CR 2000-126 Approve Excelsior Boulevard, Phase I Landscape . .. . ., y 0 \ (; '" . m .y "" o P K \ "'- Sept 28, 2000 Council Report: 2000-126 Approve Excelsior Boulevard, Phase I Landscape Contract Change Order Proposed Action. Staff recommends adoption of the following motion: "Move that Council approve Excelsior Boulevard Landscape Contract change order in the amount of$33.389.00" Overview. In December, 1999 City Council awarded a $295,244.00 contract with Arteka Corporation for Excelsior Blvd landscaping. There have been some previous contract change orders which reduced the contract amount to $284,973. This $33,389.00 increase in the contract is for additional work required to plant and irrigate the medians and new work to install irrigation and sod in the southeast quadrant area of the 11 tb Avenue intersection. Staff requests approval. . Primary Issues to Consider . Funding The increase is fair and reasonable compensation for work performed. The additional amount will be funded from the PIR account. Hennepin County, by agreement, will pay 1/3 of the cost of this change order, reducing the city cost to $22,259 or a 7.5% contract mcrease. Supporting Information . Arteka Change Order Steven 1. Stadler, Public Works Director Financial Impact: $ Yr 2000 - $22.259 Budgeted: N - PIR Related Documents (CIP, ERP, etc.): Notes: _Hennepin County will reimburse 1/3 cost of change order. or $11.130. . -- -- . . ~ M!~rY\ CHANGE ORDER PROPOSAL . A LandCare USA Company Job Number: 6135-0206 ] 5 195 Martin Drive Eden Prairie, Minnesota 55344.2036 Page 1 1 (6]2) 934.2000 . Fax (612) 934-2247 of Pages SUBMITTEDTPIoisington Koegler ~ Bruce Chamberlain DATE 9/6/00 DATE OF PLANS STREET 123 North 3rd Street, Suite 100 JOB NAME Excelsior Boulevard Streetscape CITY,STATE'~apolis, MN 55401 JOB LocATloNf-Iopkins, Milmesota PHONE (612) 338-0800 FAt612) 338-6838 ARCHITECT THE FOllOWING CONSTITUTE CHANGES TO THE LUMP-SUM CONTRACT: Change Order #3 l. Labor for tilling median islands and sign area. . 24 man and machine hours @ $75.00/Hr = $1800.00 . 72 Man hours @ $50.00/Hr = $3600.00 . Renting of machine - 4 days @ $200/day = $800.00 SUBTOTAL: $6,200.00 2. Spraying of weeds in median islands and sign area. SUBTOTAL: $475.00 3. Irrigation labor for digging to find existing water in (2) median islands and raising water services in each. SUBTOTAL: $1 850.00 4. ExtTa dirt work at sign area. . ] 76 c.Y. @ $24/c.y. SUBTOTAL: $4;224.00 5. Additional electrical work to relocate (2) receptacles in the field, repairs to existing electrical work and reinstalling pve conduit. SUBTOTAL: $3,620.00 6. I-look up on irrigation including meter, plumber, enclosure, and backflow with 110 volt power source. 1.5" or 2" stub] 8" above grade by others. SUBTOTAL: $4.800.00 7. Installation of drip irrigation in two planting beds at sign area. SUBTOTAL: $3,100.00 8. Installation of irrigation along boulevard at intersection of 11 u, Ave. and Excelsior Boulevard. Removal of 250 S.Y. sod and installation of250 S.Y. sod at intersection. SUBTOTAL: $3,000.00 9. Installation of irrigation at sign area for proposed sod area and 1,060 S. Y. sod. SUBTOTAL: $3,520.00 10. Installation of irrigation at seeded along Excelsior Boulevard SUBTOTAL: $2,600.00 Completion Date: (extended) (shortened) (unchanged) to Date: AGREE hereby to make the change(s) specified above at this price $ 33,389.00 PREVIOUS CONTRACT AMOUNT $ 284,973.00 AUTH 318,362.00 TE: This Change Order becomes part at and in conformance with the existing contract. ACCEPTED - The above prices and specifications of Signature: this Change Order are satisfactory and are hereby Title: W(Jr~ 'r- accepted. ~ /14-/0c::. Date of Acceptance: BFS3862 ~ - "--- -~ -- --.. .'-