CR 2003-098 Pavilion Renovation Project Bid Package 1 Contract Awards ~ ( '\ CITY Or: . ~: I June 17, 2003 HOPKINS Council Report 2003-098 Pavilion Renovation Project, Bid Package 1, Contract Awards Proposed Action. Staff recommends adoption of the following motion: Move that Council adopt Resolution 2003- 054. resolution to award bid for Pavilion Renovation Proiect. Bid Packaqe 1 contracts to: Del's Construction Company, Inc. for $18.887.00 (mezzanine concrete floor toppinq) and Schindler Elevator Corporation for $32,000 (install elevator). Overview. City Council at its May 20,2003 meeting approved design and construction management services contracts and a project funding resolution. Design work is proceeding and proposals are in for the bid package 1 contracts, install concrete floor topping and elevator. The city's construction manager solicited proposals from several contractors for this work and the city received four elevator bids and three floor topping bids. Staff now requests City Council adopt Resolution 2003- 054 awarding contracts to the two lowest, responsive bidders. Primary Issues to Consider. . Bid tabulation Elevator bids: Otis Elevator Company: $28,975 .ThyssenKrupp Elevator: $29,195 Schindler Elevator Corp.: $32,000 Minnesota Elevator, Inc. $35,858 Floor Toppinq bids: Del's Construction Co., Inc.: $18,887 Stellar Concrete & Masonry: $18,345 Kelleher Construction, Inc.: $24,800 I Note: The Stellar Concrete bid did not include the costs involved with accessing the mezzanine area for the pumped concrete hoses and other work elements and is therefore not responsive to the RFP. The Otis Elevator proposed elevator requires a 4'5" pit and we clearly showed that 4'0" was all that could be provided. ThyssenKrupp took exception to a specification requirement for remote reporting of elevator status and exceeded our lead times for manufacture and delivery. . Project costs & schedule Both bids are within budgeted estimated costs for these work items. Schedule: Floor topping work will begin by June 30. Elevator will be installed in Sept/Oct 2003. Supportinq information. . Bids . Resol Steven J. Stadler, Public Works Director eFinanciallmpact: $ 50,887 Budgeted: Y/N _ Y _ Source: City funds, reimbursed by ISO 270. Related Documents (CIP, ERP, etc.): Notes: JUN 13 2003 8: 18 AM FR SCHINDLER ELEVATOR6514065321 TO 99529391381 P.01 Internet: http://www.us.schindler.com ,; Schi~dler Elevator C rporation 895 Blue Gentian Road Eagan, MN 55121-1568 . June 13, 2003 Telephone: (651) 406-5300 Fax: (651) 406-5321 Mr. Steve Stadler City of Hopkins Public Works FaX# (952) 939-1381 Negotiation Number: 1610-N-520813 Project: Hopkins Pavilion Addition Location: Hopkins, MN 55343 ELEVATOR PROPOSAL Schindler Elevator Corporation is pleased to submit our proposal to furnish and install in the above building One (1) 2500# Schindler 330A Holeless Single Jack Hydraulic Elevator for the sum of Thirty-Two Thousand Dollars and 00/100. ($32,000.00), including tax. G .. BID CLARIFICATIONS - -a c .- .c u en The above proposal is based on furnishing our standard equipment as defined by the bid documents dated 6/5/03, the attached Bid Clarifications, Proposal Conditions, Specification Summary sheet, Preliminary Power Data sheet, and preliminary hoistway sketch. We offer our proposal with the following clarifications: 1) This elevator requires a clear hoistway depth 6'-0". The 5'-10" hoistway depth shown on the drawings will not be adequate. 2) This elevator is available with side opening doors only. The center opening doors shown on the drawings will not be provided. 3) This elevator will require a minimum pit depth of 4'-0" and a minimum clear overhead of 12'-1". 4) Our proposal includes provisions for 100% Performance and Payment bonds. 5) Our proposal includes a pit ladder. 6) The lead-time for shop drawings is 1-2 weeks. The lead-time for delivery of material from return of approved shop drawings and all color selections is 5 weeks. Installation should take 2-3 weeks. We will submit to you, upon acceptance of this proposal, our detailed specifications and our standard form of contract for execution. Respectfully submitted, SCHINDLER ELEVATOR CORPORATION ~ <'~\~ Stephanie J. Wickman 8ale3 Representative (651) 406-5334 I Visit our website at www.us.schindler.com . . DEL'S CONSTRUCTION COMPANY, INC. GENERAL CONTRACTOR 3583:2 OTTAWA ROAD. LE SUEUR, MINNESOTA 56058 PHONE: (507) 665-6481 FAX: (507) 665-2591 DATE: JlU1e 13,2003 TO: Attention: Steve Stadler City of Hopkins Public Works 11100 Excelsior Blvd HopkhlS, MN 55343 Fax Number: 952..939-1381 PROPOSAL FOR JOB: Concrete Topping in Pavillion Hopkins, Minnesota WE HEREBY SUBMIT SPECIFICATIONS AND COSTS FOR THE FOLLOWING: SECTION 03001 CONCRETE COMPLETE Includes: Set up, bonding agent, expansion and control joints, fiber mesh reinforced conCTete topping, trowel finish and curing. BASE BiD $18,700.00 WE HEREBY PROPOSE TO F WITH THE ABOVE SPECIFICAT AUTHORlZED SIGNATURE Note: This proposal may be withdrawn by us ifnot accepted within thirty (30) days. ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are hereby accepted. (Please sign one copy and return.) SIGNATURE DATE OF ACCEPTANCE TOTAL P.01