000 17,419,700
IPublic Works: Utilities I
Storm drainage system maintenance 01-CIP-U002 0 15,000 2,015,000 16,000 16,000 17,000 2,079,000
Storm Water Management Projects 01-CIP-U003 0 200,000 200,000
Upgrade of sanitary sewer lift station #1 04-CIP-U007 0 200,000 200,000
5th Street South Culvert Replacement 05-CIP-U008 0 550,000 550,000
Public Works: Utilities Total 215,000 2,565,000 216,000 16,000 17,000 3,029,000
Friday, June 09, 2006
Department
Project# Priority 2007
2008
2009
2010
2011
Total
Friday, June 09, 2006
2010
BUDGET
2009
BUDGET
2008
BUDGET
2007
BUDGET
APPROVED
2006
BUDGET
2005
ACTUAL
2005
BUDGET
Fund Budget
General
8,100,000
450,000
645,000
120,000
255,000
15,000
435,000
10,020,000
$
7,875,000
435,000
640,000
115,000
245,000
13,000
400,000
9,723,000
$
7,645,000
420,000
640,000
115,000
240,000
12,000
290,000
9,362,000
$
7,425,000
410,000
635,000
110,000
232,000
12,000
290,000
9,114,000
$
7,211,078
413,910
634,400
110,000
213,750
15,150
290,000
8,888,288
$
7,227,852
452,481
671,080
72,883
438,547
13,160
307,457
9,183,460
$
7,273,078
402,801
627,975
110,000
228,551
14,150
290,000
8,946,555
$
SOURCE
Current Revenues
Property Tax
Intergovernmental Revenues
License, Permits and Fines
Investment Earnings
Charges for Current Services
Other Revenue
Franchise Fee
Total Revenues
7,485,000
3,745,000
75,000
7,265,000
3,660,000
75,000
7,052,000
3,554,000
50,000
6,847,000
3,453,000
50,000
6,647,670
3,498,024
73,700
6,455,777
3,144,840
149,683
100,000
6,416,183
3,210,173
162,674
Current Expenses
Salaries and Employee Benefits
Materials, Supplies and Services
Capital Outlay
Equipment Fund Transfer
Capital Improvements Transfer
Total
75,000
11,380,000
75,000
11,075,000
50,000
10,706,000
100,000
10,450,000
I-'
\D
10,219,394
(1,385,000)
9,995,000
25,000
10,020,000
(1,375,000)
9,700,000
23,000
9,723.000
(1,365,000)
9,341,000
21,000
9,362,000
(1,355,000)
9,095,000
19,000
9,114,000
(l ,348, 106)
8,871,288
17,000
8,888,288
4,311.195
$
4,311.195
$
4,311.195
$
4,311.195
$
4,311.195
$
9,850,300
(1,344,231)
8,506,069
437,492
8,943,561
239,899
4,311.195
9,789,030
Less Expenditues Charged to
Other Activities
(1,341,302)
8,447,728
498,827
8,946,555
Net Total
Other Financing Uses
Total Expenditures
$
$
Change in Fund Balance
Fund Balance
projected
m1l
5,575
projected
m1Q.
projected
~
(301)
projected
~
projected
mQ1
}>,UU{ CAl'ff"u. lW'ROVEME~TS FlJND
83,487
projected
wQ9.
71,695
Actual
~
1,779 2,908 1,792 139
58,871 40,000 10,000 10,000
o ~ - ----.;;;;;;- ~ - -
--6O,6sO 42,908 - 102,480 11,792 102,087 10,139
50,142 85,000 60,000 130,000 180,000
~~~~~- -
-----so:i42 85,000 60,000 130,000 0 180,000 0
15,714
2,087
100,000
5,575
83,487
99,215
2,480
100,000
71,695
116,307
99,215
116,307
96,397
2,410
100,000
2,500
~
85,889
Actual
WQ1
111,490
1,994
39,600
4,100
~
71 295
, 0
~
VI orking Capital Beginning year
Total Sources
Cl.P. Projects
lee Arena
Total Uses
Interest
Dedication fees
Donations
96,397
85,889
VI orking Capital year End
\
N
o
1>ro)ected
~
40&,000
39,003
915,014
1>ro)ected
~
408,000
21,5&0
689,494
1>ro)ected
y22---
408,000
42,404
1,060,091
1>ro)ected
~
1,451,295
(302)
-Pro)ected
J5fl--
1,983,860
1'lmnc-re1\L S'fA.'fE A.lD ~
Mtul\\ A.ctua\ "projected
2004 2005 20~
~~~
2,005,662
408,000
50,195
~~~44f.003
408,000
69,435
~
1,911,435
408,000
10,198
2,313,453
2,830,665
W or\<i1lg capiuU Beginning Ba\
100,000
~
850,000
512,011
000
~
150,00
915,074
121,000
~
821,000
6&9,494
150,000
~
&50,000
-36l%~~
8\8,645 402,470 500,000
~~-soo:ooo~
*
2,310,000
140,000
34,619
308,662
52,111
j\nUualhllotroent
Interest Earnings
Bond issue
Total Sources
'Transfer out for l'tojects
eu> State hid 1>ro)ects
Debt service e1t1>ense
Total Dses
"No rnore than 50% of annual a.\\otrnent can be used for debt service
1,060,091
. .' . for Co. Rd 3"PbaSe 1 cornp\eted in 2000/2001
.. Bsurnated outstanding \\ab\hty to llenneprn County
1,451,295
1,9&3,860
2,005,662
2,373,453
W orlOJlg capiuU Ending Ba\ance
,
t-J
"""'
.
cArnAL lMl'llOVEMENTS FUND (305)
Actual Actual Projected projected projected projected projected projected
~ ~ ~ WQ1 ~ ~ mill mil
Working Capital Beginning year 258,972 228,397 120,099 86,501 69,394 123,663 279,846 228,839
Charges for services 3,470 6,183 13,992 11,442
Interest 1,000 2,500 2,402 3,893
1:ransfers In from General Fund 100,000 100,000 50,000 75,000 75,000
Tax LeV)' 247\7 25000 50000 50,000 75,000 75,000 100,000
-- --- --- 27',2.1.7 ~ - 153,893 - 103,470 -156,183 - 163,992 -1\1,442
Total Sources 1,000
Cl.P. Projects 31 575 135,515 161,000 \71,000 49,200 o 215,000 0
,--- -- -- -- --- ---- -
Total Uses _ 31,575 - 135,515 161,000 171,000 49,200 0 215,000 0
Working Capital Year End 228,397 120,099 86,501 69,394 123,663 279,846 228,839 340,281
N
N
~
-projected
~
~
fA.ClLrrv: \1\'1YROVE~l'O'S
610,441
Actual
~
1,391,643
Actual
~
Actual
~
Actual
W91
6,340,352
* Retainages O/S at 12131105
~ ---0
17,927 0
350,000
1,00'0
~
10,935 *
216 *
13,216 *
6'0,210
10'0,'062
621,991
1,515,393
'044,623
2,939,101
10,196,651
3,050,000
~
3,061,239
o
W orlOng ca-pital BeginI\ing v: eat
2,066,134
4,406,4'00
450,324
13,165,2'01
___~~5123 ~
6:923,538 5,299,717 80 , ,
5'06,020
610,441
1,391,643
99,309
10,160,000
149,133
~
136,350
151,64'0
61,050
222,314
120
~
112,4'0
Proceeds frorn bOnd issue
Re\irnburscrnents - -proiect costs
Interest
'Iotal Sources
Fire Station
-public Works
-police Remodel
Bond issue costs - -public Vlorl<slfire
Bond issue costs - -police
'Iransfer to Debt
Total Uses
6,340,352
10,196,651
W or\cing Ca-pital v: eat End
,
to.)
VJ
1>ro)ected
~
2,144,910
1>ro)ected
~
1>ro)ected
~
1>ro)ected
~
(501)
l' lll. F~D
550,000
(131,606)
600,000
851,993
600,000
466,811
1>ro)ected
~
1,419,411
1>ro)ected
~
p..ctul\\ Mtul\\
~~
96,521
650,000
1,212,203
(5,264)
1,534,311
34,320
16,341
600,000
49,619
600,000
665,361
1,163,199
'iN orking ea\lital Beginning '{ear
~
1,000,000
600,000
58,219
~
2,108,219
1,200,000
850,000
58,219
~
2,318,219
000
~
4,594,13
150,000
530,100
133,219
~
1,623,919
~
1,000,000
1,082,000
133,219
~
2,215,219
000
~
2,666,34
900,000
432,000
210,219
~
1,602,219
~
42,421
000
~
2,142,42
1,280,000
445,000
210,219
53,862
~ ---n9:fi3
831,118
115,884
29,399
S~ia\ Assessment Revenues
Refunds & Reimbursements
Interest
'transfers In
MiscellaneoUs
Bond 1>roceeds
't ota\ Sources
220,886
683,212
2,144,9\0
(131,606)
851,993
466,811
---=- ~ ~
--434,\05 \,04\,397 \,935,2\9
1,419,411
1,212,203
210,219
213,219
C.1.1> .1>ro)ects
ell' . fro}ects - S\lecia\ Assm
pebt service 'transfers - curt debt
Debt service 'transfers - new debt
't ota\ Uses
1,534,311
'iN or\dng ea\li\ll\ '{ear End
,
N
~
Projected
2011
Proj ected
2010
Projected
2009
WATER FUND - WORKING CAPITAL PROJECTION
Proj ected
2008
Projected
2007
Projected
2006
Actual
2005
Actual
2004
439,760
1,227,486
30,000
19,789
427,480
1,227,486
30,000
19,237
84,974
1,027,486
30,000
3,824
268,788
1,007,339
30,000
12,095
420,834
987,587
30,000
18,938
561,051
968,223
30,000
25,247
659,363
949,238
38,903
10,213
1.102,734
813,243
22,756
8,018
Working Capital Beginning Year
Operating Revenues
Other
Interest
500,000
1,561,310
Transfer In
Bond Issuance
Total Sources
1,277,275
914,919
41,910
14,400
1,276,722
892,604
49,638
15,000
870,833
56,870
1,049,434
849,593
63,655
,036,525
828,872
69,999
1,023,470
808,655
76,032
998,354
788,932
79,532
844,017
775,825
42,912
40,300
75,000
155,000
20,000
45,000
1,306,529
22,200
75,000
145,000
20,000
45,000
1,264,442
3 1,100
75,000
140,000
10,000
135,000
130,000
44,700
75,000
125,000
39,000
75,000
120,000
12,855
53,954
115,000
24,394
289,006
110,000
45,000
1,218,803
45,000
1,233,248
45,000
1.188,571
45,000
1.163,687
45,000
1,095,273
45,000
1,287,137
Operation Expense
Other Expense
Other Expense - interest on bonds
Transfer Out
Capital Outlay
Capital Improvements
Principal Bond payment
Principal Bond payment - new debt
Capital Lease (PW Facility)
Total Uses
r-.J
V1
(29,254 )
12,280
342,506
(183,814)
(152,046)
(140,217)
(96,919)
(443,120)
Change in available funds
(1,393)
(251 )
659,363
Ending Year
Inventory change
Working Capital
410,506
439,760
427,480
84,974
268,788
420,834
561,051
Rate History
1984 $0.85
Notes -
Income - 2005 base year - each year adds $45,000; 2010 rate increase in projections
2006 Capital Outlay - $17,000 computer software upgrade; $22,000 other equipment
2006 Capital Improvements - $75,000 residential street improvements
1993 $1.05
1997 $1.10
2000 $1.20
2005 $1.40
2010 $1.60
2015 $1.80
Projected
2011
Proj ected
2010
STORM SEWER FUND - WORKING CAPITAL PROJECTION
Proj ected
2009
Projected
2008
Proj ected
2007
Projected
2006
Actual
2005
Actual
2004
871,065
861,202
5,000
39,198
734,924
861,202
5,000
33,072
794,774
861,202
5,000
35,765
890,188
761,202
5,000
40,058
900,237
761,202
5,000
40,511
894,371
761,202
5,000
40,247
935,339
661,202
5,646
15,649
1,062,480
674,553
43,137
24,140
Working Capital Beginning Year
Operating Revenues
Other
Interest
Transfer In
Bond Issuance
Total Sources
905,400
163,809
66,073
899,274
159,814
77,319
901,967
155,916
91,901
806,260
152,859
105,816
806,713
149,861
118,900
806,449
146,923
130,660
682,497
144,042
130,213
741,830
110,094
141,647
Operation Expense
Other Expense (interest on bonds)
Transfer Out
10,000
117,000
110,000
55,000
25,000
546,882
116,000
105,000
225,000
55,000
25,000
763.133
324,000
100,000
215,000
50,000
25,000
961,817
253,000
100,000
215,000
50,000
25,000
901,675
173,000
95,000
205,000
50,000
25,000
816,761
9,000
159,000
90,000
195,000
45,000
25,000
800,583
99,210
85,000
195,000
45,000
25,000
723,465
262,230
80,000
190,000
60,000
25,000
868,971
nd payment
.uvnd payment
Bond payment
Capital Outlay
Capital Improvements
1999 Principal Bo
2001 Principal n ^
2003 Principal
Capital Lease
Tc
~
~
Uses
358,518
136,141
(59,850)
(95,414)
(10,049)
5,866
(40,968)
(127,141)
funds
Change in available
Rate Risto
1989 $4.75 per quarter
1991 $6.00 per quarter
1992 $2.50
1993 $3.00
1998 $3.20
1999 $4.00
2006 $4.50
1,229,583
871,065
734,924
794,774
890,188
900,237
894,371
935,339
Working Capital Ending Year
increase is calcuated into 2006 and 2009 revenues
2006 Capital outlay - $9,000 computer software upgrade
2006 capital improvements - $100,000 residential streets; $8,000 concrete alleys;
$15,000 storm drainage maintenance, $50,000 for Van Buren Ave culvert
Notes -
Rate
2009 $5.00
Projected
2011
Projected
2010
Proj ected
2009
WORKING CAPITAL PROJECTION
Projected
2008
Projected
2007
Proj ected
2006
REFUSE FUND
Actual
2005
Actual
2004
R
297,493
851,138
20,000
13,387
884,525
235,595
138
20,500
10,602
834,240
803
G
316,691
803,138
21,000
14,251
838,389
297,015
753,138
21,500
13,366
788,004
R
262,122
753,138
22,000
11,795
786,933
277,109
705,138
23,000
12,500
740,638
G
252,065
705,138
16,000
22,667
6,295
750,100
521,482
591,860
22,891
12,734
627,485
Beginning Year
Operating Revenues
Grants
Interest
Working Capital
744,716
93,000
25,000
862,716
737,342
10,000
25,000
772,342
722,885
171,600
25,000
919,485
715,727
27,600
25,000
768,327
708,641
18,400
25,000
752,041
701,625
29,000
25,000
755,625
694,678
4,971
25,000
724,649
654,760
215,132
25,000
894,892
Total Sources
Operation Expense
Transfer Out
Capital Outlay
Capital Lease (pW Facility)
Total Uses
tv
-.J
21,809
61,897
(81,096)
19,676
34,892
(14,987)
25,451
(267,407)
Change in available funds
(407)
(2,010)
Inventory change
Rate History
1989 $15.10
1991 $17.25
1995 $11.00-14.45 refuse
$2.25 recycling fee
2002 $2.75 recycle fee
2005 $12.50, 14.60, 15.90,
2007 $3.25 recycling fee
2009 $13.85, 16.05, 17.50,
2011 $3.75 recycling fee
319,302
297,493
235,595
316,691
297,015
increase
Increase
262,122
G = Garbage fee
R = Recycling fee
277,109
252,065
Ending Year
Working Capital
$9,000 for computer software upgrade; $20,000 refuse containers
Notes -
2006 Capital outlay
refuse
refuse
STORM SEWER FUND -tRKING CAPITAL PROJECTION
Projected
2011
Proj ected
2010
Projected
2009
Projected
2008
Projected
2007
Projected
2006
Actual
2005
Actual
2004
928,124
861,202
5,000
41,766
789,526
861,202
5,000
35,529
847,024
861,202
5,000
38,116
940,188
761,202
5,000
42,308
900,237
761,202
5,000
40,511
894,371
761,202
5,000
40,247
935,339
661,202
5,646
15,649
1,062,480
674,553
43,137
24,140
Working Capital Beginning Year
Operating Revenues
Other
Interest
Transfer In
Bond Issuance
Total
907,968
163,809
66,073
901,731
159,814
77,319
904,318
155,916
91,901
808,510
152,859
105,816
806,713
149,861
118,900
806,449
146,923
130,660
682,497
144,042
130,213
741,830
110,094
141,647
Sources
Operation Expense
Other Expense (interest on bonds)
Transfer Out
10,000
117,000
110,000
55,000
25,000
546,882
116,000
105,000
225,000
55,000
25,000
763,133
324,000
100,000
215,000
50,000
25,000
961,817
253,000
100,000
215,000
50,000
25,000
901,675
123,000
95,000
205,000
50,000
25,000
766,761
9,000
159,000
90,000
195,000
45,000
25,000
800,583
99,210
85,000
195,000
45,000
25,000
723,465
262,230
80,000
190,000
60,000
25,000
868,971
nd payment
.u~nd payment
Bond payment
Capital Outlay
Capital Improvements
1999 Principal Bo
2001 Principal n",
2003 Principal
Lease
Tc
~
co
Capital
Uses
361,086
138,598
(57,499)
164)
(93
39,951
5,866
(40,968)
(127,141)
Change in available funds
1,289,209
928,124
789,526
847,024
940,188
900,237
,>~,:;~il~4~
935,339
Ending Year
Working Capital
Notes
Rate increase is calcuated into 2006 and 2009 revenues
2006 Capital outlay - $9,000 computer software upgrade
2006 capital improvements - $100,000 residential streets; $8,000 concrete alleys;
$15,000 storm drainage maintenance
Rate Histo
1989 $4.75 per quarter
1991 $6.00 per quarter
1992 $2.50
1993 $3.00
1998 $3.20
1999 $4.00
2006 $4.50
2009 $5.00
PAVILION - ICE ARENA - WORKING CAPITAL PROJECTIONS
Projected
2011
Projected
2010
Projected
2009
Projected
2008
Proj ected
2007
Projected
2006
Actual
2005
Actual
2004
(42,144)
390,000
10,000
(22,144)
385,000
10,000
(47,144)
380,000
10,000
(64,644)
375,000
10,000
(42,644)
370,000
10,000
(77,990)
369,500
12,500
(21,218)
341,580
5,763
(32,169)
352,416
8,881
Working Capital Beginning Year
Operating Revenues
Other
-
9,785
18,760
389,842
Interest
Advance from Equipment Repl
Transfer In
-
382,000
-
347,343
400,000
375,000
395,000
360,000
390,000
345,000
385,000
330,000
380,000
320,000
316,654
314,642
4,690
291,865
2,610
Total Sources
Operation Expense
Other Expense
Transfer Out
20,000
395,000
35,000
20,000
415,000
20,000
365,000
17,500
20,000
367,500
52,000
30,000
402,000
-
30,000
346,654
-
2,242
46,197
36,344
404,115
-
84,416
-
378,891
Capital Outlay
Capital Improvements
Payment on Interfund Loan
Total Uses
N
~
5,000
(37,144)
(20,000)
(42,144)
25,000
(22,144)
17,500
(47,144)
Notes -
No capital outlay scheduled for 2006
(22,000)
(64,644)
35,346
(42,644)
(56,772)
(77,990)
10,951
(21,218)
Change in available funds
Ending Year
Working Capital
Economic Development
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2007 thru 2011
Contact ED Director
Department Development
roject #
01-CIP-D401
Type Improvement
Useful Life Unassigned
Category Economic Development
Priority nla
Redevelopment, East Excelsior Boulevard
nprovement Plan
Total Project Cost $4,000,000
Description
North side of Excelsior Boulevard from Highway 169 to approximately Blake Road.
Redevelopment of older commercial area. Based on the existing zoning, it would involve both commercial and
industrial uses. Identified in the East End Redevelopment Study.
Justification
Excelsior Boulevard is being upgraded in this area, which will provide for additional property on the north side of the
roadway. The buildings in this area are older and no longer the highest and best use for this property. The funding
amount is an estimate and will vary depending on the scope of the proj ect.
Total
2008
4,000,000
4,000,000
2009
2010
2011
Total
4,000,000
4,000,000
Expenditures 2007
Construction/Maintenance
Funding Sources 2007
TF - Tax Increment Financing
Total
2008
4,000,000
4,000,000
2009
2010
2011
Total
4,000,000
4,000,000
Operational Impact/Other
The schedule for this project is still tentative.
Consistent with Comprehensive Plan and City Visioning Process.
Tuesday, May 16, 2006
CAPITAL IMPROVEMENT PLAN
City of Hopkins, :MN
2007 thru 2011
Contact ED Director
Department Development
roject #
Ol-CIP-D402
North Annex Redevelopment Project
Type Improvement
Useful Life Unassigned
Category Economic Development
Priority nla
nprovement Plan
Total Project Cost $20,000,000
Description
Northeast quadrant of Highway 169 and Excelsior Boulevard.
Redevelopment of SuperValu North Annex property. The project would involve construction of approximately 525,000
sq ft office building. The TIF would be used for land writedown, demolition, parking improvements, and off- and on-
site improvements. The 2006 expenditure is based on estimate of when redevelopment may occur.
Justification
The existing facility was formerly owned by Red Owl. It was constructed in the mid-1950's and is no longer the highest
and best use for this property.
Prior
110,000.000 I
Total
Expenditures
Construction/Maintenance
2007
3,300,000
3,300,000
2008
3,300,000
3,300,000
2009
3,400,000
3,400,000
2010
2011
Total
10,000,000
10,000,000
Total
Prior
110,000,000 I
Total
Funding Sources
TF - Tax Increment Financing
Total
2007
3,300,000
3,300,000
2008
3,300,000
3,300,000
2009
3,400,000
3,400,000
2010
2011
Total
10,000,000
10,000,000
Operational Impact/Other
Tuesday, May 16, 2006
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
06-CIP-D404
ProjectName Block 64 Redevelopment Project
2007 thru 2011
Contact ED Director
Department Development
Type Improvement
Useful Life
nprovement Plan
Category Economic Development
Priority n/a
Description I
Redevelopment of block between 5th and 6th Avenues, north of Mainstreet, south of 1st Street North
Total Project Cost $7,000,000
Justification I
Will redevelop older commercial, residential areas.
Expenditures
Construction/Maintenance
2007
4,000,000
2008
3,000,000
3,000,000
2009
2010
2011
Total
7,000,000
7,000,000
Total 4,000,000
Funding Sources
TF - Tax Increment Financing
Total
2007
4,000,000
4,000,000
2008
3,000,000
3,000,000
2009
2010
2011
Total
7,000,000
7,000,000
OperationallmpactJOther I
Tuesday, May 16, 2006
CAPITAL IMPROVEMENT PLAN
ity of Hopkins, MN
07-CIP-D405
nprovement Plan
Description
Marketplace and Main
2007 thru 2011
Contact ED Director
Department Development
Type Improvement
Useful Life
Category Economic Development
Priority n/a
Total Project Cost $2,700,000
Redevelopment of property between 6th and 8th Avenue North of Main street (former Luther Company property)
Justification
Will redevelop older commercial area.
Expenditures
Construction/Maintenance
Total
Funding Sources
TF - Tax Increment Financing
Total
Operational Impact/Other
2001
2.700,000
2,700,000
2001
2,700,000
2,700,000
2008
2008
2009
2009
2010
2011
Total
2.700,000
2,700,000
2010
2011
Total
2.700,000
2,700,000
Tuesday, May 16, 2006
Streets
PROGRAM
CD
..,;:::=====
~
e::::
~
e..
U)
-
;:J
o
..J
~
CI')
s,
MPROVEMENT
s'-\s
I
ST. LOUIS PARK
~
BLVD ~:;.""'"
-~
c:i
~ g
-
RD. g
'"
51 !
w w
-' Z
([ c:
0 0 ~~
w ~
~ ~)
EDIN A
o
~
llil
@
~
TAL
( I) REGENCY LA. W.
( 2 I REGENCY LA. E.
(31 CASSIE C1.
( <) CAMERON CT.
(51 PARKS! DE BL VD.
(61 ABBIE LA.
(7) LINDSEY LA.
(B) RENA I SSANCE C 1.
(q I VAN BUREN WAY N.
( 10) VAN BUREN TR. N.
( II) VAN BUREN TER. N.
(12) VAN BUREN PL. N.
( 1 3 ) MONROE PL.
( H) SHADYSIDE CIR
( 15) SUNNY SIDE LA
SPRUCEr~n roll
LEGEND
INTERSTATE TRUNK HIGHWAY- - - -
U.S. TRUNK fUGHWAY- - - - - - .
STATE TRUNK HIGHWAY- - - - - .
COUNTY STATE AID HIGHWAY- - - -
COUNTY ROAD- - - - - - - -
CORPORATE 1I1.C1TS- - - - - - -
PUBLIC ROAD-
PRIV ATE ROAD
I
CAP
S.
~
~
~
~
~
z
Q
~
~.
vi
F
~
~
Z
"
~
W
Z
Z
-
~
~.~1. S. .
~ ~nV)
([ S. I gjl
Ul
51
Ul I g
vi
d1~
SMETANA T RD.
MINNETONKA
I~
NNEHAHA @I
MINNETONKA
M
@
CD
s
N
~
~
Z
<)
E-<
~
Z
Z
-
~
B
.
.
.
CAPITAL IMPROVEMENTS PLAN
City of Hopkins, MN
Project # 01-CIP-SI0l
Project Name Residential Street Improvements
2007 thru 2011
Contact PW Director
Department Public Works: Streets/Traffic
Type Improvement
Useful Life Unassigned
Category Trans: Streets
Priority n/a
nprovement Plan
Total Project Cost $8,065,000
Description
Program to improve streets needing repair or reconstruction as indicated by street condition survey, or as part of an area street improvement.
2007: Drillane and 19th Ave No at 3rd St recon, 12th-16th Ave No overlay, Blake Road overlay
2008: Parkridge neighborhood streets - Recon
2009: Street maintenance - overlays per pavement management program; 19th Ave No Mainstreet to 2nd St; 20th Ave No from Mainstreet to 3rd
St; 3rd St - 19th to 18th
2010: Park Valley neighborhood streets - reconstruction.
10th Ave So from 6th St So to 7th St So; 9th Ave So from 7th St So to Westbrooke Way; 7th St So from 11th Ave to end; 6th St So from W Park
Valley Dr to 10th Ave So; 5th Ave So from 5th St So to 7th St So; East and West Park Valley Drive.
2011 and 2012: Interlachen reconstruction
Justification
Pavement Management analysis shows a minimum $300,000 street improvement commitment (sealcoating, mill/overlays, reconstruction) to
maintain current overall street conditions and backlog. The numbers assume a 70% assessed and 30% general city share of costs for reconstruction
projects and 100% city costs for sealcoat and mill/overlay projects.
Sealcoat project costs budgeted in street maintenance budget. Costs for sanitary sewer and water main reconstruction are not shown.
Prior
. 825,000 I
Total
Expenditures
Construction/Maintenance
2007
1,440,000
1,440,000
2008
1,500,000
1,500,000
2009
1,100,000
1,100,000
2010
1,600,000
1,600,000
2011
1,600,000
1,600,000
Total
7,240,000
7,240,000
Total
Prior Funding Sources 2007 2008 2009 2010 2011 Total
I 1,252,000 I MS - Municipal State Aid Stree 140,000 140,000
Total PI - PIR/General Obligation Bo 900,000 900,000 650,000 1,000,000 1,000,000 4,450,000
SA - Special Assessment 400,000 600,000 450,000 600,000 600,000 2,650,000
Total 1,440,000 1,500,000 1,100,000 1,600,000 1,600,000 7,240,000
Operational Impact/Other
Public hearing - year prior to planned construction
Plans and specifications - year prior to planned construction
Bid and assessment - year of planned construction
Tuesday, June 06, 2006
CAPITAL IMPROVEMENTS PLAN
City of Hopkins, J\1N
Project # Ol-CIP-SI02
Project Name Residential Street Improvements--Utilities
2007 thru 2011
Contact PW Director
Department Public Works: Streets/Traffic
Type Improvement
Useful Life Unassigned
Category Trans: Streets
Priority n/a
nprovement Plan
Total Project Cost $1,750,000
Description
Locations to be determined as they are consistent with the street reconstruction program.
Program to reconstruct deteriorated water main and sanitary sewer and to provide storm sewer improvements in conjunction with street
improvement projects.
Public hearing: Year prior to planned construction
Plans and specifications: Year prior to planned construction
Bid: Year of planned construction
Consistent with the Storm Water Mana ement Plan, Water and Sewer Utili Master Plan, and television ins ections.
Justification
In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installed new. In some cases,
water main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The numbers assume the city funding 100% of
major storm sewer, water main, and sanitary sewer construction/reconstruction. These costs are to be used in conjuncton with street reconstruction
costs shown on Ol-CIP-SIOl.
Prior
500,000 I
Total
Expenditures
Construction/Maintenance
2007
250,000
250,000
2008
250,000
250,000
2009
250,000
250,000
2010
250,000
250,000
2011
250,000
250,000
Total
1,250,000
1,250,000
Total
Prior Funding Sources 2007 2008 2009 2010 2011 Total
500,000 I SF - Sanitary Sewer Fund 75,000 75,000 75,000 75,000 75,000 375,000
Total SU - Storm Sewer Fund 100,000 100,000 100,000 100,000 100,000 500,000
WF - Water Fund 75,000 75,000 75,000 75,000 75,000 375,000
Total 250,000 250,000 250,000 250,000 250,000 1,250,000
Operational Impact/Other
Public hearing - year prior to planned construction
Plans and specifications - year prior to planned construction
Bid - year of planned construction
Consistent with the Storm Water Mana ement Plan, Water and Sewer Utilit Master Plan, and television ins ections.
Friday, June 09, 2006
CAPITAL IMPROVEMENTS PLAN
City of Hopkins, l\1N
2007 thru 2011
Contact PW Director
Project #
Ol-CIP-SI03
Department Public Works: Streets/Traffic
Type Improvement
Useful Life Unassigned
Category Trans: Streets
Priority n/a
Project Name Citywide Concrete Alleys
nprovement Plan
Total Project Cost $145,000
Description
2007: Alley south of 6th Street South and north of9 Mile Creek, between 11th Avenue South and 10th Avenue South
2008: Alley south of3rd Street North and North of 2nd Street North, between 6th Avenue North and 5th Avenue North
2009: Lake St NE alley (South side of Lake St NE) (Murphy to Texas Ave)
Program to construct concrete alleys in areas designated as poor on the alley condition survey.
Justification
The city has had a policy of constructing concrete alleys for a number of years. This policy has proved to be sound by the concrete alleys' .
durability and low maintenance costs. Current policy has the city share at 20% of the cost in residential areas. The city will experience cost
savings due to lower maintenance costs.
_Prior
25,000 I
Total
Expenditures
Construction/Maintenance
2007
40,000
40,000
2008
40,000
40,000
2009
40,000
40,000
2010
2011
Total
120,000
120,000
Total
Prior Funding Sources 2007 2008 2009 2010 2011 Total
25,000 I SA - Special Assessment 32,000 32,000 32,000 96,000
Total SU - Storm Sewer Fund 8,000 8,000 8,000 24,000
Total 40,000 40,000 40,000 120,000
Operational Impact/Other
Approxmately 1250 feet per year for four years
Public hearing - year prior to project
Plans, specifications, bid construction - year of project
Monday, June 05, 2006
CAPITAL IMPROVEMENTS PLAN
City of Hopkins, lVIN
Project # Ol-CIP-SI04
Project Name County Road 3
2007 thru2011
Contact PW Director
Department Public Works: Streets/Traffic
nprovement Plan
Type Improvement
Useful Life Unassigned
Category Trans: Streets
Priority n/a
Total Project Cost $2,300,000
Description
County Road 3 from Shady Oak Road to Meadowbrook Road.
Lighting, landscaping, street, etc. improvements along Excelsior Boulevard from the east to west city limits.
GO Bond payments to be financed by a combination of existing TlF revenue, Municipal State Aid road funds, additional TIF revenue created by
economic development, grant funds, and, as a last resort, general city revenue
Segment 1: Construction - 1998/1999
Segment 2: Planning - 2004; bidding and construction (median upgrades only) - 2005
Segment 3: Planning and acquisition - 1999/2001, bidding/construction - 2002/2003/2004
Segment 4: Planning and acquisition - 2007/2008, bidding/construction - 2008/2009
TlF funded work includes the following:
A signalized intersection will be constructed at Monroe Avenue. A second intersection will also be built at Jackson Ave/St. Louis Street. There
will also be a reconfiguration of Monroe Avenue and Milwaukee south of Excelsior Boulevard. This work is being completed in conjunction with
the reconstruction of Excelsior Boulevard from Highway 169 to Blake Road. The intersection is being constructed to facilitate redevelopment of
the Su erValu north annex site.
Justification
Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in all four segments of County Road 3:
- Segment 1 from Shady Oak Road to 11 th Ave So; upgrade existing undivided roadway, upgrade 11 th Ave intersection to meet future needs,
implement beautification program--completed in 1998
- Segment 2 from 11th Ave So to Hwy 169; median pavers construction
- Segment 3 from Hwy 169 to Blake Road; upgrade existing narrow undivided roadway, resolve safety issues at railroad crossing, improve north-
south access, account for future LRT access, address redevelopment needs, add integration for full access at Jackson Ave.
- Se ent 4 from Blake Road to Meadowbrook Road; u ade roadwa , im Iement beautification ro am.
Prior Expenditures 2007 2008 2009 2010
o I Construction/Maintenance
Total
Total
2011
2,300,000
2,300,000
Total
2,300,000
2,300,000
Prior Funding Sources 2007 2008 2009 2010 2011 Total
01 GU - Other Governmental Unit 1,600,000 1,600,000
Total MS - Municipal State Aid Stree 700,000 700,000
Total 2,300,000 2,300,000
Operational Impact/Other
GO bond payments to be financed by a combination of existing TlF revenue, Municipal State Aid road funds, additional TlF revenue created by
economic development, grant funds, and, as a last resort, general city revenue.
Segment 1: Construction - 1998/1999
Segment 2: Planning - 2005; bidding and construction (median upgrades only) - 2006
egment 3: Planning and acquisition - 1999/2000; bidding/construction - 2003/2004
egment 4: Planning and acquisition - 2007; bidding and construction - 2008/2009
Consistent with Henne in Coun ClP and Cit Council action.
Monday, June 05, 2006
CAPITAL IMPROVEMENTS PLAN
City of Hopkins, MN
2007 thru 2011
Contact PW Director
Department Public Works: Streets/Traffic
Project # 01-CIP-S106
Project Name County Road 61 (Shady Oak Road)
Type Improvement
Useful Life Unassigned
Category Trans: Streets
Priority n/a
nprovement Plan
Total Project Cost $4,829,700
Description
Shady Oak Road from Co Rd 3 to T.R. 7, Mainstreet from 20th Ave to Shady Oak Road.
Lighting, lanscaping, street, etc., improvements from Co Rd 3 to T.R. 7
Reconstruction and amenities on Mainstreet from 20th Ave to Shady Oak Road.
Reconstruction of West Park Road, 2nd Street No, and 21st Avenue No (2nd St-4th St N)
Justification
Deficiencies appear on Shady Oak Road in terms of roadway conditions, traffic/pedestrian movement, safety, and aesthetics. Upgrade an
undivided roadway, resolve safety issues with number of driveway access points and intersection at Mainstreet. Lighting needs upgrading and
provide beautification program.
Reconstruction of Mainstreet for 1 block section needs to be done to conclude the upgrading of all of Mainstreet.
Expenditures
Construction/Maintenance
2007
2008
2009
2,879,700
2,879,700
2010
1,950,000
1,950,000
2011
Total
4,829,700
4,829,700
Total
Funding Sources 2007 2008 2009 2010 2011 Total
GU - Other Governmental Unit 2,010,000 1,500,000 3,510,000
MS - Municipal State Aid Stree 721,000 721,000
PI - PIRlGeneral Obligation Bo 100,000 200,000 300,000
SA - Special Assessment 48,700 250,000 298,700
Total 2,879,700 1,950,000 4,829,700
Operational Impact/Other
2005/2008: Planning and acquisition
2009/2010: Bidding and construction
ade the roadwa , and reconstruction ro am for all of Main street..
Monday, June 05, 2006
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2007 thru 2011
Contact Public Works Director
Department Public Works: Streets/Traffic
Type Improvement
Useful Life Unassigned
Category Trans; Streets
Priority n/a
Project # 02-CIP-Sl16
Project Name Municipal State Aid Road Improvements
nprovement Plan
Total Project Cost $1,480,000
Description I
Minnetonka Mills Road from 5th Ave No to Herman Terrace.
2nd 8t NE from Herman Terrace to Blake Road - Mill and overlay
5th St So from 11th Ave So to Corporate limits, reconstruction
Plans/ specifications: 2007
Construction: 2008
Justification I
Pavement condition, substandard drainage and lack of curb and gutter warrant reconstruction of this Municipal State
Aid collector road.
Concerns have been expressed by the adj acent residential neighborhood regarding the appearance and condition of this
street. This street is abutted by major industrial users as well as residential units that utilize Second Street for vehicular
access or pedestrian access.
Expenditures
Construction/Maintenance
2007
Total
2008
1,480,000
2009
2010
2011
Total
1,480,000
1,480,000
1 A80,000
Funding Sources 2007
MS - Municipal State Aid Stree
PI - PIRlGeneral Obligation Bo
SA - Special Assessment
SF - Sanitary Sewer Fund
SU - Stonn Sewer Fund
WF - Water Fund
Total
2008
750,000
100,000
450,000
20,000
130,000
30,000
1,480,000
2009
2010
2011
Total
750,000
100,000
450,000
20,000
130,000
30,000
1,480,000
Operational Impact/Other I
Tuesday, May 16, 2006
CAPITAL IMPROVEMENT PLAN
City of Hopkins, :MN
2007 thru 2011
Project # 06-CIP-Sl18
Project Name Reconstruct Parking Lot 200
nprovement Plan
Description
Municipal Parking Lot 200, south of Mainstreet between 8th and 9th Avenues.
Rehabilitate parking lot pavement
Contact Public Works Director
Department Public Works: Streets/Traffic
Type Improvement
Useful Life
Category Trans: Parking Facilities
Priority n/a
Total Project Cost $200,000
Justification
Pavement has deteriorated to the point where cracksealing and sealcoating are not effective.
Expenditures
Construction/Maintenance
2007
2008
2009
Total
Funding Sources
CI - Capital Improvement Fund
Total
2007
2008
2009
Operational Impact/Other
2010
200,000
200,000
2010
200,000
200,000
2011
Total
200,000
200,000
2011
Total
200,000
200,000
Tuesday, May 16, 2006
Parks and Recreation
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
Project # 05-CIP-P202
Project Name Central Park Tennis Courts
2007 thru 2011
Contact Public Works Director
Department Public Works: Parks
nprovement Plan
Type Improvement
Useful Life 20 years
Category Parks/Forestry/Pavilion: Neigh
Priority nla
Total Project Cost $50,000
Description I
Remove and replace blacktop tennis court surfaces at Central Park.
Recoat and restripe for tennis.
Justification
I
Current age of courts is 28 years. Annual crack maintenance and color coating is excessive. Replacement
recommended by 2008.
Expenditures 2007
Construction/Maintenance
Total
2008
50,000
50,000
2009
2010
2011
Total
50,000
50,000
Funding Sources 2007
PDF- Park Dedication Fund
Total
2008
50,000
50,000
2009
2010
2011
Total
50,000
50,000
Operational Impact/Other I
Design 2008, install 2008
Identified 3-21-05, High Priority Park Board
Tuesday, May 16, 2006
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
Project # 02-CIP-P210
Project Name Pavilion Community Message Sign
2007 thru 2011
Contact PW Director
nprovement Plan
Department Public Works: Parks
Type Improvement
Useful Life 10 years
Category Parks/Forestry/Pavilion: Comm
Priority 3 Important
Total Project Cost $35,000
Description I
This message sign to be placed near Co. Rd. 3 in front of pavilion will be used to promote community events,
registrations, news items, etc.
Justification I
No sign within Hopkins is available to promote the city. Present sign was a used sign, retrofitted to meet minimum
needs of pavilion. Opportunity exists to promote at a much higher, professional level.
2008: Purchase, install
Ranked Category #3 in Park Board Proj ect List, April 2001
Perhaps approach School District for funding assistance
Expenditures 2007 2008
Construction/Maintenance 35,000
Total 35,000
2009
2010
2011
Total
35,000
35,000
Total
2008
17,500
17,500
35,000
2009
2010
2011
Total
17,500
17,500
35,000
Funding Sources 2007
PA - Pavilion Fund
PF - Private Sector Funds
Operational Impact/Other I
2008 - purchase, install
Ranked in Category #3 in Park Board project list, April 2001
Tuesday, May 16, 2006
CAPITAL IMPROVEMENTS PLAN
City of Hopkins, MN
2007 thru 2011
Contact PW Director
Department Public Works: Parks
Type Improvement
Useful Life 20 years
Category ParkslForestry/Pavilion: Comm
Priority 1 Urgent
Project # 02-CIP-P213
Project Name Co Rd 3 Beautification Corridor
nprovement Plan
Total Project Cost $80,000
Description
Miniature golf course - $60,000
Memorial garden park - $20,000
Justification
Council directive to Park Board to explore ways to beautify the south side of Co Rd 3 corridor, Depot to 8th Ave So
Design: 2007; construction: 2008. Maintenance offset by user fees.
Expenditures
Construction/Maintenance
2007
2008
80,000
80,000
2009
2010
2011
Total
80,000
80,000
Total
Funding Sources
PDF- Park Dedication Fund
2007
2008
80,000
80,000
2009
2010
2011
Total
80,000
80,000
Total
I Operational Impact/Other
Monday, June 05, 2006
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
Project # 07-CIP-P217
Project Name Central Park Ballfield #2
2007 thru 2011
Contact Public Works Director
Department Public Works: Parks
Type Improvement
Useful Life
Category Parks/Forestry/Pavilion: Comm
Priority n/a
nprovement Plan
Total Project Cost $25,000
Description
2007 - Regrade, level, supplement soils and resod ballfield #2
Justification
Ballfield #2 sod was not a part of the Central Park renovations completed in 1991. Extensive settling of existing sod
has taken place over time and now needs landscaping repairs.
Expenditures
Construction/Maintenance
2007
25,000
25,000
2008
2009
2010
2011
Total
25,000
25,000
Total
Funding Sources
PDF- Park Dedication Fund
2007
25,000
25,000
2008
2009
2010
2011
Total
25,000
25,000
Total
Operational Impact/Other
2007 - Contract, install
Tuesday, May 16, 2006
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2007 thru 2011
Project #
07-CIP-P218
Contact Public Works Director
Department Public Works: Parks
Type Improvement
Useful Life
Category Parks/ForestzylPavilion: Connn
Priority n/a
Project Name Park Shelter Roofs
nprovement Plan
Description
I
Total Project Cost $20,000
Reroof park shelter roofs at Oakes, Valley and Maetzold
Justification I
Oakes Park and Valley Park shelter buildings were constructed in 1976. Roofs are now 30 years old. The asphalt
shingle roofs have out-lived the expected 25 years. Will also reroof Valley picnic shelter and Maetzold batting cage
building.
Expenditures
Construction/Maintenance
2007
20,000
20,000
2008
2009
2010
2011
Total
20,000
20,000
Total
Funding Sources
PDF- Park Dedication Fund
Total
2007
20,000
20,000
2008
2009
2010
2011
Total
20,000
20,000
Operational Impact/Other I
2007 - Contract, Install
Tuesday, May 16, 2006
CAPITAL IMPROVEMENTS PLAN
City of Hopkins, MN
Project # 07-CIP-P219
Project Name Shady Oak Beach Water Play Area Renovation
2007 thru 2011
Contact Public Works Director
Department Public Works: Parks
Type Improvement
Useful Life
Category Unassigned
Priority n/a
nprovement Plan
Total Project Cost $540,000
Description
The Shady Oak Beach water play area was condtructed as part of the 1998 beach renovation project. This system provides an enjoyable aquatic
experience for young children who are not yet comfortable swimming in a lake setting. In addition, use of this area is a popular activity when
weather conditions are not conducive to swimming.
Justification
Existing equipment at the site was estimated to last 12-15 years. This schedule has been expetited due to recent revisions to the State of Minnesota
Pool Code requiring zero-depth water play areas to be operated and maintained in the same manner as swimming pools. This project is required to
meet State health codes and to continue providing a safe and healthy alternative aquatic experience at Shady Oak Beach. In order to achieve these
new standards, new filtering systems, play features, piping and control systems are required. In addition, completion of this project will eliminate
the existing maintenance area considered to be a confined space.
Expenditures
Construction/Maintenance
2007
2008
2009
2010
540,000
540,000
2011
Total
540,000
540,000
Total
Funding Sources 2007 2008 2009 2010 2011 Total
GU - Other Governmental Unit 360,000 360,000
PDF- Park Dedication Fund 180,000 180,000
Total 540,000 540,000
Operational Impact/Other
Elimination of the underground confinced space that houses the operational equipment will extend the life expectancy of mechanical and electrical
systems by removing them from a damp and corrosive environment.
Thursday, June 08, 2006
General Public
Buildings
CAPITAL IMPROVEMENTS PLAN
City of Hopkins, MN
2007 thru 2011
Contact Public Works Director
Department Public Works: Bldg/Equip Serv
Project # 05-CIP-B305
Project Name City Hall Carpet Replacement
Type Improvement
Useful Life Unassigned
Category Buildings: Administrative Offt
Priority n/a
nprovement Plan
Total Project Cost $95,000
Description
Complete carpet replacement City Hall; upper and lower levels, $80,000; reconfigure office layout in Community services area, $15,000.
2000 sq yards @ $40/yard = $80,000
Justification
Carpeting is 14 years old as of2005. Worn, exceeded useful life.
Due to attrition several office areas are currently vacant within the Community Services area. For greater efrficiency and to implement a central
filing system, a space needs assessment was done. Cost is for the implementation of the recommended layout.
Expenditures
Construction/Maintenance
2007
. 95,000
95,000
2008
2009
2010
2011
Total
95,000
95,000
Total
Funding Sources
CI - Capital Improvement Fund
Total
2007
95,000
95,000
2008
2009
2010
2011
Total
95,000
95,000
Operational Impact/Other
Monday, June 05, 2006
CAPITAL IMPROVEMENTS PLAN
City of Hopkins, MN
2007 thru 2011
Contact Public Works Director
Department Public Works: Bldg/Equip Serv
Project # 05-CIP-B307
Project Name City Hall Boiler Additions
Type Improvement
Useful Life Unassigned
Category Buildings: Administrative Offi
Priority nla
nprovement Plan
Total Project Cost $23,000
Description
Purchase smaller, fuel efficient boiler for City Hall.
To be used during summer months for dehumidification.
Justification
Currently we run one or both boilers year-round for dehumidification. We could get by with one small energy efficient boiler during these times.
Expenditures
Construction/Maintenance
2007
2008
23,000
23,000
2009
2010
2011
Total
23,000
23,000
Total
Funding Sources
CI - Capital Improvement Fund
Total
2007
2008
23,000
23,000
2009
2010
2011
Total
23,000
23,000
Operational Impact/Other
Monday, June 05, 2006
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
Project # 05-CIP-B308
Project Name Activity Center Window Replacement
nprovement Plan
Description
Replacement of windows at Hopkins Activity Center
Justification
Seals leaking, windows fogging. Replace glass inserts
Expenditures 2007
Construction/Maintenance
Total
Funding Sources 2007
CI - Capital Improvement Fund
Total
Operational Impact/Other
2008
5,200
5,200
2008
5,200
5,200
2007 thru 2011
2009
2009
2010
2010
Contact PW Director
Department Public Works: Bldg/Equip Serv
Type Improvement
Useful Life Unassigned
Category Buildings: Community Center
Priority n/a
Total Project Cost $5,200
2011
Total
5,200
5,200
2011
Total
5,200
5,200
Friday, May 19, 2006
CAPITAL IMPROVEMENT PLAN
City of Hopkins, :MN
2007 thru 2011
Contact Public Works Director
Department Public Works: Bldg/Equip Serv
Project # 07-CIP-B312
Project Name City Hall HV AC Upgrade
Type Improvement
Useful Life 15-18 years
Category Equipment
Priority n/a
nprovement Plan
Description
I
Total Project Cost $76,000
Replace existing chilled water cooling system and air handler with two roof top AC systems and add one small, energy
efficient boiler.
Justification I
The current 80 ton chiller, air handler and boilers are over 40 years old. We propose to replace the chiller and air
handler with two roof top units. We would also add a third smaller energy efficient boiler for off-peak times. Payback
in 3-4 years on energy savings.
Expenditures
Construction/Maintenance
2007
76.000
76,000
2008
2009
2010
2011
Total
76,000
76,000
Total
Funding Sources
CI - Capital Improvement Fund
Total
2007
76,000
76,000
2008
2009
2010
2011
Total
76,000
76,000
Operational Impact/Other I
Tuesday, May 16, 2006
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2007 thru 2011
Contact Public Works Director
Department Public Works: Bldg/Equip Serv
. Type Improvement
Useful Life 10 years
Category Parks/Forestry/Pavilion: Comm
Priority n/a
Project #
07-CIP-B313
Project Name Pavilion Skate Tile ReplacementlLobby Improvement
nprovement Plan
Total Project Cost $52,000
Description I
Replacement of existing skate tile and adding skate tile and ceramic tile to the lobby.
Replacement of existing tile in team rooms, arena, warming room, and referees room: 5,500 square feet
Install skate tile to a protion of lobby so skaters can access drinking fountains; 500 square feet.
Install ceramic tile in the entryway and a portion of the lobby: 500 square feet
Justification I
Current skate tile is 16 years old and is the original tile; the wear layer of the tile is worn through in the high traffic
areas. Original tile was not glued, which increases maintenance and can create gaps in seams. This can allow skates to
touch the concrete underneath th~ tile. Lobby skate and cermic tile would add to the building aesthetics.
Expenditures
Construction/Maintenance
2007
52,000
52,000
2008
2009
2010
2011
Total
52,000
52,000
Total
Funding Sources
PA - Pavilion Fund
2007
52,000
Total 52,000
2008
2009
2010
2011
Total
52,000
52,000
Operational Impact/Other I
New tile glued down will save on maintenance, be safer, and improve facility appearance and marketability.
Tuesday, May 16,2006
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
Project # 07-CIP-B314
Project Name Pavilion Overhead Door Improvement
2007 thru 2011
Contact Public Works Director
Department Public Works: BldglEquip Serv
Type Improvement
Useful Life 30 years
Category ParkslForestry/Pavilion: Comm
Priority n/a
nprovement Plan
Total Project Cost $35,000
Description
I
Remove and block-in four of the six overhead doors on the west side of the Pavilion with a portion to have windows or
glass block to allow light to come through.
Install automatic openers on the remaining four overhead doors in the arena.
Remove and block-in one of the two exterior concession windows.
Justification I
Currently the overhead doors are seldom utilized and the removal and installation of glass block or windows will
decrease the need to use arena lighting and add to arena aesthetics.
Pavilion user groups have asked for this project.
Expenditures 2007
Construction/Maintenance
2008
2009
2010
35,000
35,000
2011
Total
35,000
35,000
Total
Funding Sources
PA - Pavilion Fund
2007
2008
2009
2010
35,000
35,000
2011
Total
35,000
35,000
Total
Operational Impact/Other I
Potentioal savings on utilities and greater satisfaction from user groups with arena aesthetics.
Tuesday, May 16, 2006
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
Project # 07-CIP-B316
Project Name Arts Center Carpet Second Floor Lobby
2007 thru 2011
Contact Public Works Director
Department Public Works: Bldg/Equip Serv
Type Improvement
Useful Life 10 years
Category Buildings: Arts Center
Priority nla
nprovement Plan
Total Project Cost $21,000
Description
Remove and replace carpet and carpet base in the Arts Center second floor lobby.
420 sq yards x $50/yard = $20,000
Justification
Carpeting is 9 years old as of 2006. Main floor lobby carpet replaced in 2006. Excessive wear in high traffic areas,
worn, and has exceeded useful life.
Total
2008
21,000
21,000
2009
2010
2011
Total
21,000
21,000
Expenditures 2007
Construction/Maintenance
Funding Sources 2007
CI - Capital Improvement Fund
Total
2008
21,000
21,000
2009
2010
2011
Total
21,000
21,000
Operational Impact/Other
Tuesday, May 16, 2006
CAPITAL IMPROVEMENT PLAN
City of Hopldns, l\1N
2007 thru 2011
Project # 07-CIP-B317
Project Name Arts Center Carpet: Carom RID, Green Rm, Hallway
nprovement Plan
Description
I
Total Project Cost $15,000
Contact Public Works Director
Department Public Works: Bldg/Equip Serv
Type Improvement
Useful Life 10 years
Category BUIldings: Arts Center
Priority n/a
Remove and replace carpet and carpet base in the Community Room, Green Room, and Green Room Hallway.
270 sq yards x $55/yard - $14,850
Justification I
Carpeting is 9 years old as of 2006. Carpet has exceeded useful life.
2009
2011
Total
15,000
15,000
Expenditures 2007
Construction/Maintenance
2008
2010
15,000
15,000
Total
Funding Sources 2007
CI - Capital Improvement Fund
Total
2008
2009
2010
15,000
15,000
2011
Total
15,000
15,000
Operational Impact/Other I
Tuesday, May 16, 2006
Utilities
CAPITAL IMPROVEMENT PLAN
City of Hopkins, l\1N
2007 thru 2011
Contact PW Director
Depaa-tment Public Works: Utilities
Project #
Ol-CIP-U002
Type Improvement
Useful Life Unassigned
Category Utilities: Municipal Sanitary S
Priority n/a
Project Name Storm drainage system maintenance
nprovement Plan
Total Project Cost $2,227,000
Description
2007-2012: Concrete alley repairs
2008: Nine Mile Creek bank stabilization, 5th St So culvert, pond construction and maintenance, habitat enhancement
Justification
Annual alley pavement concrete slab repairs are needed.
Nine Mile Creek banks are eroding and will soon threaten the adjacent park trail and Westbrooke Way street pavement.
Pond sand/silt removal last done in 1999. Built up sedimentation has decreased stormwater holding capacity causing
overflow of sediment into Nine Mile Creek watershed system.
Prior Expenditures 2007 2008
148,000 I Construction/Maintenance 15,000 2,015,000
Total Total 15,000 2,015,000
2009
16,000
16,000
2010
16,000
16,000
2011
17,000
17,000
Total
2,079,000
2,079,000
Prior Funding Sources 2007 2008 2009 2010 2011 Total
148,000 I GU - Other Governmental Unit 2,000,000 2,000,000
Total SU - Storm Sewer Fund 15,000 15,000 16,000 16,000 17,000 79,000
Total 15,000 2,015,000 16,000 16,000 17 ,000 2,079,000
Operational Impact/Other
Consistent with the Storm Water Management Plan.
Tuesday, May 16,2006
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
Project # Ol-CIP-U003
ProjectName Storm Water Management Projects
2007 thru 2011
Contact PW Director
Department Public Works: Utilities
Type Improvement
Useful Life Unassigned
Category Utilities: Storm Sewer
Priority n/a
nprovement Plan
Total Project Cost $220,000
Description
2009 - Provide outlet pipe to Shady Oak Pond into CSAH 61 storm drainage piping in conjunction with Shady Oak
Road reconstruction
Justification
Shady Oak Pond has no outlet and floods streets and residential property if not pumped.
Consistent with City Council approved action plan of October 21, 1997, the City's storm management plan, and Shady
Oak Road reconstruction timetable.
Prior
20,000 I
Total
Expenditures
Construction/Maintenance
2007
2008
2009
200,000
200,000
2010
2011
Total
200,000
200,000
Total
Prior
20,000 I
Total
Funding Sources
SU - Storm Sewer Fund
2007
2008
2009
200,000
200,000
2010
2011
Total
200,000
200,000
Total
Operational Impact/Other
Consistent with City Council approved Action Plan of October 21, 1997, the City's Storm Management Plan, and Shady
Oak Road reconstruction timetable.
Tuesday, May 16, 2006
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2007 thru 2011
Contact PW Director
Department Public Works: Utilities
Type Improvement
Useful Life Unassigned
Category Utilities: Municipal Sanitary S
Priority n/a
Project #
04-CIP-U007
Project Name Upgrade of sanitary sewer lift station #1
nprovement Plan
Total Project Cost $200,000
Description
Replace a confined space lift station that was installed in 1957 with a new submersible lift station and rerouting of the
discharge line, or elimate lift station and install new gravity sanitary sewer pipe to Minnetonka trunk sewer pipe in
Shady Oak Road.
Justification
The station has given the city a long life and now needs to be replaced.
Expenditures
Construction/Maintenance
2007
200,000
200,000
2008
2009
2010
2011
Total
200,000
200,000
Total
Funding Sources
SF - Sanitary Sewer Fund
Total
2007
200,000
200,000
2008
2009
2010
2011
Total
200,000
200,000
Operational Impact/Other
Tuesday, May 16, 2006
CAPITAL IMPROVEMENTS PLAN
City of Hopkins, MN
Project # 05-CIP-U008
Project Name 5th Street South Culvert Replacement
2007 thru 2011
Contact PW Director
nprovement Plan
Department Public Works: Utilities
Type Improvement
Useful Life Unassigned
Category Utilities: Storm Sewer
Priority nla
Total Project Cost $550,000
Description
Replace Nine Mile Creek corrugated metal culvert pipes under 5th Street South with precase concrete box culvert.
Justification
Existing corrugated metal pipes are buckled, deteriorating, and susceptible to blockage causing street damage and flooding during heavy rainfall
events.
Expenditures
Construction/Maintenance
2007
2008
550,000
550,000
2009
2010
2011
Total
550,000
550,000
Total
Funding Sources
GU - Other Governmental Unit
WF - Water Fund
2007
2008
520,000
30,000
550,000
2009
2010
2011
Total
520,000
30,000
550,000
Total
I Operational Impact/Other
Monday, June 05, 2006