Loading...
VI.2. Theater Site Redevelopment; Elverum CITY OF HOPKINS Memorandum To: Honorable Mayor and City Council Mike Mornson, City Manager From: Kersten Elverum, Director of Planning & Development Date: April 19, 2022 Subject: Theater Site Redevelopment _____________________________________________________________________ PURPOSE Enclave Companies will update the City Council on their plans for the redevelopment of the Theater site on Mainstreet. No action is necessary by the City Council for this item but Enclave is asking for feedback on their development proposal around the design and willingness of the City to provide financial assistance and dedicated parking spaces in the adjacent public ramp. INFORMATION Since the Hopkins Cinema 6 closed as a result of the Covid epidemic, there have been discussions about a redevelopment of the site into a mixed-use, retail and apartment development first by The Beard Group, and then by Enclave Companies. As the attached narrative describes, the site and current market conditions pose challenges to making a development feasible. The developer will present the latest concept drawings and site plan, discuss a proposed parking solution that utilizes the City-owned parking ramp and describe the financial gap in their project proforma. The following are considerations for each of these issues: Site Plan The developer has revisited the architecture of the building since they submitted an application for land use approvals in December 2021 to reflect feedback from the City Council. That feedback included moving the rooftop deck to the east side of the building to provide a better transition from the one-story commercial building (30 Bales) and using changes in architecture and materials to break the building into different segments, rather than an overall design and appearance as one large building. Because the land use applications were put on hold by the developer, a full zoning review has not been conducted. Comments on the site plan and renderings will help inform additional changes to the concept. Parking Commitment in the Municipal Ramp Enclave is offering to pay for 45 parking spaces at a rate of $50 per space/month. Currently a parking permit is $42/month with no overnight parking allowed, with two exceptions: residents living on Mainstreet between 8th and 11th and residents of Gallery Flats apartments that can purchase permits through the management company. Those permits are allowed through a parking agreement that runs through 2024 but can be terminated by either party with 120-day notice. The Gallery Flats agreement allows for the nonexclusive right to use 36 parking spaces in the ramp at a cost of $24,000 per year plus the pro rata share of property taxes for the 36 spaces. Gallery Flats must also carry comprehensive general public liability insurance covering their use of the ramp. This agreement with Gallery Flats was entered into as a way to bridge the parking demand from today until the Green Line Extension is operational, when it is believed fewer residents will own automobiles. The main difference in these two arrangements would be the long-term commitment that Enclave is requesting to lock-in the private residential use for up to 20 years. They have indicated that a long-term commitment is necessary for project financing. There are 380 total spaces in the municipal ramp that was built to support commercial uses in the downtown. It is currently underutilized most of the time but does serve as the parking for the Hopkins Center for the Arts, the Wells Fargo building and event/peak hour parking for the downtown. It is unclear what impact the Bear Cave Brewing business, and other new businesses, will have on the ramp going forward. Public Financial Assistance The developer has not completed a formal application for public financial assistance/tax increment financing, but the project proforma has been reviewed by the City’s financial advisor, Stacie Kvilvang from Ehler’s. A memo regarding the financial analysis is attached and Stacie Kvilvang will be at the City Council meeting to answer any questions the City Council may have regarding the need for assistance. To date, staff and our advisor have attempted to limit possible financial assistance to a one-time forgivable loan for demolition while the developer has indicated a greater need for financial assistance for the first several years of the project when returns are not adequate. FUTURE ACTION If the City Council is supportive of the project as outlined by Enclave, and the associated requests for assistance, staff will begin working on refining the financial assistance request and parking ramp agreement terms with the City Attorney and Financial Advisor, as well as the land use approval applications necessary for the project to move forward including site plan, conditional use permit and planned unit development reviews. This will also include completing a parking study that was started but put on hold when the development was put on hold by Enclave. ATTACHMENTS: • Memo from Brian Bochman, Enclave • Memo from Stacie Kvilvang, Ehlers • Site B Plans • Rendering April !3,2022 To: City of Hopkins From: Enclave Companies We look forward to talking to the Council on April l-2th to get their feedback on our proposed redevelopment of the Mann Theater in downtown Hopkins. Enclave has been looking for opportunities to become part of the Hopkins community for several years now, and we look forward to being a long term partner in the City's growth. Enclave Companies is a fully integrated development and construction company with offices in Fargo and St. Louis Park. What that means is that we are the Developer, the Contractor, The Manager and the long term Owner of all of our projects. We are currently building in North Dakota, South Dakota, Minnesota, Nebraska, Montana, and Washington. ln the Minneapolis Metro, we started in October of 2Ot9 and have current projects in Shakopee, Savage, Maple Grove, Rogers, Brooklyn Park, Richfield, Bloomington, Hastings, Cottage Grove and Eagan in different stages of the process. We pride ourselves on being a good neighbor as we commit long term to our projects and their communities. We do not build and sell our projects. When we commit to a project we commit to designing, developing, constructing and managing the project like we will be the owners of the property for decades to come. Each site, each neighborhood and each community are our long term priority. For the Downtown Hopkins project there are several items to review on the project, but I believe the three key points to cover are Design, Parking and Financial Assistance. I will try and give a bit of background on each of these issues in this document, so that Council can get up to speed prior to the meeting on the 12th. DESIGN: When we first looked ot the project and its original plon, we were mode oware of the height issue with neighboring properties. So in our plon we removed a fullfloor to reduce the overall project height. The floor removed was a parking level. Removing that on-site parking caused the site porking issue we will need to discuss. Remova! of the porking level did not bring the building into height compliance when using the overage height languoge in City code. But we think there may be some wdys to address this issue through the PLJD or o Conditionol lJse Permit moy help solve for thdt situotion. Our origina! plan chonged the took to d more stondard "Downtown" type look to the proiect. We included a "Sky Lounge" amenity that would look over the new brew pub and their roof top amenity. City Stoff has recommended that we have our "Sky Lounge" on the opposite side of the building to help lessen the height difference between the new Mixed lJse building and the remaining retail building thot will be retained ond updoted during the project. Staff atso preferred the more broken up look that the previous opplicont had presented, so we mode some exterior chonges to reflect those requests. You will see the two different options in your pockets. PARKING: We currently have 120 underground porking spaces in our design for the 150 proposed units. We olso have 30 surface porking spoces on site. The project's proximity to the 397 spoce City owned parking ramp can help olleviote our parking shortage. During the doytime business hours our tenants ond customers for our retoil businesses will be oble to use our surfoce porking lot os well as the porking romp to come and go from the project. The porking romp is not highly used during these times so the odditionol parking that will come with new customers ond new residents in the orea can be accommodoted wetl. These new customers ond new residents will olso help other oreo businesses os we add new people to live, work ond shop in Downtown Hopkins. We witt need to lease 45 spaces for overnight porking within the romp. This will get the residential portion of the project adequote spqces to occommodate our tenonts' vehicles. With 9L% of the units being Studio or 1- bedroom units, coupled with the proximity to moss tansit options make this number work for this proiect' We would propose to pay 550.00 per spoce per month or 522,000/yeor for these spaces. And since there is no overnight parking ollowed in the romp except by permit, the porking structure is essentiolly olmost empty on o nightty bosis. So these renta! spoces con provide income to help maintain the structure while providing new residents o ploce to pork their vehicles. We witt need to hove a commitment to maintoin these spaces for the long term as without them the project witl not be able to acquire or maintain financing minimums for the project. We would propose o 10 yeor leose with o 10 yeor option to renew or o 5 yeor lease with three 5 year options. That timing will cover two thirds of our finoncing commitment' We also have an option where a solar canopy could be added to the roof of the parking romp to moke the top ftoor of the romp more attractive to park. The solar power creoted would then be availoble for locol residents ond businesses to subscribe to for discounted energy costs. The Developer would be happy to look into this option further if Council is interested in discussing it. FINANCIAL ASSISTANCE: Downtown redevelopment is never inexpensive due to the complexity of the build, the tightness of the site ond the buildings to be removed ond buitt around. So this project was alwoys going to cost more to build on o per unit bosis then the some type project buitt on a five acre greenfield. That is why it is extremely rore for these types of redevelopment projects to not receive some sort of financiol ossistonce to moke them buildoble. Those cost issues ore vastly magnified in our current environment of skyrocketing construction costs, delivery delays, ond rising interest rotes. Our construction costs hove risen by olmost 50% since Morch of 2020, our construction timelines hove increosed by on overage of 2 months due to recurring supply delays or shortoges, ond we hove seen our interest rates increose by over o full percentoge point as well. So this project will require some form of assistonce to make it financially feasible. ls thot TlF, is it abotement, is it fee reductions...it could be any ond oll of those. We are open to looking at ony ond oll available options to help moke this project buitdobte. We witl work with Staff ond Ehlers to try ond find some creative solutions that can make the difference for the eorly years of the project where the proiect does not produce ot o tronsactable level. So, ln conclusion we remain very bullish on Hopkins and its Downtown. We simply need some help to get this project to the finish line. We believe that the 545,000,000+ project when completed will be a great addition to the Downtown and the community. With new retail spaces and other area retailers positively impacted by new Hopkins residents walking to their shops, stores and restaurants. This project will continue to build on the commitment your community has made to its Downtown and help to ensure the long term viability and success of the area. We look forward to being a part of it. Please let us know if you should have any questions. Best Regards. Brian Bochman Enclave Development 300 23'd Ave E, Suite 300, West Fargo, ND 58078 o. 701.997.2567 C. 701.212.8110 W. enclavecompanies.com MEMORANDUM TO: Kersten Elverum – Director of Planning and Development FROM: Stacie Kvilvang - Ehlers DATE: April 19, 2022 SUBJECT: Enclave Request for Assistance Enclave is proposing to construct a 150-unit market rate apartment on the former Hopkins Theater site and adjacent commercial building. They initially requested approximately $5.578M in tax abatement assistance over 15 years. As you may recall, this site was part of TIF District 1-2 (entertainment district), that was certified in 1995. The City provided the developer (Beard Group) the land for $1 and utilized the TIF generated to repay themselves for the land write down of $750,000 over the 26-year period. The District doesn’t decertify until December 31, 2023, at which time the intrfund loan will be paid in full. Since the City has yet to realize any tax revenue from this property and it is still in a TIF District, we stated that similar to the Trilogy development along Blake Road, that we could recommend providing up front assistance for demolition costs since that is the only extraordinary cost of the site. In addition, we requested that Enclave go back and revisit their land acquisition price of $5.1M with the property owner (since high at $32,000/unit), their developer fee, their contingency costs and discuss a reduced return expectation with their equity investors. Enclave stated they would do that and that their preliminary estimates for demolition was $750,000. The funding source for demolition could come from TIF District 2-11 (Super Valu), which is a redevelopment TIF District that the City/HRA has cash available for use on qualified redevelopment expenditures like these (these are restricted funds per State Statute and can only be used for qualified purposes). The District currently has enough funds in the account to pay the $750,000, without impeding the City from having dollars available for other qualified redevelopment purposes in the future. If the City wanted to provide tax abatement to the development, the first year would be in 2024 when the TIF District is done. Overall, investment of $750,000 for redevelopment of the site will net higher returns to the City in the form of future tax base and taxes. Currently the pay 2022 taxable value of the property is $2.594M and generates approximately $92,400 in annual taxes, of which the City’s portion is approximately $22,500. Upon completion of the development, the value will be approximately $33.75M and will generate approximately $674,000 in annual taxes, of which the City’s portion is approximately $293,800. Based upon these factors and preliminary “high level” review of the development proforma, the request for up front assistance of $750,000 for demolition is reasonable and will not unduly enrich the developer. Please contact me at 651-697-8506 with any questions. C 2021 MOMENTUM DESIGN GROUP LLC D0 COVER SHEET 118 Mainstreet, Hopkins, MN 55343 03/30/22 21061 Hopkins Apartments F.A.R. SITE AREA 82,016 SF (1.88 ACRES) Gross Area Excluding Garages F.A.R. 123276 SF 1.50 GROSS BUILDING AREA BY FLOOR Garage 42461 SF 1st Floor 31455 SF 2nd Floor 31133 SF 3rd Floor 31105 SF 4th Floor 29583 SF Total 165737 SF GROSS BUILDING AREA BY USE Amenity 2355 SF 2% Circulation 17042 SF 14% Commercial 5281 SF 4% Storage 1727 SF 1% Unit 95640 SF 78% Utility 1230 SF 1% TOTAL (w/o GARAGE) 123276 SF 100% TOTAL UNIT COUNT 1 BED 49 2 BED 13 ALCOVE 67 STUDIO 21 Grand total: 150 PARKING SCHEDULE GARAGE 120 SURFACE LOT 30 Grand total: 150 PLANNING SUMMARY PROPOSED ZONING CODE: R-2 HIGH DENSITY MULTIPLE FAMILY EXISTING ZONING CODE: B-2 GENERAL BUSINESS SETBACKS FRONT YARD: 30' SIDE YARD: 5' REAR YARD: 25' OR 1/2 THE HEIGHT, WHICHEVER IS GREATER MAXIMUM HEIGHT: 4 STORIES LOT AREA: 82,016 SF ARCHITECTURAL SHEETS SHEET SHEET NAME DATE ISSUED D0 COVER SHEET 03/30/22 D1 CONCEPT DESIGN SITE PLAN 03/30/22 D2 CONCEPT DESIGN PLANS 03/30/22 D3 CONCEPT DESIGN PLANS 03/30/22 D4 CONCEPT PERSPECTIVES 03/30/22 D5 CONCEPT ELEVATIONS 03/30/22 D6 CONCEPT ELEVATIONS 03/30/22 D7 BUILDING SETBACKS & HEIGHTS 03/30/22 D8 SHADOW STUDY 03/30/22 D9 BIKE ROUTES & PUBLIC PARKING 03/30/22 D10 PUBLIC TRANSIT ROUTES 03/30/22 PROJECT SUMMARY SHEET INDEX: ARCHITECT MOMENTUM DESIGN GROUP Jesse Hamer Anna Cobus 755 Prior Avenue North, Suite 301A St. PaulL, MN 55114 612.859.5833 jesse@mdgarchitects.com 651.280.8065 anna@mdgarchitects.com DEVELOPER ENCLAVE DEVELOPMENT Brian Bochman 300 23rd Ave. E. Suite 300 West Fargo, ND 58078 701.212.8110 701.478.4300 brian@enclavecompanies.com CIVIL ENGINEER SAMBATEK Brian Frank 12800 Whitewater Dr #300 Minnetonka, MN 55343 507.328.1507 765.297.3654 bfrank@sambatek.com Hopkins Apartments CITY SUBMITTAL 118 Mainstreet, Hopkins, MN 55343 BICYCLE COUNT SCHEDULE GARAGE SURFACE LOT 88 20 Grand total: 98 DENSITY TOTAL UNIT COUNT PARCEL SIZE 150 1.88 ACRES Resulting Density: 80 Units/Acre (Max. Allowed Density: 44 Units/Acre) 30 PARKING STALLS EXISTING BUILDING TO REMAIN 100' TO GARAGE PUBLIC PARKING GARAGE AND SURFACE LOT HOPKINS CENTER FOR ARTS AND THEATER ST. GABRIEL THE ARCHANGEL - ST. JOSEPH CHURCH AND AMERICAN LEGION PRIVATE SURFACE LOT CONDOMINIUM SEE FIRST FLOOR PLAN PARKING GARAGE BELOW TRASH PICK-UP EXISTING BUILDING'S TRANSFORMER TO REMAIN EXIT12TH AVE. PEDESTRIAN ENTRANCE EXIT COMMERCIAL RETAINING WALL PEDESTRIAN PATH EXISTING BUILDING'S DRIVE AISLE TO REMAIN MAIN STREET PEDESTRIAN ENTRANCE M A I N S T R E E T 12TH AVENUE SOUTH11TH AVENUE SOUTHTRANSFORMER & GENERATOR LOCATION COMMERCIAL EXISTING SIDEWALK TO REMAIN PROPERTY LINE30' - 0"LANDSCAPE BUFFER AND RETAINING WALL TO PROVIDE SEPERATION BETWEEN FIRST FLOOR UNITS AND PUBLIC SIDEWALK; SEE ELEVATIONS C 2021 MOMENTUM DESIGN GROUP LLC D1 CONCEPT DESIGN SITE PLAN 118 Mainstreet, Hopkins, MN 55343 03/30/22 21061 Hopkins Apartments N 1" = 20'-0" SITE PLAN 40764 SF GARAGE 120 PARKING STALLSBIKE RACKSUTILITY UTILITY UTILITY 0.3% 89' - 2"1.3%89' - 0" 89' - 0" 89' - 2" 8.4% 88 BICYCLE RACKS 37' - 0"200' - 1"46' - 0"225' - 2"67' - 8"203' - 6"139' - 8"97' - 5" 10' - 10"18' - 0" DRIVE AISLE 24' - 0"18' - 0"18' - 0" DRIVE AISLE 24' - 0"18' - 0"5' - 2 3/8"DRIVE AISLE24' - 0"16' - 3 7/8"5' - 4 3/8"18' - 0"24' - 0"18' - 0"30 PARKING STALLS EXSTG BUILDING TO REMAIN 2035 SF COMMERCIAL 1607 SF COMMERCIAL 1179 SF AMENITY ALCOVE ALCOVE ALCOVE 1 BED 2 BED STUDIO ALCOVE STUDIO 1 BED 1 BED ALCOVE Trash ALCOVEALCOVE ALCOVE ALCOVE STUDIO 1 BED 1 BED 1 BED1 BEDALCOVEALCOVE 2 BED ALCOVE ALCOVE 1 BED TO GARAGE 1 BED STUDIO TRASH PICK-UP PEDESTRIAN ENTRANCE PEDESTRIAN ENTRANCE PEDESTRIAN ENTRANCE 1639 SF COMMERCIAL TEN (10) BICYCLE RACKS ALCOVE 10 1 12 7 RESIDENTIAL COMMON AREA PROPERTY LINE 708 SF AMENITY 1 BED 18' - 0"24' - 0"18' - 0"24' - 0"18' - 0"C 2021 MOMENTUM DESIGN GROUP LLC D2 CONCEPT DESIGN PLANS 118 Mainstreet, Hopkins, MN 55343 03/30/22 21061 Hopkins Apartments 1/16" = 1'-0" Garage 1/16" = 1'-0" 1st Floor N 1 BEDALCOVE2 BED STUDIO 1 BED ALCOVE ALCOVE 1 BED 2 BED STUDIO ALCOVE 1 BED 1 BED 1 BED ALCOVE STUDIO ALCOVE ALCOVE ALCOVE ALCOVE STUDIO 1 BED 1 BED 1 BED 1 BEDALCOVEALCOVE 2 BED ALCOVESTUDIO 1 BED ALCOVE 1 BED STUDIO ALCOVE 1 BEDALCOVE ALCOVE ALCOVE STUDIO 2 BED ROOF DECK 1 BED AMENITY ALCOVE 1 BED ALCOVE ALCOVE 1 BED 2 BED ALCOVE 1 BED 1 BED 1 BED ALCOVE STUDIO ALCOVE ALCOVE ALCOVE ALCOVE ALCOVE 1 BED 1 BED 1 BED 1 BEDALCOVEALCOVE2 BED ALCOVESTUDIO 1 BED 1 BED STUDIO ALCOVE 1 BEDALCOVE ALCOVE STUDIO ALCOVE STUDIO 2 BED ALCOVE C 2021 MOMENTUM DESIGN GROUP LLC D3 CONCEPT DESIGN PLANS 118 Mainstreet, Hopkins, MN 55343 03/30/22 21061 Hopkins Apartments 1/16" = 1'-0" 2nd - 3rd Floor 1/16" = 1'-0" 4th Floor N C 2021 MOMENTUM DESIGN GROUP LLC D4 CONCEPT PERSPECTIVES 118 Mainstreet, Hopkins, MN 55343 03/30/22 21061 Hopkins Apartments NORTH PERSPECTIVE: OPTION 1 NORTH PERSPECTIVE: OPTION 2 EAST PERSPECTIVE WEST PERSPECTIVE ROOF 145' -0" 2nd Floor 112' -0" 3rd Floor 123' -0" 4th Floor 134' -0" PARAPET 146' -6" 1st Floor 100' -0" DARK METAL PANEL BRICK SOLDIER COURSE BRICK TRELLIS BRICK PREF. ALUM BALCONY & RAILING FIBER CEMENT SIDING WOOD LOOK METAL PANEL NEIGHBORING BUILDING FLUSH METAL PANEL CAST STONE OVERALL BUILDING HEIGHT45' - 0"LINEAR CAST LIGHTING LINEAR CAST LIGHTING WALL-MOUNTED LANTERN LIGHT FULLY RECESSED PREF. ALUM BALCONY & RAILING DARK METAL PANEL FIBER CEMENT SIDING CAST STONE SILL FIBER CEMENT SIDING ROOF 145' -0" 2nd Floor 112' -0" 3rd Floor 123' -0" 4th Floor 134' -0" Garage 912' -4" PARAPET 146' -6" 1st Floor 100' -0" FIBER CEMENT SIDING WOOD LOOK METAL PANEL PREF. ALUM. BALCONY & RAILING DARK METAL PANEL BRICK DARK METAL PANELWOOD-LOOK METAL PANEL CAST STONE WOOD-LOOK METAL PANEL CAST STONE FIBER CEMENT SIDING 50' - 0"CAST STONE SILL ROOF 145' -0" 2nd Floor 112' -0" 3rd Floor 123' -0" 4th Floor 134' -0" Garage 912' -4" PARAPET 146' -6" 1st Floor 100' -0" FIBER CEMENT SIDING DARK METAL PANEL PREF. ALUM BALCONY & RAILING CAST STONE BRICK WOOD-LOOK METAL PANEL TRELLIS FLUSH METAL PANEL WOOD LOOK METAL PANEL OVERALL BUILDING HEIGHT45' - 0"AWNING CAST STONE SEMI-RECESSED PREF. ALUM BALCONY & RAILING PREF. ALUM BALCONY & RAILINGDARK METAL PANELDARK METAL PANEL C 2021 MOMENTUM DESIGN GROUP LLC D5 CONCEPT ELEVATIONS 118 Mainstreet, Hopkins, MN 55343 03/30/22 21061 Hopkins Apartments 1/8" = 1'-0" NORTH ELEVATION 1/8" = 1'-0" SOUTH ELEVATION 1/8" = 1'-0" WEST ELEVATION ROOF 145' -0" 2nd Floor 112' -0" 3rd Floor 123' -0" 4th Floor 134' -0" PARAPET 146' -6" 1st Floor 100' -0" BRICK FIBER CEMENT SIDING DARK METAL PANEL AWNING OVERALL BUILDING HEIGHT45' - 0"FULLY RECESSED PREF. ALUM BALCONY & RAILING DARK METAL PANEL CAST STONE SILL ROOF 145' -0" 2nd Floor 112' -0" 3rd Floor 123' -0" 4th Floor 134' -0" PARAPET 146' -6" 1st Floor 100' -0" PREF. ALUM. BALCONY & RAILING DARK METAL PANELFIBER CEMENT SIDING BRICK WOOD LOOK METAL PANEL CAST STONE FIBER CEMENT SIDING 45' - 0"SEMI-RECESSED PREF. ALUM BALCONY & RAILING PREF. ALUM. BALCONY & RAILING CAST STONE SILL ROOF 145' -0" 2nd Floor 112' -0" 3rd Floor 123' -0" 4th Floor 134' -0" PARAPET 146' -6" 1st Floor 100' -0" BRICK SIGNAGE DARK METAL PANEL BRICK DARK METAL PANEL CAST STONE FIBER CEMENT SIDING PREF. ALUM. BALCONY & RAILING FLUSH METAL PANEL OVERALL BUILDING HEIGHT45' - 0"CAST STONE SILL CAST STONE SILL MATERIAL PERCENTAGES - WEST ELEVATION: BRICK: 1,541 SF 11% CAST STONE: 1,147 SF 8% METAL PANEL: 7,656 SF 56% FIBER CEMENT: 3,439 SF 25% __________________________________________ TOTAL SF: 13,783 SF 100% MATERIAL PERCENTAGES - SOUTH COURTYARD ELEVATION: BRICK: 501 SF 6% CAST STONE: 117 SF ~1% METAL PANEL: 3,533 SF 44% FIBER CEMENT: 3,950 SF 49% __________________________________________ TOTAL SF: 8,101 SF 100% MATERIAL PERCENTAGES - NORTH COURTYARD ELEVATION: BRICK: 484 SF 14% CAST STONE: 12 SF ~1% METAL PANEL: 651 SF 19% FIBER CEMENT: 2,215 SF 66% _________________________________________ TOTAL SF: 3,362 SF 100% MATERIAL PERCENTAGES - EAST ELEVATION: BRICK: 4,676 SF 36% CAST STONE: 280 SF 2% METAL PANEL: 1,458 SF 12% FIBER CEMENT: 6,485 SF 50% __________________________________________ TOTAL SF: 12,899 SF 100% MATERIAL PERCENTAGES - SOUTH ELEVATION: BRICK: 501 SF 4% CAST STONE: 745 SF 6% METAL PANEL: 9,421 SF 79% FIBER CEMENT: 1,326 SF 11% __________________________________________ TOTAL SF: 11,993 SF 100% MATERIAL PERCENTAGES - NORTH ELEVATION: BRICK: 3,784 SF 57% CAST STONE: 204 SF 3% METAL PANEL: 1,316 SF 20% FIBER CEMENT: 1,310 SF 20% __________________________________________ TOTAL SF: 6,614 SF 100% MATERIAL PERCENTAGES - NORTH ELEVATION: BRICK: 1,512 SF 23% CAST STONE: 1,601 SF 24% METAL PANEL: 2,025 SF 31% FIBER CEMENT: 1,462 SF 22% __________________________________________ TOTAL SF: 6,600 SF 100% MATERIAL PERCENTAGES - WEST ELEVATION: BRICK: 0 SF 0% CAST STONE: 2,546 SF 19% METAL PANEL: 7,496 SF 54% FIBER CEMENT: 3,744 SF 27% __________________________________________ TOTAL SF: 13,786 SF 100% FIRST FLOOR GLAZING PERCENTAGES: NORTH ELEVATION: 49% EAST ELEVATION: 28% SOUTH ELEVATION: 23% WEST ELEVATION: 25% NORTH COURTYARD ELEVATION: 39% SOUTH COURTYARD ELEVATION: 21% OPTION 1OPTION 2 GLAZING(SEE D4 -CONCEPT PERSPECTIVES) C 2021 MOMENTUM DESIGN GROUP LLC D6 CONCEPT ELEVATIONS 118 Mainstreet, Hopkins, MN 55343 03/30/22 21061 Hopkins Apartments 1/8" = 1'-0" NORTH ELEVATION - COURTYARD 1/8" = 1'-0" SOUTH ELEVATION - COURTYARD 1/8" = 1'-0" EAST ELEVATION ROOF 145' -0" Garage 912' -4" 1st Floor 100' -0"45' - 0"3' - 6"Public Parking Ramp (Top of Stairway)36' - 0"CitiGables (12th Ave South)37' - 6"Performing Arts Center (Mainstreet)38' - 0"Wells Fargo Building (Roof Along 1st South)50' - 0"Previously Proposed Project Height52' - 0"48' - 6"CitiGables (South Side)52' - 0"ROOF 145' -0" Garage 912' -4" 1st Floor 100' -0"Wells Fargo Building (to Roof Along 1st South)50' - 0"Performing Arts Center (Mainstreet)38' - 0"CitiGables (South Side)52' - 0"Public Parking Ramp (Top of Stairway)36' - 0"20' - 4"45' - 0"Previously Proposed Project Height52' - 0"CitiGables (12th Ave South)37' - 6"BUILDING EDGE12' - 1"BUILDING EDGE 13' - 11" BUILDING EDGE 12' - 8"MIN. SETBACK = 22'-6" (1/2 BUILDING HGT)29' - 2"SIDE YARD (ABUTTING R-5)FRONT YARDFRONT YARD FRONT YARDPerforming Arts Center 38'-0"(Mainstreet) Public Parking Ramp 36'-0" (Top of Stairway) CitiGables 52'-0"(South Side) Wells Fargo Building 50'-0"(Roof Along 1st South) Street Elevation = 924'-0" Street Elevation = 922'-6" Street Elevation = 918'-0" Street Elevation = 917'-0" EXISTING BUILDING TO REMAIN 20'-4" EXISTING SIDEWALK TO REMAIN CitiGables 37'-6"(12th Ave South) ROOF 145' -0" Garage 912' -4" 1st Floor 100' -0"45' - 0"Wells Fargo Building (Roof Along 1st South)50' - 0"Performing Arts Center (Mainstreet)38' - 0"CitiGables (12th Ave South)37' - 6"3' - 6"Public Parking Ramp (Top of Stairway)36' - 0"TYP. GRADE SOUTH ELEVATION Previously Proposed Project Height52' - 0"48' - 6"CitiGables (South Side)52' - 0"C 2021 MOMENTUM DESIGN GROUP LLC D7 BUILDING SETBACKS & HEIGHTS 118 Mainstreet, Hopkins, MN 55343 03/30/22 21061 Hopkins Apartments SETBACK REQUIREMENTS FOR B-2: FRONT YARD = 1'-0" - IF ABUTTING A RESIDENTIAL DISTRICT - 1/2 REQUIREMENT OF THE ABUTTING R-DISTRICT - ABUTTING R-5 DISTRICT FRON TYARD = 30'-0" SIDE YARD = 0'-0" - IF ABUTTING A RESIDENTIAL DISTRICT - SAME REQUIREMENT AS ABUTTING R-DISTRICT - ABUTTING R-5 DISTRICT SIDE YARD = 15'-0" OR 1/2 HEIGHT OF BUILDING (WHICHEVER IS GREATER) REAR YARD = 25'-0" - IF ABUTTING A RESIDENTIAL DISTRICT - SAME REQUIREMENT AS ABUTTING R-DISTRICT - ABUTTING R-6 DISTRICT REAR YARD = 25'-0" OR 1/2 HEIGHT OF BUILDING (WHICHEVER IS GREATER) 1/16" = 1'-0" West Elevation - Building Height 1/16" = 1'-0" North Elevation - Building Height 1" = 40'-0" First Floor - w/ Setbacks & Heights 1/16" = 1'-0" South Elevation - Building Height N C 2021 MOMENTUM DESIGN GROUP LLC D8 SHADOW STUDY 118 Mainstreet, Hopkins, MN 55343 03/30/22 21061 Hopkins Apartments 1" = 30'-0" SUMMER SOLSTICE @ 6AM 1" = 30'-0" SUMMER SOLSTICE @ NOON 1" = 30'-0" SUMMER SOLSTICE @ 6PM (10) BICYCLE RACKS (2) EXISTING BICYCLE RACKS TO REMAIN (8) BICYCLE RACKS (8) EXISTING BICYCLE RACKS TO REMAIN C 2021 MOMENTUM DESIGN GROUP LLC D9 BIKE ROUTES & PUBLIC PARKING 118 Mainstreet, Hopkins, MN 55343 03/30/22 21061 Hopkins Apartments 1" = 40'-0" BICYCLE STALL LOCATIONS 0.19 MILES0.22 MILES0.27 MILES BUS STOPS BUS STOPSROUTE 615MAIN STREET ROUTE 670ROUTES 12, 612 & 66411TH AVE SO.12TH AVE SO.C 2021 MOMENTUM DESIGN GROUP LLC D10 PUBLIC TRANSIT ROUTES 118 Mainstreet, Hopkins, MN 55343 03/30/22 21061 Hopkins Apartments 1" = 40'-0" BUS STOP LOCATIONS MATERIAL PERCENTAGES: MASONRY -BRICK: 2937.15 SF METAL PANEL: 3685.78 SF LAP SIDING:1131.41 SF GLAZING: 2974.76 SF MASONRY -CMU: 378 SF MANUFACTURED STONE WOOD-LOOK METAL PANELS METAL PANEL BRICK FIBER CEMENT METAL PANEL WOOD-LOOK METAL PANEL METAL PANEL ROOF DECK AT TRELLIS AREA C 2021 MOMENTUM DESIGN GROUP LLC D11 NORTH FACADE ELEVATION 118 Mainstreet, Hopkins, MN 55343 03/16/22 21061 Hopkins Apartments 1" = 10'-0" NORTH ELEVATION C 2021 MOMENTUM DESIGN GROUP LLC D12 NW CORNER PERSPECTIVE 118 Mainstreet, Hopkins, MN 55343 03/16/22 21061 Hopkins Apartments NW Front Corner