Memo-Shady Oak Road Reconstruction Update , . PublicW orks Department "Memorandum To: Honorable Mayor and Members of the City Council Copy: Jim Genellie, Acting City Manager ' Steven J. Stadler, Public Works Director~ From: Date: June 24, 2004 Subject: Shady Oak Road Reconstruction Update The County's consulting engineer is currently preparing a preliminary report on the Shady Oak R.oad corridor. The report will include information on existing conditions, traffic volume design requirements, 3-lane vs. 4-lane roadway design and at least three alternative roadway alignments with findings on each alternative. This report should be . completed by July 21. The report will represent the County Transportation Department's position regarding acceptable traffic solutions and the associated preliminary design options for this road corridor. Concurrent with consideration of roadway alignment and width, Hennepin County Transit and Community Works Department staff will facilitate and fund consultant studies on options for redevelopment along the corridor. Staff anticipates the next actionto be Hopkins City Council review of the County consultant's preliminary report, perhaps at the July 27 Councilworksession. At that worksession, staff and Council could discuss and come to agreement on the public review/input process. This process would lead to recommendations on preliminary road desigh and redevelopment options for areas impacted along the corridor. A joint meeting with Minnetonka City Council could be scheduled for early August. . . PROJECT INFORMATION April 6, 2004 CSAH 61 (Shady Oak Road) - CSAH 3 to TH 7 Hennepin County Project9112 b J)J SAP 27-661-??; MSAP ?1?-???-?? . '4P'r.. Hennepin County Transportation and the Cities of Hopkins and Minnetonka are ,.. . collaborating in the development of a proposal to reconstruct CSAH 61 from north of CSAH 3 (Excelsior Boulevard) to State Trunk Highway 7 (TH-7) as a multi-lane roadway. The County has contracted with WSH & Associates to initially prepare up to three conceptual layouts for this project. A list of County and City contacts appear at the end ofthis document. I invite you to contact any ofthose listed if you have questions. Purpose & Justification The purpose ofthe project is to improve safety, the condition of the roadway, and increase capacity. The roadway was constructed prior to 1930 as a two-lane roadway, and is rated as deficient in structure, drainage and traffic capacity. . Backeround Information The CSAH 61 reconstruction is funded in the Hennepin County Transportation 2006 element of the December 2003 approved Capital Improvement Program. In conjunction with the roadway reconstruction the City's of Hopkins and Minnetonka are interested in maximizing the corridors business potential. Hennepin County Transportation is serving as the lead agency in the development of the roadway reconstruction project The design would be coordinated with the City staff, business community, property owners and affected utility companies. The Cities would be the lead agency for redevelopment outside the roadway corridor. The corridor consists of a mix of businesses, rental units and single-family dwellings. The city boundary between Hopkins and Minnetonka is circuitous in that it shifts back and forth, east and west, of the roadway centerline. Traffic Volumes CSAH 61 is a minor arterial linking Hopkins and Minnetonka with TH-62. The 2003 Average Daily Traffic (ADT) is 13,000 vehicles per day with a 20-year projection in the high teens. For volumes greater than 15,000 projected ADT, the Metro State Aid Office would suggest at least four through~traffic lanes be provided. CSAH 61 in the project area is predominantly a two- lane undivided roadway with minimal channelization at Main Street. Delays and vehicle back- ups are being experienced at the TH-7 intersection. A traffic simulation would be performed on the preferred concepts for operational performance. \. Work/PROJECT lNFORMA TION 4-6-04.doc -. Traffic Si20als . There are three existing signalized intersections. CSAH61at CSAH 3 (Excelsior Boulevard) traffic signals were reconstructed with Hennepin County Proj ect 9224 in 1999 and no revisions are proposed with this project. CSAH 61 atMain St. currently has a temporary traffic. signal that was put into service October 1993. This location is proposed to have a permanent signal. The lane configuration is to be determined. CSAH 61 at TH -7 traffic signal is MnDOT owned and operated. The lane configuration for CSAH 61 northbound and southbound approaches would be analyzed. Reconstruction ofa portion ofTH-Tis outside the scope of this project. A level of service (LOS) would be determined for each signalized intersection. A minimum LOS 'D' is required. Schedule The conceptual planning and design phase of the project is anticipated to be complete mid- summer 2004. A consultant will be contracted to develop a preliminary layout based on the preferred concept. Neighborhood involvement will be solicited at this time in the form of a Citizen Advisory Committee. City Council approval of the preliminary layoutis anticipated in spring 2005. Upon approval of the preliminary layout by both City Councils, a consultant will be contracted to develop the detail design ofthe plan and specifications. The County Right of WayDivision would preform property acquisition. Neighborhood open houses would occur as necessary. It is anticipated that bid letting would occur fall of2006 and construction beginning spring of 2007 with completion in 2008. . \ Cost The estimated roadway construction cost for the project is $8.0 million, including right of way acquisitions and consultant fees. A combination of state, county and city funds would be used to finance the project. State Aid rules would apply due to the funding source. Contacts For more information or if you have specific questions, I invite you to call: Hennepin County Transportation Department Guy Nowlan, P.R, Senior Project Manager Phone: 763-745-7655 City of Hopkins Steve Stadler, P.E., City Engineer Phone: 952-939-1388 City ofMinnetonka Lee Gustafson, P.R, City Engineer Phone: 952-939-8239 . WorkIPROJECT INFORMA nON 4-6-04.doc -. .~@@IjJ$ T! ..,. r.~\...' \ \:( . .~'..'..' ".~ ~----.........:/. ..' ~ HOPt(ttlS ./< ....... ------ ' . " .---.-" ' , -~-,~----~ . Equipment ReplacemenlPlan 2005 - 2009. '. . .~~ ..,.... < ,'" "'1"", ~.' . , ' ,..,:,," "."." ,,' ,: ":"":~ ,,,,,,,,/,,,;:>Wlil~' . ,- ". .', . . : ..' . , . ' . ;( ,;' .. , "DRAFT" EQUIPMENT REPLACEMENT PLAN 2005 ~ 2024 . Backe:roimd The Equipment Replacement Plan is a twenty~yearforecast,of equipment,n~eds in the City of Hopkins. It is intended to iriform the Council and ,citizens to the major equipment needs on the horizon. The first year of the plan 'becomes an adopted equipment bl.ldget and relates almost completely ' to the operating budgetof the equipment replacement fund, which is approved on an annual basis. The remaining nineteen years represent an estimate 'of equipment needs' and funding capabilities of the City. Funding requirements vary from year to> year. In order to m,aintain it fairly consistent levy each year) the twenty-year schedule is projected With a 3% inflation factor and a yearly average dollar need for the equipment repla.cement fund is presently $630,500. The cash flow requirements to 'fund the equipment needs in the equipment replacemenffund" will 'experience a roller coaster effect overthe next 20 years given the projected equipment needs and 3% inflation rate; Available funds will remain, about thesaJlle through the year 2013 and then the fund will experience a substantial increase in funds available thtu 2017 in preparation for replacement of some major fire equipment in 2018, 2019 and 2020. ,It is anticipated that the 'intragovernmental charge to the general fund will need to increase incrementally. by 2% each year . until 2009. The charges will continue to 'increase each year after that, butaf a slower pace. The future increases in charg~s to the general fund shoUld provide sufficient funds to carry us through 2024. " .. A goal' of the city this year was to reevaluate the major adjustments made in 2004 and adjust the schedule accordingly. ' Changes to the plan are reflected ih the document., The success of the , '\' ( .. adjustments made'in 2004 can be witnessed with no needed changes to the plannedofunding sources; R.efurbishments, extended.life expectancy arid closer, cost estimates ,of replacements have accomplished the goal of reducing future replacement costs. The charges to the general fund for equipment replacement will be increased by $10,28Din 2005. This represents a scheduled increase of 4% over the current rates. The equipment replacement charges in the general fund represent only 3% of total general fund expenditures. Future increases incrementally of 2% every year are needed to fund the equipment replacement plan without issuing debt. ' ' , The Equipment Replacement :plan's basic premise .is scheduled replacement of present equipment. A ,new item must) in the year proposed, be presented in the annual operating budget with a stipulation that replacement will be necessary in the future; , Flexibility of the Equipment Replacement Plan is established through annual review and revision, if necessary. . '.' . 1;( ? Highlights of changes from last year: . Fire: The Luveme pumper has been moved up from 2007 to 2005. It had been moved back in 2004 but is in heed of major repairs so replacement is necessary. , The Duty Chiefvehic1e has been moved back from 2005 to 2006. The Stuphen aerial truck refurbishment has been moved back from 2006 to 2007. Police: The K-9 marked patrol vehicle has been transferred to marked patrol vehicles since the K-9 program has been eliminated. It will be used by the power shift officers. This is an overlap shift th~t provides additional coverage during peak call times. It Was scheduled for replacement in 2005 but has been moved back one yearto 2006. This vehicle is on a four-year replacement schedule. City Hall: The main copy machine costs have been reduced due to the lease changes. . Finance computer system software has been moved up to 2007 for an upgrade only to Invision/Tyler Technologies software. This will move full replacement back until 20 14. . >l '. Public Works: Activity Center has added their refrigerator/freezer for replacement in 2006. The cost is $6,500. " ' The skid loader replacement has been extended from 2008 to 2010 ,and the cost Qecreased for a $12,000 savings. Cost has been reduced due to cooperative bidding by ,the State. An additional skid loader will he purchased in.2004 and will become an item in the ERP for replacement in , '2016..This skid loader will be a smaller machine than the other one. ' , " The Parks Dept. trailer has been moved up from 2006 to 2005. ,The cost of the trailer is $1,400. The stump cutter replacement has been extended frorrf2007 to 2012 and its usefullife from 15 to 20 years. The front end loader replacement cost. has been increased $20,000 to reflect actual cost:' . The. ',~ ton pickup for the Street Dept.' has been changed toa % ton 4x4 with a plow. The actual cost has been increased by. $5,800 to reflect this . Upgrade;..,. " . .""".. '.'.' The % ton truck for the Street Dept. has been: upgraded to a 4x4 with a plow. However, the cost will belessenedb)7$3,200 to reflect actual cost. The Sewer utility truck has been upgraded to a %ton.truck. This will cost an additional$3,200in 2006. The Sewer % ton utility truck replacement in 2007 cost has been decreased by $5,100 to reflect actual cost., The two Sewer utility trucks have been combined on one worksheet. . " ,~ . EQUIPMENTREPLACEMENTPLAN2005 -2,009 -,.' , , ' TABLE OF CONTENTS SECTION I Capital Equipment Five YearFunding Summary ",A ' , , , Sources of Revenue Summary , 'B Projects by Funding Source B-1 thruB-2 Department Summary C Projects by Department C.:l thru C-3 Item Requests/Justification Twenty Year Equipment Replacement Schedule D SECTION II . .. Equipment and Building Inventory Vehicle/Equipmentlnventory , I - V , Building Inventory VI - VIII . " ~ . e , ' . . ,'- , ,': : CAPITAL EQIJIPMENT,', I ',' ' ' . e. ,; ;< ., ~ r-OO~O~ ~ 0 ~ ~ r- ~ ~oo~o- r- 0 r- ~ ~ ~ .- ~oo~o~ 0 0, 0 ~ r-.. .'. o ~ ~O~M~O ~ ~ ~ ~ N C . g ~ r-N-~N~ - ~ ~ 0 N n ~ ~ ~ ~ ~ ~ ~ .- ~ - .- OOO~ON 0 0 0 V ~ o ~00r-0~ - 0 .- V .- ~ ~ ~OO~O~ ~ ~ - ~ 0 00 ~ ~O~~~~ ~ ~ ~ ~ ~ ~l ~ ~N-~N~ - 0 N ~ ~ ,~ q ~ ~ ~ ~ ~ ~ .- ~ - _ _OO~O~ ~ 0 ~ ~ 0 ~ ~ ~ ~OOr-O~ ~ 0 ~ 0 r- N ,- ~ ~OONO'- .- r- ~ ~ - - o ... 1'\ 1'\ 1'\ .... ...... " 1'\ no 1'\'" ,.. o ~ ~O~~~.- ~ 0 ~ ~ r- ~ N .- O--~NO .- ~ ~ ~ r- ~ ~ ~- ~ ~ ~ ~ q ~ .- ~ .- ~ NOO~O~ ~ 0 ~ ~ 0 ~ ~O ~O~ .- ~ ~ ~ ~ ~ ~ ~q ~qq ~ ~ q ~ ~ o ~ ~O r-~~ ~ ~ 0 ~ .- N r- ~~ NNr- .- N ~ ~ ~ ~ N~ ~ N N ~ ~ ~ ~.... N -., - ~ ~. ~ OOO~O~ ~ 0 ~ ~ ~ ~ ~ 00 000 - 0 - ~ ~ ~ _ NO ~O~ 0 ~ ~ ~ ~ ~ ~ 0 ~ ~6 NN~ ~ .- ~ ~ ~ g ~ N ~ ~~ ~N~ .... ~ ~ ~,~ 0:1 Z q N ~ r- r- ~ ~ ~ ~ - c:Q ;;a '$ ~ ~ 0 0 0 ~ 0 ~ ~ 0 ~ ~ ~ 's. . ~ r- NO OON 0 0 0 ~ ~ 0:1 < ~ ~ ~q ~~~ ~ ~ ~ ~ q U ~ 00 r- ~N ~~O ~ 0 ~ ~ 0 ~ ~ N ~ ~~ ~....~ .- ~ r- ~ ~ ~ ~ ~ N ~ ~ ~ 0 0 .... . ~ -:-.-of ..r,: o ~ ~ ~ ~ ~ Or-~~ ~ ~~~ ~ ~ ~ r- ~ ~~N ~ ~.-.- ~ ~ ~ ~ ~.... ~~~ r- '-N~ ~ ~ SO .- ~ ~~~ ~ ~~~ ~ ~ g 0 ~ N ~ .- ~~~ ~ ~ ,~ 0 N N ~ ~ ~ f"J n n n ~ N - .- ~ o ~ ~~.... ~ N .- ~ ~ ~ N O~~ ~ r- r- ~ ~ N ~ ~ ""~N 0 ~ ~ ~ ~ o 0 6 ~~~ ~ ~ ~ ~ N ~ .- N ~....~ N ~ 0 0 ~ ,~ r- ~ ~ N ~ 0 ~ ~ N ~ ~ ~ ~..J (I) ..J.... CJ -0:1 ,-.. C S E . o:l ~.... ~.... td ~ 0..2 ~ c CO >- Uo:lc rn 0 ~ ..... (\) C:l bJ) (\) c rn I I ::l rn s:: ::: 0 ._ (\) c ~ - ... c 0.0 ~ c c (\) "0'::= 't:l 0:1 (\) 1-<00 ....:l......... :::- t:Q ell .- .- .... - C"' 0 W 0:1 .d :-;:: :;:: 3 0 ~ .- ..c ~ o~>~ - ~ I~ td... "'" C:l".eIlo.orn- (\) > ...- .- I'< p,.. p,.. ~ (\) S -- >- ell .... ~ g. 2 I I 'e- S 0 ~ .s p,.. g. u U ~~~"'<lJE-< ;;"So u . rn- - ". > .j;j 0.... 0.0 <IJ I-< I-< (\) (\) .... I-< bJ) .S ;::l t.2 t.2 ti I-< "0 - t.2 .5 ~ ~rnrn(\)1-< ~.$CIl ~ I-< ~ ~ ::: ~ ~ ~.'''' ~ I-< o ~~~2.s ~ g.~ 0 ~ ~E-<E-(.sO ~ UE-< ~ <c " ., EQUIPMENT REPLACEMENT PLAN .' City of Hopkins, MN SOURCES OF REVENUE SUMMARY 2005 thru 2009 Source 2005 2006 2007 2008 2009 Total Cable Tel,evision Fund .40,600 40,600 ,Equipment Replaeement,Fund 741,800 225,300 540,700 307,500 551,000 2,366,300 " RF. Refuse Fund . 8,400 c c. ,27,600 " 171,600 207,600 SF. Sanitary Sewer Fund 25,000 ' 51,500 36,400 112,900 SU . Storm Sewer Fund 8,400 8,400 WF - Water Fund 10,600 34,700 21,100 66.400 Total 752,400 250,300 684,300 335,100 , 780,100 2,802,200 . . Thursda~. Ju'ne 24,2004 ' ~', ~ EQUIPMENT REPLACEMENT PLAN . City of Hopkins, MN . PROJECTS BY FUNDING SOURCE 2005 thru 2009 Source Project# Priority 2005 2006 2007 2008 2009 Total Cable Television Fund Cable/Council Chamber Cameras & Control System 01-ERP-050 0 40,600 40,600 Cable Television Fund Total 40,600 40,600 Equipment Replacement Fund City Hall Main Copy Machine 01-ERP-001 0 8,000 8.000 8.000 8.000 12,000 44,000 City Hall Small Copy Machine 01-ERP-002 0 23,200 23,200 Network Server Upgrade 01-ERP-003 0 5,000 5,000 5,000 ' 5,000 5,000 25,000 Finance Computer System Software ' 01-ERP-005 0 50,000 50,000 Computers 01-ERP-006 0 30,000 30,000 30,000 30,000 30,000 150,000 Refrig erator/F reezer 01-ERP-031 0 6,500 6,500 Luveme Pumper 01-ERP-101 0 400,000 400,000 Duty Chief Vehicle 01-ERP-103 0 28,100 28,100 . Lite Rescue 01-ERP-105 0 35,000 35;000 Stuphen Aeriai Truck 01-ERP-106 0 300,000 300,000 Extraction Tool 01-ERP-109 0 20,300 20,300 Marked Patrol Vehicles (6) and Sergeanfs Vehicle 01-ERP-200 0 56,200 28,900 89,400 92,100 266,600 Parking Enforcement Vehicle (210) 01-ERP-202 0 18,700 18,700 Utility 4x4 (211) 01-ERP-203 0 37,700 37.700 Police Administrative Vehicles (2) 01-ERP-204 0 23,400 24,100 24,800 25,600 26,300 124,200 Copy Machine 01-ERP-207 0 , 16,500 16,500 Logging Recorder 01-ERP-208 0 29,900 29,900 Network Server (3) 01-ERP-209 0 8,500 8,500 8,500 8,700 8,700 42,900 4x4 3/4 Ton Pickup with Plow 01-ERP-300 0 25,000 25,000 4X4 3/4 TonTruck with Plow 01-ERP-301 0 24,000 24,000 4x4 1 Ton Dump Truck 01-ERP-302 0 40.600 40,600 1 Ton Dump Truck (2) o 1-ERP-303 0 31,800 31,800 1 Ton Traffic Boom Truck 01-ERP-304 0 25,000 25,000 Front End Loaders (2) 01-ERP.308 0 140,000 157,500 297,500 Trailer 01-ERP-316 0 4,900 4,900 4X4 1/2 Ton Truck 01-ERP-710 0 24,100 24,100 3/4 Ton Utility Truck 01-ERP-802 0 32,200 32,200 Swap Loader 01-ERP-803 0 27,600 27,600 Aerial Lift o 1-ERP-805 0 110,000 110,000 . Tractors (2) 01-ERP-806 0 41,400 41,400 Trucksters (3) 01-ERP-807 0 16,600 16,600 Riding Mowers (2) 01.ERP-808 0 22,800 22,800 Thursday, June 24, 2004 "', Source Project#Priority 2005 2006 ,2007 2008 2009 Total ., Brush Chipper 01-ERP-813 0 22,800 22,800 , ' Trailer Flatbed 01-ERP-814 0 1,400 1 ,400 "'.EqUiPment Replacement Fund Total 741,800 225,300 ' 540,700 307,500 551,000 2,366,300 RF - Refuse Fund Refuse Truck 01-ERP-900 0 ' 171.600 171,600 Utility Billing System, 01-ERP-902 0 8;400 8,400 ' Swap Loader 01-ERP-910 0 27,600 27,600 RF - Refuse F'und Total 8,400 27,600 171,600 207,600 '" SF,~ Sanitary Sewer Fund , 3/4 T onUtility Truck (2) 01-ERP-551 0 25,000 ' 26,000 51,000 .. Rodding Machine 01-ERP-553 0 36 ;400 36.400 , Utility Billing System 01-ERP-556 0 25,500 25,500 SF - Sanitary Sewer Fund TotaL 25,000 51,500 36,400 112,900 SU - Storm Sewer Fund Utility Billing System 01-ERP-950 0 8,400 ,8,400 SU- Storm Sewer Fund Total 8,400 8,400 WF -Water Fund .2 Ton Truck 01-ERP-500 0 20,500 20,500 '.' "ir Compressor 01-ERP-S03 0 21,100 21,100 Utility, Billing System ' 01-ERP-505 0 ., 14,200 14,200 Public Works Copy Machine .. 01-ERP-506 0 10,600 10,600 WF - Water Fund Total 10,600 ",' 34,700 ' , 21,100 66,400" ' GRAND TOTAL 752,400 250,300 684,300 , 335,100 780,100 2,802,200 . Thursday, June 24, 2004 -- ~ EQUIPMENT REPLACEMENT PLAN ~, City of Hopkins, MN DEPARTMENT SUMMARY . 2005 thru 2009 Department 2005 2006 2007 2008 2009 Total Activity Center 6,500 6,500 Cable TV 40,600 40,600 City HallAdministration 43,000 66,200 93,000 43,000 47,000 292,200 Fire 420,300 28,100 300,000 35,000 783,400 Police 88,100 107,900 122,700 164,100 53,700 536,500 Public Works: Bldg/Equip SeN 24,100 24,100 Public Works: Parks/Forestry 1 ,400 16,600 59,800 197,000 274,800 PublicWorks: StreetslTraffic 189,000 25,000 40,600 194,200 448,800 Refuse BAOO 27,600 171,600 207,600 Sewer 25,000 51,500 36.400 112,900 Storm Sewer BAOO BAOO Water 10,600 34,700 21,100 66,400 . Total 752,400 250,300 684,300 335,100 780,100 2,802,200 . Thursday, June 24.2004 w . EQUIPMENT REPLACEMENT PLAN . City of Hopkins, MN" PROJECTS BY DEPARTMENT ,2005. thtu 2009" Department project# Priority 2005 2006 't007 2008 ,2009 Tobll Activity Center Refrtgerator/Freezer 01-ERP.Q31 ,0 6,500 6,500 A~tivity Center Total 6,500, 6,500 Cable TV Cable/Council Chamber Cameras ,& Control System 01-ERP.Q50 0, 40,600 40,600 Cable TV Total 40,600, " 40,600 City Hall Administration 01-ERP-00l "City Hall Main Copy Mabhine 0 8,000 8.000 8,000 8,000 " 12,000 44,000 City Hail Smail Copy Machine 01-ERP.Q02 0 23,200 23,200 , , , .etWork Server Upgrade' " 01cERP-003 0 5,000 5,000 5,000 5,000 5,00b 25,000, inance Computer System Software 01-ERP-005 0 50,000 50,000 'Computers 01-ERP-006 0 30,000 30,000 30,000 30,000 30,000 ' 150,000 City Hall Administration Total 43,000 66,200 93,000 43,000 47,000 292,200 Fire Lwerne Pumper 01-ERP-101 0 400,000 400,000 " ,Duty ChiefVehicfe 01-ERP-l03 0 28,100 28,100 Lite Rescue 01-ERP~105 0 35,000 35,000 Stuphen Aerial Truck 01-ERP-l06 0 300,000 300,000 Extraction Tool OHRP-l09 0 20,300 20,300 ,Fire Total 420,300 28,100 300,000 35,000 783,400 Police Marked Patrol Vehicles (6) and Sergeanfs Vehicle 01-ERP-200 0 56,200 28,900 ' 89,400 9?,100 266,600 Parking Enforcement Vehicle, (210) 01-ERP-2D2 0 18,700 18,700 Utility 4x4(211) OHRP-203 0 37,700 37,700 , ' Police Administrative Vehicles (2) , 01-ERP-204 ' 0 23,400 24,100 24,600 25,600 26,300 124,200 Copy Machine ' 01-ERP.207 0 16,500 16,500 Logging Recorder, 01-ERP-208 0 29,900 29,900 .etwork Server (3) 01-ERP-209 0, 8,500 8.500 8,500 8,700 8,700 42,900 Police Total 88.100 107,900 ' "122,700 , 164,100 53,700 , 536;500 Thursday, June, 24. 2004 . - .-1. " Department Project# Priority 2005 2006 2007 2008 2009 Total ~ Public Works: BIdg/Equip Serv 4X4 1/2 Ton Truck 01-ERP-710 0 24,100 24,100 Public Works: BldglEquip Serv Total 24,100 24,100 . Public Works: ParkslForestry 3/4 Ton Utility Truck 01-ERP-802 0 32,200 32,200 Swap Loader 01-ERP-803 0 27,600 27,600 Aerial Lift 01-ERP-805 0 110,000 110,000 Tractors (2) 01-ERP-806 0 41 ,400 41 ,400 Trucksters (3) 01-ERPc807 0 16,600 16,600 Riding Mowers (2) 01-ERP-808 0 22,800 22,800 Brush Chipper 01-ERP-813 0 22,800 22,800 Trailer Flatbed 01-ERP-814 0 1 ,400 1,400 Public Works: Parks/Forestry Total 1,400 16,600 59,800 197,000 274,800 Public Works: Streets/Traffic 4x4 3/4Ton Pickup with Plow 01-ERP-300 0 25,000 25,000 4X4 3/4 Ton Truck with Plow 01-ERP-301 0 24,000 24,000 4x4 1 Ton Dump Truck 01-ERP-302 0 40,600 40,600 1 Ton Dump Truck (2) 01-ERP-303 0 31,800 31,800 1 Ton Traffic Boom Truck 01-ERP-304 0 25,000 25,000 Front End Loaders (2) 01-ERP-308 0 140,000 157,500 297,500 Trailer 01-ERP-316 0 4,900 4,900 . Public Works: Streets/Traffic Total 189,000 25,000 40,600 194,200 448,800 Refuse Refuse Truck 01-ERP-900 0 171,600 171,600 Utility Billing System 01-ERP-902 0 8.400 8.400 Swap Loader 01-ERP-910 0 27,600 27,600 Refuse Total 8,400 27,600 171,600 207,600 Sewer 3/4 Ton Utility Truck (2) 01-ERP-551 0 25,000 26,000 51,000 Rodding Machine 01-ERP-553 0 36,400 36,400 Utility Billing System 01-ERP-556 0 25,500 25,500 Sewer Total 25,000 51,500 36,400 112,900 Storm Sewer Utility Billing System 01-ERP-950 0 8.400 8.400 Storm Sewer Total 8,400 8,400 Water . 1/2 Ton Truck 01-ERP-500 0 20,500 20,500 Air Compressor 01-ERP-503 0 21,100 21,100 Utility Billing System 01-ERP-505 0 14,200 14,200 Thursday, June 24, 2004 ;' Department Project# Priority 2005 2006 2007 2008 2009 Total ;; pubiicWorks Copy Machine 01-ERP-506 0 10.600 10,600 . Water Total'. 10,600 34,700 , 21,100 66,400 GRAND TOTAL, 152,400 250,300, 684,300 335,100 780,100 2,802,200 . . Thursday, June 24, 2004 ' .,-- ' ; ; EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Finance Director City of Hopkins, MN Department City Ral1 Administration Ol-ERP-OOl ' Type Equipment City Hall Main Copy Machine . :Useful Life Category Equipment 'Priority ,n/a TotalProject Cost $351,000, Description' Copy machine to service needsofal1 departments located at City Hal1. I. Variety of copying tasks. . 2, High volume product copier. Justification " Daily use to make copies of correspondence and forms. Periodical1y produce documents, i.e., budgets, financial reports, council reports and updates, city code , revisions, various department reports, and hearing and information notices: Machine will duplex, sort, collate,and staple copies, ' ' Prior Expenditures, 2005 2006 ,2007 2008 '2009 Total Future I 59,000 I, Equipment 8.000 . 8,000 8,000 ' 8,000 12,000 44,000 I 248,000 r' Total Total 8,000 8,000 8,000 8,000 ' 12,000 44,000 Total . Prior Funding Sources 2005 ' 2006' 2007. 2008 2009 Total Future I," 59,000 1 Equipment Replacement Fund 8,000 8,000 8,006 .' ,8,000 . 12,000 '" " 44,000 I 248,000 I Total Total 8,000 8,000 ' 8,000, 8,000 ' 12,000 44,000 Total Operational Impact/Other Variance from 20 year plan - lease amount reduced Estimate salvage/resale value on replaced item: $-0- . Thursday, June 24, 2004 " , , ' ~ EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Finance Director City of Hopkins, MN Department City Hall Administration Project # Ol-ERP-002 Type Equipment . Useful Life 5 years Project Name City Hall Small Copy Machine Category Equipment Priority n/a Total Project Cost $137,500 Description I Coyy machine to service needs of all departments located at City Hall. 1, Variety of copying tasks. 2, High volume product copier. Justification I Daily use to make copies of correspondence and forms. Periodically produce documents, i.e., budgets, financial reports, council reports and updates, city code revisions, various department reports, and hearing and infonnation notices. Machine will duplex, sort, collate and staple copies, , Prior Expenditures 2005 2006 2007 2008 2009 Total Future I 20,000 I Equipment 23,200 23,200 I 94,300 I Total Total 23,200 23,200 Total . Prior Funding Sources 2005 2006 2007 2008 2009 Total FutUl'e I 20,000 I Equipment Replacement Fund 23,200 23,200 I 94,300 I Total Total 23,200 23,200 Total Operational Impact/Other I Variance from 20 year plan - move back one year to 2001 Estimate salvage/resale value on replaced item: $2,500 . Thursday, June 24, 2004 :; ; EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Finance Director City of Hopkins, MN . Department City Hall Administration roj ect # 01~ERP..;OO3 Type Equipment l.Jseful Life I year Network Server Upgrade ' Category Equipment' '., Priority nla Total Project Cost $120,000. , Description The network selVer is the hub of the network, New computers are faster and more reliable." Justification Networking allows user to share information that is stored in a single location, the rietworkserver. This iS,more efficient because the ,information does not have to be stored on many different computers. It also makes for better accuracy because as the information changes or is updated, every user is working with the same dat Prior Expenditures 2005 2006 2007 2008, 2009 Total Future " I 20,000 I' Equipment 5,000 5,000 5,000 5,000 .. 5,000 25,000 I 75,000 I . . Total Total . .5,000 5,000 ,5,000 5,000 5,000 25,000 Total . Prior Funding Sou rces 2005 2006 2007 2008 2009 '. Total Future I 20,0091 Equipment Replacement Fund 5,000 5,000 5.000 5,000 ' 5,000 25,000 I 75,000 I Total Total 5,000 " '5,000 5,000 5,000 5,000.., . 25;000 Total Operational Impact/Other Variance from 20 year plan" none Estimate salvagetresale value on replaced item: $-0- . 17ll1rsday, June 24,2004 ~<. < " EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Finance Director . City of Hopkins, MN Department City Hall Administration Project # Ol-ERP-005 Type Equipment . Useful Life 7 years Project Namc Finance Computer System Software Category Equipment Priority n/a Total Project Cost $338,000 Description I Financial software package upgrade, Upgrade current financial software to)nvision, Justification I Produce reports, checks and bills for payroll, accounting and accounts payable, Provide a platform for citywide network. Provide on line inquiry for all departments. Tyler Technology version is user friendly and adds more flexibility, Integrate utility billing software with financial system, Prior Expenditures 2005 2006 2007 2008 2009 Total Future I 30,000 I Equipment , 50,000 50.000 I 258.000 I Total Total 50,000 50,000 Total . Prior Funding Sources 2005 2006 2007 2008 2009 Total Future I 30,000 I Equipment Replacement Fund 50,000 50,000 I 258,000 I Total Total 50,000 50,000 Total Operational Impact/Other I Variance from 20 year plan - upgrade in2007. Beginning in 2014 schedule replacement every 7 years, Estimate salvage/resale value on replaced item: $-0- . Thursday, June 24. 2004 ~ ; EQUIPMENT REPLACEMENT PLAN 2005 thru2009 Contact Finance 'Director City of Hopkins, MN Department City Hall Administration roject II, Ol':'ERP-006 Type ' Equipment Project Name Computers Useful Life 3~5 years . Category Equipment Priority nla . Total Project Cost $720,000 Description Personal computer purchases and upgrades for the entire City staff. Coordinating personal compi,1ter purchases from individual departments to one ,fund, Justification Toqls enabling staff to perfonnjob responsibilities efficiently and effectively, Prior Expenditures 2005 2006, 2007 2008" 2009 Total Future I 120,OQO I Equipment 30,000 ' 30,000 30,000 30,000 30,000 150,000 I 450,000 I Total Total 30,000 30,000 '30,000 , 30,000 30,000 150,000 Total .., . Prior Funding Sources 2005 2006 2007 2008 2009 Total Future I ,120,000 I Equipment Replacement Fund 30,000 30,000 30,000 30,000 30,000 150,000 I 450,0001, Total Total 30,000 30,000 30,000 30,000 30,000 150;000 Total Operational Impact/Other , Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $-0- . Thursday, June 24, 2004 .. EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director . City of Hopkins, MN Department Activity Center Project # Ol-ERP-031 Type Equipment . Useful Life 30 years Project Name RefrigeratorlFreezer Category Equipment Priority nJa Total Project Cost $10,500 Description I Commerical, stainless steel refrigerator and freezer. Justification I Cooling/freezing needed for programs or by use of the participants and their activities. Present unit was here when. activity center opened in 1980, This unit was part of the old South Jr. High cafeteria kitchen, The unit continues to have problems due to the age of the unit Prior Expenditures 2005 2006 2007 2008 2009 Total I 4,000 I Equipment 6,500 6,500 Total Total 6,500 6,500 . Prior Funding Sources 2005 2006 2007 2008 2009 Total I 4,000 I Equipment Replacement Fund 6,500 6,500 Total Total 6,500 6,500 , Operational Impact/Other I Variance from 20 year plan - new item Estimate salvage/resale value on replaced item: $ . . Thursday, June 24, 2004 ;; ~, EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 ,Contact City Manager City ofHopkins,MN Department . Cable TV Ol-ERP-050 Type Equipment , Useful Life 8 years Cable/Council Chamber Cameras &;Control System ,'.' ". Category Equipment Priority. nla Total Project Cost $157,300 Description, . Replacement of cameras, motors and ves communications specialist camera control unit. . 1 Cameras and their control equipment for meeting c~ble castS and presentations. Expenditures 2005 2006 2007 2008, t009, Total Futu re Equipment 40,600 40,600 I 116,700 I Total 40,~0 " 40,600 Total . Funding Sources 2005 2006 2007 2008 2009 Total Future CableTelevision Fund 40,600 40,600 I 116,700 I Total 40,600, 40 ,600 Total Operational Impact/Other Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $-0- . Thursday, June24, 2004 " ' .."...., ",' EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Fire Chief ~ City of Hopkins, MN Department Fire Project # Ol-ERP-IOl Type Equipment . Useful Life 25 years Project Name Luverne Pumper Category Equipment Priority nla Total Project Cost $400,000 Description I 1500 aPM fire pumper, fully equipped to respond to all fire situations in the city. Responds t6 mutual aid calls in other cities. Justification I .. Current unit is a second alarm unit. Replacement would be used as first out pumper. This apparatus construction wilI require 25 year specificationsfor life of the apparatus, Current Engine 3 is requiring major maintenance annually, ' ! Expenditures 200S 2006 2007 2008 2009 Total Equipment 400,000 400,000 Total 400,000 400,000 . Funding Sources 200S 2006 2007 2008 2009 Total Equipment Replacement Fund 400,000 400,000 Total 400,000 400,000 Operational Impact/Other I Variance from 20 year plan - Move up from 2007 to 2005. Need for major repairs. Estimate salvage/resale value on replaced item: $2,500 . Thursday, June 24, 2004 '" '. EQUIPMENT REP:LACEMENT PLAN' 2005 thru 2009 Contact Fire Chief City ofIIopkins,MN Department Fire' ' , , roject # ,Ol-ERP-103 Type Equipment Useful Life 7 years Duty Chief Vehicle Category Vehicles PrioritynJa Total 'Project Cost $105,200 Description A marked passenger vehicle for use by the Duty Chief in transporting required equipment, reference materials and personnel for emergency response, and routine Fire Departmehtbusiness, Justification, Used by the Fire Chief when responding to fires and other emergencies, Used for official business in lUId out of the city and for fire fighter travel on official Fire Department b4siness, Expenditures, ' 200S. 2007 200S. 2009, Total Future Vehicles 28,100 [ 77,100 I Total .28,100 Total , :., . '" Funding Sources 2005 !2006 2007 200S 2009 Total ' Future Equipment Replacement Fund 28,100 ' 28,100 I 77,1QO I Total ' 28,100 28,100 Total Operational Impact/Other Variance from 20 year plane Move back one year, Estimate salvage/resale value on replaced item: $4,000 . Thursday, June 24,2004 ' ,1,'. ~. EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Fire Chief - City of Hopkins, MN Department Fire Project # Ol-ERP-105 Type Equipment . Useful Life to years Project Name Lite Rescue Category Vehicles Priority n/a Total Project Cost $118,800 Description I Light rescue response vehicle on a 4 wheel drive chassis, Justification I Used for all emergency medical responses; vehicle accidents; industrical accidents; hazardous materials response. Expenditures 2005 2006 2007 2008 2009 Total Future Vehicles 35,000 35,000 I 83,800 I Total 35,000 35,000 Total . Funding Sources 2005 2006 2007 2008 2009 Total Future Equipment Replacement Fund 35,000 35,000 I 83,800 I , Total 35,000 35,000 Total Operational Impact/Other I Variance from 20 year plan - move back to 2009 i Estimate salvage/resale value on replaced item $ - 4,000 . Thursday, June 24. 2004. .- . EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Fire Chief City of Hopkins~ MN , ' Department Fire Ol-ERP-I06 Type Equipment " Useful Life, 20 years Category Equipment Priority n/a Total. Project Cost $300,000 Description . One hundred foot aerial ladder truck with a 1500 GPM fire pump and a full compliment of ground ladders. . Justification . Vehicle would be used for ladder company operations during fires. This vehicle responds to al1 structure fires, Its job is to make openings in the building to let hot smoke out and to rescue'people that might be trapped. Expenditures' 2005 2006 2007 2008 2009 Total Equipment 300,000 300,000 Total 300,000 300,000 . Funding Sources 2005 2006 2007 2008' 2009 ' . Total , Equipment Replacement Fund' 300,000 300,000 Total 300,000 300,000 Operational Impact/Other Variance from 20 year plan. move back to 2007, Estimate salvage/resale value on replaced item: $ . Thursday, June 24, 2004 ~ EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Fire Chief . City of Hopkins, MN Department Fire Project # Ol-ERP-I09 Type Equipment . Oseful Life 10 years Project Name Extraction Tool Category Equipment Priority nla Total Project Cost $47,500 Description I Hydraulic rescue and extrication tool with spreader, cutters and hydraulic ram. Justification I All vehicle and industrial rescue situations which wi11 require paitient disentanglement or entrapment. Expenditures 2005 2006 2007 2008 2009 Total Future Equipment 20,300 20,300 I 27,200 I Total 20,300 20,300 T otnt . Funding Sources 2005 2006 2007 2008 2009 Total Future Equipment Replacement Fund 20,300 20,300 I 27,200 I Total 20,300 20,300 Total , Operational Impact/Other I Variance from 20 year plan. none Estimate salvage/resale value on replaced item: $1,000 . Thursday, June 24,2004 ~ ;;' EQUIPMENT,REPLACEMENT PLAN 2005 thru 2009 Contact Police Chief City of Hopkins, MN . Department Poiice 017"ERP-200 Type Equipment Useful Life 3,4 years Marked Patrol Vehicles (6) and Sergeant's Vehicle Category VehiCles P~iority nia'. Total Project Cost $1,819;200 . Description '. Marked patrol vehicles used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties., Justification Set up and marking of police vehicles must conform to Minriesota law and POST standards, Vehicles contain secure data and radio equipment for routine and emergency operations. Vehicles contain secure seating for ~risorier tratlsport.' , ' \ ' " . , Additional vehiCle comes from K-9 program. Vehicle will be used by the power shift officers (overlap shift that provides additional coverage during peak call times), This vehicle is on a 4 year life. ., ' Prior Expenditures 2005 2006 2007 2008 2009 ' Total Future I 237,800 I, Vehicles 56,200 28,900 89,400 ' 92,100 266,600 11;314~800 I Total ' Total 56,200 28,900 89,400, ., 92,100 266,600 Total . Prior Funding Sources 2005 2006 2007 2008 "2009 Total.' Future I 237,800 I ' Equipment Replacement Fund 56,200 28,900 89,400 92,100 266,600 I 1,314,800 I" Total Total 56,200 28,900 89,400 92,100 ,266,600 ,Total Operatiomll ImpactJOther Variance from 20 year plan - None.. . Estimate salvage/resale value on replaced item: $4,000 each . Thursday, June 24,2004 , ' ...; EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Police Chief . City of Hopkins, MN Department Police Project # 01-ERP-202 Type Equipment . Useful Life 10 years Project Name Parking Enforcement Vehicle (210) Category Vehicles Priority n/a TotalProjeet Cost $43,900 Description I Parking enforcement vehicle, , Justification I : Use by parking enforcement officers in the course of their duties enforcing parking regulations in the downtown area, , Expenditures 2005 2006 2007 2008 2009 Total Futu re Vehicles 18,700 18,700 I 25,200 I Total 18,700 18,700 Total . Funding Sources 2005 2006 2007 2008 '2009 Total Future Equipment Replacement Fund 18,700 18,700 I 25,200 I Total 18,700 18,700 Total Operational Impact/Other I Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $1,500 , , . Thursday.June 24, 2004 '. . EQUIPMENT REPLACEMENT PLAN ,2005 thru 2009 Contact Police Chief , . City of Hopkins, J\1N Department Police , , ' Project # Ol-,ERP-203 Type Equipment Oseful Life 6 years Project Name Utility4x4 (211) Category Vehicles , Priority ilIa Total Project Cost $175,500 Description 4 whe.el drive uitlity vehicle, Justification Vehic1e is normally used by public service officers for a wide variety of uses such as transporting animals and equipment. The 4 wheel drive vehiCle is also used at times as a patrol vehicle, particularly in the winter in extreme'snow conditions. ' " ' . Expenditures 2005 2006 ,.2007 2008 . 2009 Total Future I Vehicles 37,700 37,700 I 108,100 I Total ' 37,700 37,700 Total " . Prior . Funding Sources, 2005 2006 2007 ,2008 2009 ' Total Future I 29,700 I Equipment Replacement Fund ' 37,700 37,700 I 108,100 I Total Total 37,700 37,700 Total . " Op!;}rational Impact/Other Variance from 20 year pll\ll ~ none , ' Estimate salvage/re~ale value on replaced item: $5,000 . Thursday,June 24,2004 " EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Police Chief . City of Hopkins, MN Department Police Project # Ol-ERP-204 Type Equipment . Useful Life 2 years Project Name Police Administrative Vehicles (2) Category Vehicles Priority nla Total Project Cost $689,500 Description I Police administrative and detective vehicles, Ju.stification I Unmarked vehicles, equipped with radios, siren and red grille lites used by chief and captain, Staffuse is for two years, Vehicles are then rotated doWn to detectives and are kept for an additional 3-4 years. Vehicles are also used for surveillance by unifonn and plain clothes officers, Prior Expenditures 2005 2006 2007 2008 2009 Total Future I 61,100 I Vehicles 23,400 24,100 24,800 25,600 26,300 124,200 I 504,200 I Total Total 23,400 24,100 24,800 25,600 26,300 124,200 Total . Prior Funding Sources 2005 2006 2007 2008 2009 Total Future I 61.100 I Equipment Replacement Fund 23,400 24,100 24,800 25,600 26,300 124,200 I 504,200 I Total Total 23,400 24,100 24,800 25,600 26,300 124,200 Total Operational Impact/Other I Variance from 20 year plan - move back schedules cars one year, Estimate salvage/resale value on replaced item: $4,000 each . Thursday, June 24, 2004 'i . .EQUIPMENT REPLACEMENT PLAN 2005thru 2009 ,Contact Police Chief ,City ofHopkins,MN p , Departme~tPolice roject # 01~ERP-207 Type Equipment Copy Machine Oseful Life ',5 years Category Equipment Priority nla Total Pl'ojeCt Cost $97,500 Description Police Department'copy machIne capable of producing double sidec6piesand collating pages, Justification . Used to make duplicate copies of reports, .letters, memos, etc" generated by police presonnel. Prior Expenditures 2005 2006 2007 2008' 2009' Total ' Future I 14,2001 Equipment 16,500 16,500 ,I 66,800 I Total Total 16,500 ' 16,500' Total . Prior Funding Sources 2005 2006 2007 2008 ,2009 Total Future I "14,200 I Equipment Replacement Fund 16,500 16,500 I . 66,800 I Total, Total 16,500 16,500 Total Operational ,Impact/Other , " Variance from, 20 year plan - none Estimatesalvage/resale value on replaced item: $1,000 . Thursday, June 24; 2004 " EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Police Chief . City of Hopkins, MN Department Police Project # Ol-ERP-208 Type Equipment . Useful Life 7 years Project Name Logging Recorder Category Equipment Priority n/a Total Proj ect Cost $111.800 Description I The police logging recorder is a device which tape records all telephone and radio transmissions which go through the Police Department Justification I Records all phone calls coming into the dispatch center and all incoming and outgoing radio transmissions. This is necessary in case questions arise as to how calls for service were received or dispatched, , Expenditures 2005 2006 2007 2008 2009 Total Future Equipment 29,900 29,900 I 81,900 I Total 29,900 29,900 Total . Funding Sources 2005 2006 2007 2008 2009 Total Future Equipment Replacement Fund 29,900 29.900 I 81;900 I Total 29,900 29,900 Total . Operational Impact/Other I ,. Variance from 20 year plan - moved back from 1998 to 1999 Estimate salvage/resale value 6n replaced item: $-0- . Thursday, June 24, 2004 .. . EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 " Contact Police Chief City of Hopkins, MN Department Police roject # 'Ot-ERP-209 Type Equipment Useful Life 3 years Network Server (3) Category Equipment Priodty , n/a Total J>l'oject Cost $196,700 Justification 'Prior Expenditures 2005 2006 2007 2008 2009 'Total Future I 17,0001" Equipment 8.500 8.500 , 8,500 8,700 8,700 42,900 I 136,800 1 Total Total 8,500: 8,500 8,500 8,700 8,700 42,900 Total . Prior ' Funding Sources , 2005 ' ,2006 2007 2008 2009 Total Future ',I' 17,000 I Equipment Replacement Fund ,8,500 8,500 ' 8,500 ' 8,700 8,700 42,900 I 136,800 I Total Total 8,500 ,8,500 8,500 8,700 8,700, , 42,900 Total Operational Impact/Other' Variance from 20 year plan~ Estimate salvage/resale value on replaced item ~$ . Thursday. June 24, 2004 EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director . City of Hopkins, MN Department Public Works: StreetsfTraffic Project # 01-ERP-300 Type Equipment . Useful Life 10 years Project Name 4x4 3/4 Ton Pickup with Plow Category Vehicles Priority nla Total Project Cost $58,600 Description I Pickup used by various divisions of Public Works, Justification I , Light hauling and transportation for supervisors, Maintenance garage service vehicle, Expenditures 2005 2006 2007 2008 2009 Total Future Vehicles 25,000 25,000 I 33,600 I Total 25,000 25,000 Total . Funding Sources 2005 2006 2007 2008 2009 Total Future Equipment Replacement Fund 25,000 25,000 I 33,600 I Total 25,000 25,000 Total OperationallmpactlOther I Variance from 20 year plan - Increase expenditure to reflect actual cost Change from 1/2 tOil pickup to 3/4 ton 4x4 pickup. Estimate salvagelresale value on replaced item: $1,500 . Thursday, June 24. 2004 >: ;; EQUIPMENT REPLACEMENT PLAN. 2005 thru 2009 Contact Public Works Director City of Hopkins, MN Department Public Works: Streetsffraffic roject # Ol-ERP':'301 Type Equipment Useful Life 8 years 4X4 3/4 Ton Truck with Plow Category VehiCles Priority n/a Total Project Cost $92,900 Description 3/4 ton pickup use,d by Street Divison of Public Works for heavy loads and p",lIing trailers, Justification Lighfhauling, pullingtrililers, transportation to and from job sites, Expenditures 2005 2006 2007 2008< ' 2009 Total' Future Vehicles 24,000 24,000 I, ., 68,900 I, Total 24,000 , 24,000 Total . Funding Sources .' 2005 2006 2007 2008 2009 Total Future Equipment Replacement Fund 24,000 " 24,000 I 68,900 I Total 24,000 24,000 Total . Operational Impact/Other. , Variance from 20 year plan - none " Estimate salvage/resale. value on replaced item: $1,500 . Thttrsday, Nne 24, 2004 , .. EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director .. City of Hopkins, MN Department Public Works: Streetsrrraffic Pro,ject # Ol-ERP-302 Type Equipment . Useful Life 8 years Project Name 4x4 1 Ton Dump Truck Category Vehicles Priority n/a TotalProject Cost $157,300 Description I Truck is used in the Street Division of Public Works, Justification I Plows alleys in winter, light hauling, snow removal and transportation, Expenditures 2005 2006 2007 2008 2009 Total Future Vehicles 40,600 40,600 I 116,700 I Total 40,600 40,600 Total . Funding Sources 2005 2006 2007 2008 2009 Total Future Equipment Replacement Fund 40,600 40.600 I 116,700 I Total 40,600 40,600 Total Operational Impact/Other I Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $3,500 . Thursday, June 24, 2004 .. . EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director City of Hopkins, MN Department Public Works: StreetsfTraffic roject # 01~ERP-303 Type Equipment Useful Life 12 years Project Name 1 Ton Dump Truck (2) Category Vehicles Priority n/a Total Project Cost $152,400 Description Truck is used in the Street Division of Public Works, Justification Vehicle used by various departments for street and park maintenance and light hauling. Prior Expenditures 2005 2006 2007 2008 2009 Total Future I 30,500 I Vehicles 31,800 31,800 I 90,100 I Total Total 31,800 31,800 Total . Prior Funding Sources 2005 2006 2007 2008 2009 Total Future I 30,500 I Equipment Replacement Fund 31,800 31,800 I 90,100 I Total Total 31,800 31,800 Total Operational Impact/Other I Variance from 20 year plan -move one truck back one year to 2003 Estimate salvage/resale value on replaced item: $3,500 . Thursday, June 24, 2004 ~ EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director . City of Hopkins, MN Department Public Works: Streets/Traffic . Type Equipment . Project # Ol-ERP-304 USeful Life 12 years Project Name 1 Ton Traffic Boom Truck Category Vehicles , Priority n/a TQtaJProject Cost $101,300 Description Boom truck used in Street and Traffic Divisions of Public Works. Justification Vehicle used by Traffic Department for signal and light polemaintep.ance, Expenditures 2005 2006 2007 2008 2009 Total Future Vehicles 25,000 . 25,000 I 76,3001 Total 25,000 25,000 Total . Funding Sources 2005 2006 2007 2009 Total Future Equipment Replacement Fund 25,000 25,000 I 76,300 I Total 25,000 25,000 Total Operational Impact/Other Variance from 20 year phin - change to 25,000 cost in 2007 - cost to replace cab/chassis and reuse lift assembly, Estimate salvage/resale value on replaced item: $8,000 . Thursday, June 24, 2004 . " EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director City of Hopkins, MN Department Public Works: StreetslTraffic roj eet # Ol-ERP-308 Type Equipment Useful Life 15 years Front End Loaders (2) Category Equipment Priority n/a Total Project Cost $761,100 Description Justification Expenditures 2005 2006 2007 2008 2009 Total Future Equipment 140,000 157,500 297,500 I 463,600 I Total 140,000 157,500 297,500 Total . ,Funding Sources 2005 2006 2007 2008 2009 Total Future Equipment Replacement Fund 140,000 157,500 297,500 I 463,600 I Total 140,000 157,500 297,500 Total Operational Impact/Other Variance from 20 year plan -Increase costs to reflect actual replacement cost. Estimate salvage/resale value on replaced item: $ . Thursday, June 24, 2004 " EQUIPMENT REPLACEMENT PLAN 2005 IhriJ 2009 Contact Public Works Director City of Hopkins,MN Department Public Works: Streetsrrraffic Project # 01-ERP-316 Type Equipment . Useful Life 20 years Project Name Trailer Category Equipment Priority nla Total P,"oject Cost $4,900 Description Justification Expenditures 2005 2006 2007, 2008 2009 Total Equipment 4,900 4,900 Total 4,900 '4,900 . FundingSoul'ces 2005 2006 2007, 2008 2009 Total Equipment Replacement Fund ." .4,900 4,900 Total 4,900 4,900 Operatiohal Impact/Other Variance from 20 year plan - none Estiamte salvage/resale value on replaced item:$ . Thursday, June 24, 2004 .. . EQUIPMENT REPLACEMENT PLAN. 2005 thru 2009 Contact Public Works Director City of Hopkins, MN Department Water roject # Ol-ERP-500 Type Equipment Useful Life 10 years 1/2 Ton Truck Category Equipment Priority nla Total Project Cost $47,300 Description Trucks used by Water Department Justification Expenditures 2005 2006 2007 2008 2009 Total Future Vehicles 20,500 20,500 ' I 26,800 I Total 20,500 20,500 Total . Funding Sources 2005 2006 2007 2008 2009 Total Future WF- Water Fund 20,500 20,500 I 26,800 I Total 20,500 20,500 , Total , Operational Impact/Other I Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $ . Thursday, June 24. 2004 ~ EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director . City of Hopkins, MN Water Project # Ol-ERP-S03 Type Equipment . Useful Life 20 years Project Name Air Compressor Category 'Equipment Priority' nla Totall'roJect Cost $21,100 Description Portable air compressor used by various departments of Public Works. Justification Air supply for operating jackhammerS, blowing out irrigation Jines, sand blasting and operations of various tools. Expenditures' 2005 2006 2007 2008 2009 Total Equipment 21,100 21,100 Total 21,100 21,100 . FundingSources ' 2005 2006 2007 2008 2009 Total WF - Water Fund 21,100 21,100 Total 21,100 21,100 , Operational Impact/Other . Variance from 20 year plan - move back to 2009 - current compressor in good condition Estimate salvage/resale value on replaced .item : $2,000 . 'Thwsday, June 24.2004 . .' EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Finance Director City of Hopkins, MN Department Water roject # Ol-ERP-505 Type Equipment Useful Life 8 years Project Name Utility Billing System Category Equipment Priority n/a Total Project Cost $55,000 Description Utility billing system for billing customers for water/sewer/refuse and sllmn sewer usage. Justification Allows billing clerk to bill customers efficiently and effectively, Also, provides tools for analysis and monitoring. Expenditures 2005 2006 2007 2008 2009 Total Future Equipment 14,200 14,200 I 40,800 I Total 14,200 14,200 Total . Funding Sources 2005 2006 2007 2008 2009 Total Future WF - Water Fund 14,200 14,200 I 40,800 I Total 14,200 14,200 Total \ Operational Impact/Other I Variance from 20 year plan. none Estimat~ salvage/resale value on replaced item: $ . Thursday, June 24. 2004 ~ EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director c City of Hopkins, MN Department Water Project # Ol-ERP-506 Type Equipment . Usefu I Life 5 years Project Name Public Works Copy Machine Category Equipment Priority nla Total P,'oject Cost $53,500 Description Copy machine to service needs of all division of Public Works. Justification Making copies for various departments. Expenditures 2005 2006 2007 2Q08 2009 Total Future Equipment 10,600 10,600 I 42,900 I Total 10,600 10,600 Total . Funding Sources 2005 2006 2007 2008 2009 Total Future WF . Water Fund 10,600 10,600 I 42,900 I Total 10,600 10,600 Total Operational Impact/Other Variance from 20 year plan. none Estimate salvage/resale value on replaced item: $800 . Thursday, June 24. 2004 ;. . EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director City of Hopkins, MN Department Sewer rojcct # Ol-ERP-551 Type Equipment Useful Life I 0 years 3/4 Ton Utility Truck (2) Category Vehicles Priority n/a Total Project Cost $119,500 Description 3/4 ton utility trucks used by the WaterlSewer Division of Public Works, Justification .!-' Transportation to and from job sites, box carries tools used by personnel for job site repairs and light hauling, Expenditures 2005 2006 2007 2008 2009 Total Future Vehicles 25,000 26.000 51,000 I 68,500 I Total 25,000 , 26,000 51,000 , Total . Funding Sources 2005 2006 2007 2008 2009 Total Future SF - Sanitary Sewer Fund 25,000 26,000 51,000 I 68,500 I Total 25,000 26,000 51,000 Total Operational Impact/Other I Variance from 20 year plan - Delete 1/2 ton truck and 4x4 3/4 ton truck - change to 3/4 ton truck, Adjust expenditures to reflect actual cost. Estimate salvage/resale value on replaced item: $2,500 . Thursday, June 24. 2004 ~ EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact, Public Works Director " City of Hopkins, MN Department Sewer Project # Ol-ERP-553 Type Equipment . Usefnl Ufe 20 years Project Name Rodding Machine Category Equipment Priority n/a, Total Project Cost $36;400 Description Mechanical sanitary sewer cleaning machine. Justification Expenditures 2005 2006 2007 2008 2009 Total Equipment 36;400 36.400 Total 36,400 36,400 . Funding Sources 2005 2006 2007 2008 2009" Total SF - Sanitary Sewer Fund 36.400 36,400 Total 36,400 36,400 Operational Impact/Other Variance from 20 year plan - extend life to 20 years to reflectactual. Estimate salvage resale vallie on replaced item: $ . Thursday, June 24, 2004 .. ., EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Finance Director City of Hopkins, MN Department Sewer roject # Ol-ERP-556 Type Equipment, Useful Life 8 years Utility Billing System Category Equipment Priority nla Total Project Cost $98,700 Description Utility billing system for billing customers for water/sewer/refuse and storm sewer usage. Justification Allows billing clerk to bill customers efficiently and effectively, Also, provides tools for analysis and monitoring, Expenditures 2005 2006 2007 2008 2009 Total Future Equipment 25,500 25,500 I 73,200 I Total 25,500 25,500 Total . , Funding Sources 2005 2006 2007 2008 2009 Total Future SF - Sanitary Sewer Fund 25,500 ' 25,500 I 73,200 I Total 25,500 25,500 Total , Operational Impact/Other I Variance from 20 year plan. none Estimate salvage/resale value on replaced item: $ . Thursday, June 24, 2004 .' EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director . City of Hopkins, MN ' Department Public Works: BldglEquip Ser Projel't 1/ , o l-ERP-71 0 Type Equipment . Useful Life 10 years Project Name 4X4 1/2 Ton Truck' , Category Vehicles Priority nla Total Project Cost $56,400 Description Pickup used by various divisions of Public Works, Justification Light hauling and transportation for supervisors. Maintenance garage service vehicle, Expenditures 2005 2006 2007 ' , 2008. 2009 Total 'Future Vehicles 24,100 . 24,100' I 32,300 I Total 24,100 24,100 Total . Funding Sources 2005 2006 2007 2008 2009 Total Future Equipment Replacement Fund 24,100 24,100, I 32,300 I Total 24,100 24,100 Total Operational Impact/Other Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $1,500 . Thursday, June 24,2004 '", ; EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director City of Hopkins, MN Department Public Works: ParkslForestry roject # Ol-ERP-802 Type Equipmeilt Useful Ufe 10 years 3/4 Ton Utility Truck Category Vehicles PriOl'ity u/a Total Project Cost $75,600 Description Truck used by Parks Division of Public Works, Justification' Expenditures 2005 2006 2007 2008 2009 Total Future Vehicles 32,200 32,200 'I 43,400 I Total 32,200 32,200 Total . Funding Sources 2005 ., 2006 2007 2008 2009 Total Future Equipment Replacement Fund 32,200 32,200 I 43,400 I Total 32,200 32,200 Total Operational Impact/Other I Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $ . Thursday, June 24, 2004 ... EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director , City of Hopkins, MN. Dcpartment Public Works: Parks/Forestry Project /I Ol-ERP-803 , Type Equipment . UsefuU-ife 15 years Project Name Swap Loader , Equipment Category Priority nla Total Project Cost $70,500 Description I Justification Expenditures 2005 2006 2007 2008 2009 Total Future Equipment 27,600 27,600 I 42,900 I Total 27,600 27,600 Total . Funding Sources 2005 2006 2007 2009 'Total Future Equipment Replacement Fund 27,600 I 42,900 I Total 27,600 Total Operational Impact/Other Variance from 20 year plan - Apply 50% of replacement to Refuse Fund. .Estimate salvagelresale value on replaced item: $ . Thursday, June 24,2004 \~, ~ EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director City of Hopkins, MN Department Public Works: ParkslForestry roJect # Ol-ERP-805 Type Equipment Useful Life 20 years Aerial Lift Category Equipment Priority n/a Total Project Cost $110,000 Description Justification Expenditures 2005 2006 2007 2008 2009 Total Equipment 110,000 110,000 Total 11 0,000 110,000 . Funding Sources 2005 2006 2007 2008 2009 Total Equipment Replacement Fund 110,000 110,000 Total 110,000 110,000 Operational ImpacVOther I Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $ . Thursday, June 24, 2004 ., EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director ~ City of Hopkins, MN Department Public Works:Parks/Forestry. Project # 0l-ERP-806 Type Equipment . , Useful Lite 20 years Project Name Tractors (2) Category Equipmerit Priority nla Total Project Cost $82,800 Description Farm type tractors with cab used with various attachments. Justification Ice rink sweeping, flail mower, fertilizing, aeration, plowing arid grass seeding, Expenditures 2005 2006 2007 2008 2009 Total Future Equipment 41.400 41,400 I 41,400 I Total 41,400 41 ,400 Total . Funding Sources 2005 2006 2007 2008 2009 Total Future Equipment Replacement Fund ' 4MOO 41 ,400 I 41,400 I Total 41,400 41 ,400 Total Operational Impact/Other Variance from 20 year plan - move tractor back from2004 to 2009, move back tractor from 2006 to 20 10; Estimate salvagelresalevalue on replaced item: $3,500 . Thursday. June 24. 2004' " ':;: EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director City of Hopkins, MN Department Public Works: ParkslForestry roject # Ol-ERP-807 Type Equipment Useful Life ,,15 years 'Trucksters (3) Category Equipment Priority n/a Total Project Cost $105,900 Description Truckster used by Parks Division of Public Works for ballfield and parks maintenance, Justification Park maintenance, ballfield grooming and weed spraying. Prior Expenditures 2005 2006 2007 2008 2009 Total Future I ' 29,900 I Equipment 16,600 16,600 I 59,400 I Total Total 16,600 16,600 Total . Prior Funding Sources 2005 2006 2007 2008 2009 Total Future I 29,900 I Equipment Replacement Fund 16,600 16,600 I 59,4001 Total Total 16,600 16,600 Total , Operational Impact/Other I Variance from 20 year plan -none Estimate salvage/resale value on replaced item: $1,400 each . ThursdOy, June 24,2004 ~ EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director " City of Hopkins,MN Department Public Wqrks: Parks/ForeStry Project # Ol-ERP-808 ' Type Equipment . Useful Life 8 years ProjectNarne Riding Mowers (2) " Category Equipment Priority n/a Total Project Cost $108,000 Description Riding mowers used by Parks Divison of Public Works. One mower also used for sidewalk snow removalduri'1gwinter months. Justification Mowing city parks and right of ways and sidewalk snoW removal. Prior Expenditures, 2005 2006 2008 2009,' Total Future I 33,000 I Equipment 22,800 22,800 I 52,200 I Total Total 22,800 22,800 Total . Prior Funding Sources 2005 2006 2007 2008 2009 Total Future I 33,000 I Equipment Replacement Fund 22,800 22,800 I 52,200 I Total Total 22,800 22,800 Total Operational Impact/Other Variance from 20 year plan - none, Estimate salvage/resale value on replaced item: $600 each . Thursday, Juile 24, 2004 l< " EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Directo~ ~ity of Hopkins, MN Department Public Works: Parks/Forestry 01-ERP-813 Type Equipment Useful Life 15 years Brush Chipper Category Equipment Priority il/a Total Project Cost $58,300 Description Brush chipper used for Forestry and brush pick up operations of Public Works. Justification Expenditures 2005 2006 ' 2007 2008 2009 Total Future Equipment 22,800 22,800 I 35,500 I Total 22,800 22,800 Total . Funding Sources 2005 2006 2007 2008 2009 Total Future Equipment Replacement Fund 22,800 22,800 I 35,500 I Total 22,800 22,800 Total Operational Impact/Other Variance from 20 year plan - change to usable life to 15 years, Estimate salvage/resale value on replaced item: $ . Thursday, June 24, 2004 " EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director .:<- City ofHopkins,MN Department Public Works: ParkslForestry Project # Ol-ERP-814 Type Equipment . Useful Life 15 years Project Name Trailer Flatbed Category Equipment, Priority nla, Total projett Cost $3,600 Description Justification Expenditures 2005 2006 2007 2008 2009 Total. Future Equipment 1,400 1 ,400 I ,2,2001 Total 1,400 1,400 Total . Funding Sources 2005 2006 2007 2008 2009 Total' Future Equipment Replacement Fund 1 ,400 1,400 I 2,200 I Total 1,400 1,400 Total Operational Impact/Other Variance from 20 year plan. Move up one year. . Estimate salvage/resale value on replaced item: $ . I Thursday, June 24, 2004 ;, ';' EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director City of Hopkins, MN Department Refuse rojectll Ol-ERP-900 Type Equipment Useful Life 5 years Refuse Truck Category Vehicles Priority n/a Total Project Cost $1,016,200 Description Refuse truck used by Refuse Utility Division of Public Works, Justification Residential waste pick up. Prior Expenditures 2005 2006 2007 2008 2009 Total Future I 148,000 I Vehicles 171 ,600 171,600 I 696,600 I Total Total 171,600 171,600 Total . Prior Funding Sources 2005 2006 2007 2008 2009 Total Future I 148,000 I RF - Refuse, Fund 171,600 171,600 I 696,600 I Total Total 171,600 171,600 Total Operational Impact/Other Variance from 20 year plan - none Estimate salvage/resale value on replaced item;.$18,OOO . Thursday, June 24. 2004 EQUIPMENT REPLACEMENT PLAN City of Hopkins, MN Ol-ERP-902 i . ' ,;. EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Public Works Director City of Hopkins,MN Department Refuse roject # o l-ERP-91 0 Type Equipment Useful Life 15 years Swap Loader Category Equipment Priority n/a Total Project Cost $70,500 Description Justification Expenditures 2005 2006 2007 2008 2009 Total Future Equipment . 27,600 27,600 I 42,900 I Total 27,600 27,600 Total . Funding Sources 2005 2006 2007 2008 2009 Total Future RF - Refuse ,Fund 27,600 27,600 I 42,900 I Total 27,600 27,600 Total . Operational Impact/Other I Variance from 20 year plan - 50% to Refuse Fund/50% to Equipment Replacement. Estimate salvage/resale value on replaced item: $ . Thursday, June 24, 2004 ~ ^< EQUIPMENT REPLACEMENT PLAN 2005 thru 2009 Contact Finance Director ~ City of Hopkins, MN Department Stonn Sewer , Type Equipment . Project # Ol-ERP-950 Useful Ufe 8 years Project Name Utility Billing System Category Equipment Priority n/a Total Project Cost $32,900 Description Utility billing system for billing customers for water, sewer, refuse and stonn sewer usage: Justification Allows billing clerk to bill customers efficiently and effectively, Also, provides tools for analysis and monitoring. Expenditures 2005 2006 2007 2008 2009 Total Future Equipment 8,400 8,400 I 24,500 I Total ' 8,400 8,400 Total . Funding Sources 2005 2006 2007 2008 2009 Total Future SU ~ Storm Sewer Fund B,400 8,400 I 24,500 I Total 8,400 8,400 Total Operational Impact/Other Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $ . Thursday, June 24, 2004 0; ,'" ~ >,,<< 1 .il:'. .~~ g , " ~~ ~. N .-. ~ o ~ ~ '" ~.l'.' ~,;; ;' . "' [' "'.~,:~ ~ ~ ~ 1::':'/, ~ ti 0: ~ '" - ':,:~l.~i ,~, 8 8 N . "'.i, r--~ M~ 8 ~~ ~ 0\ '" N j,,,'> , 8 M ~ ~ i:;'; M o 0 o 0 o Nft -. N '" '" o N t- N ",". N "<t 8 g g 0\ """~ -~ M~ _ VI co Q'\ ~ M ~ 8 8 ~ ~ ~" o t- t- '" ~ o 0 o 0 r-- VI q - "' '" ~ '\.<~ . o 0 o 0 ~ ~ o '" "' '" o 0 o 0 ~ '" 0 - ~ ~ ~ '" , "~h;'; ~ ~ ~ ~,r~ ~ . ~ 0 8::88 ::z= 0 I'"'l 0 :-r- t' U ;~ ~ a-~ ;'~~ '4 00 VI h,; 0 I- .. 'c,': ~ ~ 8 g ~.~ g ~'~ ~ ~, ~;I' ~ ..:iN Q" "0 0 ~ ~ - ~ _ ~ M ~ S ~ t:: ~t3 8 8 Q.. U 00 VI~ .,-. Sz ~ ~ ~l ~ o ~ loll , , ~ 0 0\ l:~1 (5 ?2: g ":;, '4 <<JA .. i' :.~' I: ~iC: ~ ~:~,:: ~,;l ~ ~"~~~ ~ 11,'" ',,", ~ ~:~, ":';' ~ ! \ ~2:;' ~" l;:'~. l'~- ; ,': 'i~: ~:g ~,:i;\ ~ '" ,,'.."" ", ".<1\ " 8: ,'I-- ~''ll:t: f""I .~Q$ QQ ('~ '<t i= ~ IoIlI ,&1!3 ,',,"' ~ '". ~ f-o o..;~ :'l,L f-o ul ';"", ':,"'i 'I'," i;;;' f-o ~ ",.,,, ~ i'iI: f-o ~ 5 ~ '":~, ~:o: ~ {": 01 g ~;~ ~ g :l ,::r ::~i: }~ ~ ;"~:j g E :P;:~ ~ :~l!l g i:S 0 ~ ,Ai" ~ "as :l'i ~ ~ ~ ,& Jil; ~ 2 -'" "' :1"'1 ",~, ~ ,'~, ~ ~ ..: "''':', ~,~, gj "' 0'''''''' ",,:>, 0.., z "i'.>" ,:>;: '" A: '" ,~! "'30: 3:11 u '" I:l w", ~ 19' '" "':2' >-5~ :t:', '~ ,,~,,:"m ~r~ (;1ii <'i;; E;"ltl' z i:i)j~ o's!' ~:: ~;~ u ~;~l ~ ~:r ~~-; gi~ ~f:lt. ~~>:~ : ~ ~!i~! ~ ,~, gj ~ t"", '" "", V:~ '" "ra, '" ''''' '" ,;1 ~ ~ < u"..,j,~ g!!; ~:'~ g;~~~ " '",:':', ::( !~:f t,~~,;~ ~ Z~f; ::;:~ ... ~ '" 0 ;;l 0 .... e ... M ~ '" " '" '" '" ~ '" . '" '" '" ;:; '" '" '" '" '" ?! ~ ~;: '~" I '" ;:; ~ '" ,0 g g '" .~ 00 ;:; '" '" '" ... ,.; .... .... ~ '" g '" ~' g ~.;" + ' ... .. ' ~ '6 '" M '" 0' ;:; ,... 0' Jt M ~ '" '" '":t.... ~.' ! ~. .-, N i"..; '.;-' . '" ~ ". ~ Cl ..' :i . '" ~ ~ ro.:.: c",'- ~ ~rr~" 'I:' ~~J: ~ :~ ~,' '" ;:1':: ~ !~~: g i~";;::: ~>, ' .. ~~~~~ ::: ~ :'-:'1. '.<"1~~ 8 -,"I.' :;f f,~" ~~ -,~.c. '" 00 ' .- '" '" ?i)':; .:..:. '" f~ ~~ },:< . .... - ~ .... ;~~j~ ~'1; '" ~f~t~ '" '" ~,~V. ";<'1 :l'~i\ ~~f: "" i!~ :;\;:, ~ ~\~~ ~:5' '" .-:..1' '" .~;!j,; '" g '" < f~ l;r~;: ~;~ S\i ~, .J ~1:~:: "'.\ ~ ~~ ,,"'-1: L~ ~J~;;l '" ~ - '" '" - :,.f<:;:~-! ~ (.:l Z ~ ~ StS, Ji~~: :l Ii 'I l<1 ~;;i; "'z i :;: . . jig '" -< lloo Z:> Q' ~ ~~~ ~I: ffit~ -" <:::! 5 !' (g ~~ ' . ~ ~ 'r~ z k'S~ a~L.: '" ~.~ I!:: ~ ~~~ <bgi o~ ~~ili ~~ =-= ,00 g~ '" ~ :1tmt 0 ! ~Si'~~; ~,;~:,,\ llo Z ~ ..:I... g:!~, '" =l::! _~N' N;t~. ~~~~ ~: C"\ ~~'~ _ ('0\ ~~~; g ~ g ~ ~ 8 g ~~::: :J'~, g g o:t 'O:I''l1 .;1$: 0 r-. ; ~ ~ ;.igc, ;;m~ - ~V;;:? :~~~ 8 o~ ~g 8 . ^ . 8",,, ,""' 0 " : ~ ~! o~ ~' i _ "". g.;~ ~l~ N. ~ te ~ r~'; :!)~; ~ o 0 ;.;' { .\;:: :l~ 0 o 0 8"'" 8'''''' :Ji$,o ~ ~ ~ ~(~:\; '^<,H~ :;g ~ ~ ~ ~~;; ~~ ~ ~ ,', _ -"l 8 g::;." g ::" .~ 8 g : ; ;';, ~li {; ~ " ~ ; g 2:;~g: g \~' 8 '0 'D. c:t;~~. O~:',." .~~ ~ ~ . ;, ~~ ~ ~ ~ ~ lfi ~ih~ ~ ~1i~ :?~~. ;l,f.<r . O"~"'i, 0 ;,;,;" :~ g ,~ 0 ~!~,~~;!l: 0 o 0" '0"'--" ~~ 0 ~ g :~1:1 ~.: ! .,1 .,. ,I . . g ~ ~f:f~ "' W1\ '1:;: ~ ~ go;' 0'" :~ g ~ ~~!<:, ~~': :(~.;; ,,~>, ; ~,! ,', "I ~ ~:ll: ~';~'~:i ~. . ~ ~O 'i.'~' .-.;\:oi,,', "'\" ~;4" ~lr>,: ,:;\1' ...1 9 ?~, O'ic,;~"," ~'M~,l.J ~ ~'...1 ~ <5 .. z '1$ ~ ~. ' ~ "I' t, <: ..... ~~' ~'1~' ~"!fl <: - I <: .- ~ ;z; ~ ~g~,~~~ t~ ~I~ ~~\I~~~~~ ~~~~~8~i~~ ~~~I'~.~ ~~ ~~ ~ ~,1$. "'';~\ 5{~: 1=8'" ,I ~~ .' t)"i' ,<>I '" ;.. ~'11:i11 ;\'j,1U1; ,<Il <';' ,'" U <: t2 < <( z~, 'Z ;,:.t! .J !'l:;l' _ ;; I' i- ,1:l!; .", u.' , .. ::;: j' ..: <(::;: Cl.i 11 O{' ~ ..( ~ ~; ! ~"i' d ~, _ fPP i;" Z ,: 1 U >\~ l' >- . g! .."~\ ~,'~::>h ~\I ~:;, ~ u ,,:'ri1 :>:';l ~ii' .0( "'"I ~ '" i =:1:1 ~w:~ ;1;11 u~uw W 8~ · 8 ~ g N N ,,: '0' N ii ~ 8 8 N 0' ~ ". ~ ~ .~ N '" ~ g N M N ~ N '" '" ~ ~ N g g '" '" " ~ '" '" '" ~ '" ;;. Iii g N " . " " ~ I~ ~ ~~ ~ " , !~ ~ g , ' . ~ ,-. ,., ! I ~i ? .::: ~i if - 2 .' ',". ~ ," "1" ~,., .1 . ~ I: . g .. ~ ~ " o N g N g N: .. . {~:!. '," ~ ~t I '. N ~~ ~~ ,}' ~ ~."'l,:~- , ,~,.' ';;'f~:: ~rJ .. :::A1# ;;z '" <... . I ... .. ;Z; M " '''m, ~I' ,.',", I" '~" ,-;-.".., ,,'~, i'" . - ,.,' ','", ,," ,.,,;:, "i . ....z., -fie::, Mi, _ ~ . " ~ ,.,., ~ "', .......,,, .~ . ~ i/~ : L~' g/;~li~ ~~.,;~~~gL'~ 2 ~rg"f'~;~';I:f~!!gP'I":'~;' g f:j ~ 8',f& , " "..0 -1 ',.,..,Ol""'.. ." .. .' " ,"_ 0 · ~... ~ !S,..s~.""~ 0 .~,.M< ,_, '& ..,. ~ > g · ... Ii ~'" ~J;I "Ii!" "0' ;,IH".. ; ~ s · ~.~ .f", "UI ~I!! 2 ~f B'" "t I;; . ~ i ; ii}~ :'~~~!igl'3 :M.,~~.. j @ I . " 8.S .'!';,' 8 ~f,:i:: 0 ~,~( N. M' :'~. q: Ii' ~ ;; r-." iC- 0" ~":,:tf " o r-' '<l ~ N " "! ~ d';~l' r- :.i::' " g~ ~~~. ~r,;: 0 " !;,; 0 Ii' . '" M', : '" N :::it ei' :~' j' : .. 0{ ':;;: r--.."".: ~ ~1~.:' oo:t~' ;;; '" 1I"l,~;,~,. '^'?l - :.,,'.;. ,,',1 g~,~~~ 8 0 ~"::~j 0 N M' M N ';;')7I &j: :::,; ,,; :';;.'l'f 0 0 N M,'<., .. :~m , , ~t~'~ 0:;-::[ ! 0 ~~!: SJ:,,;:'~' 0 g '" ..; ;g,~, '. ~;";'i' .., 0 N '<;t',.:, r- . \0;, , :1 ;'~: ~\,~: ~"r'.:: 0 0 ~,:g 0 ~ ~" N inr ~() r-" ;;; oo":i~ 0 '" '^" , '" - " ~: . ~ .......'1..,. ..: .!^~! .1>,,'; ;!~,':~' :H:'~' ~:~j gids; ~"!;~ ~ 0 0 '" ~,~~ ;; o'r-.;., ~~~~ ;:: ~l:r '" Op"\'r~<< "" -,"'),,',. fl"I" . ,'", ..... ~';;'~n - :::~. 'J,;,.: "'~ ~i;~~l$: :5 ~~.~i,f 0 8 g;'\ ~',,: . 0 , 00 ~~l\; .. M ~." ~ 00 ;.!\\o~ ;; Ct\ltl.,() 5. ~;'~~ M.';'1; "'$('0\-' N "t,7m:J ~:~; '1; - ,,~~- :f~~";::~ <,0,";' 1~,~" .\,':, ~r,:;.<r', ~~i ~.:::~; g~7'" " 0 r- ~~~r 2 ~ ;; ~~~: gg ~~ '" l~~j ',<;~ L; g:g t;;,~ ~i~'f ~~ ~~J; ~ 0 ~J:~ '" !'tin 2 ;; N~ fO'\ 0{ '1"\:- ~ i;"~ '" "'ir: N ~,'~ " "~ ; , , > ~I ~ :,',' l'~ 0 ~ ~f:~; ~ 2 g g ~ ~~j~ ... _"s.,. ~t:,:; ;;~:tt .~<. g1U\~, ~:'~, 8 0 ot!'o: '" i~'~~,::' ~ ~J~: ;; 00 ,'l> Ii 00 .fln\ ~::~: ,~ 0 N '" '" .'"" 'L>~l - It' . . 8 g g~: ':;" ~ " oJ.:": M ~",~ co .,' g ~c:~: g r,i;; 0' g ~f;:~: .." ' t: '" ",;, }:: ,';\', o '0 g~;~::;: "" ~!~ 0.0' 0 '" ;:}.~. 0 0 00" ~:; ','~~ 00" '" '" --. ~ :'~:4: 0 ;i '" ~.~" . " !l ~:~ ~ 0 0 '" g ~ ..; ..... ..'00 g 'N' <- ~ ~:;( <- , 'n'<'~ 0 ~h,~ ':;:~ '.- 0 fji'-~: ~~1:i g g ~:~ <:; i~' t! :;f <-, '" "'-M r- .'" It.l~, , 8'8' ~ ~~l.l 0 ~"'i ~1;!i~ is 0 8 l"\.'ro,., ~ ~':I} '" ~:::;: '" ~ '" "<t :::~~. ':","t".! ':',' ~i~-' . -';~':,: , , ~.'~::~: ~i~)J G,;',~ 8 0 ~~~ 00 '" 0 0 :~~i ~ ~ 0 ~tt~; O';f'::. M N M",,<n' M ,..-, i! ~i I ,..... ;'.:1':,t @~ 0 gJt~ r- ~ ~ i :21~, <l :~J~;~ 8,:'Sl; 'y~~"", T-H'~ ;"::::,~'> :' ",~ :;/;'.1' gr/" 8 3;~ ~;:~ ~:;~: ~~~: ~ "g' o ".::. ~ :nf~ ~ 8 ;;~r 8 ;'~; "" '.'1 8 '\'S. 0,'0: 0 0 o,f')'/;'! ~ ~~.: ",:1>i' ~!;~ ;:t!;!"; ~,.'~ ~ ~ ~ l'~. ~.. @~i~~~ ~;;:~ " ' '" <- r- ei 5 ~ifS ~ 00" :;;: 0" 0: ~ ":t',..f'O" Il) N"~'M ~'~"'''' .f?t'-.....Irl ~ '" i~; ~ -\j:;~! :;~i, -~~ 15l~ 15'j~ ~!~,~{ ;'5."4': . ~:<:'^ 8 :8 ~~e;;; ,r,g:,! 0 g;.8: ~::~t~ ~ 0 0 ! 8,~ ~.,'" 8",.", ".1"" 'D;'''', ~ g .,., o 00 '" o.ii 0 ~~~:~: ~~J~.t ~~ :;f ~1i ~ ~ g <- - '~ o ~frr~:f "i' ~~,~ln m,.;:~; ;~ oo~~i~ !i N :::[': '~,;-,,: i '~,:i ' l",'u Ii: ;,',"" .~;,1': l.:;: :V,i; :,'i't: ~~~:~' . ~'ll .~" '" :;,;~;: ",--, Q.,':' I . "<;~! .;~~~; f~' 5}~: 'l:" ..., :~< ..J <.'''L ;;, ill ~ll ~ CI', , }"', ',', .~ ~ ~!I ~!~..J >'c.' ..J~:): ..J~ .:: -J ',',. '" '1;(' "" "5 ,,,d, ,,' '~'" , ~ s"~ <:... <:.. '<: ~ !I ~ ~~' !2:~;~! 5~ ,'~~~I fil 5111 <: -", ~,I ~"~ ~,!,; CI <: 1-";;' 1-":"':5 ..l e! ... o'ol i ~{tN:~ '" ~ 1'.1' ,,' ~:,,:;:: ~ ;:;j~: f"i!: j!;~i ~ il~' ~ ~~f r:~; ~ii fil'~ fl >- ~~~;~ I ~~~' II' ::J .", '" ~ ~ r., 51: ;;: ~I Slit: ~ {t .,i ~~" .;, ~;: i~ J U --','. ~ J ", ~ l' z...., g ,.,:i@:;i m;<: ~~i t~: ~ J.L.-'" (, ..' '" ~[;I ; ~jl~, filj~! ~li I ~I ~;w I ~ '~' -~"" "'~ ..lji~i;'i, ~ ~~i ",,,,' ?: Bf,W ,,/~' ~)<:l ;:!\'g. ",R '~ ::,.; e:i~~ ~t~ ~:: : 5 ~ Z'~ f~ "': .~:~s ~ ';,' ..JPj!!' "' ~ "-1;' ~~~t ',:':. fl~2 :%::1. . ~ifl "'~".~~. -~ 1 ~~' ~ ~ ~~ >- gj'g ::l$'~' otIJ~;' ~;i ~',;~; :;:!i 01:,.;:' "" ,~, :;;;~"gJ~'~ ~" ' i~ ~, : Q :: 0 ,€-' f'" b ~ 1~:, t1J-" . g c;i': . '?J,~.t <.: r;~' (/) ", ,,' (/) -; :,' ': , U';..' M Ei:!i:; l).,\fil1: ~:,~ ffi.:,*,~ uL~! 0.. ~;,: ; ;, ~< <!.~.; ~h;. : t)p~~~ C.; 'if /~ . ,EQUIPMENT & BUILDING INVENTORY . . - - ~- ~ , CITY OF HOPKINS ~ VEHICLEIEQUIPMENT INVENTORY 06/15/2004 . CURRENT REPLACEMENT UNIT # YEAR MAKE MODEL COST FIRE DEPARTMENT 102. 1989 FORD L9000 TELE-SQUIRT $240,000 103. 1982 LUVERNE PUMPER 225,000 104. 1991 PETERBIL T, HEAVY RESCUE 190,000 105. 1998 FORD CROWN VICTORIA 22,000 106. 1998 CHEV LUMINA 21,000 107. 1993 PETERBIL T PUMPER 225,000 108. 1995 CHEV 4X4 LITE RESCUE ' 25,000 109. 1972 STUPHEN AERIAL TRK 750,000 110. 2000 FORD CROWN VICTORIA 24,000 110. 1997 FORD CROWN VICTORIA 20,000 POLICE DEPARTMENT 200. 2004 FORD CROWN VICTORIA $28,100 . 201. 2004 FORD CROWN VICTORIA 28,100 , 202. 2004 FORD CROWN VICTORIA 28,100 203. 2001 FORD CROWN VICTORIA 26,105 204. 2001 FORD CROWN VICTORIA 26,000 205. 2000 FORD CROWN VICTORIA 24,000 206. 2002 FORD CROWN VICTORIA 28,000 207. 2002 FORD CROWN VICTORIA 28,000 208. 2001 FORD CROWN VICTORIA 26,105 209. 1999 FORD CROWN VICTORIA 22,000 210. 1998 CHEV GEOTRACKER 14,000 212. 2002 CHEV TAHOE ' 26,000 213. 2003 CHEV IMP ALA 25,000 214. 2001 DODGE INTREPID 20,000 215. 2002 CHEV IMPALA 18,800 217. 1999 FORD TAURUS .17,000 218. .2000 CHEV IMPALA 22,000 219. 1979 FORD VAN 20,000 241. 2001 CHRYSLER PT CRUISER 18,000 252. 1972 H.M. TRAILER' 3,000 . I ;; - <f CITY OF HOPKINS VEHICLE/EQUIPMENT INVENTORY . 06/15/2004 CURRENT REPLACEMENT UNIT # YEAR MAKE MODEL COST STREET/TRAFFIC DIVISION 300. 1995 FORD 1/2 TON $13,000 301. 1997 CHEV 3/4 TON 21,000 304. 2000 FORD F-450 34,000 305. 1997 FORD 1/2 TON 18,300 306. 1992 CHEV 4X4 1 TON 22,000 308. . 1989 CHEV 1 TON DUMP 23,000 309. 1995 CHEV 1 TON TRK 28,000 310. 1989 INTERNATIONAL SGLAX DUMP 70,000 311. 1985 INTERNATIONAL SGLAX DUMP 70,000 313. 2000 FORD L7501 72,000 314. 1998 FORD LT 8500 86,000 315. 1996 FORD L-8000 85,000 316. 1995 FORD WATER TRK . 318. 1968 FORD BOOM/AUGER TRK 320. 1991 CA TERPILLER LOADER 926E 90,000 321. 1990 CA TERPILLER LOADER 936E 120,000 324. 1989 NEW HOLLAND SKID LOADER 24,000 325. 1998 JOHN DEERE SKID LOADER 24,000 326; 1989 CATERPILLAR, 140-G 82,000 327. 2001 ELGIN PELICAN SE 105,000 330. 1989 INGERSOLIRAND ROLLER DD-25 23,000 334. 2003 GRACO GM 3500 4,500 337. 1994 CATERPILLAR ' BOXPAVER 18,000 338. 1984 STONE CEMENT MIXER 3,000 342. 1991 TARGET CONCRETE SAW 2,400 344. 1996 SNOGO WI< 800 58,000 345. 1989 M-B-W VIB PLATE 2,000 346~ 1984 WENGER STAGE TRLER 8,000 348. 1989 TRAIL- KING TK6V-1200 3,000 349. 1989 ,TRAIL-KING MK6V -1200 3,000 350. 1995 TOWMASTER Tl4 4,000 351. 1943 POLE TRAILER 500 352. ,1996 HOMEMADE TRAILER 1,400 . II ~, l- CITY OF HOPKINS VEHICLEIEQUIPMENT INVENTORY 06/15/2004 . CURRENT REPLACEMENT UNIT # YEAR MAKE MODEL COST FLOAT VEHICLES 407. 1998 FORD TAURUS $16,500 701. 1996 FORD TAURUS $6,000 ENGINEERING DIVISION 700. 2000 CHEV SUBURBAN $14,500 700A 1987 FORD ENG. VAN 20,000 BUILDING & EQUIPMENT SERVICES 703. 1999 DODGE RAM 4X4 ' $18,000 704. 1991 CHEV 1I2TS-I0 11,000 705. 1988 CHEV 3/4 TTRK 11,000 708. 1998 JLG PERSONAL LIFT 2,800 . P ARKSIFORESTRY DIVISION 800. 2001 FORD RANGER 4X4 $18,000 801. 1996 CHEV 4X4TRK 19;100 803. 2004 FORD F350 19,000 804. 2004 FORD F350 19,000 805. 1998 DODGE RAM 3500 24,000 808. 1988' CHEV 1/2 TTRKS-1O .'2,500 810. 1993 INTERNATIONAL LP 4700 50,000 811. 1987 FORD LOGTRUCK 83,000 812. 1989 FORD AERIAL LIFT 85,000 816. 1984 FORD TRACTOR291O 22,000 817. 1982 FORD TRACTOR 26 10 22,000 818. 1996 TORO TRUCKSTER 13,000 819. 1987 CUSHMAN HAULSTER 5,000 820. 2004 TaRO WORKMAN 3200 15,000 821. 2004 TaRO WORKMAN. 2 11 0 7,900 822. 2001 TORO 325-D MOWER 18,000 . III " " ~'2 CITY OF HOPKINS '. VEHICLE/EQUIPMENT INVENTORY . 06/15/2004 CURRENT REPLACEMENT UNIT # YEAR MAKE MODEL COST P ARKS/FORESTRY DIVISION (CONT.) 824. 1996 TORO GROUND MASTER $16,000 825. . 2001 TORO 455-D MOWER 40,000 826. 1994 GO- FER P-35 5,000 827. 2004 TORO Z587L 8,200 828. 2001 DEW EZE ATM72 21,000 830. 1987 OLATHE TURF SWEEP 8,500 832. 1997 VERMEER STUMP CTR630A 15,400 834. 1993 BRUSH BANDIT CHIPPER 250 14,000 836. RYAN SOD CUTTER 2,000 840. 1991 VICTORIAN TRAILER 2,000 843. . 1975 H.M. TRAILER FL TBD 2,500 844. 1973 CANOE HM TRAILER 1,000 845. 1997 REMACKEL TRAILER 5,000 . 846. 2001 DRESSEN 8110 2,000 HRA 411. 1995 CHEV 3/4 T 4X4 $17,500 WATER/SEWER , 500. 1997 CHEV C1500 $17,000 501. 2004 CHEV 4X4 3/4 T SILVERADO 19,000 502. 1993 CHEV 1/2 T PICKUP 12,500 504. 1996 JEEP CHEROKEE 18,000 505. 1992 CHEV 3/4 T 4X4 16,000 508. 1996 CHEV 3/4 T UTILITY 18,000 509. 1997 FORD F250 22,000 530. 2001 STERLING V AC-CON 180,000 533. 1993 CATERPILLAR LDR-BKHOE-446 50,000 534. 1997 KOHLER GENERA TOR/TRL 11,000 535. 1992 KOHLER GENERA TOR/TRL 10,000 536. 1989 FLEXIBLE RODDING MACHINE 25,000 . 540. 1982 SULLAIR AIR COMPRESSOR 12,000 541. 1981 WACKER TAMPER 2,000 542. 1994 WACKER TAMPER 4,000 IV.. 1: ~ CITY OF HOPKINS ,,\,' VEHICLE/EQUIPMENT INVENTORY 06/15/2004 . CURRENT REPLACEMENT UNIT # YEAR MAKE MODEL COST REFUSE 900. 1994 PETERBIL T RAPID RAIL $160,000 902. 1999 VOLVO WX42 150,000 903. 1977 FORD P AC-MOR 56,000 PAVILION 807. 2003 OLYMPIA ICE RESURF ACER $85,000 . . V ; '~ . _,'l- "~ . CITY OF HOPKINS . BUILDING INVENTORY " July 2003 'LocationlDescription Replacement Cost City Hall $1,957,000 1010 1 st Street S. Hopkins Activity Center 721,000 33 .14th Avenue S. Ice Arena/Pavilion 2,266,000 11000 Excelsior Boulevard Arts Center 3,500,000 1111 Mainstreet PW Admin/Garage 952,750 11 100 Excelsior Boulevard PW Cold Storage Bldg #1 190,600 117-12117thAvenue S. PW Cold Storage Bldg #2 278,000 . 117-121 17th Avenue S. Barn 118,500 117-121 17th Avenue S. Moline Reservoir 779,000 916 County Road 3 Blake Tower Reservoir 443,000 151 Tyler Avenue S. Well #1 Filtration Plant, 680,000 916Excelsior Boulevard Filtration Plant 587,000 1401 Elmo Park Service Road Well #4 80,000 1401 Elmo Park. Service Road Well #5 64,000 1205 Highway7 Well #6 63,000 .' 801 Highway 7 VI '~ " ~: Location/Description Replacement Cost Lift Station # 1 - 21 st 70,000 . 202 21 st Avenue N. Lift Station #2 - Drillane 20,000 619 Drillane Road Lift Station #3 - Lindee's 50,000 901 Cambridge Street N.E. Lift Station #4 - L TL Meadowbrook 100,060 244 Meadowbrook Road Lift Station #5 - Big Meadowbrook 150,000 6601 Excelsior Blvd. Lift Station #6 - Ronnie's 70,000 1029 Excelsior A venue E. Lift Station #7 - Valley 135,000 801 6th Avenue S. Park Building-Beach-Lifeguards 21,700 5200 Shady Oak Road Park Building-Beach-Concessions 24,000 . 5200 Shady OakRoad Park Building-Beach-Resirooms 27,000 5200 Shady Oak Road Park Shelter - Beach 16,000 5200 Shady Oak Road Park Shelter - Burnes 27,000 201 Park Lane Park Building - Central 70,000 101 17th Avenue S. Park Building - Harley 12,000 108 Jackson A venue S. Park Shelter - Interlachen 9,000 220 Homedale Avenue Park Building - Oakes 9,800 301 Tyler Avenue N. Park Building - Valley 10,300 . 800 7th Avenue S. VII ~ .' '*- li~ 'q Location/Description Replacement Cost \. Dow Towers (76 Units) HRA 22 5th Avenue S. 20th Avenue Townhouses (10 Units) HRA 29 20th Avenue S. Parking Ramp 1,740,000 10th A venue and Mainstreet Depot Coffee House 277,560 9451 Excelsior Boulevard Overpass Skate Park 100 Washington Avenue .r e: VIII -- ,...... :~":- _' __"_i\, .__'.r .' --.;.--.-"" ' "'!!~~~~!-- ' " 2005-2009. CAPITAL IMPROVEMENTS PLAN . .'. July 2004 , , - ,- '--. , _h ~ , '" ., .". Cityoj'l-fopkins 1010 :First Street Soutli · Jiopl(jnsJ:M::AL 55343-7573 · Plione: 952-935-8474 . :Fa;r; 952-935-1834 'We6 aaaress: 'W'UJ'UI.liopl(jnsmn.com DATE: August 2004 TO: Honorable Mayor and Members of the City Council FROM: James A. Genellie, CitYManag~ CZ.~ SUBJECT: 2005-2009 CAPITAL IMPROV ENTS PLAN With this letter, I respectfully submit the 2005-2009 Capital Improvements Plan. This five-year planning document represents the combined efforts, of city staff, advisory commissions, citizens, and the City Council. The Capital Improvements Plan is a five-year forecast of project needs in the City of Hopkins. It is intended to alert the Council and citizens to the major capital needs on the horizon. The first year of the plan becomes an adopted capital budget and relates almost completely to the operating budget that is approved on a yearly basis. The remaining four years represent an estimate of project needs and funding capabilities of the city. . This year's plan does not include proposed equipment purchases. A document relating specifically to equipment replacement needs has been developed into a separate document. The Capital Improvements Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city's capital programming needs. At the same time, sufficient project detail is provided to enable those who review the information to make informed decisions on the programming of projects over the next several years. Please use the information provided to formulate plans, projects, and questions. The Capital Improvements Plan can serve the community best by provoking thoughts and actions. This document was developed by the City Manager's Office with the assistance of all city departments. I wish to thank all those involved in the development of the Capital Improvements Plan, and especially Steve Stadler, Public Works Director; Jim Kerrigan, Planning and Economic Development Director;. Lori Yager, Finance Director; and Bish Johnson, Administrative Assistant, for their hard work and dedication. . 1.- Partnering witli tlie Community to 'E1ifia:nce tlie QJta{ity of Life + Inspire + 'Eaucate + Invo(ve + Communicate + <S' 1.' CAPITAL IMPROVEMENTS PLAN 2004-2008 "', e TABLE OF CONTENTS PAGE City Manager's Message T able of Contents IntroductiOn and Purpose 1 ' Program Descriptions/Goals and Objectives 2 Utilities Program 2 Transportation Program 4 Park and Recreatic)n Program 6, General Public Buildings Program 7 Sources of Funding 9 Five Year Project Summaries ',15 ,... SOurces of Revenue Summary 2.1 ' Projects byYear 22 Department Summary 27 ei Projects by Department 28 Projects by Department and Category ..' 30 " Projects by Department and Expenditure Type 32 .. Projects ByFuliding Source 34 Projects By Department and Funding Source 37 .' ,," Category Summary : 39 Category Summary by Department ' 40 Project By Funding Source With Balance 41 Proposed Future Projects 44 Graphs 45 Expenditures by Program for Current Year 45 Expenditures by Program for5 Years 47 Expenditures by SOUrce for Current Year .' 49 Expenditures by Source for 5 Years 51 Revenue Projections/Impact of Projects on Funding Source 53 " , ,Summary 55 General Fund 58 Municipal State Aid Fund 59 P.LR. Fund 59 Capital Improvement Fund 60 . Park Capital Improvements Fund 61 Water Utility Fund - Working Capital Projection, 62 Sanitary Sewer Fund - Cash Flow 63 Refuse Fund - Cash Flow 64 Storm Sewer Fund - Cash Flow ' , 65 ! Project Descriptions 69 Utilities 71 . Transportation 75 Map of Construction Projects 77 Parks & Recreation 89 General Public Buildings 97 Economic Development 101 Proposed Expenditures/Unscheduled Projects 105 . . . J' f INTRODUCTION AND PURPOSE . ' , The Capital' Improvements Plan is a flexible plan. based" upon long.;range physical, planning and financial projections, which schedules the major public improvements that may be', incurred by the City over the next five years. ,Flexibility' of the Capital Improvements Plan is established through annual review, and revision if necessary; The annual revieW assures that the program will become acohtinuing part of the budgetary process and that it ,will be consistent with changing demands .as well as changing patterns in cost and financial resources. Funds are appropriated only for the first year of , the program; which is then included in the annual budget. ' ' The Capital Improvements Plan serves as a toolforimplementingcertaill aspects of the City's comprehensive plan"therefore, the program describes the overall objectives of City ,development, the relationship between projects with respect to timing and need, and the City's fiscal capabilities. " , The CapitallmprovementsPl,an can help assure; " 1. A systematic approach to planning and initiating capital projects affording the opportunity to plan the location, timing; and financing of needed public improvements; , . ' , : , "",' , " ' .' 2. The development of a realistic program of capital spending within the City's projected . . fiscal capability to finance such projects, avoiding sharp change in the tax levy or , ' ,- " bonded indebtedness; 3. The, coordination ofpLiblic and' private, improvemenfpfojects perrrlitting adequate time for design and engineering to eliminate duplication of effort and expense; 4. The expenditure of public fuhdsthat are compatible with the City's adopted Comprehensive Plan; , 5. That the public is keptinformed of the proposed future proje~ts and expenditures; " " 6; That private investors are aware of the City's long-rangedevelopmentprogram so that they may guide their development in a way that. is compatible with the City's program; 7. Aid in achieving federal and/or state participation by providing the necessary planning and lead time necessary for a successful application in addition to meeting prerequisites needed for certain federal and state. grants. . ,~ " PROGRAM DESCRIPTIONS . In order to effectively plan for and manage the projects contained in a Capital Improvements Plan, it is necessary to group similar activities into "Program Categories". The City of Hopkins' activities are divided into four program categories which are 1) Utilities, 2) Transportation, 3) Parks, Forestry and Pavilion, and 4) General Public Buildings. The City also includes an outline of proposed expenditures for unscheduled projects. Program categories are explained in the following sections. UTILITIES PROGRAM Program Description: The Utilities Program includes the municipal water, municipal sanitary sewer, storm sewer and refuse systems. Program Goal: Provide reliable, efficient, and safe utility service to all parts of the City with a minimum of adverse effects on the environment. Subproarams: Water, sanitary sewer, storm sewer, and refuse service~ I. Municipal Water System Subproaram (WA) A. Subproaram Goal: The goal of the Municipal Water System subprogram is to . provide water in sufficient quantities at sufficient pressure, with a high degree of reliability and safety to all parts of the City so as to satisfy the normal demands of the general public for water while at the same time providing sufficient reserves in case of fire emergency or poWer outages. B.Obiectives: 1. Water quality shall meet the purity standards of the Minnesota Department of Health. 2. Any hydrant on the system shall, under.maximum condition, deliver no less than 500 gallons per minute with a residual pressure ()f 20 pounds per square inch. 3. The system shall be looped to provide maximum reliability. 4. The supply and storage system shall be designed and maintained to have maximum reliability. . 1." ~ . II. Municipal' Sanitary s~vvet Subproaram(SA) ; A. Subprooram Goal: The goal of the Municipal Sanitary Sewer subprogram is to promote a healthful environment by collecting all sewage from existing and' projected development, in a sanitary and economic' manner. S.Obiectives: " " ' , 1. Provide sewer lines of adequate size and grade to collect and transmit all discharge sewage. ' " , .. 2. 'Prevent sewage, from ~v~rfloWirlg into the naturalemvironrnent. ' 3;, Prevent sewage back-ups. 4. E ncoLJ rage or,prcmlote connection of all generators ()fsewagetothe Municipal system., . ",. ' .' , . '. . ,,', . '. 5. Meet the effluentand infiltration standards of the Metropolitan Waste Control Commission. ' III. Storm Sewer Subproaram (SS) .. , ' '. .. .. '> - ,,', " , " ' A. Subprogram Goal: Manage al1dcontrol surface and ground waters in order to ; protect the man-made and natural environment in a safe and efficient manner. B. Obiectives: , 1. Prevent flooding. '" 2. Prevent damage to property due to erosion. ' 3. Meet water quality standards established by the controlling regulatory law or authority. : '. . .' IV., Refuse Subproaram (RF) " ' A. Subprogram Goal: To promote a healthful environment by collecting all residential solid waste in a sanitary and ec:onomic manner. S. Objectives: 1. Provide ,efficient refuse collection in a timely maimer to minimize . disruption to residents. , , . ~ ';' 2. Provide residential recycling programs that minimize the amount of . refuse that needs to be landfilled. 3. Provide yard waste collection that meets state statutes and is also convenient for the residents. 4. Provide bulk pick-up/drop-off and brush pick-up alternatives for the residents to eliminate these items from being put in the refuse cans. TRANSPORTATION PROGRAM Proqram Description: This program includes streets, walkways, traffic signs and signals, vehicular parking facilities, and street lighting. Proqram Goal: Provide for the safe and efficient movement of people and goods throughout the city. Subproqrams: Streets, Walkways/Sidewalks, Signs/SignalS, Parking Facilities, and Street Lights. I. Streets Suboroaram (ST) A. Subproqram Goal: The goal of the Streets subprogram is to provide safe, . convenient, economic public streets to best facilitate the movement of vehicular traffic. B.Obiectives: 1. Streets should be constructed with permanent surfaces, concrete curb and gutter, and with ancillary storm drainage, to standards established by the City. 2. Streets should be ofa size and load capacity consistent with their functional classifications. 3.. Timely major repair to preserve the basic capital Investment in streets. II. Walkwavs/Sidewalks Suboroaram (WS) A. Subprogram Goal: To provide a safe and convenient pedestrian system with incidental recreational benefits. ' ' . '.l.' 17 . ' III.Sians/SianalsSLibproaram (SI) ". A. Subproqram Goal: The goal of the Signs/Signals subprogram is to provide an efficient and, orderly system of streetand traffic signing so as to promote safe, convenient travellhroughout the City. B.Obiectives: 1. Signs and signals should be installed in confbrmitywith.the Minnesota Manual on Uniform Traffic Control Devices. ... " , - , 2. 'Periodic surveys and studies shoLild, be made to document the effectiveness of City signing patterns. IV. ParkinaFacilities Suboroaram (PA) , A. Subprogram Goal: To provide such supporting facilities aswill promote , 'maximum use, of public parking spaces by employers, employees, customers, arid visitors. ' '., B. Obiectives: . .1. ,Provide parking facilities for present and anticipated needs of the City of . Hopkins. V. Street Liahts Subproararn (SL) , . , A. Subprogram Goal: To provide a system of street lighting within the City that will . " protnote~afe and convenientvehicular and pedestrian travel on City Stre,ets. " B. Objectives: 1. To provide lighting at each street intersection within the City. 2. To provide mid-block street lighting in conformance with the City's street lighting policy, in ordefto provide equitable, cost efficient lighting. 3. To continually update the system so as to provide energy and cost efficient lighting.' , .. 1 .. PARKS. FORESTRY AND PAVILION PROGRAM . Proqram Description: This program includes community park$, neighborhood parks, open spaces, recreational structures and facilities. Proqram Goal: The goal of the Park and Recreation Program is to provide facilities for safe, stimulating, and comprehensive leisure time activities of Hopkins citizens. Subproqrams: Neiqhborhood Facilities. Community Facilities I. Neiahborhood Facilities Subproaram (NF) A. Subproqram Goals: To acquire ownership or use rights of park sites located to provide convenient walkingaccess.toall Hopkins citizens and to develop such sites to provide optimum recreational serviceability consistent with the preservation and enhancement of pleasing aesthetic qualities. B.Obiectives: 1. Acquire property or use rights on those neighborhoods that do not have convenient walking access to neighborhood park facilities. 2. Develop neighborhood park facilities to meet the needs of various user . groups. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Preserve and enhance the aesthetic qualities of neighborhood parks. II. Community Facilities Subproaram (CF) . A. Suboroaram Goals: The goal of the Community Facilities subprogram is to develop, or acquire ownership or use rights of sites which serve the entire City and to provide facilities that serve community-wide needs. B. ,. Obiectives: 1. Acquire sites that have valuable and unique natural characteristics to preserve irreplaceable community resources. 2. Preserve by acquisition, gift, or other .arrangement properties that have ,valuable' historic-cultural qualities. . ~ 'i' .'" ' ' 3: preserv,eand maintain existing structures and facilities in order to retain , current service 'and safety levels. , ' ' .' .' . ,. ':', '. 4. Qonstruct or acquire structures and facilities necessary to meet the changing needs of the community. ' GENERAL PUBLIC BUILDINGS PROGRAM , ' Program Description:p The General Public BuilCJings Program includeS all municipal buildings except those provided for in the 'Utility and Park F~cilities Program. ' '.' '. 'Program Goal: Provide buildings that are adequate ar'ldconvenientfor the efficient accommodation of City functions. ' ' Subprograms: Administrative Offices. 'Maintenance Facilities.: Fire " Facilities.. Community Center. " ..' .. Administtative Offices SubproQrafuO~O) A.Subprogram Goal: The goal ofth~ Administrative Offices subprogram isto ' ..,. Pfovidefadlitiesforthe efficient and safe conduct of legislative and .,. ., ' . administrative functions of the City. . . ' . B. Objectives: . ' 1. Maintain currenffacilitiesin astate'ofgoodrepairso asto maximize cost effectiveness and avoid costly r~pair. " '., , ' 2. Upgrade facilities as necess8rytoprovidefor the efficient, safe, and ,. effective provision :of the City services.. . II. Maintenance Facilities Subproaram (MF) A. Subprogram Goal: The goal of the Maintenance Facilities subprogram is to provide facilities for the efficient and safe conduct of City maintenance functions. " . I I, :c ( B. Obiectives: . 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of City services.. III. Fire Facilities Subprogram (FF) A. Suborooram Goal: To provide a fire station, or stations, for storage of Fire Department equipment and for the training and meetings of volunteer fire fighters to provide prompt and efficient protection to . life and property. B.Obiectives: 1. Provide a maximum four-minute daytime and three-minute nighttime response to all points within the City. 2. Meet objective 1 through the use of volunteers, IV. Community Center Subproaram (CC) A. Suborooram Goal: To provide a community facility, or facilities, which meet the . social, recreational, and cultural needs of all citizens, particularly senior citizens. B. Obiectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repairs, 2. Construct or acquire structures and facilities necessary to meet the changing needs of the City. 3. Upgrade facilities as necessary to provide for efficient, safe, and effective provision of City services. . " 'i . Sources of Funding' ,. '. " , , ' ,..'. " '. . ' SOURCES OF FUNDING .. ", Inorder to fund the anticipated Capital Improvements, the City mustdrawupon a variety" of sources. Many of these sources have a specific or "dedicated"purpose (Le., the water utility fund will financ~ water main installation but nota street oVf3[lay).Therefore,it is , important to identify the uses and limitations of the various revenue sources. CURRENT REVENUES- GENERAL FUND (CR) , , , , . '.', , . This represents funding from current year revenue' collectionsinthe General Fund that' support operations and capital outlay expenditures. Revenue sources include property tax levies, state' aid payments, and various permit and license fees. ..' Thissource"of ' fundin9 is generally used ,onlyfor.operations and small capital purchases. " , . , GENERAL FUND RESERVES (GR) ReserVes of the general fund are the funds remaining after subtracting cash flow and emergency amounts from the City's cash balance, sometimes {eferred to as "fund balance". Thel.lse'ofGeneral 'Fund ReserVes is, not recommended, for Capital ... Improvements withoutsignificantstaff and Council review. ' ,. CABLE TELEVISION FUND (CT) , '. This funding source consists of franchise fees received from Paragon Cable TV, in' excess of the amounts earmarked for the access programming and commission budgets. ExpEmdituresare limited to cable-related facilities, or must haye a cable relatedpurpose. ECONOMIC DEVELOPMENT FUND (EDl This funding source was established by the Housing and 'Redevelopment Authority (HRA) , and the City ,of Hopkins, to provide funding for the purpose of promoting development and redevelopment within the City. The Economic Development fund isa revolving fund .' administered by the HRA, intendedto provide an ongoing fundingsource used to reduce or extend the long, term debt involved with development' and redevelopment activities. The HRA reviews all proposed uses of this fund onan individual basis. . " ( GRANT -IN-AID (GA) . This is aid received from either the Federal or State government. In many cases, grants are made on matching basis, which. means the City shares a portion of the costs of the project being funded. MUNICIPAL STATE AID STREETS (MS) This funding source represents funds received from the State of Minnesota to support construction and maintenance of State Aid classified municipal streets. State law defines the types and limits of State Aid Streets expenditures. PERMANENT IMPROVEMENT REVOLVING/GENERAL OBLIGATION BONDS (PI) Improvements with a life of several years may be financed from the proceeds of a General Obligation Bond Issue. Law limits the total debt that can be incurred under this method of financing. With some exception, General Obligation Bonds are generally subject to a referendum process. Examples of projects, which may not require a referendum, are those financed through the use of special assessments where af least 20 percent of the project cost is . assessed to the benefiting property owners. The remaining portion not assessed can be financed through general obligation bonds repaid by a tax levy. ' PRIVATE SECTOR FUNDING (PF) This funding source consists primarily of payments made by developers for the purchase of land, the installation of water, sewer, or streets or other related expenditures. It can also refer to donations made to the City by individClals or groups. REVENUE BONDS (RB) These are bonds issued for improvements made fora specific revenue producing facility or operation. The debt incurred is repaid from the revenue generated by the facility. If the revenue generated is insufficient, then the difference becomes an annual obligation of the taxpayers and becomes an additional tax levy. These are generally not subject to referendum. . .. " . REAL ESTATE SALES FUND (RE) This funding source consists primarily of fundsbuilt upfrolllthe sale9f City owned property. To date, the fund has been used for building improvements. Because the sale , ,of both general City property and, park/recreation property are.accumulated intQthisfund, earmarking a portion for recreational purposes may be justified,: ' " SPECIAL ASSESSMENT (SA) , . " , , A number of projects may be realistiqallYJinanced using Special Assessmentto pay the, ultimate cost. Almost any project can potentially be financedljsing the assessment .' process. In each, case it is necessary, to make a determination., that the assessed property will benefit by the amount of the assessment. The cost of street reconstruction is shared 700;obythe property owner and30%:bythe 'City. Concurrent improvement costs to the utility systems are assumed by the respective utility funds. TAX INCREMENT FINANCING (IF) . This funding source results from the tax value of newdevelopmentthat is 'iincrementally" greater than the existing tax value. Typically, bonds ,~re sold based on the Clssumption .. , that the higher tax receipts ' will retire the bonds> However, the use of TIFfunds through a "pay as you go" method has become more common. This type offLinding can, be used for public' improvements within a redevelopniehtdistrictto support, the goals of. redevelopment, 'specifically the elimination of blighted conditions. , Approval of the , Hopkins HRA should be anticipated prior to the commitment of these funds. State law strictly regulates the use of these funds. ' , ,SANITARY SEWER FUNDS (SF) Sanitary sewer funds . consist of revenue generated from charges made for sewage' ,. disposal. The cost of operations plus system' (capital) improvements determines the ultimate charge levied for the service provided ~ , WATER FUNDS (WF) Water funds consistof revenue generated from thesale of water. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. . , ,., < STORM SEWER UTILITY REVENUES (SU) . Storm sewer funds consist of revenue generated by charging storm water drainage fee to parcels of land for the availability and use of municipal storm, sewer facilities. Expenditures from this funding source are related to drainage facilities. OTHER GOVERNMENTAL UNITS (GU) These are funds received from Hennepin County, adjacent communities, etc. for projects that also benefit a jurisdiction other than the C ity of Hopkins~ REFUSE FUND (RF) Refuse funds consist of revenues generated from cbllection fees, (bulk pickup and weekly collections) recycling fees, and recycling and composting grants from Hennepin County. Revenues are used to support the City's refuse collection services as well as its recycling program. The cost of operations plus system (capital) improvements determines the charge for the services provided. PAVILION FUND (PA) . Pavilion Funds consist of revenues generated from rental fees collected from users of the Pavilion. These funds are utilized to pay for operating, and capital expenditures. . , " . '." , , ' . Five Year' : Proj ecf Su~maries ' .. . . " .,' .". .. . . ,Funding Sources Current Revenue,s ;.... General Fund CR " General'Fund Reserves GR Cable Television Fund CT Economic Development Fund "ED Grant-In-Aid GA Municipal State~Aid Streets ,MS Permanent Improvement Revolvingl General Obligation Bonds PI , ' Private Sector Funds PF Revenue Bonds RB . " Real Estate Sales Fund ' RE Special Assessment SA Tax Increment Financing TF Sanitary Sewer Fund, SF Storm Sewer Fund SU ' Water Fund " WF Refuse Fund ' "RF Pavilion Fund PA Other Government Units GU Housing ahd Redevelopment Authority HRA park Dedication Fund PDF . .;, ';1' CAPITAL IMPROVEMENTS ,PLAN . City of Hopkins, MN SOURCES OF REVENUE SUMMARY '2005 thru 2009 Source 2005 2006 2007 2008 2009 , Total CI , Capitallinprovement Fun.d 328,000 138,000 19,000 .485,000 CR - Current Revenues - General Fund 50,000 50,000 GU - Other Govemmental Units 2,275,000 2,160,000 2,950,000 " 7,385,000 MS - Municipal State Aid Streets, 1,100,000 ' 751,000 ,.700,000 310,000 2,861,000 PA .Pavilion Fund 17,500 17,500 PDF- park Dedication Fund, 115,000 40,000 155,000 PF- Private Sector Funds 17,500 ' 17,500 ,', PI- PIR/General Obligation Bonds 202,000 200,000 450,000 " 260,000 .150,000 1,262,000 SA - SPecial Assessment 300,000 80,700 , 916,000 882,000 2,178,700 SF - Sanitary Sewer Fund 75,000 275,000 75,000 20,000 445,000 ' , . SU - Stonn Sewer Fund 224,000 132,000 838,000 152,000 114,000 1,460,000 I ' ,', TF ~ Tax Increment Financing 2,000,000 13,600,000 15,600,000 " WF - Water Furid 175,000 75,000 105,000 ,30,000, 385,000 Total 6.794,000 ,17,536,700 6,053,000 1,654,000 264,000 , 32,301,700 . Wednesday, July 07, 2004 ... , . Prdgrams,and Categories, ' Utilities Proqram Municipal Water System Category , Municipal Sanitary Sewer C~tegory .. Storm Sewer Category Refuse Category TransportationProQram , , Streets Category " ' " , Walkways/Sidewalks Category Signs/SignalsCategory ParkingF acilitiesCategory .. ..' " , . Street Lights Category ..' Parks. Forestry and Pavilion ProQram " , ' Neighborhood Facilities Category' Community Facilities Category General Public Buildings Program Administrative Offices Category ,Maintenance Facilities Category Fire Facilities Category Community Center Category . Economic Development Proqram " ", , '"' CAPITAL IMPROVEMENTS PLAN ", 'l City of Hopkins, MN . PROJECTS BY YEAR 2005 thru 2009 Project Name Department Project # Priority Project Value 2005 Redevelopment, East Excelsior Boulevard Development 01-CIP-D401 0 2,000,000 City Hall Wall Covering Replacement Public Works: Bldg/Equip Serv 05-CIP-B304 0 23,000 Building Maintenance Office and Shop Upgrade Public Works: Bldg/Equip Serv 05-CIP-B309 0 5,000 City Hall Site Improvements Public Works: Bldg/Equip Serv 05-CIP-B310 0 50,000 Valley Park Improvements Public Works: Parks 01-CIP-P201 0 65,000 Burnes Park Play Equipment Public Works: Parks 04-CIP'P216 0 50,000 Residential Street Improvements Public Works: StreetslTraffic 01-CIP-S101 0 427,000 Residential Street Improvements--Utilities Public Works: StreetslTraffic 01-CIP-S102 0 250,000 ExcelsiorBoulevard Streetscape Improvements Public Works: StreetslTraffic 01-CIP-S109 0 750,000 CSAH 73/CSAH 5 Intersection Public Works: StreetslTraffic 01-CIP-S111 0 2,500,000 City Parking Lot Improvements Public Works: StreetslTraffic 01-CIP-S113 0 250,000 . Minnetonka Boulevard (CSAH 5) Corridor Improvement Public Works: StreetslTraffic 01-CIP-S114 0 350,000 Storm drainage system maintenance Public Works: Utilities 01-CIP-U002 0 74,000 Total for 2005 6,794,000 2006 North Ahnex Redevelopment Project Development 01-CIP-D402 0 13,600,000 City Hall Carpet Replacement Public Works: Bldg/Equip Serv 05-CIP-B305 0 80,000 Historical Society Roof Replacement Public Works: Bldg/Equip Serv 05-CIP-B306 0 35,000 City Hall Boiler Additions Public Works: Bldg/EquipServ 05-CIP-B307 0 23,000 Citywide Trail Connections Public Works: Parks 01-CIP-P206 0 50,000 Pavilion Community Message Sign Public Works: Parks 02-CIP-P210 3 35,000 Co Rd 3 Beautification Corridor Public Works: Parks 02-CIP-P213 1 80,000 Residential Street Improvements Public Works: StreetslTraffic 01-CIP-S101 0 100,000 Residential Street Improvements-Utilities Public Works: StreetslTraffic 01-CIP-$102 0 250,000 Citywide Concrete Alleys Public Works: StreetslTraffic 01-CIP'S103 ' 0 40,000 County Road 61 (Shady Oak Road) Public Works: StreetslTraffic 01'CIP-S106 0 2,879,700 Storm drainage system maintenance Public Works: Utilities ' 01-CIP-UOp2 0 14,000 Upgrade of sanitary sewer lift station #1 Public Works: Utilities 04-CIP-U007 0 200,000 Total for 2006 17,386,700 2007 Activity CenterWindow Replacement Public Works: Bldg/Equip Serv 05-CIP-B308 0 19,000 Residential Street Improvements Public Works: StreetslTraffic 01-CIP-S101 0 1,350,000 Residential Street Improvements--Utilities Public Works: StreetslTraffic 01-CIP-$102 0 250,000 . Citywide Concrete Alleys Public Works: StreetslTraffic 01-CIP~103 0 20,000 County Road 3 Public Works: StreetslTraffic 01-CIP-S104 0 2,300,000 County Road 61 (Shady Oak Road) Public Works: StreetslTraffic 01-CIP-S106 0 1,500,000 Wednesday, July07, 2004 . Pruj(!ctName Department Project # ' Priority Project Value Storm drainage system maintenance Public Works: Utilities 01~CIP.UOO2 0' 14,000 . Storm Water Management Projects Public Works: Utilities 01~CIP.UOO3 0 200,000 , 5th ~treet South Culvert Repla~ment Public Works: Utilities 05-CIP.UOO8 0 550,000 Total ,for 2007 6,203,000 2008 Residential Street Improvements Public Works: StreetslTraffic 01-CIP-S101 0 700,000 Citywide Concrete Alleys Public Works:, StreetslTraffic 01-CIP.S103 0 40,000 ., Minnetonka Mills Road Improvements ' Public Works: StreetslTraffic 02-CIP-S116 0 900,000 ,. Storm drainage system maintenance ' Public Works: Utilities 01.CIP..lJOO2 0 14,000 Total for,2008 1 ;654,000 2009 Residential Street Improvements Public Works: StreetslTraffic 01-CIP-S101 ' 0 150,000 Storm drainage system maintenance . Public Works: Utilities " '01-CIP~OO2 0 114,000 Total for 2009 264,000 GRAND TOTAL 32,301,700 .. .. .' Wednesday,. July 07,2004 ,', " oj' '. ., Five- Year Summary . Projects by Department . ". -. "",',. " l' CAPITAL IMPROVEMENTS PLAN . " City of Hopkins, MN . DEPARTMENT SUMMARY .' 2005 thru 2009 " , , Department 2005 2006 2007' 2008 2009 Total Development 2,000,000 13,600,000 15,600,000 Public Works: BldgJEquip Serv 78,000 138,000 19,000 .. 235,000 Public Works: Parks .115,000 165,000 280,000 Public Works: StfeelsfTraflic" .' .4,527,000 3,269,700' 5,420,000' , 1,640,000 150,000 15~006,700 Public Works: Utilities ,74;000 .. 214,000 764,000 14,000 114,000 1,180,000 Total ' 6,794.000 17,386.700 ,6;203,000 .. ,1.654,000 264,000 32,301,700 : . .. . . Wednesday, July 07, 2004 " ,. CAPITAL IMPROVEMENTS PLAN '. , City of Hopkins, MN . PROJECTS BY DEPARTMENT 2005 thru 2009 Department Project# Priority 2005 2006 2007 2008 2009 Total Development Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 2,000,000 2,000,000 North Annex Redevelopment Project 01-CIP-D402 0 13,600,000 13,600,000 Development Total 2,000,000 13,600,000 15,600,000 Public Works: Bldg/Equip Serv City Hall Wall Covering Replacement 05-CIP-B304 0 23,000 23,000 City Hall Carpet Replacement 05-CIP-B305 0 80,000 80,000 Historical Society Roof Replacement 05-CIP-B306 0 35,000 35,000 City Hall Boiler Additions 05-CIP-B307 0 23,000 23,000 Activity Center Window Replacement 05-CIP-B308 0 19,000 19,000 Building Maintenance Office and Shop Upgrade 05-CIP-B309 0 5,000 5,000 . City Hall Site Improvements 05-CIP-B310 0 50,000 50,000 Public Works: BldglEquip Serv Total 78,000 138,000 19,000 235,000 Public Works: Parks Valley Park Improvements 01-CIP-P201 0 65,000 65,000 Citywide Trail Connections 01-CIP-P206 0 50,000 50,000 Pavilion Community Message Sign 02-CIP-P210 3 35,000 35,000 Co Rd 3 Beautiflcation Corridor 02-CIP-P213 1 80,000 80,000 Burnes Park Play Equipment 04-CIP-P216 0 50,000 50,000 Public Works: Parks Total 115,000 165,000 280,000 Public Works: Streetsrrraffic Residential Street Improvements 01-CIP-S101 0 427,000 100,000 1,350,000 700,000 150,000 2,727,000 Residential Street Improvements-Utilities 01-CIP-S102 0 250,000 250,000 250,000 750,000 Citywide Concrete Alleys 01-CIP-S103 0 40,000 20,000 40,000 100,000 County Road 3 01-CIP-S104 0 2,300,000 2,300,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,879,700 1,500,000 4,379,700 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 750,000 750,000 CSAH 73/CSAH 5 Intersection 01-CIP-S111 0 2,500,000 2,500,000 City Parking Lot Improvements 01-CIP-S113 0 250,000 250,000 . Minnetonka Boulevard (CSAH 5) Corridor Improvement 01-CIP-S114 0 350,000 350,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 900,000 900,000 Wednesday, July 07, 2004 . Department ProjeCt# Priority 2005, 2006 2007 2008 2009 Total Public Works: Streets/Traffic Total 4,527,000 3,269,700 5;420,000 ' 1,640,000 150,000 15,006,700 .PUbliC Works:. Utilities .Storm drainage system maintenance 01-CIP-U002 0 .' 74,000 14,000 14,000 14,000 114,000 230,000 , Storm Water Management Projects 01-CIP-U003 . 0 200,000 200,000 , Upgrade of sanitary sewer lift station #1 04-CIP-U007 0 200,000 200,000 5th Street South Culvert Replacement 05-CIP-U008 ' 0 550,000 ' 550,000 Public Works: Utilities Total 7 4,~00, 214,000 ,.., 764,000 14,000 " 114,000 1,180,000 , GRAND TOTAL 6,794,000 17,386,700 6,203,000 1,654,000 264,000 32,301,700 . . Wednesday, July 07, 2004 ,"." '~ , , CAPITAL IMPROVEMENTS PLAN " j City of Hopkins, MN . PROJECTS BY DEPARTMENT AND CATEGORY 2005 thru 2009 Department Category 2005 2006 .2007 2008 2009 Total Future Development Economic Develooment Redevelopment, East Excelsior Boulevard 2,000,000 2,000,000 North Annex Redevelopment Project 13,600,000 13,600,000 Total: 2,000,000 13,600,000 15,600,000 Department Total: 2,000,000 13,600,000 15,600,000 Public Works: Bldg/Equip Serv Buildinas: Administrative Offices City Hall Wall Covering Replacement 23,000 23,000 City Hall Carpet Replacement 80,000 80,000 City Hall Boiler Additions 23,000 23,000 Building Maintenance Office and Shop Upgrade 5,000 5,000 City Hall Site Improvements 50,000 50,000 Total: 78,000 103,000 181,000 Buildinos: Communitv Center . Historical Society Roof Replacement 35,000 35,000 Activity Center Window Replacement 19,000 19,000 Tolal: 35,000 19,000 54,000 Department Total: 78,000 138,000 19,000 235,000 Public Works: Parks Parks/Forestrv/Pavilion' Communitv Facilities Citywide Trail Connections 50,000 . 50,000 Pavilion Community Message Sign 35,000 35,000 Co Rd 3 Beautification Corridor 80,000 80,000 Burnes Park Play Equipment 50,000 50,000 Total: 50,000 165,000 215,000 Parks/Forestrv/Pavilion' Neiahborhood Facilities Valley Park Improvements 65,000 65,000 Total: 65,000 65,000 Department Total: 115,000 165,000 280,000 Public Works: StreetslTraffic Trans' Parkina Facilities City Parking lollmprovements 250.000 250,000 Total: 250,000 250,000 Traris: Streets 400,000. Sixth Street Sauth (11th to 12th Avenue South) Residential Street Improvements 427,000 100,000 1,350,000 700,000 150,000 2,727,000 Residential Street Improvements.-Utilities 250,000 250,000 250,000 750,000 Citywide Concrete Alleys 40,000 20,000 40,000 100,000 Wednesday, July 07, 2004 .' Department Category 2005 2006 2007 2008 2009 Total Future County Road 3 2,300,000 2,300,000 , . County Road 61 (Shady Oak Road) 2,879,700 1,500,000 4,379,700 . ,Excelslor'Boulevard Streetscap~ Improvements 750,000 750,000 CSAH 73/CSAH 5 Intersection 2,500,000 2,500,000 Minnetonka Boulevard (CSAH 5) Corridor Improvement 350,000 350,000 Minnetonka Mills Road Improvements 900,000 900,000 Total: 4,277,000 3,269,700 . 5,420,000 1,640,000 150,000 14,756,700 400,000' Department Total: 4,527,000 3,269,700 5,420,000 1,640,000 150,000 15,006,700 400,000 Public Works: Transportation Trans: Streets light Rail Transit Stations (2) 150,000 Ninth Avenue lRT corridor 700,000 Total: 850,000 Department Total: 850,000 Public Works: Utilities Utilities' Municipal Sanitary Sewer 114,000 Storm drainage system maintenance 74,000 ' 14.000 14,000 14,000 230,000 Upgrade of sanitary seWer 11ft station #1 200,000 ' 200,000: Total: 74,000 214,000 14,000 14,000 114,000 430,000 Utilities: Storm Sewer , Storm Water Management Projects 200,000 200,000 , 5tli Street South Culvert Replacement 550,600 , 550,000 . Total: 750,000 750,000 Department Total: 74,000 214,000 764,000 14,000 114,000 " , 1,180,000 ' GRAND TOTAL: ,6,794;000 17;386,700, 6;203,000 ,1,654,000 264,000 32,301,700 1,250,000 . Wednesday; July 07, 2004 CAPITAL IMPROVEMENTS PLAN < . City ofHopkin.s, MN . PROJECTS BY DEPARTMENT AND EXPENDITURE TYPE 2005 thru 2009 Department Project# Priority 2005 2006 2007 2008 2009 Total ConstructionlMaintenance Development Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 2,000,000 2,000,000 North Annex Redevelopment Project 01-CIP-D402 0 13,600,000 13,600,000 Development Total 2,000,000 13,600,000 15,600,000 Public Workl;: Bldg/Equip Serv City Hall Wall Covering Replacement 05-CIP-B304 0 23,000 23,000 City Hall Carpet Replacement 05-CIP-B305 0 80,000 80,000 Historical Society Roof Replacement 05-CIP-B306 0 35,000 35,000 City Hall Boiler Additions 05-CIP-B307 0 23,000 23,000 Activity CenterWindow Replacement 05-CIP-B308 0 19,000 19,000 Building Maintenance Office and Shop Upgrade 05-CIP-B309 0 5,000 5,000 . City Hall Site Improvements 05-CIP-B310 0 50,000 50,000 Public Works: Bldg/Equip Serv Total 78,000 138,000 19,000 235,000 Public Works: Parks Valley Park Improvements 01-CIP-P201 0 65,000 65,000 Citywide Trail Connections 01-CIP-P206 0 50,000 50,000 Pavilion Community Message Sign 02-CIP-P210 3 35,000 35,000 CoRd3 Beautification Corridor 02'CIP-P213 1 80,000 80,000 Burnes Park Play Equipment 04-CIP-P216 0 50,000 50,000 Public Works: Parks Total 115,000 165,000 280,000 Public Works: StreetslTraffic Residential Street Improvements 01-CIP-S101 0 427,000 100,000 1,350,000 700,000 150,000 2,727,000 Residential Street Improvements-Utilities 01-CIP-S102 0 250,000 250,000 250,000 750,000 Citywide Concrete Alleys 01-CIP-S103 0 40,000 20,000 40,000 100,000 County Road 3 01-CIP-S104 0 2,300,000 2,300,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,879,700 1,500,000 4,379,700 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 750,000 750,000 CSAH 73/CSAH 5 Intersection 01-CIP-S111 0 2,500,000 2,500,000 City Parking Lot Improvements 01-CIP-S113 0 250,000 250,000 . Minnetonka Boulevard (CSAH 5) Corridor Improvement 01-CIP-S114 0 350,000 350,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 900,000 900,000 Wednesday, July 07, 2004 '" Department Project# Priority 2005 2006 2007, 2008 2009 Total Public Works: StreetslTraffic Total ,4,527,000 3,269,700 5,420,000 1,640,000 150,000 15,006,700 eUbliC Works: Utilities " '0 14,000 Storm drainage system maintenance 01-CIP-U002 14,000 ,14,000. ,.14,000, ' 114,000 230,000 Storm Water Management Projects 01-CIP-U003 0 ,,200,000 200,000 Upgrade of saniiary sewer lift station #1 04-CIP-U007 0 < 200,000 200,000 5th Street South Culvert Replacement 05-CIP-U008 0 550,000 550,000 Public Works: Utilities Total 214,000 764,000 1,180,000 Construction/Maintenance Total " 6,794,000 17,386,700 ' .. 6,203,000 1,654,000 264,000 32,301,700 GRAND TOTAL 6,794,000" 17,386,700 6,203,000 ,1,654,000 .' 264,000 " 32,301,700 _no.. ...... nom......... 'n"" .....~. mn... ,.. ...0 .. "n. n.. .> ,'" .. Wednesday, July 07,2004 CAPITAL IMPROVEMENTS PLAN ,~' City of Hopkins, MN . PROJECTS BY FUNDINGSOURCE 2005 thru 2009 Source Project# Priority 2005 2006 2007 2008 2009 Total CI ... Capital Improvement Fund City Parking Lot Improvements 01-CIP-SI13 0 250,000 ' 250,000 City Hall Wall Covering Replacement 05-CIP-B304 0 23,000 23,000 City Hall Carpet Replacement 05-CIP-B305 0 80,000 80,000 HistoricalSociety Roof Replacement 05-CIP-B306 0 35,000 35,000 City Hall Boiler Additions 05-CIP-B307 0 23,000 23,000 Activity Center Window Replacement, 05-CIP-B308 0 19,000 19,000 Building Maintenance Office and Shop Upgrade 05-CIP-B309 0 5,000 5,000 City Hail Site Improvements 05-CIP-B310 0 50,000 50,000 CI - Capital Improvement Fund Total 328,000 138,000 19,000 485,000 CR - Current Revenues - General Fund Citywide Trail Connections 01'CIP-P206 0 10,000 10,000 . Co Rd 3 BeauUfication Corridor 02-CIP-P213 1 40,000 40,000 CR - CurrentRevenues - General 50,000 50 ,000 Fund Total GtJ - Other Governmental Units County Road 3 01-CIP-S104 0 1,600,000 1,600,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,160,00P 1,350,000 3,510,000 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 200,000 200,000 CSAH73/CSAH 5 Intersection 01-CIP-S111 0 1,900,000 1,900,000 Minnetonka Boulevard (CSAH 5) Corridor Improvement 01-CIP-S114 0 175,000 175,000 GU... Other Governmental,Units Total 2,275,000 2,160,000 2,950,000 7,38~,000 MS - Municipal State Aid Streets Citywide Trail Connections 01-CIP-P206 0 30,000 30,000 Residential Street Improvements 01-CIP-S101 0 0 0 0 County Road 3 01-CIP-S104 0 700,000 700,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 721,000 721,000 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 550,000 550,000 CSAH73/CSAH 5 Intersection 01-CIP-S111 0 450,000 450,000 Minnetonka Boulevard (CSAH 5) Corridor Improvement 01-CIP-S114 0 100,000 100,000 . Minnetonka Mills Road Improvements 02-CIP-S116 0 310,000 310,000 Wednesday, July 07, 2004 .. Source Project# Priority' 2005 2006 2007 2008 2009 Total MS - Municipal State Aid Streets 1,100,000 751,000 700,000 310,000 2,861,000 '. Total P A - Pavilion Fund Pavilion Community Message Sign 02-CIP.P210 3 ,17,500 " 17 ;500 PA - Pavilion Fund Total 17,500 17,500 PDF-Park Dedication Fund Valley Park Improvements 01-CIP-P201 0 ' 65,000 65!000 Co Rd 3 Beautification Corridor 02';clp.P213 ' 1 40,000 40,000 Bumes Park Play Equipment 04-CIP-P216 0 50,000 50,000 PDF-Park Dedication Fund Total 115,000 "40,000 155,000 PF - Private Sector Funds Pavilion Community Message Sign 02-CIP~P210 3 ,17,500 17,500 PF - Private Sector Funds Total 17,500 " 17,500 ;-.' PI -,PIR/General Obligation Bonds ~esidential Street Improvements 01-CIP-Sl01 0 127,000 ,,' 100,000 450,000 210,000 150,000 1,037,000 County Road 61 (Shady Oak Road) 01-CIP-Sl06 ' 0 100,000 100,000 ' MinnetonkaBo41evard (CSAH 5) Corridor Improvement 01~CIP-Sl14 0 75,000 75,000 ' "" . Minnetonka Mills Road Improvements , 02-CIP-S116 0 '50,000 " 50,000 Pl- PIRIGeneral Obligation Bonds 202,000 200,000 450,000 260,000 , 150,000 1,262,000 Total SA - Special Ass~ssment Residential Street Improvements 01-CIP-Sl01 0 300,000 0 900,000, 490,000 1,690,000 , ,.', CitYwide Concrete Alleys 01-CIP-Sl03 0 32,000 16,000 32,000 ' " 80,000 CounlyRoad 61 (Shady Oak Road) 01-CIP-Sl06 0 48;700 ' 48,700 Mirinetonka Mills Road Improvements 02-CIP-Sl16 0 360,000 360,000 SA - Special AssessmentTotal 300,000 80,700 916,000 882,000 2,178,700 SF - Sanitary Sewer Fund ,Residential Street Improvements--Utilities 01-CIP-Sl02 0 75,000 75,000 75,000 225,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 ' 20,000 20,000 Upgrade of sanitary sewer lift station #1 04-CIP.U007 0 200,000 200,000 ,SF - Sanitary Sew~rFund Total 75,000 275,000 ' 75,000", ' 20,000 . 445,000 SU - Storm Sewer Fund Citywide Trail Connections 01-GIP-P206 0 10,000 10,000 Residential 'Street Improvements-Utilities 01-CIP-Sl02 0 100,000 100,000 100,000 300,000 Citywide Concrete Alleys 01~CIP-S103 0 ,.8,000 4,000 8,000 20,000 .SAH 73/CSAH 5 Intersection 01-CIP"S111 0 50,000 50.000 Stonn drainage system mainteriance 01-CIP~U002 0 74,000 14,000 14,000 14,000 114,000 230,000 StOrm Water Management Projects 01-CIP-U003 0 200,000 200,000 Wednesday, July 07, 2004 ", ,I Source Project# Priority 2005 2006 2007 2008 2009 Total ~- "' Minnetonka Mills Road Improvements 02-CIP-S116 0 130,000 130,000 5th Street South Culvert Replacement 05-CIP-UOOB 0 520,000 520,000 SU - Storm Sewer Fund Total 224,000 132,000 838,000 152,000 114,000 1,460,000 . TF - Tax Increment Financing Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 2,000,000 2.000,000 North Annex Redevelopment Project 01-CIP-D402 0 13,600,000 13.600.000 TF - Tax Increment Financing Total 2,000,000 13,600,000 15,600,000 WF - Water Fund Residential Street Improvements-Utilities 01-CIP-S102 0 75.000 75,000 75,000 225,000 CSAH 73/CSAH 5 Intersection 01-CIP-Sll1 0 100,000 100,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 30,000 30,000 5th Street South Culvert Replacement 05-CIP-UOOB 0 ' 30,000 30,000 WF- Water Fund Total 175,000 75,000 105,000 30,000 385,000 GRAND TOTAL 6,794,000 ' 17,536,700 6,053,000 1,654,000 264,000 32,301,700 . , . Wednesday, July 07, 2004 . .~ CAPrrAL IMPROVEMENTS PLAN ., " City 'ofHopldns, MN PROJECTS BY DEP ARTMENTANJ).FUNDING SOURCE ,2005 ' thru 2009"" Department Project# Priority 2005 2006 2007 2008 2009 Total Development Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 2,000,000 2,000,000 TF 0 Tax InCfW!1ent Financing 2,000,000 ' 2,000,000 Nortti Annex Redevelopmimt Project 01-CIP-D402 0 13,600,000 13,600,000 TF - Tax Increment Financing, '13,600,000' , 13,600,000 Development Total .. 2,000,000 13,600,000 15,600,000 Public'Works:Bldg/Equip Serv City HallWall Covering Replacement , 05~IP-B304 0 " , 23,000 23,000 ,Clo Capital Improvement Fund 23,000 " 23,000 City Hall Carpet Replacement OS-CIP-B305 0 80,000 80,000 Clo Capital Improvement Fund 80,000 80,000 . Historical Socie~ RoofReplacement 05-CIP-B306 ' 0 . 35,000 35,000 , , , CI- Capltal,/niprovement Fund 35,000 : 35,000 City Hall Boiler Additions 05-CIP-B307 0 23,000 23,000 :CI. Capital Improvement Fund 23,000 :,' 23,000 Activity Center Window Replacement 05-CIP~B308 0 19,000 19,000 CI. Capital Improvement Fund 19,000 19,000 Building Maintenance Office and Shop Upgrade 05-CIP-B309 0 5,000 5,000 CI. Capital Improvement Fund 5,000 5,000 , City Hall Site Improvements ' 05-CIP-B310 0 50,000 50,000 CI. Capitallmprovement Fund, 50,000 50,000 Public Works: Bldg/.Equip Serv Total 78,OO~ ..' 138,000 19,000 235,000 Public Works: Parks Valley Park Improvements 01-CIP-P201 0 65,000 65,000 , PDF- Park DedIcatIon Fund 65,000 65,000 Citywide Trail Connections 01-CIP-P206 0 50,000 50,000 CR 0 Current Revenues 0 General Fund 10,000 10,000 MS. Municipal State'Aid Streets 30,000 30,000 SU 0 Storm Sewer Fund 10,000 10,000 Pavilion Community Message Sign 02-Clp:P210 3 35,000 35,000 PA . PaVilion Fund , 17,500 17,500 PF. Private Sector Funds 17,500 17,500 Co Rd 3 Beautification Corridor 02-CIP-P213 1 80,000 80,000 CR 0 Current Revenues. General Fund 40,000 40,000 PDF- Park Dedication Fund 40,000 40,000 . Bumes.Park Play Equipment 04-CIP-P216 0 50,000 50,000 . PDF- Park Dedlcatkm Fund 50,000 50,000 Wednesday, July 07, 2004 Department Project# Priority 2005 2006 2007 2008 2009 Total, " Public Works: Parks Total 115,000 165,000 280,000 Public Works: Streetsffraffic . Residential Street Improvements 01-CIP-S101 0 427,000 100,000 1,350,000 700,000 150,000 2,727,000 MS . Municipal State AId Streets 0 0 0 PI. PIR/General Obligation Bonds 127,000 100,000 450,000 210,000 150,000 1,037,000 SA 0 Special Assessment 300,000 0 900,000 490,000 1,690,000 Residential Street Improvements-Utilities 01-CIP-S102 0 250,000 250,000 250,000 750,000 SF - Sanitary Sewer Fund 75,000 75,000 75,000 225,000 SU 0 Slooo Sewer Fund 100,000 100,000 100,000 300,000 WF - Water Fund 75,000 75,000 75,000 225,000 Citywide Concrete Alleys 01-CIP-S 103 0 40,000 20,000 40,000 100,000 SA - Special Assessment 32,000 16,000 32,000 80,000 SU. Stooo Sewer Fund 8,000 4,000 8,000 20,000 County Road 3 01-CIP-S104 0 2,300,000 2,300,000 GU . Other Governmental Units 1,600,000 1,600,000 MS.M~~~/StamAmStreets 700,000 700,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,879,700 1,500,000 4,379,700 GU. Other Governmental Units 2, 160,000 1,350,000 3,510,000 MS . Municipal State Aid Streets 721,000 721,000 PI. PIR/General Obligation Bonds 100,000 100,000 SA 0 Special Assessment 48,700 48,700 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 750,000 750,000 GU. Other Governmental Units 200,000 200,000 MS 0 Municipal State Aid Streets 550,000 550,000 CSAH 73/CSAH 5 Intersection 01-CIP-S111 0 2,500,000 2,500,000 GU. Other Governmental Units 1,900,000 1,900,000 MS . Municipal State Aid Streets 450,000 450,000 . SU - Storm Sewer Fund 50,000 50,000 WF. Water Fund 100,000 100,000 ' City Parking Lot Improvements 01-CIP-S113 0 250,000 250,000 Clo Capital Improvement Fund 250,000 250,000 Minnetonka Boulevard (CSAH 5) Corridor Improvement 01-CIP-S114 0 350,000 350,000 GU" Other Governmental Units 175,000 175,000 ,MS. Municipal State Aid Streets 100,000 100,000 PI. PIR/General Obligation Bonds 75,000 75,000 Mihnetonka Mills Road Improvements 02-CIP-S116 0 900,000 900,000 MS 0 Municipal State Aid Streets 310,000 310,000 PI. PIR/General Obligation Bonds 50,000 50,000 SA . Special Assessment 360,000 360,000 SF. Sanitary Sewer Fund 20,000 20,000 SU. Stooo Sewer Fund 130,000 130,000 WF - Water Fund 30,000 30,000 Public Works: Streetsffraffic Total 4,527,000 3,269,700 5,420,000 1,640,000 150,000 15,006,700 Public Works: Utilities Storm drainage system maintenance 01-GIP-U002 0 74,000 14,000 14,000 14,000 114,000 230,000 SU. Stooo Sewer Fund 74,000 14,000 14,000 14,000 114,000 230,000 Storm Water Management Projects 01-GIP-U003 0 200,000 200,000 SU 0 Slooo Sewer Fund 200,000 200,000 Upgrade of sanitary sewer lift station #1 04-CIP-U007 0 200,000 200,000 SF 0 Sanitary Sewer Fund 200,000 200,000 5th Street South Culvert Replacement 05-CIP-U008 0 550,000 550,000 . SU 0 Stooo Sewer Fund 520,000 520,000 WF. Waler Fund 30,000 30,000 Wednesday, July 07, 2004 . Department Project# Priority 2005 2006 2007 2008 2009 Total Public Works: Utilities Total 74,000 ' 214,000 14,000 114,000 1,180,000 . " GRAND TOTAL 6,794,000 17,386,700 6,203,000 1,654,000 264,000 32,301,700 . . Wednesday, July 07, 2004 -- --- CAPITAL IMPROVEMENTS PLAN (L ) City of Hopkins, MN . CATEGORY SUMMARY BY DEPARTMENT 2005 thru 2009 Department Category 2005 2006 2007 2008 2009 Total Future Development Economic Development 2,000,000 13,600,000 15,600,000 . Total: 2,000,000 13,600,000 15,600,000 Public Works:Bldg/Equip Serv Buildings: Administrative Offices 78,000 103,000 181,000 Buildings: Community Center 35,000 19,000 54,000 Total: 78,000 ' 138,000 19,000 235,000 Public Works: Parks Parks/Forestry/Pavilion: Community Facilities 50,000 165,000 215,000 Parks/Forestry/Pavilion: Neighborhood Facilities 65,000 65,000 Total: 115,000 165,000 280,000 Public Works:StreetslTraffic Trans: Parking Facilities 250,000 250,000 Trans: Streets 4,277,000 3,269,700 5,420,000 1,640,000 150,000 14,756,700 400,000 Total: 4,527,000 3,269,700 5,420,000 1,640,000 150,000 15,006,700 400,000 Public Works: Transportation . Trans: Streets 850,000 Total: 850,000 Public Works: Utilities Utilities: Municipal Sanita,1Y Sewer 74,000 214,000 14,000 14,000 114,000 430,000 Utilities: Storm Sewer 750,000 750,000 Total: 74,000 214,000 764,000 14,000 114,000 1,180,000 GRAND TOTAL: 6,794,000 17,386,700 6,203,000 1,654,000 264,000 32,301,700 1,250,000 . Wednesday, July 07, 2004 .. ... f CAPITAL,IMPROVEMENTS PLAN , . , '., City of Hopkins, MN " .. . PROJECTS BY FUNDING SOURCE WITH BALANCES 2005 thru 2009 Source Project# Priority, 2005 2006 2007 " 2008 "',2009 Total CI ~'Capital Improvement Fund Beainnina Balance City Parking Lot Improvements 01:CIP-S113 0 2S0,000 2S0,000 City Hall Wall Covering Replacement OS.CIP-B304 0 23,000 , 23,000 City Hall Carpet Replacement ' OS.CIP-B30S 0 80,000 80,000 ., Historical Society Roof Replacement 05-CIP-B306 ' 0 35,000 35,000 City Hall Boiler Additions 05-CIP-B307 0 23,000 23,000 Activity Center Window Replacement 05-CIP-B308 0 19,000 19,000 Building Maintenance Office and Shop Upgrade 05-CIP-B309 0 5,000 5,000 , , Oity Hall Site Improvements 05-CIP-B310 0 50,000 50,000 CI - Capital Improvement Fund Total 328~00O 138,000 19,000, 485,000 , eCR 7' Current Revenues- General Fund Beainnina Balance CityWide Trail Connections 01-CIP-P206 0 10,000 ' 10,000 Co Rd 3 Beautification Corridor 02-CIP-P213 1 40,000 40,000 CR -. Current 'Revenues - General' 50;000 SO,OOO' Fund Total GU- Other Governmental Units Beainning Balance County Road 3 01-CIP-S104 0 1,600,000 1,600,000 County Road 61(Shady Oak Road) 01-CIP-S106 0 2,160,000 1,350,000 3,510,000 Excelsior Boulevard Streetscape Improvements 01-CIP-sl09 0 200,000 200,000 CSAH 73/CSAH 5 Intersection 01-CIP-S 111 0 1,900,000 1,900,000 Minnetilnk~ Boulevard (CSAH 5) Corridor Improvement 01-CIP-Sl14 0 175,000 175,000 GU - Other Governritental Units Total 2,275,000 2,160,000 2,950,000 7,385,000 MS- MuniCipal State Aid Streets' Beainnina Balance CityWide Trail Connections 01-Clp.P206 0 30,000 30,000 e Residential Street Improvements 01-CIP-S101 0 0 '0 0 , County Road 3 " " 01-CIP-S104 0 700,000 700,000 County Road 61 (Shady Oak. Road) 01-CIP-S106 0 721,000 721,000 , Excelsior Boulevard Streetscape Improvements 01.CIP-S109 0 550,000 550,000 , , Wednesday, July 07, 2004 " ' Source project# Priority 2005 2006 2007 2008 2009 Total '- '; CSAH 73/CSAH 5 Intersection 01-CIP-S111 0 450,000 450,000 Minnetohka Boulevard (CSAH 5) Corridor Improvement 01,CIP-S114 0 100,000 100,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 310,000 310,000 . MS - Municipal State Aid Streets 1,100,000 751,000 700,000 310,000 2,861,000 Total P A - Pavilion Fund . Beainnina Balance Pavilion Community Message Sign 02-CIP-P210 3 17,500 17,500 PA - Pavilion Fund Total 17,500 17,500 PDF- Park Dedication Fund Beainnina Balance Valley Park Improvements 01-CIP-P201 0 65,000 65,000 Co Rd 3 Beautification Corridor 02-CIP-P213 1 40,000 40,000 Bumes Park Play Equipment 04-CIP-P216 0 50,000 50,000 PDF- Park Dedication Fund Total 115,000 40,000 155,000 PF - Private Sector Funds Beainnina Balance Pavilion Community Message Sign 02-CIP-P210 3 17,500 17,500 PF - Private Sector Funds Total 17,500 17,500 . PI - PIR/General Obligation Bonds Beainnina Balance Residential Street Improvements 01-CIP-S101 0 127,000 100,000 450,000 210,000 150,000 1 ,037,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 100,000 100,000 Minnetonka Boulevard (CSAH 5) Corridor Improvement 01-CIP-S114 0 75,000 75,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 , 50,000 50,000 PI - PIR/General Obligation Bonds 202,000 200,000 450,000 260,000 150,000 1,262,000 Total SA - Special Assessment Beainnina Balance Residential Street Improvements 01-CIP-S101 0 300,000 0 900,000 490,000 1,690,000 Citywide Concrete Alleys 01-CIP-S103 0 32,000 16,000 32,000 80,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 48,700 48,700 Minnetonka Mills Road Improvements 02-CIP-S116 0 360,000 360,000 SA - Special Assessment Total 300,000 80,700 916,000 882,000 2,178,700 SF - Sanitary Sewer Fund . Beainnina Balance Residential Street Improvements-Utilities 01-CIP-S102 0 75,000 75,000 75,000 225,000 Wednesday, July 07, 2004 < Sourte Project# Priority. , 2005 2006 2007 2008 2009 Total " Minnetonka Mills Road Improvements ,02cCIP-Sl16 0 20,000 20,000 . Upgrade of sanitary s~wer lift station #1 , 04-CIP-U007 0 200,000 200,000 SF - Sanitary Sewer Fund Total 75,000 .275,000 75,000 20,000 445,000 SU ~ Storm Sewer.Fund 'Beainnina Balance CityWide Trail, Connections 01-CIP:P206 0' 10,000 10,000 , 'Residential Street Improvements-Utilities 01-CIP-s102 0 100,000 100,000 100,000 300,000 Citywide Concrete Alleys' . ," 01.CIP-S103 " 0 8,000 4,000 8,000 ,20,000 CSAH 73/CSAH 5 Intersection 01 :CIP:.s111 0 50,000 '50,000 , Storm drainage system maintenance 01.CIP.U002 0 74,000 14,000 14,000 14,000 114,000 230,000 , Storm Water Management projects' , 01-CIP-UOO3 0 200,000 200,000 , Minnetonka Mills Road Improvements 02-CIP:S116 " 0 ' 130,000 130,000 5th Street South ,Culvert Replacement 05-CIP~U008 '0 520,000 520,000 SU - ,Storm Sewer Fund Total 224,000 132,000 838,000 152,000 ' 114,000 1,460,000 TF -,Taxiti~rement Financing BeainninaBalBnce Redevelopment, East Excelsior Boulevard 01-,CIP-D401 0 ' 2,000,060 2,000,000 North Annex Redevelopment Project 01-CIP-D402 0 13,600,000 13,600,000 . TF - Tax Iricrement Financing Total ' 2,000,000 13,600,000 15,600,000 WF - Water Fund Beainnina Balance " ,Residential Street Improvements-Utilities 01-CIP-S102 0 75,000 75,000 75,000 225,000 ' CSAH 73/CSAH 5 Intersection 01-CIP-S111 0 100,000 100,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 30,000 30,000 5th street South Culvert Replacement' 05-CIP-U008 0 30,000 30,000 WF - water Fund Total 175,000 '75,000 ' 105,000 30,000 385,000 GRAND TOTAL ' 6,794,00017,536,700 6,053,000 1,654,000 264,000 32,301,700 . Wednesday, July 07,' 2004 CAPITAL IMPROVEMENTS PLAN ,~ :. City of Hopkins, MN . PROJECTS BY YEAR & PRIORITY 2005 thru 2009 Project Name Department Project # Priority Project Value 2005 Priority n/a Redevelopment, East Excelsior Boulevard Development 01-CIP-D401 0 2,000,000 City Hall Wall Covering Replacement Public Works: Bldg/Equip Serv 05-CIP-B304 0 23,000 Building Maintenance Office and Shop Upgrade Public Works: Bldg/Equip Serv 05-CIP-B309 0 5,000 City Hall Site Improvements Public Works: Bldg/EquipServ 05-CIP-B310 0 50,000 Valley Park Improvements Public Works: Parks 01-CIP-P201 0 65,000 Burnes Park Play Equipment Public Works: Parks 04-CIP-P216 0 50,000 Residential Street Improvements Public Works: StreetslTraffic 01-CIP..s 101 0 427,000 Residential Street Improvements-Utilities Public Works: StreetslTraffic 01-CIP..s102 0 250,000 Excelsior Boulevard Streetscape Improvements Public Works: StreetslTraffic 01-CIP-S109 0 750,000 CSAH 73/CSAH 5 Intersection Public Works: StreetslTraffic 01-CIP-S111 0 2,500,000 . City Parking Lot Improvements Public Works: StreetslTraffic 01-CIP..s113 0 250,000 Minnetonka Boulevard (CSAH 5) Corridor Improvement Public Works: StreatslTraffic 01-CIP..s 114 0 350,000 Storm drainage system maintenance Public Works: Utilities 01-CIP-U002 0 74,000 Total for Priority 0 6,794,000 Total for 2005 6,794,000 2006 Priority n/a North Annex Redevelopment Project Development 01-CIP-D402 0 13,600,000 City Hall Carpet Replacement Public Works: Bldg/Equip Serv 05-CIP-B305 0 80,000 Historical Society Roof Replacement Public Works: Bldg/Equip Serv 05-CIP-B306 0 35,000 City Hall Boiler Additions Public Works: Bldg/Equip Serv 05-CIP-B307 0 23,000 Citywide Trail Connections Public Works: Parks 01-CIP-P206 0 50,000 Residential Street Improvements Public Works: StreetslTraffic 01-CIP..s 101 0 100,000 Residential Street Improvements-Utilities Public Works: StreetslTraffic 01-CIP..s102 0 250,000 Citywide Concrete Alleys Public Works: StreetslTraffic 01-CIP..s103 0 40,000 County Road 61 (Shady Oak Road) Public Works: StreetslTraffic 01-CIP-S106 0 2,879,700 Storm drainage system maintenance Public Works: Utilities 01-CIP-U002 0 14,000 Upgrade of sanitary sewer lift station #1 Public Works: Utilities 04-CIP-U007 0 200,000 Total for Priority 0 17,271,700 Priority 1 Urgent Co Rd 3 Beautification Corridor Public Works: Parks 02-CIP-P213 1 80,000 . Total for Priority 1 80,000 Priority 3 Important Wednesday, July 07, 2004 - '" ~ ,Department , Project# , Priority Project Value ..", Project Name Pavilion Community Message Sign Public Works: Parks, 02-CIP:-P210 ' 3 35,000, .; Tota/(orPriority 3 35,000 Totalfor 2006 17,386,700 2007 Prioritynla ACtivity Center WindOYl Replacement Public Wor~s: Bldg/Equlp Serv 05-CIP-B308 0 19,000 Residential Street Improvements Public Works: StreetslTraffic 01-CIP-S101 0 1,350,000 Residential Street Improvements--Utilities Public Works:. StreetslTraffic 01-CIP~S102 0 250,000 "Citywide Concrete Alleys,' '. Public Works: StreetsITrafflc 01-CIP-S103 0 20,000 Cou~ty Road 3 PublicWorks: StreetslTraffic 01-CIP-S104 O. 2,300,000 County Road 61 (Shady Oak Road) , Public Wor~s: StreetslTraffic 01-CIP-S106 0 1,500,000 " , Storm drainage system maintenance Public Works:' Utilities, 01-CIP-U002 ' 0 14,000 Storm Water Management Projects Public Works: 'Utilities 01-CIP-UOO3 0 200,000 5th Street Southpulvert Replacement Public Works: Utilities 05~C1P-U008 0 550,000 Total for Priority 0,. 6,203,000 , Total for 2007 6,203,000 2008 Prioritynla , Residential Street Improvements Public Works: , StreetslTraffie 01-CIP-S101 0 700,000 Citywide Concrete Alleys Public Works: StreetslTraffic 01-CIP-Sl03 0 40,000 Minnetonka Mills Road Improvements Public Works: StreetsfTraffic 02-CiP-S 116 . 0 900,000 . Storm drainage system maintenance Public Works: Utilities. . 01-CIP-UOO2 ,0 14,000 Total for Priority 0 1,654,000 Total for 2008 1,654,000 ,2009 " Priority nla , , Residential Street Improvements : Public Works: StreetslTraffic ' 01-CIP-S101 0 150,000 , Storm drainage system maintenance Public Works: Utilities 01-CIP-lJ002 " 0 114,000 Total for Priority 0 264,000 , Total for 2009 264,000 GRAND TOTAL 32,301,700 . Wednesday,july 07,2004 CAPITAL IMPROVEMENTS PLAN ~ " City of Hopkins, MN . PROJECTS BY CATEGORY 2005 thru 2009 Category Project# Priority 2005 2006 2007 2008 2009 Total Buildings: Administrative Offices City Hall Wall Covering Replacement 05-CIP-B304 0 23,000 23,000 City Hall Carpet Replacement 05-CIP-B305 0 80,000 80,000 City Hall Boiler Additions 05-CIP-B307 0 23,000 23,000 Building Maintenance Office and Shop Upgrade 05-CIP-B309 0 5,000 5,000 City Hall Site Improvements 05-CIP-B310 0 50,000 50,000 Buildings: Administrative Offices 78,000 103,000 181,000 Total Buildings: Community Center Historical Society Roof Replacement 05-CIP-B306 0 35,000 35,000 Activity Center Window Replacement 05-CIP-B308 0 19,000 19,000 . Buildings: Community Center Total 35,000 19,000 54,000 Economic Development Redevelopment East Excelsior Boulevard 01-CIP-D401 0 2,000,000 2,000,000 North Annex Redevelopment Project 01-CIP-D402 0 13,600,000 13,600,000 Economic Development Total 2,000,000 13,600,000 15,600,000 Parks/Forestry/Pavilion: Community F Citywide Trail Connections 01-Clp.P206 0 '.50,000 50,000 Pavilion Community Message Sign 02-Clp.P210 3 35,000 35,000 Co Rd 3 Beautification Corridor 02.Clp.P213 1 80,000 80,000 Bumes Park Play Equipment 04-CIP.P216 0 50,000 50,000 Parks/Forestry/Pavilion: Community 50,000 165,000 215,000 Facilities Total Parks/Forestry/Pavilion: Neighborhood Valley Park Improvements ' 01-CIP-P201 0 65,000 65,000 ParkslF orestry/Pavilion: 65,000 65,000 Neighborhood Facilities Total Trans: Parking Facilities . City Parking Lot Improvements 01-CIP-S113 0 250,000 250,000 Wednesday, July 07, 2004 . Category Project# Priority 2005 2006 2007 2008 2009 Total Trans: Parking Facilities Total 250,.0.0.0 , 25.0,.0.0.0 ~ ' .rans: Streets Residential Street Improvements 01-CIP-S101 0 427,000 100,000 1,350,000 700,000 150,000 2,727,000 Residential Street Improvements:.:.Utilities Q1-CIP-S102 0 ,250,000 ' 250,000 250,000 750,000 Citywide Concrete Alleys, ' 01-CIP-S103 0 40,000 20,000 40,000 100,000 , County Road 3 01-CIP-S104 0 2,300,000 2,300,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,879,700 1,500,000 4,379,700 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 750,000 750,000 CSAH 73/CSAH 5 Intersection 01-CIP-S111 0 2,500,000 , .2,500,000, Minnetonka BOulevard (CSAH 5) Corridor Improvement 01-CIP-S114 0 350,000 350,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 900,000 ' ' 900,000 TranS: Streets Total 4,277,.0.0.0 3;269,7.0.0 5,42.0,.0.0.0 . 1,64.0,.0.0.0 150,.0.0.0 14,756,7.0.0 Utilities: Mimicipal Sanitary Sewer , ' Storm draimige system maintenance 01-CIP-U002 0 74,000 '14,000 14,000 14,000 114,000 , 230,000 Upgrade of sanitary 'sewer lift station #1 04cCIP-U007 0 " 200,000 200,000" " Utilities: Municipal Sanitary Sewer " ',' 74,.0.0.0 " 214,.0.0.0 ' ' , 14,.0.0.0 '14,00.0 114,.000 43.0,.0.0.0 Total .ptilities:Storm Sewer , Storm Water Management Projects 01 :CIP-U003 0 '200,000 200,000 .th Street South Culvert Replacement 05-CIP-U008 0 ' 550,000 550,000 Utilities: Storm Sewer Total :, 75.0,.0.0.0 75.0,.0.0.0 GRAND TOTAL 6,794,.0.0.0 17,386,7.0.0 ,6,2.03,.0.0.0 1,654,.0.0.0 264,.0.0.0 32,3.01,7.0.0 , . ' ' Wednesday, July 07, 20Q4 CAPITAL IMPROVEMENTS PLAN , , City of Hopkins, MN . PROJECTS & FUNDING SOURCES BY DEPARTMENT 2005 thru 2009 Department project# Priority 2005 2006 2007 ,.'2008 2009 Total Development Redevelopment East Excelsior Boulevard 01-CIP-D401 0 2,000,000 2,000,000 North Annex Redevelopment Project 01-CIP-D402 0 13,600,000 13,600,000 Development Total 2,000,000 13,600,000 15,600,000 Public Works: BldglEquip Serv City Hall Wall Covering Replacement 05-CIP-B304 0 23,000 23,000 . City Hall Carpet Replacement 05-CIP-B305 0 80,000 80,000 Historical Society Roof Replacement 05-CIP-B306 0 35,000 35,000 City Hall Boiler Additions 05-CIP-B307 0 23,000 23,000 Activity Center Window Replacement 05-CIP-B308 0 19,000 19,000 Building Maintenance Office and Shop Upgrade 05-CIP-B309 0 5,000 5,000 City Hall Site Improvements 05-CIP-8310 0 50,000 50,000 Public Works: BldglEquip Serv Total 78,000 , 138,000 19,000 235,000 Public Works: Parks Valley Park Improvements 01-C\P-P201 0 65,000 65,000 Citywide Trail Connections 01-CIP-P206 0 50,000 SO,OOO Pavilion Community Message Sign 02-CIP-P210 3 35,000 35,000 Co Rd 3 Beautification Corridor 02-CIP-P213 1 80,000 80,000 Bumes Park Play Equipment 04-CIP-P216 0 50.000 50,000 Public Works: Parks Total 115,000 165,000 280,000 . Wednesday, July 07, 2004 < Department Project# 2005 2006 2007 2008 2009 Total Public Works: StreetsJTraffic Residential Street Improvements 01-CIP-S101 0 427,000 100,000 1,350,000 700,000 150,000 2,727,000 , Residential Street Improvements-Utilities 01-CIP-S102 0 250,000 250,000 250,000 750,000 Citywide conCrete Alleys 01-CIP-S103 " 40,000 0 40,000 20,000 100,000 , County Road 3 01-CIP-S104 0 . 2,300,000 2,300,000 ,County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,879,700 1,500,000 4,379,700 Excelsior Bouievard Streetscape Improvements 01-CIP-S109 0 750,000 750,000 '" CSAH 73/CSAH 5 Intersection 01-CIP-S111 0 2,500,000 2,500,000 City Parlling Lot Improvements 01~CIP-S113 0 ' 250,000 250;000 . Minnetonka Boulevard (CSAH 5) Corridor Improvement 01-CIP-S114 ' 0 350,000 350,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 900,000 " 900,000 . Public Works: Streets/Traffic Total 4,527,000 3,269,700 . 5,420,000 1,640,000 150,000 15,006,700 Public Works: Utilities Stonn drainage system maintenance 01-CIP-U002 0 74,000 14,000 14,000 14,000 114,000 230,000 Stonn Water Management Projects 01-CIP-U003 0 200,000 200,000 Upgrade cif sanitary sewer lift stalion #1 04-CiP-U007 0 200,000 200,000 5th Street South Culvert Replacement 05-CIP-U008 0 550,000 550,000 Public Works: Utilities Total 74,000 214,000 ,764,000 14,000 114,000 1,180,000 .. 'Wednesday, July 07,2004 ,\ .~ . Department Project# Priority 2005 2006 2007 2008 2009 Total, " . . . Wednesday, July 07, 2004 :- 'i. CAPITAL IMPROVEMENTS PLAN . City of Hopkins, MN CATEGORY ,SUMMARY 2005 thru 2009 Category 2005 2006 2007 2008 2009 Total Future Buildings: Administrative Offices, 78,000 103,000 181,000 . Buildings: Community Center , 35,000 ,19,000 54,000 Economic Development 2,000,000 13,600,000 15:600,ooli parks/ForestrY/pavilion:, Community Fa 50,000 165,006 215,000 Parks/Forestry/Pavilion: Neighborhood 65,000 65,000 , Trans: .Parking Facilities ' 250,000 250,000 Trans: Streets 4,277,000 3,269,700 5,420;000 1,640,000 150,000 14,756,700 1,250,000 Utilities: Municipal Sahitary Sewer 74,000 214,000 14,000 14,000 114,000 430,000 Utilities: Storm Sewer 750,000 ,750,000 Total: , H,3S6,700 .. 6,794,000 6,203,000 1,654;000 264,000 32,301,700 1,250,000 ." . Wednesday, July 07, 2004 " ' " ,. ,.'.. '. ' Graphs . " " ", . '. . " '. ,,:' l- . C ctSL.() _ 0 a.. 0 Eo O ('llo ....0 +-' !:::r-: N C/) (\I ,... -1.0 ~ (1) _ Q) s.... ~ ~ E~ \.,., Q) E ' > m ~ e L.. 0 c.C> C\I E 0 ~8 ~ s.... ~~ 0 . -a.. 5~\ '+- _ 000 ]l >- .~o (J) 8 ._ ~ ~o ~ C. ~ w 0_ " ::J r ,^a~ ~ ~ '" VrI "C ~ .- ~ \U Q) ai / "'0 V.I () s.... 0 ' c I': ~ :J ~ 8_ ,(I) CO ....,,, +-' ('ll 1.0 a. f:F) o .- a. ~ X 0-0 W N C I Q) _ m L.() c.. c::: 0 1f ~ X [& / 0 o UJ' .Q8 ~ O ' (1)0 > (\I- N ~~ . .., , .' . . 'Eo C ~O ca [ :;t\ 00 - <0 , - ~ ~~ u a. I,;, <3 ;; . 0 _ Cll (jj C~ a.. (I)." L.. E ~ m (I) 0 .9- " >- > .... a-g 0 'E !:I:!,.r.i LOa O OM . ~N ~ ~ ... Cll iii .. 0 'C: ~ ~ -~ E en (J) 0 o 0 mM - .. 0 ~ _ · '" ~o. ::J N -... ~o ....M ! >-. 8' ~ ::c fI7 .- .c c: ~ m _0 g~ C- ow CD "'.0 /' >< O .. ~o w ::s =00 -- "... ~ ~ 5~ _ ""'. '-.. III o"C .... o c:::: 0 NCD l- Ie. 11)>< OW (.) O t;:::0 - 0 N ~...... ~~ _M ~ . ~IJ') .... "... i5~ . < ... . ---~-~---'---'-'----'-'--~2005-2009 Ca~i;a~ Im~~ov;';ent Plan ~-~'--_.----,-,----_._-, 'l Expenditures by Source for 2005 CR $O"-'--'~----'--------_._------~~-----------l $0 . PF $0 , $75,000 I PDF $115,000 I $175,000 PI $202,000 $224,000 SA $300,000 $328,000 MS $1,100,000 I $2,000,000 GU $2,27 ,000 $0 $500,000 $1,000,000 $1,500,000 $2;000,000 $2,500,000 . Total Expenditures 'for 2005 LEGEND GU Other Government Units . $2,275,000 TF Taxlncrement Financing $2,000,000 MS Municipal State-Aid $1,100,000 CI Capital Improvement Fund $328,000 SA Special Assessment $300,000 SU Storm Sewer Fund $224,000 PI PIR/GO Bonds $202,000 WF Water Fund $175,000 PDF Park Dedication Fund $115,000 SF Sanitary Sewer Fund $75,000 PF Private Sector $0 PA Pavilion Fund $0 CR Current Revenues $0 $6,794,000 . < . . 2005-2009 Capital Improvement Plan Expenditures by Source for 5 Years PA CR WF CI TF $15,600,000 l3'0 ~ l3'v l3'()l l3'c9 l3'7. l3'7 l3'7- rS'7. "OQ "OQ "OQ "OQ <?Q ~Q ~Q ~Q ~Q ~Q ~Q ~Q Vo Vo Vo Vo ~ ~ ~ ~ ..~ ..~ ..~ ..~ v v v v . Total Expenditures torS Year Period $32,301,700 TF Tax Increment $15,600,000 GU Other Governmental Units $7,385,000 MS Municipal State-Aid Streets $2,861,000 SA Special Assessment $2,178,700 SU Storm Sewer Fund $1,460,000 PI PIR/GO Bonds $1,262,000 CI Capital Improvement Fund $485,000 SF Sanitary Sewer Fund $445,000 WF Water Fund . $385,000 PDF Park Dedication Fund $155,000 CR Current Revenue $50,000 PF Private Sector Funds $17,500 PA Pavilion Fund $17,500 $32,301,700 . .. . .. " - '" " "'.. Revenue P,rojecti(}ns 'Showing '.,,' . ImpactofProj ects' On Funding Source . . . ". - ' '. SUMMARY OF IMP ACTS ON MAJOR FUNDING SOURCES CURRENTREVENUES/GENERAL FUND RESERVES " , General fund expenditures historically have increased every year but in 2003 and 2004 , " this trend reversed. The city experienced cut backs in funding from the state. as a result of the economy. The city has reduced spending in the general fundtooffset the aid lost. In the process of determining what funds will be available from the general fund for capital, , the city ,has postponeci the citywide trail, connections and the Co. Rd. 3 boulevard beautification projects out to 2006; The levy is the general funds ,major source of revenues and therefore would need to, increase if general fund openiting and capital expenditures increase in 2005. The legislature has not implemented levyJimitsin 2005. PERMANENT IMPROVEMENT REVOLVING FUND, (P.LR.) - G.O. DEBT " " , , Funding from bonds is used to reimburse the PJ.R. fund for public improvement projects, which have taken place in the past. ' The debt is funded by special assessment collections and city tax levies over an eight to ten year period. ' In 2004, the leyy for permanent improvement revolving, debt was $150,000. In 2005, the levy for d~btwill be $147,000. . The outstanding debt is from 1992, (refunded in 2001 ),"1999 and 2002. The P.I.R..fund has completed substantial projects over the last three years; ,With thecurrerit funding ,. .,' issues for the general fund, the city .has scaled back its planned future sti'eet ' improvements to lighten the.potentiallevy' increases for debt service in the future." It is anticipated that the City will not need to issue bonds until 2008. The debt leVy forPJ.R. projects will be $147,000 each year unt112008, when it wil1decr~ase to, $85,000 for one year. The P .l.R. fund will maintain a stable fundbalance into the near future.' MUNICIPAL STATE AID FUND Funding is insufficient for the projects listed in the elP docU111entin 2004 unless anticipated project costs are delayed or the city borrows funds from the state. ' The county road 3 projects are substantial projects that are being conducted jointly with Hennepin County. The city anticipates paying on these projects in the near future. In order to accomplish payment the city, will be requesting an advance on future allotments from the state to cover the project costs. The advance is similar to borrowing from the state at' market or below current interest rates. It is projected that the city ,will need to borrow, approximately $2,000,000 from the state in 2004 and another $ ~ ,000,000 in 2006. Debt , ' , payments for these borrowings will come out of future dollars allotted to the city; . ,",.r. t', " . ~' ", , ... CAPITAL IMPROVEMENT FUND . Funding for this fund in the future is dependent on future infrastructure improvement and maintenance needs. Current funding is transfers from the general fund. Finance is recommending transfers from the general fund in 2004 and 2005. After that a levy for infrastructure improvements is recommended. PARK IMPROVEMENT FUND The source of funding for this fund is development fees charged to developers for park development. Future funds are very dependent on future development and redevelopment in the city. The County Road 3 beautification project has been pushed out to 2006 when funds will more likely be available for this type ofproject. WATER FUND Several large facility upgrades completed between 1999 and 2001 require rate increases in the future to help pay for bonds issued. In addition to that, the public works facility improvement project will cost the water enterprise $45,000 a year for twenty years. Increased operatin.g costs and improvements to water facilities prompted. a $.10 cent per . 1,000 gallon rate increase, that was approved in 2000. The next anticipated rate increases will most likely be in 2005 and 2008. The 2005 rate increase is planned to be about $.20 cents per 1,000 gallons for a new rate of $1.40. This increase in the rate is necessary to maintain the planned projects and to payoff bonds that were issued to provide funding for water improvement projects. SANITARY SEWER FUND The current revenues and working capital balance will cover the projected operating and capital costs through 2005. In 2006, lift station #1 will need to be replaced. This station has been operating since 1957. In addition to the new lift station, he Metropolitan Waste Control Commission is projecting increases in its disposal charges to local governments. Also, the public works facility improvement project will cost the sewer enterprise $50,000 a year for twenty years. These events will prompt the city to increase .its' current rates to cover costs and keep a healthy working capital balance. Analysis of projected capital projects and the projected operating costs may necessitate a rate increase in 2006 from $2.25 per 1,000 gallons to $2.50 per 1,000 gallons. Looking further into the future the city may need to increase rates every three years to keep pace with disposal costs and infrastructure needs. . , .' . REFUSE FUND , , ,Single stream recycling was implemented in 2003 to encourage recycHngactivit)' and reduce refuse disposal costs. Future analysis will determine how effective this plan is. Currently the city, does'not recoup its' costs for brush, yard waste arid leaf collection which are provided to residents. Refuse staff was in the process of recommending; a charge of either $50/annually or $20/seasonally for brush, yard waste and.leaf collection. This fee had the potential of generating $50,000 in new revenues and would have postponed an overall rate increase for refuse disposal serVices. The proposed fee has been temporarily postponed for further analysis. Absent a new fee for brush, yard waste and leaf collection, refuse disposal rates will need to increase every four years to offset costs and rec)'cHng rates will need to increase every four years to offset recycling costs; The projected refuse disposal rate increase is about 10% in 2005. The proposed new rates for 2005 are as follows: 30 gal. - $12.50, 60 gaL- $14.60, ,90 gal. - $15.90. Refuse, rates have not changed since 1995. The public works facility improvement project will cost the refuse enterprise $25,000 a year for twenty years. , STORM SEWER FuND , _' " I The storm sewer utility issued bonds in 2003 to help cover infrastructure costs that were . incurred prior to 2003. The City anticipates the continued pace. of construction thro~gh 2006. The public works facilityimprovement project will cost the stomi se:wefenterprise $25,000 a year for twenty years. The storm sewer utility rate will need to increase to ,cover the' costs of the new bonds and future operating. and construction costs. The proposed rate increase willinost likely take effect in 2006. The proposed rate increase is 10% over the curreht rates. TAX INCREMENT FINANCING FUNDS , Considering aU. tax increment districts, as a whole, cash. on hand, projected increments and loan repayments, are' sufficient to cover TIF project expenditures. The state has provided municipalities' with a pooling tool to accommodate short-term deficiencies within its' districts. The city will be allowed to pool its' districts tax increment revenues to cover outstanding debt. Currently none of the city's districts are projected to have . shortfalls. . J ~ ~\ '" '" ~ '" '" '" T "''''~or l~or G"- oo C"'"l.....r-o<noor- '<::l"'<::l"C""\ON O\MOM 10 00 .....00\0.....r-00\ '<::l"lnf'10f'1 OO'<::l"O'<::l" "'d" ..... . go ~ .~ 'l5' 0 ~ 0:: ,0 .~ ~.~M..no\' ~~M.r: r-!' ..,f ..... 00"'" C""\",," 0\00 '<:to\00r-0\ f'1\OMOO 0'1 r- N::> lnC""\I/").....N MO Moof'1 In '<::l".......... '-" M CO r...:' 0\ r-~N 0 ,....:~ ..~ M ..... '-'" """ -. t:i \OOlnOr-OO 00 f'1.....00 '<t \0 r-O r- .C\ '<::l" l""l_r-00\00 - 0\_0\0 0\ In ('")0 ('") ~ '<::l" _~ O~ O\~ O~ O\~ r-~ O~ 00 NO\'<::l"O \0 r- 0\0 0\ ,...c \0 r-O oONoOO 0\ ..0 C'f-r M ,r: go \O\O\OI,(')M 0\ 0 \0 ..... \OOOMMC"'"l 0\ C""\ C""\\O'<:t'<:t 00 0 ooM 0 \0 r- N::> .....C""\<n-M N r- 000("") M '<t~ 00 Q\ ~ f'1~ r...:' 00 r...:'N 0 00 00 '--' CO ..... ("") - '-'" fA /iA """ -- l-< \OOlnOOOOO 0\ C""\ln\OO '<::l" C""\ ..... 0 - ~ ('") \Op.J C""\.....r-O.....OO ("") '<::l"\Or-O 00 r- _ 0 ..... r- \0 ..... 00\0"'" r-O 0\ 1/")1/")\00 r- ..... \00 \0 \0" r- oO ..o..o"":O.no\O 00 .n..,fNO N oi Mo\ N ~ 00 00 \OOOMMN 0\ ..... OC""\Mln ..... r- ('") ..... In l"'l ("") M::> ooC""\\O.....M M In ooooM 0 l""l \0 \0 ~ In ..0 00 ..oN 0 00 00 -- ~ CO ..... ..... '-" fA fA 0 I -. ~ p.J ~ \OOlnOlnOO \0 lnO'- \0 0 \00 \0 \0 l""l_r-OOOO M 00..... .- l""l 000 00 10 C""\ r.nlnO .....OO\Olnr-O l""l~ O\I/")'<t 00 .- \00 \0 ~ """ 000 ~\JS~Or--:~O - ..-: \.IS ..q-n N N d'r-= r...:' \0 N p..0 \00000'-- ~ \0 '<tOO I/") I/") o ~ ..... 10 r- ON;:J \0 ("")I/").-M N lnooC""\ \0 C""\" ('")1""'4 '<:t ~ \0 ex::: CO ..0 00 ..oN oi .- 00 00 ......" M p.. '-'" fA ./iA I -. l-< '\0 0 I/") 0 0 0 0 - oolnM \0 M MOO ..... Q\ '<:tlJJ M.-r-Olnl/")O M ooMO ..... '<:t r-~ M M . .-OO\O.....MO \0 Q\0r- r- r- 0\\0 \0 r-~ 00 ..0 ..0 ....: O~ O~ '<t~ .n M o\.nN r...:' 00 00"; M l""l 00 \0 00 MO..... N\O r- 1/")\00\ - C""\ r-O'I r- 0 N;:J \Ol""l\O.....M M M Nr-M <"l C""\~ O\M N 00 CO ..0 00 ..oN 0\ - r-: 00 M '-" fA fA 0 ,<:!"O'<:t I - p.J ~ OO\OO'<::l"00 0 00 N \000 '<:!" \0 <n O_\OOC""\OO ..... ooM'- .- M Q\'<:t '<::l" \0 0\ E-<'<::l"-< OOC""\O-OO \f) O\f)'<:t 0" M r-\O '<t ~ r- Uog 0' ..0 00 O~ 00 00 v) v) ..,fN..,f .- .n ..r;~ 0 10 00 lJJo OooMO..... \f) Q\ ("")00Q\ ..... M r-O\ r- M M -'NU \Ol""l\O.....M M ..... .....\ON .- ~ r- C""\ ..... 00 ~ <: ..0 00 ..oN 0\ .- ~ 00 M -- p.. fA fA en (2 VJ t::~ 0 lJJ lJJ ~> E-< 00 ffi U ..... ffi~ &3 ~ ~ >r.n lJJ 00 CO~ ~ Eo-< ~~~CI)~ ~ ~Z r.n ~ ~ ~ ~<: E-<. r/.)~ U E-<~~~~ ~ Or/.) ffi Ur/.) g3~ ~ ...:l[:3 ';;; r/.)lJJ ::>~ ~ ~Zr/.)~ VJ = p......:l ga- 0 ';;;p..>-clJJ i-< ~ ~ "'I'"...:::>"'''' p.Jp..<:> Os;: ~ = ~ p.. ~lJJU~ffi~ ~~t::~ 5t=~~~ ~ 'C 00 ~r.alJJE-<~lJJ~r-t 00 <l) = Q,l Q,l -<v5'O~ ZU -< ~ ~ = p..>p..ffi~>r.ao 00 VJ....:lO~ lJJ-<b~~ = = 'C Q,l E-<OI.1i';;;(2~~r:- Q,l ~, ca = > =- ~~~~~~~i-<~ CO . = ~ ~~r/.)E-<Oex:::u ~ ~ lJJ ~ ~r.aE-<E-<l-<p.J t:i~ ~ g f .... r.affii2ex:::~Z .... ~~o::o::~~oz!iJ ~ = = ~ O~~~~b~ Q,l <:<: p.J E-< ~ ~ Q,l ~ ~ = :::> ~ U ~ U ~ ~ r/.) UU...:l 0 Q,l 0 = = ~ r/.) U U U E-< . . ~O~ 00 - '~ 0 ~ ~ O~~ ~ .' , V') 0 V') 0 0 - ~ 0, ~ 0\ 0 ~ ~ '<t ~~ q qq ~ ~qq ~ ~ q~~ ~ 0- ~ OV') '<t o'<t 0 - - o~- lJ') N 0 lJ')N ~ N~ ~ ~ 00\0\ 0\ '<t N - 'N ~ ~-'<tN N 0 0'00 ~ ,V') .0 0\ = ~ 0 0\ 0\ "~ - O'<tOO V') ~ 0 ,~. =~ 0-- ~ ~lJ') 00\00 '<t ~N 0 0\ =0\ ONN ~ g~ ~~6~ ~ 8~ 6 ~ ~~ ~a~ ~ N~ ,~ ~~ N~ ~ ~~ ~~,~ ~ .,..... .~ ......-l ~ ~ OV') 00 N ~ 0 V') V') 0~0\ lJ') ~ O~ =0 - NON N 0-- ~ ~~ O~ 00 lJ') ~~ O,~ ~ONN N 8~ ~~ 6~ ~ 8~ 6 ~ ~ ~a~ ~ N - co NON N N '<t ~,:<:t N \0 - ~ 0\ ~ '<t ~N - ~ :<:t V') ~N~ - - - - o 0 ~ = 0 0 ~ ~ 0 V') V') 0 0\ 0\ .~ ~ O,~= 00 ~ ~ 0 ~ ~O-- N ~~ q~~. qq ~ ~~ q, ~ ~ ~~~ ~ O'<t ~'<t= -0 V') O~ 0 ~ ~ 000 V') 00 0 = V')V') - O~ - '<t V') ~-O\'<t N_ '<t ~ ~- ~ N~ V') V') NN.'<t ~, ..... - - ~ ~ ~ O~ O~ 0 - 0 - - 00\0\ ~ ~ 0- 00 0\ ~ 0 ~ ~ 0-- ~ S V') N 0 '<t 00 ~' ..... V') V') 0 0 0 ,ON N ("<') , 06 ~.~' 66 ~ = o~ 6 6 6 ~6~ ~ < s- o~ OV') 0 ,~ SV') 0\ V') '<t 0-- ~ ~ ..~ '<t ~- - ~ ..~ V') ~' V')~~ ~ E-4 - - - , , < . ~ i.n 0 "'t = - 00 ' ~ ~ 0 N.O N, '0 0\ 0\ - .;j ~o ~ = N ~ ' "'J N \0:-0 N' 0''''''' - ~ < '<t \0 0 V') = ~ N ..... "<t N ,~ . 0 '<t ,0'1 N - V') ~ 0 0' 00' v1 = M or, ~ o~... l'-~ .~. 1-4'"' r-: 'M~ ~" -:", ..... 0("<') O~= ~ _ o~ 0 ~ ~~-~V') U N~ '<t ~ ~ 0\ N~ ~ ~ ~NlJ') ~ ..... N N, '<t - - ~~,. '<t ~\O ~ V') ~ V') ~oo ~OO\O\ ~ ~ ~'<t 0 \0 - ~ 0 0 ~ '<t-V') N ~"<t -~ ~ ~ ~~ '<t N 0\ V') '<tN~ N 8~ ~~ ~ 6 8~ ~ ~ ~ ~' ~~~ ~ N~ ~ ~ ~ N~ ~ N ~ ~, ~~~ ~ NO, NO, _ . _ ~ V') - ~., '<t 0\' :<:t ~ '<t 0 lJ')', ~ 0 ~ ~ "<tOO ~,~ N \0 O~ 0'<tV')0V') - NN '<tV') ~ '<t N~ ~ ~- O~ """O~ ~ -' 0 N .-: r--: v) V)t'\ 0 N \Cr. 00 ~.... 0"- "0\" . N :00 0 (".f S- ~V') ~ ~ S'<t \0 N~lJ') N~~ '<t .. \0 V') - ~ V') ... ~ ~ - ~ ~ .0 N N - N N ~ ~ ~ ~ (l) ~ ~ U (l) H'. a "- <Il ,~ ~ ~ ~ OJ:) CIS OJ:) ::l.el "1:l .$ ,:q.$ 5 5 = = . .el OJ:) => ~ <Il p:J = U = = (l) ~ (l) <Il <Il ..... (l) .el''''' ..... ,J (l) U ""' (l) ""' OJ:) '0' U (l) "1:l OJ:) '"'" e: S'~ <Il ~ (l) ""' (l) ~ = (l) .....::l 0 <Il:::> "- , ,:q..... ~ '0' (l) p:J ,:q 5 .0 r:/) a - "... ~5 ~ 5 ~ ~ '3 '3 s s - ""' $:I '3 . .'t: S ,c: c..=. "1:l (l)' ..... ..... ~ '0 en {l $:I . en f-< ~ ..... , ~o 's ..... ..... (l) ~ ~ (l) ~ = 5(l) 0 t (l) r:""' ~ U ::::: 'CIS (l) 8 <e: .9 U U ~~, ..... (l) 8 f-< .g,.9 U OJ:) <e:~~ ,,",Bt '~' OJ:) <en e:6e et OJ:) = _.....en(l)~(l) = = -_.....(l)-~ ~(l) = ..... CIS en..... c..=. +.:i en ..... ..... CIS ~ CI) <..:=. Q) ...... "CZl ..... ...::.:: ::s ~ "1:l CI) r:/)..... ...::.:: ~ .-.... ~ ,I'll U "Ij ~ ..... ...::.:: ""' '= (l) = = '~.D ""' ""' U <.E (l) = CI) = . .0""' o =..... 0 ~ = (l) 0 0 (l) (l) ..... (Ij ..... 0 ..... (l) 0 ~ <.5 ,,:q f-< U Cl ~ ~ ~ ~ .5 ~,::E ,:q 00 ~ T ,) ~ _ 0- 00 ~ ~ MO M 0 ~ M _ 0- 00 ~ ~ 00 0 ~ 0\\ M~ O\~ O~ O\~ O~ 0" -~ g;\ O~ ~ \r1, OO~ 00. .., 8 00 ~ O~ 00 ~ 0 M ~ ~ ~ M~' 00 ~~ - M - - ~ .........,-4 N 00 ~ O~ 00 ~ ~ 0\0 0\ 0 ~ o _ 0- 00 M ~ 00 0 ~ 0001 ~ ~ q~ qq ~ ~I ~ M~ ~ q O 00 ~ ~O\ 00 00 0 00 ~ ~ M M 0\ ~~ MM ~ M - ~ M OM 00 00 ~ 0\0 0\ 0 ~ 00 M OM 00 0 ~ -0 - ~ ~I ~ 00 0 00 0 0 l"'I ~\ ~ - ~ ~ ~ g 0 _ ~~ ~~ 00 8 ~ ~ ~ 00 M ~ ~~ -- 0\ M ~ 0\ 00\ 00 ~ e ~ 00 0 0 0 0 ~ ~ ~ _ 0- 00 00 ~ 0 ~o ~ 0 0 ~ , ~I O\~ ~ o~ \r1, o~ o~ ~~ ~ ~I ~~ 0\ M~ -~ o~ o~ ~~ o ~ M OM 0000 0 00 00 ~ ~ ~ 0 0 ~ ~ ~ M ~~ l"'Il"'I ~ ~ M ~ ~ ~ 00" - - - Z ~ ~ Z ~ ~ M ~O ~ 00 ~ ~ ~ 00 0 0 0 0 ~ ~ ~ 00 0 00 ~ 0 0 00 0 0 0 0 0 > ~I ~ ~q ~ qq ~ ~ ~I q ~~ ~ ~ q q ~ o 8 0 ~O l"'I 0000 ~ ~ g 0 l"'IO 00 M ~ ~ ~ ~ M ~ ~ ~ ~~ ~ ~ M ~ M ~ ~ ~ ~ ~ ~ ~.. ~ 8000 00 0 M ~ 0 ~ooo ~ 0\00\ ~ .., ~ ~ 00\0 0\ ~ ~ 0\ ~ooo ~ l"'IO~ 0 ~ ~\ ~ q~q ~ ~ < ~I ~ ~~q~ ~ ~q- q ~ 0 ~ 00-0 ~ 0 u 0 0\ l"'I~MOO - -0- 0 _ 0 ~ _ 0 00 ~ 0 - ~ ~ M~~ M j M M '-' _ l"'I ~ M - - <: ~ ~ 00 0 0 ~ M ~o~o 0 MOM 0 ~ 00 0 ~ M ~oooo ~ ~ ~ 0\ ~I ~ 00 0 ~ ~I - _~oo~ 0 - - 0\ 8 ~ ~o ~ ~ 8 ~ ~ooooo ~ 0 0 ~ M ~ ~ ~ ~ M ~M ~ ~ ~ ~ . ~ 00\ 0\ 0 ~ ~ ~~ O~~ MOM M o O~ ~ ~ ~ l"'IOO 0000 M M M 811 ~ O~ 0\ O\~ ~~ 811 ~~ ~~ ~~ ~~ -~ OO~ O~ O~ -~ o ~ 00 00 ~ 0 - ~OO -~O ~ ~ 0\ M 0\ - - ~ M ~ ~ -MO\ M M ~ ~ ~ ~ ~ ~ ~ c: ~ >< ;::l >< ~ ~ ~ s:::..... ~ c: ~ ._ ~ S:::.- s::: s::: ~ Vl I:.il s::: Vl (J:l s::: ~ ~ Vl s::: ~ Vl ._ c: 0 ~ ~ .- 0 ~ ~ ~ Vl ~ 5 r.n ~ ~..... 5 r.n ~ ~ ~ c.') 0 ~ ~ ~ 5 0 ~ ~ ._ s:: en "';j S r;n ..... Cd r: c <<i ~ -; Cd r/j (1) - .a] .'t:: ~ ..s ..... r.n 0 .'t:: .'t:: ~ Vl ,fl Vl 0 .- g. : c: ~ t)E-< g. ~ ~ 5 ~ t) E-< ~ . U 0"'" ~ U U s:::.J:l c: r' ~ U <..::. r.n '0' 0 Vl S .- '0' ~ ~ Vl. ~ ~ ~ ~..r1 S:::o'- ~ ~ s::: ~ s::: ~.....~ 0.. c: s::: .....';;; ~~ o..~ c: ...... b.O CI'J ~ ...... .- en U "i: ~ ~ '- .- ~ ~~~~ ~ ~ ~ ~~~s:::~ ~< ~ o ..s:::.....E!~ -: 0 0 BQ)o~~ .....Q) 0 ~ U~E-<~ d ~ ~~oo~~ 0~ ~ .' " . ~ - '~~ 0 ~ QO 00 00 ~I"~' ~~ ~ o 0 __ _ ~ 0 0\ 0'1' rrJ N E-t Z Iitil ~ ~ ~\O' 0 0 - ~ ~ NM 0 0 00 > ~I C"'i O\~ O\~ q O~ -~ o g ~ ~~ 0 0 0 ~ N~ ~ ~ 0'1 ~ . '~ - 0 0 ~ 00 ~ ,~ ~ ~ 00 0\00 0'1 '~ ~ ~I ~ 00 \00\0 N N ~ ~ ~ n n ~ n ~ .00 ~. ~~ O\~QO ~ ~ U ~ -- M~~ ~ 00 < N C"'i ~O\~ C"'i 0'1 ~ ~ N - ~ 0\ 00'10\ ~O~'O'I r-.., - ~' O~M MOONO'~ ~ ~I - ONN r-..~M~ QO ~ g ~ 6~~ ~~d~ ~ ~ ~ 00 ,~~\O ~0~0\ N ~ ,~ ,- 0' 0 0 ~ ~ 0 N O' ('f')'"' M c--f ~ t----" \Or. ,- ,0 0 .~ M - 0\ 0 ~, 0 ~ 0'1 OMM QOO~-Nt- ~ NI' 0 - - 0\ ~ 0 ~ ..... 0\ - o ' .' 6 .~ ~ ~ oo~ ~ ~ 0'1':' ~ ~ S? ~ ~ 0 ~ .'~ \0 N N - 00 ,~ r-.. - 0\ - - N - r-.. - o~ o~ o~ - - - ~ ;><, ~. ~ .- Q) c:: @ ~ ~ '" r..Ll 'So .;!l 2 Q) ~ Q) "0 ;:) ~ Q) ,~ c:: 0 ~;>< o CIl_ '"; ..c _ . __ ~ +-oJ .a -;; ...., "" Q) ",,.0 0 ..... .- S +J ~ 0 Q) .- . ~ 0 0 ~ouQ~ i U ~ h c:: 1-0 S Q) 0 U 00", ... .... blj '" ._,~ '" .... 'OJ) c:: "0.... 1tl::.> ~ ~ !i) c:: ......-1 Q) en ~ U Cl) "- ~ "- ~ Q) Q) CIl ._ u "0 en ~ 1-00 u!i) Q) ::0'- c:: r::: 1-0 o .... .... - 0' t':l 0 ~ l-o c:: .- ;:) 0 1-0 ~ ::.> j:l,,'_ ~~~~E- ::.> , , ,,,-., ~ ~O~ O~ 010 000001 ~ ~ ~ ~ ~ N N~ OOOO~ ~ 01 ~\ 01 l,() ~ 0 01 00 ...... 0 0 0 ............ ...... .'" o r. F\'" ",,'" "" ",.""... f'''' 1'\ O~ ~ l,() ~ ~~ ......00l,()0 ~ ~ ~,~ ~ _ _ ~l,() Ml,()~~~ l,() 00 ,~~ ~ ~ ~ __ ~ ~ 01 ............ - ~ MOO O~ ~l,() OOOOM 0 ~ ~ ~ ~ _ l,()l,() 0000- 0 ~ ~\~ ~ ~ ~ ~~ ~~~~~ ~ ~ 001 ~ ~ - ~~ 0l,()0l,()0...... ~ 01...... ~...... ...... N~ -O~~~ ~ ~ M _ ~ ~ -- - M - - - ,,-., ~ MOO O~ ~~ OOOO~ ~ ~ o ~ l,() 00 ~~ OOOO~ - ~ ~\~ l,(),. ~ ~ ~~ ~~~~q ~ ~ 0- 01 l,() ~ ~~ ~l,()l,()l,()~ 00 01 N~ l,() _ ~ O~ ~ON~~ 01 - ~ ~ ~ ~ ~~ ~ ~ M -...... - Z o ~ ~ ~O~ O~ ON 000001 l,() ~ ~ ~ 01 ~ _ ~ ~M OOOO~ 00 0 ~ u ~\~ l,() ~ ~ ~o OOOO~ ~ - ~ ~ g~ ~ ~ N ~~ O~O~N ~ ~ M ~ ~,~ 0""" 01 OO~ -~N~- ~ = o ,~~ - ...... ~ - - ~ ~ ~ - - - ~ ~ ~ ,,-., < ~ ~O- O~ NN OOOO~ ~ ~ E-c ~ ~ 0 M ~~ OOOO~ ~ 01 ~ ~I~ ~ ~ ~ l,()~ ~OOO~ ~ ~ ~ ~.~ ~ ~ ~ ~~ ~~~~i ~ ~ = U ,~~ ~ 0 ~ -- 01 ~ ~ ~ ~ - - = ~ ~ ~ N ~O~ O~ _~ 000000 ~ M ~ . ~ ~ ~ ~ 01 N~ OOOO~ ~ ~ o ~\~, l,() ~ l,() ~O OOOO~ ~ ~ ~ > gN N ~ ~ ~~ O~O~~ ~ M ~ ~ 010 ~ ~ ~ ~oo l,()0......~~ ~ l,() ~ I ...... ~ 00 ~ l,()- l,() ~ ~ - ~ - - ~ ~ ~ ~ l,()0~00~ ~~ O-OO~ M 01 01 ~ ...... ~ ~O 00 _~ ~O 01 ~ l,() ~ ~ ~\.~ ~ ~~ ~ ~~ ~~ ~ ~ ~ ~ ~ OO~ N ~O ~ ~~ ~l,() 0 ~ - 01 ~ ~,01 ~ NO ~ ~~ ~O ~ ~ 0 < ,~~ ~ ~ ~ ~ __ 0 - ~ ~ - -...... ,,-., ,,-., ~ ~~000000 _000~000~ 00 ~ ~ ~ ~~~O ~ oo~001~O ~ ~ ~ - 010.\.~ ~ ~~ ~ ~~~~~~ ~ ~ C ~ 0- l,() OO~ 0 ~~0l,()010 ~ ~ M ~,OO l,() ~~ ~ _~O 00 ...... l,() N '~N 00 _ 0 ~ M 01...... ~ M ~ .... " F\ ~ - ...... - ~ ~ CIl ~ ~ ~ ~ ~ ~ ..... CIl ~ S 8 = CIl:Q ~ 'So ... .eJ ~ ~ ~ :.a ~ CIl g = S ~.ta = c:o:g 1Zl ~ S~..... > ~ "';j = -:::: = ~ 0. S ~ 2:>n "';j ~ ~ ~ ~ >~ 0 = - ~ ..... > ~ 0 0. ~ >> 0 = ~ E-< ..... ~ ..... 0. ~ uf-< x=...~... CIl Q) 0.1 . U~ ~ = ~ ~ ~ 0::1 ~ 0.,Q ~ OJ) -8 u~ 00 = = = co .....::l =0. S'"'"'~ = O-N"l!t'~QO OJ) t:: ...CIl ox...o-~~ ~ C OJ) ~~~~~~ = ..... +-' Q) CIl ..... ~ ~ _ _ 0. _ ..t:: 0 = ..... ~ ~ ~ ~ ~ ._ ~... a'j 't; ..... ~ ... ~ S S ..... S u....-::r: ~ ... ~ ... = ~ ... ~ = ..... ._ U._ ~ ~ Q) ~ 0 ~,o ~ o g, oS ~ ~ g g, oS e ~ ~ -2 go > 0 ~ ~ g g =: =: ~ OOEf-<~ OOE-<UU~U S ~ ~_01MMM . ;,. l"') 00\000 \0 N 000 N C"I \0' N 0 \0 0 \0 l"') 000 C"I ,C"I V") . ~I- '0 00 0 00 ~~ '<:1"00 f'l V") \O~ o ~ V")~ C"I~ 0 oo~ \O~ V")~ O~ 000 l"') V") l"') - NO N ...... 0 C"I \0 C"I t- V") N - M l"') , ~ - \O~ f'l ~ - '<:I" '- -:- ...... - 0- 000- 0 0- \0 000 \0 '<:I" C"I 00 0 0 0 t- 000 t- C"I N , , QOlo- 0 ,0\. ~ l:'-~ 000 t-~ ......, -. Cl ~ .n " O~ O~ O~ O~ 00 Clt- 00 C"I C"I C"I M~ M C"I '<:I" -NV") N, - 0 'r:.. ~ ~ '<:1"" - C"I - ...... - ...... ,-.. \0 000 0 0 t-ClOOO t- t- O- t-I= 0 0 0 NClOOO N N 00 0 00 00 '<:I" ClV") 00 o-~ -, 0- o '~ trl trl 0 ~=-:'v)O ~ ~ 0...... C"I C"I NV") N - '<:I" - Cl V") t- V") .0- V") 0- , C"I '<:t" '<:1"" f'l~ ~ ...... - '--' ...... - - - 'Z 0 ,-.. ~ C"I ClO- 0 - 00 '000 00 t- \0 c:7\ ,~ V") Cl N N V") 000 V") l"') - I() U '=I~ Cl t- r-:-- 0- 000 0- N -~. 0 'e; ~'" .n '<:I"~ .' 0\ t-~ V")~ V")~ O~ ~ 00 - r;;' M~ M N '<:I" 0- N t- V") '<:I" ~ V") M' ~ '<:I" '<:I" N N, \0 - C"I -.:t' ,~ ~ ~ '--' ~ - - .- Q.. ~ ~ ,-.. < 00 00 N 0 N t-- 000 l' V") l"') ~ .0 0 V") \F) 0 000 0 V") \F) ~ V")1t- 0 t- t- - 000 .- l"') ('t) Q.. o ~ trl ~ N~ V") O~ V")~ O~ 0 t-~ 0\ 0\0 < N...... N N' V") 00 ...... t-- V") N \0 '<:I" Cl U \0 f'l f'l N~ '<:t~ '--' VI ,- 0 " - -' - ...... ,~ . '~ - ,-.. ~ 0- ,00 '<:t 0 0 '<:I" V") 000' V") - "00 ' M C"I - t- OO - 000 ...... C"I "0 - 0 '<:1"10- t- V") N ...... '<:t~ O~. O~ ~ N t- ~, o ~ 00 V") .,f' ~ -V")O N oo~ \0" y ~ 0'<:1" = N::g N '<:t t- \0 ooNV") N '<:I" - ~ N N N !"i t-~ ~ \0 'ii I :~ - - - - - eel -::i- 0 0'\' 0 0 000 ^ 00 C"I ' V") V") 00 t- 0'\ P:: 00 V") V") 0 - - - N 00 C"I C"I C"IIV") N V") 0 00 - \F) \0 ...... 00 0'\ ~ o ~ .,f' \0"0' 0' ~ 00 .,f' ~ '-' .,f' O~ ~ N~ N NO V") \0 \0 l"') - \0 l"') '<:t t- l"') '<:t C"I 0" ~ " ~ " - ...... - ...... - 00 NC"It-OC> ,-.. 0 N t-000000 C"I ...... 0'\ 00 C"I ~ N 0 N \0000 00 \0 .- 00 NIV") V") '<:I" 0 O~ t- - V") ~ ~ N C"I V") o ~ -.::iMv) \J')" ~ 0: 0' 0\ O~ C"I, l"') l"') C"I t- t- \0 0 '<:I" t- '<:I" Nl"') l"') l"') N V") - ~ V") t- " " . '--' - - - ...... - ... ~ ~ ell >- '"0 ~ = on ~' ~ !:: >- '2 ell CI) 0/) ,<IJ <IJ ~ CI) ~ ~ fI} ~ c:: 2 ell !:: ~ ~50 II CI) ~ <IJ ~ ~ ::I ell "'" CI) '" 0 c:: 0 'Cd c:: y y y '~, CI), CI) CI) ~ = = = ::I en '" S ,"Cd ~ CI) ..... .... .- '3 c:: CI)'3, !:: CI) .... 0/) "Cd <IJ ~ <IJ CI) CI) ;> 0 .S la' .... ... ..., ... . 'g. ;> ~....~eCl)f-< 's.. r: r: f ~ g~ CI). ..c:: ~ ::I ';:: 0.. ~ 0/) () \o;j ;go;~".,= U !:: \o;j !:: 0 <3 S~ la U OIl ..... ::I 0 .... . . .I()t--Cl gp C::' ... ell 0'" ..... 0/) [I) N N N . . . .- ......, 0.) tI) .- V --4 -""I _ ..c:: B c:: .- 1;1'7 1;1'7 GI7 M M ~ :g ~ ,ell '-<=<"'" ~ 't; ,fS, ,fS $ U :g ::t ~~~ ... ... CI) ell '"0 ~ !:: 's..'a.'s.. c:: CI)-C"IO'\\ClQO~ CI) CI) ... c:: c:: CI) 0' o....s ~ ,!:l 0 0.. !:l \o;j \o;j\o;j ~ ~ ~O'\O'\~ClO_ ~ ~O'\~O'\ClClCl OO.....~1Xl Of-<UUU ..... ---MMN J r--. c.-. ~o['--. ['--. 0\ 00 0\ N - N Q 0 N N N 00 N 0 N ~I co ~O~ ~ \0 '00 0 N oo~ 0 . N ~ -: '0'" <rl N -: It)''' ~ c.-. ~ ""'" ....N '<:t ['--. ['--. N \0 N - - t-- ['--. '00 - CO - '-' r--. 0 OON N 0\ 00 0\ ['--. c.-. ~I 0\ 000 0 '00 00 '00 '00 N '<:t Otr)'<:t 0'\ 0'\ '00 0 <n 'oO~ CO "<i ad' -:' r--: v5 <rl ['--.~ <rl 00 - N' '00 '00 N 0\ 10 N N - N ~ ..... 10 \0 10 ['--. '-' ..... N ~Oc.-. c.-. \() 00 \() ['--. 0 \fI ~I \0 ~ 0 0 0 ['--. 00 ['--. N 0\ ~ 0 ~ON N c.-. '<:to ['--. '<:t "t' f"l 0' oON~ ['--.~ ~ oo~ <rl N~ '<:t~ ~~ t-- 10 \ON 0'\ \() N 0\ 10 r<"l ..... \C '00 10 10 ..... Z 0 fA' !-I r--. E- 0\ 000 0 ['--. 00 ['--. ['--. N U ['--. 001") I") '<:t 00 '<:t - \0 ~ ~I ['--.~ 0<n1O - 00 00 00 ['--. 0 0'N'00 ~ N' v1..n N' o~ - - - 0\ N N \() <n N 00 c.-. 10 ..... \0 \0 '00 \0 '-' ..... ~ ~ r--. '00 00'00 10 I") 00 c.-. l'- 0\ \0 000\ 0\ 00 00 00 CO ['--. ~ ~I '<:t ~0'oO \0 I") 00 c.-. IO~ ['--.~, ~ <rl eS~o\ N~ v5 t.r'I" v-) v5 c.-. ..... ..... N N \() "t' N ['--. N 0\ Q U N \C '00 \0 '00 '-' - .... C-' 0 ~ ~ .... r-. ~ . N O'<:t'<:t 00 I") 00 I") '00 \0 N CO o 0\ l'- \0 00 00 00 - \0 ,...; 0 ~I '<:t~ o I") \() 0'\ 0'\ 00 0\ 0 ~ Q.l cr ~ -=-- "<i ~ IJ:5 tr)~ 0' IJ:5 \()~ ("l ~ - = N ooNN N I") \ON I") 0 - I <n \() \0 \0 N 0\ ("") N t'# ~ '-" '; ~ ~ r.. r-. """" - O"t'CO N I") \0 0 0'\ ['--. N N riIil 0\ r")0'\['--. 0 '<:t 00 N N 00 00 r:F.1 ~I ['--. 0'\1")r") ['--. C"l N \0 0'\ ("") ~ Q t-..:' v1c-r)~ N' - t-..:' oo~ <rl '-" - r.. 0'\ - N"'" <n N N ['--. N \() \() <n \0 \0 '-" \() ~ 00 """" CO I") 00 \() \0 00 00 CO lI") - ['--. ""'"O\~ 00 ~ ['--. - '00 lI") 0\ ~I ""'" \0 00 0\ ~ 0 0 - C"l '-" l'- 'oO~ "<i 00 o~ "<i <rl 00 I") ..... ['--.~ ['--. -NN \0 I") ""'" N 0\ \() '00 \0 \0 \0 <n Q,l Q,l l-. VI ~ VI J: <Il J: >- ~ ~ e s::: e OJ) r.S Q,l <!) s::: >- ~~ = Q.l= 'i:J <Il <!) b1) <!) ~ \fI ~ s::: ~ <Il :0 s::: r.S gp<!) .n .$:l r-: ..... 'So <!) ~ :e ~:.=~ - b1).... b1) ::l <Il <!) <Il 0 ::J '@ rE V) ~.2 =.S! If) .S! CQ <l) <!) ::l fZl <Il ,fj ~ ""'"uu\O-~- ,fj s::: S s::: <!) S . <!) ;>, . CoI . CoI <!) <!) 0 .S ~ ~ 1-<. U -.:t' ~\O ~ .~ ;;.. ~ ~..... ~ <!) ~ .~ r~;qe-:e-:e <!) <!) . P:::: ~::l+::~ OJ) .J:: NO . <n ~ \fI U U U o .. N <- """ ..." b1) s::: 0 ::l <!) ~ Q OJ) .5 ~ o l-.O...:l gp t5 ~ :::: """ C'i M .f'! l"'i t-: s::: .- OJ _ _ .J:: 0 .... """ """ """.... r<"l .... r<"l :g ..... .el <Il ~'tj,fj,fj U ..... :.;2 ::I: fA fA fA fA f:! <!) s::: <l) s::: l-. 8. ~ .~.~ <!) I-< <!)-lI") N\fIt--~.... 0 o..f:!2 t; ~ ~O'\O'\ o~o~,...; ~ 00.5 O~UU 0'\0\ 0000= 0-< -..... NNNNM ~' . ~ ~O~ ~ 0-000 6066- ~' N N =ON N ~oo 0 oooo~ ~' N .' ~I~ ~S~ ~ ~~S S SS~S~ ~ ~ g- .~~ ~ N-O ~ o~o~~ N N~' ~ 00 'N 0\ 0 t-- 0 - ~ N 00 ~ 00 00 - - ~ -N 00 ~'~o~ N -~ooooooot-- ~ ,~ '~ 0 0 N M M - 0 0 0 0 '0 ~ ' ,00' N 001_. 00. S ~~ NO\. 00. o. o. ,~. o. o. t--.~. ,~ g~~~~ M O\~ N o~o~t-- ~- Nt-- ,t-- 00 -0 I/) O'-~N~ ,.- 0\ t-- t-- - - - -.N t-- 0;.-.... o ~ON= 00 000'00 00'000 - ~ In Z - 000= 0 000 00 OOOO~ t-- ',~ ~ t--I' ,~ 000 ~ = ~ ~ ~ ~ 0 0' 0 0 0 00 ~ "'"' In ... ........... r- .... f'\ J'\ "'.... ...... f"\ .... ....' .... _..... ... e g~ ~~oo= 00 r--oo ~oo ~I/)O~t-- 0\ '~' '~ ~ N C8 ~ N ~ a:: :::::: - ~ ~,:f-i ~ N ~ ::g t-- ~ U _ '-" , .e; o ~ ,~ ~,~O N 00 ~ 0 0 0 0 0 0 00 -=:I" ~ 0 - 00' QCI/) ~ r--~ 0 OOO,O~ N - ~ agl' ~ ~ O. ~. -. N. ~. O. O. O. O. O. ~ N. ~ < = ~ . ~ \I:) ~.' ~ 0 N 0 I/) ~ I/) N 'N V) ~N ~ (::: N ~ ,::: ,~, :.l ~ ~ ~. N ~ r-- ~ ~ ~ = ~ ~ < ~~ U ." ,-.' ~ ~ ~ ~O~ 0\ ~OOOO OOOO~ ~'~ ~ ~ t-- 0 0 0000 - ~ 0 0 00.0 t--' 00, 00' ~I' ~ 00 0 ~ ..,.. 0 MOO 0 0 0 ~', - M " ~ g~ ~~~ ~ ~~ ~ ~~~~~' -~' ~ N .eg ~ N ~'::: :!: ~ 00 ~ ~ N &J', ~ .' ~ .. .$ o '-" ,~ , ~ ~ . I ,-., . ~ M ~~N N 00~000 OOOO~ N - Z ~ 0 ~ 00 ~ 0\ 0 ,0 0 0,0 0 0 0" ~ t- - ~I'~ ~~S ~ ~~ SS SSSS~ ~ ~ ~, '~, ~N~ - O~ 0- OOO~~ ~ ~ ~ f-iO t-~~ ~ -~ ~O ooO\~Nt-- N 00, ~ ~"~ l'-: - "'"' ~ - ~ ~ ~', ~ ~ '~ ,c _ 00 M -~~ O~t--~O~t-- 00 Ot-- 0 ~, , 00 t-~~ O~ ~~O I/) 00 - ~M '~ ~I """ 0\, I/) 00 0 ~ 0\ 00 0 I/) 00 ~ 0\ ,~, 0.... ............ ........ ....... '1'\ ... ....... f\..... n. ..... 00 't- ~ V) ~ ~ ~ 0 ~ 0 0 t- t- ~' O'~O NMN ~~ ~~O I/) oot-- """ 00 ~ ~ ~~ -t--N ..... """ ~ ~ ~ ~- - 00 ,-. . ,-. o V)t-~0000 N~OO~OOO O~ t- ~ t- t-t-~O - Nt-- 000 0 00 00 NIO 0 t- l""l 0 ~ V) M N 0 0 ..... ~ ~', g 00" 0""'00'" 0\ 0 ~ ..n ~ ~ v) v) ",r. \f5' -: Ng $-C~ ~ S~ ~~t- ~ f-i i .... .... '" - r'.... ---' ..-.l ~ N......... '-" .-., ~,', ~ ~ -g ~ >0 '0.... .... .... .... "0 ~ ~ '~ ~ ~ ~ c:: ~ ,gp c:: S S S s c.E>o ..... ~ 0 --- , ___ ___ 0 c:: 0 ~~:::;)~ _ 01} c:: (.):t;:; w ww w. ~ ,.0 c:: '6iJ ~ 0 .. .[!l c. c. c. c. ~ .2:! :.a o ~ g ~ c:: "1;;l "0 "0 "1;;l ::J .- c:: o:l g en ~= SSSSS ~ ~ u.:l '~c:: - ao o~o:lo:lo:l-S c::l - ~ ~ ..-S ~~ ,;>____ 0 c:: -S . .- '... "" 0 ..... c::i ..... 0 c::l c::l c::l 'c::l 0 f-; .- .- c. 0 (.)~c::"".2:!~c.c.c.c. 0 c. , Uc::l ~ c:: a f-; u.'l 0 ;::I .... c..- .- .-.- ~ 01) c::l 0 0 0 0 = = .. 01} -;::I c::c.O;::lSggggo c:: U s~~~~~~ 01} c:: .... ,~ 0 ~ ~ 0 - .- .- .- .- ....:l ~ 01} , ~ N~ ~ """ . . .... ..... .... ~ ~ .- rT) 0 .... .... .... .... _..... .- LL>. LL>. LL>. LL>. ....... ....... .:= .... 00 ~ - .... ..... ~ ~ ~ ~ ~ ~ ~' Cil U':="'" ",.,.",.,.",.,.",.,. 'In "', '';:': c::l ~ 0 00 ' ~ .... ~ ~ ~ ....'.;:.:...... . .... ~ 0 .... c:: "1;;l 1-<0 c:: .- .- 0\ 0\ - ~ .- .... 0 N ~ 00' 0\ \C, ~ o c.;S.s c::l S g,..c: c::l go g. 00 ~ 00 g. 0 ~ ~ ~ ~ ~ = = :,. 0 0 c:: ~ IY'I 0 0.... ~ U' U ~ ~ 0 0 u :".-vI 0\ 0\ ~. 0\, = = ~ . ~~~ ,'.~ ~~NN ~ "~~~~'~NN ~' . . ,Proj ectDescripti'ons . .' " " .' " . , Utilities .' . ,- .. CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 Contact PW Director City of Hopkins, MN Department Public Works: Utilities Project # Ol-CIP-UOO2 Type Improvement .' Useful Life Project Name Storm drainage system maintenance Category Utilities: Municipal Sanitary S Priority nla Total Project Cost. $230,000 DesCription 2004~2008: Concrete alley repairs 2005: Nine Mile Creek bank stabilization 2009: Nine Mile Creekh61ding pond - Excavation and removal of sandi silt from pond area Justification Alley pavement concrete slab, repairs are needed; Nine Mile Creek banks are eroding and will soon threaten the adj~Cent park trail and Westbrooke Way street pavement. Pond sand/silt removal last done in 1999. Built up sedimentation has decreased stormwater holding capacity causing overflow of sediment into'Nine Mile Creek' watershed system, .' , Prior Expenditures 2005 ,2006 2007 2008 2009 Total I 0.1 Construction/MaintenanCe, , '74,000 14.000 14,000 14.000 ' 114,000 " 230,000 Total Total ,74,000 14,000 14,000 ' ' 14,000 114,000 230,600 . Prior Funding Sources 2005 2006 2007 2008 2009 Total r' o I SU - Storm Sewer Fund 74,000 14.000 . 14,000 14.000 114,000 ' ' 230.000 Total Total 74,000 14,000 14~000 . 14,000 ' 114,000, 230,000 Operational Impact/Other City's portion of the Nine Mile'Creek Headwaters project to be paid in years 2001 and 2002, Consistent with the Storm Water Management Plan. . Friday, July 09, 2004, " '" CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 t. " Contact PW Director City of Hopkins, MN Department Public Works: Utilities Project # Ol-CIP-UOO3 Type Improvement, . Useful Life Project Name Storm Water Management Projects Category Utilities: Storm Sewer Priority nla Total Project Cost $220,000 Description 1 2007 -Provide outlet pipe to Shady Oak Pond into CSAH 61 storm d.rainage piping in conjunction with Shady Oak Road reconstruction Justification Shady Oak Pond has no outlet and floods streets and residential property if not pumped. Consistent with City Council approved action plan of October 21, 1997, the City's storm management plan, and Shady Oak Road reconstruction timetable. Prior Expenditures 2005 2006 2007 2008 2009 Total .1 20,000 I Construction/Maintenance 200,000 200,000 Total Total 200,000 200,000 . Prior Funding Sources 2005 2006 2007 2008 2009 Total I 20,000 I SU - Storm Sewer Fund 200,000 200,000 Total Total 200,000 200,000 Operational Impact/Other I , Consistent with City Council approved Action Plan of October 21, 1997, the City's Stonn Management Plan, and ShadyOakRoad reconstruction timetable. .' .. . Friday, July 09, 2004 . CAPITAL IMPROVEMENfS PLAN 2005 thru 2009 ,Contact PW Director City 'of Hopkins, .MN Department Public Works: Utilities Project # 04':'CIP-UOO7 Type ' Improvement Useful Life Project Name, ,Upgrade Of sanitary sewer lift station #1 Category Utilities: Municipal Sanitary S Priority nla TotaIProjcct Cost $200,000 Description ' Replace a confined'space lift station that was. installed in 1957 with a new submersible lift; station and rerouting of the discharge line. Justification The station has given the city a lorig life and now needs to betl:placed, Expenditures 2005 2006 2007 2008 2009 Total Const.ructiontMalntenance ' 200,000 ' 200,000 , Total 200,000 , 200,000 ; I . FundiIig Sources 2005 2006 2007 2008 2009' Total SF - Sanitary Sewer Fund 200,000 ' 200,000 Total ' 200,000 200,000 ' Operational IrilpactlOther . Friday, July 09,2004 ----- .. CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 , " Contact PW Director City of Hopkins, MN Department Public Works: Utilities Project # 05-CIP-UOO8 Type Improvement . " Useful Life Project Name 5th Street South Culvert Replacement Category utilities: Stomi Sewer Priority nla Total Project Cost $550,000 Description I Replace NilleMile Creek corrugated metal culvert pipes under 5th Street South with precase concrete box culvert, Justification I Existing corrugated metal pipes are buckled, deteriorating, and susceptible to blockage causing street damage and flooding during heavy rainfall events. Expenditures 2005 2006 2007 2008 2009 Total Construction/Maintenance 550,000 550,000 Total 550,000 550,000 . Funding Sources 2005 2006 2007 2008 2009 Total SU - Storm Sewer Fund 520,000 520,000 WF - Water Fund 30,000 30,000 Total 550,000 550,000 . Operational Impact/Other I . Friday, July 09, 2004 .. -. . Streets . . L' CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 Contact PWDirector City ofHopldns, MN 'Department Public Works: Streetsrrraffic Project # Ol-CIP"'Sl()l Type Improvement Useful Life Project Name Residential Street Improvements Category Trans: Streets Priority nJad ,Total Project Cost $2,727,000 Description Program to improve streets needitigrepair or reconstruction as indicated by street condition survey, or, as part ofanarea street improvement. 2004: 1st Street Nofrom17th Ave to 21st Ave , . 2005: West Park Rd, 2ndSt No from West Park Rd to 21st Ave, 21stAvefrom 2nd SUo 4th St. 2006: Street lI\aintenanee-overlays per pavementmariagementprogram 2007: 5th St So from Minnetonka to 11 th Ave So; Oakwood neighborhood streets: Madison Ave No, Jackson Ave No, Monroe Ave So, Van Buren Ave No, Madison Circle- Reeon .''' 2008: Recon: 18th, 19th, and 20th Ave So from Maitistreetto Excelsior Blvd or existing cul~de-sacends, IstSt So from 17th Ave Soto 19th Ave 2009: Street maintenance - overlays perpavement 1l!anagement program 201 (): Parkridge neighborhood streets - , Recon ' 2011: Streefmaintenance - overlays per pavement managementprogram 2012: Park Valley neighborhood, streets -partial recon; 7th St So from 6th Ave SE to end. ,', Mill/overlay; 10th Ave So from 6th St So to 7th St So, 9th Ave So from 7th St SotoWestbrookeWay, 7th St So from 5th Ave to 11th Ave So,' 6th St So from W Park Valle Dr to 10th Ave So, 5th Ave So from 5th St So to 7th StSo - recon, Justification Pavement Management analysis shows a minimum $300,000 street improvement commitment(sealcoating, mill/overlays, reconstruction) to maintain current , overall street conditions and backlog. The riumbers assume a 70% assessed and 30% general city share of costs for'reconstrUction projects and 100% city costs for seal coat and mill/overlay projects: , ' ' Sealcoat project costs budgeted iti.street maintenanCe budget. Costs for sanitary sewer and water main reconstruction are not shown. Expenditures 2005 2006 2007 2008 " 2009 Total 01 Construction/Maintenance 427,000 100,000 ' 1,350,000 ',' 700,000 '. 150,000 , 2,727,000 Total ,Total 427,000 ' ' 100,000 1 ;350,000 700,000 150,000 . 2,727,000 Prior Funding Sources 2005 2006, 2007 2008 2009 Total I 01 MS ~Municipal State Aid Stree 0 0 0 Total PI - PIRlG.eneral Obligation Bo 127,000 100,000 450,000 210,000 , ' 150,000 1,031,000 SA - Special Assessment 300,000 0 900,000 " 490,000 1,690,000 Total 427,000 100,000 1,350,000 ' 700,000 150,000 . , 2,727,000 Operational Impact/Other Public hearing - year prior to planned construction Plans and specifications-year prior to planned cOnstruction Bid and assessment - year of planned construction Consistent with the Ci . Friday, July 09,2004 , -. I -~ ,- - CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 r ] Contact PW Director City of Hopkins, MN Department Public Works: Streetsffraffic Project # Ol-CIP-SI02 Type Improvement . Useful Life Project Name Residential Street Improvements--Utilities Category Trans: Streets Priority n/a Total Project Cost $750,000 Description 1 Locations to be determined as they are consistent with the street reconstruction program. Program to reconstruct deteriorated water main and sanitary sewer and to provide storm seWer improvements in conjunction with street improvement projects. Public hearing: Year prior to planned construction Plans and specifications: Year prior to planned construction Bid: Year of planned construction Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections. Justification -I In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installednew.1t1 some cases, water main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The numbers assume the city funding 100% of major storm sewer, water main, and sanitary sewer construction/reconstruction. These costs are to be used in conjuncton with street reconstruction costs shown on 0 l-eIP-S I 0 I. Prior Expenditures 2005 2006 2007 2008 2009 Total I 01 Construction/Maintenance 250,000 250,000 250,000 750,000 Total Total 250,000 250,000 250,000 750,000 . Prior Funding Sources 2005 2006 2007 2008 2009 Total I o I SF - Sanitary Sewer Fund 75,000 75,000 75.000 225,000 Total SU - Storm Sewer Fund 100,000 100,000 100,000 300,000 WF - Water Fund 75,000 75,000 75,000 225,000 Total 250,000 250,000 250,000 750,000 Operational Impact/Other Public hearing - year prior to planned construction Plans and specifications - year prior to planned construction Bid - year of planned construction Consistent with the Storm Water Mana ement Plan, Water and Sewer Utili . Friday. July 09, 2004 eo, CAPITAL IMPROVEMENTS PLAN 2005 thru2OO9 Contact PW Director CityofHopkihs,MN ' Department Public Works: Streetsffraffic , 01~CIP-Sl03 '. Type, Improvement, Useful Life' Citywide Concrete Alleys Category Trans: Streets Priority n/a Total Project Cost $100,000 Description 2006: Alley southof3rd Street North and North of 2nd Street North, between 6th Avenue North and 5th Avenue North 2007: Alley south of 6th Street South and north of9 Mile Creek, betWeen IltllAvenue South arid lOth Avenue South. 2008: LakeS! NE alley (South side of Lake St NE) (Murphy to TexaS Ave) , , Program to construct concrete alleys in areas designated as poor on the alley' condition survey.' ' Justification The city has had a policy of constructing Concrete alleys for. a number of years, This policy has proved to be sOUlid by the concrete alleys' durability and low . maintenance costs, Current policy has the cityshate at 20% of the costin residential areas, The city will experience cost savings due to lower maintenance costs. Prior Expenditures 2005 2006 2007 2008 2009 I 01 Construction/Maintenance ' 40,000 20,000 40,000 .Total " Total 40,000 20,000 40,000 Prior Funding Sources.' 2005 ' 2006 2007 2008" 2009 Total I o I SA - Special Assessment 32,000 16,000 . 32,000 ' 80,000 Total SU - Storm Sewer Fund 8,000 4,000 8,000 20,000 Total ,40,000 20,000 40,000 100,000 . Operational ImpactJOther Approxmately 1250 feet per year for four years Public hearing. year prior to project Plans, specifications, bid construction. year of project . Friday; July 09, 20f)4 .~~- --" CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 " ,> Contact PW Director City of Hopkins, MN Department Public Works: Streetsrrraffic Ol-CIP-SI04 Type Improvement . Project # Useful Life Project Name County Road 3 Category Trans: Streets Priority n/a Total Project Cost 52,300,000 Description County Road 3 from Shady Oak Road to Meadowbrook Road. Lighting, landscaping, street, etc. improvements along ExcelsiorBoulevard from the. east to west city limits, GO. Bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds~ additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue Segment 1: Construction - 1998/1999 Segm.ent 2: Planning - 2004; bidding and construction (median upgrades only) - 2005 Segment 3 : Planning and acquisition - 1999/2001, bidding/construction- 2002/2003/2004 Segment 4: Planning and acquisition - 2006, bidding/construction - 2007/2008 TlF funded work includes the following: A signalized intersection will be constructed at Monroe Avenue. A second intersection will also be built at Jackson Ave/St Lollis Street: There will also be a reconfigurationofMonroe Avenue and Milwaukee south of Excelsior Boulevard. This work is being completed in conjunction with the reconstruction of Excelsior Boulevard from Hi hwa 169 to Blake Road. The intersection is bein constructed to facilitate redevelo' mentofthe Su erValu north annex site. Justification 1 Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in all four segments of County Road 3: _ Segment 1 from Shady Oak Road to lith Ave So; upgrade existing undivided roadway, upgrade 11th Ave intersection to meet future needs, implement beautificationprogram--completed in 1998 - Segment 2 from lith Ave So to Hwy 169; median pavers construction _ Segment 3 from Hwy 169 to Blake Road; upgrade existing narrow undivided roadway, resolve safety issues at railroad crossing, improve north-south access, account for future LRT access, address redevelopment needs, add integration for full access at Jackson Ave. - Segment 4 from Blake Road to Meadowbrook Road; upgrade roadway, implement beautification program. P,'ior Expenditures 2005 2006 2007 2008 2009 Total . I 01 Construction/Maintenance 2,300,000 2,300,000 Total Total 2,300,000 2,300,000 P,'ior Funding Sources 2005 2006 20<17 2008 2009 Total I 01 GU - Other Governmental Unit 1,600,000 1,600,000 Total MS - Municipal State Aid Stree . 700,000 700,000 Total 2,300,000 2,300,000 Operational Impact/Other GO bond payments to be financed by a combination of existing TlF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue. . , Segment I: Construction - 1998/1999 Segment 2: Planning - 2004; bidding and construction (median upgrades only) - 2005 Segment 3: Planning and acquisition. 1999/2000; bidding/construction - 2003/2004 Segment 4: Planning and acquisition - 2006; bidding and construction - 2007/2008 Consistent with Henne in Coun CIP and Ci Council action. . Friday, July 09, 2004 i CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 , ' Contact PW Director City of Hopkins, MN Department Public Works: Streetsrrraffic 01-CIP-S106 Type ' Improvement Useful Life County Road 61 (Shady Oak Road) (:9tegory Trans: Streets Priority . nla " Total Project Cost $4,379,700 Description Shady Oak Road from Co Rd 3 to T.H. 7, Mainstreet from 20th Ave to Shady Oak Road. ., Lighting, lahscaping, street, etc.,. improvements from Co Rd ~ to T.H. 7 Reconstruction imd amenities on Mainstreet from 20th Ave to Shady Oak Road Justification , Deficiencies appear on Shady Oak Road in termsof'roadway conditions, traffic/pedestrian movement, safety,and aesthetics.. Upgrade an undivided roadway, resolye safety issues with number of driveway access points and intersection at Mainstreet Lighting needs upgrading andprovide beautification program, Reconstruction' of Mainstreet for I block section needs to be done to' conclude the upgrading of all of Mainstrtet E!penditures: 2005 2006 2007 1008 2009 Total Construction/Maintenance 2,879,700 1,500,000 .. 4,379,700 Total ' ., 1;500,000 4,379,700 2,879,700 . Funding Sources 2005 2006 2007 2008 2009 Total GU - Other Governmental Unit 2,160,000 ' 1,350,000 3,510,000 MS,. M~nicipal State A,id Stree }21,000 721,000 PI . PIRlGeneral ObligationBo 100,000 100,000 SA - Special Assessment 48,700 48,700 Total 3,029,700 1,350,000 , 4,379,700 Operational Impact/Other 200512006: Planning and acquisition 2006/2007: Bidding and construction, . Friday, July 09, 2004 , . .. .' CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 ',. " Contact PW Director City of Hopkins, MN Department Public Works: Streets/Traffic Ol-CIP-SI09 Type Improvement . Project # Useful Life Project Name Excelsior Boulevard Streetscape Improvements Category Trans: Streets Priority nla Total Project Cost $750,000 Description I Excelsior Boulevard from 9th Avenue South to Highway 169 Street lighting, landscaping, pedestrian improvements along Excelsior Boulevard. Justification 1 Work is needed to bring the function and appearance of this segment of Excelsior Boulevard up to standards of previously completed segments. , P,'ior Expenditures 2005 2006 2007 2008 2009 Total I 01 Construction/Maintenance 750,000 750,000 Total Total 750,000 750,000 . Prior Funding Sources 2005 2006 2007 2008 2009 Total I o I GU - other Governmental Unit 200,000 200,000 Total MS - Municipal State Aid Stree 550,000 550,000 Total 750,000 750,000 Operational Impact/Other I 2004: Planning/design 2005: Install lighting and north side improvements 2005: Construct south side improvements Consistent with CSAH 3 Corridor Study recommendations, within guidelines of Hennepin County Roadside Enhancement Partnership program. Will be desilmedlconstructed in consideration of Metro Transit future transit station/Dark and rideimDrovements. ' . Friday, July 09, 2004 , CAPrrAL IMPROVEMENTS PLAN 2005 thru 2009 Contact PW Director City of Hopkins, MN 'Department ,Public Works:Streetsffraffic Ol-CIP-Sll1 Type ,Improvement Usefnl Life CSAH 73/CSAH 5 Intersection .. Category , Trans: Streets '.Priority n/a Total Project Cost $2,500,000 Description CSAH 73/CSAH 5 intersection Constiuctintersection improvement including traffic signals, modified geometries, pedestrian ways, and landscaping'to improve pedestrian safety; improve vehicular and traffic flow and eliminate confusion at the intersection; and improve intersection aesthetiCs,' . 2003/2004: Design 2005: Construction Recommended by construction citizen task force. . City Council approved intersection improvements. Justification Tile existing four-way stop and poor geometries have contributed to long-standing problems, including safety concerns for pedestrians, local and regional traffic, and tile adjoining residential prope~ies and neighborhood area. , Expenditures ,2005 2006 2007 2008 '2009,. Total Construction/Maintenance, 2,500,000 2,500,000 Total 2,500,000 2,500,000 . Funding Sources 2005 2006 2007 2008' 2009, Total GU - Other Governmental Unit 1,900,000 1,900,000 MS - Municipal State Aid Stree 450,000 ' 450,000 SU - Storm Sewer Fuild 50,000 50,000 WF - Water Fund 100,000 100,000 Total 2,500,000 2,500,000 OperationallmpactlOther 2000: Design 200 I:, Construction .. " " , , Recommended by construction citizen taSk force, City Council approved intersection improvements, . Fridtiy, July 09,2004 CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 ,. , Contact PW Director City of Hopkins, MN Department Public Works: Streetsffraffic Ol-CIP-S113 Type Improvement . Project # Useful Life Project Name City Parking Lot Improvements " Category ,Trans: Parking Facilities Priority nla Total Project Cost $250,000 Description I Lot 800 Redesign and reconstruct city lot 800, north of First Street North between 10th and 11th Avenues North. Justification I Lot 800 is on or approaching a critical point on a deterioration curve. Seal coats and crack sealing will not redeem it. Mill and overlay area minimum improvement needed. Project costs are for total replacement of the bituminous pavement, curb installation, and parking lot lighting, 2004: Planning/design 2005: Bid and construction Expenditures 2005 2006 2007 2008 2009 ,Total Construction/Maintenance 250,000 250.000 Total 250,000 250,000 . Funding Sources 2005 2006 2007 2008 2009 Total CI - Capital Improvement Fund 250,000 250,000 Total 250,000 250,000 Operational Impact/Other I . Friday, July 09,2004 ", CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 . Contact PW Director , , ' City of Hopkins, MN Departmelit, Public Works: Streetsffraffic Ol-CIP-S114 ,Type Improvement Useful Life ' Minnetonka Boulevard (CSAH 5) Corridor Improvement C/ltegory, Trans:Streets Priority nla Total Project Cost $350,000 Description Minnetonka Boulevard from Hopkins Crossroads to Atwater Street Corridor improvements including multi-purpose trail, landscaping, curbing, landscaping and neighborhood signage. 2003/4: Planning 2005.: Bidding and construction Justification Improvements areneeded to upgrade the appearance of this roadcorrirlor and to help calm traffic flow, , Prior Expenditures 2005 2006 " 2007,' 2008 .,2009 Total I o I ,Construction/Maintenance . 350,000 350,000 Total Total. 350,000 350,000 . Prior Funding.Sour~es 1005. 2006 2007 2008 2009 Total I 01 GU ~ Other Governmental Unit 175,000 175,000 Total, MS - Municipal State Aid Stree , 100,000 100,000 PI . PIRlGeneral Obligation Bo 75,000 75,000 Total 350,000 350,000 Operational Impact/Other 2004: Planning and acquisition 2005: . Bidding and construction , Consistent with City Council action and city task force recommendations. . Friday, July 09, 2004 CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 , ,< Contact Public Works Director City of Hopkins, MN Department Public Works: Streetsrrraffic Project # 02.;CIP-S116 Type Improvement . Useful Life Project Name Minnetonka Mills Road Improvements , Category Trans: Streets Priority r1/a Total Project Cost $900,000 Description I Minnetonka Mills Road from 5th Ave No to Herman Terrace. 2ndSt NE from Herman Terrace to Blake Road Plans/speCifications: 2007 Construction: 2008 Justification I Pavement condition, substandard drainage and lack of curb and gutter warrant reconstruction of this Municipal State Aid collector road, Concemshave been expressed by the adjacent residential neighborhood regarding the appearance and condition of this street. This street is abutted by major industrial users as well as residential units that utilize Second Street for vehicular access or pedestrian access. Expenditures 2005 2006 2007 2008 2009 Total Construction/Maintenance 900,000 900,000 Total 900,000 900,000 . Funding Sources 2005 2006 2007 2008 2009 Total MS - Municipal State Aid Stree 310,000 310,000 PI - PIRlGeneral Obligation Bo 50,000 50,000 SA - Special Assessment 360,000 360,000 SF - Sanitary Sewer Fund . 20,000 20,000 SU - Storm Sewer Fund 130,000 130,000 WF - Water Fund 30,000 30,000 Total 900,000 900,000 Operational Impact/Other I . Friday, July 09, 2004 , . . , , Parks and Recreation . . ,- CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 Contact. PW Director City of Hopkins, MN Department' Public Works: Parks 01~CIP-P201 Type Improvement Useful Life Valley Park Improvements. (;ategory PilrksIForestry/Paviliort: Neigh Priority nla Total Project Cost $65,000 DesCription, 2005 ;. Parking addition ($20,000) 2005 . Hockey rink upgrade ($45,000) Justification Parking addition. Valley Park is getting more use each year as a community park; as these uses. grow, the demartd for additional parking is created, Consistent with Park Board adopted guidelines and CIP priority list of April 2001 Expenditures 2005 ,2006 ,2007 2008' 2009 Total , ConstructionlMaintenance 65,000 65,000 ' 'Total. 65,000 . 65,000 . . Fundilig Sources 2005 2006 ,2007 2008 2009 ' , Total PDF. Park Dedication Fund 65,000 65,000 " Total '65,000 ' 65,000 Opemtional Impact/Other Consistent with Park Board adopted guidelines .and CIP priority list of 4/20/90. . Friday, July 09, 2004 , ' CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 , ,; Contact PW Director City of Hopkins, MN Department Public Works: Parks '. Type Improvement . Proj eet # 01-CIP~P206 Useful Life ProjeetName Citywide Trail Connections Category Parks/Forestry/Pavilion: Comm . Priority nJa Total Project Cost $153,750 Description I Develop various intra-city connections to existing trails and sidewalks in Hopkins, including the existing regional trail system. Install trail amenities, Primary trail projects: 2003 - Trail signage and amenities 2004 - Trail connections along 2nd St No from 20th Ave No to Shady Oak Road 2004 - Trail connection from Cedar Lake Trail to Oakes Park, 2006 - Trail along the west side of Oakridge Road Justification Safe intra-city connections to the expanding use patterns on the regional trails arid City trail and sidewalk system is necessary. City of Hopkins Master Trail and Sidewalk Plan Regional Trail Plan under review. Prior Expenditures 2005 2006 2007 2008 2009 Total I 103,750 I Construction/Maintenance 50,000 50,000 Total Total 50,000 50,000 . Prior Funding Sources 2005 2006 2007 2008 2009 Total I 103,750 I CR - Current Revenues - Gene 10,000 10,000 Total MS - MunicipalState Aid Stree 30,000 30,000 SU - Storm Sewer Fund 10,000 10,000 Total 50,000 50,000 Operational Impact/Other I Regional trail plan under review. , , , . Friday, July 09, 2004 . . C~ITAL.IMPROVEMENTS PLAN 2005 thru.2009 Contact PW Director City of Hopkins, . MN ' Department. ,Public Works: Parks 02-CIP-P210 Type ,Improvement Useful Life 10 years ProjeCt Name ,Pavilion Community Message Sign Category ParkslForestry/Pavilion: Comm Priority 3 Important Total Project Cost $35,000 De~cription . This message sign to be placed near Co, Rd. 3 in. front of pavilion will be used to promote community events, registrations, news items, etc. Justification No sign within Hopkins is available to promote the city. Present Sign was a used sign, retrofitted to meet minimum needs of pavilion. Opportunity exists to promote at a much higher,' professional level. 2004: Purchase, install Ranked Categofy #3, in Park Board Project List;' April 200 I Perhaps approach SchoolDistrictfor funding assistance Expenditures' 2005 2006 2007 2008 2009 , , Total Construction/Maintenance . 35,000 35,000 Total 35,000 , " 35,000 . FundingSources: 2005 2006 2007 2008 '2009 Total PA. Pavilion Fund 17,500 17,500 " PF . Private Sector Funds 17,500 ' 17,500 Total . 35,000 35,000 Operational Impact/Other 2004 . purchase, install Ranked in Category #3.in Park Board project list, April 2001 . Friday, July 09, 2004 CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 , .' Contact PW Director City of Hopkins, MN Department Public Works: Parks Project # 02-CIP-P213 ,Type Improvement . Useful Life 20 years Project Name Co Rd 3 Beautification Corridor Category ParkslForestry/Pavilion: Comm Priority I Urgent Total Project Cost $80,000 Description Miniature golf course. $60,000 Memorial garden park. $20,000 Justification I Council directive to Park Board to explore ways to beautify the south side of Co Rd 3 corridor, Depot to 8th Ave So Design: 2003; construction: 2004. Maintenance offset by user fees. Ranked Category # I on Park Board Projects List, April 200 I Expenditures 2005 2006 2007 2008 2009 Total Construction/Maintenance 80,000 80,000 Total 80,000 80,000 . Funding Sources 2005 2006 2007 2008 2009 Total CR . Current Revenues - Gene 40,000 . 40,000 PDF- Park Dedication Fund 40,000 40,000 Total 80,000 80,000 Operational Impact/Other 1 Design 2002, construction 2002, maintenance fees offset by user fees. Ranked Category # I on Park Board Projects List, April 200 I. . Friday, July 09,2004 . CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 Contact PW Director City of Hopkins, MN Department Public Works: Parks 04-CIP-P216 Type Improvement Useful Life Burnes Park Play Equipment Category Parks/Forestry/Pavilion: Comm Priority nla Total Project Cost sso,ooo Description Remove arid replace the Miracle Equipment Mark IV playground Justification Estimated intl\llation date of I 975, equipment will be 30 years old in 2005. Manufacturer has asked the city to consider removal. Equipment is too high, with other safety related liability issues. Expenditures 2005 ,2006 2007 . 2008' 2009 Total Construction/Maintenance SO,OOO 50,000 . Total 50,000 50,000 . Funding Sources 2005 2006 2007 2008 2009 Total PDF- Park Dedication Fund' 50,000 50,000 ' Total 50,000 50,000 Operational IrripactJOther . Friday, July 09, 2004 n , "~h ",..,,, ,. ' _ . 1- ,'" ,'" m ,~" _", V>~ "'" ,.." .. ~_ ,_,'" ><. ''-.,_ y, '.. --!-."_ 'f. . . .,...,. ." . .. ' " General Public '. , Buildings . ',"",,- . i.' CAPITAL IMPROVEMENTS PLAN ' 2005 thru 2009 COlltact PW Director City ofHopldns, MN ,Department Public Works: B1dg/EquipServ Project # , 05-CIP-B304 Type Improvement Project Name City Hall Wall Covering Replacement Useful Life Category Buildings: Administrative Offi Priority n/a Total Project Cost $23,000 Descripti;on Remove existing wall coverings in upper and lower. levels of City Hall. Paintwalls in office areas, recover walls in front entrance. Justification Wallpaper not adhering to walls; dirty, wo~,moldlmildewissuesassociated with wall coverings. , Expenditures 2005 2006 2008 2009 Total Construction/Maintenance 23,000 ' 23,000 ' Total 23,000 , 23,000 . Funding Sourc,es 2005 2006 '2007 2008 2009 Total .CI - Qapitallmprovemetit Fund 23,00Q , 23,000 Total 23,000 23,000 . Friday, July 09, 2004 -. ' ~...o", CAPITAL IMPROVEMENTS PLAN 200Sthru 2009 T ~i Contact Public Works Director City of Hopkins, MN Department Public Works: BldglEquip Serv Project # 05-CIP'-B305 Type Improvement . Useful Life Project Name City Hall Carpet Replacement Category Buildings: Administrative om Priority n/a TOtal Project Cost $80,000 Description Complete carpet replacement City Hall; upper and lower levels. 2000 sq yards@ $40/yard = $80,000 Justification I '. Carpeting is 14 years old as of2005, Worn, exceded useful life, , Expenditures 2005 2006 2007 2008 2009 Total Construction/Maintenance 80,000 80,000 Total 80,000 80,000 . Funding Sources 2005 2006 2007 2008 2009 Total CI - Capital Improvement Fund 80,000 , 80,000 Total 80,000 80,000 Operational Impact/Other I . Friday, July 09, ~004 i CAl>ITAL'lMPROVEMENTS PLAN 2005 thru 2009 Contact PW Director City of Hopkins, MN Department Public. Works: BldglEquip Serv 05-CIP~B306 Type Improvement . 'Useful Life Historical Society Roof Replacement ,Category 'Buildings: Community Center Priority nla T~tal Project Cost $35,000 Description Roofreplacement for roof over Hopkins Historical SoCiety at the Hopkins Activity Center " Cost of$35,OOO dependent on type or roof. Justification , Roofwas noted in 1990 as needing replacement in 5-10 years. Decking lacks adequate insulation and has had numerdusleaks over past 10 years. ' Expenditures 2005 ,2006 2007 2008 2009 ' Total Construction/Maintenance 35,000 . , 35,000 Total ,', , 35,000 ' 35,000 . Funding Sources 2007. ' ., 2009 2005 2006 2008 Total CI -Capital Improvement Fund 35,000 ,,' 35,000,' , Total 35,000 ' 35,000 , Operational Impact/Other . ,Friday, July 09, 2004 ",.;,. , ", CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 ~, . Contact Public Works Director City of Hopkins, MN Department Public Works: B1dglEquip Serv Project # 05-CIP-B307 Type Improvement . Useful Life Project Name City Hall Boiler Additions . Category Buildings: Administrative Offi Priority nla Total Project Cost $23,000 Description I Purchase smaller, fuel efficient boiler for City Hall. To be used during summer months for dehumidification. Justification I Currently we run one or both boilers year-round for dehumidification, We could get by with one small energy efficient boiler during these times. ., Expenditures 2005 2006 2007 2008 2009 Total Construction/Maintenance 23,000 23,000 Total 23,000 23,000 . Funding Sources 2005 2006 2007 2008 2009 Total CI - Capital Improvement Fund 23,000 23,000 Total 23,000 23,000 Operational Impact/Other I . Friday, July 09, 2004 ;: CAPITAL IMPROVEMENTS ,PLAN . 2005 thru 2009 Contact PWDirector City of Hopkins, MN Department Public Works: Bldg/Equip Serv . Project # 05-CIP-B308 Type Improvement Project Name Activity Center Window Replacement Useful Life Category Buildings:CorrimunityCenter PrioritY nla .Total Project Cost $19,000 Description Replacement of windows at Hopkins ActivitY Center j ; Justification Windows leaking, corroding, over 40 years old: Scheduled in 2003 with grant money that never materialized. Expenditures 2005 ,2006 2007 .' 2008 2009 ' Total Construction/Maintenance , 19,000 19,000 Total 19,000 19,000 , . ,FundingSources 2005 2006 2007 2008 2009 Total CI -Capital Improvement Fund 19,000 ' 19,000 , Total 19,000 . 19,000 Ope~tiona1 Impact/Other . ' ", Friday, July 09, 2004 i I. .. CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 , , Contact PW Director City of Hopkins, MN Department Public Works: B1dg/Equip Serv Project # 05-CIP-B310 Type Improvement . Useful Life Project Name City Hall Site Improvements Category Buildings: Administrative Offi Priority nla Total Project Cost $50,000 Description I Front entrance to City Hall needs to be relandscaped. Justification I , Railings are corroded beyond repair. Shrubs and trees are overgrown and need to be replaced; rocks removed and cleaned. Raspberry logo deteriorating ,at front entrance. , , Expenditures 2005 2006 2007 2008 2009 Total Construction/Maintenance 50,000 50,000 Total 50,000 50,000 . Funding Sources 2005 2006 2007 2008 2009 Total CI - Capital Improvement Fund 50.000 50,000 Total 50,000 50,000 Operational Impact/Other I . Friday, July 09, 2004 ~ " ':l. . ,',' , Economic Development ' , , , . ." .' CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 Contact ED Director City of Hopkins, MN Department Development Project # Ol-CIP-D401 ' Type Improvement Useful Life Project Name. Redevelopment, East Excelsior Boulevard Category Economic Development Priority nla Total Project Cost $2,000,000 Description North side of Excelsior Boulevard from Highway 169 to approximately Blake Road, , Redevelopment 'of older commercial area. BaSed on the' existirigzoning, it would involve both commercial' and' industrial uses. Identified in the East Erid Redevelopment Study.' . '. , : ' Justification Excelsior Boulevard is being upgraded in this area, which will provide for additional property on the north side of.the roadway. . The buildings in this area are older lmd no Joriger the highest 'and best use for this property, The funding amount is an estimate and will vary depending on the scope of the project. , Expenditures 2005 2006 2007 ' 2008", 2009 Construction/Maintenance 2,000,000 Total ' 2,000,000 . . Funding Sources 2005 2006 2007 ,2008 2009. Total TF . Tax Incremeilt Financing 2,000,000 2,000,000, Total 2,000,000 2,000,000 Operational Impact/Other The schedule for this project is still tentative. , , Consistent with Comprehensive Plan and City Visioning Process. . Friday, July 09, 2004 '. CAPITAL IMPROVEMENTS PLAN 2005 thru 2009 ~, .. i~ Contact ED Director City of Hopkins, MN Department Development Project # Ol-CIP-D402 Type Improvement . Useful Life Project Name North Annex Redevelopment Project Category Economic Development Priority nla Total Project Cost $13,600,000 Description 1 Northeast quadrant of Highway 169 and Excelsior Boulevard. Redevelopment of SuperValu North Annex property. The project would involve construction of approximately 525,000 sq ft office building. The TlF would be used for land writedown, demolition, parking improvements, and off- and on-site improvements. The 2006 expenditure is based on estimate of when redevelopment may occur. Justification 1 The existing facility was formerly owned by Red Owl. It was constructed in the mid-1950's and.is no longer the highest and best use for this property. ". Expenditures 200S 2006 2007 2008 2009 Total Construction/Maintenance 13,600,000 13,600,000 Total 13,600,000 13,600,000 . Funding Sources 2005 2006 2007 2008 2009 Total TF - Tax Increment Financing 13,600,000 13,600,000 Total 13,600,000 13,600,000 Operational Impact/Other 1 . Friday, July 09, 2004 ,-wi:j, ,-" ~, -'" , , .. "" ,^,_, ",'<>i\",,,, ,1'"'.",, ' ,._-,_,,> "h_'.' , .~.. " .."'- .'"" " .. >. - . > ,~. . .. . . Proposed Expendjtures, For Future Projects' , . . ",.~ - .. CAPITAL IMPROVEMENTS PLAN 2010 thru2014 Contact PW Director City of Hopkins, MN Departm~nt ,Public Works: Transportation 01;..CIP-F502 : Type, '.Improvement' , Useful Life . Light RaHTransit Stations (2). Category. Trans: Streets ' Priority 'n/a TotalProjectCost $150,000 , Description I) Intersection of Third Street South and Fifth A venue South 2) Second Street Northeast, Supplemental improvements to two Light Rail Transit (LRT) stations inthe proposed HCRRA locations, Justification The HCRRA proposes to construct two stations along the Southwest Corridor. The proposed expenditures would bein addition to the funds expended by the HCRRA. The additional funds would be used to ensure the stations are high quality in appearance. Expenditures 2010 2011 2012 2013 ' .'2014 Total . , Construction/Maintenance' 150,000 150,000 T9tal 150,000 150,000 . Funding Sources 2010 2011 2012" 2013 2014 Total TF . TaxJricrement Financing 150,000 , 150,000 Total 150,000 150,000 Operational'lmpact/Other Dependent on HCRRA plans. Consistent with plans for LRT stops in Hopkins by Hennepin County. . Thursday, June 24, 2004 ~ CAPITAL IMPROVEMENTS PLAN 2010 thru 2014 Contact PW Director j. ... ~ City ofHopldns, MN Department Public Works: Transportation Project # Ol-CIP-F503 Type Improvement' . Useful Life ProjectName Ninth Avenue LRT Corridor Category Trans: Streets Priority nla Total Project Cost $700,000 Description Ninth Avenue from County Road 3 to First Street North Relocation of utilities and reconstruction of street to accommodate light rail transit line from County Road 3 to First Street North. Justification I ! In 1984 the city hired J.J. Bakker to analyze the proposed light rail transit corridors in Hopkins. The study recommended that the northWest route Of the Southwest Corridor not cross County Road 3 at TH 169. Rather, the study recommended that the northwest route be extended north on Ninth Avenue to First Street North and then continue northwestward on the proposed corridor. Expenditures 2010 2011 2012 2013 2014 Total Construction/Maintenance 700,000 700,000 Total 700,000 . Funding Sources 2010 2011 2012 2013 2014 TO,tal SF - Sanitary Sewer Fund 350,000 350,000 I SU - Storm Sewer Fund 100,000 100,000 WF - Water Fund 250,000 250,000 700,000 I Total 700,000 Operational Impact/Other I ! Dependent on HCRRA plans. ! Consistent with recommendations made in 1984 Bakker study, . Thursday, June 24, 2004 . "\c;APITAL IMPROVEMENTS PLAN ,2010 thru 2014 Contact, PW Director . City of Hopkins, MN Department .Public Works: StreetsfTraffic Ol-CIP-F504 type Improvement Useful Life Sixth Street South (11th to 12th Avenue South) Category Trans:Stteets Priority nla Total Project Cost $400,000 Description Sixth Street South from 11th Avenue South to 12th Avenue South. Extension of roadway and box culvert crossing at Nine Mile Creek. Justification This project will offer a second access to the industrial area (fire access). Will direct some of the existing industrial.traffic north, away from the residential intersection at Seventh Street and 11th Avenue, Will connect a current dead-end alley, west of II th Avenue. Expenditures, 2010 2011 2012 2013 2014 Total ,Construction/Maintenance 400,000 400,000 Total 400,000 ' 400,000 . ' ' Funding Sources 2010 2011 2012 2013' 2014 ' Total ED . Economic Development F 100,000 100,000 MS - Municipal State Aid Stree 300,000 300,000 Total 400,000 400,000 Operational Impact/Other Currently on MSA plans. ,. '. Thursday,June 24. 2004 " "- n