Loading...
VI. 1. 2022-08 Cambridge Towers Site Plan Review July 26, 2022 Planning Application 2022-08 Site Plan Review for Renovation of 1301 Cambridge Street Cambridge Towers Proposed Action: Staff recommends the Planning & Zoning Commission adopt the following motion: Move to adopt Planning & Zoning Commission Resolution 2022-05, recommending the City Council Approve the Site Plan application from Hopkins Apartments LLC to rehabilitate the property located at 1301 Cambridge Street (PID 19-117-21-11-0126), subject to conditions. Overview The applicant, Link Wilson of Kaas Wilson Architects (on behalf of Hopkins Apartments LLC), requests site plan approval to allow renovation of the property located at 1301 Cambridge Street. The proposal consists of converting 4 existing offices to 4 apartment units, recladding portions of the exterior of the building, and installation of exterior amenities and landscaping. Based on the findings in this report, staff recommends approval of this request subject to the conditions detailed in the attached resolutions. Primary Issues to Consider • Background • Applicable Zoning • Site Plan Review • Alternatives Supporting Documents • Planning & Zoning Resolution 2022-05 • Applicant’s Letter • Plans & Elevations _____________________ Ryan Krzos, AICP City Planner Financial Impact: $ N/A Budgeted: Y/N ____ Source: _____________ Related Documents (CIP, ERP, etc.): _________________________________________ Notes: Planning Application 2022-08 Cambridge Towers Site Plan Review Page 2 BACKGROUND Development Proposal. Cambridge towers is located to the east of Blake Road and South of Highway 7. The owner of the subject property, Hopkins Apartments, LLC, has recently started repairs to the parking structure that spans much of the site. In the process of working on said repairs, the exterior stucco on the east and west elevations was found to be beyond its useful life. Accordingly, the owner is requesting replacement of the existing stucco with a combination of cement board siding and metal panels. The existing concrete surfaces of the structure would not be replaced. Site plan review is required for this type of exterior modification. The property owner is also proposing additional changes to the exterior including addition of landscaping plantings, creation of resident amenities on an existing plaza to the east of the building, and additional exterior lighting. In conjunction with exterior changes, the owner is also requesting to renovate floor area in the building; principally on the first level. The original building was built with eight office suites on the first level. Throughout the years, a number of these offices were converted to residential units or storage areas. Currently, the first level is laid out in a manner that allows for open access to residential areas from the office suites, leading to tenant safety concerns. As result the owner is requesting to renovate the first floor to convert four existing office spaces to residential units, renovate the existing first floor units, and create additional interior common areas. Neighborhood Meeting. Chapter 7 of the City’s Legislative Policy Manual requires applicants for certain types of zoning applications to hold a neighborhood meeting in addition to the City’s required public hearing process. The purpose of the neighborhood meeting is to expand and enhance the dissemination of information to the residents of the City and to encourage involvement by residents in the planning process. The meeting was held on July 21st in the Cambridge Towers community room. A summary of the meeting and any comments expressed will be provided to the Planning & Zoning Commission during the public hearing. Comments Received Before the Planning & Zoning Commission Public Hearing. This site plan review application requires a public hearing. As required, the City published notice of this public hearing in the local paper and mailed notices directly to those properties within 500’ of the subject property. As of the writing of this report, the City has received no comments on this item. Staff will provided an update on all public comments received to the Planning & Zoning Commission during the public hearing. APPLICABLE ZONING The applicant is requesting that this application be reviewed against the updated zoning code which will be in effect prior to the City Council’s review and action. The existing building, constructed in the 1970’s, conflicts with a significant number of provisions in the new Zoning Ordinance. However, the property possesses a legally nonconforming status with regard to those conflicts since it was established prior to the new code taking effect. With a legally nonconforming property, in general, one is allowed to continue the use, and make certain improvements provided those discrepancies with the code are not made worse or furthered. Staff finds that the requested interior and exterior modifications not only bring the project closer into compliance with the current zoning standards, but also create more livable environment for Planning Application 2022-08 Cambridge Towers Site Plan Review Page 3 residents of the building. SITE PLAN REVIEW Standards for reviewing site plan applications are detailed in Article 13 of Development Code. This section establishes site plan review procedures to make a determination of whether proposed buildings, uses, and structures comply with this development code and with other applicable city regulations. Site plan review is required for any developments that include the reconstruction, replacement, or remodeling of material on 50% or more on any part of the exterior of an existing building. In this case, the proposed project includes replacing more than 50% of the west and east side of the building. Site plan review applications are considered quasi-judicial actions. In such cases, the City is acting as a judge to determine if the regulations within the Comprehensive Plan, Zoning Ordinance or Subdivision Ordinances are being followed. Generally, if this application meets the City's established requirements, it should be approved. Staff’s review of the relevant standards that apply to this application is provided below. As previously noted, the scope of the review was limited to just those elements effected by the proposed changes such as building materials and parking, since the unaffected element are protected as legally nonconforming. Land Use and Zoning Standards. The proposed renovation allows for continuation of the existing multiple household living building generally consistent with the subject property’s future land use and zoning designation. The subject property is guided Activity Center by the Comprehensive Plan and zoned NX2, General Residential Mix. Multiple Housing Living Unit buildings are a permitted use in the MX2 zone. Residential density in the Activity Center designation is 20-60 units per acre. The subject site is 1.89 acres. With the addition of a net of four residential units, 120 total units result, equating to a density of 63.5 units per acre. This would marginally exceed the specified density of the property’s Comprehensive Plan designation. However, in staff’s view the changes do not represent an intensification of uses approved for this property; and thus does not represent that type of development/redevelopment activity the Plan speaks to. This determination would not hold were this a teardown and reconstruction of the building or even a building addition to accommodate more units. Furthermore, the proposed project is consistent with a number of the goals and policies of the plan including the goal of supporting and strengthening the city’s residential areas with reinvestment. Materials. Building material requirements are specified in the code with standards based on the orientation of the elevation. The proposed recladding would occur on the east and west elevations, which are considered side or non-street facades. Non-street façades have the widest pallet of allowed materials. The new materials proposed include vertical seem metal panels, and two varieties of lap cement board siding. Said materials are allowed on non-front facades without limitation to the extent of their use. The north and south facing facades would remain unchanged. Vehicle Parking. Parking standards are detailed in Article 9 – Parking and Mobility. The building, inclusive of the net new residential units, would exceed the minimum number of parking stalls required. Parking is required at a ratio of one stall per efficiency and 1 bedroom unit and two stalls per 2 or more bedroom units. As proposed, there would be 124 stalls required based on 96 efficiency and 1 bedroom units, and 14 – 2 bedroom units. A total of 168 Planning Application 2022-08 Cambridge Towers Site Plan Review Page 4 stalls are provided with 38 surface stalls and 130 covered garage stalls. Bicycle Parking. Bicycle parking is required at a ratio of 1.1 stalls per unit. The Zoning Ordinance stipulates that in instances where expansions are proposed to existing buildings or uses, only the new area is required to comply with parking standards. As such, bicycle parking standards should be applied to the four net new units, resulting in a total of four bicycle stalls being required. Staff is recommending a condition requiring that the applicant provide four stalls meeting the requirements for longer term parking on revised plans. Landscaping. A significant number of new plantings are provided in the area between and the building and parking area and the Cambridge Street right-of-way. These plantings are in area of the existing front yard, and frame a new seating area connected to the sidewalk by way of a new paved connection. Staff recommends a condition of approval require the applicant to provide a landscape and pedestrian/streetscape letter of credit in a form acceptable to the City Attorney for 125% of the value of all improvements. The City will hold the letter of credit until the plantings have survived at least one growing season Impervious Coverage. The NX2 zoning district has an impervious area coverage maximum of 60%. The existing condition exceeds this requirement with 85.7% of the site covered by building and/or paved surfaces. The proposed site improvements would result in a slight net reduction in the amount of impervious surface, down to 85.5%. As previously noted the improvements are allow to be made provided the site moves closer to compliance with the 60% maximum. Exterior Lighting. Additional site lighting is proposed as pole lights, bollard, and wall mounted lighting on and around the building and parking area. The proposed lighting design would meet the limitation on the amount of light spillover onto adjoin properties and mounting height requirements. However, the lighting design proposes several uplights mounted on the building 45 feet above the ground. This type of lighting would conflict with the code requirement that fixtures be shielded to prevent upward trespass of light. It should be noted that lessor intensity lighting, those not exceeding 1,000 lumens would be exempt from the shielding standards. As a result, staff is recommending a condition that the uplights be removed from the plan or revised to use a lessor intensity light. ALTERNATIVES 1. Recommend approval of the site plan application. By recommending approval, the City Council will consider a recommendation of approval. 2. Recommend denial of the site plan application. By recommending denial, the City Council will consider a recommendation of denial. Should the Planning & Zoning Commission consider this option, it must also identify specific findings that support this alternative. 3. Continue for further information. If the Planning & Zoning Commission indicates that further information is needed, the items should be continued. CITY OF HOPKINS Hennepin County, Minnesota PLANNING & ZONING COMMISSION RESOLUTION 2022-05 A RESOLUTION RECOMMENDING THE CITY COUNCIL APPROVE THE SITE PLAN APPLICATION TO RENOVATE THE PROPERTY LOCATED AT 1301 CAMBRIDGE STREET (PID 19-117-21-11-0126), TO CONVERT EXISTING BUILDNG SPACE INTO RESIDENTIAL UNITS, RE-CLAD PORTIONS OF THE BUILDING EXTERIOR, AND EXTRIOR SITE IMPROVEMENTS, SUBJECT TO CONDITIONS WHEREAS, the applicant, Link Wilson of Kaas Wilson Architects on behalf of Hopkins Apartments LLC, initiated an application for site plan approval to Renovate the Property Located at 1301 Cambridge Street (PID 19-117-21-11-0126). The proposal consists of converting 4 existing offices to 4 apartment units, recladding portions of the exterior of the building, and installation of exterior amenities and landscaping, and; WHEREAS, the subject property is legally described as Lot 2, Block 1, Knollwood Crossings, Hennepin County, Minnesota; and WHEREAS, the procedural history of the application is as follows: 1. That the above stated application was initiated by the applicant on June 24, 2022; 2. That the Hopkins Planning and Zoning Commission, pursuant to published and mailed notice, held a public hearing on the application and reviewed such application on July 26, 2022: all persons present were given an opportunity to be heard; and, 3. That written comments and analysis of City staff were considered; and, WHEREAS, staff recommended approval of the above stated application based on the findings outlined in the staff report dated July 26, 2022. NOW, THEREFORE, BE IT RESOLVED that the Planning & Zoning Commission of the City of Hopkins hereby recommends the City Council approve the Site Plan application from Hopkins Apartments LLC to rehabilitate the property located at 1301 Cambridge Street (PID 19-117-21-11- 0126), subject to the conditions listed below. 1. Compliance with the applicable standards of the NX2, General Residential Mix Zone. 2. Approval of all necessary permits from the Building, Engineering and Fire Departments. 3. Submittal of revised lighting plan removing proposed uplighting or revision to fixtures having output of less than 1,000 lumens. 4. Provide a landscape letter of credit equal to 1.5 times the cost of all plantings. The City shall hold this security until all plantings have survived at least one full growing season. 5. Addition of at least four bicycle parking spaces all of which must meet the Long-Term Bicycle Parking and Storage Spaces requirements. 6. Submittal of fence details prior to building permits. 7. If applicable, approval of the development by the Minnehaha Creek Watershed District and conformance with all related conditions. 8. Payment of all applicable development fees including, but not limited to SAC and City Attorney fees. Adopted this 26th day of July, 2022. _______________________ Nathan White, Chair MEMORANDUM Tel: 612.879.6000 1301 American Blvd E. Suite 100, Bloomington, MN 55425 www.kaaswilson.com Page 1 of 4 Date: June 23, 2022 Attention: City of Hopkins Planning Staff Re: Cambridge Tower Narrative RESIDING & PERMANENT PARKING REQUEST OUTLINE 1. Project History 2. History of Transaction 3. Update on Current Garage Resurfacing & Wall Shoring 4. Construction Parking 5. Failing Stucco 6. Interior Remodel 7. Overall Parking & Site Proposal 8. Conclusion __________________________________________________________________________ 1. Project History The Cambridge Towers apartments, was designed in 1975 and opened in late 1976. During this time, it preceded the City of Hopkins parking ratio requirements of 2 stalls per unit which was adopted in 1978. The building’s original design had 119 multi-family units with an additional 4 commercial spaces on the first floor. Given today’s environment, these commercial spaces appear to be a security risk for the residents. Tel: 612.879.6000 1301 American Blvd E, Bloomington, MN 55425 www.kaaswilson.com Page 2 of 4 2. History of Transaction Brian Fetterman, a Minnesota native & IPG President, purchased a large portfolio of Minnesota properties in late 2019. At some time prior to this transaction, there was a sell-off of an adjacent property to the west where 26 parking stalls that sits within the Cambridge Towers property line were included. Therefore, when IPG Living purchased the Cambridge Tower, with no knowledge of the exclusion of the 26 stalls, there was a parking challenge based on the parking requirements of the current zoning ordinance. Additionally, the below grade parking garages began to show signs of structural movement. 3. Update on Current Garage Resurfacing & Wall Shoring IPG Living retained Kaas Wilson Architects and Braun Intertec to survey the garage and verify structural stability and propose a plan to improve parking on the site. In October of 2021, a permit was pulled by Langerman Construction to repair the garage structure and to also make subtle site improvements such as adding surface parking on the North and East of the property, as well as landscaping and lighting improvements. 23 parking stalls were added to the north side of the property that was previously underutilized, as part of Phase 1 of the site improvements. Tel: 612.879.6000 1301 American Blvd E, Bloomington, MN 55425 www.kaaswilson.com Page 3 of 4 4. Construction Parking Currently there is an agreement with Commonbond Communities across the street, at address 8815 Minnesota Highway 7, St Louis Park for temporary parking. IPG Living would like to contract with Frana Construction who will be building on the above mentioned site for 15 overnight stalls until October 31st ,2022 when the garage remodel is expected to be completed. 5. Failing Stucco As the waterproofing process began while the underlying garage structure is being solidified, we had to remove stucco in order to waterproof up the wall. As a result of this process, we have found that the existing stucco is beyond its useful life and must be replaced. Existing city ordinance asks for brick to be used on the project. However, as confirmed by our Structural Engineer in letter attached, demonstrates that we need an alternative to brick. The building will require a lighter exterior cladding to keep the structure intact. Variance: Exterior Cladding – Sec. 102-276. Architectural Standards 6. Interior Remodel As Langerman Construction, Kaas Wilson and IPG are on the site continuously, we learn more and more about this property and wish to make strategic improvements to enhance the living quality of the residents. As part of the site updates, we are also asking to make improvements to the interior. This would require removal of the existing offices that pose as a security risk and update these spaces with a combination of amenities and dwelling units. The total number of entities in the building will remain the same at 123. Thus, as part of this proposal, we are requesting to convert 4 existing offices to 4 apartment units and also update 5 unused units on first floor to meet today’s Accessibility and Adaptability guidelines as well as new unit bathroom fixtures and kitchen/bath finishes. 7. Overall Parking & Site Proposal Per the new zoning ordinance ( In-Review), the current parking count proposed will meet the requirements stated in Article 9. Please see plans for required parking count & final proposed total. As part of the Phase 1 site improvements, parking was introduced on the east side of the site. However, in discussion with the city, the site was lacking in total open space that would meet existing ordinance. Therefore, we would like to propose a larger plaza and open space on the east Tel: 612.879.6000 1301 American Blvd E, Bloomington, MN 55425 www.kaaswilson.com Page 4 of 4 side to meet the 1:1 ratio requirement in the current ordinance. Please see plans for open space ratio calculation. 8. Conclusion These improvements are not meant to reposition the property into a luxury/high-end apartment complex. Rather, it is a much needed maintenance and repair of both interiors and exteriors that will improve and enhance residents livelihood and experience. We are looking for planning commission and council to approve a beautiful exterior cladding design to enhance the aesthetic but to also enhance energy saving through new windows. Additionally, we are looking to address interior safety concerns within the building, and update these spaces to amenity and apartment units. Lastly, we would also like to create recreation spaces to the east side of the building that would serve different resident interests and add a landscape screen along the east property line to be respectful of our neighbors. AC AIR CONDITIONER ACOUST ACOUSTIC/ACOUSTICAL ACT ACOUSTIC TILE ADH ADHESIVE AFF ABOVE FINISH FLOOR AGGR AGGREGATE ALT ALTERNATE ALUM ALUMINUM AP ACCESS PANEL ARCH ARCHITECTURAL ASPH ASPHALT AVE AVENUE BD/BDS BOARD/BOARDS BFE BOTTOM OF FOOTING BITUM BITUMINOUS BKT BRACKET BLDG BUILDING BLK BLOCK BLKG BLOCKING BLVD BOULEVARD BM BEAM/BENCH MARK BOT BOTTOM BR BEDROOM BRG BEARING BRK BRICK BSMT BASEMENT BTWN BETWEEN CAB CABINET CB CATCH BASIN CEM CEMENT CFB CEMENT FIBER BOARD CG CORNER GUARD CIP CAST IRON PIPE CJ CONTROL JOINT CL CENTER LINE CLG CEILING CLKG CAULKING CLO CLOSET CMU CONC MASONRY UNIT CNTR COUNTER CO COMPANY COL COLUMN COMB COMBINATION COMP COMPOSITION CONC CONCRETE CONST CONSTRUCTION CONT CONTINUOUS CONTR CONTRACTOR CORP CORPORATION CORR CORRIDOR CPT CARPET CR CURTAIN ROD CSK COUNTERSINK CT CERAMIC TILE CTOP COUNTER TOP CU FT CUBIC FOOT CU IN CUBIC INCH CU YD CUBIC YARD D DRYER DBL DOUBLE DEPT DEPARTMENT DET DETAIL DF DRINKING FOUNTAIN DIA DIAMETER DIAG DIAGONAL DIM DIMENSION DIV DIVISION DN DOWN DPRF DAMPPROOF DS DOWNSPOUT DWG DRAWING DWR DRAWER EA EACH EIFS EXTERIOR INSULUATION & FINISH SYSTEM EL ELEVATION ELEC ELECTRIC/ELECTRICAL ELEV ELEVATOR ENGR ENGINEER ENT ENTRANCE EQ EQUAL EQUIP EQUIPMENT EST ESTIMATE EW EACH WAY EWC ELECTRIC WATER COOLER EX EXISTING EXC EXCAVATE EXH EXHAUST EXP JT EXPANSION JOINT EXT EXTERIOR F TO F FACE TO FACE FAB FABRICATE FD FLOOR DRAIN FDN FOUNDATION FEC FIRE EXTINGUISHER CABINET FEP FINISHED END PANEL FE FIRE EXTINGUISHER FF FINISH FACE FH FIRE HOSE FIG FIGURE FIN FINISH/ FINISHED FIX FIXTURE FL FLOOR FLASH FLASHING FLUOR FLUORESCENT FM FACE OF MASONRY FOW FACE OF WALL FPRF FIREPROOF FR FRAME FRP FIBER REINFORCED POLYMER FS FACE STUD FSH FACE OF SHEATHING FT FOOT/FEET FTG FOOTING FURN FURNISH FURR FURRING F.V.FIELD VERIFIED G GAS GA GAUGE GAL GALLON GALV GALVANIZED GAR GARAGE GB GRAB BAR GC GENERAL CONTRACTOR GEN GENERAL GI GALVANIZED IRON GL GLASS/GLAZING GOVT GOVERNMENT GPBD GYPSUM WALLBOARD GPM GALLON PER MINUTE GR GRADE GRTG GRATING GS GREASE SHIELD GYP GYPSUM HB HOSE BIB HC HOLLOW CORE HD HEAD HDRL HANDRAIL HDWD HARDWOOD HDW HARDWARE HM HOLLOW METAL HORIZ HORIZONTAL HR HOUR HT HEIGHT HWY HIGHWAY ID IDENTIFICATION/INSIDE DIA IN INCH INCL INCLUDE INC INCORPORATE INFO INFORMATION INSUL INSULATE/INSULATION INT INTERIOR INV INVERT JAN JANITOR JCT JUNCTION JT JOINT JST JOIST KD KNOCK DOWN KIT/K KITCHEN L LINEN LAB LABORATORY LAD LADDER LAM LAMINATE LAT LATITUDE LAV LAVATORY LB/LBS POUND/POUNDS LBR LUMBER LD LOAD LDG LOADING LG LENGTH LH LEFT HAND LIB LIBRARY LIN LINOLEUM LNDY LAUNDRY LOA LENGTH OVERALL LONG LONGITUDE LR LIVING ROOM LT LIGHT MACH MACHINE MAS MASONRY MATL MATERIAL MAX MAXIMUM MC MEDICINE CABINET MECH MECHANICAL MEMB MEMBRANE MEMO MEMORANDUM MEZZ MEZZANINE MFG MANUFACTURED MFR MANUFACTURER MH MANHOLE MIN MINIMUM MIR MIRROR MISC MISCELLANEOUS MLDG MOULDING MO MASONRY OPENING MOD MODULAR MTL METAL MTD MOUNTED MULL MULLION N NORTH NIC NOT IN CONTRACT NO/#NUMBER NOM NOMINAL NTS NOT TO SCALE OA OVERALL OC ON CENTER OD OVERFLOW DRAIN OFF OFFICE OPNG OPENING OPP OPPOSITE ORIG ORIGINAL OSB ORIENTED STRAND BOARD OZ OUNCE P&G PITCH & GRAVEL PASS PASSENGER PCF POUNDS PER CUBIC FOOT PED PEDESTRIAN TRAFFIC COATING PER PERIMETER PERF PERFORATE PERP PERPENDICULAR PIL PILASTER P LAM PLASTIC LAMINATE PL PLATE PLAS PLASTER PLMB PLUMBING PLYWD PLYWOOD PNEU PNEUMATIC POL POLISHED PORC PORCELAIN PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PT PAINT/POINT PTD PAPER TOWEL DISPENSER PTN PARTITION PREFAB PREFABRICATED PREFIN PREFINISHED PROP PROPERTY PUR PURLINS QR QUARTER/QUARTER-ROUND QT QUARRY TILE QTY QUANTITY R RISER R&S ROD & SHELF RAD RADIATION/RADIUS RB RESILIENT BASE RC RESILIENT CHANNEL RCT RUBBER COMPOSITION TILE RD ROAD/ROUND/ROOF DRAIN RECP RECEPTACLE REC RECESSED REF REFERENCE REFRIG REFRIGERATOR REG REGULAR/REGISTER REINF REINFORCE/REINFORCING REQD REQUIRED RESIL RESILIENT RET RETURN RH ROBE HOOK/RIGHT HAND RFG ROOFING RM ROOM RO ROUGH OPENING RS REDUCER STRIP RWD REDWOOD RWL RAIN WATER LEADER S SOUTH SAN SANITARY SB SPLASH BLOCK SC SOLID CORE SCHED SCHEDULE SD SOAP DISH S DISP SOAP DISPENSER SEC SECOND SECT SECTION SH SHELF/SHINGLES SHR SHOWER SHT SHEET SHTG SHEATHING SID SIDING SIM SIMILAR SLID SLIDING SM SMOOTH (FINISH) SND SANITARY NAPKIN DISPENSER SNR SANITARY NAPKIN RECEPTACLE SPEC SPECIFICATION SQ SQUARE SS SERVICE SINK SSA S INGLE STRENGTH A S STL STAINLESS STEEL ST STREET STD STANDARD STL STEEL STOR STORAGE STR STRINGER STXT SPRAY TEXTURE SUB FL SUBFLOOR SUSP SUSPENDED SV SHEET VINYL S4S SURFACED FOUR SIDES T TREAD T&G TONGUE & GROOVE TB TOWEL BAR TC TOP OF CURB TECH TECHNICAL TEL TELEPHONE TEMP TEMPERED TERR TERRAZZO TEX TEXTURE TFE TOP OF FOOTING ELEV THRESH THRESHOLD THRU THROUGH TK BD TACKBOARD T.O TOP OF . . . TPH TOILET PAPER HOLDER TRANS TRANSOM TV TELEVISION TW TOP OF WALL TYP TYPICAL UL UNDERWRITER'S LAB, INC UNO UNLESS NOTED OTHERWISE VAN VANITY VB VAPOR BARRIER/VINYL BASE VEN VENEER VENT VENTILATOR VERT VERTICAL VEST VESTIBULE VFY VERIFY VIN VINYL VNL VINYL VWC VINYL WALL COVERING VCP VITRIFIED CLAY PIPE VCT VINYL COMP TILE W WEST/WASHER W/WITH W/O WITHOUT WC WATER CLOSET WD WOOD WDW WINDOW WI WROUGHT IRON WP WATERPROOF WR WATER RESISTAN WS WEATHERSTRIP WSCT WAINSCOTING WT WEIGHT WWF WELDED WIRE FABRIC YD YARD ABBREVIATIONS (These patterns are scaled for 1-1/2"= 1'-0"details) FOAM/POURED IN PLACE INSUL EARTH CONCRETE MASONRY UNIT STEEL RIGID INSULATION OR BRICK/ MANUFACTURED STONE CONCRETE SAND GRANULAR FILL GYPSUM BOARD ROUGH WOOD QUARRY OR CERAMIC TILE WOOD STUD WALL WOOD BLOCKING OR SHIM BATT INSULATION (INSUL-10) PLYWOOD 1 1 AXXX 1 DOOR NUMBER ROOM NAME / NUMBER INTERIOR/EXTERIOR WALL TYPE, FLOOR-CEILING TYPE REVISION CLOUD DETAIL CALLOUT BREAK LINE HDCP SYMBOL ELEVATION / WORK POINT NORTH ARROW KEYNOTES ADDENDUM, CHANGE ORDER, PROPOSAL REQUEST, ARCHITECTS SUPPLEMENTAL INSTRUCTIONS INTERIOR ELEVATION DETAIL SECTION ELEVATION A X X AXXX X AXXX AXXX A B C D ? ? ? X AXXX N C D B UNIT NUMBER / NAME DETAIL NUMBER? ?? ? SYMBOLS KEY ? ? ? CASEWORK TAG PARKING TAG WINDOW TAG HATCH KEY FLOOR & WALL FINISH TAG MILLWORK FINISH TAG CPT-1 PL-1 NOT FORCONSTRUCTIONDate Drawn By Checked By Project Number 1301 American Blvd. E. Suite 100 Bloomington, MN 55425 tel: (612) 879-6000 fax: (612) 879-6666 www.kaaswilson.com Copyright Kaas Wilson ArchitectsAs indicated6/24/2022 11:55:14 AMC:\Revit Local\22025 -Cambridge Renovation_V3_adams2MVKQ.rvtCover Sheet Link W. Adam S. 06/24/2022 22025 Cambridge Tower -Siding & Interior Remodel Sage Apartment Communities A000 Cambridge Tower - Siding & Interior Remodel 1301 Cambridge St, Hopkins, MN 55343 1301 Cambridge St, Hopkins, MN 55343 General Contractor: Langerman Exteriors 8416 Xerxes Ave. N. Brooklyn Park, MN 55444 Contact: Troy Poirier (612) 578-7709 troyp@langermanexteriors.com Mechanical (Design/Build): A.R. Engh Mechanical Contact: Michael Melz (763) 229-4667 mwelz@arengh.com Electrical (Design/Build): Oaks Electric Contact: Dewey (612) 366-6574 Structural: Braun Intertec 1826 Buerkle Road St. Paul, MN 55110 Contact: Kim Deibel, PE C: (651) 245-3876 KDeibel@braunintertec.com Civil/Landscape: Civil Site Group Inc. 4931 W 35th St. Suite 200 St. Louis Park, MN 55416 Contact: Matt Pavek O: (612) 615-0060 Mpavek@civilsitegroup.com 18006 Sky Park Circle Irvine, CA 92614 Drawing Index Sheet Number Sheet Name Original Issue Date Current Revision Date A000 Cover Sheet 06/24/2022 V1.0 SITE SURVEY 05/24/2021 C2.0 SITE PLAN 06/24/2022 C3.0 GRADING PLAN 06/24/2022 L1.0 LANDSCAPE PLAN 06/24/2022 A030 Existing - Levels 1 + 2 06/24/2022 A200 Proposed - Level 1 06/24/2022 A201 Proposed - Level 2 06/24/2022 A500 Exterior Elevations 06/24/2022 A501 Exterior Elevations 06/24/2022 A900 Photography & Renderings 06/24/2022 A901 Photography & Renderings 06/24/2022 -.- Photometric Plan 06/23/2022 SITE SITE MAP N ARTISTIC RENDERING OF PROPOSED NEW CLADDING UNIT MIX (RENOVATED ONLY)- GROSS AREA Name Count Unit Gross Area %Main Floor 0 BR (Studio) Unit 0-0 3 519 ft² 30% 1 BR Unit 1-0 1 733 ft² 10% Unit 1-1 1 719 ft² 10% Unit 1-2 - Type A 1 722 ft² 10% 2 BR Unit 2-0 2 1,239 ft² 20% Unit 2-1 2 1,252 ft² 20% Grand total 10 PARKING Level Type Count Level -1 Garage 130 Level 1 Plaza East 1 Level 1 Plaza West 37 168 PROJECT SCOPE 1. Proposal to add parking stalls and exterior amenity on a back deck that prior to renovation was an open concrete patio, owner will dex -o -tex treat the drivable surface with yearly check ins with Braun Intertec 2.Proposal to Reside and replace windows on the exterior of the building The reside will include decorative up lighting and backlit building signage. All other monument signage will be removed. 3.Proposal to renovate the first floor and to convert 4 empty office spaces to apartment units and renovate other first floor units to be adaptable with one accessible. No units in the building comply with MN Accessibility Code PARKING CALCULATIONS PER HOPKINS, NEW ZONING ORDINANCE ARTICLE 9: PARKING & MOBILITY REQUIRED: 1 / 1 BR UNIT 2 / 2 BR UNIT EXISTING 1 BR -90 UNITS = 90 stalls 2 BR -10 UNITS = 20 stalls RENOVATED 1 BR -6 UNITS = 6 stalls 2 BR - 4 UNITS = 8 STALLS TOTAL: 124 PARKING STALLS REQ. Rev. No.RevisionDate REVISION SUMMARYDATEDESCRIPTIONV1.0SITE SURVEY8/26/21ADDENDUM 2..........22 CAMBRIDGE STREETDIVISION STREETN88°33'54"W 273.80S0°24'51"W 304.99S88°34'04"E 268.10N1°29'08"E 304.93 12PROPOSEDCOFFEE BAR517 ft²Unit 0-0ELEV.ELEV.A5001PARKING (x37 STALLS,2 ADA)1,239 ft²Unit 2-1AMENITYPLAZA1,239 ft²Unit 2-1EXISTINGMANAGER'SAPARTMENT TORECEIVEACCESSIBILITYUPDATEMAIL519 ft²Unit 0-0519 ft²Unit 0-0A2501HAMMERHEAD FORSERVICE VEHICLES07070707071111110801 06719 ft²Unit 1-1722 ft²Unit 1-2 - Type A122 ft²Stair119 ft²Stair104 ft²Bathroom110 ft²Bathroom57 ft²Storage737 ft²Office Space368 ft²Lobby273 ft²Elevator Lobby210 ft² Package262 ft²Office Space (Existing)531 ft²Fitness525 ft²Seating Area55 ft² Storage 522 ft² Corridor 733 ft²Unit 1-0365 ft² Corridor 983 ft²Community RoomCONSTRUCTIONLIMITSFAN AREA WELL,COORDINATE WITHARCHFAN AREA WELL,COORDINATE WITHARCHOPTIONAL:BITUMINOUS OVERLAY ANDRESTRIPE EXISTING PARKINGSTALLS- FEATHER INTO EXISTINGBIT. DRIVE AISLE PAVINGVEGETATED SWALEMATCH EXISTING CITYSIDEWALK, TYP.BIT. DRIVEWAY PERCITY STANDARDS,TYP.HC SIGNSNP SIGNS, TYP.22.0'SEE ARCH PLANSFOR FINAL EASTAND WEST PATIOLAYOUTSAW CUT ANDREPLACEPAVEMENT IN KINDFOR UTILITYINSTALLATIONSAW CUT AND REPLACEPAVEMENT IN KIND FOROPTIONAL UTILITYINSTALLATION,COORDINATE WITH OWNERWINDOW WELLS TO BEFILLED WITHBITUMINOUS , PER CITYSTANDARDSNOPARKINGLFO=915.8534.3'18.0'16.0'18.0'COMPACTPARKINGSTALLREGULARPARKINGSTALL5264BOULDERSURROUNDED BYPLANTINGS4.0'7.0'4" CONCRETECURB, SEE DETAILSYNTHETIC TURF,COORDINATE WITH ARCH.FOR STYLE. INSTALL PERMANUFACTURERSREQUIREMENTSOPEN PLAY AREAOUTDOOR AMENITY DECK,COORDINATE WITH ARCH.FOR FURNISHINGS ANDPROGRAMING7.1'15.1'7.3'9. 2 '4.0'11.1'4.6'8.7'45°0'0"6' BENCH COORDINATE WITHARCH. FOR STYLE. INSTALLPER MANUFACTURERSINSTRUCTIONS4' ALUMINUMORNAMENTALFENCE, TYP.36" SWING GATE W/REQUIRED HARDWARE36" SWING GATE W/REQUIRED HARDWARECONCRETESIDEWALK PER CITYSTANDARDS, TYP.Civil Engineering Surveying Landscape Architecture4931 W. 35th Street, Suite 200St. Louis Park, MN 55416civilsitegroup.com 612-615-0060CAMBRIDGE TOWER APARTMENTS 1301 CAMBRIDGE ST., HOPKINS, MN 55343 1301 AMERICAN BLVD. E, SUITE 100, BLOOMINGTON, MN 55425 KAAS WILSON ARCHITECTS PROJECT ISSUE/SUBMITTAL SUMMARYDATEDESCRIPTION............PROJECT NUMBER:202828/6/2021PERMIT SET06/24/22SITE PLAN REVIEW - PHASE II..06/11/21BID SETDRAWN BY:REVIEWED BY:MW, KW, JSMP..............6/24/2022 11:00:21 AMCOPYRIGHT CIVIL SITE GROUP INC.c44263Matthew R. PavekLICENSE NO.DATEI HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OFMINNESOTA.6/24/228/4/2021WATERSHED SUBMITTAL8/24/2021WATERSHED SUBMITTAL9/2/2021WATERSHED SUBMITTALREVISION SUMMARYDATEDESCRIPTIONC2.0SITE PLAN6/25/21ADDENDUM 18/26/21ADDENDUM 2........SITE AREA TABLE:1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACEANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.2.CONTRACTOR SHALL VERIFY LOCATIONS AND LAYOUT OF ALL SITE ELEMENTS PRIOR TO BEGINNING CONSTRUCTION,INCLUDING BUT NOT LIMITED TO, LOCATIONS OF EXISTING AND PROPOSED PROPERTY LINES, EASEMENTS, SETBACKS,UTILITIES, BUILDINGS AND PAVEMENTS. CONTRACTOR IS RESPONSIBLE FOR FINAL LOCATIONS OF ALL ELEMENTS FOR THESITE. ANY REVISIONS REQUIRED AFTER COMMENCEMENT OF CONSTRUCTION, DUE TO LOCATIONAL ADJUSTMENTS SHALL BECORRECTED AT NO ADDITIONAL COST TO OWNER. ADJUSTMENTS TO THE LAYOUT SHALL BE APPROVED BY THEENGINEER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION OF MATERIALS. STAKE LAYOUT FOR APPROVAL.3.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION, INCLUDING A RIGHT-OF-WAY ANDSTREET OPENING PERMIT.4.THE CONTRACTOR SHALL VERIFY RECOMMENDATIONS NOTED IN THE GEO TECHNICAL REPORT PRIOR TO INSTALLATION OFSITE IMPROVEMENT MATERIALS.5.CONTRACTOR SHALL FIELD VERIFY COORDINATES AND LOCATION DIMENSIONS OF THE BUILDING AND STAKE FOR REVIEWAND APPROVAL BY THE OWNERS REPRESENTATIVE PRIOR TO INSTALLATION OF FOOTING MATERIALS.6.LOCATIONS OF STRUCTURES, ROADWAY PAVEMENTS, CURBS AND GUTTERS, BOLLARDS, AND WALKS ARE APPROXIMATE ANDSHALL BE STAKED IN THE FIELD, PRIOR TO INSTALLATION, FOR REVIEW AND APPROVAL BY THE ENGINEER/LANDSCAPEARCHITECT.7.CURB DIMENSIONS SHOWN ARE TO FACE OF CURB. BUILDING DIMENSIONS ARE TO FACE OF CONCRETE FOUNDATION.LOCATION OF BUILDING IS TO BUILDING FOUNDATION AND SHALL BE AS SHOWN ON THE DRAWINGS.8.THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OR SAMPLES AS SPECIFIED FOR REVIEW AND APPROVAL BY THEENGINEER/LANDSCAPE ARCHITECT PRIOR TO FABRICATION FOR ALL PREFABRICATED SITE IMPROVEMENT MATERIALS SUCHAS, BUT NOT LIMITED TO THE FOLLOWING, FURNISHINGS, PAVEMENTS, WALLS, RAILINGS, BENCHES, FLAGPOLES, LANDINGPADS FOR CURB RAMPS, AND LIGHT AND POLES. THE OWNER RESERVES THE RIGHT TO REJECT INSTALLED MATERIALS NOTPREVIOUSLY APPROVED.9.PEDESTRIAN CURB RAMPS SHALL BE CONSTRUCTED WITH TRUNCATED DOME LANDING AREAS IN ACCORDANCE WITH A.D.A.REQUIREMENTS-SEE DETAIL.10.CROSSWALK STRIPING SHALL BE 24" WIDE WHITE PAINTED LINE, SPACED 48" ON CENTER PERPENDICULAR TO THE FLOW OFTRAFFIC. WIDTH OF CROSSWALK SHALL BE 5' WIDE. ALL OTHER PAVEMENT MARKINGS SHALL BE WHITE IN COLOR UNLESSOTHERWISE NOTED OR REQUIRED BY ADA OR LOCAL GOVERNING BODIES.11.SEE SITE PLAN FOR CURB AND GUTTER TYPE. TAPER BETWEEN CURB TYPES-SEE DETAIL.12.ALL CURB RADII ARE MINIMUM 3' UNLESS OTHERWISE NOTED.13.CONTRACTOR SHALL REFER TO FINAL PLAT FOR LOT BOUNDARIES, NUMBERS, AREAS AND DIMENSIONS PRIOR TO SITEIMPROVEMENTS.14.FIELD VERIFY ALL EXISTING SITE CONDITIONS, DIMENSIONS.15.PARKING IS TO BE SET PARALLEL OR PERPENDICULAR TO EXISTING BUILDING UNLESS NOTED OTHERWISE.16.ALL PARKING LOT PAINT STRIPPING TO BE WHITE, 4" WIDE TYP.17.BITUMINOUS PAVING TO BE "LIGHT DUTY" UNLESS OTHERWISE NOTED. SEE DETAIL SHEETS FOR PAVEMENT SECTIONS.18.ALL TREES THAT ARE TO REMAIN ARE TO BE PROTECTED FROM DAMAGE WITH A CONSTRUCTION FENCE AT THE DRIP LINE.SEE LANDSCAPE DOCUMENTS.19.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACEANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.SITE LAYOUT NOTES:SITE PLAN LEGEND:TRAFFIC DIRECTIONAL ARROW PAVEMENT MARKINGS(IF APPLICABLE)CITY OF HOPKINS SITE SPECIFIC NOTES:SIGN AND POST ASSEMBLY (IF APPLICABLE).SHOP DRAWINGS REQUIRED.HC = ACCESSIBLE SIGNNP = NO PARKING FIRE LANEST = STOPCP = COMPACT CAR PARKING ONLY01" = 20'-0"20'-0"10'-0"N1.RESERVED FOR CITY SPECIFIC NOTES.Know what'sbelow.before you dig.CallRCONCRETE PAVEMENT (IF APPLICABLE) ASSPECIFIED (PAD OR WALK) SEE GEOTECHNICALREPORT FOR AGGREGATE BASE & CONCRETEDEPTHS, SEE DETAIL.PROPERTY LINECURB AND GUTTER-SEE NOTES (T.O.) TIP OUTGUTTER WHERE APPLICABLE-SEE PLANLIGHT DUTY BITUMINOUS PAVEMENT (IF APPLICABLE).SEE GEOTECHNICAL REPORT FOR AGGREGATE BASE& WEAR COURSE DEPTH, SEE DEATIL.HEAVY DUTY BITUMINOUS PAVEMENT (IFAPPLICABLE). SEE GEOTECHNICAL REPORT FORAGGREGATE BASE & WEAR COURSE DEPTH, SEEDETAIL.CONSTRUCTION LIMITSTOPERVIOUS PAVEMENT (IF APPLICABLE) - CONCRETEPAVER PERVIOUS SYSTEM. INCLUDE ALL BASEMATERIAL AND APPURTENANCES AS SPECIFIED PERMANUFACTURER SPECIFICATIONS & INSTRUCTIONS.MAKE: BELGARD, OR EQUIVILANTMODEL: AQUASTONE, OR EQUIVILANTCOLOR: T.B.D. - PROVIDE SAMPLES, SHOP DRAWINGS & PRODUCT DATA REQUIRED PRIORTO CONSTRUCTION.SPECIALTY PAVEMENT (IF APPLICABLE) - PROVIDE BIDFOR THE FOLLOWING OPTIONS, INCLUDE VARIATIONSOF BASE MATERIAL AND OTHER NECESSARYCOMPONENTS.1. STAMPED & COLORED CONCRETE2. CONCRETE PAVERSMAKERS, COLORS, MODELS, & PATTERN TO BEINCLUDED IN SHOP DRAWING SUBMITTAL PRIOR TOCONSTRUCTION.ACCESSIBILITY ARROW (IF APPLICABLE) DO NOTPAINT. CAMBRIDGE STREETDIVISION STREETN88°33'54"W 273.80S0°24'51"W 304.99S88°34'04"E 268.10N1°29'08"E 304.93 12PROPOSEDCOFFEE BAR517 ft²Unit 0-0ELEV.ELEV.A5001PARKING (x37 STALLS,2 ADA)1,239 ft²Unit 2-1AMENITYPLAZA1,239 ft²Unit 2-1EXISTINGMANAGER'SAPARTMENT TORECEIVEACCESSIBILITYUPDATEMAIL519 ft²Unit 0-0519 ft²Unit 0-0A2501HAMMERHEAD FORSERVICE VEHICLES07070707071111110801 06719 ft²Unit 1-1722 ft²Unit 1-2 - Type A122 ft²Stair119 ft²Stair104 ft²Bathroom110 ft²Bathroom57 ft²Storage737 ft²Office Space368 ft²Lobby273 ft²Elevator Lobby210 ft² Package262 ft²Office Space (Existing)531 ft²Fitness525 ft²Seating Area55 ft² Storage 522 ft² Corridor 733 ft²Unit 1-0365 ft² Corridor 983 ft²Community RoomCONSTRUCTIONLIMITSVEGETATED SWALENOPARKINGCivil Engineering Surveying Landscape Architecture4931 W. 35th Street, Suite 200St. Louis Park, MN 55416civilsitegroup.com 612-615-0060CAMBRIDGE TOWER APARTMENTS 1301 CAMBRIDGE ST., HOPKINS, MN 55343 1301 AMERICAN BLVD. E, SUITE 100, BLOOMINGTON, MN 55425 KAAS WILSON ARCHITECTS PROJECT ISSUE/SUBMITTAL SUMMARYDATEDESCRIPTION............PROJECT NUMBER:202828/6/2021PERMIT SET06/24/22SITE PLAN REVIEW - PHASE II..06/11/21BID SETDRAWN BY:REVIEWED BY:MW, KW, JSMP..............6/24/2022 11:00:26 AMCOPYRIGHT CIVIL SITE GROUP INC.c44263Matthew R. PavekLICENSE NO.DATEI HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OFMINNESOTA.6/24/228/4/2021WATERSHED SUBMITTAL8/24/2021WATERSHED SUBMITTAL9/2/2021WATERSHED SUBMITTALREVISION SUMMARYDATEDESCRIPTIONC3.0GRADING PLAN6/25/21ADDENDUM 1..........1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR ORREPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.2.SEE SITE PLAN FOR HORIZONTAL LAYOUT & GENERAL GRADING NOTES.3.THE CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION (INCLUDING BUT NOT LIMITED TO SITEPREPARATION, SOIL CORRECTION, EXCAVATION, EMBANKMENT, ETC.) IN ACCORDANCE WITH THE REQUIREMENTS OF THEOWNER'S SOILS ENGINEER. ALL SOIL TESTING SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER. THE CONTRACTORSHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOIL TESTS AND INSPECTIONS WITH THE SOILS ENGINEER.4.GRADING AND EXCAVATION ACTIVITIES SHALL BE PERFORMED IN ACCORDANCE WITH THE NATIONAL POLLUTION DISCHARGEELIMINATION SYSTEM (NPDES) PERMIT REQUIREMENTS & PERMIT REQUIREMENTS OF THE CITY.5.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR ORREPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.6.PROPOSED SPOT GRADES ARE FLOW-LINE FINISHED GRADE ELEVATIONS, UNLESS OTHERWISE NOTED.7.GRADES OF WALKS SHALL BE INSTALLED WITH 5% MAX. LONGITUDINAL SLOPE AND 1% MIN. AND 2% MAX. CROSS SLOPE,UNLESS OTHERWISE NOTED.8.PROPOSED SLOPES SHALL NOT EXCEED 3:1 UNLESS INDICATED OTHERWISE ON THE DRAWINGS. MAXIMUM SLOPES INMAINTAINED AREAS IS 4:19.PROPOSED RETAINING WALLS, FREESTANDING WALLS, OR COMBINATION OF WALL TYPES GREATER THAN 4' IN HEIGHTSHALL BE DESIGNED AND ENGINEERED BY A REGISTERED RETAINING WALL ENGINEER. DESIGN DRAWINGS SHALL BESUBMITTED FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION.10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF GRADE STAKES THROUGHOUT THE DURATION OFCONSTRUCTION TO ESTABLISH PROPER GRADES. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR A FINAL FIELDCHECK OF FINISHED GRADES ACCEPTABLE TO THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO TOPSOIL AND SODDINGACTIVITIES.11.IF EXCESS OR SHORTAGE OF SOIL MATERIAL EXISTS, THE CONTRACTOR SHALL TRANSPORT ALL EXCESS SOIL MATERIALOFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR IMPORT SUITABLE MATERIAL TO THE SITE.12.EXCAVATE TOPSOIL FROM AREAS TO BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN AREAS DESIGNATED ONTHE SITE. THE CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FOR RESPREADING ON THE SITE AS SPECIFIED. EXCESSTOPSOIL SHALL BE PLACED IN EMBANKMENT AREAS, OUTSIDE OF BUILDING PADS, ROADWAYS AND PARKING AREAS. THECONTRACTOR SHALL SUBCUT CUT AREAS, WHERE TURF IS TO BE ESTABLISHED, TO A DEPTH OF 6 INCHES. RESPREADTOPSOIL IN AREAS WHERE TURF IS TO BE ESTABLISHED TO A MINIMUM DEPTH OF 6 INCHES.13.FINISHED GRADING SHALL BE COMPLETED. THE CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING,INCLUDING ADJACENT TRANSITION AREAS. PROVIDE A SMOOTH FINISHED SURFACE WITHIN SPECIFIED TOLERANCES, WITHUNIFORM LEVELS OR SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN, OR BETWEEN SUCH POINTS ANDEXISTING GRADES. AREAS THAT HAVE BEEN FINISH GRADED SHALL BE PROTECTED FROM SUBSEQUENT CONSTRUCTIONOPERATIONS, TRAFFIC AND EROSION. REPAIR ALL AREAS THAT HAVE BECOME RUTTED BY TRAFFIC OR ERODED BY WATEROR HAS SETTLED BELOW THE CORRECT GRADE. ALL AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BERESTORED TO EQUAL OR BETTER THAN ORIGINAL CONDITION OR TO THE REQUIREMENTS OF THE NEW WORK.14.PRIOR TO PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL WILL BE REQUIRED ON THE STREET AND/OR PARKING AREASUBGRADE. THE CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THETEST ROLLING SHALL BE AT THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BYTHE SOILS ENGINEER. THE SOILS ENGINEER SHALL DETERMINE WHICH SECTIONS OF THE STREET OR PARKING AREA AREUNSTABLE. CORRECTION OF THE SUBGRADE SOILS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OFTHE SOILS ENGINEER. NO TEST ROLL SHALL OCCUR WITHIN 10' OF ANY UNDERGROUND STORM RETENTION/DETENTIONSYSTEMS.15. TOLERANCES15.1.THE BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.30 FOOT ABOVE, OR 0.30FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE.15.2.THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 FOOTABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION OF ANY POINT WHERE MEASUREMENT IS MADE.15.3.AREAS WHICH ARE TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.30 FOOT ABOVE OR BELOW THE REQUIREDELEVATION, UNLESS DIRECTED OTHERWISE BY THE ENGINEER.15.4.TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS.16.MAINTENANCE16.1.THE CONTRACTOR SHALL PROTECT NEWLY GRADED AREAS FROM TRAFFIC AND EROSION, AND KEEP AREA FREE OFTRASH AND DEBRIS.16.2.CONTRACTOR SHALL REPAIR AND REESTABLISH GRADES IN SETTLED, ERODED AND RUTTED AREAS TO SPECIFIEDTOLERANCES. DURING THE CONSTRUCTION, IF REQUIRED, AND DURING THE WARRANTY PERIOD, ERODED AREASWHERE TURF IS TO BE ESTABLISHED SHALL BE RESEEDED AND MULCHED.16.3.WHERE COMPLETED COMPACTED AREAS ARE DISTURBED BY SUBSEQUENT CONSTRUCTION OPERATIONS OR ADVERSEWEATHER, CONTRACTOR SHALL SCARIFY, SURFACE, RESHAPE, AND COMPACT TO REQUIRED DENSITY PRIOR TOFURTHER CONSTRUCTION.GENERAL GRADING NOTES:1.0' CONTOUR ELEVATION INTERVALGRADING PLAN LEGEND:SPOT GRADE ELEVATION GUTTERSPOT GRADE ELEVATION TOP OF CURBSPOT GRADE ELEVATION BOTTOM OF STAIRS/TOP OF STAIRSCITY OF HOPKINS GRADING NOTES:1.RESERVED FOR CITY SPECIFIC GRADING NOTES.SEE SWPPP ON SHEETS SW1.0 - SW1.3EROSION CONTROL NOTES:01" = 20'-0"20'-0"10'-0"NKnow what'sbelow.before you dig.CallREX. 1' CONTOUR ELEVATION INTERVALSPOT GRADE ELEVATION (GUTTER/FLOW LINEUNLESS OTHERWISE NOTED)CURB AND GUTTER (T.O = TIP OUT)EMERGENCY OVERFLOWEOF=1135.52TOSPOT GRADE ELEVATION MATCH EXISTINGGRADE BREAK - HIGH POINTSEOF EOF CAMBRIDGE STREETDIVISION STREETN88°33'54"W 273.80S0°24'51"W 304.99S88°34'04"E 268.10N1°29'08"E 304.93 12PROPOSEDCOFFEE BAR517 ft²Unit 0-0ELEV.ELEV.A5001PARKING (x37 STALLS,2 ADA)1,239 ft²Unit 2-1AMENITYPLAZA1,239 ft²Unit 2-1EXISTINGMANAGER'SAPARTMENT TORECEIVEACCESSIBILITYUPDATEMAIL519 ft²Unit 0-0519 ft²Unit 0-0A2501HAMMERHEAD FORSERVICE VEHICLES07070707071111110801 06719 ft²Unit 1-1722 ft²Unit 1-2 - Type A122 ft²Stair119 ft²Stair104 ft²Bathroom110 ft²Bathroom57 ft²Storage737 ft²Office Space368 ft²Lobby273 ft²Elevator Lobby210 ft² Package262 ft²Office Space (Existing)531 ft²Fitness525 ft²Seating Area55 ft² Storage 522 ft² Corridor 733 ft²Unit 1-0365 ft² Corridor 983 ft²Community RoomCONSTRUCTIONLIMITSVEGETATED SWALENOPARKING6 - HA24 - CH3 - CA37 - NW26 - PN6 - PR6 - CM3 - EP27 - SS5 - HD5 - HA34 - SH24 - AM5 - EH3 - SA25 - ZA6 - NW25 - ZA6 - SA23 - PN3 - CR24 - SS4 - EP24 - SH6 - SH3 - PR4 - HC34 - EH6 - HD5 - NW23 - AS3 - HC4 - CA37 - AA23 - CM3 - HC34 - SA26 - ZA3 - HB6 - EH6 - NW25 - HC33 - AS6 - EH7 - PR3 - CR23 - CA34 - CH4 - PN6 - AA5 - CA34 - EP25 - SA211 - SH5 - EH5 - SS5 - ZA4 - HA23 - SH26 - HA34 - HS35 - HA34 - AM2 - CR24 - AS6 - EP25 - SH7 - SA24 - SH24 - HA25 - HA38 - NW23 - HB3 - HC3 - VD5 - AA24 - AA3 - CA33 - CA54 - CA34 - AA3 - VDRIVER ROCKSWALEFOUR-O-ONEBOULDERSALUMINUM EDGINGTYP.SHRUBSQTYCOMMON / BOTANICAL NAMESIZENATIVE PLANTSPOLLINATOR FRIENDLYAA14Regent Serviceberry / Amelanchier alnifolia `Regent`#5 CONTNATIVE CULTIVARYAA212Autumn Magic Black Chokeberry / Aronia melanocarpa `Autumn Magic`#5 CONTNATIVEYCH8Hummingbird Summersweet / Clethra alnifolia `Hummingbird`#5 CONTNOT NATIVEYCM9Muskingham Gray Dogwood / Cornus racemosa `Muskingham`#2 CONTNATIVE CULTIVARNCA322Arctic Fire Dogwood / Cornus sericea `Arctic Fire`#5 CONTNATIVE CULTIVARYCA53American Hazelnut / Corylus americana#5 CONTNATIVEYPR16Raspberry Lemonade Ninebark / Physocarpus opulifolius 'ZLEYel2' TM#5 CONTNATIVE CULTIVARYVD6Arrowwood Viburnum / Viburnum dentatum 'Arrowwood'#5 CONTNATIVEYGRASSESQTYCOMMON / BOTANICAL NAMESIZENATIVE PLANTSPOLLINATOR FRIENDLYEH26Bottlebrush Grass / Elymus hystrix#1 CONTNATIVEYHA321All Gold Japanese Forest Grass / Hakonechloa macra `All Gold`#1 CONTNOT NATIVENPN13Northwind Switch Grass / Panicum virgatum `North Wind`#1 CONTNATIVE CULTIVARYSS16Smoke Signal Little Bluestem / Schizachyrium scoparium `Smoke Signal`#1 CONTNATIVE CULTIVARYSH26Prairie Dropseed / Sporobolus heterolepis#1 CONTNATIVEYPERENNIALSQTYCOMMON / BOTANICAL NAMESIZENATIVE PLANTSPOLLINATOR FRIENDLYAS10Sun King Aralia / Aralia cordata `Sun King`#2 CONTNOT NATIVENAM8Montgomery False Spiraea / Astilbe japonica `Montgomery`#1 CONTNOT NATIVEYCR28Hillside Black Beauty Snakeroot / Cimicifuga ramosa `Hillside Black Beauty`#1 CONTNOT NATIVEYEP217PowWow White Coneflower / Echinacea purpurea `PAS702918` TM#1 CONTNATIVE CULTIVARYHC312Grande Black Coral Bells / Heuchera `TNHEUGB`#1 CONTNOT NATIVEYHC6Caramel Coral Bells / Heuchera x `Caramel`#1 CONTNOT NATIVEYHS34Lemon Supreme Coral Bells / Heuchera x `Lemon Supreme`#1 CONTNOT NATIVEYHA214Blue Angel Hosta / Hosta x 'Blue Angel'#1 CONTNOT NATIVENHB6Blue Mammoth Hosta / Hosta x 'Blue Mammoth'#1 CONTNOT NATIVENHD11Diamonds are Forever Hosta / Hosta x 'Diamonds are Forever'#1 CONTNOT NATIVENNW232Walkers Low Catmint / Nepeta x faassenii `Walkers Low`#1 CONTNOT NATIVEYSA225Showy Stonecrop / Sedum spectabile `Autumn Fire`#1 CONTNOT NATIVEYSH211Helen von Stein Lamb`s Ear / Stachys byzantina `Helen von Stein`#1 CONTNOT NATIVEYZA21Golden Alexander / Zizia aurea#1 CONTNATIVEYPLANT SCHEDULEGROUND COVERSCOMMON / BOTANICAL NAMESIZEWasher River Rock / Decorative Rock Feature6"- 8" Washed river rock, uniform in size, composed ofround rocks that may be varied in color.MulchShooting Star No Mow Fine Fescue Mix / No MowSeed MixSeed MixBlue Grass Based / SodCommercial grade, locally grown, "Big Roll" preferredSodPLANT SCHEDULEREVISION SUMMARYDATEDESCRIPTIONL1.0LANDSCAPE PLAN6/25/21ADDENDUM 1..........Civil Engineering Surveying Landscape Architecture4931 W. 35th Street, Suite 200St. Louis Park, MN 55416civilsitegroup.com 612-615-0060CAMBRIDGE TOWER APARTMENTS 1301 CAMBRIDGE ST., HOPKINS, MN 55343 1301 AMERICAN BLVD. E, SUITE 100, BLOOMINGTON, MN 55425 KAAS WILSON ARCHITECTS PROJECT ISSUE/SUBMITTAL SUMMARYDATEDESCRIPTION............PROJECT NUMBER:202828/6/2021PERMIT SET06/24/22SITE PLAN REVIEW - PHASE II..06/11/21BID SETDRAWN BY:REVIEWED BY:MW, KW, JSMP..............6/24/2022 11:00:47 AMCOPYRIGHT CIVIL SITE GROUP INC.cLICENSE NO.DATEI HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULYLICENSED LANDSCAPE ARCHITECT UNDERTHE LAWS OF THE STATE OF MINNESOTA.25821Robert L. Binder6/24/228/4/2021WATERSHED SUBMITTAL8/24/2021WATERSHED SUBMITTAL9/2/2021WATERSHED SUBMITTALLANDSCAPE NOTES:01" = 20'-0"20'-0"10'-0"NKnow what'sbelow.before you dig.CallR1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR ORREPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER.2.WHERE SHOWN, SHRUB & PERENNIAL BEDS SHALL BE MULCHED WITH 4" DEPTH (MINIMUM AFTER INSTALLATION AND/ORTOP DRESSING OPERATIONS) OF SHREDDED CEDAR MULCH.3.ALL TREES SHALL BE MULCHED WITH SHREDDED CEDAR MULCH TO OUTER EDGE OF SAUCER OR TO EDGE OF PLANTINGBED, IF APPLICABLE. ALL MULCH SHALL BE KEPT WITHIN A MINIMUM OF 2" FROM TREE TRUNK.4.IF SHOWN ON PLAN, RANDOM SIZED LIMESTONE BOULDERS COLOR AND SIZE TO COMPLIMENT NEW LANDSCAPING.OWNER TO APPROVE BOULDER SAMPLES PRIOR TO INSTALLATION.5.PLANT MATERIALS SHALL CONFORM WITH THE AMERICAN ASSOCIATION OF NURSERYMEN STANDARDS AND SHALL BE OFHARDY STOCK, FREE FROM DISEASE, DAMAGE AND DISFIGURATION. CONTRACTOR IS RESPONSIBLE FOR MAINTAININGPLUMPNESS OF PLANT MATERIAL FOR DURATION OF ACCEPTANCE PERIOD.6.UPON DISCOVERY OF A DISCREPANCY BETWEEN THE QUANTITY OF PLANTS SHOWN ON THE SCHEDULE AND THEQUANTITY SHOWN ON THE PLAN, THE PLAN SHALL GOVERN.7.CONDITION OF VEGETATION SHALL BE MONITORED BY THE LANDSCAPE ARCHITECT THROUGHOUT THE DURATION OFTHE CONTRACT. LANDSCAPE MATERIALS PART OF THE CONTRACT SHALL BE WARRANTED FOR ONE (1) FULL GROWINGSEASONS FROM SUBSTANTIAL COMPLETION DATE.8.ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL RECEIVE 4" LAYER TOPSOIL AND SOD AS SPECIFIEDUNLESS OTHERWISE NOTED ON THE DRAWINGS.9.COORDINATE LOCATION OF VEGETATION WITH UNDERGROUND AND OVERHEAD UTILITIES, LIGHTING FIXTURES, DOORSAND WINDOWS. CONTRACTOR SHALL STAKE IN THE FIELD FINAL LOCATION OF TREES AND SHRUBS FOR REVIEW ANDAPPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.10.ALL PLANT MATERIALS SHALL BE WATERED AND MAINTAINED UNTIL ACCEPTANCE.11.REPAIR AT NO COST TO OWNER ALL DAMAGE RESULTING FROM LANDSCAPE CONTRACTOR'S ACTIVITIES.12.SWEEP AND MAINTAIN ALL PAVED SURFACES FREE OF DEBRIS GENERATED FROM LANDSCAPE CONTRACTOR'SACTIVITIES.13.REPAIR AT NO COST TO THE OWNER IRRIGATION SYSTEM DAMAGED FROM LANDSCAPE CONSTRUCTION ACTIVITIES.14.PROVIDE SITE WIDE IRRIGATION SYSTEM DESIGN AND INSTALLATION. SYSTEM SHALL BE FULLY PROGRAMMABLE ANDCAPABLE OF ALTERNATE DATE WATERING. THE SYSTEM SHALL PROVIDE HEAD TO HEAD OR DRIP COVERAGE AND BECAPABLE OF DELIVERING ONE INCH OF PRECIPITATION PER WEEK. SYSTEM SHALL EXTEND INTO THE PUBLICRIGHT-OF-WAY TO THE EDGE OF PAVEMENT/BACK OF CURB.15.CONTRACTOR SHALL SECURE APPROVAL OF PROPOSED IRRIGATION SYSTEM INLCUDING PRICING FROM OWNER, PRIORTO INSTALLATION. E H 1 11234567810 F G D.4 H.3 1187 SF- Office Space 119 1187 SF- UNSURE 117 1212 SF- UNSURE 196 1187 SF- UNSURE 107 1187 SF- UNSURE 105 1201 SF- UNSURE 104 362 SF- Elevator Lobby 111 501 SF- Seating 103 52 SF- Storage 102 498 SF- Fitness 112 992 SF- Community Room 101 94 SF- Bathroom 121 100 SF- Bathroom 120 334 SF- Office 114 443 SF- Corridor 116 415 SF- Lobby 110 354 SF- Corridor 108 1138 SF- Manager's Unit 109 102 SF- Stairs 118 97 SF- Stairs 106 196 SF- Seating 113 44 SF- Mail 123 E H 1 11234567810 F G D.4 H.3 2160 SF- Corridor 190 104 SF- Room 191 99 SF- Room 192 794 SF- Maint. Storage 193 394 SF- Laundry 194 1038 SF- Room 195 698 SF- Room 197 484 SF- Room 198 484 SF- Room 200 681 SF- Room 204 681 SF- Room 205 484 SF- Room 206 484 SF- Room 207 698 SF- Room 208 484 SF- Room 209 484 SF- Room 210 681 SF- Room 211 681 SF- Room 212 484 SF- Room 213 Redundant Room- Tenant Storage 214 698 SF-4 Occ. Apt. "C" (EXISTING) 85 R-2-200SF/Occ.NOT FORCONSTRUCTIONDate Drawn By Checked By Project Number 1301 American Blvd. E. Suite 100 Bloomington, MN 55425 tel: (612) 879-6000 fax: (612) 879-6666 www.kaaswilson.com Copyright Kaas Wilson Architects3/32" = 1'-0"6/24/2022 11:55:14 AMC:\Revit Local\22025 -Cambridge Renovation_V3_adams2MVKQ.rvtExisting -Levels 1 + 2 Link W. Adam S. 06/24/2022 22025 Cambridge Tower -Siding & Interior Remodel Sage Apartment Communities A030 1301 Cambridge St, Hopkins, MN 55343 General Contractor: Langerman Exteriors 8416 Xerxes Ave. N. Brooklyn Park, MN 55444 Contact: Troy Poirier (612) 578-7709 troyp@langermanexteriors.com Mechanical (Design/Build): A.R. Engh Mechanical Contact: Michael Melz (763) 229-4667 mwelz@arengh.com Electrical (Design/Build): Oaks Electric Contact: Dewey (612) 366-6574 Structural: Braun Intertec 1826 Buerkle Road St. Paul, MN 55110 Contact: Kim Deibel, PE C: (651) 245-3876 KDeibel@braunintertec.com Civil/Landscape: Civil Site Group Inc. 4931 W 35th St. Suite 200 St. Louis Park, MN 55416 Contact: Matt Pavek O: (612) 615-0060 Mpavek@civilsitegroup.com 18006 Sky Park Circle Irvine, CA 92614 3/32" = 1'-0"1 Existing Level 1 3/32" = 1'-0"2 Existing Level 2 NRev. No.RevisionDate PROPOSED COFFEE BAR 519 ft² Unit 0-0 ELEV. ELEV.A500 1 A5011 A500 2 A501 2 PLAN KEY: 0 BR (Studio) 1 BR 2 BR COMMONS ( NEW ) EXISTING EXISTING (NEW FINISHES) STORAGE PARKING (x37 STALLS, 2 ADA) 1,239 ft² Unit 2-0 AMENITY PLAZA 1,239 ft² Unit 2-0 EXISTING UNITS (x4) TO RECEIVE ACCESSIBILITY UPDATE EXISTING MANAGER'S APARTMENT TO RECEIVE ACCESSIBILITY UPDATE EXISTING UNIT TO BE RENOVATED MAIL 519 ft² Unit 0-0 519 ft² Unit 0-0 A250 1 A250 2 A251 1 A2512 HAMMERHEAD FOR SERVICE VEHICLES 07 07 07 07 07 08 08 08 08 1 2 08 08 22 1 11 1 1 01 02 08 0202 01 01 06 06 06 1 01 101 101 101 719 ft² Unit 1-1 722 ft² Unit 1-2 - Type A 122 ft² Stair 119 ft² Stair 104 ft² Bathroom 110 ft² Bathroom 57 ft² Storage 737 ft² Office Space 368 ft² Lobby 273 ft² Elevator Lobby210 ft²Package262 ft² Office Space (Existing) 531 ft² Fitness 525 ft² Seating Area 55 ft²Storage522 ft²Corridor733 ft² Unit 1-0 365 ft²Corridor983 ft² Community Room DEDICATED OPEN SPACEOPEN SPACE CALCULATION PER HOPKINS ZONING ORDINANCE SECTION 102-160, OPEN SPACE REQUIREMENT FOR R-4 = 1:1 PROPOSED EAST PLAZA -8120 SF SOUTH OPEN SPACE -3553 SF WEST OPEN SPACE -3740 SF TOTAL OPEN SPACE -15,413 SF__ BUILDING FOOTPRINT -13,616 SF RATIO PROVIDED = 1 : 1.3 NOT FORCONSTRUCTIONDate Drawn By Checked By Project Number 1301 American Blvd. E. Suite 100 Bloomington, MN 55425 tel: (612) 879-6000 fax: (612) 879-6666 www.kaaswilson.com Copyright Kaas Wilson Architects1/16" = 1'-0"6/24/2022 11:55:16 AMC:\Revit Local\22025 -Cambridge Renovation_V3_adams2MVKQ.rvtProposed -Level 1 Link W. Adam S. 06/24/2022 22025 Cambridge Tower -Siding & Interior Remodel Sage Apartment Communities A200 1301 Cambridge St, Hopkins, MN 55343 General Contractor: Langerman Exteriors 8416 Xerxes Ave. N. Brooklyn Park, MN 55444 Contact: Troy Poirier (612) 578-7709 troyp@langermanexteriors.com Mechanical (Design/Build): A.R. Engh Mechanical Contact: Michael Melz (763) 229-4667 mwelz@arengh.com Electrical (Design/Build): Oaks Electric Contact: Dewey (612) 366-6574 Structural: Braun Intertec 1826 Buerkle Road St. Paul, MN 55110 Contact: Kim Deibel, PE C: (651) 245-3876 KDeibel@braunintertec.com Civil/Landscape: Civil Site Group Inc. 4931 W 35th St. Suite 200 St. Louis Park, MN 55416 Contact: Matt Pavek O: (612) 615-0060 Mpavek@civilsitegroup.com 18006 Sky Park Circle Irvine, CA 92614 1/16" = 1'-0"1 Level 1 N Rev. No.RevisionDate 513 ft² Apt. "B" (EXISTING) 729 ft² Apt. "A" (EXISTING) 513 ft² Apt. "B" (EXISTING) 728 ft² Apt. "C" (EXISTING) 729 ft² Apt. "A" (EXISTING) 513 ft² Apt. "B" (EXISTING) 513 ft² Apt. "B" (EXISTING) 728 ft² Apt. "C" (EXISTING) 728 ft² Apt. "C" (EXISTING) 513 ft² Apt. "B" (EXISTING) 513 ft² Apt. "B" (EXISTING) 729 ft² Apt. "A" (EXISTING) 729 ft² Apt. "A" (EXISTING) 1,094 ft² Apt. "D" (EXISTING) A500 1 A5011 A500 2 PLAN KEY: 2 BR EXISTING STORAGE A250 1 A250 2 A251 1 A2512 513 ft² Apt. "B" (EXISTING) 1,252 ft² Unit 2-1 731 ft² Laundry (Expanded) 552 ft² Maintenance Storage 115 ft²Stair117 ft²Stair960 ft²CorridorNOT FORCONSTRUCTIONDate Drawn By Checked By Project Number 1301 American Blvd. E. Suite 100 Bloomington, MN 55425 tel: (612) 879-6000 fax: (612) 879-6666 www.kaaswilson.com Copyright Kaas Wilson Architects1/16" = 1'-0"6/24/2022 11:55:18 AMC:\Revit Local\22025 -Cambridge Renovation_V3_adams2MVKQ.rvtProposed -Level 2 Link W. Adam S. 06/24/2022 22025 Cambridge Tower -Siding & Interior Remodel Sage Apartment Communities A201 1301 Cambridge St, Hopkins, MN 55343 General Contractor: Langerman Exteriors 8416 Xerxes Ave. N. Brooklyn Park, MN 55444 Contact: Troy Poirier (612) 578-7709 troyp@langermanexteriors.com Mechanical (Design/Build): A.R. Engh Mechanical Contact: Michael Melz (763) 229-4667 mwelz@arengh.com Electrical (Design/Build): Oaks Electric Contact: Dewey (612) 366-6574 Structural: Braun Intertec 1826 Buerkle Road St. Paul, MN 55110 Contact: Kim Deibel, PE C: (651) 245-3876 KDeibel@braunintertec.com Civil/Landscape: Civil Site Group Inc. 4931 W 35th St. Suite 200 St. Louis Park, MN 55416 Contact: Matt Pavek O: (612) 615-0060 Mpavek@civilsitegroup.com 18006 Sky Park Circle Irvine, CA 92614 1/16" = 1'-0"1 Level 2 N Rev. No.RevisionDate Level 1 100'-0" Level 2 109'-1" Level -1 90'-11" Level 3 118'-2" Level 4 127'-3" Truss Brg. 163'-7" 1 11234567810 Level 5 136'-4" Level 6 145'-5" Level 7 154'-6" Elev. Mach. Rm. Flr. 172'-4" Elev. Mach. Rm. Roof 181'-1" WOOD-TONE SIDING VERTICAL METAL PANEL CFB LAP SIDING - ALTERNATING WIDTH UPLIGHTING Level 1 100'-0" Level 2 109'-1" Level -1 90'-11" Level 3 118'-2" Level 4 127'-3" Truss Brg. 163'-7" D E H I JFGD.3 D.4 H.3 H.6 3 A601 Level 5 136'-4" Level 6 145'-5" Level 7 154'-6" Elev. Mach. Rm. Flr. 172'-4" Elev. Mach. Rm. Roof 181'-1" EXISTING DECORATIVE CONCRETE EXTERIOR MATERIALS EXISTING DECORATIVE CONCRETE GLAZING VERTICAL METAL PANEL CFB ALTERNATING LAP SIDING CFB WOODLOOK LAP SIDING % COVERAGE 17.2% 10.8% 24.2% 23.6% 24.2%NOT FORCONSTRUCTIONDate Drawn By Checked By Project Number 1301 American Blvd. E. Suite 100 Bloomington, MN 55425 tel: (612) 879-6000 fax: (612) 879-6666 www.kaaswilson.com Copyright Kaas Wilson ArchitectsAs indicated6/24/2022 11:55:21 AMC:\Revit Local\22025 -Cambridge Renovation_V3_adams2MVKQ.rvtExterior Elevations Link W. Adam S. 06/24/2022 22025 Cambridge Tower -Siding & Interior Remodel Sage Apartment Communities A500 1301 Cambridge St, Hopkins, MN 55343 General Contractor: Langerman Exteriors 8416 Xerxes Ave. N. Brooklyn Park, MN 55444 Contact: Troy Poirier (612) 578-7709 troyp@langermanexteriors.com Mechanical (Design/Build): A.R. Engh Mechanical Contact: Michael Melz (763) 229-4667 mwelz@arengh.com Electrical (Design/Build): Oaks Electric Contact: Dewey (612) 366-6574 Structural: Braun Intertec 1826 Buerkle Road St. Paul, MN 55110 Contact: Kim Deibel, PE C: (651) 245-3876 KDeibel@braunintertec.com Civil/Landscape: Civil Site Group Inc. 4931 W 35th St. Suite 200 St. Louis Park, MN 55416 Contact: Matt Pavek O: (612) 615-0060 Mpavek@civilsitegroup.com 18006 Sky Park Circle Irvine, CA 92614 3/32" = 1'-0"1 West Elevation 3/32" = 1'-0"2 South Elevation Rev. No.RevisionDate Level 1 100'-0" Level 2 109'-1" Level -1 90'-11" Level 3 118'-2" Level 4 127'-3" Truss Brg. 163'-7" 111234567810 1 A600 __________ Level 5 136'-4" Level 6 145'-5" Level 7 154'-6" Elev. Mach. Rm. Flr. 172'-4" Elev. Mach. Rm. Roof 181'-1" WOOD-TONE SIDING VERTICAL METAL PANEL CFB LAP SIDING - ALTERNATING WIDTH UPLIGHTING Level 1 100'-0" Level 2 109'-1" Level -1 90'-11" Level 3 118'-2" Level 4 127'-3" Truss Brg. 163'-7" DEHIJFGD.3D.4H.3H.6 2 A600 3 A601 Level 5 136'-4" Level 6 145'-5" Level 7 154'-6" Elev. Mach. Rm. Flr. 172'-4" Elev. Mach. Rm. Roof 181'-1" EXISTING DECORATIVE CONCRETE CAMBRIDGE TOWER NEW BRANDING SIGNAGE - DESIGN TBD EXTERIOR MATERIALS EXISTING DECORATIVE CONCRETE GLAZING VERTICAL METAL PANEL CFB ALTERNATING LAP SIDING CFB WOODLOOK LAP SIDING % COVERAGE 17.2% 10.8% 24.2% 23.6% 24.2%NOT FORCONSTRUCTIONDate Drawn By Checked By Project Number 1301 American Blvd. E. Suite 100 Bloomington, MN 55425 tel: (612) 879-6000 fax: (612) 879-6666 www.kaaswilson.com Copyright Kaas Wilson ArchitectsAs indicated6/24/2022 11:55:23 AMC:\Revit Local\22025 -Cambridge Renovation_V3_adams2MVKQ.rvtExterior Elevations Link W. Adam S. 06/24/2022 22025 Cambridge Tower -Siding & Interior Remodel Sage Apartment Communities A501 1301 Cambridge St, Hopkins, MN 55343 General Contractor: Langerman Exteriors 8416 Xerxes Ave. N. Brooklyn Park, MN 55444 Contact: Troy Poirier (612) 578-7709 troyp@langermanexteriors.com Mechanical (Design/Build): A.R. Engh Mechanical Contact: Michael Melz (763) 229-4667 mwelz@arengh.com Electrical (Design/Build): Oaks Electric Contact: Dewey (612) 366-6574 Structural: Braun Intertec 1826 Buerkle Road St. Paul, MN 55110 Contact: Kim Deibel, PE C: (651) 245-3876 KDeibel@braunintertec.com Civil/Landscape: Civil Site Group Inc. 4931 W 35th St. Suite 200 St. Louis Park, MN 55416 Contact: Matt Pavek O: (612) 615-0060 Mpavek@civilsitegroup.com 18006 Sky Park Circle Irvine, CA 92614 3/32" = 1'-0"1 East Elevation 3/32" = 1'-0"2 North Elevation Rev. No.RevisionDate NOT FORCONSTRUCTIONDate Drawn By Checked By Project Number 1301 American Blvd. E. Suite 100 Bloomington, MN 55425 tel: (612) 879-6000 fax: (612) 879-6666 www.kaaswilson.com Copyright Kaas Wilson Architects6/24/2022 11:55:23 AMC:\Revit Local\22025 -Cambridge Renovation_V3_adams2MVKQ.rvtPhotography & Renderings Link W. Adam S. 06/24/2022 22025 Cambridge Tower -Siding & Interior Remodel Sage Apartment Communities A900 1301 Cambridge St, Hopkins, MN 55343 General Contractor: Langerman Exteriors 8416 Xerxes Ave. N. Brooklyn Park, MN 55444 Contact: Troy Poirier (612) 578-7709 troyp@langermanexteriors.com Mechanical (Design/Build): A.R. Engh Mechanical Contact: Michael Melz (763) 229-4667 mwelz@arengh.com Electrical (Design/Build): Oaks Electric Contact: Dewey (612) 366-6574 Structural: Braun Intertec 1826 Buerkle Road St. Paul, MN 55110 Contact: Kim Deibel, PE C: (651) 245-3876 KDeibel@braunintertec.com Civil/Landscape: Civil Site Group Inc. 4931 W 35th St. Suite 200 St. Louis Park, MN 55416 Contact: Matt Pavek O: (612) 615-0060 Mpavek@civilsitegroup.com 18006 Sky Park Circle Irvine, CA 92614 NORTHWEST VIEW -EXISTING NORTHWEST VIEW -PROPOSED SOUTHWEST VIEW -EXISTING SOUTHWEST VIEW -PROPOSED Rev. No.RevisionDate NOT FORCONSTRUCTIONDate Drawn By Checked By Project Number 1301 American Blvd. E. Suite 100 Bloomington, MN 55425 tel: (612) 879-6000 fax: (612) 879-6666 www.kaaswilson.com Copyright Kaas Wilson Architects6/24/2022 11:55:24 AMC:\Revit Local\22025 -Cambridge Renovation_V3_adams2MVKQ.rvtPhotography & Renderings Link W. Adam S. 06/24/2022 22025 Cambridge Tower -Siding & Interior Remodel Sage Apartment Communities A901 1301 Cambridge St, Hopkins, MN 55343 General Contractor: Langerman Exteriors 8416 Xerxes Ave. N. Brooklyn Park, MN 55444 Contact: Troy Poirier (612) 578-7709 troyp@langermanexteriors.com Mechanical (Design/Build): A.R. Engh Mechanical Contact: Michael Melz (763) 229-4667 mwelz@arengh.com Electrical (Design/Build): Oaks Electric Contact: Dewey (612) 366-6574 Structural: Braun Intertec 1826 Buerkle Road St. Paul, MN 55110 Contact: Kim Deibel, PE C: (651) 245-3876 KDeibel@braunintertec.com Civil/Landscape: Civil Site Group Inc. 4931 W 35th St. Suite 200 St. Louis Park, MN 55416 Contact: Matt Pavek O: (612) 615-0060 Mpavek@civilsitegroup.com 18006 Sky Park Circle Irvine, CA 92614 ENTRY CLOSEUP -EXISTING ENTRY CLOSEUP -PROPOSED Rev. No.RevisionDate PAGE 1 OF 1Drawn By: SANDYDate:6/23/2022Scale: AS NOTEDRevisions# Date CommentsGENERAL NOTES:A. PULSE PRODUCTS DOES NOT ASSUME RESPONSIBILITYFOR THE INTERPRETATION OF THIS CALCULATION ORCOMPLAINCE TO THE LOCAL, STATE, OR FEDERALLIGHTNG CODES OR ORDINANCES.B. LIGHTING LAYOUT IS NOT INTENDED FOR CONSTRUCTIONDOCUMENTS BUT ONLY TO ILLUSTRATE THE PERFORMANCEOF THE PRODUCT.C. ALL READINGS/CALCULATIONS SHOWN ARE SHOWN ONOBJECTS/SURFACES.CAMBRIDGE TOWERSHOPKINS, MNChecked By: RICKLuminaire ScheduleSymbolQtyLabelArrangementLLFDescriptionCalculation SummaryLabelCalcTypeUnitsArr. WattsLum. LumensAvgMaxMinAvg/MinMax/MinSITE GROUNDIlluminanceFc1.7712.00.0N.A.N.A.WEST PARKING5IlluminanceFc2.103.4AA4Single0.900NLS NOV-2-T4-32L-7-35K MOUNT ON 10FT POLE 7175261.11.9110BBSingle0.900NLS SSX-4-6R-SL-16L-7-35K SEASIDE BOLLARD 423520303CC5Single0.900NLS GRD-T5-20L-35K SURFACE MOUNT AT APPROX 9FT6761642DD5Single0.900NLS NV-2-T5-80L-7-35K MOUNT ON 20FT POLE WITH 2FT BASE168197134FF2Single0.900NLS NV-W-T2-16L-1-35K-UNV WALL MOUNT AT APPROX 12FT56.06597010GGSingle0.900LIGMAN VK-30002-M-W35 WALL MOUNT AT APPROX 45FT IN UPLIGHT POSITION27.9243510WP4Single0.900NLS NV-W-T4-16L-35-40K-UNV WALL MOUNT AT 8FT1926183.09Plan ViewScale: 1 inch= 25 Ft.64'-6 1/2"BBBBBBBBBBWP4WP4WP4WP4WP4AA4AA4AA4AA4AA4WP4WP4WP4CC5CC5CC5DD5DD5WP4FF2FF2FF2FF2WP4BBBBBBGGGGGGGGGGGGGGGGGGGGBBBB0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.4 0.5 0.20.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.0 0.1 0.1 0.3 0.2 0.3 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.3 1.9 6.3 0.90.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.00.1 0.1 0.7 1.1 1.4 1.1 0.7 0.2 0.2 0.3 0.3 0.3 0.3 0.3 1.8 3.2 2.02.0 0.9 0.2 0.0 0.0 0.0 0.0 0.0 0.00.1 0.2 0.8 2.7 3.6 2.7 0.7 0.4 0.5 0.6 0.6 0.6 0.5 0.4 0.4 2.9 9.04.5 1.4 0.1 0.1 0.1 0.2 0.3 0.2 0.10.1 0.2 0.6 2.5 4.5 2.3 0.8 0.7 0.8 1.0 1.4 1.6 1.20.2 0.3 0.6 2.1 1.0 0.10.1 0.3 0.5 0.8 1.2 1.1 1.1 1.0 1.2 1.7 3.0 5.4 2.91.0 1.5 0.8 5.5 1.5 0.20.2 0.3 0.6 0.9 1.1 1.3 1.5 1.5 1.8 2.5 5.5 11.9 5.11.7 2.2 0.6 0.7 0.5 0.10.2 0.4 0.6 1.0 1.3 1.6 1.9 2.1 2.3 2.8 4.9 9.2 4.43.2 3.0 1.0 1.5 0.7 0.20.2 0.4 0.6 1.0 1.4 1.8 2.3 2.8 2.9 2.9 3.7 4.5 3.16.7 4.1 1.6 3.9 1.6 0.20.2 0.4 0.6 0.9 1.4 1.9 2.7 3.3 3.1 3.1 4.0 5.9 3.65.2 4.7 1.2 1.2 0.6 0.20.2 0.4 0.6 0.9 1.4 1.9 2.4 2.9 3.0 3.4 6.0 11.6 5.43.6 4.5 1.0 1.0 0.6 0.20.2 0.4 0.6 1.0 1.3 1.6 2.0 2.2 2.4 3.0 5.3 10.3 5.04.2 4.6 1.4 6.3 1.5 0.20.2 0.4 0.6 0.9 1.1 1.4 1.6 1.7 1.9 2.5 4.0 6.8 6.86.3 4.7 1.5 2.0 0.9 0.20.2 0.4 0.6 0.8 1.0 1.2 1.3 1.3 1.5 2.2 4.5 10.5 10.37.5 6.7 2.1 0.9 0.5 0.10.2 0.4 0.5 0.7 0.9 1.1 1.1 1.1 1.4 2.0 4.6 9.9 11.27.7 10.1 2.7 4.5 1.4 0.20.2 0.4 0.5 0.7 0.9 1.0 1.1 1.1 1.3 1.7 2.9 5.2 4.27.1 4.3 1.8 2.5 1.3 0.20.2 0.4 0.6 0.8 1.0 1.1 1.2 1.2 1.3 1.7 2.3 2.6 2.22.8 2.6 0.9 0.7 0.5 0.20.2 0.4 0.6 0.8 1.1 1.2 1.4 1.4 1.6 2.0 3.0 4.3 2.80.5 0.9 0.9 2.1 1.2 0.20.2 0.4 0.6 0.9 1.2 1.5 1.8 1.9 2.1 2.7 5.1 10.1 4.41.7 2.3 1.0 5.9 1.8 0.20.2 0.4 0.7 1.0 1.4 1.8 2.2 2.6 2.7 3.1 5.5 10.5 4.54.8 3.5 1.0 0.7 0.5 0.10.2 0.4 0.6 0.9 1.4 1.9 2.6 3.4 3.1 3.1 3.8 5.1 3.29.2 4.6 1.4 0.7 0.4 0.10.2 0.4 0.6 0.9 1.4 1.9 2.6 3.1 3.1 3.0 3.7 4.7 3.112.0 6.1 2.2 5.3 1.6 0.20.2 0.4 0.7 1.0 1.4 1.8 2.2 2.4 2.6 3.0 5.1 9.8 4.69.3 6.5 2.0 2.2 1.4 0.20.2 0.4 0.6 0.9 1.3 1.6 1.8 1.9 2.1 2.7 5.2 10.8 4.97.4 6.3 1.4 0.7 0.5 0.10.2 0.3 0.6 0.9 1.3 1.7 1.8 1.7 1.7 2.0 3.1 5.1 3.36.3 6.7 1.9 2.0 0.9 0.20.2 0.3 0.5 0.8 1.6 3.0 3.3 2.1 1.3 1.4 2.0 3.2 3.69.0 7.4 2.5 6.3 1.7 0.30.1 0.2 0.4 0.9 2.4 6.5 8.6 3.1 1.4 1.1 1.9 4.4 8.2 4.8 1.4 2.3 4.94.2 2.1 3.7 12.0 9.4 2.7 1.4 0.7 0.20.1 0.2 0.3 0.7 2.4 6.9 9.4 3.3 1.1 0.8 1.5 4.7 9.5 5.4 1.7 1.5 1.81.7 1.9 3.9 11.1 8.8 2.2 0.6 0.2 0.10.1 0.1 0.2 0.4 1.9 5.3 6.3 3.2 0.6 0.4 0.9 4.1 6.4 4.8 1.4 0.6 0.50.6 0.8 3.6 7.5 6.9 1.8 0.3 0.1 0.10.0 0.1 0.1 0.2 1.2 1.7 2.0 1.4 0.5 0.2 0.7 1.5 2.0 1.6 1.0 0.2 0.10.1 0.6 1.5 2.3 2.4 1.2 0.2 0.1 0.00.0 0.0 0.1 0.2 0.4 0.5 0.5 0.5 0.3 0.2 0.3 0.5 0.4 0.5 0.3 0.1 0.10.1 0.2 0.5 0.5 0.5 0.4 0.2 0.0 0.00.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.00.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0TYPE AATYPE BBTYPE CCTYPE DDTYPE FF & WPTYPE GG