CR 2000-184 Approve Engineering Services Agreement Storm Sewer Improvements '\ CITY OF ~ . November 2, 2000 HOPKINS Council Report 2000-184 Approve Engineering Services Agreement Storm Sewer Improvements Monroe Ave. 12nd Street N.E. Proposed Action Staff recommends approval of the following motion: Move that council accept a consultant services proposal from SEH Engineering for storm sewer improvements to address floodinQ at Monroe Ave. and 2nd Street N.E. and authorize preparation of plans and specifications. Overview Subsequent to large rainfalls in the summer of 1997 and the resulting localized flooding, SEH Engineering (at that time RCM Associates) undertook a storm water flooding analysis, Attention was focused on flood problem areas including the Monroe Ave. /2nd Street N.E. intersection. Since 1997 various projects addressing the flooding issues have been completed. The remaining target site at Monroe Avenue has undergone further study by SEH, and a February 16] 2000 report outlines alternatives to address the flooding problem and their . costs. SEH Engineering has submitted a proposal for engineering services on a recommended project out of that February 2000 report. Council needs to act on the proposal and order project plans. Primary Issues to Consider . Project scope . Consultant proposal . Funding . Schedule . Recommendation Supporting Information . Site map . Consultant proposal Ja~/:-)~ Engineering Superintendent . Financial Impact: $98,050 Budgeted: Y/N Y Source: Storm Sewer Utility Related Documents (CIP, ERP, etc.): CIP and 2001 Budqet Notes: . Analysis . Project Scope Heavy rainfalls in the past including the rainfall event of 1997, have caused flooding near the intersection of Monroe Avenue and 2nd Street N.E. Residential flooding has also occurred at 217 Monroe A venue where 3 inches of water was reported on the lowest floor in 1997 and 18 inches in 1987. The existing storm water conveyance system delivers water from 2nd Street and Monroe Avenue through six culvert crossings before discharging into Minnehaha Creek. The culvert crossings providing significant restriction in the system's capacity are those at the end of Madison A venue North and the ABM driveway crossing just off 2nd Street N.E. The engineer recommends increasing flow capacity at ABM by installing an additional culvert. This is estimated to cost $27,500. The engineer proposes replacing the two restrictive pipes at Madison A venues with a box culvert. The estimated cost for this structure is $54,000. The total construction cost amounts to $81,000. An alternative is to make no culvert capacity improvements, to live with periodic street flooding at Monroe and 2nd Street N.E. and to condemn the property at 217 Monroe Avenue. The estimated market value of the home was $112,000 in 1998. . . Consultant proposal SEH Engineering proposes to offer their services for this project at a cost of $17,050. This includes survey work, plan/specifications preparation and assisting with the bid process. This is roughly at 21 % of the construction cost and within recommended services standards. . Funding The source of funding for this project will be the Storm Sewer Utility as budgeted in the 2001-2005 ClP and in the 2001 budget. . Schedule Staff anticipates plans to be completed by February with a bid opening in March. Construction can get underway in June. . Recommendations Staff has reviewed the SEH project scope recommendation and services proposal and finds they meet City needs. They are fair and reasonable in cost. Staff recommends approval of the proposal and the authorization for plans and specifications to be drawn up. . / . fP 00 G Q;.r ~~ 1=(" ~ u qz 0 0~ -.} l1.J (J') ,- ~~ & m. t: i;:-0 t:_ -- , ~~ ~:-c C 0) "'~- r::~ Fl 32CL Q.11./'; o ~,~ ::r::r::e:: .....11./,-.. 0'::'0 ,::..,oq:o :t:-: mg -r.::J (J 0 , ....oq: IJ.) C: I 1::: V) 0 ~ (y Z-B 't7 /1.)_ r:::: ~...o /tr ..... '-i....t e 11./ Oc.., f!! ....., r::: blJ C/) u) o c:; "0 --, ...... C; . ~ .......""0 C\i Crj 0 () 0 U Sfi; -- 0'.) UGJflfJ IJI:'I\ I € --o:::!- * (f) - ~ en -- ~ IJJ (l) ;; 0) cV. Ctr 5:'i s:::- --., "AI' o"~*J ,- 'I ~ -.i C CI) 0) ~ s:::- .- "'- () S CI) "- ~ ~ 0 ~ a 0 co 0 , "- >-- "'- ttt cr.' 12 "- ~ QQ (l) s::: .t:: f!! ~~ 0 0 .. ~ _~o.o C/) ~ (t; "f rv CV; ~ ~ C\J~ , I (l) m >-- >-- ~ .~ ::J ~- 0) .- l.J.. . 11102100 14:23 '8'952 912 2601 SEH ASSOC l4J 0011001 "'SEH 10901 Red Circle Drive, Suile 200, Minnelonka, MN ~~343-S301 9~2.9122600 952.912.2601 FAX . aTchit~clure engineering . enviTonmental . /Tan.l'fJOTtaiion November 2,2000 RE: City of Hopkins SEHNo. P-HOPKNOlO1.00 - 7671 D .;ref Il- Post-it~ Fax Note ate 11_ z. - <I> pagos Mr. James Gessele To .--.. C;;.sf From 1) . ..... .M · . Engineering Supervisor Co./Dapl. Co, City of Hopkins Phone It Phono # 1010 1 st Street S. F",,# "$"-1 ]IV Fax # Hopkins, MN 55343 Dear Jim: We have reviewed the Feasibility Report for the Monroe Avenue Drainage Project dated February 16, 2000 and submit this proposal for your review. It is our understanding you want to construct this project in the summer of 200L Based on our review of the report and the understanding the City would like to proceed with the recommended alternate number 6, including the installation of a new culvert under Madison Avenue, with a total estimated opinion of probable construction cost of approximately $81,000, we propose the following: . L Gather Data $250 2. Design Survey 3,500 3. Prepare Plans and Specifications 11,350 4. Alternate Specification for Aluminum Box 1,000 5. Assist the City with Securing Bids and Award 950 Total $17,050 We propose to provide these services on a hunp sum basis. Thank you for the opportunity to present this proposal and we look forward to working with you on this project. c11'Y' 9 c (& David C. Halter Project Manager c: Mike F oeItsch, SEH Barb Miller, SEH h l~iyil\m"('1Jct~\hnplc:in:5l\monroe a....enue PfQpa~gJ.doc . Shon Elliott Hendrickson Inc. OffiCES looated throughout lhe Upper Midwest . Equal Opportunity Employer VIt help you Plan, design, a.nd ar.hir:1Jt.