Equipment Replacement Plan
2005 - 2009
(lmI~~
~.....,..".:".",.,'...,....,'.......
i..,......,....'.,.:...:..........,....:.,....."......'.
"
""q?,,~~
~'i$\~
EQUIPMENT REPLACEMENT PLAN 2005 - 2024
Background
The Equiplnent Replacement Plan is a twenty-year forecast of equipment needs in the City of
Hopkins. It is intended to inform the Council and citizens to the major equipment needs on the
horizon. The first year of the plan becomes an adopted equipn1ent budget and relates almost
completely to the operating budget of the equiplnent replacelnent fund, which is approved on an
annual basis. The ren1aining nineteen years represent an estilnate of equipment needs and
funding capabilities of the City. Funding requirements vary from year to year. In order to
n1aintain a fairly consistent levy each year, the twenty-year schedule is projected with a 3%
inflation factor and a yearly average dollar need for the equipment replacement fund is presently
$630,500.
The cash flow requirelnents to fund the equipment needs in the equipn1ent replacen1ent fund, will
experience a roller coaster effect over the next 20 years given the projected equipment needs and
30/0 inflation rate. Available funds will remain about the san1e through the year 2013 and then
the fund will experience a substantial increase in funds available thru 2017 in preparation for
replacement of SOlne lnajor fire equipment in 2018, 2019 and 2020. It is anticipated that the
intragovernmental charge to the general fund will need to increase incrementally by 20/0 each year
until 2009. The charges will continue to increase each year after that, but at a slower pace. The
future increases in charges to the general fund should provide sufficient funds to carry us through
2024.
A goal of the city this year was to reevaluate the n1ajor adjustn1ents lnade in 2004 and adjust the
schedule accordingly. Changes to the plan are reflected in the dOCUlnent. The success of the
adjustn1ents made in 2004 can be witnessed with no needed changes to the planned funding
sources. Refurbishlnents, extended life expectancy and closer cost estimates of replacements
have accon1plished the goal of reducing future replacement costs. The charges to the general
fund for equiplnent replacen1ent will be increased by $10,280 in 2005. This represents a
scheduled increase of 40/0 over the current rates. The equipn1ent replacement charges in the
general fund represent only 30/0 of total general fund expenditures. Future increases
incrementally of 2% every year are needed to fund the equipn1ent replacen1ent plan without
issuing debt.
The Equiplnent Replacement Plan's basic pren1ise is scheduled replacelnent of present
equipment. A new item must, in the year proposed, be presented in the annual operating budget
with a stipulation that replacelnent will be necessary in the future. Flexibility of the Equipment
Replacement Plan is established through annual review and revision, if necessary.
Highlights of changes fron1 last year:
Fire:
The Luverne pumper has been moved up from 2007 to 2005. It had been
lnoved back in 2004 but is in need of major repairs so replacement is
necessary .
The Duty Chief vehicle has been moved back from 2005 to 2006.
The Stuphen aerial truck refurbishment has been n10ved back frOln 2006 to
2007.
Police:
The K-9 marked patrol vehicle has been transferred to marked patrol
vehicles since the K-9 progran1 has been eliminated. It will be used by the
power shift officers. This is an overlap shift that provides additional
coverage during peak call times. It was scheduled for replacement in 2005
but has been moved back one year to 2006. This vehicle is on a four-year
replacement schedule.
City Hall:
The main copy machine costs have been reduced due to the lease changes.
Finance cOlnputer system software has been lnoved up to 2007 for an
upgrade only to Invision/Tyler Technologies software. This will move full
replacement back until 2014.
Public Works:
Activity Center has added their refrigerator/freezer for replacen1ent In
2006. The cost is $6,500.
The skid loader replacelnent has been extended from 2008 to 2010 and the
cost decreased for a $12,000 savings. Cost has been reduced due to
cooperative bidding by the State. An additional skid loader will be
purchased in 2004 and will become an iten1 in the ERP for replacen1ent in
2016. This skid loader will be a smaller machine than the other one.
The Parks Dept. trailer has been n10ved up fron1 2006 to 2005. The cost of
the trailer is $1,400.
The stun1p cutter replacement has been extended from 2007 to 2012 and
its useful life froln 15 to 20 years.
The front end loader replacement cost has been increased $20,000 to
reflect actual cost.
The Yz ton pickup for the Street Dept. has been changed to a % ton 4x4
with a plow. The actual cost has been increased by $5,800 to reflect this
upgrade.
The % ton truck for the Street Dept. has been upgraded to a 4x4 with a
plow. However, the cost will be lessened by $3,200 to reflect actual cost.
The Sewer utility truck has been upgraded to a 3;4 ton truck. This will cost
an additional $3,200 in 2006.
The Sewer % ton utility truck replacen1ent in 2007 cost has been decreased
by $5,100 to reflect actual cost. The two Sewer utility trucks have been
con1bined on one worksheet.
EQUIPMENT REPLACEMENT PLAN 2005 - 2009
TABLE OF CONTENTS
SECTION I
Capital Equipment
Five Year Funding Summary
Sources of Revenue Summary
Projects by Funding Source
Department Summary
Projects by Department
A
B
B-1 thru B-2
C
C-l thru C-3
Item Requests/Justification
Twenty Year Equipment Replacement Schedule
D
SECTION II
Equipment and Building Inventory
Vehicle/Equipment Inventory
Building Inventory
I - V
VI - VIII
CAPITAL EQUIPMENT
"<:j- r-- 0 0 \0 0 ("r") 00 0 00 00 r--
"<:j- VI 0 0 VI 0 - r-- 0 r-- r-- "<:j-
0\ 00 o~ o~ O\~ 0 00 0 o~ 0 00 r--
0 M \D 0 VI M VI 0' v:i r--~ v:i N
0 00 r-- N - VI N 0\ VI \D 0 N
N ("r") "<:j- VI VI
0 0 0 ("r") 0 N 0 0 0 "<:j- ("r")
0 00 0 0 r-- 0 VI 0 "<:j-
00 ~ "<:j- 0 O~ '<:j""~ 0 O\~ \D VI 0
0 v:i O~ VI 00 VI '<:j"" VI r-- M ("r") ~
0 \D ("r") N - "<:j- N "<:j- 0 N 00 0\
N O~ M "<:j- M ("r")
- 0 0 "<:j- 0 VI VI 0 VI 0 00
r-- 0\ 0\ 0 0 r-- 0 \D VI 0 VI 0 r-- N
O\~ 00 0 O~ <'t 0 - r-- 00 ~
0 ~ 0'
0 VI VI 0 VI VI VI VI VI r-- 0\
N 0 - "<:j- N 0 "<:j- VI \D r-- \D
("r") - VI VI VI O~ O~ 0\
0\ N 0 0 "<:j- 0 \D "<:j- 0 "<:j- 0
00 ("r") 0 ("r") 0 \D VI \D 0\ \D
\D 0\ N~ O~ 00 0 0 r-- ~ 0 O\~ 00
0 ~ r--: v:i ~ 0'
0 ("r") 0 VI VI VI
N r-- 00 "<:j- N N r-- N "<:j- M
\D N ("r") \D N N "<:j-
N
-
Q M
-
;Z 0\ 0 0 0 ("r") 0 M ("r") 0 M 0\ 00 N
0\ 0 0 0 0 0 0 00 VI
~ VI - N O~ '<:j""~ 0 \D 0 00 00 0\ 00 V
~ 0 ~ r--: N ~ 0:: u
0 0 N VI If) r-
~ N "<:j- \D \D "<:j- N 0\ "<:j- VI r-- 0\ ~
0 N M r-- r-- \D \D
;Z ro
~ CO
:; ,S
~ VI 0 0 0 0"- 0 0\ VI 0 VI 0\ 00 0..
U r-- N 0 0 0 N 0 0 0 0\ \D ro
< "<:j- r-- 0\ 0 \0 0 VI \0 VI 0 U
..J 0 r--:' v:i N \!:i VI 0' ("r") 0' ~ ~ 0' ~I)
Q.. 0 M VI \D -:::t - 00 \D r--. '<:j"" \D
N VI N ("r") 00 00 O~ 0
~ ~
cG (3
~ ~
Z
~ VI \D 0 r--. VI 00 00 VI VI M VI '<:j""
:; r--. M VI M N \D '<:j"" - - r-- "<:j-
("r") O\~ '<:j""~ ("r") 0\ r-- - N 0\ r--. \D
~ 0 O\~ ~ "<:j-~ ~ O\~ ~
00 r-- M
- 0 0 VI N 00 00 "<:j- 0\ M VI
~ N 0 N N \D VI VI
0 N
~
0 00 00 VI - 0\ N VI ("r")
0\ N 0 "<:j- 00 0\ r-- r-- r-- VI
N O\~ ~ - 00 N O~ VI \D O\~ '<:j""
0 0 0 r-- 00 \D~ VI v:i N~
0 N VI - 0\ N 00 0 0 0\
N r--. VI VI N ("r") 0 O\~
N
Cci ~
v 0
.......:J .......:J v
F --. ~
.:3 ~ ~
~ 0.. ~ 0.. ...... ro
v ro v r- eo
>- u (jJ 0 ~
V bl) V
c:: (jJ :J (jJ a. c:: ~
"bl) v r- r- r- V
bl) V -g "'0 ~
V ~ 0 .2 :J c:: c::
co ~ > u v .2 w ro
v W
U ~ ..0
,S > > (jJ >< I
ro ro ~I) v > .~ ..c
E c.. c.. (jJ '-.-/ >, (jJ
~ ro ro ro
0.. 0 0 (jJ ~ c.. 0..
ro J::: I r- V ro U
U c:: r- t: c:: t- .~ ~ E u
ro v
bJ) (jJ v > 0
v ~ ~ v ~ bl)
c:: :J ~ ...... ~ ~ ~ ~ c::
r- (jJ
...:.::: V (jJ (jJ v ~ V ~ ...:.:::
~ r- r- ~ ~ ~
0 > ~ ro ~ 0.. 0.. ~ 0
~ v ~ ~ -;:; >< ro ~ ~
c::: t- t- O W U t-
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
SOURCES OF REVENUE SUMMARY
2005 thru 2009
Source 2005 2006 2007 2008 2009 Total
Cable Television Fund 40,600 40,600
Equipment Replacement Fund 741,800 225,300 540,700 307,500 551,000 2,366,300
RF - Refuse Fund 8,400 27,600 171,600 207,600
SF - Sanitary Sewer Fund 25,000 51,500 36,400 112,900
SU - Storm Sewer Fund 8,400 8,400
WF - Water Fund 10,600 34,700 21,100 66,400
Total 752,400 250,300 684,300 335,100 780,100 2,802,200
Thursday, .June 2-1. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
PROJECTS BY FUNDING SOURCE
2005
thru
2009
Source Project# Priority 2005 2006 2007 2008 2009 Total
Cable Television Fund
Cable/Council Chamber Cameras & Control System 01-ERP-050 0 40,600 40,600
Cable Television Fund Total 40,600 40,600
Equipment Replacement Fund
City Hall Main Copy Machine 01-ERP-001 0 8,000 8,000 8,000 8,000 12,000 44,000
City Hall Small Copy Machine 01-ERP-002 0 23,200 23,200
Network Server Upgrade 01-ERP-003 0 5,000 5,000 5,000 5,000 5,000 25,000
Finance Computer System Software 01.ERP-005 0 50,000 50,000
Computers 01-ERP-006 0 30,000 30,000 30,000 30,000 30,000 150,000
Refrigerator/Freezer 01-ERP-031 0 6,500 6,500
Luverne Pumper 01-ERP-101 0 400,000 400,000
Duty Chief Vehicle 01-ERP-103 0 28,100 28,100
Lite Rescue 01-ERP-105 0 35,000 35,000
Stuphen Aerial Truck 01-ERP-106 0 300,000 300,000
Extrication Tool 01-ERP-109 0 20,300 20,300
Marked Patrol Vehicles (6) and Sergeant's Vehicle 01-ERP-200 0 56,200 28,900 89,400 92,100 266,600
Parking Enforcement Vehicle (210) 01-ERp.202 0 18,700 18,700
Utility 4x4 (211) 01-ERP-203 0 37,700 37,700
Police Administrative Vehicles (2) 01-ERP-204 0 23,400 24,100 24,800 25,600 26,300 124,200
Copy Machine 01-ERP-207 0 16,500 16,500
Logging Recorder 01-ERP-208 0 29,900 29,900
Network Server (3) 01-ERP-209 0 8,500 8,500 8,500 8,700 8,700 42,900
4x4 3/4 Ton Pickup with Plow 01-ERP-300 0 25,000 25,000
4X4 3/4 Ton Truck with Plow 01-ERp.301 0 24,000 24,000
4x4 1 Ton Dump Truck 01-ERp.302 0 40,600 40,600
1 Ton Dump Truck (2) 01-ERP-303 0 31,800 31,800
1 Ton Traffic Boom Truck 01-ERP-304 0 25,000 25,000
Front End Loaders (2) 01-ERP-308 0 140,000 157,500 297,500
Trailer 01-ERP-316 0 4,900 4,900
4X4 1/2 Ton Truck 01.ERP-710 0 24,100 24,100
3/4 Ton Utility Truck 01-ERP-802 0 32,200 32,200
Swap Loader o 1-ERP-803 0 27,600 27,600
Aerial Lift o 1-ERP-805 0 110,000 110,000
Tractors (2) 01-ERP-806 0 41 ,400 41,400
Trucksters (3) 01-ERP-807 0 16,600 16,600
Riding Mowers (2) 01-ERP-808 0 22,800 22,800
Friday, July 09, 2004
Source Project# Priority 2005 2006 2007 2008 2009 Total
Brush Chipper 01-ERP-813 0 22,800 22,800
Trailer Flatbed 01-ERP-814 0 1,400 1,400
Equipment Replacement Fund Total 741,800 225,300 540,700 307,500 551,000 2,366,300
RF - Refuse Fund
Refuse Truck 01-ERP-900 0 171,600 171,600
Utility Billing System 01-ERP-902 0 8,400 8,400
Swap Loader 01-ERP-910 0 27,600 27,600
RF - Refuse Fund Total 8,400 27,600 171,600 207,600
SF - Sanitary Sewer Fund
3/4 Ton Utility Truck (2) 01-ERP-551 0 25,000 26,000 51 ,000
Rodding Machine 01-ERP-553 0 36,400 36,400
Utility Billing System 01-ERP-556 0 25,500 25,500
SF - Sanitary Sewer Fund Total 25,000 51,500 36,400 112,900
SU - Storm Sewer Fund
Utility Billing System o 1-E RP -950 0 8,400 8,400
SU - Storm Sewer Fund Total 8,400 8,400
WF - Water Fund
1/2 Ton Truck 01-ERP-500 0 20,500 20,500
Air Compressor 01-ERP-503 0 21,100 21,100
Utility Billing System 01-ERP-505 0 14,200 14,200
Public Works Copy Machine 01-ERP-506 0 10,600 10,600
WF - Water Fund Total 10,600 34,700 21,100 66,400
GRAND TOTAL 752,400 250,300 684,300 335,100 780,100 2,802,200
. ..__ ..___n_.____._______.. U .
Friday, July 09. 200./
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
DEPARTMENT SUMMARY
2005
thru
2009
Department 2005 2006 2007 2008 2009 Total
Activity Center 6,500 6,500
Cable TV 40,600 40,600
City Hall Administration 43,000 66,200 93,000 43,000 47,000 292,200
Fire 420,300 28,100 300,000 35,000 783,400
Police 88,1 00 107,900 122,700 164,100 53,700 536,500
Public Works: Bldg/Equip Serv 24,100 24,100
Public Works: Parks/Forestry 1,400 16,600 59,800 197,000 274,800
Public Works: StreetsfTraffic 189,000 25,000 40,600 194,200 448,800
Refuse 8,400 27,600 171,600 207,600
Sewer 25,000 51,500 36,400 112,900
Storm Sewer 8,400 8,400
Water 10,600 34,700 21,100 66,400
Total 752,400 250,300 684,300 335,100 780,100 2,802,200
Thursday, June 24, 200-1
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
PROJECTS BY DEPARTMENT
2005
thru
2009
Department Project# Priority 2005 2006 2007 2008 2009 Total
Activity Center
Refrigerator/F reezer 01-ERP-031 0 6,500 6,500
Activity Center Total 6,500 6,500
Cable TV
Cable/Council Chamber Cameras & Control System 01-ERP-050 0 40,600 40,600
Cable TV Total 40,600 40,600
City Hall Administration
City Hall Main Copy Machine 01-ERP-001 0 8,000 8,000 8,000 8,000 12,000 44,000
City Hall Small Copy Machine 01-ERP-002 0 23,200 23,200
Network Server Upgrade 01-ERP-003 0 5,000 5,000 5,000 5,000 5,000 25,000
Finance Computer System Software o 1-ERP-005 0 50,000 50,000
Computers o 1-ERP-006 0 30,000 30,000 30,000 30,000 30,000 150,000
City Hall Administration Total 43,000 66,200 93,000 43,000 47,000 292,200
Fire
Luverne Pumper 01-ERP-101 0 400,000 400,000
Duty Chief Vehicle 01-ERP-103 0 28,100 28,1 00
Lite Rescue 01-ERP-105 0 35,000 35,000
Stuphen Aerial Truck 01-ERP-106 0 300,000 300,000
Extrication Tool 01-ERP-109 0 20,300 20,300
Fire Total 420,300 28,100 300,000 35,000 783,400
Police
Marked Patrol Vehicles (6) and Sergeant's Vehicle 01-ERP-200 0 56,200 28,900 89,400 92,100 266,600
Parking Enforcement Vehicle (210) o 1-ERP-202 0 18,700 18,700
Utility 4x4 (211) 01-ERP-203 0 37,700 37,700
Police Administrative Vehicles (2) 01-ERP-204 0 23,400 24,100 24,800 25,600 26,300 124,200
Copy Machine 01-ERP-207 0 16,500 16,500
Logging Recorder 01-ERP-208 0 29,900 29,900
Network Server (3) 01-ERP-209 0 8,500 8,500 8,500 8,700 8,700 42,900
Pol ice Total 88,100 107,900 122,700 164,100 53,700 536,500
Friday, July 09, 2004
Department Project# Priority 2005 2006 2007 2008 2009 Total
Public Works: Bldg/Equip Serv
4X4 1/2 Ton Truck 01-ERP-710 0 24,100 24,100
Public Works: Bldg/Equip Serv Total 24,100 24,100
Public Works: Parks/Forestry
3/4 Ton Utility Truck o 1-ERP-802 0 32,200 32,200
Swap Loader 01-ERP-803 0 27,600 27,600
Aerial Lift 01-ERP-805 0 110,000 110,000
Tractors (2) 01-ERP-806 0 41,400 41,400
Trucksters (3) 01-ERP-807 0 16,600 16,600
Riding Mowers (2) 01-ERP-808 0 22,800 22,800
Brush Chipper 01-ERP-813 0 22,800 22,800
Trailer Flatbed 01-ERP-814 0 1,400 1,400
Public Works: Parks/Forestry Total 1,400 16,600 59,800 197,000 274,800
Public Works: Streets/Traffic
4x4 3/4 Ton Pickup with Plow 01-ERP-300 0 25,000 25,000
4X4 3/4 Ton Truck with Plow 01-ERP-301 0 24,000 24,000
4x4 1 Ton Dump Truck 01-ERP-302 0 40,600 40,600
1 Ton Dump Truck (2) 01-ERP-303 0 31,800 31 ,800
1 Ton T rafflc Boom Truck 01-ERP-304 0 25,000 25,000
Front End Loaders (2) 01-ERP-308 0 140,000 157,500 297,500
Trailer 01-ERP-316 0 4,900 4,900
Public Works: Streets/Traffic Total 189,000 25,000 40,600 194,200 448,800
Refuse
Refuse Truck o 1-ERP-900 0 171,600 171,600
Utility Billing System 01-ERP-902 0 8,400 8,400
Swap Loader 01-ERP-910 0 27,600 27,600
Refuse Total 8,400 27,600 171,600 207,600
Sewer
3/4 Ton Utility Truck (2) 01-ERP-551 0 25,000 26,000 51,000
Rodding Machine o 1-ERP-553 0 36,400 36,400
Utility Billing System 01-ERP-556 0 25,500 25,500
Sewer Total 25,000 51,500 36,400 112,900
Storm Sewer
Utility Billing System 01-ERP-950 0 8,400 8,400
Storm Sewer Total 8,400 8,400
Water
1/2 Ton Truck 01-ERP-500 0 20,500 20,500
Air Compressor 01-ERP-503 0 21,100 21,100
Utility Billing System o 1-ERP-505 0 14,200 14,200
Frida)', July 09, 2004
Department
Public Works Copy Machine
Water Total
GRAND TOTAL
Project#
01-ERP-506
Priority
o
2005
10,600
10,600
2006
2007
34,700
2008
2009
Total
10,600
66,400
752,400
250,300
684,300
335,100
21,100
780,100
2,802,200
Friday, July 09. 200./
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thrll 2009
Projcl't # Ol-ERP-OOl
Projcct Namc City Hall Main Copy Machine
Description
I
Copy machine to service needs orall departments located at City Hall.
I. Variety or copying tasks.
2. High volume product copier.
Contact Finance Director
Dcpartmcnt City Hall Administration
Typc Equipment
Useful Life
Category Equipment
Priority n/a
Total Project Cost $351,000
J usti fication
I
Daily use to make copies of correspondence and forms. Periodically produce documents, i.e., budgets, financial reports, council reports and updates, city code
revisions, various department reports, and hearing and information notices. Machine will duplex, sort, collate and staple copies.
Prior
59,000 I
Total
Expenditures
Equipment
2005
8,000
8,000
Total
Prior
59,000 I
Total
Funding Sources
Equipment Replacement Fund
2005
8,000
8,000
Total
Operational Impact/Other I
Variance from 20 year plan - lease amount reduced
Estimate salvage/resale value on replaced item: $-0-
2006
8,000
8,000
2008
8,000
8,000
2009
12,000
12,000
Total
44,000
44,000
Future
248,000 I
Total
Fu tll rc
248,000 I
Total
2007
8,000
8,000
2006
8,000
8,000
2007
8,000
8,000
2008
8,000
8,000
2009
12,000
12,000
Total
44,000
44,000
Thursday, June 2./. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Con tact Finance Director
Department City Hall Administration
Project # Ol-ERP-002
Project Name City Hall Small Copy Machine
Type Equipment
Useful Life 5 years
Category Equipment
Priority n/a
Description
I
Coyy machine to service needs of all departments located at City Hall.
I, Variety of copying tasks.
2. High volume product copier.
Total Project Cost 5137,500
J usti fication
I
Daily use to make copies of correspondence and forms. Periodically produce documents, i.e., budgets, financial reports, council reports and updates, city code
revisions, various department reports, and hearing and information notices. Machine will duplex, sort, collate and staple copies.
Expenditures
Equipment
2005
Prior
20,000 I
Total
Total
Prior
20,000 I
Total
Funding Sources
Equipment Replacement Fund
2005
Total
Operational I mpact/Other I
Variance from 20 year plan - move back one year to 200 I
Estimate salvage/resale value on replaced item: $2,500
2006
23,200
23,200
2008
2009
Total
23,200
23,200
Future
94,300 I
Total
Future
94,300 I
Total
2007
2006
23,200
23,200
2007
2008
2009
Total
23.200
23,200
Thursday. June 24. 2004
2005 thrll 2009
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Ol-ERP-003
Project #
Project Name Networl{ Server Upgrade
Description
I
Contact Finance Director
Department City Hall Administration
Type Equipment
Useful Life 1 year
Category Equipment
Priori ty n/a
Total Project Cost S 120,000
The network server is the hub of the network. New computers are faster and more reliable.
Justification
I
Networking allows user to share information that is stored in a single location, the network server. This is more efficient because the information does not have to
be stored on many different computers. It also makes for better accuracy because as the information changes or is updated, every user is working with the same dat<l
Prior
20,000 I
Total
Prior
20,000 I
Total
Expenditures
Equipment
Total
2005
5,000
5,000
2006
5,000
5,000
2007
5,000
5,000
2008
5,000
5,000
2009
5,000
5,000
Total
25,000
25,000
Future
75,000 I
Total
Funding Sou rees
Equipment Replacement Fund
Total
2005
5,000
5,000
2006
5,000
5,000
2007
5,000
5,000
2008
5,000
5,000
2009
5,000
5,000
Total
25,000
25,000
Future
75,000 I
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $-0-
Thursday. June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Con tact Finance Director
Department City Hall Administration
Project # Ol-ERP-OOS
Project Name Finance Computer System Software
Type Equipment
Useful Life 7 years
Category Equipment
Priority n/a
Total Project Cost $338,000
Description
I
Financial software package upgrade. Upgrade current financial software to InvisioIl.
Justification
I
Produce reports, checks and bills for payroll, accounting and accounts payable. Provide a platform for citywide network. Provide on line inquiry for all
departments.
Tyler Technology version is user fricndly and adds more Ocxibility.
Integrate utility billing software with financial system.
Prior
30,000 I
Total
Expenditures
Equipment
2005
2006
2007
50,000
50,000
2008
2009
Total
50,000
50,000
Futu re
258,000 I
Total
Total
Prior
30,000 I
Total
Funding Sources
Equipment Replacement Fund
2005
2006
2007
50,000
50,000
2008
2009
Total
50,000
50,000
Fu tll rc
258,000 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - upgrade in 2007. Beginning in 2014 schedule replacement every 7 years.
Estimate salvagelresale valuc on replaced item: $-0-
7/11Irsday. June 2.f. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Project # 01- ERP-006
Project Name Computers
2005 thru 2009
Description
I
Contact Finance Director
Department City Hall Administration
Type Equipment
Useful Life 3-5 years
Category Equipment
Priority nla
Total Project Cost S720,000
Personal computer purchases and upgrades for the entire City stall', Coordinating personal computer purchases from individual departments to one fund.
Justification
I
Tools enabling stalTto perform job responsibilities efficiently and ctTectively.
Prior
120,000 I
Total
Expenditures
Equipment
Total
Prior
120,000 I
Total
Funding Sources
Equipment Replacement Fund
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $-0-
2005
30,000
30,000
2005
30,000
30,000
2006
30,000
30,000
2006
30,000
30,000
2007
30,000
30,000
2007
30,000
30,000
2008
30,000
30,000
2008
30,000
30,000
2009
30,000
30,000
Total
150,000
150,000
Futl! rc
450,000 I
Total
Future
450,000 I
Total
2009
30,000
30,000
Total
150,000
150,000
71l11rsday. June 24. 20Q.l
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 lhru 2009
Contact Public Works Director
Department Activity Center
Project # 01-ERP-031
Project Name Refrigerator/Freezer
Type Equipment
Useful Life 30 years
Category Equipment
Priority n/a
Total Project Cost S10,500
Description
I
Commerical, stainless steel refrigerator and freezer.
Justification
I
Cool ing/freezing needed for programs or by use of the participants and their activities. Present unit was here when activity center opened in 1980. This unit was
part of the old South.lr. High cafeteria kitchen. The unit continues to have problems due to the age oflhe unit.
Prior
4,000 I
Total
Expenditures
Equipment
2005
2006
6,500
6,500
2007
2008
2009
Total
6,500
6,500
Total
Prior
4,000 I
Total
Funding Sources
Equipment Replacement Fund
Total
2005
2006
6,500
6,500
2007
2008
2009
Total
6,500
6,500
Operational Impact/Other I
Variance from 20 year plan - new item
Estimate salvage/resale value on replaced item: $
71l11rsday, June 24. 2()()4
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Project # OI-ERP-050
Project Name Cable/Council Chamber Cameras & Control System
Description
I
Replacement of cameras, motors and VCS communications specialist camera control unit.
Contact City Manager
Department Cable TV
Type Equipment
Usefu I Li fe 8 years
Ca tegory Equipment
Priority n/a
Total Project Cost S157,300
Justification
I
Cameras and their control equipment for meeting cable casts and presentations.
Expenditures
Equipment
2005
2008
2006
2007
40,600
40,600
Total
2009
Total
40,600
40,600
Futl! rc
116,700 I
Total
Funding Sources
Cable Television Fund
2008
2005
2006
2007
40,600
40,600
Total
2009
Total
40,600
40,600
Future
116,700 I
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $-0-
Thursday. June 2-1. 200-1
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thrll 2009
Contact Fire Chief
Department Fire
Type Equipment
Useful Life 25 years
Ca tcgory Equipment
Priority n/a
Total Project Cost S400,OOO
Projt'ct # Ol-ERP-IOl
Project Name Luverne Pumper
Description I
1500 GPM fire pumper, fully equipped to respond to all fire situations in the city. Responds to mutual aid calls in other cities.
Justification
I
Current unit is a second alarm unit. Replacement would be used as first out pumper. This apparatus construction will require 25 year specifications for life of the
apparatus. Current Engine 3 is requiring major maintenance annually.
Expenditures
Equipment
2005
400,000
400,000
2006
2007
2008
2009
Total
400,000
400,000
Total
Funding Sources
Equipment Replacement Fund
2005
400,000
400,000
2006
2007
2008
2009
Total
400,000
400,000
Total
Operational Impact/Other I
Variance from 20 year plan - Move up from 2007 to 2005. Need for major repairs.
Estimate salvage/resale value on replaced item: $2,500
Thursday. June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Contact fire Chief
Dcpartmcnt Fire
Type Equipment
lIseful Life 7 years
Ca tegory Vehicles
Priority n/a
Total Project Cost S I 05,200
Project # Ol-ERP-I03
Project Name Duty Chief Vehicle
Description I
A marked passenger vehicle far use by the Duty Chief in transporting required equipment, reference materials and personnel for emergency response, and routine
Fire Department business.
Justification
I
Used by the fire Chief when responding to fires and other emergencies. Used for orticial business in and out of the city and for fire fighter travel on orticial Fire
Department business.
Expenditures
Vehicles
2005
2006
28,100
28,100
2007
2008
2009
Total Future
28,100 77,100 I
28,100 Total
Total
Funding Sources
Equipment Replacement Fund
2005
2006
28,100
28,100
2007
2008
2009
Total
28,100
28,100
Futu rc
77,100 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - Move back one year.
Estimate salvage/resale value on replaced item: $4,000
Thursday, June 2./. 2004
EQUIPMENT REPLACEMENT PLAN 2005 thru 2009
City of Hopkins, MN
Contact Fire Chief
Department Fire
Type Equipment
Useful Life 1 0 years
Category Vehicles
Priority n/a
Total Project Cost S118,800
Project # Ol-ERP-I05
Project Name Lite Rescue
Description I
Light rescue response vehicle on a 4 wheel drive chassis.
J usti fication
I
Used for all emergency medical responses; vehicle accidents; industrical accidents; hazardous materials response.
Expenditures
Vehicles
2007
2005
2006
Total
2008
2009
35,000
35,000
Total
35,000
35,000
Future
83,800 I
Total
Funding Sources
Equipment Replacement Fund
2006
2005
2007
Total
2008
2009
35,000
35,000
Total
35,000
35,000
Future
83,800 I
Total
Operational I mpact/Other I
Variance from 20 year plan - move back to 2009
Estimate salvage/resale value on replaced item $ - 4,000
Thursday. June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 Ih,.u 2009
Contact Fire Chief
Department Fire
Type Equipment
lJseful Life 20 years
Category Eq u i pment
Priority n/a
Total Project Cost S300,OOO
Projt'ct # 01- ERP-l 06
Project Name Stuphen Aerial Truck
Description I
One hundred foot aerial ladder truck with a 1500 GPM fire pump and a full compliment of ground ladders.
J usti fication
I
Vehicle would be used for ladder company operations during fires. This vehicle responds to all structure fires. Its job is to make openings in the building to let hot
smoke out and to rescue people that might be trapped.
Expenditures
Equipment
2005
2006
2007
300,000
300,000
2008
2009
Total
300,000
300,000
Total
Funding Sources
Equipment Replacement Fund
2005
2006
2007
300,000
300,000
2008
2009
Total
300,000
300,000
Total
Operational Impact/Other I
Variance from 20 year plan - move back to 2007.
Estimate salvage/resale value on replaced item: $
Thursday, June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Ol-ERP-I09
Proj crt #
Projcct Namc Extrication Tool
2005 thru 2009
Con tact Fire Chief
Department Fire
Type Equipment
Useful Lifc 10 years
Ca tcgory Equipment
Priori ty nla
Total Project Cost $47,500
Description
I
Hydraulic rescue and extrication tool with spreader, cutters and hydraulic ram.
Justification
I
All vehicle and industrial rescue situations which will require paitient disentanglement or entrapment.
Expenditures
Equipment
Total
Funding Sources
Equipment Replacement Fund
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $1,000
2005
20,300
20,300
2006
2007
2008
2009
Total
20,300
20,300
Future
27,200 I
Total
Future
27,200 I
Total
2005
20,300
20,300
2006
2008
2009
Total
20,300
20,300
2007
Friday. J1I0,09. 2004
EQUIPMENT REPLACEMENT PLAN
City ofHopkins,MN
2005 thru 2009
Contact Police Chief
Department Police
Project # Ol-ERP-200
Project Name Marked Patrol Vehicles (6) and Sergeant's Vehicle
Type Equipment
Useful Life 3-4 years
Category Vehicles
Priority n/a
Total Project Cost S I ,819,20{)
Description
I
Marked patrol vehicles used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties.
J usti fication
I
Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for routine and
emergency operations. Vehicles contain secure seating for prisoner transport.
Additional vehicle comes from K-9 program. Vehicle will be used by the power shift officers (overlap shift that provides additional coverage during peak call
times). This vehicle is on a 4 year life.
Prior
237,800 I
Total
Expenditures
Vehicles
2005
56,200
56,200
2006
28,900
28,900
2007
89,400
89,400
2008
92,100
92,100
2009
Total
266,600
266,600
Future
I 1,314,800 I
Total
Total
Prior
237,800 I
Total
Funding Sources
Equipment Replacement Fund
2005
56,200
56,200
2006
28,900
28,900
2007
89,400
89,400
2008
92,100
92,100
2009
Total Futl! rc
266,600 I 1,314.800 I
266,600 Total
Total
Operational Impact/Other I
Variance from 20 year plan - None..
Estimate salvage/resale value on replaced item: $4,000 each
Thursday. June 2-1. 200-1
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Project # 01- ERP-202
Project Namc Parking Enforcement Vehicle (210)
Description
Parking enforcement vchiclc.
I
Departmcnt Policc
Contact Policc Chicf
Typc
Useful Lifc
Ca tcgory
Priority nla
Equ i pmcnt
10 ycars
Vehicles
Total Projcct Cost 543.900
J usti fication
I
Use by parking cnforccmcnt officcrs in thc course of their dutics enforcing parking rcgulations in the downtown area.
Expenditures
Vehicles
2005
Total
2006
2008
2009
18,700
18,700
Total
18,700
18,700
Future
25,200 I
Total
Funding Sources
Equipment Replacement Fund
2005
Total
2007
2006
2007
2008
2009
18,700
18,700
Total
18,700
18,700
Futl! re
25,200 I
Total
Operational Impact/Other I
Variance from 20 year plan - nonc
Estimate salvage/resalc value on replaccd itcm: $1,500
Thursday. June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 Ihru 2009
Contact Police Chief
Dcpa,-tment Police
Type Equipment
Useful Life 6 years
Ca tegory Vehicles
Priodty n/a
Total Project Cost S 175,500
Projl'ct # 01-ERP-203
Project Name Utility 4x4 (211)
Description I
4 wheel drive uitlity vehicle.
J usti fication
I
Vehicle is normally used by public service officers for a wide variety of uses such as transporting animals and equipment. The 4 wheel drive vehicle is also used at
times as a patrol vehicle, particularly in the winter in extreme snow conditions.
Expenditures
Vehicles
2005
Prior
29,700 I
Total
Total
Prior
29,700 I
Total
Funding Sources
Equipment Replacement Fund
2005
Total
Operational I mpact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $5,000
2006
2008
37,700
37,700
Total
37,700
37,700
Futl! rc
1 08,1 00 I
Total
Future
108,100 I
Total
2009
2007
2006
2008
37,700
37,700
Total
37,700
37,700
2009
2007
71ll1rsday, June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Con tact Police Chief
Department Police
Type Equipment
Useful Life 2 years
Category Vehicles
Priori ty nla
Total Project Cost $689,500
P,'ojCl't # Ol-ERP-204
Project Name Police Administrative V chicles (2)
Description I
Police administrative and detective vehicles.
J usti fication
I
Unmarked vehicles. equipped with radios, siren and red grille lites used by chiefand captain. Staff-use is for two years. Vehicles arc then rotated down to
detectives and are kept for an additional 3-4 years. Vehicles are also used for surveillance by uniform and plain clothes officers.
Prior
61,100 I
Total
Expenditures
Vehicles
2005
23.400
23,400
Total
Prior
61,100 I
Total
Funding Sources
Equipment Replacement Fund
2005
23.400
23,400
Total
Operational I mpact/Other I
Variance from 20 year plan - move back schedules cars one year.
Estimate salvagelresale value on replaced item: $4,000 each
2006
24,100
24,100
2006
24,100
24,100
2007
24,800
24,800
2007
24,800
24,800
2008
25,600
25,600
2009
26,300
26,300
Total
124,200
124,200
Futu rc
504,200 I
Total
Fu tu rc
504,200 I
Total
2008
25,600
25,600
2009
26,300
26,300
Total
124,200
124,200
Thursday, June 24, 2004
EQUIPMENT REPLACEMENT PLAN 2005 thrlf 2009
City of Hopkins, MN
Contact Police Chief
Department Police
Type Equipment
Useful Life 5 years
Category Equipment
Priority n/a
Total Project Cost S97 .500
Project # Ol-ERP-207
Project Name Copy Machine
Description I
Pol ice Department copy mach ine capable of producing double side copies and collating pages.
Justification
I
Used to make dupl icate copies of reports, letters, memos, etc., generated by pol ice presonnel.
Expenditures
Equipment
2007
Prior
14,200 I
Total
2005
Total
2006
16,500
16,500
2008
2009
Total
16,500
16,500
Futu rc
66,800 I
Total
Prior
14,200 I
Total
Funding Sources
Equipment Replacement Fund
2005
Total
2006
16,500
16,500
2007
2008
2009
Total
16,500
16,500
Future
66,800 I
To ta I
Operationallmpact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $1,000
Thursday. June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Contact Police Chief
Department Police
Project # Ol-ERP-208
Project Name Logging Recorder
Type Equipment
Useful Life 7 years
Category Equipment
Description
I
Priority n/a
Total Project Cost SIll ,800
The police logging recorder is a device which tape records all telephone and radio transmissions which go through the Police Department.
Justification
I
Records all phone calls coming into the dispatch center and all incoming and outgoing radio transmissions. This is necessary in case questions arise as to how calls
for service were received or dispatched.
Expenditures
Equipment
2005
Total
2006
29,900
29,900
2008
2009
Total
29,900
29,900
Futll rc
81,900 I
Total
Funding Sources
Equipment Replacement Fund
2005
Total
2007
Futu rc
81,900 I
Total
Operational Impact/Other I
Variance from 20 year plan - moved back from 1998 to 1999
Estimate salvage/resale value on replaced item: $-0-
2006
29,900
29,900
2009
Total
29,900
29,900
2007
2008
Thursday, June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 /hru 2009
Project # Ol-ERP-209
Project Name Network Server (3)
Description
I
Contact Police Chief
Depa rtm ent Pol ice
Type Equipment
Useful Life 3 years
Category Equipment
Priority nla
Total Project Cost SI96,700
J usti fication
I
Prior
17,000 I
Total
Expenditures
Equipment
2005
8,500
8,500
Total
Prior
17,000 I
Total
Funding Sources
Equipment Replacement Fund
2005
8,500
8,500
Total
Operational Impact/Other I
Variance from 20 year plan -
Estimate salvagelresale value on replaced item - $
2006
8,500
8,500
2007
8,500
8,500
2008
8,700
8,700
2008
8,700
8,700
2009
8,700
8,700
Total
42,900
42,900
Futu re
136,800 I
Total
Fu tu rc
136,800 I
Total
2006
8,500
8,500
2007
8,500
8,500
2009
8,700
8,700
Total
42,900
42,900
Thursday. June 2-1. 200-1
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 1/1,.u 2009
Contact Public Works Director
Department Public Works: Streetsffraftic
Project # Ol-ERP-300
Project Name 4x4 3/4 Ton Pickup with Plow
Type
Useful Life
Ca tegory
Priority n/a
Equipment
10 years
Vehicles
Total Project Cost S58,600
Description
I
Pickup used by various divisions of Public Works.
Justification
I
Light hauling and transportation for supervisors. Maintenance garage service vehicle.
Expenditures
Vehicles
2008
2009
2006
2007
Total
2005
25,000
25,000
Total
25,000
25,000
Futu rc
33,600 I
Total
Funding Sources
Equipment Replacement Fund
2008
2009
Total
2005
25,000
25,000
2007
2006
Total
25,000
25,000
Future
33,600 I
Total
Operational Impact/Other I
Variance from 20 year plan - Increase expenditure to reflect actual cost. Change from 1/2 ton pickup to 3/4 ton 4x4 pickup.
Estimate salvage/resale value on replaced item: $1,500
Thursday. June 2./. 200./
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Proj('ct # Ol-ERP-301
Project Name 4X4 3/4 Ton Truck with Plow
Description
I
3/4 ton pickup used by Street Divison of Public Works for heavy loads and pulling trailers.
Contact Public Works Director
Department Public Works: Streetsrrraffic
Type Equipment
Useful Life 8 years
Category Vehicles
Priority n/a
Total Project Cost S92,900
Justification
I
Light hauling, pulling trailers, transportation to and from job sites.
Expenditures
Vehicles
2005
24,000
24,000
Total
2006
2007
2008
2009
Total
24,000
24,000
Future
68,900 I
Total
Funding Sources
Equipment Replacement Fund
2005
24,000
24,000
Total
2006
2007
2008
2009
Total
24,000
24,000
Future
68,900 I
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $1,500
Thursday. June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thrll 2009
Projl'l't # Ol-ERP-302
Project Name 4x4 1 Ton Dump Truck
Description I
Truck is used in the Street Division of Public Works.
Contact Public Works Director
Department Public Works: Streetsrrratlic
Type Equipment
Useful Life 8 years
Category Vehicles
Priority nla
Total Project Cost S157,300
Justification
I
Plows alleys in winter, light hauling, snow removal and transportation.
Expenditures
Vehicles
2005
Total
2006
2007
2008
40,600
40,600
2009
Total
40,600
40,600
Futu re
116,700 I
Total
Funding Sources
Equipment Replacement Fund
2005
Total
2006
2007
2008
40,600
40,600
2009
Total
40,600
40,600
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $3,500
Fu tu re
116,700 I
Total
Thursday, ./une 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Project # Ol-ERP-303
Projcct Namc 1 Ton Dump Truck (2)
Description
I
Truck is used in the Street Division of Public Works.
Contact Public Works Director
Department Public Works: Streetsrrraflic
Type Equipment
Useful Life 12 years
Category Vehicles
Priority nla
Total Project Cost S 152,400
J usti fication
I
Vehicle used by various departments for street and park maintenance and light hauling.
Expenditures
Vehicles
2006
2007
2008
Prior
30,500 I
Total
2005
Total
Prior
30,500 I
Total
Funding Sources
Equipment Replacement Fund
2007
2008
2005
2006
Total
Operational I mpact/Other I
Variance from 20 year plan -move one truck back one year to 2003
Estimate salvage/resale value on replaced item: $3,500
2009
31,800
31,800
Total
31,800
31,800
Future
90,100 I
Total
Futu re
90,100 I
Total
2009
31,800
31,800
Total
31 ,800
31,800
Thursday. June 2.f. 2(}(}.f
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thrll 2009
Con tact Publ ic Works Director
Dcpartmcnt Public Works: Strcctsnraflic
Project # Ol-ERP-304
Projcct Namc 1 Ton Traffic Boom Truck
Typc
Useful Lifc
Equipment
12 years
Vehicles
Ca tcgor)'
Priority n/a
Total Projcct Cost SIOI,300
Description
I
Boom truck used in Street and Traffic Divisions of Public Works.
Justification
I
Vehicle used by Traffic Departmcnt for signal and light pole maintcpancc.
Expenditures
Vehicles
2005
2006
2007
25,000
25,000
2008
2009
Total
25,000
25,000
Future
76,300 I
Total
Total
Funding Sources
Equipment Replacement Fund
2005
2006
2007
25,000
25,000
2008
2009
Total Future
25,000 76,300 I
25,000 To ta I
Total
Operational Impact/Other I
Variance from 20 year plan - change to 25,000 cost in 2007 - cost to replace cab/chassis and reuse lift assembly.
Estimate salvage/rcsalc valuc on replaced itcm: $8,000
Thursday. June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 Ihrll 2009
Project # Ol-ERP-308
Project Name Front End Loaders (2)
Description
I
Contact Public Works Director
Department Public Works: Streetsn'raftlc
Type Equipment
Useful Life 15 years
Category Equipment
Priority n/a
Total Project Cost S761,100
Justification
I
Expenditures
Equipment
Total
2005
140,000
140,000
2006
2007
2008
2009
157,500
157,500
Total
297,500
297,500
Future
463,600 I
Total
Funding Sources
Equipment Replacement Fund
Total
2005
140,000
140,000
2006
2007
2008
2009
157,500
157,500
Total
297,500
297,500
Futu rc
463,600 I
Total
Operational Impact/Other I
Variance from 20 year plan - Increase costs to reflect actual replacement cost.
Estimate salvage/resale value on replaced item: S
Thursday. June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Contact Public Works Director
Department Public Works: Streetsrrranic
Project # 01-ERP-316
Type Equipment
Useful Life 20 years
Category Equipment
Project Name Trailer
Priority n/a
Total Project Cost S4,900
Description
I
Justi fication
I
Expenditures
Equipment
2005
2006
2007
2008
2009
4,900
4,900
Total
4,900
4,900
Total
Funding Sources
Equipment Replacement Fund
2005
2006
2007
2008
2009
4,900
4,900
Total
4,900
4,900
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estiamte salvage/resale value on replaced item: $
71l11rsday. Jllne 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 Ihr1l 2009
Projl'ct # Ol-ERP-SOO
Project Name 1/2 Ton Truck
Description
Trucks used by Water Department.
I
Contact Public Works Director
Department Water
Type Eq 1I i pment
Useful Life 10 years
Ca tegor)' Equipment
Priority nla
Total Project Cost S47,300
Justification
I
Expenditures
Vehicles
2005
Total
2006
2007
20,500
20,500
2008
2009
Total
20,500
20,500
rutu re
26,800 I
Total
Funding Sources
WF - Water Fund
2005
Total
2006
2007
20,500
20,500
2008
2009
Total
20,500
20,500
Future
26,800 I
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Thursday, June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Ol-ERP-S03
2005 thru 2009
Contact Public Works Director
Department Water
Project #
Type Equipment
Useful Life 20 years
Category Equipment
Project Name Air Compressor
Priori ty n/a
Total Project Cost $21, I 00
Description
I
Portable air compressor used by various departments of Public Works.
J usti fication
I
Air supply for operating jack hammers, blowing out irrigation lines, sand blasting and operations of various tools.
Expenditures
Equipment
2005
2006
2007
2008
2009
21 , 1 00
21,100
Total
21,100
21 ,100
Total
Funding Sources
WF - Water Fund
2005
2006
2007
2008
2009
21,100
21 J 100
Total
21,100
21 ,100
Total
Operational Impact/Other I
Variance from 20 year plan - move back to 2009 - current compressor in good condition
Estimate salvage/resale value on replaced item: $2,000
Thursday. June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Projl'('t # 01- ERP-505
Project Name Utility Billing System
Description
I
Uti! ity bill ing system for bill ing customers for water/sewer/refuse and storm sewer usage.
Contact Finance Director
Department Water
Type Equipment
Useful Li fe 8 years
Category Equipment
Priority n/a
Total Project Cost S55,OOO
Justification
I
Allows billing clerk to bill customers efficiently and efTectively. Also, rrovides tools for analysis and monitoring.
Expenditures
Equipment
2008
2005
2006
Total
2007
14,200
14,200
2009
Total
14,200
14,200
Future
40,800 I
Total
Funding Sources
WF - Water Fund
2005
2006
Total
2007
14,200
14,200
2008
2009
Total
14,200
14,200
rutu re
40,800 I
Total
Operational Impact/Other I
Variance from 20 year rlan - none
Estimate salvage/resale value on rerlaced item: $
Thursday, June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Project # Ol-ERP-S06
Project Name Public Works Copy Machine
Description
I
Copy machine to service needs orall division orpublic Works.
Contact Public Works Director
Department Water
Type Equipmcnt
Useful Life 5 years
Ca tegory Equipmcnt
Priori ty nla
Total Project Cost S53,500
J usti fication
I
Making copies lar various departments.
Expenditures
Equipment
2005
10,600
10,600
Total
2006
2008
2009
Total
10,600
10,600
Future
42,900 I
Total
Funding Sources
WF - Water Fund
2005
10,600
10,600
Total
2007
2006
2008
2009
Total
10,600
10,600
Futu rc
42,900 I
Total
Operational Impact/Other I
Variance rrom 20 year plan - none
Estimate salvage/rcsale value on replaced item: $800
2007
Thursday. June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Contact Public Works Director
Dcpartmcnt Sewer
Projl'ct # 01-ERP-551
Projcct Nalllc 3/4 Ton Utility Trucl{ (2)
Type
Useful Life
Equipment
10 years
Vehicles
Ca tegory
Description
I
3/4 ton utility trucks used by the Water/Sewer Division of Public Works.
Priority n/a
Total Project Cost S119,500
Justification
I
Transportation to and from job sites, box carries tools used by personnel for job sitc repairs and I ight haul ing.
Expenditures
Vehicles
2005
Total
2006
25,000
25,000
2008
2009
Total
51,000
51,000
Future
68,500 I
Total
Funding Sources
SF - Sanitary Sewer Fund
Total
2005
2007
26,000
26,000
2006
25,000
25,000
2007
26,000
26,000
2008
2009
Total
51,000
51,000
Future
68,500 I
Total
Operational Impact/Other I
Variance from 20 year plan - Delete 1/2 ton truck and 4x4 3/4 ton truck - change to 3/4 ton truck. Adjust expenditures to reflect actual cost.
Estimate salvage/resale value on replaced item: $2,500
7/lursday, June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Contact Public Works Director
Dcpartmcnt Sewer
Projcct # Ol-ERP-553
Type Equipment
Useful Life 20 years
Project Name Rodding Machine
Category Equipment
Priority nla
Total Project Cost $36,400
Description
I
Mechanical sanitary sewer cleaning machine.
J usti fication
I
Expenditures
Equipment
2005
2006
2007
2008
2009
36,400
36,400
Total
36,400
36,400
Total
Funding Sources
SF - Sanitary Sewer Fund
2005
2006
2007
2008
2009
36,400
36,400
Total
36,400
36,400
Total
OperationallmpactlOther I
Variance from 20 year plan - extend life to 20 years to renect actual.
Estimate salvage resale value on replaced item: $
7/l/Irsday, June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 lhl'1I 2009
Project # Ol-ERP-556
Projcct Namc Utility Billing System
Description
I
Uti I ity bill ing systcm for bill ing customcrs for water/sewer/refusc and storm sewer usagc.
Contact Finance Director
Dcpartmcnt Sewer
Type Equipmcnt
Useful Lifc 8 ycars
Category Equipmcnt
Priori ty n/a
Total Projcct Cost $98,700
J usti fication
I
Allows billing clerk to bill customcrs efficicntly and effcctivcly. Also, provides tools for analysis and monitoring.
Expenditures
Equipment
2005
Total
2006
2007
25,500
25,500
2008
2009
Total
25,500
25,500
Future
73,200 I
Total
Funding Sources
SF - Sanitary Sewer Fund
Total
2005
2006
2008
2009
Total
25,500
25,500
Flit II rc
73,200 I
Total
OperationallmpactlOther I
Variance from 20 year plan - none
Estimatc salvagc/rcsale valuc on rcplaccd item: $
2007
25,500
25,500
Thursday. June 2-1. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 Ihl'u 2009
Project # Ol-ERP-710
Project Name 4X4 1/2 Ton Truck
Description
I
Pickup used by various divisions of Public Works.
Con tact Publ ic Works Director
Department Public Works: BldgJEquip Ser
Type
Useful Life
Ca tegory
Priority n/a
Equipment
10 years
Vehicles
Total Project Cost S56,400
J usti fication
I
Light hauling and transportation for supervisors. Maintenance garage service vehicle.
Expenditures
Vehicles
2005
Total
2006
2008
2009
24,100
24,100
Total
24,100
24,100
Future
32,300 I
Total
Funding Sources
Equipment Replacement Fund
2005
Total
2007
2006
2007
2008
2009
24,100
24,100
Total
24,100
24,100
Fu tu rc
32,300 I
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvagclresale value on replaced item: $1,500
71/11rsday. June 2-1, 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Projt'ct # Ol-ERP-802
Project Name 3/4 Ton Utility Truck
Description
I
Truck used by Parks Division of Publ ic Works.
Contact Public Works Director
Department Public Works: Parks/Forestry
Type Equipment
Useful Life 10 years
Category Vehicles
Priority n/a
Total Project Cost $75,600
J usti tication
I
2005
2007
Expcnditurcs
Vehicles
2006
2008
32,200
32,200
Total
2009
Total
32,200
32,200
Futurc
43.400 I
Total
Funding Sources
Equipment Replacement Fund
2005
2006
2007
2008
32,200
32,200
Total
2009
Total
32,200
32,200
Futurc
43.400 I
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Thursday, June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thrll 2009
Project #
Ol-ERP-803
Project Name Swap Loader
Description
I
Contact Public Works Director
Department Public Works: Parks/Forestry
Type Equipment
Useful Li fe 15 years
Category Equipment
Priority n/a
Total Project Cost S70,500
Justification
I
Expenditures
Equipment
2005
Total
2006
2007
2008
27,600
27,600
2009
Total
27,600
27,600
Futu re
42,900 I
Total
Funding Sources
Equipment Replacement Fund
2005
Total
2006
2008
27,600
27,600
2009
Total
27,600
27,600
Future
42,900 I
l' 0 ta I
Operational Impact/Other I
Variance rrom 20 year plan - Apply 50% or replacement to Refuse Fund.
Estimate salvage/resale value on replaced item: $
2007
Thursday. June 2./. 200./
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thrll 2009
Contact Public Works Director
Departmcnt Public Works: Parks/Forestry
Projcl'l # Ol-ERP-80S
Project Namc Aerial Lift
Type Equipment
Useful Life 20 years
Category Equipment
Priority n/a
Total Project Cost S II 0,000
Description
I
Justification
I
Expenditures
Equipment
2005
2006
2007
2008
2009
110,000
110,000
Total
110,000
110,000
Total
Funding Sources
Equipment Replacement Fund
2005
2006
2007
2008
2009
110,000
110,000
Total
110,000
110,000
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $
Thursday. June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Project # 01-ERP-806
Project Namc Tractors (2)
Description
I
Farm type tractors with cab used with various attachmcnts.
Contact Public Works Director
Departmcnt Public Works: Parks/Forestry
Type Equipment
Useful Life 20 years
Category Equipment
Priority n/a
Total Project Cost S82,800
Justification
I
Icc rink swceping, flail mower, fertilizing, aeration, plowing and grass secding.
Expenditures
Equipment
2007
2008
2005
2006
Total
2009
41,400
41,400
Total
41,400
41,400
Futu rc
41 ,400 I
Total
Funding Sources
Equipment Replacement Fund
2005
2006
2007
2008
Total
2009
41 ,400
41,400
Total
41,400
41,400
Futu re
41 ,400 I
Total
Operational I mpact/Other I
Variancc from 20 year plan - move tractor back from 2004 to 2009, move back tractor from 2006 to 20 I O.
Estimate salvage/resale value on replaced item: $3,500
Thursday. June 2-1. 200.;
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
Ol-ERP-807
Project #
Project Name Trucksters (3)
2005 thru 2009
Contact Public Works Director
Department Public Works: Parks/Forestry
Type Equipment
Useful Life 15 years
Category Equipment
Priority n/a
Description
I
Total Project Cost S I 05,900
Truckster used by Parks Division of Pub I ic Works for ball field and parks maintenance.
Justification
I
Park maintenance, balllield grooming and weed spraying.
Prior
29,900 I
Total
Prior
29,900 I
Total
Expenditures
Equipment
2005
2006
16,600
16,600
Total
2007
2008
Total
16,600
16,600
Future
59,400 I
Total
Funding Sources
Equipment Replacement Fund
2005
2006
16,600
16,600
Total
2009
2007
2008
Total
16,600
16,600
Future
59,400 I
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $1,400 each
2009
Thursday. June 24. 20M
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Project # Ol-ERP-808
Project Name Riding Mowers (2)
Description
I
Contact Public Works Director
Department Public Works: Parks/Forestry
Type Equipment
Useful Life 8 years
Category Equipment
Priori ty n/a
Total Project Cost S I 08,000
Riding mowers used by Parks Divison of Public Works. One mower also used for sidewalk snow removal during winter months.
J usti fication
I
Mowing city parks and right of ways and sidcwalk snow rcmoval.
Expenditures
Equipment
2005
Prior
33,000 I
Total
Total
Prior
33,000 I
Total
Funding Sources
Equipment Replacement Fund
2005
Total
Operationallmpact/Other I
Variance from 20 year plan - none.
Estimate salvage/resale value on replaced item: 5600 cach
2006
2007
2008
2009
22,800
22,800
Total
22,800
22,800
Futl! re
52,200 I
Total
Futu rc
52,200 I
Total
2006
2008
2007
2009
22,800
22,800
Total
22,800
22,800
Thursday. June 2-1. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Contact Public Works Director
Project # 01-ERP-813
Project Nallle Brush Chipper
Department Public Works: Parks/Forestry
Type Equipment
Useful Life 15 years
Category Equipment
Priority n/a
Total Project Cost S58,300
Description
I
Brush chipper used for Forestry and brush pick up operations of Public Works.
Justification
I
Expenditures
Equipment
2005
2006
2007
2008
2009
22,800
22,800
Total
22,800
22,800
Future
35,500 I
Total
Total
Funding Sources
Equipment Replacement Fund
2005
2006
2007
2008
2009
22,800
22,800
Total
22,800
22,800
Futu rc
35,500 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - change to usable life to 15 years.
Estimate salvagelrcsalc value on replaced item: $
71ll1rsday. June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Contact Public Works Director
Department Public Works: Parks/Forestry
Type Equipment
Useful Life 15 years
Category Equipment
Priority nla
Projel't # 01-ERP-814
Project Name Trailer Flatbed
Total Project Cost S3,600
Description
I
Justification
I
Expenditures
Equipment
2005
1,400
1,400
2006
2007
2008
2009
Total
1,400
1,400
Futl! re
2,200 I
Total
Total
Funding Sources
Equipment Replacement Fund
2005
1,400
1,400
2006
2007
2008
2009
Total
1,400
1,400
Fu tll rc
2,200 I
Total
Total
Operational Impact/Other I
Variance from 20 year plan - Move up one year.
Estimate salvagc/resale value on replaced item: $
Thursday. June 24, 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Project # Ol-ERP-900
Project Name Refuse Truck
Description
I
Refuse truck used by Refuse Utility Division of Public Works.
Contact Public Works Director
Department Refuse
Type Equipment
Useful Life 5 years
Ca tegory Vehicles
Priority nla
Total Project Cost 51,016,200
J usti fication
I
Residential waste pick up.
Expenditu res
Vehicles
2005
Prior
148,000 I
Total
Total
Prior
148,000 I
Total
Funding Sources
RF - Refuse Fund
2005
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resalc value on replaced item: $18,000
2006
2007
2008
2009
171,600
171,600
Total
171,600
171,600
Future
696,600 I
Total
Future
696,600 I
Total
2006
2008
2007
2009
171,600
171,600
Total
171,600
171,600
7'llllrsday. June 2-1. 200-1
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Projl'ct # Ol-ERP-902
Project Name Utility Billing System
Description
I
Utility billing system for billing customers for water, sewer, refuse and storm sewer usage.
Contact Finance Director
Department Refuse
Type Equipment
Useful Life 8 years
Category Equipment
Priority nla
Total Project Cost S32,900
Justification
I
Allows billing clerk to bill customers efficiently and elTectivcly. Also, provides tools for analysis and monitoring.
Expenditu res
Equipment
2007
8,400
8,400
2008
2005
2006
Total
2009
Total
8,400
8,400
Future
24,500 I
Total
Funding Sources
RF - Refuse Fund
2005
2006
2007
8,400
8,400
2008
Total
2009
Total
8,400
8,400
Futu rc
24,500 I
Total
Operational] mpact/Other I
Variance from 20 year plan - none
Estimate salvage/resalc value on replaced item: $
Thursday. June 24. 2004
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thru 2009
Projl.'ct # Ol-ERP-910
Projcct Namc Swap Loader
Description
I
Contact Public Works Director
Department Refuse
Type Equipment
Useful Life 15 years
Ca tegory Eq u ipment
Priority n/a
Total Project Cost S70,500
Justification
I
Expenditures
Equipment
2006
2005
Total
2007
2008
27,600
27,600
2009
Total
27,600
27,600
Futl! re
42,900 I
Total
Funding Sources
RF - Refuse Fund
2005
2006
Total
2007
2008
27,600
27,600
2009
Total
27,600
27,600
Full! rc
42,900 I
Total
Operational I mpact/Other I
Variance from 20 year plan - 50% to Refusc Fund/50% to Equipmcnt Replacement.
Estimate salvage/resale value on replaced item: $
Thursday. June 2-1. 200-1
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN
2005 thrll 2009
Projl'ct # Ol-ERP-950
Project Name Utility Billing System
Description
I
Utility billing systcm for billing customers for water, sewer, refuse and storm sewer usage.
Contact Finance Director
Department Storm Sewcr
Type Equipment
Useful Life 8 years
Category Equipment
Priority n/a
Total Project Cost S32,900
Justification
I
Allows billing clerk to bill customers efficiently and effectively. Also, provides tools for analysis and monitoring.
Expenditures
Equipment
2005
Total
2006
2007
8,400
8,400
2008
2009
Total
8,400
8,400
Futu re
24,500 I
Total
Funding Sources
SU - Storm Sewer Fund
2005
Total
2006
2007
8,400
8,400
2008
2009
Total
8,400
8,400
Future
24,500 I
Total
Operational Impact/Other I
Variance from 20 year plan - none
Estimate salvage/resale valuc on replaced item: $
Thursday. June 24. 2004
:3
;:J
o
:.J ~
~~
f-
~!
:;:
w 2
u ".
~ ~
~ 5
::::: w::
~c'"
~ -
~ ~
;:J Z
o
:.J
.,.
o
C
::l
.,.
..J Vl
r; ~ ~
M
or.
o
r-
u
-<:
"-
z
o
f=
-<:
....l
"-
~
.,.
N
o
N
N
o
'"
N
N
o
N
N
o
'"
o
'"
o
,,'
0'
o
'"
~
o
N
!::
o
'"
~
o
N
o
'"
:::
o
N
~
~
o
N
o
N
~
o
'"
0'
o
o
N
00
o
o
r-
o
o
N
~
o
o
'"
tz
~
t
5
8
o
o
o
~
~ ~
~I
G: ~
5
g
wJ
~
I-
8 ~ 0 ~ 8
o
o
o
o
~
~
r:j
o
o
o
0'
.,.
a
o
~
;r;
g
o
~
~
~"
~
~
or; r-
N
~ - ~
or.
~ ~
~ ~
Ul C2
2 c
~ :<
:3 ~
~
or.
r- ....l
..J <:
Ulor. <l-
e; ~ C2 ~
:E ~ UJ ~ ::0
UJ ; ::J < ::J
> ~ u Z Vl
~ :r: ~ :;:
~ ~ UJ c::
~ ~ j ~
00 0'
o 0
o
o
o
~
~
r:j
~
~
g
M
o
o
o
~
~" g
;:: g
~
:::;"
o
~
;r;
o
o
o
o
o
o
~
o 0
g g
~ ~
o
::
~
o
o
o
~
~
~
~
Vl
::J
I-
~ ..J ....l
or. < 0 <
og;o i3
~-<:I- ~r-
~ <) ~ I- ~
~~f= ~Vl
8 ~ :i or.
~ ~ ~ ~ ~
:;: ;5 Gl 8 ~
o
~
r:;
o
o
00
':i
o
o
M
~~
o
~
~
o
o
~
o
o
N
~
o
g
~
o
o
o
;
o
g
;:;"
~
~
o
o
~
~ ~
~~ ~
~ ~
~. q
~ ~
~~
o 0
~ ~
~~ ~
s s
~~
~ ~
~ g';
~
~
':i
~
~
~ ~
~{ ~
g
~
o
g
;:;"
~
~
g ~
'!j ~~
o
o
~
g
~
o
~
~
~ s
~~
o
o
00
g;
~
.,.
~
~
~
f""'I ~ 1'"""1 M M "1'" "1" ~
~I
c.. ~ ~ :;t :: :n ~ 0::
000 0 0 ~ <
:5 :3 :3 :3 :3 ::> u
gSi'Si'ggSi'~
o
o
0'
r:;
o
o
00
':i
~
:cf
o
o
0-
~
o
o
-0
"i.
~
o;i
o
o
r-
;:;"
or.
UJ .,.
o ~
~ ~
o ....l
~ 5
~ ~ M N
~
.,.
~
~
~ ~
g ~~
g
;r;
~
~
~ ~
~~
~
i'f
~
::."
g 8
r- '-?
~~
2
~
..J
-<:
I-
o
r-
er. or. ::0
< < ::J
U U Vl
~ ~
o 0
< <
o 0
~ ~
~~
~
~
o 0
o 0
~~
o
o
N
~
o 0
o 0
.,.
~:
o
o
'-?
~
o 0
o 0
~r..{
o
o
o
~
~~ ~~
o
o
....,
~
~ ~
~ ~
o
o
;i
~ 8
~ ~
o
o
~
o 0
o 0
o
~ ';j
o
o
.,.
~
o 0
o 0
~ :::
o
o
:;::"
~ ~
~ ri
o
o
.,.
S
0"
o
o
-0
0-:
o
o
-0
0"
o
o
-0
0-:
~
0-:
o
o
0-:
s ~
I,) a:
N
o
o
0-
;z:
o
~.
N
.,.
~ ~ g
a:'4~
o
o
,.,
0-:
o
o
,.,
0-:
~
o
~
0-:
o
~
~
o
o
o
0-:
o
o
o
0-:
~ 8
~f 0:
o
o
o
o
o
0-:
o
o
o
0-:
o 0
o 0
o 0
O"~ a:
8 g ~
a: ~ ';f
o
o
o
r-
o;i
g
o;i
~ ~
~ QIJ~
o
~
~
o
o
r-
M
o
o
r-
o;i
o
o
.,.
Ef
o
o
r-
o;i
o
o
r-
o;i
o
o
r-
o;i
o
g
o;i
~
o;i
~
o;i
o 0 0 0
~ 0 ~ ~
'i.oo~'i
o
o
or;
o;i
~
o;i
~ :::
""
UJ
t;;
~ ~
I- or.
Vl UJ
~ ~ ffi
~ 8 8
~
or. ....l
UJ <
~ er. i3
~ ~ s;
~ 8 ~
~ ~
~ <)
UJ 0
Z ....l
0 ~ g
"T ~
N .,; ~~ 0
0 'C
'"
~
N ~
a
N
~ ~ a
a
00
N :f N ~
~
~ a ~ a
a a
N
'" ;i ':j ~~ ~
a
'"
a a ~
a a
a
'" 00 :i ~
a '"
'"
~ a ~ a
a a
0- ~- ~ ~ ~
a
N
a
00 S;
~ ;:j
!:::
a
N
'" a
v; 2 a
'" '"
a v; i2
~ a ~ a
a g
00
~ ~ :i -0 ~
:!
a
'"
~ ~ ~ a
a
:c v,
a g ;;; i '"
N
0
~ ~ ~- ~
~ ';j '" ~
~ ~ a ~
a
I"-
a .,.- v; :i ~
N ~ v;
g ~ a
a g
a ~ i
'" .....
a '" a ~ 0
0- a ~ a 0
00 0-
a ~ .r" ;j ~
a
N
'" ~
00 8
a <i <i
a
'"
I"- 8 8
a ~f ~
a
'"
'"
0
~
a 8 a a
a a :5
a a
a ~ ;{ <i ~
a
'"
Vl :: 00 ~ "" ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ a :: a :: ~ 0 a :: ::
t:::l oc N N N N en
oc >- U
U >
en
G: c.; I-
u.. Z Z
~ ~ ?E; t...l
f- ~ oc oc ::;
~ t ;:; ;:; UJ UJ -l t...l Z ::;
0 0 2 ~ 0 ..: t...l ..: Q.,
en -l -l c.. ..: f- ~ > 0
I- ~ ~ ~ f- ~ ~ :L :3 g oc 0 (,;) -< .<. -'
5 t...l :::l c.. ~ U oc ~ f0- e...? UJ
t...l c.. 0 c.. ~ ~ ::J :::l :::l UJ ~ Z tI;
8' oc ~ ::E 0 0 0 Z C2 ::: :::::
~ f- f- Z 0 ::J :::l 0 oc z z 0 0 t...l >-
l- f- fo- 5 0 :::l 0 0 0 ::E ~ fo- UJ UJ ..: oc oc ...J oc UJ c.: Vl ~ :L
0 CO oc 0 ~ ~ oc CO UJ oc
en ~ ~ f- X ~ UJ f- !Z ...J UJ UJ oc UJ ::: z 0
z z z ..: 0 0 UJ Z 0 UJ 2 UJ ;:; -l f-
::: ~ 0 .,. 0 0 -l ...J Z ~ f- ~ 0 0 ;:i UJ ::l > 0 ~ c.: G 0 f0-
X f- ~ f- fo- " " ..: ..: oc ::;: ;:; 0 f- ..: Z Z ;:i N
N c.: .,. - - - Vl Vl f- r- ::: Lt. Lt. Vl " Vl oc Vl c.. Vl r- UJ
" ~ g .,. ~ ~ - ..... :! v; '" '" v; '" 00 a .,. I"- .,. 0- g ~
"" a N a
'" a ;;; N N N N ,... ... "T Q.,
c.. ..... ..... ..... ..... ..... ..... ..... ..... I"-
",
'"
~
...,.
N
o
N
N
o
N
N
o
o
o
~
N
o
N
o
N
o
r,
'"'
o
'"
00
~
t-
O
N
""
:?
~
o
'"
::::
o
'"
o
N
o
N
o 0
o '" 0
N r-... r---
~: ~ ~
o
N
o
o
N
'"'
o
o
00
o
o
'"
t-
O
o
N
""
o
o
'"
o
o
N
5: Vl
;2 s:
~
~
~
.."
2
o
o
'"'
r;f
8 g
"" ""
c;jrj
~.
'"
'"
~ ~
~ ~
o
o
'"'
~
~
or)
o
g
~
o
o
'"'
~
o
o
...,.
...,.
~
't
o
~
-6
2 ~ ~ ~ ~ 0 ~ ~
f-
Z
~
5
o
U..l
~ ~ 2
u U f-
~ ~ ~ ~ ~ :>::
~ ~ ~ ~ ~ ~ ~ t ~
~_~ ~ ~ ~ ~ S ~ j d
~ ~ ~ ~ ;;: f- ~ ~
~ ~ ~ ~ ~ ~ 9 ~ ~
:...
:>:: '"
o 0
t; t
;2 ;2
f- f-
'" '" '"
U..l [.lJ U..l
t;; f- t;;
~ ~ ~
U U U
::l ::l ::l
:>:: :>:: :>::
f- f- f-
o
o
'"
..,
~
g
~
~
~
'" '" ffi
w ~ ..J
g 6 ~
~ :E :I:
x
~
~
o
o
o
,..;
o
o
'"'
r::'
g
.0
~ ~ ~ 0 ~ _
:>:: ffi ffi
~ ~ ~
~ ~ U
CI '" c..
~ ~ ~
CI f- Vl
~
:i
g
<Xi
g
00
~
~f
..J
-<
:>:: ~ b
~ ~ ~
a ~ ~
;;; :J
~ ~
c:l f-
~ ~ ~ ~ : ~ M : : ~ ~ ~ ~ ~ ~ ~ E ~ : ~ ~
~
~
o
o
'"'
<j
o
s;
~
~
(!2
o 0
o 0
'" ...,.
C'i ~
o
~t
o
R
;;j
o
~
~
o
o
""
,..;
'"'
o
o
~
o
o
't
't
o
g
~
o
~
~
o
o
""
-6
o 0
o 0
't ...,.
o
o
o
~f
o
g
~
o
g
;:f
8 ~ 8
~~~
o
o
o
~
o
o
o
~;
o
o
o
-6
o
o
o
-6
8 ~ 8
...0 C'f') ~
o
8
-6
o
g
-6
o
o
o
"i
g
N
g ~ 8 8
M~v{;2
o
o
o
"i
o
o
o
N
o
g
00
8
00
g ~ 8
oo~ ~ .,-\
o
g
00
~
~
Q
~ :>::
,u.:
::i 5:
~ 8
z
>- <
f- :2
U :r
u
UJ Vl
Cl i;;
;2 :>::
'" CI U..l ..J
~ 5 ~ ~
8 2 U1 ~ tI1 g
..J ~ t; 8 :>:: 2
..J r:- i;; U..l ~ ~,
~ ~ ~ ~ ~
5c~~8
o
g
vi
o
o
o
vi
o
g
vi
8 8 ~
~g~
o
o
o
.,.;
8 ~
v)N
~
o
g
vi
o
o
o
.,.;
o
o
o
vi
o
o
o
.,.;
g g g
~ g ~
o
o
o
.,.:
o
o
o
.,.;
g
vi
o
o
o
vi
o
g
vi
8
vi
g ~ g
~ ~ ~
o
o
o
.,.;
g g
g~
o
o
t-
g g
g~ ~
8 g
~~
8 g
g ~
g g
~ ~
g g
~
8 8,
g
o
o
0-:
o 0
8 g
~ ~
g g
~
o 0
8 g
g t;~
~ g
g ~
g ~
g ?j
8 g
~ ~.
o
o
t-
,....
8 g
g ~~
o
c g
~ ~
~i
o 0
8 g
g~
'"
..,
t- 0
..,
5 :>::
~ ~
"" ~..J
<..; UJ I:'- ~
z Q! 0
i::c~s
>U;2~
f: ~ G
U 1;: 0;:
~ 8 ~
g,
o
s;
'""
g
,....
~ ~
..:;) ..c
~
:2
o
o
r;
o
o
o
o
o
~
o
~
~
~
> 5
f- ::r:
~ ~
.-:: ~
U ~
U..l
:2
-<
U
0::
""
f-
Z
w U..l
U ~
VJ U
~ ~
~ ;:-
o
U
0 0
0 0
" N N
N ~ ~
0
'"
8 ~ 0 ~ 0 0 ~ 0 0 g
~ 0 0 0 0
a- '" .... N
N ~ ~. 12 ~ ~ ~ N M ~ M
0 '1'
'"
8 0
N ~ g
'" ;:i
0
N
0 0
~. 0
'"
N
0
'"
~ 0 0 0
0 0 0
0 00 00
'" ..0 ..0 g g
0
N
0 g 0 ~ 0 ~ 0
0 0 0 0
a- .... ....
0 ~ 00 00 00- 00 ~ ~
'"
~ 0 0 0 ~ 0
0 0 ~ ~
00 00 00
0 r::: r::: r::: r::: r::: r:::
'"
0 0 0 0 0
~ ~ 0 0 0
~ a- .,.
0 ~ ~ ;;; ~ ~
'"
0 ~
0
~ '"
0 ~- ~
N
~ 0 0 0 ~ 0 0 0
:?, 0 0 0 ~ ~
~ N
0 .,: ~ ~ ~ ~ ~ ~
N
0 ~ ~
0
::: a-
0 ~ ~ ;i
'"
~ ~ 0
~ ~
0 :i ;;; 12
'"
0
~
0 0 ~ 0 ~ 0 0 0
0 0 0 0 0 g
00 00 0
~ ~ ;:i ..0 g ..0 ..0 ~ ~
0 0
0 0
~ N N
0 N N
~. 0 ~ ~ ~ 0
a- ~ 0
'"
0 ;:::; ~ ~
0 N .... ....
N
0 0
00 ~ ~
0 ~ ~
0
N
0 ~ 0 0 0 ~ 0 0 0
.... 0 0 0 0 0 ~ 0
.... 0 .,. "
~ ~ ::: ;;; ~ ~ 00 00 00
8 0
'" 0
0
~ ~f ~
~ 0
0
0 '"
0 0 ~
N
...J Vl ~ ~ ~ :?, ~ ~ ~ ~ 0 :?, ~ '" ~ ~ ~ 'n ~ ~
c.. s: N '" -
l:.J
o!
:x:
~ ::E r :J t.l
;:: ...J UJ ::E ;:: ...J i? ~ ;:: ...J ~ z
~I " UJ <: r ~ ~ <: <: ~
l:.J ~I o! Iii c..: f- ~ ~ ~ <2 ::E c..: f- (J) c.. ~ <: :::E c..: f- t..: :::E o!
:::E ~ :<: Sl '" ~ ;:J ~ ~ (J) UJ
c.. o! UJ ~ 1;; :::E 0 ;;.. f- a ~ l:.J 1;; :::E 0 o! UJ ::E 0 ~ u
Vl UJ Iii ~ f- ~ E f- UJ f- t...~ f- f- ~
5 - o! -< 2 ~ :::E o! UJ c:l ~ o! <: o! Vl f- c:l ~ ~ 2 :..G UJ Vl UJ c:: Vl >- <:
0 ~ 1;; UJ Vl ~ 0 ::E 0 0 >- UJ Vl ~ :x: ~ o! Cl >- Iii ~ :x: 1;; 2 ~
UJ f- I- UJ c.. :::E z 1;; ...J :J f- f- 5 Vl z 1;; f- <: Vl o!
f- :..G l- S? ~ :2 E: Q 0 Q f- 0 1;; 0 ::>
o! 0 0 ~ ~ u ~ ~ 0 l:.J UJ UJ ...J 0 I- 0 ~
~ f- ~ Q 0 ~ u E: Q <: Cl UJ Z 0;: 0 Vl Vl Vl c.. ~ 0 CIl z <2
u ~ UJ > UJ :J UJ ;:; ::> ::> ::> Ci :J
" f- S U ~ U ...J ~ ...J Cl f- I- Cl Z Z -J ~ ... ~ <:
~ N <: :;: ~ -J ~ ~ ;Ii ;!; f- 0 UJ UJ ...J 1= :;: ~ ~ UJ ~ ~ ...J UJ
" c:l co c..: ::; o! 0 0 Cii o! o! Iii co ~
" 0 "., ~ ~ 0 '" " '" 0 ~ ...., ....,
oil 0
'" ;;: 0 0 '" ...., ...., 0 0 ~
'" '" '" 0' 0'
.,.
N
~
o <:>
~ g
~~
N
o
N
g ~
~i
N
N
o
N
o 0
g ~
00 ~.
-c
N
o
N
g ~
~~
o
1'1
o
N
g 2
~ ~
'"
o
N
~ ~ 8
*~~
00
~
~ ~
~~
r--
~
~ 8
~~
V)
o
1"
~ g
~ ~
o
N
~ ~
~~
.,.
~
g g
: ~
~
g ~
~~
o 0
o
~~
o
1"
~ 8 g
:~~
:::
o
1'1
~ ~
~ :-~
'"
o
o
N
g ~
~ ~f
o
o
1"
o
~ r--
~ ~
r--
o
o
N
~ ~
~ ~
-0
o
o
o x
~ ~
o
o
1'1
g ~
~ r::
Vl
...l
<(
f-
o
f-
'"
5
5 0'
0' UJ
S ~
G:i i= oc
> 0 UJ
~ ~ i: ~
2 2 ::l ~
C5~~_~~
o 0 u-<:
"
",
'"
c..
~
...:
~
~
:2
~ ~ ~ ~
~~~M
o
g
~
~
,.,
~ ~
;s~ g
~. ~ ~
x> oo~ ~
~.~~~
~ g
~f '-0
o
o
V)
;;:
~
~ ~ ~ ~
~ ~ ~~ ci
~
~"
~
;2
g g ~ 8
og-D~
~
N
g ~ ~
N ~ ~
s
::;
~
~-
~ g ~ ~
~:;:OtioQ
o
o
o
~
~
:::'
oc oc
c: ~
~ ~
oc
t:J
~
~ z
~ -< g
It 6 ;;
oc t;; ;;;
~
~
o
o
or)
~
o
~
,..;
~
t
o
o
00
~
o
o
o
~
~ ~
g~
o
o
r--
~
o
o
o
o
~
~
o
o
r--
~
o
~
o
o
.,.
r--
...l
3 ;::
(:) 0
f- f-
o 0
z ~
2 ...l "'-
~ ;:: ~
~ ~ ::l
& ;2 ~
o :c u
o
~
~
o
o
'"
0:
00
o
o
1'1
:2
o
g
~
o
o
-0
~
o
o
-0
~
~ ~
~. ~
..:
o
o
00
~
o
~
~
o
~-
o
o
-0
~
o
o
1'1
~
~
:!
o
o
o
~
o
o
"'.
o
o
~
o
o
C'
~
~ ~
~f ~
o
:::
;i
o
o
-0
;;:
o
:::
~
o
g
~
o
~
;2
~ ~
;:~ ~
o
o
N
1"
o
o
~
o
~
~;
o
o
o
;3
8
~
o
o
-0
~
...l
<t.
f-
o ...l
r- -<
o b
~ ~
oc 0
UJ z
~ 2
~ i:
Vl :J
~ ~
o
12
~
o
o
r--
g:"
..:
o
g
~
o
o
1"
~
o
o
C'
~.
o
:::
~.
o
~
00
r--
o
o
~
o
o
~
o
Si.
or)
..,.
o
~
-0
o
o
~
o
o
o
~
o
o
'"
~
o
o
C'
~
o
o
~
o
o
~
o
g
~
~
~
o
o
.,.
o
...l
<(
f-
o
f-
...l
<(
~
z
z
<(
Vl
o
z
2
::::l
<(
o <:>
~ ~
~~
~ 8.
~ ~
~ ~
~ S
~ g
~ ~~
~ g
~~
~ ~
~~
~ ~
~~
g g
C' V)
~ ~~
~ ~
~~
~ 8
~~
N
~ ~
~~
~ ~
~ ~~
~ ~
~~
;i
~ ~
;;;~
~ ~
g ~.
~ ~
~ ~
8 ~
~g
o
o ."
r-- '"
~ ~
~~~ ! ~ 8 ~ ~ ~ g ~ ~ ~ ~
~~ ~~~~~C'iC'iM~~
<(
g ~
= ~
~ ~:"'~ ;
]1 .,. .. :-:
N N
UJ
o
;;
...l 0
<( z
Vl ~
o "'-
2 ~
~ ~
t:J 0
a3 Gi
o z
<ii z
G ~
~ ~ ;2
~ ~ t;
-< c: ~
::z:: 5 ::0
-< 0' 0
t.T.J UJ <(
~ ~ ~
~ 8 ~ ~ ~ ~ ~ ~
~~.~~~~~~~
-: r-i
z
o
1=
~ ;2 ~
~ 1;; :#
c.. ~ ~
g~5
t:J <( UJ
~ S! 8
:J ...l oc
2 2 t;;
~
~
5
0'
t:J
Vl
~ ~
; ~
I-- 5
z 0'
Ul UJ
::0 0
~ Z
::J 02
O'UJ
l!::! UJ
g G
...l Z
al UJ
z
o
6 1=
1= z ;2 ~
~ g i ~
~ ;2 ::0 5
~ t;; 0 0'
_ <( UJ
~ ~ frl ~
~ f- f-
~ :< z Vl
o ...l ~ ~
~ ~ i: ~
:J ;; ~
al i: 1= oc
~'u ~ 2
o 0
~ N a
~ g ~
~ ~ ~
~. ~ ~
00 M f"i
f-
Z
UJ f-
t ~
5 ~
0'5
~ 0'
...l Ul ...l
~ ffi <
~ ~ ~
000
2 ~ 2
~ ~ ~
UJ t:J UJ
Z Z Z
UJ t:J t:J
000
g ~ g ~ ~ ~ ~ ~
~-:~~~ .;
g ~ ~ ~ g
~~.~~~
000
o 5 z z
z "'- 2 2
o 2 i: i: i:
5 ~ ::::l :J :J
E d3 ~ ~ ~
UJ U oc oc Ul
.J Vl ~ UJ ::5
;2alf-<(:::",-
= 25 ~ ::: ~ ~
o g 8
g C' -
; ~ ~~
o
o
o
~
~
~
N
o
z
2
>-
f-
:J
~
oc 0
~ ~
t:J Z
~ 0
6 ~
t;; ~
~
UJ
::0
<:l..
5
0'
12
Vl
Ui
g
G:i
>
>-
f-
:J
~
EQUIPMENT & BUILDING
INVENTORY
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
06/15/2004
CURRENT
REPLACEMENT
UN I T # YEAR MAKE MODEL COST
FIRE DEPARTMENT
102. 1989 FORD L9000 TELE-SQUIRT $240,000
103. 1982 LUVERNE PUMPER 225,000
104. 199] PETERBI L T HEA VY RESCUE 190,000
105. 1998 FORD CROWN VICTORIA 22,000
106. 1998 CHEV LUMINA 2],000
107. ]993 PETERBIL T PUMPER 225,000
108. ]995 CHEV 4X4 LITE RESCUE 25,000
109. 1972 STUPHEN AERIAL TRK 750,000
110. 2000 FORD CROWN VICTORIA 24,000
] 10. 1997 FORD CROWN VICTORIA 20,000
POLICE DEPARTMENT
200. 2004 FORD CROWN VICTORIA $28, ] 00
201. 2004 FORD CROWN VICTORIA 28, I 00
202. 2004 FORD CROWN VICTORIA 28, ] 00
203. 200] FORD CROWN VICTORIA 26, I 05
204. 2001 FORD CROWN VICTORIA 26,000
205. 2000 FORD CROWN VICTORIA 24,000
206. 2002 FORD CROWN VICTORIA 28,000
207. 2002 FORD CROWN VICTORIA 28,000
208. 200] FORD CROWN VICTORIA 26,105
209. 1999 FORD CROWN VICTORIA 22,000
2]0. 1998 CHEV GEO TRACKER 14,000
212. 2002 CHEV TAHOE 26,000
213. 2003 CHEV IMPALA 25,000
2 ]4. 200] DODGE INTREPI D 20,000
215. 2002 CHEV IMPALA 18,800
2] 7. 1999 FORD TAURUS 17,000
218. 2000 CHEV IMPALA 22,000
2]9. 1979 FORD VAN 20,000
241. 2001 CHRYSLER PT CRUISER 18,000
252. 1972 H.M. TRAILER 3,000
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
06/15/2004
CURRENT
REPLACEMENT
UNIT # YEAR MAKE MODEL COST
STREET/TRAFFIC DIVISION
300. 1995 FORD 1/2 TON $13,000
301. 1997 CHEV 3/4 TON 21,000
304. 2000 FORD F-450 34,000
305. 1997 FORD 1/2 TON 18,300
306. 1992 CHEV 4X4 1 TON 22,000
308. 1989 CHEV 1 TON DUMP 23,000
309. 1995 CHEV 1 TON TRK 28,000
310. 1989 INTERNA TIONAL SGLAX DUMP 70,000
311. 1985 INTERNA TIONAL SGLAX DUMP 70,000
313. 2000 FORD L 7501 72,000
314. 1998 FORD L T 8500 86,000
315. 1996 FORD L-8000 85,000
316. 1995 FORD WATER TRK
318. 1968 FORD BOOM/AUGER TRK
320. 1991 CA TERPI LLER LOADER 926E 90,000
321. 1990 CA TERPILLER LOADER 936E 120,000
324. 1989 NEW HOLLAND SKID LOADER 24,000
325. 1998 JOHN DEERE SKID LOADER 24,000
326. 1989 CA TERPI LLAR 140-G 82,000
327. 2001 ELGIN PELICAN SE 105,000
330. 1989 INGERSOL/RAND ROLLER DD-25 23,000
334. 2003 GRACO GM 3500 4,500
337. 1994 CA TERPILLAR BOX PAVER 18,000
338. 1984 STONE CEMENT MIXER 3,000
342. 1991 TARGET CONCRETE SA W 2,400
344. 1996 SNOGO WK 800 58,000
345. 1989 M-B-W VIB PLATE 2,000
346. 1984 WENGER STAGE TRLER 8,000
348. 1989 TRAIL-KING TK6V -1200 3,000
349. 1989 TRAIL-KING MK6V -1200 3,000
350. 1995 TOWMASTER T14 4,000
351. 1943 POLE TRAILER 500
352. 1996 HOMEMADE TRAILER 1,400
I I
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
06/15/2004
CURRENT
REPLACEMENT
UN IT # YEAR MAKE MODEL COST
FLOAT VEHICLES
407. 1998 FORD TAURUS $16,500
701. 1996 FORD TAURUS $6,000
ENGINEERING DIVISION
700. 2000 CHEV SUBURBAN $14,500
700A 1987 FORD ENG. VAN 20,000
BUILDING & EQUIPMENT SERVICES
703. 1999 DODGE RAM 4X4 $18,000
704. 1991 CHEV 1/2 T S- 1 0 11,000
705. 1988 CHEV 3/4 T TRK 11,000
708. 1998 JLG PERSONAL LI FT 2,800
PARKS/FORESTRY DIVISION
800. 2001 FORD RANGER 4X4 $18,000
801. 1996 CHEV 4X4 TRK 19,100
803. 2004 FORD F350 19,000
804. 2004 FORD F350 19,000
805. 1998 DODGE RAM 3500 24,000
808. 1988 CHEV 1/2 T TRK S- 1 0 2,500
810. 1993 INTERNA TIONAL LP 4700 50,000
811. 1987 FORD LOG TRUCK 83,000
812. 1989 FORD AERIAL LIFT 85,000
816. 1984 FORD TRACTOR 2910 22,000
817. 1982 FORD TRACTOR 2610 22,000
818. 1996 TORO TRUCKSTER 13,000
819. 1987 CUSHMAN HAULSTER 5,000
820. 2004 TORO WORKMAN 3200 15,000
821. 2004 TORO WORKMAN 2110 7,900
822. 2001 TORO 325-D MOWER 18,000
III
CITY OF HOPKINS
VEI-IICLE/EQUIPMENT INVENTORY
06/15/2004
CURRENT
REPLACEMENT
UN I T # YEAR MAKE MODEL COST
PARKS/FORESTRY DIVISION (CONT.)
824. 1996 TORO GROUND MASTER $16,000
825. 2001 TORO 455-D MOWER 40,000
826. 1994 GO- FER P-35 5,000
827. 2004 TORO Z587L 8,200
828. 2001 DEW EZE A TM72 21,000
830. 1987 OLATHE TURF SWEEP 8,500
832. 1997 VERMEER STUMP CTR 630A 15,400
834. 1993 BRUSH BANDIT CHIPPER 250 14,000
836. RYAN SOD CUTTER 2,000
840. 1991 VICTORIAN TRAILER 2,000
843. 1975 H.M. TRAI LER FL TBD 2,500
844. 1973 CANOE HM TRAILER 1,000
845. 1997 REMACKEL TRAILER 5,000
846. 2001 DRESSEN 8110 2,000
HRA
411. 1995 CHEV 3/4 T 4X4 $17,500
W A TERlSEWER
500. 1997 CHEV C 1500 $17,000
501. 2004 CHEV 4X4 3/4 T SIL VERADO 19,000
502. 1993 CHEV 1/2 T PICKUP 12,500
504. 1996 JEEP CHEROKEE 18,000
505. 1992 CHEV 3/4 T 4X4 16,000
508. 1996 CHEV 3/4 T UTILITY 18,000
509. 1997 FORD F250 22,000
530. 2001 STERLING V AC-CON 180,000
533. 1993 CA TERPILLAR LDR-BKHOE-446 50,000
534. 1997 KOHLER GENERA TOR/TRL 11 ,000
535. 1992 KOHLER GENERA TOR/TRL 10,000
536. 1989 FLEXIBLE ROODING MACHINE 25,000
540. 1982 SULLAIR AIR COMPRESSOR 12,000
541. 1981 WACKER TAMPER 2,000
542. 1994 WACKER TAMPER 4,000
IV
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
06/15/2004
CURRENT
REPLACEMENT
UN I T # YEAR MAKE MODEL COST
REFUSE
900. 1994 PETERBI L T RAPID RAIL $160,000
902. 1999 VOLVO WX42 150,000
903. 1977 FORD PAC-MOR 56,000
PAVILION
807. 2003 OL YMPIA ICE RESURFACER $85,000
V
Location/Description
City H a \I
1010 1st Street S.
Hopkins Activity Center
33 14th Avenue S.
Ice Arena/Pavi I ion
11000 Excelsior Boulevard
Arts Center
1111 Mainstreet
PW Admin/Garage
11100 Excelsior Boulevard
PW Cold Storage Bldg # 1
117-121 17th Avenue S.
PW Cold Storage Bldg #2
117-121 17th Avenue S.
Barn
117-121 17th Avenue S.
Moline Reservoir
916 County Road 3
Blake Tower Reservoir
151 Tyler Avenue S.
Well # I Filtration Plant
916 Excelsior Boulevard
Fi Itration Plant
1401 Elmo Park Service Road
Well #4
140 I Elmo Park Service Road
Well #5
1205 H ighway7
Well #6
80 I Highway 7
CITY OF HOPKINS
BUILDING INVENTORY
July 2003
Replacement Cost
$1,957,000
721,000
2,266,000
3,500,000
952,750
190,600
278,000
118,500
779,000
443,000
680,000
587,000
80,000
64,000
63,000
VI
Location/Description
Lift Station # 1 - 21 st
202 21 st Avenue N.
Lift Station #2 - Drillane
619 Drillane Road
Lift Station #3 - Lindee's
901 Cambridge Street N.E.
Li ft Station #4 - L TL Meadowbrook
244 Meadowbrook Road
Lift Station #5 - Big Meadowbrook
6601 Excelsior Blvd.
Lift Station #6 - Ronnie's
1029 Excelsior A venue E.
Lift Station #7 - Valley
801 6th A venue S.
Park Building-Beach-Lifeguards
5200 Shady Oak Road
Park Building-Beach-Concessions
5200 Shady Oak Road
Park Bui Iding-Beach-Restrooms
5200 Shady Oak Road
Park Shelter - Beach
5200 Shady Oak Road
Park Shelter - Burnes
201 Park Lane
Park Building - Central
101 1 7th Avenue S.
Park Building - Harley
108 Jackson A venue S.
Park Shelter - Interlachen
220 Homedale A venue
Park Building - Oakes
301 Tyler Avenue N.
Park Building - Valley
800 7th A venue S.
Replacement Cost
70,000
20,000
50,000
100,000
150,000
70,000
135,000
21,700
24,000
27,000
16,000
27,000
70,000
12,000
9,000
9,800
10,300
VII
Location/Description
Dow Towers (76 Units)
22 5th Avenue S.
20th Avenue Townhouses (10 Units)
29 20th A venue S.
Parking Ramp
1 Oth Avenue and Mainstreet
Depot Coffee House
9451 Excelsior Boulevard
Overpass Skate Park
100 Washington Avenue
Replacement Cost
HRA
HRA
1,740,000
277,560
VIII