Loading...
CR 2004-147 Conditional Use Permit-Drive Through --- ell Y OF ~ . September 1,2004 I-i 0 P K \ N S Council RepOli 04-147 CONDITIONAL USE PERMIT - DRIVE THROUGH Proposed Action. Staff recommends the following motion: Move to adopt Resolution 04-70, approving a conditional use permit for a drive-through at Starbucks Coffee. At the Zoning and Planning meeting Ms. Aristy moved and Mr. ShoHz seconded a motion to adopt Resolution RZ04-32, recommending approval of a conditional use pemlit for a drive- through at Starbucks Coffee. The motion was approved unanimously. Over'view. Mathwig Development is proposing to construct a Starbucks Coffee on the retail pad south of the former Hopkins House site. This site was re-platted and a B-3 pad was separated from the condo/townhouse site. The applicant has applied for site plan approval to construct the building. . Primarv Issues to Consider. · What is the zoning of the property, and how has the Comprehensive Plan designated the subject site? · What are the conditions for a drive-through? . What were the results of the traffic study? · What was the discussion at the Zoning and Planning meeting? Supportiul! Documents. · Analysis of Issues · Site Plans · Resolution 04-70 · Traffic Study :; .1' \ . \ /-/ J u (', .} c:1.-.... ,1"I(J(,.~ 1,111.1-/, ;",..\ Nancy sJ Anderson, AICP Planner Financial Impact: $~N/A_Budgeted: Y/N _ Source: . Related Documents (CIP, ERP, etc.): Notes: CR04-l47 Page 2 . Primary Issues to Consider. . \Vhat is the zoning of the property, and how has the Comprehensive Plan designated the subject site? The subject property is zoned B-3, General Business. A drive-through is a conditional use within the B-3 zoning district. The Comprehensive Plan has designated the site as commercial. The proposed use complies with both documents. . 'Vhat are the conditions for a drive-through? 1. The site is designed and constructed to handle parking and traffic flow according to a plan submitted to and approved by the city; 2. The site drainage is designed and constmcted according to a plan submitted to and approved by the city; 3. That screening be provided along the property lines to control headlight beams when abutting an R residential district 4. The lighting shall be accomplished in such a way as to have no direct source of light visible from the public right-of-way or adjacent land in an R residential district; 5. That the front yard and side yard shall be landscaped with the front yard not less . than 20 feet and side yard not less than ten feet; 6. That provisions be made to pick up the adjacent neighborhood daily relative to material initiated on the site; 7. Drive-through address systems shall not be audible from any residential parcel. The following are the actions that the applicant has taken to comply with the requirements: 1. A parking and traffic analysis was completed, and the results of the study are satisfactory. '") A drainage plan has been submitted. 3. The drive through will be on the west side of the property away from the residential di strict. 4. The lighting will be directed away from the residential district. s. The front setbacks are more than the 20 and 10 feet. 6. Trash container will be enclosed. 7. The drive-through area will be separated by a building from the residential area. . What were the results of the traffic study? Benshoof and Associates completed a traffic study. The study was done with an assumption that the retail pad would be a fast food restaurant with a drive through. Although the site plan is slightly different from what was analyzed, there were no concerns with traffic with . the f0l111er Hopkins House and this retail pad redevelopment. CR04-147 Page 3 . . What was the discussion at the Zoning and Planning meeting? Ms. Anderson stated that a conditional use permit was required for a drive-through. At the public hearing the manager of Caribou Coffee appeared. She was conccmed about the uri ve-through. Alternatives. I. Approve the conditional use pel111it to construct a dlive-tlu'ough. By approving the conditional use permit the applicant will be able to have a drive-througl1 at the Starbucks Coffee building. 2- Deny the conditional use pcnuit to construct a drive-through. By denying the conditional use permit to construct a drive-through at the Starbucks, the applicant will not be able to construct the drive through as proposed. If the City Council considers this altemative, findings will have to be identified that support this alternative. 3. Continue for further infonnation. If the City Council indicates that further information is needed, the item should be continued. . . CITY OF HOPKINS . Hennepin County, Minnesota RESOLUTION NO: 04-70 RESOLUTION MAKING FINDINGS OF FACT AND APPROVING A CONDITIONAL USE PERMIT TO CONSTRUCT A DRIVE-THROUGH AT ST ARBUCKS COFFEE WHEREAS, an application for Conditional Use Pennit CUP04-10 has been made by Mathwig Development; WHEREAS, the procedural history of the application is as follows: 1. That an application for a conditional use permit was made by Mathwig Development on July 30, 2004; 2. That the Hopkins Zoning and Plmming Commission, pursuant to mailed and published notice, held a public hearing on the application and reviewed such application 011 August 31, 2004: all persons present were given an oppOliunity to be heard; " That the written comments and analysis of City staff were considered; and .). . 4. A legal description of the subject property is as follows: Lot 2, Block 1, Crossroads Addition NOW, THEREFORE, BE IT RESOLVED that the application for CUP04-1 0 is hereby approved based on the following Findings of Fact: 1. That the development meets the requirements for a drive-through. BE iT FURTHER RESOLVED that application for CUP04-10 is hereby approved based on the following condition: 1. That the site plan is approved. Adopted this 7th day of September 2004. ATTEST: Eugene J. Maxwell, Mayor . Terry Obennaier, City Clerk . I" I I : RAMP DOWJ b I TO PARKING c:, I -4l I N a PROPE'hY'ij'NE - - ~ b I~ ~ IIi [][J]]H ~ D L r' < T liM ~'. i L_. 0 rrn--. ~.~ ' ~ I ~ " ".'/- Q: ... j :......f <I, 'f I w 1'<B-V Pn' ~O z ,z :J I \~""'. 5 b ~r Jill ~I r.'I ~ 1= ",' I' U) V --l [:i I ., g .frJ~ ~.. ;51 0) != rL' 1\ ) '" ~ - ~ I~ rL 0 ~' ~. g: i -II ".:l ~ , " I I ' r 1 L_J r.'- [JJ I 0) . ~ I~ I ~ I\"") I i STARBUCKS I I COFFEE I ~16 2000 SF ~ ' ._ II 1I ", . I I I ~? 'l~ rc \.) <1'-0' ~ //-/ ff9 "------I I TIP /j V\;;, I ...... : ~ _ I I "2~~:C .... I ~ I .... ... ~ EASEMENT ~ , 0000 Q0000~J - - . ~ STATE HIGHWAY NO.7 .w BENSHOOF & ASSOCIATES, INC. TRANSPORTATION ENGINEERS AND PLANNERS 10417 EXCELSIOR BOULEVARD, SUITE TWO I HOPKINS, MN 553431 (9S2) 238-16671 FAX (952) 238.1671 23 July 2004 Refer to File: 04-45 MEMORANDUM TO: Nancy Anderson, City of Hopkins I~ FROM: I ~F<l Ed Ter aar and Erik SeiberIic~:1 RE: Traffic Study for Proposed Hopkins House Redevelopment PURPOSE AND BACKGROUND The purpose of this report is to present traffic study results for the proposed redevelopment of the Hopkins House property in Hopkins, Minnesota. The focus of this study is the impact of the development on the following two intersections: . . TH 7 & lih A venue . CR 73 & 5lh Street The site of this proposed redevelopment is north of TH 7, east of CR 73, and southeast of 5[h Street and Robinwood Lane. It is east of an existing MGM Liquor Store and immediately northeast of an existing Walgreen's store. The location is shown in Figure l. Proposed Development Characteristics The proposed development, which could be completed as early as the fall of 2005, consists of three buildings. The first building involves renovation of the existing Hopkins House into 50 condominium units with 62 parking spaces as well as sub-grade parking. The next building, just to the east of the condominiums, consists of 6 townhome units. The third building, on the southeast comer of the site, will be built as a 2,000 sf retail building with a dlive-thru. For the purpose of this report, the third building will be analyzed as a common fast-food restaurant with drive-thru window. The site plan for this project is shown in Figure 2. . Ms. Nancy Anderson -2- . 23 July 2004 T I 17t.J, R22W fG 1 J 411 3 ,-.-J ~ '2}124 '4 J/ 1 04.~ , l.JJ " 0 ."" R "~ ,,;~ ///~-' PROJECT lOCATION ~081, \ 1 'hO. SERVICE ~ ~ ~::::::=:::1 0, lu -' 1)7.l 63' ._5th o. /EU.:O \[, . \~ <::T:;l) "'~ ...~. ~ ~ 0 r- lJ1\,. - . - . N. 'SE.RIJl::=-,-~ ]l_~L::l~~~ ___~-. c::::.:.= . .: -:- - :::=J r- ~......::-' ~ .~~~. :J~!: ~ l />. ~ ~,~" I 5:l SER VICE . DR. "'" ~~t!f!o w ~~ ~ I '"!HIE:lf zI15;.I0~,i~~ ~ g ~;-. ST::1 N. 11~l]~[3G ][~[~"-:-<-'l z, w .t-...... L .. 'I ~ '" .." , I I W Z "'l: Z Z '?' Z : . ~ ~ ~ 3n\ LST.1L "\ ~l ,--,13Cd ,~ L- S!JU~ ~ ~Q;i. Df 1~'ILJ!J ~~.J l~[~j ~j 1~'l3 <t: LIJ I >- -E ! :;. - >- > > - -t- :> . I I I <l: Iry I "C ~ oct ~ j.;( Z 1 E ~ 2': ~. S~l N'I~ - ,2M. . lsT. . ;,?\, ~..( D[Jr-~It::;l"'----'Q iDDLlD~. ~ '::::}~ . -~ I Zljl I LI I~~ ~ ~I f ~. . ~ I \6JL. ,2I, L~tj ~ I lst s[, ID~~lri1r~~~~Al~SA~ce lCgrt]Lrlflfl \, IJLJ0~J [~s1flJ~Jll~~llJLJj ~ tN .-- I r--:l r-::.1/ ,-:Il ./ q r-:1 n ~ . I.... I I ~' ~ I ~ (,,0 ~ } , U1 APPROXIMATE SCALE L_____ o 1000' CITY OF HOPKINS TRAFFIC STUDY FOR FIGURE 1 . PROPOSED W BENSHOOF & ASSOCIATES INC HOPKINS HOUSE PROJECT LOCATION TRANSPORTATION ENGINEERS AND PL:NHER~ REDEVELO PM ENT Ms. Nancy Anderson -3- 23 July 2004 . 11TH $TROT WORTH I' 0 -.,." ~ .-....... j ~\ i I : i ."~ 0 !) ; ! \ 1'1 , . I ~ -. J \~ I L- i I PIIOe" ~\..,..' I ! : ~ I ~ ~ !---- i I! ~ 1IDI(NI."!lOW I L- ~ ! RCOPOUtQD I r J I j -M.lM-1l-W (R ! '-- "[I f i : ~ tJ ! ~ 'I 1 J; r 1 : I ~ :I:~ j l;~ a ~ "T~ 0 fl~~ !~ ~ , : Ii ! b__d..____~_<O~ t1 ~ II; ~_._~--._. --_._~ - -------. "- \ . <==l I 19, · 1111 Ii - ~"'m: ':'[\ . II I I ., -r -._ II '\ 1,-" I - P: i------: I. , . ,. ~ . ; ! : j f I """". r'-.i i 'It UlITAJI. ..~ .) ! I ""'": : 11 " - N ' I . , I j , ; 11'1 I: "6: 51' t I ., i I I 1 I. 1 1 ! I !i i ! , ./ , '----..i) I:J i i I : ! ! ) -1\ j..._ -f '---... !__' NT8 , I j~---., :- i j I I i I W : i I r Ll ! I [ ill I r l._-. j I I i r :1:.(;!:lll,1 '---'~ , ~, ~r ~ CITY OF HOPKINS TRAFFIC STUDY FOR FIGURE 2 . PROPOSED HOPKINS HOUSE SITE PLAN \Xi BENSHOOF & ASSOCIATES, INC. REDEVELOPMENT .... V TRANSPORTATlONENGINEERSANDPLAIINE~ \... ~ Ilil.. ~ -. .-- Ms_ Nancy Anderson -4- 23 July 2004 . EXISTING CONDITIONS The proposed site for redevelopment is cunentIy home to the vacant former Hopkins House Hotel. TH 7 is a 4-lane divided principal arterial roadway with signal controlled intersections at 12th Avenue and CR 73. CR 73 is a 2 lane A-minor arterial roadway with signalized intersections at TH 7 and Stl1 Street. The two study intersections are described in detail as follows: . TH 7 & 12 Avenue - This intersection is served by two through lanes, one left turn lane and one right tum lane in the eastbound and westbound directions. A minor variation with the eastbound approach is that the right turn is channelized and yield controlled. The northbound approach provides one left turn lane, one through lane and one channelized right turn lane that is yield controlled. The southbound approach has a shared through/left turn lane and an exclusive right turn lane. The traffic signal is split phase for the north/south approaches. East and westbound left-tums operate under protected only phasing. The eastbound/westbound through traffic receives the majority of the time. . CR 73 & 5th Street - This intersection is served by one left tum lane, one through I lane, and one shared through/right turn lane in the north/southbound direction_ The eastbound and westbouud approaches are each served by one shared . left/through lane and one exclusive right turn lane. The northbound/southbound left turns operate under protected only phasing. The signal is actuated with the majorlty of the time provided for the north/south through movements. TRAFFIC FORECASTS Approach Traffic forecasts were completed for one year after the expected completion of the Hopkins House redevelopment (2006). Traffic forecasts were developed for the a.m. and p.m. peak hours on a typical weekday, which are the busiest on the sUD"ounding roadways. The following describe the scenarios for which turn movement volumes were developed at the two intersections: . Existing - Turn movement counts for this scenario were established through actual counts taken on a typical weekday from 7:00 - 9:00 a.m. and 4:00 - 6:00 p.m. 1n January and June of 2004. The counts were taken at the following intersections: 0 TH 7 & 12th Avenue (January, 2004) 0 CR 73 @ 5th Street (June, 2004) Traffic counts taken in January at the TH 7 & 12th Avenue intersection include . trips generated by the Eisenhower Elementary School including any school bus traffic during the peak hours. Ms. Nancy Anderson -5- 23 July 2004 . . 2006 No-Build - Although historical traffic trends show no growth on TH 7 and CR 73, a 1 % per year factor was applied to traffic on these roadways. Added to the 2006 base level turning movements were new trips anticipated from the already approved Oak Ridge Place Condominiums which will be located farther to the east on the frontage road north of TH7. These trips were identified in a traffic study produced by Benshoof & Associates, Inc. dated 17 February 2004. The total of the background growth and the trips identified above make up the 2006 no-build volumes. . 2006 Build - Based on the size and type of the proposed redevelopment, new volumes were generated. These new trips were then disseminated through the two intersections based on historical traffic volumes and the location of the population that will support the retail property. The total sum of the 2006 no~ build turning movements and the newly generated and distributed hips are shown by the 2006 build scenario_ Trip Generation Trip generation estimates were developed for the three buildings using data presented in the Institute for Transportation Engineers' (ITE) Trip Generation, Seventh Edition, 2003_ . The resulting trips for the a.m. peak hour are shown in Table 1 and the p.m. peak hour in Table 2. Table 1: \Veekdav A.M. Peak Hour Trip Generation Estimates AM Peak Hour Gross Trios Pass-By New Land Use Size Rate In Out In r Out In T Out 0% 100% CondofTownhome 60 0.44 4 22 0 -I 0 4 j 22 sr" 50% Fast Food Restaurant with Drive Throuoh 2,000 53.11 54 52 27 26 27 I 26 TOTAL 58 74 27 1 26 31 j 48 Table 2: Weekday A.M. Peak Hour Trip Generation Estimates PM Peak Hour Gross T~DS Pass-By New Land Use Size Rate In Out In I Out In r Out 0% 100% CondofTownhome 60 0.52 21 10 0 - f 0 21 I 10 5[% 5r" Fast Food Restaurant with Drive Throuoh 2,000 34_64 36 33 18 17 18 16 TOTAL 57 43 18 I 17 39 I 26 The trips generated by the restaurant can be classified as one of the following: . New Trips - Trips solely to and from the subject development . Ms. Nancy Anderson -6- 23 July 2004 . . Pass-By Trips - Existing "through" trips on TH 7 that will include a stop at the restaurant in the future Based on data published by the !TE, the existing traffic patterns and similar past traffjc studies, the proportion of pass-by and new trips were determined. These percentages are shown in Tables 1 and 2. Trip Distribution The next step in the traffic forecasting process is to establish trip distribution percentages. The origin and destination of the trips were determined based on existing traffic volumes, the roadway, and the location of supporting residential, office and service land Uses. The following are trip distribution percentages for the two types of trips: . New Trips 0 Residential . 20% north on CR 73 . 10% south on CR 73 . 10% west on 5th Street . 20% west on TH 7 . 35% east on TH 7 . . 5% south on 12th Avenue 0 Commercial . 20% north on CR 73 . 15% south on CR 73 . 10% west on 5111 Street . 20% west on TH 7 . 20% east on TH 7 . 10% south on lill A venue . 5% from local residences . Pass-By Trips 0 A.M. . 65% from west and then continuing east on TH 7 . 35% from east and then continuing west on TH 7 0 P.M. . 35% from west and then continuing east on TH 7 . 65% from east and then continuing west on TI-I7 Traffic Volumes Trip generation estimates for the proposed redevelopment were assigned to the two intersections based on the above trip distribution types and percentages. Using the trip assignment and resulting change in roadway volume, compaTisons can be made to determine the traffic impact of the proposed development. Traffic volumes for all . scenarios during a typical weekday a.m. peak hour are shown in Figure 3. Traffic volumes for all scenarios during a typical weekday p.m. peak hour are shown in Figure 4. Ms. Nancy Anderson -7- . 23 July 2004 ,.. "'" (') C') r-.. r-. '<t~C') a:: () !Qr-..'<T '<tC\lt::: !QCi3~ "<tcor-. l.C)C\lCl) JtL 5TH ST. 77 fl7 fl7 ---.1 L 59/59/66 -=-- 24/24/29 42142145 -----;.. r 45/45/78 89/89/89 t lir IOC\I,... o(O"<t -.---t')"-'- (OC\J~ 010(;) ~ 2004 EXISTING ~~-.--- ~ 2006 NO-BUILD ~~ I 2006 BUILD XXIXXIXX . UJ ~ o w I C\l-.::tm I- <<P::::t::: C\I :!::ol:::: .- LO:!::M -.---mr-.. Jtl TH7 24/24/24 ----.1 L 17/17/21 -=-- 640/653/650 1685/1719/1713 -----;.. r 70flonO 37/37/37 t lir N lOW.- ::!~t:: t LOU).,.... ~~l:::: LOW.- '<tC\lr-.. NOT TO SCALE \.... ~ ~ CITY OF HOPKINS TRAFFIC STUDY FOR FIGURE 3 . PROPOSED WEEKDAY A.M PEAK W BENSHOOF & ASSOCIATES, INC. HOPKINS HOUSE REDEVELOPMENT HOUR TURNING TRAN SP ORTAT10liENG IN EE R S AND PLANNERS MOVEMENT VOLUMES . Ms. Nancy Anderson -8- 23 July 2004 ,. "'" (') ,.... I l"- I"- 1O{2~ II: 0 !:Q~s lOo:lr-.; ~~N r.o t;:: ll)(')C\I J~l 5TH ST. 88/88/88 ---1 L 39/39/44 ?- 34/34/37 30/30/34 ~ r 69/69/89 108/108/108 t Iii ())C')co ~~~ -.: --...,.... ~~:::t ~~~ ~ 2004 EXISTING ())O rr= 2006 NO-BUILD ::;::g I 2006 BUILD XXIXX!XX . W ~ C\I C'Hl'l I ::r: ~""'Ol I- r--:totti C\I ~.:c:~ ,.... t-.:r.o<Xl C\I,....a;l Jtl TH7 12/13/13 -1 L 47/47/54 ~ 1327/1354/1349 879/897/896 ----)0 r 81/81/Bl 52/52/52 t lir N o co (') ~~!Q t 01{)(') l:;:~~ 010(') 1"-C\l1.O NOT TO SCALE \... ~ CITY OF HOPKINS TRAFFIC STUDY FOR FIGURE 4 . PROPOSED WEEKDAY P.M PEAK W BENSHOOF & ASSOCIATES, INC. HOPKINS HOUSE REDEVELOPMENT HOUR TURNING TAANSPGRTATIONENGINEEAS AND PLANNERS MOVEMENT VOLUMES Ms. Nancy Anderson -9- 23 July 2004 . TRAFFIC ANALYSES Capacity Analyses Capacity analyses were perfonned for the two subject intersections for the three traffic scenarios presented earlier. Existing geometries and traffic control presented earlier were used in all analyses. For the TH 7/12tJ1 Avenue intersection, signal timing was obtained from the Minnesota Department of Transportation. For the CR 73/5lh Street intersection, observations were made to determine the actuated control. These signal parameters were used throughout the analyses. Capacity analysis results are presented in terms of Level of Service (LOS) which ranges from A to F. LOS A represents the best intersection operation, with very little delay for each vehicle using the intersection. LOS F represents the worst intersection operation with excessive delay. Most agencies in Minnesota consider that LOS D represents the minimal acceptable LOS for normal peak traffic conditions. Results of the capacity analyses for a typical weekday a.m. peak hour are presented in Table 3. Results of the capacity analyses for a typical p.m. peak hour are presented in Table 4. Table 3: Weekday A.M. Peak Hour Levels of Service NB 5B EB WB INTERSECTION SCENARIO LT TH RT LT TH RT LT TH RT LT TH RT INTERSECTION . TH 7 & 12th Existing D D B D 0 B 0 F A F B A E 2006 No-Build 0 0 8 D D B D F A F B A E Avenue 2006 Build 0 0 B D D B 0 F A F B A E CR 73 & 5th Existing C A A C B B C C A B B A B 2006 No-Build C A A C B B C C A B B A B Street 2006 Build C A A C B B C C A C C A B Table 4: Weekday P.M. Peak Hour Levels of Service NB SB EB WB INTERSECTION SCENARIO LT TH RT LT TH RT LT TH RT LT TH RT INTERSECTION TH7&12th Existing C C B D D B D C A E D A D 2006 N o~Build C C B D D B 0 C A E D A D Avenue 2006 Build C C B D D B D C A E D A D CR 73 & 5th Existing C A A C B 8 C C A C C A B 2006 NO.Bulld C A A C B B C C A C C A B Street 2006 Build C A A C B B C C A C C A B Because of the high volumes presently using TH 7 and CR 73, and the low volumes added to each intersection due to the redevelopment, there is little change to delay and LOS for any particular movement or the intersection as a whole. The largest increase in delay between 2006 no-build and 2006 build at any approach during either peak hour is less than three seconds. During the a.m. peak hour at the CR 73 & 5th Street intersection, LOS decreases from B to C, although delay only increases by two seconds, just over the threshold to LOS C. Although the TH 7 & lill Avenue intersection operates at LOS E in the a.Ill- 2006 build scenario, there is little discernable change from the 2006 no-build or existing scenarios. The volumes generated by this redevelopment have very little impact on either subject intersection. . Ms. Nancy Anderson -10- 23 July 2004 . Queuing at TH 7 and 1 ill A venue The southbound lih Avenue approach to TH 7 is a very short segment (60 -70') that begins at a T-intersection at the north service road. Queues that extend beyond 60 feet have the potential to block the intersection for other movements. Observation of the cuuent operation of this intersection found that if the queue extended beyond 60', vehicles would wait either in the eastbound right turn lane or the westbound left tum lane of the north service road. Analyses of the intersection indicate that the current 95[h percentile queue for the southbound approach is 98' in the a.m. peak hour and 108' in the p.m. peak hour. A queue of about 100' means that two vehicles would be waiting in the turn lanes of the north service road. Analyses of the intersection in the 2006 build scenario indicate 95[h percentile queues of 125' during the a.m. peak hour and 116' during the p.m. peak hour. The analyses show that about one vehicle would be added to the queue in the a.m. peak hour and less than one vehicle would be added in the p.m. peak hour. The queuing process is expected to operate in the same manner in the future as it does today. If that is the case, the additional queue length due to the proposed development would not create a negative impact on the southbound queue at the TH 7 and 12th Avenue intersection. Internal Circulation . The site plan as shown will adequately accommodate the expected vehicle circulation patterns. . ------------ -------- Ms. Nancy Anderson -11- 23 July 2004 . CONCLUSIONS Based on the information and analyses presented in this report, the following conclusions were made: . The proposed Hopkins House redevelopment is expected to generate a total of 100 gross trips during the weekday a.m_ peak hour, and 132 gross trips during the weekday p.m. peak hour. . The intersection of TH 7 and lill Street presently operates at LOS E during the weekday a.m. peak hour, and LOS D during the p.m. peak hour. The intersection of CR 73 and 5th Street presently operates at LOS B in both peak hOUT periods. . The additional queue length due to the proposed development would not create a negative impact on the southbound queue at the TH 7 and 12th A venue intersection, or the operation of the lih Avenue and north service road intersection. . Intemal site circulation will be satisfactory as shown in the site plan. . It can be stated with confidence that the Hopkins House redevelopment will have . little impact on either the intersection of TH7 & lih A venue or CR 73 & 5th Street. . E D 2'-6" / O.H. TYP. MAXIMUM BUILDING HEIGHT C +19'-5" METAL CAP FLASHING T.O. WALL @ +13'-6" ~~ I 'i-i'l \::- STUCCO SIDING WALL MOUN1ED UGHT e InL. t_ SEE SHEET A3.1 CONTROL JOINTS ~Jm METAL SCUPPERS &: OOI\NSPOUTS ._...._...~..__~rr) \ . ENTRY GRADE II 0'-0" CONDENSDR UNITS ::":,;,::0~''- I) CORNER MUlliONS SO U TH DRIVE- THRU ELEVATION &: \\1NOOW HEADERS G) - METAL COUNTER/SILL PAINTED WOOD FASCIA 4 3 w/ METAL FLASHING 2'-6" O_H. TYP. ......--- PAINTED FIBER CEMENT ~~~~ONL~S~~ W/VERT. T.O_ WALL I) +14.-4" ~J'HIS~P W/METAL ,/-- SLATE CLADDING 12" STEEL CHANNEL OPEN CANOPY CANVAS AI\NING ELECTRICAL CABINET CUSTOM UGHT POLES ENTRY GRADE II 0'-0" eD WEST - REAR ELEVATION 1." = 1'-0. . ~ .4 ~th &treet Nort.h ~~_~ F11h ~~F""-. ~- ,----,., ~ _ \/,_, il(, . "-'.'ft"""",""'."Y;., ~. 0'\ _/Cv \ ~ T' T\=-~ ,v-~ YJ. /- "~ rfj LJI hi ,1~rt.-D -..- _.._=JC1I._ = ~~..-,-,'~ ~ r -.f'<:-~ 1\ \ . .. _.. _J' V - - c-.--1 '" ' ~ ~ "'-'. r ~. -'... "'-i'\ ~~"f'!'i../ l~-I .': ~. ..;' ,:" .".'~ '" -," \: [J . "~-'~-' ,./' ~ ~l _::: F1xnJr'~ 1~1 ,': ~ :::::,' tAl '.' ~ tf\'/} ~ I, ~,_""""., ~ ~ ~bb:~~.r<"," \ I _.'WOOO [fiI---" . -, _." """ "'"' => :~ ' . ,r;;;rrlr- ~ f.R:IVACTF.::NCe ~ " .:..., ,'\ , =::' - TI' 1 ' ~ nO" ~ : . .: ::~I ' . .,.' ~ HOPk,n'lI~; ~~: ~ w-J ~:=r l'J-. ~ ~~ t-- . - ]~Ii ~ - I.!!. Hou...-': ~," ~~ I ~'''-..i 1'-. V , . -" ~ . ..,~ ~ ~ \ _ : . _. : _ ~. _ ~ .. ':.. .. ~ Illlll 1 \ . , ' _,. "" 1][1",' ,q; , . I:t rttlt" 'I: '-. ,- - ~ -,: [!.-:'j! - U V1 =K'~ , ..,", -.-:. "" :;;, . ,- lli: + .;:,. I~ . - ;:;:;- ~ , ~ _ ._ I-"-l-----"" -" . ,o"mho",... = . If 1 I.. L<CJCL" . - . = .~ 1 --..' I----' - m.- . . . "" .,l..ee. r.; I .~ liJ-- _ - - -~ -" . B1 '.j:;; - '"'" - . I dd .' ~ "'0 ,','.',,',' ad ~ .,.' '. . , '0."'0"""",",. _. [B;1 ,,~, \.,;j """" r;<1 \ /""",sax """T . . _ l't 14' """" ",,~.,,~'A" _ _. r-n " ," ,I ..rn . C, ~ "X=fTTPI .: ' , "",,,"Xl",," "'" - --m!iJ - h - VlJ!LJ - no' / ~ "'* 110.-' - . I"i ,.",(rr;;;;:./ .m j:., . r; ~-:L , "" -- .': -. -- ._'~~'-'.;?'~ - -...... : - ~ ,-- ! "" .."".. ""'-0,11 .. . Hm ~ . ~ ,: ! ffi--- . ,'be - . \7" ... ~ ~, '" -i: \ - ~ " .. rr; ."':'-~ - ~ _ I r-S,==L ED6ER ..... LIC,f./T eot.I..A'!<!D H. 0 . i . ' , : 1/ _ _ > 0: ~ ~.~. , Lr"\ ~~ - ..= -.---- . . -~ -,",".:I~ - ' \ _ \ r:""VA"," ,',>'CE r;:;; t~:.,,, _ _ . .,... .-~~- <. ~ Ii= - "'" i V \ 1 \ 11 ;;; ~~ - ....~ ~. ' 1-;.,1"'" \ } i ~ :.i '.", : , .-~ jIii. · ~ '"'-- ~ 11;:l~~r ~ :.- ,.:,. ~_U-;I ~ -~ : iCr-.. ~ - '- .."~, '~ "": - '-.- . - ~.. - - :. ~ "", Z __ _ _ _ _ '3' ~;;:; ~ / ~.= pJ--"ffi-l \LOO \\ ~ -w ~ , 'l~ V "'" ~ ",'vACT "'NCE ~ ~'--fE \ . w ;;..~~~;:""'" - illlll (. , -. 5<1: \ .)' : ,lk~1' lr--'.J, f----' : \ n =- ( III ~ 'J:;:-r' " "'" L ~ n ! ~~ ~{;;"yx,hi'-^--") -rW ~ ~ \' ../ 1-1-- ~ ~ .~ ~ e.-l-- ~ '""" X ^ ^ ''"'-.. i l" ! + l -'.1 =)7( +1tR1-0T t ~'I.-::-r;'nl I-e- . ~~"J I :, Exl.tlng Walgr....n. ~ 'I r. e.-i+- ,...."c>l.MUl.C" ~ ~ ->l- ,. " , ' - -.~ '\l I ~ '. \~" I 't~__,)I'.[ @.' -0 I ,?ol .. I-K-- ~ "",:Nl I ~ " '\ L is,r;:': J.- rn"-l~ .\ I J111jJ - ,'-' I"- e.-J- ~ ~ ,.').' " ...- -t, ': . !-J..- I-<~>. - :"- ;.-. .:'.:' . --. - .1 I , L.; ~ 1iTI_ ~ , ~ ~~,'~ !-It- !-- ~ 51'" """E~- ._ - ~~~ ~~t<,~ I-J-l- 1- . . -:, - .::j' 7vv, . ,,~OO~ .~~.J" , '_ ') .. ' I WI--- '" ,.:' iI+.~ ..HI..... =UW.', ,I . jffi-. ""..~ '" \;> ,.,ll.LI...---l---~...J..t,. ..-l.T__,.! I I I I " F./':-.:..:.::.-.:>: R"',. ;:. I ' . -",. .t.. I I I I I I 1'1' ,- 1 \ ...".- ..'. -- - , -;. -'- - -:..-- ...:- .,- ..' I'''' I I I I \ \ ' -',' ---..-.\. '-..' ',,', .. ~i(-.-- ~'~'~ \ Ji:~ L- ~ '--------" \ 1/ ~ ~-M ,rlJ I t:QNCRlfi=- I \ rffi1 r1ffi rffi3 \ \ \ \ \ \ -c.~(.~~dl1= Ulu!,I~:'" "':'(.' . " ',. - - .. - , -- - ~ I &:,::,:1 ~--;:,'~ ., ~- -~ ~~ '4' EE3 H~ 1 LANDSCAPE PLAN L1.1 SCALE: 1" ." ... nJ""'I-. SCALE: 1" ~ -' ,..--...., lDj PAINTED WOOD FASCIA WI METAL FLASHING EXPOSED STRUCTURE 8" lETTERS C SOFFIT CLEAR ANODIZED, ALUMINUM CLERESTORY CONTiNUOUS @ 2 SIDES. 2'-6" O.H. TYP. . I -I -, T.O. CLERESTORY @ +17'-7" WOOD CAP W/METAL FLASHING T.O. WALL @ +14' 4" 12" STEEL CHANNEL OPEN CANOPY CANVAS AIININGS CLEAR ANODIZED, THERMAL BREAK, ALUMiNUM STOREFRONT TEMPERED AS REO'D. BY COOE. CUSTOM UGHT POLES I I ENTRY GRADE 9 0'-0" --..----------..- ~_ORTH_= ENTRY ELEVATION 0 0 0 I 1 16" WHITE FREESTANDING IllUMINATED lETTERS ON RACEWAY HIDDEIN BEHING STEEL CHANNEL (MAX SIZE) METAL CAP FLASHIN / STUCCO SIDING - / erl ._._-~-:.-.:::~~...._ -=~-/ T_O_ CLERESTORY @ +17'-7 " JI~: CANTILEVERED DRIVE-THRU CANOPY METAL FLASHING T.O_ WALL C +13'-6" O/WOOD FASCIA r ----- T.O. BEAM Ii) +11'-0" METAL SCUPPER r-~ 11< DOWNSPOUT 12" STEEL CHANNEL OPEN CANOPY TUBE STEEL CDLUMN PER SlRUCTURAL ENlRY GRADE C 0'-0" - ------..-..--------------- -I- o EAST - FREEWAY ELEVATION y." = 1'-0" GENERAL NOTES E CD NUMERICAL NOTES NOT USlED ARE NOT USF.1J. @ FOR FULL SCHEDULES, SEE SHEETS SCI THROUGH SC3. @ STARBUCKS CONTRACTS DIRECllY WITH SIGNAGE CONTRACTOR TO PERMIT, SUPPLY AND INSTALL SlGNAGE. SIGN AGE CONIRACTOR TO 'lERIFY MAXIMUM BUII.OING HEIGHT Il> +19'-5" SIGNAGE COMPUANCE WITH LOCAL CODES AND OBTAIN PERMIT AND LANDLORD APPROVAL @ ~~f~~~i~~~~~g~c~~ ~~r~~b ~g~E GC STARBUC~~ ---= AS NEEDED. GC TO NOnFY STARBUCKS CM COFFEE COM i==>' _ - METAL CAP FLASHING IMMEDIAmy IF SHOP DRA\\1NGS OR 2401 UTAH AVENUE sc::>~ INSTALLAilON IS IN DISCREPANCY WITH SEATTLE, WASHINGTc>,...,. STARBUCKS ARCHITECTURAL DRA\I1NGS. r:- -, (2051316-1575 T.O. WALL eo +13'-6" @ GC TO COORDINATE AND SCHEDULE SIGNAGE =u~5N= =~~~~....' INST~LLAl1ON WITH THE SIGN~GE CONIRACTOR ~~GNj~E~~~"'::~O::~~-- PRO~DlNG A MINIMUM SCHEDUUNG NOilCE OF STUCCO SIDING 4\\'EEKS AND 1 \lEEK PRIOR 10 SCHEDULED DATE =~~:;I~~~~~u~ ~ __ OF INSTALLA110N. STARBUCKS CM TO PROVIDE ~s::bt.~~~o;:r:IOR YI1UTlEN c::o.N - -..r- ~ GC \11TH slGNAGE CONTRACTOR CONTACT INFORMA 110N. CONSULTANTS CD GC 10 PRO'llDE 3" HIGH BLACK ACRYLIC STORE ADDRESS ON GLAZING ABOVE STOREFRONT. - CENTER ABOVE DOORS \\1-IERE POSSIBLE. EXTERIOR ELEVATION NOTES METAL SCUPPERS &: DD\\NSPOUTS REV DATE JC DESCRIPT'~~ EN1RY GRADE C 0'-0" CONDENSOR UNITS G) SOUTH - DRIVE- THRU ELEVA T ~ )~t\ \N\~ GS $ WI .sW<.DC\\O\\\ ~(!) 0- uI ~C/) PAINlEO FIBER CEMENT ~Z PANELS - INSTALL W/VER,. fJ) - JOINTS ONLY, TYP._ o:::~ WOOO CAP W/METAL ~CL T.O. WALL eo +14'-4" FLASHING - ----. COo 3'-5" SLATE CLADDING- -- 12" SlEEL CHANNEL I r OPEN CANOPY t5 ~ w @ ~ CANVAS AWNiNGS "- 8 PROJECT NO. 26672-001 ELEC1RICAL CABINET CONCEPT: ISSUE DATE: PRELIMINARY PM: ANN SCANLON CUSTOM UGHT POLES JC: - CHECKED: - EN1R'f GRADE l> 0'-0" C. M. CHKD: - SCALE: 1/4"=1'-0" (DO NOT SCALE DRAWINGS) CD WEST - REAR ELEVATION SHEET TITLE STOREFRONT ELEVATIONS & SIGNAGE 0 1 2 3 4 B 12 ~ A2.0 PROJECT CODE: ~