CR 97-17 Consultant Services Agreement Mil And Overlay 1 Y o January 27, 1997 ~ .y " o P K \ 't\ council Report No. 97-17 APPROVE CONSULTANT SERVICES AGREEMENT 1997 MILL AND OVERLAY IMPROVEMENTS ProDosed Action. staff recommends adoption of the following motion: Move that Council aoorove a suoolemental aareement to the First Street North Imorovement oro;ect as it relates to enaineerina services for the 1997 Mill and Overlav Imorovements. Overview. council has approved a 1997 overlay project as it affects streets identified in the city's Pavement Management Program. Staff needs to have plans and specifications developed that can be attached to the bidding documents being prepared for the 1st Street North Improvement Project by Bolton and Menk, Inc. primarv Issues to Consider. o Why a supplemental agreement? Bolton and Menk, Inc. has already been retained to engineer two other City projects in close proximity to the overlay areas. Staff foresees cost savings by incorporating consultant activity in one package. o Proposed cost Bolton and Menk has submitted a proposal that estimates engineering fees at approximately $16,000.00 o Recommendation Staff recommends approval of the attached consultant services agreement. The city has had success with Bolton and Menk on other projects and the proposed 16% fee is fair and within industry guidelines. SUDDortina Information. o Agreement ~e~ Engineering Superintendent SOLTON &. """ENK, Consulting Engineers & Surveyors 1515 East Highway 13. Burnsville. MN 55337-6857 Phone (612) 890-0509. FAX (612) 890-8065 INC. December 18, 1996 Mr. Steve Stadler Director of Public Works 1010 1st Street Hopkins, MN 55343 RE: Additional Mill and Overlay and Pedestrian Ramp Improvements City of Hopkins BMI Proj~...:t No. TC96.0174 Dear Mr. Stadler: As per our phone conversation pn Tuesday, December 17, the table below lists the scope of work for the additional mill and overlay and pedestrian ramp improvements, . };~i~~1,~:~ljtti~tJ~!~Utt.~n~tf,f~~~fi~:nt%~~~!~t.~..._:~;:~..:~~:::::;t~~J?t1ttfrl~t!t~t}}jf~~fB!tyi'~;wll~it~ LoCATION PAVEMENT CURB SIDEWALK FED RAMps Second Street South Mill and overlay Leave existing Relocate catch basin (7th Ave to 8th Ave) existing pavement. vertical curb in place in NW quadrant of 7th and match pavement Ave and construct ped edge on south side, ramp to the east and south, Third Street North Mill and overlay Match existing curb Leave existing ramps (11th Ave to 15th Ave) existing pavement. and gutter. in place, Fourth Street North Mill and overlay Match existing Leave existing ramps (9th Ave to 10th Ave) existing pavement. vertical concrete in place, (11th Ave to 12th Ave) curb, North Service Drive Mill and overlay Match existing Remove curb and (Elmo Service Road to existing pavement. vertical concrete sidewalk and construct Robinwood Lane) curb on north side new ped ramps where and bituminous curb needed along north on south side. side, I MANKATO. MN FAIRMONT, MN SLEEPY EYE, MN BURNSVILLE, MN An Equal Opportunity Employer AMES, IA LIBERTY, MO As we discussed, Bolton and Menk: will complete the plans and specifications for the additional mill and overlay improvements, as well as the approveJ sidewalk and curb and gutter construction as follows: 1, No field topography is anticipated at this time. City staff will furnish BMI with a GIS map of all of the existing utilities including manholes and water valves for purposes nf adjusting castings, No grade changes are anticipated at this time. It is recommended that the vertical and horizontal locations of the existing curb scheduled for removal be acquired by a survey crew in conjunction with the project construction staking, This will ensure the proper location of the new curb for replacement. No adjustments to storm sewer catch basins are anticipated except at Second Street and 7th Avenue, 2, The plan sheet for both the mill and overlay as well as the sidewalk pedestrian ramps will be a city location map of the proposed project area, BMI will add the plan sheet to the Second Street North Storm Sewer Improvement plans together with the necessary typical sections and details, 3, The specifications, quantities and bid proposal will be included with the Second Street North Storm Sewer Improvement document using separate bid schedules, We will include a crack repair bid item for Second Street South and North Service Drive and will estimate the total amount for bidding purposes. It is difficult to acquire an actual amount at this time due to the ice and snow conditions, Again, the work described above, will be added to the Second Street North Storm Sewer Improvements. We have confirmed with MnDOT Office of State Aid that we can bid both the First Street North metric project and the Second Street North Storm Sewer eng!ish project together by using separate bid documents but making the award based upon the sum total of both projects. This will anow a single contractor to manage an of this work and save on mobility costs, As directed, we will research the possibility of using Municipal State Aid funds for the North Service Drive improvements, If this is agreeable to MnDOT Office of State Aid, then the bituminous curb and gutter on the south side can be replaced with concrete curb and gutter. If approved, we can add this section of North Service Drive to the First Street North plans. We may need additional field topography for this area, however, we will review our previous drawings from the 1994 Oakridge South Improvement as well as the 1995 North Service Drive Improvement projects, Our estimated engineering fees for the scope uhvork' described above is based upon your estimated construction cost of $100,000 and is as fonows: 1. 2, 3, 4. 5, 6, 7. Pavement Auger Borings-total of 4 (AET) Field and Pavement Data Review Plans, Specifications, Quantities and Bid Documents Research State Aid for North Service Drive Construction Administration Construction Observation Construction Staking $ 1,100,00 $ 1,500.00 $ 6,000,00 $ 75/Hr $ 75/Hr (Estimated $1,500) $ 45/Hr (Estimated $4,000) $ 1.500.00 2 Again, we thank you for the opportunity to serve you and the City of Hopkins, Upon your review and concurrence of the scope of work and estimated fees, please authorize below so as to add to our existing Professional Services Agreement for Second Street North Storm Sewer Improvements, Please call should you have any questions or comments. Sincerely yours, BOLTON & MENK, INC, ---- ~~;/' Ronald A. R~tzef,W}k1 Project Manager . cc: Jim Gessele Approved for the City of Hopkins: Date: Date: 3