CR 97-206 Approve Northern States Power Company Undergroundt v „ G F ~~~ October 31, 1997 ti o p K , ~ 5 Council Report 97-206 APPROVE NORTHERN STATES POWER COMPANY UNDERGROUND ELECTRICAL WORK ORDER Proposed Action. Staff recommends adoption of the following motion: Move that Council authorize the Public Works Director to approve NSP work order in the amount of $41.490.00 for installation of Excelsior Boulevard underground electrical crossings, authorization is contineent on Hennepin Count~Board approval of City TIF funding of Phase I construction. Overview. Excelsior Boulevard improvements include eliminating the existing power poles. NSP will be able to remove most of the poles as a result of their primary distribution line upgrade which installed poles along the HCRRA right-of--way from Shady Oak Road to 5~' Avenue. Some crossings, of course, are necessary. The only city cost is to bore underground crossings at 11~' Avenue and 9~` Avenue. This work order funds those underground crossings. PrimarYIssues to Consider. • Current status -Excelsior Boulevard Improvements, Phase I • Overhead crossings. • Pole removal schedule. Supporting Information. • NSP correspondence including work order Steven J. Stadler, Public Works Director Council Report 97-206 Page 2 Analvsis of Issues. • Ctiurent status -Excelsior Boulevard Improvements, Phase I The Hennepin County Board is scheduled to discuss the project funding at an upcoming Board Briefing session. Staff is hopeful that the Board will support the proposed redevelopment district TIF funding and approve the project for advertisement and then contract award. The schedule regarding Board action on this project has not been determined. However, the intent is to get necessary approvals such that construction can begin in April -May, 1998. • Overhead crossings. The only remaining overhead crossings will be between 17~` and 18~` Avenues, and 19~` and 20~` Avenues. Staff is still working with NSP on redesign of the overhead power lines in the area from 5~ Avenue to TH 169. It is unlaiown at this time what changes are possible in this area. • Pole removal schedule. Poles will be removed in conjunction with the road reconstruction project which hopefully will begin next spring. Z~ Northern States Power Company 5309 W. 70th St. Edina, MN. 55439 Telephone (612) 829-4533 March 26, 1997 Steven J. Stadler Public Works Director City Of Hopkins 1601 Second Street South Hopkins, Minnesota 55343 Dear Mr. Stadler The following are the costs that you requested from Northern States Power Company to replace two overhead crossing over County Road No. 3 with underground. To replace the overhead crossing on County Road No. 3 at 11th Ave. So. with underground cables would be $17,959. To replace the overhead crossing on County Road No. 3 at 9th Ave. So. with underground cables would be $23,531. The total cost to replace both crossings would be $41,490. If you have any comments or questions please give me a call at 829-4533. Sincerely, Steve.Johnson ~~ October 23, 1997 City Of Hopkins ATTN: Steve Stadler 1601 Second St. So. Hopkins, MN 55343 Northern States Power Company Edina Area 5309 West 70th Street Edina, Minnesota 55439.2002 Telephone (672) 829-4500 Enclosed herein please find the Statement of Work Requested forms for the project located at: County Road No. 3 and 11th Avenue So. Sign all copies of document. Return all documents in the envelope provided. Enclose check payment, if applicable. I will forward to you a completed copy of this agreement once the appropriate NSP signature has been obtained. In the meantime, should you have any questions, feel free to give me a call. Thank you. Sincerely, Steve Johnson Customer Service Design Representative (612) 829-4533 Enclosures STATEMENT OF WORK REQUESTED Forth ~ 7-7012 (12dt) Northern Stater Company October, 23rd 19 97 WORK REQUESTED BY City of Hopkins WORK TO BE AT County Road 3 between Shady Oak Road and 11th Ave So. ADDRESS Same as above CONSISTING OF: Labor and materials to install new underground distribution crossings under County Road 3 so that overhead distribution in the area can be removed. The facilities instatied or removed by the Company shall be the property of the Company and any payment by customer shall not entitle customer to any ownership interest or right therein. I The undersigned hereby requests and authorizes the NORTHERN STATES COMPANY to do the work described and in consideration thereof, agrees to pay Forty One Thousand Four Hundred Ninety & No/100 ($ 41,490.00 ), in accordance with the following terms: Cesh in advance of construction Credit Approval Receipt of the above amount hereby acknowledged on behalf of NSP by NORTHERN STATES POWER COMPANY Customer City of Hopkins By ey ~1SP Representative Steve Johnson Division Edina NSP Proj. No. C0o3-HPK-CAH Const. $ Rem, $ Maint. $ Oper. $ Transf. $ Total $ 0.00 ORIGINAL-DIVISION ACCOUNTING COPY-CUSTOMER COPY-DIVISION DISTRIBUTION ENGINEERING