CR 01-201 Thermotech Storm Sewer Improvements CITY OF ~ December 13,2001 HOPKINS Council Report 2001-201 . Approve Change Order and Authorize Final Payment Thermotech Storm Sewer Improvements, City Proiect 99-09 Proposed Action Staff recommends adoption of the following motion: Move that Council approve Change Order No.1 and adopt Resolution 2001-95, Resolution Accepting Work and Ordering Final Payment, Thermotech Storm Sewer Improvements, City Project 99-09. Overview The contractor has completed the construction of the Thermotech Storm Sewer Improvements and has completed all punch list items to the City's satisfaction. During construction, some additional length of36" Storm Sewer Pipe and Chemical Grout Stabilized Wall were deemed necessary due to conditions discovered in the field, where a connecting pipe was not actually as long as shown on old record drawings. The additional footage of these items account for the necessity of Change Order No.1 in the amount of $5,927.20, for which staff is now requesting formal Council approval. Primary Issues to Consider . . Accepting Work and Final Payment The contractor has met all contract obligations. The work has been done satisfactorily and all the necessary documents and final payment submittals have been received. Staff recommends approval for final payment. . Project Budget and Change Orders The final contract project cost is $103,902.20, which is slightly above the bid award amount of $97,975.00 that was approved for the project. One change order in the amount of $5,927.20 was necessary for this project. Even with the change order, the construction costs for this project are still well below the original budgeted amount of $240,000. · Resolution 2001-95 Adoption of this resolution formally acknowledges completion of the work, orders final payment, and initiates a one-year warranty on the contract work. Supporting Information · Resolution 2001-95 . Application for Final Payment (including change order amount) . ~~fJr. Steven G. Bot Assistant City Engineer Financial Impact: $ 103,902.20 Related Documents (CIP, ERP, etc.): Budgeted: CIP Y/N l Source: Storm Sewer Fund Notes: . . . ....SfH 10901 Red Circle Drive, Suite 200, Minnetonka, MN 55343-9301 952.912.2600 952.912.2601 FAX architecture environmental engineering transportation December 5, 2001 RE: Hopkins, Minnesota ThermoTech Storm Sewer SEHNo. A-HOPKN0003.01 Mr. Steve Bot Assistant City Engineer City of Hopkins 1010 First Street South Hopkins, MN 55343 Dear Mr. Bot: Enclosed please find three (3) copies of Payment Application No.2 (Final) received from Metro Utilities, Inc. for the above referenced project. We recommend that the City of Hopkins make final payment in the amount of $5,195.11 as requested. Also included with this application is the Contractor's LC.-134 as well as LC.-134's from the Contractors subcontractors; together with lien waivers from subcontractors and suppliers. Please review this application. If acceptable, distribute one of the copies to Metro Utilities, Inc. with their payment and return one of the copies to SEH. Ifnot acceptable, please advise promptly. Please feel free to call should you have any questions. Duane D. Cramer Proj ect Engineer ka Enclosures h:\civillprojectslhopkinslhopkn0003.01Ipayapp2-ltr.doc Short Elliott Hendrickson Inc. Your Trusted Resource Equal Opportunity Employer APPLICATION FOR PAYMENT No.2 (Final) .g. Project No.: A-HOPKNOO03.01 Location: Hopkins, Minnesota wner Project No.: 99-09 Contractor Metro Utilities Inc. Contract Date August 8, 2000 3025 Harbor Lane, Suite 221 Plymouth, MN 55447 Contract Amount $ 97,975.00 Contract for Thermotech Storm Sewer Improvements Application Date December 4,2001 Application Amount $ 5,195.11 F or Period Ending November 30,2001 Item No. Item Unit Est. Quantity Quantity Unit Price Total Quantity This App. to Date 1 Mobilization LS 1 0 1 $3,500.00 $3,500.00 2 Remove Existing 12" Storm Sewer LF 680 0 634 $2.00 $1,268.00 3, 18" Storm Sewer Pipe LF 10 0 10 $30.00 $300.00 4 24" Storm Sewer Pipe LF 15 0 15 $35.00 $525.00 5 36" Storm ~ewer Pipe LF 600 0 623 $66.00 $41,118.00 .6 Manhole, 6' Diameter EA 1 0 1 $2,300.00 $2,300.00 7 Catch Basin; 4' Diameter EA 2 0 2 $1,000.00 $2,000.00 8 Catch Basin; 6' Diameter EA 2 0 2 $2,300.00 $4,600.00. 9 Catch Basin Casting EA 4 0 4 $250.00 $1,000.00 10 Manhole Casting EA 1 0 1 $250.00 $250.00 11 Connect Existing 12" Storm Sewer to EA 1 0 1 $700.00 $700.00 new Catch Basin 12 Connect to Existing 36" RCP EA 1 0 1 $700.00 $700.00 13 Topsoil Borrow (CV) CY 150 0 207 $5.00 $1,035.00 14 Seeding SY 1,600 0 2203 $0040 $881.20 15 Chemical Grout Stabilized Wall LF 150 0 165 $265.00 $43,725.00 Total Completed/Stored to Date: $103,902.20 . ~se-tJ 10901 Red Circle Drive, Suite 200 Minnetonka, MN 55343 Page 1 of2 APPLICATION FOR PAYMENT - Continued eal Contract Amount $ 97,975.00 Material Suitably Stored on Site, Not Incorporated into Work Contract Change Order No.,1S, '1 '-1 . to . Total Amount Earned $ 103,902.20 Contract Change Order No. Contract Change Order No. Percent Complete Percent Complete Percent Complete CONTRACTOR'S AFFIDAVIT The undersigned Contraytor hereby swears under penalty ofpeIjury that (1) all previous progress payments received from the Owner on account of work performed under the Contract referred to above have been applied by the undersigned to discharge in full all obligations of the undersigned incurred in connection with work covered by prior Applications for Payment under said contract, Thermotech Storm Sewer Improvements, Hopkins, Minnesota, and (2) all material and equipment incorporated in said Project or otherwise listed in or covered by this Application for Payment and free and clear of all liens, claims, security interests and encumbrances. GROSS AMOUNT DUE ................................. $ LESS 0 % RETAINAGE .......................$ AMOUNT DUE TO DATE ............................. $ LESS PREVIOUS APPLICATIONS ............... $ AMOUNT DUE THIS APPLICATION........... $ o 103,902.20 98,707.09 5,195.11 . Date 'UNTY OF STATE OF .~. ~ 20 ,!) / Metro Utilities Inc. ~ ~.. (Name and Title) ~ ) )SS By Before me on this appeared day of , 20. personally known to be, who being duly sworn did depose and say that he is the of the Contractor above mentioned that he executed the above Application for Payment and (Office) Affidavit on behalf of said Contractor; and that all of the statements contained therein are true, correct and complete. My Commission expires (Notary Public) The undersigned has checked the Contractor's Application for Payment shown above. A part of this Application is the Contractor's Affidavit stating that all previous payments to him under this contract have been applied by him to discharge in full all of his obligations in connecting with the work by all prior Applications for Payment. In accordance with the Contract, the undersigned approves payment to the Contractor of the Amount due. By ELLIOTT ~RICKSON INC. .#~ . Date 4S~tJ 10901 Red Circle Drive, Suite 200 Minnetonka, MN 55343 Page 2 of 2 . . . CITY OF HOPKINS HENNEPIN COUNTY, MINNESOTA RESOLUTION NO. 2001-95 RESOLUTION ACCEPTING WORK AND ORDERING FINAL PAYMENT THERMOTECH STORM SEWER IMPROVEMENTS CITY PROJECT 99-09 WHEREAS, pursuant to a written contract signed with the City on July 20, 2000, Metro Utilities, Inc., has satisfactorily completed construction ofthe.Thermotech Storm Sewer Improvements, commonly known as City Project 99-09, in accordance with such contract. NOW, THEREFORE, BE IT RESOLVED BY THE CITY OF HOPKINS, MINNESOTA: 1. The work completed under said contract is hereby declared accepted and approved. 2. Change Order No.1 inclusive is approved 3. Order for final payment on such contract is hereby ordered, taking the contractor's receipt in full. 4. A one-year warranty on contract work shall commence as of the date of this resolution. Adopted by the City Council of Hopkins, Minnesota, this 18th day of December 2001. Eugene J. Maxwell, Mayor ATTEST: Terry Obermaier, City Clerk