Ovenriew
The City of Hopkins is beginning the process of establishing the 2007-2026 equipment
replacement plan. Every year the city council reviews with the city manager and staff, the
equipment planned for replacement for the next five years. The goal is to ensure the city's
priorities and objectives are being met and the funding sources are reasonable and available.
Departments were once again asked to assess the equipment planned for replacement, evaluate
the estimated cost and life expectancy of the equipment with the intent to prolong equipment life
expectancy when practical and to refurbishing equipment instead of replacing it.
Through a combination of several equipment changes and a better estimate of costs, departments
were successful in accomplishing this goal. Included in the ERP draft is an explanation of the
changes that are considered for implementation.
ERP Goals
Maintain the integrity, reliability and safety of city equipment.
· Provide funding for replacement of current equipment as needed.
· Forecast funding needs and tax implications to assure strong long-term financial stability.
Attached is a draft of the 2007-2026 equipment replacement plan.
DRAFT
CITY OF HOPKINS
2007 - 2011
EQUIPMENT REPLACEMENT PLAN
June 22,2006
.
EQUIPMENT REPLACEMENT PLAN 2007 - 2011
Back2:round
The Equipment Replacement Plan is a twenty-year forecast and a five-year plan of equipment
needs in the City of Hopkins. It is intended to inform the Council and citizens of the major
equipment needs on the horizon. The first year of the plan becomes an adopted equipment
budget and relates to the operating budget of the equipment replacement fund, which is approved
on an annual basis. The remaining nineteen years represent an estimate of equipment needs and
funding capabilities of the City. Funding requirements vary from year to year. In order to
maintain a fairly consistent levy each year, the twenty-year schedule is projected with a 3%
inflation factor for operating expenses and a yearly average dollar capital expenditure of
$701,600.
The cash flow requirements to fund the equipment needs in the equipment replacement fund, will
experience a roller coaster effect over the next 20 years given the projected equipment needs and
3% inflation rate. Available funds will remain about the same through the year 2008, decrease
for approximately five years before increasing again in preparation for replacement of some
major fire and police equipment in 2018, and 2020. It is anticipated that the intragovemmental
charge to the general fund will need to increase each year unti12012 to replace funds lost when
charges to city funds was reduced in 2003 in response to aid cuts. If the rate increases proposed
are implemented revenues in 2012 will have returned to 2002 levels. The charges after 2013 will
continue to increase each year, but at a slower pace. The future increases in charges to the
general fund should provide sufficient funds to carry us through 2026.
Each year staff reevaluates the equipment needs and adjusts the schedule accordingly. Changes
to the plan are reflected in the document. Refurbishments, extended life expectancy and closer
cost estimates of replacements have been incorporated into the plan. The equipment replacement
charges in the general fund represent approximately 3% of total general fund expenditures.
Future increases each year are needed to fund the equipment replacement plan without issuing
debt.
The Equipment Replacement Plan's basic premise is scheduled replacement of present
equipment. A new item must, in the year proposed, be presented in the annual operating budget
with a stipulation that replacement will be necessary in the future. Flexibility of the Equipment
Replacement Plan is established through annual review and revision, if necessary.
Highlights of changes from last year's equipment replacement plan for the years 2007-2011:
Art Center:
Cost for the copy machine scheduled for replacement in 2011 has been
increased by $2,000 to reflect current pricing.
Activity Center:
Copy machine scheduled for replacement in 2010 has been moved back to
2013 and the cost adjusted to reflect current pricing. The Activity Center
was able to purchase a used color copier in 2006 at a significant savings.
The purchase of the copier replaced an item in the 2006 ERP that did not
need to be replaced as originally planned.
Cable TV
Expenditures for upgrades to council chamber studio equipment, lighting
and cameras has been extended from $40,000 in 2007 to $5,000 per year.
Equipment will be replaced when its useful life has expired.
City Hall:
Network infrastructure upgrade costs of $15,000 were added in 2007 for
replacement of wiring in city hall. This will replace the substandard
network wiring and will be done in conjunction with the reconfiguration of
the office spaces. Useful life is estimated at 15 years.
Fire:
The 100ft aerial ladder truck scheduled for replacement in 2008 at a total
cost of $900,000 ($600,000 federal grant, $300,000 ERP funding) has
been reduced to $600,000 due to lack of federal grant funding. After two
unsuccessful attempts to secure a significant federal grant, the grant
application was scaled back to a lesser amount in 2006. The truck has also
been scaled back to meet available funding from the equipment
replacement plan. ERP funding remains at $300,000 for 2008.
Upgrades to the breathing apparatus were added at a cost of $36,000.
These upgrades will be done in 2008 at a cost of $900 per unit and consists
of new regulator and rapid escape valve, which are needed to make the
units compliant with NFP A and OSHA requirements. All 40 units are
scheduled for complete replacement in 201 7.
Added a second extraction tool to the ERP in 2012 at a cost of $26,500. A
second extraction tool was purchased in 2005 from the fire department
budget and needs to be added to the ERP. The second extraction tool will
be replaced in 2015.
Added a second thermal imaging camera to the ERP in 2013 at a
replacement cost of $18,000. A second camera was purchased in 2003
from the fire department budget was needs to be added to the ERP. The
cameras have a 10-year life.
A floor scrubber purchased from the fire department budget in 2005 was
added to the ERP for replacement in 2016 at a cost of$8,000.
A floor sweeper purchased from the fire department budget in 2005 was
_ added to the ERP for replacement in 2016 at a cost of$3,500.
Workout equipment purchased from the fire department budgeted in 2005
with grant funds was added to the ERP. Three pieces of equipment are
owned and are scheduled for replacement on an ongoing basis. Added to
Police:
Public Works:
the ERP is $5,000 in 2009 for an elliptical machine, $5,000 in 2011 for a
treadmill, $5,000 in 2012 for an elliptical machine and $5,800 in 2014,
2016, and 2017, $6,700 in 2019, 2021, and 2022, $7,800 in 2024 and
2026. The fire department also owns weight equipment that will be added
to the ERP in future years once the life of the equipment has been
determ.ined~
A new computer system for public safety scheduled for replacement in
2010 at a cost of $500,000 has been updated with a cost of $700,000. The
software was purchased in 2000 at a cost of $313,700 and in 2006 would
cost $700,000 to replace.
The cost of the mobile data computers scheduled for replacement in 2007
have been increased by $7,000 to $47,000 to reflect the replacement cost
per the State of Minnesota contract.
The logging recorder scheduled for replacement in 2007 has been
eliminated. Due to unforeseen failure this item was replaced in 2006.
The lives of the equipment are annually reviewed by the public works
department and over the past 10 years they have extended the lives of the
I-ton trucks from 8 to 12 years and the dump trucks from 13 to 15 years.
Extending the lives of major equipment comes with the risk of increased
maintenance costs. When maintenance costs become unmanageable the
equipment will be put on the schedule for earlier replacement.
ParksIForestrv
A % ton utility truck originally scheduled for replacem~nt in 2008 was
moved back to 2010.
Th~ funding source for a swap mower scheduled for replacement in 2008
was changed to reflect funding as follows: 25% from ERP (was 50%),
75% from refuse (was 500;0) to better reflect how the equipment is used.
The cost of a log truck scheduled for replacement in 2007 has been
increased by $10,000 to $107,000 to reflect actual cost. Staffwill attempt
to purchase a used log truck.
Replace one tractor in 2009 and move second unit out from 2010 to 2012.
Staff will look at alternative uses or a different machine.
Streets/Traffic
The useful life of I-ton traffic boom truck (item 309 in the ERP) has been
changed from 12 to 17 years with replacement in 2012 at a cost of
$75,000. Current unit has 45,000 miles. Originally swapped cab and
chassis 10 years ago in 1996 and determined at that time the truck had 15
more years of life. The entire unit will be replaced at 20 years life.
Refuse
The funding source for a swap mower scheduled for replacement in 2008
was changed to reflect funding as follows: 25% from ERP (was 50%),
75% from refuse (was 50%) to better reflect how the equipment is used.
(602)
EQUIPMENT REPLACEMENT FUND
BUDGET BUDGET BUDGET BUDGET
2008 2009 2010 2011
- -- -- -- -
781,850
1,372,153
1,257,381
1,655,327
BUDGET
2007
ACTUAL ACTUAL BUDGET
2004 2005 2006
~ -~ -- -
460,196
418,360
1,141,330
700,876
20,000
20,000
380,327
345,752
314,320
1,006,959
1,537,775
48,882
_ 30,000 _
559,078
27,303
305,500
75,445
_ 30,000 _
543,805
26,508
1,107,600
20,000
70,281
_ 30,000 _
500,608
25,736
20,000
88,188
~ 25,000 _
478,940
24,986
137,806
300,000
57,830
25,000
~
834,956
24,259
288,367
369,241
fire
96,686
40,212
25,000
-819,506 -
256,920
100,000
91,000
18,691
43,955
-510,566 -
256,920
31,000
326,841
44,456
_ 18,910 _
678,127
Working Capital Begin Year
Revenues frolll charges
Transfer in General Fund
Transfer In _ Pavilion - Capital Lease
Federal & State Grants
Reimbursement - Radio System
Interest earnings
Other revenues
Total Revenues
851,900
-876,886 - -385,836 - 1,134,108 -332,803 -
1,008,125
781,850
360,100
1,372,153
1,257,381
296,700
-32,0,959
1,655,327
23,552
355,500
~ 379,052 -
21,606
740,387
54,656
-816,649 -
16,957
1,151,201
40,785
1,208,943-
expenditures include copier & eng scanner leases
Capital Outlay" Equipment
Transfer to Pavilion
Expenditures (excludes Depr.)
1,312,537
35,609
1,086,263
55,609
1,676,565
75,609
1,561,793
1,959,739
1,141,330
1,445,742
1,006,959
Working Capital Ending Balance
1,005,289
1,348,146
1.141,872
95,609
115,609
683,240
253,415
1,752,174
1,657,402
2,075,348
1,699,157
622,656
659,000
Cash balance
Long Term Receivable
1,627,945
1,342,240
Cash Balance + L T Receivable
1,595,010
working Capital Balance 12/31/26
liote~
(1) Revenues frolIl charges _ scheduled increases -- 2007 ~ 9%; 2008 ~ 10%; 2009 ~ 10%
2010 ~ 10%; 2011 ~ 10%: 2012 ~ 10%; 2013 ~ 6%
ACf\lAL ACf\lAL B1Jl)GEf BUDGET B1Jl)GET BUDGET BUDGET BUDGET B1Jl)GEf B1JDGET BUDGET BUDGET BUDGET B1J])GET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET B1J])GET
_ 2004 _ ~ ~ _ 2007 _ ~ _ 2009._ _ 2010 _ ~ ~ ~ 2014 _ 2015 _ ~ ~ - 2018 - - 2019 .- - 2020 - 2021_ - 2022 - 2023 - - 2024 - 2025 - - 2026 -
1,537,775 1,006,959 700,876 1,141,330 1,655,327 1,257,381 1,372.153 781,850 1,008,125 904,682 848,814 1,352,085 1,393,861 l,4S4,90 1 730,288 938,131 27,916 293,852 577,885 1,086,294 1,306,9&7 1,146,27
910,390
875,375
841,707
809,334
65,281
40,000
1,015,671
296.700 851,900 360,100 1,107,600 3l)S,SOO 695.... 670,901l 375,100 383,900 63ll,9Oll 608,5Oll 1,481,900 522,900 1,690,000 500,600 523,301l 341,700 6Il3,5llO l,l07,301l S24,4OIl
-320,959 _ 876,886- -385,836- 1,134,108- ~ 723,772- 699,866 -404,935- ~ 670,552- ~ 1,515,4.0 -557,487 1,725,625 '37,293- 561,094 - -380,628- -723,596- 1,148,599- -566,938-
42,538
1,595,010
1.899,423
72,513
40,000 _
987,888
1,146,277
1,450,689
41,299
62,582
40,000 _
-944,1.89
1,306,9S7
1,611,400
40,096
39,703
40,000
-889,037
1,086,294
1,390,707
38,928
'178,205
26,922
40,000
-845,127 -
37,794
577,885
882,298
748,274
14,955
40,000
-803,229 -
598,264
36,693
293,852
719,495
55,914
40,000
815,409 -
332,328
35,625
27,916
678,769
46,562
40,000
-765,330 -
1,242,544
34,587
938,131
640,348
80,519
40,000
-760,867-
1,034,701
33,580
730,288
615,719
76,422
~
731,141
1.484,901
1,789,313
32,601
597,785
74,542
40,000
-712,328-
1,393,861
1,698,274
31,652
1,088,826
574,794
62,696
40,000
677,489-
1,352,085
30,730
558,051
51,895
~
644,947
1,088.826
29,835
536,588
54,409
25,000_
643,998
848,814
18,000
28,966
506,216
59,064
,25,000_
620,280
904,682
20,000
28,122
460,196
48,882
~
559,078
1,008,125
20,000
27,303
418,360
75,445
~
543,805
26,508
20,000
380,327
70,281
30,000
500,608
25,736
20,000
345,752
88,188
~
478.940
24,986
20,000
(602)
369,241 137,806
fire 300,000
96,686
40,212 57,830
25,000 25,000
-819,506- -834,956-
24,259
EQUIPMENT RE'PL.~CEMENT FUND
314,320
23,552
355,500
379,052
28S,367
18,691
43,955_
510.,566
21,606
740.,387
54,656_
816,649
256,920
100,000
91,000
1,151,201
40,785
1,208,943
44,456
~
678.1:27
16,957
256,91.0
31,000
326,841
W or1cing Capital Begin Year
Revenues from chaI1!;es
Transfer in General Fund
Transfer 1n ~ Pavilion - Capital Lease
Federal & state Grants
Reimbursement - Radio system
1nterest earnings
Other revenues
T tal Re\'enues
E'XPendj:tureS (excludes De?r.)
~ include c:opie:r &. c:ng $CIlDDe:r leases
Capital OutlaY - Equipment
Transfer to Pavilion
781,850
1,656,498
1.393.239
1,372,153
1 ;257,381
1,153,226
(2,391)
1,209,095
15,609
1,312,537
35,609
1,086,263
1,676,565
1,561,793
1,655,327
1,959,739
1,141,330
700,876
1,006,959
W rkinJ!. Capital Endin~ Balance
1,224,704
55,609
75,609
95,609
1,445,742
1,005,289
1,348,146
683,240
1,141,872
1,752,174
1,657,402
115,609
253,415
622,656
659,000
Cash balance
2,Q75 ,348
1,699,157
1,627,945
Long Te:rDl Receivable
1,342,240
1,595,010
Cash Balance + LT Receivable
12/31/26
~
(1) RtV= ftoJD _ _ ~ _ - 2007 $ 9%; 2008 $10%; 2009 $ 10%
2010 == 10%; 2011 = 10%; 2012 == 10%; 2013 == 6%
W orldng eapiiB1 Balance
I
City of Hopkins, I\1N
EQUIPMENT REPLACEMENT PLAN
2007 thru 2011
DEP ARTMENT SUMMARY
Department 2007 2008 2009 2010 2011 Total
Arts Center 12,100 12, 100
Cable TV 5,000 5,000 5,000 5,000 5,000 25,000
City Hall Administration 78,140 56,640 67,140 68,500 164,900 435,320
Fire 15,000 636,000 40,000 15,300 706,300
HRA 28,800 28,800
Police 169,700 164,100 35,000 866,200 122,900 1,357,900
Public Works: Bldg/Equip Serv 24,100 24,100
Public Works: Parks/Forestry 105,000 55,200 174,200 32,200 26,400 393,000
Public Works: Streetsrrraffic 42,300 164,700 207,000
Refuse 176,700 176,700
Sewer 26,000 6,800 32,800
Water 20,500 12,200 30,300 63,000
GRAND TOTAL 419,340 916,940 387,740 1,325,500 412,500 3,462,020
Wednesday, June 21,2006
City of Hopkins, :MN
EQUIPMENT REPLACEMENT PLAN
2007 tbru 2011
PROJECTS BY DEPARTMENT
Department Project# Priority 2007 2008 2009 2010 2011 Total
IArts Center ,
Arts Center Copy Machine 01-ERP-1100 0 12,1 00 12, 100
Arts Center Total 12,100 12,100
ICable TV ,
Cable/Council Chamber Cameras & Control System 01-ERP-050 0 5,000 5,000 5,000 5,000 5,000 25,000
Cable TV Total 5,000 5,000 5,000 5,000 5,000 25,000
ICity Hall Administration I
City Hall Main Copy Machine 01-ERP-001 0 10,000 10,000 14,000 14,000 14,000 62,000
City Hall Small Copy Machine 01-ERP-002 0 26,900 26,900
Network Server 01-ERP-003 0 8,000 8,000 8,000 8,000 8,000 40,000
Telephone System 01-ERP-004 0 76,000 76,000
Computers 01-ERP-006 0 30,000 30,000 30,000 30,000 30,000 150,000
Engineering Printer/Scanner 01-ERP-007 0 8,640 8,640 8,640 10,000 10,000 45,920
Document Management Scanner (2) 01-ERP-00B 0 6,500 6,500 6,500 19,500
Network Infrastructure Upgrade 01-ERP-009 0 15,000 15,000
City Hall Administration Total 78,140 56,640 67,140 68,500 164,900 435,320
IFire I
Lite Rescue o 1-ERP-1 05 0 35,000 35,000
Stuphen Aerial Truck o 1-ERP-1 06 0 600,000 600,000
Breathing Apparatus 01-ERP-10B 0 36,000 36,000
Copy Machine 01-ERP-110 0 10,300 10,300
Thermal Imaging Camera (2) 01-ERP-112 0 15,000 15,000
Workout Equipment (7) 01-ERP-116 0 5,000 5,000 10,000
Fire Total 15,000 636,000 40,000 15,300 706,300
IHRA I
4x4 3/4 Ton Truck 01-ERP-400 0 28,800 28,800
lIRA Total 28,800 28,800
!Police I
Marked Patrol Vehicles (6) and Sergeant's Vehicle 01-ERP-200 0 89,400 92,100 130,400 67,200 379,100
Utility 4x4 (211) 01-ERP-203 0 37,700 37,700
Police Administrative Vehicles (2) 01-ERP-204 0 24,800 25,600 26,300 27,100 27,900 131,700
Computer System 01-ERP-20B 0 700,000 700,000
Copy Machine 01-ERP-209 0 19,100 19,100
Wednesday, June 21, 2006
Department Project# Priority 2007 2008 2009 2010 2011 Total
Network Server (3) 01-ERP-211 0 8,500 8,700 8,700 8,700 8,700 43,300
eObile Data Computers 01-ERP-212 0 47,000 47,000
Police Total 16.9,700 164,100 35,000 866,200 122,900 1,357,900
IPublic Works: Bldg/Equip Serv ,
4X4 1/2 Ton Truck 01-ERP-710 0 24,100 24,100
Public Works: Bldg/Equip Serv Total 24,100 24,100
IPublic Works: Parks/Forestry l
1/2 Ton Pickup Truck 01-ERP-BOO 0 26,400 26,400
3/4 Ton Utility Truck 01-ERP-B02 0 32,200 32,200
Swap Loader 01-ERP-B03 0 55,200 55,200
Log Truck 01-ERP-B04 0 105,000 105,000
Aerial Lift 01-ERP-B05 0 110,000 110,000
Tractors (2) 01-ERP-B06 0 41,400 41,400
Riding Mowers (3) 01-ERP-BOB 0 22,800 22, BOO
Public Works: ParksIForestry Total 105,000 55,200 174,200 32,200 26,400 393,000
IPublic Works: Streets/Traffic l
1 Ton Dump Truck (2) 01-ERP-303 0 37,400 37,400
Water Truck 01-ERP-307 0 133,700 133,700
Skid Loader (2) 01-ERP-309 0 31,000 31,000
Trailer 01-ERP-316 0 4,900 4,900
Public Works: Streets/Traffic Total 42,300 164,700 207,000
IRefuse ,
Refuse Truck (RAP-R) (2) 01-ERP-900 0 176,700 176,700
Refuse Total 176,700 176,700
ISewer l
3/4 Ton Utility Truck (2) 01-ERP-551 0 26,000 26,000
Telephone System 01-ERP-557 0 6,800 6,800
Sewer Total 26,000 6,800 32,800
IWater I
1/2 Ton Truck 01-ERP-500 0 20,500 20,500
Hydraulic Jack Hammer for Backhoe 01-ERP-504 0 23,500 23,500
Public Works Copy Machine 01-ERP-506 0 12,200 12,200
Telephone System 01-ERP-507 0 6,800 6,BOO
Water Total 20,500 12,200 30,300 63,000
GRAND TOTAL 419,340 916,940 387,740 1,325,500 412,500 3,462,020
Wednesday, June 21,2006
City of Hopkins, MN
EQUIPMENT REPLACEMENT PLAN
2007 thru 2011
FUNDING SOURCE SUMMARY
Source 2007 2008 2009 2010 2011 Total
Cable Television Fund 5,000 5,000 5,000 5,000 5,000 25,000
Equipment Replacement Fund 315,340 570,540 382,740 1,131,600 329,500 2,729,720
GA - Grant-in-Aid 300,000 300,000
HAC - Arts Center Fund 12,100 12, 100
HRA - Housing and Redevelopment Authority 28,800 28,800
RF - Refuse Fund 52,500 41,400 176,700 270,600
SF - Sanitary Sewer Fund 26,000 6,800 32,800
WF - Water Fund 20,500 12,200 30,300 63,000
GRAND TOTAL 419,340 916,940 387,740 1,325,500 412,500 3,462,020
Wednesday, June 21, 2006
City of Hopkins, J\1:N"
EQUIPMENT REPLACEMENT PLAN
2007 thru 2011
PROJECTS BY FUNDING SOURCE
Source Project# Priority 2007 2008 2009 2010 2011 Total
ICable Television Fund ,
Cable/Council Chamber Cameras & Control System 01-ERP-050 0 5,000 5,000 5,000 5,000 5,000 25,000
Cable Television Fund Total 5,000 5,000 5,000 5,000 5,000 25,000
!Equipment Replacement Fund l
City Hall Main Copy Machine 01-ERP-001 0 10,000 10,000 14,000 14,000 14,000 62,000
City Hall Small Copy Machine 01-ERP-002 0 26,900 26,900
Network Server 01-ERP-003 0 8,000 8,000 8,000 8,000 8,000 40,000
Telephone System 01-ERP-004 0 76,000 76,000
Computers 01-ERP-006 0 30,000 30,000 30,000 30,000 30,000 150,000
Engineering Printer/Scanner 01-ERP-007 0 8,640 8,640 8,640 10,000 10,000 45,920
Document Management Scanner (2) 01-ERP-00B 0 6,500 6,500 6,500 19,500
Network Infrastructure Upgrade 01-ERP-009 0 15,000 15,000
Lite Rescue o 1-ERP-1 05 0 35,000 35,000
Stuphen Aerial Truck 01-ERP-106 0 300,000 300,000
.reathing Apparatus 01-ERP-10B 0 36,000 36,000
Copy Machine 01-ERP-110 0 10,300 10,300
Thermal Imaging Camera (2) 01-ERP-112 0 15,000 15,000
Workout Equipment (7) 01-ERP-116 0 5,000 5,000 10,000
Marked Patrol Vehicles (6) and Sergeant's Vehicle 01-ERP-200 0 89,400 92,100 130,400 67,200 379,100
Utility 4x4 (211) 01-ERP-203 0 37,700 37,700
Police Administrative Vehicles (2) 01-ERP-204 0 24,800 25,600 26,300 27,100 27,900 131,700
Computer System 01-ERP-20B 0 700,000 700,000
Copy Machine 01-ERP-209 0 19,100 19,100
Network Server (3) 01-ERP-211 0 8,500 8,700 8,700 8,700 8,700 43,300
Mobile Data Computers 01-ERP-212 0 47,000 47,000
1 Ton Dump Truck (2) 01-ERP-303 0 37,400 37,400
Water Truck 01-ERP-307 0 133,700 133,700
Skid Loader (2) 01-ERP-309 0 31,000 31,000
Trailer 01-ERP-316 0 4,900 4,900
4X4 1/2 Ton Truck 01-ERP-710 0 24,100 24,100
1/2 Ton Pickup Truck 01-ERP-800 0 26,400 26,400
3/4 Ton Utility Truck 01-ERP-802 0 32,200 32,200
Swap Loader 01-ERP-803 0 13,800 13,800
Log Truck 01-ERP-804 0 52,500 52,500
Aerial Lift 01-ERP-805 0 110,000 110,000
Tractors (2) 01-ERP-806 0 41 ,400 41,400
Riding Mowers (3) 01-ERP-80B 0 22,800 22,800
Equipment Replacement Fund Total 315,340 570,540 382,740 1,131,600 329,500 2,729,720
IGA - Grant-In-Aid ,
Stuphen Aerial Truck 01-ERP-106 0 300,000 300,000
Wednesday, June 21,2006
Source Proj ect# Priority 2007 2008 2009 2010 2011 Total
GA - Grant-In-Aid Total 300,000 300,000
IHAC - Arts Center Fund I
Arts Center Copy Machine 01-ERP-1100 0 12,100 12, 100
HAC - Arts Center Fund Total 12,100 12,100
IHRA - Housing and Redevelopment A I
4x4 3/4 Ton Truck 01-ERP-400 0 28,800 28,800
BRA - Housing and Redevelopment 28,800 28,800
Authority Total
IRF - Refuse Fund I
Swap Loader 01-ERP.B03 0 41 ,400 41,400
Log Truck 01-ERP-B04 0 52.500 52.500
Refuse Truck (RAP-R) (2) 01-ERP-900 0 176,700 176.700
RF - Refuse Fund Total 52,500 41,400 176,700 270,600
ISF - Sanitary Sewer Fund I
3/4 Ton Utility Truck (2) 01-ERP-551 0 26,000 26,000
Telephone System 01-ERP-557 0 6,800 6,800
SF - Sanitary Sewer Fund Total 26,000 6,800 32,800
IWF - Water Fund I
1/2 Ton Truck 01-ERP-500 0 20.500 20,500
Hydraulic Jack Hammer for Backhoe 01-ERP-504 0 23,500 23.500
Public Works Copy Machine 01-ERP-506 0 12,200 12.200
Telephone System 01-ERP-507 0 6.800 6,800
WF - Water Fund Total 20,500 12,200 30,300 63,000
GRAND TOTAL 419,340 916,940 387,740 1,325,500 412,500 3,462,020
Wednesday, June 21,2006
City of Hopkins, J\1N
EQUIPMENT REPLACEMENT PLAN
2007 thru 2011
PROJECTS & FUNDING SOURCES BY DEPARTMENT
Department Pro j ect# Priority 2007 2008
IArts Center I
Arts Center Copy Machine 01-ERP-1100 0
Arts Center Total
2009
2010
2011
Total
12,100 12,100
12,100 12,100
jCable TV I
Cable/Council Chamber Cameras & Control System 01-ERP-050
o
5,000
5,000
5,000
5,000
5,000
25,000
Cable TV Total
5,000
5,000
5,000
5,000
5,000
25,000
ICity Hall Administration ,
City Hall Main Copy Machine 01-ERP-001 0 10,000 10,000 14,000 14,000 14,000 62,000
City Hall Small Copy Machine 01-ERP-002 0 26,900 26,900
Network Server 01-ERP-003 0 8,000 8,000 8,000 8,000 8,000 40,000
Telephone System 01-ERP-004 0 76,000 76,000
Computers 01-ERP-006 0 30,000 30,000 30,000 30,000 30,000 150,000
Engineering Printer/Scanner 01-ERP-007 0 8,640 8,640 8,640 10,000 10,000 45,920
Document Management S~anner (2) 01-ERP-008 0 6,500 6,500 6,500 19,500
Network Infrastructure Upgrade 01:-ERP-009 0 15,000 15,000
City Hall Administration Total 78,140 56,640 67,140 68,500 164,900 435,320
IFire
Lite Rescue
Stuphen Aerial Truck
,
01-ERP-105
01-ERP-106
o
o
35,000
35,000
600,000
600,000
Wednesday, June 21, 2006
Department Project# Priority 2007 2008 2009 2010 2011 Total
Breathing Apparatus 01-ERP-108 0 36,000 36,000
Copy Machine 01-ERP-110 0 10,300 10,300
Thermal Imaging Camera (2) 01-ERP-112 0 15,000 15,000
Workout Equipment (7) 01-ERP-116 0 5,000 5,000 10,000
Fire Total 15,000 636,000 40,000 15,300 706,300
JHRA
I
4x4 3/4 Ton Truck
01-ERP-400
o
28,800
28,800
HRA Total
28,800
28,800
IPolice I
Marked Patrol Vehicles (6) and Sergeant's Vehicle 01-ERP-200 0 89,400 92,100 130,400 67,200 379,100
Utility 4x4 (211) 01-ERP-203 0 37,700 37,700
Police Administrative Vehicles (2) 01-ERP-204 0 24,800 25,600 26,300 27,100 27,900 131,700
Computer System 01-ERP-208 0 700,000 700,000
Copy Machine 01-ERP-209 0 19,100 19,100
Network Server (3) 01-ERP-211 0 8,500 8,700 8,700 8,700 8,700 43,300
Mobile Data Computers 01-ERP-212 0 47,000 47,000
Police Total 169,700 164,100 35,000 866,200 122,900 1,357,900
IPublic Works: Bldg/Equip Serv
4X4 1/2 Ton Truck
I
01-ERP-710
o
24,100
24,100
Public Works: Bldg/Equip Serv Total
24,100
24,100
Wednesday, June 21,2006
Department Pro j ect# Priority 2007 2008 2009 2010 2011 Total
Public Works: Parks/Forestry
/2 Ton Pickup Truck 01-ERP-800 0 26,400 26,400
3/4 Ton Utility Truck 01-ERP-802 0 32,200 32,200
Swap Loader 01-ERP-803 0 55,200 55,200
Log Truck 01-ERP-804 0 105,000 105,000
Aerial Lift 01-ERP-805 0 110,000 110,000
Tractors (2) 01-ERP-806 0 41,400 41 ,400
Riding Mowers (3) 01-ERP-808 0 22,800 22,800
Public Works: ParkslForestry Total 105,000 55,200 174,200 32,200 26,400 393,000
IPublic Works: Streets/Traffic I
1 Ton Dump Truck (2) 01-ERP-303 0 37,400 37,400
Water Truck 01-ERP-307 0 133,700 133,700
Skid Loader (2) 01-ERP-309 0 31,000 31,000
Trailer 01-ERP-316 0 4,900 4,900
Public Works: Streets/Traffic Total 42,300 164,700 207,000
IRefuse
Refuse Truck (RAP-R) (2)
,
01-ERP-900
o
176,700
176,700
Refuse Total
176,700
176,700
ISewer I
3/4 Ton Utility Truck (2) 01-ERP-551 0 26,000 26,000
Telephone System 01-ERP-557 0 6,800 6,800
Sewer Total 26,000 6,800 32,800
Wednesday, June 2], 2006
Department
Project# Priority 2007
2008
2009
2010
2011
Total
IWater I
1/2 Ton Truck 01-ERP-500 0 20,500 20,500
Hydraulic Jack Hammer for Backhoe 01-ERP-504 0 23,500 23,500
Public Works Copy Machine 01-ERP-506 0 12,200 12,200
Telephone System 01-ERP-507 0 6,800 6,800
Water Total 20,500 12,200 30,300 63,000
Wednesday, June 21, 2006
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Ol-ERP-IIOO
2007 thru 2011
Arts Center Copy Machine
Contact Public Works Director
Department Arts Center
Type Equipment
Useful Life 7 years
Category Equipment
Priority nJa
Description I
Copy machine capable of enlarging and producing double sided, collated and stapled copies.
Total Project Cost $53,800
Justification I
Used to duplicate reports, letters, signs, flyers and rental information.
Prior
8,500 I
Total
Expenditures
Equipment
2007
2008
2009
2010
2011
12,100
12,100
Total Future
12,100 33,200 I
12,100 Total
Total
Prior
8,500 I
Total
Funding Sources
HAC - Arts Center Fund
2007
2008
2009
2010
2011
12,100
12,100
Total
12,100
12,100
Future
33,200 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - increase by $2,000 to reflect actual cost.
Estimate salvage/resale value on replaced item: $
Wednesday, June 21,2006
- - ------- - -----
EQUIPMENT REPLACEMENT PLAN 2007 thru 2011
Contact City Manager
City of Hopkins, MN Department Cable TV
Project # Ol-ERP-050 Type Equipment
Useful Life 8 years
Project Name Cable/Council Chamber Cameras & Control System Equipment
Category
Priority nla
Total Project Cost $100,000
Description I
Replacement of cameras, motors and ves communications specialist Calnera control unit.
Justification I
Studio equipment, lighting and cameras for meeting cable casts alld presentations.
Expenditures 2007 2008 2009 2010 2011 Total Future
Equipment 5,000 5,000 5,000 5,000 5,000 25,000 I 75,000 I
Total 5,000 5,000 5,000 5,000 5,000 25,000 Total
Funding Sources 2007 2008 2009 2010 2011 Total Future
Cable Television Fund 5,000 5,000 5,000 5,000 5,000 25,000 I 75,000 I
Total 5,000 5,000 5,000 5,000 5,000 25,000 Total
Operational Impact/Other I
Variance from 20 year plan - replace equiplnent as needed due to useful life variation.
Estimate salvage/resale value on replaced item: $-0-
Wednesday, June 21,2006
EQUIP:MENT REPLACEMENT PLAN
City of Hopkins, MN
Ol-ERP-OOl
City HaIl Main Copy Machine
2007 thru 2011
Description I
Copy machine to service needs of all departments located at City Hall.
1. Variety of copying tasks.
2. High volume product copier.
Note: equipment is leased.
Contact Finance Director
Department City Hall Administration
T)'pe Equipment
Useful Life Unassigned
Category Equipment
Priority nJa
Total Project Cost $445,000
Justification I
Daily use to make copies of correspondence and forms. Periodically produce documents, i.e., budgets, financial reports,
council reports and updates, city code revisions, various department reports, and hearing and information notices.
Machine will duplex, sort, collate and staple copies.
Expenditures
Equipment
Prior
77,000 I
Total
2007
10,000
10,000
2008
10,000
10,000
2009
14,000
14,000
2010
14,000
14,000
Total
Prior
77,000 I
Total
Funding Sources
Equipment Replacement Fund
Total
2007
10,000
10,000
2008
10,000
10,000
2009
14,000
14,000
2010
14,000
14,000
2011
14,000
14,000
Future
306,000 I
Total
Total
62,000
62,000
2011
14,000
14,000
Total Future
62,000 306,000 I
62,000 Total
Operational Impact/Other I
Variance from 20 year plan - lease alTIOunt increased as issues have arisen with current copier which may require a new
machine with a new lease.
Estimate salvage/resale value on replaced item: $-0-
Wednesday, JW1e 21,2006
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2007 thru 2011
Contact Finance Director
Project # Ol-ERP-002
Project Name City Hall Small Copy Machine
Department City Hall Administration
Type Equipment
Useful Life 5 years
Category Equipment
Priority nJa
Total Project Cost $179,500
Description I
Coyy machine to service needs of all departments located at City Hall.
1, Variety of copying tasks.
2. High volume product copier.
Note: This is a color copier.
Justification
I
Daily use to make copies of correspondence and forms. Periodically produce documents, i.e., budgets, financial reports,
council reports and updates, city code revisions, various department reports, and hearing and information notices.
Machine will duplex, sort, collate and staple copies.
Prior
43,200 I
Total
Expenditures
Equipment
2007
2008
2009
2010
2011
26,900
26,900
Total
26,900 I
26,900
Future
109,400 I
Total
Total
Prior
I 43,200 I
Total
Funding Sources
Equipment Replacement Fund
Total
2007
2008
2009
2010
2011
26,900
26,900
Total
26,900 I
26,900
Future
109,400 I
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $2,500
Wednesday, June 21,2006
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, :MN
2007 thru 2011
Contact Finance Director/IT
Project #
Ol-ERP-003
Department City Hall Administration
Type Equipment
Useful Life 1 year
Category Equipment
Priority nJa
Project Name Network Server
Description I
The network server is the hub of the network. New cOlnputers are faster and more reliable.
Total Project Cost $193,000
Justification I
Networking allows user to share information that is stored in a single location, the network server. This is more
efficient because the infonnation does not have to be stored on many different computers. It also makes for better
accuracy because as the infonnation changes or is updated, every user is working with the same data.
Prior
33,000 I
Total
Expenditures
Equipment
2007
8,000
8,000
2008
8,000
8,000
2009
8,000
8,000
2010
8,000
8,000
2011
8,000
8,000
Total Future
40,000 120,000 I
40,000 Total
Total
Prior
33,000 I
Total
Funding Sources
Equipment Replacement Fund
Total
2007
8,000
8,000
2008
8,000
8,000
2009
8,000
8,000
2010
8,000
8,000
2011
8,000
8,000
Total Future
40,000 120,000 I
40,000 Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $-0-
Wednesday, June 21,2006
----- ,
EQUIP:MENT REPLACE:MENT PLAN 2007 thru 2011 Finance Director/IT
Contact
City of Hopkins, :MN Department City Hall Administration
Project # Ol-ERP-004 Type Equipment
Useful Life 8 years
Project Name Telephone S)Tstem Category Equipment
Priority nla
Total Project Cost $238,100
Description I
Includes the PBX, the voice mail systems, and all telephone instruments. Currently there are over 200 extensions
served by this system. Also includes software for the PBX and voice mail systems.
Justification I
Making, receiving and routing telephone calls, storing voice mail messages, and providing telephone based information
services (snow line, etc.)
Prior Exp~nditures 2007 2008 2009 2010 2011 Total Future
I 60,000 I Equipment 76,000 76,000 I 102,100 I
Total Total 76,000 76,000 Total
Prior Funding Sources 2007 2008 2009 2010 2011 Total Future
I 60,000 I Equipment Replacement Fund 76,000 76,000 I 102,100 I
Total Total 76,000 76,000 Total
I
Operational Impact/Other I
Variance from 20 year plan - extend life to 8 years.
Estimate salvage/resale value on replaced item: $
Wednesday, June 21, 2006
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2007 thru 2011
Project #
Ol-ERP-006
Project Name Computers
Contact Finance Director/IT
Department City Hall Administration
Type Equipment
Useful Life 3-5 years
Category Equipment
Priority n/a
Total Project Cost $780,000
Description I
Personal computer purchases and upgrades for the entire City staff. Coordinating personal computer purchases from
individual departments to one fund.
Justification I
Tools enabling staff to perfoID1 job responsibilities efficiently and effectively.
Expenditures
Equipment
Prior
180,000 I
Total
2007
30,000
30,000
2008
30,000
30,000
2009
30,000
30,000
2010
30,000
30,000
Total
Prior
180,000 I
Total
Funding Sources
Equipment Replacement Fund
Total
2007
30,000
30,000
2008
30,000
30,000
2009
30,000
30,000
2010
30,000
30,000
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $-0-
2011
30,000
30,000
Future
450,000 I
Total
Total
150,000
150,000
201'1
30,000
30,000
Total Future
150,000 450,000 r
150,000 Total
Wednesday, June 21, 2006
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Project #
Ol-ERP-007
Project Name Engineering Printer/Scanner
2007 thru 2011
Contact Finance Director
Department City Hall Administration
Type Equipment
Useful Life 5 years
Category Equipment
Priority nla
Total Project Cost $246,560
Description I
Prillter/scanrier -large format copier use in Engineering to copy blueprints, plans and large documents.
Equipment is leased.
Justification I
Large document copier/scanner for use in Engineering. Also scans documents for permanent storage.
Prior
8,640 I
Total
Expenditures
Equipment
2007
8,640
8,640
Total
Prior
8,640 I
Total
Funding Sources
Equipment Replacement Fund
2007
8,640
8,640
Total
Operational Impact/Other I
Variance from 20 year plan - new
Estimate salvage/resale value on replaced item: $-0-
2008
8,640
8,640
2009
8,640
8,640
2010
10,000
10,000
2008
8,640
8,640
2009
8,640
8,640
2010
10,000
10,000
2011
10,000
10,000
Total
45,920 I
45,920
2011
10,000
10,000
Total
45,920 I
45,920
Futu re
192,000 I
Total
Future
192,000 I
Total
Wednesday, June 21,2006
EQUIPMENT REPLACEMENT PLAN
ity of Hopkins, MN
Ol-ERP-008
2007 thru 2011
Contact Finance Director
Document Management Scanner (2)
Department City Hall Administration
Type Equipment
Useful Life 3 years
Category Equipment
Priority nJa
Total Project Cost $91,000
Description I
Large document (11 "x1711) scanner for document Inanagement and retention as well as general administrative use.
Justification
I
2007 - Replaces the second scanner that only scans documents to 8 1/2"x1411 that was purchased in 2004.
Prior
6,500 I
Total
Expenditures
Equipment
2007
6,500
6,500
2008
2009
6,500
6,500
2010
6,500
6,500
2011
Total Future
19,500 65,000 I
19,500 Total
Total
Prior
6,500 I
Total
Funding Sources
Equipment Replacement Fund
Total
2907
6,500
6,500
2008
2009
6,500
6,500
2010
6,500
6,500
2011
Total Future
19,500 65,000 I
19,500 Tot.al
Operational Impact/Other I
Variance from 20 year plan - add second scanner that was purchased from budget in 2004.
Estimate salvage/resale value on replaced item: $500-$1,000
Wednesday, June 21,2006
EQUIPMENT REPLACEMENT PLAN 2007 thru 2011 Contact Finance DirectorlIT
City of Hopkins, MN Department City Hall Administration
Project # Ol-ERP-009 Type Equipment
Useful Life 15 years
Project Name Network Infrastructure Upgrade Equipment
Category
Priority nla
Total Project Cost $38,400
Description I
Install new and additional network wiring and equipment.
I
Justification I
Improve capacity, coverage and reliability. Installation will coincide with office space update.
Expenditures 2007 2008 2009 2010 2011 Total Future
Equipment 15,000 15,000 I 23,400 I
Total 15,000 15,000 Total
Funding Sources 2007 2008 2009 2010 2011 Total Future
Equipment Replacement Fund 15,000 15,000 I 23,400 I
Total 15,000 15,000 Total
!
Operational Impact/Other I
Variance from 20 year plan - new item to replace substandard network wiring.
I Estimate salvage/resale value on replaced item: $
I
I
!
Wednesday, June 21,2006
!
EQUIPMENT REPLACE:MENT PLAN
City of Hopkins, MN
Project #
Ol-ERP-I05
2007 thru 2011 Fire Chief
Contact
Department Fire
Type Equipment
Useful Life 10 years
Category Vehicles
Priority nJa
Total Project Cost $118,800
Project Name Lite Rescue
Description I
Light rescue response vehicle on a 4 wheel drive chassis.
Justification I
Used for all emergency medical responses; vehicle accidents; industrical accidents; hazardous materials response.
Expenditures
Vehicles
2007
2008
2009
35,000
35,000
2010
2011
Total Future
35,000 83,800 I
35,000 Total
Total
Funding Sources
Equipment Replacement Fund
Total
2007
2008
2009
35,000
35,000
2010
2011
Total Future
35,000 83,800 I
35,000 Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item $ - 4,000
Wednesday, June 21,2006
Project #
Ol-ERP-I06
2007 thru 2011 Contact Fire Chief
Department Fire
. Type Equipment
Useful ~ife 20 years
Category Vehicles
Priority nla
Total Project Cost $600,000
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, :MN
Project Name Stuphen Aerial Truck
Description I
One hundred foot aerial ladder truck with a 1500 GPM fITe pump and a full compliment of ground ladders.
Justification
I
Vehicle responds to all structural emergencies. Used especially for rescue of people trapped on upper floors and
ventilation of the hot gases and smoke.
The body of the truck was refurbished in 1991. The pump, aerial ladder and hydraulics were not. The plan was to
refurb these components in 2007. We have been informed by the manufacturer that because of the new aerial
construction standards, we will not longer be able to refurb. Need to replace.
Expenditures
Equipment
2007
2008
600,000
600,000
2009
2010
2011
Total
600,000
600,000
Total
Funding Sources 2007
Equipment Replacement Fund
GA - Grant-In-Aid
Total
2008
300,000
300,000
600,000
2009
2010
2011
Total
300,000
300,000
600,00p
Operational Impact/Other I
Variance from 20 year plan - cost of new truck reduced $300,000 due to lack of federal grant funding. Unable to secure
a significant federal grant after two attempts so the truckwill be scaled back. An application for a smaller federal grant
has been made in 2006.
Estimate salvage/resale value on replaced item: $
Wednesday, June 21,2006
Project #
Ol-ERP-I08
2007 thru 2011
Contact Fire Chief
Department Fire
Type Equipment
Useful Life 15 years
Category Equipment
Priority nJa
Total Project Cost $368,500
EQUIP:MENT REPLACE1\1ENT PLAN
City of Hopkins, :MN
Project Name Breathing Apparatus
Description
High pressure, light weight breathing apparatus carried on all emergency apparatus. Thirty minute capacity.
Justification
OSHA required self contained breathing apparatus must be worn by fire-fighters when working in hazardous
atmospheric conditions or oxygen deficient situations.
Upgrade consists of new regulator and rapid escape valve ($900 each/40 count)
Prior
130,000 I
Total
Expenditures
Equipment
2007
2008
36,000
36,000
2009
2010
2011
Total
36,000
36,000
Future
202,500 I
Total
Total
Prior
130,000 I
Total
Funding Sources
Equipment Replacement Fund
Total
2007
2008
36,000
36,000
2009
2010
2011
Total Future
36,000 202,500 I
36,000 Total
Operational Impact/Other
Variance from 20 year plan - additional one time cost for upgrade in 2008. Needed to lnake apparatus compliant to
NFP A and OSHA requirements for firefighter safety.
Estimate salvage/resale value on replaced iteln: $ 200 each
Wednesday, June 21,2006
EQUIP:MENT REPLACE:MENT PLAN
City of Hopkins, 1\1N
Project #
Project Name Copy Machine
Ol-ERP-IIO
Description
Fire Station copy machine.
Justification
Copying business papers, training records, etc.
Prior
7,400 I
Total
Prior
7,400 I
Total
Expenditures
Equipment
2007
Total
Funding Sources
Equipment Replacement Fund
2007
Total
Operational Impact/Other
Variance from 20 year plan - none
Estimate salvage/resale value 011 replaced item: $500
2008
2008
2007 thru 2011 Fire Chief
Contact
Department Fire
Type Equipment
Useful Life 8 years
Category Equipment
Priority n/a
Total Project Cost $30,800
2009
2009
2010
2011
10,300
10,300
Total Future
10,300 13,100 I
10,300 Total
2010
2011
10,300
10,300
Total
10,300
10,300
Future
13,100 I
Total
Wednesday, June 21,2006
EQUIP:MENT REPLACE1\1ENT PLAN
City of Hopkins, MN
01-ERP-112
Project Name Thermal Imaging Camera (2)
2007 thru 2011
Contact Fire Chief
Department Fire
Type Equipment
Useful Life 10 years
Category Equipment
Priority nla
Total Project Cost $77,400
Description I
Used by our fire companies to locate victuns trapped Ul a smoke filled building. It helps us determine where fire and
heat may be hidden allowing for faster extinguishment.
Note: purchased 1997 & 2003
Justification I
Current camera is ten years old and has been through Inany hot fIres and needs to be replaced. Current camera was
purchased with donation money.
Expenditures
Equipment
2007
15,000
Total 15,000
2008
2009
2010
2011
Total Future
15,000 62,400 I
15,000 Total
Funding Sources
Equipment Replacement Fund
Total
2007
15,000
15,000
2008
2009
2010
2011
Total Future
15,000 62,400 I
15,000 Total
Operational Impact/Other I
Variance from 20 year plan - department owns 2 cameras. Previously one one was included in the replacement plan.
Ulis will add to the replacement schedule the camera purchased from the Fire Dept budget in 2003.
Estimate salvage/resale value on repalced item: $-0-
Wednesday, June 21, 2006
2007 thru 2011 Fire Chief
Contact
Department Fire
Type Equipment
Useful Life 5 years
Category Equipment
Priority n/a
Total Project Cost $68,100
EQUIPJ\.1ENT REPLACE:MENT PLAN
City of Hopkins, MN
Project #
01-ERP-116
ProjectName Workout Equipment (7)
Description
Workout equipment used in Fire Department workout room.
2009 - replace eliptical
2011 - replace treadlnill
2012 - replace elipitcal
Note for subsequent years: 4 pieces of weight equipment will need to be added. Estimated life 6-9 years depending on
iece of e uipment. Estimated cost $3-5,000 de ending on piece being re laced.
Justification
This equipment is available to all City employees for health and wellness.
Expenditures
Equipment
2007
2008
2009
5,000
5,000
Total
Funding Sources 2007
Equipment Replacement Fund
Total
2008
2009
5,000
5,000
Operational Impact/Other
Variance from 20 year plan - new item
Estimate salvage/resale value on replaced item: $
2010
Total Future
10,000 58,100 I
10,000 Total
2011
5,000
5,000
2010
Total Future
10,000 58,100 I
10,000 Total
2011
5,000
5,000
Wednesday, June 21,2006
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Project #
Ol-ERP-400
2007 thru 2011 Unassigned
Contact
Department BRA
Type Equipment
Useful Life 8 years
Category Vehicles
Priority n/a
Total Project Cost $88,100
Project Name 4x4 3/4 Ton Truck
Description I
4 wheel drive 3/4 ton truck to be used by Public Housing rnaintenance staff. Includes snow plow.
Justification I
Transportation for Public Housing Superintendent and snow plowing at various HRA properties around the city.
Prior
22,800 I
Total
Expenditures
Vehicles
2007
2008
2009
2010
2011
28,800
28,800
Total Future
28,800 36,500 I
28,800 Total
Total
Prior
22,800 I
Total
Funding Sources
HRA - Housing and Redevelop
Total
2007
2008
2009
2010
2011
28,800
28,800
Total Future
28,800 36,500 I
28,800 Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $1,800
Wednesday, June 21,2006
EQUIPJ\.1ENT REPLACEMENT PLAN
City of Hopkins, MN
2007 thru 2011
Project #
Ol-ERP-200
Project Name Marked Patrol Vehicles (6) and Sergeant's Vehicle
Contact Police Chief
Department Police
Type Equipment
llseful Life 3-4 years
Category Vehicles
Priority n/a
Total Project Cost $2,128,500
Description I
Marked patrol vehicles used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties.
Justification
I
Set up and marking of police vehicles m,:!st conform to Minnesota law and POST standards. Vehicles contain secure
data and radio equipment for routine and emergency operations. Vehicles contain secure seating for prisoner transport.
Additional vehicle comes from K-9 program. Vehicle will be used by the power shift officers (overlap shift that
provides additional coverage during peak call times). This vehicle is on a 4 year life.
Prior
I 322,900 I
Total
2007
89,400
89,400
2009
2010
130,400
130,400
Total
2008
92,100
92,100
Expenditures
Vehicles
Prior
I 322,900 I
Total
2007
89,400
89,400
2008
92,100
92,100
2009
2010
130,400
130,400
Funding Sources
Equipment Replacement Fund
Total
Operational Impact/Other I
Variance frOlTI 20 year plan - None.
Estimate salvage/resale value on replaced item: $4,000 each
2011
67,200
67,200
Total Future
379,100 I 1,426,500 I
379,100 Total
2011
67,200
67,200
Total Future
379,100 I 1,426,500 I
379,100 Total
Wednesday, June 21,2006
Project # 01-ERP-203
Project Name Utility 4x4 (211)
2007 thru 2011 Police Chief
Contact
Department Police
Type Equipment
Useful Life 6 years
Category Vehicles
Priority n/a
Total Project Cost $247,600
EQUIP~NT REPLACE:MENT PLAN
City of Hopkins, M.N
Description
4 wheel drive uitlity vehicle.
Justification
Vehicle is normally used by public service officers for a wide variety of uses such as transporting annnals and
equipment. The 4 wheel drive vehicle is also used at tnnes as a patrol vehicle, particularly nl the winter in extreme
snow conditions.
Prior
. 29,700 I
Total
Expenditures
Vehicles
2007
2008
37,700
37,700
2009
2010
2011
Total Future
37,700 180,200 I
37,700 Total
Total
Prior
29,700 I
Total
Funding Sources
Equipment Replacement Fund
Total
2007
2008
37,700
37,700
2009
2010
2011
Total Future
37,700 180,200 I
37,700 Total
Operational Impact/Other
Variance from 20 year plan - none
EstiInate salvage/resale value on replaced item: $5,000
Wednesday. June 21. 2006
EQUIPMENT REPLACEMENT PLAN 2007 thru 2011 Contact Police Chief
City of Hopkins, MN Department Police
Project # Ol-ERP-204 Type Equipment
Useful Life 2 years
Project Name Police Administrative Vehicles (2) Category Vehicles
Priority nla
Total Project Cost $775,300
Description I
Police administrative and detective vehicles.
Justification I
Unmarked vehicles, equipped with radios, siren and red grille lites used by chief and captain. Staff use is for two
years. Vehicles are then rotated down to detectives and are kept for an additional 3-4 years. Vehicles are also used for
surveillance by uniform and plain clothes officers.
Prior Expenditures 2007 2008 2009 2010 2011 Total Future
I 108,600 I Vehicles 24,800 25,600 26,300 27,100 27,900 131,700 I 535,000 I
Total Total 24,800 25,600 26,300 27,100 27,900 131,700 Total
Prior Funding Sources 2007 2008 2009 2010 2011 Total Future
I 108,600 I Equipment Replacement Fund 24,800 25,600 26,300 27,100 27,900 131,700 I 535,000 I
Total Total 24,800 25,600 26,300 27,100 27,900 131,700 Tot.al
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $4,000 each
Wednesday, June 21, 2006
Project Name Computer System
2007 thru 2011 Police Chief
Contact
Department Police
Type Equipment
Useful Life 10 years
Category Equipment
Priority nla
Total Project Cost $1,640,700
EQUIP:MENT REPLACEMENT PLAN
City of Hopkins, MN
Ol-ERP-208
Description
Computer system for records management and retention of Police Department.
Justification
To store, retrieve and transfer required data to State and perform data entry, inquiries of local, state' and national crime
databases.
During last purchase, the Police Department did not have CAD or lTIobile systems. Since then, these systems have been
added and share the same data base/operating system as the records management. ReplacelTIent will have to incorporate
all three systems.
Expenditures
Equipment
2007
2008
2009
2010
700,000
700,000
2011
Total Future
700,000 940,700 I
700,000 Total
Total
Funding Sources 2007
Equipment Replacement Fund
2008
2009
2010
700,000
700,000
2011
Total Future
700,000 940,700 I
700,000 Total
Total
Operational Impact/Other
Variance from 20 year plan - need to increase budgeted amount to $700,000 to better reflect a more realistic
replacement cost for Records Mgmt Mobile Data SystelTI and COlTIputer Aided Dispatch (RMS/MDC/CAD) computer
system.
Estimate salvage/resale value on replaced item: $-0-
Wednesday, June 21,2006
- -- ---- --- - - --- -----
EQUIP1\ffiNT REPLACEMENT PLAN 2007 thru 2011 Police Chief
Contact
City of Hopkins, MN Department Police
Type Equipment I
Project # Ol-ERP-209 I
Useful Life 5 years
Project Name Copy Machine Equipment
Category
Priority nJa
Total Project Cost $127,200
Description I
Police Department copy machine capable of producing double side copies and collating pages.
Justification I
Used to make duplicate copies of reports, letters, memos, etc., generated by police presonne!.
Prior Expenditures 2007 2008 2009 2010 2011 Total Future
I 30,700 I Equipment 19,1 DO 19,100 I n,400 I
Total Total 19,100 19,100 Total
Prior Funding Sources 2007 2008 2009 2010 2011 Total Future
I 30,700 I Equipment Replacement Fund 19,100 19,100 I n ,400 I
Total Total 19,100 19,100 Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $1,000
Wednesday, June 21,2006
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2007 thru 2011
Contact Police ChiemT
Department Police
Project #
Ol-ERP-211
Type Equipment
Useful Life 3 years
Category Equipment
Priority n/a
Project Name Network Server (3)
Description I
Computer servers store information and system programs.
Total Project Cost $215~900
Justification I
Annual replacement cycle allows developlnent of system storage program. Use of newer servers for heavy use
programs while older servers rever to data storage.
Prior
34,000 I
Total
Expenditures
Equipment
2007
8,500
8,500
2008
8,700
8,700
2009
8,700
8,700
2010
8,700
8,700
2011
8,700
8,700
Total Future
43,300 138,600 I
43,300 Total
Total
Prior
34,000 ,
Total
Funding Sources
Equipment Replacement Fund
Total
2007
8,500
8,500
2008
8,700
8,700
2009
8,700
8,700
2010
8,700
8,700
2011
8,700
8,700
Total Future
43,300 138,600 f
43,300 Tot.al
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced iteln - $
Wednesday, June 21,2006
Project #
01-ERP-212
2007 thru 2011 Police Chief
Contact
Department Police
Type Equipment
Useful Life 5 years
Category Equipment
Priority nJa
Total Project Cost $237,900
EQUIP1vIENT REPLACEl\ffiNT PLAN
City of Hopkins, MN
Project Name Mobile Data Computers
Description I
Mobile data computers installed in squad cars used to receive calls from dispatch, query information from various
databases, communicate car to car.
Justification I
Originally, :MDT's (mobile data terminals) were supplied/supported by the Hennepin County Sheriffs Dept. until they
decided not to provide this service. Hopkins police obtained federal grant monies to replaced the MDT's in 2002.
Limited life of 5 years.
Expenditures
Equipment
2007
47,000
Total 47,000
2008
2009
2010
2011
Total Future
47,000 I 190,900 f
47,000 Total
Funding Sources
Equipment Replacement Fund
Total
2007
47,000
47,000
2008
2009
2010
2011
Total Future
47,000 I 190,900 I
47,000 Total
Operational Impact/Other .1
Variance from 20 year plan - Need to increase budgeted amount to $47,000. Estimated cost per unit based on State of
Minnesota contract is $4,300 each plus $2,800 tax and associated wiring or cabling needs.
Estimate salvage/resale value on replaced item: $-0-
Wednesday, June 21,2006
2007 thru 2011
EQUIPMENT REPLACE1vlENT PLAN
City of Hopkins, MN
roject #
Ol-ERP-710
4X4 1/2 Ton Truck
Description
Pickup used by various divisions of Public Works.
Contact Public Works Director
Department Public Works: BldglEquip Ser
Type Equipment
Useful Life 10 years
Category Vehicles
Priority nJa
Total Project Cost $56,400
Justification
Light hauling and transportation for supervisors. Maintenance garage service vehicle.
Expenditures
Vehicles
2007
2008
2009
24,100
24,1 00
Total
Funding Sources 2007
Equipment Replacement Fund
Total
2008
2009
24,100
24,1 00
Operational Impact/Other
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $1,500
2010
2010
2011
Total Future
24,100 32,300 I
24,100 Total
2011
Total .Future
24,100 32,300 I
24,100 Tohll
Wednesday, June 21, 2006
-------------- --- -- - --
EQUIPMENT REPLACEMENT PLAN 2007 thru 2011
Contact Public Works Director
City of Hopkins, MN Department Public Works: Parks/Forestry
Project # Ol-ERP-800 Type Equipment
Useful Life 10 years
Project Name 1/2 Ton Pickup Truck
Category Vehicles
Priority nla
Total Project Cost $61,800
Description I
Pickup used by Park Division of Public Works.
Justification I
Expenditures 2007 2008 2009 2010 2011 Total Future
Vehicles 26,400 26,400 I 35,400 I
Total 26,400 26,400 Total
Funding Sources 2007 2008 2009 2010 2011 Total Future
Equipment Replacement Fund 26,400 26,400 I 35,400 I
Total 26,400 26,400 Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced iteln: $
Wednesday, June 21, 2006
I
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Ol-ERP-802
2007 thru 2011
Contact Public Works Director
Department Public Works: Parks/Forestry
Type Equipment
Useful Life 10 years
Category Vehicles
Priority n/a
Project Name 3/4 Ton Utility Truck
Total Project Cost $75,600
Description
3/4 ton truck with utility body used for transporting tools and equipment for repair of various buildings, irrigation, etc.
around the city.
Justification
Expenditures
Vehicles
2007
2008
2009
2010
32,200
32,200
2011
Total Future
32,200 43,400 I
32,200 Total
Total
Funding Sources
Equipment Replacement Fund
2007
2008
2009
2010
32,200
32,200
2011
Total
32,200
32,200
Future
43,400 I
Total
Total
Operational Impact/Other
Variance from 20 year plan - move back two years (2008 to 2010). Current unit has 38,000 miles and is in good
condition.
Estimate salvage/resale value on replaced item: $
Wednesday, June 21,2006
EQUIP:MENT REPLACE1\1ENT PLAN
City of Hopkins, :MN
2007 thru 2011
Contact Public Works Director
Department Public Works: Parks/Forestry
T~Tpe Equipment
Useful Life 15 years
Category Equipment
Priority nia
Project #
Ol-ERP-803
Project Name Swap Loader
Total Project Cost $141,200
Description I
Single axle truck with a slide rail systelTI used to swap between various boxes and bodies. Utilitized by Refuse for
hauling dumpsters and Forestry for chipping trees.
Justification
I
Expenditures
Equipment
2007
2008
55,200
55,200
2009
2010
2011
Total Future
55,200 I 86,000 I
55,200 Total
Total
Funding Sources 2007 2008 2009 2010 2011 Total Future
Equipment Replacement Fund 13,800 13,800 I 86,000 I
RF - Refuse Fund 41 ,400 41 ,400 Tornl
Total 55,200 55,200
Operational Impact/Other I
Variance from 20 year plan - 25% Equipment Replacement/75% Refuse
Estimate salvage/resale value on replaced item: $
Wednesday, June 21, 2006
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, :MN
Ol-ERP-804
2007 thru 2011
Contact Public Works Director
Department Public Works: Parks/Forestry
Type Equipment
Useful Life 20 years
Category Vehicles
Priority n/a
Project Name Log Truck
Total Project Cost $105,000
Description
Truck is used for hauling brush and logs in the Forestry department.
Justification
Expenditures
Vehicles
2007
105,000
Total 105,000
2008
2009
2010
2011
Total
105,000
105,000
Funding Sources
Equipment Replacement Fund
RF - Refuse Fund
2007
52,500
52,500
105,000
2008
2009
2010
2011
Total
52,500
52,500
105,000
Total
Operational Impact/Other
Variance from 20 year plan - 50% Equipment Replacement/50% Refuse - increase amount to $105,000 to reflect actual
cost.
Estimate salvage/resale value on replaced item: $
Wednesday, June 21,2006
-------- ---------
EQUIP:MENT REPLACE:MENT PLAN 2007 thru 2011 Public Works Director
Contact
City of Hopkins, MN Department Public Works: ParkslForestry
Project # Ol-ERP-805 Type Equipment
Useful Life 20 years
Project Name Aerial Lift Category Equipment
Priority nla
Total Project Cost $110,000
Description I
Aerial lift truck is utilized by the Forestry department to triIn and remove trees. It is also used for ballfield light
maintenance in the parks.
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 110,000 110,000
Total 110,000 110,000
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 110,000 110,000
Total 110,000 110,000
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Wednesday, June 21, 2006
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2007 thru 2011
Contact Public Works Director
Department Public Works: ParkslForestry
Type Equipment
Useful Life 20 years
Category Equipment
Priority nJa
Project #
Ol-ERP-806
Project Name Tractors (2)
Total Project Cost $85,300
Description
Farm type tractors with cab used with various attaclllnents. Ice rink sweeping, flail mower, fertilizing, aeration,
plowing and grass seeding.
Justification
Expenditures
Equipment
2007
2008
2009
41 ,400
41 ,400
2010
2011
Total Future
41,400 43,900 I
41,400 Total
Total
Funding Sources
Equipment Replacement Fund
Total
2007
2008
2009
41 ,400
41 ,400
2010
2011
Total Future
41,400 43,900 I
41,400 Total
Operational Impact/Other
Variance from 20 year plan - replace one in 2009. Look at altenlate uses or different machine. Move second unit out to
2012.
Estimate salvage/resale value on replaced item: $3,500
Wednesday, June 21,2006
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, :MN
2007 thru 2011
Contact Public Works Director
Department Public Works: Parks/Forestry
Type Equipment
Useful Life 8 years
Category Equipment
Priority n/a
Project #
Ol-ERP-808
Project Name Riding Mowers (3)
Total Project Cost $206,600
Description I
Riding mowers used by Parks Divison of Public Works. One mower also used for sidewalk snow removal during
winter months.
Justification
I
Mowing city parks and right of ways and sidewalk snow relTIOval.
Prior
49,000 I
Total
Expenditures
Equipment
2007
2008
2009
22,800
22,800
2010
2011
Total
22,800 I
22,800
Future
134,800 I
Total
Total
Prior
I 49,000 I
Total
Funding Sources
Equipment Replacement Fund
Total
2007
2008
2009
22,800
22,800
2010
2011
Total Future
22,800 I 134,800 I
22,800 Total
Operational Impact/Other I
Variance from 20 year plan - none.
Estimate salvage/resale value on replaced item: $600 each
Wednesday, June 21, 2006
EQUIP~NT REPLACEMENT PLAN
City of Hopkins, MN
2007 thru 2011
Contact Public Works Director
Department Public Works: Streets/Traffic
Type Equipment
Useful Life 12 years
Category Vehicles
Priority nla
roject # Ol-ERP-303
Project Name 1 Ton Dump Truck (2)
Total Project Cost $205,500
Description
Truck is used in the Street Division of Public Works.
Justification
Vehicle used by various departments for street and park maintenance and light hauling.
Prior
30,500 I
Total
Expenditures
Vehicles
2007
2008
2009
37,400
37,400
2010
2011
Total Future
37,400 I " 137,600 I
37,400 Total
Total
Prior
30,500 I
Total
Funding Sources
Equipment Replacement Fund
Total
2007
2008
2009
37,400
37,400
2010
2011
Total Future
37,400 , 137,600 I
37,400 Total
Operational Impact/Other
Variance from 20 year plan -
Estimate salvage/resale value on replaced iteln: $3,500
Wednesday, June 21,2006
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Project #
Ol-ERP-307
Project Name Water Truck
Description I
Water truck used in Streets and Parks Division of Public Works.
Justification
I
Used for street flushing, watering trees and plants, rink flooding and standby fire protection.
Expenditures
Vehicles
2007
2008
Total
Funding Sources 2007
Equipment Replacement Fund
Total
2008
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $8,500
2007 thru 2011
2009
2009
2010
133,700
133,700
2010
133,700
133,700
Contact Public Works Director
Department Public Works: StreetslTraffic
Type Equipment
Useful Life 15 years
Category Vehicles
Priority nla
Total Project Cost $342,000
2011
Total Future
133,700 I 208,300 I
133,700 Total
2011
Total Future
133,700 I 208,300 I
133,700 Total
Wednesday, June 21,2006
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Ol-ERP-309
Project Name Skid Loader (2)
2007 thru 2011
Description
Loading trucks, landscape work, snow removal, material handling.
Justification
Expenditures
Equipment
2007
Total
Funding Sources
Equipment Replacement Fund
Total
2007
Operational Impact/Other
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
2008
2009
2008
2009
2010
31,000
31 fOOO
2010
31,000
31 fOOO
Contact Public Works Director
Department Public Works: StreetsfTraffic
Type Equipment
Useful Life 12 years
Category Equipment
Priority nla
Total Project Cost $117,100
2011
Total
31,000
31 fOOO
2011
Total
31,000
31 fOOD
Futu re
86,100 I
Total
Future
86,100 I
Tobll
Wednesday, June 21,2006
----------------- ---- - ---- -- ------ - - - - -- - -- - - - - - - ---
EQUIPMENT REPLACEMENT PLAN 2007 thru 2011
Contact Public Works Director
City of Hopkins, MN Department Public Works: StreetslTraffic
Project # 01-ERP-316 Type Equipment
Useful Life 20 years
Project Name Trailer Equipment
Category
Priority n/a
Total Project Cost $4,900
Description I
Used for transporting and hauling equiplnent and supplies.
Justification I
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 4,900 4,900
Total 4,900 4,900
Funding Sources 2007 2008 2009 2010 2011 Total
Equipment Replacement Fund 4,900 4,900
Total 4,900 4,900
Operational Impact/Other I
Variance from 20 year plan - none
Estiamte salvage/resale value on replaced item: $
!
I
I
Wednesday, June 21, 2006
EQUIPMENT REPLACE1\1ENT PLAN
City of Hopkins, MN
Ol-ERP-900
Refuse Truck (RAP-R) (2)
Description
Refuse truck used by Refuse Utility Division of Public Works.
Justification
Residential waste pick up.
Prior
148,000 I
Total
Prior
148,000 I
Total
Expenditures
Vehicles
2007
2008
Total
Funding Sources
RF - Refuse Fund
2007
2008
Total
Operational Impact/Other
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $18,000
2007 thru 2011
2009
2009
2010
176,700
176,700
2010
176,700
176,700
Contact Public Works Director
Department Refuse
Type Equipment
Useful Life 10 years
Category Vehicles
Priority nla
Total Project Cost $1,042,100
2011
Total Future
176,700 717,400 I
176,700 Total
2011
Total Future
176,700 717,400 I
176,700 Total
Wednesday, June 21,2006
--
EQUIPMENT REPLACEMENT PLAN 2007 thru 2011
Contact Public Works Director
City of Hopkins, 1vfN Department Sewer
Project # Ol-ERP-551 Type Equipment
Useful Life 1 0 years -
Project Name 3/4 Ton Utility Truck (2)
Category Vehicles
Priority nla
Total Project Cost $164,700
Description I
3/4 ton utility trucks used by the Water/Sewer Division of Public Works.
Justification 1
Transportation to and from job sites, box carries tools used by personnel for job site repairs and light hauling.
Prior Expenditures 2007 2008 2009 2010 2011 Total Future
I 25,000 I Vehicles 26,000 26,000 I 113,700 I
Total Total 26,000 26,000 Total
Prior Funding Sources 2007 2008 2009 2010 2011 Total Future
I 25,000 I SF - Sanitary Sewer Fund 26,000 26,000 I 113,700 I
Total Total 26,000 26,000 Tot.al
Operational Impact/Other 1
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $2,500
Wednesday, June 21,2006
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Ol-ERP-557
2007 thru 2011
Contact I:inance Director/IT
Department Sewer
Type Equipment
Useful Life 8 years
Category Equipment
Priority nla
Total Project Cost $20,200
Project Name Telephone System
Description
Includes the PBX, the voice mail systems, and all telephone instruments. Currently there are over 200 extensions
served by this system. Also includes software for the PBX and voice mail systems.
Justification
Making, receiving and routing telephone calls, storing voice mail messages, and providing telephone based information
services (snow line, etc.)
Prior
4,700 I
Total
Expenditures
Equipment
2007
2008
2009
2010
2011
6,800
6,800
Total
6,800
6,800
Future
8,700 I
Total
Total
Prior
4,700 I
Total
Funqing Sources
SF - Sanitary Sewer Fund
Total
2007
2008
2009
2010
2011
6,800
6,800
Total Future
6,800 8,700 I
6,800 Total
Operational Impact/Other
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Wednesday, June 21,2006
EQUIP:MENT REPLACEMENT PLAN 2007 thru 2011
Contact Public Works Director
City of Hopkins, MN Department Water
Project # Ol-ERP-500 Type Equipment
Useful Life 10 years
Project Name 1/2 Ton Truck
Category Equipment
Priority nla
Total Project Cost $47,300
Description I
Trucks used by Water Department.
Justification I
Expenditures 2007 2008 2009 2010 2011 Total Future
Vehicles 20,500 20,500 I 26,800 I
Total 20,500 20,500 Total
Funding Sources 2007 2008 2009 2010 2011 Total Future
WF - Water Fund 20,500 20,500 I 26,800 I
Total 20,500 20,500 Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Wednesday, June 21,2006
EQUIP:MENT REPLACEMENT PLAN
City of Hopkins, MN
Ol-ERP-504
2007 thru 2011
Contact Public Works Director
Department Water
Type Equipment
Useful Life 10 years
Category Equipment
Priority n/a
Hydraulic Jack Hammer for Backhoe
Total Project Cost $72,600
Description
Replacement of smaller hydraulic jack hmnmer that is used on the Backhoe and Skid Loader.
Justification
Breaking frost for watermain breaks, breaking up blacktop and concrete so that the old surfaces can be replaced.
Prior
17,500 I
Total
Expenditures
Equipment
2007
2008
2009
2010
2011
23,500
23,500
Total Future
23,500 31,600 I
23,500 T ota I
Totai
Prior
17,500 I
Total
Funding Sources
WF - Water Fund
2007
2008
2009
2010
2011
23,500
23,500
Total Future
23,500 31,600 I
23,500 Total
Total
Operational Impact/Other
Variance from 20 year plan - new item
Estimate salvage/resale value on repalced item: $500
Wednesday, June 21. 2006
--- ---
EQUIPMENT REPLACEMENT PLAN 2007 thru 2011 Public Works Director
Contact
City of Hopkins, MN Department Water
Project # Ol-ERP-506 Type Equipment
Useful Life 5 years
Project Name Public Works Copy Machine
Category Equipment
Priority nla
Total Project Cost $72,600
Description I
Copy Inachine to service needs of all division of Public Works.
Justification 1
Making copies for various departments.
Prior Expenditures 2007 2008 2009 2010 2011 Total Futu re
I 10.600 I Equipment 12,200 12,200 I 49,800 I
Total Total 12,200 12,200 Total
Prior Funding Sources 2007 2008 2009 2010 2011 Total Future
I 10,600 I WF - Water Fund 12,200 12,200 I 49,800 I
Total Total 12,200 12,200 Tot.al
Operational Impact/Other 1
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $800
Wednesday, June 21. 2006
,
EQUIP:MENT REPLACE1\ffiNT PLAN
City of Hopkins, MN
Ol-ERP-507
2007 thru 2011
Contact Finance DirectorlIT
Department Water
Type Equipment
Useful Life 8 years
Category Equipment
Priority nJa
Project Name Telephone System
Total Project Cost $20,200
Description I
Includes the PBX, the voice mail systems, and all telephone instruments. Currently there are over 200 extensions
served by this system. Also includes software for the PBX and voice mail systems.
Justification
I
Making, receiving and routing telephone calls, storing voice mail messages, and providing telephone based information
services (snow line, etc.)
Prior
4,700 I
Total
Expenditures
Equipment
2007
2008
2009
2010
2011
6,800
6,800
Total Future
6,800 8,700 I
6,800 Total
Total
Prior
4,700 I
Total
Funding Sources
WF - Water Fund
2007
2008
2009
2010
2011
6,800
6,800
Total Future
6,800 8,700 I
6,800 Total
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Wednesday, June 21,2006
EQUIPMENT REPLACEMENT SCHEDULE
Net General Fund 20 Year Average $652,600
Zl-Jun-06
3.0%
REPL
YRS
INFLATION FACfOR
FIRE
02 Tele~uirt 25
1 ~E~. ~~~~,..~,es~,u~,..,..
i'I,06:r!:A~rl~\{Qhi~le;<
;{'~kiittii~~~f~~(',:,~,;;'('
109 Stuphen Aerial Truck
SUBTOTAL
2026
2025
2024
2023
2022
202
2020
2019
2018
2017
2016
2015
2014
2013
2012
20
2010
2009
2008
2007
EQUIPMENT !VEHICLES
~t; )a~.
491,000
~.,~.;~:"y~f~f.~
'1);'
~~t:~:~f::r~f~~Ht~~~it;t~€~rrt~~~[~~$~Od~9~~!:;,;~.
:l:':!S"iijl~oo,
f~
t', ,'i...
491,000
42,500
83,800
500,000
34,600
35,000
600,000
600,000
),
:~~;oo6 .
202,500.
~;'
.36,000
,,,~~ \ If . -/
r' ,. . ~ .
36,600
'~.5;~M)
:..{
::i.1';~Q~J~\; <':;S
..::-.:
,.~:t,t~)~:~fr~l '~1i~~~~~~ ~\t;l !'~i~ilm!f;~!~f:~l~!~r~~lapo~fi)~'l ~~~)~~~~!l:r~ ~,.~~l~
'~:
48,800
7,800
56,600
,"
,.. ~
24.260.
:~ci:16Q ,
~
261,500
*>'
8,000
t;'l$.oo'"
5,800
7.300
r!r8;obg~~~h{~t;
~ 5,000 5,800
5,300 31,500 5,800
:ii;lAAic9~fp~~.~t;t ~,
.. ":o:;~,~i~~~~~~~t~~~\, ::'1': ~~};;,::11;1~;[~' ~~ 6:~?: : :~!
?1. T(~~i~$Y~itri~r;, ;,r~:;1';;,W!";:~C~J' :&1~::2 :}J:m~~;~,
f: ;:{t;;i;~t:~~~~~~~;~ii'.;r~;':;~~[~~~;~;!:~~~~o6a;
Floor Scrubber
::U:~;;'~l~~~$~~;p~t',::, ;;^t:
Workout Equipment
SUBTOTA
. "
30,700
f2ij tfVtiMoi;~ ~f~~~~:~~1(f\!S;:J::::~~:O::f~;~~~:~::~~~~~~::::!::':'~~f:~':~ ~7:':;;:;~b ~:. ~~\:~'.: ~;~ : ~:~:~},:.
211 Utili b:4 6 37.700
l~};"'7~':;~~:~l1f,;;:r'::~ ' ';';: ;':;2.<~ 'r.1~;;;:r;r;~1i;~U;f~j'$;gcip;:-::':~:.;'~ ~:;f~:~f'ip~i~W1:t'21~i6.Q~:1;;:~' ,]j:Y~~:i~~~~~'Op? !':j~ih~{:'7:I::~;!:, ,.:~tt:
218 Admi 24 800 26,300 27,900 29,600 31,400
Policl 22,000
83,400
52,3~?
,.
;' &2,100
36,600
:. ,5lJ,a(J(j
'^ " 0 ~~'~;~
24,200
47,900
:,;:/~:"'f 4.m~66r.l~.r-:'t:i~~C";':
46,500
~[~~l:t~~~~t:~~~Ti~:;; ;T', ':'~ ~';:4j i~Q~O:~~i~;::'~~~~~~~~'
46,500
:;. ;\):.~:;;!:;l4:&i.$00.:
00
6,700
Of" ,~!.!! ~l$b{t;;t: / l:~~i;;~,:~0:
42,500
(:'~:49J Ob~~;:~~ J'l~~:"':l~~!:~;' ,~il)::~:; g!:~t~~~:~:rl}A3:iiio~t~:~:rj;&:
42,500
';i\4i,~6'6' t;'~{g~~f,,: :t"
19,800
100
21
40.1 O~
r(.~
27,200
'I!J/b ~Yik';; gJ2~6M:p;;;~';'i;;;: '~ilr:~~'~I$l:"r;;;':'r.i,~~~k~ry~~;~o(rit~:~!!~~r.~r),~~f,~:~h;, . ::;I~~~1i;~{ '~ii~~o:{
38,900
r[nJ~~ ~'~i~~~,t:~;l~;r;l~~'
32,600 35,600 38,900
~:;~~:~~~:~:w ;:,,~~;l~;.rA~~:~il;:: ; ;1;' :~i'~";~'J;;-:~~ ~!~n::Prr{(;::lKin:l, .b '~JH~I~lliV}:':~. ;~;~;;~;lf 3'~:;t~~~~~n;;'.;;h:;~f:i ::{,
38,900
G'l':.~:r~;tl~i~i~;[;:;'
8,000
5,000
36,000
30,700
:!I~';I~~~r8p6J.~l:lt~ :::i ~~~ft;0~
29,800
'f~t;~:l~'!~~{f~~:I~~~~:'~13p;~1ip,:
29,800
~~:*l~~~}f~~
15,000
POLICE
i;J~~G[~~hf.lr~~F,; :Jl;~';b~~:ff
Squad #3
::::;:~J'1~~~~~Yi[4~~~~:~:~\:'.;~i~~~{:;~
e .;;:;~f4$~~~~':~'~;; It::r::''
Car
~~/,~OO
, 4
"52-j3b,O
""33;~6'6
72,100
';43;600,
60,400
';/:34;~6o i~.}i:ft :~';~il:~:~~o6;~Oi)~r(~""".. .:ti: ,;r,;'~~"f~~1~; ;~~~;~::lt;+ l. ",::~:'l (1)ji;tOb"~; ~:i:.. ';.,'
33,300 35,400 37,500 39,800 42,200
A~:~~ :~::~: ~ >.~~1~~r;ti!t~;f:~:~1?r:'~k.~f:~~~:':;~~~l~,~7~~~1!~~~~f'~:~~~i ~; .(~ "'(' ':~~:: r:i{t~'~~'~fi ::;i}~~~~:,::~':~~~~';~\":'~"'~Y!l:~;~4Q;~jOq~: :;:::
29,600
264,500
}B~40ci;:
t ~ :.'l:I';'~;l~rW~:~
it
306,500
'T[}~~~~~ ,,~
i';'lll,:::; 2b~ifut.lf:i ;r.;,:,:l;,i)f:; :'~r''';"1: :\,,;.,~ ,;,{;:'t;I~r:~:'~~~~I!ti~~;~it~i;liVl~~;~f,:,:' ~~^f.:;::~~r!i:t);~~:;:;:~i,ll~.I~:?~~~~~ \1*""~ i~~I,ti~~~~0r~~nllJ,d~~~ifu1;~~ti::~:!;;m~lillll~;l; '~;f,$;;I:lj~1~;r:l~!;~~:r:.: ;;';;:r~~fl.;~i~t;if~~~;J'ff;~;'~'f,;;'['1''/'!.:i ~'~Y}i;i~:; ;i "~~ i; ~,~~l,': ~i'; ~:~:l:~~!~~~:i'::'~:il'2~~6bd~)i'~,;:~~n ~:;;~~:l~~f,h~;;;,~:~,}p,~:lrt :\'r:f~ir,t~'i;!~~~:f:' 29110p
Mobile Data Computers 5 47,000 _ _ _ _ 63,200 73,200
55,500 8,700 45,900 9,000 31.100 72,200 82,500
50
39,300
9,600
41,100
9,600
83,500
9,600
224,700
37,500
80,300
228,200
950,000
162,900
9,300
75,600
367,800
13,500
213,200
88,300
136,400
9,000
63,400
63,200
95,100
27,800
57,500
708,700
26,300
8,700
155,400
14,200
SUBTOTAL
Page 2
REPL
EQUIPMENT IVEHICLES YRS 2007 2008 2009 2010 2011 2011 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
;~~~.:~~~:;
i~i:),:~"~;1~~l~l;N~.
18,100
49,500 673,500
P.W. STREETSrrRAFFIC
300 4x4 3/4 Ton Truck/Plow 10 33,600
~~J1,\.4'\\";;;";'4'~i;w.~!li<;:~)l~;;'Jlifllt~~~"~i;t$}'J_:il~\}lij;;'~~f:~;l.'i'm;;..:~~~:~J%;;"jjt"+iii~gp;~~i;l~l1;li,tli'~.'.tJ;\~
306 4x2 I Ton Dump Truck 12
~b~::~;J1fii'B~~~fptett. ~ ~ .:'!~ ,~~':11;,':;,:, :1~i:'f.;~f:f;,JL;:~:f~"" ':k:'~~~1~t~!;hl~;~~i;:r:;~;~~:t:~~Sj;flti7,~1ii~~t$~L~\:~j~i"~~~h,~;':' '~..~'i$16b(l~~~; rt ,(
312 Single Axle Dump Truck
:aif:;~~h~j!\ii;:~1ftip'1~~iL".", "
?,~~ .~~d~~I?u~p'T~~~ .. '
'~,l$ ;:Tande.in'Dump'tfuOk ' , , ;',~ '
316 Water Truck
ii~o~J:Fio~~~~t,~44~t ~{),,,:,:: ::~;' '.,,:...
322 Front End Loader 218,11
l~24 '. ;$~4:m~d~f.:r.';>:< \i ~ i: ~:;:' ,,:" .;~:\ :;,;:J' :~:~,~~':.:
325 Skid Loader
~~~~:t~1~~Ii~;}~~::>~\~,;i:~~~~!~~:~:~i~~ 'I~.
334 Striper
;#11~~y-iitt;f!" '];::~:;:.~: ':,f
344 Snow Blower
@:Jf.:Trlll:r;~r:;rF:', 't \;;,
Sign Machme
327,600 327,200 48,800 189,400 161,000 11,200 178,600 218,100 224,000 44,200
211500 - - - 28,900
- 56~ -
- 32,300
51
~:.~ >kJ}~
164,700
42,300
241100
SUBTOTAL
P.W. ENGINEERING
700 Engineering Van 10
P.W. ADMIN
Rado System 15
P.W. BLDG.lEQUIPMENl' SVCS.
703 1/2 TOil Truck 10
2008
Page 3
REPL
EQUIPMENT /VEHICLES YRS 2007
P.W. PARKS & FORESTRY
800 1/2 Ton Truck 10
iilJ~
804
2024
2026
2025
2023
~"
2022
202
35,400
'iil~tJ~i(t;/~;l:{;'~:{'; ,: J ?~~:~d~i$;;,:;i~i~i;q;;,irl:/':;'~'
42,600
H{r~7f~!:~/~:;: !::"'fi~~:4,1~~?'[.t~.~f!'~::"::1:
23.000
.~ ti~~;~1i~f#Ji~(!~:;t;;';Z;.;J.:X':' ;'/.
.,:.! :~;':li1~6Ql,~?:t?~ ,;.
143,800 35,400
2020
2019
2018
2017
2016
2015
26,400
~~
2014
') /?t/~'T,;:ifll ':{r~~M~,:~!~~;~5~:,:'i !T'~~";:';'i:. ,r 5
2013
25,700
20lZ
141,400
20ll
26,400
2010
,~~"l~}~f~:,J:>> Jll1fi~;' x
~,-~
174,200 32,200
2009
13,800
~ r"~:;~~;~~~ i~~;*jl;~'f~ !~. v. (
110,000
;': ::;';.' ':'''7n:"~':r:: ~\.'
41,400
~,~IXll: ':t:':: '$:;:"/:,
~2~ . ~!?P~ Mr<?~~~,>>,"'","r, ,. 1,
ill~6.;.'tlk~w'~A~1i!;1;;,o/;I"!i:r,%~.
832 Stump Culler
'~Sa"i;;~W:&U;d;~~[fN'~:t\.:;
~~~\\\,~i't';~?'i\)0f;'l!
SUBTOTAL 52,500 13,800
20
;~...
I 8l ~~ ." ~?I.~p... ~?~~~~
;8l~r;'J~t1rttt:wJ{1~
812 Aerial Lift
fii~~Ef,~~~iJ~:Y:, :;~T~rj;!?:;i-?:i:r:;:!~~~~t!
~ 1 ~,., T~ac.!?,~ "
'818.:;lTiU6k,ji~i
:,820 Trucksler
36,600
22,000 22,000 22,000 22,000 22,000 26,000 26,000 26,000
". ':. t:\1';~::'~~i1i;\11fJ!;1~;':~:i~l~;~ ;&?AO(i/ . "i4;'j~~/;~:11;17:.:e:~:~~"~tJ~{J~i7f1:;r,':!i:(~~:i''.!Y;:i: ~ !PI}1~L,' 4~(JQ9'
8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000
t;':i~~; tab;l ::1" ~\:~~~;!~t;:";';::i:~',,~;:: ,.,:,: ; ~T:rr~:W;:~~;;:~\:~{ ::';~\<'.:: ;~l;:}~it~;~~\:;;;J !!~~; ;t:;i:l;7l;;I~i];~;~:4:;lil#' :,:"::;
15,000
',", 'iJo;(llio;'r~;:lo:o6ir;.;}5r;:j'Q~tioO/':' ~f'~a:OM;Ki(~'0 ~a~60p~\1~0ifj6!ri65'.tii. :~;ao;(l615i!;;};::~6~~OO
12,000 14,000 14,000 14,000 14,000 14,000 16,000 16,000
R;:f~~;~pp.'~:.i:~;J~~~':r-;;;~i~:.f.;;i6.~PQ.,; F~;~ lPl~06~r) ~;F :':;jl, .~., J;f;', ;~'~;~p.6~~:ii,~.~Q.ti.:.,; '~ 'll~;:~!1~r;~"
23,400
103,900
21,500
25,700
8,000
15,000
rn;o'651~~~fs,ij~OQij;;li~:~i~ol~~a~;[M:5ij;::~;::~b:600~;1.~';'~~O@Xr
10,000 10,000 12,000 12,000 12,000 12,000
i! *K~,:AAQ%~~I{ti:'~:l~~fr:t\: ~;;~~~~~Q~~~JM~6~$p,~;;~,1;;:~i:f.;,~~illl !1>t~$CJ.~
82,100
10,600
20,300
8,000
~;t:!;~PI
8,000 8,000
):~l~W~fii~i?'?';~'~:.i
8,000
14,000
8.000
!~,OP~" ..', 1.1,OO"? q..,,,l4,~00 . .' I~,O~?
}l,!;J,~}~;: ~l:Ji;1; :1f'H' :(i;;bJ~4f'~5.1~~~\~
>> 8,~?? ,>> ., 8!~.9.~,,"." 8,000 ,.. r. 8!~~~." .. '" 8,000 8,000
::!'c~:;~~~$t~3,:~;:1 \;:Ii~l: :f.r-'ilif"J~:;~"i;:(;' . ');,' :);, ~:1 :'~~" ,
0,000
10,000
7
~l), :fm;r$~{;~;~~;ObQN;t, ~:'i,~o.oo'5,t{;. ";;~5.i)Od~:n:i~O;QOQ," l~i,7ji
.,,,,,,,,,,,.E"~~,i~~~1.~~,.~~~,~.~r~~c~~~r,, ".,,,. \" "~~~~O". ..... . ~!6t~.,... . 8,~40.~.~,~0? ,,,)~,OOO
;~~\:;;:~!pg~~titiM~~$;~@6~e'{~~;~;;~~!.;3;'~1\'~;;'~,;(6;~P9,?:'itliti irN.;;f;~i(;:r~ 'lt~;,~~Q.j:i:.~;.$9,Q, li ;tI'tf
Network Infrastructure Upgrad, 15 15,000 _
SUBTOTAL 78,140 67,140
16,700
89,000
80,600
74,500
68,000
105,700
74,500
66,000
83,500
68,500
164,900
68,500
56,640
ACTIVITY CENTER
Copier 7
~;IT~i~:I~~Ri1ti~f~(3tlit}<<';~F;tl;}r0~f~~i~: i~~~ft';:Ii}*{~Ur~;
SUBTOTAL
122,000
86,500
84,500
74,000
':""\1",1 ~:,:wr::':1"}:.}t:.~ifR.~: !':,I):~!iY;':)!;iC('
8,400
5,000
15,000
5,000
5,000
5.000
5,000
5,000
5,000
5.000
5,000
5.000
5.000
5.000
CABLE TV
Cameras/Control System
ARTS CENTER
Copier
5,000
5.000
5,000
5,000
5.000
5.000
5.000
5.000
5,000
8,300
14,900
52
12,100
Page 4
2026
2025
2024
1013
1011
1021
1020
2019
2018
1017
1016
1015
1014
2013
1012
101
1010
2009
2008
1007
REPL
YRS
EQUIPMENT /VEHICLES
36L500
:4&;000;
~~
.,/'
X'~.
~j~'5:~~lj~~;;~:;,~:,::,,;
1,9,-l?0
l'~, I,
31,600
$~o<()6,;
16,500
'~:i66::~;1~
~IIN<'-
"'~ I ".~ I
:~~,;,~(; ;:~.
28.800
10 20,500
Y . fu~:;~~1~~~~t~~;tiP::~~~~;~~3;~:;~~i: ~ ~:~ r~2]~\
20
T '" ".:':.i!, :i6<;
134,800
~;f j~~t~~~~~;~1~3~1(f6,~~~;~}~~f~~~~ }~t; ~r
23,5o.~ .,
:~?
14,~0?
14,200
~'~;'~?0:;:,:(;f,);;;6t~6.Q'(
10
,:-'1;.
5
HI
15
lIRA
4x4 3/4 Ton Truck
WATER
500 1.12 Ton Truck
;$0 i.~~4~4i~i4;ri~:rrtiel(t~.~:.
533 Backhoe
:54~>> Xit.:c~6(tis$Qr,::~' , ."
Jackhammer
\;'if,.~~;;BiIlifiiS~ie~'~~:~~r<+'::'
Copier
/". 'T~h;Ptl~fi~ $;;$tim" ~' .',
RadiO System
SUBTOTAL
41
19,100
,~:: :::;1;'4$,200.
:.-":
48,000
31,600
21,500
8,700
00
26,800
35,700
139,800
23,100
30,300
12,200
20,500
SEWER
508 3/4 Ton Utility Truck 10
~O?ii;~j~ffb~jwii~~f{~~~;/~Jj~:E;;;:;~V~~~j"i:o':f'" ;
530 Jet Vactor 20
;$,3~;':j~4jhlg;M~ihi~~";':;,:,J:~ 't'~: .':;"1J:;',\'~,O;' '"
534 Generator 25
i~.i$.~~&;~~t;;t~i:t~;~;l;;~\, ~~~:. 't+ : 12f
Billing System 7
!i'>~ei~p~~';;SY$tti1t" :.~: : '<Jf
Radio System 15
SUBTOTAL
REFUSE
901 Refuse Truck (RAP-R) 10
~Azrtji~~~iftM~~~:(~?~1t~!:~,"ii':i';Hi;'.
903 Refuse Truck (Rear-L) 10
A1 (l ~sw~~I(;}id1f\(U%fWi#o;e~~)'.!,:r:T5>: :::'::;:""~
Radio System 15 _ _ 59,700_
SUBTOTAL 176,700 101,600 59,701 239,900
45,200
.~ l:~~'
. ~?:~:~~?fO
:{: '~i-y )>>1 : ~ '.:
23,000
185,800
8,700
61,300
33,600
5,000
39,800
6,800
26,000
{,;.
275,200
136,600
64,500
204,800
2,500
41,400
52,500
125,600
2,500
53
88,100
2,500
12
STORM SEWER
Billing System
PAVILION
Ice Resurfacel
GENERAL FUND-VEffii 272,800 484,800 206,800 772,200 00 632,600 296,900 294,600 233,900 581,600 974,600 306,500
i~~RALlf.~M~~ ;n~1~Q l,I~;(~tt:i~ry4.~i;~rDl~tlfdlfqo.lg'''~'''=':QtX~:J!~~$~;4tf~::~;:;20~:78~T';';:ijJi@!;Yr~~1~~Qg;[~t;:~?ii;pA~lJ~j~~aOij:;l;;it;~rf,~Oo.;
HRA 00
:~Ati~&W'l0;~~'+~::i:~!~~r1';ll~f::' :;; "~tip~~'!~~~;~~~~9~~j!.~~~lW~:~{~~1~;ap6~;~W:;f;~(o~6)D ;'~'!ll~~~r.gQ6r:l~~~~~~Q~*;*~!~~'5~aoo ;\:~,j'!:f:j~bQ6~~r,i. :U~~;ciM!?~~1:~$i~a9~:n~~;~::i5~iJd~;j~;;;f~~'5~tiQQ't~~;t~i<5;ob()
ARTS CENTER 14,' 18,300
;wAjffifJ,1::~;~~;~~;~::'~:~;:;;i;t:; ~ lilJ~~61~~tt~~~:f~;;1}t~mr.(~llQP::~lf~~~:m :'ii~'?~o~~J~::~~~;I~yl![i~~;~~;:E!;~;:~~~;~i2t;~~~~~i:lioml:h:iilf~l~: Iii6Sn;~:!rr::~2:;;;;:'
SEWER 33,600 61,300 59,' 23,000 45,200
:iEriJSg~:;,i;~;~~,;"l:~~;::,;:!~I~:ltlfi!~:;r;;s,.w ''':1' ;',',,", Ii ;,'''[);, Q~.;).uu/!'.' .'&I.4UlJ':c ,'.'l''>,;;:f'.l' :;!r "1E,UJj:IUUk,.; W:l.. ' ~,:.! -, i~; Mi~oD:::i!::;:I:lj~r-;';:'~~;;J\~:i<,: 'i~'i8i~j;~~H~~i ':. r;:~~ ~~.~ it: ~~64:$OO?':/::13~160&V;l~':'~15:i()({r. +': "/> :.:
STORM SEWER
~P,AviLR5j;.l:. :'(:([~:~;\::
1016
1015
1014
1013
1011
1011
1010
1019
1018
1017
2016
1015
1014
257.400
1013
545,400
2012
532,400
Uf~~!;iQ'"
201
1010
2009
2008
1007
TOTALS
Page 5
,','this,GOO
500,600 523,300 341,700 683,500 1,107,300 524,400
!U~~,.' ~~:~;~~::~:~~::?:~i:~j:0r:i~~i;f~iij!ii;{~"!!~~'fii~~:~t[~~1~:t~~:~;:~~:Z~~~1;J:~~i~;:;;
5,000 5,000 5,000 5,000 5,000 5,000
i . < 1~{;} ;~i:;' < j~:~~~ir~~~,f ~:::~;;~:~;~~~h~~}~~~~;:~~~~:':it~r;~1!fri'~~rf.H~aob~t~~~~ ~t ~;i, f ,:~1.
31,600 23,000 64,500 184,600 294,300 170,800
GENERAL FUND TOTAL 315,340 87 .. 695,600 670,900 375,100 383,500 638,900 608,500 1,481,900 522,900 1,690,000
:itM iQ.r.w~~f~~:~::ir~1(1(~ni~;'ij:!;~1~~(~;:~~l!!~~~ll;il~ft;~Z~~fijil~!I~~;i1ittil~~i~j~!Jf.~lVC~aiii~Q;::;~:":;':,"~;~T: ~~lI/J!;~~. fIr.! ~ ~;$!fjH~J: m!!t!Jr.!",i~{~~!{~[;t;~1~~ :l~di6?i::i~!:;:~m.:;:'::1
CABLE TV FUND TOTAL 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
iAR'iS;b~i~;t~it~;'~P.~~t~~~f.:'iT1~1~,:t~$t~f~:~~;;.i~}~T(.~~:p,l~r~::I,~;'~~r~r,i(~~W1IX~!r;~J!lb~~~lf:l~:'::~i ;~:~?,;>;Il,~ft~;i:O~J.;.~~~;',:;~,' :,J. ;'i !:'1~ :;;llilil'i!;~mWt~~II:~'~ihl;':;f~~~,;r~~{l!~~)~$~~*~t;j~:.;~!~~~~~r;,~f~:~:',~ti~$~;1ia;~,6lij;1j\~:,;J~~~k~;:;fj: ~:;"':,11":':~~!1f. ,',.
UTILITY FUNDS TOTAL 99,000 4 62,900 149,800 225,400 219,000 33,600 88,100 179,100 17,400 449,700
i~~~~oof~~~~;~;;l~::'::;;'~~~i~~~i~::~~r
",
700,200
GENERAL FUND SALVAGE 25,000 25,000 30,000 30,000 30,000 35,000 35,000 35,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000
iNEi.Gii~E~jpii~%:::;;;~i~'E,~{~~:':;~**~J%:~~q;a~O!~4~i4~f~Ao1'x~i~~t~41~~${O:~~QQ}~]J:~~~i$:ciQl;',":':6iiO.6^OO: Y:;~~~I~o'b:jr';j~QK~~~A~~;ifi~~~bO~f0j~~';s~;fhlijf;~9ti~~~M~QQ;:.:i.d~o;<i6(r', ,,, 460;60~:~m'f4~~~~W::;~1" :1()i:7~(f(~i~ffi4{J~B~:i:o'jtjQii?:f:f4~4:~OO
1,424,900
873,100
411,100
551,300
537,100
1,144,700
581,800
1,680,900
701,600
677,500
607,500
605,500
815,700
763,500
411,500
1,325,500
387,740
916,940
419,340
ALL FUNDS ANNUAL TOTAL
20 YEAR AVERAGES: lOIBl /\.veral!.e
FIRE EQUIPMENT 1,786,900 89,300
;iI~APMi~~~ifiQ.N~~:~':.:':;,~;,:~:;r~%i.i(i.i}~~~~7iWfr~[Q,~
POLlCE EQUIPMENT 2,871,200 143,600
~poilii~~~t$Jf~1;iq,N11ff.:f~;11~.i.~~~lj~I~,~)(6p.~f~Tll~~~~~11
STREET EQUIPMENT 2,660,100 133,000
l~t~Gj7jQW:~~1f~i~Yri~~$~4~tJ:W~~~~I~~Q~iillt~)l:fjp~~
ENGINEERING EQUIPMENT 50,400 2,500
1P,q~~c;\.y~~$j:~~1$:i[dt{Ohl~~~;;!~;I;ir~~i;156:a6tt:~l}~f.Ft:;~ii8~Jij
CITY HALL ADMlNISTRATIO 91,700
:~~tiYKt~~(;f~ijft~}[@~t~ :~;:r~tJQ!~
PARKSIFORESTRY EQUIPME 49,700
GENERAL FUND VEHICLE/EQUIPMENT 8,419,400 421,000
~q~~.Qt~ii~i~viRMil~~~~~tj~8.4~b~Y,11~:i~t~&QJ
GENERAL FUND TOTAL 13,777,820 688,900
HRA
;QlJfLjr~V:f~~'~;(lik~
ARTS CENTER FUND
!;WA~lj~Jt~;p~
SEWER UTILITY FUND
~MP.#~j~~'ijJitiiii!i
STORM SEWER UTILI
:}>~ VJi.l0N:'~:OFll);fR:;:!!
54
138,500
2,770,800
UTILITY VEHICLESIEQUIPMENT