VI.6. 325 Blake Road Site Plan Review – Site B; Lindahl
December 7, 2021 City Council Report 2021-117
325 Blake Road Site B Site Plan Review
Proposed Action: Staff recommends the City Council adopt the following motions:
• Move to adopt Resolution 2021-080 approving the site plan for 325 Blake Road Site B,
subject to conditions.
Overview
The applicant, Alatus, LLC on behalf of the property owner the Minnehaha Creek Watershed
District (MCWD), requests site plan approval for Site B within the overall 325 Blake Road
redevelopment. Site B includes a 5-story, 112-unit for-sale senior cooperative building. Site B is
proposed on Lot 1, Block 2 of the newly create Mile 14 on Minnehaha Creek Addition. This site
plan design is subject to the applicant’s associated subdivision and rezoning applications
currently before the city. Based on the findings in this report, both the Planning & Zoning
Commission and staff recommend approval of the site plan for Site B subject to the conditions
detailed in the attached resolutions.
Primary Issues to Consider
• Background
• Site Plan Review
• Engineering Review
• Alternatives
Supporting Documents
• Site Location Map
• Resolution 2021-080
• Plans and Building Elevations
• Applicant’s Narrative
• Neighborhood Meeting Comments
_____________________
Jason Lindahl, AICP
City Planner
Financial Impact: $ N/A Budgeted: Y/N ____ Source: _____________
Related Documents (CIP, ERP, etc.): _________________________________________
Notes:
City Council Report 2021-117
Page 2
BACKGROUND
The attached Applicant’s Project Narrative provides a detailed summary of all the various
components of the 325 redevelopment project. Generally, Alatus intends to redevelop
approximately 12.75 acres of the nearly 17-acre site with the remaining property to be retained
by the MCWD for stormwater management and creek restoration. The applicant proposes to
redevelop their portion of the property into a mixed use, transit-oriented development near the
future Blake Road light rail transit station. The applicant proposes a two-phased redevelopment
consisting of approximately 833 housing units targeted to owners, renters (both affordable and
market rate) and seniors in both multiple unit buildings and townhome units. Features of the
development include an overall design focus to connect both residential and the public with the
Minnehaha Creek, a mix of housing types and affordability levels, a mix of residential and
commercial uses at transit supportive densities, an enhanced public realm intended to activate
public spaces and promote pedestrian and bicycle activity, sustainability components, enhance
stormwater management and shared parking.
Site B is proposed on Lot 1, Block 2 of the newly create Mile 14 on Minnehaha Creek Addition.
Site B is proposed to contain a 5-story, 112-unit for-sale senior cooperative building. This site
plan design is subject to the applicant’s associated subdivision and rezoning applications
currently before the city. Residents of this building will have use of the on-site shared amenities
in this building as well as access to the common areas throughout the site and the exercise
facility in Site C. Other notable features of Site B include:
• Central plaza in the southwest corner of the site.
• Rooftop solar energy system
• A minimum of 10% of the 184 parking spaces will have electric vehicle charging stations.
Review Process to Date. The review process for this project to date included both a concept
plan review with a neighborhood meeting and Environmental Assessment Worksheet (EAW).
The concept plan was reviewed by the Planning & Zoning Commission in August and the City
Council in September. Generally, both bodies and the public expressed support for the concept
plan, rezoning to mixed use and use of a Planned Unit Development (PUD).
The EAW is being reviewed concurrently with the land use approvals for this project. Based on
the review of the project, reasonably expected environmental impacts, and the findings of fact
and conclusions in the EAW, the City finds that the project does not have the potential for
significant environmental effects and that where there may be environmental impacts, they can
be addressed through the permitting process. The collection of land use applications
(subdivision, rezoning and PUD and individual site plans) are subject to approval of the EAW.
Neighborhood Meeting. As part of the associated rezoning application, the applicant was
required to hold a neighborhood meeting. This meeting took place on November 15, 2021 at
1002 – 2nd Street Northeast (43 Hoops). Comments from this meeting are attached as a
reference and detailed in the associated rezoning staff report.
Community Comment. Under state law, site plan review applications require a public hearing.
Accordingly, the City published notice of this request and public hearing in the Sun Sailor and
mailed notice directly to all residents and property owners within 500’ of the subject property.
That notice directed all interested parties to send questions or comments to City Planner Jason
Lindahl by mail, phone or email or to attend the public hearing where they could learn about the
City Council Report 2021-117
Page 3
request, ask questions and provide feedback. As of the writing of this report, the City had
received one email comment from Dale Johnson regarding this request (attached). Mr.
Johnson’s questions focused comparison between the Trilogy Blake Road Station and the 325
Blake Road projects, snow removal, and concerns over long term developer accountability.
During the public hearing, staff will provide an update on all public comments received prior to
the Planning & Zoning Commission meeting.
Planning & Zoning Commission Action. The Planning & Zoning Commission reviewed this
item (Planning Application 2021-22) during the November 23, 2021 regular meeting. During
that meeting, the Commission heard a summary presentation from City staff and held a public
hearing that produced no comments. After some general discussion, the Commission voted 7-0
to recommend the City Council approve the site plan for 325 Blake Road Development Site B.
SITE PLAN REVIEW FOR SITE B
Standards for reviewing site plan applications are detailed in Article IV of the City Code. This
section establishes the site plan review procedure and provides regulations pertaining to the
enforcement of site design standards. These procedures are established to promote high quality
development that ensures long-term stability of residential neighborhoods and enhance the built
and natural environments within the City as new development and redevelopment activities
occur. In this case, site plan review is required to review construction of a new building. Staff
has reviewed the proposed development against the zoning regulations for the Mixed Use
district. Staff’s review and findings for each of these regulations are detailed below.
Land Use & Zoning. The subject property is guided as Activity Center in the 2040
Comprehensive Plan. The Activity Centers future land use category surrounds and supports the
planned Blake Road and Shady Oak light rail stations along the Southwest LRT Green Line
Extension. These areas are planned to include moderate to high density mixed use development
designed to complement and enhance the existing development pattern in these areas and
support the public investment in transit. Densities in these areas will typically range from 20-60
units per acre, with 75-150 units per acre within ¼ mile of an LRT station platform. The subject
property is within the ¼ mile radius of the future Blake Road Station and results in a density of
84 units/acre.
To implement the Activity Center future land use classification, Alatus has filed a separate
application to rezone the subject property from I-2 General Industrial to Mixed Use. Staff finds
this rezoning request consistent with the Activity Center future land use category. A more
detailed review of the rezoning proposal can be found in the associated rezoning application. As
such, this site plan review for Site B evaluates the property against the zoning standards in the
Mixed Use district and any specific deviations granted through the planned unit development.
Staff recommends that a condition of site plan approval require the applicant to also receive
approval of the separate rezoning application.
Height. The applicant’s plans call for the height of the buildings Site B to exceed the Mixed Use
district standard. The Mixed Use district height standards for the Blake Road Station Area
allows 3-4 stories for residential structures and 5-6 stories for mixed use buildings. In this case,
Site B will have 5-stories or 1 story higher than allowed through the Mixed Use district. From
an overall design perspective, the greater height is necessary to achieve the transit supportive
densities called in the Activity Center future land use category of the 2040 Comprehensive Plan.
City Council Report 2021-117
Page 4
The increased height of this building is acceptable under the planned unit development as the
overall development site will include substantial open space, Outlot C is planned to include 3-
story townhouse units and Lot 2, Block 1 is planned to include 1-story commercial buildings.
Floor to Area Ratio (FAR). As designed, the Floor to Area Ratio (FAR) for site B meets the
standard of the Mixed Use district. Floor to Area Ratio (FAR) is a measurement of density
calculated by dividing the floor area of a building by the lot area of the parcel on which the
building is located. In the Blake Road Station Area, the FAR standard is a minimum of 2 and a
maximum of 3 for residential buildings and a minimum of 3 and a maximum of 5 for mixed use
buildings. In this case, the FAR for Site B is calculated to be 3.0 and conforms to the Mixed Use
district FAR standard for residential buildings.
Setbacks. As designed, the building on Site B meets the setback standards for the Mixed Use
district on only the front (west) side of the building. The table below compares the required and
proposed setbacks for Site B. It demonstrates the site meets the front (west) side setback along
Blake Road North. However, setbacks on the other 3 sides of the building exceed the Mixed
Use district standards. This design results in additional pedestrian and landscape area and is
acceptable under the overall planned unit development.
Setback Review for Blake Road Station – Site B
Setback Standard Proposed Status
Front (West) 15’ – 25’ 18.5’ Conforming
Side (North) 10’ 17.7’ +7.7 Non-Conforming
Side (South) 10’ 11.7’ +1.7 Non-Conforming
Rear (East) 10’ 16.3’ +6.3’ Non-Conforming
Off-Street Parking & Travel Demand Management. Overall, the applicant’s traffic impact
analysis study for the entire 325 Blake Road site confirms the City’s off-street parking
requirements and the number of parking stalls proposed by the developer are adequate. A
specific review of Site B finds the proposed off-street parking exceeds the requirements of the
Mixed Use district. The Mixed Use district require residential uses provide a minimum of 1 and
a maximum of 1.5 enclosed parking stalls per unit and 1 guest stall per 15 units. Using these
standards, the 112 unit building proposed for Site B is required to provide at least 120 and no
more than 176 off-street parking stalls. With 184 stalls showed on the plans, Site B exceeds the
off-street parking maximum standard of the Mixed Use district. This excess parking is
acceptable under the planned unit development.
Bicycle Parking. Site B exceeds the bicycle parking standards for the Mixed Use district. For
multifamily residential uses, the Mixed Use district requires 1 long-term space per 2 units and 1
short-term space per 20 units. With this standard, Site B must provide 56 long-term and 6
short-term spaces or a total of 62 bicycle parking spaces.
The plans for Site B show a total of 64 bicycle parking stalls. Fifty-eight long-term stalls are
shown in 3 separate bike parking rooms within the underground parking. And 6 short-term
stalls are shown on the south side of the building between the Gateway Plaza and the vehicle
drop-off area.
Shadow Study. The Mixed Use district requires a shadow study for all buildings four stories or
City Council Report 2021-117
Page 5
higher and the applicant has included this study with their plans. According to the Mixed Use
district standards, the shadow study must indicate the shadows cast at the shortest and longest
days of the year. Impacts of a shadow on the surrounding property may be a reason to lower
and/or adjust the location or height of buildings. Staff review of the shadow study finds little to
no impact on adjacent properties even with the additional height to 5-stories allowed through
the PUD.
Exterior. Exterior materials proposed for Site B do not meet the standards of the Mixed Use
district. The proposed exterior materials for the building on Site B are summarized in the table
below.
Site B Exterior Materials
Material North
Pedestrian Way
South
New Street
East
Pedestrian Way
West
Blake Road
Brick 0% 0% 0% 0%
Cast Stone 44% 42% 40% 48%
Metal Panel 26% 20% 28% 20%
Fiber Cement Panel-
Reveal System 30% 38% 32% 32%
Total 100% 100% 100% 100%
The Mixed Use district requires the primary exterior treatment of walls facing a public right-of–
way or parking lot on a structure shall be brick, cast concrete, stone, marble or other material
similar in appearance and durability. Regular or decorative concrete block, float finish stucco,
EIFS-type stucco, cementitious fiberboard, or wood clapboard may be used on the front façade
as a secondary treatment or trim but shall not be a primary exterior treatment of a wall facing a
public right-of-way. Staff interprets primary to be at least 65 percent and secondary to not
exceed 35 percent of the side of a building.
Since the Planning & Zoning Commission review, the applicant has revised the exterior
materials to decrease the amount of cast stone and increase the amount of metal and fiber
cement panels on the east elevation. The materials on the other sides of the building remain the
unchanged. Overall, the proposed deviations in materials are acceptable under the planned unit
development agreement.
Building Orientation. The building on Site B exceeds the building orientation standards of the
Mixed Use district. Buildings within the Mixed Use district must be oriented toward the
pedestrian by providing a direct link between each building and the pedestrian walking system,
with emphasis on directing people to a transit station. The applicant’s plans for Site B show the
building will have pedestrian connections to the City’s existing sidewalk system along both Blake
Road and the new spine road. Site B will also have direct access to both the east/west and
north/south pedestrian spines that provide an enhanced public realm and pedestrian and bicycle
access to the development, Minnehaha Creek, the Cedar Lake Regional Trail and the Blake Road
light rail transit station.
Façade. The building on Site B meets the façade articulation standards of the Mixed
Use district. These standards require the primary street side façade of a building shall not
consist of an unarticulated blank walls, flat front facades or an unbroken series of garage doors.
City Council Report 2021-117
Page 6
The front of a building shall be broken up into individual bays of a minimum of 25 feet and
maximum of 40 feet wide. In this case, the primary street side (south and west) facades of the
building are articulated through a combination of breaks in materials and balconies.
Transparency & Fenestration. The building on Site B meets the transparency & fenestration
standards of the Mixed Use district. The Mixed Use district requires at least 30 percent
fenestration for windows above the first floor for all sides that abut a public right-of-way. For
Site B, that applies to the south and west sides of the building. According to the applicant, the
south side of the building has 30 percent fenestration while the west side has 32 percent.
Sidewalks. Site B meets the sidewalk standards of the Mixed Use district. The Mixed Use
district requires a minimum 5-foot wide sidewalk along the frontage of all public streets and
within and along the frontage of all new development or redevelopment. As noted in the
Building Orientation section above, the applicant’s plans for Site B show an enhanced pedestrian
realm and sidewalks along the south and east sides of the building through the abutting
pedestrian spines.
Landscaping. The applicant’s plans have yet to demonstrate conformance with the Mixed Use
district’s landscape standards. This standard requires sites in excess of $4 million to provide
landscape improvements equal to 1 percent of the project’s value plus 0.10 of the value over $4
million. The applicant shall provide detailed landscape and planting plans demonstrating
compliance with these standards prior to execution of the planned unit development agreement.
Staff recommends a condition of approval require the applicant to provide a landscape and
pedestrian/streetscape letter of credit in a form acceptable to the City Attorney for 125% of the
value of all improvements. The City will hold the letter of credit until the plantings have
survived at least one growing season and the applicant has installed the pedestrian/streetscape
improvements.
Pedestrian/Streetscapes. The Mixed Use district requires pedestrian streetscape improvements
along all sidewalks. Pedestrian improvements of at least 25 percent of the landscaping budget
shall be included in the development. These improvements shall create a high quality pedestrian
experience through the provision of benches, planters, drinking fountains, waste containers,
median landscaping and the like. Pedestrian-scale light fixtures that shine downward on the
sidewalks and walkways shall be no greater than 12 feet in height and must be provided along all
sidewalks and walkways to provide ample lighting during nighttime hours for employees,
residents, and customers. The applicant’s plans appear to meet these standards. Staff
recommends a condition of approval require the applicant to provide more detailed streetscape
information demonstrating compliance with this standard prior to execution of the planned unit
development agreement.
Signs, Canopies and Awnings. The site plan for Site B does not include a sign plan. All signs
must be approved through a separate administrative permit subject to conformance with the
standards of the Mixed Use district and sign regulations contained in Article XXI - Signs.
Trash Enclosure. The applicant plans to store trash containers within the underground parking
garage. The applicant shall designate an on-site location for trash pickup. Trash pick-up shall
not occur within the public right-of-way.
City Council Report 2021-117
Page 7
Exterior Lighting. The applicant’s plans for Site B do not include exterior lighting or
photometric plans. Pedestrian-scale light fixtures that shine downward on the sidewalks and
walkways shall be no greater than 12 feet in height and must be provided along all sidewalks and
walkways to provide ample lighting during nighttime hours for employees, residents, and
customers. Staff recommends a condition of approval require the applicant submit and receive
approval of a detailed lighting and photometric plan for Site B prior to execution of the planned
unit development agreement. This plan shall include both pedestrian-scale street lights (no
greater than 12’ in height) as well as all building exterior lighting, light fixture spec sheets and
photometric data.
Stormwater Treatment. The applicant’s narrative includes stormwater treatment information that
indicates it exceeds both the City’s and Minnehaha Creek Watershed District’s (MCWD)
standards. According to the applicant, building B treatment is part of a more comprehensive
approach to stormwater developed in the PUD for the entire 325 Blake Road redevelopment.
Runoff from this site will be conveyed to the proposed 325 Blake Road regional stormwater
treatment facilities via a combination of proposed storm sewer, the Lake Street Diversion and
recirculation of pumped stormwater through the Cascade. The previous Cold Storage facility
had large impervious area of both rooftop and pavement that flowed untreated to Minnehaha
Creek. The proposed project reduces the amount of impervious surface and provides rate
control, treatment, and volume control through the use of permeable pavements, filtration,
infiltration, underground storage and cycling of pumped stormwater through the Cascade to
provide biofiltration, infiltration and storage. The pumped stormwater will flow through
Cascade in a series of pools and riffles and end in a waterfall into the upper cell of the MCWD
pond, then flow over a weir to the lower cell, where the water will be drawn up at the Pavilion,
screened of floatables and pumped through a forcemain to the west end of the Cascade to start
the cycle over. A condition of approval shall require the applicant’s stormwater design to
comply with all requirements of the City Engineer and the Minnehaha Creek Watershed District.
ENGINEERING REVIEW
The Engineering Department has reviewed the applicant’s plans for the overall 325 Blake Road
redevelopment and the specific site plan for Site B and offers the following comments listed
below.
• Addresses will be assigned once PIDs are provided.
• MCWD rules are as or more stringent than City of Hopkins. Meeting MCWD stormwater,
water quality, and construction permit requirements satisfies City of Hopkins requirements.
• All utilities will be private. Provide appropriate watermain valves to isolate private system
from public network.
• Currently plans show connecting to two 8” existing stubs. A 12” watermain is located in
Lake Street NE if water system modeling requires additional flow.
• A full engineering review will be completed once construction documents are provided.
ALTERNATIVES
1. Vote to approve the site plan application for 325 Blake Road Site B. By voting to
approve, the site plan application for Site B will be approved.
City Council Report 2021-117
Page 8
2. Vote to deny the site plan application for 325 Blake Road Site B. By voting to deny,
the site plan application for Site B will not be approved. Should the City Council consider
this option, it must also identify specific findings that support this alternative.
3. Continue for further information. If the City Council indicates that further information is
needed, the items should be continued.
Site Location Map for 325 Blake Road North
Subject Property
CITY OF HOPKINS
Hennepin County, Minnesota
RESOLUTION 2021-080
A RESOLUTION APPROVING THE SITE PLAN FOR
325 BLAKE ROAD SITE B, SUBJECT TO CONDITIONS
WHEREAS, the applicant, Alatus, LLC on behalf of the property owner the Minnehaha Creek
Watershed District (MCWD), initiated site plan review application for 325 Blake Road North Site B
within PID 19-117-21-14-0002, and
WHEREAS, this property is legally described as follows:
LOT 74 AND COM AT A PT IN THE E LINE OF MONK AVE DIST 14 48/100 FT S FROM ITS
INTERSEC WITH THE NWLY LINE OF LOT 97 TH N 14 48/100 FT TO SAID NWLY LINE
THEREOF TH NELY 845 FT ALONG SAID NWLY LINE TH S14 48/100 FT PAR WITH E LINE
OF MONK AVE TH SWLY 845 FT TO BEG EXROAD, AUDITOR'S SUBDIVISION NO. 239
HENNEPIN COUNTY, MINN
WHEREAS, the applicant has also requested to subdivide the property legally described above
to facilitate development on Site B and that plat proposes to assign Site B to Lot 1, Block 2, Mile 14 on
Minnehaha Creek Addition; and
WHEREAS, the procedural history of the application is as follows:
1. That the above stated application was initiated by the applicant on October 22, 2021; and,
2. That the Hopkins Planning & Zoning Commission, pursuant to published and mailed notice,
held a public hearing on the application and reviewed such application on November 23,
2021 and all persons present were given an opportunity to be heard; and,
3. That written comments and analysis of City staff were considered; and,
4. That the Hopkins Planning & Zoning Commission reviewed this application during their
November 23, 2021 meeting and recommended approval by the City Council, subject to
conditions; and
5. That the Hopkins City Council reviewed this application during their December 7, 2021
meeting and agreed with the findings of the Planning & Zoning Commission.
WHEREAS, staff recommended approval of the above stated application based on the findings
outlined in the staff report dated December 7, 2021.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Hopkins
hereby approves the site plan application for 325 Blake Road North Site B, subject to the conditions
listed below.
1. Approval of a negative declaration of need regarding an Environmental Impact Statement for
the 325 Blake Road development.
2. Approval of the associated rezoning application and execution of a Planned Unit
Development (PUD) Agreement in a form acceptable to the City Attorney.
3. Conformance with all applicable standards of the Mixed Use district and approved planned
unit development agreement.
4. Approval of the associated preliminary and final plat applications for Mile 14 on Minnehaha
Creek Addition and conformance with all conditions of approval.
5. Submission and approval of a detailed landscape and streetscape plan prior to execution of
the planned unit development agreement.
6. Provision of a landscape security equal to 1.5 times the cost of all plantings and streetscape
improvements in a form acceptable to the City Attorney prior to issuance of a building
permit. The City shall hold this security until all streetscape improvements have been
installed and all plantings have survived at least one full growing season.
7. The applicant shall designate an on-site location for trash pickup. Trash pick-up shall not
occur within the public right-of-way.
8. Submission and approval of exterior lighting and photometric plans prior to issuance of a
building permit. These plans shall cover the entire site and demonstrate downward directed
light fixtures, poles no higher than twenty (20) feet and light levels equal to or less than 1.0
lumens at any non-residential property line or 0.5 lumens at any residential property line.
9. Conformance with all requirements of the City Engineer.
10. Approval of all necessary permits from the Building, Engineering and Fire Departments.
11. Approval of the development by the Minnehaha Creek Watershed District and conforms with
all related conditions.
12. Payment of all applicable development fees including, but not limited to SAC, park
dedication and City Attorney fees.
Adopted by the City Council of the City of Hopkins this 7th day of December, 2021.
By: ________________________________
Kristi Halverson, Mayor Pro Tempore
ATTEST:
_______________________________
Amy Domeier, City Clerk
PROJECT TEAM325 BLAKE ROAD - SITE B (BUILDING B)SITE B - TITLE SHEETSHEET CONTENTS:Revisions:License #:Typed or printed name:Signature:Date Plotted: #SHEET NO.DATE COMMENTSThese drawings are forpreliminary coordinationonly and not to be usedfor regulatory approval orconstruction.21180GREGORY FAULKNER4019910/29/2021DALLAS · CHARLOTTE · CHICAGO · DENVER · NEW ORLEANS · NEW YORK · NEWPORT BEACH · ORLANDO · SCOTTSDALE · CHENNAI · HANOI ·LONDON · MONTEVIDEO · MEXICO CITY · TORONTOwww.humphreys.com
ARCHITECTS, L.P.HUMPHREYS PARTNERS
5339 ALPHA ROAD · SUITE 300 · DALLAS, TEXAS 75240(972) 701 - 9636 · (972) 701 - 9639 FAX
USER: irivoir XREF(s): 21180 TBLK-11X17.dwg x-Elevs-bldg II-Main.dwg X-BLDG-Podium-II.dwg X-B3-P.dwg 21180 TBLK-30X42_2.dwgSCALE: 384 DATE/TIME: Oct 28, 2021 - 3:03pmFILE: Z:\1.JOBS\2021\21180 - Hopkins\PROCESS\21180-COVER - SITE B.dwg LAYOUT: 30x42
I hereby certify that thisplan, specification, orreport was prepared byme or under my directsupervision and that I ama duly licensed architectunder the laws of theState of Minnesota.PUD SUBMITTAL10/29/2021310 South 4th Avenue Suite 7050Minneapolis, MN 55415 p: 612.332.7522325 BLAKE ROADMASTERPLANHOPKINS, MINNESOTAA101BNeighborhood Context MapSite LocationPROJECT TEAMPROJECT LOCATIONBUILDING METRICSDRAWING INDEX325 BLAKE ROAD, HOPKINS, MN
+908'CLVT80039898.2336 CULVERT80340896.00EDGE OF WATER80341896.37EDGE OF WATER80342894.22EDGE OF WATER80343896.00EDGE OF WATER80344896.02EDGE OF WATER80345896.16EDGE OF WATER80346896.06EDGE OF WATER80347895.92EDGE OF WATER80348896.16EDGE OF WATER80349896.00EDGE OF WATER80350895.02EDGE OF WATER80393897.32EDGE OF WATER80422911.06HYDRANT80423912.90ELEC METERTRAN80424913.09POWR TRANSTRAN80430913.80POWR TRANS80432914.03ELEC METERTRAN80434914.94POWR TRANSTRAN80458914.78POWR TRANS80461912.95HYDRANT6.5%RAMP U
P
6
.
5%RAMP
U
P
6
.
5%RAMP
DOWNEdge of waterPavillionBIKETRAIL5 storyMinnehahaWETLANDCEDAR
LAKEREGIONA
L
TRA
I
L
CreekRESTAURANTS-8,900 s.f.15 story765 s.f.BUILDING B5 story112 units1,246 s.f.SENIOR COOP5 story112 units891 s.f.PARKING - 7 levels-520 spacesPARKING - 5 levels- 277 spacesPODIUM PARKING - 2 levels- 184 spacesCLUBHOUSE &LEASING -2,300 s.f.CLUBHOUSE -3,500 s.f.ACCESSACCESSCLUBHOUSE - 8,000(total area)214 units175 units721 s.f.5 storyBuilding112 units33 units5 story3 story891 s.f1,790 s.f5 story1,246 s.funitsstoriesNET avgBuilding ABuilding C-TowerBuilding C-WrapBuilding DBuilding B112 units15 story5 story721 s.f765 s.f677 s.fRest./boat houseTOTALS1 story214 units175 units833 units5.9% RAMP U
P
5.9% RAMP UP2HR2HRVAN
2HR2HRFFE 919
F
F
E
9
1
6
.
5
BUILDING D187 units677 s.f.BUILDING CBUILDING AB
2A1A1A1 A1 A1 A1
B1 A1 B1
LEAS
ING
&CLUBHOUSE
2
,
3
0
0
s
.
f
.
5%
TRASH STOR.B3B3A1A+den A+den C1 C1B3B1
D1
d
n
.
dn.
d
n
.TOTAL UNITS PER BUILDING33 units 1,790 s.f.Town homes garages- 66 spacestownhomes3 storyPODIUM PARKING - 2 levels- 124 spaces5 story187 unitsTownhomes6 Sh
o
r
t
T
e
rmBik
e
P
a
r
k
6
S
h
o
r
t
T
e
rmBi
k
e
P
a
r
k6 Short TermBike Park11 Short TermBike Park4
S
h
o
r
t
T
e
rmBi
k
e
P
a
r
k
5
S
h
o
r
t
T
e
rmBi
k
e
P
a
r
k
4 Short TermBike Park27'-4"42'-8"25'-3"13'-3"10'47'-10
"62'-8
"80'-8"17'-10"17'-5"39'-5"17'-6"15'-6"22'7'-4
"32'-11
"
116'-
3
"
S
O
O
L
I
N
E
R
A
I
L
R
O
A
D440'-8
"TRASHSTORAGE/PICK UPTRASHSTORAGE/PICK UPTRASHSTORAGE/PICK UPTRASHSTORAGE/PICK UP26'283'-9
"255'-9"11'-9
"11'-9
"14'-7
"14'-7
"239'-11"406'
-10
"43'-10"45'-2"59'-10"182'-3"31'-10
"264'-6
"279'-7"8'-3
"7'-4
"20'-10"18'-6"10'-3"22'-8"8'-1"6'-4
"70'-10"366'-6"630'-2"566'-5
"350'SCALE: 1" = 40' - 0" 0' 40' 80' 160'(24"x36" SHEET)NSHEET CONTENTS:Revisions:License #:Typed or printed name:Signature:Date Plotted: #SHEET NO.DATE COMMENTSThese drawings are forpreliminary coordinationonly and not to be usedfor regulatory approval orconstruction.21180GREGORY FAULKNER4019912/1/2021DALLAS · CHARLOTTE · CHICAGO · DENVER · NEW ORLEANS · NEW YORK · NEWPORT BEACH · ORLANDO · SCOTTSDALE · CHENNAI · HANOI ·LONDON · MONTEVIDEO · MEXICO CITY · TORONTOwww.humphreys.com
ARCHITECTS, L.P.HUMPHREYS PARTNERS
5339 ALPHA ROAD · SUITE 300 · DALLAS, TEXAS 75240(972) 701 - 9636 · (972) 701 - 9639 FAX
USER: lwei XREF(s): 24x36 TBLK-FINAL.dwg 193805191_BASE_MCWD_012221-new2.dwg TH-1.dwg X-BLDG-Highrise-1.dwg X-S1-alt.dwg X-A1.dwg X-A2.dwg X-A3.dwg X-B1.dwg X-C1.dwg X-B2.DWG 24x36 TBLK-FINAL.dwg 30x42 TBLK-FINAL.dwg X-BLDG-Podium-II.dwg X-B3-P.dwg X-BLDG -WRAP-3.dwg X-BLDG-Podium-I.dwg 21180 TBLK-11X17.dwg 21180 TBLK-30X42_2.dwg S20503A-PPLAT.dwgSCALE: 192 DATE/TIME: Dec 01, 2021 - 2:17pmFILE: M:\2021\21180-Hopkins\01.5 CONCEPT\01.01 DRAWINGS\x-Site-16 - Standard\x-Site-17.dwg LAYOUT: A-201-30x42
I hereby certify that thisplan, specification, orreport was prepared byme or under my directsupervision and that I ama duly licensed architectunder the laws of theState of Minnesota.PUD SUBMITTAL12/1/2021310 South 4th Avenue Suite 7050Minneapolis, MN 55415 p: 612.332.7522325 BLAKE ROADMASTERPLANHOPKINS, MINNESOTAARQUITECTURAL SITEPLANA201
ADAADAADAADA
Parking - Bldg C520 spacesPodium -Bldg A124 spacesTownhomes garages66 spacesSurface parking39 spaces5 levels6 levelsParking -Bldg D277 spacesPodium -Bldg B184 spaces 2 levelsPodium restaurantsB
I
K
E
P
ARK
ING
1
2
4
SP
ACE
S
8
1
SP
AC
ES
ADAADA6.5%RAMP U
P
6
.
5%RAM
P
U
P
9
'
x
1
8
'
TY
P
5.9% RAMP U
P
5.9%
1
5
SPACES
/
F
L
. RAMP UPBIKE
RM
VAN
5
-
LEVE
L
,
TO
TA
L
2
7
7
SPACES
8
2
B
IKE
P
ARK
ING
REQU
IRED
5 storyLAKE
S
T
NECEDAR
LAKE
r
e
g
i
o
n
a
l
t
r
a
i
l
RESTAURANTS-8,900 s.f.15 story765 s.f.BUILDING B5 story112 units1,246 s.f.5 story112 units891 s.f.PARKING - 7 levels-520 spacesPARKING - 5 levels- 277 spacesPODIUM PARKING - 2 levels- 184 spacesACCESSACCESS214 units175 units721 s.f.5 storyBUILDING D187 units677 s.f.BUILDING CBUILDING ATOTALSBuildingspaces levelsPARKING SPACES1,253 spacesPavillion33 units1,790 s.f.Town homes garages- 66 spacestownhomes3 storyBIKE PARKING64 spaces
fi
r
s
t
l
e
ve
l
-
58
p
a
r
k
in
g
sp
a
c
e
s
TRASH MECHSPACEBELOW HALL 9´x 18´ typ.StoragePODIUM PARKING - 2 levels- 124 spaces43 spacesSCALE: 1" = 40' - 0" 0' 40' 80' 160'(24"x36" SHEET)SHEET CONTENTS:Revisions:License #:Typed or printed name:Signature:Date Plotted: #SHEET NO.DATE COMMENTSThese drawings are forpreliminary coordinationonly and not to be usedfor regulatory approval orconstruction.21180GREGORY FAULKNER4019912/1/2021DALLAS · CHARLOTTE · CHICAGO · DENVER · NEW ORLEANS · NEW YORK · NEWPORT BEACH · ORLANDO · SCOTTSDALE · CHENNAI · HANOI ·LONDON · MONTEVIDEO · MEXICO CITY · TORONTOwww.humphreys.com
ARCHITECTS, L.P.HUMPHREYS PARTNERS
5339 ALPHA ROAD · SUITE 300 · DALLAS, TEXAS 75240(972) 701 - 9636 · (972) 701 - 9639 FAX
USER: lwei XREF(s): 24x36 TBLK-FINAL.dwg 193805191_BASE_MCWD_012221-new2.dwg TH-1.dwg X-BLDG-Highrise-1.dwg X-S1-alt.dwg X-A1.dwg X-A2.dwg X-A3.dwg X-B1.dwg X-C1.dwg X-B2.DWG 24x36 TBLK-FINAL.dwg 30x42 TBLK-FINAL.dwg X-BLDG-Podium-II.dwg X-B3-P.dwg X-BLDG -WRAP-3.dwg X-BLDG-Podium-I.dwg 21180 TBLK-11X17.dwg 21180 TBLK-30X42_2.dwg S20503A-PPLAT.dwgSCALE: 192 DATE/TIME: Dec 01, 2021 - 2:20pmFILE: M:\2021\21180-Hopkins\01.5 CONCEPT\01.01 DRAWINGS\x-Site-16 - Standard\x-Site-17.dwg LAYOUT: A-202-30x42
I hereby certify that thisplan, specification, orreport was prepared byme or under my directsupervision and that I ama duly licensed architectunder the laws of theState of Minnesota.PUD SUBMITTAL12/1/2021310 South 4th Avenue Suite 7050Minneapolis, MN 55415 p: 612.332.7522325 BLAKE ROADMASTERPLANHOPKINS, MINNESOTANARQUITECTURAL SITEPLANA202
80422911.06HYDRANT80423912.90ELEC METERTRAN80424913.09POWR TRANSTRAN80430913.80POWR TRANS80432914.03ELEC METERTRAN80434914.94POWR TRANS6.5%RAMP U
P BUILDING B5 story112 units1,246 s.f.SENIOR COOPPODIUM PARKING - 2 levels- 184 spacesCLUBHOUSE &LEASING -2,300 s.f.ACCESSCLUBHOUSE - 8,000(total area)F
FE
9
1
9
F
FE
9
1
6
.
5
B2A1A1A1 A1
B1 CLUBHOUSE
2
,
3
0
0
s
.
f
.
TRASH STOR
.B3
A+
d
e
n A+
d
e
n C1
B3
B1
D1
6
S
h
o
r
t
T
e
rmBi
k
e
P
a
r
k6 Short TermBike Park4
S
h
o
r
t
T
e
rmBi
k
e
P
a
r
k
5
S
h
o
r
t
T
e
rmBi
k
e
P
a
r
k47'-10
"62'-8
"17'-10"17'-5"39'-5"17'-6"32'-11
"TRASHSTORAGE/PICK UPTRASHSTORAGE/PICK UP26'11'-9
"11'-9
"239'-11"406'
-10
"43'-10"45'-2"59'-10"182'-3"31'
-10
"264'-6
"279'-7"295'-1"8'-3
"7'-4
"20'-10"18'-6"10'-3"22'-8"6'
-4
"70'-10"SHEET CONTENTS:Revisions:License #:Typed or printed name:Signature:Date Plotted: #SHEET NO.DATE COMMENTSThese drawings are forpreliminary coordinationonly and not to be usedfor regulatory approval orconstruction.21180GREGORY FAULKNER4019911/12/2021DALLAS · CHARLOTTE · CHICAGO · DENVER · NEW ORLEANS · NEW YORK · NEWPORT BEACH · ORLANDO · SCOTTSDALE · CHENNAI · HANOI ·LONDON · MONTEVIDEO · MEXICO CITY · TORONTOwww.humphreys.com
ARCHITECTS, L.P.HUMPHREYS PARTNERS
5339 ALPHA ROAD · SUITE 300 · DALLAS, TEXAS 75240(972) 701 - 9636 · (972) 701 - 9639 FAX
USER: lwei XREF(s): 24x36 TBLK-FINAL.dwg 193805191_BASE_MCWD_012221-new2.dwg TH-1.dwg X-BLDG-Highrise.dwg X-S1-alt.dwg X-A1.dwg X-A2.dwg X-A3.dwg X-B1.dwg X-C1.dwg X-B2.DWG 24x36 TBLK-FINAL.dwg 30x42 TBLK-FINAL.dwg X-BLDG-Podium-II.dwg X-B3-P.dwg X-BLDG -WRAP-3.dwg X-BLDG-Podium-I.dwg 21180 TBLK-11X17.dwg 21180 TBLK-30X42_2.dwg S20503A-PPLAT.dwgSCALE: 192 DATE/TIME: Nov 12, 2021 - 2:06pmFILE: M:\2021\21180-Hopkins\01.5 CONCEPT\01.01 DRAWINGS\x-Site-16 - Standard\x-Site-17.dwg LAYOUT: A-201B-30x42
I hereby certify that thisplan, specification, orreport was prepared byme or under my directsupervision and that I ama duly licensed architectunder the laws of theState of Minnesota.PUD SUBMITTAL11/12/2021310 South 4th Avenue Suite 7050Minneapolis, MN 55415 p: 612.332.7522325 BLAKE ROADMASTERPLANHOPKINS, MINNESOTANSCALE: 1/32" = 1'-0" 0' 32' 64' 128'(24"x36" SHEET)ARQUITECTURAL SITEPLANA201BBLAKE ROADBLDG-BTOTAL BUILDING GROSS AREA: 175,500 S.F.LOT AREA: 1.34 ACRESFAR 3
6% RAMP DNBIKE PARKING20 SPACESRAMP UP12%24'-0"24'-0"
6% RAMP DN
24'-0"first level-99 parking spacesTOTAL- 184 parking spaces2nd level-85 parking spacesSTANDARD 9´x 18´24'-0"
24'-0"24'-0"24'-0"STANDARD 9´x 18´24'-0"6% RAMP UPSTORAGEBIKE PARKING21 SPACESBIKE PARKING17 SPACESMECH262'-9 1/4"179'-0"262'-9 1/4"179'-0"PODIUM PARKING -FirstLEVELPODIUM PARKING -SecondLEVELSCALE: 1/16" = 1'-0" 0' 16' 32' 64'(24"x36" SHEET)SHEET CONTENTS:Revisions:License #:Typed or printed name:Signature:Date Plotted: #SHEET NO.DATE COMMENTSThese drawings are forpreliminary coordinationonly and not to be usedfor regulatory approval orconstruction.21180GREGORY FAULKNER4019910/29/2021DALLAS · CHARLOTTE · CHICAGO · DENVER · NEW ORLEANS · NEW YORK ·
NEWPORT BEACH · ORLANDO · SCOTTSDALE · CHENNAI · HANOI ·LONDON · MONTEVIDEO · MEXICO CITY · TORONTOwww.humphreys.com
ARCHITECTS, L.P.
HUMPHREYS PARTNERS
5339 ALPHA ROAD · SUITE 300 · DALLAS, TEXAS 75240
(972) 701 - 9636 · (972) 701 - 9639 FAX
USER: mines XREF(s): 24x36 TBLK-FINAL.dwg X-BLDG-Podium-II.dwg X-B3-P.dwg 30x42 TBLK-FINAL.dwg x-Elevs-bldg II.dwg 21180 TBLK-30X42_2.dwg 21180 TBLK-11X17.dwgSCALE: 384 DATE/TIME: Oct 28, 2021 - 7:20pmFILE: Z:\1.JOBS\2021\21180 - Hopkins\PROCESS\BUILDINGS\PODIUM\21180-A420.dwg LAYOUT: A420 30x42
I hereby certify that thisplan, specification, orreport was prepared byme or under my directsupervision and that I ama duly licensed architectunder the laws of theState of Minnesota.PUD SUBMITTAL10/29/2021310 South 4th Avenue Suite 7050Minneapolis, MN 55415 p: 612.332.7522325 BLAKE ROADMASTERPLANHOPKINS, MINNESOTABUILDING B - BUILDING PLANSA420
B31,140 s.f.B31,140 s.f.B51,280 s.f.B21120 s.f.B41180 s.f.B81,470 s.f.B111600 s.f.B111600 s.f.B101515 s.f.B61300 s.f.B71400 s.f.B121700 s.f.A21060 s.f.B11070 s.f.B9A21060 s.f.1,500 s.f.46'-9"104'-1"CourtyardTRASHA1840 s.f.B81,470 s.f.B21120 s.f.B21120 s.f.B21120 s.f.B61300 s.f.A0800 s.f.B11070 s.f.MECH.MECH.MECH.TEL.264'-6"182'-3"B31,140 s.f.B51,280 s.f.B21120 s.f.B41180 s.f.B111600 s.f.B111600 s.f.B71400 s.f.A21060 s.f.B11070 s.f.A21060 s.f.104'-1"CourtyardA1840 s.f.B21120 s.f.rampdn-12%B101515 s.f.B91,500 s.f.B61300 s.f.TRASH50'-9"B11070 s.f.B61300 s.f.MECH.TEL.MECH.LOUNGEMAIL/PACKAGEAMENITIES5,400 S.F.(PARTIALLY DOUBLE VOLUME)DROP OFFFFE 919FFE 916.5264'-6"182'-3"B31,140 s.f.B31,140 s.f.B51,280 s.f.B21120 s.f.B41180 s.f.B81,470 s.f.B111600 s.f.B111600 s.f.B101515 s.f.B61300 s.f.B71400 s.f.A21060 s.f.B11070 s.f.B9A21060 s.f.1,500 s.f.46'-9"104'-1"CourtyardTRASHA1840 s.f.B21120 s.f.B21120 s.f.B21120 s.f.B61300 s.f.A0800 s.f.B11070 s.f.MECH.MECH.MECH.TEL.AMENITIESBELOWB121700 s.f.264'-6"182'-3"SCALE: 1/16" = 1'-0" 0' 16' 32' 64'(24"x36" SHEET)Ground floor planTypical floor plan2nd floor planSHEET CONTENTS:Revisions:License #:Typed or printed name:Signature:Date Plotted: #SHEET NO.DATE COMMENTSThese drawings are forpreliminary coordinationonly and not to be usedfor regulatory approval orconstruction.21180GREGORY FAULKNER4019910/29/2021DALLAS · CHARLOTTE · CHICAGO · DENVER · NEW ORLEANS · NEW YORK ·
NEWPORT BEACH · ORLANDO · SCOTTSDALE · CHENNAI · HANOI ·LONDON · MONTEVIDEO · MEXICO CITY · TORONTOwww.humphreys.com
ARCHITECTS, L.P.
HUMPHREYS PARTNERS
5339 ALPHA ROAD · SUITE 300 · DALLAS, TEXAS 75240
(972) 701 - 9636 · (972) 701 - 9639 FAX
USER: mines XREF(s): 24x36 TBLK-FINAL.dwg X-BLDG-Podium-II.dwg X-B3-P.dwg 30x42 TBLK-FINAL.dwg x-Elevs-bldg II.dwg 21180 TBLK-30X42_2.dwg 21180 TBLK-11X17.dwgSCALE: 384 DATE/TIME: Oct 28, 2021 - 7:21pmFILE: Z:\1.JOBS\2021\21180 - Hopkins\PROCESS\BUILDINGS\PODIUM\21180-A420.dwg LAYOUT: A421 30x42
I hereby certify that thisplan, specification, orreport was prepared byme or under my directsupervision and that I ama duly licensed architectunder the laws of theState of Minnesota.PUD SUBMITTAL10/29/2021310 South 4th Avenue Suite 7050Minneapolis, MN 55415 p: 612.332.7522325 BLAKE ROADMASTERPLANHOPKINS, MINNESOTABUILDING B - BUILDING PLANSA421
12/1/2021
12/1/2021
12/1/2021
12/1/2021
METAL PANEL
1
325 Blake Road
Building B Narrative
10-29-2021
PROJECT OVERVIEW
Building B is a 5-story, 112-unit for-sale senior co-op development with 184 underground parking stalls.
The project is at the northeast corner of the Blake Road and 2nd Street NE.
BUILDING DESIGN
The 325 Blake Road project creates an exciting, high density, mixed-use development oriented towards
pedestrians, bicyclists, and public transportation. It offers not only its residents but the neighborhood
and the regional network in its entirety, a place to live, work and play.
Building B offers two levels of mostly below grade podium parking and five stories of wood frame
residential construction above those.
Architecturally, the project proposes a contemporary but timeless architecture. Designed for human
scale and with the pedestrian at top of mind, the Project offers a distinct base on all buildings including
ground floor access to many of its units, and a clear top level with distinct materials and color palette.
While all buildings follow this format, each one has its own character and individually unique
characteristics. The design looks for individuality without sacrificing being contextual within the overall
development project.
All dwelling units will support the latest in technology while striving to provide a sustainable living
experience. Housing units, common areas, and amenities incorporate high efficiency and Wi-Fi
controlled appliances, low-flow water fixtures, low-VOC paints, building-wide recycling practices and
solar panels for electricity generation. Acoustical performance between units will exceed Building Code
requirements for resident comfort and privacy. Select buildings within the Project will also seek LEED
Certification and commissioning.
Exterior materials used are a combination of brick, cast stone, metal and glazing to ensure durability and
quality for a generational development asset. Conceptually, lower levels use a combination of brick and
cast stone as primary materials at the base, corners, building entries and garage entries. Metal, in
various forms, is used mostly on upper levels and above the pedestrian scale that will be encountered.
Intermediate levels are a combination of these two materials mentioned plus different cementitious
panel solutions with multiple façade aesthetic options. An enhanced and energy efficient HVAC variable
refrigerant flow (VRF) system ensures that building facades are uninterrupted, rather than the common
solution that presents louvers into the façade design for a sometimes-unsightly exterior aesthetic.
STREETSCAPE AND PUBLIC REALM
The development team has approached this site as a unique opportunity to create a water-centric
development that capitalizes on its’ adjacency to Minnehaha Creek, the Blake Road LRT station, and the
Cedar Lake Regional Trail. The proposed 325 Blake Road development project will transform the former
cold storage site with a rich variety of green open spaces and streetscape design improvements.
Proposed open spaces and streetscapes are designed to not only provide safe and convenient
connections to the creek, regional trail, and LRT station, but to create a rich outdoor environment for
future residents, visitors, and community members.
2
Building B is surrounded by rich pedestrian oriented pedestrian ways. The East/West spine on the north
side of the building, the North/South spine on the east side of the building, the Gateway plaza and spine
road streetscape on the south side and the Blake Road streetscape on the west side.
Gateway Plaza and Cascade
Central to the open space network are a series of plazas, water features, stormwater treatment
features, and landscaped gathering areas, reaching from the project entry at Blake Road to the Central
Plaza located next to future restaurants and the Minnehaha Creek Greenway. The primary vehicular and
pedestrian entry at Blake Road features gateway plazas on either side of the entry road. These will
include water features, special paving, lighting, and seating areas. The central water cascade feature,
located adjacent to the entry road/parkway, provides a water channel designed to manage stormwater.
Stormwater will be pumped from the future MCWD stormwater pond to the west end of the water
cascade feature, providing the ability to create a water feature that not only provides an amenity for the
development, but also filters and delivers cleaner stormwater back into the pond. It is designed to
provide places for people to gather and stroll along the waterway. Native plant materials, special paving
and lighting, site furnishings, and native stone elements will be incorporated to create an environment
that will reconnect people to local and regional landscape experiences.
North/South Pedestrian Spine
The site is designed to provide a pedestrian walkway between Buildings A and B, and the townhomes.
Building B and the townhomes will connect to a central walkway with front stoops/walks from individual
residential units. The central walkway, running north/south, is designed to include permeable pavers
and stormwater treatment planting areas to provide this area with stormwater infiltration. Native
plantings include shade and ornamental trees, shrubs, and groundcovers. Pedestrian-scaled site lighting
and wayfinding will provide a safe and convenient pedestrian environment.
East/West Pedestrian Spine and Courtyard
An east/west pedestrian walkway is located between Buildings A and B and the townhomes, connecting
people from Blake Road to the Minnehaha Creek Greenway. The corridor is anchored at the west end
with a small plaza and public art to invite people off Blake Road. At the center of the corridor a
courtyard is provided, featuring a small gathering area with a lawn area and patio with pergola.
Buildings A and B, as well as the townhomes will connect to the central walkway with front stoops/walks
from individual residential units. The walkway, running east/west, is designed to include permeable
pavers and stormwater treatment planting areas to provide stormwater infiltration. Cutouts for site
furnishings/seating are provided along the central walkway. Native plantings include shade and
ornamental trees, shrubs, and groundcovers. Pedestrian-scaled site lighting and wayfinding will provide
a safe and convenient pedestrian environment.
Streetscapes
The primary roadway through the site is designed as a tree-lined parkway, delivering people from Blake
Road through the site to development parcels, parking garages, open spaces, the Minnehaha Creek
Greenway, and eventually connecting to Lake Street. The parkway will include turf boulevards, street
tree plantings, pedestrian-scaled street lighting, site furnishings, and wayfinding signage. On-street
parallel parking and detached sidewalks will provide a safe environment for pedestrians. Raised
benches are designed to provide traffic calming measures and safe pedestrian crossings where
pedestrian spines cross the parkway. ADA compliant concrete sidewalks will be provided for pedestrian
movement throughout the site, providing connections to open spaces and trails for everyone.
3
DEVELOPMENT PHASING
Commencement of construction of the various phases is dependent upon market conditions now and
into the future as well as other external factors relating to the various entities and stakeholders that will
be working through the redevelopment effort for the site located at 325 Blake Road. Subject to those
conditions, the development team currently anticipates the following construction start date for
Building B:
Q2 2022
CITY APPLICATIONS/APPROVALS
• Site Plan Approval for Building B
PROPOSED DEVIATIONS FROM MIXED USE DISTRICT STANDARDS
Strict adherence to the Mixed-Use District standards and requirements is not required in this case to
satisfy the intent of the City’s planned unit development provisions and the proposed deviations from
those standards will not prejudice the health, safety, or welfare of the residents of the development, the
surrounding area, or the city as a whole. The proposed deviations from Mixed Use District standards for
the Blake Road Station project are as follows:
1. Building B exceeds the parking maximum. It currently has 184 spaces for 113 units.
2. The proposed development exceeds the maximum block length of 600 feet, however, multiple
pedestrian connectors are provided within each block.
SUPPORT FOR PROPOSED DEVIATIONS
The applicant believes the development, as proposed with deviations from zoning code ordinances, is a
high-quality proposal for the City of Hopkins and aligns with overall Comprehensive Plan goals. To
ensure a high-quality development, the applicant is proposing the following enhancements in support of
the proposed deviations:
Site Access Improvements
A new network of publicly accessible streets and pedestrian corridors divides the site into pedestrian-
scaled, walkable quadrants and connects the surrounding context to the Blake Road LRT station,
Minnehaha Creek, and the Cedar Lake Regional Trail. The new tree-lined parkway becomes the crucial
spine from which stems primary building entries, active uses, and a series of common open spaces. The
East/West and North/South pedestrian spines further break down proposed development sites,
improving pedestrian circulation and creating a tree-lined pedestrian ways and walk-up residential units.
As described under the ‘Streetscape and Public Realm’ section, the project vision includes extensive
pedestrian improvements for the area, including sidewalk connections through the site that do not exist
today. Building setbacks provide comfortable buffer zones between street right-of-way and the building
edges. The proposed setbacks offer a balance of enough distance to create green zones without
compromising the more urban goals of transit-oriented development. This balance of ample though not
excessive setbacks prioritizes pedestrians and human activity in and around the site.
Exceeding Stormwater Standards
The applicant is exceeding the Minnehaha Creek Watershed District and City of Hopkins’ minimum
standards for stormwater treatment. Building B contributes to the overall stormwater management
approach described in the PUD application. Runoff from this site will be conveyed to the proposed 325
4
Blake Road regional stormwater treatment facilities via a combination of proposed storm sewer, the
Lake Street Diversion and recirculation of pumped stormwater through the Cascade. The previous Cold
Storage facility had large impervious area of both rooftop and pavement that flowed untreated to
Minnehaha Creek. The proposed project reduces the amount of impervious surface and provides rate
control, treatment, and volume control through the use of permeable pavements, filtration, infiltration,
underground storage and cycling of pumped stormwater through the Cascade to provide biofiltration,
infiltration and storage. The pumped stormwater will flow through Cascade in a series of pools and
riffles and end in a waterfall into the upper cell of the MCWD pond, then flow over a weir to the lower
cell, where the water will be drawn up at the Pavilion, screened of floatables and pumped through a
forcemain to the west end of the Cascade to start the cycle over. The pump will have a base flow to
keep water flowing through the Cascade continuously, then will be throttled up during stormwater
events to engage the upper portions of the Cascade storage and overflow into the underground
stormwater chambers under the skating plaza. This pumped system allows for water level control and
continuous infiltration that is not feasible with a traditional gravity system.
This is a substantial improvement from the Cold Storage site condition that was primarily impervious
surface with stormwater that ran off without any treatment or attenuation. A total existing (previous)
assumed impervious for the site was 10.57 acres, the proposed impervious is 9.75 acres, a reduction of
0.82 acres.
The required infiltration of the 1-inch event requires volume control of 0.8125 acre-ft. The infiltration
systems as proposed provide 0.689 acre-ft of volume at a conservative 0.45 in/hr infiltration rate. The
soil infiltration rates will be confirmed and adjusted to actual rates using Double Ring Infiltrometer
testing. The remaining 0.124 acre-ft will come from the Cascade and the pumping system, the proposed
design displaces approximately 12,000 cf of treatment volume = 0.275 acre-ft.
MCWD requires proposed runoff rates to be equal to or less than the existing condition. Total proposed
site runoff rates will be reduced significantly, by approximately 25% in all rainfall events from the
existing condition. The system also takes on offsite drainage from the Cedar Lake Trail that would
otherwise go untreated.
The majority of the new/reconstructed site area will be dedicated to roof drainage, which is assumed
cleaner than pavement runoff. This will further reduce pollutant loadings discharged from the site.
Enhanced Landscaping
The deviations in setbacks offer yards that are both deep enough for landscaping and green space and
reasonable for creating a "street wall" for the pedestrian experience. The deviations also help to
implement a comprehensive plan goal of creating a ‘positive relationship to the street’ by proposing
appropriate setbacks for the residential density guided by the 2040 Comprehensive Plan (75-150 units
per acre within ¼ mile of an LRT station platform).
High Quality Common Open Spaces
As previously mentioned under ‘Streetscape and Public Realm,’ the master plan includes a series of high
quality common open spaces for residents, visitors, and community members to gather, recreate, and
connect to nature. They also provide important opportunities to reduce urban heat island effect and
stormwater runoff, while improving water and air quality. The pedestrian ways surrounding building B
offer important connections to nearby amenities and pleasant green spaces for respite.
5
Multi-Modal Opportunities
With immediate access to the Minnehaha Creek Greenway, Cedar Lake Trail, and Blake Road LRT
station, proposed pedestrian and bike facilities will promote the use of multiple modes of transportation
for residents and patrons to and from the project site. The proposed project exceeds the bike parking
requirements for Mixed-Use Districts and includes additional bike facilities such as bike pump/repair
stations, trail maps, seating for trail users and wayfinding signage.
Support of Comprehensive Plan Goals
The project supports and further advances a number of goals outlined in the City’s 2040 Cultivate
Hopkins Plan. See summary of these goals below within the PUD statement section.
From:Chris Osmundson
To:Jason Lindahl
Cc:Robert C. Lux; Chris Osmundson
Subject:[EXTERNAL] 325 Blake Road N - Nov 15th Engagement Summary
Date:Wednesday, November 17, 2021 2:57:04 PM
Attachments:image001.png
Importance:High
“A neighborhood community engagement session was hosted by Alatus LLC at 6:30pm on Monday,
November 15th, 2021 at 43 Hoops, a basketball training facility just across Blake Road N from the
proposed redevelopment site at 325 Blake Road. Members of Alatus LLC, the Minnehaha Creek
Watershed District, and the City of Hopkins were in attendance. The meeting consisted of a
presentation by Bob Lux and Chris Osmundson with Alatus, and Gabe Sherman with Minnehaha
Creek Watershed District, about the proposed master development plan, focusing on both high level
and detailed components of the proposed land use applications and integration with Minnehaha
Creek, respectively. Materials presented via a digital Power Point presentation included the latest
images and schematic design concepts from Alatus’s land use application, in addition to the most
recent engineered drawings from Minnehaha Creek Watershed District. Further discussion was also
had regarding the municipal process that the development is working through, overall site timing,
and forthcoming engagement opportunities even after land use approvals have been proposed to be
received. After the approximately 40 minute presentation, members of the development team and
Minnehaha Creek Watershed District answered specific questions with attendees on a one-on-one
basis. Based on the sign-in sheets provided by Alatus at the entry to the facility, 27 people were
signed in and were in attendance, in addition to those from the development team, Minnehaha
Creek Watershed District, and the City of Hopkins.
Questions asked included: (1) questions related to the multi-family affordable housing rental rent
and income limitations in the proposed low-income housing tax credit building and how long those
would be in place; (2) questions about how a joint health club / fitness facility would practically work
and whether or not certain buildings would have certain amenities while others would not; (3)
questions about the how senior co-ops are different and the same from/as a condominium
ownership model and what pricing the senior co-op units would range in price from; (4) various
questions about bike and pedestrian infrastructure and connections to existing infrastructure and
under-construction infrastructure; (5) questions related to parking availability and sufficiency for
guests, retail, and parkland/watershed district visitors; (6) questions about the proposed stories and
floorplans associated with the for-sale townhomes; (7) questions about integration of trash,
recycling, and composting services for all residential units, retail uses, and public parkland and public
spaces and how the owner(s) would ensure cleanliness for the whole space; (8) questions about the
timing and functionality of the solar arrays on each building and when those would be active and
generating electricity for the given residential facilities. While this list is not all inclusive, it is an
accurate representation of the questions that the development team members fielded after the
presentation.
Attendees had the opportunity to pick-up a take-away handout that contained a QR code that could
be scanned to link them directly to the 325blakeroadn.com website that is maintained by Alatus
LLC. Additionally, the presentation was recorded and the presentation, presentation materials, and
other items will be made available on the website for questions and comments and further
feedback. Invitations to the meeting were distributed via municipal notice provisions in addition to
social media postings and general word of mouth.”
Chris Osmundson
Alatus, LLC – Director of Development
(O): 612.455.0712 | (C): 612.201.8487
cbosmundson@alatusllc.com
Stay Connected: Alatus LLC | Facebook | LinkedIn
This e-mail message is intended only for the personal use of the recipient(s) names above. This message may be attorney-client
communication and as such privileged and confidential. If you are not an intended recipient, you may not review, copy or distribute this
message. If you have received this communication in error, please notify us immediately by e-mail and delete the original message.
Thank you.
From:Dale Johnson
To:Jason Lindahl; Dale Johnson
Subject:[EXTERNAL] Public Hearing
Date:Friday, November 12, 2021 5:36:39 PM
Dear Mr. Lindahl,
I got your letter regarding the meeting on 11/23.
I have also received a letter from a developer named Alatus.
Is this the same company that is developing or wants to develop the property in the NW corner of Blake
and Excelsior by the Goodwill?
I was at a council meeting several weeks ago when that project was being presented. They brought in an
upper management person from out of town who started out by mentioning he was a minority. That starts
the process off on the wrong foot for me. I don't care if he is from Mars but if he and his company feel that
is important it tells me they are playing the ethiscity card. Maybe they get better financial deals from the
feds, the state or Hopkins or the county. I don't know.
A question that I did not ask was where does the snow go when the roads get plowed. If this is a private
project, I presume they will incur the cost to plow the streets in their development, not the city! Have
they really set aside a realistic sized area for the snow? The same questions need to be asked about this
new development.
Are there time tables in the agreements? Can the person developing the property just sell out when it is
finished and therefore have no concern as to the problems that might come up? Any person who has been
educated on city planning must be aware that developers build and split.
I hope you can educate me so I can have answers before your meeting and the one next Tuesday put on by
Alatus.
Sincerely,
Lion Dale Johnson