Back2round
The Equiplnent Replacement Plan is a twenty-year forecast and a five-year plan of equipment
needs in the City of Hopkins. It is intended to inform the Council and citizens of the major
equipment needs on the horizon. The first year of the plan becomes an adopted equipn1ent
budget and relates to the operating budget of the equipment replacen1ent fund, which is approved
on an annual basis. The remaining nineteen years represent an estimate of equipment needs and
funding capabilities of the City. Funding requirements vary from year to year. In order to
maintain a fairly consistent levy each year, the twenty-year schedule is projected with a 30/0
inflation factor for operating expenses and a yearly average dollar capital expenditure of
$772,900.
The cash flow requirements to fund the equipment needs in the equipn1ent replacement fund, will
experience a roller coaster effect over the next 20 years given the projected equiplnent needs and
30icJ inflation rate. Available funds will remain about the same through the year 2012, and
decrease each year thereafter.. It is anticipated that the intragovenunental charge to the general
fund will need to increase each year to replace funds lost when charges to city funds was reduced
in 2003 in response to aid cuts. If the rate increases proposed are implemented, revenues in 2017
will have returned to 2002 levels. The charges after 2017 will continue to increase each year, but
at a slower pace. The future increases in charges to the general fund will not provide sufficient
funds to carry us through 2027 with the cunent replacen1ent schedule.
Each year staff reevaluates the equipment needs and adjusts the schedule accordingly. Changes
to the plan are reflected in the document. Refurbishments, extended life expectancy and closer
cost estin1ates of replacements have been incorporated into the plan. The equipment replacelnent
charges in the general fund represent approximately 30/0 of total general fund expenditures.
Future increases each year are needed to fund the equipment replacement plan without issuing
debt.
The Equipment Replacen1ent Plan's basic premise is scheduled replacement of present
equipment. A new iten1 n1ust, in the year proposed, be presented in the annual operating budget
with a stipulation that replacement will be necessary in the future. Flexibility of the Equipment
Replacelnent Plan is established through am1ual review and revision, if necessary.
Highlights of changes frOln last year's equipment replacelnent plan for the years 2009-2013:
City Hall:
Election booths were added at a cost of $6,400. In 2008 the city replaced
approxilnately )!z of the voting booths cunently in use. The remaining
booths are over 25 years old, n1any no longer have functioning lights and
each year a few are taken out of use as they can no longer be repaired.
Fire:
A lite rescue truck originally scheduled for replacement in 2009 at a cost of
$40,000 has been elilninated and replaced with a Quick Attack
PumperlRescue, a new item scheduled for purchase in 2012 at a cost of
$234,000. This new vehicle will be used for responding to medical calls
and small fires and will allow the department to reduce the nUlnber of
personnel responding to snlall fires. It will also allow the fire departlnent
drop one engine in 2022 when that vehcile ages out while maintaining our
ISO rating.
In addition, the Heavy Rescue truck totaling $491,000 and the Pirsch
Punlper totaling $563,100 were elilninated fronl the ERP as these vehicles
are no longer needed in the Fire Equipment Fleet. Together these two
vehicles will save over $1,000,000 in the ERP.
A duty chief vehicle originally scheduled for replacenlent in 2013 at a cost
of $34,600 has been moved to 2009 and the 7-year replacement changed to
5 years with the vehicle being replaced again in 2015 at a cost of $42,200.
Fitness Center - the elliptical Inachine originally scheduled for
replacement in 2009 has been elilninated and dun1b bells with a stand
added which is cost neutral at $5,000.
Police:
The police utility 4x4 vehicle was evaluated and the replacement nloved
from 2009 to 2014.
Digital squad car cameras purchased in 2006 with police departnlent funds
have a life expectancy of 5 years. They were added to the ERP in 2008 for
replacenlent in 2011 at a cost of $42,600. Future replacenlent costs were
left at $42,600 as technology prices have historically been going down.
Mobile Data COlnputers installed in all squad cars and used to receive calls
frOln dispatch, query information and cOlTIillunicate from car to car was
scheduled for replacelnent in 2012 at a cost of $54,500. The cost has been
increased to $62,700 to more accurately reflect the actual cost of the
computers and docking stations. Future replacement costs were left at
$62,700 as technology prices have historically been going down.
The police con1puter systeln budgeted at $700,000 in previous ERP's was
reduced to $500,000 in 2008 to better fit within the overall ERP plan. The
replacenlent cost was retunled to $700,000 for the current ERP plan, again
reduced and funded over a two year period at $200,000 per year in 2013
and 2014. Previously this itenl has been scheduled for replacen1ent in
2011. The exact cost of the replacenlent is unknown and our best estinlate
was used in placing this iten1 in the ERP.
Cable TV:
Activity Center:
Public Works:
All itelns previously in the ERP have been moved to the CIP.
Previously scheduled for replacenlent in 2013 the refrigerator/freezer has
been nloved up to 2010 due to increasing maintenance issues and the age
of the unit (has been in service since the Activity Center opened in 1980)
The lives of the equipment are annually reviewed by the public works
department and over the past 10 years they have extended the lives of the
I-ton trucks fronl 8 to 12 years and the dump trucksfrOln 13 to 15 years.
Extending the lives of major equiplnent comes with the risk of increased
maintenance costs. When n1aintenance costs becon1e unmanageable the
equipment will be put on the schedule for earlier replacement.
Streets/Traffic
The water truck scheduled for replacement in 2010 at a cost of $133,700
has been restructured. The tank only will be replaced in 2010 at a cost of
$45,000 extending the life of the vehicle. In 2017 the entire vehicle -
tanker, cab & chassis will be replaced at a cost of $150,000 and the life of
the vehicle changed to a 22 year replacement.
Parks/Forestrv
The cost of the aerial lift vehicle was increased from $110,000 to $130,000
to reflect actual cost. The vehicle is scheduled for replacement in 2009.
The large turf mower originally scheduled for replacement in 2013 has
been moved to 2011 based on nlaintenance experience and lowest overall
cost. This Inower is required to efficiently mow the large parks.
Two tractors cunently on a 20 year replacenlent plan will be changed to
one at 20 years replacen1ent and one at 30 years replacement. The 20-year
tractor scheduled for replacen1ent in 2009 relnains as scheduled and the 30-
year tractor scheduled for replacement in 2012 will be moved to 2014.
Water
No changes to itenls scheduled in the previous 5-year plan.
Sewer
No changes to iten1s scheduled in the previous 5-year plan.
Refuse
No changes to items scheduled in the previous 5-year plan.
EQUIPMENT REPLACEMENT PLAN 2009 - 2013
TABLE OF CONTENTS
Page
SECTION I
Capital Equipment
Five Year Funding Summary
Department Summary
Projects by Department
Funding Source Summary
Projects by Funding Source
Projects & Funding Sources by Depmiment
2
3
4
7
8
10
Item Requests/Justification
Activity Center
Art Center
City Hall Administration
Community Services
Fire
Police
Public Works: Engineering
Public Works: Parks/Forestry
Public Works: Streets/Traffic
Refuse
Sewer
Water'
14
16
17
20
25
36
45
46
55
65
66
67
Twenty Year Equipment Replacement Schedule
70
SECTION II
Equipment and Building Inventory
75
Veh icIe/Equipment Inventory
Building Inventory
76
80
CAPITAL EQUIPMENT
1
~
~;e~
00 '-'..-
QO
;:;N
CO
~
oi:;;;JN
~U......
000
;:;N
CO
f-
i:;;;J..-
~U..-
~OO
;:;N
CO
~
i:;;;J0
~U..-
~QO
;:;N
CO
N
o
~
~
i:;;;JC'\
~UO
000
;:;N
CO
o
z
;:J
~
~
z
~
::E
~
u
~
..J
Q..
~
~
~
z
~
:E
Q..
-
;:J
o
~
Eo--
~OO
~VO
oQO
;:;N
CO
..J
~r-
~;:JO
0'-0
UN
~
..J
~\O
~;:;O
o,~O
UN
~
~
~
:::
6
~
~
~
0\
\0
On
N 0\ r'l
00 o-.::t
N \On
00 v)r'l
0'\
~
V)
-.::t
r-
r-
r-
\On
0\
If) 0 r'l
r- o-.::t
o On
N Or'l
\0 C'l
~
\0
0'\ 0 r'l
If) o-.::t
...... On-
~ Or'l
N C'l
~
00
o
On
r-
C'l
-.::tn
o
o
If) 0 r'l
N o-.::t
1.0 On-
r-:- Or'l
o C'l
~
r-
\0
-.::t
\D~
r'l
On
o Or'l
o ooq-
If) On-
r-:- 0 r'l
00 C'l
N
00
00
If) 0 r'l
N o-.::t
..... 0
r-:- O'r'l
00 C'l
N
........
r-
"1-
V)
r-
C'ln
V)
C'ln
If) 1.0
N 0
...... 00
r-:- r-n
00 r'l
N
1.0
r-
OO
on
o
r-
0'\0-
ooo-.::t
-.:tOC'l
00 a O\n
0001.0
N-r<")
'-
c;:l
CJ
>--
CJ ~
~ g
.3..J
- >-.
c;:l (l)
.........:.:::
,..., u
c;r'o
u::r:
r"'
05D
l!)
CQ
~
0-
ro
U
~
:Q
o
~
o 0 -.:t
r<")01.O
0......
00 V)n 0
-.::t C'l 0'\
-.:t
0000
r-ooo
o ~
r-n V)n r-:-
1.0 C'l r-
-.:t
-.::to \0
1.00\0
r'l 0 \0
O\n V)n ...a
\D C'l -.:t
-.:t
C'l00
r- 0 -.:t
C'l00
r-n V)n ~
1.0 C'l N
-.:t
\D 0 0'\
o 0 -.:t
ooo-.:t
\DnO~
\DC'lO'\
~
o 0000
o 00\0
o 00 N
on onono
V) V)C'l~
-.::t 00
I C/l
r"' i::
.~ e
.;; 0
c;:l l!)
0.... ~
:'Ci)
oq- 1.0 .....
00 V) r-
~n~:}
\0 0
If)
1.0 C'l 0 00
oo\Oor-
\0 \0 r'l ~
-.0 C'ln 00
O\oq--O
0\
;::
~
C/l
>-.
(/)
o
:0
ro
e::::
,--..,
C/l
"0
C/l
C/l
ro
4-0
o
(l)
"@
~
V'l-o
Q.l s:::::
CJl:l
l. '-L. r"'
.a "@ .~
U ~ ";; (l) ~ V'l
E~c: ~f, C/lQ.l
00 (l);::: g;:
cbr"'r"' ~~ ~~
~.:= '- '- ~ U ~ ~ ~
;:JL~~e 2E"t;; ~~
~~~~CJE-<El!)
~ e e e -0 ~ "~ ~_.
~E-<E-<E-<~i.i:e::::
C/l
"~
r"'
@
l!)
~ ]
'::l 0
o Eo--
o
C'l
Vl.-
r<")
V)
C\
V)
N
-.::t
o
1.0
o
r'l
V)
0\
V)
N
oq-
o
r-
O\n
C'l
V)
oq-
OOn
00
C'l
V)
o
On
00
C'l
0\
00
r-n
C'l
C'l
-.0
V)
C'l
\0
o
r-:
C'l
0..
(l)
o
r--.
r'l
C'l
o
('.l
~~
~o
....0
-ug ~
.. ~ -g
V) r"' U
00 ;::: t:
::: ~ ro
CJ ~ t::
~o....t;:;
t; bJ) V
05. s::::: u
o .- :l
~ g b
] ~ l!)
o~ i.i: ~
~ ~ '0
3 :l U
:g ~ ~
~ (l) @
:< '- "@
u i.i: CQ
C/l
(l)
-0
:l
'0
X
~
C/l
(l)
B
:0
s:::::
0)
0.
X
[:.iJ
o V)
o
r- 00
r-:-
N 0
00 0\
o \0
o 0\
0\ On
~ r'l
\0 -.::t
00 0\
V)
0\
V)
N
-.::t
o V)
o 0
r- On
vi' 00
1.0 r'l
-.:t V)
V)
0\
V)
N
-.::t
o 0
o oq-
r-
~ O\n
-.:t
~ -.::t
V)
0\
V)
M
oq-
o 0
o 0
...... r-
ei: O\n
If) ('.l
~ -.::t
00 0\
o 0 00
000 0\
a r-:- -.::tn
V)OO \0
-.::t\O n
r-ooo
~OV)
NOr'l
..; C'ln ('.In
o C'l 00
~ r<")
r- 0\
..... r-
o 0
o r-n
~ V)
~ r'l
::
Q.lr--.
E ~
Q.c;:l
._ 0
:::::::.-
~~
o
I :.=
>"-
~ >
_ c;:l
.....0....
:: 0
0.......
- '-
~<.8
:::: (/)
Q.S:::::
~ ~
Ut=
0\
.....
-.:t
ei:
~
0\
\0
O~
......
If)
-.:t
r-
r-
r-
...a
.....
0\
\0
......
.....
00
o
O~
......
r-
.....
N
..;
o
O~
......
r-
\0
-.:t
...a
~
O~
00
00
.....
.....
r-
t1-
......
If)
r-
.....
N
If)
N~
Q.l
U
=
~
-;
CO
CJl
=
:a
=
\.l;J
~
Q.
~
U
~
~
l.
o
~
0\
~
Ir)
<$
~
I C'l
-.::t
"'::I-
\0
Ir)
0;-
\0
~
~
0\ V)
o 00
\0 ('.l
V)n \Dn
~
\0
~
0\
"'::I-
~
0\ 00
o C'l
\D-.::t
V)no\'
r'l
f'.l
f'.l
"'::I-
......~
"'::I-
Ir)
......~
0\ ........
o r-
1.0 V)
V)n ('.In
V) -
t---..
f'.l
0\
"'::I-~
0\
"'::I-
......~
0\ -.::t
o
\Onr-
V) V)
r- -
lY)
co
Ir)
~
co
"'::I-
~
0\ r-
o V)
\D 00
V)n 00-
0\ -
"'::I-
~
lY)
0\
\0
lY)
......~
0\ 0
00
\0 0
V) - C'ln
C'l
Ir)
lY)
0\
~
~
lY)
~
V)
oq-n
r'l
V)
C'l
~
~
~
-
:::
...Q
@
o
~..J
.DE
c;:l C/l
> 0
.~ 0
~~ ~
==E-D
c (l) 0
~E-<::r:
~ ~8
~OO
~..JC'l
..::::
~
G
r'ln
r'l
r-
V)
00
On
r-
OO
C'ln
00
C'l
VI.-
r'l
o
r-:
0\
VI.-
\0
r'l
VI.-
o
r-
VI.-
C'l
0\
o
00
VI.-
r'l
0\
oq-n
00
-.::tn
o
V)
"1-
\0
V)
VI.-
i::
~
;;,
c;:l
0-
2
~
.D
c;:l
>
.~
U
l!)
er::::
E-<
..J
+
l!)
~
@
"@
en
Vi
ro
U
-0
U
U
s:::::
o~
~
......
r"'
::;
o
E
ro ~
~ ~
-0 ~
a 03
o 0-
25 2
0",::
V) [)
oq- ;::
EA ;;,
4-0 ro
o 0-
~ ~
[:.iJ 00
CJ r"'
-5 g
o =: u::;
-o"@
CJ ;:j
WoE
-0 ro
;:j CJ
..D-5
i:: rJl
;:j ro
E C)
ro ~
.5 ~
5 ~
CJ ~
~Vi
t) 9->
:: a
o.R
r/l 0 [)
.~ u
o 2
25 bJ)
o c
o og
0\ a
EA c
'Oti:
......
r/l 0
o 0
u 0
"Eo
C;j~
og EA
rJl -0
CJ U
~
a
c
lC
U
.D
.8
"1"':':::
V'l U
~ ::l
o '-
zE-<
0)
'-
ti:
r"'
.~
Yl
a
0)
>-.
V)
~
~
C'l
0\
~
Cij
o
o
o
o~
V)
oq-
EA
II
-0
CJ
~
9
~
o
.D
r"'
g
<
~
"~
g.
::;
C/l
Ul
ro
~
.~
...2
t.2
~
C/l
l!)
-0
:l
]
CJ
>
o
.D
ro
c
~
~
Vi
~ Ul
i::
.~ u
~ ~
12 2.
-D >-.
E a3
t
~ ro
ti: g.
N
City of Hopkins, MN
EQUIPMENT REPLACEMENT PLAN
2009 thru 2013
DEPARTMENT SUMMARY
Department 2009 2010 2011 2012 2013 Total
Activity Center 14,000 15,000 29,000
Arts Center 12,100 12,100
City Hall Administration 38,000 38,000 114,000 38,000 38,000 266,000
Community Services 24,040 18,900 50,900 16,500 16,500 126,840
Fire 5,000 47,400 20,300 265,500 25,200 363,400
Police 66,600 133,600 199,100 134,800 368,600 902,700
Public Works: Engineering 21,500 21,500
Public Works: Parks/Forestry 194,200 32,200 91,400 97,500 25,700 441,000
Public Works: Streetsrrraffic 42,300 76,000 327,600 327,200 773,100
Refuse 176,700 176,700
Sewer 6,800 6,800
Water 12,200 6,800 134,800 153,800
GRAND TOTAL 370,140 549,000 501,400 879,900 972,500 3,272,940
Wednesday, August 27, 2008
"
.J
City of Hopkins, MN
EQUIPMENT REPLACEMENT PLAN
2009 thru 2013
PROJECTS BY DEPARTMENT
Department Project# Priority 2009 2010 2011 2012 2013 Total
IActivity Center I
Activity Center Copy Machine o 1-ERP-030 n/a 15,000 15,000
Refrig erator/F reezer 01-ERP-031 n/a 14,000 14,000
Activity Center Total 14,000 15,000 29,000
!Arts Center I
Arts Center Copy Machine 01-ERP-1100 n/a 12,100 12,100
Arts Center Total 12,100 12,100
[City Hall Administration I
Network Server 01-ERP-003 n/a 8,000 8,000 8,000 8,000 8,000 40,000
Telephone System 01-ERP-004 n/a 76,000 76,000
Computers 01-ERP-006 n/a 30,000 30,000 30,000 30,000 30,000 150,000
City Hall Administration Total 38,000 38,000 114,000 38,000 38,000 266,000
ICommunity Services I
City Hall Main Copy Machine - Oce' Copier 01-ERP-001 n/a 2,400 2,400 14,000 18,800
City Hall Small Copy Machine 01-ERP-002 n/a 26,900 26,900
Engineering PrinterlScanner 01-ERP-007 n/a 8,640 10,000 10,000 10,000 10,000 48,640
Document Management Scanner (2) 01-ERP-008 n/a 6,500 6,500 6,500 6,500 26,000
Election Booths 01-ERP-010 n/a 6,500 6,500
Community Services Total 24,040 18,900 50,900 16,500 16,500 126,840
IFire ,
Duty Chief Vehicle 01-ERP-103 n/a 36,400 36,400
Extrication Tool (2) 01-ERP-109 n/a 26,500 26,500
Copy Machine 01-ERP-110 n/a 10,300 10,300
Thennallmaging Camera (2) 01-ERP-112 n/a 18,000 18,000
Workout Equipment - Eliptical 01-ERP-116 n/a 5,000 5,000
Workout Equipment - Stairmaster 01-ERP-117 n/a 5,000 5,000
Workout Equipment - Treadmill 01-ERP-118 n/a 5,000 5,000
Workout Equipment - Weight Lifting 01-ERP-119 n/a 5,000 5,000
Automated External Defibrillator (2) 01-ERP-120 n/a 6,000 7,200 13,200
Quick Attack Pumper/Rescue 01-ERP-121 n/a 234,000 234,000
Workout Equipment - Dumb Bells 01-ERP-122 n/a 5,000 5,000
Fire Total 5,000 47,400 20,300 265,500 25,200 363,400
IPolice I
Wednesday, August 27, 2008
4
Department Project# Priority 2009 2010 2011 2012 2013 Total
Marked Patrol Vehicles (6) 01-ERP-200 n/a 31,600 97,800 67,200 34,600 106,800 33B,OOO
Sergeant's Vehicle o 1-ERP-20 1 n/a 33,600 33,600
Police Administrative Vehicles (2) 01-ERP-204 n/a 26,300 27,100 27,900 28,800 29,600 139,700
Computer System 01-ERP-20B n/a 200,000 200,000
Copy Machine 01-ERP-209 n/a 19,100 19, 100
Network Server (3) 01-ERP-211 n/a 8,700 8,700 8,700 8,700 9,000 43,BOO
Mobile Data Computers 01-ERP-212 n/a 62,700 62,700
Digital Squad Car Cameras 01-ERP-213 n/a 42,600 42,600
Tactical Ballistic Vests 01-ERP-214 n/a 23,200 23,200
Police Total 66,600 133,600 199,100 134,800 368,600 902,700
IPublic Works: Engineering I
Engineering Van 01-ERP-700 n/a 21,500 21,500
Public Works: Engineering Total 21,500 21,500
!Public Works: Parks/Forestry ,
I
1/2 Ton Pickup Truck 01-ERP-BOO n/a 26,400 26,400
4x4 3/4Ton Trucks (2) 01-ERP-B01 n/a 67,400 67,400
3/4 Ton Utility Truck 01-ERP-B02 n/a 32,200 32,200
Aerial Lift 01-ERP-B05 n/a 130,000 130,000
Tractors (2) 01-ERP-B06 n/a 41 ,400 41,400
Trucksters (3) 01-ERP-B07 n/a 19,800 19,BOO
Riding Mowers (3) 01-ERP-BOB n/a 22,800 10,300 33, 100
Large Turf Mower 01-ERP-B10 n/a 65,000 65,000
Brush Chipper 01-ERP-B13 n/a 25,700 25,700
Public Works: Parks/Forestry Total 194,200 32,200 91,400 97,500 25,700 441,000
lpublic Works: Streets/Traffic ,
4X4 3/4 Ton Truck with Plow 01-ERP-301 n/a 30,400 30,400
1 Ton Dump Truck (2) 01-ERP-303 n/a 37,400 34,700 72, 100
1 Ton Traffic Boom Truck 01-ERP-304 n/a 75,000 75,000
Tandem Dump Trucks (2) 01-ERP-306 n/a 132,300 132,300
Water Truck 01-ERP-307 n/a 45,000 45,000
Front End Loaders (2) 01-ERP-30B n/a 172,000 172,000
Skid Loader (2) 01-ERP-309 n/a 31,000 31,000
Sweeper 01-ERP-311 n/a 164,500 164,500
Roller 01-ERP-312 n/a 45,900 45,900
Trailer 01-ERP-316 n/a 4,900 4,900
Public Works: Streets/Traffic Total 42,300 76,000 327,600 327,200 773,100
IRefuse ,
Refuse Truck (RAP-R) (2) 01-ERP-900 n/a 176,700 176,700
Refuse Total 176,700 176,700
ISewer ,
Telephone System 01-ERP-557 n/a 6,800 6, BOO
Sewer Total 6,800 6,800
Wednesday, August 27, 2008
5
Department Project# Priority 2009 2010 2011 2012 2013 To ta I
IWater ,
Backhoe Loader 01-ERP-502 n/a 134,800 134,800
Public Works Copy Machine 01-ERP-506 n/a 12,200 12,200
Telephone System 01-ERP-507 n/a 6,800 6,800
Water Total 12,200 6,800 134,800 153,800
GRAND TOTAL 370,140 549,000 501,400 879,900 972,500 3,272,940
Wednesday, August 27, 2008
6
Source
Equipment Replacement Fund
HCA - Arts Center Fund
RF - Refuse Fund
SF - Sanitary Sewer Fund
WF - Water Fund
City of Hopkins, :MN
EQUIPMENT REPLACEMENT PLAN
2009 thru 2013
FUNDING SOURCE SUMMARY
2009
2010 2011
360,100 475,700
12,100
176,700
6,800
12,200 6,800
549,000 501,400
2012
879,900
879,900
2013
Total
370,140
837,700
2,923,540
12,100
176,700
6,800
153,800
134,800
GRAND TOTAL
370,140
972,500
3,272,940
7
Wednesday, August 27, 2008
City of Hopkins, MN
EQUIPMENT REPLACEMENT PLAN
2009 thru 2013
PROJECTS BY FUNDING SOURCE
Source P roj ect# Priority 2009 2010 2011 2012 2013 Total
IEquipment Replacement Fund I
City Hall Main Copy Machine - Oce' Copier 01-ERP-001 n/a 2,400 2,400 14,000 18,800
City Hall Small Copy Machine 01-ERP-002 n/a 26,900 26,900
Network Server 01-ERP-003 n/a 8,000 8,000 8,000 8,000 8,000 40,000
Telephone System 01-ERP-004 n/a 76,000 76,000
Computers 01-ERP-006 n/a 30,000 30,000 30,000 30,000 30,000 150,000
Engineering Printer/Scanner 01-ERP-007 n/a 8,640 10,000 10,000 10,000 10,000 4B,640
Document Management Scanner (2) 01-ERP-00B n/a 6,500 6,500 6,500 6,500 26,000
Election Booths 01-ERP-010 n/a 6,500 6,500
Activity Center Copy Machine 01-ERP-030 n/a 15,000 15,000
Refrigerator/Freezer 01-ERP-031 n/a 14,000 14,000
Duty Chief Vehicle 01-ERP-103 n/a 36,400 36,400
Extrication Tool (2) 01-ERP-109 n/a 26,500 26,500
Copy Machine 01-ERP-110 n/a 10,300 10,300
Thermal Imaging Camera (2) 01-ERP-112 n/a 18,000 1B,OOO
Workout Equipment - Eliptical 01-ERP-116 n/a 5,000 5,000
Workout Equipment - Stairmaster 01-ERP-117 n/a 5,000 5,000
Workout Equipment - Treadmill 01-ERP-11B n/a 5,000 5,000
Workout Equipment - Weight lifting 01-ERP-119 n/a 5,000 5,000
Automated External Defibrillator (2) 01-ERP-120 n/a 6,000 7,200 13,200
Quick Attack Pumper/Rescue 01-ERP-121 n/a 234,000 234,000
Workout Equipment - Dumb Bells 01-ERP-122 n/a 5,000 5,000
Marked Patrol Vehicles (6) 01-ERP-200 n/a 31,600 97,800 67,200 34,600 106,800 33B,OOO
Sergeant's Vehicle 01-ERP-201 n/a 33,600 33,600
Police Administrative Vehicles (2) 01-ERP-204 n/a 26,300 27,100 27,900 28,800 29,600 139,700
Computer System 01-ERP-20B n/a 200,000 200,000
Copy Machine 01-ERP-209 n/a 19,100 19,100
Network Server (3) 01-ERP-211 n/a 8,700 8,700 8,700 8,700 9,000 43,BOO
Mobile Data Computers 01-ERP-212 n/a 62,700 62,700
Digital Squad Car Cameras 01-ERP-213 n/a 42,600 42,600
Tactical Ballistic Vests 01-ERP-214 n/a 23,200 23,200
4X4 3/4 Ton Truck with Plow 01-ERP-301 n/a 30,400 30,400
1 Ton Dump Truck (2) 01-ERP-303 n/a 37,400 34,700 72, 100
1 Ton Traffic Boom Truck 01-ERP-304 n/a 75,000 75,000
Tandem Dump Trucks (2) 01-ERP-306 n/a 132,300 132,300
Water Truck o 1-ERP-307 n/a 45,000 45,000
Front End Loaders (2) 01-ERP-30B n/a 172,000 172,000
Skid Loader (2) 01-ERP-309 n/a 31,000 31,000
Sweeper 01-ERP-311 n/a 164,500 164,500
Roller 01-ERP-312 n/a 45,900 45,900
Trailer 01-ERP-316 n/a 4,900 4,900
Engineering Van 01-ERP-700 n/a 21,500 21,500
1/2 Ton Pickup Truck Ot-ERP-BOO n/a 26,400 26,400
4x4 3/4Ton Trucks (2) 01-ERP-BOt n/a 67,400 67,400
3/4 Ton Utility Truck 01-ERP-802 n/a 32,200 32,200
Wednesday, August 27, 2008
8
Source Project# Priority 2009 2010 2011 2012 2013 Total
Aerial lift 01-ERP-B05 n/a 130,000 130,000
Tractors (2) 01-ERP-B06 n/a 41,400 41,400
Trucksters (3) 01-ERP-B07 n/a 19,800 19,BOO
Riding Mowers (3) 01-ERP-BOB n/a 22,800 10,300 33, 100
Large Turf Mower o 1-ERP-B1 0 n/a 65,000 65,000
Brush Chipper 01-ERP-B13 n/a 25,700 25,700
Equipment Replacement Fund Total 370,140 360,100 475,700 879,900 837,700 2,923,540
IRCA - Arts Center Fund I
Arts Center Copy Machine 01-ERP-1100 n/a 12,100 12,100
HCA - Arts Center Fund Total 12,100 12, 100
IRF - Refuse Fund I
Refuse Truck (RAP-R) (2) 01-ERP-900 n/a 176.700 176,700
RF - Refuse Fund Total 176,700 176,700
ISF - Sanitary Sewer Fund ,
Telephone System 01-ERP-557 n/a 6,800 6,BOO
SF - Sanitary Sewer Fund Total 6,800 6,800
IWF - Water Fund I
Backhoe Loader 01-ERP-502 n/a 134,800 134,BOO
Public Works Copy Machine 01-ERP-506 n/a 12,200 12,200
Telephone System 01-ERP-50l n/a 6,800 6,800
WF - Water Fund Total 12,200 6,800 134,800 153,800
GRAND TOTAL 370,140 549,000 501,400 879,900 972,500 3,272,940
Wednesday, August 27, 2008
9
City ofHopkins,MN
EQUIPMENT REPLACEMENT PLAN
2009 thru 2013
PROJECTS & FUNDING SOURCES BY DEPARTMENT
Department Project# Priority 2009 2010 2011 2012 2013 Total
IActivity Center I
Activity Center Copy Machine 01-ERP-030 n/a 15,000 15,000
Refrigerator/Freezer 01-ERP-031 n/a 14,000 14,000
Activity Center Total 14,000 15,000 29,000
Equipment Replac~ment Fund 14,000 1:~~QOO 29,000
~ ....f" It' t.:~';,;
:- ~-
,;.... It'~ )"~- " ,.;'",;: .. "~:.-- ,
Activity C~nter Total , 14,000 .: 1.~!q~0:.1~ " 29;000
IArts Center ,
Arts Center Copy Machine 01-ERP-1100 n/a 12,100 12,100
Arts Center Total 12,100 12,100
HCA - Arts Center Fund 12.100 _ 12,100
Arts Center Total 12,100 12,100
ICity Hall Administration ,
I
Network Server 01-ERP-003 n/a 8,000 8,000 8,000 8,000 8,000 40,000
Telephone System 01-ERP-004 n/a 76,000 76,000
Computers 01-ERP-006 n/a 30,000 30,000 30,000 30,000 30,000 150,000
City Hall Administration Total 38,000 38,000 114,000 38,000 38,000 266,000
Equipmell./ Replacement Fund 38,000 38,000 114,000 38,000 . 38000 ,. 266,000
!),:' ,~:;
City Hall Administration Total 38,000 38,000 114,OqO 38,0~0 38;009, ~ , :..'~6~1000
!Community Services I
City Hall Main Copy Machine - Oce' Copier 01-ERP-001 n/a 2,400 2,400 14,000 18,800
City Hall Small Copy Machine 01-ERP-002 n/a 26,900 26,900
Engineering PrinterlScanner 01-ERP-007 n/a 8,640 10,000 10,000 10,000 10,000 48,640
Document Management Scanner (2) 01-ERP-008 n/a 6,500 6,500 6,500 6,500 26,000
Election Booths 01-ERP-010 n/a 6,500 6,500
Wednesday, August 27. 2008
10
Department
Equipment Replacement Fl!lld
IFire
Duty Chief Vehicle
Extrication Tool (2)
Copy Machine
Thermal Imaging Camera (2)
Workout Equipment - Eliptical
Workout Equipment - Stairmaster
Workout Equipment - Treadmill
Workout Equipment - Weight Lifting
Automated External Defibrillator (2)
Quick Attack Pumper/Rescue
Workout Equipment - Dumb Bells
Equipment ReplaceJ1ient Fund
lPolice
Marked Patrol Vehicles (6)
Sergeant's Vehicle
Police Administrative Vehicles (2)
Computer System
Copy Machine
Network Server (3)
Mobile Data Computers
Digital Squad Car Cameras
Tactical Ballistic Vests
Equipment Replacement Fum!
lPublic Works: Engineering
Engineering Van
Project# Priority
Community Services Total
>l.. -', ..
, Commurzity S~fvi~'es.Total
I
01-ERP-103
01-ERP-109
01-ERP-110
01-ERP-112
01-ERP-116
01-ERP-117
01-ERP-118
01-ERP-119
01-ERP-120
01-ERP-121
01-ERP-122
Fire Total
~. ~ -<~ .
. Fire T~t~r
I
01-ERP-200
01-ERP-201
01-ERP-204
01-ERP-208
01-ERP-209
01-ERP-211
01-ERP-212
01-ERP-213
01-ERP-214
Police Total
Police Tot"al
,
01-ERP-700
2009
24,040
24,040
:. -~. . j
~".i~'-~~_ ;<
24;9,40 :
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
5,000
5,000
5,600.
,~/~.~'
5,000'
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
31,600
26,300
8,700
66,600
66,600
66,600
n/a
II
2010
18,900
, .1 ~,9~O.'
~;i,""~::'.;";;: :1:-
-j' ,j~.',~:~i \~~ v~ ~.
,.
W,~06
36,400
5,000
6,000
47,400
;: 4 7 ,~OO .:'
i, A\t'l~)~r;~'~',,:~
. : ~~;j' I,J'
47;4qO." 1,
97,800
27,100
8,700
133,600
133,600
133,600
2011
50,900
50,900
,,'" .' "I. "
\ -
.... '" ~
. ~9,9~~,
10,300
5,000
5,000
20,300
'20,300'~
· : ~~~:)J
.20,300
67,200
33,600
27,900
19,100
8,700
42,600
199,100
199,100
199,100
2012
16,500
~6,500, .
. ~':'. .~~
'. . ' 16 500 .'
;':' ',t.~ '..
26,500
5,000
234,000
265,500
':265,500,,' ,
'~.:"~' ::l{;: ~.
, 26~;506
34,600
28,800
8,700
62,700
134,800
134,800
134,800
2013
16,500
16500,,-
;~}~~'~r~'
Total
126,840
., 126840
:t. ;~': :s".::!.
"16 '500'~~:i~" , "1126'840
..... ,.'l\'~~ ,~. ...J~, ~
"- ;~;: :.;.;~~~~
18,000
7,200
36,400
26,500
10,300
18,000
5,000
5,000
5,000
5,000
13,200
234,000
5,000
25,200 363,400
~q:~90\" ~.,~, ::t9~~tqo
~~\"" ," :~'~~ -~.~':.~>~~
25,2~OO "" '~""363;400
106,800
29,600
200,000
9,000
23,200
368,600
368,600
338,000
33,600
139,700
200,000
19,100
43,800
62,700
42,600
23,200
902,700
902,700
368,60,0 /' 902,700
"f, ."',t
21,500
21,500
Wednesday, August 27, 2008
Department
Project# Priority
21,500
2009
2010
2011
2012
2013
Total
Public Works: Engineering Total
21,500
21,500
, EqllipmentReplacement FUlld
~.: -~ ' .. ." :....~ ,
~ s~:;s ~
:...... 4.r~~" -~
p~~ ,...~' ........-;,. .;':":"
2f.?00~ ~.', ,_
.~ :J
,'Public Works: Engineering Totar
.~
: ~\
~~\~~
:i,t~"
.!/;.' ~'-~:.-,t
~,;..., "",!-.'.l~~
;'.})A<1~~. -:,f.i- _i~J,J,~O
'i~, ..."
.o:t,.-~
'.\; ,..'" ';~ "
jPublic Works: ParkslForestry
1/2 Ton Pickup Truck
4x4 3/4Ton Trucks (2)
3/4 Ton Utility Truck
Aerial Lift
Tractors (2)
Trucksters (3)
Riding Mowers (3)
Large Turf Mower
Brush Chipper
,
,
01-ERP-800
01-ERP-801
01-ERP-802
01-ERP-805
01-ERP-806
01-ERP-807
01-ERP-808
01-ERP-810
01-ERP-813
n/a
n/a
n/a
n/a 130,000
n/a 41 ,400
n/a
n/a 22,800
n/a
n/a
194,200
26,400
67,400
32,200
19,800
10,300
65,000
25}OO
32,200 91,400 97,500 25,700
26,400
67,400
32,200
130,000
41,400
19,800
33,100
65,000
25,700
Public Works: Parks/Forestry Total
441,000
,Equ!pment Replace/llent Fund
,. .. ," .,' )
. 'i ;l.f<< ~~1 .
194:2.09
~...- , ;-,
~.~. \~
3,2,?,O,O
.~.~ ,.~ '. ~'" ~~.
.~. ~
91,400
" ''<~~~ ~.
'97:500
.~ -,:. ~<.:' :.,..
~i' ':;i ~ if,,,,,
"~"25;799 -
~_ it)
~ '.~'~..
~
~ 441,000
", ~.~!_~'
:...i:-~ "....
Public Works: Parks/Fbre;try Total -
194:200
, :.0......
,~
;~-25,700\'..'~}.}~' 441TtO'o0
"" ~'!} ~;.'
, '32,200
. 91:400". " '97;500'
IPublic Works: Streets/Traffic I
4X4 3/4 Ton Truck with Plow 01-ERP-301 n/a
1 Ton Dump Truck (2) 01-ERP-303 n/a
1 Ton Traffic Boom Truck 01-ERP-304 n/a
Tandem Dump Trucks (2) 01-ERP-306 n/a
Water Truck 01-ERP-307 n/a
Front End Loaders (2) 01-ERP-308 n/a
Skid Loader (2) 01-ERP-309 n/a
Sweeper 01-ERP-311 n/a
Roller 01-ERP-312 n/a
Trailer 01-ERP-316 n/a
37,400
4,900
30,400 30,400
34}OO 72,100
75,000 75,000
132,300 132,300
45,000
172,000 172,000
31,000
164,500 164,500
45,900 45,900
4,900
327,600 327,200 773,100
327,600 327;200 -;;'_i 773,100
" Ii --,
.1'
327,600 327,200 773,100
45,000
31,000
Public Works: Streets/Traffic Total
42,300
76,000
Equipment Replacement Fund
42,300
76,000
Public Works: Streets/Traffic Total
76,000
42,300
lRefuse
Refuse Truck (RAP-R) (2)
I
01-ERP-900
n/a
176,700
176,700
12
Wednesday, August 27, 2008
Department
RF - Refuse Fund
ISewer
Telephone System
SF - Sanitary Sewer Flind
IWater
Backhoe Loader
Public Works Copy Machine
Telephone System
WE - Water Fund
Project# Priority
Refuse Total
Refuse Total
,
01-ERP-557
Sewer Total
{ ,
.~ Se~er Total" ,,"
I
01-ERP-502
01-ERP-506
01-ERP-507
Water Total
Water Total'
Grand Total
2009
n/a
n/a
n/a
n/a
370,140
2010
176,700
176,700
176,700
~. #., :-t.
'"i. ..~,' .:e j.- .
12.200
12,200
12.2QO
12,?OP
549,000
2011
6,800
6,800
6,800
" 6,~OO ;
6,800
6,800
',' 6,8.90,
t,,,
,')i09
501,400
....' t
879,900
2012
2013
.- "~
tl.r~ ~,
Total
176,700
r 176,700
"~.~.,~;~:~~~~~ ~ ~. 176 700
~~.t ~..::" ,
[
.. -'1~':~/~
134,800
134,800
6,800
6,800
6,800
~/:'t..f.,f ;. "li
...:'"TA
.~ "~i 6,~00
."f..~.
134,800
12,200
6,800
153,800
f ,...'..
13~,8q9., .' ~'1J5~,89D
'\". "., o~;..:~:~ .;~ .. L~~t ,:~~: ".
"'" ~k..::.i'!.~
. l1.3~,800; FJ} .1~,3'~8~0
972,500
3,272,940
13
Wednesday, AI/gust 27, 2008
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Activity Center
Project # Ol-ERP-030
Project Name Activity Center Copy Machine
Type Equipment
Useful Life Unassigned
Category Equipment
Priority nla
Total Project Cost $56,000
Description 1
Copy machine used by staff for daily operations of the Hopkins Activity Center.
Justification
I
Copy flyers, letters, forms, infonnational items, etc.
Expenditures
Equipment
2009
2010
2011
2012
2013
15,000
15,000
Total
15,000
15,000
Future
41,000 I
Total
Total
Funding Sources
Equipment Replacement Fund
2009
2010
2011
2012
2013
15,000
15,000
Total
15,000
15,00q
Future
41,000 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - None
Estimate salvage/resale value on replaced item: $
Wednesday, August 27, 2008
14
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Facilities Director
Department Activity Center
Project #
01-ERP-031
Type Equipment
Useful Life 30 years
Category Equipment
Priority nJa
Project Name Refrigerator/Freezer
Total Project Cost $24,500
Description 1
Commerical, stainless steel refrigerator and freezer.
Justification
1
Cooling/freezing needed for programs or by use of the participants and their activities. Present unit was here when
activity center opened in 1980. This unit was part of the old South Jr. High cafeteria kitchen. The unit continues to
have problems due to the age of the unit.
Prior
10,500 I
Total
Expenditures
Equipment
2009
2010
14,000
14,000
2011
2012
2013
Total
14,000
14,000
Total
Prior
10,500 I
Total
Funding Sources
Equipment Replacement Fund
2009
2010
14,000
14,000
2011
2012
2013
Total
14,000
14,000
Total
Operational Impact/Other I
Variance from 20 year plan - New dollar amount applied for replacement.
Estimate salvage/resale value on replaced item: $-0-
Wednesday, August 27, 2008
15
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Facilities Director
Department Arts Center
Type Equipment
Useful Life 7 years
Category Equipment
Priority n/a
Total Project Cost $53,800
Project #
Ol-ERP-IIOO
Project Name Arts Center Copy Machine
Description I
Copy machine capable of enlarging and producing double sided, collated and stapled copies.
Justification
I
Used to duplicate reports, letters, signs, flyers and rental infonnation.
Prior
8,500 I
Total
2010
2011
12,100
12,100
2012
2013
Total
12,100
12,100
Expenditures
Equipment
2009
Total
Prior
8,500 I
Total
2010
2011
12,100
12,100
2012
2013
Total
12,100
12,100
Funding Sources
HAC - Arts Center Fund
2009
Total
Operational Impact/Other I
Variance from 20 year plan - increase by $2,000 to reflect actual cost.
Estimate salvage/resale value on replaced item: $
Fu tu re
33,200 I
Total
Future
33,200 I
Total
16
Wednesday, August 27, 2008
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Project #
Ol-ERP-003
Project Name Network Server
Description
1
Total Project Cost $209,000
The network server is the hub of the network. New computers are faster and more reliable.
Contact Finance DirectorlIT
Department City Hall Administration
Type Equipment
Useful Life 1 year
Category Equipment
Priority nla
Justification
1
Networking allows user to share information that is stored in a single location, the network server. This is more
efficient because the information does not have to be stored on many different computers. It also makes for better
accuracy because as the infonnation changes or is updated, every user is working with the same data.
Prior
49,000 I
Total
2009
8,000
8,000
2010
8,000
8,000
2011
8,000
8,000
2012
8,000
8,000
Expenditures
Equipment
Total
2013
8,000
8,000
Total
40,000
40,000
Fu tu re
120,000 I
Total
Prior
49,000 I
Total
2009
8,000
8,000
2010
8,000
8,000
2011
8,000
8,000
2012
8,000
8,000
Funding Sources
Equipment Replacement Fund
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $-0-
2013
8,000
8,000
Total
40,000
40,000
Future
120,000 I
Total
17
Wednesday, August 27, 2008
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thrll 2013
Contact Finance Director/IT
Department City Hall Administration
Project # Ol-ERP-004
Project Name Telephone System
Type Equipment
Useful Life 8 years
Category Equipment
Priority n/a
Total Project Cost $288,000
Description I
Includes the PBX, the voice mail systems, and all telephone instruments. Currently there are over 200 extensions
served by this system. Also includes software for the PBX and voice mail systems.
Justification
I
Making, receiving and routing telephone calls, storing voice mail messages, and providing telephone based information
services (snow line, etc.)
Prior
60,000 I
To ta I
Expenditures
Equipment
2009
2010
2011
76,000
76,000
2012
2013
Total Future
76,000 152,000 I
76,000 Total
Total
Prior
60,000 I
To ta I
Funding Sources
Equipment Replacement Fund
2009
2010
2011
76,000
76,000
2012
2013
Total
76,000
76,000
Fu tu rc
152,000 I
Total
Total
Operational Impact/Other -1
Variance from 20 year plan - None.
Estimate salvage/resale value on replaced item: $
JYednesday, August 27, 2008
18
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Project #
Ol-ERP-006
Project Name Computers
Description
I
Total Project Cost $840,000
Contact Finance Director/IT
Department City Hall Administration
Type Equipment
Useful Life 3-5 years
Category Equipment
Priority nla
Personal computer purchases and upgrades for the entire City staff. Coordinating personal computer purchases from
individual departments to one fund.
Justification
1
Tools enabling staff to perfonll job responsibilities efficiently and effectively.
Prior
240,000 I
Total
2009
30,000
30,000
2010
30,000
30,000
2011
30,000
30,000
2012
30,000
30,000
Expenditures
Equipment
Total
2013
30,000
30,000
Total
150,000
150,000
Future
450,000 I
Total
Prior
240,000 I
Total
2009
30,000
30,000
2010
30,000
30,000
2011
30,000
30,000
2012
30,000
30,000
Funding Sources
Equipment Replacement Fund
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $-0-
2013
30,000
30,000
Total Future
150,000 450,000 I
150,000 Total
19
Wednesday, AI/gust 27, 2008
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Con tact City Clerk
Department Community Services
Type Equipment
Useful Life 5 years
Category Equipment
Priority nJa
Total Project Cost $165,000
Project #
Ol-ERP-OOl
Project Name City Hall Main Copy Machine - Oce' Copier
Description I
Copy machine to service needs of all departments located at City Hall.
1. Variety of copying tasks.
2. High volume product copier.
Note: equipment is leased.
Justification
-1
Daily use to make copies of correspondence and forms. Periodically produce documents, i.e., budgets, financial reports,
council reports and updates, city code revisions, various department reports, and hearing and infonnation notices.
Machine will duplex, sort, collate and staple copies.
Prior
89,400 I
Total
Expenditures
Equipment
2009
2,400
2,400
2010
2,400
2,400
2011
14,000
14,000
2012
2013
Total
18,800
18,800
Fu tu re
56,800 I
To ta I
Total
Prior
89,400 I
To ta I
Funding Sources
Equipment Replacement Fund
2009
2,400
2,400
2010
2,400
2,400
2011
14,000
14,000
2012
2013
Total
18,800
18,800
Fu tu re
56,800 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - lease renewed for 36 months. Plan to purchase new copier in 2011.
Estimate salvage/resale value on replaced item: $-0-
Wednesday, August 27, 2008
20
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact City Clerk
Department Community Services
Project # Ol-ERP-002
Project Name City Hall Small Copy Machine
Type Equipment
Useful Life 5 years
Category Equipment
Priority nla
Total Project Cost $179,500
Description I
Coyy machine to service needs of all departments located at City Hall.
1, Variety of copying tasks.
2. High volume product copier.
Note: This is a Ricoh color copier.
Justification
I
Daily use to make copies of correspondence and forms. Periodically produce documents, i.e., budgets, financial reports,
council reports and updates, city code revisions, various department reports, and hearing and information notices.
Machine will duplex, SOli, collate and staple copies.
Prior
43,200 I
Total
Expenditures
Equipment
2009
2010
2011
26,900
26,900
2012
2013
Total Future
26,900 109,400 I
26,900 To ta I
Total
Prior
43,200 I
Total
Funding Sources
Equipment Replacement Fund
Total
2009
2010
2011
26,900
26,900
2012
2013
Total
26,900
26,900
Future
109,400 I
Total
Operational Impact/Other .1
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $2,500
Wednesday, August 27, 2008
21
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Project #
Ol-ERP-007
Project Name Engineering Printer/Scanner
Contact City Clerk
Department Community Services
Type Equipment
Useful Life 5 years
Ca tegory Equipment
Priority n/a
Total Project Cost 5278,560
Description I
Printer/scanner - large format copier use in Engineering to copy blueprints, plans and large documents.
Equipment is leased.
Justification
-1
Large document copier/scanner for use in Engineering. Also scans documents for permanent storage.
Prior
25,920 I
Total
2009
8,640
8,640
2010
10,000
10,000
2011
10,000
10,000
2012
10,000
10,000
Expenditures
Equipment
Total
2013
10,000
10,000
Total
48,640
48,640
Fu tu re
204,000 I
Total
Prior
25,920 I
To ta I
Funding Sources
Equipment Replacement Fund
Total
2009
8,640
8,640
2010
10,000
10,000
2011
10,000
10,000
2012
10,000
10,000
Operational Impact/Other 1
Variance from 20 year plan - None
Estimate salvage/resale value on replaced item: $-0-
2013
10,000
10,000
Total
48,640
48,640
Future
204,000 I
Total
22
Wednesday, August 27, 2008
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Proj ect #
Ol-ERP-008
Project Name Document Management Scanner (2)
Contact City Clerk
Department Community Services
Type Equipment
Useful Life 3 years
Category Equipment
Priori!)' n/a
Total Project Cost $104,000
Description I
Large document (11 "xI7") scanner for document management and retention as well as general administrative use.
Two scanners each replaced every three years.
One replaced in 2009, 2012......
One replaced in 2010, 2013.....
Justification
1
2007 - Replaces the second scanner that only scans documents to 8 1/2"xI4" that was purchased in 2004.
Prior
13,000 I
Total
2009
6,500
6,500
2010
6,500
6,500
2011
2012
6,500
6,500
Expenditures
Equipment
Total
2013
6,500
6,500
Total Future
26,000 65,000 I
26,000 Total
Prior
13,000 I
To ta I
Funding Sources
Equipment Replacement Fund
2009
6,500
6,500
2010
6,500
6,500
2011
2012
6,500
6,500
Total
2013
6,500
6,500
Total Future
26,000 65,000 I
26,000 Total
Operational Impact/Other I
Variance from 20 year plan - None
Estimate salvage/resale value on replaced item: $500-$1,000
23
Wednesday, August 27, 2008
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact City Clerk
Department Community Services
Project #
Ol-ERP-OIO
Type Equipment
Useful Life 20 years
Category Equipment
Priority n/a
Project Name Election Booths
Total Project Cost $29,800
Description
Election booths
I
Justification
I
In 2008 the City replaced approximately 1/2 of the voting booths in use now. The booths we have now are over 25
years old - many of them no longer have functioning lights. Every year we have to stop using some because they have
broken parts and can no longer be used.
Expenditures
Equipment
2009
6,500
6,500
2010
2011
2012
2013
Total Future
6,500 23,300 I
6,500 Total
Total
Funding Sources
Equipment Replacement Fund
2009
6,500
6,500
2010
2011
2012
2013
Total
6,500
Future
23,300 I
Total
Total
6,500
Operational Impact/Other I
Variance from 20 year plan - new item - cost in 2008 - $6,400 for 1/2 of the booths. Cost in 2009 - $6,500 for 1/2 of the
booths.
Estimate salvage/resale value on replaced item: $-0-
Wednesday, August 27, 2008
24
Project # Ol-ERP-I03
Project Name Duty Chief Vehicle
2009 thru 2013
Contact Fire Chief
Department Fire
Type Equipment
Useful Life 5 years
Category Vehicles
Priority nla
Total Project Cost $212,300
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Description I
A marked passenger vehicle for use by the Duty Chief in transporting required equipment, reference materials and
personnel for emergency response, and routine Fire Department business.
Justification
I
Used by the Fire Chief when responding to fires and other emergencies. Used for official business in and out of the city
and for fire fighter travel on official Fire Department business.
Going to 3 year rotation will replace current used squad car that ends up costing us more money in repairs. Each car
will be cycled down and older squad will be replaced.
Prior
28,100 I
Total
Expenditures
Vehicles
2009
2010
36,400
36.400
2011
2012
2013
Total
36,400
36,400
Future
147,800 I
Total
Total
Prior
28,100 I
Total
Funding Sources
Equipment Replacement Fund
Total
2009
2010
36,400
36,400
2011
2012
2013
Total
36,400
36,400
Fu tu re
147,800 I
Total
Operational Impact/Other I
Variance from 20 year plan - Change from 7 year life to 3 years. Add vehicle rotation in 2009.
Estimate salvage/resale value on replaced item: $4,000
Wednesday, August 27,2008
25
EQUIP:MENT REPLACE:MENT PLAN
City of Hopkins, MN
2009 Ihru 2013
Con tact Fire Chief
Department Fire
Type Equipment
Useful Life 10 years
Category Equipment
Priorit)' nJa
Total Project Cost $146,200
Proj ect #
Ol-ERP-I09
Project Name Extrication Tool (2)
Description I
Hydraulic rescue and extrication tool with spreader, cutters and hydraulic ram.
Note: purchased 1995 & 2005
Justification
I
All vehicle and industrial rescue situations which will require paitient disentanglement or entrapment.
Prior
20,300 I
To ta I
2009
2010
2011
2012
26,500
26,500
2013
Total
26,500
26,500
Expenditures
Equipment
Total
Prior
20,300 I
Total
Funding Sources
Equipment Replacement Fund
2009
2010
2011
2012
26,500
26,500
2013
Total
26,500
26,500
Total
Operational Impact/Other I
Variance from 20 year plan - added to ERP second extrication tool purchased from Fire Dept budget in 2005.
Estimate salvagelresale value on replaced item: $1,000
Future
99,400 I
Total
Future
99,400 I
Total
26
Wednesday, August 27, 2008
EQUlPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Con tact Fire Chief
Department Fire
Type Equipment
Useful Life 8 years
Category Equipment
Priority n/a
Total Project Cost $47,400
Project # Ol-ERP-IIO
Project Name Copy Machine
Description I
Fire Station copy machine.
Justification I
Copying business papers, training records, etc.
Prior
7,400 I
Total
2009
2010
2011
10,300
10,300
2012
2013
Total
10,300
10,300
Expenditures
Equipment
Total
Prior
7,400 I
Total
Funding Sources
Equipment Replacement Fund
Total
2009
2010
2011
10,300
10,300
2012
2013
Total
10,300
10,300
Operational Impact/Other -\
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $500
Fu tu re
29,700 I
Total
Future
29,700 I
Total
27
Wednesday, August 27,2008
Project # 01-ERP-112
Project Name Thermal Imaging Camera (2)
2009 thru 2013
Contact Fire Chief
Department Fire
Type Equipment
Useful Life 10 years
Category Equipment
Priority n/a
Total Project Cost $104,600
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Description I
Used by our fire companies to locate victims trapped in a smoke filled building. It helps us detennine where fire and
heat may be hidden allowing for faster extinguishment.
Note: purchased 1997 & 2003
Justification
I
Current camera is ten years old and has been through many hot fires and needs to be replaced. Current camera was
purchased with donation money.
Prior
15,000 I
To ta 1
Expenditures
Equipment
2009
2010
2011
2012
2013
18,000
18,000
Total
18,000
18,000
Future
71,600 I
Total
Total
Prior
15,000 I
Total
Funding Sources
Equipment Replacement Fund
2009
2010
2011
2012
2013
18,000
18,000
Total
18,000
18,000
Future
71,600 I
Total
Total
. Operational Impact/Other I
Variance from 20 year plan - department owns 2 cameras. Previously one one was included in the replacement plan.
This will add to the replacement schedule the camera purchased from the Fire Dept budget in 2003.
Estimate salvagelresale value on repaIced item: $-0-
Wednesday, August 27,2008
28
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Fire Chief
Department Fire
Project # 01-ERP-116
Project Name Workout Equipment - Eliptical
Type Equipment
Useful Life 6 years
Category Equipment
Priority nla
Total Project Cost $37,800
Description I
Workout equipment used in Fire Department workout room. Two eliptical machines replaced on a 6 year cycle, one
every 3 years.
2009 - replace eliptical
2012 - replace eliptical
Justification
I
This equipment is available to all City employees for health and wellness.
Expenditures
Equipment
2009
2010
2011
2012
5,000
5,000
2013
Total Future
5,000 32,800 I
5,000 Total
Total
Funding Sources
Equipment Replacement Fund
2009
2010
2011
2012
5,000
5,000
2013
Total
5,000
5,000
Fu tll re
32,800 I
Total
Total
Operational Impact/Other]
Variance from 20 year plan - remove $5,000 in 2009 and use for dumb bells.
Estimate salvage/resale value on replaced item: $
Wednesday. August 27, 2008
29
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Fire Chief
Department Fire
Type Equipment
Useful Life 5 years
Category Equipment
Priority n/a
Total Project Cost $25,300
Project # 01-ERP-117
Project Name Workout Equipment - Stairmaster
Description I
Workout equipment used in Fire Department workout room.
One stainnaster replaced on a 5 year cycle.
Justification
I
This equipment is available to all City employees for health and weIlness.
Expenditures
Equipment
2009
2010
5,000
5,000
2011
2012
2013
Total
5,000
5,000
Total
Funding Sources
Equipment Replacement Fund
2009
2010
5,000
2011
2012
2013
Total
5,000
Total
5,000
Operational Impact/Other I
Variance from 20 year plan - new item - Originally purchased with grant funds.
Estimate salvage/resale value on replaced item: $
Future
20,300 I
Total
5,000
Fu tu're
20,300 I
Total
30
Wednesday, August 27, 2008
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Con tact Fire Chief
Department Fire
Type Equipment
Useful Life 5 years
Category Equipment
Priority n/a
Total Project Cost $25,300
Project # 01-ERP-118
Project Name Workout Equipment - Treadmill
Description I
Workout equipment used in the Fire Department workout room.
One treadmill replaced on a 5 year cycle.
Justification
I
This equipment is available to all City employees for health and welIness.
Expenditures
Equipment
2009
2010
Total
2011
5,000
5,000
2012
2013
Total
5,000
5,000
Future
20,300 I
To ta I
Funding Sources
Equipment Replacement Fund
2009
2010
Total
2011
5,000
5,000
2012
2013
To ta I
5,000
5,000
Fu tll re
20,300 I
Total
Operational Impact/Other 1
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
31
Wednesday, AI/gust 27, 2008
Project # 01-ERP-119
Project Name Workout Equipment - Weight Lifting
2009 thru 2013
Contact Fire Chief
Department Fire
Type Equipment
Useful Life 5 years
Category Equipment
Priority nJa
Total Project Cost $25,300
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Description I
Smith machine - weight lifting machine.
Justification
I
For use by Police, Fire, Public Works, City staff to keep in shape to perform job duties and stay healthy. Current
machine will be 7 years old in 2012. Suggested replacement is every 5 years.
Expenditures
Equipment
2009
2010
2011
5,000
5,000
2012
2013
Total
5,000
5,000
Fu tu re
20,300 I
Total
Total
Funding Sources
Equipment Replacement Fund
2009
2010
2011
5,000
5,000
2012
2013
Total
5,000
5,000
Future
20,300 I
Total
Total
Operational Impact/Other I
VariaI1ce from 20 year plan - new item. Not previously included in ERP. Originally purchased with grant funds.
Estimate salvage/resale value on replaced items: $
Wednesday, August 27, 2008
32
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Fire Chief
Department Fire
Type Equipment
Useful Life 3 years
Category Equipment
Priority n/a
Total Project Cost 560,200
Project # Ol-ERP-120
Project Name Automated External Defibrillator (2)
Description I
Defibrillator is used to help get someones heart restarted during a cardiac arrest.
Own 2 - both are replaced at one time due to changing technology.
Justification
I
The current AED are not in the ERP. With changes in technology, they should be replaced every three years.
Cost - $3,000 per unit
Expenditures
Equipment
2009
2010
6,000
6,000
2011
2012
2013
7,200
7,200
Total
13,200
13,200
Future
47,000 ,
Total
Total
Funding Sources
Equipment Replacement Fund
2009
2010
6,000
6,000
2011
2012
2013
7,200
7,200
Total
13,200
13,200
Future
47,000 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - new item. Not previously included in ERP. 2007 replaced with fire department funds.
Estimate salvage/resale value on replaced item: $
Wednesday, August 27,2008
33
Project # 01-ERP-121
Project Name Quick Attack Pumper/Rescue
2009 thru 2013
Contact Fire Chief
Department Fire
Type Equipment
Useful Life 25 years
Category Vehicles
Priority nJa
Total Project Cost $234,000
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Description I
Quick attack pumper/rescue.
Justification I
Would replace Rescue 8 (lite rescue) and use as a utility vehicle. This truck could be used for daytime and nighttime
medicals and small fires. This will reduce having all personnel resporid to small fires. It will also let us drop one
engine in 2022 but still keep ISO rating.
Expenditures
Vehicles
2009
2010
2011
2012
234,000
234,000
2013
Total
234,000
234,000
Total
Funding Sources
Equipment Replacement Fund
2009
2010
20.J 1
2012
234,000
234,000
2013
Total
234,000
234,000
Total
Operational Impact/Other I
Variance from 20 year plan - new item.
Estimate salvage/resale value on replaced item: $
Wednesday, August 27,2008
34
Project # Ol-ERP-122
Project Name Workout Equipment - Dumb Bells
2009 thru 2013
Con tact Fire Chief
Department Fire
Type Equipment
Useful Life 1 0 years
Category Equipment
Priority n/a
Total Project Cost $11,700
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Description I
Workout equipment used in Fire Department workout room.
Justification
1
Instead of replacing eliptical machine in 2009 - would replace dumb bell. They are used by all City employees and are
15 years old. They are also covered with lead paint that could be harmful.
Expenditures
Equipment
2009
5,000
5,000
2010
2011
2012
2013
Total
5,000
5,000
Future
6,700 I
Total
Total
Funding Sources
Equipment Replacement Fund
Total
2009
5,000
5,000
2010
2011
2012
2013
Total
5,000
5,000
Fu tu re
6,700 I
Total
Operational Impact/Other I
Variance from 20 year plan - new item.
Estimate salvage/resale value on replaced item: $
Vlednesday, August 27, 2008
35
2009 thru 2013
Con tact Police Chief
Department Police
Type Equipment
Useful Life 3 years
Category Vehicles
Priority nla
Total Project Cost $2,183,100
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Project # Ol-ERP-200
Project Name Marked Patrol Vehicles (6)
Description I
Marked patrol vehicles used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties.
Justification
I
Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure
data and radio equipment for routine and emergency operations. Vehicles contain secure seating for prisoner transport.
Prior
473,700 I
Total
2009
31,600
31,600
2010
97,800
97,800
2011
67,200
67,200
2012
34,600
34,600
Expenditures
Vehicles
Total
2013
106,800
106,800
Total Future
338,000 I 1,371,400 I
338,000 Total
Prior
473,700 I
Total
Funding Sources
Equipment Replacement Fund
2009
31,600
31,600
2010
97,800
97,800
2011
67,200
67,200
2012
34,600
34,600
Total
2013
106,800
106,800
Total Future
338,000 I 1,371,400 I
338,000 Total
Operational Impact/Other 1
Variance from 20 year plan - move sergeant's vehicle to separate project number.
Estimate salvage/resale value on replaced item: $4,000 each
36
Wednesday, August 27, 2008
Project #
Ol-ERP-201
2009 thru 2013
Contact Police Chief
Department Police
Type Equipment
Useful Life 4 years
Category Vehicles
Priority n/a
Total Project Cost $215,700
EQillPMENT REPLACEMENT PLAN
City of Hopkins, MN
Project Name Sergeant's Vehicle
Description I
Marked patrol vehicle used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties.
Justification
I
Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure
data and radio equipment for routine and emergency operations. Vehicles contain secure seating for prisoner transport.
Expenditures
Vehicles
2009
2010
2011
33,600
33,600
2012
2013
Total Future
33,600 182,100 I
33,600 Total
Total
Funding Sources
Equipment Replacement Fund
2009
2010
2011
33,600
33,600
2012
2013
Total
33,600
33,600
Fu tu re
182,100 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - move purchase of sergeant's squad back to 2011. Purchased new in 2007.
Estimate salvagelresale value on replaced item: $3,500 each
Wednesday, August 27,2008
37
EQillPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Police Chief
Department Police
Project # Ol-ERP-204
Project Name Police Administrative Vehicles (2)
Type Equipment
Useful Life 2 years
Category Vehicles
Priority nla
Total Project Cost $866,400
Description I
Police administrative and detective vehicles.
Replace Chiefs vehicle - even numbered years
Replace Captain's vehicle - odd numbered years
Justification
1
Unmarked vehicles, equipped with radios, siren and red grille lites used by chief and captain. Staff use is for two
years. Vehicles are then rotated down to detectives and are kept for an additional 3-4 years. Vehicles are also used for
surveillance by uniform and plain clothes officers.
Prior
159,000 I
Total
Expenditures
Vehicles
2009
26,300
26,300
2010
27,100
27,100
2011
27,900
27,900
2012
28,800
28,800
2013
29,600
29,600
Total
139,700
139,700
Future
567,700 I
To ta I
Total
Prior
159,000 I
Total
Funding Sources
Equipment Replacement Fund
2009
26,300
26,300
2010
27,100
27,100
2011
27,900
27,900
2012
28,800
28,800
2013
29,600
29,600
Total
139,700
139,700
Future
567,700 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $4,000 each
Wednesday, August 27, 2008
38
EQillPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013 .
Contact Police Chief
Department Police
Type Equipment
Useful Life 20 years
Category Equipment
Priority nla
Total Project Cost $400,000
Project # Ol-ERP-208
Project Name Computer System
Description I
Computer system for records management and retention of Police Department.
J ustifi cati 0 n
I
To store, retrieve and transfer required data to State and perform data entry, inquiries of local, state and national crime
databases.
During last purchase, the Police Department did not have CAD or mobile systems. Since then, these systems have been
added and share the same data base/operating system as the records management. Replacement will have to incorporate
all three systems.
Expenditures
Equipment
2009
2010
2011
2012
2013
200,000
200,000
Total Future
200,00020q,OOO
200,000 Total
Total
Funding Sources
Equipment Replacement Fund
2009
2010
2011
2012
2013
200,000
200,000
Total Future
200,00020q,000
200,000 Total
Total
Operational Impact/Other I
Variance from 20 year plan - Cost to replace needs to be increased from $500,000 to $700,000. Move back from 2010
to 2013. Change from 10 to 20 year life..
Estimate salvage/resale value on replaced item: $-0-
Wednesday, August 27, 2008
39
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Police Chief
Department Police
Type Equipment
Useful Life 5 years
Category Equipment
Priority nla
Total Project Cost $127,200
Project # Ol-ERP-209
Project Name Copy Machine
Description I
Police Department copy machine capable of producing double side copies and collating pages.
Justification
I
Used to make duplicate copies of reports, letters, memos, etc., generated by police personnel.
Prior
30,700 I
Total
2009
2010
2011
19,100
19,100
2012
2013
Total
19,100
19,100
Expenditures
Equipment
Total
Prior
30,700 I
Total
2009
2010
2011
19,100
19,100
2012
2013
Total
19,100
19,100
Funding Sources
Equipment Replacement Fund
Total
Operational Impact/Other 1
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $1,000
Future
77 ,400 I
Total
Future
77 ,400 I
Total
40
Wednesday, August 27, 2008
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Project # 01-ERP-211
Project Name Network Server (3)
Contact Police Chief/IT
Department Police
Type Equipment
Useful Life 3 years
Category Equipment
Priority n/a
Total Project Cost $235,400
Description I
Computer servers store information and system programs.
One server @ $15,000 (to be purchased for digital squad car cameras storage and retrieval - see 01-ERP-213)
Justification
-1
Annual replacement cycle allows development of system storage program. Use of newer servers for heavy use
programs while older servers used for data storage.
Prior
51,200 I
To ta I
2009
8,700
8,700
2010
8,700
8,700
2011
8,700
8,700
2012
8,700
8,700
Expenditures
Equipment
Total
2013
9,000
9,000
Total Future
43,800 140,400 I
43,800 Total
Prior
51,200 I
Total
Funding Sources
Equipment Replacement Fund
Total
2009
8,700
8,700
2010
8,700
8,700
2011
8,700
8,700
2012
8,700
8,700
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item - $
2013
9,000
9,000
Total Future
43,800 140,400 I
43,800 Total
41
Wednesday, August 27, 2008
Project # 01-ERP-212
Project Name Mobile Data Computers
2009 thru 2013
Contact Police Chief
Department Police
Type Equipment
Useful Life 5 years
Category Equipment
Priority n/a
Total Project Cost $364,400
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Description I
Mobile data computers installed in squad cars used to receive calls from dispatch, query information from various
databases, communicate car to car.
Justification
I
Limited life of 5 years - replacement necessary.
Prior
47,000 I
Total
Expenditures
Equipment
2009
2010
2011
2012
62,700
62,700
2013
Total
62,700
62,700
Fu tu re
254,700 I
Total
Total
Prior
47,000 I
Total
Funding Sources
Equipment Replacement Fund
2009
2010
2011
2012
62,700
62,700
2013
Total Future
62,700 254,700 I
62,700 Total
Total
Operational Impact/Other I
Variance from 20 year plan - Increase cost from $54,500 to $62,700 ($5,700 x 11) to better reflect actual cost of
MDC/docking station.
Estimate salvage/resale value on replaced item: $-0-
Wednesday, August 27, 2008
42
Project # 01-ERP-213
Project Name Digital Squad Car Cameras
2009 thru 2013
Contact Police Chief
Department Police
Type Equipment
Useful Life 5 years
Category Equipment
Priority n/a
Total Project Cost $215,700
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Description I
Digital video camera system in each patrol car - used to document events in and out of the patrol car. Images
downloaded to server for storage and retrieval.
Justification
I
Police Dept. currently has eight digital camera units installed and a dedicated server. The life expectancy of the
cameras is about five years. Current cameras were installed in September 2006.
Cost: 8 cameras @ $5,000 per unit plus tax - $42,600
1 server @ $15,000 (to be purchased from Police Network Server (01-ERP-211)
annual allocation that carries forward.
Estimated cost $57,600. Cost could be lower if, at the time of replacement, a suitable product is available through a
State or County equipment bid.
Expenditures
Equipment
2009
2010
2011
42,600
2012
2013
Total Future
42,600 173,100 I
42,600 Total
Total
42,600
Funding Sources
Equipment Replacement Fund
2009
2010
2011
42,600
42,600
2012
2013
Total Future
42,600 173,100 I
42,600 Total
Total
Operational Impact/Other I
Variance from 20 year plan - cost needs to be increased from $42,600 to $57,600 to reflect more accurate estimate of
replacement.
Estimate salvage/resale value on replaced item: $
Wednesday, AI/gust 27,2008
43
Project # 01-ERP-214
Project Name Tactical Ballistic Vests
2009 thru 2013
Contact Police Chief
Department Police
Type Equipment
Useful Life 5 years
Category Equipment
Priority nla
Total Project Cost $137,500
EQUlPMENT REPLACEMENT PLAN
City of Hopkins, MN
Description 1
Tactical ballistic vests worn by members of the Hopkins Police Department High-risk Entry and Assault Team
(HEA T). These vests offer a higher level of protection against weapon assault than the regular duty ballistic vest.
Justification
I
Federal and State grant monies have been available through the Ballistic Vest Program over the past several years.
These grants only pay a portion of the total cost of the vest, leaving the Police Department to pay the balance. There is
no guarantee that these grants will be available in the future.
Warranty on the current vests expires in 2007.
Cost: 9 vests x $2,133 = $19,197 (today's cost). Does not include any applicable taxes.
Prior
20,000 I
Total
Expenditures
Equipment
2009
2010
2011
2012
2013
23,200
23,200
Total
23,200
23,200
Fu tu re
94,300 I
Total
Total
Prior
20,000 I
Total
Funding Sources
Equipment Replacement Fund
Total
2009
2010
2011
2012
2013
23,200
23,200
To ta I
23,200
23,200
Fu tu re
94,300 I
Total
Operational Impact/Other I
Variance from 20 year plan - new item. Note: regular bullet proof vests funded by federal/state grants
Estimate salvage/resale value on replaced item: $
Wednesday, August 27, 2008
44
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: Engineering
Project #
Ol-ERP-700
Type Equipment
Useful Life 10 years
Category Vehicles
Priority nla
Project Name Engineering Van
Total Project Cost $66,400
Description I
Van used by Engineering Department for survey equipment and on job site work.
Justification
I
Transportation to and from job site, hauling of surveying and traffic counting equipment.
Prior
16,000 I
Total
Expenditures
Vehicles
2009
2010
2011
2012
2013
21,500
21,500
Total
21,500
21,500
Future
28,900 I
Total
Total
Prior
16,000 I
Total
Funding Sources
Equipment Replacement Fund
2009
2010
2011
2012
2013
21 ,500
21,500
Total Future
21,500 28,900 I
21,500 Total
Total
Operational Impact/Other I
Variance from 20 year plan - increase amount from 14,300 to 16,000 to reflect actual cost. Purchase used Suburban
from Hennepin Co. 2002 auction -price is $13,000 to $14,000 + $2,000 for equipment.
Estimate salvage/resale value on replaced item: $2,500
Wednesday, August 27, 2008
45
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: Parks/Forestry
Project # Ol-ERP-800
Project Name 1/2 Ton Pickup Truck
Type Equipment
Useful Life 10 years
Ca tegory Vehicles
Priority nla
Total Project Cost $61,800
Description I
Pickup used by Park Division of Public Works.
Justification
I
Expenditures
Vehicles
2009
2010
2011
26,400
26,400
2012
2013
Total
26,400
26,400
Future
35,400 I
Total
Total
Funding Sources
Equipment Replacement Fund
2009
2010
2011
26,400
26,400
2012
2013
To ta I
26,400
26,400
Fu iu re
35,400 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Wednesday, A IIgllst 27, 2008
46
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: Parks/Forestry
Project # Ol-ERP-801
Project Name 4x4 3/4Ton Trucks (2)
Type Equipment
Useful Life 8 years
Category Vehicles
Priority nla
Total Project Cost $313,800
Description I
Trucks used by Parks Division of Public Works.
Justification
-1
Snow plowing, hauling, transportation. Units are heavily used.
Prior
53,200 I
Total
Expenditures
Vehicles
2009
2010
2011
2012
67,400
67,400
2013
To ta I
67,400
67,400
Future
193,200 I
To ta 1
Total
Prior
53,200 I
Total
Funding Sources
Equipment Replacement Fund
Total
2009
2010
2011
2012
67,400
67,400
2013
Total
67,400
67,400
Future
193,200 I
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Wednesday, AI/gust 27,2008
47
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: ParksfForestry
Project # Ol-ERP-802
Project Name 3/4 Ton Utility Truck
Type Equipment
Useful Life 10 years
Category Vehicles
Priority n/a
Total Project Cost $75,600
Description I
3/4 ton truck with utility body used for transporting tools and equipment for repair of various buildings, irrigation, etc.
around the city.
Justification
I
Expenditures
Vehicles
2009
2010
32,200
32,200
2011
2012
2013
Total
32,200
32,200
Future
43,400 I
Total
Total
Funding Sources
Equipment Replacement Fund
2009
2010
32,200
32,200
2011
2012
2013
Total
32,200
32,200
Fu tu re
43,400 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - In 2007 the vehicle was moved back two years from 2008 to 2010.
Estimate salvage/resale value on replaced item: $
Wednesday, August 27,2008
48
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 fhru2013
Contact Public Works Director
Project # Ol-ERP-805
Project Name Aerial Lift
Departmcnt Public Works: ParkslForestry
Type Equipment
Useful Life 20 years
Category Equipment
Priority nJa
Total Projcct Cost S130,000
Description I
Aerial lift truck is utilized by the Forestry department to trim and remove trees. It is also used for ballfield light
maintenance in the parks.
Justification
I
Expenditures
Equipment
2009
130,000
130,000
2010
2011
2012
2013
Total
130,000
130,000
Total
Funding Sources
Equipment Replacement Fund
2009
130,000
130,000
2010
2011
2012
2013
Total
130,000
130,000
Total
Operational Impact/Other I
Variance from 20 year plan - Increase amount from $110,000 to $130,000 to reflect actual cost.
Estimate salvage/resale value on replaced item: $ 15,000
Wednesday, August 27, 2008
49
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: Parks/Forestry
Project # Ol-ERP-806
Project Name Tractors (2)
Type Equipment
Useful Life 30 years
Category Equipment
Priori!)' nJa
Total Project Cost $87,900
Description -1
Farm type tractors with cab used with various attachments. Ice rink sweeping, flail mower, fertilizing, aeration,
plowing and grass seeding.
Justification
I
Expenditures
Equipment
2009
41,400
41,400
2010
2011
2012
2013
Total
41,400
41,400
FutUl'e
46,500 I
Total
Total
Funding Sources
Equipment Replacement Fund
Total
2009
41,400
41,400
2010
2011
2012
2013
Total
41 ADO
41,400
Future
46,500 I
Total
Operational Impact/Other l
Variance from 20 year plan - Move one tractor back from 2012 to 2014. Change to 30 year life.
Estimate salvage/resale value on replaced item: $3,500
Wednesday, August 27, 2008
50
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thrll 2013
Contact Public Works Director
Department Public Works: Parks/Forestry
Project # Ol-ERP-807
Project Name Trucksters (3)
Type Equipment
Useful Life 15 years
Category Equipment
Priority nla
Total Project Cost $114,700
Description I
Truckster used by Parks Division of Public Works for ballfield and parks maintenance.
Justification
1
Park maintenance, ballfield grooming and weed spraying.
Prior
29,900 I
Total
Expenditures
Equipment
2009
2010
2011
2012
19,800
19,800
2013
Total
19,800
19,800
Future
65,000 I
Total
Total
Prior
29,900 I
To ta I
Funding Sources
Equipment Replacement Fund
2009
2010
2011
2012
19,800
19,800
2013
Total
19,800
19,800
Future
65,000 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - None
Estimate salvage/resale value on replaced item: $1,400 each
Wednesday, August 27,2008
51
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: ParksfForestry
Project # Ol-ERP-808
Project Name Riding Mowers (3)
Type Equipment
Useful Life 8 years
Category Equipment
Priority nla
Total Project Cost $223,100
Description I
Riding mowers used by Parks Divison of Public Works. One mower also used for sidewalk snow removal during
winter months.
Justification
1
Mowing city parks and right of ways and sidewalk snow removal.
Prior
49,000 I
Total
Expenditures
Equipment
2009
22,800
22,800
2010
2011
2012
10,300
10,300
2013
Total
33,100
33,100
Future
141,000 I
Total
Total
Prior
49,000 I
Total
Funding Sources
Equipment Replacement Fund
Total
2009
22,800
22,800
2010
2011
2012
10,300
10,300
2013
Total
33,100
33,100
Future
141,000 I
Total
Operational Impact/Other I
Variance from 20 year plan - none.
Estimate salvage/resale value on replaced item: $600 each
Wednesday, August 27, 2008
52
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: Parks/Forestry
Type Equipment
Useful Life 10 years
Category Equipment
Priority nla
Project #
Ol-ERP-810
Project Name Large Turf Mower
Total Project Cost $207,700
Description
I
Large turf mower (11' cutting width) used by Parks Division of Public Works.
Justification
1
Required to efficiently mow large parks.
Prior
50,000 I
Total
Expenditures
Equipment
2009
2010
2011
65,000
65,000
2012
2013
Total Future
65,000 92,700 I
65,000 Total
Total
Prior
50,000 I
To ta I
Funding Sources
Equipment Replacement Fund
Total
2009
2010
2011
65,000
65,000
2012
2013
Total Future
65,000 92,700 I
65,000 Total
Operational Impact/Other I
Variance from 20 year plan - change useful life from 12 to 10 years - move replacement year from 2013 to 2011 based
on maintenance experience and lowest overall cost.
Estimate salvage/resale value on replaced item: $3,500
Wednesday. August 27, 2008
53
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Project #
01-ERP-813
Department Public Works: ParksIForestry
Type Equipment
Useful Life 20 years
Category Equipment
Priority nJa
Project Name Brush Chipper
Total Project Cost $25,700
Description 1
Brush chipper used for Forestry and brush pick up operations of Public Works.
Justification
I
Expenditures
Equipment
2009
2010
2011
2012
2013
25,700
25,700
Total
25,700
25,700
Total
Funding Sources
Equipment Replacement Fund
Total
2009
2010
2011
2012
2013
25,700
25,700
Total
25,700
25,700
Operational Impact/Other I
Variance from 20 year plan - change to usable life to 20 years - move back from 2009 to 2013.
Estimate salvage/resale value on replaced item: $
Wednesday, August 27, 2008
54
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thrll 2013
Contact Public Works Director
Department Public Works: Streetsrrraffic
Project #
Ol-ERP-301
Type Equipment
Useful Life 8 years
Category Vehicles
Priority nla
Project Name 4X4 3/4 Ton Truck with Plow
Total Project Cost $92,900
Description I
3/4 ton pickup used by Street Divison of Public Works for heavy loads and pulling trailers.
Justification
I
Light hauling, pulling trailers, transportation to and from job sites.
Prior
24,000 I
Total
Expenditures
Vehicles
2009
2010
2011
2012
2013
30,400
30,400
Total
30,400
30,400
Future
38,500 I
Total
Total
Prior
24,000 I
Total
Funding Sources
Equipment Replacement Fund
2009
2010
2011
2012
2013
30,400
30,400
Total
30,400
30,400
Future
38,500 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $1,500
Wednesday, August 27, 2008
55
EQillPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: Streetsrrraffic
Project # Ol-ERP-303
Project Name 1 Ton Dump Truck (2)
Type Equipment
Useful Life 12 years
Category Vehicles
Priority nJa
Total Project Cost $205,500
Description I
Truck is used in the Street Division of Public Works.
Justification
1
Vehicle used by various departments for street and park maintenance and light hauling.
Prior
30,500 I
Total
Expenditures
Vehicles
2009
37,400
37,400
2010
2011
2012
34,700
34,700
2013
Total
72,100
72,100
Fu tu re
102,900 I
Total
Total
Prior
30,500 I
Total
Funding Sources
Equipment Replacement Fund
Total
2009
37,400
37,400
2010
2011
2012
34,700
34,700
2013
Total
72,100
72,100
Future
102,900 I
Total
Operational Impact/Other 1
Variance from 20 year plan -
Estimate salvage/resale value on replaced item: $3,500
Wednesday, August 27, 2008
56
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: Streetsffraffic
Project # Ol-ERP-304
Project Name 1 Ton Traffic Boom Truck
Type Equipment
Useful Life 17 years
Category Vehicles
Priority n/a
Total Project Cost $75,000
Description 1
Boom truck used in Street and Traffic Divisions of Public Works.
Justification
I
Vehicle used by Traffic Department for signal and light pole maintenance.
Expenditures
Vehicles
2009
2010
2011
2012
75,000
75,000
2013
, Total
75,000
75,000
Total
Funding Sources
Equipment Replacement Fund
2009
2010
2011
2012
75,000
75,000
2013
Total
75,000
75,000
Total
Operational Impact/Other I
Variance from 20 year plan - None
Estimate salvage/resale value on replaced item: $8,000
Wednesday, August 27, 2008
57
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: Streetsffraffic
Project # Ol-ERP-306
Project Name Tandem Dump Trucks (2)
Type Equipment
Useful Life I 7 years
Category Vehicles
Priority nla
Total Project Cost S274,700
Description 1
Dump trucks used in Streets Division of Public Works.
Justification
I
Trucks used for heavy hauling, snow plowing and sanding.
Expenditures
Vehicles
2009
2010
2011
2012
2013
132,300
132,300
Total Future
132,30014lAOO
132,300 Total
Total
Funding Sources
Equipment Replacement Fund
2009
2010
2011
2012
2013
132,300
132,300
Total Future
132,30014~AOO
132,300 Total
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $-0-
Wednesday, August 27, 2008
58
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: Streetsffraffic
Project #
Ol-ERP-307
Type Equipment
Useful Life 22 years
Category Vehicles
Priority n/a
Project Name Water Truck
Total Project Cost $195,000
Description I
Water truck used in Streets and Parks Division of Public Works.
Justification
I
Used for street flushing, watering trees and plants, rink flooding and standby fire protection.
Expenditures
Vehicles
2009
2010
45,000
45,000
2011
2012
2013
Total Future
45,000 150,000 I'
45,000 Total
Total
Funding Sources
Equipment Replacement Fund
2009
2010
45,000
45,000
2011
2012
2013
Total Future
45,000 150,000 I
45,000 Total
Total
Operational Impact/Other 1
Variance from 20 year plan - replace tanker only in 2010 - replace tanker, cab & chassis in 2017, tanker only again in
2032 and entire vehicle in 2039. Change to a 22 year life.
Estimate salvage/resale value on replaced item: $8,500
Wednesday, August 27, 2008
59
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: Streetsrrraffic
Project # Ol-ERP-308
Project Name Front End Loaders (2)
Type Equipment
Useful Life 15-18 years
Category Equipment
Priority n/a
Total Project Cost $530,100
Description
1
Justification
I
Prior
140,000 I
Total
Expenditures
Equipment
2009
2010
2011
2012
172,000
172,000
2013
Total
172,000
172,000
Fu tu re
218,100 I
Total
Total
Prior
140,000 I
Total
Funding Sources
Equipment Replacement Fund
2009
2010
2011
2012
172,000
172,000
2013
Total
172,000
172,000
rutu re
218,100 I
Total
. Total
Operational Impact/Other I
Variance from 20 year plan - None
Estimate salvage/resale value on replaced item: $
Wednesday, August 27, 2008
60
EQillPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: Streetsrrraffic
Project # Ol-ERP-309
Project Name Skid Loader (2)
Type Equipment
Useful Life 12 years
Category Equipment
Priority nla
Total Project Cost $176,800
Description I
Loading trucks, landscape work, snow removal, material handling.
Justification
I
Expenditures
Equipment
2009
2010
31,000
31,000
2011
2012
2013
To ta I
31.000
31,000
Future
145,800 I
To ta I
Total
Funding Sources
Equipment Replacement Fund
2009
2010
31,000
31,000
2011
2012
2013
Total
31.000
31,000
Future
145,800 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Wednesday, August 27, 2008
61
EQUlPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: Streetsffraffic
Project Name Sweeper
Type Equipment
Useful Life 12 years
Category Equipment
Priority n/a
Project # 01-ERP-311
Total Project Cost $514,400
Description I
Street sweeper used by Streets Division for sweeping streets and parking lots.
Justification
I
Street sweeping, event clean-up, spring sand removal.
Prior
115,300 I
Total
Expenditures
Equipment
2009
2010
2011
2012
2013
164,500
164,500
Total
164,500
164,500
Future
234,600 I
Total
Total
Prior
115,3001
Total
Funding Sources
Equipment Replacement Fund
Total
2009
2010
2011
2012
2013
164,500
164,500
Total
164,500
164,500
Future
234,600 I
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $12,000
Wednesday, August 27, 2008
62
EQUlPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Project # Ol-ERP-312
Project Name Roller
Department Public Works: Streetsrrraffic
Type Equipment
Useful Life 20 years
Category Equipment
Priority nla
Total Project Cost $45,900
Description
1
Used by Street Department for asphalt repair and resurfacing.
Justification
I
Expenditures
Equipment
2009
2010
2011
2012
45,900
45,900
2013
Total
45,900
45,900
Total
Funding Sources
Equipment Replacement Fund
Total
2009
2010
2011
2012
45,900
45,900
2013
Total
45,900
45,900
Operational Impact/Other I
Variance from 20 year plan - None
Estimate salvage/resale value on replaced item: $
Wednesday, August 27, 2008
63
EQillPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Public Works: Streetsffraffic
Project #
01-ERP-316
Type Equipment
Useful Life 20 years
Category Equipment
Priority nla
Project Name Trailer
Total Project Cost $4,900
Description 1
Used for transporting and hauling equipment and supplies.
Justification
I
Expenditures
Equipment
2009
4,900
4,900
2010
2011
2012
2013
Total
4,900
4,900
Total
Funding Sources
Equipment Replacement Fund
2009
4,900
4,900
2010
2011
2012
2013
Total
4,900
4,900
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estial11te salvage/resale value on replaced item: $
Wednesday, August 27, 2008
64
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Refuse
Project # Ol-ERP-900
Project Name Refuse Truck (RAP-R) (2)
Type Equipment
Useful Life 10 years
Category Vehicles
Priority n/a
Total Project Cost $1,042,100
Description 1
Refuse truck used by Refuse Utility Division of Public Works.
Justification
Residential waste pick up.
I
Prior
148,000 I
Total
Expenditures
Vehicles
2009
2010
176,700
176,700
2011
2012
2013
Total
176,700
176,700
Future
717,400 I
Total
Total
Prior
148,000 I
Total
Funding Sources
RF - Refuse Fund
2009
2010
176,700
176,700
2011
2012
2013
Total
176,700
176,700
Future
717,400 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $18,000
Wednesday, August 27, 2008
65
EQillPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Finance Director/IT
Department Sewer
Type Equipment
Useful Life 8 years
Category Equipment
Priority nfa
Total Project Cost $31,200
Project # Ol-ERP-557
Project Name Telephone System
Description I
Includes the PBX, the voice mail systems, and all telephone instruments. Currently there are over 200 extensions
served by this system. Also includes software for the PBX and voice mail systems.
Justification
I
Making, receiving and routing telephone calls, storing voice mail messages, and providing telephone based information
services (snow line, etc.)
Prior
4,700 I
To ta I
Expenditures
Equipment
2009
2010
2011
6,800
6,800
2012
2013
Total
6,800
6,800
Future
19,700 I
Total
Total
Prior
4,700 I
Total
Funding Sources
SF - Sanitary Sewer Fund
2009
2010
2011
6,800
6,800
2012
2013
Total
6,800
6,800
Future
19,700 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Wednesday, A llgllst 27, 2008
66
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Water
Project #
Ol-ERP-502
Type Equipment
Useful Life 20 years
Category Equipment
Priority n/a
Project Name Backhoe Loader
Total Project Cost $134,800
Description I
Unit utilitzed by Water, Sewer and Street Divisions of Public Works for repair and installation of underground utilities.
Justification
I
Expenditures
Equipment
2009
2010
2011
2012
2013
134,800
134,800
Total
134,800
134,800
Total
Funding Sources
WF - Water Fund
2009
2010
2011
2012
2013
134,800
134,800
Total
134,800
134,800
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Wednesday, August 27, 2008
67
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Public Works Director
Department Water
Project # Ol-ERP-506
Project Name Public Works Copy Machine
Type Equipment
Useful Life 5 years
Category Equipment
Priority nJa
Total Project Cost $72,600
Description I
Copy machine to service needs of all division of Public Works.
Justification
I
Making copies for various departments.
Prior
10,600 I
Total
Expenditures
Equipment
2009
2010
12,200
12,200
2011
2012
2013
Total Future
12,200 49,800 I
12,200 Total
Total
Prior
10,600 I
To ta I
Funding Sources
WF - Water Fund
2009
2010
12,200
12,200
2011
2012
2013
To ta I
12,200
12,200
Future
49,800 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $800
Wednesday, August 27,2008
68
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2009 thru 2013
Contact Finance DirectorlIT
Department Water
Type Equipment
Useful Life 8 years
Category Equipment
Priority n/a
Total Project Cost S31,200
Project #
Ol-ERP-507
Project Name Telephone System
Description I
Includes the PBX, the voice mail systems, and all telephone instruments. Currently there are over 200 extensions
served by this system. Also includes software for the PBX and voice mail systems.
Justification
I
Making, receiving and routing telephone calls, storing voice mail messages, and providing telephone based information
services (snow line, etc.)
Prior
4,700 I
Total
Expenditures
Equipment
2009
2010
2011
6,800
6,800
2012
2013
Total
6,800
6,800
Future
19,700 I
Total
Total
Prior
4,700 I
Total
Funding Sources
WF - Water Fund
2009
2010
2011
6,800
6,800
2012
2013
Total
6,800
6,800
Fu tll re
19,700 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Wednesday, August 27,2008
69
,....
u
:f)
~
~~
u~
~~
~ ~
~ E
~ ~
~~
g;
:.J N
0:
01
~
~
~
z
~ ~
r..; _ ;.-
p
~
~
~
Z
0:
N
N
~
'"
.....
~
~
~
.....
.....
;:l
C
N
f1
N
N
:;
~
~
0'
~
:=
N
N
:::.
N
'"
.....
N
N
N
C
<::
~i
o
~
00
o
o
o
or)
0'
N
~
'-
-'
""
E
~
v
~ ~
::: 9
~ u
] ~ ~
~ ->- ~)
~
.c.
:;;
~~
c ~
r-.
~ ~
<::
~
o
~
00
o
o
o
or)
c
~ ~
s;2
;:::,
DC
o
c
~.
c
c
r~
""
..'
~
v u
~
~ ]
~ ~
~
G
:2
x:
g C
cGr-g
o
c
o
00
c
c
o
00
o
o
c
00
o
o
c
00
o
o
o
00
c
c
o
00
o
o
o
00
g g g
ooreg
o
o
o
00
o
o
o
00
o
o
o
00
o
o
o
00
o
o
o
00
o
o
o
00
o
o
o
00
000
000
000
cr.:;2~
8 0
c 0
00 g
o
o
o
00
z:
~
~
u
~
:::~
~ ~
C ~
Z
;:::.
s;2
c
~~
o
o
o
g
o
8
g
o
o
o
g
o C 0
8 ~ ~.
g~:;
o
o
o
g
o
o
o
g
o
o
o
g
o
o
o
g
o
8
g
o
o
o
g
o
o
o
g
o
o
o
g
o
o
o
g
c
o
c
g
.r,
r-.
~
~~
:55
~ t:
B 3
~ ~
~ ~ ~
~. 3 ~
~ ~ ~ ~
.- ~ S
~ C ~
'.' = ~ ~
c
c
~
g
~
c
o
c
~
o
o
o
~
c
o
o
~
o
o
o
~
o
o
c
~
o
o
~
o
o
o
~
c
o
o
~
o
c
c
~
o
o
o
~
o
o
o
~
o
o
o
~
c
c
c
~
o
o
o
-i
c
o
~
~. 0 8
~-6
~ ~ g ~t
~~-i.6
coo ~
~;q~~
ceo
000
c c- 0
--ifio
~ c ~
ci 0 ~
c
o
c
~
c
~
ri
~
~
:f)
~
t:
?; ~ ~
2(ju
63g
u ->- :f.
rJ r- x
? -
~ :2 ~ ;2 =
:7.
...::," --
g .r,
..:5 -::5
c
~~
c
~:2
c
~
8 ~
-i .:::
o
o
o
-i
8 ~
ri .6
o c
8 ~
N-O
o
g
ri
c 0
is ~
r-I ..::5
o
g
o
c c
8 ;;;
0-6
o c
g ~
0..6
3~~~S
~ .:) ~
r',
~ u ~
~ 9
V') :-
:_~- ~ ~
-= :n
OJ, -= z
~2~~
OJ;:; ~
g S 2 -,
. :-_p., P-.,
~ 8 ~
.r,
~
v:;
r~
('oJ
c
~
1i
o
~
~
c
~
~
c
o
~
o
~
~
o
~
~
o
o
o
-i
c
S;
x:
o
S;
00
c
o
o
ri
o
o
c-
or)
\::J
o
~
00
o
o
o
o
c
~
-0
c
~
s;2
0:
S?:
g
00
f,
o
o
o
o
~
V"\ V"\
r..l r ~
~I ~ '7 ~
- '." .... -
~~~~
= ~ :J
:J5 ...= G
:.;
}:i
~ = ~ = ~
o
i2
~
o
o
C'
'4
o
~
rj
c
~
rl ~
p
~ ~ 5
:; :Il
~ ~ j
~ ~
<:
_i!~
- - - ~
s;2
r::
~
c
o
.,:)
~
c
c
.,:)
~
c
c
C'
00
~
o
c
o
ci
~
C
C
c
~:
c
~
r:j
~~
~ ?1
~
~
:<
~
~ g :.;
~ ~ ~
~ g ~,.~
"-":J
< X G ~
r-- g _
8
{'~
~
c
~
~
;=:
'"
~
~
(":'..1
8
,..;
o
o
o
?
fi
o
c
C
00
g
o
- ~
OJ
rl =
n
~J ~ :J
~ ~ ~
~ c,.g
~~
:.; ~ &
c
~
'4
-" tr:
~
r"':
~ ~
,-.' r-:
o
o
oc
.......
c
;2
-0
~
.:5
o
i2
-0
~
or)
3 ~
~ r-:
o c
o c
oc DO
.r)v..;
i5
c
or)
8 g
or) -0
i.1 ~
:::3 :/5 ~ ~
::.. ::.. ::... 0.,.., .
pn~ r~~o~
&~~~~~~~
~ ~.
- <::
C 0 C
~ ~ ~
v)~r--:
8 g
o 0
V)v-l
:r.: _ rl r:i
~
~
~
-.
C
<::.
c
S
.b
'"
o
c
c
.,:)
:;;
C
i2
-0
o
~
-i
('oJ
g
00'
c
c
~
~
o
o
~
o
i2
-6
~ g ~
oC 'Xi
'"
c
o
00
-0
c
~
~
o
o
0-
g
g
o
o
DO
~
o
?
.......
o
o
'"
or)
'"
o
~
o
g
~
C
o
o.
C 0
C 0
C 0
1,/""; v1
:::
;!
~ ~
-goo 2
- ~
[5 ~
~ _ ~ _ _ ~ _ ~ - = 8 ~ = ~
~
N
l-
N
N
~
N
c
;;:'.
~
or.
N
N
~
~
8
N
o
0-
~
N
N
N
N
~
~
::::i
o
~
~
e-
N
co:
N
N
o
o
':i
-.:>
N
N
....
~
c
g
~
....,
N
N
N
~
:5
~
N
~
~ ~
;r, V*,
~. ::::
o
~~
o 0
?~
-; '4
~ ~
r:jr:j
~ g
~~
o
:5 S
~~
~ 3
~) ~~
g
~A
c
o
'"
~
8
:.::
~
c
c
:i
c
i2
~
::>
o
-:l
~;~
v;
~
~
~
c
~
~
c
~
r;j
c
~
00
,-.
o
o
-:l
~
c
S
~
C
5 ~..
~: ~- ~
c
C
rl
;'
g
'!j
o
~
~ ~
~~
c
C
-:l
~
8
~.
....,
o g s
~: ~~:
o
'"
~
o
~
r:j
~
~
o
o
-:l
~
g c
.... ....
g~
o c
f2 ~
r:; f2:
o
;,
c
c
g
;'j
~
.;.,
~
::;:
~./
c
~
ri
8
~
,
o ~ 0
~ r', :5 5
~ ~ N ~
c
~
~
o
~
~
c
o
....
~
o
g
~
c 0 C 0
:;,~~~
o
o
-:l
~
o
o
0-
r..:
r'
C
g
~
r-, r', r-, "', r-, r-. "'7 _ ..:;) ('.,I (">I ::: ::::
~
S::
...
~I
~
~
;;~~:;;~~
-:;""':j-::::-='-:::;-o
r-: :-: r:: r: ~ r:
------
__ ..J .... .... .... .-
------
~~:I5:.i)~:.r:
"
]]
~ ~ ~
::.l; ~
f~~__
.... r:
\....Iv
()
~ ...J
~ ;::
~ p
3 ~
u CJ ZI
~ u '_~,._".
- ~ -
~ vs
S ~ ~
rJ r-, -t" ~l
2 ~ ~ ~ ~ 2 ~ .~..'. ~ 2 ~ ~,:_-..,. ~
- ~ ~ ~ '." - - ~ - -
:;0
ri
~
ri
V)
C
N
~
c
g
ci
'"
o
~
g
o
o
N
;i
o
o
~
~
o
~
o
:;
v{
o
rJ
o
~
~
~
~
o
~
,-:
g
~
o
o
-:l.
C
o
o
ci
~
o
:;
g
o
o
o
ci
o
N
C
:;
....;
-:l
C
g
~
0-
~
o
C
0-
~
~ CJ
~ i' ~
>- 0 ~ 8,..
:r.~2:;
:=- >. -
== "- 0(
~ G C ~
~: ~.
~
R;
000
2 ~ g
~ ~ ",'
8
r:f
~ g
~ 0"
C
C
-:;.'
~ I.r) r- r-, VI lTl li',
~ r=:
0:' ~
g
-:l
",'
~
",'
o
c
-=
",'
o
o
.:,
",'
C 0
g ~
",' r-i
-:l
g
0-'
C
;;:'.
0-'
g
0-'
o 0
8 g
':)'. r,i
-:l
8
0-'
o
o
o
0"
o
o
C
0:
o 0
g ~
~ rJ
-:l
C
g
oc:
~
00
~
x
()
e c.:; C
OJ
~ 8
~
i ~
r-- :,,:
~ ~ ~ ~ ~ ~ ~ ~
r:j
c
o
~
r:j
o
3
r:j
.:,
~
~
u ~ 2
~_ 1
3
f
" v. :;
~ ~ -'
0._-.,
~) ~
~ .-
~~ ~
.....
~
0:.
c
-=
o'
g
-=
0.'
~ ~
:i
o
o
o
fi
o
C
eJo
~
C
g
0:
o
g
eJo'
o 0
C 0
eJo I-
6-i
N ~
o
g.
g
~
o
o
o
eJo'
C
C
0-
':i
r'
C C
~ ~
~~
o
:;,
o
~
;2
o
g
00
g
"'"
o
~~
:g
z:
5
,.
~ %
:r,
~
~
Jj -
\...)
>
:/J
~
::
~ ~
'.' 2 ~
~ "
, -' ~
".
....
::.. -
r:j
o
~~
r~ ~
>
r- r-
.' ~
C
C
eJo
:.::
N
o
r-; g
x. 00
o
~
C
~
:::
v
z
.....
z
v~
~ ~
~ ~
::..~
~
;::
0:
N
;:::;
~
'"
N
~
V.
N
;:::;
.,.
N
a
N
;:1
;:::;
N
N
;:::;
N
;:::;
;:::;
~
=-
~
;:::;
;:::;
'"
;:::;
v.
a
N
a
N
.-.
;:::;
~
~ ~
c
~
~
N
a
N
;:::;
o
~
~
J. ~
~ S ~
~r:jr:;
~ ~
~: ~
~
--~' ;- ~
., ~ g
..:J
~
0:
'"
~
~-~
:- r:
.- rl ~ 4 r- ; ~ ~
:..
;:::;
=-
;:::;
~
g
-'
~
~
~
~
""-
~
:Jj"':"::
~ : r~, ~ -
~ :1 ~
C2 ~
- -
~.
~ ~ ~ ~
~
'4
o
8
g
13
~ :.:.)::~ ~
:; .;..,~ ~ ~-.:
'oJ ~:: ::
~.
~,
:5 g
o r'~
,.;
r~
~
0-'
~,
;=
o
o
..:l
~
o
O.
0'
~
~
~
~i
X
o
,.;
~
~
o
g
ff
g
c
$2
x
~1
~ :.>
E
~ :2
'"
::-
g 2 ~
~ ~ u Z
> 2 ~.~
:r, ~ .
o
g
N
0'
o
~
rJ
c
",;
o
o
"',
,,~
f2
~
:5
o
.rl
..:l
~ ~
Vi
~ r_.','
~~~uQ
G G :.:... -::I_~
~_~ S
~ = ~
r I r-.
~ 5
- ~
~ ~ ~ ~ ~ x z x
~ ~ _._~.~, ~ ~ ~ ~ ~ ~ ~ g ~ 7 ~ ~ ~ ~
- ~ ~ ~ ~ ~ ~ ~ ~ ~ - ~
~
r~
~.
r.
c
o
-=,
~
o
o
..:l
R;
c
~
,..:
c
o
o
~
o
~
~
c
~
~
c
c
:x;
x c
o 0
f,~ ~
c
g
~
g
o
..:l
~
~
o
S;
,..:
0'
o
~.
c:
c
;?,
~
o
~
0-
<:
2
~
.,.>~
~~
t:: S'''':'
8~~
::::: r-
~ - ::;
z;
o
~
'4
~
~
o
o
..:l
~
~
~
c
~
~
o
o
..:l
~
~
g
o
~
~
c
o
~
C,) O.J U
:::= : r; r) :-: ., - 1 ~ ~
::.. z :/" .
c
~
~~
--"
:.)
...:..:: ~
u '.J
~-t'-:-~-6
2 ":: == r- ~
'"' .....
8
o
;:;
o
~
rj
c
g
f-~
u u
~ ~ ~ ~
o
g
oC
~
o
o
:x;
N
o
o
c
~
o
g
r!
o
g
';j
("".J ~
rl
~
-j .3
'-'
-q
~ ~
~=.:. u-~ .::J
c;cc~3
3; :r. z.
~
~.
t-
v-,
c
c
~. ~.
i~
g ~
~
..:l
--"
,... ~
"
c
~
0"
.,.
o
~
.;
c
5
.;
c
c
of
N
'"
o
c
:x;
c
o
..:l
~
o
~,
c
c
r~
c
o
0'.
o
o
0:
c
S
..:l
N
r-
~ ~
~: g
;::
x
",;
.,.
~
~
3
-b
o
;?,
~
x
:;:-
~
o
c
.::>
,..:
~
o
8.
c
g
f2
~.
g
:j
fi
NN;J=
<:
e
=
;:.
:/J
~ '-' a
Q :3 ~
i!i!.E;~JS
r J r-, VI <.r, ~ r- x ~ r-_
~" - - -
_ :.:;, ~ :.:;. _.:'-_~.'. r~. ~::. r~. 2 ~.~.',' ~ :;:, (", r"". :;' r-, f', r-. r'
_ - ~ ~ ;2 ~ ~ ~ 8 _ ~ ~ ~ ..' ~ ~ ~ _ ~
:<: r::.. g.
N
N
~ 0 ;;;:
~ ~ g. C.
c ....:
N r-, C-
O c
-.: OJ i?, :5
N v) ':i ~
N ~
g a 0 0
or, a 0 i?,
'"
N :: 0: ~ S
~
0 8 a a
.... a 0 0
a '" '"
N ~ :1 ~ ~
N
c 0 0
c c 0
~ -. :r.- oo
c gg gg
N
0 0 0 0
N 0 a 0 g.
0 0 00,
N ~ ~i
N
N
N
0 0 a 0 ~ 0
~ ~ g 0 ~
~ 00
-:5 -:5 g g ~ ~
N "I N
0 0 a a
C' g g g g
c "" "" "" rr:;
N
g, a g. 0 0 a
0: g g c g
t-
N :;:, ~ g., ~ ~ ~
0 a 0 0 0
g 0 g, ~ ~
f{ ::: ~ -:5
~ ,;... '" '"
8 0
-.: 0
'" '"
~ ~: ~ r,
t-
o ~ 0 0 0
or, ~ i?, ~ g
N ~ -..: -i -..:
0 ~
'"
a 0 0 0 c
.... g g 0 0 c
"'. "'.
~ ~ ~ 0 ~
0 0
n g ~
N ~ ,;
~
a 0 0 a
g g, a g
<Y.l
N -:5 '" -:5 -:5
a c a
rl f. g g
N o i ,.j ;2 ;2
:::
~
~ ~ ~ N r; - - f. or, V) - ::: or, i?,
n OJ
- ;..
~ ~ !
g ~ .....
-'" -'" ..... ~ ~ .... z
~I u ~ ~I u ... ~ ~
2:: ~I -'" -'" ~I ~ ~ ~
'-' u p ~ i- 3 0 2 ~ 2 Zi
~ -'" '" [ u ;;; f' ~ i- ~ - a ~
~ ;. :::l -'" ~ g ~ ~ ..... .... u
~ :/; ~ :/) :/; ~, ::l u u u ::; ::l ..... ~
:; ] u VS 0 u -'" -;;; 2
~ r- ::. ~ CIl c-: (/)
u ~ u ~
- ~ ~ ~ "'" :/. ~ ~ "/J U U u ~
- r= u
..... -'" ~ ~ -> ~ 9 c:;
rJ u ~ .- ""
- ~ c-: < U ; ~ ,E ~ ~ ~ ~ ;, .3 c-: u
,- :...., - ..... - .;. .~
OJ ". ~ '" c "", rJ or, V) t- or. '-. .....
~I '0 ;;;. ;;:. v=;. v:. ,t=; ~ or, or "", or, or, =1 3? -
./") V) or ""' or, or
~ =- ~ ~ ~ ~ =- =- ~ =- ~ ~ =- =- ::; =- ~ ::...
::<: ::<: ::<:
- - - - - - ..' - :J - - '.'
---- -
:x:
N
N
:;
N
~
or.
N
~
....
N
N
....,
N
C
N
N
N
~
N
N
~
N
~
N
N
-.:
~
N
....
N
~
;::.i
~
N
N
""
N
~
:=; ;.-
~
::::
~
~
~
~
~
N
r-. X
l-
N
N
~.,
:'.. ~
'"
N
N
o
~ -
~ r~
or.
N
N
o
~~ :.
t"""':. ,...'".a
o.
....
N
N
g ~
~: ;:!'
;:l
~
g 8 ~.
r:j ~.
N
~
~
g ~
~~
N
N
~ ~
~~
~
o c
~ i2
V-{-i
~ 0
r::--
N
s ~
~g
;::.i
~ ~
(""~ "'7'
g ~
N
~ ~
~;i
-.:
N
g ~
~r:t:i
~ ~
N
s g ~
~3~
....
~
8 ($
("-J ':;'
~ ?;
....,
N
c
~ 0-
ci~
~
N
C
N
~
""
N
~
:::
~
r:..
5
.-:
0- -
~
.,.;
"7
c
..... c
",: 0-'
c
C
C'l
~
g 8
~. g
o
~
ri
c
g 00
~i
o C 0
~ ~ ~
6g~
c
~~
x ~ c 2
~i~i
g ~
;~
~
~:
o
~
g.
~
c 0
i2 3.
~ (3
o
~.
F-.
~ ~
~r;:
o :=>
o ~
~ ~i
~~~
;r.
% -
c
i2
;2
C',
r,
~ r~
6.. ~
rl
~
z ~
~
~ ~
~ ~
z.
~ g,
Y3 ...~
:r. -
-:::~~~:r2
~
c
c
~
~
c
g
00
:=>
c
~
:=>
c
..::>
.,;
o
c
o
~
o
i2
~
:=>
c
C'~
0-
..::>
o
o
0-
~
~
o
~
0:
o
0-
c
~
r-:
N
o.
o
12.
'"'
V)
o
~
~
c :=>
~~
~ ~~
o
o
o
o
g5
-.
.5;
f2
g
:=>
o
0-
~
:=>
12
~
c
c
~
~
~
<:
f-
9,._
~ ~ ~
~ -~ ~
~ ~
~ ~~.
< ~
~r.CC
~ ..- ~
5 <:::.
r:..
c
B
o
g
oO~
i',
c
~.
:r.
:=>
~
~
~
o
f2
~
c
~
r..:
c 0
o C
0-
";0:
r-
",:
00
~
~:
0-'
c
~
~
c
~
is S<
ri ~
~
~
l-
t;
~
~~
I-
or.
""
:x:
-=
~-~ g
~ ~
c
c
-:;
~
N.
~
....,
~
cC
:;
25
or.
~
-:;
~
c-.
-:;
-=
~
N
l-
N
c-.
~
~.
52
;:;
~
:;
o
-:;
52
~
o
;1,
g
r-
~
""
~
o
:;:.
i7.
~
"7
r:::
n
..-
~
,.
z:
~
~
~
~:
x
o ~
~ -
-.
g C
o ::3
~ ~
g 8
~ ~:
o c
is i2
g~
g ~
~ ""
..::>
C 0
C C
o 0-
~~
o c
is ~
~~
o
is ;:
':j~
0-
8 ~.
':j?;
o 0
g ~
~~
o 0
o c
c c.
<:i'!;
g 8
o
~~
o 0
is i2
~~
;G
c 0
c c
~i
:i;
o
o
o r-
g~
x 0
o c
g~
o
g
g~
~
~ '"'
:Ii ~
z:
~ ~
~ :
z
5 z
gjg
"I""
~ r",
<
c
_I S?
~g
z
2
~
z
:n ~_
~
@ j
~ ~
~ ;Z
~ c
:s ~
:2
:2
:n~ ~
:.:.J
~
~ t
< :..-
<: :...
(- ~ -
::::
r:1 " :...,. ~
:.-
c C
C 0
..::>
~~
g c g
'4~~
~ ~
';j ,i ri
c
~ r;; -
ri 8 ~:
~.o?~f2 ~
ri ~ -: r-~ :.~:
o. ;-g C\ r- ~; r:,
c c
~ r:. C
~~i!2
r-i
3
f
z
~ ~,
~ ~ 3
-_~r-~' _~
:.; ~ ~ ~
-;_:...~~o
~ ~ ~-"
<c:~-
:-; ~
;::-;~. ::; ~ ~ f:' :3
8-:~-'S~8
z
~ ~
3 Cr.
- t ~
~
~
~ ~
~ ~
?_"' ~
- ~ S=:
z ::i -
- - ~ ::: ~
Y".
- 2 _ _ _
o ~ g
~ c ':)';
~~~
~ ;;.
~~. ~
C ('l
:r.: ("I
Z f-
"'-l ?-_'"
t
~ ~
R5
~S
~ ~ ~
..-bP
~ ~ ~
...J
~.~.'. :s
::::i
~ ~ ~
(3 _ v
gg~~g
r-:\i~i~~
~ g g g ~
~: ~ ~. ~.,.; ri
. - .. ~ . -- ;?~
.--
,.... ~'':'' Z z
2:~:~:-:-~~
- - ~ ~
Z
~ :r. 2_,
:: ~.-., ~ ~-.:; ..-
-~~:/);:E/:
3 5
v
r::..
o
i2
o
c
;?,
~
o
i2
....:
c
g
~
.2)
\.;
o
z
~
~
i:
R
~
~
~
EQUIPMENT & BUILDING
INVENTORY
75
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
07/15/2008
CURRENT
REPLACEMENT
UNIT # YEAR MAKE MODEL COST
FIRE DEPARTMENT
102. 1989 FORD L9000 TELE-SQUIRT $240,000
103. 2006 PETERBILT PUMPER 403,300
104. 1991 PETERBILT HEA VY RESCUE 190,000
105. 1998 FORD CROWN VICTORIA 22,000
106. 2004 FORD . CROWN VICTORIA 28,100
107. 1993 PETERBIL T PUMPER 225,000
108. 1995 CHEV 4X4 LITE RESCUE 25,000
109. 1972 STUPHEN AERIAL TRK 750,000
110. 2000 FORD CROWN VICTORIA 24,000
112. 2006 DODGE DURANGO 28,300
115. 1952 MACK PUMPER 4,000
.120. 1995 CHEVROLET SUBURBAN
121. 2005 FREI G HTLINER M2
POLICE DEPARTMENT
200. 2004 FORD CROWN VICTORIA $28,100
201. 2008 FORD CROWN VICTORIA 28,100
202. 2008 FORD CROWN VICTORIA 28,100
203. 2005 FORD CROWN VICTORIA 28,160
204. 2007 FORD CROWN VICTORIA 29,000
205. 2007 FORD CROWN VICTORIA 29,000
206. 2007 FORD CROWN VICTORIA 29,000
207. 2002 FORD CROWN VICTORIA 28,000
208. 2007 FORD CROWN VICTORIA 29,000
209. 2005 FORD CROWN VICTORIA 30,000
211 2006 JEEP LIBERTY 18,800
212. 2002 CHEV TAHOE 26,000
213. 2003 CHEV IMP ALA 25,000
214. 2007 DODGE CHARGER 28,000
215. 2002 CHEV IMPALA . 18,800
216. 2005 CHEV IMPALA 20,000
218. 2006 FORD 500 21,800
240. 1999 CHEV P40 V AN 25,000
241. 2001 CHRYSLER PT CRUISER 18,000
76
CITY OF HOPKINS
VEHICLEIEQUIPMENT INVENTORY
07/15/2008
CURRENT
REPLACEMENT
UNIT # YEAR MAKE MODEL COST
STREET/TRAFFIC DIVISION
301. 1997 CHEV 3/4 TON $21,000
302. 2006 FORD F250 26,500
304. 2000 FORD F-450 34,000
305. 1997 FORD 1/2 TON 18,300
306. 1992 CHEV 4X4 1 TON 22,000
307. 2006 FORD F350-1 TON DUMP 27,400
309. 1995 CHEV I TON TRK 28,000
310. 1989 INTERN A TIONAL SGLAX DUMP 70,000
312. 2005 FREIGHTLINER SGLAX DUMP 98,000
313. 2001 FORD L7501 72,000
314. 1998 FORD L T 8500 86,000
315. 1996 FORD L- 8000 85,000
316. 1995 FORD WATER TRK 81,000
318. 1968 FORD BOOM/AUGER TRK 8,500
320. 1991 CA TERPILLER LOADER 926E 90,000
322. 2005 CA TERPILLER LOADER 938G 157,800
324. 2004 BOBCAT SKID LOADER 30,000
325. 1998 JOHN DEERE SKID LOADER 24,000
326. 1989 CA TERPILLAR 140-G 82,000
327. 2001 ELGIN PELICAN SE 105,000
330. 1989 INGERSOL/RAND ROLLER DD-25 23,000
334. 2003 GRACO GM 3500 4,500
337. 1994 CA TERPILLAR BOX PAVER 18,000
342. 1991 TARGET CONCRETE SAW 2,400
344. 1996 SNOGO WK 800 58,000
348. 1989 TRAIL- KING TK6V -1200 3,000
349. 1989 TRAIL- KING MK6V -1200 3,000
350. 1995 TOWMASTER T14 4,000
FLOAT VEHICLES
401. 2000 CHEV IMPALA $17,000
ENGINEERING DIVISION
700. 2000 CHEV SUBURBAN $14,500
77
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
07/15/2008
CURRENT
REPLACEMENT
UNIT # YEAR MAKE MODEL COST
BUILDING & EQUIPMENT SERVICES
703. 1999 DODGE DAKOTA 4X4 $18,000
704. 2005 FORD F250 25,400
705. 1995 FORD F150 15,000
PARKS/FORESTRY DIVISION
800. 2001 FORD RANGER4X4 $18,000
803. 2004 FORD F350 23,000
804. 2004 FORD F350 23,000
805. 1998 DODGE RAM 3500 24,000
810. 1993 INTERNATIONAL LP 4700 50,000
811. 2006 INTERN A TIONAL LP 4600 LOG TRUCK 45,000
812. 1989 FORD AERIAL LIFT 60,000
816. 1984 FORD TRACTOR 2910 22,000
817. 1982 FORD TRACTOR 2610 22,000
818. 1996 TORO TRUCKSTER 13,000
819. 1987 CUSHMAN HAULSTER 5,000
820. 2004 TORO WORKMAN 3200 15,000
821. 2004 TaRO WORKMAN 2110 7,900
822. 2001 TORO 325-D MOWER 18,000
824. 1996 TORO GROUND MASTER $16,000
825. 2001 TORO 455-D MOWER 40,000
826. 2004 TORO Z587L 8,900
828. 2001 DEW EZE A TM72 21,000
832. 1997 VERMEER STUMP CTR 630A 15,400
833. 2004 BOBCAT SKID LOADER 22,000
834. 1993 BRUSH BANDIT CHIPPER 250 14,000
836. RYAN SOD CUTTER 2,000
840. 1991 VICTORIAN TRAILER 2,000
845. 1997 REMACKEL TRAILER 5,000
846. 2001 DRESSEN 8110 2,000
78
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
07/15/2008
CURRENT
REPLACEMENT
UNIT # YEAR MAKE MODEL COST
HRA
411. 2007 CHEV 2500 HD $17,500
WATER/SEWER
500. 2007 CHEV PICKUP $22,000
501. 2004 CHEV 4X4 3/4 T SIL VERADO 19,000
504. 1996 JEEP CHEROKEE 18,000
505. 2007 CHEV CC25753 24,000
506. 2006 CHEV SIL VERADO 20,700
508. 1996 CHEV 3/4 T UTILITY 18,000
530. 2001 STERLING V AC-CON 180,000
533. 1993 CA TERPILLAR LDR-BKHOE-446 50,000 .
534. 1997 KOHLER GENERA TOR/TRL 11,000
535. 1992 KOHLER GENERA TOR/TRL 10,000
536. 1989 FLEXIBLE RODDING MACHINE 25,000
540. 1982 SULLAIR AIR COMPRESSOR 12,000
542. 1994 WACKER TAMPER 4,000
REFUSE
901. 2005 PETERBIL T 320 $162,000
902. 1999 VOLVO WX42 150,000
903. 1995 FREIGHTLINER FL-70 54,000
P A ~ION
801. 1996 CHEV 4X4TRK $19,100
809. 2003 OL YMPIA ICE RESURF ACER 85,000
79
Location/Description
City Hall
1010 1 st Street S.
Police Station
1 0 1 0 1 st Street S.
Fire Station
101 17th Avenue S.
Hopkins Activity Center
33 14th Avenue S.
Ice ArenalPavilion
11000 Excelsior Boulevard
Arts Center
1111 Mainstreet
PW Admin/Garage
11100 Excelsior Boulevard
PW Cold Storage Bldg #1
117-12117thAvenueS.
PW Cold Storage Bldg #2
117-121 17th Avenue S.
Moline Reservoir
10421 Excelsor Boulevard
Blake Tower Reservoir
151 Tyler Avenue S.
Well #1 Filtration Plant
10421 Excelsior Boulevard
Filtration Plant
1401 Elmo Park Service Road
Well #4 Workshop/Storage
1401 Elmo Park Service Road
Well #5
1205 Highway7
CITY OF HOPKINS
BUILDING INVENTORY
July 2008
Replacement Cost
$3,285,000
3,660,000
3,963,000
1,282,894
4,267,040
5,268,687
6,022,716
367,270
465,009
1,563,128
781,565
201,903
1,348,166
274,442
110,723
80
Locati on/Description
Well #6
801 Highway 7
Lift Station # 1 - 21 st
20221stAvenueN.
Lift Station #2 - DriIlane
619 DriIlane Road
Lift Station #3 - Lindee's
901 Cambridge Street N .E.
Lift Station #4 - L TL Meadowbrook
244 Meadowbrook Road
Lift Station #5 - Big Meadowbrook
6601 Excelsior Blvd.
Lift Station #6 - Ronnie's
8546 Excelsior Avenue E.
Lift Station #7 - Valley
801 6th Avenue S.
Band Shell - Downtown Park
16 9th Avenue S.
Concession Stand - Maetzold Field
1215 1 st Street N.
Park Building-Beach - Lifeguards
5200 Shady Oak Road
Park Building-Beach-Concessions
5200 Shady Oak Road
Park Shelter - Office/Bathhouse
5200 Shady Oak Road
Park Shelter - Burnes
201 Park Lane
Park Building - Central
101 17th Avenue S.
Park Building - Harley
108 Jackson Avenue S.
Park Shelter - InterIachen
220 Homedale Avenue
Replacement Cost
11 0,723
104,208
97,696
91,184
143,287
214,930
143,287
188,741
33,070
157,597
186,908
180,402
352,345
47,539
110,189
19,539
15,106
81
Locati on/Descri pti on
Park Building - Oakes
301 Tyler Avenue N.
Park Building - Valley
800 7th Avenue S.
Dow Towers (76 Units)
22 5th Avenue S.
20th Avenue Townhouses (l0 Units)
29 20th Avenue S.
Parking Ramp
1 Oth Avenue and Mainstreet
Depot Coffee House
9451 Excelsior Boulevard
Overpass Skate Park
100 Washington Avenue
Replacement Cost
37,776
44,93 1
HRA
HRA
4,271,247
454,525
7,098
82