VII.1. Rail Facility ReviewShady Oak Station Update; Krzos CITY OF HOPKINS Council Report 2023-088 To: Honorable Mayor and City Council Members Mike Mornson, City Manager From: Ryan Krzos, City Planner Date: September 5, 2023 Subject: Hopkins Rail Support Facility (1515 – 6th St S) Review _____________________________________________________________________ RECOMMENDED ACTION MOTION TO Adopt Resolution 2023-029 finding that the proposed Hopkins Rail Support Facility is consistent with the Comprehensive Plan. OVERVIEW The Metropolitan Council via Metro Transit’s Green Line Light Rail Transit (LRT) Extension project is proposing to construct an approximately 24,000 square foot maintenance facility at 1515 6th Street South. The facility will be continuously staffed by approximately 50 full-time equivalent employees to provide support for facilities and infrastructure throughout the LRT corridor. The proposed building will contain truck garage space, workshop areas, warehousing, and office spaces. Outdoor storage and exterior employee parking are proposed on the side and rear of the building. Metropolitan Council staff will give a presentation on the proposed facility at the City Council meeting. The presentation will also cover an update on the Shady Oak Station area. The Council is being asked to provide feedback and review the proposed Rail Support Facility for compliance with the Comprehensive Plan. PRIMARY ISSUES TO CONSIDER •Background •Comprehensive Plan and Zoning Review •Alternatives SUPPORTING INFORMATION •Resolution 2023-029 •Project Narrative, Plans, and Exhibits Planning & Development BACKGROUND The subject property is zoned I-TOD, Industrial TOD Center and is guided as Activity Center in the 2040 Comprehensive Plan. The site is 5.3 acres in size and contains a regional stormwater facility on the south end that would remain. Surrounding properties are industrial in use and have a similar I-TOD zoning classification. The subject site formerly contained an industrial building which was demolished. Planning for the Green Line LRT extension has been decades in the making. More recently in 2014, the City gave Municipal Consent for the project, which is a process where cities along the LRT route respectively review and approve preliminary plans. In 2015, Hopkins gave approval for the project in a second Municipal Consent process, covering changes in project scope. Up to this point the project plans included an Operations and Maintenance Facility (OMF) to be located on the subject site. The City reviewed a concept plan for the OMF in late 2015 and granted land use approvals in 2016. Due to additional changes to the project and budget considerations the Hopkins OMF was removed from the project and the Rail Support Facility was proposed. The main difference is that the OMF was a place to store and maintain Light Rail Vehicles, whereas the Rail Support Facility services the system’s facilities and infrastructure. At their meeting on August 22, 2023, the Planning and Zoning Commission reviewed the proposed facility. The Commission discussed the facility, particularly as it related to the proposed landscaping, outdoor storage, truck circulation, impervious coverage, and sustainability aspects including storm water, wastewater, and solar energy potential. The Commission also discussed development in the Shady Oak station area, and systemwide issues including safety, and station design. The Commission adopted a resolution finding that the proposed facility is in compliance with the Comprehensive Plan, while noting that the companion resolution for Council consideration should highlight sustainability-related aspects of the facility. COMPREHENSIVE PLAN AND REVIEW The proposed facility is being brought forward for City feedback and review as opposed to consideration of formal land use approval – Site Plan Review in this instance. However, for context, Staff has evaluated the proposed plans against the standards of the zoning code, which is summarized in the linked “Zoning Review” document. Under State Law, the Metropolitan Council has the ability to exempt the project from local zoning jurisdiction. Working in partnership with Metropolitan Council staff, the project was modified and revised in its design and orientation in keeping with more of the zoning requirements as described in the attached project narrative. In maintaining this partnership, the Planning & Zoning Commission is being asked to provide feedback and review the proposed Rail Support facility for compliance with the Comprehensive Plan. The 2040 Comprehensive Plan contains sections related to land use, transportation, and sustainability generally in the City. Within the Plan’s land use section, a goal relevant to this proposal is to maintain and diversify the city’s strong employment base. The policy most directly related to the proposal is to encourage development of living wage jobs, especially in the Center and District future land use categories … in close proximity to transit. The proposed facility will house 50 full-time equivalent positions, in a location that will have direct access (by new sidewalk connection) and walkability to the Shady Oak LRT station. A transportation goal within the Comprehensive Plan relevant to this proposal is to participate in the development of the Green Line Extension project to expand transportation and development benefits for the community. The most direct action step connected to this goal is acting in partnership with the County/Metro Transit around Green Line planning and construction. There are a number of goals in the Sustainability section of the plan. Specifically, the plan calls to increase the use of solar power and other renewable sources. The facility has the capacity to support installation of roof mounted solar panels (with the addition of additional steel members for solar grid attachments in the roof structure). The Metropolitan Council routinely evaluates its facilities for solar energy systems and implements new system installations as incentives and funding sources are available. Additionally, the plan sets a goal to improve water quality through management of stormwater. The facility will coincide with construction of a regional stormwater pond that will serve the Rail Support Facility, the Shady Oak Station, portions of the adjacent LRT corridor, as well as future development near the Shady Oak station platform. Staff finds that the proposed Rail Support Facility would advance the above noted principles and is consistent with the vision identified in the Comprehensive Plan. ALTERNATIVES 1.Approve Resolution 2023-029 finding that the proposed Hopkins Rail Support Facility is consistent with the Comprehensive Plan. 2. Deny Resolution 2023-029 with a finding that the proposed Hopkins Rail Support Facility is not consistent with the Comprehensive Plan. Should the City Council consider this option, it should also identify the specific findings that support this alternative. 3.Continue for further information. If the City Council indicates that further information is needed, the item should be continued. CITY OF HOPKINS HENNEPIN COUNTY, MINNESOTA RESOLUTION 2023-029 A RESOLUTION MAKING FINDINGS OF FACT AND FINDING THAT THE HOPKINS RAIL SUPPORT FACILITY IS IN COMPLIANCE WITH THE COMPREHENSIVE PLAN WHEREAS, the property at 1515 – 6th Street South with PID 25-117-22-23-0050 (the “Subject Property”) is owned by the Metropolitan Council, and WHEREAS, The Metropolitan Council via Metro Transit’s Green Line Light Rail Transit Extension project is proposing to construct an approximately 24,000 square foot maintenance facility on the Subject Property; and WHEREAS, The Subject Property is guided by the 2040 Comprehensive Plan as being within the future land use category of Activity Center; and WHEREAS, The 2040 Comprehensive Plan establishes goals to maintain and diversify the city’s strong employment base and participate in the development of the Green Line Extension project to expand transportation and development benefits for the community; and WHEREAS, The 2040 Comprehensive Plan also establishes sustainability-related goals to increase the use of solar power and other renewable sources and improve water quality through management of stormwater; and WHEREAS, The Hopkins Planning and Zoning Commission reviewed the proposed project plans and approved Planning and Zoning Resolution 2023-11 finding that the proposed Hopkins Rail Support Facility is in compliance with the Comprehensive Plan. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Hopkins hereby finds that the proposed Hopkins Rail Support Facility at 1515 – 6th Street South is in compliance with the Comprehensive Plan. Adopted by the City Council of the City of Hopkins this 5th day of September 2023. By:___________________________ Patrick Hanlon, Mayor ATTEST: _______________________________ Amy Domeier, City Clerk Hopkins Rail Support Facility 1515 South 6th St reet, Hopkins, MN 21 July 2023 Overview: The Metropolitan Council via Metro Transit’s Green Line LRT Extension project is proposing to construct an approximately 24,000 square foot maintenance facility in the City of Hopkins at 1515 South 6th Street. This maintenance facility, named the Hopkins Rail Support Fa cility (HRSF), is akin to a municipal public works facility with truck garage, workshop, warehouse, and office spaces. Specifically, the facility is planned to house approximately 50 full-�me equivalent employees over three shi�s and be staffed 24/7/365. The 5.3-acre site sits between a large regional stormwater pond to the west, exis�ng industrial proper�es to the north and east, and a freight rail corridor to the south. The METRO Green Line Shady Oak Sta�on and park and ride are within walking distance from the facility to the north. Site design: Project staff have engaged city staff in the design development of this facility. The first itera�on of the site design had the building oriented such that the overhead garage doors were facing 6th Street which required drive isles located between the building and the public street and sidewalk. This orienta�on was needed to help u�lize exis�ng improved soils from the building that was removed from the site for the project. Upon a request from city staff to rotate the building 90 degrees and place the office use along the public sidewalk, project staff conducted an addi�onal geotechnical inves�ga�on and determined that the exis�ng improved soils would support a rotated building. Project staff redesigned the site and building layout to meet the city’s request. Using the exis�ng improved soil as the base for the new building saves significa nt cost s. The proposed site design has a curb cut on either side of the building which leads to parking areas, a loading dock, and a yard located south of the building . Periodic semi-truck traffic will enter the eastern driveway and exit through the western driveway in a one-way movement. Daily maintenance trucks and employees will enter and exit the site at either driveway. Thera are 62 parking space on the site and 2 are electric vehicle ready. There are 8 bike parking spaces adjacent to the main entry. The site contains approximately 20 new trees including trees along a new public sidewalk on 6th Street South, sod in a reas closest to the street, seed in areas further from the street and closer to the wetland to the rear, perennial plan�ng beds by the front entrance and breakroom pa�o (both of which are adjacent to the public sidewalk bringing eyes on the street ), an irriga�on system for landscaping areas adjacent to the street, and a row of evergreens along the western property edge screening the loading dock and driveway. The exterior site lights are full cut off, dark sky compliant and are mounted to the building walls or pole mounted. Decora�ve landscape ligh�ng highlights the street trees and the flagpole as ground mounted up lights. Building Design: The building is comprised of two masses. A single -story mass, with a flat roof line, fronts the public street and houses the office . A two-story gable roof mass sits behind the lower mass and houses the truck garage, workshop, and warehouse. A loading dock is atached to the west side of the two-story mass. A site wall matching the building screens equipment from public view along the eastern side of the two-story mass. A series of windows around the en�re building provide dayligh�ng to the interior allowing for less ar�ficial light and energy use. Building Materials: A combina�on of glass, prefinished metal panels, and architectural concrete clad the lower mass of the building facing the public street. The entry ves�bule is made of glass storefront. Those same materials wrap the remainder of the building. The color scheme is a combina�on of gray tones highlighted with a yellow strip of metal panel along the front façade. 13 Shady Oak Station Area – HRSF site 14 Hopkins Rail Support Facility Shady Oak Station Area Planning 15 Lamberts 1402 5th St Peterson Salt 1415 5th St HRSF Site Context 16 Comet Tool 1418 5th St Kuhl 1515 5th St HRSF Site Context 17 Spantek 1520 5th St HRSF Site Context Blue Ox 535 15th Ave S 18 BNR 621 15th Ave S WL Hall 530 15th Ave S HRSF Site Context 19 HRSF Building – Main Facade 20 HRSF Site Context 22 Hopkins Rail Support Facility – Building Orientation Final DesignPrevious Design Prior improved soil perimeter Prior improved soil perimeter 23 HRSF– Building Orientation Previous Design 24 HRSF– Building Orientation Final Design 25 HRSF– Site Plan 10 ft building setback from north property line Total Area: 233,820 sf Pervious Area: 133,330 sf Impervious Area: 100,490 sf Impervious Percent: 59.6% 8 bike parking spaces at main entry 62 parking spaces – 2 EV ready GREEN LINE EXTENSION ("SOUTHWEST LRT") HOPKINS RAIL SUPPORT FACILITY DATE: JUNE 09, 2023 WARNING: THIS RECORD MAY CONTAIN SENSITIVE SECURITY INFORMATION THAT IS CONTROLLED UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15 AND 1520, EXCEPT WITH THE WRITTEN PERMISSION OF THE ADMINISTRATOR OF THE TRANSPORTATION SECURITY ADMINISTRATION OR THE SECRETARY OF TRANSPORTATION. UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S. GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 522 AND 49 CFR PARTS 15 AND 1520.BIM 360://60336960-SWLRT Hopkins Rail Support Facility/60336960_SWLRT Hopkins Rail Support Facility_A.rvt5/10/2023 1:43:10 PM NOPARKINGCOCOCOCOCOCOCOCOCONOPARKINGCOCOCOCOCOCOSHEETOFSHEET NAME:DISCIPLINE:NO.DATEDRAWNREVISION / SUBMITTALCHECKDESIGNEngineering SurveyingLandscape Architecture10151HOPKINS RAIL SUPPORT FACILITY SITE PLANCIVILHRSF-CIV-PLN-C002I hereby certify that this plan, specification, or reportwas prepared by me or under my direct supervision andthat I am a duly Licensed Professional Engineer underthe laws of the State of Minnesota.AARON K. CARRELLDATE:LIC. NO.:6/23/2347494ISSUED FOR BIDANOAKC6/23/230ANOANOAKC NOPARKINGSHEETOFSHEET NAME:DISCIPLINE:NO.DATEDRAWNREVISION / SUBMITTALCHECKDESIGN19115HOPKINS RAIL SUPPORT FACILITYLANDSCAPE PLANLANDSCAPE ARCHHRSF-LAN-PLN-L001100% SUBMISSION - NOT FOR CONSTRUCTIONOVERALLI hereby certify that this plan, specification, or reportwas prepared by me or under my direct supervision andthat I am a duly Licensed Landscape Architect underthe laws of the State of Minnesota.(MICHAEL P. MCGARVEY)DATE:LIC. NO.:04/26/1726216 UP UP 2 3 4 5 6 7 8 A A B B C E D F G SHARED FABRICATION 139 SIGNAL SHOP 140 STOCK 138 FUTURE GARAGE EXPANSION TRACK SHOP 141 TRACTION POWER SHOP 142 WASH BAY 144 AREA 'A'AREA 'B' 1 / A101A 1 / A101B AREA 'A' AREA 'B'1 / A101A 1 / A101B GEAR LOCKERS 131 H K L M M J LOADING DOCK 137 HALLWAY 146 OVERHANG ABOVE OVERHANG ABOVE 1 ENTRY VESTIBULE 100 WAITING 102 RECEPTION 101 ASST. DIR. 111 MGR T.P. 107 MGR. TRK. 109 MGR. SIG./COMM. 108 WORKROOM 104 BREAKROOM 124 COMM. SHOP 135 TOOL CRIB 136 COMM. 118 FIRE PROTECTION 130 CONF./TRAINING 103 UNISEX 120 CUSTODIAL 122 KITCHENETTE 125 SHOWER 121 HALLWAY 127 HALLWAY 126 HALLWAY 129 HALLWAY 128 OPEN 106 OPEN 105 OPEN 110 CONF. 112 ELEC. 119 HALLWAY 152124' - 6"24' - 8"FUTURE MEZZANINE ABOVE + STAIR NIC. LINE OF FUTURE MEZZANINE ABOVE + STAIR NIC. LOW ROOF HIGH ROOF LOW ROOF HIGH ROOF MECH. EQUIP. PAD MENS 132 WOMENS 133 1.3 1.5 4.5 5.1 5.2 5.7 7.9 9 10 11 D.1 F.2 C.7 C.9 D.7 D.9 D.10 G.1 G.5 H.1 4.6 4.9 GARAGE 143 HALLWAY 147 4.2 A.3 A.3 SHEET NAME: SOUTHWEST LIGHT RAIL TRANSIT HOPKINS RAIL SUPPORT FACILITY DISCIPLINE: ARCHITECTURE NO DATE DRAWN CHECK DESIGN REVISION / SUBMITTAL SHEET OF DATE: REG. NO.: 'A' 'B' 0 5'10' 20' 3/32" = 1' - 0" 'A' 'B'TRUE NORTH BIM 360://60336960-SWLRT Hopkins Rail Support Facility/60336960_SWLRT Hopkins Rail Support Facility_A.rvt5/10/2023 1:47:50 PMA101 OVERALL MAIN LEVEL FLOOR PLAN HRSF-ARC-PLN- 51 151 A101 Scale: 3/32" = 1'-0" 1 MAIN LEVEL FLOOR PLAN GENERAL NOTES - FLOOR PLANS 1. CONSTRUCTION DOCUMENTS ARE DRAWN ANSI D (22"H x 34"W) SHEET SIZE WITH CORRESPONDING GRAPHIC SCALE & DRAWING SCALE AS INDICATED ALONG WITH RESPECTIVE DRAWING TITLES. WHEN CONSTRUCTION DOCUMENTS ARE PRINTED ON TABLOID/A3 (11"H x 17"W), DRAWING SCALE IS ASSUMED TO BE HALVED OF THE ORIGINAL INDICATED DRAWING SCALES. 2. SEE G003, G004 & G005 FOR ABBREVIATIONS, TYPICAL INFORMATION, INDICATION OF MATERIALS, SYMBOLS, GENERAL NOTES & PROJECT INFORMATION. 3. REFER TO G-SERIES DRAWINGS FOR LIFE SAFETY INFORMATION. 4. REFER TO A700 & A701 FOR INTERIOR PARTITION TYPES & PARTITION NOTES. 5. REFER TO A800 FOR OPENING SCHEDULE. 6. FINISHED FLOOR ELEVATION IS TO BE 903'-0" UNO. REFER TO CIVIL FOR ADDITIONAL INFORMATION. 7. PROVIDE CONTINUOUS FIRE-RATED CONSTRUCTION AROUND ALL RECESSED FIXTURES LOCATED AT FIRE-RATED PARTITION. 8. PROVIDE BLOCKING AS REQUIRED FOR WALL-MOUNTED EQUIPMENT. 9. ALL FURNITURE NIC UNO. 0 05/01/2023 ISSUED FOR BID DN CRPPCR PP CR CR CR CR CR CR CR2 A303 1 A303 2 3 4 5 A B C ED F G H K K L MJ AREA 'B'1 / A101BAREA 'B'1 / A101BAREA 'A'AREA 'A'LOW ROOF HIGH ROOF LOW ROOF HIGH ROOF OVERHANG ABOVE OVERHANG ABOVE A604 1 5 A411 6 A410 4 A411 3 A412 1 A411 2 A411 1 A410 4 A410 5 A412 2 A412 1 A412 23' - 8" 1' - 0" 14' - 5" 8' - 6" 16' - 4" 1' - 8" 10' - 3 1/2" 11' - 7 1/2" 19' - 6" 20' - 8" 8' - 3" 11' - 3" 1' - 0" SHARED FABRICATION 139 GEAR LOCKERS 131 LOADING DOCK 137 HALLWAY 146 ENTRY VESTIBULE 100 WAITING 102 RECEPTION 101 ASST. DIR. 111 MGR T.P. 107 MGR. TRK. 109 MGR. SIG./COMM. 108 WORKROOM 104 BREAKROOM 124 COMM. SHOP 135 TOOL CRIB 136 COMM. 118 SUP. TRK. 117 SUP. T.P. 1 113 SUP. COMM. 115 SUP. SIG. 116 FIRE PROTECTION 130 CONF./TRAINING 103 UNISEX 120 CUSTODIAL 122 KITCHENETTE 125 SHOWER 121 HALLWAY 127 HALLWAY 126 HALLWAY 129 HALLWAY 128 SUP. T.P. 2 114 OPEN 106 OPEN 105 OPEN 110 FUT. WS. 123 CONF. 112 A604 1 A604 4 A605 8 A600 5 HALLWAY 152 2 A304 14' - 5 3/4"88' - 2"10' - 8 1/4" 11' - 2 1/8" 30' - 4" 124' - 6"9' - 6 3/4"19' - 7 3/8"SF. RO.24' - 0"15' - 2 1/2"9 7/8"36' - 0"1' - 9"31' - 5"34' - 9"A620 1 68' - 4 5/8"SF. RO.14' - 0"5' - 7 5/8"32' - 0 5/8"4' - 8 1/8"11' - 1 7/8"21' - 2"1' - 9 1/4"6' - 0"6' - 2"RO.20' - 0"3' - 6"A612 12 A612 5 11' - 1"3 ELEC. 119 A605 1 SF-1 SF-3SF-4 SF-11SF-12SF-5MECH. EQUIP. PAD MENS 132 WOMENS 133 WC. & EMERG. EWS/SHW. 134 5 A410 3 A411 SF-6SF-10SF-2 3 A410 2 7 8 3 11 8 6 6 A600 2 A620 3 12 1 6' - 5 1/2" 4 4 4 4 5 9 9 10 10 HALLWAY 147 1 2 A400 2 A400 1 A400 1 A400 143-1137-2138-3138-1138-2147136-1136-2136-3146124-1 122130 135121120100-1 103-2 103-1 127105106107108119109124-2110111112 143-3118-1133132132-2137-1118-2100-2143-23' - 6"11' - 2 7/8"2' - 2" 1' - 10" 18' - 2"12' - 7 5/8"20' - 3"11' - 9"8' - 4"8"9' - 8"13' - 8 7/8" 1 13 13 1 CANOPY ABOVE 25' - 4"11 1/4"2' - 8 1/8"12' - 8 1/2"4' - 1 1/8" 1.3 1.5 4.5 5.1 D.1 F.2C.9 D.7 G.1 G.5 H.1 4.6 4.9 104LA3 LB3 LB3 LB3 LB3 LB3 LB3 LB3LE3 LE3 LE3 LB3 MP-2V.MP MP-2V.MP LB3 LA3 LA3 MP-2V.6G MP-1V C8 M8.1FB M8.1FB MP-2V.6G LA3 LE3C8C81 C.J. C.J. 14 ALIGN 14 2 A703 2 SLOPESLOPEC.J.C.J.C.J.C.J. SLOPE C.J. SLOPE FD FD FD FD FD FD FD FD FD 1' - 6" 1' - 6"6" 6"6"2' - 0"15 15 15 15 15 15 3' - 0"8' - 0"8' - 6"15 4.2 A.3 x 8'-0" M.O.3' - 11 5/8"5' - 0"CMP-1C CMP-1C CMP-1C 8' - 0"2' - 4"11' - 9 3/4"2' - 4"5' - 5"3' - 9 1/4"3' - 11 3/4"C8.2G C8.2G LB3 6"16 SHEET NAME: SOUTHWEST LIGHT RAIL TRANSIT HOPKINS RAIL SUPPORT FACILITY DISCIPLINE: ARCHITECTURE NO DATE DRAWN CHECK DESIGN REVISION / SUBMITTAL SHEET OF DATE: REG. NO.: TRUE NORTH 'A' 0 5' 10' 15' 1/8" = 1' - 0" 'B'BIM 360://60336960-SWLRT Hopkins Rail Support Facility/60336960_SWLRT Hopkins Rail Support Facility_A.rvt5/10/2023 1:48:01 PMA101A MAIN LEVEL FLOOR PLAN -AREA 'A' HRSF-ARC-PLN- 52 151 A101A Scale: 1/8" = 1'-0" 1 MAIN LEVEL FLOOR PLAN - AREA 'A' GENERAL NOTES - FLOOR PLANS 1. CONSTRUCTION DOCUMENTS ARE DRAWN ANSI D (22"H x 34"W) SHEET SIZE WITH CORRESPONDING GRAPHIC SCALE & DRAWING SCALE AS INDICATED ALONG WITH RESPECTIVE DRAWING TITLES. WHEN CONSTRUCTION DOCUMENTS ARE PRINTED ON TABLOID/A3 (11"H x 17"W), DRAWING SCALE IS ASSUMED TO BE HALVED OF THE ORIGINAL INDICATED DRAWING SCALES. 2. SEE G003, G004 & G005 FOR ABBREVIATIONS, TYPICAL INFORMATION, INDICATION OF MATERIALS, SYMBOLS, GENERAL NOTES & PROJECT INFORMATION. 3. REFER TO G-SERIES DRAWINGS FOR LIFE SAFETY INFORMATION. 4. REFER TO A700 & A701 FOR INTERIOR PARTITION TYPES & PARTITION NOTES. 5. REFER TO A800 FOR OPENING SCHEDULE. 6. FINISHED FLOOR ELEVATION IS TO BE 903'-0" UNO. REFER TO CIVIL FOR ADDITIONAL INFORMATION. 7. PROVIDE CONTINUOUS FIRE-RATED CONSTRUCTION AROUND ALL RECESSED FIXTURES LOCATED AT FIRE-RATED PARTITION. 8. PROVIDE BLOCKING AS REQUIRED FOR WALL-MOUNTED EQUIPMENT. 9. ALL FURNITURE NIC UNO. KEYNOTES - FLOOR PLAN 1 SEMI-RECESSED WALL-MOUNTED FEC. 2 HYDRAULIC DOCK LEVELER & PIT. COORD. W/ STRUCT & ELEC. 3 LOADING DOCK SEAL 4 12'-0"H PALLET RACKING W/ PALLET RACK GUARD 5 TRENCH DRAIN. COORD. W/ CIVIL 6 PICNIC BENCHES. SEE LANDSCAPE 7 BOLLARD & RAIL GUARD, SEE 2/S204. 8 CONDENSER UNITS. COORD W/ MECH. 9 SCRAP METAL DUMPSTER. NIC. 10 WASTE & RECYCLING DUMPSTER. NIC. 11 CONCRETE APRON. COORD. W/ STRUCT. 12 WASTE CONTAINER. NIC. 13 AUTOMATIC DOOR ACTUATOR ON BOLLARD POST 14 O.H. DOOR 15 BOLTDOWN BOLLARD - SEE 8/S006 16 BOLLARD WITH CONC. FOOTING - SEE 7/S006 # 0 05/01/2023 ISSUED FOR BID DN CR CRCR CR CR CR 2 A303 1 A304 5 6 7 8 A B C F F H K K MJ AREA 'B'AREA 'B'AREA 'A'1 / A101AAREA 'A'1 / A101A2 A410 A601 1 LINE OF FUTURE MEZZANINE ABOVE NIC. A600 3 FUTURE MEZZANINE ABOVE NIC. 1/4" PER FT SLOPE 5 A411 2 A412 1 A412 SHARED FABRICATION 139 SIGNAL SHOP 140 STOCK 138 TRACK SHOP 141 TRACTION POWER SHOP 142 WASH BAY 144 LOADING DOCK 137 2 A304 6 A411 4 A412 10' - 0" 3' - 5" 4' - 6" RO. 12' - 0" 10' - 4 1/4" 3' - 0" 37' - 3 3/4" RO. 8' - 0" 1' - 8" 3' - 0" 44' - 8" 5' - 0" 20' - 8"19' - 6"14' - 5"24' - 8" 124' - 6"SF. RO.14' - 0"5' - 7 5/8"15' - 10"SF. RO.14' - 0"9' - 7 1/2"SF. RO.14' - 0"10' - 6 1/2"SF. RO.14' - 0"11' - 1"23' - 6"23' - 9"25' - 5"RO.20' - 0"3' - 6"RO.20' - 0"3' - 6"RO.20' - 0"5' - 6"RO.20' - 0"3' - 6"SF-7SF-8SF-10SF-9A602 1 A602 3 2 3 11 4 4 4 11 A620 3 1 6' - 5 1/2" 5 GARAGE 143 HALLWAY 151 HALLWAY 147 2 A400 2 A400 1 A400 1 A400 143-1137-2138-3138-1138-2147 143-3 137-1143-2 138-4151-2151-1138-5143-6143-4 143-5 144-1 144-2 2' - 2" 1' - 10" 20' - 3"11' - 9"1 1 CANOPY ABOVE 4.5 5.1 5.2 5.7 7.9 9 F.2 C.7 C.9 D.7 D.9 D.10 G.1 G.5 H.1 4.6 4.9 MP-1V C8 C.J. C.J. C.J. C.J.C. J .C.J.C.J. 14 14 14 14 1414 ALIGN 14 ALL FORK LIFT LANES 11'-0" CLEAR MIN. ALL FORK LIFT LANES 11'-0" CLEAR MIN. ALL FORK LIFT LANES 11'-0" CLEAR MIN.SLOPESLOPESLOPESLOPESLOPESLOPESLOPESLOPESLOPESLOPE SLOPE C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J. SLOPE SLOPE SLOPE C.J. SLOPE SLOPE C.J.C.J. C.J. C.J. FD 1' - 6" 1' - 6"6" 6"6"2' - 0"15 15 15 15 15 15 15 15 15 15 4.2 A.3 16 16 SHEET NAME: SOUTHWEST LIGHT RAIL TRANSIT HOPKINS RAIL SUPPORT FACILITY DISCIPLINE: ARCHITECTURE NO DATE DRAWN CHECK DESIGN REVISION / SUBMITTAL SHEET OF DATE: REG. NO.: 'B' TRUE NORTH 0 5' 10' 15' 1/8" = 1' - 0" 'A'BIM 360://60336960-SWLRT Hopkins Rail Support Facility/60336960_SWLRT Hopkins Rail Support Facility_A.rvt5/10/2023 1:48:09 PMA101B MAIN LEVEL FLOOR PLAN -AREA 'B' HRSF-ARC-PLN- 53 151 A101B Scale: 1/8" = 1'-0" 1 MAIN LEVEL FLOOR PLAN - AREA B GENERAL NOTES - FLOOR PLANS 1. CONSTRUCTION DOCUMENTS ARE DRAWN ANSI D (22"H x 34"W) SHEET SIZE WITH CORRESPONDING GRAPHIC SCALE & DRAWING SCALE AS INDICATED ALONG WITH RESPECTIVE DRAWING TITLES. WHEN CONSTRUCTION DOCUMENTS ARE PRINTED ON TABLOID/A3 (11"H x 17"W), DRAWING SCALE IS ASSUMED TO BE HALVED OF THE ORIGINAL INDICATED DRAWING SCALES. 2. SEE G003, G004 & G005 FOR ABBREVIATIONS, TYPICAL INFORMATION, INDICATION OF MATERIALS, SYMBOLS, GENERAL NOTES & PROJECT INFORMATION. 3. REFER TO G-SERIES DRAWINGS FOR LIFE SAFETY INFORMATION. 4. REFER TO A700 & A701 FOR INTERIOR PARTITION TYPES & PARTITION NOTES. 5. REFER TO A800 FOR OPENING SCHEDULE. 6. FINISHED FLOOR ELEVATION IS TO BE 903'-0" UNO. REFER TO CIVIL FOR ADDITIONAL INFORMATION. 7. PROVIDE CONTINUOUS FIRE-RATED CONSTRUCTION AROUND ALL RECESSED FIXTURES LOCATED AT FIRE-RATED PARTITION. 8. PROVIDE BLOCKING AS REQUIRED FOR WALL-MOUNTED EQUIPMENT. 9. ALL FURNITURE NIC UNO. KEYNOTES - FLOOR PLAN 1 SEMI-RECESSED WALL-MOUNTED FEC. 2 HYDRAULIC DOCK LEVELER & PIT. COORD. W/ STRUCT & ELEC. 3 LOADING DOCK SEAL 4 12'-0"H PALLET RACKING W/ PALLET RACK GUARD 5 TRENCH DRAIN. COORD. W/ CIVIL 6 PICNIC BENCHES. SEE LANDSCAPE 7 BOLLARD & RAIL GUARD, SEE 2/S204. 8 CONDENSER UNITS. COORD W/ MECH. 9 SCRAP METAL DUMPSTER. NIC. 10 WASTE & RECYCLING DUMPSTER. NIC. 11 CONCRETE APRON. COORD. W/ STRUCT. 12 WASTE CONTAINER. NIC. 13 AUTOMATIC DOOR ACTUATOR ON BOLLARD POST 14 O.H. DOOR 15 BOLTDOWN BOLLARD - SEE 8/S006 16 BOLLARD WITH CONC. FOOTING - SEE 7/S006 # 0 05/01/2023 ISSUED FOR BID DN CR CR CR CR CRMECHANICAL 200 2 A303 1 A303 2 3 4 5 A B C ED F G H K K L MJ 1 5 A411 6 A410 4 A411 3 A412 1 A411 2 A411 1 A410 4 A410 5 A412 2 A412 1 A412 2 A304 AREA 'B'AREA 'B'AREA 'A'AREA 'A'200-1 LOW ROOF HIGH ROOF LOW ROOF HIGH ROOF 200-20"25' - 3 1/4"1' - 7 1/4"36' - 0"1' - 9"31' - 5"34' - 9"42' - 6"12' - 4"54' - 3"15' - 5" 23' - 8" 1' - 0" 14' - 5" 8' - 6" 16' - 4" 1' - 8" 10' - 3 1/2" 11' - 7 1/2" 19' - 6" 20' - 8" 8' - 3" 11' - 3" 1' - 0" LOW ROOF BELOW 11' - 1"11' - 1"AIR COMPRESSOR ROOF BELOW CEILING BELOW MECH. EQUIP. PAD ON GRADE1 / A102B1 / A102B124' - 6" 5 A410 6 A412 3 A411 A310 7 3 A410 A620 1 Sim A620 3 Sim 2 A400 2 A400 1 A400 1 A400 A310 11 A310 12 1 1.3 1.5 4.5 5.1 D.1 F.2C.9 D.7 G.1 G.5 H.1 4.6 4.9 2 7 A410 16' - 4 3/4"7' - 0"2' - 5" 4.2 A.3 SHEET NAME: SOUTHWEST LIGHT RAIL TRANSIT HOPKINS RAIL SUPPORT FACILITY DISCIPLINE: ARCHITECTURE NO DATE DRAWN CHECK DESIGN REVISION / SUBMITTAL SHEET OF DATE: REG. NO.: TRUE NORTH 'A' 0 5' 10' 15' 1/8" = 1' - 0" 'B'BIM 360://60336960-SWLRT Hopkins Rail Support Facility/60336960_SWLRT Hopkins Rail Support Facility_A.rvt5/10/2023 1:48:22 PMA102A MEZZANINE LEVEL FLOOR PLAN -AREA 'A' HRSF-ARC-PLN- 55 151 A102A Scale: 1/8" = 1'-0" 1 MEZZANINE LEVEL FLOOR PLAN - AREA 'A' GENERAL NOTES - FLOOR PLANS 1. CONSTRUCTION DOCUMENTS ARE DRAWN ANSI D (22"H x 34"W) SHEET SIZE WITH CORRESPONDING GRAPHIC SCALE & DRAWING SCALE AS INDICATED ALONG WITH RESPECTIVE DRAWING TITLES. WHEN CONSTRUCTION DOCUMENTS ARE PRINTED ON TABLOID/A3 (11"H x 17"W), DRAWING SCALE IS ASSUMED TO BE HALVED OF THE ORIGINAL INDICATED DRAWING SCALES. 2. SEE G003, G004 & G005 FOR ABBREVIATIONS, TYPICAL INFORMATION, INDICATION OF MATERIALS, SYMBOLS, GENERAL NOTES & PROJECT INFORMATION. 3. REFER TO G-SERIES DRAWINGS FOR LIFE SAFETY INFORMATION. 4. REFER TO A700 & A701 FOR INTERIOR PARTITION TYPES & PARTITION NOTES. 5. REFER TO A800 FOR OPENING SCHEDULE. 6. FINISHED FLOOR ELEVATION IS TO BE 903'-0" UNO. REFER TO CIVIL FOR ADDITIONAL INFORMATION. 7. PROVIDE CONTINUOUS FIRE-RATED CONSTRUCTION AROUND ALL RECESSED FIXTURES LOCATED AT FIRE-RATED PARTITION. 8. PROVIDE BLOCKING AS REQUIRED FOR WALL-MOUNTED EQUIPMENT. 9. ALL FURNITURE NIC UNO. KEYNOTES - FLOOR PLAN 1 SEMI-RECESSED WALL-MOUNTED FEC. 2 HYDRAULIC DOCK LEVELER & PIT. COORD. W/ STRUCT & ELEC. 3 LOADING DOCK SEAL 4 12'-0"H PALLET RACKING W/ PALLET RACK GUARD 5 TRENCH DRAIN. COORD. W/ CIVIL 6 PICNIC BENCHES. SEE LANDSCAPE 7 BOLLARD & RAIL GUARD, SEE 2/S204. 8 CONDENSER UNITS. COORD W/ MECH. 9 SCRAP METAL DUMPSTER. NIC. 10 WASTE & RECYCLING DUMPSTER. NIC. 11 CONCRETE APRON. COORD. W/ STRUCT. 12 WASTE CONTAINER. NIC. 13 AUTOMATIC DOOR ACTUATOR ON BOLLARD POST 14 O.H. DOOR 15 BOLTDOWN BOLLARD - SEE 8/S006 16 BOLLARD WITH CONC. FOOTING - SEE 7/S006 # 0 05/01/2023 ISSUED FOR BID MAIN LEVEL EL 903' -0" T.O.W. -SHED ROOF EL 917' -0" T.O.W. -PITCH ROOF EL 925' -0" ABCDFGHKLMJ T.O.W. -LOADING DOCK EL 919' -6" ROOF RIDGE -PITCH ROOF EL 930' -6 1/2" HEADWALL -SHED ROOF EL 920' -4 3/4" 6' - 0" 11' - 2 1/8" 10' - 8 1/4"88' - 2"14' - 5 3/4"14' - 0"8' - 0"17' - 4 3/4"10' - 1 3/4"124' - 6"24' - 8" 1 A411 2 A411 1 A410 MP-3H.MPMP-2V.6 MP-2H.6 CIPCCIPC27' - 6 1/2"122222 SF-1SF-4 3 A411 2 A400 2 A400 L-1 L-2 MP-1V IMRP-1 34 55567 1" 1'-0" 1" 1'-0" D.1F.2 C.7D.7D.9G.1G.5H.1 2' - 6"4' - 8 3/4"1' - 4"1/4"5' - 10 1/2"1/4"7 A410 A.3 MAIN LEVEL EL 903' -0" T.O.W. -SHED ROOF EL 917' -0" T.O.W. -PITCH ROOF EL 925' -0" 2345678 1 ROOF RIDGE -PITCH ROOF EL 930' -6 1/2" HEADWALL -SHED ROOF EL 920' -4 3/4" 5 A411 6 A410 4 A411 3' - 6" RO. 20' - 0" 5' - 6" RO. 20' - 0" 3' - 6" RO. 20' - 0" 3' - 6" RO. 20' - 0" 6' - 0" RO. 6' - 4" 23' - 10 5/8" SF. RO. 8' - 0" 2' - 0 1/2" 4' - 8 1/8" 32' - 0 1/2" 142' - 3 1/8"36' - 8 5/8" 4 A410 6 A411 14' - 0"8' - 0"17' - 4 3/4"10' - 1 3/4"27' - 6 1/2"88888888 MP-2V.6 CIPCCIPCMP-2V.6 9 9 52 SF-5 3 A410 1 A400 1 A400 SF-6 CMP-1MP-3H.MP 2 134556799 IMRP-1 MP-1HMP-1H 1" 1'-0" 1.31.54.55.15.77.99 4.64.9 4.2 NOTE: CONSTRUCTION DOCUMENTS ARE DRAWN ON ANSI D (22"H x 34"W) SHEET SIZE WITH CORRESPONDING GRAPHIC SCALE & DRAWING SCALE AS INDICATED ALONG WITH DRAWING TITLES. WHEN CONSTRUCTION DOCUMENTS ARE PRINTED ON TABLOID/A3 (11"H x 17"W), DRAWING SCALE IS ASSUMED TO BE HALVED OF THE ORIGINAL INDICATED DRAWING SCALES. SHEET NAME: SOUTHWEST LIGHT RAIL TRANSIT HOPKINS RAIL SUPPORT FACILITY DISCIPLINE: ARCHITECTURE NO DATE DRAWN CHECK DESIGN REVISION / SUBMITTAL SHEET OF DATE: REG. NO.: 0 5' 10' 15' 1/8" = 1' - 0"BIM 360://60336960-SWLRT Hopkins Rail Support Facility/60336960_SWLRT Hopkins Rail Support Facility_A.rvt5/10/2023 1:48:50 PMA303 EXTERIOR BUILDING ELEVATIONS HRSF-ARC-ELV- 59 151 EXTERIOR MATERIALS LEGEND CIPC CAST-IN-PLACE CONCRETE, SEE SPECS FOR FINISH. CMP-1 COMPOSITE METAL PANEL. COLOR LITE SILVER IMRP-1 INSULATED METAL ROOF PANEL. COLOR: LITE GRAY MP-1H METAL PANEL. COLOR: LITE GRAY. HORIZONTAL RIB. MP-1V METAL PANEL. COLOR: LITE GRAY. VERTICAL RIB. MP-2H.6 METAL PANEL. COLOR: MID GRAY. HORIZONTAL RIB. MP-2V.6 METAL PANEL. COLOR: MID GRAY. VERTICAL RIB. MP-3H.MP METAL PANEL. COLOR: YELLOW. HORIZONTAL RIB. A303 Scale: 1/8" = 1'-0" 1 NORTH ELEVATION A303 Scale: 1/8" = 1'-0" 2 EAST ELEVATION KEYNOTES - EXTERIOR ELEVATION 1 METRO TRANSIT SIGNAGE- SEE SPECIFICATIONS 2 EXHAUST FAN HOOD. REFER TO MECH. FOR ADDITIONAL INFO.SEE 2/A520 FOR CURB DETAIL. 3 LOUVERED GRAVITY VENTILATOR. REFER TO MECH. FOR ADDITIONAL INFO. SEE 2/A520 FOR ROOF CURB DETAIL. 4 EXHAUST DUCT. REFER TO MECH. FOR ADDITIONAL INFO.SEE 3/A520 FOR PIPE PENETRATION DETAIL TYP. 5 EAVES GUTTER & DOWNSPOUT 6 METAL PANEL SCREEN - CENTRIA PERFORATED PANEL - BR5-36 40% SCREEN 7 CANOPY 8 CONCRETE FILLED BOLLARD, SEE 7/S006 9 WALL PACK. REFER TO ELEC. FOR ADDITIONAL INFO. 10 BOLLARD & RAIL GUARD, SEE 2/S204. 11 LOADING DOCK SEAL 12 12" X 12" LOUVER - SEE MECHANICAL # 0 05/01/2023 ISSUED FOR BID MAIN LEVEL EL 903' -0" T.O.W. -SHED ROOF EL 917' -0" T.O.W. -PITCH ROOF EL 925' -0" A B C ED F G H K L MJ 2 A410 T.O.W. -LOADING DOCK EL 919' -6" ROOF RIDGE -PITCH ROOF EL 930' -6 1/2" HEADWALL -SHED ROOF EL 920' -4 3/4" 1 A412 8' - 0"14' - 0"10' - 1 3/4"17' - 4 3/4"11' - 3" RO. 10' - 0" 3' - 5" 4' - 6" RO. 12' - 0" 10' - 2 1/4" RO. 3' - 4" 37' - 1 3/4" 8' - 0" 1' - 6" RO. 3' - 4" 1' - 2" 43' - 4" 24' - 8"124' - 6"27' - 6 1/2"MP-2H.6 CIPC MP-2V.6CIPC 2222 1" 1'-0" 2 A400 2 A400 233 1" 1'-0" 4 555 61079999911 MP-1H D.1 D.7 G.1 G.5 H.1 7 7 A410 A.3 MAIN LEVEL EL 903' -0" T.O.W. -SHED ROOF EL 917' -0" T.O.W. -PITCH ROOF EL 925' -0" 2 3 4 5 6 7 81 T.O.W. -LOADING DOCK EL 919' -6" ROOF RIDGE -PITCH ROOF EL 930' -6 1/2" HEADWALL -SHED ROOF EL 920' -4 3/4" 3 A412 5 A412 2 A412 4 A412 SF. 9' - 6 5/8" SF. 12' - 1 3/4" 7' - 5 5/8" SF. RO. 24' - 0" 15' - 2 1/2" 5' - 7 5/8" SF. RO. 14' - 0" 5' - 7 5/8" 11' - 1" 4' - 9" SF. RO. 14' - 0" 9' - 7 1/2" SF. RO. 14' - 0" 10' - 6 1/2" SF. RO. 14' - 0" 7' - 4" 36' - 8 5/8"142' - 3 1/8"8' - 0"14' - 0"10' - 1 3/4"17' - 4 3/4"27' - 6 1/2"MP-2V.6 MP-1VCIPC CIPC CIPC 2 9999 11 9 SF-7 SF-11SF-12 SF-3 899' - 0" 1 A400 1 A400 SF-8SF-9 SF-10 1" 1'-0" 2 3 9 9 MP-1V MP-2V.6CMP-1 MP-3H.MPMP-3H.MP IMRP-1 IMRP-1 1.3 1.5 4.5 5.1 5.2 5.7 7.9 94.6 4.9 3'-8".7'-0". 7 E.J. 5 12 5 4.2 NOTE: CONSTRUCTION DOCUMENTS ARE DRAWN ON ANSI D (22"H x 34"W) SHEET SIZE WITH CORRESPONDING GRAPHIC SCALE & DRAWING SCALE AS INDICATED ALONG WITH DRAWING TITLES. WHEN CONSTRUCTION DOCUMENTS ARE PRINTED ON TABLOID/A3 (11"H x 17"W), DRAWING SCALE IS ASSUMED TO BE HALVED OF THE ORIGINAL INDICATED DRAWING SCALES. SHEET NAME: SOUTHWEST LIGHT RAIL TRANSIT HOPKINS RAIL SUPPORT FACILITY DISCIPLINE: ARCHITECTURE NO DATE DRAWN CHECK DESIGN REVISION / SUBMITTAL SHEET OF DATE: REG. NO.: 0 5' 10' 15' 1/8" = 1' - 0"BIM 360://60336960-SWLRT Hopkins Rail Support Facility/60336960_SWLRT Hopkins Rail Support Facility_A.rvt5/10/2023 1:49:03 PMA304 EXTERIOR BUILDING ELEVATIONS HRSF-ARC-ELV- 60 151 EXTERIOR MATERIALS LEGEND CIPC CAST-IN-PLACE CONCRETE, SEE SPECS FOR FINISH. CMP-1 COMPOSITE METAL PANEL. COLOR LITE SILVER IMRP-1 INSULATED METAL ROOF PANEL. COLOR: LITE GRAY MP-1H METAL PANEL. COLOR: LITE GRAY. HORIZONTAL RIB. MP-1V METAL PANEL. COLOR: LITE GRAY. VERTICAL RIB. MP-2H.6 METAL PANEL. COLOR: MID GRAY. HORIZONTAL RIB. MP-2V.6 METAL PANEL. COLOR: MID GRAY. VERTICAL RIB. MP-3H.MP METAL PANEL. COLOR: YELLOW. HORIZONTAL RIB. A304 Scale: 1/8" = 1'-0" 1 SOUTH ELEVATION A304 Scale: 1/8" = 1'-0" 2 WEST ELEVATION KEYNOTES - EXTERIOR ELEVATION 1 METRO TRANSIT SIGNAGE- SEE SPECIFICATIONS 2 EXHAUST FAN HOOD. REFER TO MECH. FOR ADDITIONAL INFO.SEE 2/A520 FOR CURB DETAIL. 3 LOUVERED GRAVITY VENTILATOR. REFER TO MECH. FOR ADDITIONAL INFO. SEE 2/A520 FOR ROOF CURB DETAIL. 4 EXHAUST DUCT. REFER TO MECH. FOR ADDITIONAL INFO.SEE 3/A520 FOR PIPE PENETRATION DETAIL TYP. 5 EAVES GUTTER & DOWNSPOUT 6 METAL PANEL SCREEN - CENTRIA PERFORATED PANEL - BR5-36 40% SCREEN 7 CANOPY 8 CONCRETE FILLED BOLLARD, SEE 7/S006 9 WALL PACK. REFER TO ELEC. FOR ADDITIONAL INFO. 10 BOLLARD & RAIL GUARD, SEE 2/S204. 11 LOADING DOCK SEAL 12 12" X 12" LOUVER - SEE MECHANICAL # 0 05/01/2023 ISSUED FOR BID