Capital Improvement Plan Discussions 2001
~
. August 4, 2000
2001 CAPITAL IMPROVEMENT PLAN DISCUSSIONS
Overview
The City of Hopkins reviewed the 2001 Capital improvement plan document on June 2ih and
requested an analysis of the changes from the previous CIP document.
elP chao2es
. Added $28,000 in storm drainage system maintenance in years 2003 and 2004.
. Added $160,000 for watennain utility improvement on Excelsior Blvd.
. Increased residential street improvement amount in every year.
. Moved up the county road three project by one year and added $2,300,000 for future
improvements in year 2004.
. Delayed improvements to Shady Oak Rd. until 2002 and 2003 with an additional amount of
$2,300,000 in 2003 for improvements.
. . Added $805,000 of improvements to Excelsior Blvd, between 9th and 169.
. Delayed improvements to Second St. NE until future time.
. Added $900,000 to year 2002 for intersection and pedestrian improvements at 1 ih;cSAH 73.
. Added $100,000 to city parking lot 500 & 600 design.
. Added $300,000 to CSAH 5 conidor improvements in the year 2002.
. Added St. Joseph's parking lot improvements in 2001 and 2002 at $450,000.
. Added public improvement for the SuperValu warehouse project in 2001.
. Moved the funding for Central park parking lot improvements from 2004 to 2002.
. Excelsior Pedestrian Bridge project put on hold.
. Fire station wheelchair lift delayed until future years.
. City Hall HV AC control system increased $30,000 but delayed one year.
. Added public safety facility construction and remodeling at $6,780,000 in year 2003.
.
. Added redevelopment of East Excelsior Blvd. in 2003 at about $2,000,000.
- ~
. . Added North Annex redevelopment project in 2002 at about $12,298,000.
. Added East Central Business District redevelopment in year 2001 at about $1,500,000.
Attached is a summary of all the changes listed above and a draft of the 2001-2005 capital
improvement plan.
.
.
-=-=-
0 0 0 00 0 00 0 8
g 8 0 00 (;) 0'0 8.
~'<t U) 0U) 0.- 00 .q
Q)O 0" oj '" o"r' " lri'>ii o. 8
z~ II) rl rl N<:t IJ). r-"r:-; ~
. rIl '<t '<tN l""
i"'I
0 0 0 00
0 0 0' 0,0.
~'<t .0 0 a, 0'0
-- 0 ci 0 d i.6>ii
.~~ LD {\J WI r".f'-
...... ......
0
8 0 0 g 88 0 .~.. 0 00 ~., 8
0 0 . .' ~'. .0 00 .'
0 0 0 0:0 ...... oar-- '.0
~rIl .;i ..t tD g irf1l1 11)' in {\J a) a) 0. .,....;
Q)O rl 0 M r--r-- ..... ,..... ...... r--O 0 (\J
z~ In N {\J N l'o.. ('r)
N
0 0 0 '00 0 00
0---' 0 0 0.0 0 00
~..., o~ 0 0 00 ...... 00 r--
- '" d lri'l!l- 0J
.- 0 0...... 0 (J) 0'>
lIDO inN N WI ("...'f'- r-l r--O
. i: C\I r-l 0 ...... N N
0 ~
-'" r...
ro .;i.
---. 0 ill
0 OCJ 0 o >, 0 " 0,00 04 o~ 0 o 000.. 00.
0 o c 0 Ou 0 a 0,00 0 ....... .. Qi o 0 0 :;>,. . 09
l,(") o 0 0 U) ro " 0 000 0 ~~qco ql";..
~N (\i' i.611 ci ~~ U)" 0: i.6tri.oo r..: d' ci ty) r-l Om g~
(fJ Q)o rl <.0.'<' 0 rIl lIT r"f'--.N ~. In r--- In ...... j::;..
W z~ ...... ro N N E rIl 00C/) <f'
0 .0.
(') 0 ~ ....
(fJZ >, ~ <Ii 1il. .
u
f-<:( ro 0 +J.
UT Z E .Cll.
.r::: Q). '-
wu (f) aU) o oEado .'.-fY"
'>- 6 0 a/', 00 '0 00 '" 0
.8 o a, ~ 00 0 C
00::: 0 0 au oM t"< 0 00 om 0
0:::<:( ~N trl Q) 0 o C o 00000 00\ >0 <.D <.D 00 0
~ ".-. ',~ ~ ',~ ~ - ,,00 ri ci (Y)-'-; :::E
0...:;;;: .- 0 N 0 cS <.oc\! LO('IjOnm.mOO '1:"""1'
I-~ .~~ ....... 0- o~ lD r-l . I.O.Ef'> t--. N t--. t"< In r--tO +' N
('\I '" '- ~ 0 u to
Z::J +" T"""Iu ';""" ::l
~(fJ 0 ID Qj 0 '- ~ N ....... .....
. +:; ~
wW ::J E c- o ~ I;:
>0::: 0 0 Q) u 0
o 0 -ao o"tio 0 (f) 0 0 a.'\-'>, 0 0 0 'C 0 8:' ',8 0 <). 00
O::J o oc a O::Jg 00 o~oEaooco ~" !
0:::1-- ~. 0_ ro O. O. o,~ o. ~ N...<:: q ao.q O~ a. Ct31..., .,
0.0
:;;;:Z ~M N L[)-a 0 O~O rIl~ omO_LD.m<.O~~O~1 r-,
Q)O rl NC 0 o_m 000 N:;;;:tO"'~t--.LD-ar-lg : a
~w z~ ---. ...... 0 to 'N '" t+ M.J:: M ... '"'" . , C........ oW'
<:(D... ~ ~ 0. == ;: ~..... 8'M" .~ .4 in
I-X o Q) 5: .n '- .<!) ~, co
~W ~ g_ ~ 2:'> E l.L.. .~ . ~ tl. 0:::
0...0:::
<:(<( 1,13 0.. ..r:: e 0 li'i: 0.)( -..... ~
Uw u ,,' +-' ~ (I),'" 0. W' Q) .- 0'-
g~oW g oC 00 0 gboooco ~ > g' go
>- ~ " ..., 0 Z . '. 0 E 0 Z 0 Q).... $1 00 0- 0 c <( "E' . 0
0::: ~M "'mmo' 0 0 o. o>.o'-"o'oo~o Q' .J:: De o./',.
::J .- 0 ENi~~6 o~ cS~ ~<(g~~~0ro~ ~ ~ 6- ~oo
0 bDo Q}......~<.DU 0 0= 0<:( ty)~~~f'>In"''''''' ~ l.L. Q~ "~
LL "i: N g 2~c .m ('\Iro .......J:: NO'> ~ ~ ~ ~ ~~ ~
0 o Q> 0 E ~ ~ C = Q) <,-<'4)
oTIg '" ;::t; ~ (0 ro E :" E
;>, " (f) '" a; ill II) 0 <ll
0 ~ ~ '- ~ 0 ~"1tj Q> is -e .ti
ZO ro l\) <l! --. 2. Z .8 , 3' , '" .,5.. 0 ,,0..
if> :;). ,"- .J: u.. 'u" Q)u.. <( III :;).... " <( '" ~ ;:). E Ill, <( 0- III ;:)E"; III <(
~a: u" . .' <;...1 ~ ~' 00;: E ~ ~ ~ - c -g?;:u.. >. ~~-. - ~ u"ct" :it'
.....<11 <II r-- <II ,;" III Cl) so ,-.' <II IJ) 0.. co <II "",' .' III <II ~ <II c.,;. . D., III u a.. 1--. - ,ii;, . (/).
# ~~2 ~ 2:~~ ~ ~~~ ~ d ~ 2 ~':l
c-~~ 2E;E~ C\! E~2 m ~ ~"ti ~~.
O~"~O - ID'~ ,.~ ~ ~ c .'..~
~ct~~. ~,~ ~m 0 e~,o m ~ ~ 0 -~~
2 '_m' Z CL ~:a tn' ~ :3 i5,~ ~ - E: '11) 0 "fR. :~ u ~:.-~ ~
W "':;;;: '.' 1.::.2 ~ C 00 E tL "0 g; 0 0 !'1' cd is "'5 ~ 0 .b -
c 00 oZ zc~ ~.
-.-J :g E [[\ E~ co 'Ui ~ 2 E c ~ ~ . ag >, :: '" a, -g ~ ":-
I- '-2 E Cl) ~] ~.oo Q} ~ ;>, B E 00 ~ E ~ = g gl'::S <ll 1 . ~ i
I-- ~ro~:~Ma~W.~~~~~-~ ~~_~ ~_ ~ U. ill oo~:~,~
I-- cn~~~~~~'i.QuEE~~ L~,C 2~ ~. :~~ ~~~.
U 0~~~mo<ll~~Um3",ID ~$g IDC U G~t _U<l)
w
, g ~ nlJ 9-:;;;: -ti c ... .<n (J '- 'O,C1:l ~ g ~ ';;;ffi t; 8 f"> ~ .~ UJ ~ tp;:;o
0 0:: .;-< ~, 0.. l...... :t=" .2 ~ 0 ~ ..c (/) l...... ~ tn. : C "'0 'C Q) Q) '0- .c
0::: o5~Cl)u ~<l!~-mC-- ro_o 00 <llro ~'- rom
0.... C::J. ~ ~~Cl)U~m -<ll~ u~ 0- _ 0_
o "- ~ ~ ~ Q) -. 0 Q) m "- ~ +--" mill'+:; E E'o.:: . ~,_ ~ (]) CC .:.
~~o ~o __['-OEc> >c Cl) ,'~ >TI ,,00
ro'" ~ c C =Ui,-l\)<( o~ro uro ;>'.C <:(<ll ~~
~~E2Ero .ajt2~_~'~L ~'~'.~ .~~ ~~ ~~ ~,i
U~0l......~ ~~~~om~~ __~ ~o z.. ~
~mB€.8~ m$roE~~m~ EQ}k ~a o~ ~~ 0&
~~W~.~~ ~~~_w_~~ ~~~ 0_ UO ~- Q'~
. -.:;;;:
03 ~ (-.J. (T1 "t LD <.0 ,-, N (T1 ~. LD to
g:,z 0 0 0 D 0 0 0 0 0 0 0
0 0 0 0 0 0 ,-, .r-< ...... d ...... ......
~ :::> ::J ~ 3 :J I-- .1-- I-- l'-" I-- ~
(') '" if> '" '" '" '"
or: c c. c c C c
.~ ro ro m iil ro ro
IY<:( ~ ~ +> +> ~. ~ '-'. '- ~ '- ...
o....U ::J ~ ~ ::J ::J ::J I-- fC' I-- f b-
o 0
o
~~ ~
~o 0
. Z~ N
o 6
o 0
~~ 0 q
-0 0 ~.
~o N ~
...C\l
o
o 0 0 0...
000 0
000 &
~a'l ci .n 6 14
~g ::;: r-. N .":j-
ZC\l
o CI
o 0
~a'l 0 q
'~8 ~ ~
.~N .
o
o 0 0 od 0 0 00 0 0 001.... 0 0... 0
o LO 0 0.. .. 0 00 0 0 00... .0 0 0
ID r-< ~ ~ 0_ 0_0_ 0 o. 0_0_..; 0 q.. 0
~ C\l r---. L!l 0 0 0 0 0 0 0 0 0.0. .0 ui". 0
~ ~om 00 0 r-. ~ ~o N ~ O~...N m LO
w Z 0 ...... a'l r-l r-. C\l r-l r-l m. . .. N
('J C\l
~z
1-<
UI
Wu
~>- o~o 0 0 0 0 0
00::: 0 ODLO 0 0 0 .0 0
R:<( ~C\l LO.:Q....... 0.. q 0. 0.. 0
~ -Or---.~LO ~ WOo 0
~~ ~~~woo M ~ N N. ~~
w::l 0 C <Ii
. ~~ :.:J :::
wW 0 m
~~ oaOOD. 0 d 00 0 .~... ~~O 0 ~
0:::1- 0 OOC 0 0 ~o g.. . ..0 0 ~
0...- 'OJ-_<<lco.o.o.. ~ 0 ..00 .~ :" .:..0_ 0 +->
~ ~ ~ r-l r---. C ...... 0 lb 0 ~ d:O 0 ltl .U'I: 0 : 0 6 C
- QJ 0 I.D 2 r---. [Y) fI) U) +-> N.lCl N 'lit. .0 fI . . 0 LO .
~~ z2r-<w ...... ~ ...... M ~N ffl ~~M n
<x E ~ E ~ B W
'::w (j) '" ill e i:::: -
a... ......... > W Q) VJ
<0::: B i 0 EE ~
u ~ >'. . E E . ~ . ... . ~. .;:;
>- 0 ~ 0 08.. w C 0 ..0.0 0.0 . c:i 0 t'
0>00 > m.O 0.0... 0 ~o
0::: ~~~wooo.q 2.~ ...0.. qo.n q0 q ~
::l .5 0 r---. -'<' ...... 0 m. n 00 ~ 0:.0 0 E.o . E 0 _
,2 .~ 0 <.D g r---. <Y) m E ,5 w (\J 1.() N .<(-.l1'i ... LO 00
~N~_ ~ .~ u ~ m N p C
one i": ill 0 "'"' ~
t:; m .,Qg D... -=t: '!j,(J,;.-:-..., ~ Q)
Ql . E -g ~ ~ ~:i3 ~
~ ~'" ~ ro "';-.; .",,"0 E 0
CI af ~ ~ ~.~.~ ~ ~~: ..a,~ ~ 0 E
~ ~ <( :i'f<ll::::l -m- ~::::l_ "a.(/) g: _ ~::::l <Il 11)2.;::> II: ;:.:c: g_ _ VI ::::l.,",",ool.L. 0:: ~a:: 000::] .l.L.:
l.L.VllI)cE<Ila~~ ~~<<l~~~~~EEc~UWVlha~ E~~S~ U~U<<l~'" ~m
.~ .Q~oo ~ v~~ vE' u ~ ~ ~~ ~ ~ e~ ~
~ ~mc ~ ~_w ~ 0 . ~:o .5 c ~o~ c
u m>a ~ am~ : ~ U Q" ~2 ',xr ~ W .em
o~ ~~om ~ .~... ~Q _~ ~w ~.w ~ E QJQJ 6
U) X' ~ () ..,..,.........._ 0.- Q Iw..,; ....0 ~ 'U c _ Q;."'"t:J lo.... iti. 0... ~. ~
wOD >Wn", ~ _ E Po. ~~~ wOD .Ec<<l ~ 0 Do .5
> .5 <(. 1" "0 0:::: ;:::g E nil) .m E s: ~...ltl ;: (.,l"ii) co. .~ e
w<n ~B c c ~ 0 .,~ L_.E:E ill~ ~.~~ 0 >-~_~ m
~ ...c L ~ ,.: Q.) ~ .(;).:s I +-i ~ ,r: m I1J .Q.)_ '00 :>...... :0" :0, - ~ Q} ',0, ~_ _Q. N
f- +-i =:J -i--:1 1i) a. _ :Q.., , "'=! (J1 .1.1.)- '0 0.. =- '-,-,.- e:J ...J~, (IJ U ~ g.. .:!S ~
...... U <-;' <If ro nom -g ~ +-> +-> ..;; W .~2 III n U . .00 > -0 Q) W l;JO b,:i. . E
r- r"""'l .......- ::>. ~. ~ c :;::: >.. u c ,~o '-- ro :0:. b E - .~ c~ ~ .fij > lo-, ~ .c:: ~ CJ.)
I- c c 8 '0 ...;::; w...:3 ."1 ...... WE U1. III ~ C EID.. ~ 3i;.."". ... n .~. ..... W ~:.;2. S< ~ c 0
o no ill 0:. ,C -i-' .r:: Z .(jj. - CJ.) ,:.VJ. rn \...... ~ lo.... __ ~ L::J I.... .C U u +.;. lr..:. .c. - .......
W - E E .iij (/) no .. c .~ > ill ;'1;:. ~ :i:. ro.j,J 0 0 n <<I..fl1 (/) 0. ;;2. ill m .m .""""'. e L..
~ '" W .. TI +-' C~ .... <:( > <(( ..,.. ill E 0 0 "0 ro .J::L .~ S+-,O::: w (L 0..... <<l 0
Ow> -:c.:a > .cr> . 2 (/). .~ TI 7' 1.0 .C:: U . "" . -.- .'0. ..<:: m -'<'...... :::: ro
0:: -g C'lJ iD Q) - m _~,-w :S 0.. 0..':,. '.en -8 no .,.' L U} ..;..uJ. ro L ~'~. u ~ .~ '(,) ill >
a.. 0::: 0. .~.;::; ~ '-0 0 Z r---. E ....... b w j i>/I 8 -g~'0 E .~.'\l m <<l ~2 ~ ~
......Q} .0.>,0...... ..... ......- f?3 uE""o LOm .QJO l:L.Ollmo~+, eW
"0> .w=:'-o 7'0_(1] -....... I~-b _mCQ,Q ~ -vJ-;. .'.C: >'-tt{1/,I -
- e ~: <<:3:,'::::: +-' .r;. r--... Q) ::r:~. ~ Do Q;tn I ~~ ,Q r--- 0 ~.:.;: ..:x: -0 ~ c' 0 m
~o. ~3W~ 0-0 >,~ <(c ~o~- <ero ~~n $~rom~8 +-'
~E ~.~'~~ .Me ~+-' ~o +-'l.....~O. 00'-- ",~~ ~,,~,O~M'~ ~2
~~ ~?w~ m~ I~ u'g ae6~ o~ ~'S~ >"8~~u:6 ~_
~::'2'
. O::l r---. .co m u'J. 0 '"-< N (Y) 'OJ- ID .. I.D "". N.M 'OJ-
~zo 0 0 0 ...... ~ ...... ~ - ~........ 0 0 0 0
~ ~ ~ ~ m ~ ~ ~~' ~ ~'~ ,N. N N N
I- b I-.~ I- I- I- I- I- /-. I- a a.. l:L 0...
C9 ~ en VJ v.) in I.h VJ .ui (I) .0 l.J) 'w. U"l _~. '"
O I- c c: e C C C e C: c c.. e .:st;. -",. .-'<'
ro ~ ro ~ m ~. ro ~ ro ~.,~ C'lJ ~ l.....: L
O:::.c( ...... &;......... :0..... l..... J..o.. "-.~ L ""-. lo.... ('t$. C"C ,(I;]. ro
0... U I- /- I- I- 1-1- 1-1- I- J--. I- j:l. 0... n... a..
o
o
~q ~
~o ~
. Zo ID
N ~
rti
o
mq 8
So ~
~o ~
~N ~
e
o 0 00 0
o 0 00 0
,0 0 0 ',0 ID
~ffl 0 6 6 'gO ~
~o N 0 00 ~
ZO - ~ 0 00
N ..0 N rti
'~
o 0
o 0
~ ffl 0_ ,.... UJ.
-0 0 d ~
~o N 0 ~
aN ~ 5
>
0,
E:
o 0 0 0 6 '~o 0
o " 0 ~ 0 ~
, ,0 0' m 0, .-I
~ N cl 'I(f 2:t af a:l
Ul GJO N N' 0'1 M
W z~ ~ ~ 00
(;) (ijN ,~
UlZ · ~ .-I
~~ E
OI 0
WU W
'~ 0 bOO ~ ~
o~ 0 0 0 0 ~ 0 ~
g:~ ~N 0_ q q 0_ C:' Ln '~
~ -0 0 0 000 ~ ~ ID
~~ ~o N Ln 0 N E ~ 00
~~ aN rl ro t m ~
. ~UJ 2i Ph LO
w w ~ ~ u'
~~ 0 0 0 o~ ~6~ 0 g
~~ 8 8 ~ ~gi g 0'1
~ ~ ~ 8 cl LO- 1;>' 8.6 ~ 8' gf
~w GJON rl? ~ w~~ ~ ~ .-I
<( CL Z N ~,' <d':oS ~ oJ ro .-I ci
~ X '0 Oil >- >;>Q' -= .-I
_w "_ C _ 'C 0 m ~
~ a: --;;; 1:) ~ ''E ~ 0 ~
o <(<I) G", 0 0 ~'t: -0 -c
w b~o b~ <( bB =6 S ~ 0
~ ,0' ..0 o. '" W,O' . . llJo' 'P '",,"' aJ 0
~ ' ' ,c 0 ' ' . .... "co' -0 "~ '" ' " aJ
~ ~ ~q $ 0. q:(;' :oS 0.: is 0 q -:t;, - 2 ~ ' "t
._ 0 ,0 "LO 0 U' >- 0 u E ,0 '<1> '" c: 0
o l1Il 0 {\I '> rl -ctDlIl' ()} l' ' " Q ;c [3 tll <::: <Xl
LL ".: N . 0.>: ~ ~ .~ :- '~'. ~ ~ t.Q: 03 E (1J m_
e c, "'.... 0-0 -0 rl 0 E ~ r ~
-0. .b ~Q 0 c: c~. E () ~
ffi rn % - crJ ~ X' 0 a .2
c '" c:,~ 1:: <II t10 ~. 8 '-' ,E .:t
ZU. ~2w N~..C[34N ..' m
:J a: a: ;" a: OIl a: ..::l 0:: OJ a: :;:; 0:: a: '..... -0..... <ll..... ~
.....~u~u~u4~ u~~o~ u2~1~~~i~-o
~' 00 ~ ~~ ~ .~ c ~ ~. ~
.~. c.. m ~~ ~,~. ~ ~ .2 -?_ 3 00
~ ~ ~ -0->. 3 3 <II u~u ~
, "', . ,0 aJ :J 1? " GJ ()};:.,. <ll a3 ,C U ::J 0
~ x~:_~ L~oo:F"~ c~o o~N:'c~ W
W ~ OJ ,QD:'_~ ct:: "3 :;:: ,:Q.~ ~ ro ~ ',~ X :~: :o.D'~ ~ ~
WID b 0 E };I. "",' rr c: :::lro:!: >- g "E. ~ W_ L ,- - 0
--' 'c- ..'-,. L ~ :J = ,<]),0 0 IJ.;, (l) ~ o.,~ 0 c ~
i- .~.o -0 Vl.iP:4)- ~~.= '--0' c:e:" -- :.;.:. co O. I..... -t ~ 0 0....
_ ;,:,;,0 Q) c.c. "'0- f-o~. m U'J -0 ....... . : "'Q. >. In tl) "0 "---- ill A... m U'l ''';:; ,
I- 0,-6 c ~ 'll c.~: {i.~ ~ 'd Z .g,\. ~ .;g ~ .P' S! "2 ~ a. ~ = ~
I- E ,()) C U ;;:.::1 ~. - <II OJ .0. <<l m 0 - ". 'OJ '" <II ,.QJ '-,,- ED Z 0
O~~O(l):~ ~%()}~U~~mtONa3 ~pm w
W .i: "'. U C (l) 'Ci.... U C 0 l;: C LL '-, t) =lIo. <) 0 (i) ,'2-::J <]) ~ Q
(3 . ~ 2- C 'U E .... ~ ~<( ig ;:., o.lIlQ(l x Z 0' ~ CD -0 W ~
~frc~8())~ c:'" >c ~c~'PwaJl~~~ > W
CL . C g ~ >. 0-. >-. o.(O.::t: 0:. m 0 .~:5 t; g.cS b .~ ~ CL
3~~~~~ ~L =~ oo~~~m~i.~~ CL a:
--8 0 c Y '~. n ~ .Q .m 'm 0 '_: > l1J :> - ' -q u .~ <J::
'C .<\1 0 rn~, ',~ <II Q) I'-,. <) '" Y 0 0. ID ,s;; ,^::J ~ w
~li~L!1 Q)~ >.0(1 ~-~F3u~~-U - ~
o,~m~~~ .~i ~% ~~?,~~&o~~~ ~ ~
o~~-~,~ ~_ o.~. ~~~~~~.?~W~ ~ rr
- 0
~ LL
,~ .. 0 --'
. 0 :::l lI) \!l m.-i N i:f1 .-1 'N (Y) --' <(
O'zo.. 0 ~ a 0 0 Q 0 Q 0 ~
CL N N ~ ~ M (Y) m ~ ~ ~ ~ 0
0... CL DLL ro CD mop 0 0 ~
~
CD "~ 2 J2 ~" ~~ ~'"" 0",: C 1:;:- C
Or-. Ir.... L- . \;;..; VL.I ..... '-'II.J:1oM.lI 0 .0 0
rr: <:( 'm <<l OJ -0 ,2 -o:g <) 'OJ' <)
CLU~ CL CL CD m CD CD w ~ w
. M OO~ 00 00 ~ 0 00 000 000 ~ ~
~ ~ M 00 ~ ~ 0 ~ ~ 000 M N
:g I "':. 00 00 O. ~ r<1 :g 1 C"I 0 7r 7. O. o. o. r-. 7.
o ~ 7 7 O~ ,..... 0 M ~ M 00 ONN ~ 7
N ~ ~ ,..... ON ~ N ~ N 7 ~ NM~ 0 _
N 7 NN M ~ ~ ~ ~7~ ~ r-.
- -
~ 0 ~ 00 M 00 0 0 00 000 r-. ~
N ~ - 00 ~ ~ 0 ~ O~ 000 ~ 7
71 M MOO 0 ~ 71 NOr-- 0 ~ N \0 00 N ~
o 0 ~ ~ O~ ~ 0 ~ 0 ~ O~ O~~ M ~
~ N ~ ~ NN ~ ~ 00 ~ N ~N ~~_ ~ 00
~ "T ~N N 0 ~ OO"T ~Mq "T 0
~ ~ T""'"'""I....--l,--.l .......-l ....-
"T OOM 00 ~ 00 0 0 00 000 0000 00 0 ~
~ ~ N 00 N ~ - 0 00 000 0000 ~ ~ M
MI 7. 00 r--. ~. o. "l '"'l MI lf1 o. q 0 q q 0:. ~. ~ r'!, ~r r--.
o 7 ~ 0 ~~ 0""" 0 ~ 0 7 07 O--~ ~ 00 ~
01 - ~ r-- ON N ~ 0 M ~ N O~ O--N 00 \0 0
C" ~ 7 \ON ~ M N 0 ~ q~ Nq~~ ~ \0 _
~ ~ ~ ~~ ~ ~ - ~
7 000 0 7 ~ 0 ~ O~ 0000 0 N
~ ~ ~oo ~ ~ r-- 0 M OM 0000 _ 0
to;! M[ 00 "l q o. ~ "T. NI ~ q ~ O. ~ 0. -. 'S. r-- ~ r'!,
~ 0 - ~O~ 00 ~ 0 N 0 ~ O~ O~OOM ~ r-.
~ S ~ ~07 ~ - 0 0 ~ 7 ~7 00007_ M 0
~ ,~ N 7~ 00 ~ N ~ ~ OO~ OOOONq 0 ~
Q .,......c ,.........t ....--. T""'"'""I N.......-l
.... ....
< ~ ~ ~
~ 0 ~ 0
'--' 0 .... 0
'" N Z N
. < 7 000 0 7 ~ ~ 7 0 - 0- 0000 ~ ~ ~
M ~ r-. 0 ~ - M 0 7 07 0000 r-. ~ -
~ 01 7 00. M 00 00 t:! ~ 01 - o. - 0. - q '.0. O. '.0. I,Q '"'1. t:!
.1 0 M I,Q M - - ~ ~ 0 MOM OM ~I,QNM N M N
- N ~ I,Q M ~ \0 ~ N - ~ ~ 00 O~-- 0 I,Q -
< ~ 7 ~ N ~ ~ ~ ~ oo~ Mr--NM ~ ~ ~
~ - C ~ - - - - - C
.... ro ro
U - _
.... ro ro
Z iXI ~
8 \0 0 00 0 "T - 00 O~OM 000 "T ~
~ "T ~ MOM 0 N 000 - 00000 M N
81 ~ C"~ r'!, 0. "T 81 ~. ~ o. ~ ~ N 0 q - 00
o 0 ~ ~ 0 M 0 - M ~oo ~ ~~oo M N
N M \0 00 M ~ N ~ ~ "TN N ~\OO _ ~
- 7 r-- ~ M ~ - ~ MN\O ~ 0
N ~ ~ ~ ~
N M ~ \0 \0 \0 OO-~OOO~ 0-- _ M
- M N N 7 7 ~O"T-O~ ~\O- 0 ~
~I 00 ~. O. oo.~. ~I 7. q ~ r'!, ~. 0. 00 "T. ~. "T. ~ ~
~ r-- ~ ~ ~ 0 ~ - ~\O~r-.o~ ~\O"T _ _
- ~ 0 0 ~ M _ ~ 000~r--~r-- OOOO~ ~ "T
N 00 - - r-. ~N -0000 O-N M ~
,........., N"-" .,........,. ~.....,.......,....,.........,
ilJ 10-0
U ro
~ ~ if]
a ~ bfJ :g~ "2
ilJ co C C C if] "0
>-< bO .a ~ ilJ if] ~ Jl
C C C ilJ E ilJ if] if] if]
+1""""l U'}..,...., "....-4 ,.../ OJ U VJ ~ fl..) '"-'
bfJ tJt) "d bO.......if] 10-0 ro ilJif] ro
ilJ ilJ ilJ C il.> ..... 5: ;:l...... 'H ~ ilJ
iXI.... Bti ~ co 5.0 a g ~_ >-
- C if] 10-0...... - _ cC roro _
ro ilJ't:IbfJ o...c ro ro!:<!:< r::;'~""" ro
.t: E C C H -+-' .~ u::J '~ U') ~ W UJ r-" 0 .:::
0. ...... 0.- "d "0 0. 0. if]..J "d 0 .......... il.> E--< 0. ilJ
ro .2~E :.;r:c ro ro 1il....... ,s~E--< ~~u ro ~
. U - ro ro U U if] c<l U .'="1.'="1 .S: U ro
bfJ <r;:'5!~ ~";;i bfJ bO <r;if] ~2 22l-< bfJ ~
.s -;;:; < ~ n p, .S .S -;;:;"Q t:; <2:: 0... P-. 0.... ~ .S co
..;:: ;:l ~ ~ lZJ 'u ~ ~ 'u;3 ~ ~ "d ~ ~ ...... ~,.c
o ~ ~ ilJ 2:1.S 0 0 ilJ c;:::. u ro C H H .0 0 Vl
~ ~OO] U~ ~ ~ ~~]~~ 000 ~ ~
.
M 0 0 00 0- "<:t
~I 0\ 0 0 0 r-- .-<
"<j" 0 0, 0\ 0\ \0
- 0 en - 0 M
- 0 M r-1 M N
l:- f<) 0\ N 00
-
Z
0
....
E-< N - 0 0 0 M "'T
U - 00 0 0 0 0\ DO
r:; ~\ 0\. 1.0 0 0, .-< ""1"^ m
0\ l() 0' en 0;- .-< 0\
O~ - ~ \.0 0\ .-< r-<'J
en ~ 0 .-< r- "'1"
~r:fJ N - -
~-<
~2
E-'U
S:~ \0 ,-..,
0- 0\ - l:- N
<~ ~\ en M o.n N 0\ -
Uf- O 0\ \O^ \.0 ...... 0\
~~ - 00 ..... M en 0-:-
0\ N en en '-' -
""1" N - en
~6 <I)
0::3 0
0
~<( ,-., N
I:- 0\ M 0 "'1" M \0 --
,V N .-< ""1" ...... M If) -
~\ M
AO ...... "'t - M- e;. --
Z:5 N ~ \0 NN ...... N
. - If) r- '"-' 0\ -
>--, " r- - M "'t l\)
,.......... U
~p::: !::
ro
;;..~ C3
E-'P-< I:Q
....0
..:l- (<) 00 ..... 0 _ 00 I:-
,..... .
~fA ;\ ,...... 0 0 <n en r-l
.- \0 ""1". r-^"!, .....
;:J - M ..... N ...... ('1
~ en r- .-< ......
~ en N - r-
~
~
~
,..-...
N 00 0 0 r--\O M
~\ \0 00 ...... O\r-- .-
on If) 0 M tr. -
0 '-"
0 0 M ,......
01 "'1" N <I)
0\ ("<) r-- <n
1-< ,-.,
....; r.n
ro .s
l\) ~
>- ,....... Z ~
Oll u ~ l\)
~ .5 .... ><
'6 ~. ,i!'. t:lJ
~ I ~ ~
'SO '" >- ~
~
ilJ ,S 0 ~
I:Q ~
-- ilJ
C;; ro ~ "'@
1-< bJ)
..... <l.J '" ~ ;:.>-. ~ ....
'g- o.. "d ro (l.) ro 's..
0 (l.) _"'...d ro
<l.J .... ro u ~.n'noooo..,
. CJ S u ..:l 8 ~ c U 8<X:~-;('~f")~~
bll 0 < Oll
0 P: iflO~~r--'.,...-I""",,,,~
~ 1-< E-< _ _ 0 P 5::i:AfAfAfAfhfh~
J2 ~ '"'0 .... -E3 ~ -+-' lo-o ;.g
~ -,..-l "_ C r:u ..... (l)"'1"Mt'-O<TOON
1-< '"'0 ~ ~g.]-B-S 1-<
0 0 'ii:i 00 0\ 0\000"""
~ '"'0 0 ~ 0::;0\0\0\0000
-< en u uu O~ ___NNNN
-..
.
('.1 0 00 N
~I <n 0 00 In
0\ c;. 00 0-
- 1.0 .no" N
00 0\ r--- _ 0\
0 ....... -
....... -
Z
0
.....
~
U - - 00 N N
e; N M 00 In 'n
~I "'7, <n 00 0\, In
0 In 1.0 06 - ~
"'7 0 r---O 00 "T
r:t: "t. N '<t- c;. 0\
~ - .......
~
~
""""
~
~ "'7 t'- MNI.O - 0 -
u ~I 01 l./") IDVlr--- ID N
01 cr:. 01001 00 ""':.
\J ....... M v) O' on' - <n
Z "T 00 r-- 01 ,....., "T
M N "T
~ ,
- ,.....,
If)
0 0
~ 0
N
DO ID <n 00 0I'<t "t ---
I "t <n 01 "T r---on 01 .......
~I M
~ 1.0 I.r) r'l M -M 01 ---
M 01 "T N. M ("'I - ('1
. N M 0 N "7 .-
;;l 1.0 M 1.0 M <IJ
r,., - . C,.)
-< - ~
~ ell
~ <ii
~ CQ
.-,
r..l 0 0\ ID o If) 00
r.FJ ~I 00 M ....... "TOO "7
>- "7. l-: 0\. -"7 \0
~ In -< "7 Nt"')' r')
00 r--- ('I - ('~
~ If) M M '-' 1.0
&-- - .......
Z
<
C/l --.
0 0 - "TV) 0
~I 0 t"') <n ("1 N 00
"T 01 0 "t 1.0 '<t,
~ r--- 0 ~,....J <n
0 - "T DO
N "'1" If)
- -
/.;
Q,l
~
Q,l
'"
- S
'- ...... en /.;
<oj ..s 0
<IJ &-- -
~ Z I- '"
<oj
b!J U ~ <U .c
~ .9 ~ .~
. r< :::
a '-' b!J
I ~ l=: Q..
.51 U) ;:a 1:':1
l=:
<IJ 0 0 s::: ~
co 'r< ~ W '"
......
ttj ro ~ ~ Q,l
I-< ....
...... Ij) ""'" ;>-. ...... ~
.5. 0.. "5~~& .5. r~oo~~
ro 0 O....:l"5~ ro
. U E u o onr--o <nNI/')
bJ) 0 ~ < o......! e- bJ) 1r.: ......; ...-: ("'.i N r--i N
s::: I-< ~tttjc;jB s::: iVlEAEAEAEAf;17
:.2 ~ :.2
I-< "0 ~ ~ .<;:: :';:: 5 tl I-< <lJt"')OI-<MO'\_
0 ell < o..o.;>~ 0 tj 00000\ 0'\ 01.....
~ "0 I-< U C'd ell ~ 0 ~ 0:::01010\0'10\0
<J:: f-< uu....... -~~--N
.
C\ 00 0 0 0 0'1
~I r<) 00 0 0 0 r<)
0 00 o. O. 0 0
00 0'1 0 0'1 0 0 .-:
r<) 01r'") If) ,..-< ........ 00
\0 \.D
Z 0'1 00 0 0 0 0'1 0'1
0 r<) CO 0 0 C r<) r'")
~I 0 CO c;. O. 0 O. 0
.... .-: o. ..,,[
~ ...... 0 ~ 0 00
U 00 r<) M \,CJ ........ ...... r') 00
If) \,CJ r--
e;
0
=:
~
..:l '<:t '<:to\ <'<") 00 00 0'1
~ ........ '<:t \0 ...... 00 00 M
~ ~I '<:t. o If) ~ 0\. 0\ O.
.... N ..,,[0 '<:t 0\ 0\ r--
~ 0'1 r<) r'") \0 \D \,CJ 00
~ \,CJ ........ ........ If)
U
0 If)
Z 0
~ 0
01
N r'") r'") \,CJ 00 r<) ........ r-- '<:t --
........ ...... r-- 00 00 ....... 0 ........ ,..-< ,..-<
0 ~I If) If) r-- C"J. r--. ~ '<:t. 0 '<:t. <'<")
--
~ N \.0. o. r-- r-- 0 00 ........ N N
. '<:t M M \.0 ,..-< ........ C\ ........
I \.0 \.0 cu
U
~ ~
C<l
~ '"@
~ P=l
~ ,..-.,
('1 '<:t N C\ r-- 0 0 M ('I
rJJ 0 r<) '" r-- 0'1 ...... ~
~ ~I r'1 c;.~""" C. N If)
~ '" '<:to r-- 01.
~ ('1 ,..-< ("<) ........ '<:t
\.0 '-' \D
0 '<:t 0 '<:t r'") M ....... N
~I '<:t \.D 00 '<:t 00 00 0 0
r'") <r:..c;. \D. C'. 0\ N C"J.
0 r'") ........ 'T 'T ..,,[ If) '"
\.0 r'") r<) \D ('I
'" \.0
..... ,-..
....:
C<l i=:
il..>
>- ....... .....
Q C<l
OJ) 0,)
i=: .S >-
.S '-' Ul OJ)
cu Ul
i=: U CU i=:
.SO Ul ..... Ul ;:a
i=: ;::l ~
cu 0 0 ~ If)
P=l .- r./) '"@ ~ '<:t
'"@ ~ cu '"@ ~
..... Cii' -0 Oil
....... cu (5 >-'cuf-< 8 .,::: ,.-<
P- o.. 0.. ,
0 f-< ....... C<l Ul ..c r~O
C<l ;::l ':;j C<l C<l ,.-< N 0
. u o ;::l cu u u 2.,..;r--:-
OJ) S .....0......1 C- Oil
0 r.n,.........,. _..--I
~ ..... ~,.........~ 0 ~ i W ,,.'HA
;Q ~ 2 ..... C<l C<l ....... ;.g
Ul ....... ....... ~
..... "'0 ~ cu ~ "l"""'l ....... il..> ..... cuO'l.......'"
0 "'OC-B C<lo..o.. ~ 0 ....... 00 0'1 0'1
~ ..... C<l C<l ~ ~ C<l0'l0'l0'l
-<r;00 f-<UU ....... ~~~-
.
I
0 0 00 0 0 0
~I 00 0 r-- r<) 0 0 00
0-" 0 -, "7~ 0 lJ) 00
0-, 6 lJ) 00 6 - "7
N 0-, "7 r<) - r<) 0-,
lJ) If) N ....... N "7
Z
0
-
Eo-; lJ) 0 lJ) 0 0 0 0 Co
U 00 lJ) N r<) 0 0 00 .......
~I If) lJ) N 0-, 0 0 0-" r--
~ o~ ....... N lJ)" 0" ;-" 0-, -.i'
r-- 0 ;-N ....... 1.0 N 1.0
0 1.0 1.0 N- r<) lJ) lJ)
"
~
....:l
<
Eo-; ~
-
~ 0-, t-- lJ) 0 0-, N N 0
N N DO lJ) ;- ....... 0 r--
< ~I 00 N ....... r-- ....... 1.0 r<) r--
U 6 \0 ;- DO v:iO' 0-, ;-
C-' 00 l/') 0 r<) ....... N 0-,
lJ) l/') lJ) N lJ) \0
Z '-" "
.......
~ lJ)
0
0 0
"....., "....., N
~ 1.0 NOO 0 ....... 0 ;- 0-, --
00 lJ) 0 r-- 0 N N .--<
~I ;-, r-- 0 00 '"'l 0-, 00 (")
I ---
~ 0-, \0" 6 0-, lJ) r-: lJ) N
. 00 lJ) 0 r<) r<) \0 r-- .......
Z ("1 ;-1.0 N ....... 0-, lr) CI..l
;:l '- '-' U
C
~ c<:l
" "@
~ CO
~ "....., ".....,
r<) r<) 0 r-- Co 0 00 lJ)
~ ~I 0-, ("I ;- 1.0 DO
'JJ 0-, q "7" N" "'T
~ 0 - ....... 00 ~
r<) 00 00 ;- r--
(">1 r<) ("1 ....... N
'-' '-'
0
E-<
'JJ
---- ".....,
- 1.0000 00 0 0 r<)
~I N r<) ,..-< r<) 00 0-,
0; 00 r<) 00 r<) 0-"
00 0-, 0 00 00 lJ)
;- 0 r<) r<1 r-- ("'.1
lr) "'T ("1 ("~ N
--- ---
l-<
..... ,-... Q,j
....: rJj ~
c<:l ..s
<IJ ....:~ Eo-; Q,j
>- Z ..... '"
....... ..s..s c<:l
0/} u ~ CI..l .c
c .s a(l~ ~ >- .";::
.;:: --' rf) rf) CO ~
C I '1:l '1:l ~ C ~
.So rf) C i=: ~ ell
CI..l i=: 0 0 0 i=: ~
CO .s COCO " r.r.l '"
"@ ~ 0-, 0-, ~ "@ Q,j
..... 00 0-, .....
..... i!J rf) - - >-. ~ ..... ell
.- p.. "0 "5. rOOOO8~
p.. O..s~ dJ(U+->$~~
c<:l U U ~ ..... c<:l c<:l
. U j::: U ._"- 0 ~ CI..l...:l U .8r-:~~~'c:N"'::
CO 6 ..... e i:i:.....O......l< CO rf);-\Or--o-,o-,_O'.
i=: ..... 01:: p... i!J<IJ<IJ..............Eo-; i=: :Ii VlVlEAVlVlVlEA
;g IJ.., rf) '1:l ..... (/)(/)'-t;nn.... ;g
'1:l i=: i=: <IJ ..... ..... i=:._"- ~ CI..lO'.......Nr<1ooCl\....
0 '1:l e o.s ""2""2 e g. g. < 0 ~ooo,o,o,o-,o........
;S ;S 0:::0\0,0...0-,0-,0\0
<I::f-<COO CiCif-<UUU ........................................,.........t.......... N
.
.
~ 0 00 ~ ~ 0 00 ~ ~
00 0 0 MOO I"') 0
>-', '-0 1tI 0 - >-'1 '-0 1tI 0 M N
o . c . 0 c
o '-0 ~ 1tI "" ~ 0 "" ~ 1tI f'1 0
f'1 1tI 1tI "'-< N N-
o ~
""'"
~ ~
Z u
8 C:;--,
~ '-0""" 00 ~ 0 7 ~ 00 "" ~
U 00 0 0 ~ "" ~ 0 ~ M
w 01 "1 q "". ~ ~ 01 "1 r-t o. 7. ~
~ 0 0 0 M \0 0 ~ "" ~ >-' ""
O 0 1tI ,..... "'...:I 0 '-0 N N
f'l < N ~
~ ~
~ ""'"
...:I ~
~ ~
~ U
~ "" >-' 70 '-0 ~ 7 S ~o M ~
~ N '" ~ 0 Z ,..... "" ~ 1tI ""
u ~I ~ r-t "1 "1 ~ ~I 7."'1: ~ '-0. "1
"" ~ \0 7 0 "" - _ ,..... 0 ~
o - 7 '" _ 0 0 - N \0
Z 0 N"::::::.,
~ ~
o 00
> ~ MO NO "" ~ '-0 ~OO 000 0 7
~ ~ ~O ~ N ~ ~ "" 0 ~ 0 0-
I g;;1 ~ '-0. q \Oc ~ < g;;1 "1 ~ 0 O. O. O. 7.
~ "" M M'-O 7 ~ ~ "" ~ ~ '" N 1tI 1tI-
. Z - N -- 7 =- _ \0 '-0 0 - ,..... 0
~ ~ N --- M '-0 "" N
< ~
W 0
U ~ ~
""'" 1tI \0 ~07 "" ~ 0 >-'0 MOO \0
I ~I ~ ~ ~ ~ r;; w ~I S; :5 ~ ~
Zo ~ ~ ~ ~ ~ M ~ ~ 66 ~ ~
- N N ~ _ NO,..... '-0
~ W -M N
...:I U
> ~
~ Z
~ ~
1tI 0 00 1tI ~
'-01 ~ ~ ~ 0
g::; ."f" ....; v5 =
,..... ("'I f'l
~ ~
~ ~ a ~
~ ,E ... ~ ,E ...
ro ,..... ro
0fJ u t1.l 0fJ U t1.l
~ i=: >- ~ ~ >-
La --- bO 'a ~ +.' J:::: b1)
~ ' ~ i=: I ~ ro ~
'- 00 '- -- 00 ~ ~ 0 ._
0fJ ~ '"C:l 0fJ C ;::I S - '"C:l
t1.l 0 C t1.l 0 0 ~ i=:
~ ~ ~ ~ ~ ...~ c ~
~ (lj ~ ~ ro.8 ~ ~ E
E [; E .s [;... '" C I E
.- p. >,.- .- P. t1.l II.) ;:-... c ro 0fJ .-
g. 0 :: g. g. 0 ~;::l .g E: 0 @ g.
. U ;::I U U S @ 5: ;::I ~....l 0--1 U
0fJ ~ 0 0fJ 0fJ o.b~ 0 c] ~ 0fJ
C ... - c c ... ... ,.......;::: u c
~ ~~ E ... ~ ~ ~O... .s ro~ ro ~
... c.- t1.l ... ...._ t1.l ._ ...... ,.D ...
o :g E: g.~-5 0 0 :g 6-'fi g-~ 15.~ '"0 0
~ ~o uuo ~ ~ ~~o uuo~ ] ~
.
.
7 O~~ ~~O~ 000 ~~ ~
M 0 ONN ~80M O~~ 2M ~
Vl M!-- 0\0\0;- -'\Ol"l ~\OM \0 ~
00 ~ ~ 00000 M~ooO M~oo ~~ ~
N 0 ~~\O ~ ~\O ~\OM ;- M
N ~ 00 0 q ~ ~ \D
rri .,.--l,........t ~ ~
~ 000 ~30~ 000 ~~ ~
~ \D O~M \O~O\O O~~ _\0 0
7 0\ M 000 ~ -\O~ o\O\O'~ ~
00 ~ N OMM M~OO~ ~~O\ ~~ ~
o ~ ONN ~ ~~ \O\ON ~ 0
('I \0 ~ ~ ~ ~ N 00
~ .,.--l ~ ~ ~
~ o~~ o~ooo 000 0000 ~ ~
~ ~ 0\0\0 ~\Do~ 0~0\ ~~ \D ~
M N 1fI O~~ ~ .\ON O\,O\O.\D M ~
00 ~ ~ o~~ ~~OO~ o~~ ~o N 1fI
0\ ~ ~~\D ~ _~ ~\O~ ~ - M
N ~ 00 ~ ~ 0 0 0\ \,0
~ ~ ~ ~ ~
o O~~ .......~O~ 000 ~~ ;-
0\ ~ OMM O\NOM OO\~ ~M 0\
N ~ \D 0\0\,0 00 .\DOO O\D\D.N 'n
00 ~ _ O~M ~~oooo ~~~ ~o ~
N \D o-~ ~ ~~ 0\\D1fI ;- -
("-1 ~ ~ N N 0 ~ 00
N ~ ~ ~ ~ ~
. g
N
---
~ - .......
\D ~ OMM !--ooo~ 000 00....... 0 M
M 0 OMM ~~ooo OO\O\!--OO ~---
~ ~ 0 OMt'l ~ -\Or<i O\D\'o'~ \D ('1
00 ~ N ONN ~~oooo oo~N ~~ ~ ~
~ 0 1fI1f10 ~ _~ O\~~ 00 \,0 Q)
M ~ ~ N t'l ~~~ ~ g
~ N ~,........t ~N ~
~
CO:
~ O\D\D M.......O~ 000.......- ~
N ~ 7~00 ~~O~ Olfl~ ~~ 0
o .............. 1fI0Vl VlO\D\,O O~~ 00 0
o ~ 0 Noo6 ~0oo~ ci~~ 00 N
o 0 00 MM!-- ~M~Vl ~ ~ 0000 0
N \D....... M M M t'l N
~ ~ ~ ~ N
7 0 OO~~ 0 00 0\0\,0 00 -
~ ~~~ 00 00 OMr<i 00 !--
0\ ~ 0 N~~ 1fI \0\0 00000 00 -
~ 00 0 dMM M 0000 ~~r<i 66 0
~ N ~ ooM....... 1fI~""'" o\O~ ~1fI 00
1fI ~ ~ MOO .......
-""" ....-I ,........l .....-I ,.........,
..q
o
~ @ ~ 1:"'1 ~
Z Q) ~. ~
o :>< ri> ::: ti ro
r~. Q.I if!.....,-., 0;;
~ M ~ N\DV ~ ~ ~
C .... , I C> .J:i if!. . if!. .......
-: <lJ '2::: ~ ....... N .... .... ~ g ~ OIl
.... <J ~ ~ ~ I go,./) C c>;::l C
~ @.till.... if!. [J) en "'0 tl <lJ ~.... ;..a
r ~ Q)"' 6"'Cl"O. =tH p.. V . .....
Z <:l - occ- ~if!.:>< ',..c: 0 """
~ CO: CO: ~ if!. ~Z2~ ~@if!.~ ~o ~ =
~ ...c: B 0 OI)[J) c.........."O ~.....<lJ~ c- ~ $
~ <fl...... "0 [J) ~ Q) ro <lJ Q) ....... ::: b U'J ~ ;::l ro ;> ......
~ <:l p.. =v'2;::l o...c:...c:~ ....Q)~o ~o < p..
. ~ U ro ~;::l \..0 ~ - a "0 "0 ..... () g. r-< ..... E--< <:l
Uz ~ ~ ~~~~ g6Sr-< i'E~ ~ ~ ~
...... c ::: ~ - ~ ~ 0 0 <lJ 0 ...... ~
~ ~...... =~ifj~ [J)......... ~oo~ 0 ~......
~ .5 ~ ~~~~ ~~~ ~_u - I ~
~ ~Il 6 ~1::l1:!o ~gg ~~'S' u e: 0
~ ~ ~ ~E--<~b ~oo o~ ~ u ~
,
""I
1
.
FIVE YEAR
. PROJECT SUMMARIES
.
---- "- -. - ---'-":'
~
CAPITAL PLAN
. City of Hopkins, MN
PROJECTS BY YEAR
2001 thm 2005
Project Name Department Project # Priority Project Vallie
2001
East CBO Project Development 01-CIP-0403 0 1,500,000
Public Worl<s Storage Facility Public Works: Bldg/Equip Serv 01-CIP-B303 0 1.400,000
Shady Oal< Beach Redevelopment Public Works: Parks 01-CIP-P202 0 50,000
Downtown ParI< Improvements Public Works: Parks 01-CIP-P205 0 20,000
Regional T rail Conn ections Public Works: Parks 01-CIP-P206 0 15,000
Residentia I Street 1m provements Public Works: Transportation 01-CIP-T101 0 223,200
Residential Street Improvements- Utilities Public Works: Transportation 01-CIP-T102 0 200,000
Citywide Concrete Alleys Public Works: Transportation 01-CIP-T103 0 70,000
County Road 3 Public Works: Transportation 01-CIP-T104 0 4,000,000
RebUild/redesign 11th Avenue South Public Works: Transportation 01-CIP-T10l 0 269,200
Streelscape Improvements, 11th Avenue South Public Works: Transportation 01-CIP-T10B 0 135,000
ExcelsIOr Boulevard Streelscape Improvements Public Works: Transportation 01-CIP-l109 0 60,000
. CSAH 73/CSAH 5 Intersection Public Works: Transportation 01-C1P-T111 0 470,000
City Wide Sidewall< Repair Public Works: Transportation 01.CIP-T112 0 20,000
City Parl<ing Lot Improvements Public Works: Transportation 01-CIP-T113 0 350,000
SI. Joseph's Parking Lot Improvements Public Works: Transportation 01-CIP-T115 0 110,000
Public Improvements--SuperVatu Warehouse Expansion Public Works: Transportation 01-CIP-T116 0 300,000
Storm d rain age system maintenance Public Works: Utilities 01-CIP-U002 0 12,500
Storm Water Management Projects Public Works: Utilities 01-CIP-UOO3 0 125,000
Repaint Water Towers Public Works: Utilities 01-CIP-U004 0 500,000
Watermeter Radio Read System Public Works: Utilities 01-CIP-UOO5 0 200,000
Excelsior Boulevard Utility Improvements Public Works: Utilities 01-Clp.U006 0 '160,000
Total for 2001 10,189,900
.
Page I uf 3 Tlllirsdm', "JUgllsl n3, ]IJ!i()
~
Pn~j ecr"'mll (' Department Project # Priority Projea Value .
" -~ =--
2002
North Annex Redevelopment PrOlect Development 01-CIP-D402 0 12,29B,000 .
City Hall HVAC Control Upgrade Public Works: Bldg/Equio Serv 01-CIP-B301 0 25,000
Valley Park ImprovemRl1ts Public Works: Parks 01-CIP-P201 0 20,000
Central Park Parking Lot Public Works: Parks 01-CIP-P203 0 65,000
Pavilion Mezzanine Public Works: Parks 01-CIP-P204 0 250,000
Regional Trail Connections Public Works: Parks 01-CIP-P206 0 20,000
Rosldential Street Improvements Public Works: Transportation 01-CIP-T101 0 560,300
Resldenlial ::itreet Improvements--Utilities Public Works: Transportation 01-CIP-T102 0 200,000
Citywide Concrete Alleys Public Works: Transportation Oi-CIP-T103 0 35,000
County Road 3 Public Works: Transportation 01-CIP-T104 0 140,000
Fifth Avenue Soulh Public Works: Transportation 01-CIP-T105 0 176,000
County Road 61 (Shady Oak Road) Public Works: Transportation 01-CIP-T106 0 1,258.700
Rebuild/redesign 11th Avenue South Public Works: Transportation 01-CIP-T107 0 282,650
Excelsior Boulevard Stleetscape Improvements Public Works: Transportation 01-eIP-T109 0 470,000
Hwy 7 "17th P,velCSAH 73 Intersection Improvements Public Works: Transportation 01-CIP-T110 0 1,000,000
r:ity-Wide Sidewalk Repair Public Works: Transportation 01-CIP-T112 0 20,000
Minnetonka Boulevard {CSAH 51 Corndor Improvement Public Works: Transportation 01-CIP-T114 0 300,000
:3i Josephs ParKing Lut Irnprovements Public Works: Transportation 01 CIP-T115 0 340,000
Storm drainage system maintenance Public Works: Utilities 01-CIP-UDD2 0 12,500
Storm Water Management Projects Public Works: Utilities 01-CIP-UOO3 0 165,000
Watermeter Radio Read System Public Works: Utilities 01-CIP-UOO5 0 200,000
Total for 2002 17,838,150
2003 .
Rpdevelopment. East ExcelsIOr Boulevard Development 0i-CIP-D40i 0 2,000,000
;~ily Hall HVAC Control Upgrade Public Works: Bldg/Equip Serv 01-CIP-B301 0 100,000
Puulic Salety Facll,ly Public Works: Bldg/Equip Serv Oi-CIP-B302 0 6,780,000
'ialley ParI< Improvements Public Works: Parks 01-CIP-P20'1 0 45,000
Regional Trilll Cnnneclions Public Works: Parks Q1-CIP-P206 0 20,000
Residential Streellmprovements Public Works: Transportation 01-CIP-T101 0 720,000
Residential SlieBllmprovements--Utilities Public Works: Transportation 01 CIP T102 0 200,000
(:ounty Road 3 Public Works: Transportation 01-CIP-Ti04 0 -150,000
Fifth Avenue Soutrl PubliC Works: Transportation 01CIP-T105 0 501,600
County RoM 61 (Sh30Y Oak Road) Public Works: Transportation 0i-CIP-T106 0 3,021,000
Excelsior Boul~vard Slreetscape Improvements Public Works: Transportation 01-CIN109 0 275,000
r)ty-Wroe Sldewal" Repair Public Works: Transportation 0i-CIP-T112 0 20,000
Stonn dralna[le system maln:enance Public Works' Utilities 01-CIP-U002 0 14,000
Total for 2003 13,846.600
2004
Residential Streellmpruvements Public Works: Transportation 01-CIP-T101 0 1,080 200
Residential Street Improvements--Utililies Public Works: Transportation 01-CIP-T102 0 200.000
County Road 3 Public Works: Transportation 01-CIP-T104 0 2,300,000
City-Wide Sidewalk Repair Public Works: Transportation Oi-CIP T112 0 20,000
R8construci sanilary sewer Lift Station #7 Public Works: Utililies 0i-CIP-UOO1 0 350,000
Storm drainage system maintenance Public Works: Utililies 01-CIP-U002 0 14,000
Total for 2004 3.964,200 .
1.':Jg.e ~ llj" .-{ 7//l/l'Sdll\. ,/11<';/1.\'1113. :COIiI!
"
pj'(~ject Name Department Project # Priority Project Value
2005
. Residential Street Improvements Public Works: Transportation D1-CIP-T1D1 0 259,500
Residential Street Improvements--Utilities Public Works: Transportation D1-CIP-T1D2 0 200,000
City-Wide Sidewalk Repair Public Works: Transportation 01-CIP T112 0 20,000
Storm drainage system maintenance Public Works: Utilities D1-CIP-UDD2 0 14,000
Total for 2005 493,500
GRAND TOTAL 46,332,350
.
.
Puge 3 uf J 111//I'.\'do.l'. AIIgIIsI 03. 2(1()()
.
FIVE YEAR SUMMARY
. PROJECTS BY DEPARTMENT
.
CAPITAL PLAN
. City of Hopkins, MN
DEPARTMENT SUMMARY
2001 tl1m 2005
Department 2001 2002 2003 2004 2005 Total
Development 1,500,000 12,298,000 2,000,000 15,798,000
Public Works: Bldg/EqUlp Serv 1,400,000 25,000 6,BBO,000 8,305,000
Public Works: Parks 85,000 355,000 65,000 505,000
Public Works: Transportabol1 6,207.400 4.782,650 4,887,600 3,600,200 479,500 19,957,350
Public Works Utilities 997,500 377,500 14,000 364,000 14,000 1,767,000
Total 10,189,900 17,838,150 13,846,600 3,964,200 493,500 46,332,350
.
.
['age 1 of I T1U1I".\"dav. /1'lgusr 113. lUOII
--.
CAPIT AL PLAN
City of Hopkins, MN .
PROJECTS BY DEPARTMENT
2001 thm 2005
Department Project# Priorit:, 2001 Z002 2003 2004 2005 Total
Development
Redevelopment, East Excelsior Boulevard 01-CIP-D401 0 2,000,000 2,000,000
North Annex Redevelopmenl Project 01CIP-D402 0 12,29B,000 12,29B,000
East CBD Project 01-CIP-D403 0 1,500,000 1,500,000
Development Tobll 1,500,000 12,298,000 2,000,000 15,798,000
!"'ubik \\ orks: Bldg/Eq uip Ser\'
City H~II HVAC ConllOl Upgrade 01-CIP-B301 0 25,000 100,000 125,000
Public Safety FacililY 01-CIP-B302 0 6,780,000 6,780,000
Public Works Storage Facility 01-CIP-8303 0 1.400,000 1.400,000
Public \Vorks; l3Idg/Equip Set'v Total -1 ,400,000 25,000 6,B80,000 B,305,000
Publk \\ orb: Parks 65,0_
I,'alley Park Impruvements o1-CIP-P201 0 20,000 45,000
Shady O~k 8each Reuevelooll1ent Oi-CIP-P202 0 RO,OOO 50,000
e,en! ral Park Parking LOI 01.CIP-P203 0 65,000 65,000
Pavilion Iv1caanme 01-CIP-P204 0 250,000 250,000
Downtown Park Improvements 01-CIP-P205 (] 20,000 20,000
Regional Trail Connections 01-CIP-P206 0 15,000 20,000 20,000 55,000
Puhlic \Yorks: Parks Total 85,000 355,000 65,000 505,000
.
p~gc]ur2 7Jllln,!l/\, ""llIgIISI 03. ~(/OiJ
, Department Project# Priority 2001 2002 2003 2004 2005 Total
Public Works: TnmspOI-tatiun
ReSidential Street Improvements 01-CIP-T101 0 223,200 560,300 720.000 1,OBO,200 259,500 2,843,200
. Residential Street Improvements--Utilities 01-CIP-T1G2 0 200,000 200,000 200,000 200,000 200,000 1,000,000
Citywide Concrete Alleys 01-CIP-T103 0 70,000 35,000 105,000
County Road 3 01-CIP-T104 0 4,000,000 140,000 150,000 2,300,000 6,590,000
Fifth Avenue South 01-CIP-T105 0 176,000 501.600 677,600
County Road 61 (Shady Oak Road) 01-CIP-T106 0 1 ,258.700 3,021,000 4,279.700
Rebuild/redesign 11th Avenue South 01-CIP-Tl07 0 269,200 282,650 551.850
Slreetscape Improvements, 11th Avenue South 01-CIP-T108 0 135,000 135,000
Excelsior Boulevard Streetscape Improvements 01-CIP-T109 0 60,000 470,000 275,000 805,000
Hwy 7 17th Ave/CSAH 73 Intersection Improvements 01-CIP-T11O 0 1,000,000 1,000,000
CSAH 73/CSAH 5 Intersection 01-CIP-T111 0 470,000 470,000
City-Wide Sidewalk Repair 01-CIP-T112 0 20,000 20,000 20,000 20,000 20,000 100,000
City Parking Lot Improvements 01-CIP-T113 0 350,000 350,000
Minnetonka Boulevard (CSAH 5) Corridor Improvement 01-CIP-T114 0 300,000 300,000
51. Joseph's Parking Lot Improvements 01-CIP-T115 0 110,000 340,000 450,000
Public Improvements--SuperValu Warehouse Expansion 01-CiP-T116 0 300,000 300,000
Public Works: Transportation Total 6,207,400 4,782,650 4,887,600 3,600,200 479,500 19,957,350
Public Works: lTtilities
Reconstruct sanitary sewer Lift Station #7 01-CIP-U001 0 350,000 350,000
Storm drainage system maintenance 01 CIP-U002 0 12,500 12,500 14,000 14,000 14,000 67,000
. Storm Water Management Projects 01-CIP-U003 0 125,000 165,000 290,000
Repaint Water Towers 01-CIP-U004 0 500,000 500,000
Watermeter Radio Read System 01-CIP-U005 0 200,000 200,000 400,000
Excelsior Boulevard Utility Improvements 01-CIP-U006 0 160,000 160,000
Public Works: Utilities Total 997,500 377,500 14,000 364,000 14,000 1,767,000
GRAND TOTAL 10,189,900 17,838,150 13,846,600 3,964,200 493,500 46,332,350
.
Pag<: 2 uf 2 /'JllIl"sdm', AfJgfJSI 03, :won
\
.
REVENUE PROJECTIONS
SHOWING
. IMP ACT OF PROJECTS
ON FUNDING SOURCE
.
CAPITAL PLAN
. City of Hopkins, MN
SOURCES OF REVENUE SUMMARY
2001 thru 2005
Source 2001 2002 2003 2004 2005 Total
CR - Current Revenues - General Fund 105,000 150,000 185,000 20,000 20,000 480,000
G U - Other Govern mental Units 3,350,000 1,880,000 2,850,000 1,600,000 9,680,000
H RA - H Dusing and Redevelopment Authority 1.400,000 6,780,000 8,180,000
MS - Municipal State Aid Streets 1,191.800 858,750 605,700 1,120,000 3,776,250
PF Private Sector Funds 300,000 250,000 550,000
PI - P IRIGenera I Obligation Bonds 530,200 1,216,700 495,800 247,600 153,500 .2,643,800
SA - Special Assessment 571 ADO 548,400 716,100 412,600 106,000 2,354,500
SF - Sanitary Sewer Fund 75,000 75,000 75,000 425,000 75,000 725,000
SU - Storm Sewer Fund 231.500 234,500 64,000 64,000 64,000 658,000
TF - Tax Increment Financing 1.500,000 12.349,800 2.000,000 15,849,800
. WF - Water Fund 935,000 275,000 75,000 75,000 75,000 1.435,000
Total 10,189,900 i7 ,838, 150 13.846.600 3,964,200 493,500 46,332,35D
.
Page! or ] [/wfsduI', .111,1:11.>103, WOO
-- - -. --. ---" -- --
CAPITAL PLAN
City of Hopkins, MN .
PROJECTS BY FUNDING SOURCE
2001 thru 2005
SOlln~e Project# Priority 2001 2002 Z003 2004 2005 Total
~. K
CR - Curreni Revenllc~ - General Fund
City Hall HVAC Control Upgrade 01-CIP-B301 0 25,000 100,000 125,000
Valley Park Improvements 01-CIP P201 0 20,000 45,000 55,000
Shady Oak Beach Redevelopment o 1-CIP-P202 0 50,000 50,000
Cenlral ParK Parking Lot 01-CIP-P203 0 65,000 65,000
OowntolVn Park Impruvemenls 01-CIP-P205 0 20,000 20,000
Regional Trail Connections 01-CIP-P205 0 15,000 20,000 20.000 55,000
'A\'-Wlde Sidewalk RRpalr o 1CIPT1'12 0 20,000 20,000 20,000 20,000 20,000 100,000
('R - Cun-ell! Revenues - General 105,OO(} 150,000 '185,000 20,000 :W,OOli 480,000
Fund Total
(; (; - Other (;overnmentallT nits
Cou Illy Road j 01-CIP-T104 0 3,000,000 75,000 1,600,000 4,675,0.
CountY Road 61 (Shady Oak Road) 01-CIP T106 0 810,000 VOO,OOO 3510,0
f::xcelslOl Boulevard Streetscape Improvements 01-CIP-T109 0 170,000 75,000 245,000
:-Iwy 7 1 !,h .~veICSAH 73 Intersection Improvements 01-CIP-T110 0 750,000 750,000
'::Si~~: 7:\/CSAH 5 Interseclion 01-CIP-T"I"I1 0 350,000 350,000
Mmnetonl(a Boulevard ICSAH 5) Corridor Improvement 01-CIP-T114 0 150,000 150,000
ell - Other Governmental Units 3,350,000 1,880,000 2,SSO,OOO 1,600,000 9,680,000
Total
HIU\ - Homing ami Redevelopment All
P IJ bl ie Sa le'1 F aci lit 'I O'I-CIP-B302 0 6.780,000 6.780000
Puolic: Worl',; SiorJQe Filcility 01-CIP-B303 0 1,400,000 1,400,000
H RA - Housing and Redevelopment 1,400,000 6,780,000 8,180,000
Authority Total
.
IJo:l~\~ I of J rlIIIISr!O!, _-lu,g/iJ:tlfi, ~()()(j
. Source Project# Priority 2001 2002 2003 2004 2005 Total
MS - Municipal State Aid Streets
. Residential Street Improvements 01-CIP-T101 0 420,000 420,000
County Road 3 01-CIP-T1CI4 0 1,000,000 75,000 700,000 l.775,000
Fifth Avenue South 01-CIP-T105 0 73,600 209.700 283.300
County Road 61 (Shady Oak Road} 01-CIP-T106 0 400,000 321,000 721.000
Rebuild/redesign 11th Avenue South 01-CIP-T107 0 71,800 85,150 156,950
Hwy 7 17th Ave/CSAH 73 Intersection Improvements 01-CIP-Tl10 0 200,000 200,000
CSAH 731CSAH 5 Intersection 01-CIP-T111 0 120,000 120,000
Mlnnetonka Boulevard (CSAH 5) Corridor Improvement 01-C1P-T114 0 100,000 100,000
MS - Municipal State Aid Streets 1,191,800 858,750 605,700 1,120,000 3,776,250
Total
PF - Private SectOl- Funds
Pavilion Mezzanine 01-CIP-P204 0 250,000 250,000
Public Improvemenls--SuperValu Warehouse Expansion 01-CIP-Tl16 0 300,000 300,000
PF - Private Sector Funds Total 300,000 250,000 550,000
PJ - PIRJGeneral Obligation Bonds
Residential Street Improvements 01-CIP-T101 0 120,200 336,700 216,000 247,600 153,500 1,074,000
County Road 3 01-CIP-T104 0 140,000 140,000
Hfth Avenue South 01-CIP-T105 0 79,800 79,800
Streetscape Improvements, 11th Avenue South 01-CIP-T108 0 135,000 135,000
. Excelsior Boulevard Streetscape improvements 01-CIP-T109 0 60,000 300,000 200,000 560,000
Hwy 7 17th Ave/CSAH 73 Intersection Improvements 01-CIP-Tll0 0 50,000 50,000
City Parking La! Improvements 01-CIP-T113 0 105,000 105,000
MinnelOnka Boulevard (CSAH 5) Corridor Improvement 01-CIP-T114 0 50,000 50,000
St. Joseph's Parking Lot Improvements 01-CiP-T115 0 110,000 340,000 450,000
PI - FIR/General Obligation Bonds 530,200 1,216,700 495,800 247,600 153,500 2,643,800
Total
SA - Special Assessment
Residential Street Improvements 01-CIP-T101 0 103,000 223,600 504,000 412,600 106,000 1,349,200
C ilywide Con crete Alleys 01-CIP-T103 0 56,000 28,000 84,000
Fifth Avenue South 01-CIP-Tl05 0 50,600 212,100 262.700
County Road 61 (Shady Oak Road) 01-CIP- T1 06 0 48.700 48.700
Rebuild/redesign 11th Avenue South 01CIP-T107 0 167,400 197,500 364,900
City Parking Lot Improvements 01-CIP-T113 0 245,000 245,000
SA - Special Assessment Total 571,400 548,400 716,100 412,600 106,000 2,354,500
SF - Sanitat.y Sewer Fund
Residential Street Improvements Utilities 01-CIP-T102 0 75,000 75,000 75,000 75,000 75,000 375,000
Reconstruct sanitary sewer Lift Station #7 01-CIP-U001 0 350,000 350,000
. SF - Sanitary Sewer Fund Total 75,000 75,000 75,000 425,000 75,000 725,000
Page 2 l) r J nl/lrsdm'. Augllsl r!3, lOOO
Source Project# Priority 2001 2002 2003 2004 2005 Total .
,~-- -
Sl" - Storm Se\wr Fund
Residential Street Improvements-Utilities 01-CIPT102 a 50.000 50,000 50,000 50,000 50,000 250,00_
Citywide Concrete Alleys 01-CIP-T1 ~3 a 14,000 7.000 21,00
RebuildiredeslQI"l i 1th Avenue South 01-CIP Tl07 0 30,000 30,000
Storm drainage system mallltenance 01-CIP-U002 0 12,500 12,500 14,000 14,000 14, 000 67,000
Storm Water Management Projects 01-CIP-U003 0 125,000 165,000 290,000
Sf.: - Storm Sewer Fund Total 231,500 234,500 64,000 64,000 64,000 658,000
TV - Tax Increment Financing
Redevelopment. East ExcelSior Boulevard 01-CIP-D401 0 2,000,000 2,000,000
NorttlAnnex Redevelopment PrOlect 01-CIP-D402 0 12,298,000 12,298,000
Fas; CBD Project 01-CIP-D403 a i ,500,000 '1,500,000
Filth AveIlUP, South 01-CIP-T105 a 51,800 5'1,800
TF - Tax Increment Financing Total 1,500,000 12,349,800 2,000,000 15,849,800
\VF - \\ater Fund
Reoldential Street Improvements--Ulilitles 01-CIPT102 0 75,000 75,000 75,000 75,000 75,000 375,000
Repaint Water Towers o 1-CIP-U004 a 500,000 500,000
Walermetcr RadiO Read System 01-CIP-U005 0 200,000 200,000 400,000
Excelsltir80lllevard Utility Improvemen1s Oi-CIP-U006 U 160,000 160.000
WF - Water Fund Tota~ 935,000 275,0011 75,000 75,000 75,000 1,435,000
.
GRAND TOTAL 10,189,900 17,838.150 13,846,600 3,964,200 493,500 46,332.350
-
.
Pa!;~ ~ II t ~ IIl11rsi!m, 1".~lIsl !i3, .!II(J(!
-
. t
.
PROJECT DESCRIPTIONS
.
.
.
.
UTILITIES
.
.
CAPITAL PLAN 2001 fl1m 2005
eoutaet PW Director
City of Hopkins, MN Department Public Works: Utilities
. Project # OJ-eIP-UOOI Type Improvement
lIseful Life
l'rojcct Name Reconstruct sanitary sewer Lift Station #7
Category Utilities: Municipal Sanitary Sewer
Priority nla
..---..,
Description
. -..-..-- -.-.---- .. -..---.-
lift Station #7. Valley Park (South end of6th Avenue South)
IReconstruct and repair lift Station #7
.--..-.. ..----.. --. ..----
.----------.
Justification
.. .,~ .".-='==--=' - - - .--- -.--- --.. -----
Reconstruction necessary due to safety concerns, to improve reserve capacity and general condition.
Expenditures 2001 2002 2003 2004 2005 Total
Constructi on/Mai ntenance 350,000 350,000
Total 350,000 350,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
SF - Sanitary Sewer Fund 350,000 350,000
Total 350,000 350,000
Operational Impact/Other
." -""- -'."""-'."'.=~. -- - ." '-. "'''-=--,===-,"" ...
!Prujccted schedule: lift StatIOn #7
2003: Plans and specifications
2004. Bid and construction
n. __. -..--
.
CAPIT AL PLAN 2001 thrll 2005
Contact PW DIrector
City of Hopkins, MN Department Public Works: Utilities
P roj Cl't ii OJ -CIP-UOO2 Type Improvement .
Useful Life
I'n)jeet "I'lIlIe Storm drainage system maintenance
Category Utilities: Municipal Sanitary Sewer
Priority n/a
De~criptioll
- --
200 I '" lIle 1V111c Creek
200l/211U2 _ Stabilize creek banks of Nine Mile Creek headwaters and provide maintenance access to Creek ($25,000)
2003!20u5 - Repair ~nd maintenance of ellncrete alleys.
Justification
Wll11PUI the Nine f\\ile \ 'reek headwaters proJecllhc City has no reliable aeees> tu the County Road 3 box culverts for maintenance purposes.
I<:xpenditures 2001 2002 2003 2004 2005 Total
Co n struction/Mai n tenance 12,500 12,500 14,000 14,000 14,000 67,000
rotal 12,500 12,500 14,000 14,1100 14,000 67,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
SU ~ Storm Sewer Fund 12,500 12,500 14,000 14.000 14,000 67,000
Total 12,500 12,500 14,000 14,000 14,000 67,000
Operational Impact/Other
l'IlY" ponion of the NlIlc Mile Creek Headwaters project to he pald in years 20[11 and 10U2.
lCl11si,lenl with the Storm Water Management Plan.
.
CAPIT AL PLAN 2001 111m 200S
Contact PW Director
City of Hopkins, MN Department Public Works: Utilities
. l'mject # Ol-CIP-UOO3 Type Improvement
(Iseful Life
P,'ojcet Name Storm Water Management Projects
Category Utilities: Storm Sewer
Priority n/a
Description
. . --------- -- - ~
200 I - Monroe Avenue/Second Street NE
Enhance ditch system capacity from Monroe A ve No intersection to Auborn Townhomes. Create new detention pond facility.
Install box culvert at Madison Ave No. Rehab pipe crossing at Monroe and 2nd St NE
,2002 - Shady Oak Pond and First Street North (18th Ave No to Shady Oak Pond)
[Provide outlet pill to Shady Oak P9~Qj~1Q..J0innetonka, lower 18th ~velEirst St No intersectipn, instaj! !Jew pipe in First St No from 18th Ave to__S]Ja..Qy_Q~E.Q!lQ.
Justification
- - ... . . ,. ---------
-..--------- -----
'The Monroe Ave/Second St NE intersection is prone to ]ocalized flooding and there is threat to homes in the neighborhood.
,Shady Oak Pond has no outlet and floods streets and residential properly ifnot pumped.
!lntcrscction lowering and new pipe to Shady Oak Pond will alleviate flooding in alley and private property in the #]0 block between] 7th/18th Ave No.
Expenditures 2001 2002 2003 2004 2005 Total
Con struction/Maintenance 125,000 165,000 290,000
Total 125,000 165,000 290,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
SU - Storm Sewer Fund 125,000 165,000 290,000
Total 125,000 165,000 290,000
Operational Impact/Other
2001 Projects: Plans and specs, 2000; Bid and construction, 2001
2002 Projects: Plans and specs, 200]; Bid and construction, 2002
IConslstent with City Council approved Action Plan ofOclober 21, ] 997, the City's Storm Management Plan, and Shady Oak Road reconstruction timetable.
______.._ ____..._____ _u_ .__.._.__ - --. ---------
.
CAPIT AL PLAN 2001 r/1rll 2005
Contact I'W Dircctor
City of Hopkins, MN Departmcnt Public Works: Utilities
Project II 01-CIP-UOO4 Type Improvement .
l'seful Life
Pt'ojt:d N;l[lIl' Repaint Water Towers
Category Utilities: Municipal Watcr System
Priol"ity nla
Description
Fllake TOliver. 15] I yler Avenue South
RepaInt Blake water [ower in 200l
,justification
The Ulahc ['lWer is ,howlIlg signs of rusting under the extenor paint, and should be rcpainted,
Expenditures 2001 2002 2003 2004 2005 Total
ConstructionlM ainte na n ce 500,000 500,000
Total 500,000 500,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
WF - Water Fund 500,000 500,000
Total 500,000 500,000
Operational I mpact/Othel'
20(\ I: Ba] and repallli
2u() I: Nurrml rerulIlt for Blake tower
---- .
.
CAPIT AL PLAN 2001 thru 2005
Contact PW Director
City of Hopkins, MN Deportment Public Works: Utilities
. rrojcct # 01-CIP-U005 Type Improvement
lJseful Life
PI'ujcet Name Watermeter Radio Read System
Cate~ul'y Utilities: Municipal Water System
Priority nla
. Description
'City wide installation ofwalermeter radio read system.
:lnstall a radio read system on the watermeters.
-.. .-- . ------.--- --..-------.-. ------- -- -. --------..-
Justification
_ _ _ ______ I
iThe system will allow the Fin~~-~ Departmenl [;)move from a q~;r.te~iy billing system i; a monthly.utility bill. Th~ ";'o~th]y billing system has benefits for boih
!the City and the customers. It will provide a better cash flow for the City, and smaller monthly bills for the customer.
..n. . __ . . __.... ..._.____..__..
Expenditures 2001 2002 2003 2004 2005 Total
Construction/Maintenance 200,000 200,000 400,000
Total 200,000 200,000 400,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
WF - Water Fund 200,000 200,000 400,000
Total 200,000 200,000 400,000
Operationallmpact/Other
200]: u.'i~;tallaiion--~;~B~]-lgrove, Knollwood, and Drillane neighborhood~---u
2002: Installation in Avenues East, Park Ridge. and Oakwood neighborhoods
.
CAPIT AL PLAN 2001 tll r1I 2005
Contact PW Director
City of Hopkins, MN i)cpartment Public Works: Utilities
l'roject # 01-CIP-U006 Type Improvement .
lIseful LiI'e
Projt'c[ N:iHlIl' Excelsior Boulevard Utility Improvements
Category Utilities: Municipal Water System
!'."iOI";ty nla
Description
Excelsior Boulevard !l'om Highwy 169 to Blake Road
'Rcpl"ce and reJhg:n S" water distribution main, install valves and replace water services.
.-.
,Justification
-- ...-".-
l-'Xlstlllg W:lkl main is cast iron with history ur leaks The existing pIpe is located under I,nge I IS West communication duct bank
Expenditures ZOOl 2002 2003 2004 2005 Total
Construction/Main ten an ce 160,000 160,000
Total 160,000 160,000
.
Funding SOBrces 2001 2002 2003 2004 2005 Total
WF .. Water Fund 160,000 160,000
Total 160,000 160,000
Operational Impact/Other
21)On " Design -.---
~uO! - ('ollslrlll:tiun
Coincide, With rcc';l1struction Dr Fxcelsior 80ulevard
.
.
TRANSPORTATION
.
.
--- ----
CAPITAL PLAN 200t Illnt 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Transportation
. Projcct # Ot-eIP-TiOt Type Improvement
Useful Life
Project Name Residential Street Improvements
CategDJ'y Trans: Streets
Priority n/a
-------.--
Description
"",'. ,.=.:.-.=- .. . - "-'","--""-=."-"'-'--- - . ... ----.-- -... -
IProgram to improve streets nceding repair or reconstruction as indicated by street condition survey, or as part of an area street improvement.
:2001: 16th Ave Irom 1st St No to 2nd 5t No - Reconstruction
14th Ave No from 4th 5t No to So Service Drive - Partial reconstruction
8th Ave from 1st St No to Co Rd 3 - Mill/overlay
.2002: 2nd 5t No from Shady Oak Road to 21 st Avc No - Reconstruction
Yv"~KPark Road - Reconstl)Jction .-.---- - .------ -.-- -
Justification
.',"'..' ---=---=...... .. . ---. -. ..- - - -
Pavement Management analysis shows a minimum $300,000 street improvement commitment (sealcoating, mill/overlays, reconstruction) to maintain current
overall street conditions and backlog. The numbers assumc a 70% assessed and 30% general city share of costs for reconstruction projects and 100% city costs for
sealcoat and millloverlay projects.
Sea1coat project costs budgeted in street maintenance budget. Costs for sanitary sewer and water main reconstruction are not shown.
_________ _n
Expenditures 2001 2002 2003 2004 2005 Total
Constru ction/Maintenance 223,200 560,300 720,000 1,OBO,200 259,500 2,843,200
Total 223,200 560,300 720,000 1,080,200 259,500 2,843,20D
.
Funding Sources 2001 2002 2003 2004 2005 Total
MS - Municipal State Aid Street 420,000 420,000
PI - PIR/General Obligation Bo 120,200 336,700 216,000 247,600 153,500 1,074,000
SA - Special Assessment 103,000 223,600 504,000 412,600 106,000 1,349,200
Total 223,200 560,300 720,000 1,080,200 259,500 2,843,200
Operational Impact/Other
--- -
IPublic hearing - year prior to planned construction
Plans and specifications - year prior to planned construction
Bid and assessment - year of planned constmction
'Consiste.nt-wi th-the-Gi ty.Council-adopted-Road wa y. [mprovemen t-I'ol i~y,-street ratings,.and-J?avement-M anagement-pr{lgrnm_-
.
CAPIT AL PLAN 2001 t 11m 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Transpor13tion
Projt'CI # 01-CIP-T102 Type Improvement .
Useful Life
Prnjl'l.:"t :\'arnl' Residential Street Improvemen ts-- Utilities
Category Trans: Streets
Priority nla
Desuiptioll
LocallUllS to he Jelenlllllcd as tile)' are Cl1nSlstent with the street reeunstruction program.
I'rogrum to leconstrLlct deteriorated water main and sanitary sewer and to pruvidc storm sewer improvements in conjunction with street improvement projects.
,I ustification
--... ----.... - ---- - . ---- ...------. - -- - ---.-- ..
In most case> where slreet reconstruction takes place. storm sewer facl1ities either need upgradlllg or need to be installed new. [n some cases, water main and
,sanitary sewer need to be rehahilitatcd in conjunction with street reconstruction. The numbers assume the city funding 100% of major storm sewer. water mam,
'and sal1ltary >ewer construction/reconstruction. These costs arc to be used in conJuncton with street reconstruction costs shown on 0] -CIP- Tl 0 1.
Expenditures 2001 2002 2003 2004 2005 Total
Con structionlMai n tenance 200,000 200,000 200,000 200,000 200,000 1,000,000
Total 200,000 200,000 200,000 200,000 200,000 1,0(10,0(10
.
Funding Sources 2001 2002 2003 2004 2005 Total
SF - Sanitary Sewer Fund 75.000 75,000 75,000 75,000 75,000 375,000
.su - Storm Sewer Fund 50,000 50,000 50,000 50,000 50,000 250,000
WF - Water Fund 75,000 75,000 75,000 75,000 75,000 375,000
Total 200,000 200,000 200,000 200,000 200,000 1,000,000
Operational Impact/Other
Publ1~ he81"1ng - year Pill>!" to pbnned cunstruction
;]'lans and speciflcatlDns - year prim to planncd construction
Bid - vcar Df phinned constructiun
Consl,wnt With the Storm W"krM3n"gement Plan. Water und Sewer Iltiilty.MustcrPlanrand telcv-ision.inspections.
.
CAPITAL PLAN 2001 thru 2005
Co ntact PW Director
City of Hopkins, MN Department Public Works: Transportation
. Pl"Oject # 01-CIP-T103 Type Improvement
Useful Life
Pl'oject Name Citywide Concrete Alleys
Category Trans: Streets
Priority nla
-------------
Descdption
--- ..-..--.. --- - - .- -
2001: Alley bctween 5th/6th Avenues North, 2nd/3rd Streets North
Alley between Shady Oak Road and city limits, north of Bradford Road
2002: Alley west of 19th A venue North, north of 3rd Street North
Program to construct concrete alleys in areas designated as poor on the alley condition survey.
-- .--. --- -..--..-..-.--
. -. .-----.. -. .
Justification
.-- .... -=-. ------ -.-.-- --- - -- .-.., ---- - . -- --.----.--.
The city has had a policy of constructing concrete alleys for a number of years. This policy has proved to be sound by the concrete alleys' durability and low
maintenance costs. The alley condition survey indicates there are approximately 8,000 feet of alley in poor condition. The estimated cost to rebuild these alleys is
$350,000 over six years. Current policy has the city share at 20% of the cost in residential areas. The amount recommended would allow the city to complete
reconstruction of the alleys (currently rated as poor) by the year 2002. The city will experience cost savings due to lower maintenance costs.
Expenditures 2001 2002 2003 2004 2005 Total
Constru ction/Maintenance 70,000 35,000 105,000
Total 70,000 35,000 105,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
SA - Special Assessment 56,000 28,000 84,000
SU - Storm Sewer Fund 14,000 7,000 21,000
Total 70,000 35,000 105,000
Operational Impact/Other
- .- ""'".n..__ . . ... ~. .,_'- .~ _ ....._" .
Approxmately 1250 feet per year for four years
Public hearing - year prior to project
Plans, speci!ications, bid construction - year of project
'Consistent w~ th-the- Gi ty-GounciJ-adopted-Roadway-lmprovement P-Olicy and-A lle-y-rating;;.--------- ....-..------
.
CAPITAL PLAN 200t thl'lI 2005
Contact PW Director
City of Hopkins, MN IJcpartmcnt Public Works: Transportation
Project Ii 01-CIP-TI04 Type Improvement .
Useful Life
p'l"ojt'l'I N:;ulI(" County Road 3
Category Trans: Streets
Prio ri ty n/a
Descriptiun
l'c1Llnty Road 3 from Shady Oak Road lo Meadowbrook Road.
Lighting, landscaping, streer, etc. improvements along Excelsior Boulevard from the cast to west city limits.
Justification
.. . -.. - ,. -.-
Ddlciencles In tell11S 01 roadway condition, traffic/pedestrian movement, safety and acsthetics appear in all four segments of County Road 3:
_ Segment I from Shardy Oak Road to 1] lh Ave So; upgrade existing undivided loadway, upgrade 11 th Ave intersection to meet future needs, Implement
:beautilication pfllgralll
- Segment ~ from] I th Ave So to Ilwy 169; median pavers construction
_ Segmcnt .I from Hwy 16') \0 Blake Road; upgrade existing n81T0\\' undi,.ided I oadway, resolve safety issues at railroad crossing, improve norlh south access.
accounr for future I RT acce,s, address r~~','"J.Qpment needs
Expenditures 20m 2002 2003 2004 2005 Total
Planning/Design 150,000 150,000
Constru ction/ Ma intenance 4,000mO 140,000 2,300,000 6,440,000
Total 4,000,000 140,000 150,000 2,300,000 6,590,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
GU - Other Governmental Unit 3,000,000 75,000 1,600,000 4,675,000
MS - Municipal State Aid Street 1,000,000 75,000 700,000 1,775,000
PI - PIRlGeneral Obligation Bo 140,000 140,000
Total 4,000,000 140,000 150,000 2,300,000 6,590,000
Operational Impact/Other
\ ,0 bond payments 10 be lin~nced by a combination of existing TIF revenue, Municipal Slate Aid road funds, additional TIF revenue created by economic
develupment, gl ant funds. and. as a last resort, general ell)" revenue,
Segment I C Dl1strue lion - 1988/1999
Segment 2. Plunning 200]; bidding ~nd construction ,median upgrades only) 2002
Sqpllcnt ~. Planning and acqulsllion--1-999J2000;-biddingiconstruction - 2000/200 I
.
CAP IT AL PLAN 2001 thru 2005
Contact PW Director
City of Hopkins, MN Deportment Public Works: Transportation
. Project # Ot-eIP-TIOS Type lmprovement
Useful Life
I'roject Name Fifth Avenue South
Category Trans: Streets
Priority n/a
Description
----.- .-..-.. .. ---..--.----
-- - ---.-- -.. - -
2002 - Fifth Avenue from Mainstreetto County Road 3
Resurfacing and partial reconstruction of Fifth Ave from Mainstreetto Co Rd 3.
Includes sidewalk north of Minnctonka Mills Road.
2003 - Fifth Avenue from T.H. 7 to Mainstreet
Resurfacing and partial reconstruction of Fifth Ave from T.H. 7 to Mainstreel.
Includes sidewalk north q(l'0jlln~tonka MillsnR9ad "____ ----.. --- --..---
Justification
---- .....,'.-.-,.""-- ---------.. ----- --..----.- --.----
Fifth A venue was last graded and surfaced to its 44 foot width in 1964. The roadway is showing extreme wear and stress and its age alone indicates Its condition
,on the downward side of the pavement detcrioration curve.
Fifth A venue is a major access route to Mainstreet from Co Rd 3. As such, it should be afforded the same amenities or theme treatment as those installed on
Mainstreet.
----------- .....--
Expenditures 2001 2002 2003 2004 2005 Total
Construction/Mai ntenan ce 176,000 501,600 677,600
Total 176,000 501,600 677,600
.
Funding Sources 2001 2002 2003 2004 2005 Total
MS - Municipal State Aid Street 73,600 209,700 283,300
PI - PIRlGeneral Obligation 80 79,800 79,800
SA - Special Assessment 50,600 212,100 262,700
TF - Tax Increment Financing 51,800 51,800
Total 176,000 501,600 677 ,600
Operational Impact/Other
, -' - ""..=--'--"'-'==.==--''''- ".'- -. :. - -
2002 Projects: Plans and specifications - 200l
Bid and construction - 2002
2003 Projects: Plans and specifications - 2002
Bid-and-construction - 200J ----- ------
.
CAPITAL PLAN 2001 (11m 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Transportation
Project tI 01-CJP-TI06 Type Improvement .
llseful Life
Prolcct Nallll' County Road 61 (Shady Oak Road)
Category Trans' Streets
Priority n/a
Description
'Shady Oak Road from Co Rd 3 to r.K 7, Mainstrect I,'om 20th Ave to Shady Oak Road.
'Llghting, lanscaping, slreel, etc., improvements from Co Rd J to TH. 7
Reconstruction 3nd amcnities on Mainstreet from 20th Ave to Shady Oak Road
-...--
Justification
---- - - -
Ddlcienclcs 3ppcar on Shauy Oak Road in terms of roadway conditions, trame/pedestrian movement, safety, and aesthetics. Upgrade an undiVIded roauway,
resolve saktv ISSUCS with number of driveway access points and intersection at Mainstreet Lighting needs upgradlllg and provide beaulitication program.
Rcwnstruclllll1 of Malllstreel for I block section nEeds to be done to concluuc the upgrading of all of Mainstreet
Expenditures 2001 2002 2003 2004 2005 Total
Construction/M ainte nance 1,258.700 3,021,000 4,279,700
Total 1,258,700 3,021,000 4,279,700
.
Funding Sources 2001 2002 2003 2004 2005 Total
GU - Other Governmental Unit 810,000 2,700,000 3,510,000
MS - Municipal State Aid Street 400,000 321 ,000 721,000
SA - Special Assessment 48 ,lOO 48,700
Total 1,258,700 3,021,000 4,279,700
UperationallmpactlOther
2002 Plannmg and acquisitIOn
lOllc'. Blddin!.( and eonSlrllctJun
('lIl1,isrcnl. wltb H~llnepin County C!P, city.'s dcsireto upgradelhe.roadway, and recollslnlction-program-fOl'allof Mainstmet~-
.
CAPIT AL PLAN 2001 flrrtl 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Transportation
. I'roject # Ot-eIP-T107 Type Improvement
Useful Life
P.'oject Name Rebuild/redesign 11th Avenue South
Category Trans: Streets
Priority nla
--'--.--,
Description
-.--- .___..__ n. . -- ----.- --.-... ... ---.---
Segment I: Westbrooke Way to Smetana
Segment 2: Soo Line Bridge to Westbrooke Way
iImprove pavement condition, curbing and drainage, incorporate sidewalk/trail improvements. Connect stonn sewer to Westbrooke Patio Homcs proposed system
iin Segment 1
.. ..---.------- ...----- ---- - -- -..---
Justification
----,,- -.. - ---- - --
IPartial reconstruction is neccssary to replace section of tipped curb to improve drainage. Section ofstonn sewer may need to be upgraded because of
Ineighborhood flooding issues south ofWestbrooke Way. Surface condition can be upgraded with milling and overlay procedure.
.. - ----.---
Expenditures 2001 2002 2003 2004 2005 Total
ConstructionlMaintenance 269.200 282,650 551,850
Total 269,200 282,650 551,850
.
Funding Sources 2001 2002 2003 2004 2005 Total
MS - Municipal State Aid Street 71,800 85,150 156,950
SA - Special Assessment 167,400 197,500 364,900
SU - Storm Sewer Fund 30,000 30,000
Total 269,200 282,650 551,850
Operational Impact/Other
.. ---'-.... . n. ",'': "".____"'-.... -_,,,_ . __._ ---..-.-- -- - - - .
2001 Project: Plans and specifications - 2000; bids and construction - 2001
2002 Project: Plans and specifications - 200!; bids and construction - 2002
'Consistcnt with Cjty roadway-improvement policy. . .- -. -.-.-.----- --- -----
.
CAPIT AL PLAN 2001 III/'/I 2005
Contact PW Director
City of Hopkins, MN Departmcnt Public Works: Transportation
I'r..jret # 01-CIP-TI08 Type Improvcment .
liseful Life
l'ro.ic~l '\ aml' Streetscape Improvements, 11th A ven ue South
('atego.')' Trans: Streets
Priorit)' nla
Description
11th Avenue South, f'irst Street South to Mainstreet
'streciscape improvements (0 visually tie Malllstreet lO uPb'Tadcd Excelsior Boulevard. Work includes lighting, sidewalk, and landscaping. Ml11 and overlay street
ourf:\ce
.J lIstification
--- -.
An Improved I11h Avenue con'idor is needed to prOVide an cnhanced connection betwccn Excelsior Boulevard and the central business district.
,Street surtace ,Iww, distress and degradation due to many utility patches.
Expenditures 2001 2002 2003 2004 2005 Total
ConstructionlMai n ten ance 135,000 135,000
Total 135,000 135,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
PI - PIR/General Obligation Bo 135,000 135,000
Total 135,000 135,000
Operational Impact/Otllcl'
20no~ Plannmg/desq;n
2001 Cunstructlon
Provllks consIstent tr"nsltion between Mainstreet and ExcclslUf rloulevard str<,ctscapc themes.
.
CAPITAL PLAN 2001 tl1m 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Transportation
. r.'oject# 01-CIP-TI09 Type Improvement
. Useful Life
PmJcct Name Excelsior Boulevard Streets cape Improvements
Category Trans: Streets
Priority nJa
Description
--...-..-..------.-.- ,.
-------..
I ExcelsIOr Boulevard from 9th Avenue South to Highway 169
!Street lighting, landscaping, pedestrian improvements along Excelsior Boulevard.
. ---.--..------- ...
Justification
~Work is needed to bring the funcii~~ -~~.dapp;arance of this segment of Excelsior Boulevard up to standards ofprevio~sly completed segments.
...-----.-- ..-.
----------
Expenditures 2001 2002 2003 2004 2005 Total
Construction/Maintenance 60,000 470,000 275,000 805,000
Total 60,000 470,000 275,000 805,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
GU - Other Governmental Unit 170,000 75,000 245,000
PI - PIRJGeneral Obligation Bo 60,000 300,000 200,000 560,000
Total 60,000 470,000 275,000 805,000
Operational Impact/Other
. .. - - ----- --. --.. ..
.- .., ...------------- ..... ---.--- - -..-.....- -.
2001: Planning/design
2002: Install lighting and north side improvements
2003: Construct south side improvements
'41nsistent-with CSAH ~3 Corridor-$tudy-recommendations,within-guiddines-of Hennepin County- Roadside-Enhan=em-~l'lnership-prowam~ ---
.
CAPITAL PLAN 200t film 200S
Contact PW Director
City of Hopkins, MN Department Public Works: Transportation
PI"ojcct if Ot-CIP-THO Type Improvement .
Vseful Life
l'rojcl'l Namc Hwy 7 17th Ave/CSAH 73 Intersection Improvem
Cate~ory Trans: Streets
PI'lnrity nla
Description
-
17th Avcnue NOIth/CSAH 73 trom 4th Street North to 5th Street West, including Hwy 7 intersection.
Streetlmprovemcnts to implOve traffic and pedestnan safety and Improve intersectiunlevel of service. Upgrade Highway 7 intersection traffic signal system to
clght phase to lllc1ude ckdicated lcft turn lancs on all fOllr approaches.
Justification
[)c1IClencic, exist 111 Inadway conditluns and vehicular and pede;,trian safety.
Expenditm'cs 2001 2002 2003 2004 2005 Total
Con s tructionJMa Intenance 1,000,000 1,000,000
Total 1 ,000,000 1,000,000
e
Funding Sources 2001 2002 2003 2004 2005 Total
GU - Other Governmental Unit 750,000 750,000
MS - Municipal State Aid Street 200,000 200,000
PI - PIRJGeneral Obligation Bo 50,000 50,000
Total 1,000,000 1 ,000,000
OperatiDnal Impact/Other
2001 Plllnmng and "cquisition
2002 Blddillg OInt! clInstruction
('nmISlcnt wIIIl IvlnDUT. Hennepin County and City of Minnetnnka Capilal hnprovelllcnt Plans.
.
CAPIT AL PLAN 2001 thrtt 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Transportation
. Pmject# OI-CIP-Tll1 Type Improvement
Useful Life
Pt"oject Name CSAH 73/CSAH 5 Intersection
! Category Trans: Streets
Prio rity nla
... ---..-"..
Description
__~~~~~___n --.J ____________ - n__ --..- - ---- ---
.cSAH 73/CSAH 5 intersection
Construct mtersection improvement including traffic signals, modified geometries, pedestrian ways, and landscaping to improve pedestrian safety; improve
'vehicular and traffic flow and eliminate confusion at the intersection; and improve intersection aesthetics.
Justification
Th;"eri~ri;;i{o~r-way stop a~d poor geometries have contributed to long-=St;~;j;~g-prob1ems, including safety con~-~~~ for pedestrians, local a~d-~egional traffic,
and the adjoining residential properties and neighborhood area.
.- -.... - - ~ --..---.- - ---" --..-'- ------
Expenditures 2001 2002 2003 2004 2005 Total
Construction/Maintenance 470,000 470,000
Total 470,000 470,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
GU - Other Governmental Unit 350,000 350,000
MS - Municipal State Aid Street 120,000 120,000
Total 470,01111 4711,111111
Operational Impact/Other
.- ---" --,,_.
2000 Design
2001: Construction
'Recommended by construction citizen task force. City Council approved intersection improvements.
----.. -" .-.----.-..... --- -.. --...
.
CAPITAL PLAN 2001 t h /"li 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Transportatiun
ProJcct iI 01-CIP-T112 Type Improvement .
llseful Life
Project Name City- Wide Sidewalk Repair
CategOl'y Trans: Walkways/Sidewalks
Priority n/a
Description
- - --. ----
'l'ity-wI\,k sidewalk rcpair. Pcrform sidewalk maintenance un all public sidewalks and eunstruct ADA improvements,
200 I' Lon c 2 2004: Zone 1
2002 Zon e 3 2005: Zone 2
20f)"\: Lone 4
-- -
J ustificatioll
- --
Routine sidcwalk maintenance is necessary to ensure sidewalks are safe for pedestrian use. Maintenance is also necessary to remove hazards that may cause an
injury and result III tile city being held liable for the injury. Yearly projects will call lor replacement of intersection pedestrian ramps that fall below accessibility
standards as set down hy the Americans With Disabilitities Act
Expenditures 2001 2002 2003 2004 2005 Total
Con structi on/Maintenance 20,000 20,000 20,000 20,000 20,000 100,000
Total 20,000 20,000 20,000 20,000 20,000 100,000
e
Funding Sources 2001 2002 2003 2004 2005 Total
CR - Current Revenues - Gene 20,000 20,000 20,000 20,000 20,000 100,000
Total 20,000 20,000 20,000 20,000 20,000 100,000
Operational Impact/Other
Plan/b!d/construct cech yeer
(<Insistent W111\ ,wera\l n1ailHcnance of gcneral public infrastructure
.
.
CAPITAL PLAN 2001 thru 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Transportation
. Pmject # Ol-CIP- Tl13 Type Improvement
Usdul Life
Project Name City Parking Lot Improvements
Category Trans: Parking Facilities
Priority nla
._----,
Description
---.. ------. --.--.---.. ...-.---.-..-
--------
Lots 500 and 600
Redesign and reconstruct city lots 500 and 600, north of Mainstreet between 9th and 11th Avenues North.
... ..- .-
Justification
-------.-. ...- ------ .---...------
Lots 500 and 600 are on or approaching a critical point on a deterioration curve. Seal coats and crack sealing will not redeem them. Mill and overlay area
,minimum improvement needed. Project costs are for total replacement of the bituminous pavement and curb installation.
To address downtown parking issues an analysis is recommended for 2000, a feasibility report in 2000, and possible construction beyond what is here
Irecommended in 2001.
Expenditures 2001 2002 2003 2004 2005 Total
ConstructionlMaintenance 350,000 350,000
Total 350,000 350,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
PI ' PIR/General Obligation 80 105,000 105,000
SA - Special Assessment 245,000 245,000
Total 350,000 350,000
Operational Impact/Other
..-.- ----
Lots 500 and 600:
1999/2000 - Planmng
200 I - Bid and constructIOn
! L.ots-500.and .600 i mpmvemen ts-based-on-comprehen sive-parkin g. anal ysis.
.
CAPIT AL PLAN 2001 t/1I'I1 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Transportation
['!"oied It 01-CIP-T114 Type Improvement .
llseful Life
Pro.ied 'am(' Minnetonka Boulevard (CSAH 5) Corridor Impro
Catc~ory Trans: Streets
Prio rity nla
Description
MinnctonkJ Baulevard lram Hapkins Crossroads to, Atwater Street
,Conidor improvements including multi-purpo,se trail, landscaping, curbIng, landscaping and neighborhood signage.
,J ustifica tion
-- ---
improvcmento are needed to upgrade the appearance of this road COil idor and to, help calm traffic flow.
Expenditures 2001 2002 2003 2004 2005 Total
Construction/Mai nten an ce 300,000 300,000
Total 300,000 300,000
e
Funding Sources 2001 2002 2003 2004 2005 Total
GU - Other Governmental Unit 150,000 150,000
MS Municipal State Aid Street 100,000 100,000
PI - PIR/General Obligation 80 50,000 50,000
Total 300,000 300,000
Operational Impact/Other
.2000/200 I Planlllng and acquisition
21102. 13iddlllg and wnstruction
Cunsistenl with City COllncil action and city task force recommendations.
.
CAPIT AL PLAN 2001 thru 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Transportation
. Project # 01-CIP-T115 Type Improvement
Project Name Useful Life
St. Joseph's Parking Lot Improvements
Category Trans: Parking Facilities
Priority n/a
- -..- --_._- ,
Description ,
---.-.- . ""-=~-=,=~- .-- --------
'Parking area between 12th Ave So and 1st St So and Mainstrcet
;Existing parking lot improvements including lighting, crack sealing, and striping, Construct new 70 stall parking lot at the NW corner of 12th Ave So and 1st St
,So.
n_ _ __
.-
Justification
-..--..---
- .. .--- -- ---- __.__._ ___n
:Additional parking areas are necessary to handle central business area demand and reduce on-street parking problems,
----..--- - - .----.-. -
Expenditures 2001 2002 2003 2004 2005 Total
Construction/Maintenance 110,000 340,000 450,000
Total 110,000 340,000 450,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
PI - PIRlGeneral Obligation Bo 110,000 340,000 450,000
Total 110,000 340,000 450,000
Operational Impact/Other
-,."._-_. ==--'-_.."., ....-'-.-"'-'-'-- ... ~ ..,-'...."'"~""--='.. "--==""'.--'-"'------------". . _ -... .---------...--- -.---.-..---.-----
2000/2001: Planning/design and public use agreement with St. Joseph Church
,Bidding and constt'uction: Phase I - 2001 Improvements to existing parking lot
Phase 1I - Property acquisition and construct new parking lot
IMayrequlre-the vacation~f a-portion-nf-+Jth-Avc::-So-between M~instree~nd-1-st-St So
.
CAPIT AL PLAN 2001 tl1/'/I 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Transportation
I'rojcct # Ol-CIP-Tl16 Type Improvement .
tlseful Life
"mjcct Name Public Improvements--SuperValu Warehouse Exp
Category Trans: Streets
Priority nla
Description
5th St So and 6th St So lmm 6th Ave to II tll Ave So
Public improvemcllls necessary as a result ofSuperVa]u perishable warehollse expansion project. Improvements include reconstruction of portion of 5th St So to
'align with 5th St east of 6th A ve So. Partial reconstruction of 5th 5t and 6th St So to reduce road pavement width to 32 1'1. Construct new boulevard and
multipurpose tl3il along south side of 5th/6th Streets from I th Ave to 11th Ave So. Construct intersection modifications at 5th/6th Streets and lOth Avenuc South
Lnklsection
J ustificatioll
ImprovelLlents are needed to improvc pedestrian connections, improve vehIcular safety and create an improved butTer between SuperValu facihties and operations
and Single rUlllily resldcntial areas.
Expenditures 2001 2002 2003 2004 2005 Total
Co n struction/Ma intenance 300,000 300,000
Total 300,000 300,000
e
Funding Sources 2001 2002 2003 2004 2005 Total
PF - Private Sector Funds 300,000 300,000
Total 300,000 300,000
Operational Impact/Other
2000/2001: Planning and acquisilLon
2001 : Blddll1g ant! construction
CUllsistent with SupcrVulu perishahle warehouse expansIon project development agreement and conditional use permit.
.
.
PARKS & RECREATION
.
.
. - ..-..
CAPIT AL PLAN 2001 thru 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Parks
. I'rojcct # 01-CIP-P201 Type Improvement
l:Jseful Life
Pmjcct Name Valley Park Improvements
Category Parks/Forestry/pa vi1i on: N eighborhoo
Priority nla
--- -..
Description
- - --- --- -----
2002 - Parking addition ($20,000)
2003 Huckey rink upgrade ($45,0001
---.-..- -. ...- . .- --
.-
J usti11cation
.-"............="'"- , .- ---- ---- ----
Parking addition _ Valley Park is gelting more use each year as a community park; as these uses grow, the demand for additional parking is created.
.- .-- -.-----.- -.----.,- ------.
Expenditures 2001 2002 2003 2004 2005 Total
Constructlon/Mai ntenance 20,000 45,000 65,000
Total 20,000 45,000 65,000
e
Funding Sources 2001 2002 2003 2004 2005 Total
CR - Current Revenues - Gene 20,000 45,000 65,000
Total 20,000 45,000 65,000
Operational Impact/Other
Consistcn[;ilh Park--Soard adopted guidelines and (1"P-pnority-list of 4/20/90. . ..-.- -. --" ----- -
---- - --- --
.
CAPITAL PLAN 2001 f Iml 2005
Contact PW Director
City of Hopkins~ MN Department Public Works: Parks
Projt.ct II 01-C!P-P202 Type Improvement .
l.Iscful Life
Pro,j{'ct Nalllt Shady Oak Beach Redevelopment
Category Parks/ForestrylPavil ion: Commun ity
Priority n/a
OescriptiOll
-- ----- .....-..
I he 19114 Shall)' lJak Beacb ,tut1y idcnlilled structural and ADA problems. A Sbady Oak Beach master plan was developed and associated improvmenls approved
'hy the elll~' nl Mmnctllnka 3nd Hopki!1s. Phase I work, completed in 1990, includcd demol1tion llfdeep watcr docks. purchase of new. removable deep water
[jock system. and Cc1l1S1rUclion ur a lIshmg pier anJ canoe launch area. Phase Il work began in September of 1997 and includes a reconfigured entrance drivc and
17' 'p3Ce parking Illl, new changing/restroom/cntry control buildings, new concessionllilcguard station building. upgraded picnic sbcltcr, canoe/paddle boat rental
.area, sunilary ~cwer sY"lcm upgrade and otber beach improvemcnts.
Justification
;\11 beach Improvements \VIII be agreed upon witb the City ofMmnelonka. CIP runding must be identified to allow Hopkins to participate in thejoinl
fC(jevelopmenr or Shady Oak Bcach. Based on the traditional 213 Minnetonka. 1/3 Hupkins participation. the $1,685,000 project will cost Hopkllls $561,000.
hudgeted O'.CI live years from \997-2001.
Expenditures 2001 2002 2003 2004 2005 Total
ConstructionlMai ntenance 50,000 50,000
Total 50,000 50,000
e
!Funding Sources 2001 2002 2003 2004 2005 Total
CR - Current Revenues - Gene 50,000 50.000
Total 50,000 50,000
Operational Impact/Other
19'-10 rllase I \\"'JrK completed
Phase I I deSign
1'l(}7 PI\3Sc 11 I\'or~ began in September
I ')()~. Phase II \\"1)11\ completed by August 1
.
CAPITAL PLAN 2001 thru 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Parks
. Project # 01-CIP-P203 Type Improvement
Usefu I Li fe
Pl"Ojcct Name Central Park Parking Lot
Category Parks/Forestry/Pavilion: Community
PI'in ri ty n/a
---.-
Description
--=--.=:,~>'-- . --' - -- -- -'-"-- ----.- --.-.--..--- --..""---
North side of Central Park, west of volleyball courts.
Number of parking stans - 31
Handicap/van access stalls - 2
___ ___. u_ -..---
Justification
. - =--,~,. --"---- - .. --.-.--"-
Current parking lot is 25 years old and has deteriorated quickly in the last several years. Poor drainage (no storm sewer) and no permanent curbing has accelerated
this deterinration.
-.---' -- - .,-- -----.- . - -...
Expenditures 2001 2002 2003 2004 2005 Total
Construction/Maintenance 65,000 65,000
~
Total 65,IlOD 65,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
CR - Current Revenues - Gene 65,000 65,000
Total 65,000 65,000
Operational Impact/Other
.---_...-- ----. --.-..-
2003 - Design
2004 - Constrllction
IConsistent with Park Board maintenance standards
-. ,.- .-'- --" . --_.,~.
.
CAPITAL PLAN ],001 tl1,.1/ 2005
Contact
City of .Hopkins, MN Department Publtc Works: Parks
l'rojed !I 0l-CIP-P204 Type Improvement .
Useful Life
"roj eel :>'lllll (' Pavilion Mezzanine
Category Parks/Forestl y/Pavil ion: C ommunity
!'l'iorily nia
Descl'iptioli
Pavilion, I I (IOU ['xceblo, 13oulevard:
!nswll elevatw t'-l mezzanine, and install the nOllr, ceiling, partitions, sprinkler system and other items in this area.
,Justification
- - .
The onginal constnIC!H)n of the Pavilion provl(kd the rOllgh in features for the mezzanine area. The plan i, to finish off this area so it could be lIsed for city and
athletic function.1
Expenditures 2001 2002 2003 1004 2005 Total
Construction/Mai ntenan ce 250,000 250,000
Total 250,000 250,000
e
Funding Sources 200i 2002 2003 1004 2005 Total
PF - Private Sector Funds 250,000 250,000
Total 250,000 250,000
OpCl'nthlnaJ hllparVOthel"
NOll-l'aukcd nn Park Board priority list.
.
--...-
CAPITAL PLAN 2001 thl'll 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Parks
. Project # 01-CIP-P205 Type Improvement
. Useful Life
Pro.lce! Name Downtown Park Improvements
Category Parks/ForestrylPavilion: Community
Priority n/a
Description ..--.-.. ,
-----.. ,-=-=---,-"~.'. --.-.-. ..- - --- -. ."_. ..-
IDo\\>l1town Park pavers:
iRemove and replace center red concrete area of Downtown Park with pavers and new benches.
----" ..--'--" -.- -..
Justification
. -- ..~.""""~-='"""'='" ---- - - . --,,--- -'.- - ---
EXIsting concrete is cracked, posing nipping hazards. Benches in need ofreplaccment. Existing bcnches are 20 years old.
--- ---- ..--- ---.--- ---,- - ----..-----
Expenditures 2001 2002 2003 2004 2005 Total
Construction/Maintenance 20,000 20,000
Total 20,000 20,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
CR - Current Revenues - Gene 20,000 20,000
Total 20,000 20,000
OperationallmpactlOther
.
-----
CAPI"f AL PLAN 2001 tlll'lI 2005
Conlact I'W Director
City of Hopkins, MN Dcpartmcnt Public Works. Parks
PI.oj ('cl # Ol-CIP-P206 Type Improvement .
llscflll Life
Praied ,"'alll(' Regional Trail Connections
Category Parks/l'orestry/Pavihon: Community
Prior"ity n/a
Description
Develop vannu\ intra-city connGctiol1s to existing regional trails.
Justificatiun
SCllC !!ltra-cily connections to the expanding use pattcl11s on the rcgionaltrails is necessary.
Expenditures 2001 2002 2003 2004 2005 Total
Cons trudion/Ma inte na nee 15.000 20,000 20,000 55,000
Total 15,000 20,000 20,000 55,000
-
Funding Sources 2001 2002 2003 2004 2005 Total
CR - Current Revenues - Gene 15.000 20,000 20,000 55,000
Total 15,000 20,000 20,000 55,000
Operational impact/Other
RcgJl~l1al Hall plan unch:r review c
.
-- - - - --- - - --- - --------
.
GENERAL PtJBLIC
BUILDINGS
".-
--
- -
- - - -
-- .., '. ~. T~ .."" "'rT"l''1n+'<-.~~~~"""".,,,,.,, .
CAPIT AL PLAN 2001 thru 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Bldg/Equip Serv
Project II 01-CIP-B301 Type Improvement .
Useful Life
Project Name City Hall HV AC Control Upgrade
Category Buildings: Maintenance Facilities
Priority n/a
----.
Description
- ...--.- -.... ----...-. ..------ --- ------
IHopkins City Hall, 10] 0 First Street South
Upgrade of current pneumatic heating, ventilating, and air conditioning system at City Hall.
.. -..- ...--------
Justification
TI1;Zu-~ent HVAC sy~t~-m for City H~il;;d--th~ police station needs \0 be upgraded. Our present;ystem is ;;-v-ery-~~;;.;piicated air operated system-that-;;-~~d~--- - I
,constant moniloring in order to heat and cool City Hall. By upgrading the controls and adding additional cooling coils, we could adjust the system for better
efficiency and comfort with a potential for savings in heating and cooling costs.
---------- -------... ---..--
Expenditures 2001 2002 2003 2004 2005 Total
Planning/Design 25,000 25,000
Construction/Maintenance 100,000 100,000
Total 25,000 100,000 125,000
.
Funding Sources 2001 2002 2003 2004 200S Total
CR - Current Revenues - Gene 25,000 100,000 125,000
Total 25,000 100,000 125,000
Operational Impact/Other
. ___ .n .-.----. ..-..-"... - ------ ------ -- ----
.- - -
,2002: Specifications, engineering
,2003: Installation
.---.------.- - .. --..-..-.
.
- ____~_._ ._....._ n_
.
CAPITAL PLAN 2001 thru 2005
Contact rw Director
City of Hopkins, MN Department Public Works: BldgfEquip Serv
. . ..-.,.... .....,.
. Projllct # Ol-CIP-B302 I Type ..lmprovement
i U.erul Life
Project Name Public Safety Facility . _l
... . ... ." ,. ~. ~ ~~ _~.,..,.". .n ._. n. . _".. _,,_~ .__ _~,_,___ '. -.- ---.. Catll3or)' Buildings: Fire Facilities
Priority nla
.-..~~._-_. I
. Description J
~---_.- -~,..~ ~ _._~...,
This option provides for a new fire station and rernodllling of the police and fire areas in City Hall to accomrtjodate.thepolice.
i
;
~._----~-~--- -"
_~'rr~.__ _1
J ustificatioD
~Th~~Poiice and Fire Departments are in need of additional space. The citY~j~~~Osidering options ofhowtohandle~theCl'lllllpild conditions in-the Police---nc-
Department and the upcoming storage needs of the Fire Department.
The costs incl uded here are only building costs. Land purchase costs would be additional.
. - ----- _T ____.__
Expenditures 2001 2002 2003"- 2004 2005 Total
Construction/Maintenance 6,180,DOq 6;780.000
Total 6,780.000 - 6,780,000
.
. --
Funding Sources 2001 2002 2003 2004- lO{)S Total
HRA- Housing and Redevelop 6,780;000 . 6,180,000
Total 6,780iOOO &,780,000
-----.-. ...-.-.- -.--------
Operational Impact/Other
- --------------------===-~._-
I
I
I
.. --- ----..-'-- -~ ~_.__. ___J
.
--
...~'-~~;L>~,':~,.".'-~.,i.~,;; ,L~.~.~~~'.::.~-'-'LR-::...~._R~'_..~:"_"~:.;..;i.~~~~\d.i~~i:!~~~'~~....-:-;:\...;_ ~~~~?r;.-.~~i;.~d;'-~.L;~..,~~~~~.-.;~.;;;;bl.~~~~i-~~~~~~~;i~~~~.~~.j;:.)~~~~_t~~~-
CAPITAL PLAN 2001 thru 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Bldg/Equip Serv
Projc~t II Ol-CIP-B303 Type Improvement .
Useful Life
Project Name Public Works Storage Facility
j Category Buildings; Maintenance Facilities
Priority nla
-----. ------
Description
'-= - "- - -. _. ".,- -.. .------.-.. ..- .
] 11000 Excelsior Boulevard - Public Works vehicle storage building
...---.- --'---,. --,,-_._- -..--..- --- -- ---..
Justification
--- ------- ""'-=--=- - -----------... -".--- ---- _.- - ----- "-...
Scope of project is to remove building number 2 and construct a new 200 x 106 heated storage building. Utilize building number 3, the current street equipment
storage building, for salt and sand storage. Current buildings are over 50 years old and wilt be in need of major renovations in the near future.
-,-"- ~-'-'-'--'-"-'" ----_. .-.. ------- ----
Expenditures 2001 2002 2003 2004 2005 Total
Con slruclion/Mainlenance 1,400,000 1,400,000
Total 1,400,000 1,400,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
HRA - Housing and Redevelop 1 ,400,000 1 ,400,000
Total 1,400:,000 1 ,4110,OOO
OperationallmpactlOther
.,.-. - - .,..=~ .. "--. .-.- -.- -
,Plans and specitications: Year prior to construction
:Bid' Year of COIlS!Tuction
-----. --.. ..--------- ~---- ---.--'- ------ ._--~
.
.
ECONOMIC DEVELOPMENT
.
.
CAPITAL PLAN 2001 thru 2005
Contact ED Director
City of Hopkins, MN Department Development
. J'roject # Ol-CIP-D401 Type Improvement
liseful Life
Pnlject Name Redevelopment, East Excelsior Boulevard
Category Economic Development
Priority nla
Description
.-.... - -- --.-- -. --.----- ..-.--
North Side of Excelsior Boulevard from Monroe Avenue to approximately Tyler Avenue.
'Redevelopment of older commercial area. Based on the existing zoning, it would involve both commercial and industrial uses.
. _._.un -------- . - -----.-
_ ----.-----
Justification
. _ ....._____ ___.u _ __ .. _ _____
'Excelsior Boulevard is being upgraded in this area, which will provide for additional property on the north side of the roadway. The buildings in this area are
older and no longer the highest and best use for this property. The funding amount is an estimate and will vary depending on the scope of the project.
.- --....-- - -- ----... .------
Expenditures 2001 2002 2003 2004 2005 Total
Constru elion/Mainten anee 2.000,000 2,000,000
Total 2,000,000 2,000,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
TF - Tax Increment Financing 2,000,000 2,000,000
Total 2,000,000 2,000,000
Operational Impact/Other
Thc s~hcd~-I~' for this project IS still tentative. -.-. -..--- . -----.-.-....-.
Consistent with Comprehensive Plan and City Visioning Process.
.
-- ---- .
CAPIT Ai. PLAN 2001 t h I'C/ 2005
Contact ED Director
City of Hopkins, MN Oepartmcllt Development
~~fOJ(l~~ r/- Ol-CIP-D402 Type Improvement .
!Iseflll !Life
l'n'lcct :\ am,- North Annex Redevelopment Project
Category Economic Development
Priorit). n/a
Descl"iptiun
i~nrthea,l quadran! or Iliglmay I ()9 and Excelsiur Eloulevard.
Redevelopment of SuperValll North Annex property. The project would involve conslrudlon of approximately 525,000 sq ft offkc budding. The TIF would be
u,nlloT land \\TltedolVn. demolition, parking impro\'ell1ents, and off- and on-site improvements.
.Justification
Ihe eXist in" bellltv wa, forlllelly owned hv Red Owl. It was constructed in the mid-]'i5U', and is nu longer the highest and best use for tbis properly.
Expl:uditures 2001 2002 2003 2004 2005 Total
Con s truction/Mai ntenance 12,298000 12,298 000
Total 12,298,000 12,298,000
e
f'tmdll1g Sources 2001 7.002 2003 2004 :Z005 Total.
TF - Tax Increment FinanCing 12,298000 12.298,000
Total 12,298,000 12,298,000
Opcr:1.l.lOnallmpactIOther
l'ile scheduie lor lhi, jHoJeet IS still tentative.
COIlSlstelll with (kveiopment agreement between SupcrValu and the HRA uated July 10'l8. ldentified 1t1 the comprehensive plan as a redevelopment Slte Ilse
\vnuld be conslstent \\'lUi i3usmc-ss Park zonlng.
.
CAPITAL PLAN 2001 film 2005
Contact ED Director
City of Hopkins, MN Department Development
. PI'ojeet # Ol-CIP-D403 Type Improvement
Useful Life
Project Name East CBD Project
Catego.'y Economic Development
Pl'jority nla
Description
-... - --.------- --.-----
Mainstrcct between 5th and 8th Avenues. Redevelopment ofa commcrcial block fronting on Mainstreet. Tax increment dollars would be used for acquisition,
demolition, and possible assistance with structured park ifrequired.
--...----.. -- --
Justification
--- - on _ __..
The city has concentrated the majority of its redevclopment efforts in the last sevcral years at II th Avenue and Mainstreet. An interest has been expressed by the
City Council to undertake a redevelopment project to anchor the easterly portion of the CBD.
- - ..- ----.- -
Expenditures 2001 2002 2003 2004 2005 Total
Constru ction/Mainten ance 1,500,000 1,500,000
Total 1,500,000 1,500,000
.
Funding Sources 2001 2002 2003 2004 2005 Total
TF h Tax Increment Financing 1,500,000 1,500,000
Total 1,500,000 1,500,000
Operational Impact/Other
Project date is tentative. This project will ~equire execution ofa development agreeme~t.
Idcnt1fied as part of the Visioning Process undertaken in 2000.
- .---- -- --.
.
.
PROPOSED
EXPENDITURES
FOR
. FUTURE
PROJECTS
.
- .---.... --- --.
CAPIT AL PLAN 2001 thru 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Utilities
. I'roject# Ol-CIP-F501 I Type Improvement
. .., i Useful Life
PrOject Name LIft StatIOn Reconstruction !
Category Utilities: Municipal Sanitary Sewer
Priority nla
I Description
-,,"-'-"--"-~--'''.' ---'-"- ......-,....- --- ....--- ..---'- -- ..---
'Reconstruct existing wet well/dry well with wet well design for ease of maintenance and standardization with other lift stations.
_____.__ _. ___ ._._..____ .n __._ _.__ ..-'
.--.--. --.""-' ..--
Justification
-="",,~,=,-,-,-=..., ...--. ---"- - -- -...-- ___no
I Eliminates a confined space, simplifies future maintenancelrepairs.
---.--..---. ..--- ..---.-..... -.-- ...-- ---
Future
I 150,000 I
Total
.
Fulun'
I 150,000 I
Total
Operational Impact/Other
. ..._ . _ __.u__. ------ --- .----
\Future project
- -.--.-"....- ----- _.,--- --~ -.'--'-
.
CAI)IT AL PLAN 2001 lill'u 2005
Contact PW Director
City of Hopkins~ "MN Department Public Works: TranspOrlation
Prnice@ II 0l-CIP-F502 Typc Improvemem .
Pro,jcet ~anH' lIseful Ufe
Light Rail Transit Stations (2)
Calegol'~' Trans: Strcets
Priority nia
Description
. -----
II Intersection (If Thin] Streel South and Fifth Avcnue South
2} See on d S trcd N orthc a st
Supplemcmaltmprl1\cmcnts (0 two Light Rail Transit (LRTl statiuns in tilt proposcd I.ICRRA locations.
.J llstification
. - -. .. ----
'Thc HCRRA proposes to eon~truct two stations along the Southwest Cnrridor. The proposed cxpenditures would be in addition 10 the funds expended by the
HCRR1\. The additional ti.mds wuuld be u~ed tll ensure the stations are high (juahty in appearance.
.._ _un_
l<'1l1tJ re
I 150,000 I
Tolal
.
1. lJllJrl'
I 150.000 I
'( 01011
Open"twnni !mpact/Othcr
Dependent nn HeRRA plans.
'~'J"slstelH w11h plan' fC)f LRT stops in Hopkins by Hennepin County
.
.
CAPITAL PLAN 2001 thru 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Transportation
. Project # Ol-CIP-FS03 Type Improvement
Useful Life
l'rojectNamc Ninth Avenue LRT Corridor
Category Trans: Streets
Priority nla
Description
~,_"",.",,'_'_' .. __ ___ _ __ J. ..__ . .-.------ -~ -.. ._-- -----
Ninth Avenue from County Road 3 to first Street North
iRelocation of utIlities and reconstruction of street to accommodate light rail transit line from County Road 3 to First Street North.
. .-..---- .." ....---".. .-.--..--------. ..----..
---.--.-"
Justification
-- ---- -- -- - --------"- - - - ..-.-----..-..'. . ---.-.---.
IIn 1984 the city hired J.J. Bakker to analyze the proposed light rail transit corridors in Hopkins. The study reconunended that the northwest route of the Southwest
'Coni dol' not cross County Road 3 at TH 169, Rather, the study recommended that the northwest route be extended north on Ninth Avenue to First Street North
and then continue northwestward on the proposed corridor. I
.. -.-.-.--.." ... -.---- - -..--..-.
Future
I 700,000 I
Tot~1
.
FutllI'L'
I 700,000 I
"lolal
Operational Impact/Other___ n_ __u ... --- - ------ -
Dependent on BeRRA plans.
Consistent with recommendations made in ] 984 Bakker study.
.. -.-.---..--- --.- - ._-~..
.
(APrrAL PLAN 2001 I h I"li 2005
Contact PW Director
City of Hopkins~ lVIN IDcpartmell' Public Work~ Transportation
Project If Ol-CIP-F504 Type Improvement .
li~eful Life
Project "ialllc Sixth Street South (11 th to 12th Avenue South)
CategOl"Y Trans: Streets
Priority nla
Des!:ription
----....
Si\lll Stren Snulll fmlll 11111 Avenue South to 12th Avenue Soulh
F'([ensiilll of roadway and box culvcil cros~ing at Nine Mile Creek
Justification
TIm project will offer a second acce~s to the industrial area (fire access!. Will'direct so111~ of the';;-~;sting industrial traflie north, a~;y-from thc residential
Intersectiun at Seventh Sired and 111h Avenue. Will connect a current dead-cnd alley. west of 11 th Avcnue.
-.....---
r-'uilJrL'
I 400,000 I
IOfal
.
{H t U ~'l'
I 400,000 1
lo(,d
OpcraHOHa! Impact/Other
---. .
I <)<)~-19<)8 Planlllng/d iSClISSIOP
14l/S-2001l: Plans and specifications
1 'N8-200U: Blddl11g and construction
'CurTcl1tly un MSA.plans.
.
CAPIT AL PLAN 2001 t h I'll 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Transportation
. P,'ojeet # Ol-CIP-F505 Type Improvement
llseful Life
Pro.jeet Name Second Street NE
Category Trans: Streets
Prio rity nla
---...--
Description
-. -. --... --.
.Second Street NE between Blake Road and TH 169.
IImprovements to Second Street NE between Blake Road and Tyler Street involving the installation of landscaping and lighting.
Mill and overlay and partial reconstruction, ifnecessalY, of Second Street NE between Blake Road and TH 169.
------- ----.. ------ . -... .--.----
Justification
......---.---- ...--- --
'Concerns have been expressed by the adjacent residential neighborhood regarding the appearance and condition of this street This street is abutted by major
,industrial users as well as residential units that utilize Second Street for vehicular access or pedestrian access.
The CUITent roadway condition index indicates moderate decline that can be reversed with bituminous milling and overlay.
...--
Futun'
I 241,000 I
Total
.
Fulure
I 241,000 I
Total
Operational Impact/Other
'Consistent with sidewalk plan and city's pavement management program
------- -
.
-
CAPITAL PLAN 2001 111 /"If 2005
Contact PW Director
City of Hopkins, lVIN Oepartment Publle Works: Park>
Frojcd It Ol-CIP-F506 Type Improvement .
llseful Life
Projcct '\':tlll" Park Stage
Categol'y ParksIForestry/Pavilion' Community
Priol"ity nla
Description
Down (o\\n Park Slug" for p~rk!rccreatioll purposes
.1 ustificatlOlI
I'orlabk ,Lage has created prublenh with ADA accessibility. is getting old, and has CI ea(ed employec safety concerns.
nllliT
I 80,000 I
! !ll:il
.
lIllIl'l'
I 80,000 I
lOlal
Operational II11part/Otllt~r
19li'J: Dc"gn
l'reVl!lu,!y diseu,s"d and studied III November I q94
.
"
CAPITAL PLAN 2001 thru 2005
Contact PW Director
City of Hopkins, MN Department Public Works: Bldg/Equip Serv
. Project 1/ Ol-CIP-F507 Type Improvement
Project Name Useful Life
Security System Installation
Category Buildings: Community Center
Pri 0 rity nla
Description
. .... -- ------- ---- -------- - .------.-
-.. -- -- ------------..--
Parking ramp: Installation of video seculity system in parking ramp.
.. -------.----.. -- -- --.. - ---- .-----
Justification
_":'-'=-'==,-"=,-,-,-._.==-~-"".-==-,=--......=.,=-==..."..-=--_.- -.--- -.-.----.. ----- --
The use ofthc parking ramp will likely increase from its CIlITent 25% to approximately 80% upon completion of the theater/restaurant project on the fonner
Suburban Chevrolet site. Its use will increase even morc upon completion of the arts facility on the north side of this property.
...--...-.--... ----------- -----
Futtll"l'
I 54,700 I
Tlllal
.
Furlin'
I 54,700 I
Tlllal
Operational Impact/Other ---- .
Future: Planning and discussion
,Future: Bid and construction
. .. -- .".-------... ...---..
.
CAP!T At PLAN 2001 t /l/"I { 2005
Contact PW Director
City of Hopkins~ MN Derar'tmenl Public Works: Bldg/Eqllip Serv
hoj eel II 01-CIP-F508 Type improvement .
l.Iserul Life
Project "allll' Fire Station Apparatus Floor
Catcgo/'Y Buildings: Fire Facllitics
P,.;ority n/a
Description
rll'C Slatlon R<:slIdace :iL'paralllS noor
Justification
ReslIrl"a<:<: 3pparalll> Ilt'"r to put a nice t1nish on 11t'or, '111e CllrrelH nom stili has tIle miginallinish,
, U(l!!"l'
I 25,000 I
1"Hal
.
i, ulurf
I 25.000 I
I"o(al
Operationallmpact/Other
2(1()o\: Plan. hid. Cc1ll (rae(
~ 'u!l51sknt ~...,]th t't~plrl...:cnlt.:llt of tloor drains
.
CAPITAL PLAN 200] t/rrtl 2005
Contact PW Director
City of Hopkins, MN Department Public Works: BldglEquip Serv
. P,"ojeel # O]-CIP-F509 Type Improvement
Project Name llseful Life
Fire Station Wheelchair Lift
Category Buildings: Fire Facilities
Priority nla
--.----
Description
- .. .... . . ----- . .. ----.----...
:Fire Station" Wheelchair lift
----..-- ---...-.
.. -..--..
Justification
- ---. -..,. --
Wheelchair access is required to the sewnd 1100r per the Americans With Disabilities Act.
Flltur~
I 28,000 I
rot.ll
.
Future
I 28,000 I
Tnt:!1
Operational Impact/Other
. ---. - ----------
Future: Plan, bid, contract
Consistent wltll the Fire Station remodeling project.
.
-
CAPITAL j)LAN 2001 tl1m 2005
Contact PW Director
CHy of Hopkins, MN Dcpnrtmcnt Public Works: Bldg/Equip Serv
Project II 01-CIP-F510 T}'jlc Improvement .
Useful Life
I'nljed :-iamc Fire Station Floor Drains
C;ltegOl"Y Buildings: FIre f'acll1tlcs
Priority n/a
Description
Fire Stauul1 l{eplal'e .Il'-lLlr drains
Justification
.- -
Replace current drain5 witll longer drains and place sand traps in all drain>. We clIITcntly spend $600 pcr year (0 have drains cleaned. ThIS change will allow us to
do !l Durselvcs
~;utH~T
I 6,000 I
i olal
.
>LHlll"('
I 6,000 I
10t;ll
OperationallmpactiOther
Future Pian, bid, CDnl~ct
.
CAPIT AL PLAN 2001 t h /"u 2005
Contact PW Director
City of Hopkins, MN Department Public Works: BldglEquip Serv
. Pmjecl # 01-CIP-FSll Type Improvement
Useful Life
Project Name Fire Station Room Ventilation
Category Buildings: Fire Facilities
Prio rity nla
Description
Fire Station: Place vents in shop and weight room.
- ----..-
Justification
Vent both rooms. Vent shop fumes when doing work in shop; vent weight room as people arc working out.
FlltllTT
7,500 I
Total
.
l:utlJ re
7,500 I
Total
Operational Impact/Other
-.- --.--.----- _.,--
Future. Plan, bid, contract
.