CR 97-105 Award Bid - Sanitary Sewer Lift Station 5 Replacement City Project 96-02 May 29,1997 \ "'\ y 0 ~ .y 0 o P K \ ~ Council Report 97-105 AWARD OF BID SANITARY SEWER LIFT STATION NO.5 REPLACEMENT CITY PROJECT NO. 96-02 Proposed Action. Staff recommends adoption ofthe following motion: " Move that the Council adopt Resolution 97-64. Resolution for the Award of Bid. Sanitarv Sewer Lift Station No.5 Re\)lacement. Proiect 96-02." Overview. This project was advertised for bid last year, the bids were opened on July 12, 1996. The low bid at that time of the two bids received was $282, 850.00. It was determined by the City that the project be rebid in the spring of 1997 in an attempt to obtain a greater number of bidders, possibly resulting in a lower project cost. The project was re-advertised and bids were opened on May 13, 1997. The project was bid with a slight modification from the original plan plus an alternate plan for the construction of the new control building on the existing lift station foundation. The bids were $287,154.00 for the base bid and $275,029.00 for the alternate bid. It appears that the construction complexity of this project is resulting in little bidder interest and higher than expected bids. Primarv Issues to consider. . Bid tabulation . Staff recommendation . Project timetable Supportine: Information . Detailed bid tabulation . Resolution 97-64 . SEH May 21, 1997 Letter 7lf#A ~ Michael G. Lauseng Utility Superintendent Analysis . Bid tabulation Contractor Bid Lammetti and Sons Base bid Alternate bid $ 287,154.00 $ 275,029.00 Engineers Estimate $ 210,000.00 The consultant engineer has examined the bid and found that some items are still significantly over the engineer's estimate. After discussions with the contractor, it was the complexity of the project and the various types of construction that may have deterred several contractors from bidding and made the project more expensive to complete. Based on the low bid from July 12, 1996 and the bid obtained on May 13, 1997 the engineer recommends that the city adjust the budget for the project, accept the bid, and award the project to Lametti and Sons, Inc. Lametti and Sons, Inc. is familiar with this type of work and capable of adequately completing the work. -. Staff Recommendation Staff concurs with the consultant in recommending the award of bid to Lametti and 'S,o}lS, Inc. .-",' . Project timetable June 3, 1997 Award of bid July 21, 1997 Begin construction September 29,1997 End construction ~SeJ BIDS RECEIVED Client: City of Hopkins Project: Sanitary Sewer Lift Station NO.5 Replacement City Project No. 96-02 SEH No.: A-HOPKN9601.00 Date: May 13, 1997 BID AMOUNT 5% BIDDER BID BOND BASE BID ALTERNATE BID Ford Construction Lametti & Sons JP 1 75'4:00 1PZ 7';{ 4-~ 4-. 00 v/ z..<lv I . MC Magney Construction Penn Contracting Rice Lake Contracting CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO: 97-64 RESOLUTION FOR AWARD OF BID SANITARY LIFT STATION NO.5 REPLACEMENT CITY PROJECT 96-02 BE IT RESOLVED BY THE CITY COUNCIL OF HOPKINS, MINNESOTA, that the bid by Lametti & Sons, Inc. in the amount of $275,454.00 is the lowest responsible bid for the Replacement of the Sanitary Sewer Lift Station No.5, City Project 96- 02, and the Mayor and City Manager are hereby authorized and directed to enter into a contract with said bidder for and on behalf of the City. Adopted by the City Council of the City of Hopkins, Minnesota, this 3rd day of June, 1997. Charles D. Redepenning, Mayor ATTEST: Terry Obermaier, City Clerk -- ., ? ~SeJ . . 5909 s.o.KCR ROAD. SUITE 590. MIMETONKA. MN SS3.f$ 612912-2600 F-'X 612 9JH 188 AROHlTOCTlJRe . ENGINEERING . ENVIRONMENTAL . TRANSPORTATION May 21, 1997 RB: Hopkins, Minnesota . Sanitar)' Sewer Lift Station No. 5 ~ep1acement City Project No. 96-02 SEH No. A-HOPKN960l.oo 14.00 Steve Stadler Director of Public Works City of Hopkins 11100 Ex.celsior Boulevard Hopkins, MinnCSQta 55343 Dear Steve: Enclosed is the tabulation of the bid received from Lametti and Sons for the above-referenced project on Tuesday, May 13, 1997. As noted, only one bid was received for the project. The bid submitted is over the original engineer's estimate. Bids were taken for this project previously on July 12, 1996. The low bid at that time of the two bids received was $282,850.00. It was deterrO.ined by the City that the project be rebid in the spring of 1997 ill an attempt to obtain a greater ntiinberofbidders, possibly resu1ling in a lower project cost. . The bid on May 13 included the base bid from last July as weUas analtealate plan for constnJcting the control building on the existing lift station foundation. The bids were $287,154.00 for the base bid and $275,029.00 for the alternate bid. It appealS that the constmction complexity of this project is resulting in little bidder int~t and higher thail. expected bids. You have ~ressed an interest in p~uing the alte~te bid plan. The impact of the bid ~ount on the total project budget is as follows: Low Bid Amount $275,029.00 Pump Package 9,755.40 Pump Controls Package 6,574.30 Soil Boring and Testing 3,000.00 Fo~main Televising 524.00 Design and CQnsttUction Engineering 43,008.00 Less MCES Construction Reimbursement -15,250.00 . r.e.ss 11:CES Engineering and Adminis~ve Reimbursement . -2,745.00. ... .n Pennit&iesand& ,andContiDgeilci6s' ~:'d;} 6.804:36, , ..' ,~~c<"!~~~CiticS~....' __ '~,~'_~~_,:':~',~ :~~~'_:--,-,~::_~:~~~~g~_~~:, _~:_ -_ ,on,. _ - - .-~ - :-~ ~~ T.Ile tOw: atYshm as shown above is actualli higher than the preVious bid due to the cost of constrocting . . the MCES poitio~ being decreased due to lower Unit priceS from the bi~er. I ~ .,-. - ,,,~'" - -... - . .~ .- -. . ....... - SHOFrr EWoTT HCNDRICKSON Il1O. $T. PAUl. !.IN S1: a..0UD. MN OHIPl'EWAM<US. WI M.4DISCN. WI .' v.xc COI.JN1Y. IN . s:luALOPPORTUN/TYEMPLOYER . _,'J-,- _ ___.__.~" m _ """""':"-_':""-~':--'--" "-~,,,"".' :....,. .-;-;.> -.'-'.. , :"'___~_.~__::::::":'-:_n_.o...;'~:__:"_:'- .._ ._.....___...n "T. u._ - . . - ._u_'_._ >', ":. .' :. ~ . .: ...::-.... . . '. . .... . " ., ':'. <: :-,,: ......... ',' ,. . . SteV~ stadler " May.21, 1997 . Page 2 .. -...- ~..... . The budget in the capital improvements program for engineering ai1d oonstruction fot this pzoject was $280,000. "PIe JUghcr th3nC:;qlected bid Would increase the total piojcx:t cost to $326,700, ahnost 17% highet tbantheorlginal. budget of $280,000. Review of the bidreveaJs that seveaU ilellis are still significantly'over the engineer's estimate. The lIlost 'significaIit deviations from the engineec's estimate are associated with demolition of the existing building and construction of the new control building. Discussions with the bidder after the bid opening revealed that the complexity of the project and various types of constI:uction involved may have deterred several contractors from submitting a bid. Other issues and their status as they relate to the project are as follows: 1. The conditional use pennit process that the City of Saint Louis park is requiring fox the alternate bid prior to issuance of a building pennit should be complete by July 21. 1997. This permit has been resubmitted to the Saint Louis Park city staff for review. 2. All other permits have been obtained for this project. 3. Permits have been received from the Minneapolis Park Board. The requirements they have listed for the original design apply to the alternative bid with no modifications. 4. The Minneapolis Park Board has extended the duration of the temporary easement on which the pzoject sits. The easement has been quit claimed in favor of the City of Hopkins. 5. The MCES bas indicated verbally (through Jim Roth) that they would be agreeable with the award . .~ff:he !?id as teccive;:l. m'__ - . 6. MCES has stated they desire to have their usme written into the easement agreem.ent from the Minneapolis Park Boardjoint1y with the City ofHopkins. Based on the low bid from July 12, 1996, and the bid obtained on May 13, 1997, it is our recommendation that the City adjust the budget for the project. accept the bid, and award the project to Lametti and .Sons, Ine. Lametti and Sons is familiar with this type of work and capable of adequately completing the work. Sincerely,r ymb Enclosure . 'c: Jim Roth, MCES E.'....,~I~tIll'>lllDWLT...... ---'-.-~' ....----' - ---. - ::_-~~:i:~_.:.7.~-:--_ ~~-. :;:-:=-?{~-_ ~~: :-~-: - n - __ u __ ___ n .':""'___ ,-"'--_."__ -._..-:._ _0_:"_ -- .. -- - -- - -- - ----- -' . -- m _ _ ._.." ___ ".'.