Loading...
CR 01-043 Order Assessment Hearing Knollwood Pond Improvements C\IY OF m HOPKINS March 29, 2001 Council Report 2001-043 Accept Bids, Order Assessment Hearing Knollwood Pond Improvements Proposed Action. Staff recommends adoption of the following motion: Move that Council reiect the bids received for this proiect based on the bids exceedina enaineer's estimate and city budaet. Overview. Council at its March 6, 2001 meeting held a public hearing, approved design plans and ordered bids on this project. The project was advertised, a pre-bid conference was held on March 22 and bids were opened on March 28. Two bids were received. The low bid amount was $78,750.80,310/0 above the engineer's estimate of $60,000. The second bid was $115,500,920/0 above the estimate. Staff believes these bids are too high and would like to re-advertise the project in October/November, 2001 for construction during winter/spring 2002. Staff will hold another public hearing prior to re-advertisement. Primary Issues to Consider. · Why the difference between engineer's estimate and low bid? The biggest differences are in the price of regrading the slopes, $10,000 vs. $2,400 and top soil, $30-$1 OO/CY vs. $10/CY. City staff and the engineer will discuss the bids with the contractors to determine whether or not a revised engineer's estimate should be done. The reason for the wide differences in cost is not known at this time. Public notification/involvement A public meeting was held on March 28. Staff presented the bids and stated that the recommendation would be to reject the bids and re-advertise in the fall. A letter will be sent to all Knollwood residents informing them of this action and the cancellation of the pending assessment. Before the project is re-advertised, City staff will assist the neighborhood and neighborhood association in considering alternative assessment formulas that may be more universally accepted by neighborhood residents.. Steven J. Stadler, Public Works Director Financial Impact: $J2 Budgeted: Y/N _ Y _ Source: Storm Sewer. SA Related Documents (CIP, ERP, etc.): Notes: .~~ ~~.ld-r - A. BID ITEMS Bidder will complete the Work for the following price(s)as referenced in Section 01270 of the Specifications: Estimated Unit Item Description Unit Quantity Price Extension BASE BID . <.. 1.04A MobilizationlDemobilization L.S. t c::;.' Y"J; r=: ~()O ,00. ~hCC\ ;{ ..."-.. 0 . 1.04B Regrade Slopes (Work Areas 1,2, 3,4,5, 8) L.S. t tQ.OO("'\ \I') () C\ (') . tn:> . 1.04P Silt Fence L~F. 410 1.80 738. \ 0 1.04Q Flotation SlIt Curtain L.F. 20 'Zo . Ol) 4co.Qo WORK AREA 1 1.04C Remove Grouted Riprap . S.Y. 57 t to. 00 ~ I Z. '. (\ G 1.04D Riprap, Class II S.Y. 200 ~2. .on I... 4-0~ Ol"\ WORK AREA 2 1.04D Riprap, Class II S.Y. 5 50.(R) z.. sa .Ot) WORK AREA 3 1.04E Clean Outlet Each 1 560. <Jb SOC.OO ~D WORK AREA 4 Riprap, Class II S.Y. 2 50.CJl) I(,O.CO L04F Topsoil C.Y. 4 Is.., 0 .on 2.40 .ao 1.04G Sod S.Y. 21 t5.6D 3\5.00 .-W.f)R-K. AREAS 1.04C Remove Grouted Riprap S.Y. 10 llo.@ I CnC\ 3m Riprap, Class IT . S +0 C .C:fD 1.04D S.Y. 5o.ab 1.04F Topsoil C.Y. 1 (CO. <fO lQQ.dD 1.04G Sod S~Y. 7 z..a.6b \'1b.(Jt) WORK AREA 8 .~s 1.04D Riprap, Class II S.Y. 4 50. (j() ZCi('\ . <.f'n 1.04F Topsoil C.Y. 7 ~.6D L.-l 0 . (fb Z.~.(R ) -:- 1.04H Seed- Tallgrass ' i S.Y. 48 \ \ 52..00 1.041 Straw Fiber Blanket . : S.Y. ~~.48 I~q .0'\ 2..4-Ct . V'D Plantings . , Each 150 740C lOSe. cfD 1.04J . 1. 04G Sod S.Y. 44 "2..'3. p. C)Q I t') , 1- .(jt) TOTAL BASE BID '"2..51 ~ 5,75.10 00300-2 March 23, 2001 ct4'oo 21" OC")O -?l zB/U\ ~( Estimated Unit Item Description Unit Quantity Price Extension AL TERNA TE BID A .04P Silt Fence L.F. 1,290 I.~C "Z.. '1, '--7- . 0(:) WORK AREA 2 1.04F Topsoil C.Y. 48 1'2. .6b 57l.a .00 1.04H Seed - Tallgrass S.Y. 97 "3 . "'2...5 ~ \ S . z..S 1.04 I Straw Fiber Blanket S.Y. 97 4,an 38 i).OD 1.041 Plantings Each 345 Z. .10 ., 3' . 50 1.04G Sod S.Y. 290 3.(0 8~, . 00 WORK AREA 6 1.04F Topsoil C.Y. 8 I"Z .ern ~~ .{fD ~ 18.00 1.04H ~. Seed - Tallgrass S.Y. 24 ~ .2..5 1.04 I Straw Fiber Blanket S.Y. 24 . 4.lfh :7b. em 1. 041 Plantings Each 90 2....1 a '2-4-3. .OD 1.04 Sod S.Y. 22 3. (0 bR:m WORK AREA 7 1.04D Riprap, Class II S.Y. 8 ~ "Z. .<R:> 2-!5{,'.OO 1. 04 F Topsoil C.Y. 8 I 2.00 :;) ~..6b 1.04H Seed - Tallgrass S.Y. 29 5~ '2..5 ~4- ,"2.5 1.041 Straw Fiber Blanket S.Y. 29 4..ff'A \\In.CQ. 1.041 Plantings Each 75 2.. to z.o z. . 50 1.04G Sod S.Y. 20 . ~. \0 ""1..~b~ __04B WORKAREA9A Regrade Slope L.S. 1 35'0 .(~~ ~5C an 1.04K Imported Fill C.Y. 4 i 00 ~rlb +CC.c.fD 1.04D Riprap, Class II . S.Y. 16 ~5. ffi: In L\-n. C"\fl .- .L04F. . Topsoil ... C..Y~ .. J- -l Rlh-ffil ~e-(-)..~.{)8 ].04H Seed - Tallgrass S.Y. 15 ~. <..5 ~ ."l5 WORK AREA 9B AND 9C 1.04B Regrade Slope L.S. 1 f {)()O .flt . \ 0(')(\ .(Jt) 1.04K Imported Fill C.Y. 12 'no .Ch , '2..0 () .lID 1.04L Shrubs Each 29 37.QC' 10.73.lID 1. 04M . Shredded Hardwood Mulch C.Y. 4 Sl5.1fh 30() . (ff) 1.04N Erosion Control Netting S.Y. 36 3.OCJ I ()~ . tIT) 1. 04F . Topsoil i i C.Y. 6 30 .{~ \R f\ ,tffi 1.04G Sod I S.Y. 48 .:;r.. {fh .144-. on ~ \ BUFFER STRIP - POND SHORELINE 1.04F Topsoil C.Y. 243 \c. . (\h 2.9U" .n D 1.04H Seed - Tallgrass S.Y. 334 ~ALS \()&S ,5t) 1. 04 I Straw Fiber Blanket S.Y. 334 4.6h t13ln . (} () 1.041 Plantings Each 1,275 ?. /'1 () ~44-2, 50 1.040 Sod S.Y. 1,460 3 _ lD 4-~ '2-b . ~D BUFFER STRIP - ISLAND SHORELINE i I. 04 F Topsoil C.Y. 193 ~.() J)<D .5,90.00 '~vJ~ 00300-3 March 23, 2001 Estimated Unit Item Description Unit . Quantity Price Extension 1.04H Seed - TaIlgrass S.Y. 173 .041 Straw Fiber Blanket S.Y. 173 .041 Plantingsugs Each 660 1.040 12" Dia. Coir (Coconut) BioLog L.F. 470 3( ZpjO ~ 1.04G Sod S.Y. 1,160 TOTAL ALTERNATE BID A ~OIL Item Description Unit Estimated Unit Extension Quantity Price ALTERNATE BID B (ISLAND DELAYED) 1.04P Silt Fence L.F. t ,290 1.<60 "Z-. ~ "'2.:"2... .sa. WORK AREA 2 1.04F Topsoil C.Y. 48 \?- .(fD h 11r... (fD 1.04H Se.ed - TalIgrass S.Y. 97 ~ . L..5 '0 \ 5. '2-5 1. 04 I Straw Fiber Blanket S.Y. 97 L. , 94-~ (ffi &ff'r'\ 1.04J Plantings Each 345 2.. .1a 93' ~;5a 1.040 Sod S.Y. 290 ~.IO ~99~ <f1) WORK AREA 6 1.04F Topsoil C~Y. 8 I z. ~ (rn 5 b. <Jl) 1.04H Seed - TaIlgrass S.Y. ' 24 O.z.5 'l P, . ()t) 1. 04 I Straw Fiber Blanket S.Y. 24 ~. 4- 'K . tIT) _J Plantings Each 90 Z..70 2.4- ~. (\t) 4G Sod S.Y. 22 3. \0 bR .""2..0 WORK AREA 7 1. 04D Riprap, Class II S.Y. 8 ~z.~ 2..5 t:, ~ (JQ 1.04F Topsoil C.Y. 8 , Z .tfh .s> b .lfD ".- --- -- ----- -"-".,. ....... - -... --...- .-."-. ........__...~...._...__.- ......~,.- ""-'-"'-'-. ..... _., n.__._____n..h"__h<...,..o_._. -- --.....-... .... . .___.......__....___u.._._,._._ ..__po__ _n__n._n_ .. ..-..-,.-...-. 5 + ~ "2..5 1.04H Seed - T allgrass S.Y. 29 ~. '2-S 1. 04 I Straw Fiber Blanket S.Y. 29 .~-. Ub 58 t <rD 1.04J Plantiongs Each 75 "2. .1 () '2.() 'Z... ~ SQ . 1.04G Sod S.Y. 20 S:2- 5 In 5 .lfD WORK AREA 9A 1.04B Regrade Slope L.S. 1 350,Ot 3 50 . (J() 1.04K Imported Fill C.Y. 4 l (JO. (fl) 4-oD . (IT) 1.04D Riprap, Class II ; S.Y. 16 foS~C.lb I 0 4-n . tIT) 1. 04 F Topsoil C.Y. 3 100 tUb 300'.lf{) 1.04H Seed:- Tallgrass S.Y. 15 ~ :Z.S 4-R., ,S WORK AREA 9B AND 9C 1.04B Regrade Slope L.S. 1 \000 \ ("'\ t"'\M n ("\ 1:04K Imported Fill C.Y. 12 (00 l Wo . 0 t') 1.04L Shrubs Each 29 ~~.OO lC73.C() 1.04M Shredded Hardwood Mulch C.Y. 4 1S.6b 30n.nn _N . Erosion Control Netting S.Y. 36 3-Ub j() F\ . n"fJ I . 4F I Topsoil C.Y. 6 ~ 0 . (fb \BO,o"t) I 1.04G I Sod S.Y. 48 ~,CfD , 4-4-.l) () 00300-4 1Ylarch 23, 2001 Estimated Item. Description Quantity Extension BUFFER STRIP - POND SHORELINE Topsoil C.Y. 243 Seed - Tallgrass S.Y. 334 Straw. Fiber Blanket S.Y. 334 Plantings Each 1,275 Sod S.Y. 1,460 BUFFER STRIP - ISLAND SHORELINE 1.04F Topsoil C.Y. 193 1.04H Seed - Tallgrass S.Y. 173 1. 041 Straw Fiber Blanket S.Y. 173 1.04J Plantings Each 660 1.040 12" Dia. Coir (Coconut) BioLog L.F. 470 1.04G Sod S.Y. 1,160 TOTAL ALTERNATE BID B GRAND TOTAL OF EXTENSIONS .. BASE BID (in words~'I~t=:J ~ ,tln/f\Jl&"l""~ {IV"- ~IQ->ollars ($ 29 J 5/5. 10 ) v()f<" ~\ ..(,t,"-wl- ~ \.\.(,\..,~ _\--l'o/(db .. GRAND TOTAL OF EXTENSIONS - ALTERNATE BID A (in words) r tf\ll't~ 1; ~I\~ &M tulrJ.JlDollars ($ ) 41.( ~~ \U L do\.\~ ~ '101 <c1D. . . GRAND TOTAL OF E:XTENSIONS ;; ALTE:R:N'ATEBIDB (in wordsL\ ,.Crt\ U\~ c~. h\~~~ 4ri1.' IulJJnollars ($~. '70 t~ ~ ~\.lV\A "-' :1t5V. /I 4 ~ /2.10. 70 00300-5 ) March 23, 2001 ?vid k,~~~Alr ,-- -- A. BID ITEMS Bidder will complete the Work for the following price(s)as referenced in Section 01270 of the Specifications: ~;;~':~'w~~" Estimated Unit Item Description Unit Quantity Price Extension BASE BID 1.04A MobilizationlDemobilization L~S. 1 4.000 4000 , 1.04B Regrade Slopes (Work Areas 1,2, 3, 4, 5, 8) L.S. t 10.000 10.000 , I nl3: 000 1.04P Silt Fence . L.F. 410 300 1.04Q Flotation SlIt Curtain L.P. 20 ~C , 000 WORK AREA 1 , 1.04C Remove Grouted Riprap S.Y. 57 ;)0 , ' t'tf 0 1.04 D Riprap, Class IT S.Y. 200 '-'5 '5' 000 , . . WORK AREA 2 1.04D Riprap, Class II S.Y. S '00 ~()O ." WORK AREA 3 .04E Clean Outlet Each 1 500 ~DD WORK AREA 4 1.04D Riprap, Class II S.Y. 2 100 ?-oo l.04F Topsoil C.Y. 4 lOo Lf 00 1. 04G Sod S.Y. 21 ?-.5 ~~.~ WO-RK ltREA.5 . 1.04C Remove Grouted Riprap S.Y. 10 ~O .:100 l.04D Riprap, Class II S.Y. 8 1.00 800 1. 04F Topsoil C.Y. 1 300 ~ 1.04G Sod S.Y. 7 5" ~5 WORK AREA 8 1.04D Riprap, Class II S.Y. 4 1 ()C) Lloo 1.04F Topsoil C.Y. 7 100 '700 1.04H Seed- Tallgrass 1 ! S.Y. 48 ~5 I aoo 1.041 Straw Fiber Blanket : ; S.Y. '48 tn -/ LlRO Plantings . , Each 150 1J J ~on 1..o4J d-...3 '/ 1.04G Sod S.Y. 44 1 0' 9- TOTAL BASE BID D i~ 5Q;;' . - I '2. t 4-00 lei. (u)\IZ..\ '= ~(b i.~ I t-t:") L. .0<::>0 . I /3Il8f( f9\{; # Lv~\.L eNro~ (~.~.~~~C/~04\ p . 4-0 J g 2-2-, 00300-2 March 23, 2001 Estimated Unit Item Description Unit Quantity Price Extension AL TERNA TE BID A 04P Silt Fence L.F. 1,290 ;l .'1S .3 5'1/ 7~'2) WORK AREA 2 , L04F Topsoil C.Y. 48 'SO ;). I l.{ 00 L04H Seed - T3.IIgrass S.Y. 97 3.5c .:334 .~O 1.04 I Straw Fiber Blanket S.Y. 97 7- ~ '7 cr. 1. 04J Plantings Each 345 5 I '7;)~ 1.04G Sod S.Y. 290 3.5.G j'rilS- . WORK AREA 6 J 1.04F Topsoil C.Y. 8 )00 800 1.04H Seed - Tallgrass S.Y. 24 4 .q.~ 1.041 Straw Fiber Blanket S.Y. 24 .3 . '7;J. 1.04J. Plantings Each 90 3.5c 3\5 1.04 Sod S.Y. 22 4 ''88 WORK AREA 7 1.04D Riprap, Class II S.Y. 8 \00 ~QO 1. 04F Topsoil C.Y. 8 100 1$DD 1.04H Seed - Tallgrass S.Y. 29 4 1 I Co 1.04 I Straw Fiber Blanket S.Y. 29 l\ \.' ~ 1.04J . Plantings Each 75 '-{ 3rJO 1.04G Sod S.Y. 20 L( ~O _4B WORK AREA 9A Regrade Slope L.S. 1 1000 '\000 1.04K Imported Fill C.Y. 4 , nO L.( 00 L04D Riprap, Class II S.Y. 16 7t::i .\ :JOO 1,Q4-F _ _ . TQPsQ.iL______________________ __...._._.n_n...........__.._..._..___ .n' _...._..._._-.._..~- .. ......___.._...~___....____...h___._._._ J;;..X. ----- ........-...-...-.---..-................... ___:?_h___ _ ___1_00_ _ --........ ----3-QQ-- -........-... 1.04H Seed - Tallgrass S.Y. 15 5 7S . WORK AREA 9B AND 9C 1. 04 B Regrade Slope L.S. I 5ceo 5000 1.04 K Imported Fill C.Y. 12 ~O bOO . Llo , I L,O 1.04L Shrubs Each 29 l.04M Shredded Hardwood Mulch C.Y. 4 rOO 400 1. 04N Erosion Control Netting S.Y. - 36 .s \$<0 1. 04F Topsoil i i C.Y. 6 100 f.oCO 1.04G -Sod I S.Y. 48 ~" 5(: 1 ~t8 I BUFFER STRIP - POND SHORELINE 1.04F Topsoil C.Y. 243 bO ILl ~go . 4 . , 1.04H Seed - Tallgrass S.Y. 334 1. 33<:" 1.04 I Straw Fiber Blanket S.Y. 334 ,t).5"o '835' 1. 04J Plantings Each 1,275 q 5' 100 1.040 Sod S.Y. 1,460 3.~ ~' II 0 . I BUFFER STRIP - ISLAND SHORELINE . i I.04F Topsoil C.Y, 193 ~O 5,90 , 00300-3 March 23, 2001 Estimated Unit Item Description Unit Quantity Price Exte~ion 1.04H S~ed - Tallgrass S.Y. 173 6/50 .041 Straw Fiber Blanket S.Y. 173 ~ .04J Plantingsugs Each 660 '-I 1.040 12" Dia. Coir (Coconut) BioLog L.F. 470 ~O ~JI t-fllo' 1.04G Sod S.Y. 1,160 TOTAL ALTERNATE BID A O(tr . Item Description Unit Estimated Unit Extension Quantity Price ALTERNATE BID B (ISLAND DELAYED) 1.04P . Silt Fence L.F. 1.290 ~.75 35'/7.50 WORK AREA 2 1.04F Topsoil C.Y. 48 50 ;;1400 1.04H Seed - Tallgrass S.Y. 97 3.50 3":3q ,50 1.041 Straw Fiber Blanket S.Y. 97 '7 ~'7c; 1.04J Plantings Each 345 ,-f.) 17'~~ 1.04G Sod S.Y. 290 :2.50 1015 WORK AREA 6 . 1.04F Topsoil C:Y. 8 , ('){) 800 1.04H Seed - Tallgrass S.Y. 24 Lt . ~ Co 1. 041 Straw Fiber Blanket S.Y. 24 .3 7~ _41 Plantings Each 90 4 ~/_r> . 4G Sod S.Y. 22 4 " $S~ WORK AREA 7 1.04D Riprap, Class II S.Y. . 8 100 800 1. 04 F Topsoil C.Y. 8 \00 ~cf)O .........n .....n-n. .. --..............-...... n ... ..... .. -. ....... [f .. f r'b - .' 1.04H Seed - T allgrass S.Y. 29 1.041 Straw Fiber Blanket S.Y. 29 4 \ I <0 1.04J Plantiongs Each 75 4 300 1.04G Sod S.Y. 20 '-I . 80 WORK AREA 9A 1. 04B Regrade Slope L.S. 1 ~fX) ~OO 1.04K Imported Fill C.Y. 4 100 40D 1.04D Riprap, Class II ; . S.Y. 16 75 );;J 00 1. 04F Topsoil . ' .. C.Y. .3 100 300 1.04H Seed - T allgrass . . S.Y. . 15 5 ~'75 , WORK AREA 9B AND 9C 1.04B Regrade Slope L.S. 1 GOOD 6000 1.04K Imported Fill C.Y. 12 50 .to'oo 1.04L Shrubs Each 29 40 , l~O 1. 04M Shredded Hardwood Mulch C.Y. 4 \ DC) Won ~N Erosion Control Netting S.Y. 36 5 C~o .04F. ! Topsoil C.Y. 6 100 (;PDQ I 1.04G Sod S.Y. 48 3.50 I ~.<X 00300-4 March 23; 2001 . " . Estimated Item Description' Quantity v BUFFER STRIP - POND SHORELINE 4F Topsoil C.Y. 243 . 4H Seed - Tallgrass S.Y. 334 1.041 Straw Fiber Blanket S.Y. 334 1.04J Plantings Each 1,275 1.04G Sod S.Y. 1,460 BUFFER STRIP -.: ISLAND SHORELINE 1.04F Topsoil C.Y. 193 1.04H Seed - Tallgrass S.Y. 173 1.041 Straw Fiber Blanket S.Y. 173 1.04J Plantings Each 660 1.040 12" Dia. Coir (Coconut) BioLog L.F. 470 1.04G Sod S.Y. 1,160 TOTAL ALTERNATE BID B . Extension ,/(; tL ~(tp}d. GRAND TOTAL OF EXTENSIONS - BASE BID (in words) 0. Ne hWl.l>r("..Q., Si X~ - ~ci t.h OUSa. roclj Dollars ($ I ~;;) J 5'1,;l. . 00 ) va j( '-\=\'Je h"'r.JnceJ. 1tNL> t\Hne"4 -tvJc -Co \ \etrS" ~oo GRAND TOTAL OF EXTENSIONS - ALTERNATE BID A (in words) Se. oen-kt - rvur- thOu.saJ'lJ , SI? v'e;~ hUN ore~ Dollars ($ ~ ~\~ -Few %0 .D oH,^,,'S . GRAND TOTAL .OF EXTENSIONS- ALTERNATEBID.B 3'-10 ) v6f~ (in words)'Seven-\1j- i=ourt:hnu<'i!;I,utljThree \'LtNcH"ecl Q.Nc\. f:or~ ClO/ -' '1 //(JoO ~~ lletrs Dollars ($ 74,3Lfoloo ) /} ~ ~ f'-' '7 if, 7S-'-{, 50 , 00300-5 March 23, 2001