Loading...
Memo - Nine Mile Creek Bank Stabilization and Habitat EnhancementMemorandum Public Works Dlent To: Honorable Mayor and Members of the City Council CC: Rick Getschow, City Manager From: John R. Bradford, City Engineer Date: 08/08/2008 Re: Nine Mile Creek Bank Stabilization and Habitat Enhancement This work session item relates to the final feasibility report prepared by WSB & Associates and Barr Engineering for the above mentioned project. The Nine Mile Creek Watershed District will present the feasibility report with the proposed improvements. The project is estimated to cost approximately $4.05 million and includes improvements along the creek from Excelsior Boulevard to the Hwy 169 crossing. Part of the work is located in the City of Minnetonka for storm water quality treatment. All costs are covered by the Watershed District except for Easements (75% City), trail construction (50% NMCWD /50% others including the City and Three Rivers Park District) and Roof Drain connection at 10801 Excelsior (50% NMCWD/ 50% others). The project will be up for Watershed District Approval in early September, which will open the way for construction beginning in November 2008. This project will be completed in two winter construction seasons. 1 1.0 Introduction This report summarizes the proposed actions for improving the stability and water quality of the North Fork of Nine Mile Creek (North Fork), located in the City of Hopkins. It is prepared in accordance with Section 103D.71 1 of the Minnesota Watershed Act under the direction of the Board of Managers of the Nine Mile Creek Watershed District. 1.1 Background The Nine Mile Creek Watershed District (District) was established by the Minnesota Water Resources Board in 1959. Stormwater management within the urbanizing Nine Mile Creek watershed was guided initially by the District's Overall Plan dated March 1961. That plan was revised by the District in April 1973, as prescribed by the Minnesota Water Board. The 1973 revised Overall Plan guided development in the District until it was further revised in May 1996 . and again in 2006 (Water Management Plan), in accordance with the Metropolitan Surface Water Management Act and Watershed Law: Minnesota Statutes Chapters 103B and 103D, respectively. The City of Hopkins submitted a petition to the District in 2006 for the Nine Mile Creek Stabilization Project (Appendix A). The stream stability and water quality improvements recommended in this Engineer's Report area to be undertaken as a Basic Water Management Project, as described in the District's 2006 Water Management Plan. 1.2 Project Location The proposed improvement projects are primarily located in the City of Hopkins, Minnesota (see Drawing G -01, Appendix B). The North Fork begins in Hopkins, south of Excelsior Boulevard (County Road 3) and west of 11 Avenue, where stormwater from a drainage area of approximately 560 acres is discharged via a 12 -foot by 7 -foot concrete box culvert storm sewer. The study area includes an 8,500 foot reach of the North Fork, beginning at Excelsior Boulevard and extending in a southeastern direction to the Highway 169 culvert crossing. This portion of the North Fork is primarily located in Hopkins, with a small portion (600 feet) located in Minnetonka, just west of Highway 169. The study area also includes the sites of several proposed water quality ponds located in or near the creek floodplain. P: \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles\Reports_Memos \Engineers Report\Engineers_Report_Final Jul- 08.doc 1 1.3 Summary of Problems 1.3.1 Stream Stability Channels in urban areas are often lacking in many of the features that define stable channels, such as a defined floodplain and a stable, meandering pattern. Such channels have often been straightened over the years, and their floodplains filled, resulting in higher velocities and shear stress during high flows. These channels tend to be eroded by fluvial bank erosion, but the stresses are greater due to the confined nature of the channel, and the subsequent erosion can be much more severe. Similar to many other urban stream systems, the North Fork of Nine Mile Creek suffers from streambank erosion. Based on a detailed site evaluation, the major erosion problems occurring in this portion of creek may be attributed to the historical realignment of the channel from a meandering shape to a straightened channel, combined with increased runoff due to urbanization. Erosion issues develop as the creek attempts to return to a more stable, meandering pattern. This evolution is occurring via bank slumping, formation of central bars which direct flow to one bank or the other, and channel widening. In some areas, the resulting cut banks are very high, likely reflecting some degree of downcutting (channel incision). 1.3.2 Untreated Stormwater Runoff The watershed that drains to the North Fork of Nine Mile Creek was primarily developed prior to the formation of the District and before the onset of stormwater quality treatment requirements. Consequently, most of the stormwater runoff from the watershed is discharged to the creek with little or no treatment, resulting in significant loading of sediment and nutrients, such as phosphorus, to the creek system. 1.4 Project Objectives The objective of the project is to provide a stable creek system and provide the treatment of stormwater runoff where practicable and feasible. 1.5 Public Participation The Nine Mile Creek Watershed District has identified the importance of public involvement and seeks opportunities to incorporate public involvement into District projects. The District has worked in conjunction with the following stakeholders during the preliminary phases of the Nine Mile Creek Stabilization Project in Hopkins: City of Hopkins staff and their representatives, City of Minnetonka, Three Rivers Park District, Board of Soil and Water Resources, and local residents. The numerous P: \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles \Reports_Memos \Engineers Report \Engineers_Report_Final Jul- 08.doc 2 public and stakeholder involvement opportunities that have occurred throughout this project are identified below: • Numerous meetings with City of Hopkins staff and their representatives • Workshop with Hopkins City Council and Nine Mile Creek Watershed District Board of Managers on October 9, 2007 • Two citizen open house meetings on December 5 and 6, 2007 • Meeting with Hopkins city staff and residents of residential development (Nine Mile Cove) adjacent to proposed project site on January 10, 2008. • Meeting with the District administrator and engineer, Hopkins city staff, and Three Rivers Park District on February 22, 2008. • Meeting with Board of Water and Soil Resources (BWSR) on April 9, 2008 regarding potential wetland impacts. P: \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles\Reports_Memos \Engineers Report \Engineers_Report_Final Jul- 08.doc 3 4.0 Proposed Improvements 4.1 Stream Stabilization Similar to many other urban stream systems, the North Fork of Nine Mile Creek suffers from streambank erosion. Based on a detailed site evaluation, the major erosion problems occurring in this portion of creek may be attributed to the historical realignment of the channel from a meandering shape to a straightened channel, combined with increased runoff due to urbanization. Erosion issues develop as the creek attempts to return to a more stable, meandering pattern. This evolution is occurring via bank slumping, formation of central bars which direct flow to one bank or the other, and channel widening. In some areas, the resulting cut banks are very high, likely reflecting some degree of downcutting (channel incision). The proposed stream stabilization improvements for segments of the North Fork between Excelsior Boulevard and 9` Avenue South are summarized in Figure 4 -1 and segments between 9` Avenue South and Highway 169 are summarized in Figure 4 -2. Realignment of the channel to a more stable, meandering form is proposed for three reaches of the study area. In the remaining reaches, where area does not permit channel realignment, reshaping of the banks to shallower slopes and bank revegetation are recommended. Stabilization of the channel toe and grade control will be necessary in some locations. Schematics of these stream stabilization practices are shown in Figures 4 -3 through 4 -9. The recommended improvements for each segment are summarized below. 4.1.1 Segment A 4.1.1.1 Existing Conditions Segment A extends approximately 575 feet downstream from the south (downstream) side of Excelsior Boulevard to the Hennepin County Regional Railroad Authority (HCRRA) trail (see Figure 4 -1). The existing typical side slopes of the creek embankment are approximately 2:1 on the west bank and 3:1 on the east bank. The bottom width of the channel varies within the segment, but is typically 15 -feet wide. The current roof drain configuration from 10801 Excelsior Boulevard (car wash building) is resulting in erosion of the west creek embankment from overland flow and seepage issues. Erosion of the east creek embankment is being caused by runoff from 10751 Excelsior Boulevard (Scherer Brothers Lumber Company). 4.1.1.2 Recommendations Recommendations for erosion problems in Segment A include the reshaping of banks, stabilization of lower stream banks using limestone and fieldstone riprap, and revegetation of the upper stream banks P :MpIs \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles\Reports_Memos \Engineers Report \Engineers_Report_Final Jul- 08.doc 17 (see Drawing C -15, Appendix B). To remedy the erosion being caused by the roof drains of 10801 Excelsior Boulevard, consolidation of the roof drains and installation of a single piped outlet to the creek is recommended. In addition, construction of an 8 -foot gravel trail along the east side of the creek is proposed. 4.1.2 Segment B 4.1.2.1 Existing Conditions Segment B extends approximately 550 feet downstream from the Hennepin County Regional Railroad Authority trail to the 5` Street South crossing (see Figure 4 -1). The existing typical side slopes of the creek embankment vary significantly, with typical slopes of 3:1 on the west and east banks. The bottom width of the channel varies within the segment, but is typically 15 -feet wide. 4.1.2.2 Recommendations Recommendations for erosion problems in Segment B include the reshaping of banks, stabilization of lower stream banks using natural fieldstone riprap, and revegetation of the upper stream banks (see Drawings C -13 and C -14, Appendix B). 4.1.3 Segment C 4.1.3.1 Existing Conditions Segment C extends approximately 250 feet downstream from the 5 Street South crossing to the SOO Line railroad (see Figure 4 -1). The existing typical side slopes of the creek embankment are approximately 3:1 on the west bank and 1:1 on the east bank. Existing erosion control features in Segment C of the North Fork include gabion mats on the east and west embankments downstream of the 5 Street South crossing and rip rap throughout the segment. At approximately 150 feet south of 5 Street, there is severe erosion on the east embankment. Sediment deposition has built up in the creek near this location. 4.1.3.2 Recommendations Recommendations for erosion problems in Segment C include stabilizing approximately 100 feet of east streambank with a sheetpile wall and natural fieldstone riprap to remedy the existing erosion problem and installing fieldstone riprap toe protection on the west side of the creek (see Drawing C -13, Appendix B). It is also recommended that the sediment deposition located approximately 200 feet downstream from the 5` Street South crossing be removed from the creek bed, and the existing gabions be covered with topsoil and vegetation will be restored. P: \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles\Reports_Memos \Engineers Report \Engineers_Report_Final Jul- 08.doc 18 In addition, the two existing 90 -inch corrugated metal pipe (CMP) culverts will be replaced with an equivalent reinforced concrete box culvert or arch pipe. Design details will be provided upon receipt of information from WSB. 4.1.4 Segment E 4.1.4.1 Existing Conditions Segment E extends 450 feet downstream from the 11 Avenue South crossing to 7 Street South (see Figure 4 -1). The existing typical side slopes of the creek embankment vary significantly, with typical slopes of 3:1 on the west and east banks. The bottom width of the channel also varies, but is typically 20 -feet wide in this segment. 4.1.4.2 Recommendations Recommendations for erosion problems in Segment E include the reshaping of banks, stabilization of lower stream banks using fieldstone riprap, and revegetation of the stream banks with native shrubs and trees (see Drawings C-11, Appendix B). The area northeast of the creek, adjacent to the existing alley, should be regraded to provide a more gradual slope to the creek. The creek will be shifted to the southwest, as needed, to accommodate the bank stabilization on the northeast side, and the southwest streambank will be regarded and revegetated, accordingly. The installation of drain tile between the existing alley and creek is recommended to improve drainage in the alley. 4.1.5 Segment F 4.1.5.1 Existing Conditions Segment F extends approximately 820 feet downstream from the 7 Street South crossing to the 9 Avenue South crossing (see Figure 4 -2). The existing typical side slopes of the creek embankment vary significantly, ranging from 10:1 slopes to 1:1 slopes throughout this section. The bottom width of the channel also varies, but is typically 10 -feet wide. An existing 54 -inch corrugated metal pipe (CMP) located on the west side of the creek, approximately 230 feet downstream of the 7 Street South culvert, comes into the creek at an elevation above the creek bed. The stream bank is eroding around the culvert. P: \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles \Reports_Memos \Engineers Report \Engineers_Report_Final JuI- 08.doc 19 4.1.5.2 Recommendations Recommendations for erosion problems in Segment F include the reshaping of banks, stabilization of lower stream banks using fieldstone riprap, and revegetation of the stream banks with native shrubs, trees, and grasses (see Drawings C -9 and C -10, Appendix B). Recommended stabilization techniques include installation of a rock vane approximately 350 feet upstream of the 9` Avenue South crossing, to divert channel flow toward the center of the creek and away from the bank. See Figure 4 -3 for a more detailed description of how rock vanes provide bank protection. The invert of the existing 54 -inch CMP should be lowered to the normal flow level of the creek. In addition, construction of a shared -use paved trail is proposed on the northeast side of the creek. 4.1.6 Segment G 4.1.6.1 Existing Conditions Segment G extends 750 feet downstream from the east (downstream) side of 9th Avenue South crossing (see Figure 4 -2). Valley Park occupies the east bank of the channel in this reach. Westbrooke Way parallels the channel within 50 feet of the west bank for most of Segment G. Prior to 1950, the channel demonstrated a gradual meandering pattern at this location; however, the channel has since been straightened. Although the stream alignment in Segment G is relatively straight, the effective wetted area is slowly evolving toward a slightly meandering pattern. This is happening primarily via channel widening, and through bank downstream slumping and creation of central bars that direct the flow into one of the banks. Two storm sewers discharge into the creek within this reach with both discharge points located perpendicular to the natural flow of the creek, contributing to bank erosion. Central bars and channel widening in from 9 Avenue South. Segment G, looking 4.1.6.2 Recommendations The proposed solution to erosion problems in Segment G includes the realignment of the channel to a meandering pattern and establishment of deep- rooted vegetation. The channel will be realigned to the east of the current channel (see Drawing C -08 and C -09, Appendix B). This location reduces the risk of bank undercutting along Westbrooke Way. The proposed stream alignment is based on the meander observed in this location prior to straightening, based on historic aerial photos. Vegetation management, described in Figure 4 -7, will be critical for stabilizing this segment. The realigned P: \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles \Reports_Memos \Engineers Report \Engineers_Report_Final JuI- 08.doc 20 channel will be graded and vegetated with deep- rooted vegetation to provide bank stability. Erosion control blanket is proposed to protect the plantings until they are established. Because the new alignment will lie entirely to the east of the current channel, vegetation in the new channel should be established prior to redirecting the flow from the old channel to the new channel. This will require at least one growing season. The existing channel will be filled with the material excavated from the new channel after flow is introduced into the new channel. The storm sewer discharge located near the beginning of Segment G will be redirected to enter the creek discharging in the downstream direction. The second storm sewer discharge (30 -inch RCP) will be extended to the new channel location and redirected to enter the creek in the downstream direction. The existing pedestrian bridge in this segment will be removed and may be reused near the proposed water quality pond. A new pedestrian bridge will be constructed across the new channel. 4.1.7 Segment H 4.1.7.1 Existing Conditions Segment H includes a 600 -foot section of the North Fork downstream of Reach G (see Figure 4 -2). To the northeast of the channel is the city park and community garden. Westbrooke Way lies very close to the southwest side of the channel for the entire length of Segment H. The characteristics of this reach are similar to those of Segment G, although bank slumping is more extensive in this reach and the channel is becoming wider. The banks are higher in this reach, indicating greater downcutting than in Segment G. Aerial photography confirms that since 1950 the channel has moved southwest, encroaching on the present -day location of Westbrooke Way. The erosion is most severe along the southwest bank with bank undercutting already compromising the road embankment of Westbrooke Way. 4.1.7.2 Recommendations Existing land use prevents the realignment of Nine Mile Creek within this reach. Proposed solutions to erosion problems in Segment H include the reshaping of banks, establishment of deep- rooted vegetation, and the placement of stabilization works, including bank stabilization and grade stabilization. To prevent additional erosion along the road embankment of Westbrooke Way, installation of a sheet pile wall is proposed, to be located 2 feet east of the existing sidewalk (see Drawing C -07 and C -08, Appendix B). Stone toe protection (Figure 4 -4) and biolog toe protection are proposed to stabilize the bank toes. Constructed riffles (Figure 4 -9) are proposed to provide grade control and prevent downcutting in the stream. The stream banks will be graded and revegetated with native vegetation. A 50 -foot vegetated buffer is proposed for a 100 -foot portion of this reach. P: \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles \Reports_Memos \Engineers Report \Engineers_Report_Final Jul- 08.doc 21 Right bank erosion in Segment H, looking towards the right bank and Westbrooke Way 4.1.8 Segment 4.1.8.1 Existing Conditions Segment I extends 490 feet downstream from Segment H, to the inflow of three tributary channels entering from the north, south, and west (see Figure 4 -2). A community garden occupies the area north of the channel. A low -lying wetland area lies west of the channel. As with Segment G, downstream of 9 Avenue, the channel appears to have been straightened in the past, but is evolving toward a slightly meandering pattern. The meandering is developing through bank slumping, resulting in the creation of central bars that direct the flow into either bank. Slumping is significant on both sides of the channel. The banks are not as high as the most severe sections of Segment H, but are higher than in Segment G. Channel widening is more significant in this reach than in Segment G or Segment H. A 12 -inch pipe drains runoff from the community garden into the creek at the midpoint of this reach. The outlet of the pipe is set back about 5 feet from the creek, resulting in localized bank erosion. 4.1.8.2 Recommendations Recommendations for Segment I include realignment of the channel to a more stable meandering pattern. The realigned channel would be located in the wetland area southwest of the present channel (Figure 4 -2) and will not infringe on the community garden. Historical data does not extend far enough to determine the natural stream alignment in this reach prior to straightening. Therefore, the stream alignment geometry will be based approximately on the historical meander observed in P: \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles\Reports_Memos \Engineers Report \Engineers_Report_Final Jul- 08.doc 22 Segment G. The new channel will be graded and vegetated with deep- rooted plants to provide bank stability. Erosion control blanket will be used to protect the plantings until they are established. The existing channel will be filled with the material excavated from the new channel after the vegetation is established. The new alignment will lie entirely to the west of the current channel, allowing vegetation in the new channel to be established prior to redirecting the flow. The storm sewer pipe draining the community garden will be extended to the new channel. Disturbance of the existing trees at the south end of the segment will be minimized. 4.1.9 Segment J 4.1.9.1 Existing Conditions Segment J includes a 510 -foot section of the North Fork beginning at the junction of the main channel with two tributary channels entering from the north and west (Figure 4 -2). A medium - density residential development (Nine Mile Cove) exists on the north floodplain. A combination of wetland and upland areas exist to the south of the channel. Review of historic aerial photos indicates that this reach was straightened in the past but has evolved back to a meandering pattern between 1969 and 1979. High cut banks occur within this reach near the confluence of the main channel and side channels. Slumping occurs on both sides of the channel but is most significant along the cut banks. Towards the downstream end of Segment J, the cut bank occurs on the north side of the channel and is encroaching on the walking path and residential areas. An existing 21 -inch RCP culvert enters the north side of the creek from the adjacent Nine Mile Cove residential development. The outlet of the pipe is set back about 6 to 8 feet from the creek, resulting in localized bank erosion, and the discharge point is perpendicular to the natural flow of the creek. P: \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles\Reports_Memos \Engineers Report \Engineers_Report_Final Jul- 08.doc 23 Right (south) cut bank and bank slumping in Segment J, looking downstream Left (north) bank slumping near residential area in Segment J 4.1.9.2 Recommendations Existing land use and tributary channels prevent significant realignment of Nine Mile Creek within this stream segment. Proposed solutions to erosion problems in Segment J include the reshaping of banks to a milder slope and adding stone toe protection (Figure 4 -4), biolog toe protection and P: \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles\Reports _Memos \Engineers Report \Engineers_Report_Final Jul- 08.doc 24 constructed riffles (Figure 4 -9). The banks will be vegetated with deep- rooted plants to add stability. Buckthorn removal will be pursued to reduce shading of the stabilized banks. The plantings will be protected with erosion control fabric and until they are established. The existing 21 -inch culvert will be modified by installing a drop manhole and extending the culvert to the creek, with the outlet installed with a 45- degree bend. The proposed modifications will help to dissipate energy prior to discharge of stormwater into the creek and minimize streambank erosion. 4.1.10 Segment K 4.1.10.1 Existing Conditions Segment K extends 2,100 feet downstream from Segment J to the west side of Highway 169 (Figure 4 -2). Based on review of historic aerial photographs, the creek was a straight channel running southeast across the present -day wetland south of the sedimentation pond from approximately 1950 to 1969. The creek was realigned between 1969 and 1979 to flow east through a sedimentation pond before flowing south along Highway 169. The cut banks and slumping evident in Segment J continue to the existing sedimentation pond. Sandy bars at the south end of the pond suggest the flow short circuits the pond. There are no additional discharges into the pond under existing conditions. Sediment deposition near inflow to pond in Segment K P: \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles\Reports_Memos \Engineers Report \Engineers_Report_Final Jul- 08.doc 25 Downstream of the sedimentation pond, the main channel travels east towards Highway 169, where it is joined by a drainage ditch from the north. The channel then turns south and flows along Highway 169. The stream alignment in Segment K along Highway 169 is relatively straight. The effective wetted area is slowly evolving toward a slightly meandering pattern as described for upstream reaches. This is occurring primarily via channel widening, and through bank slumping and creation of central bars that direct the flow into one of the banks only. Bank slumping in Segment K below pond, looking downstream along Highway 169 4.1.10.2 Recommendations Recommendations for Segment K include realignment of the channel to a more stable meandering pattern. The realigned channel would be located in the wetland area southwest of the present channel (Figure 4 -2). The first approximately 500 feet of the channel will meander along the historic channel location, before turning south towards the Highway 169 crossing. The proposed meander pattern is based on the natural meander of a more stable reach of Nine Mile Creek located approximately one mile downstream of the project site. The new alignment will lie entirely to the south of the current channel, with vegetation in the new channel to be established prior to redirecting the flow. The new alignment will also result in a smoother connection with the culvert crossing of Highway 169. The new channel will not flow through the existing sedimentation pond. Disconnecting the creek from the pond is anticipated to have a positive effect on transport of bedload sediment in the creek; P: \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles\Reports_Memos \Engineers Report \Engineers_Report_Final JuI- 08.doc 26 as the pond currently trapping bedload sediment, therefore increasing the likelihood of bed degradation (channel downcutting) in the reach downstream of the sedimentation pond. The existing channel leading to the sedimentation pond can be filled with material excavated from the new channel after vegetation is established (see Drawing C -05, Appendix B). Low flows from the drainage ditch parallel to Highway 169 will be rerouted through a new water quality pond and then to the existing pond to provide water quality treatment. 4.2 Improved Stormwater Treatment The watershed that drains to the North Fork of Nine Mile Creek was primarily developed before the onset of stormwater quality treatment requirements. Consequently, most of the stormwater runoff from the watershed is discharged to the creek with little or no treatment, resulting in significant loading of sediment and nutrients, such as phosphorus, to the creek system. To improve the quality of stormwater being discharged to the North Fork of Nine Mile Creek, several water quality improvement projects are being recommended as part of this overall project. These improvements are described below in further detail. 4.2.1 Construction of Opportunity Court Stormwater Pond 4.2.1.1 Existing Conditions The storm sewer system along Opportunity Court in Minnetonka currently discharges untreated stormwater from a 21 -acre drainage area directly into the large wetland complex located west of TH 169 (see Figure 4 -10). The City of Minnetonka requested that the NMCWD include a proposed stormwater treatment pond for the Opportunity Court drainage area in the Nine Mile Creek Stabilization Project. The City of Hopkins has since amended their formal project petition to include the request (see Appendix A). 4.2.1.2 Recommendations Construction of a small water quality pond is proposed directly north of 5401 Opportunity Court (Figure 4 -10). The water quality pond was designed to avoid impacts to the existing wetland. As a result, the pond is sized to only treat stormwater from low -flow conditions. Stormwater from the existing 30 -inch RCP trunk system will be diverted to the proposed pond via installation of a 12 -inch pipe (see Drawing C -18, Appendix B). The 12 -inch pipe will convey stormwater from the smaller precipitation events to the pond, with the large events bypassing the pond. P: \MpIs \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles\Reports_Memos \Engineers Report \Engineers_Report_Final Jul- 08.doc 27 4.2.2 Treatment of Stormwater Discharge from TH 169 Storm Sewer System 4.2.2.1 Existing Conditions The Trunk Highway 169 ( TH 169) storm sewer system collects stormwater from a drainage area of approximately 307 acres, as shown in Figure 4 -11. The stormwater runoff is conveyed southward along TH 169 and discharged into the existing ditch that runs parallel to TH 169 via an 84 -inch RCP. Runoff from approximately 238 acres of the 307 -acre drainage area (77 %) receives little or no stormwater treatment prior to discharge into the existing ditch, and ultimately the creek system. The existing ditch system parallel to TH 169 also receives flow from the 77 -acre Park Valley drainage area, which is discharged to the ditch just north of the existing service road via a culvert beneath 2nd Avenue. From this location, stormwater runoff is conveyed eastward through the ditch and combines with the drainage ditch parallel to TH 169. The stormwater from this drainage area receives some treatment in the wetland area upstream of the culvert under Nine Mile Cove. 4.2.2.2 Recommendations The area between the TH 169 storm sewer outlet and the creek is predominantly wetland, so there is very little opportunity for construction of stormwater treatment Best Management Practices (BMPs) in the upland areas. As a result, the proposed stormwater BMPs were designed to provide treatment while minimizing negative impacts to the existing wetland system. The proposed stormwater treatment consists of rerouting the flows from the TH 169 and Park Valley drainage areas through a series of water quality ponds, including the existing sedimentation basin (South Park Pond) that the North Fork currently flows through. The first pond in the treatment system is to be constructed in the existing wet meadow area west of TH 169 (see Drawing C -16, Appendix B). The second pond in the treatment system is the existing South Park Pond, which will be dredged to increase the dead storage volume available for water quality treatment. The designs of the proposed ponds are described in additional detail below. The permanent pool (dead storage) volume of a water quality pond has a significant impact on the effectiveness of treatment. The proposed system was designed to minimize wetland impacts and avoid mitigation requirements. Due to the related design constraints in pond footprint and depth, the proposed permanent pool volume (5.3 acre -feet) falls below the NURP recommended permanent pool volume for the untreated TH 169 drainage area (9.4 acre - feet). A P8 model was used to assess the pollutant removal efficiency of the proposed treatment system. Based on modeling results from 1949 to 2000, the proposed treatment system achieves (on average) approximately 42% and 75% removal of total phosphorus (TP) and total suspended solids (TSS), respectively. Although the removal P : \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles\Reports_Memos \Engineers Report \Engineers_Report_Final Jul- 08.doc 28 efficiencies are less than what would be expected if the NURP- recommended dead storage volume were provided, the pollutant removal represents a significant overall reduction in phosphorus and sediment reaching the creek system (average annual reduction of 116 lbs TP and 60,000 lbs TSS). Construction of Water Quality Pond The first pond in the treatment system is to be constructed in the existing wet meadow area west of TH 169. Flow through the existing ditch parallel to TH 169 will be re- routed into the proposed pond through a new open channel. A control weir will be constructed in the existing ditch to redirect flows into the pond under low -flow conditions, and allow flow southward through the existing ditch under high -flow conditions (see Drawing C -16, Appendix B). The pond has been designed to enhance the functions and values of the existing wet meadow, which is currently a low quality wetland dominated by reed canary grass. The pond design incorporates a meandering water edge, with points and bays to improve wildlife habitat, and side slopes of 5:1 to promote aquatic vegetation. Excavation of the proposed pond has been limited to depths less than 6.6 feet (2 meters). No fill is proposed. A vegetation management plan for the proposed pond will be completed as part of the final design and approval process, to ensure that the area surrounding the pond blends in with the adjacent natural landscape. Dredging of Existing South Park Pond The second pond in the proposed treatment system is the existing South Park Pond. The North Fork currently flows through this sedimentation pond, but will be re- routed to the south under the recommended stream realignment (Segment K, Section 4.1.2.3). Flow from the proposed water quality pond will be routed into the existing South Park Pond through an open ditch that meanders through the existing wetland area. Dredging of the existing South Park Pond is recommended to increase the dead storage volume available for water quality treatment. The proposed excavation volume is approximately 4,000 cubic yards, with dredging depths not to exceed an elevation of 867 ft MSL (estimated original pond bottom based on historic pond clean out information). The normal water level of South Park Pond will be controlled at 870.0 ft MSL by a boulder control outlet located just upstream of the existing timber bridge (see Drawing C -17, Appendix B). The proposed dead storage volume in South Park Pond is approximately 3.7 acre -feet. P: \Mpls \23 MN\27 \2327G48 9 -Mile Hopkins \WorkFiles\Reports _Memos \Engineers Report \Engineers_Report_Final Jul- 08.doc 29 4.3 Trail Construction Construction of a multi -use trail is proposed as part of the overall project. The proposed trail begins approximately one block south of Excelsior Boulevard and extends in a southeasterly direction running generally parallel to the North Fork, to the crossing of the North Fork and TH 169 (see Drawing C -21, Appendix B). The proposed trail will be constructed by the Nine Mile Creek Watershed District, in partnership with the Three Rivers Park District and the City of Hopkins. The proposed trail is ultimately intended to be part of the Three Rivers Park District regional trail system that will run through Hopkins, Edina and Richfield to Cedar Avenue in Richfield. 4.4 Fish Habitat While lack of flow during summer months is the primary limiting factor for fish populations in this reach of Nine Mile Creek, the longitudinal and lateral channel variability in stream depth, current velocity, and bottom substrates resulting from the stream restoration work will help improve the fish community. The creation of a meandering channel shape, riffle and pool structure, and the addition of root wads at outer banks will increase the variability and complexity of the fish habitat available and provide greater water depths for refuge areas during periods of low flows. Stabilization and revegetation of the banks and riparian corridor will reduce water temperatures by providing improved overhead cover. Little fish community data has been collected for this reach of Nine Mile Creek, but an extrapolation of the fish community data from the closest downstream location can be used to generalize potential benefits. The pool and riffle complexes and fieldstone toe protection, constructed with larger substrate sizes, can benefit bigmouth shiner (Notropis dorsalis), brook stickleback (Culaea inconstans), creek chub (Semotilus atromaculatus), eastern blacknose dace (Rhinichthys stratulus), fathead minnows (Pimephales promelas), Johnny darters (Etheostoma nigrum), and white suckers (Capastomus commersoni). The increased water depths resulting from the creation of pools behind the riffles and adjacent to root wads can benefit the white suckers (C. commersoni). The variability of current velocity will benefit most of the species, but particularly the eastern blacknose dace (R. stratulus) and white suckers (C. commersoni) will benefit form the increased velocities found in the riffle sections. The lower velocities found in the pools will especially benefit brook stickleback (C. inconstans) young -of -year, creek chub (S. atromaculatus) juveniles, and Johnny darter (E. nigrum) young -of -year. The reduced sedimentation should also benefit reproduction by all species. P: \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles\Reports_Memos \Engineers Report \Engineers_Report_Final Jul- 08.doc 30 5.0 Cost Estimate Tables 5 -1 and 5 -2 detail the estimated costs for the proposed improvements between Excelsior Boulevard and 9` Avenue South and between 9 Avenue South and Highway 169, respectively. The estimated total cost of the recommended improvements described on this Engineer's Report is $4,048,800. P: \Mpls \23 MN\27\2327G48 9 -Mile Hopkins \WorkFiles \Reports_Memos \Engineers Report \Engineers_Report_Final Jul- 08.doc 42 DESCRIPTION UNIT EST. QTY. UNIT PRICE EXTENSION Mobilization /Demobilization L.S. 1 $50,000.00 $50,000.00 Rock Erosion Control Const. Entrance Each 3 $1,000.00 $3,000.00 Site Restoration (Seed and Mulch) Acre 3.7 $3,500.00 $13,000.00 Tree Clearing and Brush Removal (< 9" Dia.) Acre 1 $10,000.00 $10,000.00 Remove Selected Tree (> 6" Dia.) Each 25 $900.00 $22,500.00 Gravel Path, 8' Wide S.Y. 580 $25.00 $14,500.00 Steel Sheet Piling Wall S.F. 2800 $45.00 $126,000.00 Roof Drain Collection System L.S. 1 $3,000.00 $3,000.00 Existing Culvert Modifications and Repairs L.S. 1 $6,000.00 $6,000.00 Silt Fence L.F. 300 $2.00 $600.00 Riprap (Mn /DOT CL III) Ton 2030 $75.00 $152,300.00 Granular Filter Rock Ton 1700 $45.00 $76,500.00 Rock Boulder Vane Each 1 $2,000.00 $2,000.00 Rock Filter Dike Ton 40 $45.00 $1,800.00 Two Rail, Red Cedar Split Rail Fence L.F. 600 $10.00 $6,000.00 Imported Topsoil C.Y. 700 $22.00 $15,400.00 Landscaping and Live Plants L.S. 1 $15,000.00 $15,000.00 Replace 2- Ex. 72" CM PA Culverts under 5th St L.S. 1 $400,000.00 $400,000.00 Traffic Control L.S. 1 $10,000.00 $10,000.00 Pipe Removal L.F. 200 $15.00 $3,000.00 Wood Fiber Blanket S.Y. 3700 $3.00 $11,000.00 Sod S.Y. 7780 $4.50 $35,000.00 Bituminous Trail S.Y. 1335 $35.00 $46,700.00 Easements L.S. 1 $47,000.00 $47,000.00 Special Excavation C.Y. 1233 $15.00 $18,500.00 Miscellaneous Storm Sewer L.S. 1 $35,000.00 $35,000.00 Notes: Unless noted, the Nine Mile Creek Watershed District (NMCWD) will cover 100% of approved project costs 50% of costs related to roof drain corrections at 10801 Excelsior Boulevard will be covered by NMCWD 50% of costs related to trail construction will be covered by NMCWD Land acquisition costs will be split between NMCWD and City of Hopkins (25% NMCWD / 75% City) Table 5 -1. Engineer's Opinion of Probable Cost Excelsior Blvd. to 9th Ave. S. Nine Mile Creek Stabilization Project- Hopkins, MN Unit Price Subtotal 15% for Contingencies Engineering, Legal and Administrative (30 %) July 17, 2008 $1,123,800.00 $169,000.00 $388,000.00 Subtotal $1,680,800.00 P: \Mpls \23 MN \2712327G48 9 -Mile Hopkins \WorkFiles \Engineers Opinion of Probable Cost_1.xls Rev Eng Report- north of 9th av 43 DESCRIPTION UNIT EST. QTY. UNIT PRICE EXTENSION Mobilization /Demobilization L.S. 1 $75,000.00 $75,000.00 Storm Sewer Drop Manhole Each 1 $1,500.00 $1,500.00 45- Degree Bend Each 1 $700.00 $700.00 Rock Erosion Control Const. Entrance Each 3 $1,000.00 $3,000.00 Earthwork/Compacted Common Fill (CV) C.Y. 17200 $7.00 $120,400.00 Earthwork/Common Excavation (CV) C.Y. 15000 $10.00 $150,000.00 Excavation, Water Quality Pond and Channels (CV) C.Y. 7350 $10.00 $73,500.00 Excavation, South Park Pond (CV) C.Y. 4000 $35.00 $140,000.00 Excavation, Opportunity Court Water Quality Pond (CV) C.Y. 1330 $10.00 $13,300.00 Water Level Control Weir L.S. 1 $15,000.00 $15,000.00 Boulder Control Outlet L.S. 1 $7,500.00 $7,500.00 Site Restoration (Seed and Mulch) Acre 2 $10,000.00 $20,000.00 Tree Clearing and Brush Removal (< 6" Dia.) Acre 1 $10,000.00 $10,000.00 Remove Selected Tree (> 6" Dia.) Each 25 $900.00 $22,500.00 Remove Existing Gravel Trail w /restoration S.Y. 625 $5.00 $3,100.00 Install Root Wad w/ Footer Log Each 6 $1,200.00 $7,200.00 Fiber Log (Bio Log) L.F. 1250 $8.00 $10,000.00 Steel Sheet Piling Wall S.F. 6750 $45.00 $303,800.00 10' x 60' Prefabricated Steel Bridge Each 3 $22,000.00 $66,000.00 Bridge Abutments Each 3 $25,000.00 $75,000.00 Silt Fence L.F. 2500 $2.00 $5,000.00 Rock Boulder Riffle Each 14 $2,600.00 $36,400.00 Rock Boulder Vane Each 3 $1,600.00 $4,800.00 Riprap (Mn /DOT CL III) Ton 380 $60.00 $22,800.00 Granular Filter Rock Ton 190 $35.00 $6,650.00 Rock Filter Dike Ton 70 $40.00 $2,800.00 Two Rail, Red Cedar Split Rail Fence L.F. 600 $10.00 $6,000.00 Imported Topsoil (CV) 800 $15.00 $12,000.00 Storm Pipe Extension (12" to 24 ") _C.Y. L.F. 85 $30.00 $2,550.00 Storm Pipe Extension (30" to 48 ") L.F. 88 $70.00 $6,160.00 Storm Diversion Pipe (12 ") L.F. 58 $50.00 $2,900.00 12" Pipe Apron Each 1 $600.00 $600.00 Furnish & Install 60" Diameter Manhole Each 1 $5,000.00 $5,000.00 Landscaping and Live Plants L.S. 1 $30,000.00 $30,000.00 Strip, Salvage, and Replace Topsoil C.Y. 1000 $3.00 $3,000.00 Regional Shared -Use Paved Trail S.Y. 3000 $30.00 $90,000.00 Kiosk- Education /Outreach L.S. 1 $10,000.00 $10,000.00 Wetland Mitigation' S.F. 110,000 $2.00_ $220,000.00 1 Wetland mitigation requirements pending official determination by the Army Corps of Engineers Notes: Unless noted, the Nine Mile Creek Watershed District (NMCWD) will cover 100% of approved project costs 50% of costs related to amenity pedestrian bridges (Segment G) will be covered by NMCWD 50% of costs related to trail construction will be covered by NMCWD Land acquisition costs will be split between NMCWD and City of Hopkins (25% NMCWD / 75% City) Table 5 -2. Engineer's Opinion of Probable Cost 9th Ave. S. to Highway 169 Nine Mile Creek Stabilization Project July 17, 2008 Unit Price Subtotal 15% for Contingencies Engineering, Legal and Administrative (30 %) $1,584,000.00 $237,600.00 $546,400.00 Subtotal $2,368,000.00 P: \Mpls \23 MN \27 \2327G48 9 -Mile Hopkins \WorkFiles \Engineers Opinion of Probable Cost_1.xls REV Eng Report- South of 9th Av 44 Segment A - Shape eroded stream banks - Riprap lower stream banks - Construct 8 -foot gravel trail - Revegetate upper stream banks - Consolidate roof drains at 10801 Excelsior Blvd, pipe to creek Segment C - Stabilize 100 feet of east streambank with sheetpile and riprap - Replace two 72" CMPA with a single equivalent culvert Segment D - Stable reach; no action required Segment B - Shape eroded stream banks - Riprap lower stream banks - Revegetate upper stream banks Segment E - Grade northeast area adjacent to alley to provide more gradual slope to creek - Shape eroded stream banks - Riprap lower stream banks - Install drain tile between alley and creek - Plant native trees and shrubs along stream corridor - Add trail to connect to south - Place fieldstone around culverts - Shift creek to southwest as needed to accommodate bank stabilization - Regrade and revegetate southwest streambank Segment F - Shape eroded stream banks - Fieldstone riprap on lower stream banks - Stabalize west bank using rock vane - Plant native shrubs, trees and grasses - Add 8 -foot bituminous trail on east side - Lower storm sewer to normal flow level of creek Connection to Storm Sewer --- Existing Ditch - Existing Channel New Channel Filled Channel New Pipe Sheet Pile M Pedestrian Bridges e Feet 0 150 300 600 FIGURE 4 -1 PROPOSED STREAM IMPROVEMENTS EXCELSIOR BOULEVARD TO 9th AVE SOUTH North Fork of Nine Mile Creek Hopkins, MN E Segment F - Shape eroded stream banks - Fieldstone riprap on lower stream banks - Stabalize west bank using rock vane - Plant native shrubs, trees and grasses `i - Add 8 -foot bituminous trail on east side - Lower storm sewer to normal flow level of creek :X.; Segment G - Create new, meandering channel - Reuse one existing pedestrian bridge - Install one new pedestrian bridge - Avoid park trees - Redirect /extend two stormsewer pipes Segment H - Install sheet pile in embankment next to Westbrooke Way - Construct riffles for grade control - Stabilize banks with rock vanes, c l root wads and stone toe protection Segment J - Reshape eroding banks - Construct riffles for grade control - Stabilize banks with rock veins, root wads and stone toe protection Segment K - Create new meandering channel - Separate stream from pond 3 Relocated Pedestrian Bridge - Divert ditch flow to proposed pond via open channel Pl. - Construct water quality pond - Maintain channel adjacent to Highway 169 for drainage Segment 1 - Create new, meandering channel - Extend stormsewer from community garden - Avoid trees at south end Connection to Storm Sewer Existing Ditch - Existing Channel New Channel W N Filled Channel New Pipe Sheet Pile Pedestrian Bridges ■ Diversion Weir e Feet 0 150 300 600 FIGURE 4 -2 PROPOSED STREAM IMPROVEMENTS 9th AVE SOUTH to HIGHWAY 169 North Fork of Nine Mile Creek Hopkins, MN