Loading...
Memo - Shady Oak Road Project . Public Warks Department Memorandum To: Honorable Mayor and Members of the City Council Copy: Jim Genellie, Acting City Manager ~ From: Steven J. Stadler, Public Works Director Date: August27,2004 Subject: Shady Oak Road project The Shady Oak Road reconstruction project will require several important decisions by City Council. These will include: roadway design elements, road alignment, redevelopment areas and access issues. The first major element to consider is the roadway design as this translates to right-of-way width and resulting property impacts, . This Council work session item is limited to a presentation and discussion on the potential roadway design options and resulting right-of-way widths, Staff and consultants are currently putting together the feasible options for road alignment and the resulting property impacts and potential redevelopment considerations. These issues will be presented for discussion at a work session in October. At this work session, the County consulting engineer will present the results of their study of future traffic flow for 3-lane and 4-lane road options. There will be a report and diagrams showing the differences in the proposed road designs. Unfortunately, this information is not available to staff as of this date. The goal of the work session is for City Council to understand the traffic flow implications of the 3-lane and 4-lane options and to reach preliminary agreement on a preferred design. . -- ---.--