December 14, 2000 Council Report 2000-200
Accept Feasibility Report
Order Public Hearing
Parking Lots 500 & 600 and 10th and 11 th Avenue Improvements
Proposed Action.
Staff recommends adoption of the following motion: Move that Council adopt
Resolution 2000-91. Resolution Orderina Public Hearina. Parkina lots 500 & 600 and
10th and 11th Avenue Improvements. Proiect 98-12.
This action continues an assessable project for street and parking lot improvements.
Overview.
Council at its July 18,2000 meeting authorized RLK-Kuusisto, Ltd. to prepare a
feasibility study concerning improvements to parking lots 500, 600 and 10th and 11 th
Avenues between Mainstreet and 1 st Street North. The report is complete and is now
. submitted to City Council for review and continued action.
Primary Issues to Consider.
. Scope of improvements
. Public Input
. Project costs and assessments
. Project budget
. Project Schedule
. Staff recommendation
Supportina information.
. Analysis of Issues
. Feasibility Study
. R~
Steven J. Stadler, Public Works Director
Financial Impact $ 472.056.53 Budgeted: Y/N Y Source: Utilities. PIR. SA
. Related Documents (CIP, ERP, etc.):
Notes: PIR: $248.410: Utility Funds: $23,270; Special Assessment: $200,377
---
.
Council Report 2000-200
Page 2
Analvsis of Issues
. Scope of Improvements
Pavements: Parking lot pavement surface deterioration and poor underlying soils
necessitate complete removal and reconstruction of parking lots 500 and 600. The
pavement condition of 10th and 11th Avenues is fair-poor. A full depth asphalt mill and
overlay is recommended. Concrete sidewalk and curb and gutter will be replaced
where in poor condition, impacted by underground utility work or due to parking/curbline
re-alignments.
Drainage: Underground storm sewer will be added to 10th Avenue and along the
parking lots to collect pavement runoff and runoff from roof downspouts.
. Landscaping: New trees are proposed along both avenues and the south edge of lot
500. Existing trees will predominantly remain in place.
Parking: Parking changes are proposed in order to meet the objectives of improving
pedestrian and vehicular safety. The number of parking stalls within lots 500 and 600
are reduced from 191 to 188. Parking along 10th and 11th Avenues is reduced from 81
to 56. Overall, parking is reduced from 360 to 332 stalls.
. Public Input
Four public meetings were held while developing the feasibility report. The meetings
were productive with business and property owners providing valuable input on all areas
covered by the report.
. Project costs and assessments
The total estimated project cost for 10th and 11 th Avenues and the parking lots is
$242,604.79 and 229,451.74, respectively. The corresponding proposed assessable
costs are $65,441.94 and $134,934.97, respectively. It is proposed that both the
parking lot and street work be assessed with owner paying 70% and city 30%. The
street assessment formula was based on an adjusted building square footage (SF).
. The resulting formula meant that properties with street frontage paid a higher
assessment rate than properties without street frontage - see preliminary assessment
roll on pages 21-24 of feasibility report.
-
.
Council Report 2000-200
Page 3
. Project Budget
The current CIP budget for this project is $350,000. This CIP estimate did not include
10th and 11th Avenue improvements.
. Project Schedule
Present Feasibility Report and Order Public Hearing... ... ... ...... ... .Dec 19
Public Hearing...................................................... ............ ..Jan 2, 2001
Approve Plans and Order Bids... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ..Feb 13, 2001
Bid Opening and Order Assessment Hearing............ ............... . March/April, 2001
Assessment Hearing... .................. ... ......... ............... ......... ....May, 2001
. Award Bid... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...June, 2001
Construction............... ............ .......................................... ..June - October, 2001
. Staff Recommendation
Staff recommends accepting the feasibility study and ordering a public hearing for
January 2, 2001.
.
CITY OF HOPKINS
. Hennepin County, Minnesota
RESOLUTION NO. 2000-91
RESOLUTION ORDERING PUBLIC HEARING
RECONSTRUCTION OF MUNICIPAL PARKING LOTS 500 & 600
AND 10TH AND 11TH AVENUES NORTH
PROJECT 98-12
WHEREAS , the City Council authorized and directed the City
Engineer to prepare a report with reference to the aforesaid
improvement, and
WHEREAS , the City Engineer has caused to be prepared the
aforesaid report for improvements on loth Avenue North from 1 st
Street North to Mainstreet; 11 th Avenue North from 1st Street
North to Mainstreet; municipal parking lots 500 and 600.
NOW, THEREFORE, BE IT RESOLVEDr by the City Council of the
City of Hopkins, Minnesota:
1. The Council will consider the aforesaid improvements ln
. accordance with the report and the assessment of benefiting
property for all or a portion of the cost of the street
improvements pursuant to Minnesota Statutes Chapter 429 at
an estimated total cost of $480,056,00.
2. A public hearing will be held in the Council Chambers of
the City Hall at 1010 First street South on Tuesday, the 2 nd
day of JanuarYr 2001r to consider said improvements. The
hearing time is 7:45 P.M.
The City Clerk shall give mailed and published notice of said
hearing and improvements as required by law,
Adopted by the City Council of the city of Hopkins this 19th day
of December, 2001.
BY
Eugene J. Maxwell, Mayor
ATTEST:
.
Terry Obermaier, City Clerk