2021 - 2025 CIPCAPITAL IMPROVEMENT PLAN 2021-2025 DATE: November 17, 2020 TO: Honorable Mayor and Members of the City Council FROM: Mike Mornson, City Manager SUBJECT: 2021-2025 CAPITAL IMPROVEMENT PLAN With this letter I respectfully submit the 2021-2026 Capital Improvement Plan. This five- year planning document represents the combined efforts of city staff, advisory commissions, residents and the City Council. The Capital Improvement Plan is a five-year forecast of project needs in the City of Hopkins. It is intended to alert the Council and residents to the major capital needs on the horizon. The first year of the plan becomes an adopted capital budget and relates almost completely to the operating budget that is approved on a yearly basis. The remaining four year represents an estimate of project needs and funding capabilities of the city. This plan does not include proposed equipment purchases. A document relating specifically to equipment replacement needs has been developed into a separate document. The Capital Improvement Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city’s capital programming needs. At the same time, sufficient projected detail is provided to enable those who review the information to make informed decisions on the programming of projects over the next several years. Please use the information provided to formulate plans, projects and questions. The Capital Improvement Plan can serve the community best by provoking thoughts and actions. This document was developed by the Finance Department with assistance of all city departments. I want to especially thank all those involved in the development of the Capital Improvement Plan and especially Steve Stadler, Public Works Director, Nate Stanley, City Engineer, Kersten Elverum, Planning and Economic Development Director, Ari Lenz, Assistant City Manager and Nick Bishop, Finance Director for their hard work and dedication. 1 2 Page City Manager's Message 1 Table of Contents 3 Introduction Introduction and Purpose 6 Program Descriptions Utilities Program 7 Transportation Program 8 Parks, Forestry, and Pavilion Program 10 General Public Buildings Program 11 Economic Development 13 Sources of Funding Sources of Funding 16 Funding Source Abreviations 19 Summary of Impacts on Major Funding Sources 22 Cash Flow Statements Park Capital Improvement Fund 26 Capital Improvement Fund 27 Municipal State Aid Fund 28 Permanent Improvement Revolving Fund (PIR)29 Water Utility Fund 30 Sewer Utility Fund 31 Storm Sewer Utiltiy Fund 32 Pavilion - Ice Arena Fund 33 Five-Year Project Summaries Projects by Year 36 Department Summary 39 Projects by Department 40 Funding Source Summary 42 Projects by Funding Source 43 Project Descriptions & Narratives General Public Buildings 49 Parks & Recreation 81 Streets 93 Utilities 101 CAPITAL IMPROVEMENT PLAN 2019-2023 TABLE OF CONTENTS 3 4 Introduction 5 INTRODUCTION AND PURPOSE The Capital Improvement Plan is a flexible plan based upon long-range physical planning and financial projections, which schedules the major public improvements that may be incurred by the City over the next five years. Flexibility of the Capital Improvement Plan is established through annual review, and revision if necessary. The annual review assures that the program will become a continuing part of the budgetary process and that it will be consistent with changing demands as well as changing patterns in cost and financial resources. Funds are appropriated only for the first year of the program, which is then included in the annual budget. The Capital Improvement Plan serves as a tool for implementing certain aspects of the City's comprehensive plan; therefore, the program describes the overall objectives of City development, the relationship between projects with respect to timing and need, and the City's fiscal capabilities. The Capital Improvement Plan can help assure: 1. A systematic approach to planning and initiating capital projects affording the opportunity to plan the location, timing, and financing of needed public improvements; 2. The development of a realistic program of capital spending within the City's projected fiscal capability to finance such projects, avoiding sharp change in the tax levy or bonded indebtedness; 3. The coordination of public and private improvement projects permitting adequate time for design and engineering to eliminate duplication of effort and expense; 4. The expenditure of public funds that is compatible with the City's adopted Comprehensive Plan; 5. That the public is kept informed of the proposed future projects and expenditures; 6. That private investors are aware of the City's long-range development program so that they may guide their development in a way that is compatible with the City's program; 7. Aid in achieving federal and/or state participation by providing the necessary planning and lead time necessary for a successful application in addition to meeting prerequisites needed for certain federal and state grants. 6 PROGRAM DESCRIPTIONS In order to effectively plan for and manage the projects contained in a Capital Improvement Plan, it is necessary to group similar activities into "Program Categories". The City of Hopkins' activities are divided into four program categories which are 1) Utilities, 2) Transportation, 3) Parks, Forestry and Pavilion, and 4) General Public Buildings. The City also includes an outline of proposed expenditures for unscheduled projects. Program categories are explained in the following sections. UTILITIES PROGRAM Program Description: The Utilities Program includes the municipal water, municipal sanitary sewer, storm sewer and refuse systems. Program Goal: Provide reliable, efficient, and safe utility service to all parts of the City with a minimum of adverse effects on the environment. Subprograms: Water, sanitary sewer, storm sewer, and refuse service. I.Municipal Water System Subprogram (WA) A.Subprogram Goal: The goal of the Municipal Water System subprogram is to provide water in sufficient quantities at sufficient pressure, with a high degree of reliability and safety to all parts of the City so as to satisfy the normal demands of the general public for water while at the same time providing sufficient reserves in case of fire emergency or power outages. B.Objectives: 1. Water quality shall meet the purity standards of the Minnesota Department of Health. 2. Any hydrant on the system shall, under maximum condition, deliver no less than 500 gallons per minute with a residual pressure of 20 pounds per square inch. 3. The system shall be looped to provide maximum reliability. 4. The supply and storage system shall be designed and maintained to have maximum reliability. 7 II.Municipal Sanitary Sewer Subprogram (SA) A.Subprogram Goal: The goal of the Municipal Sanitary Sewer subprogram is to promote a healthful environment by collecting all sewage from existing and projected development in a sanitary and economic manner. B.Objectives: 1. Provide sewer lines of adequate size and grade to collect and transmit all discharge sewage. 2. Prevent sewage from overflowing into the natural environment. 3. Prevent sewage back-ups. 4. Encourage or promote connection of all generators of sewage to the Municipal system. 5. Meet the effluent and infiltration standards of the Metropolitan Waste Control Commission. III.Storm Sewer Subprogram (SS) A.Subprogram Goal: Manage and control surface and ground waters in order to protect the man-made and natural environment in a safe and efficient manner. B.Objectives: 1. Prevent flooding. 2. Prevent damage to property due to erosion. 3. Meet water quality standards established by the controlling regulatory law or authority. TRANSPORTATION PROGRAM Program Description: This program includes streets, walkways, traffic signs and signals, vehicular parking facilities, and street lighting. Program Goal: Provide for the safe and efficient movement of people and goods throughout the city. Subprograms: Streets, Walkways/Sidewalks, Signs/Signals, Parking Facilities, and Street Lights. 8 I. Streets Subprogram (ST) A. Subprogram Goal: The goal of the Streets subprogram is to provide safe, convenient, economic public streets to best facilitate the movement of vehicular traffic. B. Objectives: 1. Streets should be constructed with permanent surfaces, concrete curb and gutter, and with ancillary storm drainage, to standards established by the City. 2. Streets should be of a size and load capacity consistent with their functional classifications. 3. Timely major repair to preserve the basic capital investment in streets. II. Walkways/Sidewalks Subprogram (WS) A. Subprogram Goal: To provide a safe and convenient pedestrian system with incidental recreational benefits. III. Signs/Signals Subprogram (SI) A. Subprogram Goal: The goal of the Signs/Signals subprogram is to provide an efficient and orderly system of street and traffic signing so as to promote safe, convenient travel throughout the City. B. Objectives: 1. Signs and signals should be installed in conformity with the Minnesota Manual on Uniform Traffic Control Devices. 2. Periodic surveys and studies should be made to document the effectiveness of City signing patterns. IV. Parking Facilities Subprogram (PA) A. Subprogram Goal: To provide such supporting facilities as will promote maximum use of public parking spaces by employers, employees, customers, and visitors. B. Objectives: 1. Provide parking facilities for present and anticipated needs of the City of Hopkins. 9 V.Street Lights Subprogram (SL) A.Subprogram Goal: To provide a system of street lighting within the City that will promote safe and convenient vehicular and pedestrian travel on City Streets. B.Objectives: 1. To provide lighting at each street intersection within the City. 2. To provide mid-block street lighting in conformance with the City's street lighting policy, in order to provide equitable, cost efficient lighting. 3. To continually update the system so as to provide energy and cost efficient lighting. PARKS, FORESTRY AND PAVILION PROGRAM Program Description: This program includes community parks, neighborhood parks, open spaces, recreational structures and facilities. Program Goal: The goal of the Park and Recreation Program is to provide facilities for safe, stimulating, and comprehensive leisure time activities of Hopkins citizens. Subprograms: Neighborhood Facilities, Community Facilities I.Neighborhood Facilities Subprogram (NF) A.Subprogram Goals: To acquire ownership or use rights of park sites located to provide convenient walking access to all Hopkins citizens and to develop such sites to provide optimum recreational serviceability consistent with the preservation and enhancement of pleasing aesthetic qualities. B.Objectives: 1. Acquire property or use rights on those neighborhoods that do not have convenient walking access to neighborhood park facilities. 2. Develop neighborhood park facilities to meet the needs of various user groups. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Preserve and enhance the aesthetic qualities of neighborhood parks. 10 II. Community Facilities Subprogram (CF) A. Subprogram Goals: The goal of the Community Facilities subprogram is to develop, or acquire ownership or use rights of sites which serve the entire City and to provide facilities that serve community-wide needs. B. Objectives: 1. Acquire sites that have valuable and unique natural characteristics to preserve irreplaceable community resources. 2. Preserve by acquisition, gift, or other arrangement properties that have valuable historic-cultural qualities. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Construct or acquire structures and facilities necessary to meet the changing needs of the community. GENERAL PUBLIC BUILDINGS PROGRAM Program Description: The General Public Buildings Program includes all municipal buildings except those provided for in the Utility and Park Facilities Program. Program Goal: Provide buildings that are adequate and convenient for the efficient accommodation of City functions. Subprograms: Administrative Offices, Maintenance Facilities, Fire Facilities, Community Center. I. Administrative Offices Subprogram (AO) A. Subprogram Goal: The goal of the Administrative Offices subprogram is to provide facilities for the efficient and safe conduct of legislative and administrative functions of the City. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of the City services. 11 II.Maintenance Facilities Subprogram (MF) A.Subprogram Goal: The goal of the Maintenance Facilities subprogram is to provide facilities for the efficient and safe conduct of City maintenance functions. B.Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of City services. III.Fire Facilities Subprogram (FF) A.Subprogram Goal: To provide a fire station, or stations, for storage of Fire Department equipment and for the training and meetings of volunteer fire fighters to provide prompt and efficient protection to life and property. B.Objectives: 1. Provide a maximum four-minute daytime and three-minute nighttime response to all points within the City. 2. Meet objective 1 through the use of volunteers. IV.Community Center Subprogram (CC) A.Subprogram Goal: To provide a community facility, or facilities, which meet the social, recreational, and cultural needs of all citizens, particularly senior citizens. B.Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repairs. 2. Construct or acquire structures and facilities necessary to meet the changing needs of the City. 3. Upgrade facilities as necessary to provide for efficient, safe, and effective provision of City services. 12 ECONOMIC DEVELOPMENT PROGRAM Program Description: This program includes redevelopment projects that have been identified through adopted plans and goals of the City of Hopkins. Program Goal: To facilitate the redevelopment of key sites in order to achieve the state objectives of the project. Objectives: 1.Elimination of blight or blighting conditions 2.Creation of jobs 3.Increase property value(s) 4.Catalyst of additional redevelopment 5.Environmental clean-up 6.Increase transit-oriented development around LRT stations 13 14 Sources of Funding 15 SOURCES OF FUNDING In order to fund the anticipated Capital Improvements, the City must draw upon a variety of sources. Many of these sources have a specific or "dedicated" purpose (i.e., the water utility fund will finance water main installation but not a street overlay). Therefore, it is important to identify the uses and limitations of the various revenue sources. CURRENT REVENUES - GENERAL FUND (CR) This represents funding from current year revenue collections in the General Fund that support operations and capital outlay expenditures. Revenue sources include property tax levies, state aid payments, and various permit and license fees. This source of funding is generally used only for operations and small capital purchases. GENERAL FUND RESERVES (GR) Reserves of the general fund are the funds remaining after subtracting cash flow and emergency amounts from the City's cash balance, sometimes referred to as "fund balance". The use of General Fund Reserves is not recommended for Capital Improvements without significant staff and Council review. COMMUNICATION (formerly Cable TV) FUND (CT) This funding source consists of franchise fees received from the local Cable TV company, in excess of the amounts earmarked for the access programming and commission budgets. Expenditures are limited to cable-related facilities, or must have a cable related purpose. ECONOMIC DEVELOPMENT FUND (ED) This funding source was established by the Housing and Redevelopment Authority (HRA) and the City of Hopkins, to provide funding for the purpose of promoting development and redevelopment within the City. The Economic Development fund is a revolving fund administered by the HRA, intended to provide an ongoing funding source used to reduce or extend the long term debt involved with development and redevelopment activities. The HRA reviews all proposed uses of this fund on an individual basis. GRANT-IN-AID (GA) This is aid received from either the Federal or State government. In many cases, grants are made on matching basis, which means the City shares a portion of the costs of the project being funded. 16 MUNICIPAL STATE AID STREETS (MS) This funding source represents funds received from the State of Minnesota to support construction and maintenance of State Aid classified municipal streets. State law defines the types and limits of State Aid Streets expenditures. PERMANENT IMPROVEMENT REVOLVING/GENERAL OBLIGATION BONDS (PI) Improvements with a life of several years may be financed from the proceeds of a General Obligation Bond Issue. Law limits the total debt that can be incurred under this method of financing. With some exception, General Obligation Bonds are generally subject to a referendum process. Examples of projects, which may not require a referendum, are those financed through the use of special assessments where at least 20 percent of the project cost is assessed to the benefiting property owners. The remaining portion not assessed can be financed through general obligation bonds repaid by a tax levy. PRIVATE SECTOR FUNDING (PF) This funding source consists primarily of payments made by developers for the purchase of land, the installation of water, sewer, or streets or other related expenditures. It can also refer to donations made to the City by individuals or groups. OTHER GOVERNMENTAL UNITS (GU) These are funds received from Hennepin County, adjacent communities, etc. for projects that also benefit a jurisdiction other than the City of Hopkins. REVENUE BONDS (RB) These are bonds issued for improvements made for specific revenue producing facility or operation. The debt incurred is repaid from the revenue generated by the facility. If the revenue generated is insufficient, then the difference becomes an annual obligation of the taxpayers and becomes an additional tax levy. These are generally not subject to referendum. REAL ESTATE SALES FUND (RE) This funding source consists primarily of funds built up from the sale of City owned property. To date, the fund has been used for building improvements. Because the sale of both general City property and park/recreation property are accumulated into this fund, earmarking a portion for recreational purposes may be justified. 17 SPECIAL ASSESSMENT (SA) A number of projects may be realistically financed using Special Assessment to pay the ultimate cost. Almost any project can potentially be financed using the assessment process. In each case it is necessary to make a determination that the assessed property will benefit by the amount of the assessment. The cost of street reconstruction is shared by the property owner and the City. Special assessments to individual properties are capped per city policy. Concurrent improvement costs to the utility systems are assumed by the respective utility funds. TAX INCREMENT FINANCING (TF) This funding source results from the tax value of new development that is "incrementally" greater than the existing tax value. Typically, bonds are sold based on the assumption that the higher tax receipts will retire the bonds. However, the use of TIF funds through a "pay as you go" method has become more common. This type of funding can be used for public improvements within a redevelopment district to support the goals of redevelopment, specifically the elimination of blighted conditions. Approval of the Hopkins HRA should be anticipated prior to the commitment of these funds. State law strictly regulates the use of these funds. WATER FUNDS (WF) Water funds consist of revenue generated from the sale of water. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. SANITARY SEWER FUNDS (SF) Sanitary sewer funds consist of revenue generated from charges made for sewage disposal. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. STORM SEWER UTILITY REVENUES (SU) Storm sewer funds consist of revenue generated by charging storm water drainage fee to parcels of land for the availability and use of municipal storm sewer facilities. Expenditures from this funding source are related to drainage facilities. PAVILION FUND (PA) Pavilion Funds consist of revenues generated from rental fees collected from users of the Pavilion. These funds are utilized to pay for operating, and capital expenditures. 18 Funding Sources Communication (formerly Cable TV) Fund CT Current Revenues – General Fund CR General Fund Reserves GR Economic Development Fund ED Grant-In-Aid GA Housing and Redevelopment Authority HRA Municipal State-Aid Streets MS Other Government Units GU Park Dedication Fund PDF Pavilion Fund PA Permanent Improvement Revolving/General Obligation Bonds PI Private Sector Funds PF Real Estate Sales Fund RE Revenue Bonds RB Sanitary Sewer Fund SF Special Assessment SA Storm Sewer Fund SU Tax Increment Financing TF Water Fund WF 19 20 Summary of Impacts on Major Funding Sources 21 SUMMARY OF PROJECT IMPACTS ON MAJOR FUNDING SOURCES CURRENT REVENUES/GENERAL FUND RESERVES Expenditures for 2021 are budgeted at an increase of 1.48% over the 2020 budget. The 2021 budget has no levy limits and the City will receive approximately $855,000 in LGA. The tax levy is the major source of revenues (82%) for the General Fund and therefore presents a challenge when levy limits are in place. Fund balance in the General Fund totals $6,083,989 at the end of 2019 and is projected to remain at that level for 2020 or increase slightly. The State Auditor’s Office recommends no less than five month of operating expenditures in reserves. For 2020 five months of expenditures would total $6,562,949 or 41.7%. At January 1, 2020 the unassigned fund balance was at 35.7% of budgeted expenditures. PERMANENT IMPROVEMENT REVOLVING FUND, (P.I.R.) - G.O. DEBT Funding from bonds is used to reimburse the P.I.R. fund for public improvement projects, which have been previously expended. The debt is funded by special assessment collections and city tax levies over a ten to fifteen year period. Bonds totaling $2,560,000, were sold in 2020 to fund portions of 2020/2021 street improvement projects. The next bond sale is scheduled for 2021 and will be for the second half of the 2020/2021 street improvement project. These bonds are expected to total approximately $5,250,000. The P.I.R. fund has completed substantial projects over the last five years and this pace is expected to continue with scheduled projects for 2021 totaling $5,542,000 and future projects in the years 2022-2025 approximately $17 million. Projects scheduled for 2021 include the Interlachen Park street reconstruction project, pedestrian and bicycle access improvements, along with street overlay and street sign management programs. The funding is provided for these projects by special assessments and PIR/Bonding. In the years 2021-2025 as mentioned above, the city has an aggressive residential street improvement schedule planned, all of which will require bonding. MUNICIPAL STATE AID FUND Funding for municipal state aid road projects comes from state MSA funding and is drawn down as projects are done. State funding is not sufficient for current planned projects as the City has been aggressive in doing MSA projects. In the queue for reimbursement is a request for is the Shady Oak project. In late 2014 we received an advance on the Shady Oak project which essentially cleared up our receivable backlog for Excelsior Blvd and Minnetonka Mills Road. This leaves Shady Oak Road as the only project in the funding queue. Currently two MSA projects are scheduled. They are street improvements on County Road 3 from Shady Oak Road to Meadowbrook Road in 2023 and 17th Avenue in 2024. 22 CAPITAL IMPROVEMENT FUND The Capital Improvement Fund received only tax levy support from 2005 through 2018. Gas and electric franchise fees were increased beginning in 2019, to support the capital improvement fund. The franchise fees are expected to generate $361,500 annually for the fund. The fund will not receive tax levy support in 2021. There are no projects scheduled in 2021. PARK IMPROVEMENT FUND The source of funding for this fund is development fees charged to developers for park development, in addition to franchise fees from gas and electric services. The franchise fees are expected to supply approximately $305,000 to the fund for much needed park projects. Developer payments are uncertain as they are dependent on future development and redevelopment in the city. Only minimal projects are scheduled for 2021, $33,300 for improvements at Shady Oak beach. WATER FUND Increasing consumption charges and bond proceeds in 2021 provide the funding needed for projects scheduled for 2021. Bonds will need to be sold each year thereafter in which there are water projects associated with the residential street improvement program. Projects planned for 2021 total $2,071,000 and include water main improvements done in conjunction with the 2nd half of the Interlachen Park Street Improvement project. SANITARY SEWER FUND Increasing consumption charges and bond proceeds in 2021 provide the funding needed for projects scheduled for 2021. Bonds will need to be sold each year thereafter in which there are sanitary sewer projects associated with the residential street improvement program. Projects planned for 2021 total $1,757,000 and include water main improvements done in conjunction with the 2nd half of the Interlachen Park Street Improvement project and sewer lining. STORM SEWER FUND Bonds will be sold in 2021 for the 2021 storm water management project. These bonds issues along with current revenues should provide the needed funding for scheduled projects. Bonds will need to be sold each year thereafter in which there are storm sewer projects associated with the residential street improvement program. Projects planned for 2021 total $964,000 in storm sewer improvements done in conjunction with the 2nd half of the Interlachen Park Street Improvement project. The most recent rate increase pursuant to the 2007 Utility Master Plan was done in 2009. This rate increase is expected to support the storm sewer system well into the future and currently no additional rates increases are proposed. 23 PAVILION FUND This facility completed a significant upgrade project in 2018, with a total project cost of approximately $5,700,000. The new expanded facility has a new refrigeration system and was expanded to better meet the needs of the community. The project received contributions from the Park Improvement Fund along with outside organizations. A bond was issued for the remaining costs of approximately $3,200,000. The fund will continue to receive tax levy support in 2021 to pay ongoing debt service costs. A Financial Management Plan was developed in 2014 to address the growing capital needs of the Pavilion along with other funds. A levy was put in place for 2015 and 2016 to address the growing capital needs and will be continued in 2021 based on the additional debt service requirements related to the 2018 project. 24 Cash Flow Statements 25 City of HopkinsPark Capital Improvements Fund (301)ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET2019 2020 2021 2022 2023 2024 2025Working Capital Begin Year78,084 (58,679) 57,030 62,322 22,767 67,717 243,116 RevenuesFranchise Fees299,379 300,200 305,022 305,022 305,022 305,022 305,022 Dedication Fees3,000 - - - - - - Interest earnings- 781 570 623 228 677 2,431 Hennepin County Grants- - - - - - - Donations- - - - - - - Transfer In- - - - - - - Bond Proceeds- - - - - - - Total Revenues302,379 300,981 305,592 305,645 305,250 305,699 307,453 ExpendituresCurrent30,563 2,900 7,000 7,000 7,000 7,000 7,000 Capital Projects298,579 72,372 33,300 228,200 133,300 3,300 3,300 Transfer Out- - - - - - - Bond Payment Contribution (2015)10,000 10,000 10,000 10,000 10,000 10,000 10,000 Bond Payment Contribution (2016)100,000 100,000 100,000 100,000 110,000 110,000 110,000 Bond Payment Contribution (2017)- - 150,000 - - - - Total Expenditures439,142 185,272 300,300 345,200 260,300 130,300 130,300 Working Capital Ending Balance(58,679) 57,030 62,322 22,767 67,717 243,116 420,269 (Unrestricted Net Position)26 City of HopkinsCapital Improvements Fund (305)ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET2019 2020 2021 2022 2023 2024 2025Working Capital Begin Year(404,874) 319,784 199,438 202,932 213,461 (17,904) 1,417 Revenues from chargesTax Levy99,473 75,000 - 200,000 100,000 100,000 100,000 Interest earnings- 3,198 1,994 2,029 2,135 (179) 14 Other revenues- -- - - - - Bond Proceeds- -- - - - - Franchise Fees354,579 361,456 361,500 361,500 361,500 361,500 361,500 Interfund Loan or Bond Proceeds- - - - - - - City Hall Bond Proceeds4,800,000 - - - - - - Total Revenues5,254,052 439,654 363,494 563,529 463,635 461,321 461,514 ExpendituresCurrent23,022 - - - - - - Capital Projects4,506,372 200,000 - 193,000 335,000 82,000 340,000 City Hall Debt Service360,000 360,000 360,000 360,000 360,000 360,000 Total Expenditures4,529,394 560,000 360,000 553,000 695,000 442,000 700,000 Working Capital Ending Balance319,784 199,438 202,932 213,461 (17,904) 1,417 (237,069) (Unrestricted Net Position)27 City of HopkinsPermanent Improving Revolving Fund (501)ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET2019 2020 2021 2022 2023 2024 2025Working Capital Begin Year(925,676) (1,097,452) 37,704 66,081 71,742 92,459 88,584 RevenuesTax Levy1,911 697 - - - - - Special Assessments (Prepaid)498,036 1,030,597 320,000 100,000 210,000 109,200 201,200 Grants6,800 - - - - - - Reimbursements1,584,078 - - - - - - Investments264,044 53,142 377 661 717 925 886 Bond Proceeds5,089,596 2,675,364 5,250,000 2,950,000 3,500,000 3,900,000 4,900,000 - - - - - - Total Revenues7,444,465 3,759,800 5,570,377 3,050,661 3,710,717 4,010,125 5,102,086 ExpendituresCurrent- - - - - - Residential Street Improvements3,441,838 2,403,046 4,672,000 1,150,000 3,220,000 3,519,000 3,891,000 8th Avenue Construction39,250 - - - - - Pedestrian & Bicycle Access Improvements- - 125,000 25,000 25,000 25,000 100,000 Blake Road Corridor Improvements3,762,173 32,461 - - - - Street Overlay Improvements292,186 108,343 725,000 400,000 425,000 450,000 475,000 Street Sign Management- - 20,000 20,000 20,000 20,000 20,000 Trunk Water Main Rehabilitation- - - 1,450,000 - - Minnetonka Mills Signal Replacement- - - - - - 590,000 Transfer Out80,794 80,794 - - - - Total Expenditures 7,616,241 2,624,644 5,542,000 3,045,000 3,690,000 4,014,000 5,076,000 Working Capital Ending Balance (1,097,452) 37,704 66,081 71,742 92,459 88,584 114,670 (Unrestricted Net Position)28 City of HopkinsMunicipal State Aid Fund (302)ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET2019 2020 2021 2022 2023 2024 2025Working Capital Begin Year98,489 504,933 66,873 624,433 1,187,568 1,756,335 1,830,789 RevenuesState MSA Funds, projects556,891 556,891 556,891 556,891 556,891 556,891 556,891 Community Works Grant - CountyInterest Earnings2,092 5,049 669 6,244 11,876 17,563 18,308 Total Revenues558,983 561,940 557,560 563,135 568,767 574,454 ExpendituresCIP State Aid Projects152,539 1,000,000 - - 500,000 700,000 Total Expenditures152,539 1,000,000 - - - 500,000 700,000 Working Capital Ending Balance504,933 66,873 624,433 1,187,568 1,756,335 1,830,789 1,130,789 (Unrestricted Net Position)29 Water Fund - Working Capital ProjectionACTUAL ACTUAL ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET2017 2018 2019 2020 2021 2022 2023 2024Working Capital Begin Year(1,109,720) (874,824) (865,324) (1,055,580) (925,946) (816,917) (720,526) (712,691) RevenuesOperating Revenues1,690,426 1,829,354 1,865,540 2,081,819 2,185,910 2,295,205 2,409,966 2,530,464 Other147,158 125,628 132,231 152,263 155,308 158,414 161,583 164,814 Bond Proceeds - Capital2,092,903 1,040,548 1,699,024 - 2,100,000 2,500,000 1,450,000 475,000 Bond Proceeds - Refunding1,307 444,500 - - - - - Total Revenues3,931,794 2,995,530 4,141,295 2,234,082 4,441,218 4,953,620 4,021,548 3,170,278 ExpendituresOperating Expenditures1,449,904 1,336,994 1,826,962 1,402,480 1,444,554 1,487,891 1,532,528 1,578,504 Interest/Fiscal Agent Expense62,709 71,065 48,502 62,498 146,435 139,738 129,135 118,838 Capital Outlay1,866,978 1,124,672 1,486,971 - 2,071,000 2,468,000 1,430,000 445,000 Bond Payments145,000 210,000 603,300 174,250 195,200 286,600 422,050 434,100 Transfer Out - Bond Payments172,910 232,476 351,552 465,220 475,000 475,000 500,000 525,000 Total Expenses3,697,501 2,975,207 4,317,287 2,104,448 4,332,189 4,857,229 4,013,713 3,101,442 Inventory Change4,977 (4,230) 631 Bond Premium/Discount Expense(4,374) (6,593) (14,895) Working Capital Ending Balance(874,824) (865,324) (1,055,580) (925,946) (816,917) (720,526) (712,691) (643,854) (Unrestricted Net Position)30 Sewer Fund - Working Capital ProjectionACTUAL ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET2018 2019 2020 2021 2022 2023 2024 2025Working Capital Begin Year278,565 406,288 783,242 1,027,418 1,262,124 1,402,110 1,395,530 1,271,666 RevenuesOperating Revenues2,764,350 2,860,436 2,926,712 3,014,513 3,104,949 3,198,097 3,294,040 3,392,861 Other15,940 20,248 - - - - - - Interest- - - 10,274 12,621 14,021 13,955 12,717 Intergovernmental Grants520 213,219 - - - - - - Bond Proceeds - Capital884,032 1,103,450 - 1,800,000 975,000 1,450,000 750,000 1,550,000 Bond Proceeds - Refunding190,500 Total Revenues3,664,842 4,387,853 2,926,712 4,824,788 4,092,570 4,662,118 4,057,995 4,955,578 ExpendituresOperating Expenditures2,082,156 2,211,297 2,134,802 2,198,846 2,264,811 2,332,756 2,402,738 2,474,821 Interest/Fiscal Agent Expense74,880 60,287 64,100 126,835 118,073 110,203 102,501 88,179 Capital Outlay1,103,554 794,153 - 1,757,000 965,500 1,418,000 728,000 1,527,000 Bond Payments105,000 626,900 98,500 117,400 154,200 267,740 278,620 285,600 Transfer Out - Bond Payments163,831 310,800 385,134 390,000 450,000 540,000 670,000 670,000 Total Expenses3,529,421 4,003,437 2,682,536 4,590,081 3,952,584 4,668,699 4,181,859 5,045,600 Inventory Change550 - Bond Premium/Discount Expense(8,248) (7,462) Working Capital Ending Balance406,288 783,242 1,027,418 1,262,124 1,402,110 1,395,530 1,271,666 1,181,644 (Unrestricted Net Position)31 Storm Sewer Fund - Working Capital ProjectionACTUAL ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET2018 2019 2020 2021 2022 2023 2024 2025Working Capital Begin Year1,393,731 1,508,578 1,565,796 1,781,735 1,897,435 1,898,734 1,780,216 1,652,844 RevenuesOperating Revenues800,869 779,332 800,605 800,605 800,605 800,605 800,605 800,605 Other5,736 7,027 - - - - - - Interest4,356 9,612 4,179 17,817 18,974 18,987 17,802 16,528 Intergovernmental Grants129 131 - - - - - - Bond Proceeds334,397 518,496 - 975,000 450,000 550,000 1,100,000 650,000 Total Revenues1,145,487 1,314,598 804,784 1,793,422 1,269,579 1,369,592 1,918,407 1,467,133 ExpendituresOperating Expenditures134,314 271,612 244,237 251,564 259,111 266,884 274,891 283,138 Interest/Fiscal Agent Expense48,396 19,909 21,082 84,758 76,970 70,016 64,608 53,969 Capital Outlay - Construction456,122 656,340 - 964,000 428,000 506,000 1,094,000 610,000 Bond Payments115,000 122,100 127,250 127,400 164,200 270,210 192,280 199,200 Transfer Out - Bond Payments275,504 174,942 196,276 250,000 340,000 375,000 420,000 450,000 Total Expenses1,029,336 1,244,903 588,845 1,677,722 1,268,281 1,488,110 2,045,779 1,596,307 Inventory Change- - Bond Premium/Discount Expense(1,304) (12,477) Working Capital Ending Balance1,508,578 1,565,796 1,781,735 1,897,435 1,898,734 1,780,216 1,652,844 1,523,671 (Unrestricted Net Position)32 Pavilion Fund - Working Capital Projection (747)PROJECTED ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET2018 2019 2020 2021 2022 2023 2024 2025Working Capital Begin Year19,240 (91,305) (269,677) (376,356) (299,434) (230,459) 5,370 231,845 RevenuesProperty Taxes81 40,054 288,525 340,383 340,383 490,383 490,383 490,383 Operating Revenues392,966 479,410 333,568 479,410 488,998 498,778 508,754 518,929 Other2,767 5,786 59,703 60,897 62,115 63,357 64,624 65,917 Interest192 13 - - - - - - Transfer In5,858,280 - - Bond Proceeds3,285,000 - - - - - - - Total Revenues9,539,286 525,263 681,796 880,690 891,496 1,052,518 1,063,761 1,075,229 ExpendituresOperating Expenditures461,542 497,845 475,795 490,069 504,771 519,914 535,511 551,577 Interest/Fiscal Agent Expense127,615 99,807 97,480 91,700 85,750 79,775 79,775 79,775 Capital Outlay - Construction5,858,281 85,983 - - - - - - Bond Payments- 20,000 195,000 200,000 210,000 195,000 200,000 205,000 Transfer Out - Bond Payments20,000 - 20,200 22,000 22,000 22,000 22,000 22,000 Transfer Out - Capital Contributions3,182,393 - Total Expenses9,649,831 703,635 788,475 803,769 822,521 816,689 837,286 858,352 Bond Premium/Discount ExpenseWorking Capital Ending Balance(91,305) (269,677) (376,356) (299,434) (230,459) 5,370 231,845 448,722 (Unrestricted Net Position)33 34 Five Year Project Summaries 35 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY YEAR 2021 2025thru Project Name Department Project # Priority Project Cost 2021 19-CIP-AR001Arts Center - Carpeting 2 22,000Comm Svcs - Arts Center 19-CIP-AR003Arts Center - Tile Flooring n/a 15,000Comm Svcs - Arts Center 19-CIP-AR005Arts Center - Key Card Exterior & Interior Access 2 20,000Comm Svcs - Arts Center 13-CIP-P066Shady Oak Beach - Picnic Shelter 3 30,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 9,390,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 725,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S001Central Business District Lighting Upgrades n/a 100,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 110,000Public Works: Streets/Traffic 20-CIP-S006Trail Segment - Bellgrove n/a 100,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 24,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 50,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 10,000Recreation 10,641,000Total for 2021 2022 08-CIP-AC018Activity Center - Replace Gymnasium Roof n/a 105,000Comm Svcs - Activity Center 19-CIP-AC045Activity Center - Facility Improvements n/a 10,000Comm Svcs - Activity Center 19-CIP-AC048Activity Center - Gym Acoustical Panels n/a 15,000Comm Svcs - Activity Center 19-CIP-AR005Arts Center - Key Card Exterior & Interior Access 2 20,000Comm Svcs - Arts Center 19-CIP-AR006Arts Center - Fire Panel 2 30,000Comm Svcs - Arts Center 08-CIP-FD123Fire Station - Replace Boilers n/a 45,000Fire 08-CIP-B023Public Works - Replace Overhead Doors n/a 90,000Public Works: Bldg/Equip Serv 13-CIP-P066Shady Oak Beach - Picnic Shelter 3 180,000Public Works: Parks 17-CIP-P004Downtown Park Rehab 3 35,000Public Works: Parks 20-CIP-P071Central Park Picnic Shelters Rehab n/a 50,000Public Works: Parks 20-CIP-P072Central Park East Play Equipment Replacement n/a 75,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 2,375,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 400,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S001Central Business District Lighting Upgrades n/a 40,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 190,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 25,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 52,500Public Works: Utilities 19-CIP-U017Trunk Water Main Rehabilitation 2 3,955,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 25,000Recreation 7,762,500Total for 2022 2023 08-CIP-AC024Activity Center - Raspberry Room Roof Replacement n/a 80,000Comm Svcs - Activity Center 09-CIP-AC031Activity Center - Lower Roof Replacement n/a 80,000Comm Svcs - Activity Center Thursday, November 12, 2020 36 Project Name Department Project # Priority Project Cost 19-CIP-AC045Activity Center - Facility Improvements n/a 175,000Comm Svcs - Activity Center 19-CIP-AR007Arts Center - Roof Replacement 2 150,000Comm Svcs - Arts Center 20-CIP-PV333Pavilion - Mezzanine Flooring Replacement 3 90,000Pavilion 13-CIP-P044Oakes Park - Tennis Courts n/a 130,000Public Works: Parks 16-CIP-P002Minnehaha Creek Overlook - Blake Rd/Lake St Pedest n/a 400,000Public Works: Parks 17-CIP-P004Downtown Park Rehab 3 200,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 6,493,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 425,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 200,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 26,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 55,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 10,000Recreation 8,559,000Total for 2023 2024 08-CIP-B121Fire Station: Replace 25 Ton AHU n/a 82,000Fire 20-CIP-PV334Pavilion - Arena Exit Door Replacement 3 105,000Pavilion 01-CIP-S101Residential Street Improvements and Utilities n/a 6,500,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 450,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 90,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 27,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 60,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 10,000Recreation 7,369,000Total for 2024 2025 08-CIP-CH011City Hall- Site Landscaping Improvement n/a 100,000City Hall Administration 08-CIP-PD215City Hall Police Station Rooftop n/a 240,000Police 01-CIP-S101Residential Street Improvements and Utilities n/a 7,542,000Public Works: Streets/Traffic 01-CIP-S104County Road 3 n/a 2,300,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 100,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 475,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 225,000Public Works: Streets/Traffic 20-CIP-S005Minnetonka Mills/5th St N Signal Replacement 5 600,000Public Works: Streets/Traffic 16-CIP-R003Shady Oak Beach Improvements 3 10,000Recreation 11,612,000Total for 2025 GRAND TOTAL 45,943,500 Thursday, November 12, 2020 37 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP DEPARTMENT SUMMARY 2021 2025thru Total2021 2022 2023 2024 2025Department City Hall Administration 100,000100,000 Comm Svcs - Activity Center 465,000130,000 335,000 Comm Svcs - Arts Center 257,00057,000 50,000 150,000 Fire 127,00045,000 82,000 Pavilion 195,00090,000 105,000 Police 240,000240,000 Public Works: Bldg/Equip Serv 90,00090,000 Public Works: Parks 1,100,00030,000 340,000 730,000 Public Works: Streets/Traffic 39,030,00010,470,000 3,050,000 7,163,000 7,085,000 11,262,000 Public Works: Utilities 4,274,50074,000 4,032,500 81,000 87,000 Recreation 65,00010,000 25,000 10,000 10,000 10,000 10,641,000 7,762,500 8,559,000 7,369,000 11,612,000 45,943,500TOTAL Thursday, November 12, 202038 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY DEPARTMENT 2021 2025thru Total2021 2022 2023 2024 2025Department Project # Priority City Hall Administration 08-CIP-CH011 100,000100,000City Hall- Site Landscaping Improvement n/a 100,000100,000City Hall Administration Total Comm Svcs - Activity Center 08-CIP-AC018 105,000105,000Activity Center - Replace Gymnasium Roof n/a 08-CIP-AC024 80,00080,000Activity Center - Raspberry Room Roof Replacement n/a 09-CIP-AC031 80,00080,000Activity Center - Lower Roof Replacement n/a 19-CIP-AC045 185,00010,000 175,000Activity Center - Facility Improvements n/a 19-CIP-AC048 15,00015,000Activity Center - Gym Acoustical Panels n/a 465,000130,000 335,000Comm Svcs - Activity Center Total Comm Svcs - Arts Center 19-CIP-AR001 22,00022,000Arts Center - Carpeting 2 19-CIP-AR003 15,00015,000Arts Center - Tile Flooring n/a 19-CIP-AR005 40,00020,000 20,000Arts Center - Key Card Exterior & Interior Access 2 19-CIP-AR006 30,00030,000Arts Center - Fire Panel 2 19-CIP-AR007 150,000150,000Arts Center - Roof Replacement 2 257,00057,000 50,000 150,000Comm Svcs - Arts Center Total Fire 08-CIP-B121 82,00082,000Fire Station: Replace 25 Ton AHU n/a 08-CIP-FD123 45,00045,000Fire Station - Replace Boilers n/a 127,00045,000 82,000Fire Total Pavilion 20-CIP-PV333 90,00090,000Pavilion - Mezzanine Flooring Replacement 3 20-CIP-PV334 105,000105,000Pavilion - Arena Exit Door Replacement 3 195,00090,000 105,000Pavilion Total Police 08-CIP-PD215 240,000240,000City Hall Police Station Rooftop n/a 240,000240,000Police Total Public Works: Bldg/Equip Serv 08-CIP-B023 90,00090,000Public Works - Replace Overhead Doors n/a 90,00090,000Public Works: Bldg/Equip Serv Total Public Works: Parks 13-CIP-P044 130,000130,000Oakes Park - Tennis Courts n/a Thursday, November 12, 202039 Total2021 2022 2023 2024 2025Department Project # Priority 13-CIP-P066 210,00030,000 180,000Shady Oak Beach - Picnic Shelter 3 16-CIP-P002 400,000400,000Minnehaha Creek Overlook - Blake Rd/Lake St Pedest n/a 17-CIP-P004 235,00035,000 200,000Downtown Park Rehab 3 20-CIP-P071 50,00050,000Central Park Picnic Shelters Rehab n/a 20-CIP-P072 75,00075,000Central Park East Play Equipment Replacement n/a 1,100,00030,000 340,000 730,000Public Works: Parks Total Public Works: Streets/Traffic 01-CIP-S101 32,300,0009,390,000 2,375,000 6,493,000 6,500,000 7,542,000Residential Street Improvements and Utilities n/a 01-CIP-S104 2,300,0002,300,000County Road 3 n/a 13-CIP-S040 200,00025,000 25,000 25,000 25,000 100,000Pedestrian & Bicycle Access Improvements n/a 16-CIP-S041 2,475,000725,000 400,000 425,000 450,000 475,000Street Rehabilitation Improvements n/a 16-CIP-S042 100,00020,000 20,000 20,000 20,000 20,000Street Sign Management n/a 20-CIP-S001 140,000100,000 40,000Central Business District Lighting Upgrades n/a 20-CIP-S002 815,000110,000 190,000 200,000 90,000 225,000City Street Lighting Upgrades n/a 20-CIP-S005 600,000600,000Minnetonka Mills/5th St N Signal Replacement 5 20-CIP-S006 100,000100,000Trail Segment - Bellgrove n/a 39,030,00010,470,000 3,050,000 7,163,000 7,085,000 11,262,000Public Works: Streets/Traffic Total Public Works: Utilities 01-CIP-U002 102,00024,000 25,000 26,000 27,000Storm Drainage System Maintenance - Alley Repairs n/a 18-CIP-U016 217,50050,000 52,500 55,000 60,000Sewer Lining 2 19-CIP-U017 3,955,0003,955,000Trunk Water Main Rehabilitation 2 4,274,50074,000 4,032,500 81,000 87,000Public Works: Utilities Total Recreation 16-CIP-R003 65,00010,000 25,000 10,000 10,000 10,000Shady Oak Beach Improvements 3 65,00010,000 25,000 10,000 10,000 10,000Recreation Total GRAND TOTAL 45,943,50010,641,000 7,762,500 8,559,000 7,369,000 11,612,000 Thursday, November 12, 202040 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP FUNDING SOURCE SUMMARY 2021 thru 2025 TotalSource2021 2022 2023 2024 2025 AC - Arts Center Fund 257,00057,000 50,000 150,000 CI - Capital Improvement Fund 950,000193,000 335,000 82,000 340,000 GU - Other Governmental Units 2,063,6006,700 136,800 6,700 306,700 1,606,700 MS - Municipal State Aid Streets 1,200,000500,000 700,000 PA - Pavilion Fund 195,00090,000 105,000 PDF- Park Dedication Fund 601,40033,300 228,200 333,300 3,300 3,300 PI - PIR/General Obligation Bonds 18,021,0004,152,000 2,775,000 3,240,000 3,559,000 4,295,000 RF - Refuse Fund 18,00018,000 SA - Special Assessment 4,702,0001,600,000 500,000 1,050,000 546,000 1,006,000 SF - Sanitary Sewer Fund 6,395,5001,757,000 965,500 1,418,000 728,000 1,527,000 SU - Storm Sewer Fund 3,602,000964,000 428,000 506,000 1,094,000 610,000 WF - Water Fund 7,938,0002,071,000 2,468,000 1,430,000 445,000 1,524,000 10,641,000 7,762,500 8,559,000 7,369,000 11,612,000 45,943,500GRAND TOTAL Thursday, November 12, 2020 41 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY FUNDING SOURCE 2021 2025thru TotalSource Project # Priority 2021 2022 2023 2024 2025 AC - Arts Center Fund 19-CIP-AR001 22,00022,000Arts Center - Carpeting 2 19-CIP-AR003 15,00015,000Arts Center - Tile Flooring n/a 19-CIP-AR005 40,00020,000 20,000Arts Center - Key Card Exterior & Interior Access 2 19-CIP-AR006 30,00030,000Arts Center - Fire Panel 2 19-CIP-AR007 150,000150,000Arts Center - Roof Replacement 2 257,00057,000 50,000 150,000AC - Arts Center Fund Total CI - Capital Improvement Fund 08-CIP-AC018 105,000105,000Activity Center - Replace Gymnasium Roof n/a 08-CIP-AC024 80,00080,000Activity Center - Raspberry Room Roof Replacement n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 08-CIP-B121 82,00082,000Fire Station: Replace 25 Ton AHU n/a 08-CIP-CH011 100,000100,000City Hall- Site Landscaping Improvement n/a 08-CIP-FD123 45,00045,000Fire Station - Replace Boilers n/a 08-CIP-PD215 240,000240,000City Hall Police Station Rooftop n/a 09-CIP-AC031 80,00080,000Activity Center - Lower Roof Replacement n/a 19-CIP-AC045 185,00010,000 175,000Activity Center - Facility Improvements n/a 19-CIP-AC048 15,00015,000Activity Center - Gym Acoustical Panels n/a 950,000193,000 335,000 82,000 340,000CI - Capital Improvement Fund Total GU - Other Governmental Units 01-CIP-S101 300,000300,000Residential Street Improvements and Utilities n/a 01-CIP-S104 1,600,0001,600,000County Road 3 n/a 13-CIP-P066 120,000120,000Shady Oak Beach - Picnic Shelter 3 16-CIP-R003 43,6006,700 16,800 6,700 6,700 6,700Shady Oak Beach Improvements 3 2,063,6006,700 136,800 6,700 306,700 1,606,700GU - Other Governmental Units Total MS - Municipal State Aid Streets 01-CIP-S101 500,000500,000Residential Street Improvements and Utilities n/a 01-CIP-S104 700,000700,000County Road 3 n/a 1,200,000500,000 700,000MS - Municipal State Aid Streets Total PA - Pavilion Fund 20-CIP-PV333 90,00090,000Pavilion - Mezzanine Flooring Replacement 3 20-CIP-PV334 105,000105,000Pavilion - Arena Exit Door Replacement 3 195,00090,000 105,000PA - Pavilion Fund Total Thursday, November 12, 2020 42 TotalSource Project # Priority 2021 2022 2023 2024 2025 PDF- Park Dedication Fund 13-CIP-P044 130,000130,000Oakes Park - Tennis Courts n/a 13-CIP-P066 90,00030,000 60,000Shady Oak Beach - Picnic Shelter 3 16-CIP-P002 200,000200,000Minnehaha Creek Overlook - Blake Rd/Lake St Pedest n/a 16-CIP-R003 21,4003,300 8,200 3,300 3,300 3,300Shady Oak Beach Improvements 3 17-CIP-P004 35,00035,000Downtown Park Rehab 3 20-CIP-P071 50,00050,000Central Park Picnic Shelters Rehab n/a 20-CIP-P072 75,00075,000Central Park East Play Equipment Replacement n/a 601,40033,300 228,200 333,300 3,300 3,300PDF- Park Dedication Fund Total PI - PIR/General Obligation Bonds 01-CIP-S101 11,751,0003,072,000 650,000 2,170,000 2,974,000 2,885,000Residential Street Improvements and Utilities n/a 13-CIP-S040 200,00025,000 25,000 25,000 25,000 100,000Pedestrian & Bicycle Access Improvements n/a 16-CIP-P002 200,000200,000Minnehaha Creek Overlook - Blake Rd/Lake St Pedest n/a 16-CIP-S041 2,475,000725,000 400,000 425,000 450,000 475,000Street Rehabilitation Improvements n/a 16-CIP-S042 100,00020,000 20,000 20,000 20,000 20,000Street Sign Management n/a 17-CIP-P004 200,000200,000Downtown Park Rehab 3 19-CIP-U017 1,450,0001,450,000Trunk Water Main Rehabilitation 2 20-CIP-S001 140,000100,000 40,000Central Business District Lighting Upgrades n/a 20-CIP-S002 815,000110,000 190,000 200,000 90,000 225,000City Street Lighting Upgrades n/a 20-CIP-S005 590,000590,000Minnetonka Mills/5th St N Signal Replacement 5 20-CIP-S006 100,000100,000Trail Segment - Bellgrove n/a 18,021,0004,152,000 2,775,000 3,240,000 3,559,000 4,295,000PI - PIR/General Obligation Bonds Total RF - Refuse Fund 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 18,00018,000RF - Refuse Fund Total SA - Special Assessment 01-CIP-S101 4,702,0001,600,000 500,000 1,050,000 546,000 1,006,000Residential Street Improvements and Utilities n/a 4,702,0001,600,000 500,000 1,050,000 546,000 1,006,000SA - Special Assessment Total SF - Sanitary Sewer Fund 01-CIP-S101 5,765,0001,707,000 500,000 1,363,000 668,000 1,527,000Residential Street Improvements and Utilities n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 18-CIP-U016 217,50050,000 52,500 55,000 60,000Sewer Lining 2 19-CIP-U017 395,000395,000Trunk Water Main Rehabilitation 2 6,395,5001,757,000 965,500 1,418,000 728,000 1,527,000SF - Sanitary Sewer Fund Total SU - Storm Sewer Fund 01-CIP-S101 3,312,000940,000 225,000 480,000 1,067,000 600,000Residential Street Improvements and Utilities n/a 01-CIP-U002 102,00024,000 25,000 26,000 27,000Storm Drainage System Maintenance - Alley Repairs n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 19-CIP-U017 160,000160,000Trunk Water Main Rehabilitation 2 20-CIP-S005 10,00010,000Minnetonka Mills/5th St N Signal Replacement 5 Thursday, November 12, 2020 43 TotalSource Project # Priority 2021 2022 2023 2024 2025 3,602,000964,000 428,000 506,000 1,094,000 610,000SU - Storm Sewer Fund Total WF - Water Fund 01-CIP-S101 5,970,0002,071,000 500,000 1,430,000 445,000 1,524,000Residential Street Improvements and Utilities n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 19-CIP-U017 1,950,0001,950,000Trunk Water Main Rehabilitation 2 7,938,0002,071,000 2,468,000 1,430,000 445,000 1,524,000WF - Water Fund Total 45,943,50010,641,000 7,762,500 8,559,000 7,369,000 11,612,000GRAND TOTAL Thursday, November 12, 2020 44 Project Descriptions And Narratives 45 46 General Public Buildings 47 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Asst City Manager 2021 2025 thru Department City Hall Administration Description Site Landscaping Improvement Project #08-CIP-CH011 Priority n/a Justification Budget Impact/Other Useful LifeProject Name City Hall- Site Landscaping Improvement Category Bldgs: Administrative Offices Type Improvement Future Total Project Cost:$100,000 Total2021 2022 2023 2024 2025Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total2021 2022 2023 2024 2025Funding Sources 100,000100,000CI - Capital Improvement Fund 100,000 100,000Total Thursday, November 12, 2020 48 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2021 2025 thru Department Comm Svcs - Activity Center Description Existing roof was installed in 1989 and is at the end of its projected useful life. Portion is cost share with Raspberry Ridge Condo Assn. Project #08-CIP-AC018 Priority n/a Justification Roof was installed in 1989 and is at the end of its 25 year useful life. Budget Impact/Other Move from 2021 to 2022. Useful Life 25 yearsProject Name Activity Center - Replace Gymnasium Roof Category Buildings: Activity Center Type Improvement Future Total Project Cost:$105,000 Total2021 2022 2023 2024 2025Expenditures 105,000105,000Construction/Maintenance 105,000 105,000Total Total2021 2022 2023 2024 2025Funding Sources 105,000105,000CI - Capital Improvement Fund 105,000 105,000Total Thursday, November 12, 2020 49 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2021 2025 thru Department Comm Svcs - Activity Center Description Built up asphalt roofing system covering Raspberry Rooms, Craft Room and Hallways at the Activity Center Project #08-CIP-AC024 Priority n/a Justification Existing roof was replaced in 1992. Following inspection in 2018, move out to 2023. Budget Impact/Other Inspection, repair and upkeep of roofing systems prevent deterioration of interior building structure and damage to interior components of building. Variance from 20 year plan: Moved from 2018 to 2023 and all roof components will be done with one contract for better bids. Useful Life 25 yearsProject Name Activity Center - Raspberry Room Roof Replacement Category Buildings: Activity Center Type Improvement Future Total Project Cost:$80,000 Total2021 2022 2023 2024 2025Expenditures 80,00080,000Construction/Maintenance 80,000 80,000Total Total2021 2022 2023 2024 2025Funding Sources 80,00080,000CI - Capital Improvement Fund 80,000 80,000Total Thursday, November 12, 2020 50 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2021 2025 thru Department Comm Svcs - Activity Center Description Built up Roof on Activity Center Raspberry Rooms and Hallway. Project #09-CIP-AC031 Priority n/a Justification Existing roof was installed in 1992. Budget Impact/Other Variance from 20 year plan: Moved from 2018 to 2023 and all roof components will be done with one contract for better bids. Useful Life 25 yearsProject Name Activity Center - Lower Roof Replacement Category Buildings: Activity Center Type Improvement Future Total Project Cost:$80,000 Total2021 2022 2023 2024 2025Expenditures 80,00080,000Construction/Maintenance 80,000 80,000Total Total2021 2022 2023 2024 2025Funding Sources 80,00080,000CI - Capital Improvement Fund 80,000 80,000Total Thursday, November 12, 2020 51 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Asst City Manager 2021 2025 thru Department Comm Svcs - Activity Center Description Several projects have been proposed in previous CIPs. With the unknowns of the future of the Historical Society, we would like to combine several projects into one larger project and complete a facility needs assessment in 2022. Project dependent on status of Historical Society. Project #19-CIP-AC045 Priority n/a Justification The project would aim to update several areas of the facility that have not been updated since 1990 (some areas were renovated in 2012) and address a few larger concerns: use of former historical society area, eastside room configurations (increases maximum capacity of the gymnasium), office/reception enhancements. We will spend 2021 gathering data on current programming usage, 2022 developing a plan and 2023 would be construction. We would also suggest to correlate AV updates to the facility with the project. Budget Impact/Other Useful Life 30 yearsProject Name Activity Center - Facility Improvements Category Buildings: Activity Center Type Improvement Future Total Project Cost:$185,000 Total2021 2022 2023 2024 2025Expenditures 185,00010,000 175,000Construction 10,000 175,000 185,000Total Total2021 2022 2023 2024 2025Funding Sources 185,00010,000 175,000CI - Capital Improvement Fund 10,000 175,000 185,000Total Thursday, November 12, 2020 52 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Activity Ctr Director 2021 2025 thru Department Comm Svcs - Activity Center Description Install additional acoustical panels in the gymnasium to enhance our guests hearing experiences when attending classes, lectures, health fairs, dinners, and recreational events. Project #19-CIP-AC048 Priority n/a Justification We added 1 row of acoustical panels on the gym walls in 2017. Even though the panels have helped in the sound issues in the gym, more assistance is needed. Another row of acoustical panels will help our older participants when trying to listen to instructors, speakers, individual conversation at health fairs and dinners, enjoying musical and recreational events. Budget Impact/Other Useful Life 30 yearsProject Name Activity Center - Gym Acoustical Panels Category Buildings: Activity Center Type Improvement Future Total Project Cost:$15,000 Total2021 2022 2023 2024 2025Expenditures 15,00015,000Construction 15,000 15,000Total Total2021 2022 2023 2024 2025Funding Sources 15,00015,000CI - Capital Improvement Fund 15,000 15,000Total Thursday, November 12, 2020 53 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Asst City Manager 2021 2025 thru Department Comm Svcs - Arts Center Description 2019: Replace Arts Center's carpeting in spaces (Community room/Conference room/Green Room.) Expected life span: 8-10 years Estimate: $30,000 2020: Various rooms as needed Estimated life span: 8-10 years Estimate: $22,000 2021: Replace office carpet (Stages) Estimated life span: 8-10 years Estimate: $22,000 Project #19-CIP-AR001 Priority 2 Very Important Justification Based on wear, replace in areas needed in order to maintain overall appearance of the Center. Budget Impact/Other Presentability of Center - appealing to customers Useful Life 10 yearsProject Name Arts Center - Carpeting Category Buildings: Arts Center Type Improvement Future Total Project Cost:$74,000 Total2021 2022 2023 2024 2025Expenditures 22,00022,000Construction/Maintenance 22,000 22,000Total Total2021 2022 2023 2024 2025Funding Sources 22,00022,000AC - Arts Center Fund 22,000 22,000Total Thursday, November 12, 2020 54 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2021 2025 thru Department Comm Svcs - Arts Center Description 2020: Re-seal floors - Kitchen & restrooms Estimated life span: 5years Estimate: $15,000 Annual maintenance done yearly at a cost of $2000 Project #19-CIP-AR003 Priority n/a Justification In order to keep tile flooring and grout looking clean and protected. Budget Impact/Other Presentability of Center - appealing to customers Useful Life 5 yearsProject Name Arts Center - Tile Flooring Category Buildings: Arts Center Type Improvement Future Total Project Cost:$15,000 Total2021 2022 2023 2024 2025Expenditures 15,00015,000Construction/Maintenance 15,000 15,000Total Total2021 2022 2023 2024 2025Funding Sources 15,00015,000AC - Arts Center Fund 15,000 15,000Total Thursday, November 12, 2020 55 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Asst City Manager 2021 2025 thru Department Comm Svcs - Arts Center Description Retrofitting Center exterior HCA and Stages staff entrances with keycard access. The estimate for the work to equip HCA back entrance, Stages back entrance, and Green Room street entrance is $18,000 (2019.) Retrofitting interior doors over a series of 2-3 years and software upgrades is estimated at $20,000 each year (2020 - 2022) Project #19-CIP-AR005 Priority 2 Very Important Justification Installing keycard access would allow better control of who is allowed to enter the building as well as the ability to track who is in the building. Stages Theatre Company has many staff members, and many who are contracted, working as needed on a project. The contracted employees are given keys when needed, however, from a building management standpoint, it is difficult to track and make sure that people don't have access to the building that shouldn't. Long-term the goal is to key all interior office and room doors with the same system, primarily to be able to keep key situation under better control and to allow for a safe lock-down procedure if ever needed. Budget Impact/Other Useful LifeProject Name Arts Center - Key Card Exterior & Interior Access Category Buildings: Arts Center Type Improvement Future Total Project Cost:$78,000 Total2021 2022 2023 2024 2025Expenditures 40,00020,000 20,000Construction/Maintenance 20,000 20,000 40,000Total Total2021 2022 2023 2024 2025Funding Sources 40,00020,000 20,000AC - Arts Center Fund 20,000 20,000 40,000Total Thursday, November 12, 2020 56 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2021 2025 thru Department Comm Svcs - Arts Center Description Replacing fire panel. Project #19-CIP-AR006 Priority 2 Very Important Justification Current system is outdated and obselete. Additional cost has occurred when needed to repair due to age. Budget Impact/Other Moved from 2020 to 2022 Useful LifeProject Name Arts Center - Fire Panel Category Buildings: Arts Center Type Improvement Future Total Project Cost:$30,000 Total2021 2022 2023 2024 2025Expenditures 30,00030,000Construction 30,000 30,000Total Total2021 2022 2023 2024 2025Funding Sources 30,00030,000AC - Arts Center Fund 30,000 30,000Total Thursday, November 12, 2020 57 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2021 2025 thru Department Comm Svcs - Arts Center Description Replacement of Roof Project #19-CIP-AR007 Priority 2 Very Important Justification Facility originally built in 1997. Budget Impact/Other Useful LifeProject Name Arts Center - Roof Replacement Category Buildings: Arts Center Type Improvement Future Total Project Cost:$150,000 Total2021 2022 2023 2024 2025Expenditures 150,000150,000Construction 150,000 150,000Total Total2021 2022 2023 2024 2025Funding Sources 150,000150,000AC - Arts Center Fund 150,000 150,000Total Thursday, November 12, 2020 58 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2021 2025 thru Department Fire Description Replace 35 ton Air Handling Unit Project #08-CIP-B121 Priority n/a Justification Budget Impact/Other Useful LifeProject Name Fire Station: Replace 25 Ton AHU Category Buildings: Fire Facilities Type Improvement Future Total Project Cost:$82,000 Total2021 2022 2023 2024 2025Expenditures 82,00082,000Construction/Maintenance 82,000 82,000Total Total2021 2022 2023 2024 2025Funding Sources 82,00082,000CI - Capital Improvement Fund 82,000 82,000Total Thursday, November 12, 2020 59 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2021 2025 thru Department Fire Description Replace boilers Project #08-CIP-FD123 Priority n/a Justification Budget Impact/Other Move from 2021 to 2022. Useful LifeProject Name Fire Station - Replace Boilers Category Buildings: Fire Facilities Type Improvement Future Total Project Cost:$45,000 Total2021 2022 2023 2024 2025Expenditures 45,00045,000Construction/Maintenance 45,000 45,000Total Total2021 2022 2023 2024 2025Funding Sources 45,00045,000CI - Capital Improvement Fund 45,000 45,000Total Thursday, November 12, 2020 60 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2021 2025 thru Department Pavilion Description Replace the mezzanine vinyl tile with rubber flooring. Project #20-CIP-PV333 Priority 3 Important Justification Current flooring has cracks, gouges, and severe wear areas. Rubber floor is easier maintain and is more durable and versitle than vinyl tile. Budget Impact/Other Useful Life 20 yearsProject Name Pavilion - Mezzanine Flooring Replacement Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$90,000 Total2021 2022 2023 2024 2025Expenditures 90,00090,000Construction/Maintenance 90,000 90,000Total Total2021 2022 2023 2024 2025Funding Sources 90,00090,000PA - Pavilion Fund 90,000 90,000Total Thursday, November 12, 2020 61 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2021 2025 thru Department Pavilion Description Replace the arena exit doors, frames, hinges, and closers. Project #20-CIP-PV334 Priority 3 Important Justification The frames and hardware are original, installed during the construction of the facility. Frames are rusting and hardware is failing. Budget Impact/Other Useful Life 15-20 yearsProject Name Pavilion - Arena Exit Door Replacement Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$105,000 Total2021 2022 2023 2024 2025Expenditures 105,000105,000Construction/Maintenance 105,000 105,000Total Total2021 2022 2023 2024 2025Funding Sources 105,000105,000PA - Pavilion Fund 105,000 105,000Total Thursday, November 12, 2020 62 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2021 2025 thru Department Police Description Project #08-CIP-PD215 Priority n/a Justification Budget Impact/Other Useful LifeProject Name City Hall Police Station Rooftop Category Buildings: Police Department Type Improvement Future Total Project Cost:$240,000 Total2021 2022 2023 2024 2025Expenditures 240,000240,000Construction/Maintenance 240,000 240,000Total Total2021 2022 2023 2024 2025Funding Sources 240,000240,000CI - Capital Improvement Fund 240,000 240,000Total Thursday, November 12, 2020 63 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2021 2025 thru Department Public Works: Bldg/Equip Ser Description Replace overhead doors Project #08-CIP-B023 Priority n/a Justification Budget Impact/Other Inspected in 2019, will move from 2020 to 2022. Useful LifeProject Name Public Works - Replace Overhead Doors Category Buildings: Public Works Type Improvement Future Total Project Cost:$90,000 Total2021 2022 2023 2024 2025Expenditures 90,00090,000Construction/Maintenance 90,000 90,000Total Total2021 2022 2023 2024 2025Funding Sources 18,00018,000CI - Capital Improvement Fund 18,00018,000RF - Refuse Fund 18,00018,000SF - Sanitary Sewer Fund 18,00018,000SU - Storm Sewer Fund 18,00018,000WF - Water Fund 90,000 90,000Total Thursday, November 12, 2020 64 Parks and Recreation 65 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Parks Description Repair tennis courts - $20,000 2023 - Tennis Courts Reconstruct = $130,000 (2 courts) Project #13-CIP-P044 Priority n/a Justification Periodic repairs needed to ensure quality safe playing surface Budget Impact/Other Revised estimated costs to $130k (from $180k) Useful LifeProject Name Oakes Park - Tennis Courts Category Parks/Fores/Pav.: Comm. Facil. Type Improvement Future Total Project Cost:$150,000 Total2021 2022 2023 2024 2025Expenditures 130,000130,000Construction/Maintenance 130,000 130,000Total Total2021 2022 2023 2024 2025Funding Sources 130,000130,000PDF- Park Dedication Fund 130,000 130,000Total Thursday, November 12, 2020 66 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Parks Description Replace/Rehab existing picnic shelter. Project #13-CIP-P066 Priority 3 Important Justification Existing picnic shelter is 30+ years old and deteriorated. Budget Impact/Other Useful LifeProject Name Shady Oak Beach - Picnic Shelter Category Parks/Fores/Pav.: Comm. Facil. Type Improvement Future Total Project Cost:$210,000 Total2021 2022 2023 2024 2025Expenditures 30,00030,000Planning/Design 180,000180,000Construction 30,000 180,000 210,000Total Total2021 2022 2023 2024 2025Funding Sources 120,000120,000GU - Other Governmental Units 90,00030,000 60,000PDF- Park Dedication Fund 30,000 180,000 210,000Total Thursday, November 12, 2020 67 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Parks Description Improvements to the area adjacent to Minnehaha Creek, Blake Road and Lake Street to include a creek overlook area, creek interpretation/education feature, pedestrian plaza area to match the Blake Road corridor improvements. Project #16-CIP-P002 Priority n/a Justification City is committed to upgrade this area via a cooperative agreement with the Minnehaha Creek Watershed District. The area needs to be upgraded commensurate with the Cottageville Park improvements, Blake Road corridor upgrades and upcoming Cold Storage site redevelopment. Budget Impact/Other Useful LifeProject Name Minnehaha Creek Overlook - Blake Rd/Lake St Pedest Category Parks/Fores/Pav.: Comm. Facil. Type Improvement Future Total Project Cost:$400,000 Total2021 2022 2023 2024 2025Expenditures 400,000400,000Construction/Maintenance 400,000 400,000Total Total2021 2022 2023 2024 2025Funding Sources 200,000200,000PDF- Park Dedication Fund 200,000200,000PI - PIR/General Obligation Bonds 400,000 400,000Total Thursday, November 12, 2020 68 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2021 2025 thru Department Public Works: Parks Description A general upgrade of this urban-setting park to include: lighting, landscaping, signage. Plus, the addition of some play equipment for 2-5 yr olds. Project #17-CIP-P004 Priority 3 Important Justification This is a heavily used urban park serving the city's central business district which has a growing population due to redevelopments and increased housing. Park has not been upgraded for several decades, is used as a venue for entertainment and is in need of revitalization. Budget Impact/Other Useful Life 25 yearsProject Name Downtown Park Rehab Category PW - Parks Type Improvement Future Total Project Cost:$235,000 Total2021 2022 2023 2024 2025Expenditures 35,00035,000Planning/Design 200,000200,000Construction/Maintenance 35,000 200,000 235,000Total Total2021 2022 2023 2024 2025Funding Sources 35,00035,000PDF- Park Dedication Fund 200,000200,000PI - PIR/General Obligation Bonds 35,000 200,000 235,000Total Thursday, November 12, 2020 69 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Parks Description Replace roofing & fascia boards, clean and stain wood columns, glu-lam beams and tongue/groove roof deck boards, replace concrete floor slab and turf restoration for both Central Park picnic shelters Project #20-CIP-P071 Priority n/a Justification The picnic shelter are 30+ years old, look drab, concrete floor slabs are heaved and cracked. Rehab will restore the appearance and function of these picnic shelters. Budget Impact/Other Useful Life 15 yearsProject Name Central Park Picnic Shelters Rehab Category Parks/Forestry Type Improvement Future Total Project Cost:$50,000 Total2021 2022 2023 2024 2025Expenditures 50,00050,000Construction/Maintenance 50,000 50,000Total Total2021 2022 2023 2024 2025Funding Sources 50,00050,000PDF- Park Dedication Fund 50,000 50,000Total Thursday, November 12, 2020 70 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2021 2025 thru Department Public Works: Parks Description Replace existing play equipment with a new play set, including demolition, new EWF safety surfacing. Project #20-CIP-P072 Priority n/a Justification The existing play equipment is 30 years old and needs replacement. Budget Impact/Other Useful LifeProject Name Central Park East Play Equipment Replacement Category Parks/Forestry Type Improvement Future Total Project Cost:$75,000 Total2021 2022 2023 2024 2025Expenditures 75,00075,000Construction/Maintenance 75,000 75,000Total Total2021 2022 2023 2024 2025Funding Sources 75,00075,000PDF- Park Dedication Fund 75,000 75,000Total Thursday, November 12, 2020 71 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2021 2025 thru Department Recreation Description The joint recreation agreement in place between the cities of Hopkins and Minnetonka provides for the sharing of operational and maintenance expenses for Shady Oak Beach. These expenses are split 33% city of Hopkins and 67% city of Minnetonka. Shady Oak Beach is operated from June - August annually; however the park is available for use year round. 2021: Dock maintenance ($10,000) 2022: Miscellaneous building components, i.e. installation of energy efficient lighting in restrooms/gate area, patio tables and chairs ($15,000); inflatables replacement ($10,000) 2023: Miscellaneous building maintenance ($10,000) 2024: Inflatable replacement ($10,000) 2025: Miscellaneous building maintenance ($10,000) Project #16-CIP-R003 Priority 3 Important Justification Since last undergoing a renovation in 1998, Shady Oak Beach contiues to be a primary park destination for residents of Hopkins and Minnetonka. Scheduled items are intended to keep the park in excellent appearence, establish a gateway to the park, and to provide park users with a quality recreational experience. 2020: Water play inflatable amenities 2021: Dock maintenance and replacement of picnic shelter 2022: Miscellaneous building components 2023: Miscellaneous building maintenance 2024: Miscellaneous building components Budget Impact/Other Useful Life 10-20 yearsProject Name Shady Oak Beach Improvements Category PW - Parks Type Improvement Future Total Project Cost:$350,000 Total2021 2022 2023 2024 2025Expenditures 65,00010,000 25,000 10,000 10,000 10,000Construction/Maintenance 10,000 25,000 10,000 10,000 10,000 65,000Total Total2021 2022 2023 2024 2025Funding Sources 43,6006,700 16,800 6,700 6,700 6,700GU - Other Governmental Units 21,4003,300 8,200 3,300 3,300 3,300PDF- Park Dedication Fund 10,000 25,000 10,000 10,000 10,000 65,000Total Thursday, November 12, 2020 72 Streets, Traffic & Transportation 73 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Streets/Traffic Description Locations to be determined consistent with the street reconstruction program. Program includes reconstruction of deteriorated water main, sanitary sewer and storm sewer in conjunction with street improvement projects. Utility improvements are consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. 2020-2021: Interlachen Park Reconstruction Project 2022: 6th Ave South/7th Ave South 2023: Central Avenues Reconstruction 2024: 17th Avenue 2025-2027: Central Avenues Reconstruction (East) Project #01-CIP-S101 Priority n/a Justification In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installed new. In most cases, water main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The costs assume the city funding 100% of major storm sewer, water main, and sanitary sewer improvements. Budget Impact/Other Public Hearing - year prior to planned construction Plans and specifications - year prior to planned construction Bid - year of planned construction Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections. Consistent with the City Council adopted Roadway Improvement Policy, Street Ratings, Pavement Management Program, Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. Useful Life UnassignedProject Name Residential Street Improvements and Utilities Category Trans: Streets Type Improvement Future Total Project Cost:$65,284,000 Total2021 2022 2023 2024 2025Expenditures 32,300,0009,390,000 2,375,000 6,493,000 6,500,000 7,542,000Construction/Maintenance 9,390,000 2,375,000 6,493,000 6,500,000 7,542,000 32,300,000Total Total2021 2022 2023 2024 2025Funding Sources 300,000300,000GU - Other Governmental Units 500,000500,000MS - Municipal State Aid Streets 11,751,0003,072,000 650,000 2,170,000 2,974,000 2,885,000PI - PIR/General Obligation Bonds 4,702,0001,600,000 500,000 1,050,000 546,000 1,006,000SA - Special Assessment 5,765,0001,707,000 500,000 1,363,000 668,000 1,527,000SF - Sanitary Sewer Fund 3,312,000940,000 225,000 480,000 1,067,000 600,000SU - Storm Sewer Fund 5,970,0002,071,000 500,000 1,430,000 445,000 1,524,000WF - Water Fund 9,390,000 2,375,000 6,493,000 6,500,000 7,542,000 32,300,000Total Thursday, November 12, 2020 74 Highway 7 Highway 169Highway 7 Highway 169Excelsior Blvd Minnetonka Blvd Shady Oak RdHopkins CrossroadsHopkins Crossroads1st St N 11th Ave SMainstreet 7th St S Smetana Rd 3rd St N 2nd St NE2nd St N 5th Ave NCambridge St 12th Ave N6th St S Lake St NE Boyce St15th Ave N14th Ave N9th Ave N11th Ave N2nd Ave S8th Ave N5th St S 10th Ave NFeltl Rd7th Ave N17th Ave N19th Ave N18th Ave N6th Ave NGoodrich St1st St S Nolan DrOakridge RdBirch PlAnn Ln 16th Ave N20th Ave NAshley RdManitoba Rd Meadowbrook RdBlake Rd SHolly RdAtwater StPowell Rd3rd St S Preston LnTyler Ave NLoring Rd Lincoln Dr5th Ave SHarrison Ave SMonroe Ave SDivision St Hawthorne RdW e s t b r o o k e W a y Cotta g e L n Oxford St 13th Ave NSpruce RdAlthea LnHomedale Rd8th Ave SLake St Ext Sandra Ln 21st Ave NVan Buren Ave S17th Ave SK-Tel Dr Hiawatha Ave Feltl CtPark Ln2nd St S Merilane Adams AveHill St 12th Ave S13th Ave SMill Rd19th Ave S8th St S18th Ave S9th Ave S7th Ave SValley WayEdgemoor DrFai r w a y D r Milwauk e e St 6th Ave SBridle L n Campbell DrAnnaway DrOak Ridge Tr Washington Ave N Wayside Rd W Minnetonka M i l l s R d Cottage Downs Oakvale Rd S 37th St W 5th St N Oakvale Rd N East Saint A l b a n s R d Opportunity Ct4th St N Herman TerVan Buren Ave NOakglen DrMonroe Ave NBradford R d Texas AveHazel Ln7th St W Saint L o ui s St John StOakton Dr 20th Ave S47th St W Wilshire Walk Fletcher Pl Burnes DrSweet Briar LnLake St W Griffit St10th Ave SOak Dr L n Highway 7 Frontage Rd Smetana Dr16th Ave S15th Ave SIndependence Ave SGettysburg Ave SPompano DrCrawford RdJackson Ave SRobinwood Ter Saint Johns Rd Oakton RdgRobinwood Ln Cre e k L n Cedar Pointe Dr SEast Park Valley DrDeer Ridge Ln Ho l l y h o c k L nAutumnwood LnCedar CrossingWest Park Valley DrDrillane RdHedberg DrGethsemane RdWebster Pl Honeywood LnWoodhil l C t Oak Dr L a n e Madison Ave SJefferson Ave SAbbie Ln Meadowbrook LnAq u i l a A v e S Landmark Trail N 34th Circle WPierce AveOld Settlers Trail Arthur StLandmark Tr S Dearborn CtNine M i le Cove E N Van Buren TrailTrailwood SOak Ridge PlaceEdgebro o k Dr Nine Mile Cove SOak Park Ln 14th Ave SPioneer Rd Robinwood Ter Althea Ln5th St S 6th Ave S7th St S 2nd St S16th Ave N2nd St N 13th Ave S12th Ave S4th St N Smetana Dr15th Ave S5th Ave S8th Ave S2nd St S 3rd St N 9th Ave SHighway 7 Frontage Rd Tyler Ave N7th Ave S6th St S Legend 2020 Reconstruct 2020 Mill and Overlay 2021 Reconstruct 2021 Mill and Overlay 2022 Reconstruct 2022 Mill and Overlay 2023 Reconstruct 2023 Mill and Overlay 2024 Reconstruct 2024 Mill and Overlay 2025-2027, Construction City Parking Mill and Overlay ST. LOUIS PARK ST. LOUIS PARKEDINAMINNETONKAMINNETONKA EDINA MINNETONKA MINNETONKATHE CITY OF HOPKINS, MINNESOTA HENNEPIN COUNTY 2020 - 2027 Capital Improvement Projects Revised 7/15/2020 75 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Streets/Traffic Description County Road 3 from Shady Oak Road to Meadowbrook Road. Lighting, landscaping, street, etc. improvements along Excelsior Boulevard from the east to west city limits. GO Bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue Project has been delayed pending county funding for remaining 4th segement. Project #01-CIP-S104 Priority n/a Justification Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in remaining segment of County Road 3. - Segment 4 from Blake Road to Meadowbrook Road; upgrade roadway, implement beautification program. Budget Impact/Other GO bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue. Segment 4: Planning and acquisition - Not in County Funding Plan, when funded city will complete our portion. Consistent with Hennepin County CIP and City Council action. Useful Life UnassignedProject Name County Road 3 Category Trans: Streets Type Improvement Future Total Project Cost:$2,300,000 Total2021 2022 2023 2024 2025Expenditures 2,300,0002,300,000Construction/Maintenance 2,300,000 2,300,000Total Total2021 2022 2023 2024 2025Funding Sources 1,600,0001,600,000GU - Other Governmental Units 700,000700,000MS - Municipal State Aid Streets 2,300,000 2,300,000Total Thursday, November 12, 2020 76 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2021 2025 thru Department Public Works: Streets/Traffic Description Painting bike lanes, constructing trails and sidewalks, safety improvements and other general pedestrian and bicycle improvements to the system. 2020: ADA Upgrades in the Central Business District 2021: Upgrade of the 11th Avenue South pedestrian crossings in the Westbrooke Area to pedestrian activated RRFB. Project #13-CIP-S040 Priority n/a Justification Council adopted plan to increase pedestrian and bicycle access and safety, these improvements begin to implement that plan. The existing overhead flushers provide very little benefit. Pedestrian activated rectangular rapid flushing beacons (RRFB) have shown to provide very high compliance for motorists and increases pedestrian safety and comfort. Budget Impact/Other Useful Life 20 yearsProject Name Pedestrian & Bicycle Access Improvements Category Trans: Streets Type Improvement Future Total Project Cost:$375,000 Total2021 2022 2023 2024 2025Expenditures 200,00025,000 25,000 25,000 25,000 100,000Construction/Maintenance 25,000 25,000 25,000 25,000 100,000 200,000Total Total2021 2022 2023 2024 2025Funding Sources 200,00025,000 25,000 25,000 25,000 100,000PI - PIR/General Obligation Bonds 25,000 25,000 25,000 25,000 100,000 200,000Total Thursday, November 12, 2020 77 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Streets/Traffic Description Location to be determined based on Pavement Management Program. Program includes mill and overlay of deteriorated pavements to extend the useful life of the street. Streets for this method of rehabilitation have usually been rehabilitated or reconstructed within the last 20 years. 2020: 1st St N, North CBD Avenues 2021: Knollwood Neighborhood 2022: 1st St. N, Lot 700, Maetzold Field Lot 2023: 2nd Ave S. 2024: 1st St. S, South CBD Avenues Project #16-CIP-S041 Priority n/a Justification Properly timed mill and overlay projects can significantly extend the life of a street and delay the need for reconstruction. Mill and overlay projects also require less disturbance and are shorter in duration than reconstruction, which results in less impact of the traveling public. Budget Impact/Other Annual pavement rehabilitation category. Useful LifeProject Name Street Rehabilitation Improvements Category Trans: Streets Type Improvement Future Total Project Cost:$3,975,000 Total2021 2022 2023 2024 2025Expenditures 2,475,000725,000 400,000 425,000 450,000 475,000Construction/Maintenance 725,000 400,000 425,000 450,000 475,000 2,475,000Total Total2021 2022 2023 2024 2025Funding Sources 2,475,000725,000 400,000 425,000 450,000 475,000PI - PIR/General Obligation Bonds 725,000 400,000 425,000 450,000 475,000 2,475,000Total Thursday, November 12, 2020 78 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Streets/Traffic Description Replacement of aged regulatory and warning signs that have lost minimum retroreflectivity and replacement of posts, when needed. Project #16-CIP-S042 Priority n/a Justification The city is required to have a sign management program which includes a sign replacement strategy to ensure regulatory and warning signs provide adequate retroreflectivity. Sign replacement cycle is 8 years. Estimated costs assume sign replacements by contract. Parking signs will be replaced as needed due to age, fading, etc. Sign inventory data base will be updated to reflect install date/sign age. Budget Impact/Other Useful LifeProject Name Street Sign Management Category Trans: Streets Type Improvement Future Total Project Cost:$200,000 Total2021 2022 2023 2024 2025Expenditures 100,00020,000 20,000 20,000 20,000 20,000Construction/Maintenance 20,000 20,000 20,000 20,000 20,000 100,000Total Total2021 2022 2023 2024 2025Funding Sources 100,00020,000 20,000 20,000 20,000 20,000PI - PIR/General Obligation Bonds 20,000 20,000 20,000 20,000 20,000 100,000Total Thursday, November 12, 2020 79 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2021 2025 thru Department Public Works: Streets/Traffic Description Upgrade existing lighting in the Central Business District to newer LED fixtures, replace light poles and electrical service feed cabinets, as needed. 2021: Mainstreet East of 5th Ave - 20 fixtures 10th, 11th and 12th Ave N & S of Mainstreet - 52 fixtures Parking Lots 500 and 600 - 15 fixtures 2022: 7th, 8th and 9th Ave N & S of Mainstreet - 28 fixtures Parking Lots 700 and 750 - 8 fixtures Project #20-CIP-S001 Priority n/a Justification There is a need to continue the upgrade of lighting in the Central Business District. The Mainstreet lights were all upgraded to LED fixtures in 2015. An upgrade to LED fixtures will provide energy savings, maintenance savings and create a more uniform lighting appearance throughout the downtown area. Budget Impact/Other Useful LifeProject Name Central Business District Lighting Upgrades Category Trans: Street Lights Type Improvement Future Total Project Cost:$140,000 Total2021 2022 2023 2024 2025Expenditures 140,000100,000 40,000Construction 100,000 40,000 140,000Total Total2021 2022 2023 2024 2025Funding Sources 140,000100,000 40,000PI - PIR/General Obligation Bonds 100,000 40,000 140,000Total Thursday, November 12, 2020 80 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Streets/Traffic Description Street lighting upgrades are needed to replace deteriorated poles, electrical feedpoints and old, energy inefficent fixtures. 2021: Feltl Court street lighting: replace 10 lights, poles and electrical feedpoint. 2022: 11th Ave S, south of 7th St S, replace 18 poles and fixtures and one electrical feedpoint. 2023: Hobby Acres neighborhood streets, replace 17th poles and fixtures to match Xcel Energy upgraded poles/lights and three electrical feedpoints. 2024: Westbrooke Way street lighting, upgrade 22 lights, poles and wiring via new Xcel Energy agreement to replace expired 30-year agreement 2025: Excelsior Boulevard street lighting, upgrade lighting to LED fixtures via Xcel Energy upgrade program. Project #20-CIP-S002 Priority n/a Justification A replacement plan is needed as these lighting and electrical feed systems are reaching the end of their useful life, with out-dated electrical cabinets, poles and bases and old, energy inefficent light fixtures. Budget Impact/Other Useful LifeProject Name City Street Lighting Upgrades Category Trans: Street Lights Type Improvement Future Total Project Cost:$815,000 Total2021 2022 2023 2024 2025Expenditures 815,000110,000 190,000 200,000 90,000 225,000Construction 110,000 190,000 200,000 90,000 225,000 815,000Total Total2021 2022 2023 2024 2025Funding Sources 815,000110,000 190,000 200,000 90,000 225,000PI - PIR/General Obligation Bonds 110,000 190,000 200,000 90,000 225,000 815,000Total Thursday, November 12, 2020 81 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2021 2025 thru Department Public Works: Streets/Traffic Description Replacement and upgrading of traffic signal infrastructure including poles, mast arms, cabinets and controls, signal heads, pedestrian heads, and push ?? The work will also include upgrading the pedestrian ramps and crossings to meet ADA standards. 2024: Removal and replacement of signal and ADA upgrades Project #20-CIP-S005 Priority 5 Future Consideration Justification The existing signal is old and reaching the end of it's service life. Pedestrian crossing and ADA improvements should be completed as there are increased levels of both pedestrian and vehicular traffic through the intersection since the development of the Excelsior Crossings office park and improvements to Burnes Park. Budget Impact/Other Useful LifeProject Name Minnetonka Mills/5th St N Signal Replacement Category Trans: Sign/Signals Type Improvement Future Total Project Cost:$600,000 Total2021 2022 2023 2024 2025Expenditures 600,000600,000Construction/Maintenance 600,000 600,000Total Total2021 2022 2023 2024 2025Funding Sources 590,000590,000PI - PIR/General Obligation Bonds 10,00010,000SU - Storm Sewer Fund 600,000 600,000Total Thursday, November 12, 2020 82 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact 2021 2025 thru Department Public Works: Streets/Traffic Description Trail in Bellgrove Neighborhood Project #20-CIP-S006 Priority n/a Justification Budget Impact/Other Useful LifeProject Name Trail Segment - Bellgrove Category Unassigned Type Unassigned Future Total Project Cost:$100,000 Total2021 2022 2023 2024 2025Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total2021 2022 2023 2024 2025Funding Sources 100,000100,000PI - PIR/General Obligation Bonds 100,000 100,000Total Thursday, November 12, 2020 83 84 Utilities 85 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Utilities Description Annual concrete repairs and patching of existing alleys. Project #01-CIP-U002 Priority n/a Justification Annual alley pavement concrete slab repairs are needed. Budget Impact/Other Consistent with the Storm Water Management Plan. Useful Life UnassignedProject Name Storm Drainage System Maintenance - Alley Repairs Category Utilities: Municipal Sanitary Se Type Improvement Future Total Project Cost:$336,000 Total2021 2022 2023 2024 2025Expenditures 102,00024,000 25,000 26,000 27,000Construction/Maintenance 24,000 25,000 26,000 27,000 102,000Total Total2021 2022 2023 2024 2025Funding Sources 102,00024,000 25,000 26,000 27,000SU - Storm Sewer Fund 24,000 25,000 26,000 27,000 102,000Total Thursday, November 12, 2020 86 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Utilities Description This will help us line our sanitary sewers to eliminate infiltration root intrusion and avoid expensive repairs and sewer backups. Project #18-CIP-U016 Priority 2 Very Important Justification We have an old collection system that needs immediate attention. Continuously cleaning the sewer does not stop roots or infiltration from going into the pipes, we need a more permanent fix. The majority of our sanitary sewer pipe is made out of clay pipe and has reached its life expectancy. Budget Impact/Other Useful LifeProject Name Sewer Lining Category Utilities: Municipal Sanitary Se Type Improvement Future Total Project Cost:$367,500 Total2021 2022 2023 2024 2025Expenditures 217,50050,000 52,500 55,000 60,000Construction/Maintenance 50,000 52,500 55,000 60,000 217,500Total Total2021 2022 2023 2024 2025Funding Sources 217,50050,000 52,500 55,000 60,000SF - Sanitary Sewer Fund 50,000 52,500 55,000 60,000 217,500Total Thursday, November 12, 2020 87 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2021 2025 thru Department Public Works: Utilities Description Program includes rehabilitatation of trunk water mains around the city. Staff has conducted some non-destructive condition assessment testing of various trunk lines around the city. The testing determines a level of deterioration based on a calculated reduction of thickness of the pipe wall. Review of how critical the line is, break records, pipe age, and soil conditions are also considered in determining projects. 2022: Replacement of trunk main along North TH 7 Service Drive from Oakridge Road to west of Hopkins Crossroad and trunk main from Water Treatment Plant to North Service Drive. Project #19-CIP-U017 Priority 2 Very Important Justification Trunk water mains are large diameter, high capacity lines that are critical to supply water to and from the water treatment plant, water towers, and distribution lines around the city and cannot easily be taken out of service. Public Works staff has been managing the trunk main system as a standalone asset, as these mains cannot always be included for rehabilitation with street reconstruction projects. Much of the city's trunk system was constructed over 50 years ago and is approaching the end of it's service life. Budget Impact/Other Useful LifeProject Name Trunk Water Main Rehabilitation Category Utilities: Municipal Water Syst Type Improvement Future Total Project Cost:$3,955,000 Total2021 2022 2023 2024 2025Expenditures 3,955,0003,955,000Construction/Maintenance 3,955,000 3,955,000Total Total2021 2022 2023 2024 2025Funding Sources 1,450,0001,450,000PI - PIR/General Obligation Bonds 395,000395,000SF - Sanitary Sewer Fund 160,000160,000SU - Storm Sewer Fund 1,950,0001,950,000WF - Water Fund 3,955,000 3,955,000Total Thursday, November 12, 2020 88