2006 - 2010 CIP2006-2010 CAPITAL IMPROVEMENT PLAN CITY OF HOPKINS dill�l�u.- July 1, 2005 DATE: July 2005 TO: Honorable Mayor and Members pf the City Council FROM: Rick Getschow, City Manager SUBJECT: 2006-2010 CAPITAL IMPROVEMENTS PLAN With this letter, I respectfully submit the 2006-2010 Capital Improvements Plan. This five-year planning document represents the combined efforts of city staff, advisory commissions, citizens, and the City Council. The Capital Improvements Plan is a five-year forecast of project needs in the City of Hopkins. It is intended to alert the Council and citizens to the major capital needs on the horizon. The first year of the plan becomes an adopted capital budget and relates almost completely to the operating budget that is approved on a yearly basis. The remaining four years represent an estimate of project needs and funding capabilities of the city. This year's plan does not include proposed equipment purchases. A document relating specifically to equipment replacement needs has been developed into a separate document. The Capital Improvements Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city's capital programming needs. At the same time, sufficient project detail is provided to enable those who review the information to make informed decisions on the programming of projects over the next several years. Please use the information provided to formulate plans, projects, and questions. The Capital Improvements Plan can serve the community best by provoking thoughts and actions. This document was developed by the City Manager's Office with the assistance of all city departments. I wish to thank all those involved in the development of the Capital Improvements Plan, and especially Steve Stadler, Public Works Director; Jim Kerrigan, Planning and Economic Development Director; Christine Harkess, Finance Director; and Bish Johnson, Administrative Assistant, for their hard work and dedication. CAPITAL IMPROVEMENT PLAN CITY OF HOPKINS July 1, 2005 CA000>1 q %lb- 1d10 19 DATE: City of Ifopkins 1010 First Street South • Hopkins, Mai 55343-7573 • Phone: 952-935-8474 • FaX- 952-935-1834 Web address: www.hopkinsmn.com July 2005 TO: Honorable Mayor and Membersf the City Council V FROM: Rick Getschow, City Manager I till SUBJECT: 2006-2010 CAPITAL IMPROVEMENTS PLAN With this letter, I respectfully submit the 2006-2010 Capital Improvements Plan. This five-year planning document represents the combined efforts of city staff, advisory commissions, citizens, and the City Council. The Capital Improvements Plan is a five-year forecast of project needs in the City of Hopkins. It is intended to alert the Council and citizens to the major capital needs on the horizon. The first year of the plan becomes an adopted capital budget and relates almost completely to the operating budget that is approved on a yearly basis. The remaining four years represent an estimate of project needs and funding capabilities of the city. This year's plan does not include proposed equipment purchases. A document relating specifically to equipment replacement needs has been developed into a separate document. The Capital Improvements Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city's capital programming needs. At the same time, sufficient project detail is provided to enable those who review the information to make informed decisions on the programming of projects over the next several years. Please use the information provided to formulate plans, projects, and questions. The Capital Improvements Plan can serve the community best by provoking thoughts and actions. This document was developed by the City Manager's Office with the assistance of all city departments. I wish to thank all those involved in the development of the Capital Improvements Plan, and especially Steve Stadler, Public Works Director; Jim Kerrigan, Planning and Economic Development Director; Christine Harkess, Finance Director; and Bish Johnson, Administrative Assistant, for their hard work and dedication. Partnering with the Community to Enhance the Quality of Life • Inspire • Educate • Involve • Communicate • CAPITAL IMPROVEMENTS PLAN 2005-2009 TABLE OF CONTENTS City Manager's Message Table of Contents PA(;F Introduction and Purpose 1 Program Descriptions/Goals and Objectives 2 Utilities Program 2 Transportation Program 4 Park and Recreation Program 6 General Public Buildings Program 7 Sources of Funding 9 Five -Year Project Summaries Sources of Revenue Summary 14 Category Summary 16 Category Summary by Department 17 Projects by Category 18 Department Summary 21 Projects by Department 22 Projects by Department and Category 24 Projects by Department and Expenditure Type 26 Projects By Department and Funding Source 28 Projects by Year 31 Proposed Future Projects 33 Projects By Funding Source 35 Projects By Funding Source With Balance 38 Projects and Funding Sources by Department 41 Graphs Expenditures by Program for Current Year 45 Expenditures by Program for 5 Years 47 Expenditures by Source for Current Year 49 Expenditures by Source for 5 Years 51 Revenue Projections/Impact of Projects on Funding Source Summary 53 General Fund 56 Municipal State Aid Fund 57 P.I.R. Fund 501 57 Capital Improvements Fund 58 Park Capital Improvements Fund 58 Facility Improvements Fund 59 Water Fund — Working Capital Projection 60 Sewer Fund — Working Capital Projection 61 Storm Sewer Fund — Working Capital Projection 62 Refuse Fund — Working Capital Projection 63 Project Descriptions Economic Development 65 General Public Buildings 69 Parks & Recreation 77 Streets 83 Utilities 97 Proposed Expenditures/Unscheduled Projects 101 INTRODUCTION AND PURPOSE The Capital Improvements Plan is a flexible plan based upon long-range physical planning and financial projections, which schedules the major public improvements that may be incurred by the City over the next five years. Flexibility of the Capital Improvements Plan is established through annual review, and revision if necessary. The annual review assures that the program will become a continuing part of the budgetary process and that it will be consistent with changing demands as well as changing patterns in cost and financial resources. Funds are appropriated only for the first year of the program, which is then included in the annual budget. The Capital Improvements Plan serves as a tool for implementing certain aspects of the City's comprehensive plan, therefore, the program describes the overall objectives of City development, the relationship between projects with respect to timing and need, and the City's fiscal capabilities. The Capital Improvements Plan can help assure: 1. A systematic approach to planning and initiating capital projects affording the opportunity to plan the location, timing, and financing of needed public improvements; 2. The development of a realistic program of capital spending within the City's projected fiscal capability to finance such projects, avoiding sharp change in the tax levy or bonded indebtedness; 3. The coordination of public and private improvement projects permitting adequate time for design and engineering to eliminate duplication of effort and expense; 4. The expenditure of public funds that are compatible with the City's adopted Comprehensive Plan; 5. That the public is kept informed of the proposed future projects and expenditures; 6. That private investors are aware of the City's long-range development program so that they may guide their development in a way that is compatible with the City's program; 7. Aid in achieving federal and/or state participation by providing the necessary planning and lead time necessary for a successful application in addition to meeting prerequisites needed for certain federal and state grants. 1 PROGRAM DESCRIPTIONS In order to effectively plan for and manage the projects contained in a Capital Improvements Plan, it is necessary to group similar activities into "Program Categories". The City of Hopkins' activities are divided into four program categories which are 1) Utilities, 2) Transportation, 3) Parks, Forestry and Pavilion, and 4) General Public Buildings. The City also includes an outline of proposed expenditures for unscheduled projects. Program categories are explained in the following sections. UTILITIES PROGRAM Program Description: The Utilities Program includes the municipal water, municipal sanitary sewer, storm sewer and refuse systems. Program Goal: Provide reliable, efficient, and safe utility service to all parts of the City with a minimum of adverse effects on the environment. Subprograms: Water, sanitary sewer, storm sewer, and refuse service. I. Municipal Water System Subprogram (WA) A. Subprogram Goal: The goal of the Municipal Water System subprogram is to provide water in sufficient quantities at sufficient pressure, with a high degree of reliability and safety to all parts of the City so as to satisfy the normal demands of the general public for water while at the same time providing sufficient reserves in case of fire emergency or power outages. B. Objectives: 1. Water quality shall meet the purity standards of the Minnesota Department of Health. 2. Any hydrant on the system shall, under maximum condition, deliver no less than 500 gallons per minute with a residual pressure of 20 pounds per square inch. 3. The system shall be looped to provide maximum reliability. 4. The supply and storage system shall be designed and maintained to have maximum reliability. 2 II. Municipal Sanitary Sewer Subprogram (SA) A. Subprogram Goal: The goal of the Municipal Sanitary Sewer subprogram is to promote a healthful environment by collecting all sewage from existing and projected development in a sanitary and economic manner. B. Objectives: 1. Provide sewer lines of adequate size and grade to collect and transmit all discharge sewage. 2. Prevent sewage from overflowing into the natural environment. 3. Prevent sewage back-ups. 4. Encourage or promote connection of all generators of sewage to the Municipal system. 5. Meet the effluent and infiltration standards of the Metropolitan Waste Control Commission. III. Storm Sewer Subprogram (SS) A. Subprogram Goal: Manage and control surface and ground waters in order to protect the man-made and natural environment in a safe and efficient manner. B. Objectives: 1. Prevent flooding. 2. Prevent damage to property due to erosion. 3. Meet water quality standards established by the controlling regulatory law or authority. IV. Refuse Subprogram (RF) A. Subprogram Goal: To promote a healthful environment by collecting all residential solid waste in a sanitary and economic manner. B. Objectives: 1. Provide efficient refuse collection in a timely manner to minimize disruption to residents. 3 2. Provide residential recycling programs that minimize the amount of refuse that needs to be landfilled. 3. Provide yard waste collection that meets state statutes and is also convenient for the residents. 4. Provide bulk pick-up/drop-off and brush pick-up alternatives for the residents to eliminate these items from being put in the refuse cans. TRANSPORTATION PROGRAM Program Description: This program includes streets, walkways, traffic signs and signals, vehicular parking facilities, and street lighting. Program Goal: Provide for the safe and efficient movement of people and goods throughout the city. Subprograms: Streets, Walkways/Sidewalks, Signs/Signals, Parking Facilities, and Street Lights. I. Streets Subprogram (ST) A. Subprogram Goal: The goal of the Streets subprogram is to provide safe, convenient, economic public streets to best facilitate the movement of vehicular traffic. B. Objectives: 1. Streets should be constructed with permanent surfaces, concrete curb and gutter, and with ancillary storm drainage, to standards established by the City. 2. Streets should be of a size and load capacity consistent with their functional classifications. 3. Timely major repair to preserve the basic capital investment in streets. II. Walkways/Sidewalks Subprogram (WS) A. Subprogram Goal: To provide a safe and convenient pedestrian system with incidental recreational benefits. 4 III. Signs/Signals Subprogram (SI) A. Subprogram Goal: The goal of the Signs/Signals subprogram is to provide an efficient and orderly system of street and traffic signing so as to promote safe, convenient travel throughout the City. B. Objectives: 1. Signs and signals should be installed in conformity with the Minnesota Manual on Uniform Traffic Control Devices. 2. Periodic surveys and studies should be made to document the effectiveness of City signing patterns. IV. Parking Facilities Subprogram (PA) A. Subprogram Goal: To provide such supporting facilities as will promote maximum use of public parking spaces by employers, employees, customers, and visitors. B. Objectives: 1. Provide parking facilities for present and anticipated needs of the City of Hopkins. V. Street Lights Subprogram (SL) A. Subprogram Goal: To provide a system of street lighting within the City that will promote safe and convenient vehicular and pedestrian travel on City Streets. B. Objectives: 1. To provide lighting at each street intersection within the City. 2. To provide mid -block street lighting in conformance with the City's street lighting policy, in order to provide equitable, cost efficient lighting. 3. To continually update the system so as to provide energy and cost efficient lighting. 5 PARKS, FORESTRY AND PAVILION PROGRAM Program Description: This program includes community parks, neighborhood parks, open spaces, recreational structures and facilities. Program Goal: The goal of the Park and Recreation Program is to provide facilities for safe, stimulating, and comprehensive leisure time activities of Hopkins citizens. Subprograms: Neighborhood Facilities, Community Facilities I. Neighborhood Facilities Subprogram (NF) A. Subprogram Goals: To acquire ownership or use rights of park sites located to provide convenient walking access to all Hopkins citizens and to develop such sites to provide optimum recreational serviceability consistent with the preservation and enhancement of pleasing aesthetic qualities. B. Objectives: 1. Acquire property or use rights on those neighborhoods that do not have convenient walking access to neighborhood park facilities. 2. Develop neighborhood park facilities to meet the needs of various user groups. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Preserve and enhance the aesthetic qualities of neighborhood parks. II. Community Facilities Subprogram (CF) A. Subprogram Goals: The goal of the Community Facilities subprogram is to develop, or acquire ownership or use rights of sites which serve the entire City and to provide facilities that serve community -wide needs. B. Objectives: 1. Acquire sites that have valuable and unique natural characteristics to preserve irreplaceable community resources. 2. Preserve by acquisition, gift, or other arrangement properties that have valuable historic -cultural qualities. Al 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Construct or acquire structures and facilities necessary to meet the changing needs of the community. GENERAL PUBLIC BUILDINGS PROGRAM Program Description: The General Public Buildings Program includes all municipal buildings except those provided for in the Utility and Park Facilities Program. Program Goal: Provide buildings that are adequate and convenient for the efficient accommodation of City functions. Subprograms: Administrative Offices, Maintenance Facilities, Fire Facilities, and Community Center. I. Administrative Offices Subprogram (AO) A. Subprogram Goal: The goal of the Administrative Offices subprogram is to provide facilities for the efficient and safe conduct of legislative and administrative functions of the City. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of the City services. II. Maintenance Facilities Subprogram (MF) A. Subprogram Goal: The goal of the Maintenance Facilities subprogram is to provide facilities for the efficient and safe conduct of City maintenance functions. 7 B. Obiectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of City services. III. Fire Facilities Subprogram (FF) A. Subprogram Goal: To provide a fire station, or stations, for storage of Fire Department equipment and for the training and meetings of volunteer fire fighters to provide prompt and efficient protection to life and property. B. Objectives: 1. Provide a maximum four -minute daytime and three-minute nighttime response to all points within the City. 2. Meet objective 1 through the use of volunteers. IV. Community Center Subprogram (CC) A. Subprogram Goal: To provide a community facility, or facilities, which meet the social, recreational, and cultural needs of all citizens, particularly senior citizens. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repairs. 2. Construct or acquire structures and facilities necessary to meet the changing needs of the City. 3. Upgrade facilities as necessary to provide for efficient, safe, and effective provision of City services. SOURCES OF FUNDING In order to fund the anticipated Capital Improvements, the City must draw upon a variety of sources. Many of these sources have a specific or "dedicated" purpose (i.e., the water utility fund will finance water main installation but not a street overlay). Therefore, it is important to identify the uses and limitations of the various revenue sources. CURRENT REVENUES - GENERAL FUND (CR) This represents funding from current year revenue collections in the General Fund that support operations and capital outlay expenditures. Revenue sources include property tax levies, charges for services, franchise fees, interest income, and various permit and license fees. This source of funding is generally used only for operations and small capital purchases. GENERAL FUND RESERVES (GR) Reserves of the general fund are the funds remaining after subtracting cash flow and emergency amounts from the City's cash balance, sometimes referred to as "fund balance". The use of General Fund Reserves is not recommended for Capital Improvements without significant staff and Council review. CABLE TELEVISION FUND (CT) This funding source consists of franchise fees received from Paragon Cable TV in excess of the amounts earmarked for the access programming and commission budgets. Expenditures are limited to cable -related facilities, or must have a cable related purpose. ECONOMIC DEVELOPMENT FUND (ED) This funding source was established by the Housing and Redevelopment Authority (HRA) and the City of Hopkins, to provide funding for the purpose of promoting development and redevelopment within the City. The Economic Development fund is a revolving fund administered by the HRA, intended to provide an ongoing funding source used to reduce or extend the long term debt involved with development and redevelopment activities. The HRA reviews all proposed uses of this fund on an individual basis. X GRANT-IN-AID (GA) This is aid received from either the Federal or State government. In many cases, grants are made on matching basis, which means the City shares a portion of the costs of the project being funded. MUNICIPAL STATE AID STREETS (MS) This funding source represents funds received from the State of Minnesota to support construction and maintenance of State Aid classified municipal streets. State law defines the types and limits of State Aid Streets expenditures. PERMANENT IMPROVEMENT REVOLVING/GENERAL OBLIGATION BONDS (PI) Improvements with a life of several years may be financed from the proceeds of a General Obligation Bond Issue. Law limits the total debt that can be incurred under this method of financing. With some exception, General Obligation Bonds are generally subject to a referendum process. Examples of projects, which may not require a referendum, are those financed through the use of special assessments where at least 20 percent of the project cost is assessed to the benefiting property owners. The remaining portion not assessed can be financed through general obligation bonds repaid by a tax levy. PRIVATE SECTOR FUNDING (PF) This funding source consists primarily of payments made by developers for the purchase of land, the installation of water, sewer, or streets or other related expenditures. It can also refer to donations made to the City by individuals or groups. REVENUE BONDS (RB) These are bonds issued for improvements made for a specific revenue producing facility or operation. The debt incurred is repaid from the revenue generated by the facility. If the revenue generated is insufficient, then the difference becomes an annual obligation of the taxpayers and becomes an additional tax levy. These are generally not subject to referendum. 10 REAL ESTATE SALES FUND (RE) This funding source consists primarily of funds built up from the sale of City owned property. To date, the fund has been used for building improvements. Because the sale of both general City property and park/recreation property are accumulated into this fund, earmarking a portion for recreational purposes may be justified. SPECIAL ASSESSMENT (SA) A number of projects may be realistically financed using Special Assessment to pay the ultimate cost. Almost any project can potentially be financed using the assessment process. In each case it is necessary to make a determination that the assessed property will benefit by the amount of the assessment. The cost of street reconstruction is shared 70% by the property owner and 30% by the City. Concurrent improvement costs to the utility systems are assumed by the respective utility funds. TAX INCREMENT FINANCING (TF) This funding source results from the tax value of new development that is "incrementally" greater than the existing tax value. Typically, bonds are sold based on the assumption that the higher tax receipts will retire the bonds. However, the use of TIF funds through a "pay as you go" method has become more common. This type of funding can be used for public improvements within a redevelopment district to support the goals of redevelopment, specifically the elimination of blighted conditions. Approval of the Hopkins HRA should be anticipated prior to the commitment of these funds. State law strictly regulates the use of these funds. WATER FUNDS (WF) Water funds consist of revenue generated from the sale of water. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. SANITARY SEWER FUNDS (SF) Sanitary sewer funds consist of revenue generated from charges made for sewage disposal. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. 11 STORM SEWER UTILITY REVENUES (SU) Storm sewer funds consist of revenue generated by charging storm water drainage fee to parcels of land for the availability and use of municipal storm sewer facilities. Expenditures from this funding source are related to drainage facilities. REFUSE FUND (RF) Refuse funds consist of revenues generated from collection fees, (bulk pickup and weekly collections) recycling fees, and recycling and composting grants from Hennepin County. Revenues are used to support the City's refuse collection services as well as its recycling program. The cost of operations plus system (capital) improvements determines the charge for the services provided. PAVILION FUND (PA) Pavilion Funds consist of revenues generated from rental fees collected from users of the Pavilion. These funds are utilized to pay for operating, and capital expenditures. OTHER GOVERNMENTAL UNITS (GU) These are funds received from Hennepin County, adjacent communities, etc. for projects that also benefit a jurisdiction other than the City of Hopkins. 12 Funding Sources Current Revenues — General Fund CR General Fund Reserves GR Cable Television Fund CT Economic Development Fund ED Grant -In -Aid GA Municipal State -Aid Streets MS Permanent Improvement Revolving/ General Obligation Bonds PI Private Sector Funds PF Revenue Bonds RB Real Estate Sales Fund RE Special Assessment SA Tax Increment Financing TF Water Fund WF Sanitary Sewer Fund SF Storm Sewer Fund SU Refuse Fund RF Pavilion Fund PA Other Government Units GU Housing and Redevelopment Authority HRA Park Dedication Fund PDF 13 CAPITAL IMPROVEMENT PLAN City of Hopkins, NIN SOURCES OF REVENUE SUMMARY 2006 thru 2010 Source 2006 2007 2008 2009 2010 Total Cl - Capital Improvement Fund 161,000 122,000 150,000 433,000 CR - Current Revenues - General Fund 10,000 40,000 50,000 GU - Other Governmental Units 440,000 3,610,000 1,500,000 5,550,000 MS - Municipal State Aid Streets 500,000 270,000 1,421,000 2,191,000 PA - Pavilion Fund 17,500 17,500 PDF- Park Dedication Fund 85,000 40,000 50,000 175,000 PF - Private Sector Funds 17,500 17,500 ' PI - PIR/General Obligation Bonds 1,280,000 350,000 450,000 750,000 1,000,000 3,830,000 SA - Special Assessment 445,000 432,000 832,000 498,700 1,050,000 3,257,700 SF - Sanitary Sewer Fund 75,000 275,000 95,000 75,000 75,000 595,000 SU - Storm Sewer Fund 159,000 642,000 252,000 414,000 100,000 1,567,000 TF - Tax Increment Financing 18,000,000 2,000,000 20,000,000 WF - Water Fund 75,000 105,000 105,000 75,000 75,000 435,000 Total 21,265,000 4,006,000 2,004,000 6,843,700 4,000,000 38,118,700 14 Thursday, June 30. 2005 Programs and Categories Programs and Categories Utilities Program Municipal Water System Category Municipal Sanitary Sewer Category Storm Sewer Category Refuse Category Transportation Program Streets Category Walkways/Sidewalks Category Signs/Signals Category Parking Facilities Category Street Lights Category Parks, Forestry and Pavilion Program Neighborhood Facilities Category Community Facilities Category General Public Buildings Program Administrative Offices Category Maintenance Facilities Category Fire Facilities Category Community Center Category Economic Development Program 15 Category CAPITAL IMPROVEMENT PLAN City of Hopkins, MN CATEGORY SUMMARY 2006 thru 2010 2006 2007 2008 2009 2010 Buildings: Administrative Offices 73,000 103,000 Buildings: Arts Center 18,000 Buildings: Community Center 35,000 19,000 Economic Development 18,000,000 2,000,000 Parks/Forestry/Pavilion: Community Fa 45,000 80,000 Parks/Forestry/Pavilion: Neighborhood 85,000 Trans: Parking Facilities Trans: Sign/Signals 35,000 Trans: Streets 2,900,000 1,040,000 1,990,000 6,529,700 Utilities: Municipal Sanitary Sewer 74,000 214,000 14,000 114,000 Utilities: Storm Sewer 550,000 200,000 Total: 21,265,000 4,006,000 2,004,000 6,843,700 Total Future 176,000 18,000 54,000 20,000,000 125,000 50,000 135,000 150,000 150,000 35,000 3,800,000 16,259,700 416,000 750,000 4,000,000 38,118,700 1,250,000 1,250,000 Thursday, June 30, 2005 16 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN CATEGORY SUMMARY BY DEPARTMENT 2006 th,-t, 2010 Department Category 2006 2007 2008 2009 2010 Total Future Development Economic Development 18,000,000 2,000,000 20,000,000 Total: 18,000,000 2,000,000 20,000,000 Public Works: Bldg/Equip Sery Buildings: Administrative Offices 73,000 103,000 176,000 Buildings: Arts Center 18,000 18,000 Buildings: Community Center 35,000 19,000 54,000 Total: 126,000 122,000 248,000 Public Works: Parks Parks/Forestry/Pavilion: Community Facilities 45,000 80,000 125,000 Parks/Forestry/Pavilion: Neighborhood Facilities 85,000 50,000 135,000 Total: 130,000 80,000 50,000 260,000 Public Works: Streets/Traffic Trans: Parking Facilities 150,000 150,000 Trans: Sign/Signals 35,000 35,000 Trans: Streets 2,900,000 1,040,000 1,990,000 6,529,700 3,800,000 16,259,700 400,000 Total: 2,935,000 1,040,000 1,990,000 6,529,700 3,950,000 16,444,700 400,000 Public Works: Transportation Trans: Streets 850,000 Total: 850,000 Public Works: Utilities Utilities: Municipal Sanitary Sewer 74,000 214,000 14,000 114,000 416,000 Utilities: Storm Sewer 550,000 200,000 750,000 Total: 74,000 764,000 14,000 314,000 1,166,000 GRAND TOTAL: 21,265,000 4,006,000 2,004,000 6,843,700 4,000,000 38,118,700 1,250,000 Thursday, June 30, 2005 17 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN PROJECTS BY CATEGORY 2006 thm 2010 Category Project# Priority 2006 2007 2008 2009 2010 Total Buildings: Administrative Offices City Hall Wall Covering Replacement 05-CIP-13304 0 23,000 23,000 City Hall Carpet Replacement 05-CIP-B305 0 80,000 80,000 City Hall Boiler Additions 05-CIP-13307 0 23,000 23,000 City Hall Site Improvements 05-CIP-B310 0 50,000 50,000 Buildings: Administrative Offices 73,000 103,000 176,000 Total Buildings: Arts Center Carpet, Arts Center Lobby 06-CIP-8311 0 18,000 18,000 Buildings: Arts Center Total 18,000 18,000 Buildings: Community Center Historical Society Roof Replacement 05-CIP-6306 0 35,000 35,000 Activity Center Window Replacement 05-CIP-13308 0 19,000 19,000 Buildings: Community Center Total 35,000 19,000 54,000 Economic Development Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 2,000,000 2,000,000 North Annex Redevelopment Project 01-CIP-D402 0 10,000,000 10,000,000 Block 64 Redevelopment Project 06-CIP-D403 0 8,000,000 8,000,000 Economic Development Total 18,000,000 2,000,000 20,000,000 Parks/Forestry/Pavilion: Community F Citywide Trail Connections 01-CIP-P206 0 10,000 10,000 Pavilion Community Message Sign 02-CIP-P210 3 35,000 35,000 Co Rd 3 Beautification Corridor 02-CIP-P213 1 80,000 80,000 Parks/Forestry/Pavilion: Community 45,000 80,000 125,000 Facilities Total Parks/Forestry/Pavilion: Neighborhood Valley Park Improvements 01-CIP-P201 0 85,000 85,000 Central Park Tennis Courts 05-CIP-P202 0 50,000 50,000 18 lfttrrsday, June 30, 2005 Category Project# Priority 2006 2007 2008 2009 2010 Total Parks/Forestry/Pavilion: 85,000 50,000 135,000 Neighborhood Facilities Total Trans: Parking Facilities Reconstruct Parking Lot 200 06-CIP-S118 0 150,000 150,000 Trans: Parking Facilities Total 150,000 150,000 Trans: Sign/Signals City-wide Sign Master Plan 06-CIP-S119 0 35,000 35,000 Trans: Sign/Signals Total 35,000 35,000 Trans: Streets Residential Street Improvements 01-CIP-S101 0 825,000 750,000 1,000,000 1,100,000 1,600,000 5,275,000 Residential Street Improvements -Utilities 01-CIP-S102 0 250,000 250,000 250,000 250,000 250,000 1,250,000 Citywide Concrete Alleys 01-CIP-S103 0 25,000 40,000 40,000 105,000 County Road 3 01-CIP-S104 0 2,300,000 2,300,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,879,700 1,950,000 4,829,700 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 1,800,000 1,800,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 700,000 700,000 Trans: Streets Total 2,900,000 1,040,000 1,990,000 6,529,700 3,800,000 16,259,700 Utilities: Municipal Sanitary Sewer Storm drainage system maintenance 01-CIP-0002 0 74,000 14,000 14,000 114,000 216,000 Upgrade of sanitary sewer lift station #1 04-CIP-0007 0 200,000 200,000 Utilities: Municipal Sanitary Sewer 74,000 214,000 14,000 114,000 416,000 Total Utilities: Storm Sewer Storm Water Management Projects 01-CIP-0003 0 200,000 200,000 5th Street South Culvert Replacement 05-CIP-0008 0 550,000 550,000 Utilities: Storm Sewer Total 550,000 200,000 750,000 GRAND TOTAL 21,265,000 4,006,000 2,004,000 6,843,700 4,000,000 38,118,700 19 Thursday. June 30, 2005 20 Projects by Department CAPITAL IMPROVEMENT PLAN City of Hopkins, MN DEPARTMENT SUMMARY 2006 thru 2010 Department 2006 2007 2008 2009 2010 Total Development 18,000,000 2,000,000 20,000,000 Public Works: Bldg/Equip Sery 126,000 122,000 248,000 Public Works: Parks 130,000 80,000 50,000 260,000 Public Works: Streets/Traffic 2,935,000 1,040,000 1,990,000 6,529,700 3,950,000 16,444,700 Public Works: Utilities 74,000 764,000 14,000 314,000 1,166,000 Total 21,265,000 4,006,000 2,004,000 6,843,700 4,000,000 38,118,700 21 Thursday, June 30, 2005 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN PROJECTS BY DEPARTMENT 2006 thru 2010 Department Project# Priority 2006 2007 2008 2009 2010 Total Development Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 2,000,000 2,000,000 North Annex Redevelopment Project 01-CIP-D402 0 10,000,000 10,000,000 Block 64 Redevelopment Project 06-CIP-D403 0 8,000,000 8,000,000 Development Total 18,000,000 2,000,000 20,000,000 Public Works: Bldg/Equip Sery City Hall Wall Covering Replacement 05-CIP-B304 0 23,000 23,000 City Hall Carpet Replacement 05-CIP-B305 0 80,000 80,000 Historical Society Roof Replacement 05-CIP-B306 0 35,000 35,000 City Hall Boiler Additions 05-CIP-B307 0 23,000 23,000 Activity Center Window Replacement 05-CIP-B308 0 19,000 19,000 City Hall Site Improvements 05-CIP-B310 0 50,000 50,000 Carpet, Arts Center Lobby 06-CIP-8311 0 18,000 18,000 Public Works: Bldg/Equip Sery Total 126,000 122,000 248,000 Public Works: Parks Valley Park Improvements 01-CIP-P201 0 85,000 85,000 Citywide Trail Connections 01-CIP-P206 0 10,000 10,000 Pavilion Community Message Sign 02-CIP-P210 3 35,000 35,000 Co Rd 3 Beautification Corridor 02-CIP-P213 1 80,000 80,000 Central Park Tennis Courts 05-CIP-P202 0 50,000 50,000 Public Works: Parks Total 130,000 80,000 50,000 260,000 Public Works: Streets/Traffic Residential Street Improvements 01-CIP-S101 0 825,000 750,000 1,000,000 1,100,000 1,600,000 5,275,000 Residential Street Improvements --Utilities 01-CIP-S102 0 250,000 250,000 250,000 250,000 250,000 1,250,000 Citywide Concrete Alleys 01-CIP-S103 0 25,000 40,000 40,000 105,000 County Road 3 01-CIP-S104 0 2,300,000 2,300,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,879,700 1,950,000 4,829,700 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 1,800,000 1,800,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 700,000 700,000 Reconstruct Parking Lot 200 06-CIP-S118 0 150,000 150,000 City-wide Sign Master Plan 06-CIP-S119 0 35,000 35,000 22 77mrsday, June 30, 2005 Department Project# Priority 2006 2007 2008 2009 2010 Total Public Works: Streets/Traffic Total Public Works: Utilities Storm drainage system maintenance Storm Water Management Projects Upgrade of sanitary sewer lift station #1 5th Street South Culvert Replacement Public Works: Utilities Total GRAND TOTAL 2,935,000 1,040,000 1,990,000 6,529,700 3,950,000 16,444,700 01-CIP-0002 0 74,000 14,000 14,000 114,000 216,000 01-CIP-0003 0 200,000 200,000 04-CIP-0007 0 200,000 200,000 05-CIP-0008 0 550,000 550,000 74,000 764,000 14,000 314,000 1,166,000 21,265,000 4,006,000 2,004,000 6,843,700 4,000,000 38,118,700 23 Thursday. June 30, 2005 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN PROJECTS BY DEPARTMENT AND CATEGORY 2006 thru 2010 Department Category 2006 2007 2008 2009 2010 Total Future Development Economic Development Redevelopment, East Excelsior Boulevard 2,000,000 2,000,000 North Annex Redevelopment Project 10,000,000 10,000,000 Block 64 Redevelopment Project 8,000,000 8,000,000 Total: 18,000,000 2,000,000 20,000,000 Department Total: 18,000,000 2,000,000 20,000,000 Public Works: Bldg/Equip Sery Buildings: Administrative Offices City Hall Wall Covering Replacement 23,000 23,000 City Hall Carpet Replacement 80,000 80,000 City Hall Boiler Additions 23,000 23,000 City Hall Site Improvements 50,000 50,000 Total: 73,000 103,000 176,000 Buildings: Arts Center Carpet, Arts Center Lobby 18,000 - 18,000 Total: 18,000 18,000 Buildings: Community Center Historical Society Roof Replacement 35,000 35,000 Activity Center Window Replacement 19,000 19,000 Total: 35,000 19,000 54,000 Department Total: 126,000 122,000 248,000 Public Works: Parks Parks/Forestry/Pavilion: Community Facilities Citywide Trail Connections 10,000 10,000 Pavilion Community Message Sign 35,000 35,000 Co Rd 3 Beautification Corridor 80,000 80,000 Total: 45,000 80,000 125,000 Parks/Forestry/Pavilion: Neighborhood Facilities Valley Park Improvements 85,000 85,000 Central Park Tennis Courts 50,000 50,000 Total: 85,000 50,000 135,000 Department Total: 130,000 80,000 50,000 260,000 Public Works: Streets/Traffic Trans: Parking_ Facilities Reconstruct Parking Lot 200 150,000 150,000 Total: 150,000 150,000 24 "Thursday, June 30, 2005 Department Category 2006 2007 2008 2009 2010 Total Future Trans: Sign/Signals City-wide Sign Master Plan 35,000 35,000 Total: 35,000 35,000 Trans: Streets Sixth Street South (11th to 12th Avenue South) 400,000 Residential Street Improvements 825,000 750,000 1,000,000 1,100,000 1,600,000 5,275,000 Residential Street Improvements --Utilities 250,000 250,000 250,000 250,000 250,000 1,250,000 Citywide Concrete Alleys 25,000 40,000 40,000 105,000 County Road 3 2,300,000 2,300,000 County Road 61 (Shady Oak Road) 2,879,700 1,950,000 4,829,700 Excelsior Boulevard Streetscape Improvements 1,800,000 1,800,000 Minnetonka Mills Road Improvements 700,000 700,000 Total: 2,900,000 1,040,000 1,990,000 6,529,700 3,800,000 16,259,700 400,000 Department Total: 2,935,000 1,040,000 1,990,000 6,529,700 3,950,000 16,444,700 400,000 Public Works: Transportation Trans: Streets Light Rail Transit Stations (2) 150,000 Ninth Avenue LRT Corridor 700,000 Total: 850,000 Department Total: 850,000 Public Works: Utilities Utilities: Municipal Sanitary Sewer Storm drainage system maintenance 74,000 14,000 14,000 114,000 216,000 Upgrade of sanitary sewer lift station #1 200,000 200,000 Total: 74,000 214,000 14,000 114,000 416,000 Utilities: Storm Sewer Storm Water Management Projects 200,000 200,000 5th Street South Culvert Replacement 550,000 550,000 Total: 550,000 200,000 750,000 Department Total: 74,000 764,000 14,000 314,000 1,166,000 GRAND TOTAL: 21,265,000 4,006,000 2,004,000 6,843,700 4,000,000 38,118,700 1,250,000 25 'Thursday, June 30, 2005 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN PROJECTS BY DEPARTMENT AND EXPENDITURE TYPE 2006 thru 2010 Department Project# Priority 2006 2007 2008 2009 2010 Total Construction/Maintenance Development Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 2,000,000 2,000,000 North Annex Redevelopment Project 01-CIP-D402 0 10,000,000 10,000,000 Block 64 Redevelopment Project 06-CIP-D403 0 8,000,000 8,000,000 Development Total 18,000,000 2,000,000 20,000,000 Public Works: Bldg/Equip Sery City Hall Wall Covering Replacement 05-CIP-B304 0 23,000 23,000 City Hall Carpet Replacement 05-CIP-13305 0 80,000 80,000 Historical Society Roof Replacement 05-CIP-6306 0 35,000 35,000 City Hall Boiler Additions 05-CIP-8307 0 23,000 23,000 Activity Center Window Replacement 05-CIP-B308 0 19,000 19,000 City Hall Site Improvements 05-CIP-13310 0 50,000 50,000 Carpet, Arts Center Lobby 06-CIP-6311 0 18,000 18,000 Public Works: Bldg/Equip Sery Total 126,000 122,000 248,000 Public Works: Parks Valley Park Improvements 01-CIP-P201 0 85,000 85,000 Citywide Trail Connections 01-CIP-P206 0 10,000 10,000 Pavilion Community Message Sign 02-CIP-P210 3 35,000 35,000 Co Rd 3 Beautification Corridor 02-CIP-P213 1 80,000 80,000 Central Park Tennis Courts 05-CIP-P202 0 50,000 50,000 Public Works: Parks Total 130,000 80,000 50,000 260,000 Public Works: Streets/Traffic Residential Street Improvements 01-CIP-S101 0 825,000 750,000 1,000,000 1,100,000 1,600,000 5,275,000 Residential Street Improvements --Utilities 01-CIP-S102 0 250,000 250,000 250,000 250,000 250,000 1,250,000 Citywide Concrete Alleys 01-CIP-S103 0 25,000 40,000 40,000 105,000 County Road 3 01-CIP-S104 0 2,300,000 2,300,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,879,700 1,950,000 4,829,700 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 1,800,000 1,800,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 700,000 700,000 Reconstruct Parking Lot 200 06-CIP-S118 0 150,000 150,000 26 Thursday, June 30, 2005 Department Project# Priority 2006 2007 2008 2009 2010 Total Public Works: Streets/Traffic Total 2,900,000 1,040,000 1,990,000 6,529,700 3,950,000 16,409,700 Public Works: Utilities Storm drainage system maintenance 01-CIP-0002 0 74,000 14,000 14,000 114,000 216,000 Storm Water Management Projects 01-CIP-0003 0 200,000 200,000 Upgrade of sanitary sewer lift station #1 04-CIP-UO07 0 200,000 200,000 5th Street South Culvert Replacement 05-CIP-0008 0 550,000 550,000 Public Works: Utilities Total 74,000 764,000 14,000 314,000 1,166,000 Construction/Maintenance Total 21,230,000 4,006,000 2,004,000 6,843,700 4,000,000 38,083,700 Planning/Design Public Works: Streets/Traffic City-wide Sign Master Plan 06-CIP-S119 0 35,000 35,000 Public Works: Streets/Traffic Total 35,000 35,000 Planning/Design Total 35,000 35,000 GRAND TOTAL 21,265,000 4,006,000 2,004,000 6,843,700 4,000,000 38,118,700 27 7Tu.rrsduy, June 30, 2005 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN PROJECTS BY DEPARTMENT AND FUNDING SOURCE 2006 thru 2010 Department Project# Priority 2006 2007 2008 2009 2010 Total Development Redevelopment, East Excelsior Boulevard TF - Tax Increment Financing North Annex Redevelopment Project TF - Tax Increment Financing Block 64 Redevelopment Project TF - Tax Increment Financing Development Total Public Works: Bldg/Equip Sery City Hall Wall Covering Replacement Cl - Capital Improvement Fund City Hall Carpet Replacement Cl - Capital Improvement Fund Historical Society Roof Replacement Cl - Capital Improvement Fund City Hall Boiler Additions Cl - Capital Improvement Fund Activity Center Window Replacement CI - Capital Improvement Fund City Hall Site Improvements Cl - Capital Improvement Fund Carpet, Arts Center Lobby Cl - Capital Improvement Fund Public Works: Bldg/Equip Sery Total Public Works: Parks Valley Park Improvements PDF- Park Dedication Fund Citywide Trail Connections CR - Current Revenues - General Fund Pavilion Community Message Sign PA - Pavilion Fund PF - Private Sector Funds Co Rd 3 Beautification Corridor CR - Current Revenues - General Fund PDF- Park Dedication Fund Central Park Tennis Courts PDF- Park Dedication Fund 01-CIP-D401 0 2,000,000 2,000,000 01-CIP-D402 0 10,000,000 10, 000, 000 06-CIP-D403 0 8,000,000 8,000,000 2,000,000 Z000,000 10,000,000 10, 000, 000 8,000,000 8,000,000 18,000,000 2,000,000 20,000,000 05-CIP-B304 0 23,000 23,000 05-CIP-B305 0 05-CIP-B306 0 35,000 35,000 05-CIP-B307 0 05-CIP-B308 0 05-CIP-B310 0 50,000 50,000 06-CIP-8311 0 18,000 18,000 80,000 80,000 23,000 23,000 19,000 19,000 23,000 23,000 80,000 80,000 35,000 35,000 23,000 23,000 19,000 19,000 50,000 50,000 18,000 18,000 126,000 122,000 248,000 01-CIP-P201 0 85,000 85,000 01-CIP-P206 0 10,000 10,000 02-CIP-P210 3 35,000 17,500 17,500 02-CIP-P213 1 80,000 40,000 40,000 05-CIP-P202 0 85,000 85,000 10,000 10,000 35,000 17,500 17,500 80,000 40,000 40,000 50,000 50,000 50,000 50,000 Thursday, June 30, 2005 28 Department Project# Priority 2006 2007 2008 2009 2010 Total Public Works: Parks Total 130,000 80,000 50,000 260,000 Public Works: Streets/Traffic Residential Street Improvements 01-CIP-S101 0 825,000 750,000 1,000,000 1,100,000 1,600,000 5,275,000 MS - Municipal State Aid Streets 0 0 Pl - PIR/GeneralObligation Bonds 400,000 350,000 400,000 650,000 800,000 2,600,000 SA- Special Assessment 425,000 400,000 600,000 450,000 800,000 2,675,000 Residential Street Improvements--Utilities 01-CIP-S102 0 250,000 250,000 250,000 250,000 250,000 1,250,000 SF- Sanitary Sewer Fund 75,000 75,000 75,000 75,000 75,000 375,000 SU -Storm Sewer Fund 100,000 100,000 100,000 100,000 100,000 500,000 WF - Water Fund 75,000 75,000 75,000 75,000 75,000 375,000 Citywide Concrete Alleys 01-CIP-S103 0 25,000 40,000 40,000 105,000 SA - Special Assessment 20,000 32,000 32,000 84,000 SU -Storm Sewer Fund 5,000 8,000 8,000 21,000 County Road 3 01-CIP-S104 0 2,300,000 2,300,000 GU - Other Governmental Units 1,600,000 1,600,000 MS - Municipal State Aid Streets 700,000 700,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,879,700 1,950,000 4,829,700 GU- Other Governmental Units 2,010,000 1,500,000 3,510,000 MS - Municipal State Aid Streets 721,000 721,000 PI - PIR/General Obligation Bonds 100,000 100,000 300,000 SA - Special Assessment 48,700 250,000 298,700 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 1,800,000 1,800,000 GU - Other Governmental Units 420,000 420,000 MS - Municipal State Aid Streets 500,000 500,000 PI - PIR/General Obligation Bonds 880,000 880,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 700,000 700,000 MS - Municipal State Aid Streets 270,000 270,000 PI - PIR/General Obligation Bonds 50,000 50,000 SA - Special Assessment 200,000 200,000 SF - Sanitary Sewer Fund 20,000 20,000 SU - Storm Sewer Fund 130,000 130,000 WF- Water Fund 30,000 30,000 Reconstruct Parking Lot 200 06-CIP-S118 0 150,000 150,000 Cl - Capital Improvement Fund 150,000 150,000 City-wide Sign Master Plan 06-CIP-Sl 19 0 35,000 35,000 Cl - Capital Improvement Fund 35,000 35,000 Public Works: Streets/Traffic Total 2,935,000 1,040,000 1,990,000 6,529,700 3,950,000 16,444,700 Public Works: Utilities Storm drainage system maintenance 01-CIP-0002 0 74,000 14,000 14,000 114,000 216,000 GU - Other Governmental Units 20,000 20,000 SU - Storm Sewer Fund 54,000 14,000 14,000 114,000 196,000 Storm Water Management Projects 01-CIP-0003 0 200,000 200,000 SU - Storm Sewer Fund 200,000 200,000 Upgrade of sanitary sewer lift station #1 04-CIP-0007 0 200,000 200,000 SF - Sanitary Sewer Fund 200,000 200,000 5th Street South Culvert Replacement 05-CIP-0008 0 550,000 550,000 SU - Storm Sewer Fund 520,000 520,000 WF - Water Fund 30,000 30,000 Public Works: Utilities Total 74,000 764,000 14,000 314,000 1,166,000 GRAND TOTAL 21,265,000 4,006,000 2,004,000 6,843,700 4,000,000 38,118,700 29 Thursday, June 30, 2005 30 Projects by Year CAPITAL IMPROVEMENT PLAN City of Hopkins, MN PROJECTS BY YEAR 2006 th,-t, 2010 Project Name Department Project # Priority Project Value 2006 Public Works: Bldg/Equip Sery 05-CIP-B305 0 80,000 North Annex Redevelopment Project Development 01-CIP-D402 0 10,000,000 Block 64 Redevelopment Project Development 06-CIP-D403 0 8,000,000 City Hall Wall Covering Replacement Public Works: Bldg/Equip Sery 05-CIP-B304 0 23,000 Historical Society Roof Replacement Public Works: Bldg/Equip Sery 05-CIP-B306 0 35,000 City Hall Site Improvements Public Works: Bldg/Equip Sery 05-CIP-B310 0 50,000 Carpet, Arts Center Lobby Public Works: Bldg/Equip Sery 06-CIP-13311 0 18,000 Valley Park Improvements Public Works: Parks 01-CIP-P201 0 85,000 Citywide Trail Connections Public Works: Parks 01-CIP-P206 0 10,000 Pavilion Community Message Sign Public Works: Parks 02-CIP-P210 3 35,000 Residential Street Improvements Public Works: Streets/Traffic 01-CIP-S101 0 825,000 Residential Street Improvements --Utilities Public Works: Streets/Traffic 01-CIP-S102 0 250,000 Citywide Concrete Alleys Public Works: Streets/Traffic 01-CIP-S103 0 25,000 Excelsior Boulevard Streetscape Improvements Public Works: Streets/Traffic 01-CIP-S109 0 1,800,000 City-wide Sign MasterPlan Public Works: Streets/Traffic 06-CIP-S119 0 35,000 Storm drainage system maintenance Public Works: Utilities 01-CIP-0002 0 74,000 Total for 2006 21,265,000 2007 Redevelopment, East Excelsior Boulevard Development 01-CIP-D401 0 2,000,000 City Hall Carpet Replacement Public Works: Bldg/Equip Sery 05-CIP-B305 0 80,000 City Hall BoilerAdditions Public Works: Bldg/Equip Sery 05-CIP-B307 0 23,000 Activity Center Window Replacement Public Works: Bldg/Equip Sery 05-CIP-6308 0 19,000 Co Rd 3 Beautification Comdor Public Works: Parks 02-CIP-P213 1 80,000 Residential Street Improvements Public Works: Streets/Traffic 01-CIP-S101 0 750,000 Residential Street Improvements --Utilities Public Works: Streets/Traffic 01-CIP-S102 0 250,000 Citywide Concrete Alleys Public Works: Streets/Traffic 01-CIP-S103 0 40,000 Storm drainage system maintenance Public Works: Utilities 01-CIP-0002 0 14,000 Upgrade of sanitary sewer lift station #1 Public Works: Utilities 04-CIP-0007 0 200,000 5th Street South Culvert Replacement Public Works: Utilities 05-CIP-0008 0 550,000 Total for 2007 4,006,000 r�1:� Residential Street Improvements Public Works: Streets/Traffic 01-CIP-S101 0 1,000,000 Residential Street Improvements --Utilities Public Works: Streets/Traffic 01-CIP-S102 0 250,000 Citywide Concrete Alleys Public Works: Streets/Traffic 01-CIP-S103 0 40,000 Minnetonka Mills Road Improvements Public Works: Streets/Traffic 02-CIP-S116 0 700,000 Storm drainage system maintenance Public Works: Utilities 01-CIP-0002 0 14,000 Total for 2008 2,004,000 2009 31 "Thursday, June 30, 2005 Project Name Department Project # Priority Project Value Residential Street Improvements Public Works: Streets/Traffic 01-CIP-S101 0 1,100,000 Residential Street Improvements --Utilities Public Works: Streets/Traffic 01-CIP-S102 0 250,000 County Road 3 Public Works: Streets/Traffic 01-CIP-S104 0 2,300,000 County Road 61 (Shady Oak Road) Public Works: Streets/Traffic 01-CIP-S106 0 2,879,700 Storm drainage system maintenance Public Works: Utilities 01-CIP-0002 0 114,000 Storm Water Management Projects Public Works: Utilities 01-CIP-0003 0 200,000 Total for 2009 6,843,700 2010 Central Park Tennis Courts Public Works: Parks 05-CIP-P202 0 50,000 Residential Street Improvements Public Works: Streets/Traffic 01-CIP-S101 0 1,600,000 Residential Street Improvements --Utilities Public Works: Streets/Traffic 01-CIP-S102 0 250,000 County Road 61 (Shady Oak Road) Public Works: Streets/Traffic 01-CIP-S106 0 1,950,000 Reconstruct Parking Lot 200 Public Works: Streets/Traffic 06-CIP-S118 0 150,000 Total for 2010 4,000,000 GRAND TOTAL 38,118,700 32 Thursday, June 30, 2005 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN PROJECTS BY YEAR 2011 thm 2015 Project Name Department Project # 2015 Sixth Street South (11th to 12th Avenue South) Light Rail Transit Stations (2) Ninth Avenue LRT Corridor GRAND TOTAL Priority Project Value Public Works: StreetstTraffic 01-CIP-F504 0 400,000 Public Works: Transportation 01-CIP-F502 0 150,000 Public Works: Transportation 01-CIP-F503 0 700,000 Total for 2015 1,250,000 1,250,000 Thursday, June 30. 2005 33 34 Sources of Funding CAPITAL IMPROVEMENT PLAN City of Hopkins, MN PROJECTS BY FUNDING SOURCE 2006 thru 2010 Source Project# Priority 2006 2007 2008 2009 2010 Total CI - Capital Improvement Fund City Hall Wall Covering Replacement 05-CIP-B304 0 23,000 23,000 City Hall Carpet Replacement 05-CIP-8305 0 80,000 80,000 Historical Society Roof Replacement 05-CIP-6306 0 35,000 35,000 City Hall Boiler Additions 05-CIP-13307 0 23,000 23,000 Activity Center Window Replacement 05-CIP-8308 0 19,000 19,000 City Hall Site Improvements 05-CIP-B310 0 50,000 50,000 Carpet, Arts Center Lobby 06-CIP-B311 0 18,000 18,000 Reconstruct Parking Lot 200 06-CIP-S118 0 150,000 150,000 City-wide Sign Master Plan 06-CIP-S119 0 35,000 35,000 Cl - Capital Improvement Fund Total 161,000 122,000 150,000 433,000 CR - Current Revenues - General Fund Citywide Trail Connections 01-CIP-P206 0 10,000 10,000 Co Rd 3 Beautification Corridor 02-CIP-P213 1 40,000 40,000 CR - Current Revenues - General 10,000 40,000 50,000 Fund Total GU - Other Governmental Units County Road 3 01-CIP-S104 0 1,600,000 1,600,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,010,000 1,500,000 3,510,000 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 420,000 420,000 Storm drainage system maintenance 01-CIP-0002 0 20,000 20,000 GU - Other Governmental Units Total 440,000 3,610,000 1,500,000 5,550,000 MS - Municipal State Aid Streets Residential Street Improvements 01-CIP-S101 0 0 0 County Road 3 01-CIP-S104 0 700,000 700,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 721,000 721,000 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 500,000 500,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 270,000 270,000 MS - Municipal State Aid Streets 500,000 270,000 1,421,000 2,191,000 Total PA - Pavilion Fund Pavilion Community Message Sign 02-CIP-P210 3 17,500 17,500 35 Thursday, June 30, 2005 Source Project# Priority 2006 2007 2008 2009 2010 Total PA - Pavilion Fund Total 17,500 17,500 PDF- Park Dedication Fund Valley Park Improvements 01-CIP-P201 0 85,000 85,000 Co Rd 3 Beautification Corridor 02-CIP-P213 1 40,000 40,000 Central Park Tennis Courts 05-CIP-P202 0 50,000 50,000 PDF- Park Dedication Fund Total 85,000 40,000 50,000 175,000 PF - Private Sector Funds Pavilion Community Message Sign 02-CIP-P210 3 17,500 17,500 PF - Private Sector Funds Total 17,500 17,500 PI - PIR/General Obligation Bonds Residential Street Improvements 01-CIP-S101 0 400,000 350,000 400,000 650,000 800,000 2,600,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 100,000 200,000 300,000 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 880,000 880,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 50,000 50,000 PI - PIR/General Obligation Bonds 1,280,000 350,000 450,000 750,000 1,000,000 3,830,000 Total SA - Special Assessment Residential Street Improvements 01-CIP-S101 0 425,000 400,000 600,000 450,000 800,000 2,675,000 Citywide Concrete Alleys 01-CIP-S103 0 20,000 32,000 32,000 84,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 48,700 250,000 298,700 Minnetonka Mills Road Improvements 02-CIP-S116 0 200,000 200,000 SA - Special Assessment Total 445,000 432,000 832,000 498,700 1,050,000 3,257,700 SF - Sanitary Sewer Fund Residential Street Improvements --Utilities 01-CIP-S102 0 75,000 75,000 75,000 75,000 75,000 375,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 20,000 20,000 Upgrade of sanitary sewer lift station #1 04-CIP-0007 0 200,000 200,000 SF - Sanitary Sewer Fund Total 75,000 275,000 95,000 75,000 75,000 595,000 SU - Storm Sewer Fund Residential Street Improvements --Utilities 01-CIP-S102 0 100,000 100,000 100,000 100,000 100,000 500,000 Citywide Concrete Alleys 01-CIP-S103 0 5,000 8,000 8,000 21,000 Storm drainage system maintenance 01-CIP-0002 0 54,000 14,000 14,000 114,000 196,000 Storm Water Management Projects 01-CIP-0003 0 200,000 200,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 130,000 130,000 5th Street South Culvert Replacement 05-CIP-0008 0 520,000 520,000 SU - Storm Sewer Fund Total 159,000 642,000 252,000 414,000 100,000 1,567,000 TF - Tax Increment Financing Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 2,000,000 2,000,000 North Annex Redevelopment Project 01-CIP-D402 0 10,000,000 10,000,000 36 Thursday, June 30, 2005 Source Project# Priority 2006 2007 2008 2009 2010 Total Block 64 Redevelopment Project 06-CIP-D403 TF - Tax Increment Financing Total WF - Water Fund Residential Street Improvements—Utilities 01-CIP-S102 Minnetonka Mills Road Improvements 02-CIP-S116 5th Street South Culvert Replacement 05-CIP-0008 WF - Water Fund Total 0 8,000,000 8,000,000 18,000,000 2,000,000 20,000,000 0 75,000 0 0 75,000 75,000 30,000 30,000 75,000 75,000 375,000 30,000 30,000 75,000 105,000 105,000 75,000 75,000 435,000 GRAND TOTAL 21,265,000 4,006,000 2,004,000 6,843,700 4,000,000 38,118,700 37 Thursday, Jane 30, 2005 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN PROJECTS BY FUNDING SOURCE WITH BALANCES 2006 thru 2010 Source Project# Priority 2006 2007 2008 2009 2010 Total Cl - Capital Improvement Fund Beginning Balance City Hall Wall Covering Replacement 05-CIP-B304 0 23,000 23,000 City Hall Carpet Replacement 05-CIP-13305 0 80,000 80,000 Historical Society Roof Replacement 05-CIP-B306 0 35,000 35,000 City Hall Boiler Additions 05-CIP-B307 0 23,000 23,000 Activity Center Window Replacement 05-CIP-B308 0 19,000 19,000 City Hall Site Improvements 05-CIP-6310 0 50,000 50,000 Carpet, Arts Center Lobby 06-CIP-8311 0 18,000 18,000 Reconstruct Parking Lot 200 06-CIP-Sl 18 0 150,000 150,000 City-wide Sign Master Plan 06-CIP-Sl 19 0 35,000 35,000 Cl - Capital Improvement Fund Total 161,000 122,000 150,000 433,000 CR - Current Revenues - General Fund Beginning Balance Citywide Trail Connections 01-CIP-P206 0 10,000 10,000 Cc Rd 3 Beautification Corridor 02-CIP-P213 1 40,000 40,000 CR - Current Revenues - General 10,000 40,000 50,000 Fund Total GU - Other Governmental Units Beginning Balance County Road 3 01-CIP-S104 0 1,600,000 1,600,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,010,000 1,500,000 3,510,000 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 420,000 420,000 Storm drainage system maintenance 01-CIP-0002 0 20,000 20,000 GU - Other Governmental Units Total 440,000 3,610,000 1,500,000 5,550,000 MS - Municipal State Aid Streets Beginning Balance Residential Street Improvements 01-CIP-S101 0 0 0 County Road 3 01-CIP-S104 0 700,000 700,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 721,000 721,000 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 500,000 500,000 Minnetonka Mills Road Improvements 02-CIP-Sl16 0 270,000 270,000 38 Thursday, June 30, 2005 Source Project# Priority 2006 2007 2008 2009 2010 Total MS - Municipal State Aid Streets 500,000 270,000 1,421,000 2,191,000 Total PA - Pavilion Fund Beginning Balance Pavilion Community Message Sign 02-CIP-P210 3 17,500 17,500 PA - Pavilion Fund Total 17,500 17,500 PDF- Park Dedication Fund Beginning Balance Valley Park Improvements 01-CIP-P201 0 85,000 85,000 Co Rd 3 Beautification Corridor 02-CIP-P213 1 40,000 40,000 Central Park Tennis Courts 05-CIP-P202 0 50,000 50,000 PDF- Park Dedication Fund Total 85,000 40,000 50,000 175,000 PF - Private Sector Funds Beginning Balance Pavilion Community Message Sign 02-CIP-P210 3 17,500 17,500 PF - Private Sector Funds Total 17,500 17,500 P1 - PIR/General Obligation Bonds Beginning Balance Residential Street Improvements 01-CIP-S101 0 400,000 350,000 400,000 650,000 800,000 2,600,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 100,000 200,000 300,000 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 880,000 880,000 Minnetonka Mills Road Improvements 02-CIP-Sl16 0 50,000 50,000 PI - PIR/General Obligation Bonds 1,280,000 350,000 450,000 750,000 1,000,000 3,830,000 Total SA - Special Assessment Beginning Balance Residential Street Improvements 01-CIP-S101 0 425,000 400,000 600,000 450,000 800,000 2,675,000 Citywide Concrete Alleys 01-CIP-S103 0 20,000 32,000 32,000 84,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 48,700 250,000 298,700 Minnetonka Mills Road Improvements 02-CIP-S116 0 200,000 200,000 SA - Special Assessment Total 445,000 432,000 832,000 498,700 1,050,000 3,257,700 SF - Sanitary Sewer Fund Beginning Balance Residential Street Improvements-Utilities 01-CIP-S102 0 75,000 75,000 75,000 75,000 75,000 375,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 20,000 20,000 Upgrade of sanitary sewer lift station #1 04-CIP-0007 0 200,000 200,000 39 Thursday, June 30, 2005 Source Project# Priority 2006 2007 2008 2009 2010 Total SF - Sanitary Sewer Fund Total 75,000 275,000 95,000 75,000 75,000 595,000 SU - Storm Sewer Fund Beginning Balance Residential Street Improvements --Utilities 01-CIP-S102 0 100,000 100,000 100,000 100,000 100,000 500,000 Citywide Concrete Alleys 01-CIP-S103 0 5,000 8,000 8,000 21,000 Storm drainage system maintenance 01-CIP-0002 0 54,000 14,000 14,000 114,000 196,000 Storm Water Management Projects 01-CIP-0003 0 200,000 200,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 130,000 130,000 5th Street South Culvert Replacement 05-CIP-0008 0 520,000 520,000 SU - Storm Sewer Fund Total 159,000 642,000 252,000 414,000 100,000 1,567,000 TF - Tax increment Financing Beginning Balance Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 2,000,000 2,000,000 North Annex Redevelopment Project 01-CIP-D402 0 10,000,000 10,000,000 Block 64 Redevelopment Project 06-CIP-D403 0 8,000,000 8,000,000 TF - Tax Increment Financing Total 18,000,000 2,000,000 20,000,000 WF - Water Fund Beginning Balance Residential Street Improvements --Utilities 01-CIP-S102 0 75,000 75,000 75,000 75,000 75,000 375,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 30,000 30,000 5th Street South Culvert Replacement 05-CIP-0008 0 30,000 30,000 WF - Water Fund Total 75,000 105,000 105,000 75,000 75,000 435,000 GRAND TOTAL 21,265,000 4,006,000 2,004,000 6,843,700 4,000,000 38,118,700 40 Thursday, June 30, 2005 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN PROJECTS & FUNDING SOURCES BY DEPARTMENT 2006 thm 2010 Department Project# Priority 2006 2007 2008 2009 2010 Total Development 80,000 80,000 Historical Society Roof Replacement 05-CIP-8306 0 35,000 Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 City Hall Boiler Additions 05-CIP-B307 0 2,000,000 2,000,000 North Annex Redevelopment Project 01-CIP-D402 0 10,000,000 19,000 10,000,000 Block 64 Redevelopment Project 06-CIP-D403 0 8,000,000 50,000 8,000,000 18,000 Development Total 18,000,000 2,000,000 20,000,000 TF - Tax Increment Financing 248,000 18,000,000 2,000,000 20,000,000 CI - Capital Improvement Fund Development Total 18,000,000 2,000,000 20,000,000 Public Works: Bldg/Equip Sery City Hall Wall Covering Replacement 05-CIP-6304 0 23,000 0 85,000 23,000 City Hall Carpet Replacement 05-CIP-B305 0 01-CIP-P206 80,000 80,000 Historical Society Roof Replacement 05-CIP-8306 0 35,000 3 35,000 35,000 City Hall Boiler Additions 05-CIP-B307 0 02-CIP-P213 23,000 23,000 Activity Center Window Replacement 05-CIP-6308 0 05-CIP-P202 19,000 19,000 City Hall Site Improvements 05-CIP-B310 0 50,000 50,000 Carpet, Arts Center Lobby 06-CIP-6311 0 18,000 18,000 Public Works: Bldg/Equip Sery Total 126,000 122,000 248,000 CI - Capital Improvement Fund 126,000 122,000 248,000 Public Works: Bldg/Equip Sery Total 126,000 122,000 248,000 Public Works: Parks Valley Park Improvements 01-CIP-P201 0 85,000 85,000 Citywide Trail Connections 01-CIP-P206 0 10,000 10,000 Pavilion Community Message Sign 02-CIP-P210 3 35,000 35,000 Co Rd 3 Beautification Corridor 02-CIP-P213 1 80,000 80,000 Central Park Tennis Courts 05-CIP-P202 0 50,000 50,000 Thursday, June 30, 2005 41 Department Project# Priority 2006 2007 2008 2009 2010 Total Public Works: Parks Total 130,000 80,000 50,000 260,000 CR - Current Revenues - General Fuad 10,000 40,000 250,000 50,000 PA - Pavilion Fund 17,500 01-CIP-S103 0 25,000 17,500 PDF- Park Dedication Fund 85,000 40,000 50,000 175,000 PF - Private Sector Funds 17,500 17,500 Public Works: Parks Total 130,000 80,000 50,000 260,000 Public Works: Streets/Traffic Residential Street Improvements 01-CIP-S101 0 825,000 750,000 1,000,000 1,100,000 1,600,000 5,275,000 Residential Street Improvements -Utilities 01-CIP-S102 0 250,000 250,000 250,000 250,000 250,000 1,250,000 Citywide Concrete Alleys 01-CIP-S103 0 25,000 40,000 40,000 105,000 County Road 3 01-CIP-S104 0 2,300,000 2,300,000 County Road 61 (Shady Oak Road) 01-CIP-S106 0 2,879,700 1,950,000 4,829,700 Excelsior Boulevard Streetscape Improvements 01-CIP-S109 0 1,800,000 1,800,000 Minnetonka Mills Road Improvements 02-CIP-S116 0 700,000 700,000 Reconstruct Parking Lot 200 06-CIP-S118 0 150,000 150,000 City-wide Sign Master Plan 06-CIP-S119 0 35,000 35,000 Public Works: Streets/Traffic Total 2,935,000 1,040,000 1,990,000 6,529,700 3,950,000 16,444,700 CI - Capital Improvement Fund 35,000 "P 150,000 185,000 GU- Other Governmental Units 420,000 3,610,000 1,500,000 5,530,000 MS - Allunicipal State Aid Streets 500,000 270,000 1,421,000 2,191,000 PI - PIR/General Obligation Bonds 1,280,000 350,000 450,000 750,000 1,000,000 3,830,000 SA -Special Assessment 445,000 432,000 832,000 498,700 1,050,000 3,257,700 SF- Sanitary Sewer Fund 75,000 75,000 95,000 75,000 75,000 395,000 SU - Storm Sewer Fund 105,000 108,000 238,000 100,000 100,000 651,000 IfVF - Water Frain 75,000 75,000 105,000 75,000 75,000 405,000 Public Works: Streets/Traffic Total 2,935,000 1,040,000 1,990,000 6,529,700 3,950,000 16,444,700 Public Works: Utilities Storm drainage system maintenance 01-CIP-0002 0 74,000 14,000 14,000 114,000 216,000 Storm Water Management Projects 01-CIP-0003 0 200,000 200,000 Upgrade of sanitary sewer lift station #1 04-CIP-0007 0 200,000 200,000 5th Street South Culvert Replacement 05-CIP-0008 0 550,000 550,000 Public Works: Utilities Total 74,000 764,000 14,000 314,000 1,166,000 GU - Other Governmental Units 20,000 20,000 SF - Sanitary Server Ftin d 200,000 200,000 Thursday, June 30, 2005 42 Department Project# Priority 2006 2007 2008 2009 2010 Total SU - Storm Seiner Fund JYF - Water Fund 54,000 534,000 14,000 314,000 916,000 30,000 30,000 Public Works: Utilities Total 74,000 764,000 14,000 314,000 1,166,000 43 Thursday, June 30, 1005 44 Graphs co O O N L- l�O T m C� U O O N co O O N N o Q O 00 >CC) o� U) C) 0 O ulc:) �o CoC) Co Ef3 U (D co O O L U) M N � � N Lzea co 45 O O N O 4- O cn O a� O �LO N O N x W m `O 1 L W LO L O L O L CL ^V ,♦ i CL x W c o a� o CD 0- 0- o 0 0 �o > o N N C) bg CD C:) �o C)7 CD LU 00 CY)NT _0 N m Efl 0 C) C:) Y O N Efi O OCD N 47 0 nW a - L L J O L � 0 �+.-- CO `M t Y � ♦� MW ) 60D- LUca 4-00 2006-2010 Capital Improvement Plan Expenditures by Source for 2006 CR $10,000 PF $17,500 PA $17,500 wF $75,000 SF $75,000 PDF $85,000 Su $159,000 CI $161,000 Gu $440,000 SA $445,000 Ms $500,000 PI $1,280,000 TF PDF $0 $5,000,000 LEGEND $18,000,000 $10,000,000 $15,000,000 $20,000,000 Total Expenditures for 2006 TF Tax Increment Financing $18,000,000 PI PIR/GO Bonds $1,280,000 MS Municipal State -Aid $500,000 SA Special Assessment $445,000 GU Other Government Units $440,000 Cl Capital Improvement Fund $161,000 SU Storm Sewer Fund $159,000 PDF Park Dedication Fund $85,000 SF Sanitary Sewer Fund $75,000 WF Water Fund $75,000 PA Pavilion Fund $17,500 PF Private Sector Funds $17,500 CR Current Revenues $10,000 $21,265,000 49 PA PF I CR PDF CI WF 8 SF SU MS SA i PI GU TF 2006-2010 Capital Improvement Plan Expenditures by Source for 5 Years $17,500 $17,500 $50,000 $175,000 $433,000 $435,000 $595,000 $1,567,000 $2,191,000 $3,257,700 $3,830,000 $5,550,000 I8O SO s8'6, JPO'87S Other Governmental Units $5,550,000 PI 000 000 0000 X000 000 MS Municipal State Aid Streets $2,191,000 SU Storm Sewer Fund $1,567,000 SF 00 00 00 000 000 Cl Capital Improvement Fund $433,000 PDF Park Dedication Fund $175,000 Total Expenditures for 5 Year Period $38,118,700 $20,000,000 0000 0000 O O TF Tax Increment $20,000,000 GU Other Governmental Units $5,550,000 PI PIR/GO Bonds $3,830,000 SA Special Assessment $3,257,700 MS Municipal State Aid Streets $2,191,000 SU Storm Sewer Fund $1,567,000 SF Sanitary Sewer Fund $595,000 WF Water Fund $435,000 Cl Capital Improvement Fund $433,000 PDF Park Dedication Fund $175,000 CR Current Revenues $50,000 PF Private Sector Funds $17,500 PA Pavillion Fund $17,500 $38,118,700 51 Revenue Projections Showing Impact of Projects On Funding Source SUMMARY OF IMPACTS ON MAJOR FUNDING SOURCES CURRENT REVENUES/GENERAL FUND RESERVES General fund expenditures historically have increased every year with the exception of 2003. Due to significant cuts in Local Government Aid the city took action to limit any potential tax increases by reducing expenditures and postponing capital expenditures normally funded from the General Fund. Expenditures for 2005 are budgeted at a 7.8% increase over the 2004 budget. In the process of determining what funds will be available from the general fund for capital, the city has postponed the citywide trail connections and the Co. Rd. 3 boulevard beautification projects out to 2006. The tax levy is the major source of revenues (82%) for the General Fund and therefore would need to increase if general fund operating and capital expenditures increase in 2006. The legislature is still debating the future of tax levy limits for 2006 and beyond. Reserves in the General Fund total $4,071,293 at the end of 2004 and are projected to remain at that level for 2005. The city requires funds totaling approximately 5 months of expenditures on hand for cash flow since tax revenue are received twice a year in June and December. This amounts to $3,720,000. PERMANENT IMPROVEMENT REVOLVING FUND, (P.LR.) - G.O. DEBT Funding from bonds is used to reimburse the P.I.R. fund for public improvement projects, which have been previously expended. The debt is funded by special assessment collections and city tax levies over an eight to ten year period. In 2005, the levy for permanent improvement revolving debt was $147,000. In 2006, the levy for debt will again be $147,000. The outstanding debt is from 1992, (refunded in 2001), 1999 and 2002. The P.I.R. fund has completed substantial projects over the last three years. In 2006 the city will undertake Excelsior Boulevard streetscape improvements at an estimated cost of $1,800,000 of which approximately $880,000 will be funded with PIR funds. Total projects for 2006 total $1,725,000 of which $445,000 will be assessed. It is anticipated that the city will need to issue bonds until in 2006 to fund those improvements. In the years 2007-2010 the city has an aggressive residential street improvement schedule planned totaling $4.45 million of which $2.25 will be assessed. This will require additional bonding in 2008 and 2010 to fund these projects. MUNICIPAL STATE AID FUND Funding is insufficient for the projects listed in the CIP document in 2009 and beyond unless anticipated project costs are delayed or the city borrows funds from the state. Excelsior Boulevard streetscape improvements totaling $500,000 are scheduled for 2006 and the County Road 3 project is a substantial project that is being conducted jointly with 53 Hennepin County scheduled for the 2009 construction season. In order to fund these projects the city will be requesting an advance on future allotments from the state to cover these projects costs. The advance is similar to borrowing from the state at market or below current interest rates. It is projected that the city will need to borrow approximately $1,000,000 from the state in 2009. Debt payments for these borrowings will come out of future dollars allotted to the city. CAPITAL IMPROVEMENT FUND Funding for this fund in the future is dependent on future infrastructure improvement and maintenance needs. Past funding has been transfers from the general fund. A $25,000 levy for capital improvements was established for 2005 with annual increases planned for future years. To supplement the tax levy future transfers are also budgeted from the general fund to adequately provide for scheduled projects. Significant improvements scheduled in 2006-07 include city hall interior and exterior improvements. PARK IMPROVEMENT FUND The source of funding for this fund is development fees charged to developers for park development. Future funds are very dependent on future development and redevelopment in the city. The County Road 3 beautification project has been pushed out to 2007 when funds will more likely be available for this type of project. Projects scheduled for 2007 are in Valley Park and include a parking addition at $40,000 and upgrades to the hockey rinks at $45,000. WATER FUND Several large facility upgrades completed between 1999 and 2001 require rate increases in the future to help pay for bonds issued. In addition, the public works facility improvement project will cost the water enterprise $45,000 a year for twenty years. Increased operating costs and improvements to water facilities prompted a $.20 cent per 1,000 gallon rate increase that was approved for 2005. The next anticipated rate increase would most likely be in 2010. The increases in the rate are necessary for operations, to maintain the planned projects and to pay off bonds that were issued to provide funding for water improvement projects. SANITARY SEWER FUND The current revenues and working capital balance will cover the projected operating and capital costs through 2007. In 2007, lift station #1 will need to be replaced. This station has been operating since 1957. In addition to the new lift station, the Metropolitan Waste 54 Control Commission is projecting increases in its disposal charges to local governments. Also, the public works facility improvement project will cost the sewer enterprise $50,000 a year for twenty years. These events will prompt the city to increase its current rates to cover costs and keep a healthy working capital balance. Analysis of projected capital projects and the projected operating costs may necessitate a rate increase in 2006 from $2.25 per 1,000 gallons to $2.50 per 1,000 gallons. Looking further into the future the city may need to increase rates every two to three years to keep pace with disposal costs and infrastructure needs. In addition, it is anticipated that we will need to bond in 2008 to fund all scheduled projects. REFUSE FUND A rate increase was approved for 2005 and was the first rate increase since 1995. Absent a new fee for brush, yard waste and leaf collection, refuse disposal rates will need to increase every four years to offset costs and recycling rates will need to increase every four years to offset recycling costs. The public works facility improvement project will cost the refuse enterprise $25,000 a year for twenty years. STORM SEWER FUND The storm sewer utility issued bonds in 2003 to help cover infrastructure costs that were incurred prior to 2003. The city anticipates the continued pace of construction through 2007 which require additional bonding in 2008 to maintain sufficient cash flow. A significant project scheduled for 2007 is the 5th Street South culvert replacement at an estimated cost of $520,000. The public works facility improvement project will cost the storm sewer enterprise $25,000 a year for twenty years. The storm sewer utility rate will need to increase to cover the costs of outstanding bonds and future operating and construction costs. The proposed rate increase will most likely take effect in 2006. The proposed rate increase is 12.5% over the current rates. TAX INCREMENT FINANCING FUNDS Considering all tax increment districts, as a whole, cash on hand, projected increments and loan repayments are sufficient to cover TIF project expenditures. The state has provided municipalities with a pooling tool to accommodate short-term deficiencies within its' districts. The city will be allowed to pool its' districts tax increment revenues to cover outstanding debt. Currently none of the city's districts are projected to have shortfalls. 55 u 00 W O O Q N rD � 0 0 0 0 0 0 It Ln O 1,0 m 0 Vl 00 O N LJ-) on O I— M to — N N M rI CT 6A [� O Ln O O O 00 N �-C IlC kr M - G1 \O M M u7 N N r-- 100 6H O O Cn 0 �D M O O O 00 N --+ M CN M M �C N N CJS (` 100 69 O tn CN O M 00 O [— M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C7, 00 00 �o CW7 O N O 0 O �n 00 O 0 t� 00 MLr) O 0 kr — O 0 M N — o 0 N 0 0 •--+ 0 0 Cn N 0 0 M O O N C,� O o O O 01 O 0 O kn M O 0 In O 0 00 O 0 yr O o 0 Nkr --+ Nt 0 0 N 0 0 M 00 -- ^- o0 O M C1� I� d N N (� N M CJS I� C N Nlzt (n N M \�6 C7� 69 c1 M 00 [� N Es9 00 00 69 00 W O O Q N rD � 0 0 0 0 0 0 It Ln O 1,0 m 0 Vl 00 O N LJ-) on O I— M to — N N M rI CT 6A [� O Ln O O O 00 N �-C IlC kr M - G1 \O M M u7 N N r-- 100 6H O O Cn 0 �D M O O O 00 N --+ M CN M M �C N N CJS (` 100 69 O tn CN O M 00 O [— M 6q a 00 `C Cl V') to V> t— — — M O \�C N— t--00 `C Ln 110CT .-� C7, 00 Cn V> M I:T M O OQ Lr) N M � 00 r- Lr N Cn O F' \J i- It 00 o0 C1� M d N N (� N M r- O M 00 N Nlzt (n N M \�6 M C7� c1 M 00 [� N Es9 00 00 6�1 O Lr) C) O N O � 0 �� O `C M M O O `C lf M V7 \C O N I'D O N \C — •-- N~ N N O `C `C O � 00 00 cV N 0 69 �,C Cn M O 00 00 M � � U �C [� N M �C N 00 00 �t w 6r4 cn 00 00 � CIA � o c U w \ O cn.� r- CIA Ile -- Nr-: kn N ct Ln r \C N •-- [� > H \C M En C71 �, 00 o0 cn H4 N N t— M \10 O V \C O 00 IT C' IT N 00 M Cl N O M \C M N O � I� N [— N V-) Cn Lr Zt M o0 v� U N 00 -4 M 00 6q 00 00 11-N 00 00 O 00 M O \�C O `C O I'D 0 — c1 [� M O Lr) --- O N 00 00 �O M lr CT1 M \J M cl 00 o0 (— 00 [� r- — 00 N O N O M 00 M �C (n N M M 6q 56 00 00 11-N 00 00 O 00 I o0 [l- N Cn N Cn It0 0 O M Ln l— O O WI) t� --- N 00 00 O C cl Cn '-+ O 00 r- �t zl- kn — rl- M N � O O 00 M M M C7� c1 M [� N 00 00 6�1 Cl t— I -C O N O V-) o0 O O `C O O Ln 00 V7 \C O N O O O N N 00 — •-- O N O `C lr O � 00 -� cV N 0 kn �,C Cn M O 00 00 M O M �C [� N M �C N 00 00 �t 6r4 cn 00 00 CIA � o N \ O r- CIA Ile -- Nr-: kn N ct Ln r \C N •-- [� \C M C71 00 o0 H4 N N t— M \10 O V \C O 00 IT C' IT N 00 M Cl N O M \C M N -- [� O I� N [— N V-) Cn Lr Zt M o0 -^ r - N 00 -4 M 00 N — N O �C N r- 00 69 \C M M M O O Cn �C � CN M l— 00 � •- N O 00 rM N 0 V1 V-) Cn \C \,O r-- O N O M M M t� C7� C7� N I— N 00 O 00 d 69 Ln 7� � a m o c U cnm u o c a � W >Eo U'��' a cn cd cd in N O U O U U 56 57 rn en O O 11C C>I O � O O N O O l— O Nt d' O 00 (ON 7t 00 r- O O 0� ON a1 O It O O -- I O N M t— M M r- 0000 O O O O `J O� oM0 O00 d O C O� N M O H O �t a1 N� 01 d' —4 7t O ON O M N �O O 00 N O O d r- O I O O 00 00 N O N [— O O et O `O 00 tf O ON O� 00 N O O 00 W) (=> O O O r- N N a\ It O O d' 'ITN t ONO O � � ' O N 00 Ln 00 O N kr) O O N I� -- O O O N O N 00 �16 O W [� N 00 O O M v) A O�� O N N M -- c M d O Lr) M l7t M C71\ N 00 O •--+ N a\ It N Ln Ln I� N 00 0 A O06 00 O M O O O�� N rl� oo O � O r-+ O cV N o0 O O � O � en O 000 N a d O v) vn O [— N O% N O O O IZT v> d M O O O 00 O_ O Or- [� O N I— � 00 M O O O 000 0\ Ln M M M M O N N 00 O O N N O M Ln M � I� 0 O_ r- 00 O ON Lr)� 0 0 d' O O O\ t ON O 06 0\ V) 0�0 r+ O MM O � 00 N 00 00 � N 00 M � � 00 M N N S M M N IZT Lf') 00 M N 110 O �J r- a1 tn a1 M N V N cl� t N 140 -� N 4 d \0 .� N � 00 .--i 00 •--+ r- M N Ln 00 N 000 N 00 •-+ N cd U r-. U U U CC Cd E U w U to U cn 0 b�A U E b Cd a k o U bi t p o U C4e) to d w �. .� � to o —"� CIS ( � N rn Ub 57 O � O 000 O 000 O Nt d' [— O N (ON N O r ON NT M It O O N M t— O� oM0 O00 d O C O� N O N N [� O N �t a1 d' —4 I O ON ON M N N I:t It [— O O O O O ON O� 00 00 M O O 00 W) (=> O 00 v-) O O r- N N a\ It O O d' 'ITN t ONO O � � ' n N 00 Ln kr) O N N v) M N M [� N 00 O O M v) M kf) O�� O N N M -- c M d O Lr) M l7t M C71\ N 00 O •--+ N a\ It N Ln Ln I� N 00 0 A �O O 0 00 O 00 O�� N Z \,O oo O � O r-+ O cV N o0 O O � O � en O 000 N M d O v) vn O [— N O% N a; [� O M O O O 01 0\ Ln M O r- O N N 00 O O N l � O M M � I� 0 O_ r- 00 O ON Lr)� 0 0 N O O O\ t ON M 0\ V) r- r+ 00 00 0\ M 00 N 00 00 N r - M O O � � N O N S M M Lf') [� 00 N 110 r- a1 tn a1 M N V N cl� t N 140 -� 0 0 4 d \0 .� N � 00 .--i 00 •--+ 01 t M N 000 N 00 •-+ cd U U E U w U 0 Cd 'b o bi w��a. o a, C4e) Cd 57 cd o_ .d --4Op- bA w cd 00 rn U 4 O cd U o ►� H 0 w o cis; (U E Cl O O 0000 O O 0000 O O 0000 M M N � N [� O G� � � O N z .--( -- --• tr) .-. B O O O\ O O O 00 N CD CD N \�o C' O O :t O O d O O 00 C) M � O 00 r - NO \O 00 •--� [� O 00 O kr) Fail N •- � .--4 r. Lr Lr O O I- O O --� 00 N 00 0o O� \.c O O � VI) O H N N kr kr kr 00 r- oo v) O N O O O CN u Llr) ON D N O O O kr I� 00 l� O O [- O O ON a W O O o �r O N N N o kr) Ol� O 0\ "o - 0000 \D H N O .--� •--+ cp Ili z .-. r. W m w 00 N -4 00 0 0 00 O O O OM \D �p O N O O N O O N ✓✓ O M N O O N '� v') O M O 00 so `O O rq C14MO eq Q, N .-. ^, r.. r-4 cC v O 00 M O M O O N M O „O O N N N N U di0 Ln N 0 0 0 O 00 [� O O 00 00 00 O 00 •-- ,-- \J \J M O � H a � rq N N N O O O O N [� O O O [- M O� O O O ON a O O V) v7 kr) N .- .- � N cd .d bA w cd O rn U 4 O cd U o ►� H 0 w o cis; (U E Cl 3 U�� 1 .b W U V> [- O 1�0 00 tf) M O O N M Lr) M M N O N N N M M N -It' 00 CIA CIA 58 Llr) O O I� M v) (r) O O M M H O N N z N \�o Ol� O O O,110 O o CN C) O Q1 00 O� M O O M Fail C) •- � N C 1 Lr Lr O 00 00 N H 0.000 r- oo v) O N O O O CN u Llr) N D N O O O kr N 00 M Z' Ul V� a o �r O o qzt tn o kr) Ol� O 0\ "o - 0000 \D N N O .--� •--+ cp Ili kr .-. r. W m 00 N -4 OM \D N O 00 \O O\ Lf) 00 W) '� d. M O 00 O C14MO eq N N .-. ^, r.. r-4 cC v by „O di0 Ln Cd OCd �. o H a Cd a 1-4 58 kr) tn rq A M Ln Ln M O O M tn Lr) 00 00 Ln N O \O 9z O� C� [— O oo to M R 0,6to ,__.CIA M CN H~ z w N O 00 00 M M M O vl IT CN Ln Lr O `C M M Lr) 0000 C� OM M a Ile N �n •--� H-I O d Gl� 00 N M M 00 N O M to N [- Irt V o o t- �I'D N CD M O O O It d (s O M M N d' O O M M O 00 C) qct O N •-• —4 N O T O O O O U � U O 3 b U U U U O Cd 59 O o0 O M d V \1 kr O in rl C\ O N Vl N l� O\ V) M i� M U1 N N O O O N --+ 00 O O O O C1 N kn I- It' r- M O O O O O N � p [ r o0 O Q1 N O O O 00 N O O O N p lc 00 N N r— kn N 000 N Ul M 00 M 00 N O N N � N O O O N O 0 0 0 0 N 00 N N I:t [— O� N 00 r- O 00 O o0 O M d V \1 kr O in rl C\ O N Vl N l� O\ V) M i� M U1 60 N 110 O M (= Ol� NV-) O O O O [-- M t� ON O O O O v� N p lc 00 N O Ln O kf C� •--, 00 N O N N � �� •-- O M A N N N O [-� •-- M O 00 O N ON O O O O O N U�t O o0 01 O O O O o0 00 W O N -- r- ON a a a 00 O N N N OON M O O O O O M ODO M l C'4 O O � V N o0 0�0 N o O - N� •� o d' N kn C,7 E!5 M O O O O O N 0 0 0 0 00 0o kn �O O O O O M 0 0 0 (= -4 M N O O N M[ O O O O O 00 vi OO O� M O� cl� •-- O .- O N O� I� --� 5 tr1 �O M N M N 00 V) ON t1, O r- 00 A N z M 0 .--� _ W O N M N o0 M vi .4' v C d M 00 N 00 -- t 00 V') vl N d Or M •-• •-• � O � 14 ":T \O V'1 O [� - N O N M N O �D �O o0 O O N M C cd N � C ..•EllbA _ b a. a k" o a� F� Cd. a cl C F-' W p o M uCd tn 0 0 0 0 0 U a 0 W U o 00 O cy d �o 00 to VA C5 ., N M O O tn c d a a a o (ON o oo O, � 3 a 00,�[�i� o a'� 00 m m' cz VUaU LY..i a, a,O-,Oo 00 --4 r -" — NN NN 60 cd M O O 00 O 00 C� O O O O O O\ .-4 M Vn O kn kn IZT O O O O O It Ol� \�D p O O O kn 0 0 0 0 to N oM f � C� 00 O to O O N W --� M M \C IT N tn \O G1 N I� \C 00 kn O O ON O O O1 O O O O O M >Cd CIN O r- r- N O O O O O N IZT kr) G' O O a\ O\ 00 O It O O O N N C) 00 o O O O Lr M N Lr� N O \16 N O Olq 00 \�6 O Lr) tQO U cd U M M M r- to to l— C1 V� a O O v1 l- O �n N V O 00 O W .--� 0 0 OItt O � US N (-i N 69 64 VI 64 yg 54 M �C'scd +-j 03 64N Lr) 'C O\ O 01 - +� O O\ Cl� O O O O\ O C Cn cd Op O O �0 C . O O�0 I'D O O C) "D O 3 O rte O N M M �., cd H U O �6 oo O Lr O M M O Ln ►� 00 M O M O -- Cn Ln `O [— Ln 61 coo C� z O O O ON o0 0 0 0 O 00 0 V o o o o o O M On N 00 N W) r- In r- vi C� 000 O � N Ln v') N M a a�. O O O O O O O O O O O O O M F-4 0o O Ln Ln d O O O d CS, �'o t— O — 00 O O O 00 O ry. 00 � t- M C�N O In O o 0 116M -- W-4 It m N kr)Ln [�CIA 110 V N Ln z �n o 0 o O O Ln o o O Ln n o M O O O Ln O O (= kn V-) 00 O O O 00 O O O 00 00 [� O O r3 O Lr) MN 110M O O M CN O� It M M �i C� [— N M Q O � ON N kn N N ON 1%0 O N N M M 00 d O O1 O O M N O O O 00 r- ON 00 kn Vn O 1� 00 M M V-) O 00 Ln '-+ 00 CN O N N O W) `J � M �D cd n b O >Cd Cd ou Cd .., Q. U0 C) o O Cd �'" ice. ice. ice. O C's tQO U cd U O v') O O to U pq a O O v1 l- O �n N V O O W u .-� cl ,� Cl. U O � US N (-i N 69 64 VI 64 yg 54 M �C'scd +-j 03 64N 'C 4-1 64 y c . ,.. v - +� u M C O C cd O ,� C% C . O ¢, O �+ 00 00 Q\ O� C,\O O rl 3 , O rte t0. +� O O �., cd H U cd U cd U ONO1 O) O� ON O O O ►� E-� a 61 Wei r- O000 00 oO\0000 000000\ O t -- C) M r1 "T— 0 0 0 0 0 0 0 kn 00 O OI O O — Wn M to O O O O O O M l— IZT 0 00 O � � 00 O tri kr v') O tr M 14- 4 N Lr) oo M O l� N O (= N Ln W) N r- It O r- 00 ^ N r-+ -4 N U 00 00 IT O O N N 00 -b 0 0 0 0 0 0 0 0 D\ � r -- O C:) O O O O 'b O l- O O 0 0 0 0 0 0 [- I- N O\ l� O O en O M d• O\ O ^' 0 0 0 0 0 0 cn O \C O O `J O V V O N �--� O ":fO N O O� 1-4 00 00 00 N O 00 d' M O O\ M .--� O r-. vi vi N r- :T kr) O 00 N O O �C O IC [- 1.0 0 0 0 0 0 0 U O M N I- O CN CN O O M O M O-4 p iC O O O O O N r- O O N O N t4l) 00 � O O O O d O M O O O O vi [� O N o0 v'i r N O tr O U tr Ile L ._, N `C 00 O O\ CN O o v') O - kn a N"t .� d O V -4 0 0 O r- r-+ -4 00 O\ O\ O\ ON O\ o 0 N - N ON 00 O ca c� °\000U 3 a,o\O\O\O\O\O\oo .--- -- -- -- N N �i O O O r- O 62 V7 O 0 0 0 0 0 0 O kn 00 N a M O O r- r- O O O O O O O "--+ M a1 O\ O O l- I- "C ON Itt O O O O O O1 -4 l 00 O OO 00 C M � Q O 000 0 M n H O\ O O N N (� N r- co r" -+ C N M r-4 a Q U kn OO�t v O\o 000 000 00\ 0 V O O N N C� \O O O O O O N M M t- �o O O O O a) 't 00 O O O C� O v7 vl t v7 00 M O 00 M -- all M Lr) Q\ Q\ N M .--a 00 00 00 A a\ O O 00 O 0 0 0 0 0 0 O 00 O tn O Lr) Lr) r O O O O O N ZM M O O O O O tn O O O O O �C v? [� O vi O M --� � r-:, � v'i v'i W v'i v i �D N N (Z+ ON M00 d- N �t 00 M0 00 O\ � N I� M O W � M oo O N O O O O O�\� N O O O � 00 � V �C t� �t N r1' r-4 Itt \C 00 O\ 110 N \%C N M r- .-+ .--+ N .-+ 00 M 0 0 00 N 00 O l- O O O r O �C 00 l- v7 C> O kn o0 M Cl, V-) 00 O M � '--^ to O O Lf 06 t— M v7 W o M M O t� N ON M N O N N CC1 � -4 N N Wei Oto •� 00 u ON U cd ¢. cd tZ+ cd t�. C>dl. �1. N cd -b a� s. U N O � r 'b 'b 'b 'b Cd O 0 0 O O O O ^' > W a. a. Cd cz 1-4 cts U cz o 5 U U U U U U O r- O N O N O W) O to p y-. vi p iC iG �, O � (A 4 (nqz � www d aaaaa �. r 'd C,, a� U ..: .. ._, M o0 ... y O\ •-+ N Moo O\ \4C\ o �; o a .� .� o\ o 0 0 o 00 O\ O\ O\ ON O\ o 0 �O►�E�� OOOE�VU ca c� °\000U 3 a,o\O\O\O\O\O\oo .--- -- -- -- N N 62 r- 0 0 M o O M N 00 N O O vl vl N O O N M V'� O I I- N M C� O O 01 1f• 00 M It O r- IN O N 00 ON N .--i M O — M I-- 00 r- l� d [� O O ON I O\ O\ O I- � O O 00 00 V) O O vl [-- N O �0 O d O 1- O I- IND 't O M "Z r-+ C\ I to 00 — kl � O1 M O M O\ N M 00 I` N 00 00 N - I` 00 \J •-+ 00 M 63 V-� V O O 1 O LJ ct O O N O) Vr N M M O d O N 00 N 00 00 N N M M z 0 H U 00 It 000,0 O o0o O, r- 00 �! o O N N o O O O O O O N O r- i M N- 00 r- 00 Ql) 00 M M 000 00 aO a �.., r oo�.-4 O O --4--4 � N O O N O ON 00 d' *4Q � to -� N O� O O N 11.0a N ON N� cnO 1%0N o NV z O 00 O O 00 N I— O Ln M N M O vNi N M O1 M Q1 O Q N z M O N O N w 00 � O*i M 00 M O ON O --� 00 00 r- O 00 O O Q cli N - N Lr) kn ~ N ttn �c N N 00 �-c N kn N a �Q r. O� 00 N M �O O CN M r- M D1 M [— M O I— � M 00 N N N 00 M 00 "T a1 �--� N �- 00 Ln N vl �n (n a� cu kn Z4 C's ccs bn cl o �`? c kn kn 00 kn N bA O O �• _MSM x 6R 60q 6R 6o9 b9 65A E� b9 +�' 1.4 N • 4 C5U • .. 0r, 01 "M p O cd U` G� ► u O Q. H U A. U 0 ,� ° +-+ Ll; 00 O� O O O O O� ON O� O O O O O r" N N N N 63 64 Project Descriptions Economic Development CAPITAL IMPROVEMENT PLAN 2006 a i, 2010 Contact ED Director City of Hopkins, MN Department Development Type Improvement Useful Life Unassigned Category Economic Development Priority n/a Total Project Cost $2,000,000 Description North side of Excelsior Boulevard from Highway 169 to approximately Blake Road. Redevelopment of older commercial area. Based on the existing zoning, it would involve both commercial and industrial uses. Identified in the East End Redevelopment Study. Justification Excelsior Boulevard is being upgraded in this area, which will provide for additional property on the north side of the roadway. The buildings in this area are older and no longer the highest and best use for this property. The funding amount is an estimate and will vary depending on the scope of the project. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 2,000,000 2,000,000 Total 2,000,000 2,000,000 Funding Sources 2006 2007 2008 2009 2010 Total TF - Tax Increment Financing 2,000,000 2,000,000 Total 2,000,000 Operational Imp act/Other The schedule for this project is still tentative. Consistent with Comprehensive Plan and City Visioning Process. 65 2,000,000 Thursday, June 30, 2005 CAPITAL IMPROVEMENT PLAN 2006 thru 2010 Contact ED Director City Of Hopkins, MN Department Development Project # 01-CIP-D402 "Type Improvement Useful Life Unassigned Project Name North Annex Redevelopment Project Category Economic Development Priority n/a Total Project Cost $10,000,000 Description Northeast quadrant of Highway 169 and Excelsior Boulevard. Redevelopment of Supervalu North Annex property. The project would involve construction of approximately 525,000 sq ft office building. The TIF would be used for land writedown, demolition, parking improvements, and off- and on- site improvements. The 2006 expenditure is based on estimate of when redevelopment may occur. Justification The existing facility was formerly owned by Red Owl. It was constructed in the mid -1950's and is no longer the highest and best use for this property. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 10,000,000 10,000,000 Total 10,000,000 10,000,000 Funding Sources 2006 2007 2008 2009 2010 Total TF - Tax Increment Financing 10,000,000 10,000,000 Total 10,000,000 Operational Impact/Other 66 10,000,000 Thursday, June 30, 2005 CAPITAL IMPROVEMENT PLAN 2006 thru 2010 Contact ED Director City Of HOpkims, MN Department Development Project # 06-CIP-D403 Type Improvement Useful Life Project Name Block 64 Redevelopment Project Category Economic Development Priority n/a 'rotal Project Cost $8,000,000 Description Redevelopment of block between 5th and 6th Avenues, north of Mainstreet, south of 1 st Street North Justification Will redevelop older commercial, residential areas. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 8,000,000 8,000,000 Total 8,000,000 8,000,000 Funding Sources 2006 2007 2008 2009 2010 Total TF - Tax Increment Financing 8,000,000 8,000,000 Total 8,000,000 Operational Impact/Other 8,000,000 67 Thursday, June 30, 2005 68 General Public Buildings CAPITAL IMPROVEMENT PLAN 2006 a ,, 2010 Contact PW Director City of Hopkins, MN Department Public Works: Bldg/Equip Sery Project # 05-C1P-13304 Type Improvement Useful Life Unassigned Project Name City Hall Wall Covering Replacement Category Buildings: Administrative Offi Priority n/a Total Project Cost $23,000 Description Remove existing wall coverings in upper and lower levels of City Hall. Paint walls in office areas, recover walls in front entrance. Justification \k"al Ihaper not adhering to walls; dirty, worn, mold/mildew issues associated with wall coverings. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 23,000 23,000 Total 23,000 23,000 Funding Sources 2006 2007 2008 2009 2010 "Total Cl - Capital Improvement Fund 23,000 23,000 Total 23,000 Operational Impact/Other 23,000 69 Thursday, June 30, 2005 CAPITAL IMPROVEMENT PLAN 2006 thru 2010 City of Hopkins, MN Project # 05-CIP-B305 Project Name City Hall Carpet Replacement Description Complete carpet replacement City Hall; upper and lower levels. 2000 sq yards @ $40/yard = $80,000 Justification Carpeting is 14 years old as of 2005. Worn, exceeded useful life. Contact Public Works Director Department Public Works: Bldg/Equip Sery Type Improvement Useful Life Unassigned Category Buildings: Administrative Otli Priority n/a Total Project Cost $80,000 Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 80,000 80,000 Total 80,000 80,000 Funding Sources 2006 2007 2008 2009 2010 Total CI - Capital Improvement Fund 80,000 80,000 Total Operational Impact/Other 80,000 70 80,000 Thursday, June 30, 2005 CAPITAL IlVIPROVEMENT PLAN 2006 til, -t{ 2010 ''.« Contact I'W Director City Of HOpEns, MN Department Public Works: Bldg/Equip Sery Project # 05-CIP-13306 Type Improvement Llsefull.ife Unassigned Project Name Historical Society Roof Replacement Category Buildings: Community Center Priority n/a Total Project Cost $35,000 Description Roof replacement for roof over Hopkins Historical Society at the Hopkins Activity Center Cost of $35,000 dependent on type or roof. Justification I Roof was noted in 1990 as needing replacement in 5-10 years. Decking lacks adequate insulation and has had numerous leaks over past 10 years. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 35,000 35,000 Total 35,000 35,000 Funding Sources 2006 2007 2008 2009 2010 Total Cl - Capital Improvement Fund 35,000 35,000 Total 35,000 Operational Impact/Other 35,000 71 Thursday, June 30, 2005 CAPITAL IMPROVEMENT PLAN 2006 t/„ -u 2010 City of Hopkins, MN Project # 05-CIP-B307 Project Name City Hall Boiler Additions Description Purchase smaller, fuel efficient boiler for City Hall. To be used during summer months for dehumidification. Contact Public Works Director Department Public Works: Bldg/Equip Sery Type Improvement Useful Life Unassigned Category Buildings: Administrative Offi Priority n/a Total Project Cost $23,000 Justification Currently we run one or both boilers year-round for dehumidification. We could get by with one small energy efficient boiler during these times. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 23,000 23,000 Total 23,000 23,000 Funding Sources 2006 2007 2008 2009 2010 Total Cl - Capital Improvement Fund 23,000 23,000 Total Operational Impact/Other 23,000 23,000 Thursday, June 30, 2005 72 CAPITAL HVIPROVEMENT PLAN 2006 thru 2010 City of Hopkins, MN Project # 05-CIP-B308 Project Name Activity Center Window Replacement Description Replacement of windows at Hopkins Activity Center Contact PW Director Department Public Works: Bldg/Equip Sery "Tvpe Improvement Useful Life Unassigned Category Buildings: Community Center Priority n/a "Total Project Cost $19,000 Justification Windows leaking, corroding, over 40 years old. Scheduled in 2003 with grant money that never materialized. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 19,000 19,000 Total 19,000 19,000 Funding Sources 2006 2007 2008 2009 2010 Total Cl - Capital Improvement Fund 19,000 19,000 Total Operational Impact/Other 19,000 19,000 73 Thursday, June 30, 2005 CAPITAL M'ROVEMENT PLAN 2006 thri, 2010 City of Hopkins, MN Project # 05-CIP-B310 Project Name City Hall Site Improvements Description I Front entrance to City Hall needs to be relandscaped. Contact PW Director Department Public Works: Bldg/Equip Sery "Type Improvement Useful Life Unassigned Category Buildings: Administrative Otfi Priority n/a Total Project Cost $50,000 Justification Railings are corroded beyond repair. Shrubs and trees are overgrown and need to be replaced; rocks removed and cleaned. Raspberry logo deteriorating at front entrance. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 50,000 50,000 Total 50,000 50,000 Funding Sources 2006 2007 2008 2009 2010 Total Cl - Capital Improvement Fund 50,000 50,000 Total 50,000 Operational Impact/Other 50,000 74 Thursday, June 30, 2005 CAPITAL IMPROVEMENT PLAN 2006 thi-i, 2010 City of Hopkins, MN Project # 06-CIP-B311 Project Name Carpet, Arts Center Lobby Description Remove and replace carpet in Art Center lobby including three (3) staircases. Justification The current carpet is 8 years old and is showing deep wear in high traffice areas. Contact Public Works Director Department Public Works: Bldg/Equip Sery Type Improvement Useful Life 10 years Category Buildings: Arts Center Priority n/a Total Project Cost $18,000 Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 18,000 18,000 Total 18,000 18,000 Funding Sources 2006 2007 2008 2009 2010 Total .Cl - Capital Improvement Fund 18,000 18,000 Total 18,000 Operational Impact/Other 18,000 75 Thursday, June 30. 2005 76 Parks and Recreation CAPITAL IMPROVEMENT PLAN 2006 ai rl, 2010 City of Hopkins, MN Project ## 01-CIP-P201 Project Name Valley Park Improvements Description ?006 - Parking addition ($40,000) 2006 - Hockey rink upgrade ($45,000) Contact PW Director Department Public Works: Parks Type Improvement Useful Life Unassigned Category Parks/Forestry/Pavilion: Neigh Priority n/a Total Project Cost $85,000 Justification I Parking addition - Valley Park is getting more use each year as a community park; as these uses grow, the demand for additional parking is created. Consistent with Park Board adopted guidelines and CIP priority list of April 2001 Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 85,000 85,000 Total 85,000 85,000 Funding Sources 2006 2007 2008 2009 2010 Total PDF- Park Dedication Fund 85,000 85,000 Total 85,000 Operational Impact/Other I Consistent with Park Board adopted guidelines and CIP priority list of 4/20/90. 85,000 Thursday, June 30, 2005 77 CAPITAL RvIPROVEMENT PLAN 2006 thru 2010 City of Hopkins, MN Project # 05-CIP-P202 Project Name Central Park Tennis Courts Description Remove and replace blacktop tennis court surfaces at Central Park. Recoat and restripe for tennis. Contact Public Works Director Department Public Works: Parks Type Improvement Useful Life 20 years Category Parks/Forestry/Pavilion: Neigh Priority n/a Total Project Cost $50,000 Justification Current age of courts is 28 years. Annual crack maintenance and color coating is excessive. Replacement recommended by 2010. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 50,000 50,000 Total 50,000 50,000 Funding Sources 2006 2007 2008 2009 2010 Total PDF- Park Dedication Fund 50,000 50,000 Total OperationalImpact/Other I Design 2010, install 2010 Identified 3-21-05, High Priority Park Board 50,000 50,000 78 Thursday, June 30, 2005 CAPITAL IMPROVEMENT PLAN 2006 rht-u 2010 City of Hopkins, MN Project # 01-CIP-P206 Project Name Citywide Trail Connections Description I Contact PW Director Department Public Works: Parks Type Improvement Useful Life Unassigned Category Parks/Forestry/Pavilion: Comm Priority n/a Total Project Cost $113,750 Develop various intra -city connections to existing trails and sidewalks in Hopkins, including the existing regional trail system. Install trail amenities. Primary trail projects: 2006 - Trail signage and amenities Justification Safe intra -city connections to the expanding use patterns on the regional trails and City trail and sidewalk system is necessary. City of Hopkins Master Trail and Sidewalk Plan Regional Trail Plan under review. Prior Expenditures 2006 2007 2008 2009 2010 Total 103,750 Construction/Maintenance 10,000 10,000 1'o to I Total 10,000 10,000 Prior Funding Sources 103,750 CR - Current Revenues - Gene Total Total Operational Impact/Other Regional trail plan under review. 2006 2007 2008 2009 2010 10,000 10,000 Total 10,000 10,000 79 Thursday, June 30, 2005 CAPITAL RvIPROVEWNT PLAN 2006 amt 2010 Contact PW Director City of Hopkins, NW Department Public Works: Parks Project # 02-CIP-P210 Type Improvement Useful Life 10 yearsProject Nene Pavilion Community Message Sign Category Parks/Forestry/Pavilion: Comm Priority 3Important Total Project Cost $35,000 Description I,his message sign to be placed near Co. Rd. 3 in front of pavilion will be used to promote community events registrations, news items, etc. Justification No sign within Hopkins is available to promote the city. Present sign was a used sign, retrofitted to meet minimum needs of pavilion. Opportunity exists to promote at a much higher, professional level. 2004: Purchase, install Ranked Category #3 in Park Board Project List, April 2001 Perhaps approach School District for funding assistance Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 35,000 35,000 Total 35,000 35,000 Funding Sources 2006 2007 2008 2009 2010 Total PA - Pavilion Fund 17,500 17,500 PF - Private Sector Funds 17,500 17,500 Total 35,000 OperationalImpact/Other I 2004 - purchase, install Ranked in Category #3 in Park Board project list, April 2001 35,000 Thursday, June 30, 2005 CAPITAL IMPROVEMENT PLAN 2006 thru 2010 City of Hopkins, MN Project # 02-CIP-P213 Project Name Co Rd 3 Beautification Corridor Description Miniature golf course - $60,000 Memorial garden park - $20,000 Contact PW Director Department Public Works: Parks Type Improvement Useful Life 20 years Category Parks/Forestry/Pavilion: Comm Priority I Urgent Total Project Cost $80,000 Justification I Council directive to Park Board to explore ways to beautify the south side of Co Rd 3 corridor, Depot to 8th Ave So Design: 2006; construction: 2007. Maintenance offset by user fees. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 80,000 80,000 Total 80,000 80,000 Funding Sources 2006 2007 2008 2009 2010 Total CR - Current Revenues - Gene 40,000 40,000 PDF- Park Dedication Fund 40,000 40,000 Total Operational Impact/Other 80,000 80,000 81 Thursday, June 30, 2005 82 Streets CAPITAL IMPROVEMENT PLAN 2006 rr„•t, 2010 City of Hopkins, MN Project # O1-CIP-S101 Pro~cct name Residential Street Improvements Contact PW Director Department Public Works Streets/I~raffic 'Type Improvement Useful Life Unassigned Category 'brans: Streets Priority n/a "1'ot:~l Project Cost 55,275,000 Description Program to improve streets needing repair or reconstruction as indicated by street condition survey, or as part of an area street improvement. 2006: Recon: 18th, 19th, and 20th Ave So from Mainstreet to Excelsior Blvd or existing cul-de-sac ends, 1st St So from 17th Ave So to 19th Ave, Blake Road overlay 2007: 5th St So from Minnetonka to 1 lth Ave So; Drillane recon 2008: Parkridge neighborhood streets - Recon 2009: Street maintenance -overlays per pavement management program; 19th Ave No; 20th Ave No from Mainstreet to 3rd St; 3rd St - 19th to 18th 2010: Park Valley neighborhood streets -reconstruction. 10th Ave So from 6th St So to 7th St So; 9th Ave So from 7th St So to Westbrooke Way; 7th St So from 1 1 th Ave to end; 6th St So from W Park Valley Dr to 10th Ave So; 5th Ave So from Sth St So to 7th St So; East and West Park Valley Drive. 201 l :Street maintenance -overlays per pavement management aro~ram Justification Pavement Management analysis shows a minimum $300,000 street improvement commitment (sealcoating, mill/overlays, reconstruction) to maintain current overall street conditions and backlog. The numbers assume a 70% assessed and 30% general city share of costs for reconstruction projects and 100% city costs for sealcoat and [Hill/overlay projects. sealcoat project costs budgeted in street maintenance budget. Costs for sanitary sewer and water main reconstruction at'e not ShOWiI. 1'-'ior{~1' ~ Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 825,000 750,000 1,000,000 1,100,000 1,600,000 5,275,000 Total Total 825,000 750,000 1,000,000 1,100,000 1,600,000 5,275,000 1'ri{>t' Funding Sources 427,000 MS -Municipal State Aid Stree -1~r,t~1~ PI - PIR/General Obligation Bo SA -Special Assessment 2006 2007 2008 2009 2010 Total 0 0 400,000 350,000 400,000 650,000 800,000 2,600,000 425,000 400,000 600,000 450,000 800,000 2,675,000 Total 825,000 750,000 1,000,000 1,100,000 1,600,000 5,275,000 Thursday, June 30, ~00~ 85 CAPITAL IMPROVEMENT PLAN 2006 t~„~Z, 2010 ~T Contact PW Director City of Hopkins, Ml~l Department Public Works: Streets~I~raf~tic Operational Impact/Other Public hearing -year prior to planned construction Plans and specifications -year prior to planned construction Bid and assessment -year of planned construction Consistent with the City Council adopted Roadway Improvement Policy, street ratings, and Pavement Management pro~ratll. T{tursday, Jtu~e 30, 200 86 CAPITAL IMPROVEMENT PLAN 2006 rrr,-1, 2010 City of Hopkins, MN Project # ~1-CIP-S1~2 Project Namc Residential Street Improvements--Utilities Contact PW Director Department Public Works: Streets~I'raftic "hype Improvement Useful Life Unassigned Category Trans: Streets Priority n/a "hotal Project Cost $1,500,000 Description Locations to be detenrrined as they are consistent with the street reconstruction program. Program to reconstruct deteriorated water main and sanitary sewer and to provide storm sewer improvements in conjunction with street improvement projects. Public hearing: Year prior to planned construction Plans and specifications: Year prior to planned construction Bid: Year of planned construction Consistent with the Storm Water Mana ement Plan, Water and Sewer Utilit Master Plan, and television ins ections. Justification In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installed new. In some cases, water main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The numbers assume the city funding 100% of major storm sewer, water main, and sanitary sewer construction/reconstruction. These costs are to be used in conjuncton with street reconstruction costs shown on O1-CIP- S101. 1'rio-' Expenditures 2006 2007 2008 2009 2010 Total 250,000 Construction/Maintenance 250,000 250,000 250,000 250,000 250,000 1,250,000 t ot~tl Total 250,000 250,000 250,000 250,000 250,000 1,250,000 Prior Funding Sources 250,000 SF -Sanitary Sewer Fund 'I~ot~tl SU -Storm Sewer Fund WF -Water Fund 2006 2007 2008 2009 2010 Total 75,000 75,000 75,000 75,000 75,000 375,000 100,000 100,000 100,000 100,000 100,000 500,000 75,000 75,000 75,000 75,000 75,000 375,000 Total 250,000 250,000 250,000 250,000 250,000 1,250,000 Operationallmpact/Other Public hearing -year prior to planned construction Plans and specifications -year prior to planned construction Bid -year of planned construction Consistent with the Storm Water M Plan, Water and Sewer Utility Master Plan, and television inspections. Thursda~~, June 30. ?UOj 87 CAPITAL IlVII'ROVEMENT PLAN 2006 r~„~„ 2010 '_-Y Contact PW Director C1~ Of ITOpKll1S~ ~~ Department Public Works: Streets/l~rifli~ "rye Im rovement 1'rojcct # O1-CIP-S103 ~' p l'sefull,ife Unassigned Project Name. Citywide Concrete Alleys Category Trans: Streets Priority n/a "Total Project Cost 5105,000 Description 2006: Alley south of 6th Street South and north of 9 Mile Creek, between 1 ]th Avenue South and 10th Avenue South 2007: Alley south of 3rd Street North and North of 2nd Street North, between 6th Avenue North and 5th Avenue North 2008: Lake St NE alley (South side of Lake St NE) (Murphy to Texas Ave) Program to construct concrete alleys in areas designated as poor on the alley condition survey. Public hearing -Year prior to project Plans, specifications, bid, construction -year of project Consistent with the Cit Council ado ted Roadwa Im rovement Polic and Al(e ratin s Justification The city has had a policy of constructing concrete alleys for a number of years. This policy has proved to be sound by the concrete alleys' durability and low maintenance costs. Current policy has the city share at 20% of the cost in residential areas. The city will experience cost savings due to lower maintenance costs. Prior Expenditures ~0~ Construction/Maintenance 7 t~tttl Total 25,000 40,000 40,000 Prior Funding Sources ~~ SA -Special Assessment T~ot~tl SU -Storm Sewer Fund 2006 2007 2008 2009 2010 Total 25,000 40,000 40,000 105,000 105,000 2006 2007 2008 2009 2010 Total 20,000 32,000 32,000 5,000 8,000 8,000 84,000 21,000 Total 25,000 40,000 40,000 Operational Impact/Other 105,000 Approxmately 1250 feet per year for four years Public hearing -year prior to project Plans, specifications, bid construction -year of project Consistent with the City Council adopted Roadway Improvement Policy and Alley ratings. 8 8 7hursdu~°. June 30. 211(1 i CAPITAL IMPROVEMENT PLAN 2006 r~z,•u 2010 City of Hopkins, MN Project ~ O1-CIP-5104 Project Name COUIlt~' ROad 3 Contact PW Director Department Public Works: Streets/rraf•tic "I'y~pe Improvement ('seful Life Unassigned (~ategory Trans: Streets Priority n/a Total Project Cost 52,300,000 Description County Road 3 from Shady Oak Road to Meadowbrook Road. Llghtlilg, landscaping, street, etc. improvements along Excelsior Boulevard from the east to west city limits. GO Bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue Segment l: Construction - 1998/1999 Segment 2: Planning - 2004; bidding and construction (median upgrades only) - 2005 Segment 3: Planning and acquisition - 1999/2001, bidding/construction - 2002/2003/2004 Segment 4: Planning and acquisition - 2007/2008, bidding/construction - 2008/2009 TIF funded work includes the following: A signalized intersection will be constructed at Monroe Avenue. A second intersection will also be built at Jackson Ave/St. Louis Street. There will also be a reconfiguration of Monroe Avenue and Milwaukee south of Excelsior Boulevard. This work is being completed in conjunction with the reconstruction of Excelsior Boulevard from Highway 169 to Blake Road. The intersection is being constructed to facilitate redevelopment of the SuperValu north annex site. Justification Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in all four segments of County Road 3: -Segment 1 from Shady Oak Road to 1 1 th Ave So; upgrade existing undivided roadway, upgrade 1 1 th Ave intersection to meet future needs, implement beautification program--completed in 1998 - Segment 2 from 11th Ave So to Hwy 169; median pavers construction - Segment 3 from Hwy 169 to Blake Road; upgrade existing narrow undivided roadway, resolve safety issues at railroad crossing, improve north-south access, account for future LRT access, address redevelopment needs, add integration for full access at Jackson Ave. - Se meat 4 from Blake Road to Meadowbrook Road; u rade roadwa , 1111 lenient beautification ro ram. Prio-~ Expenditures 2006 2007 2008 2009 2010 Total 1..._.,.._ " ( Construction/Maintenance 2,300,000 2,300,000 •I~ot~~ l Total 2,300,000 2,300,000 Pri~~or --~~ Total Funding Sources 2006 2007 2008 2009 2010 Total GU -Other Governmental Unit 1,600,000 1,600,000 MS -Municipal State Aid Stree 700,000 700,000 Total 2,300,000 2,300,000 8 9 Thursday, June 30. ?OO,i CAPITAL IlViI'ROVEMENT PLAN 2006 1i„~t{ 2010 Contact PW Director City of Hopkins, ~~ llcpartmcnt Public Works: Strects/'fraftic Operational Impact/Other GO bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue. Segment 1: Construction - 1998/1999 Segment 2: Planning - 2005; bidding and construction (median upgrades only) - 2006 Segment 3: Planning and acquisition - 1999/2000; bidding/construction - 2003/2004 Segment 4: Planning and acquisition - 2007; bidding and construction - 2008/2009 Consistent with Hennepin County CIP and City Council action. Thursday, June 30, ?00~ 90 CAPITAL IlVIl'ROVEMENT PLAN 2006 rj„-t, 2010 City of Hopkins, MN Project # O1-CIP-S106 Project Name County Road 61 (Shady Oak Road) Contact PW Director Department Public Works: StreetsrTraftic Type Improvement Useful Life Unassigned Category Trans: Streets Priority n/a Total Project Cost 54,829,700 Description ~ Shady Oak Road from Co Rd 3 to T.H. 7, Mainstreet from 20th Ave to Shady Oak Road. Lighting, lanscaping, street, etc., improvements from Co Rd 3 to T.H. 7 Reconstruction and amenities on Mainstreet from 20th Ave to Shady Oak Road. Reconstruction of West Park Road, 2nd Street No, and 21st Avenue No (2nd St-4th St N) Justification Deficiencies appear on Shady Oak Road in terms of roadway conditions, traffic/pedestrian movement, safety, and aesthetics. Upgrade an undivided roadway, resolve safety issues with number of driveway access points and intersection at Mainstreet. Lighting needs upgrading and provide beautification program. Reconstruction of Mainstreet for 1 block section needs to be done to conclude the upgrading of all of Mainstreet. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 2,879,700 1,950,000 4,829,700 Total 2,879,700 1,950,000 4,829,700 Funding Sources 2006 2007 2008 2009 2010 Total GU -Other Governmental Unit 2,010,000 1,500,000 3,510,000 MS -Municipal State Aid Stree 721,000 721,000 PI - PIR/General Obligation Bo 100,000 200,000 300,000 SA -Special Assessment 48,700 250,000 298,700 Total 2,879,700 1,950,000 4,829,700 OperationalImpact/Other 2005/2008: Planning and acquisition 2009/2010: Bidding and construction Consistent ~~~ith Hennepin County CIP, city's desire to upgrade the roadway, and reconstruction program for all of Mainstreet. ~ ~ 7hursdal•, Jz~i~e 30. ?OO i CAPITAL IMPROVEMENT PLAN 2006 r~„~t, 2010 City of Hopkins, MN Project # O1-CIP-5109 Project Name Excelsior Boulevard Streetscape Improvements Description Priority n/a Total Project Cost 51,800,000 Contact PW Director Department Public Works: Streets/"I'raftic 'Type Improvement l'sefull,ife Unassigned Category Trans: Streets Excelsior Boulevard from 9th Avenue South to Highway 169 Street lighting, landscaping, pedestrian improvements along Excelsior Boulevard. Sod and irrigation installation for Excelsior Boulevard, Phase I boulevards Justification Work is needed to bring the function and appearance of this segment of Excelsior Boulevard up to standards of previously completed segments. I P~•ior Expenditures 2006 2007 2008 2009 2010 Total ~~~ Construction/Maintenance 1,800,000 1,800,000 'T'otal Total Funding Sources 1,800,000 2006 2007 1,800,000 2008 2009 2010 Total GU -Other Governmental Unit MS -Municipal State Aid Stree PI - PIR/General Obligation Bo 420,000 500,000 880,000 420,000 500,000 880,000 Total 1,800,000 1,800,000 Operational ImpactlOther 2005: Planning/design 2006: Construction Consistent with CSAH 3 Corridor Study recommendations, within guidelines of Hennepin County Roadside Enhancement Partnership program. Will be designed/constructed in consideration of Metro Transit future transit station/park and ride improvements. 9 2 Thursda}'. Jtu~e 30, ?00~ CAPITAL IMPROVEMENT PLAN 2006 thru 2010 City of Hopkins, MN Project # 02-CIP-S116 Project Name Minnetonka Mills Road Improvements 700,000 Description Minnetonka Mills Road from 5th Ave No to Herman Terrace. 2nd St NE from Herman Terrace to Blake Road -Mill and overlay Plans/specifications: 2007 Construction: 2008 Justification Pavement condition, substandard drainage and lack of curb and gutter warrant reconstruction of this Municipal State Aid collector road. Concerns have been expressed by the adjacent residential neighborhood regarding the appearance and condition of this street. This street is abutted by major industrial users as well as residential units that utilize Second Street for vehicular access or pedestrian access. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 700,000 700,000 Total Priority n/a Total Project Cost 5700,000 Contact Public Works Director Department Public Works: Streets/1'raflic "Type Improvement [:sefull.ife Unassigned Category Trans: Streets 700,000 Funding Sources 2006 2007 2008 2009 2010 Total MS -Municipal State Aid Stree 270,000 270,000 PI - PIR/General Obligation Bo 50,000 50,000 SA -Special Assessment 200,000 200,000 SF -Sanitary Sewer Fund 20,000 20,000 SU -Storm Sewer Fund 130,000 130,000 WF -Water Fund 30,000 30,000 Total Operational Impact/Other 700,000 700,000 9 3 Thursday, June 3Q 200 CAPITAL IMPROVEMENT PLAN 2006 r~„-j, 2010 City of Hopkins, MN Project # 06-CIP-S118 i'rojcct I\amc Reconstruct Parking Lot 200 Description I Municipal Parking Lot 200, south of Mainstreet between 8th and 9th Avenues. Rehabilitate parking lot pavement Priority n/a "Total Project Cost $150,000 Contact Public Works Director Department Public Works: Streets/Traftic Type Improvement l;seful Life Category Trans: Parking Facilities Justification Pavement has deteriorated to the point where cracksealing and sealcoating are not effective. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 150,000 150,000 Total 150,000 150,000 Funding Sources 2006 2007 2008 2009 2010 Total CI -Capital Improvement Fund 150,000 150,000 Total Operational ImpactlOther 150,000 150,000 Thursday. June 30. 200 94 CAPITAL IMPROVEMENT PLAN 2006 rh,-u 2010 Contact Public Works Director City of Hopkins, MN Department Public Works: Streetsrl~raffic "Type Improvement Project # 06-CIP-S119 l!seful life Project Namc City-wide Sign Master Plan Category '['raps: Sign/Signals Priority n/a Total Project Cost X35,000 Description Provide detailed sign -naster plan for upgrade of city entrance signs, building signs, and park signs. Justification Current city entrance movement signs are old and outdated. Sign plan Will provide for acity-wide Hopkins design and establish commonality of signs. Expenditures 2006 2007 2008 2009 2010 Total Planning/Design 35,000 35,000 Total 35,000 Funding Sources 2006 2007 2008 2009 2010 Total CI -Capital Improvement Fund 35,000 35,000 Total 35,000 Operational Impact/Other 35,000 35,000 9 S Thursday, June 30, ?~0 i 96 Utilities CAPITAL IMPROVEMENT PLAN 2006 r~„-t~ 2010 City of Hopkins, MN Project # O1-CIP-U002 Project Name Storm drainage system maintenance Description 2004-2008: Concrete alley repairs 2006: Nine Mile Creek bank stabilization Priority n/a 'Total Project Cost X290,000 Contact PW Director Department Public Works: Utilities "Type Improvement Useful Life Unassigned Category Utilities: Municipal Sanitary S 12009: Nine Mile Creek holding pond -Excavation and removal of sand/silt from pond area. Justification Annual alley pavement concrete slab repairs are needed. Nine Mile Creek banks are eroding and will soon threaten the adjacent park trail and Westbrooke Way street pavement. Pond sand/silt removal last done in 1999. Built up sedimentation has decreased stonnwater holding capacity causing overflow of sediment into Nine Mile Creek watershed system. Prior Expenditures 2006 2007 2008 2009 2010 Total 74,000 Construction/Maintenance 74,000 14,000 14,000 114,000 216,000 ~~~1ta~ Total 74,000 14,000 14,000 114,000 216,000 Prior Funding Sources 2006 2007 2008 2009 2010 Total 74,000 GU -Other Governmental Unit 20,000 20,000 •l~otal SU -Storm Sewer Fund 54,000 14,000 14,000 114,000 196,000 Total 74,000 14,000 14,000 114,000 216,000 OperationalImpact/Other I ~ity's portion of the Nine Mile Creek Headwaters project to be paid in years 2001 and 2002. Consistent with the Storm Water Management Plan. Thursday. June 30. ?OO,i 97 CAPITAL IMPROVEMENT PLAN 2006 ~~„-t{ 2010 City of Hopkins, MN Project # O1-CIP-U003 ['rojcct i\ame Storm Water Management Projects Contact PW Director Department Public Works: Utilities "Type Improvement 1'seful Life Unassigned Category Utilities: Storm Sc«~r Priority n/a Total Project Cost $220,000 Description 2009 -Provide outlet pipe to Shady Oak Pond into CSAH 61 storm drainage piping in conjunction with Shady Oak Road reconstruction Justification Shady Oak Pond has no outlet and floods streets and residential property if not pumped. Consistent with City Council approved action plan of October 21, 1997, the City's storm management plan, and Shady Oak Road reconstruction timetable. Prior Expenditures 2006 2007 2008 2009 2010 Total 20,000 Construction/Maintenance 200,000 200,000 ~~otal Total 200,000 200,000 Prior Funding Sources 20,000 SU -Storm Sewer Fund 'Total 2006 2007 2008 2009 2010 200,000 Total 200,000 200,000 OperationalImpactlOther Consistent with City Council approved Action Plan of October 21, 1997, the City's Storm Management Plan, and Shady Oak Road reconstruction timetable. Thursday, Jurre 30, 200.1 Total 200,000 98 CAPITAL IMPROVEMENT PLAN 2006 rj,,,u 2010 ''.Y Contact PW Director City Of ~IOpk1riS, MN Department Public Works: Utilities Type Improvement Project # 04-CIP-U007 l'seful Life Unassigned Project Name Upgrade of sanitary sewer lift station #1 Category Utilities: Municipal Sanitary S Priority n/a 'T'otal Project Cost 5200,000 Description Replace a confined space lift station that was installed in 1957 with a new submersible lift station and rerouting of the discharge line, or elimate lift station and install new gravity sanitary sewer pipe to Minnetonka trunk sewer pipe in Shady Oak Road. Justification The station has given the city a long life and now needs to be replaced. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 200,000 200,000 Total Funding Sources 2006 200,000 2007 2008 200,000 2009 2010 Total SF -Sanitary Sewer Fund 200,000 200,000 Total 200,000 200,000 Operational Impact/Other 9 9 Thursday, June 30. 200.1 CAPITAL IMPROVEMENT PLAN 2006 cjrtt 2010 Contact PW Director City of Hopkins, MN Department Public Works: Utilities 550,000 Priority n/a "Total Project Cost SSS0,000 Description Replace Nine Mile Creek corrugated metal culvert pipes under 5th Street South with precase concrete box culvert. Justification Existing corrugated metal pipes are buckled, deteriorating, and susceptible to blockage causing street damage and flooding during heavy rainfall events. Expenditures 2006 2007 2008 2009 2010 Total Construction/Maintenance 550,000 550,000 Total "Type Improvement l'seful Life Unassigned Category Utilities: Storm Sewer 550,000 Funding Sources 2006 2007 2008 2009 2010 Total SU -Storm Sewer Fund 520,000 520,000 WF -Water Fund 30,000 30,000 Total Operational Impact/Other 550,000 550,000 100 Thursday, Jude 3U. 200 osed Expenditures Prop or Future Pr°~ects F CAPITAL Il~H'ROVEMENT PLAN 2011 r!„~t, 2015 City of Hopkins, MN I'rojcct # O1-CIP-F504 I'r-oject 1\ame Sixth Street South (11th to 12th Avenue South) Description I Sixth Street South from 1 lth Avenue South to 12th Avenue South. Extension of roadway and box culvert crossing at Nine Mile Creek. 1'riurit~~ n/a "Total 1'rojcct Cost X400,000 Contact PW Director Department Public Works: Streets/f~raftic 7~ype Improvement l:seful Life Unassigned Categor~~ Trans: Streets Justification This project will offer a second access to the industrial area (fire access). Will direct some of the existing industrial traffic north, away from the residential intersection at Seventh Street and 1 lth Avenue. Will connect a current dead-end alley, west of l 1 th Avenue. Expenditures 2011 2012 2013 2014 2015 Total Construction/Maintenance 400,000 400,000 Total Funding Sources 2011 400,000 2012 2013 2014 2015 400,000 Total ED -Economic Development F MS -Municipal State Aid Stree 100,000 300,000 100,000 300,000 Total aoo,ooo aoo,ooo Operational Impact/Other Currently on MSA plans. ~. rhursdati~. Jiun~ .ill. ?IJ(1 i CAPITAL IMPROVEMENT PLAN 2011 tl„•„ 2015 City of Hopkins, MN Project # O1-CIP-F502 Project name Llght Ball TraClSlt Stat1011S (2) Priority n/a "I"otal Project Cost 5150,000 Contact PW Director Department Public Works: '[~ransportation 'Type Improvement Useful Life Unassigned Category "I•rans Streets Description I 1) Intersection of Third Street South and Fifth Avenue South 2) Second Street Northeast Supplemental improvements to two Light Rail Transit (LRT) stations in the proposed HCRRA locations. Justification The HCRRA proposes to construct two stations along the Southwest Corridor. The proposed expenditures would be in addition to the funds expended by the HCRRA. The additional funds would be used to ensure the stations are high duality in appearance. Expenditures 2011 2012 2013 2014 2015 Total Construction/Maintenance 150,000 150,000 Total 150,000 150,000 Funding Sources 2011 2012 2013 2014 2015 Total TF -Tax Increment Financing 150,000 150,000 Total 150,000 150,000 OperationalImpactlOther dependent on HCRRA plans. consistent with plans for LRT stops in Hopkins by Hennepin County. 102 T{rursday, Jude 30, 2nn CAPITAL IMPROVEMENT PLAN 2011 li„-~, 2015 City of Hopkins, MN Project ~ O1-CIP-F503 Project Name Ninth Avenue LRT Corridor Priority n/a Total Project Cost 5700,000 Contact I'W Director Department Public Works: Transportation "Type Improvement Useful Life Unassigned Category' Trans: Streets Description Ninth Avenue from County Road 3 to First Street North Relocation of utilities and reconstruction of street to accommodate light rail transit line from County Road 3 to First Street North. Justification In 1984 the city hired J.J. Bakker to analyze the proposed light rail transit corridors in Hopkins. The study recommended that the northwest route of the Southwest Corridor not cross County Road 3 at TH 169. Rather, the study recommended that the northwest route be extended north on Ninth Avenue to First Street North and then continue northwestward on the proposed corridor. Expenditures 2011 2012 2013 2014 2015 Total Construction/Maintenance 700,000 700,000 Total 700,000 700,000 Funding Sources 2011 2012 2013 2014 2015 Total SF -Sanitary Sewer Fund 350,000 350,000 SU -Storm Sewer Fund 100,000 100,000 WF -Water Fund 250,000 250,000 Total 700,000 700,000 OperationalImpact/Other Dependent on HCRRA plans. Consistent with recommendations made in 1984 Bakker study. 103 Tltursdu}'. Juire 30. ?00