Loading...
V.1. Public Improvement Hearing - 2024 Street and Utility Improvements, City Project 2023-10; Klingbeil CITY OF HOPKINS City Council Report 2023-117 To: Honorable Mayor and Council Members Mike Mornson, City Manager From: Eric Klingbeil, PE, City Engineer Date: November 14, 2023 Subject: Public Improvement Hearing - 2024 Street and Utility Improvements, City Project 2023-10 _____________________________________________________________________ RECOMMENDED ACTION MOTION TO adopt Resolution 2023-042, Resolution Ordering Improvement, 2024 Street and Utility Improvements and companion Resolution 2023-043, stating the City’s intent to reimburse itself using bonds OVERVIEW At its October 4, 2023 meeting, a feasibility report concerning street and utility improvements along 7th Avenue N from the former HCRRA alley to Minnetonka Mills Road, 8th Avenue N from 2nd Street N to Minnetonka Mills Road, 3rd Street N from 5th Avenue N to 8th Avenue N, 6th Avenue N from Mainstreet to 1st Street N, 1st Street N from 5th Avenue N to 8th Avenue N, 2nd Street N from 5th Avenue N to 8th Avenue N was presented to the City Council and a public hearing on the improvements was ordered for November 14, 2023. In accordance with state statutes, the City Council needs to conduct a public hearing and determine authorization of the project. Hearing notices have been mailed to all affected property owners of record. Following the public hearing, if the project is ordered, City Council is asked to state the City’s intent to reimburse itself using bonds. SUPPORTING INFORMATION Feasibility Report –available upon request Notice of Public Hearing Affidavits of Mailing Preliminary Assessment Roll Final Design Services Proposal Resolutions 2023-042 & 2023-043 Public Works Dept. ANALYSIS OF ISSUES Scope of Improvements This project includes the following improvements: Full reconstruction of the following streets: o 7th Avenue N from the former HCRRA Alley to Minnetonka Mills Road o 8th Avenue from 2nd Street N to Minnetonka Mills Road o 3rd Street N from 5th Avenue N to 8th Avenue N Reclamation and resurfacing of 6th Avenue N from Mainstreet to 1st St N Mill and Overlay of the following streets: o 1st Street N from 5th Avenue N to 8th Avenue N o 2nd Street N from 5th Avenue N to 8th Avenue N The pavement condition index for most of the project area is below 40, which indicates failed pavement and warrants reconstruction. Maintenance procedures such as seal coating, mill and overlay, or reclamation are no longer effective strategies. Proposed street improvements include full reconstruction of streets and new curb and gutter. Water main is proposed to be replaced in the entire reconstruction area. Most of the existing main is in excess of 60 years old, undersized, and made from cast iron. New main will be ductile iron, which has better reliability and when properly installed a longer lifecycle than cast iron. All water services will be replaced from the main to the property line. Sanitary sewer improvements consist of replacing old and outdated material mains. The existing sanitary sewer mains are in excess of 60 years old and are made of an outdated material, clay. Proposed storm sewer improvements include new curb and gutter, removal and replacement of the existing storm sewer mains, upsizing mains in select areas to better handle larger storm events, and addition of storm sewer inlets to reduce water ponding in the street. Pedestrian facilities include: Replacement of existing sidewalk and pedestrian ramps in the reconstruction area During the scoping for this project, it was determined that there was other work that should be included in the project. Traditionally this work was bid as a separate, standalone project but in recent years it has been bid with the street and utility improvement project and the City has received very favorable bid prices as a result. This additional work will be funded by separate items in the CIP and Budget and includes the following: Sanitary Sewer Lining in areas across the City as identified by Public Works Citywide sidewalk repairs Public Input Public informational meetings regarding the improvements were held on September 13th and October 24th. The meeting formats consisted of a presentation of the overall project scope, with an open house style question and answer session. A questionnaire was sent to all properties in the project area in May 2023 in advance of the neighborhood meetings. Drainage concerns, pedestrian facility concerns, desire for improved street surface, and property specific concerns were the most common responses. Assessments The proposed street assessments are based on the City’s assessment policy, whereby 70% of the street reconstruction cost and 50% of the water and sewer service replacement are assessed to benefiting properties. The policy also allows for assessments to be capped should assessments exceed previous year assessments by 20%; the costs for this project will trigger the assessment cap. A preliminary assessment roll has been calculated and can be found in the appendix of the attached Feasibility Report. As with the 2023 Street and Utility Improvement Project staff has identified properties that were assessed in previous adjacent projects to determine if the assessment cap would have been in a factor if the projects had been assessed as one project. The assessment cap for residential properties is $106.14 per front foot, following the typical 3% increase per year. Without the cap assessments could be more than double the capped rate. Project Budget and Costs The estimate for this project which includes contingency, and costs for legal, administrative, and engineering costs for all the work, totals to $7,860,000. Due to rounding, there may be slightly different estimated projects costs may be shown in different materials. Project costs and funding sources are as follows: Funding Source CIP Budget Street Reconstruction CIP Budget Street Rehabilitation/ Sewer Lining/ Pedestrian Improvements Estimated Cost PI-PIR/General Obligation Bonds $3,000,000 $450,000 $3,009,000 Assessments 1,046,000 956,000 Storm Sewer Fund 624,000 1,196,000 Sanitary Sewer Fund 1,588,000 60,000 1,172,000 Water Fund 1,585,000 1,536,000 Total $7,843,000 $510,000 $7,869,000 Preliminary cost estimates show the project tracking within CIP budget. Construction unit prices have begun to stabilize, but construction material costs remain volatile. It is anticipated the project will remain within the CIP budget. Project Schedule Public hearing/order final design November 14, 2023 Approve final plans/order bids January 16, 2024 Order Assessment Hearing February 20, 2024 Public Informational Neighborhood Meeting March 11-14 (Date TBD) Conduct Public Assessment Hearing March 19, 2024 Adopt Assessment Roll/Award Contract March 19, 2024 Begin Construction Spring 2024 Complete Construction Fall 2024 Staff Recommendation Staff recommends ordering the above details improvement with adoption of Resolutions 2023-042 and 2023-043 following the public hearing. CITY OF HOPKINS HENNEPIN COUNTY, MINNESOTA RESOLUTION 2023-042 RESOLUTION ORDERING PUBLIC IMPROVEMENT 2024 STREET AND UTILITY IMPROVEMENTS, PROJECT NO. 2023-10 WHEREAS, a resolution of the City Council adopted the 3rd day of October, 2023 fixed a date for a Council Hearing on the improvements on 7th Avenue N from the former HCRRA alley to Minnetonka Mills Road, 8th Avenue N from 2nd Street N to Minnetonka Mills Road, 3rd Street N from 5th Avenue N to 8th Avenue N, 6th Avenue N from Mainstreet to 1st Street N, 1st Street N from 5th Avenue N to 8th Avenue N, 2nd Street N from 5th Avenue N to 8th Avenue N; including pavement, curbing, sidewalk, signage, drainage, water and sanitary sewer improvements and all necessary appurtenances, and WHEREAS, t the City Council deems it appropriate and expedient to make such improvements, and WHEREAS, ten days mailed notice and two weeks published notice of the hearing was given, and the hearing was held thereon on the 14th day of November, 2023 at which all persons desiring to be heard were given an opportunity to be heard thereon. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Hopkins, Minnesota: 1. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report and the recommendations are hereby accepted. 2. Such improvement is hereby ordered as proposed in the Council Resolution adopted the 14th day of November, 2023. The total estimated project cost is $7,860,000 of which $946,000 is estimated to be assessed. 3. Bolton & Menk, Inc. is hereby designated as the engineer for this improvement and shall prepare plans and specifications for the making of such improvement. The Mayor and City Manager are hereby authorized to enter into a contract for engineering and construction services for this improvement. 4. The City Attorney and City Engineer are hereby authorized to acquire necessary easements by negotiation or condemnation. Adopted by the City Council of the City of Hopkins, Minnesota, this 14th day of November, 2023. _________________________ Patrick Hanlon, Mayor __________________________ Amy Domeier, City Clerk CITY OF HOPKINS HENNEPIN COUNTY, MINNESOTA RESOLUTION 2023-043 RESOLUTION DECLARING THE OFFICIAL INTENT OF THE CITY OF HOPKINS TO REIMBURSE CERTAIN EXPENDITURES FROM GENERAL OBLIGATION IMPROVEMENT BOND PROCEEDS TO BE ISSUED BY THE CITY OF HOPKINS WHEREAS, the Internal Revenue Service has issued Treas. Reg. #1.150-2 providing that proceeds of tax-exempt bonds used to reimburse prior expenditures shall not be deemed spent unless certain requirements are met; and WHEREAS, the City expects to incur certain expenditures, which may be financed temporarily from sources other than bonds, and reimbursed from the bond proceeds; NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Hopkins, Minnesota: 1. The City intends to incur expenditures for the project described in Council Report 2023-117, for City Project 2023-10 (the “Project”), and intends to reimburse itself for such expenditures from the bond proceeds to be issued by the City in the maximum principal amount described in the “project”. 2. The City Manager is authorized to designate additions to Project 2023-10 in circumstances where time is of the essence, and any such designation shall be reported to the Council at the earliest practicable date and shall be filed with the official books and records of the City. 3. This resolution is intended to constitute a declaration of official intent for the purpose of Treas. Reg. #1.150-2 and any successor law, regulation, ruling or amendment pertaining thereto. Adopted by the City Council of the City of Hopkins, Minnesota, this 14th day of November, 2023. _________________________ Patrick Hanlon, Mayor __________________________ Amy Domeier, City Clerk CITY OF HOPKINS 2024 CENTRAL AVENUES IMPROVEMENTS PUBLIC HEARING TO WHOM IT MAY CONCERN: Notice is hereby given that the City Council will hold the Public Hearing in the Council Chambers of City Hall, 1010 1st St S, at 6:30 p.m. on Tuesday, November 14th, 2023, to consider the making of improvements on: 7th Avenue North from 200’ north of Mainstreet to Minnetonka Mills Road; 8th Avenue North from 2nd Street North to Minnetonka Mills Road; and 3rd Street North from 5th Avenue North to 8th Avenue North. Generally, the project involves the addition/replacement of storm sewer; water main replacement; water service replacement; sanitary sewer replacement; sanitary sewer service replacement; concrete curb & gutter addition/replacement; bituminous street removal and reconstruction; and turf restoration; pursuant to Minn. Statutes, Section 429.011 to 429.111. The area proposed to be assessed for such improvement includes all properties located along the streets listed above and as shown below. Plat Name Sec Twp Rng Q/Q West Minneapolis 2nd Division 24 117 22 NW/SE West Minneapolis 2nd Division 24 117 22 SW/NE The estimated cost of the improvement is $7,860,000. A reasonable estimate of the impact of the assessment will be available at the hearing. Such persons as desire to be heard with reference to the proposed improvement will be heard at this meeting. Amy Domeier, City Clerk 952-548-6304 Published in the Sun Sailor on November 2, 2023 & November 9, 2023. AFFIDAVIT OF MAILING PUBLIC HEARING NOTICE STATE OF MINNESOTA ) )SS. COUNCIL OF HOPKINS ) Jackie Caple,being first duly sworn,deposed and says: I am a United States citizen,over 21 years of age.On October 5",2023,acting on behalf of the City of Hopkins,I caused to be deposited in the United States Post Office at the City of Burnsville,Minnesota,copies of the attached Notice of Public Hearing for the 2024 Central Avenues Improvements,City of Hopkins,MN Project No.2023-010,enclosed in sealed envelopes,with postage thereon fully prepaid,addressed to the following persons at the addresses appearing on the attached copy of the mailing list. There is delivery service by United States mail between the place of mailing and the places so addressed. y. Subscribed and sworn to before me this 5"day of October,2023. Co "nt 0x. Notary Public CATHRYN M.DEBAKER NOTARY PUBLIC $}MINNESOTAMyCommissionExpiresJan.31,2027 MATTHEW SLAMA 607 2ND ST N HOPKINS MN 55343 MATTHEW BRADLEY MILLER SARAH BRIANNE STOUT MILLER 202 5TH AVE N HOPKINS MN 55343 MARY STONE 217A ASBURY ST HOUSTON TX 77007 DJ DOLINA &A E DOLINA 226 5TH AVE N HOPKINS MN 55343 ANNETTE R WELLS 238 5TH AVE N HOPKINS MN 55343 EDWARD T GIWOYNA 6212ND ST N HOPKINS MN 55343 NANCY LYNNETTE MILLER 206 5TH AVE N HOPKINS MN 55343 LINDA K WELSCH 1383 HWY 58 P.O.BOX 187 DANNEBROG NE 68831 JUSTIN WINZENBURG JILL WINZENBURG 230 5TH AVE N HOPKINS MN 55343 JOHN M AHLFS 242 5TH AVE N HOPKINS MN 55343 TYLER DALE BREN 801 2ND ST N HOPKINS MN 55343 BRUCE G THIES 210 5TH AVE N HOPKINS MN 55343 DAVID D BARTEN KRISTINA M BARTEN 222 5TH AVE N HOPKINS MN 55343 SUSAN J OWEN BASIL A OWEN Ill 234 5TH AVE N HOPKINS MN 55343 HERBERT H &FRANCES L HESCH 246 N 5TH AVE HOPKINS MN 55343 DAKARAI K BROWN JOSEPH F RINALDI Ill KATLYN MALAM &DANIEL MALAM LAURA A BROWN 2016TH AVE N 209 6TH AVE N 300 5TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 HOPKINS MN 55343 KELLYE LAMB JEANNE TERHAAR TIMOTHY PAUL HOFFMAN 210 6TH AVE N 214 6TH AVE N 215 6TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 HOPKINS MN 55343 MICHAEL J ESTOMBA CHRISTOPHER M VENJOHN GLORIA J CONNOR 221 6TH AVE N NATALYA SHARMA VENJOHN 225 6TH AVE NO HOPKINS MN 55343 224 6TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 LISA M LARSON KEVIN R WEHBER ANTONIA E CELESTINE BARLAGE 226 6TH AVE N RACHEL A WEHBER ANDRW ROBERT BARLAGE HOPKINS MN 55343 229 6TH AVE N 230 6TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 MICHAEL T &INGRID Y BROWN CHARLES E DORN GREGORY V CHAMBERLIN 233 6TH AVE N 234 6TH AVE N 237 6TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 HOPKINS MN 55343 LAURIE R ERICKSON STEVEN J &JULIE B HRUSKA ZACHARY E LEIRDAHL 238 6TH AVE N 2416TH AVE N AKEXANDRA K NAAS HOPKINS MN 55343 HOPKINS MN 55343 242 6TH AVE N HOPKINS MN 55343 JOSHUA J DOBBINS DOUGLAS NHIEN NGUYEN AMBER L RISHAVY MICHELLE L DOBBINS 246 6TH AV N 302 6TH AVE N 245 6TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 HOPKINS MN 55343 SAMUEL OSTLUND A E &M PROPERTIES LLC A E &M PROPERTIES LLC JULIA OSTLUND 8320 KELZER POND DR 8320 KELZER POND DR 303 6TH AVE N VICTORIA MN 55386 VICTORIA MN 55386 HOPKINS MN 55343 RAELA SCHOENHERR KYLIE E SWANSON ERIC WERGIN 17 7TH AVE N 18 7TH AV N 21 7TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 HOPKINS MN 55343 MICHAEL R PETERSEN 22 7TH AVE N HOPKINS MN 55343 JAMES SEALE &KATE SEALE 25 7TH AVE N HOPKINS MN 55343 KIRSTEN S EICKENBERG 26 7TH AVE N HOPKINS MN 55343 TINA M WATTS/DANIELJ WATTS KATHLEEN J HINES ANDREW &ELIZABETH FISCHER 29 7TH AVE N JOHN HINES Ill 33 7TH AVE N HOPKINS MN 55343 30 7TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 ROBERT D ROSSBOROUGH CLIFFORD A &TONI M TALLMAN DALE &JEAN SEARLES 34 7TH AVE N 37 7TH AVE N 38 7TH AVE NO HOPKINS MN 55343 HOPKINS MN 55343 HOPKINS MN 55343 AMY N &JON BAUGH 101 7TH AVE N HOPKINS MN 55343 MICHAEL JULES ERICKSON 102 7TH AVE N HOPKINS MN 55343 MEAGAN MCMAHAN 105 7TH AVE N HOPKINS MN 55343 MATTHEWS HANSON MICHAEL D ESSEN MRS ROBERT (KATHLEEN)CASHIN KATIE CHANSON 109-7TH AVE NO 110 7TH AVE N 4200 SHADY OAK RD S HOPKINS MN 55343 HOPKINS MN 55343 MINNETONKA MN 55343 DEAN E EMPANGER MARKE DOBBINS THEODORE M &SUSAN J JOHNSON 113 7TH AVE N SARA L KRALEWSKI 117 7TH AVE N HOPKINS MN 55343 114 7TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 118 HOPKINS LLC 535 EVERGREEN LAN PLYMOUTH MN 55441 JOHN R &LORETTA WOODSTROM 125 7TH AVE N HOPKINS MN 55343 MICHAEL OPHEIM/CARRIE OPHEIM 121 7TH AVE N HOPKINS MN 55343 RYAN M FITZGERALD 126 7TH AVE N HOPKINS MN 55343 SHAWN B &SUER NORMANDIN 122 7TH AVE N HOPKINS MN 55343 JACQUES A &CHERYLL YOUAKIM 129 7TH AVE N HOPKINS MN 55343 DYLAN BARNES-HANSEN COLLEEN M JENSEN LAUREN PANZER JOCELYN BARNES-HANSEN 133 7TH AVE N 134 7TH AVE N 130 7TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 HOPKINS MN 55343 RONALD D &SHERI L SALARGO COLE NIELSEN BRANDON L WILLS 137 7TH AVE N 138 7TH AVE N JESSICA E WILLS HOPKINS MN 55343 HOPKINS MN 55343 141 7TH AVE N HOPKINS MN 55343 ROGER G KUMM NICOLE FORSYTHE NICOLE E FORSYTHE 142 7TH AVE N CHRISTOPHER FORSYTHE CHRISTOPHER M FORSYTHE HOPKINS MN 55343 146 7TH AVE N 146 7TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 TIMOTHY W COATS LORI BARON JOEY A WIRTH 202 7TH AVE N 2081 MEETING STREET 20885 CHANNEL DR HOPKINS MN 55343 WAYZATA MN 55391 GREENWOOD MN 55331 THOMAS C RUSTAD ANNA VLADIMIROVNA BULOCHNIK KARIN L VAVRICHEK CODY M RUSTAD YEVGENY BULOCHNIK 213 7TH AVE N 209 7TH AVE N 210 7TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 HOPKINS MN 55343 LINDSEY CHIPKA KELLY D HEIKKILA SCOTT A BARTELLS 214 7TH AVE N 217 7TH AVE N STEPHANIE A BARTELLS HOPKINS MN 55343 HOPKINS MN 55343 218 7TH AVE N HOPKINS MN 55343 DEBRAH W &JAMES A GE NELLIE PATRICK TIMMERS JOHN &MARJORIE RACKLIFFE 221 7TH AVE N ELLEN TIMMERS 225 7TH AVE N HOPKINS MN 55343 222 7TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 GILi MUSSMAN PETER M AMES &AMY JAMES YUNSHA HE &YING CHEN RILEY PETERSON 229 7TH AVE N 1661 WEST 63RD STREET 226 7TH AVE N HOPKINS MN 55343 EXCELSIOR MN 55331 HOPKINS MN 55343 PAOLO LOVAGNINI 233 7TH AVE N HOPKINS MN 55343 MELODIE BARD 238 7TH AVE N HOPKINS MN 55343 EDITH M BEECHER 245 7TH AVE N HOPKINS MN 55343 BETH A BEATTY 234 7TH AVE N HOPKINS MN 55343 VICTORIA/R BENJAMIN TWOGOOD 241 7TH AVE N HOPKINS MN 55343 LAURA SADLER 300 7TH AVE N HOPKINS MN 55343 JULIE ANN BOEHMER 237 7TH AVE N HOPKINS MN 55343 CRAIG BAUNE 242 7TH AVE N HOPKINS MN 55343 JUNIPER LAND TRUST LLC 5576 BRISTOL LANE MINNETONKA MN 55343 GINGER LYNN WORWA HEINZ RICHTER &MONIKA KOPEC CHRISTOPHER J GILSON 304 7TH AVE N 307 7TH AVE N TERRI G GILSON HOPKINS MN 55343 HOPKINS MN 55343 309 7TH AVE N HOPKINS MN 55343 MARK CJONES JERALD P &GAYLE L SEABERG MARSHALL DAVIS 310 7TH AVE N 313 7TH AVE NO 314 7TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 HOPKINS MN 55343 ROSE KELLY 316 7TH AVE N HOPKINS MN 55343 LINDA A ELIE 326 7TH AVE N HOPKINS MN 55343 HEATHER BUESSELER 209 8TH AVE N HOPKINS MN 55343 BARBARA J WEAVER 214 8TH AVE N HOPKINS MN 55343 JOSEPH R/DIANNA L DIPALERMO 222 8TH AVE N HOPKINS MN 55343 KAYLA N SAUVE 321 7TH AVE N HOPKINS MN 55343 ELLEN VONDENKAMP 2018TH AVE N HOPKINS MN 55343 JUSTIN P DOYLE CLAIRE C DOYLE 210 8TH AVE N HOPKINS MN 55343 ALLISON WACHUTKA 218 8TH AVE N HOPKINS MN 55343 KEVIN NEWBERGER CARLY MYRDAL 225 8TH AVE N HOPKINS MN 55343 MARK &TIPHANIE DIRNBERGER 322 7TH AVE N HOPKINS MN 55343 HEIDI A HANSCHU 205 8TH AVE N HOPKINS MN 55343 TIMOTHY SNYDER JOY SNYDER 213 8TH AVE N HOPKINS MN 55343 CURTIS D &KRISTA J DEDERICH 2218TH AVE N HOPKINS MN 55343 S &L MCSPADDEN 226 8TH AVE N HOPKINS MN 55343 LAURA A MESTLER JEFFREY L URBAN ERIK R HENRICKSEN 229 8TH AVE N SUSAN W URBAN 233 8TH AVE N HOPKINS MN 55343 230 8TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 BRANDON HAYES/JOURDAN HAYES GLENN M PRIEST STEREME LLC 234 8TH AVE N 237 8TH AVE N 2601 CASCO PT RD HOPKINS MN 55343 HOPKINS MN 55343 WAYZATA MN 55391 TERRY P &LORRI L EISWALD 242 8TH AVE N HOPKINS MN 55343 HIEN M LU &VAN THUY VUONG 243 8TH AVE N HOPKINS MN 55343 DAVID B LENTZ 245 8TH AVE N HOPKINS MN 55343 MOLLY LONG &DAVID LOVETT MARY B LAUER PAMELA J KOLLODGE 246 8TH AVE N 300 8TH AVE N BLAIR CROCKETT HOPKINS MN 55343 HOPKINS MN 55343 3018TH AVE N HOPKINS MN 55343 ELIZABETH S CLEARY MARY ELLEN GABRIELE JOSH REDIGER 305 8TH AVE N 7710 CORCORAN TRL W LARRY S REDIGER HOPKINS MN 55343 CORCORAN MN 55340 309 8TH AVE N HOPKINS MN 55343 RONALD J HELGESON JOSHUA DEAN ZUZEK MICHAELS CRANE 310 8TH AVE N ELIZABETH RUTH ZUZEK SARAH L REEH-CRANE HOPKINS MN 55343 314 8TH AVE N 315 8TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 CHARLES M PLUNKETT BRIAN J/JACQUELINE LO HUNKE HEIDI J HEMMEN DEBRA P PLUNKETT 318 8TH AVE N 3218TH AVE N 317 8TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 HOPKINS MN 55343 JAMES JAECKELS AMY TODD KING &COLLEEN KING NANCY JAECKELS LKT PROPERTIES LLC 6045 BRAND CIR 324 8TH AVE N 405 12TH AVE N EXCELSIOR MN 55331 HOPKINS MN 55343 HOPKINS MN 55343 JANELA &THEODORE EHRLICH MICHAEL J MOULTON CYPRIAN R TROYER 330 8TH AVE N 333 8TH AVE N 334 8TH AVE N HOPKINS MN 55343 HOPKINS MN 55343 HOPKINS MN 55343 JEAN HAMMOND 338 8TH AVE N HOPKINS MN 55343 PRELIMINARY ASSESSMENT ROLL 2024 CENTRAL AVENUES IMPROVEMENTS CITY OF HOPKINS, MN CITY PROJECT NO. 2023-010 BMI PROJECT NO. 0T1.130543 PID PROPERTY ADDRESS TAXPAYER NAME TAXPAYER ADDRESS (LINE 1)TAXPAYER ADDRESS (LINE 2)TAXPAYER ADDRESS (LINE 3) PROPOSED STREET ASSESSMENT PROPOSED WATER SERVICE ASSESSMENT PROPOSED SEWER SERVICE ASSESSMENT TOTAL PROPOSED ASSESSMENT 2411722130040 607 2ND STREET NORTH MATTHEW SLAMA 607 2ND ST N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130041 621 2ND STREET NORTH EDWARD T GIWOYNA 621 2ND ST N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130085 801 2ND STREET NORTH TYLER DALE BREN 801 2ND ST N HOPKINS MN 55343 1,284.14$1,675.00$1,600.00$4,559.14$ 2411722130020 202 5TH AVENUE NORTH MATTHEW BRADLEY MILLER SARAH BRIANNE STOUT MILLER 202 5TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130019 206 5TH AVENUE NORTH NANCY LYNNETTE MILLER 206 5TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130018 210 5TH AVENUE NORTH BRUCE G THIES 210 5TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130017 214 5TH AVENUE NORTH MARY STONE 217A ASBURY ST HOUSTON TX 77007 3,784.54$-$-$3,784.54$ 2411722130016 218 5TH AVENUE NORTH LINDA K WELSCH 1383 HWY 58 P.O. BOX 187 DANNEBROG NE 68831 3,784.54$-$-$3,784.54$ 2411722130015 222 5TH AVENUE NORTH DAVID D BARTEN KRISTINA M BARTEN 222 5TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130014 226 5TH AVENUE NORTH D J DOLINA & A E DOLINA 226 5TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130013 230 5TH AVENUE NORTH JUSTIN WINZENBURG JILL WINZENBURG 230 5TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130012 234 5TH AVENUE NORTH SUSAN J OWEN BASIL A OWEN III 234 5TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130011 238 5TH AVENUE NORTH ANNETTE R WELLS 238 5TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130010 242 5TH AVENUE NORTH JOHN M AHLFS 242 5TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130009 246 5TH AVENUE NORTH HERBERT H & FRANCES L HESCH 246 N 5TH AVE HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130145 300 5TH AVENUE NORTH DAKARAI K BROWN LAURA A BROWN 300 5TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130021 201 6TH AVENUE NORTH JOSEPH F RINALDI III 201 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130022 209 6TH AVENUE NORTH KATLYN MALAM & DANIEL MALAM 209 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130039 210 6TH AVENUE NORTH KELLY E LAMB 210 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130038 214 6TH AVENUE NORTH JEANNE TERHAAR 214 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130023 215 6TH AVENUE NORTH TIMOTHY PAUL HOFFMAN 215 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130024 221 6TH AVENUE NORTH MICHAEL J ESTOMBA 221 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130037 224 6TH AVENUE NORTH CHRISTOPHER M VENJOHN NATALYA SHARMA VENJOHN 224 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130025 225 6TH AVENUE NORTH GLORIA J CONNOR 225 6TH AVE NO HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130036 226 6TH AVENUE NORTH LISA M LARSON 226 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130026 229 6TH AVENUE NORTH KEVIN R WEHBER RACHEL A WEHBER 229 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130035 230 6TH AVENUE NORTH ANTONIA E CELESTINE BARLAGE ANDRW ROBERT BARLAGE 230 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130027 233 6TH AVENUE NORTH MICHAEL T & INGRID Y BROWN 233 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130034 234 6TH AVENUE NORTH CHARLES E DORN 234 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130028 237 6TH AVENUE NORTH GREGORY V CHAMBERLIN 237 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130033 238 6TH AVENUE NORTH LAURIE R ERICKSON 238 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130029 241 6TH AVENUE NORTH STEVEN J & JULIE B HRUSKA 241 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130032 242 6TH AVENUE NORTH ZACHARY E LEIRDAHL AKEXANDRA K NAAS 242 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130030 245 6TH AVENUE NORTH JOSHUA J DOBBINS MICHELLE L DOBBINS 245 6TH AVE N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130031 246 6TH AVENUE NORTH DOUGLAS NHIEN NGUYEN 246 6TH AV N HOPKINS MN 55343 3,784.54$-$-$3,784.54$ 2411722130138 302 6TH AVENUE NORTH AMBER L RISHAVY 302 6TH AVE N HOPKINS MN 55343 1,504.59$-$-$1,504.59$ 2411722130146 303 6TH AVENUE NORTH SAMUEL OSTLUND JULIA OSTLUND 303 6TH AVE N HOPKINS MN 55343 1,504.59$-$-$1,504.59$ 2411722420035 11 7TH AVENUE NORTH A E & M PROPERTIES LLC 8320 KELZER POND DR VICTORIA MN 55386 6,963.84$3,850.00$3,200.00$14,013.84$ 2411722420034 13 7TH AVENUE NORTH A E & M PROPERTIES LLC 8320 KELZER POND DR VICTORIA MN 55386 5,200.86$1,675.00$1,600.00$8,475.86$ 2411722420036 17 7TH AVENUE NORTH RAELA SCHOENHERR 17 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420047 18 7TH AVENUE NORTH KYLIE E SWANSON 18 7TH AV N HOPKINS MN 55343 7,960.50$1,675.00$1,600.00$11,235.50$ 2411722420037 21 7TH AVENUE NORTH ERIC WERGIN 21 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420046 22 7TH AVENUE NORTH MICHAEL R PETERSEN 22 7TH AVE N HOPKINS MN 55343 3,608.76$1,675.00$1,600.00$6,883.76$ 2411722420038 25 7TH AVENUE NORTH JAMES SEALE & KATE SEALE 25 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420045 26 7TH AVENUE NORTH KIRSTEN S EICKENBERG 26 7TH AVE N HOPKINS MN 55343 6,368.40$1,675.00$1,600.00$9,643.40$ 2411722420039 29 7TH AVENUE NORTH TINA M WATTS/DANIEL J WATTS 29 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420044 30 7TH AVENUE NORTH KATHLEEN J HINES JOHN HINES III 30 7TH AVE N HOPKINS MN 55343 4,245.60$1,675.00$1,600.00$7,520.60$ 2411722420040 33 7TH AVENUE NORTH ANDREW & ELIZABETH FISCHER 33 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420043 34 7TH AVENUE NORTH ROBERT D ROSSBOROUGH 34 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420041 37 7TH AVENUE NORTH CLIFFORD A & TONI M TALLMAN 37 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420042 38 7TH AVENUE NORTH DALE & JEAN SEARLES 38 7TH AVE NO HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420139 101 7TH AVENUE NORTH AMY N & JON BAUGH 101 7TH AVE N HOPKINS MN 55343 5,307.00$-$-$5,307.00$ 2411722420114 102 7TH AVENUE NORTH MICHAEL JULES ERICKSON 102 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$-$6,982.00$ 2411722420140 105 7TH AVENUE NORTH MEAGAN MCMAHAN 105 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$-$6,982.00$ 2411722420113 106 7TH AVENUE NORTH MATTHEW S HANSON KATIE C HANSON 4200 SHADY OAK RD S MINNETONKA MN 55343 5,307.00$1,675.00$-$6,982.00$ PRELIMINARY ASSESSMENT ROLL 2024 CENTRAL AVENUES IMPROVEMENTS CITY OF HOPKINS, MN CITY PROJECT NO. 2023-010 BMI PROJECT NO. 0T1.130543 PID PROPERTY ADDRESS TAXPAYER NAME TAXPAYER ADDRESS (LINE 1)TAXPAYER ADDRESS (LINE 2)TAXPAYER ADDRESS (LINE 3) PROPOSED STREET ASSESSMENT PROPOSED WATER SERVICE ASSESSMENT PROPOSED SEWER SERVICE ASSESSMENT TOTAL PROPOSED ASSESSMENT 2411722420141 109 7TH AVENUE NORTH MICHAEL D ESSEN 109-7TH AVE NO HOPKINS MN 55343 5,307.00$1,675.00$-$6,982.00$ 2411722420112 110 7TH AVENUE NORTH MRS ROBERT (KATHLEEN) CASHIN 110 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$-$6,982.00$ 2411722420142 113 7TH AVENUE NORTH DEAN E EMPANGER 113 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$-$6,982.00$ 2411722420111 114 7TH AVENUE NORTH MARK E DOBBINS SARA L KRALEWSKI 114 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$-$6,982.00$ 2411722420143 117 7TH AVENUE NORTH THEODORE M & SUSAN J JOHNSON 117 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$-$6,982.00$ 2411722420110 118 7TH AVENUE NORTH 118 HOPKINS LLC 535 EVERGREEN LA N PLYMOUTH MN 55441 5,307.00$1,675.00$-$6,982.00$ 2411722420144 121 7TH AVENUE NORTH MICHAEL OPHEIM/CARRIE OPHEIM 121 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$-$6,982.00$ 2411722420109 122 7TH AVENUE NORTH SHAWN B & SUE R NORMANDIN 122 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$-$6,982.00$ 2411722420145 125 7TH AVENUE NORTH JOHN R & LORETTA WOODSTROM 125 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420108 126 7TH AVENUE NORTH RYAN M FITZGERALD 126 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420146 129 7TH AVENUE NORTH JACQUES A & CHERYL L YOUAKIM 129 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420107 130 7TH AVENUE NORTH DYLAN BARNES-HANSEN JOCELYN BARNES-HANSEN 130 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420147 133 7TH AVENUE NORTH COLLEEN M JENSEN 133 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420106 134 7TH AVENUE NORTH LAUREN PANZER 134 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420148 137 7TH AVENUE NORTH RONALD D & SHERI L SALARGO 137 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420105 138 7TH AVENUE NORTH COLE NIELSEN 138 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420149 141 7TH AVENUE NORTH BRANDON L WILLS JESSICA E WILLS 141 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420104 142 7TH AVENUE NORTH ROGER G KUMM 142 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722420150 145 7TH AVENUE NORTH NICOLE FORSYTHE CHRISTOPHER FORSYTHE 146 7TH AVE N HOPKINS MN 55343 5,200.86$1,675.00$1,600.00$8,475.86$ 2411722420103 146 7TH AVENUE NORTH NICOLE E FORSYTHE CHRISTOPHER M FORSYTHE 146 7TH AVE N HOPKINS MN 55343 5,200.86$1,675.00$1,600.00$8,475.86$ 2411722130063 202 7TH AVENUE NORTH TIMOTHY W COATS 202 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130042 205 7TH AVENUE NORTH LORI BARON 2081 MEETING STREET WAYZATA MN 55391 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130062 206 7TH AVENUE NORTH JOEY A WIRTH 20885 CHANNEL DR GREENWOOD MN 55331 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130043 209 7TH AVENUE NORTH THOMAS C RUSTAD CODY M RUSTAD 209 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130061 210 7TH AVENUE NORTH ANNA VLADIMIROVNA BULOCHNIK YEVGENY BULOCHNIK 210 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130044 213 7TH AVENUE NORTH KARIN L VAVRICHEK 213 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130060 214 7TH AVENUE NORTH LINDSEY CHIPKA 214 7TH AVE N HOPKINS MN 55343 5,625.42$1,675.00$1,600.00$8,900.42$ 2411722130045 217 7TH AVENUE NORTH KELLY D HEIKKILA 217 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130059 218 7TH AVENUE NORTH SCOTT A BARTELLS STEPHANIE A BARTELLS 218 7TH AVE N HOPKINS MN 55343 4,776.30$1,675.00$1,600.00$8,051.30$ 2411722130046 221 7TH AVENUE NORTH DEBRAH W & JAMES A GENELLIE 221 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130058 222 7TH AVENUE NORTH PATRICK TIMMERS ELLEN TIMMERS 222 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130047 225 7TH AVENUE NORTH JOHN & MARJORIE RACKLIFFE 225 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130057 226 7TH AVENUE NORTH GILI MUSSMAN RILEY PETERSON 226 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130048 229 7TH AVENUE NORTH PETER M AMES & AMY J AMES 229 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130056 232 7TH AVENUE NORTH YUNSHA HE & YING CHEN 1661 WEST 63RD STREET EXCELSIOR MN 55331 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130049 233 7TH AVENUE NORTH PAOLO LOVAGNINI 233 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130055 234 7TH AVENUE NORTH BETH A BEATTY 234 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130050 237 7TH AVENUE NORTH JULIE ANN BOEHMER 237 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130054 238 7TH AVENUE NORTH MELODIE BARD 238 7TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130051 241 7TH AVENUE NORTH VICTORIA/R BENJAMIN TWOGOOD 241 7TH AVE N HOPKINS MN 55343 4,776.30$1,675.00$1,600.00$8,051.30$ 2411722130053 242 7TH AVENUE NORTH CRAIG BAUNE 242 7TH AVE N HOPKINS MN 55343 9,552.60$1,675.00$1,600.00$12,827.60$ 2411722130052 245 7TH AVENUE NORTH EDITH M BEECHER 245 7TH AVE N HOPKINS MN 55343 4,776.30$1,675.00$1,600.00$8,051.30$ 2411722130124 300 7TH AVENUE NORTH LAURA SADLER 300 7TH AVE N HOPKINS MN 55343 2,109.87$1,675.00$1,600.00$5,384.87$ 2411722130139 303 7TH AVENUE NORTH JUNIPER LAND TRUST LLC 5576 BRISTOL LANE MINNETONKA MN 55343 2,109.87$1,675.00$1,600.00$5,384.87$ 2411722130123 304 7TH AVENUE NORTH GINGER LYNN WORWA 304 7TH AVE N HOPKINS MN 55343 2,109.87$1,675.00$1,600.00$5,384.87$ 2411722130140 307 7TH AVENUE NORTH HEINZ RICHTER & MONIKA KOPEC 307 7TH AVE N HOPKINS MN 55343 2,109.87$1,675.00$1,600.00$5,384.87$ 2411722130141 309 7TH AVENUE NORTH CHRISTOPHER J GILSON TERRI G GILSON 309 7TH AVE N HOPKINS MN 55343 2,109.87$1,675.00$1,600.00$5,384.87$ 2411722130122 310 7TH AVENUE NORTH MARK C JONES 310 7TH AVE N HOPKINS MN 55343 3,171.27$1,675.00$1,600.00$6,446.27$ 2411722130142 313 7TH AVENUE NORTH JERALD P & GAYLE L SEABERG 313 7TH AVE NO HOPKINS MN 55343 2,109.87$1,675.00$1,600.00$5,384.87$ 2411722130121 314 7TH AVENUE NORTH MARSHALL DAVIS 314 7TH AVE N HOPKINS MN 55343 1,154.61$1,675.00$1,600.00$4,429.61$ 2411722130120 316 7TH AVENUE NORTH ROSE KELLY 316 7TH AVE N HOPKINS MN 55343 2,109.87$1,675.00$1,600.00$5,384.87$ 2411722130143 321 7TH AVENUE NORTH KAYLA N SAUVE 321 7TH AVE N HOPKINS MN 55343 6,037.05$-$1,600.00$7,637.05$ 2411722130119 322 7TH AVENUE NORTH MARK & TIPHANIE DIRNBERGER 322 7TH AVE N HOPKINS MN 55343 2,640.57$1,675.00$1,600.00$5,915.57$ 2411722130118 326 7TH AVENUE NORTH LINDA A ELIE 326 7TH AVE N HOPKINS MN 55343 2,852.85$1,675.00$1,600.00$6,127.85$ 2411722130064 201 8TH AVENUE NORTH ELLEN VONDENKAMP 201 8TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ PRELIMINARY ASSESSMENT ROLL 2024 CENTRAL AVENUES IMPROVEMENTS CITY OF HOPKINS, MN CITY PROJECT NO. 2023-010 BMI PROJECT NO. 0T1.130543 PID PROPERTY ADDRESS TAXPAYER NAME TAXPAYER ADDRESS (LINE 1)TAXPAYER ADDRESS (LINE 2)TAXPAYER ADDRESS (LINE 3) PROPOSED STREET ASSESSMENT PROPOSED WATER SERVICE ASSESSMENT PROPOSED SEWER SERVICE ASSESSMENT TOTAL PROPOSED ASSESSMENT 2411722130065 205 8TH AVENUE NORTH HEIDI A HANSCHU 205 8TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130066 209 8TH AVENUE NORTH HEATHER BUESSELER 209 8TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130084 210 8TH AVENUE NORTH JUSTIN P DOYLE CLAIRE C DOYLE 210 8TH AVE N HOPKINS MN 55343 2,027.12$1,675.00$1,600.00$5,302.12$ 2411722130067 213 8TH AVENUE NORTH TIMOTHY SNYDER JOY SNYDER 213 8TH AVE N HOPKINS MN 55343 7,960.50$1,675.00$1,600.00$11,235.50$ 2411722130083 214 8TH AVENUE NORTH BARBARA J WEAVER 214 8TH AVE N HOPKINS MN 55343 2,027.12$1,675.00$1,600.00$5,302.12$ 2411722130082 218 8TH AVENUE NORTH ALLISON WACHUTKA 218 8TH AVE N HOPKINS MN 55343 2,027.12$1,675.00$1,600.00$5,302.12$ 2411722130068 221 8TH AVENUE NORTH CURTIS D & KRISTA J DEDERICH 221 8TH AVE N HOPKINS MN 55343 7,960.50$1,675.00$1,600.00$11,235.50$ 2411722130081 222 8TH AVENUE NORTH JOSEPH R/DIANNA L DIPALERMO 222 8TH AVE N HOPKINS MN 55343 2,027.12$1,675.00$1,600.00$5,302.12$ 2411722130069 225 8TH AVENUE NORTH KEVIN NEWBERGER CARLY MYRDAL 225 8TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130080 226 8TH AVENUE NORTH S & L MCSPADDEN 226 8TH AVE N HOPKINS MN 55343 2,027.12$1,675.00$1,600.00$5,302.12$ 2411722130070 229 8TH AVENUE NORTH LAURA A MESTLER 229 8TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130079 230 8TH AVENUE NORTH JEFFREY L URBAN SUSAN W URBAN 230 8TH AVE N HOPKINS MN 55343 2,027.12$1,675.00$1,600.00$5,302.12$ 2411722130071 233 8TH AVENUE NORTH ERIK R HENRICKSEN 233 8TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130078 234 8TH AVENUE NORTH BRANDON HAYES/JOURDAN HAYES 234 8TH AVE N HOPKINS MN 55343 2,027.12$1,675.00$1,600.00$5,302.12$ 2411722130072 237 8TH AVENUE NORTH GLENN M PRIEST 237 8TH AVE N HOPKINS MN 55343 5,307.00$1,675.00$1,600.00$8,582.00$ 2411722130077 238 8TH AVENUE NORTH STEREME LLC 2601 CASCO PT RD WAYZATA MN 55391 2,027.12$1,675.00$1,600.00$5,302.12$ 2411722130076 242 8TH AVENUE NORTH TERRY P & LORRI L EISWALD 242 8TH AVE N HOPKINS MN 55343 1,496.42$1,675.00$1,600.00$4,771.42$ 2411722130073 243 8TH AVENUE NORTH HIEN M LU & VAN THUY VUONG 243 8TH AVE N HOPKINS MN 55343 4,776.30$1,675.00$1,600.00$8,051.30$ 2411722130074 245 8TH AVENUE NORTH DAVID B LENTZ 245 8TH AVE N HOPKINS MN 55343 4,670.16$1,675.00$1,600.00$7,945.16$ 2411722130075 246 8TH AVENUE NORTH MOLLY LONG & DAVID LOVETT 246 8TH AVE N HOPKINS MN 55343 1,390.28$1,675.00$1,600.00$4,665.28$ 2411722130108 300 8TH AVENUE NORTH MARY B LAUER 300 8TH AVE N HOPKINS MN 55343 -$1,675.00$-$1,675.00$ 2411722130125 301 8TH AVENUE NORTH PAMELA J KOLLODGE BLAIR CROCKETT 301 8TH AVE N HOPKINS MN 55343 2,109.87$1,675.00$1,600.00$5,384.87$ 2411722130126 305 8TH AVENUE NORTH ELIZABETH S CLEARY 305 8TH AVE N HOPKINS MN 55343 2,109.87$1,675.00$1,600.00$5,384.87$ 2411722130107 306 8TH AVENUE NORTH MARY ELLEN GABRIELE 7710 CORCORAN TRL W CORCORAN MN 55340 -$1,675.00$1,600.00$3,275.00$ 2411722130127 309 8TH AVENUE NORTH JOSH REDIGER LARRY S REDIGER 309 8TH AVE N HOPKINS MN 55343 1,579.17$1,675.00$1,600.00$4,854.17$ 2411722130106 310 8TH AVENUE NORTH RONALD J HELGESON 310 8TH AVE N HOPKINS MN 55343 -$1,675.00$1,600.00$3,275.00$ 2411722130105 314 8TH AVENUE NORTH JOSHUA DEAN ZUZEK ELIZABETH RUTH ZUZEK 314 8TH AVE N HOPKINS MN 55343 -$1,675.00$1,600.00$3,275.00$ 2411722130128 315 8TH AVENUE NORTH MICHAEL S CRANE SARAH L REEH-CRANE 315 8TH AVE N HOPKINS MN 55343 2,640.57$1,675.00$1,600.00$5,915.57$ 2411722130129 317 8TH AVENUE NORTH CHARLES M PLUNKETT DEBRA P PLUNKETT 317 8TH AVE N HOPKINS MN 55343 2,109.87$1,675.00$1,600.00$5,384.87$ 2411722130104 318 8TH AVENUE NORTH BRIAN J/JACQUELINE L O HUNKE 318 8TH AVE N HOPKINS MN 55343 -$1,675.00$1,600.00$3,275.00$ 2411722130130 321 8TH AVENUE NORTH HEIDI J HEMMEN 321 8TH AVE N HOPKINS MN 55343 2,109.87$1,675.00$1,600.00$5,384.87$ 2411722130103 324 8TH AVENUE NORTH JAMES JAECKELS NANCY JAECKELS 324 8TH AVE N HOPKINS MN 55343 4,776.30$1,675.00$1,600.00$8,051.30$ 2411722130131 325 8TH AVENUE NORTH LKT PROPERTIES LLC LKT PROPERTIES LLC 405 12TH AVE N HOPKINS MN 55343 2,109.87$1,675.00$1,600.00$5,384.87$ 2411722130132 329 8TH AVENUE NORTH TODD KING & COLLEEN KING 6045 BRAND CIR EXCELSIOR MN 55331 2,109.87$1,675.00$1,600.00$5,384.87$ 2411722130102 330 8TH AVENUE NORTH JANELA & THEODORE EHRLICH 330 8TH AVE N HOPKINS MN 55343 -$1,675.00$1,600.00$3,275.00$ 2411722130133 333 8TH AVENUE NORTH MICHAEL J MOULTON 333 8TH AVE N HOPKINS MN 55343 4,444.95$1,675.00$1,600.00$7,719.95$ 2411722130101 334 8TH AVENUE NORTH CYPRIAN R TROYER 334 8TH AVE N HOPKINS MN 55343 -$1,675.00$1,600.00$3,275.00$ 2411722130100 338 8TH AVENUE NORTH JEAN HAMMOND 338 8TH AVE N HOPKINS MN 55343 -$1,675.00$1,600.00$3,275.00$ PRELIMINARY TOTAL AMOUNT TO BE ASSESSED 946,221.55$ N:\Proposals\Hopkins\Central Avenues\Final Design & Construction\Klingbeil 103023.docx October 30, 2023 Mr. Eric Klingbeil, P.E., City Engineer City of Hopkins 1010 1st St S Hopkins, MN 55343 Re: Proposal for Professional Engineering and Surveying Services 2024 Central Avenues Improvements – Final Design & Construction Services City of Hopkins, Minnesota Mr. Klingbeil: We are pleased to offer you our proposal for professional engineering and surveying services for the final design and construction phases of the City of Hopkins’ 2024 Central Avenues Improvements. This proposal is based on the preliminary engineering report prepared as part of the feasibility phase of the project and has been prepared in the form of our standard agreement , consistent with past projects. Our proposed efforts include all remaining engineering efforts on the project, totaling $899,283 for 5,444 proposed labor hours. The enclosed Detailed Work Plan and Estimate of Project Fees further detail our proposed level of effort. In addition to the enclosed standard agreement, Exhibit I details our proposed process and scope of work to be performed. The schedule presented in Exhibit I illustrates a streamlined schedule, for council meetings, consistent with the approach followed in years past for assessment projects. The proposed project schedule is intended to meet the City’s desire to have a bid opening in February and contract award in March. Upon authorization by the Council on November 14th, we will proceed with final design o f the improvements immediately to meet all required deadlines. As always, thank you for allowing Bolton & Menk, Inc. to submit this proposal for your consideration. Upon your review and approval of this agreement, please sign and return one copy to our office. If you have any questions regarding this proposal or would like to discuss any of its details, please do not hesitate to call me. We truly appreciate and value our continued working relationship with the City of Hopkins. Sincerely, Bolton & Menk, Inc. Nicholas J. Amatuccio, P.E. Michael J. Waltman, P.E. Associate Project Manager Principal Engineer Burnsville Work Group Leader City of Hopkins Standard Agreement (Modified from 2004 Standard Form) VER. 12/05/2017 Page 1 of 9 AGREEMENT FOR PROFESSIONAL SERVICES 2024 CENTRAL AVENUES IMPROVEMENTS FINAL DESIGN & CONSTRUCTION PHASE ENGINEERING SERVICES CITY OF HOPKINS, MINNESOTA This Agreement, made this 14th day of November 2023, by and between CITY OF HOPKINS, 1010 1st St S, Hopkins, MN 55343, hereinafter referred to as CLIENT, and BOLTON & MENK, INC., 12224 Nicollet Avenue, Burnsville, MN 55337, hereinafter referred to as CONSULTANT. WITNESS, whereas the CLIENT requires professional services in conjunction with the 202 4 CENTRAL AVENUES IMPROVEMENTS and whereas the CONSULTANT agrees to furnish the various professional services required by the CLIENT. NOW, THEREFORE, in consideration of the mutual covenants and promises between the parties hereto, it is agreed: SECTION I - CONSULTANT'S SERVICES A. The CONSULTANT agrees to perform the various Basic Services in connection with the proposed project as described in Exhibit I. B. Upon mutual agreement of the parties hereto, Additional Services may be authorized as described in Exhibit I or as described in Paragraph IV.B. SECTION II - THE CLIENT'S RESPONSIBILITIES A. The CLIENT shall promptly compensate the CONSULTANT in accordance with Section III of this Agreement. B. The CLIENT shall place any and all information related to the project in its custody at the disposal of the CONSULTANT for its use. Such information shall include but shall not be limited boundary surveys, topographic surveys, preliminary sketch plan layouts, building plans, soil surveys, abstracts, deed descriptions, tile maps and layouts, aerial photos, utility agreements, environmental reviews, and zoning limitations. The CONSULTANT may rely upon the accuracy and sufficiency of all such information in performing services unless otherwise instructed, in wr it ing, by CLIENT. This obligation shall not include information that is classified as private or confidential under the Minnesota Government Data Practices Act (MGDPA), unless access to such information is essential to the CONSULTANT’s scope of services, in which case the CLIENT shall establish in writing, and CONSULTANT shall comply with, any conditions governing access to and use of such private or confidential information. C. The CLIENT will guarantee access to and make all provisions for entry upon both public and private portions of the project and pertinent adjoining properties. D. The CLIENT will give prompt notice to the CONSULTANT whenever the CLIENT observes or otherwise becomes aware of any defect in the proposed project. City of Hopkins Standard Agreement (Modified from 2004 Standard Form) VER. 12/05/2017 Page 2 of 9 E. The CLIENT shall designate a liaison person to act as the CLIENT'S representative with respect to services to be rendered under this Agreement. Said representative shall have the authority to transmit instructions, receive instructions, receive information, interpret an d define the CLIENT'S policies with respect to the project and CONSULTANT'S services. F. The CLIENT shall provide such legal, accounting, independent cost estimating and insurance counseling services as may be required for completion of the consultant ser vi ces described in this agreement. G. The CLIENT will obtain any and all regulatory permits required for the proper and legal execution of the project. H. The CLIENT will hire, when requested by the CONSULTANT, an independent test company to perform laboratory and material testing services, and soil investigation that can be justified for the proper design and construction of the project. The CONSULTANT shall assist the CLIENT in selecting a testing company. Payment for testing services shall be made directly to the testing company by the CLIENT and is not part of this Agreement. City of Hopkins Standard Agreement (Modified from 2004 Standard Form) VER. 12/05/2017 Page 3 of 9 SECTION III - COMPENSATION FOR SERVICES A. FEES. 1. The CLIENT will compensate the CONSULTANT in accordance with the following schedule of fees for the time spent in performance of Agreement services. Schedule of Fees Classification Hourly Rates Sr. Project Manager – Sr. Principal Engineer/Surveyor $155-280/Hour Sr. Project Manager – Principal Engineer/Surveyor $165 -225/Hour Project Manager $145-195/Hour Project/Design Engin eer /Planner/Surveyor/Landscape Architect $130-195/Hour Specialist (Nat. Resources; GIS; Traffic; Other) $105 -165 /Hour Senior Technician (Inc. Survey1) $125 -188/Hour Technician (Inc. Survey 1) $105-188 /Hour Administrative/Corporate Specialists $90 -135/Hour Structural/Electrical/Mechanical/Architect $125-$200/Hour GPS/Robotic Survey Equipment No Charge CAD/Computer Usage No Charge Routine Photo Copying/Reproduction No Charge Routine Office Supplies No Charge Field Supplies/Survey Stakes & Equipment No Charge Mileage No Charge 1No separate charges will be made for GPS or robotic total stations on Bolton & Menk, Inc. survey assignments; the cost of this equipment is included in the rates for Survey Technicians. 2. Total cost for the services itemized under Exhibit I, Section A (Basic Services) is estimated to be $899,283. Itemization of this cost is as shown in the attached DETAILED WORK PLAN and PROJECT FEES tables, attached hereto as Exhibit II. 3. In addition to the foregoing, CONSULTANT shall be reimbursed at cost plus an overhead fee (not-to-exceed 10%) for the following Direct Expenses when incurred in the performance of the work. a. CLIENT approved outside (facilities not owned by CONSULTANT) computer services. b. CLIENT approved outside professional and technical services. c. Outside reproduction and reprographic charges. d. Expendable field supplies and special field equipment rental. e. Other costs for such additional items and services that the CLIENT may require the CONSULTANT to provide to fulfill the terms of this Agreement. 4. Additional services as outlined in Section I.B will vary depending upon project conditions and will be billed on an hourly basis at the rate described in Section III.A.1. 5. The payment to the CONSULTANT will be made by the CLIENT upon billing at intervals not more often than monthly at the herein rates. Itemized invoices identifying all work completed shall be submitted to the CLIENT by CONSULTANT and paid in the same manner as other claims made to the CLIENT. City of Hopkins Standard Agreement (Modified from 2004 Standard Form) VER. 12/05/2017 Page 4 of 9 SECTION IV - GENERAL A. STANDARD OF CARE Professional services provided under this Agreement will be conducted in a manner consistent with that level of care and skill ordinarily exercised by members of the Consultant's profession currently practicing under similar conditions. No warranty, express or implied, is made. B. CHANGE IN PROJECT SCOPE In the event the CLIENT changes or is required to change the scope of the project fro m that described in Section I and/o r the applicable addendum, and such changes require Additional Services by the CONSULTANT, the CONSULTANT shall be entitled to additional compensation at the applicable hourly rates. The CONSULTANT shall give notice to the CLIENT of any Additional Services, prior to fu rnishing such additional services and the CLIENT must approve an Additional Services in writing . The CLIENT may request an estimate of additional cost from the CONSULTANT, and upon receipt of the request, the CONSULTANT shall furnish such, prior to authorization of the changed scope of work. C. INDEPENDENT CONTRACTOR The CONSULTANT shall at times be deemed an independent contractor. The CONSULTANT is not to be deemed an employee or agent of the CLIENT and has no authority to make any binding commitments or obligations on behalf of the CLIENT except to the extent expressly provided herein. All services provided by the CONSUTANT pursuant to this agreement shall be provide on an independent contractor basis not as an employee of the CLIENT for any purpose including, but not limited to, income tax withholding, workers’ compensation, unemployment compensation, FICA taxes, liability for torts, and eligibility for employee benefits. D. LIMITATION OF LIABILITY CONSULTANT shall indemnify, defend, and hold harmless CLIENT and its officials, agents and employees from any loss, claim, liability, and expense (including reasonable attorneys’ fees and expenses of litigation) arising from, or based in the whole, or in any part, on any negligent act or omission by CONSULTANT’S employees, agents, or subconsultants. In no event shall CLIENT be liable to CONSULTANT for consequential, incidental, indirect, special, or punitive damages. CLIENT shall indemnify, defend, and hold harmless CONSULTANT and its employees from any loss, claim, liability, and expense (including reasonable attorneys’ fees and expenses of litigation) arising from, or based in the whole, or in any part, on any negligent act or omission by CLIENT’S employees, agents, or consultants. In no event shall CONSULTANT be liable to CLIENT for consequential, incidental, indirect, special, or punitive damages. Nothing contained in this Agreement shall be construed as a limitation on or waiver of any immunities or limitations on liability otherwise available to the CLIENT. Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of a third party against either the CLIENT or the CONSULTANT. The CONSULTANT'S services under this Agreement are being performed solely for the CLIENT'S benefit, and no other entity shall have any claim against the CONSULTANT because of this Agreement or the performance or nonperformance of services provided hereunder. The CLIENT agree s to include a provision in all City of Hopkins Standard Agreement (Modified from 2004 Standard Form) VER. 12/05/2017 Page 5 of 9 contracts with contractors and other entities involved in this project to carry out the intent of the paragraph. E. INSURANCE 1. The CONSULTANT agrees to maintain, at CONSULTANT’S expense a commercial general liability and excess umbrella general liability insurance policy or policies insuring CONSULTANT against claims for bodily injury, death or property damage arising out of CONSULTANT’S general business activities. The general liability coverage shall provide limits o f not less than $2,000,000 per occurrence and not less than $2,000,000 general aggregate. Coverage shall include Premises and Operations Bodily Injury and Property Damage; Personal and Advertising Injury; Blanket Contractual Liability; Products and Completed Operations Liability. 2. The CONSULTANT also ag rees to maintain, at CONSULTANT’S expense, a single limit or combined limit automobile liability insurance and excess umbrella liability policy or policies insuring owned, non-owned and hired vehicles used by CONSULTANT under this Agreement. The automobile liability coverages shall provide limits of not less than $1,000,000 per accident for property damage, $2,000,000 for bodily injuries, death and damages to any one person and $2,000,000 for total bodily injury, death and damage claims arising from one accident. 3. CLIENT shall be named Additional Insured for the above liability policies. 4. The CONSULTANT agrees to maintain, at the CONSULTANT'S expense, statutory worker's compensation coverage together with Coverage B, Employer’s Liability limits of not less than $500,000 for Bodily Injury by Disease per employee, $500,000.00 for Bodily Injury by Disease aggregate and $500,000 for Bodily Injury by Accident. 5. During the period of design and construction of the project, the CONSULTANT also agrees to maintain, at CONSULTANT’S expense, Professional Liability Insurance coverage insuring CONSULTANT against damages for legal liability arising from an error, omission or negligent act in the performance of pro fessional services required by this agreement. Th e professional liability insurance coverage shall provide limits of not less than $2,000,000 per claim and an annual aggregate of not less than $2,000,000 on a claims-made basis. 6. Prior to commencement of this Agreemen t, the CONSULTANT will provide the CLIENT with certificates of insurance, showing evidence of required coverages. All policies of insurance shall contain a provision or endorsement that the coverage afforded will not be canceled or reduced in limits by endorsement for any reason except no n-payment of premium, until at least 30 days’ prior written notice has been given to the CLIENT, and at least 10 days’ prior written notice in the case of non-payment of premium. F. OPINIONS OR ESTIMATES OF CONSTRUCTION COST Where provided by the CONSULTANT as part of Exhibit I or otherwise, opinions or estimates of construction cost will generally be based upon public construction cost information. Since the CONSULTANT has no control over the cost of labor, materials, competitive bidd ing process, weather conditions and other factors affecting the cost of construction, all cost estimates are opinions for general information of the CLIENT and the CONSULTANT does not warrant or guarantee the accuracy of construction cost opinions or estimates. The CLIENT acknowledges that City of Hopkins Standard Agreement (Modified from 2004 Standard Form) VER. 12/05/2017 Page 6 of 9 costs for project financing should be based upon contracted construction costs with appropriate contingencies. G. CONSTRUCTION SERVICES It is agreed that the CONSULTANT and its representatives shall not be responsible for the means, methods, techniques, schedules or procedures of construction selected by the contractor or the safety precautions or programs incident to the work of the contractor. H. USE OF ELECTRONIC/DIGITAL DATA Because of the potential instability of electronic/digital data and susceptibility to unauthorized changes, copies of documents that may be relied upon by CLIENT are limited to the printed copies (also known as hard copies) that are signed or sealed by CONSULTANT. Except for electronic/digital data which is specifically identified as a project deliverable by this AGREEMENT or except as otherwise explicitly provided in this AGREEMENT, all electronic/digital data developed by the CONSULTANT as part of the PROJECT is acknowledged to be an internal working document for the CONSULTANT’S purposes solely and any such information provided to the CLIENT shall be on an “AS IS” basis strictly for the convenience of the CLIENT without any warranties of any kind. As such, the CLIENT is advised and acknowledges that use of such information may require substantial modification and independent verification by the CLIENT (or its designees). Provision of electronic/digital data, whether required by this Agreement or provided as a convenience to the Client, does not include any license of software or other systems necessary to read, use or reproduce the information. It is the responsibility of the CLIENT to verify compatibility with its system and long -term stability of media. CLIENT shall indemnify and hold harmless CONSULTANT and its Subconsultants from all claims, damages, losses, and expenses, including attorneys' fees arising out of or resulting from third party use or any adaptation or distribution of electronic/digital data provided under this AGREEMENT, unless such third party use and adaptation or distribution is explicitly authorized by this AGREEMENT. I. DATA PRACTICES All data collected, created, received, maintained, or disseminated, or used for any pu rposes in the course of the CONSULTANT’S performance of the Agreement is governed by the Minnesota Government Data Practices Act, Minnesota Statutes Section 13.01, et seq. or any other applicable state statutes and state rules adopted to implement the Act, as well as state statutes and federal regulations on data privacy. The Consultant agrees to abide by these statutes, rules and regulations and as they may be amended. In the event the CONSULTANT receives a request to release data, it shall notify CLIENT as soon as practical. The CLIENT will give instructions concerning release of data to requesting party and CONSULTANT will be reimbursed as Additional Services by CLIENT for its reasonable expenses in complying with the request. City of Hopkins Standard Agreement (Modified from 2004 Standard Form) VER. 12/05/2017 Page 7 of 9 J. PERIOD OF AGREEMENT This Agreement will remain in effect for the longer of a period of two years or such other explicitly identified completion period, after which time the Agreement may be extended upon mutual agreement of both parties. K PAYMENTS If CLIENT fails to make any payment due CONSULTANT for services and expenses within 60 days after date of the CONSULTANT'S itemized invoice, a service charge of one and one -half percent (1.5%) per month or the maximum rate permitted by law, whichever is less, will be charge d on any unpaid balance. In addition after giving seven days' written notice to CLIENT, CONSULTANT may, without waiving any claim or right against the CLIENT and without incurring liability whatsoever to the CLIENT, suspend services and withhold project d eliverables due under this Agreement until CONSULTANT has been paid in full all amounts due for services, expenses and charges. L. TERMINATION This Agreement may be terminated by the CLIENT for any reason or for convenience by the CLIENT upon seven (7) days written notice. The CONSULTANT may only terminate for non- payment by CLIENT upon CLIENT’s failure to cure upon 30 days written notice. M. CONTINGENT FEE The CONSULTANT warrants that it has not employed or retained any company or person, other than a bona fide employee working solely for the CONSULTANT to solicit or secure this Contract, and that it has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift or any oth er consideration, contingent upon or resulting from award or making of this Agreement. N. NON-DISCRIMINATION The provisions of any applicable law or ordinance relating to civil rights and discrimination shall be considered part of this Agreement as if fully set forth herein. The CONSULTANT is an Equal Opportunity Employer and it is the policy of the CONSULTANT that all employees, persons seeking employment, subcontractors, subconsultants and vendors are treated without regard to their race, religion, sex, color, nation al origin, disability, age, sexual orientation, marital status, public assistance status or any other characteristic protected by federal, state or local law. O. CONTROLLING LAW This Agreement is to be governed by the law of the State of Minnesota. City of Hopkins Standard Agreement (Modified from 2004 Standard Form) VER. 12/05/2017 Page 8 of 9 P. DISPUTE RESOLUTION CLIENT and CONSULTANT agree to negotiate all disputes between them in good faith for a period of 30 days from the date of notice of dispute prior to proceeding to formal dispute resolution or exercising their rights under law. Q. SURVIVAL All obligations, representations and provisions made in or given in Section IV of this Agreement will survive the completion of all services of the CONSULTANT under this Agreement or the termination of this Agreement for any reason. R. SEVERABILITY Any provision or part of the Agreement held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon CLIENT and CONSULTANT, who agree that the Agreement shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. S. AUDIT DISCLOSURE The CONSULTANT must allow the CLIENT, or its duly authorized agents, and the state auditor or legislative auditor reasonable access to the CONSULTANT’s books, records, documents, and accounting procedures and practices that are pertinent to all services provided under th is Agreement for a minimum of six years from the termination of this Agreement. [remainder of the page intentionally blank] City of Hopkins Standard Agreement (Modified from 2004 Standard Form) VER. 12/05/2017 Page 9 of 9 SECTION V - SIGNATURES THIS INSTRUMENT embodies the whole agreement of the parties, there being no promises, terms, conditions or obligation referring to the subject matter other th an contained herein. This Agreement may only be amended, supplemented, modified or canceled by a duly executed written instrument signed by both parties. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed in their behalf. CLIENT: City of Hopkins, Minnesota CONSULTANT: Bolton & Menk, Inc. Mike Waltman, P.E., Burnsville Work Group Leader 11/14/2023 Date Date City of Hopkins November 14, 2023 1 EXHIBIT I FINAL DESIGN, CONSTRUCTION OBSERVATION, ADMINISTRATION & STAKING 2024 CENTRAL AVENUES IMPROVEMENTS CITY OF HOPKINS, MINNESOTA A. BASIC SERVICES In accordance with the City of Hopkins’ Preliminary Engineering Report, Bolton & Menk, Inc. has been requested to complete final design, bidding assistance, construction staking, construction observation and construction administration services for the City’s 2024 Central Avenues Improvements. The project area includes the f ollowing corridors: ▪ Street & U tility Reconstruction ▪ 7th Avenue N, HCRRA ROW to Minnetonka Mills Road ▪ 8th Avenue N, 2nd Street North to Minnetonka Mills Road ▪ 3rd Street N, 8th Avenue N to 5th Avenue N ▪ Street Resurfacing and Spot Utility/Concrete Improvements ▪ 6th Avenue N, Mainstreet to 1st Street N ▪ 1st Street N, 8th Avenue N to 5th Avenue N ▪ 2nd Street N, 8th Avenue N to 5th Avenue N ▪ Storm sewer modifications at Cottageville Park ▪ CIPP Lining in near the project area and other areas of the City Building from tasks 1 through 4 of our preliminary design scope of services, detailed tasks associated with the work are itemized in the attached D etailed Work Pl an and are described below. Task 5: Final Design & Bidding Services Final Design Final design for the 2024 Central Avenues Improvements will be completed based on th e Preliminary Engineering Report completed by Bolton & Menk, Inc. in September 2023. Final plans and specifications will be completed in compliance with the City of Hopkins’ Engineering Guidelines and consistent with plan content for the 2023 Street & Utility Improvement project. Detailed construction plans will be prepared in Civil3D design software at 25 scale. The plans and specifications will include: • Plan and profile views of the street reconstruction and utility improve ments at 25 scale. • Cross sections will be shown for reconstructed streets at approximately 25' spacing and at each driveway . • Required construction details. • Special provisions for elements of work not addressed in the MnDOT 20 20 Standard Construction Sp ecifications. City of Hopkins November 14, 2023 2 Final plans will be submitted for review and comment by private utility owners. Permit applications as noted in the Preliminary Engineering Report will be completed and submitted to the permitting agency . Upon completion of construction plans and specifications, a final estimate of construction cost will be p repared and submitted to the client. The project will be advertised, bids will be taken, and a recommendation will be made to accept or reject bids. Meetings included during final desi gn include one (1) private utility coordination meeting, one (1) City Staff meetings for design review, one (1) neighborhood meeting prior to the assessment hearing and construction , and two (2) City Council meetings for final plan presentation and conducting the Pub lic Assessment Hearing. The need for stormwater management BMPs (ponding, infiltration, filtration, etc) is not anticipated on this project based on meetings with Nine Mile Creek Watershed District (NMCWD) representatives during the preliminary design process. As indicated by NMCWD, the City can obtain a permit from Nine Mile Creek Watershed prior to their upcoming rule changes which we understand would avoid requirements causing deviations from past project area designs. However, Bolton & Menk plans to conduct one (1) meeting with Watershed staff to confirm requirements prior to submitting the permit application. Impacts to some trees and privately maintained landscaping within the public right-of- way are anticipated. Coordination efforts will be undertaken with homeowners regarding tree removals and landscaping impacts prior to construction. Letters will be sent to each affected property to inform the owner of the known or potential tree and/or landscaping impacts to their property. The Construction Observer , Construction Manager, and/or Project Manager will respond to questions of the owner(s) and will coordinate on-site meetings as necessary to coordinate any impacts prior to construction. Special Assessments Assistance For this project, the City of Hopkins intends to assess benefitting prop erties prior to awarding the contract, based on the bid of the lowest responsible bid. Bolton & Menk will prepare a final assessment roll based upon the lowest responsible bid and will attend the public assessment hearing. Bolton & Menk will assist Ci ty Staff with the assessment process and associated statutory requireme nts, as well as aid in responding to property owner inquiries throughout the process. Bolton & Menk will attend and fac ilitate one neighborhood meeting prior to the final assessment hea ring to provide additional information on assessment amounts, payment o ptions, and any remaining questions on the proposed improvements. Tasks 6: Construction Services Construction Staking Construction staking indicating cuts to the line and grade of th e proposed utilities will typically be performed at in tervals of 50 feet. These utilities include sanitary sewer pipe and manholes; watermain pipe, hydrants, and bends; storm sewer pipe, manholes, and catch basins. Curb stakes will be provided along the reconstructed roadways at intervals of 25 feet. City of Hopkins November 14, 2023 3 Construction Observation and Administration This project is proposed to be constructed du ring the 2024 construction season and is anticipated to occur over multiple phases of construction between late April and early November. The projected fee estimate is based upon a 26-week construction season. Full time construction observation is proposed for this project with the assistance of an intern during the peak 12 weeks of the construction season . The contractor’s use of several construction crews across the multi-phased project will be necessary for timely completion. Duties of the Lead Construction Observer will include attendance at the pre-construction meeting and all construction -related meetings, service as a liaison between the City and the contractor, review of the completed work to determine if th e project is in general conformance with the plans and specifications, review and scheduling of all materials testing, maintenance of construction d ocumentation, tracking quantities, project closeout including checking in on punch list items, and communication with affected property owners, as necessary, to address their construction -related concerns and issues. Communication will include door-to-door notices as often as daily, phone calls, text messages, emails, and in-person meetings. The Construction Manager will support the Construction Observer and Intern to ensure that all duties are being fulfilled to satisfy resident requests, achieve contract compliance, and coordinate needs between the Contractor and City. Administration duties by the Project or Construction Manager include a pre-construction meeting, weekly project meetings including minutes, review of shop drawings, sending out weekly email updates to re sident subscribers, preparing and mailing out monthly newsletters to residents, maintaining a pro ject website, and preparation of pay estimates. Observation and administration serv ices will be completed on an hourly basis. Construction Materials Testing Bolton & Menk will coordinate with Braun Intertec to ensure that all material testing requirements are met per the specifications. This testing includes but is not limited to: concrete slump, air, and strength; bituminous samples and core evaluations ; utility trench densities; and select granular and aggregate base gradations and densities. Bruan Intertec will perform the field and lab tests and prepare reports to inform Bolton & Menk of the results. Bruan Intertec will also act as the geotechnical consultant as needed during construction. Record Drawings & GIS Integration Record drawings detailing the completed improvements as recorded by the construction observer will be completed and furnished to the City in hard copy and electronic format. These record drawings will also be integrated with the City’s GIS web application in PDF. Utilities , curb stops, and structures will be located (horizontally) after construction using a handheld GPS unit and will also be incorporated in the GIS schematic layout as GIS entities. City of Hopkins November 14, 2023 4 The following is a preliminary schedule for the 2024 Central Avenues Improvements: Preparation of Final Plans & Specifications .......... November 15 , 2023 – January 16, 2024 Approve Final Plans & Specifications / Authorize Advertisement for Bids ............................................ January 16, 2024 Bid Opening .................................................................................................. February 9, 2024 Council Sets Public Assessme nt Hearing Date .................................. February 20, 2024 Neighborhood Meeting 3 ........................................................................ March 11 – 14, 2024 Council Accepts Bids / Conduct Public Assessment Hearing / Adopt Assessment Roll / Award Bid ............................................ March 19, 2024 Construction ............................................................................................ May – October 2024 B. ADDITIONAL SERVICES Consulting services performed other than those authorized under Section I.A. shall be considered not part of the Contract Services and may be authorized by the CLIENT as additional services. Additional Services consist of those services which are not generally considered to be Contract Services; or exceed the requirements of the Contract Services; or are not definable prior to the commencement of the project; or vary depending on the technique, procedures or schedule of the project contractor. Additional services ma y consist of the following: 1. Cost of postage for mass mailing (those with greater than 100 rec ipients). 2. All other services not specifically identified in Section A. DETAILED WORK PLAN ESTIMATED PERSON-HOURS 2024 CENTRAL AVENUES IMPROVEMENTS: FINAL DESIGN & CONSTRUCTION SERVICES CITY OF HOPKINS, MINNESOTA 10/30/2023 CLIENT:CITY OF HOPKINS, MINNESOTA PROJECT: CONSULTANT: 2024 CENTRAL AVENUES IMPROVEMENTS: FINAL DESIGN & CONSTRUCTION SERVICES BOLTON & MENK, INC. Task No.Work Task Description 5.0 FINAL DESIGN & BIDDING 5.1 Utility Engineering and Design 10 60 100 60 230 5.2 Roadway Engineering and Design 10 60 200 270 5.3 Plan Set Production 160 80 120 360 5.4 Private Utility Coordination 4 20 20 10 54 5.5 Construction Quantities and Cost Estimates 4 40 40 40 20 144 5.6 Construction Specifications 4 40 30 74 5.7 Permit Applications 4 16 8 16 4 48 5.8 Bidding Assistance, Addenda, Award Recommendation 4 16 4 4 30 58 5.9 Final Assessment Roll Preparation 4 8 4 16 5.10 QA / QC 80 60 20 4 164 5.11 Project Meetings (1 City Staff, 1 Watershed, 1 Neighborhood Meeting, Public Communication)20 40 30 20 20 16 146 5.12 City Council Meeting (2 meetings)8 8 16 SUBTOTAL HOURS: TASK 4 152 368 404 302 170 0 80 20 4 0 0 0 80 1580 6.0 CONSTRUCTION SERVICES 6.1 Construction Phase Startup (Precon, Resident Coordination, Contractor Coordination, etc.)8 24 40 40 20 132 6.2 Construction Administration (26 weeks @ 10 hrs/week)52 260 160 80 552 6.3 Construction Observation (Lead 26 weeks @ 55 hrs/week, Intern 12 weeks @ 40 hrs/week)390 1430 480 2300 6.4 Construction Staking 50 120 450 620 6.5 Contruction Materials Testing 0 6.6 Record Drawings 4 8 60 72 6.7 Project Closeout, Punch List 12 40 20 80 152 6.8 GIS Integration 4 4 8 20 36 SUBTOTAL HOURS: TASK 5 72 332 0 462 1618 480 0 180 20 50 120 450 80 3864 TOTAL HOURS 224 700 404 764 1788 480 80 200 24 50 120 450 160 5444 ClericalConstruction Observer Communications Specialist Water Resouces Engineer GIS Specialist ESTIMATED PERSON-HOURS TotalsPrincipal Engineer Project Manager Engineering Technician Survey Manager / L.S. Surveying Technician Construction Manager Construction Intern Survey Crew (1-man) ESTIMATE OF PROJECT FEES 2024 CENTRAL AVENUES IMPROVEMENTS: FINAL DESIGN & CONSTRUCTION SERVICES CITY OF HOPKINS, MINNESOTA 10/30/2023 CLIENT:CITY OF HOPKINS, MINNESOTA PROJECT: CONSULTANT: 2024 CENTRAL AVENUES IMPROVEMENTS: FINAL DESIGN & CONSTRUCTION SERVICES BOLTON & MENK, INC. AVERAGE RATE:$210.00 $180.00 $140.00 $165.00 $136.00 $100.00 $198.00 $125.00 $145.00 $199.00 $140.00 $188.00 $105.00 5.0 FINAL DESIGN & BIDDING 5.1 Utility Engineering and Design $2,100.00 $10,800.00 $0.00 $16,500.00 $0.00 $0.00 $11,880.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $41,280.00 5.2 Roadway Engineering and Design $2,100.00 $10,800.00 $28,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $40,900.00 5.3 Plan Set Production $0.00 $0.00 $22,400.00 $13,200.00 $16,320.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $51,920.00 5.4 Private Utility Coordination $840.00 $3,600.00 $0.00 $3,300.00 $1,360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9,100.00 5.5 Construction Quantities and Cost Estimates $840.00 $7,200.00 $5,600.00 $6,600.00 $2,720.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $22,960.00 5.6 Construction Specifications $840.00 $7,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,150.00 $0.00 $11,190.00 5.7 Permit Applications $840.00 $2,880.00 $0.00 $1,320.00 $0.00 $0.00 $3,168.00 $0.00 $0.00 $0.00 $0.00 $0.00 $420.00 $0.00 $8,628.00 5.8 Bidding Assistance, Addenda, Award Recommendation $840.00 $2,880.00 $560.00 $660.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,150.00 $0.00 $8,090.00 5.9 Final Assessment Roll Preparation $840.00 $1,440.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $580.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,860.00 5.10 QA / QC $16,800.00 $10,800.00 $0.00 $3,300.00 $0.00 $0.00 $792.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $31,692.00 5.11 Project Meetings (1 City Staff, 1 Watershed, 1 Neighborhood Meeting, Public Communication)$4,200.00 $7,200.00 $0.00 $4,950.00 $2,720.00 $0.00 $0.00 $2,500.00 $0.00 $0.00 $0.00 $0.00 $1,680.00 $0.00 $23,250.00 5.12 City Council Meeting (2 meetings)$1,680.00 $1,440.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,120.00 SUBTOTAL FEES: TASK 4 $31,920.00 $66,240.00 $56,560.00 $49,830.00 $23,120.00 $0.00 $15,840.00 $2,500.00 $580.00 $0.00 $0.00 $0.00 $8,400.00 $0.00 $254,990.00 6.0 CONSTRUCTION SERVICES 6.1 Construction Phase Startup (Precon, Resident Coordination, Contractor Coordination, etc.)$1,680.00 $4,320.00 $0.00 $6,600.00 $5,440.00 $0.00 $0.00 $2,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $20,540.00 6.2 Construction Administration (26 weeks @ 10 hrs/week)$10,920.00 $46,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $20,000.00 $0.00 $0.00 $0.00 $0.00 $8,400.00 $0.00 $86,120.00 6.3 Construction Observation (Lead 26 weeks @ 55 hrs/week, Intern 12 weeks @ 40 hrs/week)$0.00 $0.00 $0.00 $64,350.00 $194,480.00 $48,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $306,830.00 6.4 Construction Staking $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9,950.00 $16,800.00 $84,600.00 $0.00 $0.00 $111,350.00 6.5 Contruction Materials Testing $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $79,985.00 $79,985.00 6.6 Record Drawings $0.00 $720.00 $0.00 $1,320.00 $8,160.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $10,200.00 6.7 Project Closeout, Punch List $2,520.00 $7,200.00 $0.00 $3,300.00 $10,880.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $23,900.00 6.8 GIS Integration $0.00 $720.00 $0.00 $660.00 $1,088.00 $0.00 $0.00 $0.00 $2,900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5,368.00 SUBTOTAL FEES: TASK 5 $15,120.00 $59,760.00 $0.00 $76,230.00 $220,048.00 $48,000.00 $0.00 $22,500.00 $2,900.00 $9,950.00 $16,800.00 $84,600.00 $8,400.00 $79,985.00 $644,293.00 TOTAL FEES $47,040.00 $126,000.00 $56,560.00 $126,060.00 $243,168.00 $48,000.00 $15,840.00 $25,000.00 $3,480.00 $9,950.00 $16,800.00 $84,600.00 $16,800.00 $79,985.00 $899,283.00 Survey Crew (1-man)Clerical Totals PROJECT FEES Principal Engineer Project Manager Engineering Technician Construction Observer Water Resouces Engineer Contracted/ Specialty Services Communications Specialist GIS SpecialistConstruction Manager Construction Intern Survey Manager / L.S. Surveying Technician AA/EOE Braun Intertec Corporation 11001 Hampshire Avenue S Minneapolis, MN 55438 Phone: 952.995.2000 Fax: 952.995.2020 Web: braunintertec.com October 27, 2023 Proposal QTB186399 Nick Amatuccio, PE Bolton & Menk, Inc. 12224 Nicollet Avenue Burnsville, MN 55337 Re: Proposal for Construction Materials Testing Services 2024 Central Avenues Improvements City Project No. 2023-010 Bolton & Menk, Inc. Project No. 0T1.130543 Hopkins, Minnesota Dear Mr. Amatuccio: Braun Intertec Corporation is pleased to submit this proposal to provide construction materials testing services for the 2024 Central Avenues Improvements project in Hopkins, Minnesota. We have completed the geotechnical evaluation, so we have a unique understanding of the site and construction challenges. We can aid the construction team by applying this experience and transferring our knowledge developed during the design phase which will provide professional continuity to the construction. Our work on the project to date gives us familiarity with the project team and design development which allows us to understand some of the considerations used when developing the project’s design. Since our inception in 1957, we have grown into one of the largest employee owned engineering firms in the nation. With more than 1,000 employee owners, retaining our firm gives you access to a diverse range of services and professionals you can consult with if the unforeseen occurs. The size of our company also allows us to respond quickly when schedule constraints occur. Our Understanding of Project This project consists of full reconstruction along 7th Avenue North, 8th Avenue North and 3rd Street North, full depth reclamation of bituminous and underlying aggregate base and bituminous paving along 6th Avenue North, as well as a bituminous mill and overlay along 1st Street North and 2nd Street North. This project will include pavement subgrade preparation, select granular embankment, and aggregate base placement, new concrete curb and gutter, sidewalk, steps and driveways along with a new bituminous pavement. Improvements to the sanitary, storm, and water main utilities will also be part of this project. Available Project Information This proposal was prepared using the following documents and information. Bolton & Menk, Inc. Proposal QTB186399 October 27, 2023 Page 2  Project Preliminary Engineering Report prepared by Bolton & Menk, Inc., dated September 22. 2023.  Discussions with Nick Amatuccio with Bolton & Menk, Inc. regarding testing for retaining walls and subgrade preparation. We were not provided with any plans, specifications or other quality control documents for this project. We assumed specifications and testing rates similar to pervious projects completed. Scope of Services Services are performed under the direction of a licensed professional engineer. Observation and testing services will be performed on a full-time or an on-call, as-needed basis as requested and scheduled by you or your on-site project representative. After reviewing available information to determine compliance with project plans and/or specifications and other design or construction documents, our scope of services for the project will be limited to the tasks defined below. Soil Related Services  Observe and evaluate the soils exposed in the bottoms of excavations to determine if the soils are similar to those encountered with the geotechnical evaluation and suitable for support of fill, foundations or pavements. Our engineer can provide consultation for conditions that appear to differ from the geotechnical evaluation.  Measure the in-place dry density, moisture content and relative compaction of fill placed for pavement and/or utility support, and of utility and cast-in place retaining wall backfill for compliance with the project documents. This task includes performing laboratory Proctor tests to provide maximum dry densities from which the relative compaction of fill can be determined, as well as the use of a nuclear density gauge to measure in-place dry densities and moisture contents.  Sample and test aggregate base, full depth reclamation, select granular embankment, coarse aggregate bedding, stabilizing aggregate and retaining wall backfill materials for compliance with the project documents. This task includes laboratory gradation testing of aggregate base material.  Perform MnDOT dynamic cone penetrometer (DCP) tests on aggregate base material and full depth reclaim materials. Concrete Related Services  Sample and test fresh concrete associated with pavement and/or curb-and-gutter for compliance with the project documents, and cast test cylinders for laboratory compressive strength testing. We assume that we will be able to appropriately dispose of excess concrete (and associated wash water) on site at no additional cost to us. Bolton & Menk, Inc. Proposal QTB186399 October 27, 2023 Page 3  Measure and report the compressive strength of the concrete test cylinders for compliance with the project documents. A set of three cylinders will be tested at 28 days for each set cast. If field cure cylinders are requested, each additional cylinder will be charged at the unit price listed in our cost estimate. Bituminous Related Services  Sample and test bituminous pavement materials for compliance with the project documents. This task includes Rice specific gravity, Gyratory density, fine aggregate angularity, percent crushed, asphalt content and extracted aggregate gradation tests of the bituminous.  Randomly determine bituminous core locations for non-wear course paving by using MnDOT’s random core worksheet and provide random locations to Bolton and Menk, Inc. so they can mark out locations.  Obtain cores and measure the thickness and density of the compacted bituminous pavement by the core method for compliance with the project documents. We assume the bituminous contractor will cut the cores.  Measure the in-place wet density of the fresh bituminous wear course paving with a nuclear density gauge to observe and document the contractor’s roll pattern growth curve. Consulting, Project Communication and Reporting Services  Project management, including scheduling of our field personnel.  Review observation and test reports, and communicating with you and the parties you may designate such as the project contractor(s), and other project team members, as needed.  Transmit test results to the project team on a weekly basis. Basis of Scope of Work The costs associated with the proposed scope of services were estimated using the following assumptions. If the construction schedule is modified or the contractor completes the various phases of the project at different frequencies or durations than shown in this proposal, we may need to adjust the overall cost accordingly. The scope of work and number of trips required to perform these services are as shown in the attached table. Notable assumptions in developing our estimate include:  We assume it will take forty-four trips to complete the nuclear density gauge testing on this project.  We assume compaction testing on aggregate base material will be performed using the Dynamic Cone Penetration (DCP) method; a minimum of three tests will be conducted each trip with five trips assumed.  We assume forty-eight sets of concrete tests will be required to complete the project. Bolton & Menk, Inc. Proposal QTB186399 October 27, 2023 Page 4  We assume the rebar observations before concrete placements will be completed by the project representative’s construction oversight manager.  We assume your full time on-site construction observer will observe the test rolling of soils and base materials for this project.  We assume bituminous paving will be completed in ten days for this project.  We assume the project engineer of record will review and approve contractor’s quality control submittals and test results.  You, or others you may designate, will provide us with current and approved plans and specifications for the project. Modification to these plans must also be sent to us so we can review their incorporation into the work.  We will require a minimum of 24 hours’ notice for scheduling inspections for a specific time. Shorter than 24 hours’ notice may impact our ability to perform the requested services, and the associated impacts will be the responsibility of others. If the work is completed at different rates than described above, this proposal should be revised. If the pace of construction is different than described above, this proposal should be revised. Cost and Invoicing We will furnish the services described herein for an estimated fee of $72,714. Our estimated costs are based on industry averages for construction production. Depending on the contractor’s performance, our costs may be significantly reduced or slightly higher than estimated. A tabulation showing our estimated hourly and/or unit rates associated with our proposed scope of services is also attached. The actual cost of our services will be based on the actual units or hours expended to meet the requirements of the project documents. This cost estimate was developed with the understanding that the scope of services defined herein will be required and requested during our normal work hours of 6:00 a.m. to 4:00 p.m., Monday through Friday. Services that we are asked to provide to meet the project requirements or the contractor’s construction schedule outside our normal business hours will be invoiced using an overtime rate factor. The factor for services provided outside our normal work hours or on Saturday will be 1.25 times the listed hourly rate for the service provided. The factor for services provided on Sunday or legal holidays will be 1.5 times the listed hourly rate for the service provided. We have not included premiums for overtime in our cost estimate; however, we recommend that allowances and contingencies be made for overtime charges based on conversations with the contractor. You will be billed only for services provided on a time and materials basis. Bolton & Menk, Inc. Proposal QTB186399 October 27, 2023 Page 5 Because our services are directly controlled by the schedule and performance of others, the actual cost may vary from our estimate. It is difficult to project all of the services and the quantity of services that may be required for any project. If services are required that are not discussed above, we will provide them at the rates shown in the attached table or, if not shown, at our current Schedule of Charges. We will invoice you on a monthly basis. General Remarks We will be happy to meet with you to discuss our proposed scope of services further and clarify the various scope components. We appreciate the opportunity to present this proposal to you. After reviewing this proposal, please sign and return one copy to our office as notification of acceptance and authorization to proceed. If anything in this proposal is not consistent with your requirements, please let us know immediately. Braun Intertec will not release any written reports until we have received a signed agreement. Also, ordering services from Braun Intertec constitutes acceptance of the terms of this proposal. The proposed fee is based on the scope of services described and the assumption that our services will be authorized within 30 days and that others will not delay us beyond our proposed schedule. Bolton & Menk, Inc. Proposal QTB186399 October 27, 2023 Page 6 Our services will be provided under the terms of the Master Subconsultant Agreement for Professional Services dated January 1, 2020. To have questions answered or schedule a time to meet and discuss our approach to this project further, please contact Colin Keane at 612.704.2674 (ckeane@braunintertec.com) or Andrew Valerius at 952.995.2242 (avalerius@braunintertec.com). Sincerely, BRAUN INTERTEC CORPORATION Colin M. Keane Staff Engineer Andrew M. Valerius Account Leader, Senior Project Manager Charles M. Cadenhead, Jr., PE Vice President, Principal Engineer Attachments: Project Proposal – QTB186399 The proposal is accepted. We will reimburse you in accordance with this agreement, and you are authorized to proceed: Authorizer’s Firm Authorizer’s Signature Authorizer’s Name (please print or type) Authorizer’s Title Date Client:Service Description:Work Site Address: 6th Avenue N, 7th Avenue N, 8th Avenue, 1st Street N, 2nd Street N and 3rd Street N between Minnetonka Mills Road and Lake Minnetonka LRT Regional Trail Hopkins, MN 55343 Bolton & Menk, Inc. Nick Amatuccio 1960 Premier Dr Mankato, MN 56001 (952) 448-8838 Construction Materials Testing City Project No. 2023-010 BMI Project No. 0T1.130543 Description Quantity Units Unit Price Extension Phase 1 Construction Materials Testing Activity 1.1 Soils Testing $27,816.00 207 Compaction Testing - Nuclear 110.00 Hour 94.00 $10,340.00 Work Activity Detail Qty Units Hrs/Unit Extension Utilities: Storm, Sanitary & Watermain 40.00 Trips 2.50 100.00 Select Granular Embankment 2.00 Trips 2.50 5.00 CIP Retaining Wall 2.00 Trips 2.50 5.00 1308 Nuclear moisture-density meter charge, per hour 110.00 Each 28.00 $3,080.00 1861 CMT Trip Charge 65.00 Each 40.00 $2,600.00 217 Compaction Testing - DCP's 15.00 Hour 94.00 $1,410.00 Work Activity Detail Qty Units Hrs/Unit Extension Aggregate Base / Full Depth Reclaim 5.00 Trips 3.00 15.00 1228 Topsoil Testing with nutrients, per sample 1.00 Each 410.00 $410.00 1530AG Asphalt Content of Aggregate Base, per sample 2.00 Each 162.00 $324.00 209 Sample pick-up 24.00 Hour 94.00 $2,256.00 Work Activity Detail Qty Units Hrs/Unit Extension Sample Pickup 16.00 Trips 1.50 24.00 1318 Moisture Density Relationship (Proctor)20.00 Each 200.00 $4,000.00 126 Project Engineer 5.00 Hour 180.00 $900.00 1162 Sieve Analysis with 200 wash, per sample 16.00 Each 156.00 $2,496.00 Activity 1.2 Concrete Testing $21,888.00 261 Concrete Testing 120.00 Hour 94.00 $11,280.00 Work Activity Detail Qty Units Hrs/Unit Extension Curb and Gutter 10.00 Trips 2.50 25.00 Flatwork - Sidewalks & Driveways 17.00 Trips 2.50 42.50 Concrete Steps 16.00 Trips 2.50 40.00 Light Pole Foundations 1.00 Trips 2.50 2.50 CIP Retaining Wall 4.00 Trips 2.50 10.00 1861 CMT Trip Charge 72.00 Each 40.00 $2,880.00 1364 Compressive strength of concrete cylinders, per specimen 144.00 Each 38.00 $5,472.00 Work Activity Detail Qty Units Hrs/Unit Extension Curb and Gutter 10.00 Sets 3.00 30.00 Flatwork - Sidewalks & Driveways 17.00 Sets 3.00 51.00 Concrete Steps 16.00 Sets 3.00 48.00 Light Pole Foundations 1.00 Sets 3.00 3.00 CIP Retaining Wall 4.00 Sets 3.00 12.00 278 Concrete Cylinder Pick up 24.00 Hour 94.00 $2,256.00 Work Activity Detail Qty Units Hrs/Unit Extension Concrete Cylinder Pickups 24.00 Trips 1.00 24.00 Activity 1.3 Pavement Testing $13,170.00 2689 MnDOT Bituminous Verification, per sample 10.00 Each 740.00 $7,400.00 Page 1 of 210/27/2023 07:57 AM Project Proposal QTB186399 Hopkins - 2024 Central Avenues Improvements Proposal Total:$72,714.00 209 Sample pick-up 10.00 Hour 94.00 $940.00 Work Activity Detail Qty Units Hrs/Unit Extension Non-Wear HMA Sample Pickup 5.00 Trips 2.00 10.00 221 Bituminous Coring 15.00 Hour 120.00 $1,800.00 Work Activity Detail Qty Units Hrs/Unit Extension Mark & Observing Cores - Non-wear 5.00 Trips 3.00 15.00 1542 Thickness and Density of Bituminous Core 10.00 Each 60.00 $600.00 207 Compaction Testing - Nuclear 15.00 Hour 94.00 $1,410.00 Work Activity Detail Qty Units Hrs/Unit Extension Wear Course Roll Pattern & HMA Sample Pickup 5.00 Trips 3.00 15.00 1308 Nuclear moisture-density meter charge, per hour 15.00 Each 28.00 $420.00 1861 CMT Trip Charge 15.00 Each 40.00 $600.00 Activity 1.4 Project Management $9,840.00 226 Project Manager 40.00 Hour 174.00 $6,960.00 228 Senior Project Manager 5.00 Hour 200.00 $1,000.00 238 Project Assistant 20.00 Hour 94.00 $1,880.00 Phase 1 Total:$72,714.00 Page 2 of 210/27/2023 07:57 AM Project Proposal QTB186399 Hopkins - 2024 Central Avenues Improvements