CR 01-045 Xcel Energy Street Lighting Contract .. 't C\TY Or: " m HOPKINS March 29, 2001 Council Report 2001-045 Approve Xcel Energy Street Lighting Contract - Excelsior Boulevard, Phase II Proposed Action. Staff recommends adoption of the following motion: Move that Council authorize the mayor and City Manaaer to enter into a. contract with Xcel Enerav (Northern States Power) for installation of 55 street liahts alona Excelsior Boulevard from Hiahway 169 to Blake Road. Overview. This contract would require NSP, now Xcel Energy, to install and maintain street lighting similar to those installed along Excelsior Boulevard from Shady Oak Road to 9th Avenue. The proposed $255,250 contract covers purchase and installation costs only. Energy and maintenance fees would be $6.45/uniUmonth. This is the same rate as those installed along the Excelsior Blvd, Phase I segment. If approved, the new lighting would be installed by an Xcel Energy contractor during road reconstruction in 2002. Approving the contract now locks-in the per pole & fixture price for 2002 construction. Primary Issues to Consider. Project cost and funding Scope of maintenance Supportina information. January 31, 2001 letter and March 21, 2001 NSP contract orks Director Financial Impact: $ 255.250 Budgeted: Y/N 'Y-- Source: MSA Funds Related Documents (CIP, ERP, etc.): Notes: $120.000 funded by Hennepin County per cost participation policy " l Council Report 2001-045 Page 2 Analvsis of Issues Project cost and funding The proposed cost is $255,250 for 55 street lights, or $4,640/light. This is a 30% increase per light over the phase I, 1998 contract amount. The cost increase is due to increased labor and material costs. The cost for street lighting replacement has been included in the overall Excelsior Boulevard, Phase II city budget. The work will be funded from the city's municipal state aid fund account. The annual cost of energy and maintenance for this section of Excelsior Blvd street lighting will be $4,257/year. Scope of Maintenance 25-year coverage including: repair/replacement of knocked down or damaged poles, group relamp all lamps every 5-8 years, replacement of burned out lamps, replacement of failed ballasts, fuses, photo-electric controls, etc. Xcel Energy has been responsive in its maintenance/repair of the Excelsior Blvd, Phase I lighting. They have responded fairly quickly on the last two pole knockdowns. (lXcelEnergysM OUTDOOR LIGHTING 1971 Gateway Boulevard Arden Hills, Minnesota 55112-2750 January31,2001 Mr. Steven Stadler P. E. City of Hopkins 1010 1st Street South Hopkins, MN 55343-9475 Dear Mr. Stadler: I'm submitting you a cost break down for the lighting project that we have discussed on Excelsior Boulevard in the City of Hopkins. These cost will reflect the labor to install and material for each grouping that is shown. To include the following. Conduit/Wire - Plowing/Boring - Screw-in Anchor bases Poles/Fixtures/GFI's - Feed points/Fusing/ - Termination/Energize circuits/ Other misc./Tax $25,618 $41,505 $21,170 $132,670 $23,937 The total cost for the above is $244,900. This cost reflects 2001 pricing for labor and material. I would also like the submit pricing to install lights on the City of Hopkins sign. To include; 6 ea. fixture's, cement base, all wire and conduit, and stub up conduit at (3) locations for irrigation. The cost to complete this will be $10,350. If you have any questions, please do not hesitate to call me. Outdoor Lighting Contract ~ .~~~~, ~ '(Customer) City of Hopkins - Steven Stadler ~~~t ~service a~ess): Excelsior Boulevard from Hwy 169 to Blake Road . :n~~4;-~Clty) Hopkins. (State) MN (ZIp Code) 55343 \~ \ ii: \ I ill f Jhe sum of Two Hundred-fifty-five thousand Two hundred-fifty and no/100 , Dollars ($255,250) \\;~:~';~L:;;;,(will be paid to NSP by (other than above) same ~.,~if;'~~r1n~r A~dress (o~er than above) 1010 First Stre~t South . WULlUuJ,1 (CIty) Hopkins . (State) MN (ZIp Code) 55343 y-/ in accordance with the following terms of payment: 30 days after construction begins ~I~,: ~ Service consisting of: i I ~ i ! I i i I I I 55 ea. - 150 watt HPS HP Acorn fixture I I 55 ea. - GFlreceptacles I i 2 ea. - MN DOT Feed point cabinets ! fi I ! ~ 'I' This cost includes the 6 fixtures, cement base, all wire and conduit for sign lighting, also stub up conduit at (3) t J locations for irrigation. All fixtures, poles and other accessories will be RAL 3007 in color. . i I f I')X~ will be plowing most of the wiring and conduit with the exception of road crossing which will be I t directional boring method. ~ ~ I I Any permitting for railroad right-away has NOT included in this contract. i I J I The rate on th;ese fixtures will be $6.45, energy and maintenance per light. The surcharge per light is $1.30. i I The energy portion of the $6.45 is $2.80 per light per month. I I This proposal is valid for 30 calendar days. I I I I I i g I i I Dated this _day of i I i. i Customer: City of Hopkins I ~ ~f"*~'~ By: II II H " h r"';;;;.fi j !l Title: J I I ~ I II: NSP Rep: John E Hygrell ~J ~ NSP Proj/Serv No: ~'::::-~5 Total Amount Paid: In consideration of NORTHERN STATES POWER COMPANY, hereinafter called "NSP" extending its facilities to make outdoor lighting services available to: To install a Purchase Option (Group five) street lighting system consisting of the following: 55 ea. - 15'Aluminum Eden Poles 57 ea. - 6" Screw-in anchor 20_ Dated this _ day of 20 Northern States Power Company By: Title: Lii!htini! Consultant Date: 3/21/2001 Div: St. Paul Page 1 of 3