2020 - 2024 ERP
EQUIPMENT REPLACEMENT PLAN
2020-2024
DATE: October 15, 2019
TO: Honorable Mayor and Members of the City Council
FROM: Mike Mornson, City Manager
SUBJECT: 2020-2024 EQUIPMENT REPLACEMENT PLAN
With this letter, I respectfully submit the 2020-2024 Equipment Replacement Plan. This
five-year planning document represents the combined efforts of city staff and the City
Council.
The Equipment Replacement Plan is a five-year forecast of equipment replacement needs
in the City of Hopkins. It is intended to alert the Council and residents of equipment
replacement needs that are needed to maintain the efficiency of city services and the
safety of city staff. The first year of the plan becomes the adopted budget, however the
equipment is again re-evaluated before final approval is given for the purchase. The
remaining four years represents estimated replacement needs and the related funding.
The Equipment Replacement Plan does not include proposed capital projects. A
document relating specifically to capital project needs has been developed into a separate
document.
The Equipment Replacement Plan is intended to serve as a planning tool and is therefore
structured to present a meaningful, long-range perspective of the city’s equipment needs
over the next 20 years. At the same time sufficient details on individual pieces of
equipment scheduled for replacement is provided to enable those who review the
information to make informed decisions of the city’s equipment needs over the next
several years.
Please use the information provided to assist in the understanding of the city’s equipment
needs as they relate to the delivery of service to the citizens of Hopkins.
This document was developed by the Finance Department with the assistance of all city
departments. I wish to especially thank all those involved in the development of the
Equipment Replacement Plan, and especially Steve Stadler, Public Works Director, Brent
Johnson, Police Chief, Dale Specken, Fire Chief, Ari Lenz, Assistant City Manager, and
Nick Bishop, Finance Director for their hard work and dedication.
1
2
Page
City Manager's Message 1
Table of Contents 3
Introduction
Background and Summary of Changes from 2017 Plan 6
Cash Flow Statements
Equipment Replacement Fund 10
Five-Year Project Summaries
Projects by Year 12
Department Summary 15
Projects by Department 16
Funding Source Summary 19
Projects by Funding Source 20
Equipment Requests
Individual Equipment Request Details
Activity Center 24
Arts Center 27
Community Services - IT 29
Fire 41
HRA 49
Pavilion 51
Police 52
Public Works 64
Refuse 81
Water/Sewer 82
Twenty Year Replacement Schedule
Twenty Year Replacement Schedule by Department 86
Equipment Inventory 90
EQUIPMENT REPLACEMENT PLAN
2020-2024
TABLE OF CONTENTS
3
4
INTRODUCTION
5
EQUIPMENT REPLACEMENT PLAN 2020-2024
BACKGROUND AND SUMMARY OF CHANGES FROM 2019 PLAN
Background
The Equipment Replacement Plan is a twenty-year forecast and a five-year plan of equipment needs in
the City of Hopkins. It is intended to inform the Council and residents of the major equipment needs on
the horizon. The first year of the plan becomes an adopted equipment budget and relates to the operating
budget of the equipment replacement fund, which is approved on an annual basis. The remaining
nineteen years represent an estimate of equipment needs and funding capabilities of the City. Funding
requirements vary from year to year. In order to maintain a fairly consistent levy each year, the twenty-
year schedule is projected with a 3% inflation factor for operating expenses.
The cash flow requirements to fund equipment needs in the equipment replacement fund will experience
a roller coaster effect over the next 20 years given the projected equipment needs and 3% inflation rate.
The intragovernmental charges were increased in 2019 by 9% and will be increased in 2020 by 9%.
Plans are to increase the rate going forward with increases of 9% in 2021 and 6% in 2022-2024. The
majority of items purchased with ERP funds are used by departments within the General Fund which
accounts for the most of the operations of the city. The fund will also implement a tax levy for 2020.
The levy being proposed for 2019 is $110,000. It is planned to continue at $250,000 for 2021-2024.
There have been many changes in technology and the way we operate and as a result there is more
equipment in the plan; however the rate has not increased to accommodate the increase in equipment.
Equipment that was purchased with grants such as digital squad cameras, laptop computers in squad cars
and fire vehicles, and infrared cameras are included in the ERP but the rates have not kept up with the
addition of all these items. In addition society is dictating some of the equipment under consideration.
One of the items that has been under discussion in recent years was police body cameras, which are
currently included in this plan.
The long term viability of the fund remains questionable and will result in difficult decisions regarding
equipment and operations. These issues were addressed as part of the Financial Management Plan
(FMP) first completed in 2014. The FMP establishes funding mechanisms to get the fund to a constant
balance of $750,000. Items that will be considered and/or implemented are rate increases, a tax levy and
issuing equipment certificates.
Equipment Certificates were sold for $590,000 in 2018. This will allow us to replace aging equipment
and spread the payments over 10 years. The required Equipment Certificate payment will be part of the
debt levy in the applicable year. Equipment certificates are also planned as a funding source in 2020.
Each year staff re-evaluates the equipment needs and adjusts the schedule accordingly. Changes to the
plan are reflected in the document. Refurbishments, extended life expectancy and closer cost estimates
of replacements have been incorporated into the plan. The equipment replacement charges in the general
fund represent approximately 3% of total general fund expenditures.
6
The Equipment Replacement Plan’s basic premise is scheduled replacement of present equipment. A
new item must, in the year proposed, be presented in the annual operating budget with a stipulation that
replacement will be necessary in the future. Flexibility of the Equipment Replacement Plan is
established through annual review and revision, if necessary.
Summary of Changes from 2019 Plan
Highlights of changes from last year’s equipment replacement plan for the years 2020-2023:
CS - Activity Center: Security System Upgrade was delayed from 2020 to 2021.
A/V Replacements and upgrades were delayed from 2020 to 2021.
CS - Arts Center: No changes
CS - IT: Financial Software Upgrade added in 2021 for $307,468. (Project has been
cancelled)
Community Services: No changes
Fire: Hose replacement project added in 2023 for $38,000.
Quick Attack Pumper/Rescue advanced from 2023 to 2022 and costs
increased from $314,500 to $525,000.
HRA No changes.
Police: Building Video Server for $20,000 in 2020 was deleted. Video storage will be
done on the cloud in 2020.
.
Public Works: Building/Equipment Services
4x4 ¾ Ton Truck with Service Body was added in 2020 for $35,000.
Parks/Forestry
Turf Mower added for $25,300 in 2022.
Streets/Traffic
Wheel Loader was advanced from 2025 to 2020 for $170,000
1 Ton Boom Truck was advanced from 2029 to 2023 for $136,400.
Refuse
No changes
Sewer
No Changes
Water
No Changes
7
8
CASH FLOW STATEMENT
9
City of Hopkins
Equipment Replacement Fund (602)
Rate Change 10%9%9%9%6%6%6%
ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET
2018 2019 2020 2021 2022 2023 2024
Working Capital Begin Year (24,461) (114,895) (9,347) 19,438 72,477 179,852 346,870
Revenues from charges 487,900 531,811 579,674 631,845 669,755 709,941 752,537
Tax Levy 230,000 110,000 250,000 250,000 250,000 250,000
Transfer in Debt Service Fund - - - - -
Interest earnings - - - 97 362 899 3,000
Other revenues (sale of assets)(36,670) 35,000 35,000 35,000 35,000 35,000 35,000
Enterpirse contribution to software upgrade - - - - -
Equipment Certificates (Bonds)592,000 - 170,000 200,000 - 1,600,000
Interfund Loan - - - - -
Total Revenues 1,043,230 796,811 894,674 1,116,942 955,118 2,595,840 1,040,537
Expenditures (excludes Leases & Depr.) 259,742 33,873 34,889 35,936 37,014 38,124 39,268
Fire Truck Financing Pymnts (2009-2018)52,295 - - - -
Capital Outlay - Equipment 821,627 657,390 831,000 1,027,967 810,729 2,390,697 698,354
Repayment of Interfund Loan -
Total Expenses 1,133,664 691,263 865,889 1,063,903 847,743 2,428,821 737,622
Working Capital Ending Balance (114,895) (9,347) 19,438 72,477 179,852 346,870 649,785
(Unrestricted Net Position)
10
FIVE-YEAR
PROJECT SUMMARIES
11
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
PROJECTS BY YEAR
2020 2024thru
Project Name Department Project #Priority Project Cost
2020
01-ERP-0003CH - Network Server n/a 22,000Comm Svcs - IT
01-ERP-0006Computers n/a 31,500Comm Svcs - IT
01-ERP-0014Distribution Network Switches n/a 50,000Comm Svcs - IT
01-ERP-0015Backup Server n/a 66,000Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 22,000Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 10,000Comm Svcs - IT
01-ERP-0022IT - Windows 10 Enterprise Upgrade n/a 21,000Comm Svcs - IT
01-ERP-0211PD - Network Server n/a 22,000Comm Svcs - IT
01-ERP-0109Extrication Tool (2)n/a 29,000Fire
01-ERP-0200Marked Patrol Vehicles (7)n/a 107,400Police
01-ERP-0219PD - Video Data Server n/a 10,000Police
01-ERP-0712PW - 4x4 3/4 Ton Truck with Service Body n/a 35,000Public Works: Bldg/Equip Serv
01-ERP-08014x4 3/4Ton Trucks (2)n/a 85,200Public Works: Parks/Forestry
01-ERP-0808Riding Mowers (2)n/a 13,900Public Works: Parks/Forestry
01-ERP-0810Large Turf Mower n/a 96,000Public Works: Parks/Forestry
01-ERP-0321Wheel Loader 1 170,000Public Works: Streets/Traffic
791,000Total for 2020
2021
01-ERP-0037Activity Center Security System Upgrade 1 20,000Comm Svcs - Activity Center
01-ERP-0041Activity Center A/V Replacement & Upgrade 3 62,624Comm Svcs - Activity Center
01-ERP-0003CH - Network Server n/a 22,000Comm Svcs - IT
01-ERP-0005Financial Software - Various Depts.n/a 307,468Comm Svcs - IT
01-ERP-0006Computers n/a 33,075Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 33,000Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 10,000Comm Svcs - IT
01-ERP-0022IT - Windows 10 Enterprise Upgrade n/a 21,000Comm Svcs - IT
01-ERP-0211PD - Network Server n/a 22,000Comm Svcs - IT
01-ERP-0200Marked Patrol Vehicles (7)n/a 161,100Police
01-ERP-0201Sergeant's Vehicle n/a 57,000Police
01-ERP-0202PSO / Parking Enforcement Vehicle n/a 53,700Police
01-ERP-0305Single Axle Dump Truck (2)n/a 225,000Public Works: Streets/Traffic
01-ERP-0900Refuse Truck (RAP-R) (2)n/a 270,300Refuse
1,298,267Total for 2021
2022
01-ERP-0038Activity Center Kitchen Storage 5 17,000Comm Svcs - Activity Center
01-ERP-1105Art Center Jaycee Studio Audio Visual n/a 13,500Comm Svcs - Arts Center
01-ERP-0003CH - Network Server n/a 25,000Comm Svcs - IT
01-ERP-0006Computers n/a 34,729Comm Svcs - IT
01-ERP-0009Network Infrastructure Upgrade n/a 23,400Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 44,000Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 10,000Comm Svcs - IT
Wednesday, October 9, 2019
12
Project Name Department Project #Priority Project Cost
01-ERP-0022IT - Windows 10 Enterprise Upgrade n/a 42,000Comm Svcs - IT
01-ERP-0211PD - Network Server n/a 25,000Comm Svcs - IT
01-ERP-0109Extrication Tool (2)n/a 30,000Fire
01-ERP-0401HRA Copier n/a 16,500HRA
01-ERP-0200Marked Patrol Vehicles (7)n/a 110,000Police
01-ERP-0203PSO - Utility 4x4 n/a 72,100Police
01-ERP-0221Records Management System n/a 150,000Police
01-ERP-0804Log Truck n/a 163,600Public Works: Parks/Forestry
01-ERP-0808Riding Mowers (2)n/a 25,300Public Works: Parks/Forestry
01-ERP-03031 Ton Dump Truck (2)n/a 53,400Public Works: Streets/Traffic
01-ERP-0309Skid Loader (2)n/a 50,000Public Works: Streets/Traffic
01-ERP-0555Generator (2)n/a 43,000Sewer
948,529Total for 2022
2023
01-ERP-0038Activity Center Kitchen Storage 5 12,000Comm Svcs - Activity Center
01-ERP-0003CH - Network Server n/a 26,250Comm Svcs - IT
01-ERP-0004Telephone System n/a 89,600Comm Svcs - IT
01-ERP-0006Computers n/a 36,465Comm Svcs - IT
01-ERP-0015Backup Server n/a 72,120Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 44,000Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 10,000Comm Svcs - IT
01-ERP-0022IT - Windows 10 Enterprise Upgrade n/a 42,000Comm Svcs - IT
01-ERP-0211PD - Network Server n/a 26,250Comm Svcs - IT
01-ERP-0105Quick Attack Pumper/Rescue (Rescue 8)n/a 525,000Fire
01-ERP-0109Extrication Tool (2)n/a 32,000Fire
01-ERP-0112Thermal Imaging Camera (2)n/a 15,400Fire
01-ERP-0125Fire Radios - Portable and Mobile Devices n/a 368,000Fire
01-ERP-0126Fire - Fire Helmets n/a 16,000Fire
01-ERP-0127Fire - Lucus Device n/a 18,000Fire
01-ERP-0128Fire - Hose Replacement 2 38,000Fire
01-ERP-04004x4 3/4 Ton Truck n/a 41,100HRA
01-ERP-0200Marked Patrol Vehicles (7)n/a 117,400Police
01-ERP-0214Tactical Ballistic Vests / Helmets - SWAT 3 76,512Police
01-ERP-0215Police - Portable Radios n/a 290,000Police
01-ERP-0217Taser Replacement n/a 80,000Police
01-ERP-0218Building Video Server n/a 17,000Police
01-ERP-08001/2 Ton Pickup Truck n/a 35,400Public Works: Parks/Forestry
01-ERP-03004x4 1/2 Ton Pickup with Plow n/a 28,900Public Works: Streets/Traffic
01-ERP-03041 Ton Traffic Boom Truck n/a 136,400Public Works: Streets/Traffic
01-ERP-0308Front End Loaders (2)n/a 268,600Public Works: Streets/Traffic
2,462,397Total for 2023
2024
01-ERP-1107Art Center Theater Projection Screen 2 6,700Comm Svcs - Arts Center
01-ERP-0003CH - Network Server n/a 27,037Comm Svcs - IT
01-ERP-0006Computers n/a 37,559Comm Svcs - IT
01-ERP-0012Core Network Switch n/a 20,000Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 45,320Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 10,000Comm Svcs - IT
01-ERP-0022IT - Windows 10 Enterprise Upgrade n/a 63,000Comm Svcs - IT
01-ERP-0211PD - Network Server n/a 27,038Comm Svcs - IT
01-ERP-0129Fire - EOC Upgrade n/a 12,000Fire
01-ERP-1003Pavilion - Floor Scrubber n/a 11,600Pavilion
01-ERP-0200Marked Patrol Vehicles (7)n/a 117,400Police
Wednesday, October 9, 2019
13
Project Name Department Project #Priority Project Cost
01-ERP-0212Squad Car Camera Systems/ Body Worn Camera n/a 105,000Police
01-ERP-0220Squad Computers n/a 90,000Police
01-ERP-0700Engineering Van n/a 28,900Public Works: Engineering
01-ERP-0814Trailer Flatbed n/a 10,000Public Works: Parks/Forestry
01-ERP-03014X4 3/4 Ton Truck with Plow n/a 38,500Public Works: Streets/Traffic
01-ERP-03031 Ton Dump Truck (2)n/a 49,500Public Works: Streets/Traffic
01-ERP-0318Asphalt Hot Mix Heating Box - Trailer n/a 22,100Public Works: Streets/Traffic
01-ERP-05504x4 3/4 Ton Truck n/a 40,300Sewer
761,954Total for 2024
GRAND TOTAL 6,262,147
Wednesday, October 9, 2019
14
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
DEPARTMENT SUMMARY
2020 2024thru
Total20202021202220232024Department
Comm Svcs - Activity Center 111,62482,624 17,000 12,000
Comm Svcs - Arts Center 20,20013,500 6,700
Comm Svcs - IT 1,473,811244,500 448,543 204,129 346,685 229,954
Fire 1,083,40029,000 30,000 1,012,400 12,000
HRA 57,60016,500 41,100
Pavilion 11,60011,600
Police 1,614,612117,400 271,800 332,100 580,912 312,400
Public Works: Bldg/Equip Serv 35,00035,000
Public Works: Engineering 28,90028,900
Public Works: Parks/Forestry 429,400195,100 188,900 35,400 10,000
Public Works: Streets/Traffic 1,042,400170,000 225,000 103,400 433,900 110,100
Refuse 270,300270,300
Sewer 83,30043,000 40,300
791,000 1,298,267 948,529 2,462,397 761,954 6,262,147TOTAL
Wednesday, October 9, 201915
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
PROJECTS BY DEPARTMENT
2020 2024thru
Total20202021202220232024DepartmentProject #Priority
Comm Svcs - Activity Center
01-ERP-0037 20,00020,000Activity Center Security System Upgrade 1
01-ERP-0038 29,00017,000 12,000Activity Center Kitchen Storage 5
01-ERP-0041 62,62462,624Activity Center A/V Replacement & Upgrade 3
111,62482,624 17,000 12,000Comm Svcs - Activity Center Total
Comm Svcs - Arts Center
01-ERP-1105 13,50013,500Art Center Jaycee Studio Audio Visual n/a
01-ERP-1107 6,7006,700Art Center Theater Projection Screen 2
20,20013,500 6,700Comm Svcs - Arts Center Total
Comm Svcs - IT
01-ERP-0003 122,28722,000 22,000 25,000 26,250 27,037CH - Network Server n/a
01-ERP-0004 89,60089,600Telephone System n/a
01-ERP-0005 307,468307,468Financial Software - Various Depts.n/a
01-ERP-0006 173,32831,500 33,075 34,729 36,465 37,559Computersn/a
01-ERP-0009 23,40023,400Network Infrastructure Upgrade n/a
01-ERP-0012 20,00020,000Core Network Switch n/a
01-ERP-0014 50,00050,000Distribution Network Switches n/a
01-ERP-0015 138,12066,000 72,120Backup Server n/a
01-ERP-0017 188,32022,000 33,000 44,000 44,000 45,320IT - Office 365 n/a
01-ERP-0020 50,00010,000 10,000 10,000 10,000 10,000IT - Patching Automation Software 1
01-ERP-0022 189,00021,000 21,000 42,000 42,000 63,000IT - Windows 10 Enterprise Upgrade n/a
01-ERP-0211 122,28822,000 22,000 25,000 26,250 27,038PD - Network Server n/a
1,473,811244,500 448,543 204,129 346,685 229,954Comm Svcs - IT Total
Fire
01-ERP-0105 525,000525,000Quick Attack Pumper/Rescue (Rescue 8)n/a
01-ERP-0109 91,00029,000 30,000 32,000Extrication Tool (2)n/a
01-ERP-0112 15,40015,400Thermal Imaging Camera (2)n/a
01-ERP-0125 368,000368,000Fire Radios - Portable and Mobile Devices n/a
01-ERP-0126 16,00016,000Fire - Fire Helmets n/a
01-ERP-0127 18,00018,000Fire - Lucus Device n/a
01-ERP-0128 38,00038,000Fire - Hose Replacement 2
01-ERP-0129 12,00012,000Fire - EOC Upgrade n/a
1,083,40029,000 30,000 1,012,400 12,000Fire Total
HRA
01-ERP-0400 41,10041,1004x4 3/4 Ton Truck n/a
01-ERP-0401 16,50016,500HRA Copier n/a
57,60016,500 41,100HRA Total
Wednesday, October 9, 201916
Total20202021202220232024DepartmentProject #Priority
Pavilion
01-ERP-1003 11,60011,600Pavilion - Floor Scrubber n/a
11,60011,600Pavilion Total
Police
01-ERP-0200 613,300107,400 161,100 110,000 117,400 117,400Marked Patrol Vehicles (7)n/a
01-ERP-0201 57,00057,000Sergeant's Vehicle n/a
01-ERP-0202 53,70053,700PSO / Parking Enforcement Vehicle n/a
01-ERP-0203 72,10072,100PSO - Utility 4x4 n/a
01-ERP-0212 105,000105,000Squad Car Camera Systems/ Body Worn Camera n/a
01-ERP-0214 76,51276,512Tactical Ballistic Vests / Helmets - SWAT 3
01-ERP-0215 290,000290,000Police - Portable Radios n/a
01-ERP-0217 80,00080,000Taser Replacement n/a
01-ERP-0218 17,00017,000Building Video Server n/a
01-ERP-0219 10,00010,000PD - Video Data Server n/a
01-ERP-0220 90,00090,000Squad Computers n/a
01-ERP-0221 150,000150,000Records Management System n/a
1,614,612117,400 271,800 332,100 580,912 312,400Police Total
Public Works: Bldg/Equip Serv
01-ERP-0712 35,00035,000PW - 4x4 3/4 Ton Truck with Service Body n/a
35,00035,000Public Works: Bldg/Equip Serv Total
Public Works: Engineering
01-ERP-0700 28,90028,900Engineering Van n/a
28,90028,900Public Works: Engineering Total
Public Works: Parks/Forestry
01-ERP-0800 35,40035,4001/2 Ton Pickup Truck n/a
01-ERP-0801 85,20085,2004x4 3/4Ton Trucks (2)n/a
01-ERP-0804 163,600163,600Log Truck n/a
01-ERP-0808 39,20013,900 25,300Riding Mowers (2)n/a
01-ERP-0810 96,00096,000Large Turf Mower n/a
01-ERP-0814 10,00010,000Trailer Flatbed n/a
429,400195,100 188,900 35,400 10,000Public Works: Parks/Forestry Total
Public Works: Streets/Traffic
01-ERP-0300 28,90028,9004x4 1/2 Ton Pickup with Plow n/a
01-ERP-0301 38,50038,5004X4 3/4 Ton Truck with Plow n/a
01-ERP-0303 102,90053,400 49,5001 Ton Dump Truck (2)n/a
01-ERP-0304 136,400136,4001 Ton Traffic Boom Truck n/a
01-ERP-0305 225,000225,000Single Axle Dump Truck (2)n/a
01-ERP-0308 268,600268,600Front End Loaders (2)n/a
01-ERP-0309 50,00050,000Skid Loader (2)n/a
01-ERP-0318 22,10022,100Asphalt Hot Mix Heating Box - Trailer n/a
01-ERP-0321 170,000170,000Wheel Loader 1
1,042,400170,000 225,000 103,400 433,900 110,100Public Works: Streets/Traffic Total
Refuse
01-ERP-0900 270,300270,300Refuse Truck (RAP-R) (2)n/a
Wednesday, October 9, 201917
Total20202021202220232024DepartmentProject #Priority
270,300270,300Refuse Total
Sewer
01-ERP-0550 40,30040,3004x4 3/4 Ton Truck n/a
01-ERP-0555 43,00043,000Generator (2)n/a
83,30043,000 40,300Sewer Total
GRAND TOTAL 6,262,147791,000 1,298,267 948,529 2,462,397 761,954
Wednesday, October 9, 201918
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
FUNDING SOURCE SUMMARY
2020 thru 2024
TotalSource20202021202220232024
AC - Arts Center Fund 20,20013,500 6,700
Equipment Replacement Fund 5,718,747791,000 1,027,967 810,729 2,390,697 698,354
HRA - Housing and Redevelopment Authority 57,60016,500 41,100
PA - Pavilion Fund 11,60011,600
PKG - Parking Fund 5,0005,000
RF - Refuse Fund 352,100270,300 81,800
SF - Sanitary Sewer Fund 90,10043,000 6,800 40,300
WF - Water Fund 6,8006,800
791,000 1,298,267 965,529 2,445,397 761,954 6,262,147GRAND TOTAL
Wednesday, October 9, 2019
19
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
PROJECTS BY FUNDING SOURCE
2020 2024thru
TotalSourceProject #Priority 2020 2021 2022 2023 2024
AC - Arts Center Fund
01-ERP-1105 13,50013,500Art Center Jaycee Studio Audio Visual n/a
01-ERP-1107 6,7006,700Art Center Theater Projection Screen 2
20,20013,500 6,700AC - Arts Center Fund Total
Equipment Replacement Fund
01-ERP-0003 122,28722,000 22,000 25,000 26,250 27,037CH - Network Server n/a
01-ERP-0004 76,00076,000Telephone System n/a
01-ERP-0005 307,468307,468Financial Software - Various Depts.n/a
01-ERP-0006 173,32831,500 33,075 34,729 36,465 37,559Computersn/a
01-ERP-0009 23,40023,400Network Infrastructure Upgrade n/a
01-ERP-0012 20,00020,000Core Network Switch n/a
01-ERP-0014 50,00050,000Distribution Network Switches n/a
01-ERP-0015 138,12066,000 72,120Backup Server n/a
01-ERP-0017 188,32022,000 33,000 44,000 44,000 45,320IT - Office 365 n/a
01-ERP-0020 50,00010,000 10,000 10,000 10,000 10,000IT - Patching Automation Software 1
01-ERP-0022 189,00021,000 21,000 42,000 42,000 63,000IT - Windows 10 Enterprise Upgrade n/a
01-ERP-0037 20,00020,000Activity Center Security System Upgrade 1
01-ERP-0038 29,00017,000 12,000Activity Center Kitchen Storage 5
01-ERP-0041 62,62462,624Activity Center A/V Replacement & Upgrade 3
01-ERP-0105 525,000525,000Quick Attack Pumper/Rescue (Rescue 8)n/a
01-ERP-0109 91,00029,000 30,000 32,000Extrication Tool (2)n/a
01-ERP-0112 15,40015,400Thermal Imaging Camera (2)n/a
01-ERP-0125 368,000368,000Fire Radios - Portable and Mobile Devices n/a
01-ERP-0126 16,00016,000Fire - Fire Helmets n/a
01-ERP-0127 18,00018,000Fire - Lucus Device n/a
01-ERP-0128 38,00038,000Fire - Hose Replacement 2
01-ERP-0129 12,00012,000Fire - EOC Upgrade n/a
01-ERP-0200 613,300107,400 161,100 110,000 117,400 117,400Marked Patrol Vehicles (7)n/a
01-ERP-0201 57,00057,000Sergeant's Vehicle n/a
01-ERP-0202 53,70053,700PSO / Parking Enforcement Vehicle n/a
01-ERP-0203 72,10072,100PSO - Utility 4x4 n/a
01-ERP-0211 122,28822,000 22,000 25,000 26,250 27,038PD - Network Server n/a
01-ERP-0212 100,000100,000Squad Car Camera Systems/ Body Worn Camera n/a
01-ERP-0214 76,51276,512Tactical Ballistic Vests / Helmets - SWAT 3
01-ERP-0215 290,000290,000Police - Portable Radios n/a
01-ERP-0217 80,00080,000Taser Replacement n/a
01-ERP-0218 17,00017,000Building Video Server n/a
01-ERP-0219 10,00010,000PD - Video Data Server n/a
01-ERP-0220 90,00090,000Squad Computers n/a
01-ERP-0221 150,000150,000Records Management System n/a
01-ERP-0300 28,90028,9004x4 1/2 Ton Pickup with Plow n/a
01-ERP-0301 38,50038,5004X4 3/4 Ton Truck with Plow n/a
01-ERP-0303 102,90053,400 49,5001 Ton Dump Truck (2)n/a
Wednesday, October 9, 2019
20
TotalSourceProject #Priority 2020 2021 2022 2023 2024
01-ERP-0304 136,400136,4001 Ton Traffic Boom Truck n/a
01-ERP-0305 225,000225,000Single Axle Dump Truck (2)n/a
01-ERP-0308 268,600268,600Front End Loaders (2)n/a
01-ERP-0309 50,00050,000Skid Loader (2)n/a
01-ERP-0318 22,10022,100Asphalt Hot Mix Heating Box - Trailer n/a
01-ERP-0321 170,000170,000Wheel Loader 1
01-ERP-0700 28,90028,900Engineering Van n/a
01-ERP-0712 35,00035,000PW - 4x4 3/4 Ton Truck with Service Body n/a
01-ERP-0800 35,40035,4001/2 Ton Pickup Truck n/a
01-ERP-0801 85,20085,2004x4 3/4Ton Trucks (2)n/a
01-ERP-0804 81,80081,800Log Truck n/a
01-ERP-0808 39,20013,900 25,300Riding Mowers (2)n/a
01-ERP-0810 96,00096,000Large Turf Mower n/a
01-ERP-0814 10,00010,000Trailer Flatbed n/a
5,718,747791,000 1,027,967 810,729 2,390,697 698,354Equipment Replacement Fund Total
HRA - Housing and Redevelopment A
01-ERP-0400 41,10041,1004x4 3/4 Ton Truck n/a
01-ERP-0401 16,50016,500HRA Copier n/a
57,60016,500 41,100HRA - Housing and Redevelopment
Authority Total
PA - Pavilion Fund
01-ERP-1003 11,60011,600Pavilion - Floor Scrubber n/a
11,60011,600PA - Pavilion Fund Total
PKG - Parking Fund
01-ERP-0212 5,0005,000Squad Car Camera Systems/ Body Worn Camera n/a
5,0005,000PKG - Parking Fund Total
RF - Refuse Fund
01-ERP-0804 81,80081,800Log Truck n/a
01-ERP-0900 270,300270,300Refuse Truck (RAP-R) (2)n/a
352,100270,300 81,800RF - Refuse Fund Total
SF - Sanitary Sewer Fund
01-ERP-0004 6,8006,800Telephone System n/a
01-ERP-0550 40,30040,3004x4 3/4 Ton Truck n/a
01-ERP-0555 43,00043,000Generator (2)n/a
90,10043,000 6,800 40,300SF - Sanitary Sewer Fund Total
WF - Water Fund
01-ERP-0004 6,8006,800Telephone System n/a
6,8006,800WF - Water Fund Total
Wednesday, October 9, 2019
21
TotalSourceProject #Priority 2020 2021 2022 2023 2024
6,262,147791,000 1,298,267 965,529 2,445,397 761,954GRAND TOTAL
Wednesday, October 9, 2019
22
EQUIPMENT REQUESTS
23
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Activity Ctr Director
2020 2024
thru Department Comm Svcs - Activity Center
Description
Upgrade the present security system, which was installed in 2008.
Project #01-ERP-0037
Priority 1 Urgent
Justification
We monitor the Activity Center to insure the safety of our participants and staff. Staff works numerous hours while alone within the building. We
rely on security cameras to deter harm to participants or staff, or damage to the building itself. Cameras can help identify the perpetrator if
something should happen. Recommendation to complete security upgrades after capital improvements in the facility.
Budget Impact/Other
Useful Life 15-18 yearsProject Name Activity Center Security System Upgrade Category Equipment
Type Equipment
Future
Total Project Cost:$51,160
Total2020 2021 2022 2023 2024Expenditures
20,00020,000Equipment
20,000 20,000Total
Total2020 2021 2022 2023 2024Funding Sources
20,00020,000Equipment Replacement Fund
20,000 20,000Total
Wednesday, October 9, 2019
24
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Activity Ctr Director
2020 2024
thru Department Comm Svcs - Activity Center
Description
Purchase of stainless steel enclosed cabinets for the kitchen over a 2-year span.
Project #01-ERP-0038
Priority 5 Future Consideration
Justification
The Activity Center kitchen presently has open type shelving cages, purchased in 1991. Shelving should be replaced with shelving conducive to
water as some shelves are used for storing silverware and coffee cups directly from the dishwasher. The present shelving is rusting. Enclosed units
are needed to secure items we use for our own kitchen operation from facility use renters, as well as proper storage of equipment from the dirt,
dust, and grim associated with everyday use of the kitchen.
Budget Impact/Other
Useful Life 30 yearsProject Name Activity Center Kitchen Storage Category Equipment
Type Equipment
Future
Total Project Cost:$29,000
Total2020 2021 2022 2023 2024Expenditures
29,00017,000 12,000Equipment
17,000 12,000 29,000Total
Total2020 2021 2022 2023 2024Funding Sources
29,00017,000 12,000Equipment Replacement Fund
17,000 12,000 29,000Total
Wednesday, October 9, 2019
25
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Activity Ctr Director
2020 2024
thru Department Comm Svcs - Activity Center
Description
Continue this replacement project that began in 2016 to replace and upgrade the audio and visual system within the Hopkins Activity Center, area
by area, throughout the next 4 years. Note: The gym has already been replaced and upgraded.
Project #01-ERP-0041
Priority 3 Important
Justification
The present sound system in this facility was installed in 1980. It was primarily used as a paging system. This replacement and upgrading project
began in 2016. We continue to replace and upgrade the audio/visual system to allow better hearing for our participants as well amplification
devices for speakers, presenters, leaders, and instructors. We add equipment to use the technology now available for visual enhancements using
our present televisions in various areas that are used in presentations, classroom instruction, and recreational activities. We are recommending
delaying the project to corelate with the potential improvements at the Activity Center. We would like to complete upgrades at once time to ensure
all equipment is compatible. We have upgraded sound and visual in the gymnasium and it has made significant difference in our participant’s
ability to hear and see in the programs they participate in. In addition, those who have rented from us and have used our upgraded equipment say
how much it has enhanced their events.
Budget Impact/Other
Useful Life 15-20 yearsProject Name Activity Center A/V Replacement & Upgrade Category Equipment
Type Improvement
Future
Total Project Cost:$160,192
Total2020 2021 2022 2023 2024Expenditures
62,62462,624Equipment
62,624 62,624Total
Total2020 2021 2022 2023 2024Funding Sources
62,62462,624Equipment Replacement Fund
62,624 62,624Total
Wednesday, October 9, 2019
26
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Arts Center Director
2020 2024
thru Department Comm Svcs - Arts Center
Description
Install a projector in a ceiling mount. Wire speakers into the ceiling. Wire input for computer on front wall. Add two microphones. Mount
supporting hardware in rack that fits into closet.
Originally scheduled for the Community Room this project was moved to the Jaycee Studio as they found a greater need for this equipment in that
room.
Project #01-ERP-1105
Priority n/a
Justification
An increasing number of users of this room require media support. Current means of providing this include the use of an oversized A/V cart, cords
stretch across the floor and a large speaker on a stick. We can streamline the appearance and functionality by making these appropriate changes.
These changes also address safety concerns. They will help attract safety concerns. They will help attract and retain rental customers as well as
appropriately support our own activities.
Budget Impact/Other
Move this item from 2014 to 2015.
Useful Life 7 yearsProject Name Art Center Jaycee Studio Audio Visual Category Equipment
Type Equipment
Future
Total Project Cost:$61,515
Total2020 2021 2022 2023 2024Expenditures
13,50013,500Equipment
13,500 13,500Total
Total2020 2021 2022 2023 2024Funding Sources
13,50013,500AC - Arts Center Fund
13,500 13,500Total
Wednesday, October 9, 2019
27
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Arts Center Director
2020 2024
thru Department Comm Svcs - Arts Center
Description
Replace original retractable projection screen in the theater with wider format screen to mesh with current technology.
Project #01-ERP-1107
Priority 2 Very Important
Justification
This is an item being requested more frequently from renters as they find the dimensions of the current screen do not match up with the
presentations they bring in.
Budget Impact/Other
Variance from 20-year plan: New item
Useful Life 10 yearsProject Name Art Center Theater Projection Screen Category Equipment
Type Equipment
Future
Total Project Cost:$32,794
Total2020 2021 2022 2023 2024Expenditures
6,7006,700Equipment
6,700 6,700Total
Total2020 2021 2022 2023 2024Funding Sources
6,7006,700AC - Arts Center Fund
6,700 6,700Total
Wednesday, October 9, 2019
28
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2020 2024
thru Department Comm Svcs - IT
Description
The network server is the hub of the network. New computers are faster and more reliable.
Project #01-ERP-0003
Priority n/a
Justification
Networking allows user to share information that is stored in a single location, the network server. This is more efficient because the information
does not have to be stored on many different computers. It also makes for better accuracy because as the information changes or is updated, every
user is working with the same data.
Budget Impact/Other
Changes reflect anticipated need for increased storage.
Useful Life 1 yearProject Name CH - Network Server Category Equipment
Type Equipment
Future
Total Project Cost:$1,113,900
Total2020 2021 2022 2023 2024Expenditures
122,28722,000 22,000 25,000 26,250 27,037Equipment
22,000 22,000 25,000 26,250 27,037 122,287Total
Total2020 2021 2022 2023 2024Funding Sources
122,28722,000 22,000 25,000 26,250 27,037Equipment Replacement Fund
22,000 22,000 25,000 26,250 27,037 122,287Total
Wednesday, October 9, 2019
29
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2020 2024
thru Department Comm Svcs - IT
Description
Includes the PBX, the voice mail systems, and all telephone instruments. Currently there are over 200 extensions served by this system. Also
includes software for the PBX and voice mail systems.
Project #01-ERP-0004
Priority n/a
Justification
Making, receiving and routing telephone calls, storing voice mail messages, and providing telephone based information services (snow line, etc.)
Budget Impact/Other
Variance from 20 year plan - Upgrade to controller in 2009 delays complete replacement to 2015.
Estimate salvage/resale value on replaced item: $
Useful Life 8 yearsProject Name Telephone System Category Equipment
Type Equipment
Future
Total Project Cost:$490,131
Total2020 2021 2022 2023 2024Expenditures
89,60089,600Equipment
89,600 89,600Total
Total2020 2021 2022 2023 2024Funding Sources
76,00076,000Equipment Replacement Fund
6,8006,800SF - Sanitary Sewer Fund
6,8006,800WF - Water Fund
89,600 89,600Total
Wednesday, October 9, 2019
30
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Finance Director
2020 2024
thru Department Comm Svcs - IT
Description
Finance software upgrade. Software currently used by Finance, City Clerk, Inspections and Public Works. This includes software for all finance
applications including general ledger, payroll, accounts payable, accounts receivable, fixed assets, utility billing; Business Licenses, Building
Permits, GIS Mapping, Purchasing, etc.
Project #01-ERP-0005
Priority n/a
Justification
Current software vendor is unable to keep up with technology and internet security standards. Staff is often frustrated with how the software
works and are often unable to get reports they need from the system.
Budget Impact/Other
Variance from 20 year plan - replacement needed in 2014
Estimate salvage/resale value on replaced item: $-0-
Useful Life 7 yearsProject Name Financial Software - Various Depts.Category Equipment
Type Equipment
Future
Total Project Cost:$1,565,687
Total2020 2021 2022 2023 2024Expenditures
307,468307,468Equipment
307,468 307,468Total
Total2020 2021 2022 2023 2024Funding Sources
307,468307,468Equipment Replacement Fund
307,468 307,468Total
Wednesday, October 9, 2019
31
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Finance Director/IT
2020 2024
thru Department Comm Svcs - IT
Description
Personal computer purchases and upgrades for the entire City staff. Coordinating personal computer purchases from individual departments to one
fund.
Project #01-ERP-0006
Priority n/a
Justification
Tools enabling staff to perform job responsibilities efficiently and effectively.
Budget Impact/Other
Increase in expenditure a result of supporting more computers than when the original allotment was put in place.
Useful Life 3-5 yearsProject Name Computers Category Equipment
Type Equipment
Future
Total Project Cost:$1,852,679
Total2020 2021 2022 2023 2024Expenditures
173,32831,500 33,075 34,729 36,465 37,559Equipment
31,500 33,075 34,729 36,465 37,559 173,328Total
Total2020 2021 2022 2023 2024Funding Sources
173,32831,500 33,075 34,729 36,465 37,559Equipment Replacement Fund
31,500 33,075 34,729 36,465 37,559 173,328Total
Wednesday, October 9, 2019
32
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Finance Director/IT
2020 2024
thru Department Comm Svcs - IT
Description
Install new and additional network wiring and equipment.
Project #01-ERP-0009
Priority n/a
Justification
Improve capacity, coverage and reliability. Installation will coincide with office space update.
Budget Impact/Other
Variance from 20 year plan - new item to replace substandard network wiring.
Estimate salvage/resale value on replaced item: $
Useful Life 15 yearsProject Name Network Infrastructure Upgrade Category Equipment
Type Equipment
Future
Total Project Cost:$74,856
Total2020 2021 2022 2023 2024Expenditures
23,40023,400Equipment
23,400 23,400Total
Total2020 2021 2022 2023 2024Funding Sources
23,40023,400Equipment Replacement Fund
23,400 23,400Total
Wednesday, October 9, 2019
33
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Finance Director/IT
2020 2024
thru Department Comm Svcs - IT
Description
Provides layer 3 IP presence for the network, core switching connectivity, backbone on which all network communication is built and facilitates
fiber optic network connection to fire department.
2 - Cisco 3560E-24PD managed switch - $3,000 each
2 - Cisco X2-10GB-LR fiber optic transceiver - $1200 each
cost listed is for equipment only and does not include tax, shipping and other related costs
Project #01-ERP-0012
Priority n/a
Justification
Current two switches are obsolete, end of life and no longer supported by manufacturer. Past lost of service resulted in significant network outage
that was immediately noticed by many employees.
Budget Impact/Other
Variance from 20 year plan - Not currently in ERP but critical to network communication infrastructure. This is outside the budget for city hall
server network budget as the "Lisa" service is scheduled for replacement due to end of life, out of PCI compliance and obsolete.
2015 - change amount from $12,000 to $17,000 - more expensive than originally thought based on 2015 replacement.
Estimate salvage/resale value on replace item: - $-0-
Useful Life 6 yearsProject Name Core Network Switch Category Equipment
Type Equipment
Future
Total Project Cost:$133,878
Total2020 2021 2022 2023 2024Expenditures
20,00020,000Equipment
20,000 20,000Total
Total2020 2021 2022 2023 2024Funding Sources
20,00020,000Equipment Replacement Fund
20,000 20,000Total
Wednesday, October 9, 2019
34
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2020 2024
thru Department Comm Svcs - IT
Description
We have 25 distribution network switches in our enterprise environment along with fiber optic transceivers and direct attach sfp cables to connect
them. Distribution switches connect to the core switches and bring the data to the actual endpoints such as desktops, servers, telephones, and
copiers.
Project #01-ERP-0014
Priority n/a
Justification
Replacement of these switches with current technology is vital to the function of the network as well as the safety of the data being passed through
the switch.
Budget Impact/Other
2016 - New item in ERP
Useful Life 5 yearsProject Name Distribution Network Switches Category Equipment
Type Equipment
Future
Total Project Cost:$338,486
Total2020 2021 2022 2023 2024Expenditures
50,00050,000Equipment
50,000 50,000Total
Total2020 2021 2022 2023 2024Funding Sources
50,00050,000Equipment Replacement Fund
50,000 50,000Total
Wednesday, October 9, 2019
35
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2020 2024
thru Department Comm Svcs - IT
Description
Group of Dell servers to run Dell Rapid Recovery software to backup city computers and servers, along with Windows and VMWare licsensing
required to run the servers.
Project #01-ERP-0015
Priority n/a
Justification
Backup servers are essential to keep the electronic data for the city safe. We have overgrown our current system and are not able to backup
everything that needs to be backed up in a timely manor. Additinally restores on the curent system take hours to days. If we needed to restore a
critical server from backup, we would be looking at an unacceptable amount of downtime.
Budget Impact/Other
Useful Life 3 yearsProject Name Backup Server Category Equipment
Type Equipment
Future
Total Project Cost:$801,110
Total2020 2021 2022 2023 2024Expenditures
138,12066,000 72,120Equipment
66,000 72,120 138,120Total
Total2020 2021 2022 2023 2024Funding Sources
138,12066,000 72,120Equipment Replacement Fund
66,000 72,120 138,120Total
Wednesday, October 9, 2019
36
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2020 2024
thru Department Comm Svcs - IT
Description
Transition from the legacy model of Microsoft Office to Office 365. This project would transition 25 percent of our users and devices per year.
Project #01-ERP-0017
Priority n/a
Justification
As we become a more mobile workforce embracing new mobile and remote technology we need to move away from the traditonal office that can
only be installed on a Windows computer and transition to the version of Office that can be used in the cloud and as a mobile app. Unfortunately,
as is becoming common with most enterprise softwre, you can no longer just purchase it out right, you must rent it from the software author. The
cost for Office 365 will now be a yearly ongoing cost. Office 365 is common at other cities, corporations, and educational environments.
Budget Impact/Other
Useful Life 1 yearProject Name IT - Office 365 Category Equipment
Type Equipment
Future
Total Project Cost:$2,420,118
Total2020 2021 2022 2023 2024Expenditures
188,32022,000 33,000 44,000 44,000 45,320Equipment
22,000 33,000 44,000 44,000 45,320 188,320Total
Total2020 2021 2022 2023 2024Funding Sources
188,32022,000 33,000 44,000 44,000 45,320Equipment Replacement Fund
22,000 33,000 44,000 44,000 45,320 188,320Total
Wednesday, October 9, 2019
37
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2020 2024
thru Department Comm Svcs - IT
Description
Software to automate the delivery of critical and maintenance patches to our enterprise endpoints and yearly maintenance of the software going
forward.
Project #01-ERP-0020
Priority 1 Urgent
Justification
Microsoft software has to be patched the second Tuesday of every month. Adobe software has to be patched every time a critical vulnerability is
discovered, which can be twice in a week in a bad week. Other applications have to be patched as new releases are produced from vendors.
Currently our staff must touch every endpoint for the majority of the software installs. We are using up an inordinate amount of staff time to patch
all of our endpoints only to have to restart the cycle 3 weeks later. Automation of this process would free up staff time to work on other projects
and problems for the city. Approx. two full weeks of 1FTE per month or 960 hours per year saved.
Budget Impact/Other
Useful Life 1 yearProject Name IT - Patching Automation Software Category Equipment
Type Equipment
Future
Total Project Cost:$287,617
Total2020 2021 2022 2023 2024Expenditures
50,00010,000 10,000 10,000 10,000 10,000Equipment
10,000 10,000 10,000 10,000 10,000 50,000Total
Total2020 2021 2022 2023 2024Funding Sources
50,00010,000 10,000 10,000 10,000 10,000Equipment Replacement Fund
10,000 10,000 10,000 10,000 10,000 50,000Total
Wednesday, October 9, 2019
38
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2020 2024
thru Department Comm Svcs - IT
Description
Upgrade Windows 10 Pro software to Windows 10 Enterprise. Required to renew every 3 years. This plan would bring the PD into compliance in
2020 then upgrade 60 city computers a year until all city computers are upgraded. Each batch of 60 computers needs to be renewed every 3 years.
It is estimated that it will take 3 years to fully upgrade the city to Windows 10 Enterprise.
Project #01-ERP-0022
Priority n/a
Justification
The BCA has mandated that we move to Enterprise edition for our Windows computers in the PD. Microsoft is changing the way they deliver
Windows. It is becoming like Office, where you will no longer own Windows outright, you will have to rent it from them. We have to switch to
Enterprise in the PD for compliance reasons, but it is strongly suggested that we plan on switching to Enterprise for all city computers as well.
There may come a time where we are forced to switch to Enterprise edition for the city. It would be ideal to plan ahead and budget money for a
gradual upgrade for the city so it doesn't come as a surprise.
Budget Impact/Other
Useful Life 1 yearProject Name IT - Windows 10 Enterprise Upgrade Category Unassigned
Type Equipment
Future
Total Project Cost:$189,000
Total2020 2021 2022 2023 2024Expenditures
189,00021,000 21,000 42,000 42,000 63,000Equipment
21,000 21,000 42,000 42,000 63,000 189,000Total
Total2020 2021 2022 2023 2024Funding Sources
189,00021,000 21,000 42,000 42,000 63,000Equipment Replacement Fund
21,000 21,000 42,000 42,000 63,000 189,000Total
Wednesday, October 9, 2019
39
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2020 2024
thru Department Comm Svcs - IT
Description
Computer servers store information and system programs for Police Department.
Project #01-ERP-0211
Priority n/a
Justification
Annual replacement cycle allows development of system storage program. Use of newer servers for heavy use programs while older servers
usedfor data storage
Budget Impact/Other
Useful Life 1 yearProject Name PD - Network Server Category Equipment
Type Equipment
Future
Total Project Cost:$1,118,901
Total2020 2021 2022 2023 2024Expenditures
122,28822,000 22,000 25,000 26,250 27,038Equipment
22,000 22,000 25,000 26,250 27,038 122,288Total
Total2020 2021 2022 2023 2024Funding Sources
122,28822,000 22,000 25,000 26,250 27,038Equipment Replacement Fund
22,000 22,000 25,000 26,250 27,038 122,288Total
Wednesday, October 9, 2019
40
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2020 2024
thru Department Fire
Description
Quick attack pumper/rescue.
Current vehicle: 2012 Rescue (#104)
Project #01-ERP-0105
Priority n/a
Justification
This truck is used for day to day operation. We would move to a bigger vehicle due to the use of the vehicle for response. The current vehicle is
undersized for the type of truck it is on. We are spending $20,000.00 per maintanance cost per year.
Would replace Rescue 8 (lite rescue) and use as a utility vehicle. This truck could be used for daytime and nighttime medicals and small fires.
This will reduce having all personnel respond to small fires. It will also let us drop one engine in 2022 but still keep ISO rating.
Budget Impact/Other
Variance from 20 year plan - Useful life change to 10 years.
Reoccurs every 10 years.
Useful Life 10 yearsProject Name Quick Attack Pumper/Rescue (Rescue 8)Category Vehicles
Type Equipment
Future
Total Project Cost:$1,230,557
Total2020 2021 2022 2023 2024Expenditures
525,000525,000Equipment
525,000 525,000Total
Total2020 2021 2022 2023 2024Funding Sources
525,000525,000Equipment Replacement Fund
525,000 525,000Total
Wednesday, October 9, 2019
41
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2020 2024
thru Department Fire
Description
Hydraulic rescue and extrication tool with spreader, cutters and hydraulic ram.
Project #01-ERP-0109
Priority n/a
Justification
All vehicle and industrial rescue situations which will require patient disentanglement or entrapment. This tool will be added to the purchase of the
quick attack pumper. The tool will be scaled down to a smaller tool, possibly reducing cost.
Budget Impact/Other
Estimate salvage/resale value on replaced item: $1,000
Purchased: 2007
Useful Life 10 yearsProject Name Extrication Tool (2)Category Equipment
Type Equipment
Future
Total Project Cost:$210,800
Total2020 2021 2022 2023 2024Expenditures
91,00029,000 30,000 32,000Equipment
29,000 30,000 32,000 91,000Total
Total2020 2021 2022 2023 2024Funding Sources
91,00029,000 30,000 32,000Equipment Replacement Fund
29,000 30,000 32,000 91,000Total
Wednesday, October 9, 2019
42
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2020 2024
thru Department Fire
Description
Used by our fire companies to locate victims trapped in a smoke filled building. It helps us determine where fire and heat may be hidden allowing
for faster extinguishment.
Note: purchased 2013 & 2017
Project #01-ERP-0112
Priority n/a
Justification
Current camera is ten years old and has been through many hot fires and needs to be replaced. Current camera was purchased with donation money.
Budget Impact/Other
Variance from 20 year plan - department owns 2 cameras.
Reoccuring expenditure.
Estimate salvage/resale value on replaced item: $-0-
Useful Life 10 yearsProject Name Thermal Imaging Camera (2)Category Equipment
Type Equipment
Future
Total Project Cost:$144,105
Total2020 2021 2022 2023 2024Expenditures
15,40015,400Equipment
15,400 15,400Total
Total2020 2021 2022 2023 2024Funding Sources
15,40015,400Equipment Replacement Fund
15,400 15,400Total
Wednesday, October 9, 2019
43
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2020 2024
thru Department Fire
Description
Portable and mobile radios used by the police departments to allow the department to communicate on one frequency.
Fire has 50 portable and 13 mobile radios along with 50 pagers.
Cost in ERP includes portable radios (30), portable radio's encrypted (20), mobile radio's (13), pagers (50), chargers single (60), charger base (3)
plus other needed equipment. Details of all items are on file with Fire and Finance Depts.
Project #01-ERP-0125
Priority n/a
Justification
Provides radios so that the police, fire and public works can communicate on a common radio frequency during an emergency and multiple county
interoperability.
Budget Impact/Other
In 2016 the Fire radios were separated from Police for better accountability. Project was adjusted for current pricing.
2019 - 340,000 FD
2019 - 28,000 PW
Useful Life 5-7 yearsProject Name Fire Radios - Portable and Mobile Devices Category Equipment
Type Equipment
Future
Total Project Cost:$2,355,889
Total2020 2021 2022 2023 2024Expenditures
368,000368,000Equipment
368,000 368,000Total
Total2020 2021 2022 2023 2024Funding Sources
368,000368,000Equipment Replacement Fund
368,000 368,000Total
Wednesday, October 9, 2019
44
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2020 2024
thru Department Fire
Description
Fire Helmets for firefighters. Helmets are used for safety of personnel at Fire and other Emergency incidents. In 2017, the NFPA and OSHA
Standard changed to recommending helmet change every 10 years.
Project #01-ERP-0126
Priority n/a
Justification
Safety of Firefighters. Current helmets useful life will be up in 2023.
Budget Impact/Other
Reoccuring every 10 years.
Useful Life 10 yearsProject Name Fire - Fire Helmets Category Equipment
Type Equipment
Future
Total Project Cost:$58,191
Total2020 2021 2022 2023 2024Expenditures
16,00016,000Equipment
16,000 16,000Total
Total2020 2021 2022 2023 2024Funding Sources
16,00016,000Equipment Replacement Fund
16,000 16,000Total
Wednesday, October 9, 2019
45
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2020 2024
thru Department Fire
Description
Lucus device is used to assist CPR during full arrest. The current device was purchased in 2016 and with changed in technology, it is
recommended to update every 5 years.
Project #01-ERP-0127
Priority n/a
Justification
To continue to serve citizens of Hopkins during medical incidents.
Budget Impact/Other
Reoccurs every 5 years.
Useful Life 5 yearsProject Name Fire - Lucus Device Category Equipment
Type Equipment
Future
Total Project Cost:$98,686
Total2020 2021 2022 2023 2024Expenditures
18,00018,000Equipment
18,000 18,000Total
Total2020 2021 2022 2023 2024Funding Sources
18,00018,000Equipment Replacement Fund
18,000 18,000Total
Wednesday, October 9, 2019
46
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2020 2024
thru Department Fire
Description
Replacement of Firefighteing Hose
Project #01-ERP-0128
Priority 2 Very Important
Justification
Per OSHA and NFPA all hose needs to be replaced every 10 years. We currently replace our hose as it wears out. This will put us on a complete
replacement every 10 years to comply with the standard
Budget Impact/Other
Useful Life 10 yearsProject Name Fire - Hose Replacement Category Equipment
Type Equipment
Future
Total Project Cost:$157,698
Total2020 2021 2022 2023 2024Expenditures
38,00038,000Equipment
38,000 38,000Total
Total2020 2021 2022 2023 2024Funding Sources
38,00038,000Equipment Replacement Fund
38,000 38,000Total
Wednesday, October 9, 2019
47
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2020 2024
thru Department Fire
Description
Upgrade EOC
Project #01-ERP-0129
Priority n/a
Justification
The EOC has not been upgraded since the station opened in 2004. The upgrade would consist of upgrading Technology IE: TV and Video
conferencing.
Budget Impact/Other
Useful Life 20 yearsProject Name Fire - EOC Upgrade Category Equipment
Type Equipment
Future
Total Project Cost:$12,000
Total2020 2021 2022 2023 2024Expenditures
12,00012,000Equipment
12,000 12,000Total
Total2020 2021 2022 2023 2024Funding Sources
12,00012,000Equipment Replacement Fund
12,000 12,000Total
Wednesday, October 9, 2019
48
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Unassigned
2020 2024
thru Department HRA
Description
4 wheel drive 3/4 ton truck to be used by Public Housing maintenance staff. Includes snow plow.
Current vehicle: 2015 Chevrolet Pickup
Project #01-ERP-0400
Priority n/a
Justification
Transportation for Public Housing Superintendent and snow plowing at various HRA properties around the city.
Budget Impact/Other
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $1,800
Useful Life 8 yearsProject Name 4x4 3/4 Ton Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$214,398
Total2020 2021 2022 2023 2024Expenditures
41,10041,100Vehicles
41,100 41,100Total
Total2020 2021 2022 2023 2024Funding Sources
41,10041,100HRA - Housing and
Redevelopment Authority
41,100 41,100Total
Wednesday, October 9, 2019
49
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Finance Director
2020 2024
thru Department HRA
Description
Color copy machine to service the needs of the HRA. High volume product copier to do a variety of copying tasks.
Current equipment: Imagistics ZB35
Project #01-ERP-0401
Priority n/a
Justification
Daily use to make copies of correspondence, forms and rental documents. Periodically produce documents such as resident newsletters and
marketing. Machine will duplex, sort, collate and staple copies.
Budget Impact/Other
Variance from 20 year plan - New item.
Estimate salvage/resale value on replace item: $ - 0 -
Useful Life 8 yearsProject Name HRA Copier Category Equipment
Type Equipment
Future
Total Project Cost:$76,876
Total2020 2021 2022 2023 2024Expenditures
16,50016,500Equipment
16,500 16,500Total
Total2020 2021 2022 2023 2024Funding Sources
16,50016,500HRA - Housing and
Redevelopment Authority
16,500 16,500Total
Wednesday, October 9, 2019
50
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Pavilion Manager
2020 2024
thru Department Pavilion
Description
26" to 28" battery operated walk behind floor scrubber. Floor scrubber is used to clean the arenas concrete floor and tiled surfaces throughout the
building.
2014 cost = $8,651.94
Asset ID #5172
Project #01-ERP-1003
Priority n/a
Justification
Replace the existing floor scrubber with new model. Current floor scrubber was purchased in 2014 and is scheduled to be replaced in 2024.
Budget Impact/Other
Variance from 20 year plan - New item
Estimate salvage/resale value on replaced item: $
Useful Life 10 yearsProject Name Pavilion - Floor Scrubber Category Equipment
Type Equipment
Future
Total Project Cost:$48,167
Total2020 2021 2022 2023 2024Expenditures
11,60011,600Equipment
11,600 11,600Total
Total2020 2021 2022 2023 2024Funding Sources
11,60011,600PA - Pavilion Fund
11,600 11,600Total
Wednesday, October 9, 2019
51
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2020 2024
thru Department Police
Description
Marked patrol vehicles used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties.
Fleet consists of 7 marked patrol vehicles
Project #01-ERP-0200
Priority n/a
Justification
Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for
routine and emergency operations. Vehicles contain secure seating for prisoner transport.
Budget Impact/Other
In 2019, no vehicles were purchased. Planned reallocation to body camera project.
Useful Life 3 yearsProject Name Marked Patrol Vehicles (7)Category Vehicles
Type Equipment
Future
Total Project Cost:$3,287,200
Total2020 2021 2022 2023 2024Expenditures
613,300107,400 161,100 110,000 117,400 117,400Vehicles
107,400 161,100 110,000 117,400 117,400 613,300Total
Total2020 2021 2022 2023 2024Funding Sources
613,300107,400 161,100 110,000 117,400 117,400Equipment Replacement Fund
107,400 161,100 110,000 117,400 117,400 613,300Total
Wednesday, October 9, 2019
52
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2020 2024
thru Department Police
Description
Marked patrol vehicle used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties.
4 year rotation.
Current vehicle: Ford Utility
Project #01-ERP-0201
Priority n/a
Justification
Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for
routine and emergency operations. Vehicles contain secure seating for prisoner transport.
Budget Impact/Other
Useful Life 4 yearsProject Name Sergeant's Vehicle Category Vehicles
Type Equipment
Future
Total Project Cost:$596,642
Total2020 2021 2022 2023 2024Expenditures
57,00057,000Vehicles
57,000 57,000Total
Total2020 2021 2022 2023 2024Funding Sources
57,00057,000Equipment Replacement Fund
57,000 57,000Total
Wednesday, October 9, 2019
53
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2020 2024
thru Department Police
Description
Marked patrol vehicle used by Parking Enforcement Officer to respond to calls for service, enforce parking laws, and perfom duties as assigned.
Current Vehicle: (1) 2016 Ford Utility
Project #01-ERP-0202
Priority n/a
Justification
Use by parking enforcement officers in the course of their duties enforcing parking regulations in the downtown area.
Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for
routine and emergency operations. Vehicles contain secure seating for prisoner transport.
Budget Impact/Other
2016 - Change in replacement schedule due to full time use of vehicle and change of position responsibilities. Next replacement scheduled for
2021 from 2026
Useful Life 5 yearsProject Name PSO / Parking Enforcement Vehicle Category Vehicles
Type Equipment
Future
Total Project Cost:$412,572
Total2020 2021 2022 2023 2024Expenditures
53,70053,700Vehicles
53,700 53,700Total
Total2020 2021 2022 2023 2024Funding Sources
53,70053,700Equipment Replacement Fund
53,700 53,700Total
Wednesday, October 9, 2019
54
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2020 2024
thru Department Police
Description
Four wheel drive marked patrol vehicle used by PSOs to respond to calls for service, handle animal complaints, and perform other duties
associated with department operations.
Current vehicle: 2018 Ford F150 (#212)
Project #01-ERP-0203
Priority n/a
Justification
Vehicle is normally used by public service officers for a wide variety of uses such as transporting animals, prisoners and equipment. The 4 wheel
drive vehicle is also used at times as a patrol vehicle, particularly in the winter in extreme snow conditions.
Budget Impact/Other
2016 - Variance from 20 year plan - Change in replacement schedule due to full time use of vehicle. Changing useful life from 6 years to 4 years
Useful Life 4 yearsProject Name PSO - Utility 4x4 Category Vehicles
Type Equipment
Future
Total Project Cost:$795,189
Total2020 2021 2022 2023 2024Expenditures
72,10072,100Vehicles
72,100 72,100Total
Total2020 2021 2022 2023 2024Funding Sources
72,10072,100Equipment Replacement Fund
72,100 72,100Total
Wednesday, October 9, 2019
55
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2020 2024
thru Department Police
Description
Squad car camera systems are used to document events inside and outside of the patrol vehicles. The cameras utilize a forward facing camera and a
prisoner transport area camaera.
Body cameras capture interactions between the officers and the public for transparency. Body cameras also capture evidence used in future court
proceedings.
Project #01-ERP-0212
Priority n/a
Justification
The police vehicle cameras are a necessary component of the patrol vehicles. Evidentiary information is collected from the cameras and often used
in court. Cameras also provide a snapshot of an officers interaction with the public so we are able to maintain transparency and public trust with
our operations.
Budget Impact/Other
Integrated camera system - 12 Squad car cameras and 20 body cameras
Squad cameras 6,000/each. Body cameras 1,200/each.
Cameras to be purchased in 2019.
Useful Life 5 yearsProject Name Squad Car Camera Systems/ Body Worn Camera Category Equipment
Type Equipment
Future
Total Project Cost:$811,921
Total2020 2021 2022 2023 2024Expenditures
105,000105,000Equipment
105,000 105,000Total
Total2020 2021 2022 2023 2024Funding Sources
100,000100,000Equipment Replacement Fund
5,0005,000PKG - Parking Fund
105,000 105,000Total
Wednesday, October 9, 2019
56
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2020 2024
thru Department Police
Description
12 Tactical Ballistical Vests worn by members of the Hopkins Police Department SWAT (Special Weapons and Tactics) team. These vests offer a
higher level of protection for officers involved in high risk situations; this protection offers a higher level of ballistic protection compared to regular
duty vests. SWAT team members also require ballistic helmets on the same rotational cycle. Equipment breakdown: 12 vests @ $4,215 =
$50,580. 12 ballistic helmets @ $642 = $7,716. 2 New protective shields @ $2,864 = $5,729. 12 Radio headsets @ $1,042 = $12,500.
Project #01-ERP-0214
Priority 3 Important
Justification
Variance - Change in vendor equipment pricing and SWAT team staffing levels. Current price is reflective of a twelve person (fully staffed)
SWAT team with current vendor pricing.
Budget Impact/Other
5 year replacement schedule
Useful Life 5 yearsProject Name Tactical Ballistic Vests / Helmets - SWAT Category Equipment
Type Equipment
Future
Total Project Cost:$623,626
Total2020 2021 2022 2023 2024Expenditures
76,51276,512Equipment
76,512 76,512Total
Total2020 2021 2022 2023 2024Funding Sources
76,51276,512Equipment Replacement Fund
76,512 76,512Total
Wednesday, October 9, 2019
57
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2020 2024
thru Department Police
Description
Portable radios used by the police departments to allow the department to communicate on one frequency.
Estimated Replacement Cost
Portable - $4,500 x 50 = $225,000
Plus chargers, shoulder mic's and batteries - $11,300
TOTAL = $236,300
In 2016 we will need to replace the portables as the current model will no longer be supported by Hennepin County.
Project #01-ERP-0215
Priority n/a
Justification
Provides radios so that the police, fire and public works can communicate on a common radio frequency during an emergency and multiple county
interoperability.
Budget Impact/Other
Radio's have a 7-10 year life expectancy. Portables need replacement due to manufacturer issues and county requirements. Increase in cost from
$3,800 to $4,500 per radior. Mobile radios were removed and now will be included with the vehicles as they are replaced.
Estimate salvage/resale value on replaced item: $0
Useful Life 5-7 yearsProject Name Police - Portable Radios Category Equipment
Type Equipment
Future
Total Project Cost:$1,906,203
Total2020 2021 2022 2023 2024Expenditures
290,000290,000Equipment
290,000 290,000Total
Total2020 2021 2022 2023 2024Funding Sources
290,000290,000Equipment Replacement Fund
290,000 290,000Total
Wednesday, October 9, 2019
58
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Captain
2020 2024
thru Department Police
Description
Tasers can prevent officers and the public from injuries.Taser technology continues to develop and are worn/ carried 24/7. Tasers have a useful life
expectancy of approximately 5 years.
Project #01-ERP-0217
Priority n/a
Justification
Tasers are a crtical tool for Law Enforcement for control purposes during use of force encounters.
Budget Impact/Other
35- X2 Tasers, each officer has their own taser.
Total overall cost each Taser in 2018 = $2166.00 (+ shipping)
Useful Life 4 yearsProject Name Taser Replacement Category Equipment
Type Equipment
Future
Total Project Cost:$711,905
Total2020 2021 2022 2023 2024Expenditures
80,00080,000Equipment
80,000 80,000Total
Total2020 2021 2022 2023 2024Funding Sources
80,00080,000Equipment Replacement Fund
80,000 80,000Total
Wednesday, October 9, 2019
59
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief/IT
2020 2024
thru Department Police
Description
Building Video Server hardware and associated software is used to store video recorded by the cameras in and around the police department
including interview rooms as well as booking. We record approximately 6 TB of video every 2-3 weeks. Large amounts of storage are required for
30 days of archival storage on the server itself.
Project #01-ERP-0218
Priority n/a
Justification
Maintenance agreement with software vendor needs to be renewed every three years. Computer hardware should be refreshed around the same
time to minimize drive failure and take advantage of new storage technology.
Budget Impact/Other
Variance from 20 year plan - Change in replacement schedule and estimated cost. Current equipment was purchased with DTF funding. Beginning
in 2020 it will be funded with ERP funds.
Estimate salvage/resale value on replaced item: $-0-
Useful Life 4 yearsProject Name Building Video Server Category Equipment
Type Equipment
Future
Total Project Cost:$88,000
Total2020 2021 2022 2023 2024Expenditures
17,00017,000Equipment
17,000 17,000Total
Total2020 2021 2022 2023 2024Funding Sources
17,00017,000Equipment Replacement Fund
17,000 17,000Total
Wednesday, October 9, 2019
60
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief/IT
2020 2024
thru Department Police
Description
The police department video server is used to store evidentiary video and audio data. Rules pertaining to criminal procedure, and laws regarding
data privacy and retention place requirements on the Police Department to store and manage the data for varying lengths of time.
The current data storage solution was designed for squad car video only and is near capacity. The storage solution is also not currently designed to
efficiently back up data and is potentially subject to data loss from environmental factors such as drive failure and unsuited fire suppression systems
Project #01-ERP-0219
Priority n/a
Justification
The video server will be replaced with a cloud based storage solution after 2020.
Budget Impact/Other
Cost of yearly maintenance for video data storgae server: $10,000.00/year
Server no longer maintained after 2020.
Useful Life 5 yearsProject Name PD - Video Data Server Category Equipment
Type Equipment
Future
Total Project Cost:$135,000
Total2020 2021 2022 2023 2024Expenditures
10,00010,000Equipment
10,000 10,000Total
Total2020 2021 2022 2023 2024Funding Sources
10,00010,000Equipment Replacement Fund
10,000 10,000Total
Wednesday, October 9, 2019
61
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief/IT
2020 2024
thru Department Police
Description
Mobile Data Computers are used in the squad cars to receive calls for service from dispatch, query information from criminal justice databases, and
facilitate communication between squad cars.
Replacement in 2019 for 12 computers. To be replaced in 2024.
Project #01-ERP-0220
Priority n/a
Justification
Mobile Data Computers have a limited life expectancy. The computers facilitate the basic response to emergency calls for service to which police
officers respond. Vital information is forwarded to officers via the mobile data computers. Officers complete investigative reports, issue traffic
related warnings and citations, and process arrest incidents from the mobile data computers.
As technology evolves the officers must be able to access information using up to date computers that can process the large amount of data and
applications. Mobile data computers are currently used to host the squad car video camera system and have the potential to be integrated with a
possible body worn camera.
Budget Impact/Other
Change in replacement year to accurately reflect life expectancy in relation to when the computers were purchased.
Useful Life 5 yearsProject Name Squad Computers Category Equipment
Type Equipment
Future
Total Project Cost:$561,242
Total2020 2021 2022 2023 2024Expenditures
90,00090,000Equipment
90,000 90,000Total
Total2020 2021 2022 2023 2024Funding Sources
90,00090,000Equipment Replacement Fund
90,000 90,000Total
Wednesday, October 9, 2019
62
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief/IT
2020 2024
thru Department Police
Description
LETG - Records Management System was purchased at the end of 2012. This maintains all police records and reports.
Project #01-ERP-0221
Priority n/a
Justification
A new RMS system may be needed by 2022.
Budget Impact/Other
Current cost to maintain system is $29,368 anually.
Useful LifeProject Name Records Management System Category Equipment
Type Equipment
Future
Total Project Cost:$150,000
Total2020 2021 2022 2023 2024Expenditures
150,000150,000Equipment
150,000 150,000Total
Total2020 2021 2022 2023 2024Funding Sources
150,000150,000Equipment Replacement Fund
150,000 150,000Total
Wednesday, October 9, 2019
63
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Bldg/Equip Supt
2020 2024
thru Department Public Works: Bldg/Equip Ser
Description
Current vehicle is used to trasport building maintenenace technician, haul his equipment and tools for the maintenance of the City's multiple
facilities. This vehicle also hauls cleaning and paper supplies to the different sites.
Current Vehicle: 2006 Ford F-250 Unit #704
Project #01-ERP-0712
Priority n/a
Justification
Technician needs to have reliable transportation to maintain City's facilities, and have a source to supply the different facilities with their
operational needs.
Budget Impact/Other
Useful Life 12 yearsProject Name PW - 4x4 3/4 Ton Truck with Service Body Category Equipment
Type Equipment
Future
Total Project Cost:$85,000
Total2020 2021 2022 2023 2024Expenditures
35,00035,000Vehicles
35,000 35,000Total
Total2020 2021 2022 2023 2024Funding Sources
35,00035,000Equipment Replacement Fund
35,000 35,000Total
Wednesday, October 9, 2019
64
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Engineering
Description
Van used by Engineering Department for survey equipment and on job site work.
Cost to paint the old Police Dept. Chevy Tahoe
Current vehicle: 2000 Chevrolet Suburban (#700)
Project #01-ERP-0700
Priority n/a
Justification
Transportation to and from job site, hauling of surveying and traffic counting equipment.
Budget Impact/Other
Variance from 20 year plan - Replace with surplus Police Tahoe in 2014. Leave $2,000 for modifications..
Estimate salvage/resale value on replaced item: $2,500
Useful Life 10 yearsProject Name Engineering Van Category Vehicles
Type Equipment
Future
Total Project Cost:$85,700
Total2020 2021 2022 2023 2024Expenditures
28,90028,900Vehicles
28,900 28,900Total
Total2020 2021 2022 2023 2024Funding Sources
28,90028,900Equipment Replacement Fund
28,900 28,900Total
Wednesday, October 9, 2019
65
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Parks/Forestry
Description
Pickup used by Park Division of Public Works.
Project #01-ERP-0800
Priority n/a
Justification
Budget Impact/Other
Estimate salvage/resale value on replaced item: $
Useful Life 10 yearsProject Name 1/2 Ton Pickup Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$173,369
Total2020 2021 2022 2023 2024Expenditures
35,40035,400Vehicles
35,400 35,400Total
Total2020 2021 2022 2023 2024Funding Sources
35,40035,400Equipment Replacement Fund
35,400 35,400Total
Wednesday, October 9, 2019
66
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Parks/Forestry
Description
Trucks used by Parks Division of Public Works.
Current vehicles: 2012 Ford F350 4X4 (#801) & 2012 Ford F350 4X4 (#802)
Project #01-ERP-0801
Priority n/a
Justification
Snow plowing, hauling, transportation. Units are heavily used.
Budget Impact/Other
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Useful Life 8 yearsProject Name 4x4 3/4Ton Trucks (2)Category Vehicles
Type Equipment
Future
Total Project Cost:$623,918
Total2020 2021 2022 2023 2024Expenditures
85,20085,200Vehicles
85,200 85,200Total
Total2020 2021 2022 2023 2024Funding Sources
85,20085,200Equipment Replacement Fund
85,200 85,200Total
Wednesday, October 9, 2019
67
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Parks/Forestry
Description
Truck is used for hauling brush and logs in the Forestry department.
Current vehicle: 2007 International LP4600 Log Truck (#811)
Project #01-ERP-0804
Priority n/a
Justification
Budget Impact/Other
Variance from 20 year plan - 50% Equipment Replacement/50% Refuse - increase amount to $105,000 to reflect actual cost.
Estimated useful life reduced from 20 to 15 years.
Useful Life 15 yearsProject Name Log Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$523,484
Total2020 2021 2022 2023 2024Expenditures
163,600163,600Vehicles
163,600 163,600Total
Total2020 2021 2022 2023 2024Funding Sources
81,80081,800Equipment Replacement Fund
81,80081,800RF - Refuse Fund
163,600 163,600Total
Wednesday, October 9, 2019
68
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Parks/Forestry
Description
Riding mowers used by Parks Division of Public Works.
Current equipment: 2004 Toro Zero Turn (#826), 2006 Jacobson Rotary Mower (#823)
Project #01-ERP-0808
Priority n/a
Justification
Mowing city parks and right of ways.
Move replacement of #826 to 2020 - Ran 10 years past useful life
Move replacement of #823 to 2022
Budget Impact/Other
Variance from 20 year plan
Estimate salvage/resale value on replaced item: $600 each
Moved useful life from 8 year to 6
Useful Life 6 yearsProject Name Riding Mowers (2)Category Equipment
Type Equipment
Future
Total Project Cost:$299,230
Total2020 2021 2022 2023 2024Expenditures
39,20013,900 25,300Equipment
13,900 25,300 39,200Total
Total2020 2021 2022 2023 2024Funding Sources
39,20013,900 25,300Equipment Replacement Fund
13,900 25,300 39,200Total
Wednesday, October 9, 2019
69
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Parks/Forestry
Description
Large turf mower (11' cutting width) used by Parks Division of Public Works.
Current equipment: 2010 Toro Groundmaster (#825)
Project #01-ERP-0810
Priority n/a
Justification
Required to efficiently mow large parks.
Budget Impact/Other
Variance from 20 year plan - move from 2011 to 2010 due to poor condition of existing mower. Estimated useful life reduced from 10 to 8 years.
Estimate salvage/resale value on replaced item: $3,500
Useful Life 8 yearsProject Name Large Turf Mower Category Equipment
Type Equipment
Future
Total Project Cost:$486,659
Total2020 2021 2022 2023 2024Expenditures
96,00096,000Equipment
96,000 96,000Total
Total2020 2021 2022 2023 2024Funding Sources
96,00096,000Equipment Replacement Fund
96,000 96,000Total
Wednesday, October 9, 2019
70
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Parks/Forestry
Description
Used to haul multiple riding mowers
Current trailor: Unit #845, 1997 Remackle Trailer, overhauled/refurbished in 2016
Project #01-ERP-0814
Priority n/a
Justification
Allows one truck to pull two riding mowers to parks
Budget Impact/Other
Variance from 20 year plan - extend life 4 years due to overhaul/refurbishment.
Estimate salvage/resale value on replaced item: $
2016-Increased estimated replacement cost from $2,200 to $10,000
Useful Life 15 yearsProject Name Trailer Flatbed Category Equipment
Type Equipment
Future
Total Project Cost:$26,980
Total2020 2021 2022 2023 2024Expenditures
10,00010,000Equipment
10,000 10,000Total
Total2020 2021 2022 2023 2024Funding Sources
10,00010,000Equipment Replacement Fund
10,000 10,000Total
Wednesday, October 9, 2019
71
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Streets/Traffic
Description
Pickup used by various divisions of Public Works.
Current vehicle: 2013 Ford F-150 (#301)
Project #01-ERP-0300
Priority n/a
Justification
Light hauling and transportation for supervisors. Maintenance garage service vehicle.
Budget Impact/Other
Variance from 20 year plan - Move up from 2015 to 2013. Replace with 1/2 ton 4x4 pickup. Reduce amount from 33,600 to 21,500..
Estimate salvage/resale value on replaced item: $1,500
Useful Life 10 yearsProject Name 4x4 1/2 Ton Pickup with Plow Category Vehicles
Type Equipment
Future
Total Project Cost:$114,200
Total2020 2021 2022 2023 2024Expenditures
28,90028,900Vehicles
28,900 28,900Total
Total2020 2021 2022 2023 2024Funding Sources
28,90028,900Equipment Replacement Fund
28,900 28,900Total
Wednesday, October 9, 2019
72
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Streets/Traffic
Description
3/4 ton pickup used by Street Division of Public Works for heavy loads and pulling trailers.
Current vehicle: 2018 Ford F350 (#302)
Project #01-ERP-0301
Priority n/a
Justification
Light hauling, pulling trailers, transportation to and from job sites.
Budget Impact/Other
Estimate salvage/resale value on replaced item: $1,500
Useful Life 8 yearsProject Name 4X4 3/4 Ton Truck with Plow Category Vehicles
Type Equipment
Future
Total Project Cost:$203,519
Total2020 2021 2022 2023 2024Expenditures
38,50038,500Vehicles
38,500 38,500Total
Total2020 2021 2022 2023 2024Funding Sources
38,50038,500Equipment Replacement Fund
38,500 38,500Total
Wednesday, October 9, 2019
73
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Streets/Traffic
Description
Truck is used in the Street Division of Public Works.
Current vehicles: 2000 Ford F450 (#304) & 2011 Ford F350 (#308)
Project #01-ERP-0303
Priority n/a
Justification
Vehicle used by various departments for street and park maintenance and light hauling.
Budget Impact/Other
Variance from 20 year plan - move back from 2009 to 2010.
Estimated useful life reduced from 12 to 8 years.
Estimate salvage/resale value on replaced item: $3,500
Useful Life 8 yearsProject Name 1 Ton Dump Truck (2)Category Vehicles
Type Equipment
Future
Total Project Cost:$281,600
Total2020 2021 2022 2023 2024Expenditures
102,90053,400 49,500Vehicles
53,400 49,500 102,900Total
Total2020 2021 2022 2023 2024Funding Sources
102,90053,400 49,500Equipment Replacement Fund
53,400 49,500 102,900Total
Wednesday, October 9, 2019
74
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Streets/Traffic
Description
Boom truck used in Street and Traffic Divisions of Public Works.
Current vehicle: 2012 Ford F450 (#309)
Project #01-ERP-0304
Priority n/a
Justification
Vehicle used by Traffic Department for signal and light pole maintenance.
Budget Impact/Other
Variance from 20 year plan - Increase amount to reflect actual.
Estimate salvage/resale value on replaced item: $8,000
Useful Life 17 yearsProject Name 1 Ton Traffic Boom Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$218,900
Total2020 2021 2022 2023 2024Expenditures
136,400136,400Vehicles
136,400 136,400Total
Total2020 2021 2022 2023 2024Funding Sources
136,400136,400Equipment Replacement Fund
136,400 136,400Total
Wednesday, October 9, 2019
75
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Streets/Traffic
Description
Single axle dump truck used by various division of Public Works.
Current vehicles: 2005 Freightliner M2 106 (#312) and 2011 Freightliner MZ-1068 (#311)
Project #01-ERP-0305
Priority n/a
Justification
Vehicle used for heavy hauling, snow plowing and sanding.
Moved single axel dump truck due in 2018 to a tandem axel dump truck in 2018. Done to increase snow hauling and other material hauling
capacity.
Budget Impact/Other
Variance from 20 year plan - Move 1 truck from single axle to tandem axel to increase hauling capacity for snow and road materials.
Estimate salvage/resale value on replaced item: $4,500 each
We will then have 2 single axel (change from 3) dump trucks and 2 (change from 1) tandem axel dump trucks.
Estimated useful life reduced from 17 to 15 years.
Useful Life 15 yearsProject Name Single Axle Dump Truck (2)Category Vehicles
Type Equipment
Future
Total Project Cost:$643,000
Total2020 2021 2022 2023 2024Expenditures
225,000225,000Vehicles
225,000 225,000Total
Total2020 2021 2022 2023 2024Funding Sources
225,000225,000Equipment Replacement Fund
225,000 225,000Total
Wednesday, October 9, 2019
76
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Streets/Traffic
Description
Current equipment: 1991 Caterpillar 928E Loader (#320) & 2005 Caterpillar 938G (#322)
Project #01-ERP-0308
Priority n/a
Justification
Budget Impact/Other
Variance from 20 year plan - None
Estimate salvage/resale value on replaced item: $
Useful Life 15-18 yearsProject Name Front End Loaders (2)Category Equipment
Type Equipment
Future
Total Project Cost:$848,600
Total2020 2021 2022 2023 2024Expenditures
268,600268,600Equipment
268,600 268,600Total
Total2020 2021 2022 2023 2024Funding Sources
268,600268,600Equipment Replacement Fund
268,600 268,600Total
Wednesday, October 9, 2019
77
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Streets/Traffic
Description
Loading trucks, landscape work, snow removal, material handling.
Current equipment: 2004 Bobcat S-1851R Skid Loader (#324) & 2011 Bobcat S650 Skid-Steer Loader (#325)
Project #01-ERP-0309
Priority n/a
Justification
Budget Impact/Other
Variance from 20 year plan - move back from 2010 to 2011.
Estimate salvage/resale value on replaced item: $
Useful life reduced from 12 years to 10.
Useful Life 10 yearsProject Name Skid Loader (2)Category Equipment
Type Equipment
Future
Total Project Cost:$258,900
Total2020 2021 2022 2023 2024Expenditures
50,00050,000Equipment
50,000 50,000Total
Total2020 2021 2022 2023 2024Funding Sources
50,00050,000Equipment Replacement Fund
50,000 50,000Total
Wednesday, October 9, 2019
78
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Public Works: Streets/Traffic
Description
A trailer that hauls up to 2.5 tons of hot asphalt and heats the mix to keep it workable.
Project #01-ERP-0318
Priority n/a
Justification
Current asphalt hot mix heating box insert sits in the back of a truck and is too small, 1 ton capacity. Sits too high to be handled easily. The trailer
will hold more mix, reducing the trips to the asphalt plant, and will work better ergonomically.
Budget Impact/Other
Variance from 20 year plan - New item.
2016 - Upgrading from mounted unit to trailer
Estimate salvage/resale value on replaced item: $-0-.
Useful Life 12 yearsProject Name Asphalt Hot Mix Heating Box - Trailer Category Equipment
Type Equipment
Future
Total Project Cost:$84,109
Total2020 2021 2022 2023 2024Expenditures
22,10022,100Equipment
22,100 22,100Total
Total2020 2021 2022 2023 2024Funding Sources
22,10022,100Equipment Replacement Fund
22,100 22,100Total
Wednesday, October 9, 2019
79
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Facilities Director
2020 2024
thru Department Public Works: Streets/Traffic
Description
Wheel loader used for snow plowing with V-blade all alleys in the city and loading trucks.
Project #01-ERP-0321
Priority 1 Urgent
Justification
Both pieces of equipment has surpassed useful life exptectancies. Estimates for trade in were done by Ziegler Caterpillar Equiment. Current loader
is 30 years old (1990). Current trade in value is $19,150.
The city has a 31 year old Grader (1989 Unit #326) that is used for a backup snowplow. Current trade in value is $30,415, We would like to utilize
trading in the two 30+ year old equipment for 1 new loader.
Actual full price of equiment is approx. $218,000.
Budget Impact/Other
Useful Life 20 yearsProject Name Wheel Loader Category Equipment
Type Equipment
Future
Total Project Cost:$170,000
Total2020 2021 2022 2023 2024Expenditures
170,000170,000Vehicles
170,000 170,000Total
Total2020 2021 2022 2023 2024Funding Sources
170,000170,000Equipment Replacement Fund
170,000 170,000Total
Wednesday, October 9, 2019
80
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Refuse
Description
Refuse truck used by Refuse Utility Division of Public Works.
Current vehicle: 2005 Peterbilt Rapid Rail (#901) & 2011 Freightliner Rapid Rail (#900)
Project #01-ERP-0900
Priority n/a
Justification
Residential waste pick up.
Budget Impact/Other
Variance from 20 year plan - increase cost to reflect actual
Estimate salvage/resale value on replaced item: $18,000
Useful Life 10 yearsProject Name Refuse Truck (RAP-R) (2)Category Vehicles
Type Equipment
Future
Total Project Cost:$1,462,600
Total2020 2021 2022 2023 2024Expenditures
270,300270,300Vehicles
270,300 270,300Total
Total2020 2021 2022 2023 2024Funding Sources
270,300270,300RF - Refuse Fund
270,300 270,300Total
Wednesday, October 9, 2019
81
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Sewer
Description
Truck used by Water/Sewer Division of Public Works.
Current vehicle: 2004 Chevrolet Pickup (#501)
Project #01-ERP-0550
Priority n/a
Justification
Snow plowing, light hauling, pulling trailers, general purpose transportation.
Budget Impact/Other
Variance from 20 year plan. Reduce amount to $30,000 to reflect actual.
Estimate salvage/resale value on replaced item:
Useful Life 10 yearsProject Name 4x4 3/4 Ton Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$151,100
Total2020 2021 2022 2023 2024Expenditures
40,30040,300Vehicles
40,300 40,300Total
Total2020 2021 2022 2023 2024Funding Sources
40,30040,300SF - Sanitary Sewer Fund
40,300 40,300Total
Wednesday, October 9, 2019
82
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2020 2024
thru Department Sewer
Description
Portable generator used by Water/Sewer Divisions of Public Works.
Current equipment: 1997 Kohler Generator, 2010 Caterpillar C15 (#537)
Project #01-ERP-0555
Priority n/a
Justification
Emergency back up generator for lift stations and pumps, off site power for lights and welding.
Budget Impact/Other
Estimated useful life reduced from 25 to 20 years.
Estimate salvage/resale value on replaced item: $2,500
Useful Life 20 yearsProject Name Generator (2)Category Equipment
Type Equipment
Future
Total Project Cost:$79,000
Total2020 2021 2022 2023 2024Expenditures
43,00043,000Equipment
43,000 43,000Total
Total2020 2021 2022 2023 2024Funding Sources
43,00043,000SF - Sanitary Sewer Fund
43,000 43,000Total
Wednesday, October 9, 2019
83
84
TWENTY-YEAR
REPLACEMENT SCHEDULE
85
10/15/2019 EQUIPMENT REPLACEMENT SCHEDULE
Net General Fund 20 Year Average:1,264,800$
INFLATION FACTOR 3.0%
REPL
EQUIPMENT /VEHICLES YRS 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039
ACTIVITY CENTER
ERP-0032 Sound System 15 13,700
ERP-0035 Floor Scrubber 10 6,700 9,000
ERP-0036 Sound System Replacement 25
ERP-0037 Security System Upgrade 15-18 20,000 32,000
ERP-0038 Kitchen Storage 30 17,000 12,000
ERP-0039 Dishwasher 30
ERP-0041 A/V Replacement & Upgrade 20 62,624
SUBTOTAL 82,624 17,000 12,000 6,700 13,700 9,000 32,000
ARTS CENTER
ERP-1101 Carpet Extractor 10 7,000
ERP-1102 Kitchen Catering Equipment 12 7,100
ERP-1105 Community Room A/V 7 13,500 16,600
ERP-1107 Theater Projection Screen 10 6,700 9,000
ERP-1109 Floor Scrubber 10 10,800
ERP-1112 Surveillance System 5 6,000 8,000 10,000
13,500 6,700 10,800 7,100 6,000 16,600 15,000 9,000 10,000
COMMUNITY SERVICES
ERP-0010 Election Booths 20 6,500
ERP-0051 Exterior Security Camera System 15 65,000
EQUIPMENT SUBTOTAL 6,500 65,000
FIRE
ERP-0100 Tele-Squirt E-2 10 1,000,000 1,350,000
ERP-0101 Fire Pumper E-3 20 722,400
ERP-0105 Quick Attack Pumper/Rescue R-8 10 525,000 705,000
ERP-0106 Aerial Truck 20 1,572,000
VEHICLES SUBTOTAL 525,000 722,400 1,000,000 1,572,000 705,000 1,350,000
ERP-0107 Air Compressor 15 54,400
ERP-0108 Breathing Apparatus (45) (SCBA)10 250,000 336,000
ERP-0109 Extrication Tool (2)10 29,000 30,000 32,000 36,900 40,300
ERP-0112 Thermal Imaging Camera (2)10 15,400 17,400 20,700
ERP-0113 Emergency Preparedness Siren 20 38,500
ERP-0114 Floor Scrubber 12 20,300
ERP-0125 Radios-Portable & Mobile 5-7 368,000 431,498 514,700
ERP-0126 Helmets 10 16,000 22,000
ERP-0127 Lucus Device 5 18,000 20,000 24,000 30,000
ERP-0128 Hose Replacement 20 38,000
ERP-0129 EOC Upgrade 20 12,000
EQUIPMENT SUBTOTAL 29,000 30,000 487,400 12,000 250,000 38,500 37,700 20,000 468,398 54,400 40,300 66,700 850,700 30,000
IT
ERP-0003 City Hall - Network Upgrade 1 22,000 22,000 25,000 26,250 27,038 27,849 28,684 29,545 30,431 31,344 32,284 33,253 34,250 35,278 36,336 37,426 38,549 39,705 40,897 42,124
ERP-0004 Phone System 8 89,600 110,700 140,000
ERP-0005 Financial Software 7 307,468
ERP-0006 Computers 3-5 31,500 33,075 34,729 36,465 37,559 39,437 41,409 43,479 45,653 47,936 50,333 52,849 55,492 58,266 61,180 64,239 67,451 70,823 74,364 78,082
ERP-0009 Network Infrastructure Upgrade 15 23,400
ERP-0012 Core Network Switch 6 20,000 24,000 27,000
ERP-0014 Distribution Network Switches 5 50,000 57,000 65,000 75,000
ERP-0015 Backup Server 3 66,000 72,120 74,000 78,000 82,000 87,000
ERP-0017 Office 365 1 22,000 33,000 44,000 44,000 45,320 47,000 49,000 51,000 54,000 57,000 60,000 63,000 66,000 69,000 72,000 75,000 78,000 80,000 85,000 88,000
ERP-0018 RSA/Netmotion VPN 5 24,000 27,000 31,500
ERP-0019 Email Threat Protection 5 26,500 30,000
ERP-0020 Patching Automation Software 5 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 50,000 10,000 10,000 10,000 10,000 60,000 10,000 10,000 10,000 10,000 10,000
ERP-0022 Windows 10 Enterprise Upgrade 1 21,000 21,000 42,000 42,000 63,000 64,890 66,837 68,842 70,907 73,034 75,225 77,482 79,807 82,201 84,667 87,207 89,823 92,518 95,293 98,152
ERP-0211 Police - Network Server (3)3 22,000 22,000 25,000 26,250 27,038 27,849 28,684 29,545 30,431 31,344 32,284 33,253 34,250 35,278 36,336 37,426 38,549 39,705 40,897 42,124
EQUIPMENT SUBTOTAL 244,500 448,543 204,129 346,685 229,954 274,024 298,614 232,410 241,422 419,158 349,126 380,537 279,799 372,023 407,519 386,298 436,372 332,752 346,451 529,981
POLICE
ERP-0200 Squad 3 107,400 161,100 110,000 117,400 117,400 117,400 128,000 128,000 128,000 140,000 140,000 140,000 153,200 153,200 153,000 157,000 160,000 165,000 170,000 175,000
ERP-0201 Sergeant Vehicle #209 4 57,000 57,000 60,000 72,000 80,000
ERP-0202 Parking Vehicle #211 10 53,700 60,000 65,000
ERP-0203 PSO Utility 4x4 #212 6 72,100 86,100 90,000 92,000 107,000
ERP-0205 SWAT Vehicle #240 15 77,900
VEHICLES SUBTOTAL 107,400 271,800 182,100 117,400 117,400 174,400 274,100 128,000 128,000 200,000 230,000 217,900 153,200 225,200 245,000 157,000 225,000 245,000 170,000 282,000
ERP-0208 Computer System 20 200,000
ERP-0212 Mobile Data Computers/Digital Cameras 7 105,000 148,500 150,000
ERP-0214 Tactical Ballistic Vests (9)5 76,512 45,000 50,000
ERP-0215 Radios-Portable & Mobile 5-7 290,000 310,000 325,000
ERP-0217 Taser Replacement 4 80,000 35,000 38,000 42,000 45,000
ERP-0218 Building Video Server 4 17,000 17,000 17,000 19,000 21,500
ERP-0219 PD - Squad Video Server 5 10,000 11,593 13,439 15,580
ERP-0220 Squad Cams 5 90,000 104,335 120,952 140,217
ERP-0222 Body Worn Camera 5 150,000 165,000 175,000 185,000
EQUIPMENT SUBTOTAL 10,000 150,000 463,512 195,000 11,593 35,000 182,000 45,000 562,835 51,439 17,000 175,000 250,000 312,952 359,580 185,000 45,000 161,717
86
REPL
EQUIPMENT /VEHICLES YRS 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039
P.W. BLDG./EQUIPMENT SVCS
ERP-0710 1/2 Ton Truck 10 42,100 47,000
ERP-0711 Vehicle Washer 12 8,300
ERP-0712 4x4 3/4 Ton Pick-up Truck 15 35,000 52,000
ERP-0715 PW - Forklift 15 28,000
35,000 42,100 8,300 28,000 52,000 47,000
P.W. ENGINEERING
ERP-0700 Engineering Van 10 28,900 38,800
P.W. PARKS & FORESTRY
ERP-0800 1/2 Ton Truck 10 35,400 47,600
ERP-0801 4x4 3/4 Ton Truck 8 85,200 108,000 115,000
ERP-0802 3/4 Ton Utility Truck 10 48,700
ERP-0804 Log Truck (50% w/Refuse)15 81,800 128,000
ERP-0805 Aerial Lift 20 228,900
ERP-0806 Tractor 30 52,000
ERP-0807 Truckster 15 17,140 53,200
ERP-0808 Riding Mower (8 13,900 25,300 17,500 32,100 21,000 35,000
ERP-0810 Large Turf Mower (#825)10 96,000 130,000 175,000
ERP-0812 Stump Cutter 20 45,000
ERP-0813 Brush Clipper 20 43,700
ERP-0814 Trailer Flatbed 15 10,000 12,500
ERP-0815 Skid Loader 12 45,600 50,000
ERP-0816 Toolcat 8 80,200 101,600
ERP-0817 Grass Seed Applicator 20 17,900
VEHICLES SUBTOTAL 195,100 107,100 35,400 10,000 80,200 34,640 108,000 207,700 295,500 91,300 227,800 162,500 173,000 50,000 175,000
P.W. STREETS/TRAFFIC
ERP-0300 4x4 3/4 Ton Truck/Plow 10 28,900 38,800
ERP-0301 4x4 3/4 Ton Truck/Plow 8 38,500 48,800
ERP-0302 4x2 1 Ton Dump Truck 12 77,800
ERP-0303 1 Ton Dump Truck 12 53,400 49,500 76,100
ERP-0304 1 Ton Boom Truck 17 136,400
ERP-0305 Single Axle Dump Truck 17 225,000 210,600 372,000
ERP-0306 Tandem Dump Truck 17 286,000 294,000
ERP-0307 Water Truck 22 201,000
ERP-0308 Front End Loader 15 268,600 415,000
ERP-0309 Skid Loader 12 50,000 59,700 71,300
ERP-0310 Grader 20 167,300
ERP-0311 Sweeper 20
ERP-0312 Roller 20 82,000
ERP-0313 Striper 12 16,000
ERP-0314 Paver 20 120,000
ERP-0315 Snow Blower 20 117,000
ERP-0316 Trailer 20 4,900
ERP-0317 Sign Machine 10 18,100 24,000
ERP-0318 Asphalt Hot Mix Heating Box 12 22,100 31,500
ERP-0319 Regenerative Air Sweeper 20 210,000
ERP-0320 Planer 20 18,600
ERP-321 Wheel Loader 20 170,000 308,000
VEHICLES SUBTOTAL 170,000 225,000 103,400 433,900 110,100 167,300 18,100 269,700 226,600 82,700 219,600 168,800 38,800 550,400 294,000 55,500 82,000 787,000 308,000
HRA
ERP-0400 4x4 3/4 Ton Truck 8 41,100 52,100 66,000
ERP-0401 Copier 8 16,500 20,900
SUBTOTAL 16,500 41,100 20,900 52,100 66,000
PAVILION
ERP-1000 Ice Resurfacer 12 165,000 235,200
ERP-1001 Electric Ice Edger 12 8,900 12,700
ERP-1002 Arena Scoreboard 20 12,000
ERP-1003 Floor Scrubber 10 11,600 15,600
ERP-1004 Scissor Lift 15 16,200
SUBTOTAL 11,600 185,900 16,200 15,600 247,900
REFUSE
ERP-0900 Refuse Truck (RAP-R)10 270,300 363,200
ERP-0901 Refuse Truck (Rear-L)10 136,500
ERP-0803 Swap Loader 20 171,000
ERP-0804 Log Truck (50% w/Forestry)20 81,800
SUBTOTAL 270,300 81,800 363,200 136,500 171,000
87
REPL
EQUIPMENT /VEHICLES YRS 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039
WATER
ERP-0500 1./2 Ton Truck 10 36,000 54,000
ERP-0501 3/4 Ton Utility Truck 10 46,900 63,000
ERP-0502 Backhoe 20 153,700
ERP-0503 Air Compressor 20
SUBTOTAL 46,900 36,000 153,700 63,000 54,000
SEWER
ERP-0550 4x4 3/4 Ton Truck 10 40,300 54,200
ERP-0551 3/4 Ton Utility Truck 10 45,200 54,000
ERP-0552 Jet Vactor 20
ERP-0555 Generator 25 43,000
SUBTOTAL 43,000 40,300 45,200 54,200 54,000
TOTALS 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039
GENERAL FUND-VEHICLES/EQUIP 507,500 496,800 392,600 1,111,700 266,400 341,700 1,136,900 1,162,640 2,077,700 634,300 608,200 437,500 322,000 1,060,300 1,114,000 451,000 490,000 1,850,000 1,007,000 765,000
GENERAL FUND-OTHER EQUIP 283,500 531,167 401,129 1,309,597 436,954 535,617 378,814 452,110 306,422 1,458,691 420,765 451,937 495,099 716,723 720,471 1,661,577 630,372 364,752 421,451 691,699
HRA - - 16,500 41,100 20,900 52,100 66,000
ARTS CENTER - - 13,500 6,700 10,800 7,100 6,000 16,600 15,000 9,000 10,000
REFUSE - 270,300 81,800 363,200 136,500 171,000
PAVILION - - - 11,600 185,900 16,200 15,600 247,900
WATER - - - 46,900 36,000 153,700 63,000 54,000
SEWER - - 43,000 40,300 45,200 54,200 54,000
GENERAL FUND TOTAL 791,000 1,027,967 793,729 2,421,297 703,354 877,317 1,515,714 1,614,750 2,384,122 2,092,991 1,028,965 889,437 817,099 1,777,023 1,834,471 2,112,577 1,120,372 2,214,752 1,428,451 1,456,699
HRA TOTAL - - 16,500 41,100 20,900 52,100 66,000
ARTS CENTER FUND TOTAL - - 13,500 6,700 10,800 7,100 6,000 16,600 15,000 9,000 10,000
ENTERPRISE FUNDS TOTAL - 270,300 124,800 51,900 278,000 36,000 16,200 363,200 290,200 171,000 69,800 63,000 108,000 247,900
TOTAL ALL FUNDS 791,000 1,298,267 948,529 2,462,397 761,954 888,117 1,800,814 1,656,750 2,384,122 2,125,791 1,049,865 1,304,737 1,122,299 1,948,023 1,913,271 2,175,577 1,228,372 2,224,752 1,676,351 1,522,699
GENERAL FUND SALVAGE 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000
NET GENERAL FUND 751,000 987,967 753,729 2,381,297 663,354 837,317 1,475,714 1,574,750 2,344,122 2,052,991 988,965 849,437 777,099 1,737,023 1,794,471 2,072,577 1,080,372 2,174,752 1,388,451
20 YEAR AVERAGES:Total Average
ACTIVITY CENTER ADMINISTRATION 173,024 8,700 x
IT 6,760,296 338,000 x
COMMUNITY SERVICES 71,500 3,600 x
FIRE EQUIPMENT 5,874,400 293,700 x
FIRE ADMINISTRATION 2,415,098 120,800 x
POLICE EQUIPMENT 3,850,900 192,500 x
POLICE ADMINISTRATION 3,212,628 160,600 x
PUBLIC WORKS ADMINISTRATION
BLDG./EQUIPMENT SERVICES EQUIPMENT 212,400 10,600 x
ENGINEERING EQUIPMENT 67,700 3,400 x
PARKS/FORESTRY EQUIPMENT 1,953,240 97,700 x
STREET EQUIPMENT 4,310,900 215,500 x
GENERAL FUND VEHICLE/EQUIPMENT 16,269,540 813,500
GENERAL FUND OTHER EQUIPMENT 12,632,545 631,600
GENERAL FUND TOTAL 28,902,085 1,445,100
HRA FUND 196,600 9,800
ARTS CENTER FUND 94,700 4,700 x
REFUSE FUND 1,022,800 51,100 x
PAVILION FUND 477,200 23,900
WATER FUND 353,600 17,700 x
SEWER FUND 236,700 11,800 x
UTILITY VEHICLES/EQUIPMENT 2,381,600 119,100
31,283,685
88
EQUIPMENT INVENTORY
89
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
FALL, 2019
UNIT #YEAR MAKE MODEL VALUE
FIRE DEPARTMENT
100 2017 PIERCE IMPEL 900,000$
103 2006 PETERBILT 357 420,000
104 2012 FORD F550 248,500
105 2016 FORD F150 25,000
106 2019 FORD EXPLORER 55,000
107 2019 FORD EXPLORER 55,000
108 2019 FORD F150 33,000
109 2008 PIERCE AREO XT 874,000
110 2017 FORD EXPLORER 47,500
115 1952 MACK NONE 4,000
POLICE DEPARTMENT
200 2018 FORD UTILITY 49,000$
201 2018 FORD UTILITY 49,000
202 2018 FORD UTILITY 49,000
205 2016 FORD UTILITY 45,000
206 2016 FORD UTILITY 45,000
207 2017 FORD UTILITY 49,000
208 2017 FORD UTILITY 49,000
209 2018 FORD UTILITY 49,000
211 2016 FORD UTILITY 34,000
212 2018 FORD F150 55,000
213 2016 FORD TAURUS 25,000
214 2018 FORD EXPLORER 49,000
216 2011 FORD TAURUS 30,000
218 2013 FORD UTILITY BLUE 40,000
219 2013 FORD TAURUS 24,000
220 2017 FORD EXPLORER 50,000
221 2019 FORD EXPLORER 55,000
240 2017 FORD TRANSIT-350 67,000
299 2018 FORD F150 55,000
DWI.2015 FORD UTILITY 41,000
90
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
FALL, 2019
UNIT #YEAR MAKE MODEL VALUE
STREET/TRAFFIC DIVISION
301 2013 FORD F-150 19,500$
302 2018 FORD F350 DRW 54,600
303 2016 FORD F-250 26,500
307 2006 FORD F-350 27,400
308 2011 FORD F-350 20,300
309 2012 FORD F-450 30,300
311 2011 FREIGHTLINER M2-106V 79,400
312 2004 FREIGHTLINER M2-106 98,000
315 2017 FREIGHTLINER 114SD 221,700
317 2016 FREIGHTLINER M2-106 69,400
318 2019 FREIGHTLINER 114SD 235,000
320 1991 CATERPILLAR 928E 90,000
321 2012 CATERPILLAR 924K 177,500
322 2005 CATERPILLAR 938G 157,800
325 2011 BOBCAT S-650 35,100
326 1989 CATERPILLAR 140-G 82,000
327 2019 ELGIN PELICAN 230,000
328 2013 ISUZU 435 REGEN SWEEP 145,300
329 2017 BOMAG BW120 SL5 ROLLE 45,900
331 2016 BOBCAT S-650 35,100
337 1994 CATERPILLAR AP200B 17,000
344 1996 SNO-GO WK800 58,000
346 2017 SNO- GO SG WK-800 160,000
348 2014 SPARKS T6202 TRAILER 5,300
350 1993 TOWMASTER T14 TRAILER 4,000
351 2004 TENNANT SWEEPER 3640 10,000
352 2017 FALCON PATCH TRAILER 15,000
ENGINEERING DIVISION
706 2015 FORD TRANSIT 250 24,000$
BUILDING MAINTENANCE & EQUIPMENT SERVICES
700 2015 FORD UTILITY 35,000$
702 2004 FORD F350 18,000
704 2006 FORD F250 18,000
705 2018 FORD F350 30,000
708 2016 FORD TRANSIT 350 29,700
712 2015 FORD UTILITY 35,000
713 2014 FORD UTILITY 30,000
750 2018 CLARK GTS25-FORKLIFT 25,000
91
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
FALL, 2019
UNIT #YEAR MAKE MODEL VALUE
PARKS/FORESTRY DIVISION
800 2013 FORD F-150 23,700$
801 2012 FORD F-350 24,100
803 2004 FORD F-350 17,500
804 1995 CHEVROLET CC31403 45,000
806 2016 FORD TRANSIT 350 29,700
811 2006 INTERNATIONAL LOG TRUCK 45,000
812 2010 FREIGHTLINER AERIAL LIFT 130,000
813 2019 FREIGHTLINER M2-106 235,000
816 2014 BOBCAT 5610 50,900
817 2018 BOBCAT 5600 63,300
818 2017 TORO WORKMAN HDX 13,000
820 2004 TORO WORKMAN 3200 15,000
822 2014 TORO MDE 18,000
823 2006 JACOBSON TURFCAT 600 10,000
825 2010 TORO 4100-D 56,500
826 2004 TORO Z587L 8,900
828 2001 DEWEZE ATM-72 21,000
829 2016 TORO 3280-D 10,000
831 2016 RAYCO RG45X 3,400
832 1997 VERMEER SC502 STUMP CTR 15,400
834 2013 VERMEER BRUSH CHIPPER 29,800
835 2016 BOBCAT S70 55,000
843 2007 CARR TRAILER 2,500
844 2010 FELLING FT-6T 6,000
845 1997 REMACKEL DT-D7-E 3,500
846 2001 DRESSEN 8110 2,000
848 2017 LOAD TRAIL TILT DECK 5,400
92
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
FALL, 2019
UNIT #YEAR MAKE MODEL VALUE
HRA
411 2007 CHEVROLET 2500 17,500$
WATER/SEWER
501 2004 CHEVROLET 2500HD 16,000$
502 2017 FORD F-150 SUPERCAB 28,000
503 2015 FORD F-350 24,000
508 2016 FORD TRANSIT CONNECT 25,000
509 2016 FORD F-350 65,000
510 2016 FORD F-350 30,000
531 2017 FREIGHTLINER 114SD 425,400
533 2012 CATERPILLAR 420-EH2 87,700
535 1992 KOHLER GEN/TRL 10,000
537 2010 CATERPILLAR C15 144,300
PAVILION
802 2012 FORD F-350 20,000$
808 2014 ZAMBONI 552 126,000
809 2002 OLYMPIA MILLINEUM 87,800
REFUSE
900 2011 FREIGHTLINER M2-106 201,109$
902 2015 FREIGHTLINER M2-106 232,500
903 2015 PETERBILT REAR LOADER 155,000
93